ContentsSummary MONTHLY CONSTRUCTION PROGRESS...
Transcript of ContentsSummary MONTHLY CONSTRUCTION PROGRESS...
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Summary
Contents
Key Activities
Scope Development
Schedule
Progress Photos
12345
EXTERIOR DESIGN BUILD TEAM I JE DUNN I TREANOR ARCHITECTS I ADG
JULY 2016
OKLAHOMA STATE CAPITOL RESTORATION
Exterior Rehabilitation
EXTERIOR DESIGN BUILD TEAM I JE DUNN I TREANORHL ARCHITECTS I ADG
OKLAHOMA STATE CAPITOL RESTORATION
Exterior Rehabilitation
ContentsSummary
Safety
Progress Photos
Attachments
1234`
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
JANUARY 2018
STATE CAPITOL RESTTATE CAPITOL RESTO STATE CAPITOL REST
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY, OK 73104 I P 405.302.4500 I WWW.JEDUNN.COM
RETURNS TO TABLE OF CONTENTSCLICK HERE
Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG
JANUARY 2018
Summary:
During the month of January on the Oklahoma Capitol Exterior Restoration project we completed the South Wing
East Elevation (Golf). The copper gutter was completed and the flood test passed. The punchlist walk was conducted, the
tarps and temporary power were removed, and we began dismantling the scaffold at the end of January. The scaffold will
be completely dismantled by mid-February. This scaffold will move to the West Wing South Elevation (Juliette) along with
the scaffolding from the India and Hotel elevations (South Wing West Elevation and South Wing South Elevation).
The South Wing West Elevation (India) stone repair walk was completed. Window sashes will begin arriving on-site in
February for installation. Once complete, the windows will be sealed, painted and water tested.
The window installation on the East Wing South Elevation (Foxtrot) phase 1 has been completed. The window
installation on phase 2 of this elevation is on-going and should be completed by the end of February. Stone cleaning has
started on phase 1 and will continue through-out February. The stone masons will move to phase 2 once the phase 1
cleaning is complete and the phase 2 window installation is complete. The gutter framing on phase 1 started at the end
of January and should complete the first week in February.
On the interior of the East Wing North Elevation (Delta) on the 2nd, 3rd, 4th and 5th floors we completed the
wall, ceiling and carpet repairs in the Senate offices, Senate Lounge and the Treasurer’s Office. These same repairs were
also completed on the East Wing East Elevation (Echo) in the Blue Room and the Governor’s Suite. The Court of Criminal
Appeals on the North Wing East Elevation (Charlie) also had the wall, ceiling and carpet repairs completed in January.
The South Portico (South Wing South Elevation – Hotel) cast iron paint has been completely removed following the
micro abrasion cleaning process. Painting mock-ups will be conducted in February. Once the mock-ups are complete, the
painting work will begin. The Stone Masons completed the repairs and cleaning on the upper portion of the portico. The
punchlist for the upper portion of the portico will be completed in early February. Following the punchlist, bird deterrent
will be installed from the column capitals to the coffered ceilings to prevent birds from nesting in the portico. The lower
portion of this elevation will be completed in mid-February. The scaffold is scheduled to begin coming down at the end of
February.
Exterior door demolition began in January and will continue through-out February. The demolition started on
the North Wing North Elevation (Bravo) and will work around the building clock-wise. Temporary doors are being installed
where the existing doors are being removed. This process will allow us to better understand how the historical doors were
installed and discover any unforeseen conditions prior to the new doors arriving on-site.
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY, OK 73104 I P 405.302.4500 I WWW.JEDUNN.COM
RETURNS TO TABLE OF CONTENTSCLICK HERE
KeyActivities:
- Delta low roof metal panel installation complete - Foxtrot Phase 1 stone cleaning in progress - Foxtrot Phase 1 storm window install in progress - Foxtrot Phase 2 window install in progress - Foxtrot parapet metal panel installation in progress - Golf copper gutter installation compelte - Golf elevation restoration complete - Hotel stone cleaning in progress - Hotel stone repairs complete - Hotel cast iron painting and restoration in progress - India gutter restoration in progress - Juliette scaffold erection in progress - Kilo scaffold erection in progress - West entrance stair tread removal in progress
Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG
JANUARY 2018
Hotel Cermonial Door Cast Iron Restoration In Progress
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY, OK 73104 I P 405.302.4500 I WWW.JEDUNN.COM
RETURNS TO TABLE OF CONTENTSCLICK HERE
Safety:The safety of our workforce and the general public during the course of construction is the most import-ant task that we must deliver. To that end, every craftsmen involved with the project receives a detailed project orientation, and prior to performing any task, the teams develop detailed task specific work plans. These work plans are often called Job Site Analysis (JSA) and assist project teams with analyzing different hazards associated with each work activity prior to beginning work.
Safety Data and Metrics
Orientations Performed through 01.31.18 473
First Aid Incidents for the month of January 0
Lost time Incidents for the month of January 0
Trade Partner Incidents for the month of January 0
Total Man-Hours for the month of January (hrs.) 6,497
Total Project Man-Hours (hrs.) 99,183
Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG
JANUARY 2018
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY, OK 73104 I P 405.302.4500 I WWW.JEDUNN.COM
RETURNS TO TABLE OF CONTENTSCLICK HERE
Safety Spotlight
JANUARY 2018 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG
Every Monday morning all of our on-site crew members participate in a safety meeting to discuss upcoming work and
precautions that need to be taken while working on the jobsite.
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY, OK 73104 I P 405.302.4500 I WWW.JEDUNN.COM
RETURNS TO TABLE OF CONTENTSCLICK HERE
JANUARY 2018 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG
Progress Photos & Field Reports
The photos and field reports attached in the subsequent pages represent progress photos taken during the month of January for the Oklahoma State Capitol Exterior Restoration project.
P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field
Reports\ADG\OSCR FR 65 - 2018_01-04.docx
Page 1 of 10
FIELD OBSERVATION REPORT REPORT NO: 65 DATE: 1/4/2018
TIME: 9:30 AM DAY OF WEEK: Thursday
OWNER: OMES TEMP. RANGE: Upper 20s
PROJECT: Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO: 15039DB
JE DUNN PROJECT NO: 15025800
ADG PROJECT NO: 15-007
TREANOR PROJECT NO: HP 15.007.00B
ZFI PROJECT NO: 15071-01
ALVINE PROJECT NO: 2014-4286
SRB PROJECT NO: 114801
WEATHER: Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _________
SITE CONDITIONS: Clear Dusty Muddy Other ______________________
PERSONS CONTACTED: Landon Heaton and Mark Maska - JE Dunn Construction
WORK OBSERVED:
The following was observed during this site visit:
1. Metal wall panel, flashing and gutter installation progressing on backside of parapet on north
elevation of east wing (Delta) and east elevation of east wing (Echo).
2. Scaffold removal progressing on east elevation of east wing (Echo).
3. Window frame painting progressing on east portion on south elevation of east wing (Foxtrot).
4. Window component installation progressing on east portion on south elevation of east wing
(Foxtrot).
5. Window frame repair progressing on west portion on south elevation of east wing (Foxtrot).
6. Lead t-cap installation progressing on east elevation of south wing (Golf).
7. Window sealant installation progressing on east elevation of south wing (Golf).
8. Stone repair progressing on east elevation of south wing (Golf).
9. Gutter work progressing on east elevation of south wing (Golf).
10. Stone repair progressing on south elevation of south wing (Hotel).
11. Stone cleaning progressing on south elevation of south wing (Hotel).
12. Door cleaning progressing on south elevation of south wing (Hotel).
13. Window frame repair progressing on west elevation of south wing (India).
14. Window frame abatement progressing on west elevation of south wing (India).
15. Gutter work progressing on west elevation of south wing (India).
16. Scaffold installation progressing on west elevation of west wing (Kilo).
17. West Plaza waterproofing progressing.
ITEMS DISCUSSED:
None
P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field
Reports\ADG\OSCR FR 65 - 2018_01-04.docx
Page 2 of 10
ACTION REQUIRED:
None
ITEMS TO VERIFY:
None
REMARKS:
None
OBSERVED BY: Peter Breninger (ADG)
COPIES TO: Bobby Snyder (JE Dunn), Heath Glenn (JE Dunn), Landon Heaton (JE Dunn), Lindsey Ross
(JE Dunn), Lynnsee Boyse (JE Dunn), Mark Maska (JE Dunn), JC Witcher (ADG), Robert
Meek (ADG), Amelia Hudspeth (TreanorHL), Julia Manglitz (TreanorHL), Kelsey Liu
(TreanorHL), Todd Renyer (TreanorHL), Vance Kelley (TreanorHL), Mike Thompson (ZFI),
Andy Wiese (Alvine), Ed Kongs (Alvine), Sam Haberman (Alvine), Steve Alvine (Alvine),
Gary Noland (Smith Roberts Baldischwiler)
Metal furring channel, metal wall panel, copper flashing, and gutter installation progress on backside of
parapet on north elevation of east wing (Delta)
P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field
Reports\ADG\OSCR FR 65 - 2018_01-04.docx
Page 3 of 10
Scaffold removal progress on east elevation of east wing (Echo). Temporary protection at east entry will
remain until scaffold is removed from south elevation of east wing (Foxtrot).
