ContentsSummary MONTHLY CONSTRUCTION PROGRESS...

54
` EXTERIOR DESIGN BUILD TEAM I JE DUNN I TREANORHL ARCHITECTS I ADG OKLAHOMA STATE CAPITOL RESTORATION Exterior Rehabilitation Contents Summary Safety Progress Photos Stone Chimeras Field Reports & Attachments 1 2 3 4 5 15039DB MONTHLY CONSTRUCTION PROGRESS REPORT DECEMBER 2016

Transcript of ContentsSummary MONTHLY CONSTRUCTION PROGRESS...

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Summary

Contents

Key Activities

Scope Development

Schedule

Progress Photos

12345

EXTERIOR DESIGN BUILD TEAM I JE DUNN I TREANOR ARCHITECTS I ADG

JULY 2016

OKLAHOMA STATE CAPITOL RESTORATION

Exterior Rehabilitation

`

EXTERIOR DESIGN BUILD TEAM I JE DUNN I TREANORHL ARCHITECTS I ADG

OKLAHOMA STATE CAPITOL RESTORATION

Exterior Rehabilitation

ContentsSummary

Safety

Progress Photos

Stone Chimeras

Field Reports amp Attachments

12345

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

DECEMBER 2016

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Summary Work on the Exterior Oklahoma Capitol Restoration project during the month of December saw several different activities completed With the colder temperatures outside tarps have been installed on the Alpha Bravo and Charlie elevations and will continue over to Delta during the month of January The tarps are required for the temperature sensitive activities we are completing such as stone clean-ing stone repointing and repairs window abatement and window priming The temperature inside of the tarps is maintained typically anywhere between forty (40) and seventy (70) degrees Heating units with ductwork up to the second level of scaffold have been installed at each elevation to help maintain the required temperatures New entry and exit doors have also been installed to minimize the heat lost when moving to and from the scaffold Exhaust fans and return air ductwork are also present on each elevation to ensure fresh air is moving through the scaffold space The primary work activities completed this month include the completion of window abatement and removal on the Charlie elevation window repairs and stone cleaning on the Alpha elevation stone repairs and the completion of the Delta scaffold The subsequent pages of this report will highlight additional stone repair mock-ups stone repair walks progress photos and a schedule update

KeyActivities - Dutchman Repairs - Full Stone Replacements - Exterior Stone Cleaning on Alpha Elevation - Installation of tarps on Alpha Bravo and Charlie - Completion of Delta Scaffold Erection - Completion of Window Abatement on Charlie - Window Repairs on Alpha

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

SafetyThe safety of our workforce and the general public during the course of construction is the most import-ant task that we must deliver To that end every craftsmen involved with the project receives a detailed project orientation and prior to performing any task the teams develop detailed task specific work plans These work plans are often called Job Site Analysis (JSA) and assist project teams with analyzing different hazards associated with each work activity prior to beginning work

Safety Data and Metrics

Orientations Performed through 123016 137

First Aid Incidents 0

OSHA Recordable Incidents 0

Total Man-Hours for the month of December (hrs) 3426

Total Project Man-Hours (hrs) 15537

Man-hours have been updated to include all after-hour work and salaried employees working on the project

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Safety Spotlight

DECEMBER 2016

On December 9 2016 our exterior team met with Labor Commissioner Melissa Houston and her team to discuss the progress of the exterior resto-ration as well as how we promote safety on-site A few of the items discussed during this meeting include

1 100 glove policy We have recently required all trade partners to wear gloves at all times when working on-site2 Safety Meetings We hold an on-site safety meeting with all trade partners every Monday morning3 Orientations All new staff members or trade partners that work on-site are required to complete safety orientations before beginning work4 Right to Stop Work We encourage all on-site staff and trade partners to stop any unsafe work at any time while on-site5 BIM 360 Safety Walks We use a program called BIM 360 on iPads to track safety non-conforming and conforming items when walking the job site We are able to take photos of safety items and directly link it back to the respective trade partner

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Progress Photos

The photos attached in the subsequent pages represent progress photos taken during the month of November for the Exterior Rehabilitation of the State Capitol of Oklahoma

Drone Footage

December Drone Footage gt Click Here

DECEMBER 2016

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 14 DATE 1262016

TIME 1100 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 40deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Landon Heaton Project Engineer - JE Dunn Construction

Tony Talerico Project Engineer - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold erection progressing on north elevation of east wing (Delta)

2 Window abatement progressing on east elevation of north wing (Charlie)

3 Gutter work progressing on east elevation of north wing (Charlie)

4 Plywood moved to interior side of cast iron frames on north elevation of north wing (Bravo)

5 Tarp added to scaffold exterior on west elevation of north wing (Alpha)

6 Scaffold lateral ties in place at scaffold on west elevation of north wing (Alpha)

7 Scaffold lateral tie installation progressing at scaffold on east elevation of north wing (Charlie)

8 Thermometers in place at scaffold on west elevation of north wing (Alpha)

9 Stone repair progressing on west and north elevations of north wing (Alpha and Bravo)

10 Site fence added at South Plaza and southeast quadrant of project site

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 2 of 8

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott

(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)

Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve

Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 4 of 8

Window abatement progressing on north elevation of north wing (Bravo)

Gutter masonry work progressing on west elevation of north wing (Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 5 of 8

Plywood moved to interior side of cast iron frames on east elevation of north wing (Charlie)

Tarp added to west elevation of north wing (Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 6 of 8

Scaffold lateral ties with danger tape in place at scaffold on west elevation of north wing (Alpha)

Scaffold lateral tie installation progressing at scaffold on east elevation of north wing (Charlie)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 7 of 8

Thermometer in place at scaffold on west elevation of north wing (Alpha)

Entire replacement of stone (RP2) on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 8 of 8

Fencing in place at South Plaza

Fencing in place at southeast quadrant of site

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 1 of 6

FIELD OBSERVATION REPORT REPORT NO 15 DATE 12132016

TIME 1030 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 35deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Tony Talerico Project Engineer - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold erection progressing on north elevation of east wing (Delta)

2 Window abatement progressing on east elevation of north wing (Charlie)

3 Scaffold tarp installation progressing on west elevation of north wing (Alpha)

4 Heater placed for scaffold on west elevation of north wing (Alpha)

5 Joint raking progressing on north elevation of north wing (Bravo)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 2 of 6

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott

(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)

Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve

Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 3 of 6

Scaffold installation progressing on north elevation of east wing (Delta)

Scaffold installation progressing on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 4 of 6

Window abatement progressing on north elevation of north wing (Bravo)

Scaffold tarp installation progressing on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 5 of 6

Scaffold tarp installation at parapet on west elevation of north wing (Alpha)

Scaffold tarp installation in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 6 of 6

Heater at scaffold at west elevation of north wing (Alpha)

Joint raking progressing on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 16 DATE 12212016

TIME 330 AM DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE 55deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Tony Talerico Project Engineer - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold erection progressing on north elevation of east wing (Delta)

2 Scaffold tarp installation progressing on east elevation of north wing (Charlie)

3 Cleaning progressing on west elevation of north wing (Alpha)

4 Joint raking progressing on north elevation of north wing (Bravo)

5 Parapet cap removal progressing on west elevation of north wing (Alpha)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 2 of 5

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott

(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)

Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve

Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 3 of 5

Scaffold installation progressing on north elevation of east wing (Delta)

Scaffold installation progressing on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 4 of 5

Scaffold tarp installation progressing on east elevation of north wing (Charlie)

Parapet cap removal progressing on west elevation of north wing (Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 5 of 5

Parapet cap removal progressing on west elevation of north wing (Alpha)

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Oklahoma State Capitol Stone ChimeraThe following report explains the history behind the stone Chimerarsquos (ldquogriffinsrdquo) that have sat atop the Oklahoma State Capitol for the last 100 years

Chimeras (Griffins) of the Oklahoma State Capitol

Report provided by TreanorHL

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Griffin A bird head and foreshybody and cat rear always with a beak

Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City

Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company

Mythological Cat Creature Examples

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (left side) summer of 1916 shy no chimeras present

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (right side) November 2 1916 shy chimeras set

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti

South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016

TIME 900a to 530p DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE Lo 40s to 60

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

Trait Thompson - OMES

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking on A206 (Alpha)

Demolition for RP2 repair NW-0A06

ITEMS DISCUSSED

With WJE reviewed masonry cleaning processes changes to biological cleaning that have been

necessary to achieve the same results as trial repairs raking and repointing mockups for limestone

and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an

injection repairs patching repairs to limestone and granite See meeting notes from 11302016

follow up meeting to discuss WJE observations regarding the work

With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work

that necessary to make the area complete

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 2 of 4

ACTION REQUIRED

Revisions to repairs on A206 due to discovered conditions (TreanorHL)

bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone

bull at NW-0501 due to condition uncovered by joint raking

ITEMS TO VERIFY

REMARKS

OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes

Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to

tour the scaffold Reviewed window and masonry related work

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A206 ndash Site tour with OMES and WJE

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 3 of 4

A209 (left) and A208 (right) ndash Scaffold construction continues

A206 ndash NW-0A06 demolition in progress

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 4 of 4

A206 ndash Stone salvaged from NW-0A06

A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016

TIME 1000a to 530p DAY OF WEEK Monday

OWNER OMES TEMP RANGE Mid 50s to Lo 60s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Lukasz Lesniak Field Superintendent ndash Mark 1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking and repointing on A206 (Alpha)

Roofing materials being hoisted to the north wing roof

ITEMS DISCUSSED

Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps

there is some cold soak left to perform and sealant removal at window perimeter Temperature

restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this

week to create heated enclosure Discussed the need to monitor temperature and record it not only

on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and

other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is

approximately 50 complete

Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece

(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)

Met with JE Dunn to organize field walk for WJE visit

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 2 of 5

Reviewed window sill conditions including additional condition involving lead sheet flashing at the

bottom of cast iron sills

Temporary protection for built-in gutter

Stone color no word on additional lighter shades to better match light colored existing stones Mark

1 will salvage pieces of usable material where possible from other locations in case it is needed

ACTION REQUIRED

Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation

(TreanorHL)

ITEMS TO VERIFY

REMARKS

Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been

effective overall but the drying times are quite variable Some areas that have not seen water in

over a week are still visibly damp

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 3 of 5

A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in

right photo ndash end of tape is against the window frame in both photos

A208 ndash Residual dampness on A208 from cleaning

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 4 of 5

A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital

A207 ndash Lead T-cap installation for mock up review

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 5 of 5

A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining

material is brittle in some locations Additional detail will be issued for condition as part of forthcoming

ASI Believe this is window 459 ndash type G

A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016

TIME 800a to 12 noon DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE Mid 30s to Lo 50s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Raking on A206 (Alpha)

Substrate and backing conditions at RP repair NW-0A06

Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were

found on the west end of the frieze stone The tie-wire was easily removed from the back up

construction No rivet was found the pocket (which had been cut through) appears to have been

slugged full with mortar as construction progressed

Tarps being hung on A206 (Alpha)

ITEMS DISCUSSED

Protection for weather and monitoring conditions within the enclosure

Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to

moderate efflorescence were noted The most prominent is at the location of the redressing on NE-

0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent

dampness during cleaning operations The scaling that was the impetus for the redressing is located

at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 2 of 5

area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material

the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to

indicate the sealer is present even at this depth Potential sources of salts identified backing

construction penetrating sealer applied to building Area was discussed with WJE personnel

Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the

bottom of the corbel molding Both locations are unique to this elevation

ACTION REQUIRED

Tarp installation on all facades placement and distribution of heating devices including monitoring

devices for temperature (Mark1 and JE Dunn)

Direction for spot cleaning on A208 (Charlie)

ITEMS TO VERIFY

Method for monitoring conditions inside the tarped area (JE Dunn)

REMARKS

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 3 of 5

A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter

round differs from those specified in 1914 but specifications do not mention attachment at concrete

This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over

and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed

A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above

is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 4 of 5

A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been

slugged full with mortar prior to setting course above tie wire pulled freely from backing construction

Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction

aides to plumb up the tall stones during setting

A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No

signs of distress observed but area was dusty and full of debris from demolition

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 5 of 5

A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze

stones

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

JED

JEDBak

er

Mar

k 1

ProjectOklahoma StateCapitolRehabilitation

Date12072016

DrawingSite UtilizationPlan

Legend -JED Trailer Compound

-Phase 1 Site Fencing

-Gravel laydown

-Fence gate

-Future phases site fencing

-Future phases gravel laydown

EnvAct

Review

JED

Mark 1

JED

Faith

Dumpster

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Window Abatement Tracking Plan

DECEMBER 2016

Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Summary Work on the Exterior Oklahoma Capitol Restoration project during the month of December saw several different activities completed With the colder temperatures outside tarps have been installed on the Alpha Bravo and Charlie elevations and will continue over to Delta during the month of January The tarps are required for the temperature sensitive activities we are completing such as stone clean-ing stone repointing and repairs window abatement and window priming The temperature inside of the tarps is maintained typically anywhere between forty (40) and seventy (70) degrees Heating units with ductwork up to the second level of scaffold have been installed at each elevation to help maintain the required temperatures New entry and exit doors have also been installed to minimize the heat lost when moving to and from the scaffold Exhaust fans and return air ductwork are also present on each elevation to ensure fresh air is moving through the scaffold space The primary work activities completed this month include the completion of window abatement and removal on the Charlie elevation window repairs and stone cleaning on the Alpha elevation stone repairs and the completion of the Delta scaffold The subsequent pages of this report will highlight additional stone repair mock-ups stone repair walks progress photos and a schedule update

KeyActivities - Dutchman Repairs - Full Stone Replacements - Exterior Stone Cleaning on Alpha Elevation - Installation of tarps on Alpha Bravo and Charlie - Completion of Delta Scaffold Erection - Completion of Window Abatement on Charlie - Window Repairs on Alpha

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

SafetyThe safety of our workforce and the general public during the course of construction is the most import-ant task that we must deliver To that end every craftsmen involved with the project receives a detailed project orientation and prior to performing any task the teams develop detailed task specific work plans These work plans are often called Job Site Analysis (JSA) and assist project teams with analyzing different hazards associated with each work activity prior to beginning work

Safety Data and Metrics

Orientations Performed through 123016 137

First Aid Incidents 0

OSHA Recordable Incidents 0

Total Man-Hours for the month of December (hrs) 3426

Total Project Man-Hours (hrs) 15537

Man-hours have been updated to include all after-hour work and salaried employees working on the project

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Safety Spotlight

DECEMBER 2016

On December 9 2016 our exterior team met with Labor Commissioner Melissa Houston and her team to discuss the progress of the exterior resto-ration as well as how we promote safety on-site A few of the items discussed during this meeting include

1 100 glove policy We have recently required all trade partners to wear gloves at all times when working on-site2 Safety Meetings We hold an on-site safety meeting with all trade partners every Monday morning3 Orientations All new staff members or trade partners that work on-site are required to complete safety orientations before beginning work4 Right to Stop Work We encourage all on-site staff and trade partners to stop any unsafe work at any time while on-site5 BIM 360 Safety Walks We use a program called BIM 360 on iPads to track safety non-conforming and conforming items when walking the job site We are able to take photos of safety items and directly link it back to the respective trade partner

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Progress Photos

The photos attached in the subsequent pages represent progress photos taken during the month of November for the Exterior Rehabilitation of the State Capitol of Oklahoma

Drone Footage

December Drone Footage gt Click Here

DECEMBER 2016

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 14 DATE 1262016

TIME 1100 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 40deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Landon Heaton Project Engineer - JE Dunn Construction

Tony Talerico Project Engineer - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold erection progressing on north elevation of east wing (Delta)

2 Window abatement progressing on east elevation of north wing (Charlie)

3 Gutter work progressing on east elevation of north wing (Charlie)

4 Plywood moved to interior side of cast iron frames on north elevation of north wing (Bravo)

5 Tarp added to scaffold exterior on west elevation of north wing (Alpha)

6 Scaffold lateral ties in place at scaffold on west elevation of north wing (Alpha)

7 Scaffold lateral tie installation progressing at scaffold on east elevation of north wing (Charlie)

8 Thermometers in place at scaffold on west elevation of north wing (Alpha)

9 Stone repair progressing on west and north elevations of north wing (Alpha and Bravo)

10 Site fence added at South Plaza and southeast quadrant of project site

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 2 of 8

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott

(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)

Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve

Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 4 of 8

Window abatement progressing on north elevation of north wing (Bravo)

Gutter masonry work progressing on west elevation of north wing (Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 5 of 8

Plywood moved to interior side of cast iron frames on east elevation of north wing (Charlie)

Tarp added to west elevation of north wing (Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 6 of 8

Scaffold lateral ties with danger tape in place at scaffold on west elevation of north wing (Alpha)

Scaffold lateral tie installation progressing at scaffold on east elevation of north wing (Charlie)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 7 of 8

Thermometer in place at scaffold on west elevation of north wing (Alpha)

Entire replacement of stone (RP2) on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 8 of 8

Fencing in place at South Plaza

Fencing in place at southeast quadrant of site

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 1 of 6

FIELD OBSERVATION REPORT REPORT NO 15 DATE 12132016

TIME 1030 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 35deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Tony Talerico Project Engineer - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold erection progressing on north elevation of east wing (Delta)

2 Window abatement progressing on east elevation of north wing (Charlie)

3 Scaffold tarp installation progressing on west elevation of north wing (Alpha)

4 Heater placed for scaffold on west elevation of north wing (Alpha)

5 Joint raking progressing on north elevation of north wing (Bravo)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 2 of 6

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott

(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)

Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve

Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 3 of 6

Scaffold installation progressing on north elevation of east wing (Delta)

Scaffold installation progressing on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 4 of 6

Window abatement progressing on north elevation of north wing (Bravo)

Scaffold tarp installation progressing on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 5 of 6

Scaffold tarp installation at parapet on west elevation of north wing (Alpha)

Scaffold tarp installation in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 6 of 6

Heater at scaffold at west elevation of north wing (Alpha)

Joint raking progressing on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 16 DATE 12212016

TIME 330 AM DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE 55deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Tony Talerico Project Engineer - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold erection progressing on north elevation of east wing (Delta)

2 Scaffold tarp installation progressing on east elevation of north wing (Charlie)

3 Cleaning progressing on west elevation of north wing (Alpha)

4 Joint raking progressing on north elevation of north wing (Bravo)

5 Parapet cap removal progressing on west elevation of north wing (Alpha)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 2 of 5

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott

(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)

Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve

Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 3 of 5

Scaffold installation progressing on north elevation of east wing (Delta)

Scaffold installation progressing on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 4 of 5

Scaffold tarp installation progressing on east elevation of north wing (Charlie)

Parapet cap removal progressing on west elevation of north wing (Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 5 of 5

Parapet cap removal progressing on west elevation of north wing (Alpha)

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Oklahoma State Capitol Stone ChimeraThe following report explains the history behind the stone Chimerarsquos (ldquogriffinsrdquo) that have sat atop the Oklahoma State Capitol for the last 100 years

Chimeras (Griffins) of the Oklahoma State Capitol

Report provided by TreanorHL

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Griffin A bird head and foreshybody and cat rear always with a beak

Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City

Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company

Mythological Cat Creature Examples

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (left side) summer of 1916 shy no chimeras present

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (right side) November 2 1916 shy chimeras set

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti

South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016

TIME 900a to 530p DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE Lo 40s to 60

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

Trait Thompson - OMES

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking on A206 (Alpha)

Demolition for RP2 repair NW-0A06

ITEMS DISCUSSED

With WJE reviewed masonry cleaning processes changes to biological cleaning that have been

necessary to achieve the same results as trial repairs raking and repointing mockups for limestone

and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an

injection repairs patching repairs to limestone and granite See meeting notes from 11302016

follow up meeting to discuss WJE observations regarding the work

With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work

that necessary to make the area complete

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 2 of 4

ACTION REQUIRED

Revisions to repairs on A206 due to discovered conditions (TreanorHL)

bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone

bull at NW-0501 due to condition uncovered by joint raking

ITEMS TO VERIFY

REMARKS

OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes

Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to

tour the scaffold Reviewed window and masonry related work

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A206 ndash Site tour with OMES and WJE

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 3 of 4

A209 (left) and A208 (right) ndash Scaffold construction continues

A206 ndash NW-0A06 demolition in progress

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 4 of 4

A206 ndash Stone salvaged from NW-0A06

A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016

TIME 1000a to 530p DAY OF WEEK Monday

OWNER OMES TEMP RANGE Mid 50s to Lo 60s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Lukasz Lesniak Field Superintendent ndash Mark 1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking and repointing on A206 (Alpha)

Roofing materials being hoisted to the north wing roof

ITEMS DISCUSSED

Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps

there is some cold soak left to perform and sealant removal at window perimeter Temperature

restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this

week to create heated enclosure Discussed the need to monitor temperature and record it not only

on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and

other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is

approximately 50 complete

Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece

(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)

Met with JE Dunn to organize field walk for WJE visit

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 2 of 5

Reviewed window sill conditions including additional condition involving lead sheet flashing at the

bottom of cast iron sills

Temporary protection for built-in gutter

Stone color no word on additional lighter shades to better match light colored existing stones Mark

1 will salvage pieces of usable material where possible from other locations in case it is needed

ACTION REQUIRED

Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation

(TreanorHL)

ITEMS TO VERIFY

REMARKS

Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been

effective overall but the drying times are quite variable Some areas that have not seen water in

over a week are still visibly damp

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 3 of 5

A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in

right photo ndash end of tape is against the window frame in both photos

A208 ndash Residual dampness on A208 from cleaning

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 4 of 5

A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital

A207 ndash Lead T-cap installation for mock up review

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 5 of 5

A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining

material is brittle in some locations Additional detail will be issued for condition as part of forthcoming

ASI Believe this is window 459 ndash type G

A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016

TIME 800a to 12 noon DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE Mid 30s to Lo 50s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Raking on A206 (Alpha)

Substrate and backing conditions at RP repair NW-0A06

Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were

found on the west end of the frieze stone The tie-wire was easily removed from the back up

construction No rivet was found the pocket (which had been cut through) appears to have been

slugged full with mortar as construction progressed

Tarps being hung on A206 (Alpha)

ITEMS DISCUSSED

Protection for weather and monitoring conditions within the enclosure

Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to

moderate efflorescence were noted The most prominent is at the location of the redressing on NE-

0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent

dampness during cleaning operations The scaling that was the impetus for the redressing is located

at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 2 of 5

area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material

the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to

indicate the sealer is present even at this depth Potential sources of salts identified backing

construction penetrating sealer applied to building Area was discussed with WJE personnel

Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the

bottom of the corbel molding Both locations are unique to this elevation

ACTION REQUIRED

Tarp installation on all facades placement and distribution of heating devices including monitoring

devices for temperature (Mark1 and JE Dunn)

Direction for spot cleaning on A208 (Charlie)

ITEMS TO VERIFY

Method for monitoring conditions inside the tarped area (JE Dunn)

REMARKS

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 3 of 5

A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter

round differs from those specified in 1914 but specifications do not mention attachment at concrete

This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over

and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed

A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above

is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 4 of 5

A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been

slugged full with mortar prior to setting course above tie wire pulled freely from backing construction

Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction

aides to plumb up the tall stones during setting

A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No

signs of distress observed but area was dusty and full of debris from demolition

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 5 of 5

A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze

stones

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

JED

JEDBak

er

Mar

k 1

ProjectOklahoma StateCapitolRehabilitation

Date12072016

DrawingSite UtilizationPlan

Legend -JED Trailer Compound

-Phase 1 Site Fencing

-Gravel laydown

-Fence gate

-Future phases site fencing

-Future phases gravel laydown

EnvAct

Review

JED

Mark 1

JED

Faith

Dumpster

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Window Abatement Tracking Plan

DECEMBER 2016

Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

SafetyThe safety of our workforce and the general public during the course of construction is the most import-ant task that we must deliver To that end every craftsmen involved with the project receives a detailed project orientation and prior to performing any task the teams develop detailed task specific work plans These work plans are often called Job Site Analysis (JSA) and assist project teams with analyzing different hazards associated with each work activity prior to beginning work

Safety Data and Metrics

Orientations Performed through 123016 137

First Aid Incidents 0

OSHA Recordable Incidents 0

Total Man-Hours for the month of December (hrs) 3426

Total Project Man-Hours (hrs) 15537

Man-hours have been updated to include all after-hour work and salaried employees working on the project

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Safety Spotlight

DECEMBER 2016

On December 9 2016 our exterior team met with Labor Commissioner Melissa Houston and her team to discuss the progress of the exterior resto-ration as well as how we promote safety on-site A few of the items discussed during this meeting include

1 100 glove policy We have recently required all trade partners to wear gloves at all times when working on-site2 Safety Meetings We hold an on-site safety meeting with all trade partners every Monday morning3 Orientations All new staff members or trade partners that work on-site are required to complete safety orientations before beginning work4 Right to Stop Work We encourage all on-site staff and trade partners to stop any unsafe work at any time while on-site5 BIM 360 Safety Walks We use a program called BIM 360 on iPads to track safety non-conforming and conforming items when walking the job site We are able to take photos of safety items and directly link it back to the respective trade partner

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Progress Photos

The photos attached in the subsequent pages represent progress photos taken during the month of November for the Exterior Rehabilitation of the State Capitol of Oklahoma

Drone Footage

December Drone Footage gt Click Here

DECEMBER 2016

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 14 DATE 1262016

TIME 1100 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 40deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Landon Heaton Project Engineer - JE Dunn Construction

Tony Talerico Project Engineer - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold erection progressing on north elevation of east wing (Delta)

2 Window abatement progressing on east elevation of north wing (Charlie)

3 Gutter work progressing on east elevation of north wing (Charlie)

4 Plywood moved to interior side of cast iron frames on north elevation of north wing (Bravo)

5 Tarp added to scaffold exterior on west elevation of north wing (Alpha)

6 Scaffold lateral ties in place at scaffold on west elevation of north wing (Alpha)

7 Scaffold lateral tie installation progressing at scaffold on east elevation of north wing (Charlie)

8 Thermometers in place at scaffold on west elevation of north wing (Alpha)

9 Stone repair progressing on west and north elevations of north wing (Alpha and Bravo)

10 Site fence added at South Plaza and southeast quadrant of project site

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 2 of 8

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott

(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)

Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve

Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 4 of 8

Window abatement progressing on north elevation of north wing (Bravo)

Gutter masonry work progressing on west elevation of north wing (Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 5 of 8

Plywood moved to interior side of cast iron frames on east elevation of north wing (Charlie)

Tarp added to west elevation of north wing (Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 6 of 8

Scaffold lateral ties with danger tape in place at scaffold on west elevation of north wing (Alpha)

Scaffold lateral tie installation progressing at scaffold on east elevation of north wing (Charlie)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 7 of 8

Thermometer in place at scaffold on west elevation of north wing (Alpha)

Entire replacement of stone (RP2) on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 8 of 8

Fencing in place at South Plaza

Fencing in place at southeast quadrant of site

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 1 of 6

FIELD OBSERVATION REPORT REPORT NO 15 DATE 12132016

TIME 1030 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 35deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Tony Talerico Project Engineer - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold erection progressing on north elevation of east wing (Delta)

2 Window abatement progressing on east elevation of north wing (Charlie)

3 Scaffold tarp installation progressing on west elevation of north wing (Alpha)

4 Heater placed for scaffold on west elevation of north wing (Alpha)

5 Joint raking progressing on north elevation of north wing (Bravo)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 2 of 6

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott

(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)

Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve

Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 3 of 6

Scaffold installation progressing on north elevation of east wing (Delta)

Scaffold installation progressing on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 4 of 6

Window abatement progressing on north elevation of north wing (Bravo)

Scaffold tarp installation progressing on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 5 of 6

Scaffold tarp installation at parapet on west elevation of north wing (Alpha)

Scaffold tarp installation in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 6 of 6

Heater at scaffold at west elevation of north wing (Alpha)

Joint raking progressing on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 16 DATE 12212016

TIME 330 AM DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE 55deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Tony Talerico Project Engineer - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold erection progressing on north elevation of east wing (Delta)

2 Scaffold tarp installation progressing on east elevation of north wing (Charlie)

3 Cleaning progressing on west elevation of north wing (Alpha)

4 Joint raking progressing on north elevation of north wing (Bravo)

5 Parapet cap removal progressing on west elevation of north wing (Alpha)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 2 of 5

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott

(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)

Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve

Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 3 of 5

Scaffold installation progressing on north elevation of east wing (Delta)

Scaffold installation progressing on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 4 of 5

Scaffold tarp installation progressing on east elevation of north wing (Charlie)

Parapet cap removal progressing on west elevation of north wing (Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 5 of 5

Parapet cap removal progressing on west elevation of north wing (Alpha)

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Oklahoma State Capitol Stone ChimeraThe following report explains the history behind the stone Chimerarsquos (ldquogriffinsrdquo) that have sat atop the Oklahoma State Capitol for the last 100 years

Chimeras (Griffins) of the Oklahoma State Capitol

Report provided by TreanorHL

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Griffin A bird head and foreshybody and cat rear always with a beak

Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City

Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company

Mythological Cat Creature Examples

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (left side) summer of 1916 shy no chimeras present

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (right side) November 2 1916 shy chimeras set

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti

South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016

TIME 900a to 530p DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE Lo 40s to 60

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

Trait Thompson - OMES

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking on A206 (Alpha)

Demolition for RP2 repair NW-0A06

ITEMS DISCUSSED

With WJE reviewed masonry cleaning processes changes to biological cleaning that have been

necessary to achieve the same results as trial repairs raking and repointing mockups for limestone

and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an

injection repairs patching repairs to limestone and granite See meeting notes from 11302016

follow up meeting to discuss WJE observations regarding the work

With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work

that necessary to make the area complete

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 2 of 4

ACTION REQUIRED

Revisions to repairs on A206 due to discovered conditions (TreanorHL)

bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone

bull at NW-0501 due to condition uncovered by joint raking

ITEMS TO VERIFY

REMARKS

OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes

Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to

tour the scaffold Reviewed window and masonry related work

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A206 ndash Site tour with OMES and WJE