Portable heater in place on east portion on south elevation of east wing (Foxtrot)
P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field
Reports\ADG\OSCR FR 65 - 2018_01-04.docx
Page 4 of 10
Window frame painting progress at second floor on east portion on south elevation of east wing (Foxtrot)
Window frame painting progress at fourth floor on east portion on south elevation of east wing (Foxtrot)
P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field
Reports\ADG\OSCR FR 65 - 2018_01-04.docx
Page 5 of 10
Window component installation in progress on east portion on south elevation of east wing (Foxtrot)
Lead t-cap installation progress on top of granite water table on east elevation of south wing (Golf)
P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field
Reports\ADG\OSCR FR 65 - 2018_01-04.docx
Page 6 of 10
Sealant installation at window in progress on east elevation of south wing (Golf)
Limestone patch progress at frieze panel on east elevation of south wing (Golf)
P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field
Reports\ADG\OSCR FR 65 - 2018_01-04.docx
Page 7 of 10
Copper installation progress at gutter on east elevation of south wing (Golf)
Limestone full stone replacement progress at frieze panel on south elevation of south wing (Hotel)
P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field
Reports\ADG\OSCR FR 65 - 2018_01-04.docx
Page 8 of 10
Limestone Dutchman repair progress at architrave on south elevation of south wing (Hotel)
Micro-abrasion cleaning progress at entrance on south elevation of south wing (Hotel)
P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field
Reports\ADG\OSCR FR 65 - 2018_01-04.docx
Page 9 of 10
Window frame repair progress at first floor on west elevation of south wing (India)
Window frame lead paint abatement in progress at second floor on west elevation of south wing (India)
P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field
Reports\ADG\OSCR FR 65 - 2018_01-04.docx
Page 10 of 10
Gutter progress on west elevation of south wing (India)
Scaffold installation in progress on west elevation of west wing (Kilo)
P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field
Reports\ADG\OSCR FR 66 - 2018_01-17.docx
Page 1 of 8
FIELD OBSERVATION REPORT REPORT NO: 66 DATE: 1/17/2018
TIME: 1:30 PM DAY OF WEEK: Wednesday
OWNER: OMES TEMP. RANGE: Lower 30s
PROJECT: Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO: 15039DB
JE DUNN PROJECT NO: 15025800
ADG PROJECT NO: 15-007
TREANOR PROJECT NO: HP 15.007.00B
ZFI PROJECT NO: 15071-01
ALVINE PROJECT NO: 2014-4286
SRB PROJECT NO: 114801
WEATHER: Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _________
SITE CONDITIONS: Clear Dusty Muddy Other ______________________
PERSONS CONTACTED: Lindsey Ross, Lynnsee Boyse, and Mark Maska - JE Dunn Construction
Julia Manglitz - TreanorHL
WORK OBSERVED:
The following was observed during this site visit:
1. Storm water piping installation progressing on east elevation of south wing (Golf).
2. Light fixture installation progressing on south elevation of south wing (Hotel).
3. Stone removal progressing at West Plaza stairs.
ITEMS DISCUSSED:
The following items were discussed during this site visit:
1. Review of Range Rider statue base and As Long as the Waters Flow statue base.
ACTION REQUIRED:
Acceptance of modified frame system for downlights at South Portico (TreanorHL, Alvine).
ITEMS TO VERIFY:
None
REMARKS:
None
OBSERVED BY: Peter Breninger (ADG)
COPIES TO: Bobby Snyder (JE Dunn), Heath Glenn (JE Dunn), Landon Heaton (JE Dunn), Lindsey Ross
(JE Dunn), Lynnsee Boyse (JE Dunn), Mark Maska (JE Dunn), JC Witcher (ADG), Robert
Meek (ADG), Amelia Hudspeth (TreanorHL), Julia Manglitz (TreanorHL), Kelsey Liu
P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field
Reports\ADG\OSCR FR 66 - 2018_01-17.docx
Page 2 of 8
(TreanorHL), Todd Renyer (TreanorHL), Vance Kelley (TreanorHL), Mike Thompson (ZFI),
Andy Wiese (Alvine), Ed Kongs (Alvine), Sam Haberman (Alvine), Steve Alvine (Alvine),
Gary Noland (Smith Roberts Baldischwiler)
Storm water piping installation in attic on east elevation of south wing (Golf). Piping connects the new
roof drain to the existing storm drain line.
P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field
Reports\ADG\OSCR FR 66 - 2018_01-17.docx
Page 3 of 8
Storm water piping installation in attic on east elevation of south wing (Golf). Piping connects the new
roof drain to the existing storm drain line.
Framing system for downlight progress in westernmost coffer on south elevation of south wing (Hotel)
P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field
Reports\ADG\OSCR FR 66 - 2018_01-17.docx
Page 4 of 8
Framing system for downlight progress in adjacent coffer on south elevation of south wing (Hotel)
Cracked mortar joint on east elevation of Range Rider statue granite base
P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field
Reports\ADG\OSCR FR 66 - 2018_01-17.docx
Page 5 of 8
Eroded and cracked mortar joint on base of Range Rider statue granite base
Displaced granite on As Long as the Waters Flow statue base
P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field
Reports\ADG\OSCR FR 66 - 2018_01-17.docx
Page 6 of 8
Displaced granite on As Long as the Waters Flow statue base
Sealant joint on As Long as the Waters Flow statue base
P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field
Reports\ADG\OSCR FR 66 - 2018_01-17.docx
Page 7 of 8
Backup construction of brick, hollow clay tile, mortar and concrete exposed subsequent to stone tread
and wall cladding removal at West Plaza south stair
Wall cladding removal progress at West Plaza south stair. Backup construction of brick, hollow clay tile,
and mortar exposed to view.
P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field
Reports\ADG\OSCR FR 66 - 2018_01-17.docx
Page 8 of 8
Stone tread removal progress at West Plaza south stair. Concrete stringer to be demolished and replaced
as part of stair work.
P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field
Reports\ADG\OSCR FR 67 - 2018_01-23.docx
Page 1 of 9
FIELD OBSERVATION REPORT REPORT NO: 67 DATE: 1/23/2018
TIME: 11:30 AM DAY OF WEEK: Tuesday
OWNER: OMES TEMP. RANGE: Lower 40s
PROJECT: Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO: 15039DB
JE DUNN PROJECT NO: 15025800
ADG PROJECT NO: 15-007
TREANOR PROJECT NO: HP 15.007.00B
ZFI PROJECT NO: 15071-01
ALVINE PROJECT NO: 2014-4286
SRB PROJECT NO: 114801
WEATHER: Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _________
SITE CONDITIONS: Clear Dusty Muddy Other ______________________
PERSONS CONTACTED: Lindsey Ross, Lynnsee Boyse, and Mark Maska - JE Dunn Construction
Mike Thompson - ZFI
WORK OBSERVED:
The following was observed during this site visit:
1. Metal wall panel, flashing and gutter installation progressing on backside of parapet on north
elevation of east wing (Delta) and east elevation of east wing (Echo).
2. Stone cleaning progressing on east portion on south elevation of east wing (Foxtrot).
3. Window frame painting progressing on east portion on south elevation of east wing (Foxtrot).
4. Final pointing mortar installation progressing on south elevation of south wing (Hotel).
5. Sealant installation progressing on south elevation of south wing (Hotel).
6. Light fixture installation progressing on south elevation of south wing (Hotel).
7. Gutter work progressing on west elevation of south wing (India).
8. Scaffold installation progressing on west elevation of west wing (Kilo).
9. Window removal progressing on west elevation of west wing (Kilo).
10. Stone removal progressing at West Plaza stairs.
ITEMS DISCUSSED:
The following items were discussed during this site visit:
1. The OAC Meeting occurred prior to the site visit in the jobsite trailers. Refer to OAC Meeting
Minutes dated January 23, 2018, for items discussed during the meeting.