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 3 of 4

A209 (left) and A208 (right) ndash Scaffold construction continues

A206 ndash NW-0A06 demolition in progress

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 4 of 4

A206 ndash Stone salvaged from NW-0A06

A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016

TIME 1000a to 530p DAY OF WEEK Monday

OWNER OMES TEMP RANGE Mid 50s to Lo 60s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Lukasz Lesniak Field Superintendent ndash Mark 1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking and repointing on A206 (Alpha)

Roofing materials being hoisted to the north wing roof

ITEMS DISCUSSED

Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps

there is some cold soak left to perform and sealant removal at window perimeter Temperature

restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this

week to create heated enclosure Discussed the need to monitor temperature and record it not only

on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and

other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is

approximately 50 complete

Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece

(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)

Met with JE Dunn to organize field walk for WJE visit

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 2 of 5

Reviewed window sill conditions including additional condition involving lead sheet flashing at the

bottom of cast iron sills

Temporary protection for built-in gutter

Stone color no word on additional lighter shades to better match light colored existing stones Mark

1 will salvage pieces of usable material where possible from other locations in case it is needed

ACTION REQUIRED

Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation

(TreanorHL)

ITEMS TO VERIFY

REMARKS

Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been

effective overall but the drying times are quite variable Some areas that have not seen water in

over a week are still visibly damp

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 3 of 5

A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in

right photo ndash end of tape is against the window frame in both photos

A208 ndash Residual dampness on A208 from cleaning

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 4 of 5

A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital

A207 ndash Lead T-cap installation for mock up review

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 5 of 5

A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining

material is brittle in some locations Additional detail will be issued for condition as part of forthcoming

ASI Believe this is window 459 ndash type G

A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016

TIME 800a to 12 noon DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE Mid 30s to Lo 50s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Raking on A206 (Alpha)

Substrate and backing conditions at RP repair NW-0A06

Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were

found on the west end of the frieze stone The tie-wire was easily removed from the back up

construction No rivet was found the pocket (which had been cut through) appears to have been

slugged full with mortar as construction progressed

Tarps being hung on A206 (Alpha)

ITEMS DISCUSSED

Protection for weather and monitoring conditions within the enclosure

Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to

moderate efflorescence were noted The most prominent is at the location of the redressing on NE-

0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent

dampness during cleaning operations The scaling that was the impetus for the redressing is located

at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 2 of 5

area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material

the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to

indicate the sealer is present even at this depth Potential sources of salts identified backing

construction penetrating sealer applied to building Area was discussed with WJE personnel

Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the

bottom of the corbel molding Both locations are unique to this elevation

ACTION REQUIRED

Tarp installation on all facades placement and distribution of heating devices including monitoring

devices for temperature (Mark1 and JE Dunn)

Direction for spot cleaning on A208 (Charlie)

ITEMS TO VERIFY

Method for monitoring conditions inside the tarped area (JE Dunn)

REMARKS

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 3 of 5

A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter

round differs from those specified in 1914 but specifications do not mention attachment at concrete

This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over

and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed

A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above

is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 4 of 5

A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been

slugged full with mortar prior to setting course above tie wire pulled freely from backing construction

Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction

aides to plumb up the tall stones during setting

A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No

signs of distress observed but area was dusty and full of debris from demolition

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 5 of 5

A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze

stones

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

JED

JEDBak

er

Mar

k 1

ProjectOklahoma StateCapitolRehabilitation

Date12072016

DrawingSite UtilizationPlan

Legend -JED Trailer Compound

-Phase 1 Site Fencing

-Gravel laydown

-Fence gate

-Future phases site fencing

-Future phases gravel laydown

EnvAct

Review

JED

Mark 1

JED

Faith

Dumpster

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Window Abatement Tracking Plan

DECEMBER 2016

Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Safety Spotlight

DECEMBER 2016

On December 9 2016 our exterior team met with Labor Commissioner Melissa Houston and her team to discuss the progress of the exterior resto-ration as well as how we promote safety on-site A few of the items discussed during this meeting include

1 100 glove policy We have recently required all trade partners to wear gloves at all times when working on-site2 Safety Meetings We hold an on-site safety meeting with all trade partners every Monday morning3 Orientations All new staff members or trade partners that work on-site are required to complete safety orientations before beginning work4 Right to Stop Work We encourage all on-site staff and trade partners to stop any unsafe work at any time while on-site5 BIM 360 Safety Walks We use a program called BIM 360 on iPads to track safety non-conforming and conforming items when walking the job site We are able to take photos of safety items and directly link it back to the respective trade partner

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Progress Photos

The photos attached in the subsequent pages represent progress photos taken during the month of November for the Exterior Rehabilitation of the State Capitol of Oklahoma

Drone Footage

December Drone Footage gt Click Here

DECEMBER 2016

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 14 DATE 1262016

TIME 1100 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 40deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Landon Heaton Project Engineer - JE Dunn Construction

Tony Talerico Project Engineer - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold erection progressing on north elevation of east wing (Delta)

2 Window abatement progressing on east elevation of north wing (Charlie)

3 Gutter work progressing on east elevation of north wing (Charlie)

4 Plywood moved to interior side of cast iron frames on north elevation of north wing (Bravo)

5 Tarp added to scaffold exterior on west elevation of north wing (Alpha)

6 Scaffold lateral ties in place at scaffold on west elevation of north wing (Alpha)

7 Scaffold lateral tie installation progressing at scaffold on east elevation of north wing (Charlie)

8 Thermometers in place at scaffold on west elevation of north wing (Alpha)

9 Stone repair progressing on west and north elevations of north wing (Alpha and Bravo)

10 Site fence added at South Plaza and southeast quadrant of project site

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 2 of 8

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott

(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)

Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve

Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 4 of 8

Window abatement progressing on north elevation of north wing (Bravo)

Gutter masonry work progressing on west elevation of north wing (Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 5 of 8

Plywood moved to interior side of cast iron frames on east elevation of north wing (Charlie)

Tarp added to west elevation of north wing (Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 6 of 8

Scaffold lateral ties with danger tape in place at scaffold on west elevation of north wing (Alpha)

Scaffold lateral tie installation progressing at scaffold on east elevation of north wing (Charlie)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 7 of 8

Thermometer in place at scaffold on west elevation of north wing (Alpha)

Entire replacement of stone (RP2) on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 8 of 8

Fencing in place at South Plaza

Fencing in place at southeast quadrant of site

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 1 of 6

FIELD OBSERVATION REPORT REPORT NO 15 DATE 12132016

TIME 1030 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 35deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Tony Talerico Project Engineer - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold erection progressing on north elevation of east wing (Delta)

2 Window abatement progressing on east elevation of north wing (Charlie)

3 Scaffold tarp installation progressing on west elevation of north wing (Alpha)

4 Heater placed for scaffold on west elevation of north wing (Alpha)

5 Joint raking progressing on north elevation of north wing (Bravo)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 2 of 6

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott

(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)

Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve

Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 3 of 6

Scaffold installation progressing on north elevation of east wing (Delta)

Scaffold installation progressing on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 4 of 6

Window abatement progressing on north elevation of north wing (Bravo)

Scaffold tarp installation progressing on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 5 of 6

Scaffold tarp installation at parapet on west elevation of north wing (Alpha)

Scaffold tarp installation in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 6 of 6

Heater at scaffold at west elevation of north wing (Alpha)

Joint raking progressing on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 16 DATE 12212016

TIME 330 AM DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE 55deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Tony Talerico Project Engineer - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold erection progressing on north elevation of east wing (Delta)

2 Scaffold tarp installation progressing on east elevation of north wing (Charlie)

3 Cleaning progressing on west elevation of north wing (Alpha)

4 Joint raking progressing on north elevation of north wing (Bravo)

5 Parapet cap removal progressing on west elevation of north wing (Alpha)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 2 of 5

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott

(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)

Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve

Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 3 of 5

Scaffold installation progressing on north elevation of east wing (Delta)

Scaffold installation progressing on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 4 of 5

Scaffold tarp installation progressing on east elevation of north wing (Charlie)

Parapet cap removal progressing on west elevation of north wing (Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 5 of 5

Parapet cap removal progressing on west elevation of north wing (Alpha)

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Oklahoma State Capitol Stone ChimeraThe following report explains the history behind the stone Chimerarsquos (ldquogriffinsrdquo) that have sat atop the Oklahoma State Capitol for the last 100 years

Chimeras (Griffins) of the Oklahoma State Capitol

Report provided by TreanorHL

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Griffin A bird head and foreshybody and cat rear always with a beak

Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City

Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company

Mythological Cat Creature Examples

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (left side) summer of 1916 shy no chimeras present

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (right side) November 2 1916 shy chimeras set

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti

South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016

TIME 900a to 530p DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE Lo 40s to 60

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

Trait Thompson - OMES

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking on A206 (Alpha)

Demolition for RP2 repair NW-0A06

ITEMS DISCUSSED

With WJE reviewed masonry cleaning processes changes to biological cleaning that have been

necessary to achieve the same results as trial repairs raking and repointing mockups for limestone

and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an

injection repairs patching repairs to limestone and granite See meeting notes from 11302016

follow up meeting to discuss WJE observations regarding the work

With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work

that necessary to make the area complete

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 2 of 4

ACTION REQUIRED

Revisions to repairs on A206 due to discovered conditions (TreanorHL)

bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone

bull at NW-0501 due to condition uncovered by joint raking

ITEMS TO VERIFY

REMARKS

OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes

Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to

tour the scaffold Reviewed window and masonry related work

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A206 ndash Site tour with OMES and WJE

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 3 of 4

A209 (left) and A208 (right) ndash Scaffold construction continues

A206 ndash NW-0A06 demolition in progress

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 4 of 4

A206 ndash Stone salvaged from NW-0A06

A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016

TIME 1000a to 530p DAY OF WEEK Monday

OWNER OMES TEMP RANGE Mid 50s to Lo 60s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Lukasz Lesniak Field Superintendent ndash Mark 1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking and repointing on A206 (Alpha)

Roofing materials being hoisted to the north wing roof

ITEMS DISCUSSED

Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps

there is some cold soak left to perform and sealant removal at window perimeter Temperature

restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this

week to create heated enclosure Discussed the need to monitor temperature and record it not only

on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and

other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is

approximately 50 complete

Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece

(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)

Met with JE Dunn to organize field walk for WJE visit

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 2 of 5

Reviewed window sill conditions including additional condition involving lead sheet flashing at the

bottom of cast iron sills

Temporary protection for built-in gutter

Stone color no word on additional lighter shades to better match light colored existing stones Mark

1 will salvage pieces of usable material where possible from other locations in case it is needed

ACTION REQUIRED

Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation

(TreanorHL)

ITEMS TO VERIFY

REMARKS

Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been

effective overall but the drying times are quite variable Some areas that have not seen water in

over a week are still visibly damp

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 3 of 5

A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in

right photo ndash end of tape is against the window frame in both photos

A208 ndash Residual dampness on A208 from cleaning

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 4 of 5

A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital

A207 ndash Lead T-cap installation for mock up review

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 5 of 5

A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining

material is brittle in some locations Additional detail will be issued for condition as part of forthcoming

ASI Believe this is window 459 ndash type G

A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016

TIME 800a to 12 noon DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE Mid 30s to Lo 50s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Raking on A206 (Alpha)

Substrate and backing conditions at RP repair NW-0A06

Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were

found on the west end of the frieze stone The tie-wire was easily removed from the back up

construction No rivet was found the pocket (which had been cut through) appears to have been

slugged full with mortar as construction progressed

Tarps being hung on A206 (Alpha)

ITEMS DISCUSSED

Protection for weather and monitoring conditions within the enclosure

Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to

moderate efflorescence were noted The most prominent is at the location of the redressing on NE-

0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent

dampness during cleaning operations The scaling that was the impetus for the redressing is located

at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 2 of 5

area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material

the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to

indicate the sealer is present even at this depth Potential sources of salts identified backing

construction penetrating sealer applied to building Area was discussed with WJE personnel

Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the

bottom of the corbel molding Both locations are unique to this elevation

ACTION REQUIRED

Tarp installation on all facades placement and distribution of heating devices including monitoring

devices for temperature (Mark1 and JE Dunn)

Direction for spot cleaning on A208 (Charlie)

ITEMS TO VERIFY

Method for monitoring conditions inside the tarped area (JE Dunn)

REMARKS

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 3 of 5

A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter

round differs from those specified in 1914 but specifications do not mention attachment at concrete

This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over

and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed

A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above

is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 4 of 5

A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been

slugged full with mortar prior to setting course above tie wire pulled freely from backing construction

Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction

aides to plumb up the tall stones during setting

A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No

signs of distress observed but area was dusty and full of debris from demolition

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 5 of 5

A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze

stones

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

JED

JEDBak

er

Mar

k 1

ProjectOklahoma StateCapitolRehabilitation

Date12072016

DrawingSite UtilizationPlan

Legend -JED Trailer Compound

-Phase 1 Site Fencing

-Gravel laydown

-Fence gate

-Future phases site fencing

-Future phases gravel laydown

EnvAct

Review

JED

Mark 1

JED

Faith

Dumpster

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Window Abatement Tracking Plan

DECEMBER 2016

Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Progress Photos

The photos attached in the subsequent pages represent progress photos taken during the month of November for the Exterior Rehabilitation of the State Capitol of Oklahoma

Drone Footage

December Drone Footage gt Click Here

DECEMBER 2016

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 14 DATE 1262016

TIME 1100 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 40deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Landon Heaton Project Engineer - JE Dunn Construction

Tony Talerico Project Engineer - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold erection progressing on north elevation of east wing (Delta)

2 Window abatement progressing on east elevation of north wing (Charlie)

3 Gutter work progressing on east elevation of north wing (Charlie)

4 Plywood moved to interior side of cast iron frames on north elevation of north wing (Bravo)

5 Tarp added to scaffold exterior on west elevation of north wing (Alpha)

6 Scaffold lateral ties in place at scaffold on west elevation of north wing (Alpha)

7 Scaffold lateral tie installation progressing at scaffold on east elevation of north wing (Charlie)

8 Thermometers in place at scaffold on west elevation of north wing (Alpha)

9 Stone repair progressing on west and north elevations of north wing (Alpha and Bravo)

10 Site fence added at South Plaza and southeast quadrant of project site

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 2 of 8

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott

(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)

Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve

Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 4 of 8

Window abatement progressing on north elevation of north wing (Bravo)

Gutter masonry work progressing on west elevation of north wing (Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 5 of 8

Plywood moved to interior side of cast iron frames on east elevation of north wing (Charlie)

Tarp added to west elevation of north wing (Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 6 of 8

Scaffold lateral ties with danger tape in place at scaffold on west elevation of north wing (Alpha)

Scaffold lateral tie installation progressing at scaffold on east elevation of north wing (Charlie)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 7 of 8

Thermometer in place at scaffold on west elevation of north wing (Alpha)

Entire replacement of stone (RP2) on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 8 of 8

Fencing in place at South Plaza

Fencing in place at southeast quadrant of site

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 1 of 6

FIELD OBSERVATION REPORT REPORT NO 15 DATE 12132016

TIME 1030 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 35deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Tony Talerico Project Engineer - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold erection progressing on north elevation of east wing (Delta)

2 Window abatement progressing on east elevation of north wing (Charlie)

3 Scaffold tarp installation progressing on west elevation of north wing (Alpha)

4 Heater placed for scaffold on west elevation of north wing (Alpha)

5 Joint raking progressing on north elevation of north wing (Bravo)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 2 of 6

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott

(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)

Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve

Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 3 of 6

Scaffold installation progressing on north elevation of east wing (Delta)

Scaffold installation progressing on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 4 of 6

Window abatement progressing on north elevation of north wing (Bravo)

Scaffold tarp installation progressing on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 5 of 6

Scaffold tarp installation at parapet on west elevation of north wing (Alpha)

Scaffold tarp installation in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 6 of 6

Heater at scaffold at west elevation of north wing (Alpha)

Joint raking progressing on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 16 DATE 12212016

TIME 330 AM DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE 55deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Tony Talerico Project Engineer - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold erection progressing on north elevation of east wing (Delta)

2 Scaffold tarp installation progressing on east elevation of north wing (Charlie)

3 Cleaning progressing on west elevation of north wing (Alpha)

4 Joint raking progressing on north elevation of north wing (Bravo)

5 Parapet cap removal progressing on west elevation of north wing (Alpha)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 2 of 5

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott

(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)

Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve

Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 3 of 5

Scaffold installation progressing on north elevation of east wing (Delta)

Scaffold installation progressing on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 4 of 5

Scaffold tarp installation progressing on east elevation of north wing (Charlie)

Parapet cap removal progressing on west elevation of north wing (Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 5 of 5

Parapet cap removal progressing on west elevation of north wing (Alpha)

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Oklahoma State Capitol Stone ChimeraThe following report explains the history behind the stone Chimerarsquos (ldquogriffinsrdquo) that have sat atop the Oklahoma State Capitol for the last 100 years

Chimeras (Griffins) of the Oklahoma State Capitol

Report provided by TreanorHL

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Griffin A bird head and foreshybody and cat rear always with a beak

Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City

Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company

Mythological Cat Creature Examples

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (left side) summer of 1916 shy no chimeras present

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (right side) November 2 1916 shy chimeras set

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti

South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016

TIME 900a to 530p DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE Lo 40s to 60

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

Trait Thompson - OMES

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking on A206 (Alpha)

Demolition for RP2 repair NW-0A06

ITEMS DISCUSSED

With WJE reviewed masonry cleaning processes changes to biological cleaning that have been

necessary to achieve the same results as trial repairs raking and repointing mockups for limestone

and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an

injection repairs patching repairs to limestone and granite See meeting notes from 11302016

follow up meeting to discuss WJE observations regarding the work

With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work

that necessary to make the area complete

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 2 of 4

ACTION REQUIRED

Revisions to repairs on A206 due to discovered conditions (TreanorHL)

bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone

bull at NW-0501 due to condition uncovered by joint raking

ITEMS TO VERIFY

REMARKS

OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes

Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to

tour the scaffold Reviewed window and masonry related work

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A206 ndash Site tour with OMES and WJE

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 3 of 4

A209 (left) and A208 (right) ndash Scaffold construction continues

A206 ndash NW-0A06 demolition in progress

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 4 of 4

A206 ndash Stone salvaged from NW-0A06

A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016

TIME 1000a to 530p DAY OF WEEK Monday

OWNER OMES TEMP RANGE Mid 50s to Lo 60s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Lukasz Lesniak Field Superintendent ndash Mark 1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking and repointing on A206 (Alpha)

Roofing materials being hoisted to the north wing roof

ITEMS DISCUSSED

Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps

there is some cold soak left to perform and sealant removal at window perimeter Temperature

restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this

week to create heated enclosure Discussed the need to monitor temperature and record it not only

on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and

other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is

approximately 50 complete

Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece

(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)

Met with JE Dunn to organize field walk for WJE visit

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 2 of 5

Reviewed window sill conditions including additional condition involving lead sheet flashing at the

bottom of cast iron sills

Temporary protection for built-in gutter

Stone color no word on additional lighter shades to better match light colored existing stones Mark

1 will salvage pieces of usable material where possible from other locations in case it is needed

ACTION REQUIRED

Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation

(TreanorHL)

ITEMS TO VERIFY

REMARKS

Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been

effective overall but the drying times are quite variable Some areas that have not seen water in

over a week are still visibly damp

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 3 of 5

A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in

right photo ndash end of tape is against the window frame in both photos

A208 ndash Residual dampness on A208 from cleaning

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 4 of 5

A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital

A207 ndash Lead T-cap installation for mock up review

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 5 of 5

A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining

material is brittle in some locations Additional detail will be issued for condition as part of forthcoming

ASI Believe this is window 459 ndash type G

A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016

TIME 800a to 12 noon DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE Mid 30s to Lo 50s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Raking on A206 (Alpha)

Substrate and backing conditions at RP repair NW-0A06

Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were

found on the west end of the frieze stone The tie-wire was easily removed from the back up

construction No rivet was found the pocket (which had been cut through) appears to have been

slugged full with mortar as construction progressed

Tarps being hung on A206 (Alpha)

ITEMS DISCUSSED

Protection for weather and monitoring conditions within the enclosure

Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to

moderate efflorescence were noted The most prominent is at the location of the redressing on NE-

0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent

dampness during cleaning operations The scaling that was the impetus for the redressing is located

at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 2 of 5

area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material

the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to

indicate the sealer is present even at this depth Potential sources of salts identified backing

construction penetrating sealer applied to building Area was discussed with WJE personnel

Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the

bottom of the corbel molding Both locations are unique to this elevation

ACTION REQUIRED

Tarp installation on all facades placement and distribution of heating devices including monitoring

devices for temperature (Mark1 and JE Dunn)

Direction for spot cleaning on A208 (Charlie)

ITEMS TO VERIFY

Method for monitoring conditions inside the tarped area (JE Dunn)

REMARKS

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 3 of 5

A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter

round differs from those specified in 1914 but specifications do not mention attachment at concrete

This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over

and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed

A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above

is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 4 of 5

A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been

slugged full with mortar prior to setting course above tie wire pulled freely from backing construction

Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction

aides to plumb up the tall stones during setting

A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No

signs of distress observed but area was dusty and full of debris from demolition

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 5 of 5

A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze

stones

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

JED

JEDBak

er

Mar

k 1

ProjectOklahoma StateCapitolRehabilitation

Date12072016

DrawingSite UtilizationPlan

Legend -JED Trailer Compound

-Phase 1 Site Fencing

-Gravel laydown

-Fence gate

-Future phases site fencing

-Future phases gravel laydown

EnvAct

Review

JED

Mark 1

JED

Faith

Dumpster

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Window Abatement Tracking Plan

DECEMBER 2016

Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 1 of 8

FIELD OBSERVATION REPORT REPORT NO 14 DATE 1262016

TIME 1100 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 40deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Landon Heaton Project Engineer - JE Dunn Construction

Tony Talerico Project Engineer - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold erection progressing on north elevation of east wing (Delta)

2 Window abatement progressing on east elevation of north wing (Charlie)

3 Gutter work progressing on east elevation of north wing (Charlie)

4 Plywood moved to interior side of cast iron frames on north elevation of north wing (Bravo)

5 Tarp added to scaffold exterior on west elevation of north wing (Alpha)

6 Scaffold lateral ties in place at scaffold on west elevation of north wing (Alpha)

7 Scaffold lateral tie installation progressing at scaffold on east elevation of north wing (Charlie)

8 Thermometers in place at scaffold on west elevation of north wing (Alpha)

9 Stone repair progressing on west and north elevations of north wing (Alpha and Bravo)

10 Site fence added at South Plaza and southeast quadrant of project site

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 2 of 8

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott

(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)

Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve

Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 4 of 8

Window abatement progressing on north elevation of north wing (Bravo)

Gutter masonry work progressing on west elevation of north wing (Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 5 of 8

Plywood moved to interior side of cast iron frames on east elevation of north wing (Charlie)

Tarp added to west elevation of north wing (Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 6 of 8

Scaffold lateral ties with danger tape in place at scaffold on west elevation of north wing (Alpha)

Scaffold lateral tie installation progressing at scaffold on east elevation of north wing (Charlie)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 7 of 8

Thermometer in place at scaffold on west elevation of north wing (Alpha)

Entire replacement of stone (RP2) on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 8 of 8

Fencing in place at South Plaza

Fencing in place at southeast quadrant of site

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 1 of 6

FIELD OBSERVATION REPORT REPORT NO 15 DATE 12132016

TIME 1030 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 35deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Tony Talerico Project Engineer - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold erection progressing on north elevation of east wing (Delta)

2 Window abatement progressing on east elevation of north wing (Charlie)

3 Scaffold tarp installation progressing on west elevation of north wing (Alpha)

4 Heater placed for scaffold on west elevation of north wing (Alpha)

5 Joint raking progressing on north elevation of north wing (Bravo)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 2 of 6

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott

(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)

Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve

Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 3 of 6

Scaffold installation progressing on north elevation of east wing (Delta)

Scaffold installation progressing on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 4 of 6

Window abatement progressing on north elevation of north wing (Bravo)

Scaffold tarp installation progressing on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 5 of 6

Scaffold tarp installation at parapet on west elevation of north wing (Alpha)

Scaffold tarp installation in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 6 of 6

Heater at scaffold at west elevation of north wing (Alpha)

Joint raking progressing on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 16 DATE 12212016

TIME 330 AM DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE 55deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Tony Talerico Project Engineer - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold erection progressing on north elevation of east wing (Delta)

2 Scaffold tarp installation progressing on east elevation of north wing (Charlie)

3 Cleaning progressing on west elevation of north wing (Alpha)

4 Joint raking progressing on north elevation of north wing (Bravo)

5 Parapet cap removal progressing on west elevation of north wing (Alpha)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 2 of 5

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott

(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)

Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve

Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 3 of 5

Scaffold installation progressing on north elevation of east wing (Delta)

Scaffold installation progressing on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 4 of 5

Scaffold tarp installation progressing on east elevation of north wing (Charlie)

Parapet cap removal progressing on west elevation of north wing (Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 5 of 5

Parapet cap removal progressing on west elevation of north wing (Alpha)

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Oklahoma State Capitol Stone ChimeraThe following report explains the history behind the stone Chimerarsquos (ldquogriffinsrdquo) that have sat atop the Oklahoma State Capitol for the last 100 years

Chimeras (Griffins) of the Oklahoma State Capitol

Report provided by TreanorHL

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Griffin A bird head and foreshybody and cat rear always with a beak

Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City

Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company

Mythological Cat Creature Examples

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (left side) summer of 1916 shy no chimeras present

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (right side) November 2 1916 shy chimeras set

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti

South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016

TIME 900a to 530p DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE Lo 40s to 60

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

Trait Thompson - OMES

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking on A206 (Alpha)

Demolition for RP2 repair NW-0A06

ITEMS DISCUSSED

With WJE reviewed masonry cleaning processes changes to biological cleaning that have been

necessary to achieve the same results as trial repairs raking and repointing mockups for limestone

and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an

injection repairs patching repairs to limestone and granite See meeting notes from 11302016

follow up meeting to discuss WJE observations regarding the work

With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work

that necessary to make the area complete

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 2 of 4

ACTION REQUIRED

Revisions to repairs on A206 due to discovered conditions (TreanorHL)

bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone

bull at NW-0501 due to condition uncovered by joint raking

ITEMS TO VERIFY

REMARKS

OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes

Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to

tour the scaffold Reviewed window and masonry related work

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A206 ndash Site tour with OMES and WJE

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 3 of 4

A209 (left) and A208 (right) ndash Scaffold construction continues

A206 ndash NW-0A06 demolition in progress

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 4 of 4

A206 ndash Stone salvaged from NW-0A06

A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016

TIME 1000a to 530p DAY OF WEEK Monday

OWNER OMES TEMP RANGE Mid 50s to Lo 60s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Lukasz Lesniak Field Superintendent ndash Mark 1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking and repointing on A206 (Alpha)

Roofing materials being hoisted to the north wing roof

ITEMS DISCUSSED

Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps

there is some cold soak left to perform and sealant removal at window perimeter Temperature

restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this

week to create heated enclosure Discussed the need to monitor temperature and record it not only

on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and

other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is

approximately 50 complete

Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece

(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)

Met with JE Dunn to organize field walk for WJE visit

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 2 of 5

Reviewed window sill conditions including additional condition involving lead sheet flashing at the

bottom of cast iron sills

Temporary protection for built-in gutter

Stone color no word on additional lighter shades to better match light colored existing stones Mark

1 will salvage pieces of usable material where possible from other locations in case it is needed

ACTION REQUIRED

Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation

(TreanorHL)

ITEMS TO VERIFY

REMARKS

Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been

effective overall but the drying times are quite variable Some areas that have not seen water in

over a week are still visibly damp

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 3 of 5

A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in

right photo ndash end of tape is against the window frame in both photos

A208 ndash Residual dampness on A208 from cleaning

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 4 of 5

A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital

A207 ndash Lead T-cap installation for mock up review

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 5 of 5

A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining

material is brittle in some locations Additional detail will be issued for condition as part of forthcoming

ASI Believe this is window 459 ndash type G

A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016

TIME 800a to 12 noon DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE Mid 30s to Lo 50s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Raking on A206 (Alpha)

Substrate and backing conditions at RP repair NW-0A06

Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were

found on the west end of the frieze stone The tie-wire was easily removed from the back up

construction No rivet was found the pocket (which had been cut through) appears to have been

slugged full with mortar as construction progressed

Tarps being hung on A206 (Alpha)

ITEMS DISCUSSED

Protection for weather and monitoring conditions within the enclosure

Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to

moderate efflorescence were noted The most prominent is at the location of the redressing on NE-

0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent

dampness during cleaning operations The scaling that was the impetus for the redressing is located

at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 2 of 5

area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material

the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to

indicate the sealer is present even at this depth Potential sources of salts identified backing

construction penetrating sealer applied to building Area was discussed with WJE personnel

Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the

bottom of the corbel molding Both locations are unique to this elevation

ACTION REQUIRED

Tarp installation on all facades placement and distribution of heating devices including monitoring

devices for temperature (Mark1 and JE Dunn)

Direction for spot cleaning on A208 (Charlie)

ITEMS TO VERIFY

Method for monitoring conditions inside the tarped area (JE Dunn)

REMARKS

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 3 of 5

A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter

round differs from those specified in 1914 but specifications do not mention attachment at concrete

This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over

and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed

A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above

is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 4 of 5

A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been

slugged full with mortar prior to setting course above tie wire pulled freely from backing construction

Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction

aides to plumb up the tall stones during setting

A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No

signs of distress observed but area was dusty and full of debris from demolition

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 5 of 5

A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze

stones

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

JED

JEDBak

er

Mar

k 1

ProjectOklahoma StateCapitolRehabilitation

Date12072016

DrawingSite UtilizationPlan

Legend -JED Trailer Compound

-Phase 1 Site Fencing

-Gravel laydown

-Fence gate

-Future phases site fencing

-Future phases gravel laydown

EnvAct

Review

JED

Mark 1

JED

Faith

Dumpster

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Window Abatement Tracking Plan

DECEMBER 2016

Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 2 of 8

OBSERVED BY Peter Breninger (ADG)

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott

(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)

Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve

Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 4 of 8

Window abatement progressing on north elevation of north wing (Bravo)

Gutter masonry work progressing on west elevation of north wing (Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 5 of 8