ACTION REQUIRED:
None
ITEMS TO VERIFY:
None
P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field
Reports\ADG\OSCR FR 67 - 2018_01-23.docx
Page 2 of 9
REMARKS:
None
OBSERVED BY: Peter Breninger (ADG)
COPIES TO: Bobby Snyder (JE Dunn), Heath Glenn (JE Dunn), Landon Heaton (JE Dunn), Lindsey Ross
(JE Dunn), Lynnsee Boyse (JE Dunn), Mark Maska (JE Dunn), JC Witcher (ADG), Robert
Meek (ADG), Amelia Hudspeth (TreanorHL), Julia Manglitz (TreanorHL), Kelsey Liu
(TreanorHL), Todd Renyer (TreanorHL), Vance Kelley (TreanorHL), Mike Thompson (ZFI),
Andy Wiese (Alvine), Ed Kongs (Alvine), Sam Haberman (Alvine), Steve Alvine (Alvine),
Gary Noland (Smith Roberts Baldischwiler)
Metal furring channel, metal wall panel, copper flashing, and gutter installation progress on backside of
parapet on north elevation of east wing (Delta)
P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field
Reports\ADG\OSCR FR 67 - 2018_01-23.docx
Page 3 of 9
Stone cleaning in progress at limestone column capitals on east portion on south elevation of east wing
(Foxtrot)
Window frame painting progress on east portion on south elevation of east wing (Foxtrot)
P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field
Reports\ADG\OSCR FR 67 - 2018_01-23.docx
Page 4 of 9
Final pointing mortar installation in progress at top of limestone column capitals on south elevation of
south wing (Hotel)
Sealant installation progress at engaged column on south elevation of south wing (Hotel)
P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field
Reports\ADG\OSCR FR 67 - 2018_01-23.docx
Page 5 of 9
Downlights in place in westernmost coffer on south elevation of south wing (Hotel)
Coffer limestone cored prior to installation of downlights
P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field
Reports\ADG\OSCR FR 67 - 2018_01-23.docx
Page 6 of 9
Brick replacement at gutter on west elevation of south wing (India)
Scaffold installation in progress on west elevation of west wing (Kilo)
P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field
Reports\ADG\OSCR FR 67 - 2018_01-23.docx
Page 7 of 9
Window removal progress at first floor on west elevation of west wing (Kilo)
Concrete in place adjacent to cornerstone and generator areaway near West Plaza
P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field
Reports\ADG\OSCR FR 67 - 2018_01-23.docx
Page 8 of 9
Stone tread and wall cladding removal progress at West Plaza south stair. Backup construction of brick,
hollow clay tile, mortar and concrete exposed after removal of stair wall stone cladding.
Stone tread and wall cladding removal progress at West Plaza north stair
P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field
Reports\ADG\OSCR FR 67 - 2018_01-23.docx
Page 9 of 9
Stone laydown area at southwest portion of project site. Stone shown has been removed from West Plaza
north and south stairs.
P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field
Reports\ADG\OSCR FR 68 - 2018_01-30.docx
Page 1 of 11
FIELD OBSERVATION REPORT REPORT NO: 68 DATE: 1/30/2018
TIME: 1:45 PM DAY OF WEEK: Tuesday
OWNER: OMES TEMP. RANGE: Lower 50s
PROJECT: Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO: 15039DB
JE DUNN PROJECT NO: 15025800
ADG PROJECT NO: 15-007
TREANOR PROJECT NO: HP 15.007.00B
ZFI PROJECT NO: 15071-01
ALVINE PROJECT NO: 2014-4286
SRB PROJECT NO: 114801
WEATHER: Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _________
SITE CONDITIONS: Clear Dusty Muddy Other ______________________
PERSONS CONTACTED: Landon Heaton, Lindsey Ross, Lynnsee Boyse, and Mark Maska - JE Dunn
Construction
WORK OBSERVED:
The following was observed during this site visit:
1. Metal wall panel, flashing and gutter installation progressing on backside of parapet on north
elevation of east wing (Delta).
2. Stone repairs progressing on east elevation of drum base.
3. Window frame painting progressing on east portion on south elevation of east wing (Foxtrot).
4. Gutter work progressing on south elevation of east wing (Foxtrot).
5. Metal wall panel and waterproofing installation progressing on backside of parapet on east
elevation of east wing (Echo) and south elevation of east wing (Foxtrot).
6. Window component installation progressing on west portion on south elevation of east wing
(Foxtrot).
7. Scaffold tarp removed on east elevation of south wing (Golf).
8. Lightning protection installation progressing on east elevation of south wing (Golf).
9. Lead t-cap installation progressing on south elevation of south wing (Hotel).
10. Light fixture installation progressing on south elevation of south wing (Hotel).
11. Window frame painting progressing on west elevation of south wing (India).
12. Window sash installation progressing on west elevation of south wing (India).
13. Stone repairs progressing on west elevation of south wing (India).
14. Scaffold installation progressing on west elevation of west wing (Kilo).
15. Stone removal progressing at West Plaza stairs.
ITEMS DISCUSSED:
None
P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field
Reports\ADG\OSCR FR 68 - 2018_01-30.docx
Page 2 of 11
ACTION REQUIRED:
None
ITEMS TO VERIFY:
None
REMARKS:
None
OBSERVED BY: Peter Breninger (ADG)
COPIES TO: Bobby Snyder (JE Dunn), Heath Glenn (JE Dunn), Landon Heaton (JE Dunn), Lindsey Ross
(JE Dunn), Lynnsee Boyse (JE Dunn), Mark Maska (JE Dunn), JC Witcher (ADG), Robert
Meek (ADG), Amelia Hudspeth (TreanorHL), Julia Manglitz (TreanorHL), Kelsey Liu
(TreanorHL), Todd Renyer (TreanorHL), Vance Kelley (TreanorHL), Mike Thompson (ZFI),
Andy Wiese (Alvine), Ed Kongs (Alvine), Sam Haberman (Alvine), Steve Alvine (Alvine),
Gary Noland (Smith Roberts Baldischwiler)
Metal furring channel, metal wall panel, copper flashing, and gutter installation progress on backside of
parapet on north elevation of east wing (Delta)
P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field
Reports\ADG\OSCR FR 68 - 2018_01-30.docx
Page 3 of 11
Limestone patch in progress at backside of parapet at east elevation of dome base
Window interior sash stop installation in progress on east portion on south elevation of east wing
(Foxtrot)
P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field
Reports\ADG\OSCR FR 68 - 2018_01-30.docx
Page 4 of 11
Plywood installation progress at gutter on south elevation of east wing (Foxtrot)
Metal furring channel installation in progress at backside of parapet on east elevation of east wing (Echo)
P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field
Reports\ADG\OSCR FR 68 - 2018_01-30.docx
Page 5 of 11
Metal wall panel and waterproofing installation progress at backside of parapet on south elevation of east
wing (Foxtrot)
Window sash installation progress on west portion on south elevation of east wing (Foxtrot)
P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field
Reports\ADG\OSCR FR 68 - 2018_01-30.docx
Page 6 of 11
Scaffold tarp removed on east elevation of south wing (Golf)
Lightning protection installation progress on top of granite water table on east elevation of south wing
(Golf)
P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field
Reports\ADG\OSCR FR 68 - 2018_01-30.docx
Page 7 of 11
Lead t-cap installation progress at limestone fascia course on south elevation of south wing (Hotel)
Downlights in place at coffer on south elevation of south wing (Hotel)
P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field
Reports\ADG\OSCR FR 68 - 2018_01-30.docx
Page 8 of 11
Window frame painting progress at first floor on west elevation of south wing (India)
Window frame painting and sash installation progress at second floor on west elevation of south wing
(India)
P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field
Reports\ADG\OSCR FR 68 - 2018_01-30.docx
Page 9 of 11
Limestone Dutchman repair in progress at fascia course on west elevation of south wing (India)
Scaffold installation progress past fifth floor on west elevation of west wing (Kilo)
P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field
Reports\ADG\OSCR FR 68 - 2018_01-30.docx
Page 10 of 11
Stone tread and wall cladding removal progress at West Plaza north stair
Laydown area for the West Plaza stone at the northwest corner of the site
P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field
Reports\ADG\OSCR FR 68 - 2018_01-30.docx
Page 11 of 11
Temporary door and plywood in place on north elevation of north wing (Bravo)
C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.093 - 2018_01_09.docx Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO: 093 DATE: 01/09/2018 TIME: 7:30 am-4:30 pm DAY OF WEEK: Tuesday OWNER: OMES TEMP. RANGE: Mid 30s – Mid 50s PROJECT: Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO: 15039DB JE DUNN PROJECT NO: 15025800 ADG PROJECT NO: 15-007 TREANOR PROJECT NO: HP 15.007.00B ZFI PROJECT NO: 15071-01 ALVINE PROJECT NO: 2014-4286 SRB PROJECT NO: 114801 WEATHER: Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS: Clear Dusty Muddy Other ______________________ PERSONS CONTACTED: Mark Maska, Lindsey Ross, Landon Heaton, Bobby Snyder (JE Dunn) Lukasz Lesniak (Mark 1) Mike Thompson (ZFI) Peter Breninger (ADG) Vince Latona (Baker Roofing) Trait Thompson, David Mihm, Doug Kellogg (OMES/State) Duane Mass, Jason Cady (Mass Architects) Steven Naggatz, Joshua Freedland (WJE) WORK OBSERVED:
Work on A212 (Golf) nearing completion. Reglet for the south end of the gutter is not in the correct location per ASI-008. Lead T-cap has been installed, but stone needs to be patched for the T-cap to seal properly.
Installation of rain screen is ongoing on D1 & E2/A215 (Delta low roof). Copper work appears to be complete or nearly so.
Masonry repairs are ongoing on the back of A211 (Foxtrot).
Membrane roofing replacement ongoing on the back side of A212 (Golf) parapet.