Plywood moved to interior side of cast iron frames on east elevation of north wing (Charlie)

Tarp added to west elevation of north wing (Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 6 of 8

Scaffold lateral ties with danger tape in place at scaffold on west elevation of north wing (Alpha)

Scaffold lateral tie installation progressing at scaffold on east elevation of north wing (Charlie)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 7 of 8

Thermometer in place at scaffold on west elevation of north wing (Alpha)

Entire replacement of stone (RP2) on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 8 of 8

Fencing in place at South Plaza

Fencing in place at southeast quadrant of site

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 1 of 6

FIELD OBSERVATION REPORT REPORT NO 15 DATE 12132016

TIME 1030 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 35deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Tony Talerico Project Engineer - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold erection progressing on north elevation of east wing (Delta)

2 Window abatement progressing on east elevation of north wing (Charlie)

3 Scaffold tarp installation progressing on west elevation of north wing (Alpha)

4 Heater placed for scaffold on west elevation of north wing (Alpha)

5 Joint raking progressing on north elevation of north wing (Bravo)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 2 of 6

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott

(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)

Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve

Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 3 of 6

Scaffold installation progressing on north elevation of east wing (Delta)

Scaffold installation progressing on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 4 of 6

Window abatement progressing on north elevation of north wing (Bravo)

Scaffold tarp installation progressing on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 5 of 6

Scaffold tarp installation at parapet on west elevation of north wing (Alpha)

Scaffold tarp installation in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 6 of 6

Heater at scaffold at west elevation of north wing (Alpha)

Joint raking progressing on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 16 DATE 12212016

TIME 330 AM DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE 55deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Tony Talerico Project Engineer - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold erection progressing on north elevation of east wing (Delta)

2 Scaffold tarp installation progressing on east elevation of north wing (Charlie)

3 Cleaning progressing on west elevation of north wing (Alpha)

4 Joint raking progressing on north elevation of north wing (Bravo)

5 Parapet cap removal progressing on west elevation of north wing (Alpha)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 2 of 5

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott

(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)

Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve

Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 3 of 5

Scaffold installation progressing on north elevation of east wing (Delta)

Scaffold installation progressing on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 4 of 5

Scaffold tarp installation progressing on east elevation of north wing (Charlie)

Parapet cap removal progressing on west elevation of north wing (Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 5 of 5

Parapet cap removal progressing on west elevation of north wing (Alpha)

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Oklahoma State Capitol Stone ChimeraThe following report explains the history behind the stone Chimerarsquos (ldquogriffinsrdquo) that have sat atop the Oklahoma State Capitol for the last 100 years

Chimeras (Griffins) of the Oklahoma State Capitol

Report provided by TreanorHL

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Griffin A bird head and foreshybody and cat rear always with a beak

Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City

Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company

Mythological Cat Creature Examples

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (left side) summer of 1916 shy no chimeras present

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (right side) November 2 1916 shy chimeras set

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti

South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016

TIME 900a to 530p DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE Lo 40s to 60

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

Trait Thompson - OMES

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking on A206 (Alpha)

Demolition for RP2 repair NW-0A06

ITEMS DISCUSSED

With WJE reviewed masonry cleaning processes changes to biological cleaning that have been

necessary to achieve the same results as trial repairs raking and repointing mockups for limestone

and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an

injection repairs patching repairs to limestone and granite See meeting notes from 11302016

follow up meeting to discuss WJE observations regarding the work

With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work

that necessary to make the area complete

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 2 of 4

ACTION REQUIRED

Revisions to repairs on A206 due to discovered conditions (TreanorHL)

bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone

bull at NW-0501 due to condition uncovered by joint raking

ITEMS TO VERIFY

REMARKS

OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes

Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to

tour the scaffold Reviewed window and masonry related work

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A206 ndash Site tour with OMES and WJE

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 3 of 4

A209 (left) and A208 (right) ndash Scaffold construction continues

A206 ndash NW-0A06 demolition in progress

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 4 of 4

A206 ndash Stone salvaged from NW-0A06

A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016

TIME 1000a to 530p DAY OF WEEK Monday

OWNER OMES TEMP RANGE Mid 50s to Lo 60s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Lukasz Lesniak Field Superintendent ndash Mark 1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking and repointing on A206 (Alpha)

Roofing materials being hoisted to the north wing roof

ITEMS DISCUSSED

Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps

there is some cold soak left to perform and sealant removal at window perimeter Temperature

restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this

week to create heated enclosure Discussed the need to monitor temperature and record it not only

on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and

other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is

approximately 50 complete

Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece

(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)

Met with JE Dunn to organize field walk for WJE visit

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 2 of 5

Reviewed window sill conditions including additional condition involving lead sheet flashing at the

bottom of cast iron sills

Temporary protection for built-in gutter

Stone color no word on additional lighter shades to better match light colored existing stones Mark

1 will salvage pieces of usable material where possible from other locations in case it is needed

ACTION REQUIRED

Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation

(TreanorHL)

ITEMS TO VERIFY

REMARKS

Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been

effective overall but the drying times are quite variable Some areas that have not seen water in

over a week are still visibly damp

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 3 of 5

A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in

right photo ndash end of tape is against the window frame in both photos

A208 ndash Residual dampness on A208 from cleaning

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 4 of 5

A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital

A207 ndash Lead T-cap installation for mock up review

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 5 of 5

A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining

material is brittle in some locations Additional detail will be issued for condition as part of forthcoming

ASI Believe this is window 459 ndash type G

A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016

TIME 800a to 12 noon DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE Mid 30s to Lo 50s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Raking on A206 (Alpha)

Substrate and backing conditions at RP repair NW-0A06

Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were

found on the west end of the frieze stone The tie-wire was easily removed from the back up

construction No rivet was found the pocket (which had been cut through) appears to have been

slugged full with mortar as construction progressed

Tarps being hung on A206 (Alpha)

ITEMS DISCUSSED

Protection for weather and monitoring conditions within the enclosure

Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to

moderate efflorescence were noted The most prominent is at the location of the redressing on NE-

0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent

dampness during cleaning operations The scaling that was the impetus for the redressing is located

at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 2 of 5

area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material

the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to

indicate the sealer is present even at this depth Potential sources of salts identified backing

construction penetrating sealer applied to building Area was discussed with WJE personnel

Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the

bottom of the corbel molding Both locations are unique to this elevation

ACTION REQUIRED

Tarp installation on all facades placement and distribution of heating devices including monitoring

devices for temperature (Mark1 and JE Dunn)

Direction for spot cleaning on A208 (Charlie)

ITEMS TO VERIFY

Method for monitoring conditions inside the tarped area (JE Dunn)

REMARKS

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 3 of 5

A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter

round differs from those specified in 1914 but specifications do not mention attachment at concrete

This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over

and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed

A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above

is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 4 of 5

A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been

slugged full with mortar prior to setting course above tie wire pulled freely from backing construction

Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction

aides to plumb up the tall stones during setting

A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No

signs of distress observed but area was dusty and full of debris from demolition

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 5 of 5

A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze

stones

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

JED

JEDBak

er

Mar

k 1

ProjectOklahoma StateCapitolRehabilitation

Date12072016

DrawingSite UtilizationPlan

Legend -JED Trailer Compound

-Phase 1 Site Fencing

-Gravel laydown

-Fence gate

-Future phases site fencing

-Future phases gravel laydown

EnvAct

Review

JED

Mark 1

JED

Faith

Dumpster

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Window Abatement Tracking Plan

DECEMBER 2016

Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 4 of 8

Window abatement progressing on north elevation of north wing (Bravo)

Gutter masonry work progressing on west elevation of north wing (Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 5 of 8

Plywood moved to interior side of cast iron frames on east elevation of north wing (Charlie)

Tarp added to west elevation of north wing (Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 6 of 8

Scaffold lateral ties with danger tape in place at scaffold on west elevation of north wing (Alpha)

Scaffold lateral tie installation progressing at scaffold on east elevation of north wing (Charlie)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 7 of 8

Thermometer in place at scaffold on west elevation of north wing (Alpha)

Entire replacement of stone (RP2) on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 8 of 8

Fencing in place at South Plaza

Fencing in place at southeast quadrant of site

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 1 of 6

FIELD OBSERVATION REPORT REPORT NO 15 DATE 12132016

TIME 1030 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 35deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Tony Talerico Project Engineer - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold erection progressing on north elevation of east wing (Delta)

2 Window abatement progressing on east elevation of north wing (Charlie)

3 Scaffold tarp installation progressing on west elevation of north wing (Alpha)

4 Heater placed for scaffold on west elevation of north wing (Alpha)

5 Joint raking progressing on north elevation of north wing (Bravo)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 2 of 6

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott

(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)

Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve

Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 3 of 6

Scaffold installation progressing on north elevation of east wing (Delta)

Scaffold installation progressing on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 4 of 6

Window abatement progressing on north elevation of north wing (Bravo)

Scaffold tarp installation progressing on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 5 of 6

Scaffold tarp installation at parapet on west elevation of north wing (Alpha)

Scaffold tarp installation in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 6 of 6

Heater at scaffold at west elevation of north wing (Alpha)

Joint raking progressing on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 16 DATE 12212016

TIME 330 AM DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE 55deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Tony Talerico Project Engineer - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold erection progressing on north elevation of east wing (Delta)

2 Scaffold tarp installation progressing on east elevation of north wing (Charlie)

3 Cleaning progressing on west elevation of north wing (Alpha)

4 Joint raking progressing on north elevation of north wing (Bravo)

5 Parapet cap removal progressing on west elevation of north wing (Alpha)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 2 of 5

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott

(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)

Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve

Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 3 of 5

Scaffold installation progressing on north elevation of east wing (Delta)

Scaffold installation progressing on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 4 of 5

Scaffold tarp installation progressing on east elevation of north wing (Charlie)

Parapet cap removal progressing on west elevation of north wing (Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 5 of 5

Parapet cap removal progressing on west elevation of north wing (Alpha)

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Oklahoma State Capitol Stone ChimeraThe following report explains the history behind the stone Chimerarsquos (ldquogriffinsrdquo) that have sat atop the Oklahoma State Capitol for the last 100 years

Chimeras (Griffins) of the Oklahoma State Capitol

Report provided by TreanorHL

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Griffin A bird head and foreshybody and cat rear always with a beak

Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City

Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company

Mythological Cat Creature Examples

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (left side) summer of 1916 shy no chimeras present

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (right side) November 2 1916 shy chimeras set

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti

South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016

TIME 900a to 530p DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE Lo 40s to 60

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

Trait Thompson - OMES

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking on A206 (Alpha)

Demolition for RP2 repair NW-0A06

ITEMS DISCUSSED

With WJE reviewed masonry cleaning processes changes to biological cleaning that have been

necessary to achieve the same results as trial repairs raking and repointing mockups for limestone

and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an

injection repairs patching repairs to limestone and granite See meeting notes from 11302016

follow up meeting to discuss WJE observations regarding the work

With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work

that necessary to make the area complete

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 2 of 4

ACTION REQUIRED

Revisions to repairs on A206 due to discovered conditions (TreanorHL)

bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone

bull at NW-0501 due to condition uncovered by joint raking

ITEMS TO VERIFY

REMARKS

OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes

Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to

tour the scaffold Reviewed window and masonry related work

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A206 ndash Site tour with OMES and WJE

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 3 of 4

A209 (left) and A208 (right) ndash Scaffold construction continues

A206 ndash NW-0A06 demolition in progress

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 4 of 4

A206 ndash Stone salvaged from NW-0A06

A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016

TIME 1000a to 530p DAY OF WEEK Monday

OWNER OMES TEMP RANGE Mid 50s to Lo 60s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Lukasz Lesniak Field Superintendent ndash Mark 1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking and repointing on A206 (Alpha)

Roofing materials being hoisted to the north wing roof

ITEMS DISCUSSED

Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps

there is some cold soak left to perform and sealant removal at window perimeter Temperature

restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this

week to create heated enclosure Discussed the need to monitor temperature and record it not only

on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and

other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is

approximately 50 complete

Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece

(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)

Met with JE Dunn to organize field walk for WJE visit

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 2 of 5

Reviewed window sill conditions including additional condition involving lead sheet flashing at the

bottom of cast iron sills

Temporary protection for built-in gutter

Stone color no word on additional lighter shades to better match light colored existing stones Mark

1 will salvage pieces of usable material where possible from other locations in case it is needed

ACTION REQUIRED

Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation

(TreanorHL)

ITEMS TO VERIFY

REMARKS

Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been

effective overall but the drying times are quite variable Some areas that have not seen water in

over a week are still visibly damp

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 3 of 5

A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in

right photo ndash end of tape is against the window frame in both photos

A208 ndash Residual dampness on A208 from cleaning

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 4 of 5

A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital

A207 ndash Lead T-cap installation for mock up review

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 5 of 5

A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining

material is brittle in some locations Additional detail will be issued for condition as part of forthcoming

ASI Believe this is window 459 ndash type G

A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016

TIME 800a to 12 noon DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE Mid 30s to Lo 50s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Raking on A206 (Alpha)

Substrate and backing conditions at RP repair NW-0A06

Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were

found on the west end of the frieze stone The tie-wire was easily removed from the back up

construction No rivet was found the pocket (which had been cut through) appears to have been

slugged full with mortar as construction progressed

Tarps being hung on A206 (Alpha)

ITEMS DISCUSSED

Protection for weather and monitoring conditions within the enclosure

Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to

moderate efflorescence were noted The most prominent is at the location of the redressing on NE-

0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent

dampness during cleaning operations The scaling that was the impetus for the redressing is located

at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 2 of 5

area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material

the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to

indicate the sealer is present even at this depth Potential sources of salts identified backing

construction penetrating sealer applied to building Area was discussed with WJE personnel

Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the

bottom of the corbel molding Both locations are unique to this elevation

ACTION REQUIRED

Tarp installation on all facades placement and distribution of heating devices including monitoring

devices for temperature (Mark1 and JE Dunn)

Direction for spot cleaning on A208 (Charlie)

ITEMS TO VERIFY

Method for monitoring conditions inside the tarped area (JE Dunn)

REMARKS

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 3 of 5

A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter

round differs from those specified in 1914 but specifications do not mention attachment at concrete

This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over

and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed

A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above

is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 4 of 5

A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been

slugged full with mortar prior to setting course above tie wire pulled freely from backing construction

Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction

aides to plumb up the tall stones during setting

A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No

signs of distress observed but area was dusty and full of debris from demolition

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 5 of 5

A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze

stones

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

JED

JEDBak

er

Mar

k 1

ProjectOklahoma StateCapitolRehabilitation

Date12072016

DrawingSite UtilizationPlan

Legend -JED Trailer Compound

-Phase 1 Site Fencing

-Gravel laydown

-Fence gate

-Future phases site fencing

-Future phases gravel laydown

EnvAct

Review

JED

Mark 1

JED

Faith

Dumpster

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Window Abatement Tracking Plan

DECEMBER 2016

Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 5 of 8

Plywood moved to interior side of cast iron frames on east elevation of north wing (Charlie)

Tarp added to west elevation of north wing (Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 6 of 8

Scaffold lateral ties with danger tape in place at scaffold on west elevation of north wing (Alpha)

Scaffold lateral tie installation progressing at scaffold on east elevation of north wing (Charlie)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 7 of 8

Thermometer in place at scaffold on west elevation of north wing (Alpha)

Entire replacement of stone (RP2) on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 8 of 8

Fencing in place at South Plaza

Fencing in place at southeast quadrant of site

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 1 of 6

FIELD OBSERVATION REPORT REPORT NO 15 DATE 12132016

TIME 1030 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 35deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Tony Talerico Project Engineer - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold erection progressing on north elevation of east wing (Delta)

2 Window abatement progressing on east elevation of north wing (Charlie)

3 Scaffold tarp installation progressing on west elevation of north wing (Alpha)

4 Heater placed for scaffold on west elevation of north wing (Alpha)

5 Joint raking progressing on north elevation of north wing (Bravo)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 2 of 6

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott

(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)

Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve

Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 3 of 6

Scaffold installation progressing on north elevation of east wing (Delta)

Scaffold installation progressing on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 4 of 6

Window abatement progressing on north elevation of north wing (Bravo)

Scaffold tarp installation progressing on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 5 of 6

Scaffold tarp installation at parapet on west elevation of north wing (Alpha)

Scaffold tarp installation in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 6 of 6

Heater at scaffold at west elevation of north wing (Alpha)

Joint raking progressing on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 16 DATE 12212016

TIME 330 AM DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE 55deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Tony Talerico Project Engineer - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold erection progressing on north elevation of east wing (Delta)

2 Scaffold tarp installation progressing on east elevation of north wing (Charlie)

3 Cleaning progressing on west elevation of north wing (Alpha)

4 Joint raking progressing on north elevation of north wing (Bravo)

5 Parapet cap removal progressing on west elevation of north wing (Alpha)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 2 of 5

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott

(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)

Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve

Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 3 of 5

Scaffold installation progressing on north elevation of east wing (Delta)

Scaffold installation progressing on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 4 of 5

Scaffold tarp installation progressing on east elevation of north wing (Charlie)

Parapet cap removal progressing on west elevation of north wing (Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 5 of 5

Parapet cap removal progressing on west elevation of north wing (Alpha)

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Oklahoma State Capitol Stone ChimeraThe following report explains the history behind the stone Chimerarsquos (ldquogriffinsrdquo) that have sat atop the Oklahoma State Capitol for the last 100 years

Chimeras (Griffins) of the Oklahoma State Capitol

Report provided by TreanorHL

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Griffin A bird head and foreshybody and cat rear always with a beak

Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City

Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company

Mythological Cat Creature Examples

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (left side) summer of 1916 shy no chimeras present

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (right side) November 2 1916 shy chimeras set

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti

South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016

TIME 900a to 530p DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE Lo 40s to 60

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

Trait Thompson - OMES

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking on A206 (Alpha)

Demolition for RP2 repair NW-0A06

ITEMS DISCUSSED

With WJE reviewed masonry cleaning processes changes to biological cleaning that have been

necessary to achieve the same results as trial repairs raking and repointing mockups for limestone

and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an

injection repairs patching repairs to limestone and granite See meeting notes from 11302016

follow up meeting to discuss WJE observations regarding the work

With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work

that necessary to make the area complete

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 2 of 4

ACTION REQUIRED

Revisions to repairs on A206 due to discovered conditions (TreanorHL)

bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone

bull at NW-0501 due to condition uncovered by joint raking

ITEMS TO VERIFY

REMARKS

OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes

Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to

tour the scaffold Reviewed window and masonry related work

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A206 ndash Site tour with OMES and WJE

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 3 of 4

A209 (left) and A208 (right) ndash Scaffold construction continues

A206 ndash NW-0A06 demolition in progress

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 4 of 4

A206 ndash Stone salvaged from NW-0A06

A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016

TIME 1000a to 530p DAY OF WEEK Monday

OWNER OMES TEMP RANGE Mid 50s to Lo 60s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Lukasz Lesniak Field Superintendent ndash Mark 1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking and repointing on A206 (Alpha)

Roofing materials being hoisted to the north wing roof

ITEMS DISCUSSED

Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps

there is some cold soak left to perform and sealant removal at window perimeter Temperature

restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this

week to create heated enclosure Discussed the need to monitor temperature and record it not only

on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and

other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is

approximately 50 complete

Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece

(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)

Met with JE Dunn to organize field walk for WJE visit

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 2 of 5

Reviewed window sill conditions including additional condition involving lead sheet flashing at the

bottom of cast iron sills

Temporary protection for built-in gutter

Stone color no word on additional lighter shades to better match light colored existing stones Mark

1 will salvage pieces of usable material where possible from other locations in case it is needed

ACTION REQUIRED

Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation

(TreanorHL)

ITEMS TO VERIFY

REMARKS

Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been

effective overall but the drying times are quite variable Some areas that have not seen water in

over a week are still visibly damp

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 3 of 5

A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in

right photo ndash end of tape is against the window frame in both photos

A208 ndash Residual dampness on A208 from cleaning

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 4 of 5

A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital

A207 ndash Lead T-cap installation for mock up review

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 5 of 5

A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining

material is brittle in some locations Additional detail will be issued for condition as part of forthcoming

ASI Believe this is window 459 ndash type G

A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016

TIME 800a to 12 noon DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE Mid 30s to Lo 50s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Raking on A206 (Alpha)

Substrate and backing conditions at RP repair NW-0A06

Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were

found on the west end of the frieze stone The tie-wire was easily removed from the back up

construction No rivet was found the pocket (which had been cut through) appears to have been

slugged full with mortar as construction progressed

Tarps being hung on A206 (Alpha)

ITEMS DISCUSSED

Protection for weather and monitoring conditions within the enclosure

Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to

moderate efflorescence were noted The most prominent is at the location of the redressing on NE-

0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent

dampness during cleaning operations The scaling that was the impetus for the redressing is located

at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 2 of 5

area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material

the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to

indicate the sealer is present even at this depth Potential sources of salts identified backing

construction penetrating sealer applied to building Area was discussed with WJE personnel

Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the

bottom of the corbel molding Both locations are unique to this elevation

ACTION REQUIRED

Tarp installation on all facades placement and distribution of heating devices including monitoring

devices for temperature (Mark1 and JE Dunn)

Direction for spot cleaning on A208 (Charlie)

ITEMS TO VERIFY

Method for monitoring conditions inside the tarped area (JE Dunn)

REMARKS

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 3 of 5

A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter

round differs from those specified in 1914 but specifications do not mention attachment at concrete

This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over

and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed

A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above

is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 4 of 5

A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been

slugged full with mortar prior to setting course above tie wire pulled freely from backing construction

Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction

aides to plumb up the tall stones during setting

A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No

signs of distress observed but area was dusty and full of debris from demolition

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 5 of 5

A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze

stones

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

JED

JEDBak

er

Mar

k 1

ProjectOklahoma StateCapitolRehabilitation

Date12072016

DrawingSite UtilizationPlan

Legend -JED Trailer Compound

-Phase 1 Site Fencing

-Gravel laydown

-Fence gate

-Future phases site fencing

-Future phases gravel laydown

EnvAct

Review

JED

Mark 1

JED

Faith

Dumpster

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Window Abatement Tracking Plan

DECEMBER 2016

Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 6 of 8

Scaffold lateral ties with danger tape in place at scaffold on west elevation of north wing (Alpha)

Scaffold lateral tie installation progressing at scaffold on east elevation of north wing (Charlie)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 7 of 8

Thermometer in place at scaffold on west elevation of north wing (Alpha)

Entire replacement of stone (RP2) on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 8 of 8

Fencing in place at South Plaza

Fencing in place at southeast quadrant of site

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 1 of 6

FIELD OBSERVATION REPORT REPORT NO 15 DATE 12132016

TIME 1030 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 35deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Tony Talerico Project Engineer - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold erection progressing on north elevation of east wing (Delta)

2 Window abatement progressing on east elevation of north wing (Charlie)

3 Scaffold tarp installation progressing on west elevation of north wing (Alpha)

4 Heater placed for scaffold on west elevation of north wing (Alpha)

5 Joint raking progressing on north elevation of north wing (Bravo)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 2 of 6

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott

(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)

Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve

Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 3 of 6

Scaffold installation progressing on north elevation of east wing (Delta)

Scaffold installation progressing on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 4 of 6

Window abatement progressing on north elevation of north wing (Bravo)

Scaffold tarp installation progressing on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 5 of 6

Scaffold tarp installation at parapet on west elevation of north wing (Alpha)

Scaffold tarp installation in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 6 of 6

Heater at scaffold at west elevation of north wing (Alpha)

Joint raking progressing on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 16 DATE 12212016

TIME 330 AM DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE 55deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Tony Talerico Project Engineer - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold erection progressing on north elevation of east wing (Delta)

2 Scaffold tarp installation progressing on east elevation of north wing (Charlie)

3 Cleaning progressing on west elevation of north wing (Alpha)

4 Joint raking progressing on north elevation of north wing (Bravo)

5 Parapet cap removal progressing on west elevation of north wing (Alpha)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 2 of 5

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott

(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)

Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve

Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 3 of 5

Scaffold installation progressing on north elevation of east wing (Delta)

Scaffold installation progressing on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 4 of 5

Scaffold tarp installation progressing on east elevation of north wing (Charlie)

Parapet cap removal progressing on west elevation of north wing (Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 5 of 5

Parapet cap removal progressing on west elevation of north wing (Alpha)

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Oklahoma State Capitol Stone ChimeraThe following report explains the history behind the stone Chimerarsquos (ldquogriffinsrdquo) that have sat atop the Oklahoma State Capitol for the last 100 years

Chimeras (Griffins) of the Oklahoma State Capitol

Report provided by TreanorHL

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Griffin A bird head and foreshybody and cat rear always with a beak

Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City

Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company

Mythological Cat Creature Examples

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (left side) summer of 1916 shy no chimeras present

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (right side) November 2 1916 shy chimeras set

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti

South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016

TIME 900a to 530p DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE Lo 40s to 60

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

Trait Thompson - OMES

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking on A206 (Alpha)

Demolition for RP2 repair NW-0A06

ITEMS DISCUSSED

With WJE reviewed masonry cleaning processes changes to biological cleaning that have been

necessary to achieve the same results as trial repairs raking and repointing mockups for limestone

and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an

injection repairs patching repairs to limestone and granite See meeting notes from 11302016

follow up meeting to discuss WJE observations regarding the work

With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work

that necessary to make the area complete

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 2 of 4

ACTION REQUIRED

Revisions to repairs on A206 due to discovered conditions (TreanorHL)

bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone

bull at NW-0501 due to condition uncovered by joint raking

ITEMS TO VERIFY

REMARKS

OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes

Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to

tour the scaffold Reviewed window and masonry related work

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A206 ndash Site tour with OMES and WJE

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 3 of 4

A209 (left) and A208 (right) ndash Scaffold construction continues

A206 ndash NW-0A06 demolition in progress

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 4 of 4

A206 ndash Stone salvaged from NW-0A06

A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016

TIME 1000a to 530p DAY OF WEEK Monday

OWNER OMES TEMP RANGE Mid 50s to Lo 60s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Lukasz Lesniak Field Superintendent ndash Mark 1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking and repointing on A206 (Alpha)

Roofing materials being hoisted to the north wing roof

ITEMS DISCUSSED

Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps

there is some cold soak left to perform and sealant removal at window perimeter Temperature

restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this

week to create heated enclosure Discussed the need to monitor temperature and record it not only

on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and

other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is

approximately 50 complete

Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece

(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)

Met with JE Dunn to organize field walk for WJE visit

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 2 of 5

Reviewed window sill conditions including additional condition involving lead sheet flashing at the

bottom of cast iron sills

Temporary protection for built-in gutter

Stone color no word on additional lighter shades to better match light colored existing stones Mark

1 will salvage pieces of usable material where possible from other locations in case it is needed

ACTION REQUIRED

Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation

(TreanorHL)

ITEMS TO VERIFY

REMARKS

Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been

effective overall but the drying times are quite variable Some areas that have not seen water in

over a week are still visibly damp

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 3 of 5

A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in

right photo ndash end of tape is against the window frame in both photos

A208 ndash Residual dampness on A208 from cleaning

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 4 of 5

A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital

A207 ndash Lead T-cap installation for mock up review

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 5 of 5

A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining

material is brittle in some locations Additional detail will be issued for condition as part of forthcoming

ASI Believe this is window 459 ndash type G

A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016

TIME 800a to 12 noon DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE Mid 30s to Lo 50s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Raking on A206 (Alpha)

Substrate and backing conditions at RP repair NW-0A06

Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were

found on the west end of the frieze stone The tie-wire was easily removed from the back up

construction No rivet was found the pocket (which had been cut through) appears to have been

slugged full with mortar as construction progressed

Tarps being hung on A206 (Alpha)

ITEMS DISCUSSED

Protection for weather and monitoring conditions within the enclosure

Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to

moderate efflorescence were noted The most prominent is at the location of the redressing on NE-

0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent

dampness during cleaning operations The scaling that was the impetus for the redressing is located

at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 2 of 5

area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material

the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to

indicate the sealer is present even at this depth Potential sources of salts identified backing

construction penetrating sealer applied to building Area was discussed with WJE personnel

Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the

bottom of the corbel molding Both locations are unique to this elevation

ACTION REQUIRED

Tarp installation on all facades placement and distribution of heating devices including monitoring

devices for temperature (Mark1 and JE Dunn)

Direction for spot cleaning on A208 (Charlie)

ITEMS TO VERIFY

Method for monitoring conditions inside the tarped area (JE Dunn)

REMARKS

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 3 of 5

A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter

round differs from those specified in 1914 but specifications do not mention attachment at concrete

This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over

and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed

A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above

is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 4 of 5

A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been

slugged full with mortar prior to setting course above tie wire pulled freely from backing construction

Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction

aides to plumb up the tall stones during setting

A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No

signs of distress observed but area was dusty and full of debris from demolition

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 5 of 5

A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze

stones

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

JED

JEDBak

er

Mar

k 1

ProjectOklahoma StateCapitolRehabilitation

Date12072016

DrawingSite UtilizationPlan

Legend -JED Trailer Compound

-Phase 1 Site Fencing

-Gravel laydown

-Fence gate

-Future phases site fencing

-Future phases gravel laydown

EnvAct

Review

JED

Mark 1

JED

Faith

Dumpster

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Window Abatement Tracking Plan

DECEMBER 2016

Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 7 of 8

Thermometer in place at scaffold on west elevation of north wing (Alpha)

Entire replacement of stone (RP2) on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 8 of 8

Fencing in place at South Plaza

Fencing in place at southeast quadrant of site

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 1 of 6

FIELD OBSERVATION REPORT REPORT NO 15 DATE 12132016

TIME 1030 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 35deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Tony Talerico Project Engineer - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold erection progressing on north elevation of east wing (Delta)

2 Window abatement progressing on east elevation of north wing (Charlie)

3 Scaffold tarp installation progressing on west elevation of north wing (Alpha)

4 Heater placed for scaffold on west elevation of north wing (Alpha)

5 Joint raking progressing on north elevation of north wing (Bravo)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 2 of 6

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott

(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)

Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve

Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 3 of 6

Scaffold installation progressing on north elevation of east wing (Delta)

Scaffold installation progressing on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 4 of 6