Window restoration and painting work in progress on A211 (Foxtrot). Quality control issues observed: Sealant is being used in lieu of epoxy in some locations – this is not acceptable. Sealant is being placed on top of the intermediate coat of paint and between the primer and intermediate – this is also not acceptable. Small gaps are to be filled after the primer is applied and before intermediate coat.
C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.093 - 2018_01_09.docx Page 2 of 5
ITEMS DISCUSSED:
Reglet for Golf (A212) gutter south end termination. (Mark 1, Baker)
Corrosion on new lead T-cap on used on A2121 (Golf) gutter. Baker will try to remove with vinegar. T-cap needs to be removed for stone patching and then re-installed in sealant. (Baker/Mark 1)
Addition of a small Dutchman to the lower edge of stone SS-05/02 on A201 (Hotel). (Mark 1)
Addition of a small Dutchman over the new anchor between the corona and raking cornice to give the reglet a hard edge rather than a mortar patch. (Mark 1)
ACTION REQUIRED:
Point reglet, layout in correct location and recut as marked/discussed to cover the new anchor between the corona and raking cornice stones. (Mark 1, Baker)
Meet with ReView regarding issues observed on A211 (Foxtrot) and corrective actions to be taken. (JE Dunn, TreanorHL)
ITEMS TO VERIFY:
REMARKS:
Design-build team meeting at 8:00 AM
OAC meeting at 9:00 AM
WJE site visit most of the day.
OBSERVED BY: Julia Manglitz, Associate Principal (TreanorHL) COPIES TO: David Mihm (OMES), Doug Kellogg (OMES), Mike Jones (OMES), Trait Thompson
(OMES), Duane Mass (MAI), Jason Cady (MAI), Matthew Radcliffe (MAI), Mark Maska (JE Dunn), Bobby Snyder (JE Dunn), Landon Heaton (JE Dunn), Lindsey Ross (JE Dunn), Lynnsee Boyse (JE Dunn), JC Witcher (ADG), Robert Meek (ADG), Julia Manglitz (TreanorHL), Todd Renyer (TreanorHL), Vance Kelley (TreanorHL), Mike Thompson (ZFI), Steve Ford (ZFI), Andy Wiese (Alvine), Ed Kongs (Alvine), Sam Haberman (Alvine), Steve Alvine (Alvine), Gary Noland (Smith Roberts Baldischwiler)
C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.093 - 2018_01_09.docx Page 3 of 5
Reglet at the south end of A212 (Golf) laid out improperly. Corrections per ASI-008 need to be made.
Additional Dutchman over anchor to provide hard edge for reglet running along the gutter is also needed due to the alignment.
Corrosion on lead T-cap, cap needs to be cleaned or replaced. Patch missing at stone above the T-cap.
A212 (Golf)
C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.093 - 2018_01_09.docx Page 4 of 5
Northeast low roof area work in progress installing the rain screen, copper guttering tying to A209 (Delta)
and A210 (Echo) is nearly complete.
Dutchman repair to back of fascia through course stone C1/A216 (back of Foxtrot).
C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.093 - 2018_01_09.docx Page 5 of 5
Inconsistent sealant color applied over primer at window on left, cream color should be used in this
location; improper use of sealant as surfacing compound on the jamb in photo on the left. Improper use of sealant over intermediate coat in photo on the right, area needs to be coated with intermediate coat
again. Both locations on A211 (Foxtrot).
Epoxy filler not sanded down prior to application of coatings on A211 (Foxtrot)– area needs to be sanded
and recoated.
C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.094 - 2018_01_10.docx Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO: 094 DATE: 01/10/2018 TIME: 7:00 am-4:00 pm DAY OF WEEK: Wednesday OWNER: OMES TEMP. RANGE: Lo 40s – Hi 50s PROJECT: Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO: 15039DB JE DUNN PROJECT NO: 15025800 ADG PROJECT NO: 15-007 TREANOR PROJECT NO: HP 15.007.00B ZFI PROJECT NO: 15071-01 ALVINE PROJECT NO: 2014-4286 SRB PROJECT NO: 114801 WEATHER: Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS: Clear Dusty Muddy Other ______________________ PERSONS CONTACTED: Mark Maska, Lindsey Ross, Landon Heaton (JE Dunn) Lukasz Lesniak, Wesley Kutylowksi (Mark 1) Mike Thompson (ZFI) Peter Breninger (ADG) Vince Latona (Baker Roofing) Todd Maxwell (ReView) Trait Thompson, David Mihm, Doug Kellogg (OMES/State) Jason Cady (Mass Architects) Steven Naggatz, Joshua Freedland (WJE) WORK OBSERVED:
Kilo scaffold being erected, Juliette scaffold bases are in and up out of the light well.
West plaza south stair removal is starting.
Final pointing ongoing at upper portion of A201 (Hotel). Masonry repairs continue at lower levels. Repairs to brick backing construction completed on the east end of A201 (Hotel), repairs pending on the west end. Frieze panels will be installed next week.
ITEMS DISCUSSED:
Quality control of metal repairs (use of proper materials for different conditions) and process of interaction with various coating layers, particularly primer and intermediate coats. Intermediate coat shall be applied a second time at areas that have been sealed. Remove sealant improperly applied where surfacing epoxy should have been used and install proper patch. (ReView, JE Dunn, TreanorHL)
Paint removal and surface preparation at ceremonial doors. Several locations do not appear to be complete. Existing historic hardware was not protected and is damaged. (ReView, TreanorHL)
C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.094 - 2018_01_10.docx Page 2 of 5
Upcoming scaffold and punch list dates. (JE Dunn, TreanorHL)
Gutter on north side of east clerestory A1/A215 (Delta low roof area) – Mass asks for review of the entire existing copper gutter run. (Mass, JE Dunn, TreanorHL)
ACTION REQUIRED:
Set meeting with Baker to review clerestory gutter. (TreanorHL) ITEMS TO VERIFY:
REMARKS:
WJE site visit until 3 PM.
OBSERVED BY: Julia Manglitz, Associate Principal (TreanorHL) COPIES TO: David Mihm (OMES), Doug Kellogg (OMES), Mike Jones (OMES), Trait Thompson
(OMES), Duane Mass (MAI), Jason Cady (MAI), Matthew Radcliffe (MAI), Mark Maska (JE Dunn), Bobby Snyder (JE Dunn), Landon Heaton (JE Dunn), Lindsey Ross (JE Dunn), Lynnsee Boyse (JE Dunn), JC Witcher (ADG), Robert Meek (ADG), Julia Manglitz (TreanorHL), Todd Renyer (TreanorHL), Vance Kelley (TreanorHL), Mike Thompson (ZFI), Steve Ford (ZFI), Andy Wiese (Alvine), Ed Kongs (Alvine), Sam Haberman (Alvine), Steve Alvine (Alvine), Gary Noland (Smith Roberts Baldischwiler)
A203 (Juliette) scaffold. A202 (India) elevation under tarps.
C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.094 - 2018_01_10.docx Page 3 of 5
A204 (Kilo) scaffold under construction. Shoring beams at the bottom of the scaffold to spaces below the
west plaza.
Traces of red primer left along flutes of column, removal of existing coatings requires some touch up.
Ceremonial door A201 (Hotel).
C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.094 - 2018_01_10.docx Page 4 of 5
Damage to hardware from paint removal and surface preparation at ceremonial door on A201 (Hotel)).
Results of paint removal and surface prep at cornice above the door A201 (Hotel).
C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.094 - 2018_01_10.docx Page 5 of 5
Results of paint removal at ceremonial door on A201 (Hotel) upper half.
Final pointing work on A201 (Hotel) in the coffers of the upper portico.
C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.095 - 2018_01_16.docx Page 1 of 7
FIELD OBSERVATION REPORT REPORT NO: 095 DATE: 01/16/2018 TIME: 7:30 am-4:00 pm DAY OF WEEK: Tuesday OWNER: OMES TEMP. RANGE: Mid Single digits – Hi teens PROJECT: Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO: 15039DB JE DUNN PROJECT NO: 15025800 ADG PROJECT NO: 15-007 TREANOR PROJECT NO: HP 15.007.00B ZFI PROJECT NO: 15071-01 ALVINE PROJECT NO: 2014-4286 SRB PROJECT NO: 114801 WEATHER: Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS: Clear Dusty Muddy Other ______________________ PERSONS CONTACTED: Lynnsee Boyse, Mark Maska, Lindsey Ross, Landon Heaton (JE Dunn) Lukasz Lesniak, Wesley Kutylowski, Robert Gebarowski (Mark 1) Mike Thompson (ZFI) Peter Breninger (ADG) Vince Latona (Baker Roofing) Todd Maxwell via phone, Jim Hickman, Brandon Thompson (ReView) WORK OBSERVED:
A201 (Hotel) stone repairs are ongoing. Frieze panels are set at the east end of the portico face. Stones for west end are being moved to the scaffold. Patching and other repairs continue in warmer areas.