Window abatement progressing on north elevation of north wing (Bravo)

Scaffold tarp installation progressing on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 5 of 6

Scaffold tarp installation at parapet on west elevation of north wing (Alpha)

Scaffold tarp installation in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 6 of 6

Heater at scaffold at west elevation of north wing (Alpha)

Joint raking progressing on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 16 DATE 12212016

TIME 330 AM DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE 55deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Tony Talerico Project Engineer - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold erection progressing on north elevation of east wing (Delta)

2 Scaffold tarp installation progressing on east elevation of north wing (Charlie)

3 Cleaning progressing on west elevation of north wing (Alpha)

4 Joint raking progressing on north elevation of north wing (Bravo)

5 Parapet cap removal progressing on west elevation of north wing (Alpha)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 2 of 5

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott

(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)

Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve

Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 3 of 5

Scaffold installation progressing on north elevation of east wing (Delta)

Scaffold installation progressing on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 4 of 5

Scaffold tarp installation progressing on east elevation of north wing (Charlie)

Parapet cap removal progressing on west elevation of north wing (Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 5 of 5

Parapet cap removal progressing on west elevation of north wing (Alpha)

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Oklahoma State Capitol Stone ChimeraThe following report explains the history behind the stone Chimerarsquos (ldquogriffinsrdquo) that have sat atop the Oklahoma State Capitol for the last 100 years

Chimeras (Griffins) of the Oklahoma State Capitol

Report provided by TreanorHL

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Griffin A bird head and foreshybody and cat rear always with a beak

Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City

Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company

Mythological Cat Creature Examples

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (left side) summer of 1916 shy no chimeras present

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (right side) November 2 1916 shy chimeras set

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti

South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016

TIME 900a to 530p DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE Lo 40s to 60

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

Trait Thompson - OMES

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking on A206 (Alpha)

Demolition for RP2 repair NW-0A06

ITEMS DISCUSSED

With WJE reviewed masonry cleaning processes changes to biological cleaning that have been

necessary to achieve the same results as trial repairs raking and repointing mockups for limestone

and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an

injection repairs patching repairs to limestone and granite See meeting notes from 11302016

follow up meeting to discuss WJE observations regarding the work

With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work

that necessary to make the area complete

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 2 of 4

ACTION REQUIRED

Revisions to repairs on A206 due to discovered conditions (TreanorHL)

bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone

bull at NW-0501 due to condition uncovered by joint raking

ITEMS TO VERIFY

REMARKS

OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes

Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to

tour the scaffold Reviewed window and masonry related work

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A206 ndash Site tour with OMES and WJE

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 3 of 4

A209 (left) and A208 (right) ndash Scaffold construction continues

A206 ndash NW-0A06 demolition in progress

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 4 of 4

A206 ndash Stone salvaged from NW-0A06

A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016

TIME 1000a to 530p DAY OF WEEK Monday

OWNER OMES TEMP RANGE Mid 50s to Lo 60s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Lukasz Lesniak Field Superintendent ndash Mark 1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking and repointing on A206 (Alpha)

Roofing materials being hoisted to the north wing roof

ITEMS DISCUSSED

Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps

there is some cold soak left to perform and sealant removal at window perimeter Temperature

restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this

week to create heated enclosure Discussed the need to monitor temperature and record it not only

on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and

other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is

approximately 50 complete

Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece

(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)

Met with JE Dunn to organize field walk for WJE visit

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 2 of 5

Reviewed window sill conditions including additional condition involving lead sheet flashing at the

bottom of cast iron sills

Temporary protection for built-in gutter

Stone color no word on additional lighter shades to better match light colored existing stones Mark

1 will salvage pieces of usable material where possible from other locations in case it is needed

ACTION REQUIRED

Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation

(TreanorHL)

ITEMS TO VERIFY

REMARKS

Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been

effective overall but the drying times are quite variable Some areas that have not seen water in

over a week are still visibly damp

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 3 of 5

A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in

right photo ndash end of tape is against the window frame in both photos

A208 ndash Residual dampness on A208 from cleaning

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 4 of 5

A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital

A207 ndash Lead T-cap installation for mock up review

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 5 of 5

A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining

material is brittle in some locations Additional detail will be issued for condition as part of forthcoming

ASI Believe this is window 459 ndash type G

A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016

TIME 800a to 12 noon DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE Mid 30s to Lo 50s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Raking on A206 (Alpha)

Substrate and backing conditions at RP repair NW-0A06

Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were

found on the west end of the frieze stone The tie-wire was easily removed from the back up

construction No rivet was found the pocket (which had been cut through) appears to have been

slugged full with mortar as construction progressed

Tarps being hung on A206 (Alpha)

ITEMS DISCUSSED

Protection for weather and monitoring conditions within the enclosure

Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to

moderate efflorescence were noted The most prominent is at the location of the redressing on NE-

0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent

dampness during cleaning operations The scaling that was the impetus for the redressing is located

at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 2 of 5

area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material

the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to

indicate the sealer is present even at this depth Potential sources of salts identified backing

construction penetrating sealer applied to building Area was discussed with WJE personnel

Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the

bottom of the corbel molding Both locations are unique to this elevation

ACTION REQUIRED

Tarp installation on all facades placement and distribution of heating devices including monitoring

devices for temperature (Mark1 and JE Dunn)

Direction for spot cleaning on A208 (Charlie)

ITEMS TO VERIFY

Method for monitoring conditions inside the tarped area (JE Dunn)

REMARKS

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 3 of 5

A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter

round differs from those specified in 1914 but specifications do not mention attachment at concrete

This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over

and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed

A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above

is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 4 of 5

A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been

slugged full with mortar prior to setting course above tie wire pulled freely from backing construction

Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction

aides to plumb up the tall stones during setting

A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No

signs of distress observed but area was dusty and full of debris from demolition

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 5 of 5

A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze

stones

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

JED

JEDBak

er

Mar

k 1

ProjectOklahoma StateCapitolRehabilitation

Date12072016

DrawingSite UtilizationPlan

Legend -JED Trailer Compound

-Phase 1 Site Fencing

-Gravel laydown

-Fence gate

-Future phases site fencing

-Future phases gravel laydown

EnvAct

Review

JED

Mark 1

JED

Faith

Dumpster

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Window Abatement Tracking Plan

DECEMBER 2016

Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 14 - 2016_12-06docx

Page 8 of 8

Fencing in place at South Plaza

Fencing in place at southeast quadrant of site

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 1 of 6

FIELD OBSERVATION REPORT REPORT NO 15 DATE 12132016

TIME 1030 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 35deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Tony Talerico Project Engineer - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold erection progressing on north elevation of east wing (Delta)

2 Window abatement progressing on east elevation of north wing (Charlie)

3 Scaffold tarp installation progressing on west elevation of north wing (Alpha)

4 Heater placed for scaffold on west elevation of north wing (Alpha)

5 Joint raking progressing on north elevation of north wing (Bravo)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 2 of 6

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott

(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)

Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve

Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 3 of 6

Scaffold installation progressing on north elevation of east wing (Delta)

Scaffold installation progressing on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 4 of 6

Window abatement progressing on north elevation of north wing (Bravo)

Scaffold tarp installation progressing on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 5 of 6

Scaffold tarp installation at parapet on west elevation of north wing (Alpha)

Scaffold tarp installation in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 6 of 6

Heater at scaffold at west elevation of north wing (Alpha)

Joint raking progressing on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 16 DATE 12212016

TIME 330 AM DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE 55deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Tony Talerico Project Engineer - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold erection progressing on north elevation of east wing (Delta)

2 Scaffold tarp installation progressing on east elevation of north wing (Charlie)

3 Cleaning progressing on west elevation of north wing (Alpha)

4 Joint raking progressing on north elevation of north wing (Bravo)

5 Parapet cap removal progressing on west elevation of north wing (Alpha)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 2 of 5

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott

(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)

Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve

Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 3 of 5

Scaffold installation progressing on north elevation of east wing (Delta)

Scaffold installation progressing on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 4 of 5

Scaffold tarp installation progressing on east elevation of north wing (Charlie)

Parapet cap removal progressing on west elevation of north wing (Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 5 of 5

Parapet cap removal progressing on west elevation of north wing (Alpha)

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Oklahoma State Capitol Stone ChimeraThe following report explains the history behind the stone Chimerarsquos (ldquogriffinsrdquo) that have sat atop the Oklahoma State Capitol for the last 100 years

Chimeras (Griffins) of the Oklahoma State Capitol

Report provided by TreanorHL

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Griffin A bird head and foreshybody and cat rear always with a beak

Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City

Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company

Mythological Cat Creature Examples

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (left side) summer of 1916 shy no chimeras present

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (right side) November 2 1916 shy chimeras set

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti

South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016

TIME 900a to 530p DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE Lo 40s to 60

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

Trait Thompson - OMES

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking on A206 (Alpha)

Demolition for RP2 repair NW-0A06

ITEMS DISCUSSED

With WJE reviewed masonry cleaning processes changes to biological cleaning that have been

necessary to achieve the same results as trial repairs raking and repointing mockups for limestone

and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an

injection repairs patching repairs to limestone and granite See meeting notes from 11302016

follow up meeting to discuss WJE observations regarding the work

With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work

that necessary to make the area complete

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 2 of 4

ACTION REQUIRED

Revisions to repairs on A206 due to discovered conditions (TreanorHL)

bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone

bull at NW-0501 due to condition uncovered by joint raking

ITEMS TO VERIFY

REMARKS

OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes

Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to

tour the scaffold Reviewed window and masonry related work

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A206 ndash Site tour with OMES and WJE

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 3 of 4

A209 (left) and A208 (right) ndash Scaffold construction continues

A206 ndash NW-0A06 demolition in progress

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 4 of 4

A206 ndash Stone salvaged from NW-0A06

A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016

TIME 1000a to 530p DAY OF WEEK Monday

OWNER OMES TEMP RANGE Mid 50s to Lo 60s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Lukasz Lesniak Field Superintendent ndash Mark 1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking and repointing on A206 (Alpha)

Roofing materials being hoisted to the north wing roof

ITEMS DISCUSSED

Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps

there is some cold soak left to perform and sealant removal at window perimeter Temperature

restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this

week to create heated enclosure Discussed the need to monitor temperature and record it not only

on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and

other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is

approximately 50 complete

Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece

(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)

Met with JE Dunn to organize field walk for WJE visit

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 2 of 5

Reviewed window sill conditions including additional condition involving lead sheet flashing at the

bottom of cast iron sills

Temporary protection for built-in gutter

Stone color no word on additional lighter shades to better match light colored existing stones Mark

1 will salvage pieces of usable material where possible from other locations in case it is needed

ACTION REQUIRED

Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation

(TreanorHL)

ITEMS TO VERIFY

REMARKS

Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been

effective overall but the drying times are quite variable Some areas that have not seen water in

over a week are still visibly damp

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 3 of 5

A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in

right photo ndash end of tape is against the window frame in both photos

A208 ndash Residual dampness on A208 from cleaning

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 4 of 5

A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital

A207 ndash Lead T-cap installation for mock up review

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 5 of 5

A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining

material is brittle in some locations Additional detail will be issued for condition as part of forthcoming

ASI Believe this is window 459 ndash type G

A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016

TIME 800a to 12 noon DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE Mid 30s to Lo 50s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Raking on A206 (Alpha)

Substrate and backing conditions at RP repair NW-0A06

Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were

found on the west end of the frieze stone The tie-wire was easily removed from the back up

construction No rivet was found the pocket (which had been cut through) appears to have been

slugged full with mortar as construction progressed

Tarps being hung on A206 (Alpha)

ITEMS DISCUSSED

Protection for weather and monitoring conditions within the enclosure

Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to

moderate efflorescence were noted The most prominent is at the location of the redressing on NE-

0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent

dampness during cleaning operations The scaling that was the impetus for the redressing is located

at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 2 of 5

area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material

the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to

indicate the sealer is present even at this depth Potential sources of salts identified backing

construction penetrating sealer applied to building Area was discussed with WJE personnel

Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the

bottom of the corbel molding Both locations are unique to this elevation

ACTION REQUIRED

Tarp installation on all facades placement and distribution of heating devices including monitoring

devices for temperature (Mark1 and JE Dunn)

Direction for spot cleaning on A208 (Charlie)

ITEMS TO VERIFY

Method for monitoring conditions inside the tarped area (JE Dunn)

REMARKS

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 3 of 5

A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter

round differs from those specified in 1914 but specifications do not mention attachment at concrete

This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over

and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed

A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above

is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 4 of 5

A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been

slugged full with mortar prior to setting course above tie wire pulled freely from backing construction

Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction

aides to plumb up the tall stones during setting

A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No

signs of distress observed but area was dusty and full of debris from demolition

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 5 of 5

A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze

stones

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

JED

JEDBak

er

Mar

k 1

ProjectOklahoma StateCapitolRehabilitation

Date12072016

DrawingSite UtilizationPlan

Legend -JED Trailer Compound

-Phase 1 Site Fencing

-Gravel laydown

-Fence gate

-Future phases site fencing

-Future phases gravel laydown

EnvAct

Review

JED

Mark 1

JED

Faith

Dumpster

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Window Abatement Tracking Plan

DECEMBER 2016

Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 1 of 6

FIELD OBSERVATION REPORT REPORT NO 15 DATE 12132016

TIME 1030 AM DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE 35deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Tony Talerico Project Engineer - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold erection progressing on north elevation of east wing (Delta)

2 Window abatement progressing on east elevation of north wing (Charlie)

3 Scaffold tarp installation progressing on west elevation of north wing (Alpha)

4 Heater placed for scaffold on west elevation of north wing (Alpha)

5 Joint raking progressing on north elevation of north wing (Bravo)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 2 of 6

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott

(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)

Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve

Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 3 of 6

Scaffold installation progressing on north elevation of east wing (Delta)

Scaffold installation progressing on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 4 of 6

Window abatement progressing on north elevation of north wing (Bravo)

Scaffold tarp installation progressing on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 5 of 6

Scaffold tarp installation at parapet on west elevation of north wing (Alpha)

Scaffold tarp installation in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 6 of 6

Heater at scaffold at west elevation of north wing (Alpha)

Joint raking progressing on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 16 DATE 12212016

TIME 330 AM DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE 55deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Tony Talerico Project Engineer - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold erection progressing on north elevation of east wing (Delta)

2 Scaffold tarp installation progressing on east elevation of north wing (Charlie)

3 Cleaning progressing on west elevation of north wing (Alpha)

4 Joint raking progressing on north elevation of north wing (Bravo)

5 Parapet cap removal progressing on west elevation of north wing (Alpha)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 2 of 5

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott

(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)

Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve

Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 3 of 5

Scaffold installation progressing on north elevation of east wing (Delta)

Scaffold installation progressing on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 4 of 5

Scaffold tarp installation progressing on east elevation of north wing (Charlie)

Parapet cap removal progressing on west elevation of north wing (Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 5 of 5

Parapet cap removal progressing on west elevation of north wing (Alpha)

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Oklahoma State Capitol Stone ChimeraThe following report explains the history behind the stone Chimerarsquos (ldquogriffinsrdquo) that have sat atop the Oklahoma State Capitol for the last 100 years

Chimeras (Griffins) of the Oklahoma State Capitol

Report provided by TreanorHL

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Griffin A bird head and foreshybody and cat rear always with a beak

Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City

Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company

Mythological Cat Creature Examples

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (left side) summer of 1916 shy no chimeras present

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (right side) November 2 1916 shy chimeras set

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti

South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016

TIME 900a to 530p DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE Lo 40s to 60

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

Trait Thompson - OMES

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking on A206 (Alpha)

Demolition for RP2 repair NW-0A06

ITEMS DISCUSSED

With WJE reviewed masonry cleaning processes changes to biological cleaning that have been

necessary to achieve the same results as trial repairs raking and repointing mockups for limestone

and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an

injection repairs patching repairs to limestone and granite See meeting notes from 11302016

follow up meeting to discuss WJE observations regarding the work

With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work

that necessary to make the area complete

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 2 of 4

ACTION REQUIRED

Revisions to repairs on A206 due to discovered conditions (TreanorHL)

bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone

bull at NW-0501 due to condition uncovered by joint raking

ITEMS TO VERIFY

REMARKS

OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes

Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to

tour the scaffold Reviewed window and masonry related work

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A206 ndash Site tour with OMES and WJE

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 3 of 4

A209 (left) and A208 (right) ndash Scaffold construction continues

A206 ndash NW-0A06 demolition in progress

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 4 of 4

A206 ndash Stone salvaged from NW-0A06

A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016

TIME 1000a to 530p DAY OF WEEK Monday

OWNER OMES TEMP RANGE Mid 50s to Lo 60s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Lukasz Lesniak Field Superintendent ndash Mark 1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking and repointing on A206 (Alpha)

Roofing materials being hoisted to the north wing roof

ITEMS DISCUSSED

Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps

there is some cold soak left to perform and sealant removal at window perimeter Temperature

restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this

week to create heated enclosure Discussed the need to monitor temperature and record it not only

on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and

other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is

approximately 50 complete

Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece

(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)

Met with JE Dunn to organize field walk for WJE visit

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 2 of 5

Reviewed window sill conditions including additional condition involving lead sheet flashing at the

bottom of cast iron sills

Temporary protection for built-in gutter

Stone color no word on additional lighter shades to better match light colored existing stones Mark

1 will salvage pieces of usable material where possible from other locations in case it is needed

ACTION REQUIRED

Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation

(TreanorHL)

ITEMS TO VERIFY

REMARKS

Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been

effective overall but the drying times are quite variable Some areas that have not seen water in

over a week are still visibly damp

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 3 of 5

A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in

right photo ndash end of tape is against the window frame in both photos

A208 ndash Residual dampness on A208 from cleaning

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 4 of 5

A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital

A207 ndash Lead T-cap installation for mock up review

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 5 of 5

A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining

material is brittle in some locations Additional detail will be issued for condition as part of forthcoming

ASI Believe this is window 459 ndash type G

A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016

TIME 800a to 12 noon DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE Mid 30s to Lo 50s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Raking on A206 (Alpha)

Substrate and backing conditions at RP repair NW-0A06

Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were

found on the west end of the frieze stone The tie-wire was easily removed from the back up

construction No rivet was found the pocket (which had been cut through) appears to have been

slugged full with mortar as construction progressed

Tarps being hung on A206 (Alpha)

ITEMS DISCUSSED

Protection for weather and monitoring conditions within the enclosure

Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to

moderate efflorescence were noted The most prominent is at the location of the redressing on NE-

0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent

dampness during cleaning operations The scaling that was the impetus for the redressing is located

at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 2 of 5

area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material

the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to

indicate the sealer is present even at this depth Potential sources of salts identified backing

construction penetrating sealer applied to building Area was discussed with WJE personnel

Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the

bottom of the corbel molding Both locations are unique to this elevation

ACTION REQUIRED

Tarp installation on all facades placement and distribution of heating devices including monitoring

devices for temperature (Mark1 and JE Dunn)

Direction for spot cleaning on A208 (Charlie)

ITEMS TO VERIFY

Method for monitoring conditions inside the tarped area (JE Dunn)

REMARKS

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 3 of 5

A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter

round differs from those specified in 1914 but specifications do not mention attachment at concrete

This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over

and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed

A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above

is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 4 of 5

A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been

slugged full with mortar prior to setting course above tie wire pulled freely from backing construction

Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction

aides to plumb up the tall stones during setting

A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No

signs of distress observed but area was dusty and full of debris from demolition

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 5 of 5

A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze

stones

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

JED

JEDBak

er

Mar

k 1

ProjectOklahoma StateCapitolRehabilitation

Date12072016

DrawingSite UtilizationPlan

Legend -JED Trailer Compound

-Phase 1 Site Fencing

-Gravel laydown

-Fence gate

-Future phases site fencing

-Future phases gravel laydown

EnvAct

Review

JED

Mark 1

JED

Faith

Dumpster

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Window Abatement Tracking Plan

DECEMBER 2016

Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 2 of 6

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott

(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)

Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve

Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 3 of 6

Scaffold installation progressing on north elevation of east wing (Delta)

Scaffold installation progressing on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 4 of 6

Window abatement progressing on north elevation of north wing (Bravo)

Scaffold tarp installation progressing on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 5 of 6

Scaffold tarp installation at parapet on west elevation of north wing (Alpha)

Scaffold tarp installation in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 6 of 6

Heater at scaffold at west elevation of north wing (Alpha)

Joint raking progressing on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 16 DATE 12212016

TIME 330 AM DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE 55deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Tony Talerico Project Engineer - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold erection progressing on north elevation of east wing (Delta)

2 Scaffold tarp installation progressing on east elevation of north wing (Charlie)

3 Cleaning progressing on west elevation of north wing (Alpha)

4 Joint raking progressing on north elevation of north wing (Bravo)

5 Parapet cap removal progressing on west elevation of north wing (Alpha)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 2 of 5

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott

(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)

Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve

Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 3 of 5

Scaffold installation progressing on north elevation of east wing (Delta)

Scaffold installation progressing on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 4 of 5

Scaffold tarp installation progressing on east elevation of north wing (Charlie)

Parapet cap removal progressing on west elevation of north wing (Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 5 of 5

Parapet cap removal progressing on west elevation of north wing (Alpha)

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Oklahoma State Capitol Stone ChimeraThe following report explains the history behind the stone Chimerarsquos (ldquogriffinsrdquo) that have sat atop the Oklahoma State Capitol for the last 100 years

Chimeras (Griffins) of the Oklahoma State Capitol

Report provided by TreanorHL

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Griffin A bird head and foreshybody and cat rear always with a beak

Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City

Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company

Mythological Cat Creature Examples

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (left side) summer of 1916 shy no chimeras present

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (right side) November 2 1916 shy chimeras set

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti

South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016

TIME 900a to 530p DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE Lo 40s to 60

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

Trait Thompson - OMES

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking on A206 (Alpha)

Demolition for RP2 repair NW-0A06

ITEMS DISCUSSED

With WJE reviewed masonry cleaning processes changes to biological cleaning that have been

necessary to achieve the same results as trial repairs raking and repointing mockups for limestone

and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an

injection repairs patching repairs to limestone and granite See meeting notes from 11302016

follow up meeting to discuss WJE observations regarding the work

With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work

that necessary to make the area complete

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 2 of 4

ACTION REQUIRED

Revisions to repairs on A206 due to discovered conditions (TreanorHL)

bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone

bull at NW-0501 due to condition uncovered by joint raking

ITEMS TO VERIFY

REMARKS

OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes

Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to

tour the scaffold Reviewed window and masonry related work

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A206 ndash Site tour with OMES and WJE

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 3 of 4

A209 (left) and A208 (right) ndash Scaffold construction continues

A206 ndash NW-0A06 demolition in progress

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 4 of 4

A206 ndash Stone salvaged from NW-0A06

A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016

TIME 1000a to 530p DAY OF WEEK Monday

OWNER OMES TEMP RANGE Mid 50s to Lo 60s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Lukasz Lesniak Field Superintendent ndash Mark 1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking and repointing on A206 (Alpha)

Roofing materials being hoisted to the north wing roof

ITEMS DISCUSSED

Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps

there is some cold soak left to perform and sealant removal at window perimeter Temperature

restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this

week to create heated enclosure Discussed the need to monitor temperature and record it not only

on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and

other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is

approximately 50 complete

Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece

(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)

Met with JE Dunn to organize field walk for WJE visit

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 2 of 5

Reviewed window sill conditions including additional condition involving lead sheet flashing at the

bottom of cast iron sills

Temporary protection for built-in gutter

Stone color no word on additional lighter shades to better match light colored existing stones Mark

1 will salvage pieces of usable material where possible from other locations in case it is needed

ACTION REQUIRED

Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation

(TreanorHL)

ITEMS TO VERIFY

REMARKS

Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been

effective overall but the drying times are quite variable Some areas that have not seen water in

over a week are still visibly damp

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 3 of 5

A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in

right photo ndash end of tape is against the window frame in both photos

A208 ndash Residual dampness on A208 from cleaning

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 4 of 5

A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital

A207 ndash Lead T-cap installation for mock up review

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 5 of 5

A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining

material is brittle in some locations Additional detail will be issued for condition as part of forthcoming

ASI Believe this is window 459 ndash type G

A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016

TIME 800a to 12 noon DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE Mid 30s to Lo 50s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Raking on A206 (Alpha)

Substrate and backing conditions at RP repair NW-0A06

Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were

found on the west end of the frieze stone The tie-wire was easily removed from the back up

construction No rivet was found the pocket (which had been cut through) appears to have been

slugged full with mortar as construction progressed

Tarps being hung on A206 (Alpha)

ITEMS DISCUSSED

Protection for weather and monitoring conditions within the enclosure

Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to

moderate efflorescence were noted The most prominent is at the location of the redressing on NE-

0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent

dampness during cleaning operations The scaling that was the impetus for the redressing is located

at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 2 of 5

area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material

the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to

indicate the sealer is present even at this depth Potential sources of salts identified backing

construction penetrating sealer applied to building Area was discussed with WJE personnel

Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the

bottom of the corbel molding Both locations are unique to this elevation

ACTION REQUIRED

Tarp installation on all facades placement and distribution of heating devices including monitoring

devices for temperature (Mark1 and JE Dunn)

Direction for spot cleaning on A208 (Charlie)

ITEMS TO VERIFY

Method for monitoring conditions inside the tarped area (JE Dunn)

REMARKS

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 3 of 5

A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter

round differs from those specified in 1914 but specifications do not mention attachment at concrete

This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over

and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed

A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above

is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 4 of 5

A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been

slugged full with mortar prior to setting course above tie wire pulled freely from backing construction

Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction

aides to plumb up the tall stones during setting

A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No

signs of distress observed but area was dusty and full of debris from demolition

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 5 of 5

A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze

stones

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

JED

JEDBak

er

Mar

k 1

ProjectOklahoma StateCapitolRehabilitation

Date12072016

DrawingSite UtilizationPlan

Legend -JED Trailer Compound

-Phase 1 Site Fencing

-Gravel laydown

-Fence gate

-Future phases site fencing

-Future phases gravel laydown

EnvAct

Review

JED

Mark 1

JED

Faith

Dumpster

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Window Abatement Tracking Plan

DECEMBER 2016

Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 3 of 6

Scaffold installation progressing on north elevation of east wing (Delta)

Scaffold installation progressing on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 4 of 6

Window abatement progressing on north elevation of north wing (Bravo)

Scaffold tarp installation progressing on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 5 of 6

Scaffold tarp installation at parapet on west elevation of north wing (Alpha)

Scaffold tarp installation in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 6 of 6

Heater at scaffold at west elevation of north wing (Alpha)

Joint raking progressing on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 16 DATE 12212016

TIME 330 AM DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE 55deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Tony Talerico Project Engineer - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold erection progressing on north elevation of east wing (Delta)

2 Scaffold tarp installation progressing on east elevation of north wing (Charlie)

3 Cleaning progressing on west elevation of north wing (Alpha)

4 Joint raking progressing on north elevation of north wing (Bravo)

5 Parapet cap removal progressing on west elevation of north wing (Alpha)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 2 of 5

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott

(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)

Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve

Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 3 of 5

Scaffold installation progressing on north elevation of east wing (Delta)

Scaffold installation progressing on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 4 of 5

Scaffold tarp installation progressing on east elevation of north wing (Charlie)

Parapet cap removal progressing on west elevation of north wing (Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 5 of 5

Parapet cap removal progressing on west elevation of north wing (Alpha)

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Oklahoma State Capitol Stone ChimeraThe following report explains the history behind the stone Chimerarsquos (ldquogriffinsrdquo) that have sat atop the Oklahoma State Capitol for the last 100 years

Chimeras (Griffins) of the Oklahoma State Capitol

Report provided by TreanorHL

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Griffin A bird head and foreshybody and cat rear always with a beak

Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City

Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company

Mythological Cat Creature Examples

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (left side) summer of 1916 shy no chimeras present

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (right side) November 2 1916 shy chimeras set

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti

South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016

TIME 900a to 530p DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE Lo 40s to 60

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

Trait Thompson - OMES

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking on A206 (Alpha)

Demolition for RP2 repair NW-0A06

ITEMS DISCUSSED

With WJE reviewed masonry cleaning processes changes to biological cleaning that have been

necessary to achieve the same results as trial repairs raking and repointing mockups for limestone

and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an

injection repairs patching repairs to limestone and granite See meeting notes from 11302016

follow up meeting to discuss WJE observations regarding the work

With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work

that necessary to make the area complete

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 2 of 4

ACTION REQUIRED

Revisions to repairs on A206 due to discovered conditions (TreanorHL)

bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone

bull at NW-0501 due to condition uncovered by joint raking

ITEMS TO VERIFY

REMARKS

OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes

Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to

tour the scaffold Reviewed window and masonry related work

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A206 ndash Site tour with OMES and WJE

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 3 of 4

A209 (left) and A208 (right) ndash Scaffold construction continues

A206 ndash NW-0A06 demolition in progress

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 4 of 4

A206 ndash Stone salvaged from NW-0A06

A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016

TIME 1000a to 530p DAY OF WEEK Monday

OWNER OMES TEMP RANGE Mid 50s to Lo 60s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Lukasz Lesniak Field Superintendent ndash Mark 1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking and repointing on A206 (Alpha)

Roofing materials being hoisted to the north wing roof

ITEMS DISCUSSED

Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps

there is some cold soak left to perform and sealant removal at window perimeter Temperature

restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this

week to create heated enclosure Discussed the need to monitor temperature and record it not only

on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and

other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is

approximately 50 complete

Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece

(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)

Met with JE Dunn to organize field walk for WJE visit

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 2 of 5

Reviewed window sill conditions including additional condition involving lead sheet flashing at the

bottom of cast iron sills

Temporary protection for built-in gutter

Stone color no word on additional lighter shades to better match light colored existing stones Mark

1 will salvage pieces of usable material where possible from other locations in case it is needed

ACTION REQUIRED

Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation

(TreanorHL)

ITEMS TO VERIFY

REMARKS

Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been

effective overall but the drying times are quite variable Some areas that have not seen water in

over a week are still visibly damp

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 3 of 5

A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in

right photo ndash end of tape is against the window frame in both photos

A208 ndash Residual dampness on A208 from cleaning

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 4 of 5

A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital

A207 ndash Lead T-cap installation for mock up review

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 5 of 5

A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining

material is brittle in some locations Additional detail will be issued for condition as part of forthcoming

ASI Believe this is window 459 ndash type G

A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016

TIME 800a to 12 noon DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE Mid 30s to Lo 50s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Raking on A206 (Alpha)

Substrate and backing conditions at RP repair NW-0A06

Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were

found on the west end of the frieze stone The tie-wire was easily removed from the back up

construction No rivet was found the pocket (which had been cut through) appears to have been

slugged full with mortar as construction progressed

Tarps being hung on A206 (Alpha)

ITEMS DISCUSSED

Protection for weather and monitoring conditions within the enclosure

Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to

moderate efflorescence were noted The most prominent is at the location of the redressing on NE-

0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent

dampness during cleaning operations The scaling that was the impetus for the redressing is located

at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 2 of 5

area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material

the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to

indicate the sealer is present even at this depth Potential sources of salts identified backing

construction penetrating sealer applied to building Area was discussed with WJE personnel

Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the

bottom of the corbel molding Both locations are unique to this elevation

ACTION REQUIRED

Tarp installation on all facades placement and distribution of heating devices including monitoring

devices for temperature (Mark1 and JE Dunn)

Direction for spot cleaning on A208 (Charlie)

ITEMS TO VERIFY

Method for monitoring conditions inside the tarped area (JE Dunn)

REMARKS

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 3 of 5

A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter

round differs from those specified in 1914 but specifications do not mention attachment at concrete

This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over

and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed

A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above

is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 4 of 5

A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been

slugged full with mortar prior to setting course above tie wire pulled freely from backing construction

Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction

aides to plumb up the tall stones during setting

A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No

signs of distress observed but area was dusty and full of debris from demolition

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 5 of 5

A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze

stones

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

JED

JEDBak

er

Mar

k 1

ProjectOklahoma StateCapitolRehabilitation

Date12072016

DrawingSite UtilizationPlan

Legend -JED Trailer Compound

-Phase 1 Site Fencing

-Gravel laydown

-Fence gate

-Future phases site fencing

-Future phases gravel laydown

EnvAct

Review

JED

Mark 1

JED

Faith

Dumpster

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Window Abatement Tracking Plan

DECEMBER 2016

Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 4 of 6

Window abatement progressing on north elevation of north wing (Bravo)

Scaffold tarp installation progressing on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 5 of 6

Scaffold tarp installation at parapet on west elevation of north wing (Alpha)

Scaffold tarp installation in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 6 of 6

Heater at scaffold at west elevation of north wing (Alpha)

Joint raking progressing on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 16 DATE 12212016

TIME 330 AM DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE 55deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Tony Talerico Project Engineer - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold erection progressing on north elevation of east wing (Delta)

2 Scaffold tarp installation progressing on east elevation of north wing (Charlie)

3 Cleaning progressing on west elevation of north wing (Alpha)

4 Joint raking progressing on north elevation of north wing (Bravo)

5 Parapet cap removal progressing on west elevation of north wing (Alpha)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 2 of 5

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott

(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)

Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve

Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 3 of 5

Scaffold installation progressing on north elevation of east wing (Delta)

Scaffold installation progressing on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 4 of 5

Scaffold tarp installation progressing on east elevation of north wing (Charlie)

Parapet cap removal progressing on west elevation of north wing (Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 5 of 5

Parapet cap removal progressing on west elevation of north wing (Alpha)

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Oklahoma State Capitol Stone ChimeraThe following report explains the history behind the stone Chimerarsquos (ldquogriffinsrdquo) that have sat atop the Oklahoma State Capitol for the last 100 years

Chimeras (Griffins) of the Oklahoma State Capitol

Report provided by TreanorHL

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Griffin A bird head and foreshybody and cat rear always with a beak

Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City

Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company

Mythological Cat Creature Examples

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (left side) summer of 1916 shy no chimeras present

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (right side) November 2 1916 shy chimeras set

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti

South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016

TIME 900a to 530p DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE Lo 40s to 60

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

Trait Thompson - OMES

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking on A206 (Alpha)

Demolition for RP2 repair NW-0A06

ITEMS DISCUSSED

With WJE reviewed masonry cleaning processes changes to biological cleaning that have been

necessary to achieve the same results as trial repairs raking and repointing mockups for limestone

and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an

injection repairs patching repairs to limestone and granite See meeting notes from 11302016

follow up meeting to discuss WJE observations regarding the work

With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work

that necessary to make the area complete

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 2 of 4

ACTION REQUIRED

Revisions to repairs on A206 due to discovered conditions (TreanorHL)

bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone

bull at NW-0501 due to condition uncovered by joint raking

ITEMS TO VERIFY

REMARKS

OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes

Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to

tour the scaffold Reviewed window and masonry related work

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A206 ndash Site tour with OMES and WJE

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 3 of 4

A209 (left) and A208 (right) ndash Scaffold construction continues

A206 ndash NW-0A06 demolition in progress

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 4 of 4

A206 ndash Stone salvaged from NW-0A06

A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016

TIME 1000a to 530p DAY OF WEEK Monday

OWNER OMES TEMP RANGE Mid 50s to Lo 60s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Lukasz Lesniak Field Superintendent ndash Mark 1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking and repointing on A206 (Alpha)

Roofing materials being hoisted to the north wing roof

ITEMS DISCUSSED

Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps

there is some cold soak left to perform and sealant removal at window perimeter Temperature

restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this

week to create heated enclosure Discussed the need to monitor temperature and record it not only

on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and

other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is

approximately 50 complete

Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece

(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)

Met with JE Dunn to organize field walk for WJE visit

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 2 of 5

Reviewed window sill conditions including additional condition involving lead sheet flashing at the

bottom of cast iron sills

Temporary protection for built-in gutter

Stone color no word on additional lighter shades to better match light colored existing stones Mark

1 will salvage pieces of usable material where possible from other locations in case it is needed

ACTION REQUIRED

Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation

(TreanorHL)

ITEMS TO VERIFY

REMARKS

Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been

effective overall but the drying times are quite variable Some areas that have not seen water in

over a week are still visibly damp

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 3 of 5

A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in

right photo ndash end of tape is against the window frame in both photos

A208 ndash Residual dampness on A208 from cleaning

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 4 of 5

A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital

A207 ndash Lead T-cap installation for mock up review

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 5 of 5

A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining

material is brittle in some locations Additional detail will be issued for condition as part of forthcoming

ASI Believe this is window 459 ndash type G

A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016

TIME 800a to 12 noon DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE Mid 30s to Lo 50s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Raking on A206 (Alpha)

Substrate and backing conditions at RP repair NW-0A06

Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were

found on the west end of the frieze stone The tie-wire was easily removed from the back up

construction No rivet was found the pocket (which had been cut through) appears to have been

slugged full with mortar as construction progressed

Tarps being hung on A206 (Alpha)

ITEMS DISCUSSED

Protection for weather and monitoring conditions within the enclosure

Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to

moderate efflorescence were noted The most prominent is at the location of the redressing on NE-

0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent

dampness during cleaning operations The scaling that was the impetus for the redressing is located

at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 2 of 5

area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material

the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to

indicate the sealer is present even at this depth Potential sources of salts identified backing

construction penetrating sealer applied to building Area was discussed with WJE personnel

Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the

bottom of the corbel molding Both locations are unique to this elevation

ACTION REQUIRED

Tarp installation on all facades placement and distribution of heating devices including monitoring

devices for temperature (Mark1 and JE Dunn)

Direction for spot cleaning on A208 (Charlie)

ITEMS TO VERIFY

Method for monitoring conditions inside the tarped area (JE Dunn)

REMARKS

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 3 of 5

A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter

round differs from those specified in 1914 but specifications do not mention attachment at concrete

This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over

and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed

A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above

is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 4 of 5

A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been

slugged full with mortar prior to setting course above tie wire pulled freely from backing construction

Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction

aides to plumb up the tall stones during setting

A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No

signs of distress observed but area was dusty and full of debris from demolition

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 5 of 5

A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze

stones

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

JED

JEDBak

er

Mar

k 1

ProjectOklahoma StateCapitolRehabilitation

Date12072016

DrawingSite UtilizationPlan

Legend -JED Trailer Compound

-Phase 1 Site Fencing

-Gravel laydown

-Fence gate

-Future phases site fencing

-Future phases gravel laydown

EnvAct

Review

JED

Mark 1

JED

Faith

Dumpster

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Window Abatement Tracking Plan

DECEMBER 2016

Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 5 of 6

Scaffold tarp installation at parapet on west elevation of north wing (Alpha)

Scaffold tarp installation in progress on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 6 of 6

Heater at scaffold at west elevation of north wing (Alpha)

Joint raking progressing on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 16 DATE 12212016

TIME 330 AM DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE 55deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Tony Talerico Project Engineer - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold erection progressing on north elevation of east wing (Delta)

2 Scaffold tarp installation progressing on east elevation of north wing (Charlie)

3 Cleaning progressing on west elevation of north wing (Alpha)

4 Joint raking progressing on north elevation of north wing (Bravo)

5 Parapet cap removal progressing on west elevation of north wing (Alpha)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 2 of 5

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott

(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)

Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve

Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 3 of 5

Scaffold installation progressing on north elevation of east wing (Delta)

Scaffold installation progressing on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 4 of 5

Scaffold tarp installation progressing on east elevation of north wing (Charlie)

Parapet cap removal progressing on west elevation of north wing (Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 5 of 5

Parapet cap removal progressing on west elevation of north wing (Alpha)

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Oklahoma State Capitol Stone ChimeraThe following report explains the history behind the stone Chimerarsquos (ldquogriffinsrdquo) that have sat atop the Oklahoma State Capitol for the last 100 years

Chimeras (Griffins) of the Oklahoma State Capitol

Report provided by TreanorHL

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Griffin A bird head and foreshybody and cat rear always with a beak

Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City

Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company

Mythological Cat Creature Examples

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (left side) summer of 1916 shy no chimeras present

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (right side) November 2 1916 shy chimeras set

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti

South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016

TIME 900a to 530p DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE Lo 40s to 60

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

Trait Thompson - OMES

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking on A206 (Alpha)

Demolition for RP2 repair NW-0A06

ITEMS DISCUSSED

With WJE reviewed masonry cleaning processes changes to biological cleaning that have been

necessary to achieve the same results as trial repairs raking and repointing mockups for limestone

and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an

injection repairs patching repairs to limestone and granite See meeting notes from 11302016

follow up meeting to discuss WJE observations regarding the work

With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work

that necessary to make the area complete

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 2 of 4

ACTION REQUIRED

Revisions to repairs on A206 due to discovered conditions (TreanorHL)

bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone

bull at NW-0501 due to condition uncovered by joint raking

ITEMS TO VERIFY

REMARKS

OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes

Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to

tour the scaffold Reviewed window and masonry related work

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A206 ndash Site tour with OMES and WJE

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 3 of 4

A209 (left) and A208 (right) ndash Scaffold construction continues

A206 ndash NW-0A06 demolition in progress

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 4 of 4

A206 ndash Stone salvaged from NW-0A06

A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016

TIME 1000a to 530p DAY OF WEEK Monday

OWNER OMES TEMP RANGE Mid 50s to Lo 60s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Lukasz Lesniak Field Superintendent ndash Mark 1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking and repointing on A206 (Alpha)

Roofing materials being hoisted to the north wing roof

ITEMS DISCUSSED

Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps

there is some cold soak left to perform and sealant removal at window perimeter Temperature

restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this

week to create heated enclosure Discussed the need to monitor temperature and record it not only

on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and

other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is

approximately 50 complete

Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece

(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)

Met with JE Dunn to organize field walk for WJE visit

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 2 of 5

Reviewed window sill conditions including additional condition involving lead sheet flashing at the

bottom of cast iron sills

Temporary protection for built-in gutter

Stone color no word on additional lighter shades to better match light colored existing stones Mark

1 will salvage pieces of usable material where possible from other locations in case it is needed

ACTION REQUIRED

Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation

(TreanorHL)

ITEMS TO VERIFY

REMARKS

Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been

effective overall but the drying times are quite variable Some areas that have not seen water in

over a week are still visibly damp

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 3 of 5

A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in

right photo ndash end of tape is against the window frame in both photos

A208 ndash Residual dampness on A208 from cleaning

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 4 of 5

A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital

A207 ndash Lead T-cap installation for mock up review

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 5 of 5

A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining

material is brittle in some locations Additional detail will be issued for condition as part of forthcoming

ASI Believe this is window 459 ndash type G

A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016

TIME 800a to 12 noon DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE Mid 30s to Lo 50s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Raking on A206 (Alpha)

Substrate and backing conditions at RP repair NW-0A06

Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were

found on the west end of the frieze stone The tie-wire was easily removed from the back up

construction No rivet was found the pocket (which had been cut through) appears to have been

slugged full with mortar as construction progressed

Tarps being hung on A206 (Alpha)

ITEMS DISCUSSED

Protection for weather and monitoring conditions within the enclosure

Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to

moderate efflorescence were noted The most prominent is at the location of the redressing on NE-

0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent

dampness during cleaning operations The scaling that was the impetus for the redressing is located

at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 2 of 5

area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material

the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to

indicate the sealer is present even at this depth Potential sources of salts identified backing

construction penetrating sealer applied to building Area was discussed with WJE personnel

Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the

bottom of the corbel molding Both locations are unique to this elevation

ACTION REQUIRED

Tarp installation on all facades placement and distribution of heating devices including monitoring

devices for temperature (Mark1 and JE Dunn)

Direction for spot cleaning on A208 (Charlie)

ITEMS TO VERIFY

Method for monitoring conditions inside the tarped area (JE Dunn)

REMARKS

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 3 of 5

A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter

round differs from those specified in 1914 but specifications do not mention attachment at concrete

This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over

and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed

A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above

is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 4 of 5

A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been

slugged full with mortar prior to setting course above tie wire pulled freely from backing construction

Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction

aides to plumb up the tall stones during setting

A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No

signs of distress observed but area was dusty and full of debris from demolition

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 5 of 5

A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze

stones

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

JED

JEDBak

er

Mar

k 1

ProjectOklahoma StateCapitolRehabilitation

Date12072016

DrawingSite UtilizationPlan

Legend -JED Trailer Compound

-Phase 1 Site Fencing

-Gravel laydown

-Fence gate

-Future phases site fencing

-Future phases gravel laydown

EnvAct

Review

JED

Mark 1

JED

Faith

Dumpster

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Window Abatement Tracking Plan

DECEMBER 2016

Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 15 - 2016_12-13docx

Page 6 of 6

Heater at scaffold at west elevation of north wing (Alpha)

Joint raking progressing on north elevation of north wing (Bravo)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 16 DATE 12212016

TIME 330 AM DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE 55deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Tony Talerico Project Engineer - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold erection progressing on north elevation of east wing (Delta)

2 Scaffold tarp installation progressing on east elevation of north wing (Charlie)

3 Cleaning progressing on west elevation of north wing (Alpha)

4 Joint raking progressing on north elevation of north wing (Bravo)

5 Parapet cap removal progressing on west elevation of north wing (Alpha)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 2 of 5

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott

(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)

Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve

Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 3 of 5

Scaffold installation progressing on north elevation of east wing (Delta)

Scaffold installation progressing on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 4 of 5

Scaffold tarp installation progressing on east elevation of north wing (Charlie)

Parapet cap removal progressing on west elevation of north wing (Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 5 of 5

Parapet cap removal progressing on west elevation of north wing (Alpha)

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Oklahoma State Capitol Stone ChimeraThe following report explains the history behind the stone Chimerarsquos (ldquogriffinsrdquo) that have sat atop the Oklahoma State Capitol for the last 100 years

Chimeras (Griffins) of the Oklahoma State Capitol

Report provided by TreanorHL

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Griffin A bird head and foreshybody and cat rear always with a beak

Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City

Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company

Mythological Cat Creature Examples

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (left side) summer of 1916 shy no chimeras present

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (right side) November 2 1916 shy chimeras set

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti

South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016

TIME 900a to 530p DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE Lo 40s to 60

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

Trait Thompson - OMES

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking on A206 (Alpha)

Demolition for RP2 repair NW-0A06

ITEMS DISCUSSED

With WJE reviewed masonry cleaning processes changes to biological cleaning that have been

necessary to achieve the same results as trial repairs raking and repointing mockups for limestone

and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an

injection repairs patching repairs to limestone and granite See meeting notes from 11302016

follow up meeting to discuss WJE observations regarding the work

With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work

that necessary to make the area complete

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 2 of 4

ACTION REQUIRED

Revisions to repairs on A206 due to discovered conditions (TreanorHL)

bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone

bull at NW-0501 due to condition uncovered by joint raking

ITEMS TO VERIFY

REMARKS

OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes

Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to

tour the scaffold Reviewed window and masonry related work

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A206 ndash Site tour with OMES and WJE

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 3 of 4

A209 (left) and A208 (right) ndash Scaffold construction continues

A206 ndash NW-0A06 demolition in progress

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 4 of 4

A206 ndash Stone salvaged from NW-0A06

A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016

TIME 1000a to 530p DAY OF WEEK Monday

OWNER OMES TEMP RANGE Mid 50s to Lo 60s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Lukasz Lesniak Field Superintendent ndash Mark 1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking and repointing on A206 (Alpha)

Roofing materials being hoisted to the north wing roof

ITEMS DISCUSSED

Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps

there is some cold soak left to perform and sealant removal at window perimeter Temperature

restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this

week to create heated enclosure Discussed the need to monitor temperature and record it not only

on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and

other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is

approximately 50 complete

Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece

(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)

Met with JE Dunn to organize field walk for WJE visit

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 2 of 5

Reviewed window sill conditions including additional condition involving lead sheet flashing at the

bottom of cast iron sills

Temporary protection for built-in gutter

Stone color no word on additional lighter shades to better match light colored existing stones Mark

1 will salvage pieces of usable material where possible from other locations in case it is needed

ACTION REQUIRED

Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation

(TreanorHL)

ITEMS TO VERIFY

REMARKS

Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been

effective overall but the drying times are quite variable Some areas that have not seen water in

over a week are still visibly damp

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 3 of 5

A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in

right photo ndash end of tape is against the window frame in both photos

A208 ndash Residual dampness on A208 from cleaning

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 4 of 5

A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital

A207 ndash Lead T-cap installation for mock up review

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 5 of 5

A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining

material is brittle in some locations Additional detail will be issued for condition as part of forthcoming

ASI Believe this is window 459 ndash type G

A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016

TIME 800a to 12 noon DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE Mid 30s to Lo 50s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Raking on A206 (Alpha)

Substrate and backing conditions at RP repair NW-0A06

Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were

found on the west end of the frieze stone The tie-wire was easily removed from the back up

construction No rivet was found the pocket (which had been cut through) appears to have been

slugged full with mortar as construction progressed

Tarps being hung on A206 (Alpha)

ITEMS DISCUSSED

Protection for weather and monitoring conditions within the enclosure

Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to

moderate efflorescence were noted The most prominent is at the location of the redressing on NE-

0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent

dampness during cleaning operations The scaling that was the impetus for the redressing is located

at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 2 of 5

area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material

the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to

indicate the sealer is present even at this depth Potential sources of salts identified backing

construction penetrating sealer applied to building Area was discussed with WJE personnel

Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the

bottom of the corbel molding Both locations are unique to this elevation

ACTION REQUIRED

Tarp installation on all facades placement and distribution of heating devices including monitoring

devices for temperature (Mark1 and JE Dunn)

Direction for spot cleaning on A208 (Charlie)

ITEMS TO VERIFY

Method for monitoring conditions inside the tarped area (JE Dunn)

REMARKS

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 3 of 5

A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter

round differs from those specified in 1914 but specifications do not mention attachment at concrete

This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over

and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed

A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above

is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 4 of 5

A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been

slugged full with mortar prior to setting course above tie wire pulled freely from backing construction

Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction

aides to plumb up the tall stones during setting

A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No

signs of distress observed but area was dusty and full of debris from demolition

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 5 of 5

A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze

stones

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

JED

JEDBak

er

Mar

k 1

ProjectOklahoma StateCapitolRehabilitation

Date12072016

DrawingSite UtilizationPlan

Legend -JED Trailer Compound

-Phase 1 Site Fencing

-Gravel laydown

-Fence gate

-Future phases site fencing

-Future phases gravel laydown

EnvAct

Review

JED

Mark 1

JED

Faith

Dumpster

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Window Abatement Tracking Plan

DECEMBER 2016

Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 16 DATE 12212016

TIME 330 AM DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE 55deg F

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction

Landon Heaton Project Engineer - JE Dunn Construction

Tony Talerico Project Engineer - JE Dunn Construction

WORK OBSERVED

The following was observed during this site visit

1 Scaffold erection progressing on north elevation of east wing (Delta)

2 Scaffold tarp installation progressing on east elevation of north wing (Charlie)

3 Cleaning progressing on west elevation of north wing (Alpha)

4 Joint raking progressing on north elevation of north wing (Bravo)

5 Parapet cap removal progressing on west elevation of north wing (Alpha)

ITEMS DISCUSSED

None

ACTION REQUIRED

None

ITEMS TO VERIFY

None

REMARKS

None

OBSERVED BY Peter Breninger (ADG)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 2 of 5

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott

(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)

Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve

Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 3 of 5

Scaffold installation progressing on north elevation of east wing (Delta)

Scaffold installation progressing on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 4 of 5

Scaffold tarp installation progressing on east elevation of north wing (Charlie)

Parapet cap removal progressing on west elevation of north wing (Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 5 of 5

Parapet cap removal progressing on west elevation of north wing (Alpha)

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Oklahoma State Capitol Stone ChimeraThe following report explains the history behind the stone Chimerarsquos (ldquogriffinsrdquo) that have sat atop the Oklahoma State Capitol for the last 100 years

Chimeras (Griffins) of the Oklahoma State Capitol

Report provided by TreanorHL

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Griffin A bird head and foreshybody and cat rear always with a beak

Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City

Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company

Mythological Cat Creature Examples

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (left side) summer of 1916 shy no chimeras present

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (right side) November 2 1916 shy chimeras set

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti

South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016

TIME 900a to 530p DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE Lo 40s to 60

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

Trait Thompson - OMES

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking on A206 (Alpha)

Demolition for RP2 repair NW-0A06

ITEMS DISCUSSED

With WJE reviewed masonry cleaning processes changes to biological cleaning that have been

necessary to achieve the same results as trial repairs raking and repointing mockups for limestone

and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an

injection repairs patching repairs to limestone and granite See meeting notes from 11302016

follow up meeting to discuss WJE observations regarding the work

With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work

that necessary to make the area complete

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 2 of 4

ACTION REQUIRED

Revisions to repairs on A206 due to discovered conditions (TreanorHL)

bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone

bull at NW-0501 due to condition uncovered by joint raking

ITEMS TO VERIFY

REMARKS

OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes

Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to

tour the scaffold Reviewed window and masonry related work

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A206 ndash Site tour with OMES and WJE

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 3 of 4

A209 (left) and A208 (right) ndash Scaffold construction continues

A206 ndash NW-0A06 demolition in progress

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 4 of 4

A206 ndash Stone salvaged from NW-0A06

A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016

TIME 1000a to 530p DAY OF WEEK Monday

OWNER OMES TEMP RANGE Mid 50s to Lo 60s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Lukasz Lesniak Field Superintendent ndash Mark 1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking and repointing on A206 (Alpha)

Roofing materials being hoisted to the north wing roof

ITEMS DISCUSSED

Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps

there is some cold soak left to perform and sealant removal at window perimeter Temperature

restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this

week to create heated enclosure Discussed the need to monitor temperature and record it not only

on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and

other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is

approximately 50 complete

Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece

(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)

Met with JE Dunn to organize field walk for WJE visit

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 2 of 5

Reviewed window sill conditions including additional condition involving lead sheet flashing at the

bottom of cast iron sills

Temporary protection for built-in gutter

Stone color no word on additional lighter shades to better match light colored existing stones Mark

1 will salvage pieces of usable material where possible from other locations in case it is needed

ACTION REQUIRED

Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation

(TreanorHL)

ITEMS TO VERIFY

REMARKS

Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been

effective overall but the drying times are quite variable Some areas that have not seen water in

over a week are still visibly damp

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 3 of 5

A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in

right photo ndash end of tape is against the window frame in both photos

A208 ndash Residual dampness on A208 from cleaning

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 4 of 5

A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital

A207 ndash Lead T-cap installation for mock up review

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 5 of 5

A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining

material is brittle in some locations Additional detail will be issued for condition as part of forthcoming

ASI Believe this is window 459 ndash type G

A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016

TIME 800a to 12 noon DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE Mid 30s to Lo 50s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Raking on A206 (Alpha)

Substrate and backing conditions at RP repair NW-0A06

Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were

found on the west end of the frieze stone The tie-wire was easily removed from the back up

construction No rivet was found the pocket (which had been cut through) appears to have been

slugged full with mortar as construction progressed

Tarps being hung on A206 (Alpha)

ITEMS DISCUSSED

Protection for weather and monitoring conditions within the enclosure

Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to

moderate efflorescence were noted The most prominent is at the location of the redressing on NE-

0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent

dampness during cleaning operations The scaling that was the impetus for the redressing is located

at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 2 of 5

area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material

the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to

indicate the sealer is present even at this depth Potential sources of salts identified backing

construction penetrating sealer applied to building Area was discussed with WJE personnel

Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the

bottom of the corbel molding Both locations are unique to this elevation

ACTION REQUIRED

Tarp installation on all facades placement and distribution of heating devices including monitoring

devices for temperature (Mark1 and JE Dunn)

Direction for spot cleaning on A208 (Charlie)

ITEMS TO VERIFY

Method for monitoring conditions inside the tarped area (JE Dunn)

REMARKS

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 3 of 5

A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter

round differs from those specified in 1914 but specifications do not mention attachment at concrete

This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over

and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed

A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above

is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 4 of 5

A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been

slugged full with mortar prior to setting course above tie wire pulled freely from backing construction

Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction

aides to plumb up the tall stones during setting

A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No

signs of distress observed but area was dusty and full of debris from demolition

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 5 of 5

A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze

stones

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

JED

JEDBak

er

Mar

k 1

ProjectOklahoma StateCapitolRehabilitation

Date12072016

DrawingSite UtilizationPlan

Legend -JED Trailer Compound

-Phase 1 Site Fencing

-Gravel laydown

-Fence gate

-Future phases site fencing

-Future phases gravel laydown

EnvAct

Review

JED

Mark 1

JED

Faith

Dumpster

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Window Abatement Tracking Plan

DECEMBER 2016

Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 2 of 5

COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross

(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott

(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)

Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve

Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 3 of 5

Scaffold installation progressing on north elevation of east wing (Delta)

Scaffold installation progressing on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 4 of 5

Scaffold tarp installation progressing on east elevation of north wing (Charlie)

Parapet cap removal progressing on west elevation of north wing (Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 5 of 5

Parapet cap removal progressing on west elevation of north wing (Alpha)

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Oklahoma State Capitol Stone ChimeraThe following report explains the history behind the stone Chimerarsquos (ldquogriffinsrdquo) that have sat atop the Oklahoma State Capitol for the last 100 years

Chimeras (Griffins) of the Oklahoma State Capitol

Report provided by TreanorHL

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Griffin A bird head and foreshybody and cat rear always with a beak

Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City

Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company

Mythological Cat Creature Examples

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (left side) summer of 1916 shy no chimeras present

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (right side) November 2 1916 shy chimeras set

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti

South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016

TIME 900a to 530p DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE Lo 40s to 60

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

Trait Thompson - OMES

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking on A206 (Alpha)

Demolition for RP2 repair NW-0A06

ITEMS DISCUSSED

With WJE reviewed masonry cleaning processes changes to biological cleaning that have been

necessary to achieve the same results as trial repairs raking and repointing mockups for limestone

and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an

injection repairs patching repairs to limestone and granite See meeting notes from 11302016

follow up meeting to discuss WJE observations regarding the work

With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work

that necessary to make the area complete

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 2 of 4

ACTION REQUIRED

Revisions to repairs on A206 due to discovered conditions (TreanorHL)

bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone

bull at NW-0501 due to condition uncovered by joint raking

ITEMS TO VERIFY

REMARKS

OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes

Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to

tour the scaffold Reviewed window and masonry related work

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A206 ndash Site tour with OMES and WJE

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 3 of 4

A209 (left) and A208 (right) ndash Scaffold construction continues

A206 ndash NW-0A06 demolition in progress

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 4 of 4

A206 ndash Stone salvaged from NW-0A06

A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016

TIME 1000a to 530p DAY OF WEEK Monday

OWNER OMES TEMP RANGE Mid 50s to Lo 60s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Lukasz Lesniak Field Superintendent ndash Mark 1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking and repointing on A206 (Alpha)

Roofing materials being hoisted to the north wing roof

ITEMS DISCUSSED

Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps

there is some cold soak left to perform and sealant removal at window perimeter Temperature

restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this

week to create heated enclosure Discussed the need to monitor temperature and record it not only

on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and

other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is

approximately 50 complete

Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece

(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)

Met with JE Dunn to organize field walk for WJE visit

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 2 of 5

Reviewed window sill conditions including additional condition involving lead sheet flashing at the

bottom of cast iron sills

Temporary protection for built-in gutter

Stone color no word on additional lighter shades to better match light colored existing stones Mark

1 will salvage pieces of usable material where possible from other locations in case it is needed

ACTION REQUIRED

Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation

(TreanorHL)

ITEMS TO VERIFY

REMARKS

Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been

effective overall but the drying times are quite variable Some areas that have not seen water in

over a week are still visibly damp

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 3 of 5

A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in

right photo ndash end of tape is against the window frame in both photos

A208 ndash Residual dampness on A208 from cleaning

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 4 of 5

A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital

A207 ndash Lead T-cap installation for mock up review

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 5 of 5

A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining

material is brittle in some locations Additional detail will be issued for condition as part of forthcoming

ASI Believe this is window 459 ndash type G

A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016

TIME 800a to 12 noon DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE Mid 30s to Lo 50s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Raking on A206 (Alpha)

Substrate and backing conditions at RP repair NW-0A06

Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were

found on the west end of the frieze stone The tie-wire was easily removed from the back up

construction No rivet was found the pocket (which had been cut through) appears to have been

slugged full with mortar as construction progressed

Tarps being hung on A206 (Alpha)