West plaza south stair removal continues. ITEMS DISCUSSED:
Temperatures are not high enough for temperature dependent work on A202 (India) and are questionable in some locations on other enclosed scaffold. Extra heaters have been brought in, but it has not been 7 days since last cleaning operation. Per specification no masonry work involving water may occur when the forecasted lows are below 40. This applies to enclosed areas where heat cannot be successfully maintained. Effort must be made to determine when enough heat will not overcome outside temperatures and/or effect of wind. (JE Dunn, Mark 1, TreanorHL)
Walked cleaning results for A201 (Hotel) – crusting on the bottom of the corbel is resistant to steam and to micro-abrasion and will remain. Touch up of spot cleaning noted in a few locations. (Mark 1, TreanorHL)
C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.095 - 2018_01_16.docx Page 2 of 7
West plaza south stair cheek wall unforeseen condition – wall interior is made up of a combination of brick, hollow tile and mortar or concrete spoils. Rebuilding from the top of the concrete stringer wall will be necessary to reliably anchor the veneer stones. Options to rebuild include brick and concrete, two cramps or other anchors per stone typical. ADG to start detail for ZFI and TreanorHL input. (JE Dunn, ZFI, TreanorHL, ADG).
Reviewed metal substrate repair needs at ceremonial door on A201 (Hotel). Voids in original casting need to be filled with epoxy (structural or surfacing as size of flaw dictates). Gaps between pieces should be filled with sealant as is done with the window surrounds. Missing pieces noted on right side slider door and left side slider door. Right jamb has damage from use of a prybar to move slider door. Discussed options for replacement pieces (spliced is acceptable if it can be done cleanly).
ACTION REQUIRED:
Paint color samples selected from cards – draw downs need to be ordered. (ReView) ITEMS TO VERIFY:
REMARKS:
Meeting regarding timeline for upcoming work. (ReView, JE Dunn, ADG, ZFI)
Meeting regarding items for next SCREOC meeting Feb 22nd, 2018.
Reviewed window conditions on A205-A209 (Lima, Alpha, Bravo, Charlie and Delta) from the exterior. Delta has significantly more signs of condensation and icing than any of the other facades. Review of how interior conditions differ in the areas affected and not affected should be undertaken. Requested JE Dunn put data loggers in other locations to gather humidity information for comparison.
OBSERVED BY: Julia Manglitz, Associate Principal (TreanorHL) COPIES TO: David Mihm (OMES), Doug Kellogg (OMES), Mike Jones (OMES), Trait Thompson
(OMES), Duane Mass (MAI), Jason Cady (MAI), Matthew Radcliffe (MAI), Mark Maska (JE Dunn), Bobby Snyder (JE Dunn), Landon Heaton (JE Dunn), Lindsey Ross (JE Dunn), Lynnsee Boyse (JE Dunn), JC Witcher (ADG), Robert Meek (ADG), Julia Manglitz (TreanorHL), Todd Renyer (TreanorHL), Vance Kelley (TreanorHL), Mike Thompson (ZFI), Steve Ford (ZFI), Andy Wiese (Alvine), Ed Kongs (Alvine), Sam Haberman (Alvine), Steve Alvine (Alvine), Gary Noland (Smith Roberts Baldischwiler)
C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.095 - 2018_01_16.docx Page 3 of 7
Example of casting defect that needs to be filled with epoxy prior to primer coating. Ceremonial door.
Example of casting defects that needs to be filled with epoxy prior to primer coating. Ceremonial door.
C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.095 - 2018_01_16.docx Page 4 of 7
Eagle body should be sealed with polyurethane to the column between the primer and intermediate coats
of paint.
Joints in casting pieces should be sealed with polyurethane between the primer and intermediate coats of
paint.
C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.095 - 2018_01_16.docx Page 5 of 7
Faux astragal trim missing from both sides of ceremonial door right slider. Replacement in kind discussed.
Bent and crushed piece of formed metal molding adjacent to the right slider. Piece needs to be replaced
in kind.
C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.095 - 2018_01_16.docx Page 6 of 7
Backing brick on west end of A201 (Hotel) at the frieze level.
Replacement frieze stone on the scaffold awaiting installation.
C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.095 - 2018_01_16.docx Page 7 of 7
Replacement frieze installed on east end of A201 (Hotel).
C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.096 - 2018_01_17.docx Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO: 096 DATE: 01/17/2018 TIME: 7:30 am-4:00 pm DAY OF WEEK: Wednesday OWNER: OMES TEMP. RANGE: Mid Single digits – Lo 30s PROJECT: Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO: 15039DB JE DUNN PROJECT NO: 15025800 ADG PROJECT NO: 15-007 TREANOR PROJECT NO: HP 15.007.00B ZFI PROJECT NO: 15071-01 ALVINE PROJECT NO: 2014-4286 SRB PROJECT NO: 114801 WEATHER: Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS: Clear Dusty Muddy Other ______________________ PERSONS CONTACTED: Lynnsee Boyse, Mark Maska, Lindsey Ross, Landon Heaton (JE Dunn) JE Dunn self-perform concrete and surveyor Faith Electric Lukasz Lesniak, Wesley Kutylowski, Robert Gebarowski (Mark 1) Peter Breninger (ADG) Vince Latona (Baker Roofing) Jim Hickman, Brandon Thompson (ReView) WORK OBSERVED:
A201 (Hotel) stone repairs are ongoing, west frieze panel replacements are being installed.
West plaza south stair removal continues.
Rain screen installation continues on the northeast low roof. ITEMS DISCUSSED:
Existing gutter along the north face of the east clerestory. Gutter serves approximately 6,500 sf (plan area) and is 150 ft long with four downspouts and no expansion joints. All joints in copper gutter sections are lapped and riveted with blind rivets. Steel mandrels in rivets are rusting and joints evidence of leaking. Apron is missing at west end or severely damaged. Gutter will need to be replaced to introduce expansion joints and address leaky joint construction. Sizing and number of downspouts needs to be evaluated as part of the work. Roof edge condition will need to be examined/evaluated when gutter is removed. East edge of north clerestory was also reviewed - this gutter is damaged and will not be able to be bent back into proper form – it will require replacement with the sky light work planned for later in the year. (Baker, TreanorHL)
C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.096 - 2018_01_17.docx Page 2 of 5
Expansion joint in copper base flashing at pilaster was not continued up through the counter flashing and pieces are fully soldered. Expansion joint needs to continue up. (TreanorHL, JE Dunn, Baker)
ACTION REQUIRED:
Provide direction for gutter replacement at northeast low roofs. (TreanorHL)
Provide direction for stone anchors found in gutter on A202 (India). (TreanorHL, ZFI)
Add expansion joint in copper counter flashing on northeast low roof. (Baker) ITEMS TO VERIFY:
REMARKS:
Pre-installation/construction meeting regarding stair and battlement work.
A202 (India) repair confirmation walk started.
OBSERVED BY: Julia Manglitz, Associate Principal (TreanorHL) COPIES TO: David Mihm (OMES), Doug Kellogg (OMES), Mike Jones (OMES), Trait Thompson
(OMES), Duane Mass (MAI), Jason Cady (MAI), Matthew Radcliffe (MAI), Mark Maska (JE Dunn), Bobby Snyder (JE Dunn), Landon Heaton (JE Dunn), Lindsey Ross (JE Dunn), Lynnsee Boyse (JE Dunn), JC Witcher (ADG), Robert Meek (ADG), Julia Manglitz (TreanorHL), Todd Renyer (TreanorHL), Vance Kelley (TreanorHL), Mike Thompson (ZFI), Steve Ford (ZFI), Andy Wiese (Alvine), Ed Kongs (Alvine), Sam Haberman (Alvine), Steve Alvine (Alvine), Gary Noland (Smith Roberts Baldischwiler)
C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.096 - 2018_01_17.docx Page 3 of 5
Installation of replacement frieze panel west end of A201 (Hotel)
Unforeseen gutter condition found on A202 (India) is similar to that found on A212 (Golf). Slight
modifications to repair will be needed to account for cracks in stone at either end of anchor in photo.
C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.096 - 2018_01_17.docx Page 4 of 5
Repair confirmation walk, A202 (India)
Northeast low roof area; rain screen installation ongoing. Leaking at joints in gutter is evident by the
green staining on the clerestory wall.
C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.096 - 2018_01_17.docx Page 5 of 5
Northeast low roof area, looking west along clerestory. Roofing rises between the two the windows on
the left of the frame, indicating a possible anchorage problem. Gutter apron on the extreme west end is damaged beyond repair.
C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.097 - 2018_01_18.docx Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO: 097 DATE: 01/18/2018 TIME: 7:00 am-3:00 pm DAY OF WEEK: Thursday OWNER: OMES TEMP. RANGE: Lo 20s – Mid 40s PROJECT: Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO: 15039DB JE DUNN PROJECT NO: 15025800 ADG PROJECT NO: 15-007 TREANOR PROJECT NO: HP 15.007.00B ZFI PROJECT NO: 15071-01 ALVINE PROJECT NO: 2014-4286 SRB PROJECT NO: 114801 WEATHER: Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _ ___ SITE CONDITIONS: Clear Dusty Muddy Other ______________________ PERSONS CONTACTED: Lynnsee Boyse, Mark Maska, Lindsey Ross, Landon Heaton (JE Dunn) Lukasz Lesniak, Wesley Kutylowski, Wojtek Zeglin (Mark 1) Vince Latona (Baker Roofing) Brandon Thompson (ReView) Trait Thompson (OMES) Peter Breninger (ADG) Andy Wiese via phone (Alvine) WORK OBSERVED:
A201 (Hotel) stone repairs are ongoing.
West plaza south stair removal continues.
A204 (kilo) scaffold erection is ongoing.
Blast-It-Clean is on site to touch up areas on ceremonial doors. ITEMS DISCUSSED:
Statue bases for “Tribute to the Range Riders” and “As Long as the Waters Flow” – State has requested that these stone bases be evaluated for repairs and cleaning.
ACTION REQUIRED:
Distribute repair confirmation notes for A202 (India). (TreanorHL) ITEMS TO VERIFY:
C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.097 - 2018_01_18.docx Page 2 of 5
REMARKS:
Golf (A212) punch list walk.
Finished India (A202) repair confirmation walk.
Team meeting to discuss proposed exterior lighting. OBSERVED BY: Julia Manglitz, Associate Principal (TreanorHL) COPIES TO: David Mihm (OMES), Doug Kellogg (OMES), Mike Jones (OMES), Trait Thompson
(OMES), Duane Mass (MAI), Jason Cady (MAI), Matthew Radcliffe (MAI), Mark Maska (JE Dunn), Bobby Snyder (JE Dunn), Landon Heaton (JE Dunn), Lindsey Ross (JE Dunn), Lynnsee Boyse (JE Dunn), JC Witcher (ADG), Robert Meek (ADG), Julia Manglitz (TreanorHL), Todd Renyer (TreanorHL), Vance Kelley (TreanorHL), Mike Thompson (ZFI), Steve Ford (ZFI), Andy Wiese (Alvine), Ed Kongs (Alvine), Sam Haberman (Alvine), Steve Alvine (Alvine), Gary Noland (Smith Roberts Baldischwiler)
Eagle on A212 (Golf) at the corner with A211 (Foxtrot).
C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.097 - 2018_01_18.docx Page 3 of 5
A212 (golf) punch list walk – blue tape marks locations for paint coating touch up.
A212 (golf) gutter during punch list. 24 Hour flood test passed.
C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.097 - 2018_01_18.docx Page 4 of 5
Containment for Blast-It-Clean at ceremonial door on A201 (Hotel).
A204 (Kilo) scaffold erection.
C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.097 - 2018_01_18.docx Page 5 of 5
West plaza, south stair with treads removed.
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY, OK 73104 I P 405.302.4500 I WWW.JEDUNN.COM
RETURNS TO TABLE OF CONTENTSCLICK HERE
JANUARY 2018 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG
Phasing & Schedule Attachments: The following documents are included in the subsequent pages:
- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY, OK 73104 I P 405.302.4500 I WWW.JEDUNN.COM
RETURNS TO TABLE OF CONTENTSCLICK HERE
JANUARY 2018 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG
Site Phasing Plan:
The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation. Beginning with Alpha (west elevation of the north wing), scaffolding was constructed continuing on to Bravo, Charlie, Delta and Echo. We construct a phase of scaffolding at a time, which is followed by hazardous material removal, window restoration, and stone and lighting repair. As each phase is complet-ed, the scaffolding will be disassembled and reassembled on similar elevations. Thus far, the Alpha, Bravo, Charlie, Delta, Echo, and Golf elevations have been completed. This site phasing will occur for the duration of the rehabilitation until all work is complete, and the State Capitol is back to its original beauty and functionality.
Trailer Compound
TUNNEL (will continue across Lincoln)
DELTA
FOX TROT
ECHO
KILO
ALPHA
CHARLIE
GOLF
INDIA
HOTEL
JULIETTE
LIMA
BRAVO
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
COMPLETED
CO
MPLETED
CO
MPLE
TED
COMPLETED
ACTIVE ELEVATIONSCO
MPLETED
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY, OK 73104 I P 405.302.4500 I WWW.JEDUNN.COM
RETURNS TO TABLE OF CONTENTSCLICK HERE
JANUARY 2018 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG
Site Utilization Plan:
Per our site utilization plan, the JE Dunn trailer compound is the designated area for our staff members,trade partners, and material storage areas. It currently houses four field offices.
Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building, helping to ensure a safe work environment.
The gravel lay-down areas are designated paths where machinery, supplies, and equipment are stored and provide a roadway for machinery to move supplies to and from the job site. The gravel will also serve as a protective barrier of the subsurface. Fence gates mark all areas where access can be gained to the job site for material and/or equipmentdeliveries, emergency access, or personnel access. These gates remain closed and are locked every night to ensure a safe work environment.
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY, OK 73104 I P 405.302.4500 I WWW.JEDUNN.COM
RETURNS TO TABLE OF CONTENTSCLICK HERE
JANUARY 2018
Stone Repair Tracking:
The following document depicts the stone repairs that we have identified for the Hotel, Golf, and India elevation. Once the raking of all mortar joints is complete on a respective elevation, we complete a full assessment of every stone to determine what repairs need be made, if any. We are able to track these repairs during our repair assessment walk using our BIM 360 software downloaded on iPads. Once complete, we are able to then transmit this information to our masonry trade partner for completion of all repairs.
Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG
SECOND FLOOR
100'-0"
THIRD FLOOR
114'-6"
FIRST FLOOR
88'-0"
FOURTH FLOOR
126'-3"
FIFTH FLOOR
137'-5"
ATTIC
150'-0"
ROOF PLAN
172'-6"
116A2
117A2
216A1
217A1
218A1
118A2
102
TOP OF PARAPET
162'-2"
SE-01/02 SE-01/03 SE-01/04
SE-02/02
SE-02/01
SE-0A/01
SE-0A/04
SE-05/02
SE-05/01
SE-0A/03
SE-02/03
SE-02/04
SE-0A/05
SE-05/03
SE-05/04
SE-0A/02
S03
S18
S07
DN01
S05
S01
S03
S07
S07
S06
S07
S10
S03
.
BO WATERTABLE TYP
BO DOORHEADER
.
UNO
.
.
BO CORNICETYP
.
.
FO
R E
AS
T W
ING
SO
UT
H E
LE
VA
TIO
N S
EE
A1/A
211
WE25
WE28
S15
FO
R S
OU
TH
WIN
G S
OU
TH
ELE
VA
TIO
N S
EE
A1/A
201
S17
TYP OF 3GUARDS
S16
S02
S07
TYP AT JTW/ CONC
S06
FOR EAST WING EASTELEVATION SEE A1/A210
.
.
WE44
S15
BO HEADERTYP OF 3TYPE A2OPENINGS
TYP OF 3TYPE A2OPENINGS
S16
S07
S15
BO HEADERTYP OF 3TYPE A1OPENINGS
TYP OF 3TYPE A1OPENINGS
S18
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
DISMANTLESALVAGE &REINSTALL LIGHTFIXTURE;RE ELECTRICAL
DISMANTLESALVAGE &REINSTALL LIGHTFIXTURE;RE ELECTRICAL
WE28
S14
S12TYP ATSTONEGUTTER
S20
WE37
S02
TYP AT JT W/ HORIZTRAFFIC SURFACES
S07
TYP THISELEMENT
A. PROTECT ALL ADJACENT MATERIALS AND ASSEMBLIESFROM DAMAGE DURING THE WORK. ERECT AND MAINTAINTEMPORARY BARRIERS AND COVERS THAT AREAPPROPRIATE TO PROTECT FROM INCIDENTAL DAMAGE.REFERENCE 013591 FOR HISTORIC TREATMENTPROCEDURES.
B. PROTECT ROOFING AND ROOF DRAINAGE. PREVENTDEBRIS FROM ENTERING THE ROOF DRAINAGE SYSTEM. DONOT RINSE CHEMICALS OR DEBRIS FROM CLEANING ANDCONSTRUCTION ACTIVITIES INTO ROOF DRAIN PIPINGWITHOUT WRITTEN CONSENT OF DESIGN BUILDER.CAPTURE OR REROUTE DRAINAGE FROM CLEANINGACTIVITIES AND CONVEY IT TO GRADE WITHOUT DAMAGETO BUILDING FACADES OR TO LANDSCAPE AND GROUNDSURFACES BELOW.
C. PROTECT LIGHT WELL DRAINAGE AND ASSOCIATED PIPING.PREVENT DEBRIS FROM ENTERING THE SYSTEM. DO NOTRINSE CHEMICALS OR DEBRIS FROM CLEANING ANDCONSTRUCTION ACTIVITIES INTO PIPING WITHOUTWRITTEN CONSENT OF DESIGN BUILDER. CAPTURE ORREROUTE DRAINAGE FROM CLEANING ACTIVITIES ANDCONVEY IT TO GRADE WITHOUT DAMAGE TO BUILDINGFACADES OR TO LANDSCAPE AND GROUND SURFACES.