ITEMS DISCUSSED

Protection for weather and monitoring conditions within the enclosure

Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to

moderate efflorescence were noted The most prominent is at the location of the redressing on NE-

0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent

dampness during cleaning operations The scaling that was the impetus for the redressing is located

at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 2 of 5

area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material

the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to

indicate the sealer is present even at this depth Potential sources of salts identified backing

construction penetrating sealer applied to building Area was discussed with WJE personnel

Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the

bottom of the corbel molding Both locations are unique to this elevation

ACTION REQUIRED

Tarp installation on all facades placement and distribution of heating devices including monitoring

devices for temperature (Mark1 and JE Dunn)

Direction for spot cleaning on A208 (Charlie)

ITEMS TO VERIFY

Method for monitoring conditions inside the tarped area (JE Dunn)

REMARKS

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 3 of 5

A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter

round differs from those specified in 1914 but specifications do not mention attachment at concrete

This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over

and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed

A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above

is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 4 of 5

A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been

slugged full with mortar prior to setting course above tie wire pulled freely from backing construction

Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction

aides to plumb up the tall stones during setting

A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No

signs of distress observed but area was dusty and full of debris from demolition

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 5 of 5

A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze

stones

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

JED

JEDBak

er

Mar

k 1

ProjectOklahoma StateCapitolRehabilitation

Date12072016

DrawingSite UtilizationPlan

Legend -JED Trailer Compound

-Phase 1 Site Fencing

-Gravel laydown

-Fence gate

-Future phases site fencing

-Future phases gravel laydown

EnvAct

Review

JED

Mark 1

JED

Faith

Dumpster

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Window Abatement Tracking Plan

DECEMBER 2016

Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 3 of 5

Scaffold installation progressing on north elevation of east wing (Delta)

Scaffold installation progressing on north elevation of east wing (Delta)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 4 of 5

Scaffold tarp installation progressing on east elevation of north wing (Charlie)

Parapet cap removal progressing on west elevation of north wing (Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 5 of 5

Parapet cap removal progressing on west elevation of north wing (Alpha)

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Oklahoma State Capitol Stone ChimeraThe following report explains the history behind the stone Chimerarsquos (ldquogriffinsrdquo) that have sat atop the Oklahoma State Capitol for the last 100 years

Chimeras (Griffins) of the Oklahoma State Capitol

Report provided by TreanorHL

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Griffin A bird head and foreshybody and cat rear always with a beak

Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City

Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company

Mythological Cat Creature Examples

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (left side) summer of 1916 shy no chimeras present

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (right side) November 2 1916 shy chimeras set

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti

South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016

TIME 900a to 530p DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE Lo 40s to 60

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

Trait Thompson - OMES

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking on A206 (Alpha)

Demolition for RP2 repair NW-0A06

ITEMS DISCUSSED

With WJE reviewed masonry cleaning processes changes to biological cleaning that have been

necessary to achieve the same results as trial repairs raking and repointing mockups for limestone

and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an

injection repairs patching repairs to limestone and granite See meeting notes from 11302016

follow up meeting to discuss WJE observations regarding the work

With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work

that necessary to make the area complete

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 2 of 4

ACTION REQUIRED

Revisions to repairs on A206 due to discovered conditions (TreanorHL)

bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone

bull at NW-0501 due to condition uncovered by joint raking

ITEMS TO VERIFY

REMARKS

OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes

Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to

tour the scaffold Reviewed window and masonry related work

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A206 ndash Site tour with OMES and WJE

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 3 of 4

A209 (left) and A208 (right) ndash Scaffold construction continues

A206 ndash NW-0A06 demolition in progress

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 4 of 4

A206 ndash Stone salvaged from NW-0A06

A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016

TIME 1000a to 530p DAY OF WEEK Monday

OWNER OMES TEMP RANGE Mid 50s to Lo 60s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Lukasz Lesniak Field Superintendent ndash Mark 1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking and repointing on A206 (Alpha)

Roofing materials being hoisted to the north wing roof

ITEMS DISCUSSED

Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps

there is some cold soak left to perform and sealant removal at window perimeter Temperature

restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this

week to create heated enclosure Discussed the need to monitor temperature and record it not only

on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and

other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is

approximately 50 complete

Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece

(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)

Met with JE Dunn to organize field walk for WJE visit

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 2 of 5

Reviewed window sill conditions including additional condition involving lead sheet flashing at the

bottom of cast iron sills

Temporary protection for built-in gutter

Stone color no word on additional lighter shades to better match light colored existing stones Mark

1 will salvage pieces of usable material where possible from other locations in case it is needed

ACTION REQUIRED

Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation

(TreanorHL)

ITEMS TO VERIFY

REMARKS

Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been

effective overall but the drying times are quite variable Some areas that have not seen water in

over a week are still visibly damp

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 3 of 5

A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in

right photo ndash end of tape is against the window frame in both photos

A208 ndash Residual dampness on A208 from cleaning

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 4 of 5

A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital

A207 ndash Lead T-cap installation for mock up review

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 5 of 5

A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining

material is brittle in some locations Additional detail will be issued for condition as part of forthcoming

ASI Believe this is window 459 ndash type G

A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016

TIME 800a to 12 noon DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE Mid 30s to Lo 50s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Raking on A206 (Alpha)

Substrate and backing conditions at RP repair NW-0A06

Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were

found on the west end of the frieze stone The tie-wire was easily removed from the back up

construction No rivet was found the pocket (which had been cut through) appears to have been

slugged full with mortar as construction progressed

Tarps being hung on A206 (Alpha)

ITEMS DISCUSSED

Protection for weather and monitoring conditions within the enclosure

Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to

moderate efflorescence were noted The most prominent is at the location of the redressing on NE-

0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent

dampness during cleaning operations The scaling that was the impetus for the redressing is located

at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 2 of 5

area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material

the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to

indicate the sealer is present even at this depth Potential sources of salts identified backing

construction penetrating sealer applied to building Area was discussed with WJE personnel

Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the

bottom of the corbel molding Both locations are unique to this elevation

ACTION REQUIRED

Tarp installation on all facades placement and distribution of heating devices including monitoring

devices for temperature (Mark1 and JE Dunn)

Direction for spot cleaning on A208 (Charlie)

ITEMS TO VERIFY

Method for monitoring conditions inside the tarped area (JE Dunn)

REMARKS

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 3 of 5

A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter

round differs from those specified in 1914 but specifications do not mention attachment at concrete

This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over

and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed

A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above

is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 4 of 5

A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been

slugged full with mortar prior to setting course above tie wire pulled freely from backing construction

Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction

aides to plumb up the tall stones during setting

A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No

signs of distress observed but area was dusty and full of debris from demolition

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 5 of 5

A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze

stones

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

JED

JEDBak

er

Mar

k 1

ProjectOklahoma StateCapitolRehabilitation

Date12072016

DrawingSite UtilizationPlan

Legend -JED Trailer Compound

-Phase 1 Site Fencing

-Gravel laydown

-Fence gate

-Future phases site fencing

-Future phases gravel laydown

EnvAct

Review

JED

Mark 1

JED

Faith

Dumpster

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Window Abatement Tracking Plan

DECEMBER 2016

Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 4 of 5

Scaffold tarp installation progressing on east elevation of north wing (Charlie)

Parapet cap removal progressing on west elevation of north wing (Alpha)

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 5 of 5

Parapet cap removal progressing on west elevation of north wing (Alpha)

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Oklahoma State Capitol Stone ChimeraThe following report explains the history behind the stone Chimerarsquos (ldquogriffinsrdquo) that have sat atop the Oklahoma State Capitol for the last 100 years

Chimeras (Griffins) of the Oklahoma State Capitol

Report provided by TreanorHL

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Griffin A bird head and foreshybody and cat rear always with a beak

Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City

Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company

Mythological Cat Creature Examples

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (left side) summer of 1916 shy no chimeras present

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (right side) November 2 1916 shy chimeras set

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti

South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016

TIME 900a to 530p DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE Lo 40s to 60

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

Trait Thompson - OMES

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking on A206 (Alpha)

Demolition for RP2 repair NW-0A06

ITEMS DISCUSSED

With WJE reviewed masonry cleaning processes changes to biological cleaning that have been

necessary to achieve the same results as trial repairs raking and repointing mockups for limestone

and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an

injection repairs patching repairs to limestone and granite See meeting notes from 11302016

follow up meeting to discuss WJE observations regarding the work

With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work

that necessary to make the area complete

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 2 of 4

ACTION REQUIRED

Revisions to repairs on A206 due to discovered conditions (TreanorHL)

bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone

bull at NW-0501 due to condition uncovered by joint raking

ITEMS TO VERIFY

REMARKS

OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes

Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to

tour the scaffold Reviewed window and masonry related work

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A206 ndash Site tour with OMES and WJE

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 3 of 4

A209 (left) and A208 (right) ndash Scaffold construction continues

A206 ndash NW-0A06 demolition in progress

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 4 of 4

A206 ndash Stone salvaged from NW-0A06

A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016

TIME 1000a to 530p DAY OF WEEK Monday

OWNER OMES TEMP RANGE Mid 50s to Lo 60s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Lukasz Lesniak Field Superintendent ndash Mark 1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking and repointing on A206 (Alpha)

Roofing materials being hoisted to the north wing roof

ITEMS DISCUSSED

Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps

there is some cold soak left to perform and sealant removal at window perimeter Temperature

restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this

week to create heated enclosure Discussed the need to monitor temperature and record it not only

on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and

other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is

approximately 50 complete

Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece

(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)

Met with JE Dunn to organize field walk for WJE visit

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 2 of 5

Reviewed window sill conditions including additional condition involving lead sheet flashing at the

bottom of cast iron sills

Temporary protection for built-in gutter

Stone color no word on additional lighter shades to better match light colored existing stones Mark

1 will salvage pieces of usable material where possible from other locations in case it is needed

ACTION REQUIRED

Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation

(TreanorHL)

ITEMS TO VERIFY

REMARKS

Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been

effective overall but the drying times are quite variable Some areas that have not seen water in

over a week are still visibly damp

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 3 of 5

A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in

right photo ndash end of tape is against the window frame in both photos

A208 ndash Residual dampness on A208 from cleaning

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 4 of 5

A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital

A207 ndash Lead T-cap installation for mock up review

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 5 of 5

A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining

material is brittle in some locations Additional detail will be issued for condition as part of forthcoming

ASI Believe this is window 459 ndash type G

A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016

TIME 800a to 12 noon DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE Mid 30s to Lo 50s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Raking on A206 (Alpha)

Substrate and backing conditions at RP repair NW-0A06

Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were

found on the west end of the frieze stone The tie-wire was easily removed from the back up

construction No rivet was found the pocket (which had been cut through) appears to have been

slugged full with mortar as construction progressed

Tarps being hung on A206 (Alpha)

ITEMS DISCUSSED

Protection for weather and monitoring conditions within the enclosure

Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to

moderate efflorescence were noted The most prominent is at the location of the redressing on NE-

0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent

dampness during cleaning operations The scaling that was the impetus for the redressing is located

at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 2 of 5

area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material

the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to

indicate the sealer is present even at this depth Potential sources of salts identified backing

construction penetrating sealer applied to building Area was discussed with WJE personnel

Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the

bottom of the corbel molding Both locations are unique to this elevation

ACTION REQUIRED

Tarp installation on all facades placement and distribution of heating devices including monitoring

devices for temperature (Mark1 and JE Dunn)

Direction for spot cleaning on A208 (Charlie)

ITEMS TO VERIFY

Method for monitoring conditions inside the tarped area (JE Dunn)

REMARKS

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 3 of 5

A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter

round differs from those specified in 1914 but specifications do not mention attachment at concrete

This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over

and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed

A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above

is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 4 of 5

A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been

slugged full with mortar prior to setting course above tie wire pulled freely from backing construction

Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction

aides to plumb up the tall stones during setting

A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No

signs of distress observed but area was dusty and full of debris from demolition

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 5 of 5

A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze

stones

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

JED

JEDBak

er

Mar

k 1

ProjectOklahoma StateCapitolRehabilitation

Date12072016

DrawingSite UtilizationPlan

Legend -JED Trailer Compound

-Phase 1 Site Fencing

-Gravel laydown

-Fence gate

-Future phases site fencing

-Future phases gravel laydown

EnvAct

Review

JED

Mark 1

JED

Faith

Dumpster

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Window Abatement Tracking Plan

DECEMBER 2016

Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField

ReportsOSCR FR 16 - 2016_12-21docx

Page 5 of 5

Parapet cap removal progressing on west elevation of north wing (Alpha)

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Oklahoma State Capitol Stone ChimeraThe following report explains the history behind the stone Chimerarsquos (ldquogriffinsrdquo) that have sat atop the Oklahoma State Capitol for the last 100 years

Chimeras (Griffins) of the Oklahoma State Capitol

Report provided by TreanorHL

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Griffin A bird head and foreshybody and cat rear always with a beak

Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City

Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company

Mythological Cat Creature Examples

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (left side) summer of 1916 shy no chimeras present

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (right side) November 2 1916 shy chimeras set

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti

South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016

TIME 900a to 530p DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE Lo 40s to 60

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

Trait Thompson - OMES

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking on A206 (Alpha)

Demolition for RP2 repair NW-0A06

ITEMS DISCUSSED

With WJE reviewed masonry cleaning processes changes to biological cleaning that have been

necessary to achieve the same results as trial repairs raking and repointing mockups for limestone

and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an

injection repairs patching repairs to limestone and granite See meeting notes from 11302016

follow up meeting to discuss WJE observations regarding the work

With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work

that necessary to make the area complete

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 2 of 4

ACTION REQUIRED

Revisions to repairs on A206 due to discovered conditions (TreanorHL)

bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone

bull at NW-0501 due to condition uncovered by joint raking

ITEMS TO VERIFY

REMARKS

OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes

Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to

tour the scaffold Reviewed window and masonry related work

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A206 ndash Site tour with OMES and WJE

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 3 of 4

A209 (left) and A208 (right) ndash Scaffold construction continues

A206 ndash NW-0A06 demolition in progress

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 4 of 4

A206 ndash Stone salvaged from NW-0A06

A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016

TIME 1000a to 530p DAY OF WEEK Monday

OWNER OMES TEMP RANGE Mid 50s to Lo 60s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Lukasz Lesniak Field Superintendent ndash Mark 1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking and repointing on A206 (Alpha)

Roofing materials being hoisted to the north wing roof

ITEMS DISCUSSED

Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps

there is some cold soak left to perform and sealant removal at window perimeter Temperature

restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this

week to create heated enclosure Discussed the need to monitor temperature and record it not only

on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and

other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is

approximately 50 complete

Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece

(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)

Met with JE Dunn to organize field walk for WJE visit

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 2 of 5

Reviewed window sill conditions including additional condition involving lead sheet flashing at the

bottom of cast iron sills

Temporary protection for built-in gutter

Stone color no word on additional lighter shades to better match light colored existing stones Mark

1 will salvage pieces of usable material where possible from other locations in case it is needed

ACTION REQUIRED

Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation

(TreanorHL)

ITEMS TO VERIFY

REMARKS

Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been

effective overall but the drying times are quite variable Some areas that have not seen water in

over a week are still visibly damp

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 3 of 5

A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in

right photo ndash end of tape is against the window frame in both photos

A208 ndash Residual dampness on A208 from cleaning

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 4 of 5

A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital

A207 ndash Lead T-cap installation for mock up review

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 5 of 5

A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining

material is brittle in some locations Additional detail will be issued for condition as part of forthcoming

ASI Believe this is window 459 ndash type G

A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016

TIME 800a to 12 noon DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE Mid 30s to Lo 50s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Raking on A206 (Alpha)

Substrate and backing conditions at RP repair NW-0A06

Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were

found on the west end of the frieze stone The tie-wire was easily removed from the back up

construction No rivet was found the pocket (which had been cut through) appears to have been

slugged full with mortar as construction progressed

Tarps being hung on A206 (Alpha)

ITEMS DISCUSSED

Protection for weather and monitoring conditions within the enclosure

Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to

moderate efflorescence were noted The most prominent is at the location of the redressing on NE-

0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent

dampness during cleaning operations The scaling that was the impetus for the redressing is located

at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 2 of 5

area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material

the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to

indicate the sealer is present even at this depth Potential sources of salts identified backing

construction penetrating sealer applied to building Area was discussed with WJE personnel

Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the

bottom of the corbel molding Both locations are unique to this elevation

ACTION REQUIRED

Tarp installation on all facades placement and distribution of heating devices including monitoring

devices for temperature (Mark1 and JE Dunn)

Direction for spot cleaning on A208 (Charlie)

ITEMS TO VERIFY

Method for monitoring conditions inside the tarped area (JE Dunn)

REMARKS

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 3 of 5

A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter

round differs from those specified in 1914 but specifications do not mention attachment at concrete

This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over

and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed

A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above

is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 4 of 5

A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been

slugged full with mortar prior to setting course above tie wire pulled freely from backing construction

Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction

aides to plumb up the tall stones during setting

A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No

signs of distress observed but area was dusty and full of debris from demolition

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 5 of 5

A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze

stones

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

JED

JEDBak

er

Mar

k 1

ProjectOklahoma StateCapitolRehabilitation

Date12072016

DrawingSite UtilizationPlan

Legend -JED Trailer Compound

-Phase 1 Site Fencing

-Gravel laydown

-Fence gate

-Future phases site fencing

-Future phases gravel laydown

EnvAct

Review

JED

Mark 1

JED

Faith

Dumpster

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Window Abatement Tracking Plan

DECEMBER 2016

Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Oklahoma State Capitol Stone ChimeraThe following report explains the history behind the stone Chimerarsquos (ldquogriffinsrdquo) that have sat atop the Oklahoma State Capitol for the last 100 years

Chimeras (Griffins) of the Oklahoma State Capitol

Report provided by TreanorHL

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Griffin A bird head and foreshybody and cat rear always with a beak

Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City

Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company

Mythological Cat Creature Examples

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (left side) summer of 1916 shy no chimeras present

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (right side) November 2 1916 shy chimeras set

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti

South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016

TIME 900a to 530p DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE Lo 40s to 60

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

Trait Thompson - OMES

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking on A206 (Alpha)

Demolition for RP2 repair NW-0A06

ITEMS DISCUSSED

With WJE reviewed masonry cleaning processes changes to biological cleaning that have been

necessary to achieve the same results as trial repairs raking and repointing mockups for limestone

and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an

injection repairs patching repairs to limestone and granite See meeting notes from 11302016

follow up meeting to discuss WJE observations regarding the work

With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work

that necessary to make the area complete

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 2 of 4

ACTION REQUIRED

Revisions to repairs on A206 due to discovered conditions (TreanorHL)

bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone

bull at NW-0501 due to condition uncovered by joint raking

ITEMS TO VERIFY

REMARKS

OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes

Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to

tour the scaffold Reviewed window and masonry related work

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A206 ndash Site tour with OMES and WJE

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 3 of 4

A209 (left) and A208 (right) ndash Scaffold construction continues

A206 ndash NW-0A06 demolition in progress

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 4 of 4

A206 ndash Stone salvaged from NW-0A06

A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016

TIME 1000a to 530p DAY OF WEEK Monday

OWNER OMES TEMP RANGE Mid 50s to Lo 60s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Lukasz Lesniak Field Superintendent ndash Mark 1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking and repointing on A206 (Alpha)

Roofing materials being hoisted to the north wing roof

ITEMS DISCUSSED

Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps

there is some cold soak left to perform and sealant removal at window perimeter Temperature

restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this

week to create heated enclosure Discussed the need to monitor temperature and record it not only

on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and

other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is

approximately 50 complete

Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece

(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)

Met with JE Dunn to organize field walk for WJE visit

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 2 of 5

Reviewed window sill conditions including additional condition involving lead sheet flashing at the

bottom of cast iron sills

Temporary protection for built-in gutter

Stone color no word on additional lighter shades to better match light colored existing stones Mark

1 will salvage pieces of usable material where possible from other locations in case it is needed

ACTION REQUIRED

Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation

(TreanorHL)

ITEMS TO VERIFY

REMARKS

Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been

effective overall but the drying times are quite variable Some areas that have not seen water in

over a week are still visibly damp

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 3 of 5

A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in

right photo ndash end of tape is against the window frame in both photos

A208 ndash Residual dampness on A208 from cleaning

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 4 of 5

A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital

A207 ndash Lead T-cap installation for mock up review

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 5 of 5

A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining

material is brittle in some locations Additional detail will be issued for condition as part of forthcoming

ASI Believe this is window 459 ndash type G

A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016

TIME 800a to 12 noon DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE Mid 30s to Lo 50s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Raking on A206 (Alpha)

Substrate and backing conditions at RP repair NW-0A06

Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were

found on the west end of the frieze stone The tie-wire was easily removed from the back up

construction No rivet was found the pocket (which had been cut through) appears to have been

slugged full with mortar as construction progressed

Tarps being hung on A206 (Alpha)

ITEMS DISCUSSED

Protection for weather and monitoring conditions within the enclosure

Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to

moderate efflorescence were noted The most prominent is at the location of the redressing on NE-

0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent

dampness during cleaning operations The scaling that was the impetus for the redressing is located

at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 2 of 5

area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material

the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to

indicate the sealer is present even at this depth Potential sources of salts identified backing

construction penetrating sealer applied to building Area was discussed with WJE personnel

Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the

bottom of the corbel molding Both locations are unique to this elevation

ACTION REQUIRED

Tarp installation on all facades placement and distribution of heating devices including monitoring

devices for temperature (Mark1 and JE Dunn)

Direction for spot cleaning on A208 (Charlie)

ITEMS TO VERIFY

Method for monitoring conditions inside the tarped area (JE Dunn)

REMARKS

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 3 of 5

A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter

round differs from those specified in 1914 but specifications do not mention attachment at concrete

This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over

and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed

A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above

is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 4 of 5

A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been

slugged full with mortar prior to setting course above tie wire pulled freely from backing construction

Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction

aides to plumb up the tall stones during setting

A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No

signs of distress observed but area was dusty and full of debris from demolition

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 5 of 5

A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze

stones

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

JED

JEDBak

er

Mar

k 1

ProjectOklahoma StateCapitolRehabilitation

Date12072016

DrawingSite UtilizationPlan

Legend -JED Trailer Compound

-Phase 1 Site Fencing

-Gravel laydown

-Fence gate

-Future phases site fencing

-Future phases gravel laydown

EnvAct

Review

JED

Mark 1

JED

Faith

Dumpster

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Window Abatement Tracking Plan

DECEMBER 2016

Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Griffin A bird head and foreshybody and cat rear always with a beak

Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City

Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company

Mythological Cat Creature Examples

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (left side) summer of 1916 shy no chimeras present

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (right side) November 2 1916 shy chimeras set

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti

South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016

TIME 900a to 530p DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE Lo 40s to 60

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

Trait Thompson - OMES

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking on A206 (Alpha)

Demolition for RP2 repair NW-0A06

ITEMS DISCUSSED

With WJE reviewed masonry cleaning processes changes to biological cleaning that have been

necessary to achieve the same results as trial repairs raking and repointing mockups for limestone

and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an

injection repairs patching repairs to limestone and granite See meeting notes from 11302016

follow up meeting to discuss WJE observations regarding the work

With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work

that necessary to make the area complete

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 2 of 4

ACTION REQUIRED

Revisions to repairs on A206 due to discovered conditions (TreanorHL)

bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone

bull at NW-0501 due to condition uncovered by joint raking

ITEMS TO VERIFY

REMARKS

OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes

Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to

tour the scaffold Reviewed window and masonry related work

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A206 ndash Site tour with OMES and WJE

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 3 of 4

A209 (left) and A208 (right) ndash Scaffold construction continues

A206 ndash NW-0A06 demolition in progress

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 4 of 4

A206 ndash Stone salvaged from NW-0A06

A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016

TIME 1000a to 530p DAY OF WEEK Monday

OWNER OMES TEMP RANGE Mid 50s to Lo 60s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Lukasz Lesniak Field Superintendent ndash Mark 1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking and repointing on A206 (Alpha)

Roofing materials being hoisted to the north wing roof

ITEMS DISCUSSED

Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps

there is some cold soak left to perform and sealant removal at window perimeter Temperature

restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this

week to create heated enclosure Discussed the need to monitor temperature and record it not only

on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and

other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is

approximately 50 complete

Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece

(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)

Met with JE Dunn to organize field walk for WJE visit

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 2 of 5

Reviewed window sill conditions including additional condition involving lead sheet flashing at the

bottom of cast iron sills

Temporary protection for built-in gutter

Stone color no word on additional lighter shades to better match light colored existing stones Mark

1 will salvage pieces of usable material where possible from other locations in case it is needed

ACTION REQUIRED

Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation

(TreanorHL)

ITEMS TO VERIFY

REMARKS

Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been

effective overall but the drying times are quite variable Some areas that have not seen water in

over a week are still visibly damp

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 3 of 5

A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in

right photo ndash end of tape is against the window frame in both photos

A208 ndash Residual dampness on A208 from cleaning

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 4 of 5

A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital

A207 ndash Lead T-cap installation for mock up review

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 5 of 5

A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining

material is brittle in some locations Additional detail will be issued for condition as part of forthcoming

ASI Believe this is window 459 ndash type G

A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016

TIME 800a to 12 noon DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE Mid 30s to Lo 50s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Raking on A206 (Alpha)

Substrate and backing conditions at RP repair NW-0A06

Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were

found on the west end of the frieze stone The tie-wire was easily removed from the back up

construction No rivet was found the pocket (which had been cut through) appears to have been

slugged full with mortar as construction progressed

Tarps being hung on A206 (Alpha)

ITEMS DISCUSSED

Protection for weather and monitoring conditions within the enclosure

Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to

moderate efflorescence were noted The most prominent is at the location of the redressing on NE-

0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent

dampness during cleaning operations The scaling that was the impetus for the redressing is located

at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 2 of 5

area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material

the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to

indicate the sealer is present even at this depth Potential sources of salts identified backing

construction penetrating sealer applied to building Area was discussed with WJE personnel

Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the

bottom of the corbel molding Both locations are unique to this elevation

ACTION REQUIRED

Tarp installation on all facades placement and distribution of heating devices including monitoring

devices for temperature (Mark1 and JE Dunn)

Direction for spot cleaning on A208 (Charlie)

ITEMS TO VERIFY

Method for monitoring conditions inside the tarped area (JE Dunn)

REMARKS

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 3 of 5

A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter

round differs from those specified in 1914 but specifications do not mention attachment at concrete

This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over

and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed

A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above

is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 4 of 5

A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been

slugged full with mortar prior to setting course above tie wire pulled freely from backing construction

Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction

aides to plumb up the tall stones during setting

A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No

signs of distress observed but area was dusty and full of debris from demolition

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 5 of 5

A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze

stones

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

JED

JEDBak

er

Mar

k 1

ProjectOklahoma StateCapitolRehabilitation

Date12072016

DrawingSite UtilizationPlan

Legend -JED Trailer Compound

-Phase 1 Site Fencing

-Gravel laydown

-Fence gate

-Future phases site fencing

-Future phases gravel laydown

EnvAct

Review

JED

Mark 1

JED

Faith

Dumpster

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Window Abatement Tracking Plan

DECEMBER 2016

Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (left side) summer of 1916 shy no chimeras present

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (right side) November 2 1916 shy chimeras set

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti

South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016

TIME 900a to 530p DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE Lo 40s to 60

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

Trait Thompson - OMES

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking on A206 (Alpha)

Demolition for RP2 repair NW-0A06

ITEMS DISCUSSED

With WJE reviewed masonry cleaning processes changes to biological cleaning that have been

necessary to achieve the same results as trial repairs raking and repointing mockups for limestone

and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an

injection repairs patching repairs to limestone and granite See meeting notes from 11302016

follow up meeting to discuss WJE observations regarding the work

With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work

that necessary to make the area complete

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 2 of 4

ACTION REQUIRED

Revisions to repairs on A206 due to discovered conditions (TreanorHL)

bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone

bull at NW-0501 due to condition uncovered by joint raking

ITEMS TO VERIFY

REMARKS

OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes

Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to

tour the scaffold Reviewed window and masonry related work

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A206 ndash Site tour with OMES and WJE

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 3 of 4

A209 (left) and A208 (right) ndash Scaffold construction continues

A206 ndash NW-0A06 demolition in progress

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 4 of 4

A206 ndash Stone salvaged from NW-0A06

A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016

TIME 1000a to 530p DAY OF WEEK Monday

OWNER OMES TEMP RANGE Mid 50s to Lo 60s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Lukasz Lesniak Field Superintendent ndash Mark 1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking and repointing on A206 (Alpha)

Roofing materials being hoisted to the north wing roof

ITEMS DISCUSSED

Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps

there is some cold soak left to perform and sealant removal at window perimeter Temperature

restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this

week to create heated enclosure Discussed the need to monitor temperature and record it not only

on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and

other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is

approximately 50 complete

Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece

(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)

Met with JE Dunn to organize field walk for WJE visit

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 2 of 5

Reviewed window sill conditions including additional condition involving lead sheet flashing at the

bottom of cast iron sills

Temporary protection for built-in gutter

Stone color no word on additional lighter shades to better match light colored existing stones Mark

1 will salvage pieces of usable material where possible from other locations in case it is needed

ACTION REQUIRED

Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation

(TreanorHL)

ITEMS TO VERIFY

REMARKS

Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been

effective overall but the drying times are quite variable Some areas that have not seen water in

over a week are still visibly damp

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 3 of 5

A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in

right photo ndash end of tape is against the window frame in both photos

A208 ndash Residual dampness on A208 from cleaning

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 4 of 5

A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital

A207 ndash Lead T-cap installation for mock up review

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 5 of 5

A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining

material is brittle in some locations Additional detail will be issued for condition as part of forthcoming

ASI Believe this is window 459 ndash type G

A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016

TIME 800a to 12 noon DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE Mid 30s to Lo 50s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Raking on A206 (Alpha)

Substrate and backing conditions at RP repair NW-0A06

Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were

found on the west end of the frieze stone The tie-wire was easily removed from the back up

construction No rivet was found the pocket (which had been cut through) appears to have been

slugged full with mortar as construction progressed

Tarps being hung on A206 (Alpha)