D. MAINTAIN BUILDING IN A WEATHER-TIGHT CONDITION.PROVIDE TEMPORARY COVERS AND CLOSURES ATOPENINGS IN THE WALL OR ROOF SYSTEMS THAT AREWIND AND PRECIPITATION RESISTANT. DO NOT REMOVEMORE WINDOWS, DOORS, CLADDING, OR COVERINGS THANCAN BE PROTECTED IN THE SAME WORKDAY. MONITORWEATHER CONDITIONS AND PROVIDE ADEQUATE NOTICEWHEN CONDITIONS NECESSITATE WORK SHUT DOWNPRIOR TO TYPICAL WORK HOURS.
E. WHERE EXTERIOR LIGHTING/CONDUIT, SECURITYCAMERAS/CONDUIT, LIGHTNING PROTECTION AIRTERMINALS/DOWN LEADERS, AND ASSOCIATEDFASTENERS, OR OTHER MEP ITEMS NEED TO BE REMOVEDAND REINSTALLED FOR THE WORK, DO NOT INTERRUPTSERVICE WITHOUT AUTHORIZATION OF DESIGN BUILDER.PROVIDE TEMPORARY CONNECTIONS AND SERVICE ASNECESSARY AND/OR WHERE DIRECTED TO DO SO BYDESIGN BUILDER.
F. REFERENCE SCHEDULES FOR WINDOW, DOOR, ANDMASONRY REPAIR WORK AT SPECIFIC LOCATIONINDICATED ON THE DRAWINGS. REFERENCE MASONRYREPAIR SCHEDULES FOR MASONRY REPAIR ID KEY.
G. REFERENCE GI SHEETS FOR BUILDING NOMENCLATURE,OVERALL DIMENSIONS, TYPICAL BAYS, AND MATERIALLOCATIONS AND LEGENDS.
H. FOR WINDOW RESTORATION ALL ADJACENTCONSTRUCTION SHALL BE PROTECTED WITH BOX OUTS,TARPS, OR SIMILAR MEANS ACCEPTABLE TO THEARCHITECT AND DESIGN BUILDER TO ENSURE THATWINDOW/PAINT/MEDIA DO NOT STAIN OR DAMAGEADJACENT SURFACES. IN ADDITION, PROTECTION ANDTEMPORARY INFILL MAY NEED TO BE PROVIDED TOELIMINATE DUST, AND MINIMIZE ODOR, AND PARTICLEMIGRATION INTO THE BUILDING THROUGH ADJACENTWINDOWS, LOUVERS, DOORS, ETC. DURINGCONSTRUCTION. ADDITIONALLY, TEMPORARY SHORING,BRACING, BLOCKING, ETC. SHALL BE PROVIDED ANYWHEREREMOVAL OF FASTENED COMPONENTS OCCUR.
I. 018126 KNOWN HAZARDOUS MATERIALS WILL BE REMOVEDBY OWNER BEFORE START OF WORK. IF MATERIALSSUSPECTED OF CONTAINING HAZARDOUS MATERIALS AREENCOUNTERED DO NOT DISTURB; IMMEDIATELY NOTIFYDESIGN BUILDER.
GENERAL PLAN & ELEVATION NOTES:
WINDOW INFILL PANEL
WINDOW SPANDREL PANEL
RUST
MATERIALS ELEVATION LEGEND
WATERPROOFING MATERIAL
Date:
ADG Project:
Sheet No.
Drawn By:
Checked By:
Revisions:
Approved By:
Copyright ADG, PC 2016
KEY PLAN
TA Project #
15-007
EXTERIOR
REHABILITATION
A360://HP15.007.00B Oklahoma State Capitol Exterior Rehabili/OSC_Exterior Rehab.rvt
6/28/2016 7:22:12 PM
A212
SOUTH WING
EAST ELEVATION
JUNE 30, 2016
MS / SCK
JEM / TGR / JCW
KVK
2300 NORTH
LINCOLN
BOULEVARD
OKLA
HOMA CITY, OK 73105
FINAL CONSTRUCTION SET
OFFICE O
F M
ANAGEMENT AND ENTERPRISE SERVICES
CAP PROJECT NO. 15039DB
HP15.007.00B
1/8" = 1'-0" A1SOUTH WING EAST ELEVATION
KEYNOTES
DN01 081113 DOOR, FRAME, AND TRANSOM, TO BE REPLACED,ALT #02
S01 040343 REPOINT WITH MORTAR, RE A1/A403
S02 040343 REPOINT AT JOINTS BETWEEN DISSIMILARMATERIALS WITH SEALANT, RE B1/A403
S03 040343 REPOINT WITH LEAD T-CAP, REF C1/A403
S05 040310 GENERAL AND PRELIMINARY CLEANING
S06 040310 SPOT TREATMENT BIOLOGICAL SOIL (CHEMICAL)
S07 040310 SPOT TREATMENT ATMOSPHERIC CRUSTS (COLDWATER SOAK)
S10 040310 SPOT TREATMENT ATMOSPHERIC SOILING (HOTWATER) FOR ORANGE/BROWN SOILING DISPERSEDOVER 25% OF FACADE
S12 079200 REMOVE EXISTING SEALANT(S), CLEAN TOBRIGHT, AND RESEAL REGLET, C3/A403
S14 040322 REMOVE EXISTING SEALANT AND/OR MORTAR,SALVAGE PARAPET CAP STONE, REINSTALL OVER THRUWALL FLASHING 076200, RE D1/A141, ALT #05
S15 040310 REMOVE SEALANT RESIDUE AT PERIMETER OFMASONRY OPENING
S16 079200 CLEAN, PRIME, AND RESEAL PERIMETER OFDOOR AND/OR WINDOW INCLUDING ASSOCIATED CASTIRON; RE C5/A403
S17 050383 WROUGHT IRON GUARD; DISMANTLE, SALVAGE,PREPARE, PAINT, AND REINSTALL ELEMENTS
S18 040343 REPOINT WITH SEALANT CONTINUOUS FROMTOP TO BOTTOM OF FACADE, RE B3/A403
S20 A3/A403 TYP AT GRANITE WATERTABLE
WE25 080351.23 MECHANICAL PENETRATION TO REMAIN -TEMPORARILY REMOVE AND TERMINATE MECHANICALSYSTEM - REINSTALL SUBSEQUENT TO WINDOWRESTORATION RE MECHANICAL, ALT #01
WE28 080351.23 INFILL PANEL
WE37 080351.23 ELECTRICAL PENETRATION TO BE REMOVEDAND TERMINATED FOR COMPLETE WINDOWRESTORATION - RE ELECTRICAL, ALT #01
WE44 080351.23 SECURITY CAMERA TO REMAIN TEMPORARILYREMOVE AND TERMINATE SYSTEM. REINSTALLSUBSEQUENT TO WINDOW RESTORATION. REELECTRICAL.ALT #01
4'0 8' 16'
A212/A1 SE-0A/01 DM 0.33 0.33 0.33 0.33 0.00 0.11 0.04 L A1/A407
A212/A1 SE-0A/02 CP1 0.00 0.00 0.00 0.00 2.00 0.00 0.00 L
A212/A1 SE-0A/03 RD 3.00 3.00 0.00 0.00 0.00 9.00 0.00 L
A212/A1 SE-0A/04 DM 0.50 0.50 0.00 0.50 0.00 0.25 0.13 L C1/A407
A212/A1 SE-0A/05 DM 1.00 0.50 0.00 0.67 0.00 0.50 0.34 L C1/A407
A212/A1 SE-0A/06 DM 0.67 0.67 0.50 0.50 0.00 0.45 0.22 L C3/A405
A212/A1 SE-01/02 CR2 0.00 0.00 0.00 0.00 1.00 0.00 0.00 G
A212/A1 SE-01/03 CR1 0.00 0.00 0.00 0.00 1.00 0.00 0.00 G
A212/A1 SE-01/04 CR1 0.00 0.00 0.00 0.00 1.00 0.00 0.00 G
A212/A1 SE-01/04 CR1 0.00 0.00 0.00 0.00 1.00 0.00 0.00 G
A212/A1 SE-02/01 CR1 0.00 0.00 0.00 0.00 2.00 0.00 0.00 L
A212/A1 SE-02/02 CR1 0.00 0.00 0.00 0.00 1.00 0.00 0.00 L
A212/A1 SE-02/03 DM 0.33 0.33 0.00 0.33 0.00 0.11 0.04 L C1/A407
A212/A1 SE-02/04 DM 0.67 0.33 0.00 0.33 0.00 0.22 0.07 L C1/A407
A212/A1 SE-05/01 RD 0.67 8.00 0.00 0.00 0.00 5.33 0.00 L
A212/A1 SE-05/02 DM 0.50 0.33 0.50 0.50 0.00 0.17 0.08 L C1/A407
A212/A1 SE-05/03 CP1 0.00 0.00 0.00 0.00 1.00 0.00 0.00 L A2/A404
A212/A1 SE-05/04 CR1 0.00 0.00 0.00 0.00 2.00 0.00 0.00 L
PAx2
PAx2
PAx2
PAx4
PA
PAx2 CR1 1.66
DM 1.0,1.25,0.5PAPA
PA
0.660.5 0.5
CP2
CP2 2.0
Add CP2 repair
DM 0.5,0.5,0.33Create stone dowel back into cap
NR
PA
0.33 1.5 0.75 0.75DM
RP2 3.5, 4.6, 1.0
DM 0.33,0.75,0.5
Like this on east end
Foxtrotcap stonerepair ifnecessary
Lateral pins to stabilize crack (if needed) at 6and 11" measured from the back, mid height
Per typ detail
Dowel only
Cramp with dowel cut offbelow flashing
CP1 2.75
DM 0.5,0.5,0.25PAPA ret
PA
PA
PA
PAx3
PA
PAx2
PAPAx2
PA
CR1 1.5CR1 0.5PAx2
PA
PAx3
PAx2
PA
PA
PA
PA
PAx3
PA
PA
PA
PA
PA
PA
PA
PA
PA ret
PA
PAx2
PA
PA
PA
CR1 0.5
PA
PAPAx3
PA
PA
PAx2
PA
PAx3
PA
Glassline
NR
PAx3
NR
PA
PAx2
PA
PA
NR
Glassline
PA ret
PA ret
PA ret
PA
CR1 1.0
PA
CR1 1.0CR1 0.66
CR1 1.0
CR1 1.0
CR1 2.0
PAx6
RAx2PA
PA jamb stone
CR1 1.0
CR1 1.0
PA
PAx5
CR1 2.0
CR1 0.5
RA
RA
Door operation sensormounted to stone. Shouldbe removed for cleaning.Will it go back in the samelocation?