ITEMS DISCUSSED

Protection for weather and monitoring conditions within the enclosure

Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to

moderate efflorescence were noted The most prominent is at the location of the redressing on NE-

0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent

dampness during cleaning operations The scaling that was the impetus for the redressing is located

at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 2 of 5

area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material

the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to

indicate the sealer is present even at this depth Potential sources of salts identified backing

construction penetrating sealer applied to building Area was discussed with WJE personnel

Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the

bottom of the corbel molding Both locations are unique to this elevation

ACTION REQUIRED

Tarp installation on all facades placement and distribution of heating devices including monitoring

devices for temperature (Mark1 and JE Dunn)

Direction for spot cleaning on A208 (Charlie)

ITEMS TO VERIFY

Method for monitoring conditions inside the tarped area (JE Dunn)

REMARKS

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 3 of 5

A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter

round differs from those specified in 1914 but specifications do not mention attachment at concrete

This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over

and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed

A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above

is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 4 of 5

A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been

slugged full with mortar prior to setting course above tie wire pulled freely from backing construction

Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction

aides to plumb up the tall stones during setting

A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No

signs of distress observed but area was dusty and full of debris from demolition

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 5 of 5

A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze

stones

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

JED

JEDBak

er

Mar

k 1

ProjectOklahoma StateCapitolRehabilitation

Date12072016

DrawingSite UtilizationPlan

Legend -JED Trailer Compound

-Phase 1 Site Fencing

-Gravel laydown

-Fence gate

-Future phases site fencing

-Future phases gravel laydown

EnvAct

Review

JED

Mark 1

JED

Faith

Dumpster

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Window Abatement Tracking Plan

DECEMBER 2016

Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (left side) summer of 1916 shy no chimeras present

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (right side) November 2 1916 shy chimeras set

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti

South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016

TIME 900a to 530p DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE Lo 40s to 60

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

Trait Thompson - OMES

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking on A206 (Alpha)

Demolition for RP2 repair NW-0A06

ITEMS DISCUSSED

With WJE reviewed masonry cleaning processes changes to biological cleaning that have been

necessary to achieve the same results as trial repairs raking and repointing mockups for limestone

and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an

injection repairs patching repairs to limestone and granite See meeting notes from 11302016

follow up meeting to discuss WJE observations regarding the work

With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work

that necessary to make the area complete

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 2 of 4

ACTION REQUIRED

Revisions to repairs on A206 due to discovered conditions (TreanorHL)

bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone

bull at NW-0501 due to condition uncovered by joint raking

ITEMS TO VERIFY

REMARKS

OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes

Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to

tour the scaffold Reviewed window and masonry related work

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A206 ndash Site tour with OMES and WJE

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 3 of 4

A209 (left) and A208 (right) ndash Scaffold construction continues

A206 ndash NW-0A06 demolition in progress

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 4 of 4

A206 ndash Stone salvaged from NW-0A06

A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016

TIME 1000a to 530p DAY OF WEEK Monday

OWNER OMES TEMP RANGE Mid 50s to Lo 60s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Lukasz Lesniak Field Superintendent ndash Mark 1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking and repointing on A206 (Alpha)

Roofing materials being hoisted to the north wing roof

ITEMS DISCUSSED

Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps

there is some cold soak left to perform and sealant removal at window perimeter Temperature

restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this

week to create heated enclosure Discussed the need to monitor temperature and record it not only

on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and

other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is

approximately 50 complete

Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece

(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)

Met with JE Dunn to organize field walk for WJE visit

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 2 of 5

Reviewed window sill conditions including additional condition involving lead sheet flashing at the

bottom of cast iron sills

Temporary protection for built-in gutter

Stone color no word on additional lighter shades to better match light colored existing stones Mark

1 will salvage pieces of usable material where possible from other locations in case it is needed

ACTION REQUIRED

Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation

(TreanorHL)

ITEMS TO VERIFY

REMARKS

Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been

effective overall but the drying times are quite variable Some areas that have not seen water in

over a week are still visibly damp

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 3 of 5

A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in

right photo ndash end of tape is against the window frame in both photos

A208 ndash Residual dampness on A208 from cleaning

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 4 of 5

A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital

A207 ndash Lead T-cap installation for mock up review

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 5 of 5

A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining

material is brittle in some locations Additional detail will be issued for condition as part of forthcoming

ASI Believe this is window 459 ndash type G

A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016

TIME 800a to 12 noon DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE Mid 30s to Lo 50s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Raking on A206 (Alpha)

Substrate and backing conditions at RP repair NW-0A06

Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were

found on the west end of the frieze stone The tie-wire was easily removed from the back up

construction No rivet was found the pocket (which had been cut through) appears to have been

slugged full with mortar as construction progressed

Tarps being hung on A206 (Alpha)

ITEMS DISCUSSED

Protection for weather and monitoring conditions within the enclosure

Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to

moderate efflorescence were noted The most prominent is at the location of the redressing on NE-

0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent

dampness during cleaning operations The scaling that was the impetus for the redressing is located

at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 2 of 5

area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material

the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to

indicate the sealer is present even at this depth Potential sources of salts identified backing

construction penetrating sealer applied to building Area was discussed with WJE personnel

Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the

bottom of the corbel molding Both locations are unique to this elevation

ACTION REQUIRED

Tarp installation on all facades placement and distribution of heating devices including monitoring

devices for temperature (Mark1 and JE Dunn)

Direction for spot cleaning on A208 (Charlie)

ITEMS TO VERIFY

Method for monitoring conditions inside the tarped area (JE Dunn)

REMARKS

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 3 of 5

A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter

round differs from those specified in 1914 but specifications do not mention attachment at concrete

This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over

and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed

A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above

is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 4 of 5

A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been

slugged full with mortar prior to setting course above tie wire pulled freely from backing construction

Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction

aides to plumb up the tall stones during setting

A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No

signs of distress observed but area was dusty and full of debris from demolition

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 5 of 5

A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze

stones

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

JED

JEDBak

er

Mar

k 1

ProjectOklahoma StateCapitolRehabilitation

Date12072016

DrawingSite UtilizationPlan

Legend -JED Trailer Compound

-Phase 1 Site Fencing

-Gravel laydown

-Fence gate

-Future phases site fencing

-Future phases gravel laydown

EnvAct

Review

JED

Mark 1

JED

Faith

Dumpster

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Window Abatement Tracking Plan

DECEMBER 2016

Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing (right side) November 2 1916 shy chimeras set

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti

South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016

TIME 900a to 530p DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE Lo 40s to 60

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

Trait Thompson - OMES

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking on A206 (Alpha)

Demolition for RP2 repair NW-0A06

ITEMS DISCUSSED

With WJE reviewed masonry cleaning processes changes to biological cleaning that have been

necessary to achieve the same results as trial repairs raking and repointing mockups for limestone

and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an

injection repairs patching repairs to limestone and granite See meeting notes from 11302016

follow up meeting to discuss WJE observations regarding the work

With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work

that necessary to make the area complete

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 2 of 4

ACTION REQUIRED

Revisions to repairs on A206 due to discovered conditions (TreanorHL)

bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone

bull at NW-0501 due to condition uncovered by joint raking

ITEMS TO VERIFY

REMARKS

OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes

Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to

tour the scaffold Reviewed window and masonry related work

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A206 ndash Site tour with OMES and WJE

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 3 of 4

A209 (left) and A208 (right) ndash Scaffold construction continues

A206 ndash NW-0A06 demolition in progress

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 4 of 4

A206 ndash Stone salvaged from NW-0A06

A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016

TIME 1000a to 530p DAY OF WEEK Monday

OWNER OMES TEMP RANGE Mid 50s to Lo 60s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Lukasz Lesniak Field Superintendent ndash Mark 1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking and repointing on A206 (Alpha)

Roofing materials being hoisted to the north wing roof

ITEMS DISCUSSED

Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps

there is some cold soak left to perform and sealant removal at window perimeter Temperature

restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this

week to create heated enclosure Discussed the need to monitor temperature and record it not only

on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and

other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is

approximately 50 complete

Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece

(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)

Met with JE Dunn to organize field walk for WJE visit

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 2 of 5

Reviewed window sill conditions including additional condition involving lead sheet flashing at the

bottom of cast iron sills

Temporary protection for built-in gutter

Stone color no word on additional lighter shades to better match light colored existing stones Mark

1 will salvage pieces of usable material where possible from other locations in case it is needed

ACTION REQUIRED

Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation

(TreanorHL)

ITEMS TO VERIFY

REMARKS

Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been

effective overall but the drying times are quite variable Some areas that have not seen water in

over a week are still visibly damp

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 3 of 5

A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in

right photo ndash end of tape is against the window frame in both photos

A208 ndash Residual dampness on A208 from cleaning

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 4 of 5

A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital

A207 ndash Lead T-cap installation for mock up review

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 5 of 5

A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining

material is brittle in some locations Additional detail will be issued for condition as part of forthcoming

ASI Believe this is window 459 ndash type G

A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016

TIME 800a to 12 noon DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE Mid 30s to Lo 50s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Raking on A206 (Alpha)

Substrate and backing conditions at RP repair NW-0A06

Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were

found on the west end of the frieze stone The tie-wire was easily removed from the back up

construction No rivet was found the pocket (which had been cut through) appears to have been

slugged full with mortar as construction progressed

Tarps being hung on A206 (Alpha)

ITEMS DISCUSSED

Protection for weather and monitoring conditions within the enclosure

Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to

moderate efflorescence were noted The most prominent is at the location of the redressing on NE-

0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent

dampness during cleaning operations The scaling that was the impetus for the redressing is located

at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 2 of 5

area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material

the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to

indicate the sealer is present even at this depth Potential sources of salts identified backing

construction penetrating sealer applied to building Area was discussed with WJE personnel

Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the

bottom of the corbel molding Both locations are unique to this elevation

ACTION REQUIRED

Tarp installation on all facades placement and distribution of heating devices including monitoring

devices for temperature (Mark1 and JE Dunn)

Direction for spot cleaning on A208 (Charlie)

ITEMS TO VERIFY

Method for monitoring conditions inside the tarped area (JE Dunn)

REMARKS

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 3 of 5

A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter

round differs from those specified in 1914 but specifications do not mention attachment at concrete

This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over

and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed

A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above

is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 4 of 5

A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been

slugged full with mortar prior to setting course above tie wire pulled freely from backing construction

Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction

aides to plumb up the tall stones during setting

A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No

signs of distress observed but area was dusty and full of debris from demolition

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 5 of 5

A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze

stones

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

JED

JEDBak

er

Mar

k 1

ProjectOklahoma StateCapitolRehabilitation

Date12072016

DrawingSite UtilizationPlan

Legend -JED Trailer Compound

-Phase 1 Site Fencing

-Gravel laydown

-Fence gate

-Future phases site fencing

-Future phases gravel laydown

EnvAct

Review

JED

Mark 1

JED

Faith

Dumpster

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Window Abatement Tracking Plan

DECEMBER 2016

Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti

South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016

TIME 900a to 530p DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE Lo 40s to 60

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

Trait Thompson - OMES

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking on A206 (Alpha)

Demolition for RP2 repair NW-0A06

ITEMS DISCUSSED

With WJE reviewed masonry cleaning processes changes to biological cleaning that have been

necessary to achieve the same results as trial repairs raking and repointing mockups for limestone

and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an

injection repairs patching repairs to limestone and granite See meeting notes from 11302016

follow up meeting to discuss WJE observations regarding the work

With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work

that necessary to make the area complete

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 2 of 4

ACTION REQUIRED

Revisions to repairs on A206 due to discovered conditions (TreanorHL)

bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone

bull at NW-0501 due to condition uncovered by joint raking

ITEMS TO VERIFY

REMARKS

OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes

Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to

tour the scaffold Reviewed window and masonry related work

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A206 ndash Site tour with OMES and WJE

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 3 of 4

A209 (left) and A208 (right) ndash Scaffold construction continues

A206 ndash NW-0A06 demolition in progress

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 4 of 4

A206 ndash Stone salvaged from NW-0A06

A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016

TIME 1000a to 530p DAY OF WEEK Monday

OWNER OMES TEMP RANGE Mid 50s to Lo 60s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Lukasz Lesniak Field Superintendent ndash Mark 1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking and repointing on A206 (Alpha)

Roofing materials being hoisted to the north wing roof

ITEMS DISCUSSED

Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps

there is some cold soak left to perform and sealant removal at window perimeter Temperature

restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this

week to create heated enclosure Discussed the need to monitor temperature and record it not only

on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and

other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is

approximately 50 complete

Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece

(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)

Met with JE Dunn to organize field walk for WJE visit

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 2 of 5

Reviewed window sill conditions including additional condition involving lead sheet flashing at the

bottom of cast iron sills

Temporary protection for built-in gutter

Stone color no word on additional lighter shades to better match light colored existing stones Mark

1 will salvage pieces of usable material where possible from other locations in case it is needed

ACTION REQUIRED

Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation

(TreanorHL)

ITEMS TO VERIFY

REMARKS

Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been

effective overall but the drying times are quite variable Some areas that have not seen water in

over a week are still visibly damp

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 3 of 5

A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in

right photo ndash end of tape is against the window frame in both photos

A208 ndash Residual dampness on A208 from cleaning

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 4 of 5

A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital

A207 ndash Lead T-cap installation for mock up review

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 5 of 5

A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining

material is brittle in some locations Additional detail will be issued for condition as part of forthcoming

ASI Believe this is window 459 ndash type G

A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016

TIME 800a to 12 noon DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE Mid 30s to Lo 50s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Raking on A206 (Alpha)

Substrate and backing conditions at RP repair NW-0A06

Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were

found on the west end of the frieze stone The tie-wire was easily removed from the back up

construction No rivet was found the pocket (which had been cut through) appears to have been

slugged full with mortar as construction progressed

Tarps being hung on A206 (Alpha)

ITEMS DISCUSSED

Protection for weather and monitoring conditions within the enclosure

Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to

moderate efflorescence were noted The most prominent is at the location of the redressing on NE-

0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent

dampness during cleaning operations The scaling that was the impetus for the redressing is located

at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 2 of 5

area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material

the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to

indicate the sealer is present even at this depth Potential sources of salts identified backing

construction penetrating sealer applied to building Area was discussed with WJE personnel

Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the

bottom of the corbel molding Both locations are unique to this elevation

ACTION REQUIRED

Tarp installation on all facades placement and distribution of heating devices including monitoring

devices for temperature (Mark1 and JE Dunn)

Direction for spot cleaning on A208 (Charlie)

ITEMS TO VERIFY

Method for monitoring conditions inside the tarped area (JE Dunn)

REMARKS

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 3 of 5

A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter

round differs from those specified in 1914 but specifications do not mention attachment at concrete

This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over

and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed

A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above

is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 4 of 5

A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been

slugged full with mortar prior to setting course above tie wire pulled freely from backing construction

Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction

aides to plumb up the tall stones during setting

A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No

signs of distress observed but area was dusty and full of debris from demolition

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 5 of 5

A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze

stones

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

JED

JEDBak

er

Mar

k 1

ProjectOklahoma StateCapitolRehabilitation

Date12072016

DrawingSite UtilizationPlan

Legend -JED Trailer Compound

-Phase 1 Site Fencing

-Gravel laydown

-Fence gate

-Future phases site fencing

-Future phases gravel laydown

EnvAct

Review

JED

Mark 1

JED

Faith

Dumpster

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Window Abatement Tracking Plan

DECEMBER 2016

Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016

TIME 900a to 530p DAY OF WEEK Tuesday

OWNER OMES TEMP RANGE Lo 40s to 60

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

Trait Thompson - OMES

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking on A206 (Alpha)

Demolition for RP2 repair NW-0A06

ITEMS DISCUSSED

With WJE reviewed masonry cleaning processes changes to biological cleaning that have been

necessary to achieve the same results as trial repairs raking and repointing mockups for limestone

and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an

injection repairs patching repairs to limestone and granite See meeting notes from 11302016

follow up meeting to discuss WJE observations regarding the work

With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work

that necessary to make the area complete

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 2 of 4

ACTION REQUIRED

Revisions to repairs on A206 due to discovered conditions (TreanorHL)

bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone

bull at NW-0501 due to condition uncovered by joint raking

ITEMS TO VERIFY

REMARKS

OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes

Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to

tour the scaffold Reviewed window and masonry related work

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A206 ndash Site tour with OMES and WJE

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 3 of 4

A209 (left) and A208 (right) ndash Scaffold construction continues

A206 ndash NW-0A06 demolition in progress

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 4 of 4

A206 ndash Stone salvaged from NW-0A06

A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016

TIME 1000a to 530p DAY OF WEEK Monday

OWNER OMES TEMP RANGE Mid 50s to Lo 60s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Lukasz Lesniak Field Superintendent ndash Mark 1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking and repointing on A206 (Alpha)

Roofing materials being hoisted to the north wing roof

ITEMS DISCUSSED

Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps

there is some cold soak left to perform and sealant removal at window perimeter Temperature

restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this

week to create heated enclosure Discussed the need to monitor temperature and record it not only

on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and

other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is

approximately 50 complete

Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece

(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)

Met with JE Dunn to organize field walk for WJE visit

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 2 of 5

Reviewed window sill conditions including additional condition involving lead sheet flashing at the

bottom of cast iron sills

Temporary protection for built-in gutter

Stone color no word on additional lighter shades to better match light colored existing stones Mark

1 will salvage pieces of usable material where possible from other locations in case it is needed

ACTION REQUIRED

Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation

(TreanorHL)

ITEMS TO VERIFY

REMARKS

Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been

effective overall but the drying times are quite variable Some areas that have not seen water in

over a week are still visibly damp

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 3 of 5

A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in

right photo ndash end of tape is against the window frame in both photos

A208 ndash Residual dampness on A208 from cleaning

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 4 of 5

A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital

A207 ndash Lead T-cap installation for mock up review

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 5 of 5

A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining

material is brittle in some locations Additional detail will be issued for condition as part of forthcoming

ASI Believe this is window 459 ndash type G

A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016

TIME 800a to 12 noon DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE Mid 30s to Lo 50s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Raking on A206 (Alpha)

Substrate and backing conditions at RP repair NW-0A06

Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were

found on the west end of the frieze stone The tie-wire was easily removed from the back up

construction No rivet was found the pocket (which had been cut through) appears to have been

slugged full with mortar as construction progressed

Tarps being hung on A206 (Alpha)

ITEMS DISCUSSED

Protection for weather and monitoring conditions within the enclosure

Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to

moderate efflorescence were noted The most prominent is at the location of the redressing on NE-

0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent

dampness during cleaning operations The scaling that was the impetus for the redressing is located

at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 2 of 5

area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material

the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to

indicate the sealer is present even at this depth Potential sources of salts identified backing

construction penetrating sealer applied to building Area was discussed with WJE personnel

Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the

bottom of the corbel molding Both locations are unique to this elevation

ACTION REQUIRED

Tarp installation on all facades placement and distribution of heating devices including monitoring

devices for temperature (Mark1 and JE Dunn)

Direction for spot cleaning on A208 (Charlie)

ITEMS TO VERIFY

Method for monitoring conditions inside the tarped area (JE Dunn)

REMARKS

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 3 of 5

A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter

round differs from those specified in 1914 but specifications do not mention attachment at concrete

This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over

and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed

A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above

is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 4 of 5

A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been

slugged full with mortar prior to setting course above tie wire pulled freely from backing construction

Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction

aides to plumb up the tall stones during setting

A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No

signs of distress observed but area was dusty and full of debris from demolition

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 5 of 5

A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze

stones

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

JED

JEDBak

er

Mar

k 1

ProjectOklahoma StateCapitolRehabilitation

Date12072016

DrawingSite UtilizationPlan

Legend -JED Trailer Compound

-Phase 1 Site Fencing

-Gravel laydown

-Fence gate

-Future phases site fencing

-Future phases gravel laydown

EnvAct

Review

JED

Mark 1

JED

Faith

Dumpster

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Window Abatement Tracking Plan

DECEMBER 2016

Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 2 of 4

ACTION REQUIRED

Revisions to repairs on A206 due to discovered conditions (TreanorHL)

bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone

bull at NW-0501 due to condition uncovered by joint raking

ITEMS TO VERIFY

REMARKS

OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes

Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to

tour the scaffold Reviewed window and masonry related work

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A206 ndash Site tour with OMES and WJE

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 3 of 4

A209 (left) and A208 (right) ndash Scaffold construction continues

A206 ndash NW-0A06 demolition in progress

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 4 of 4

A206 ndash Stone salvaged from NW-0A06

A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016

TIME 1000a to 530p DAY OF WEEK Monday

OWNER OMES TEMP RANGE Mid 50s to Lo 60s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Lukasz Lesniak Field Superintendent ndash Mark 1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking and repointing on A206 (Alpha)

Roofing materials being hoisted to the north wing roof

ITEMS DISCUSSED

Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps

there is some cold soak left to perform and sealant removal at window perimeter Temperature

restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this

week to create heated enclosure Discussed the need to monitor temperature and record it not only

on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and

other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is

approximately 50 complete

Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece

(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)

Met with JE Dunn to organize field walk for WJE visit

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 2 of 5

Reviewed window sill conditions including additional condition involving lead sheet flashing at the

bottom of cast iron sills

Temporary protection for built-in gutter

Stone color no word on additional lighter shades to better match light colored existing stones Mark

1 will salvage pieces of usable material where possible from other locations in case it is needed

ACTION REQUIRED

Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation

(TreanorHL)

ITEMS TO VERIFY

REMARKS

Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been

effective overall but the drying times are quite variable Some areas that have not seen water in

over a week are still visibly damp

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 3 of 5

A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in

right photo ndash end of tape is against the window frame in both photos

A208 ndash Residual dampness on A208 from cleaning

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 4 of 5

A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital

A207 ndash Lead T-cap installation for mock up review

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 5 of 5

A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining

material is brittle in some locations Additional detail will be issued for condition as part of forthcoming

ASI Believe this is window 459 ndash type G

A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016

TIME 800a to 12 noon DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE Mid 30s to Lo 50s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Raking on A206 (Alpha)

Substrate and backing conditions at RP repair NW-0A06

Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were

found on the west end of the frieze stone The tie-wire was easily removed from the back up

construction No rivet was found the pocket (which had been cut through) appears to have been

slugged full with mortar as construction progressed

Tarps being hung on A206 (Alpha)

ITEMS DISCUSSED

Protection for weather and monitoring conditions within the enclosure

Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to

moderate efflorescence were noted The most prominent is at the location of the redressing on NE-

0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent

dampness during cleaning operations The scaling that was the impetus for the redressing is located

at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 2 of 5

area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material

the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to

indicate the sealer is present even at this depth Potential sources of salts identified backing

construction penetrating sealer applied to building Area was discussed with WJE personnel

Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the

bottom of the corbel molding Both locations are unique to this elevation

ACTION REQUIRED

Tarp installation on all facades placement and distribution of heating devices including monitoring

devices for temperature (Mark1 and JE Dunn)

Direction for spot cleaning on A208 (Charlie)

ITEMS TO VERIFY

Method for monitoring conditions inside the tarped area (JE Dunn)

REMARKS

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 3 of 5

A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter

round differs from those specified in 1914 but specifications do not mention attachment at concrete

This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over

and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed

A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above

is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 4 of 5

A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been

slugged full with mortar prior to setting course above tie wire pulled freely from backing construction

Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction

aides to plumb up the tall stones during setting

A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No

signs of distress observed but area was dusty and full of debris from demolition

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 5 of 5

A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze

stones

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

JED

JEDBak

er

Mar

k 1

ProjectOklahoma StateCapitolRehabilitation

Date12072016

DrawingSite UtilizationPlan

Legend -JED Trailer Compound

-Phase 1 Site Fencing

-Gravel laydown

-Fence gate

-Future phases site fencing

-Future phases gravel laydown

EnvAct

Review

JED

Mark 1

JED

Faith

Dumpster

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Window Abatement Tracking Plan

DECEMBER 2016

Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 3 of 4

A209 (left) and A208 (right) ndash Scaffold construction continues

A206 ndash NW-0A06 demolition in progress

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 4 of 4

A206 ndash Stone salvaged from NW-0A06

A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016

TIME 1000a to 530p DAY OF WEEK Monday

OWNER OMES TEMP RANGE Mid 50s to Lo 60s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Lukasz Lesniak Field Superintendent ndash Mark 1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking and repointing on A206 (Alpha)

Roofing materials being hoisted to the north wing roof

ITEMS DISCUSSED

Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps

there is some cold soak left to perform and sealant removal at window perimeter Temperature

restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this

week to create heated enclosure Discussed the need to monitor temperature and record it not only

on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and

other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is

approximately 50 complete

Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece

(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)

Met with JE Dunn to organize field walk for WJE visit

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 2 of 5

Reviewed window sill conditions including additional condition involving lead sheet flashing at the

bottom of cast iron sills

Temporary protection for built-in gutter

Stone color no word on additional lighter shades to better match light colored existing stones Mark

1 will salvage pieces of usable material where possible from other locations in case it is needed

ACTION REQUIRED

Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation

(TreanorHL)

ITEMS TO VERIFY

REMARKS

Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been

effective overall but the drying times are quite variable Some areas that have not seen water in

over a week are still visibly damp

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 3 of 5

A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in

right photo ndash end of tape is against the window frame in both photos

A208 ndash Residual dampness on A208 from cleaning

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 4 of 5

A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital

A207 ndash Lead T-cap installation for mock up review

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 5 of 5

A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining

material is brittle in some locations Additional detail will be issued for condition as part of forthcoming

ASI Believe this is window 459 ndash type G

A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016

TIME 800a to 12 noon DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE Mid 30s to Lo 50s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Raking on A206 (Alpha)

Substrate and backing conditions at RP repair NW-0A06

Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were

found on the west end of the frieze stone The tie-wire was easily removed from the back up

construction No rivet was found the pocket (which had been cut through) appears to have been

slugged full with mortar as construction progressed

Tarps being hung on A206 (Alpha)

ITEMS DISCUSSED

Protection for weather and monitoring conditions within the enclosure

Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to

moderate efflorescence were noted The most prominent is at the location of the redressing on NE-

0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent

dampness during cleaning operations The scaling that was the impetus for the redressing is located

at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 2 of 5

area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material

the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to

indicate the sealer is present even at this depth Potential sources of salts identified backing

construction penetrating sealer applied to building Area was discussed with WJE personnel

Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the

bottom of the corbel molding Both locations are unique to this elevation

ACTION REQUIRED

Tarp installation on all facades placement and distribution of heating devices including monitoring

devices for temperature (Mark1 and JE Dunn)

Direction for spot cleaning on A208 (Charlie)

ITEMS TO VERIFY

Method for monitoring conditions inside the tarped area (JE Dunn)

REMARKS

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 3 of 5

A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter

round differs from those specified in 1914 but specifications do not mention attachment at concrete

This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over

and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed

A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above

is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 4 of 5

A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been

slugged full with mortar prior to setting course above tie wire pulled freely from backing construction

Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction

aides to plumb up the tall stones during setting

A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No

signs of distress observed but area was dusty and full of debris from demolition

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 5 of 5

A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze

stones

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

JED

JEDBak

er

Mar

k 1

ProjectOklahoma StateCapitolRehabilitation

Date12072016

DrawingSite UtilizationPlan

Legend -JED Trailer Compound

-Phase 1 Site Fencing

-Gravel laydown

-Fence gate

-Future phases site fencing

-Future phases gravel laydown

EnvAct

Review

JED

Mark 1

JED

Faith

Dumpster

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Window Abatement Tracking Plan

DECEMBER 2016

Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx

Page 4 of 4

A206 ndash Stone salvaged from NW-0A06

A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016

TIME 1000a to 530p DAY OF WEEK Monday

OWNER OMES TEMP RANGE Mid 50s to Lo 60s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Lukasz Lesniak Field Superintendent ndash Mark 1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking and repointing on A206 (Alpha)

Roofing materials being hoisted to the north wing roof

ITEMS DISCUSSED

Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps

there is some cold soak left to perform and sealant removal at window perimeter Temperature

restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this

week to create heated enclosure Discussed the need to monitor temperature and record it not only

on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and

other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is

approximately 50 complete

Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece

(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)

Met with JE Dunn to organize field walk for WJE visit

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 2 of 5

Reviewed window sill conditions including additional condition involving lead sheet flashing at the

bottom of cast iron sills

Temporary protection for built-in gutter

Stone color no word on additional lighter shades to better match light colored existing stones Mark

1 will salvage pieces of usable material where possible from other locations in case it is needed

ACTION REQUIRED

Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation

(TreanorHL)

ITEMS TO VERIFY

REMARKS

Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been

effective overall but the drying times are quite variable Some areas that have not seen water in

over a week are still visibly damp

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 3 of 5

A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in

right photo ndash end of tape is against the window frame in both photos

A208 ndash Residual dampness on A208 from cleaning

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 4 of 5

A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital

A207 ndash Lead T-cap installation for mock up review

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 5 of 5

A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining

material is brittle in some locations Additional detail will be issued for condition as part of forthcoming

ASI Believe this is window 459 ndash type G

A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016

TIME 800a to 12 noon DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE Mid 30s to Lo 50s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Raking on A206 (Alpha)

Substrate and backing conditions at RP repair NW-0A06

Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were

found on the west end of the frieze stone The tie-wire was easily removed from the back up

construction No rivet was found the pocket (which had been cut through) appears to have been

slugged full with mortar as construction progressed

Tarps being hung on A206 (Alpha)

ITEMS DISCUSSED

Protection for weather and monitoring conditions within the enclosure

Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to

moderate efflorescence were noted The most prominent is at the location of the redressing on NE-

0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent

dampness during cleaning operations The scaling that was the impetus for the redressing is located

at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 2 of 5

area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material

the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to

indicate the sealer is present even at this depth Potential sources of salts identified backing

construction penetrating sealer applied to building Area was discussed with WJE personnel

Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the

bottom of the corbel molding Both locations are unique to this elevation

ACTION REQUIRED

Tarp installation on all facades placement and distribution of heating devices including monitoring

devices for temperature (Mark1 and JE Dunn)

Direction for spot cleaning on A208 (Charlie)

ITEMS TO VERIFY

Method for monitoring conditions inside the tarped area (JE Dunn)

REMARKS

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 3 of 5

A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter

round differs from those specified in 1914 but specifications do not mention attachment at concrete

This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over

and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed

A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above

is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 4 of 5

A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been

slugged full with mortar prior to setting course above tie wire pulled freely from backing construction

Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction

aides to plumb up the tall stones during setting

A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No

signs of distress observed but area was dusty and full of debris from demolition

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 5 of 5

A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze

stones

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

JED

JEDBak

er

Mar

k 1

ProjectOklahoma StateCapitolRehabilitation

Date12072016

DrawingSite UtilizationPlan

Legend -JED Trailer Compound

-Phase 1 Site Fencing

-Gravel laydown

-Fence gate

-Future phases site fencing

-Future phases gravel laydown

EnvAct

Review

JED

Mark 1

JED

Faith

Dumpster

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Window Abatement Tracking Plan

DECEMBER 2016

Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016

TIME 1000a to 530p DAY OF WEEK Monday

OWNER OMES TEMP RANGE Mid 50s to Lo 60s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Lukasz Lesniak Field Superintendent ndash Mark 1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Abatement at windows is in progress on A208 (Charlie)

Raking and repointing on A206 (Alpha)

Roofing materials being hoisted to the north wing roof

ITEMS DISCUSSED

Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps

there is some cold soak left to perform and sealant removal at window perimeter Temperature

restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this

week to create heated enclosure Discussed the need to monitor temperature and record it not only

on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and

other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is

approximately 50 complete

Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece

(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)

Met with JE Dunn to organize field walk for WJE visit

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 2 of 5

Reviewed window sill conditions including additional condition involving lead sheet flashing at the

bottom of cast iron sills

Temporary protection for built-in gutter

Stone color no word on additional lighter shades to better match light colored existing stones Mark

1 will salvage pieces of usable material where possible from other locations in case it is needed

ACTION REQUIRED

Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation

(TreanorHL)

ITEMS TO VERIFY

REMARKS

Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been

effective overall but the drying times are quite variable Some areas that have not seen water in

over a week are still visibly damp

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 3 of 5

A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in

right photo ndash end of tape is against the window frame in both photos

A208 ndash Residual dampness on A208 from cleaning

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 4 of 5

A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital

A207 ndash Lead T-cap installation for mock up review

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 5 of 5

A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining

material is brittle in some locations Additional detail will be issued for condition as part of forthcoming

ASI Believe this is window 459 ndash type G

A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016

TIME 800a to 12 noon DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE Mid 30s to Lo 50s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Raking on A206 (Alpha)

Substrate and backing conditions at RP repair NW-0A06

Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were

found on the west end of the frieze stone The tie-wire was easily removed from the back up

construction No rivet was found the pocket (which had been cut through) appears to have been

slugged full with mortar as construction progressed

Tarps being hung on A206 (Alpha)

ITEMS DISCUSSED

Protection for weather and monitoring conditions within the enclosure

Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to

moderate efflorescence were noted The most prominent is at the location of the redressing on NE-

0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent

dampness during cleaning operations The scaling that was the impetus for the redressing is located

at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 2 of 5

area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material

the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to

indicate the sealer is present even at this depth Potential sources of salts identified backing

construction penetrating sealer applied to building Area was discussed with WJE personnel

Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the

bottom of the corbel molding Both locations are unique to this elevation

ACTION REQUIRED

Tarp installation on all facades placement and distribution of heating devices including monitoring

devices for temperature (Mark1 and JE Dunn)

Direction for spot cleaning on A208 (Charlie)

ITEMS TO VERIFY

Method for monitoring conditions inside the tarped area (JE Dunn)

REMARKS

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 3 of 5

A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter

round differs from those specified in 1914 but specifications do not mention attachment at concrete

This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over

and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed

A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above

is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 4 of 5

A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been

slugged full with mortar prior to setting course above tie wire pulled freely from backing construction

Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction

aides to plumb up the tall stones during setting

A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No

signs of distress observed but area was dusty and full of debris from demolition

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 5 of 5

A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze

stones

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

JED

JEDBak

er

Mar

k 1

ProjectOklahoma StateCapitolRehabilitation

Date12072016

DrawingSite UtilizationPlan

Legend -JED Trailer Compound

-Phase 1 Site Fencing

-Gravel laydown

-Fence gate

-Future phases site fencing

-Future phases gravel laydown

EnvAct

Review

JED

Mark 1

JED

Faith

Dumpster

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Window Abatement Tracking Plan

DECEMBER 2016

Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 2 of 5

Reviewed window sill conditions including additional condition involving lead sheet flashing at the

bottom of cast iron sills

Temporary protection for built-in gutter

Stone color no word on additional lighter shades to better match light colored existing stones Mark

1 will salvage pieces of usable material where possible from other locations in case it is needed

ACTION REQUIRED

Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation

(TreanorHL)

ITEMS TO VERIFY

REMARKS

Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been

effective overall but the drying times are quite variable Some areas that have not seen water in

over a week are still visibly damp

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 3 of 5

A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in

right photo ndash end of tape is against the window frame in both photos

A208 ndash Residual dampness on A208 from cleaning

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 4 of 5

A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital

A207 ndash Lead T-cap installation for mock up review

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 5 of 5

A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining

material is brittle in some locations Additional detail will be issued for condition as part of forthcoming

ASI Believe this is window 459 ndash type G

A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016

TIME 800a to 12 noon DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE Mid 30s to Lo 50s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Raking on A206 (Alpha)

Substrate and backing conditions at RP repair NW-0A06

Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were

found on the west end of the frieze stone The tie-wire was easily removed from the back up

construction No rivet was found the pocket (which had been cut through) appears to have been

slugged full with mortar as construction progressed

Tarps being hung on A206 (Alpha)

ITEMS DISCUSSED

Protection for weather and monitoring conditions within the enclosure

Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to

moderate efflorescence were noted The most prominent is at the location of the redressing on NE-

0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent

dampness during cleaning operations The scaling that was the impetus for the redressing is located

at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 2 of 5

area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material

the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to

indicate the sealer is present even at this depth Potential sources of salts identified backing

construction penetrating sealer applied to building Area was discussed with WJE personnel

Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the

bottom of the corbel molding Both locations are unique to this elevation

ACTION REQUIRED

Tarp installation on all facades placement and distribution of heating devices including monitoring

devices for temperature (Mark1 and JE Dunn)

Direction for spot cleaning on A208 (Charlie)

ITEMS TO VERIFY

Method for monitoring conditions inside the tarped area (JE Dunn)

REMARKS

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 3 of 5

A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter

round differs from those specified in 1914 but specifications do not mention attachment at concrete

This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over

and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed

A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above

is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 4 of 5

A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been

slugged full with mortar prior to setting course above tie wire pulled freely from backing construction

Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction

aides to plumb up the tall stones during setting

A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No

signs of distress observed but area was dusty and full of debris from demolition

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 5 of 5

A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze

stones

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

JED

JEDBak

er

Mar

k 1

ProjectOklahoma StateCapitolRehabilitation

Date12072016

DrawingSite UtilizationPlan

Legend -JED Trailer Compound

-Phase 1 Site Fencing

-Gravel laydown

-Fence gate

-Future phases site fencing

-Future phases gravel laydown

EnvAct

Review

JED

Mark 1

JED

Faith

Dumpster

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Window Abatement Tracking Plan

DECEMBER 2016

Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 3 of 5

A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in

right photo ndash end of tape is against the window frame in both photos

A208 ndash Residual dampness on A208 from cleaning

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 4 of 5

A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital

A207 ndash Lead T-cap installation for mock up review

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 5 of 5

A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining

material is brittle in some locations Additional detail will be issued for condition as part of forthcoming

ASI Believe this is window 459 ndash type G

A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016

TIME 800a to 12 noon DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE Mid 30s to Lo 50s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Raking on A206 (Alpha)

Substrate and backing conditions at RP repair NW-0A06

Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were

found on the west end of the frieze stone The tie-wire was easily removed from the back up

construction No rivet was found the pocket (which had been cut through) appears to have been

slugged full with mortar as construction progressed

Tarps being hung on A206 (Alpha)

ITEMS DISCUSSED

Protection for weather and monitoring conditions within the enclosure

Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to

moderate efflorescence were noted The most prominent is at the location of the redressing on NE-

0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent

dampness during cleaning operations The scaling that was the impetus for the redressing is located

at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 2 of 5

area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material

the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to

indicate the sealer is present even at this depth Potential sources of salts identified backing

construction penetrating sealer applied to building Area was discussed with WJE personnel

Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the

bottom of the corbel molding Both locations are unique to this elevation

ACTION REQUIRED

Tarp installation on all facades placement and distribution of heating devices including monitoring

devices for temperature (Mark1 and JE Dunn)

Direction for spot cleaning on A208 (Charlie)

ITEMS TO VERIFY

Method for monitoring conditions inside the tarped area (JE Dunn)

REMARKS

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 3 of 5

A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter

round differs from those specified in 1914 but specifications do not mention attachment at concrete

This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over

and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed

A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above

is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 4 of 5

A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been

slugged full with mortar prior to setting course above tie wire pulled freely from backing construction

Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction

aides to plumb up the tall stones during setting

A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No

signs of distress observed but area was dusty and full of debris from demolition

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 5 of 5

A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze

stones

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

JED

JEDBak

er

Mar

k 1

ProjectOklahoma StateCapitolRehabilitation

Date12072016

DrawingSite UtilizationPlan

Legend -JED Trailer Compound

-Phase 1 Site Fencing

-Gravel laydown

-Fence gate

-Future phases site fencing

-Future phases gravel laydown

EnvAct

Review

JED

Mark 1

JED

Faith

Dumpster

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Window Abatement Tracking Plan

DECEMBER 2016

Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 4 of 5

A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital

A207 ndash Lead T-cap installation for mock up review

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 5 of 5

A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining

material is brittle in some locations Additional detail will be issued for condition as part of forthcoming

ASI Believe this is window 459 ndash type G

A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016

TIME 800a to 12 noon DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE Mid 30s to Lo 50s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Raking on A206 (Alpha)

Substrate and backing conditions at RP repair NW-0A06

Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were

found on the west end of the frieze stone The tie-wire was easily removed from the back up

construction No rivet was found the pocket (which had been cut through) appears to have been

slugged full with mortar as construction progressed

Tarps being hung on A206 (Alpha)

ITEMS DISCUSSED

Protection for weather and monitoring conditions within the enclosure

Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to

moderate efflorescence were noted The most prominent is at the location of the redressing on NE-

0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent

dampness during cleaning operations The scaling that was the impetus for the redressing is located

at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 2 of 5

area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material

the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to

indicate the sealer is present even at this depth Potential sources of salts identified backing

construction penetrating sealer applied to building Area was discussed with WJE personnel

Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the

bottom of the corbel molding Both locations are unique to this elevation

ACTION REQUIRED

Tarp installation on all facades placement and distribution of heating devices including monitoring

devices for temperature (Mark1 and JE Dunn)

Direction for spot cleaning on A208 (Charlie)

ITEMS TO VERIFY

Method for monitoring conditions inside the tarped area (JE Dunn)

REMARKS

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 3 of 5

A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter

round differs from those specified in 1914 but specifications do not mention attachment at concrete

This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over

and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed

A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above

is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 4 of 5

A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been

slugged full with mortar prior to setting course above tie wire pulled freely from backing construction

Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction

aides to plumb up the tall stones during setting

A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No

signs of distress observed but area was dusty and full of debris from demolition

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 5 of 5

A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze

stones

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

JED

JEDBak

er

Mar

k 1

ProjectOklahoma StateCapitolRehabilitation

Date12072016

DrawingSite UtilizationPlan

Legend -JED Trailer Compound

-Phase 1 Site Fencing

-Gravel laydown

-Fence gate

-Future phases site fencing

-Future phases gravel laydown

EnvAct

Review

JED

Mark 1

JED

Faith

Dumpster

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Window Abatement Tracking Plan

DECEMBER 2016

Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx

Page 5 of 5

A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining

material is brittle in some locations Additional detail will be issued for condition as part of forthcoming

ASI Believe this is window 459 ndash type G

A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016

TIME 800a to 12 noon DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE Mid 30s to Lo 50s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Raking on A206 (Alpha)

Substrate and backing conditions at RP repair NW-0A06

Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were

found on the west end of the frieze stone The tie-wire was easily removed from the back up

construction No rivet was found the pocket (which had been cut through) appears to have been

slugged full with mortar as construction progressed

Tarps being hung on A206 (Alpha)

ITEMS DISCUSSED

Protection for weather and monitoring conditions within the enclosure

Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to

moderate efflorescence were noted The most prominent is at the location of the redressing on NE-

0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent

dampness during cleaning operations The scaling that was the impetus for the redressing is located

at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 2 of 5

area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material

the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to

indicate the sealer is present even at this depth Potential sources of salts identified backing

construction penetrating sealer applied to building Area was discussed with WJE personnel

Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the

bottom of the corbel molding Both locations are unique to this elevation

ACTION REQUIRED

Tarp installation on all facades placement and distribution of heating devices including monitoring

devices for temperature (Mark1 and JE Dunn)

Direction for spot cleaning on A208 (Charlie)

ITEMS TO VERIFY

Method for monitoring conditions inside the tarped area (JE Dunn)

REMARKS

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 3 of 5

A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter

round differs from those specified in 1914 but specifications do not mention attachment at concrete

This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over

and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed

A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above

is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 4 of 5

A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been

slugged full with mortar prior to setting course above tie wire pulled freely from backing construction

Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction

aides to plumb up the tall stones during setting

A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No

signs of distress observed but area was dusty and full of debris from demolition

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 5 of 5

A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze

stones

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

JED

JEDBak

er

Mar

k 1

ProjectOklahoma StateCapitolRehabilitation

Date12072016

DrawingSite UtilizationPlan

Legend -JED Trailer Compound

-Phase 1 Site Fencing

-Gravel laydown

-Fence gate

-Future phases site fencing

-Future phases gravel laydown

EnvAct

Review

JED

Mark 1

JED

Faith

Dumpster

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Window Abatement Tracking Plan

DECEMBER 2016

Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 1 of 5

FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016

TIME 800a to 12 noon DAY OF WEEK Wednesday

OWNER OMES TEMP RANGE Mid 30s to Lo 50s

PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO 15039DB

JE DUNN PROJECT NO 15025800

ADG PROJECT NO 15-007

TREANOR PROJECT NO HP 1500700B

ZFI PROJECT NO 15071-01

ALVINE PROJECT NO 2014-4286

SRB PROJECT NO 114801

WEATHER Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _ ___

SITE CONDITIONS Clear Dusty Muddy Other ______________________

PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction

Heath Glenn Superintendent ndash JE Dunn Construction

Lynnsee Boyse Project Manager ndash JE Dunn Construction

Landon Heaton Project Engineer ndash JE Dunn Construction

Jason Cady ndash Mass Architects AE-1

S Naggatz J Freedland ndash WJE AE-1

WORK OBSERVED

Scaffold erection on A209 (Delta) on going

Raking on A206 (Alpha)

Substrate and backing conditions at RP repair NW-0A06

Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were

found on the west end of the frieze stone The tie-wire was easily removed from the back up

construction No rivet was found the pocket (which had been cut through) appears to have been

slugged full with mortar as construction progressed

Tarps being hung on A206 (Alpha)

ITEMS DISCUSSED

Protection for weather and monitoring conditions within the enclosure

Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to

moderate efflorescence were noted The most prominent is at the location of the redressing on NE-

0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent

dampness during cleaning operations The scaling that was the impetus for the redressing is located

at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 2 of 5

area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material

the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to

indicate the sealer is present even at this depth Potential sources of salts identified backing

construction penetrating sealer applied to building Area was discussed with WJE personnel

Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the

bottom of the corbel molding Both locations are unique to this elevation

ACTION REQUIRED

Tarp installation on all facades placement and distribution of heating devices including monitoring

devices for temperature (Mark1 and JE Dunn)

Direction for spot cleaning on A208 (Charlie)

ITEMS TO VERIFY

Method for monitoring conditions inside the tarped area (JE Dunn)

REMARKS

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 3 of 5

A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter

round differs from those specified in 1914 but specifications do not mention attachment at concrete

This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over

and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed

A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above

is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 4 of 5

A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been

slugged full with mortar prior to setting course above tie wire pulled freely from backing construction

Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction

aides to plumb up the tall stones during setting

A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No

signs of distress observed but area was dusty and full of debris from demolition

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 5 of 5

A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze

stones

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

JED

JEDBak

er

Mar

k 1

ProjectOklahoma StateCapitolRehabilitation

Date12072016

DrawingSite UtilizationPlan

Legend -JED Trailer Compound

-Phase 1 Site Fencing

-Gravel laydown

-Fence gate

-Future phases site fencing

-Future phases gravel laydown

EnvAct

Review

JED

Mark 1

JED

Faith

Dumpster

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Window Abatement Tracking Plan

DECEMBER 2016

Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 2 of 5

area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material

the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to

indicate the sealer is present even at this depth Potential sources of salts identified backing

construction penetrating sealer applied to building Area was discussed with WJE personnel

Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the

bottom of the corbel molding Both locations are unique to this elevation

ACTION REQUIRED

Tarp installation on all facades placement and distribution of heating devices including monitoring

devices for temperature (Mark1 and JE Dunn)

Direction for spot cleaning on A208 (Charlie)

ITEMS TO VERIFY

Method for monitoring conditions inside the tarped area (JE Dunn)

REMARKS

OBSERVED BY Julia Manglitz (TreanorHL)

COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson

(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew

Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE

Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC

Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott

(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor

Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs

(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts

Baldischwiler)

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 3 of 5

A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter

round differs from those specified in 1914 but specifications do not mention attachment at concrete

This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over

and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed

A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above

is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 4 of 5

A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been

slugged full with mortar prior to setting course above tie wire pulled freely from backing construction

Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction

aides to plumb up the tall stones during setting

A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No

signs of distress observed but area was dusty and full of debris from demolition

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 5 of 5

A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze

stones

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

JED

JEDBak

er

Mar

k 1

ProjectOklahoma StateCapitolRehabilitation

Date12072016

DrawingSite UtilizationPlan

Legend -JED Trailer Compound

-Phase 1 Site Fencing

-Gravel laydown

-Fence gate

-Future phases site fencing

-Future phases gravel laydown

EnvAct

Review

JED

Mark 1

JED

Faith

Dumpster

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Window Abatement Tracking Plan

DECEMBER 2016

Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 3 of 5

A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter

round differs from those specified in 1914 but specifications do not mention attachment at concrete

This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over

and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed

A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above

is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 4 of 5

A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been

slugged full with mortar prior to setting course above tie wire pulled freely from backing construction

Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction

aides to plumb up the tall stones during setting

A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No

signs of distress observed but area was dusty and full of debris from demolition

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 5 of 5

A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze

stones

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

JED

JEDBak

er

Mar

k 1

ProjectOklahoma StateCapitolRehabilitation

Date12072016

DrawingSite UtilizationPlan

Legend -JED Trailer Compound

-Phase 1 Site Fencing

-Gravel laydown

-Fence gate

-Future phases site fencing

-Future phases gravel laydown

EnvAct

Review

JED

Mark 1

JED

Faith

Dumpster

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Window Abatement Tracking Plan

DECEMBER 2016

Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 4 of 5

A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been

slugged full with mortar prior to setting course above tie wire pulled freely from backing construction

Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction

aides to plumb up the tall stones during setting

A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No

signs of distress observed but area was dusty and full of debris from demolition

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 5 of 5

A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze

stones

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

JED

JEDBak

er

Mar

k 1

ProjectOklahoma StateCapitolRehabilitation

Date12072016

DrawingSite UtilizationPlan

Legend -JED Trailer Compound

-Phase 1 Site Fencing

-Gravel laydown

-Fence gate

-Future phases site fencing

-Future phases gravel laydown

EnvAct

Review

JED

Mark 1

JED

Faith

Dumpster

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Window Abatement Tracking Plan

DECEMBER 2016

Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx

Page 5 of 5

A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze

stones

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

JED

JEDBak

er

Mar

k 1

ProjectOklahoma StateCapitolRehabilitation

Date12072016

DrawingSite UtilizationPlan

Legend -JED Trailer Compound

-Phase 1 Site Fencing

-Gravel laydown

-Fence gate

-Future phases site fencing

-Future phases gravel laydown

EnvAct

Review

JED

Mark 1

JED

Faith

Dumpster

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Window Abatement Tracking Plan

DECEMBER 2016

Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Phasing amp Schedule Attachments The following documents are included in the subsequent pages

- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

JED

JEDBak

er

Mar

k 1

ProjectOklahoma StateCapitolRehabilitation

Date12072016

DrawingSite UtilizationPlan

Legend -JED Trailer Compound

-Phase 1 Site Fencing

-Gravel laydown

-Fence gate

-Future phases site fencing

-Future phases gravel laydown

EnvAct

Review

JED

Mark 1

JED

Faith

Dumpster

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Window Abatement Tracking Plan

DECEMBER 2016

Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Phasing Plan

The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

JED

JEDBak

er

Mar

k 1

ProjectOklahoma StateCapitolRehabilitation

Date12072016

DrawingSite UtilizationPlan

Legend -JED Trailer Compound

-Phase 1 Site Fencing

-Gravel laydown

-Fence gate

-Future phases site fencing

-Future phases gravel laydown

EnvAct

Review

JED

Mark 1

JED

Faith

Dumpster

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Window Abatement Tracking Plan

DECEMBER 2016

Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

ACTIVE ELEVATIONS

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

JED

JEDBak

er

Mar

k 1

ProjectOklahoma StateCapitolRehabilitation

Date12072016

DrawingSite UtilizationPlan

Legend -JED Trailer Compound

-Phase 1 Site Fencing

-Gravel laydown

-Fence gate

-Future phases site fencing

-Future phases gravel laydown

EnvAct

Review

JED

Mark 1

JED

Faith

Dumpster

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Window Abatement Tracking Plan

DECEMBER 2016

Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2016

Site Utilization Plan

Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment

The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment

JED

JEDBak

er

Mar

k 1

ProjectOklahoma StateCapitolRehabilitation

Date12072016

DrawingSite UtilizationPlan

Legend -JED Trailer Compound

-Phase 1 Site Fencing

-Gravel laydown

-Fence gate

-Future phases site fencing

-Future phases gravel laydown

EnvAct

Review

JED

Mark 1

JED

Faith

Dumpster

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Window Abatement Tracking Plan

DECEMBER 2016

Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

JED

JEDBak

er

Mar

k 1

ProjectOklahoma StateCapitolRehabilitation

Date12072016

DrawingSite UtilizationPlan

Legend -JED Trailer Compound

-Phase 1 Site Fencing

-Gravel laydown

-Fence gate

-Future phases site fencing

-Future phases gravel laydown

EnvAct

Review

JED

Mark 1

JED

Faith

Dumpster

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Window Abatement Tracking Plan

DECEMBER 2016

Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

Exterior Rehabilitation

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM

JE DUNN I TREANOR ARCHITECTS I ADG

RETURNS TO TABLE OF CONTENTSCLICK HERE

Window Abatement Tracking Plan

DECEMBER 2016

Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

SECOND FLOOR

100-0

THIRD FLOOR

114-6

FIRST FLOOR

88-0

BASEMENT

74-0

FOURTH FLOOR

126-3

FIFTH FLOOR

137-5

ATTIC

150-0

257A3

343A3

254C

256C

448G

449G

450G

538G

537G

536G

451A3

032L

033L

034A2

031L

154A2

153B

152B

151B

TOP OF PARAPET

162-2

255C

NE-0A08

NE-0A04NE-0A03 NE-0A09NE-0A01

NE-0501

NE-0203

NE-0202

NE-0A07

NE-0201

NE-0303

NE-0301

NE-0302

NE-0502

0

S01

S10

S05

S03

S06

S07

S07

S06

S03

S18

UNO

BO CORNICE TYP

S06

S07

BO WATERTABLE TYP

S07

FO

R N

OR

TH

WIN

G N

OR

TH

ELE

VA

TIO

N S

EE

A1A

207

WE25

WE25

WE25

WE25

WE28

WE28

WE28

S16

S18

S02

TYP AT JTW CONC

FO

R E

AS

T W

ING

NO

RT

H E

LE

VA

TIO

N S

EE

A1A

209

FOR EAST WINGEAST ELEVATION

SEE A1A210

NE-0A02

NE-0A06NE-0A05

WE44

WE28

S15

BO HEADERTYP OF 2 TYPEA2 OPENINGS

TYP OF 2 TYPEA2 OPENINGS

BO HEADERTYP OF 3TYPE BOPENINGS

TYP OF 3TYPE BOPENINGS

BO HEADERTYP OF 3TYPE COPENINGS

TYP OF 3TYPE COPENINGS

S07

S15

S16

S07S15

S16

BO HEADER TYPOF 3 TYPE A3OPENINGS

TYP OF 3TYPE A3OPENINGS

BO HEADERTYP OF 3TYPE GOPENINGS

TYP OF 6TYPE GOPENINGS

S16

S16

S07

S07

S15

S15

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

TYP THISCOURSE

WE28

WE28

WE25

WE27

2-8 18

7-3 1

8

S14

S12TYP ATSTONEGUTTER

S20

S07

TYP THISELEMENT

18 = 1-0

NORTH WING EAST ELEVATION40 8 16

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Asbestos Removed

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

Historic Window RestorationProgress Legend

Lead Paint RemovedFrom Screw Heads

Storm WindowRemoved

Historic GlassRemoved

Lead Paint RemovedFrom Window Frame

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14

22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14

Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20

21-Nov-16 A 24-Jan-17 21-Nov-16 20

CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8

CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4

CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4

CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4

ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20

19-Dec-16 A 24-Jan-17 19-Dec-16 20

CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5

CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50

CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54

Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20

20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20

CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12

09-Jan-17 24-Jan-17 12

CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3

CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3

CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3

CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3

Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12

28-Nov-16 A 12-Jan-17 28-Nov-16 12

CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12

New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50

Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50

CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50

Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40

27-Dec-16 21-Feb-17 40

CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40

ParapetParapetParapet 27-Dec-16 24-Jan-17 20

27-Dec-16 24-Jan-17 20

CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5

CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5

CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5

CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5

Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45

27-Dec-16 28-Feb-17 45

CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40

CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5

ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15

29-Dec-16 19-Jan-17 15

CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2

CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7

CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3

CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3

Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20

12-Dec-16 A 24-Jan-17 12-Dec-16 20

CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3

CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3

CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3

CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3

CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3

CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3

CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2

CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2

CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2

CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3

CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2

CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3

CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2

CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2

CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3

CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2

CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3

CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2

CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2

CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3

GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5

16-Jan-17 20-Jan-17 5

CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2

CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1

CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0

CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5

Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30

Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10

27-Dec-16 10-Jan-17 10

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Alpha-Shop restoration of windows

Alpha-Engineering approval of scaffold design

Alpha-Bay 1-Frame Testing amp Repairs

Alpha-Bay 2-Frame Testing amp Repairs

Alpha-Bay 3-Frame Testing amp Repairs

Alpha-Bay 4-Frame Testing amp Repairs

Alpha- Bay 1-Frame PrepPrime

Alpha-Bay 2-Frame PrepPrime

Alpha-Bay 3-Frame PrepPrime

Alpha-Remove Coping Stones

Alpha-Fill Voids amp Reset Loose Brick(s)

Alpha-Install Cramp amp Pin Anchors

Alpha-Fabricate Through-Wall Flashing

Alpha-Field Mea

Bravo-Shop restoration of windows

Bravo-Engineering approval of scaffold design

Bravo-Bay 1-Frame Testing amp Repairs

Bravo-Bay 2-Frame Testing amp Repairs

Bravo-Bay 3-Frame Testing amp Repairs

Bravo-Bay 4-Frame Testing amp Repairs

Bravo-Grinding and pointing step 1

Bravo-Field Mea

Charlie-Shop restoration of windows

Charlie-Remove Coping Stones

Charlie-Fill Voids amp Reset Loose Brick(s)

Charlie-Install Cramp amp Pin Anchors

Charlie-Fabricate Through-Wall Flashing

Delta-Submit Scaffold Engineering

Delta-Engineering approval of scaffold design

Delta-Shop restoration of windows

Delta-Field measure glass from the exterior face

Delta-Install temporary louversfresh air intake

Delta-Cover scaffolding with tarp

Delta-Install scaffold temporary power

Delta-Install scaffold temporary HVAC

Delta-Bay 1-WindowTrim Removal

Delta-Bay 2-WindowTrim Removal

Delta-Bay 3-WindowTrim Removal

Delta-Bay 4-WindowTrim Removal

Delta-Bay 5-WindowTrim Removal

Delta-Bay 6-WindowTrim Removal

Delta-Bay 1-Ext Abatement

Delta-Bay 2-Ext Abatement

Delta-Bay 3-Ext Abatement

Delta-Bay 1-Lead paint removal from window frames

Delta-Bay 4-Ext Abatement

Delta-Bay 2-Lead paint removal from window frames

Delta-Bay 5-Ext Abatement

Delta-Bay 6-Ext Abatement

Delta-Bay 3-Lead paint removal from window frames

Delta-Bay 7-Ext Abatement

Delta-Bay 4-Lead paint removal from window frames

Delta-Bay 8-Ext Abatement

Delta-Bay 9-Ext Abatement

Delta-Bay 5-Lead paint removal from window frames

Delta-Remove Electrical

Delta-Remove Lightning Protection

Delta-GutterParapet Start

Delta-Scaffold Back of Parapet

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 1 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2

Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur

CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5

CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5

ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20

11-Jan-17 07-Feb-17 20

CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20

CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5

InteriorInteriorInterior 11-Jan-17 17-Jan-17 5

11-Jan-17 17-Jan-17 5

CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5

Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue

Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12

Echo-Submit Scaffold Engineering

Echo-Engineering approval of scaffold design

Echo-Erect Scaffold

Echo-Install Overhead Protection Entrances

Echo-Asbestos containing material initial survey

4 -Week Look-Ahead

Data Date 26-Dec-16

Run Date 23-Dec-16 1302

Oklahoma State Capitol Exterior Renovation

Page 2 of 2