RAx3
CR1 1.0
CR1 0.66
RA back
RAx2
RAx6PA
RAx3
RAx4
08.09.2017 - Repair confirmation walk: J. Manglitz, J. Wolski08.10.2017 - Repair confirmation walk continued: J. Manglitz, L. Lesniak
Protection or tarps obscuring area
FP = fill pocket - typically a slot in the top of the stone used for hoisting the stoneinto place. fill with setting mortar
RA = remove anchor (per specs) and patch
NR = no repair
* = following repair means the repair may need to be changed if field conditionswarrant (redressing and damage is deeper, or similar)
Area to be done with Foxtrot
Where repair sizes changed - see schedule edits
Coordination item for JE Dunn to provide direction
A212 parapet, northern most stone
SE-0A/06
SE-0A/06
SE-0A/X02DM 0.33,1.25, 0.5
DM 0.33,0.75,0.33
SE-0A/X03
SE-0A/X04
SE-0A/X05
SE-0A/X06
SE-0A/X07
SE-0A/05
SE-0A/01
SE-0A/X08
SE-0A/X10
SE-0A/X11
SE-0A/X09
NR
SE-05/X01
SE-05/X02
SE-05/X03
SE-05/X04
SE-05/X05
SE-05/X06SE-05/X07
SE-05/X08
SE-04/X01
SE-04/X02
SE-04/X03SE-04/X04
SE-04/X05
SE-04/X06
SE-04/X07
SE-04/X08
SE-04/X09
SE-04/X10
SE-04/X11
SE-03/X01
SE-03/X02
SE-03/X03
SE-03/X04
SE-03/X05
SE-03/X06
SE-03/X07
SE-03/X08
SE-03/X09
SE-03/X10
SE-03/X11
SE-03/X12
SE-03/X13
SE-03/X16
SE-03/X14
SE-03/X15
SE-03/X17
SE-02/X01
SE-02/X02
SE-02/X03
SE-02/X04
SE-02/X05
SE-02/X06
SE-02/X07
SE-02/X08SE-02/X09
SE-02/X10
SE-02/X11
SE-02/X12
SE-02/X13
SE-02/X14
SE-02/X15
SE-02/X16
SE-02/X17
SE-02/X18SE-02/X19
SE-02/X20SE-02/X21
SE-02/X22
SE-02/X23
SE-01/X01
SE-01/X02
SE-01/X03
SE-01/X04
SE-01/X05
SE-01/X06
SE-01/X07
SE-01/X08
SE-01/X09
SE-01/X10
SE-01/X11
SE-01/X12SE-01/X13
SE-01/X14
SE-01/X15
SE-01/X16
SE-01/X17
SE-01/X18
SE-01/X20
SE-01/X19
SE-01/X22
SE-01/X21
SE-01/X23
See Revisions and photo below
NR
NR
NR
SECOND FLOOR
100'-0"
THIRD FLOOR
114'-6"
FIRST FLOOR
88'-0"
FOURTH FLOOR
126'-3"
FIFTH FLOOR
137'-5"
ATTIC
150'-0"
ROOF PLAN
172'-6"
116A2
117A2
216A1
217A1
218A1
118A2
102
TOP OF PARAPET
162'-2"
SE-01/02 SE-01/03 SE-01/04
SE-02/02
SE-02/01
SE-0A/01
SE-0A/04
SE-05/02
SE-05/01
SE-0A/03
SE-02/03
SE-02/04
SE-0A/05
SE-05/03
SE-05/04
SE-0A/02
S03
S18
S07
DN01
S05
S01
S03
S07
S07
S06
S07
S10
S03
.
BO WATERTABLE TYP
BO DOORHEADER
.
UNO
.
.
BO CORNICETYP
.
.
FO
R E
AS
T W
ING
SO
UT
H E
LE
VA
TIO
N S
EE
A1/A
211
WE25
WE28
S15
FO
R S
OU
TH
WIN
G S
OU
TH
ELE
VA
TIO
N S
EE
A1/A
201
S17
TYP OF 3GUARDS
S16
S02
S07
TYP AT JTW/ CONC
S06
FOR EAST WING EASTELEVATION SEE A1/A210
.
.
WE44
S15
BO HEADERTYP OF 3TYPE A2OPENINGS
TYP OF 3TYPE A2OPENINGS
S16
S07
S15
BO HEADERTYP OF 3TYPE A1OPENINGS
TYP OF 3TYPE A1OPENINGS
S18
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
DISMANTLESALVAGE &REINSTALL LIGHTFIXTURE;RE ELECTRICAL
DISMANTLESALVAGE &REINSTALL LIGHTFIXTURE;RE ELECTRICAL
WE28
S14
S12TYP ATSTONEGUTTER
S20
WE37
S02
TYP AT JT W/ HORIZTRAFFIC SURFACES
S07
TYP THISELEMENT
A. PROTECT ALL ADJACENT MATERIALS AND ASSEMBLIESFROM DAMAGE DURING THE WORK. ERECT AND MAINTAINTEMPORARY BARRIERS AND COVERS THAT AREAPPROPRIATE TO PROTECT FROM INCIDENTAL DAMAGE.REFERENCE 013591 FOR HISTORIC TREATMENTPROCEDURES.
B. PROTECT ROOFING AND ROOF DRAINAGE. PREVENTDEBRIS FROM ENTERING THE ROOF DRAINAGE SYSTEM. DONOT RINSE CHEMICALS OR DEBRIS FROM CLEANING ANDCONSTRUCTION ACTIVITIES INTO ROOF DRAIN PIPINGWITHOUT WRITTEN CONSENT OF DESIGN BUILDER.CAPTURE OR REROUTE DRAINAGE FROM CLEANINGACTIVITIES AND CONVEY IT TO GRADE WITHOUT DAMAGETO BUILDING FACADES OR TO LANDSCAPE AND GROUNDSURFACES BELOW.
C. PROTECT LIGHT WELL DRAINAGE AND ASSOCIATED PIPING.PREVENT DEBRIS FROM ENTERING THE SYSTEM. DO NOTRINSE CHEMICALS OR DEBRIS FROM CLEANING ANDCONSTRUCTION ACTIVITIES INTO PIPING WITHOUTWRITTEN CONSENT OF DESIGN BUILDER. CAPTURE ORREROUTE DRAINAGE FROM CLEANING ACTIVITIES ANDCONVEY IT TO GRADE WITHOUT DAMAGE TO BUILDINGFACADES OR TO LANDSCAPE AND GROUND SURFACES.
D. MAINTAIN BUILDING IN A WEATHER-TIGHT CONDITION.PROVIDE TEMPORARY COVERS AND CLOSURES ATOPENINGS IN THE WALL OR ROOF SYSTEMS THAT AREWIND AND PRECIPITATION RESISTANT. DO NOT REMOVEMORE WINDOWS, DOORS, CLADDING, OR COVERINGS THANCAN BE PROTECTED IN THE SAME WORKDAY. MONITORWEATHER CONDITIONS AND PROVIDE ADEQUATE NOTICEWHEN CONDITIONS NECESSITATE WORK SHUT DOWNPRIOR TO TYPICAL WORK HOURS.
E. WHERE EXTERIOR LIGHTING/CONDUIT, SECURITYCAMERAS/CONDUIT, LIGHTNING PROTECTION AIRTERMINALS/DOWN LEADERS, AND ASSOCIATEDFASTENERS, OR OTHER MEP ITEMS NEED TO BE REMOVEDAND REINSTALLED FOR THE WORK, DO NOT INTERRUPTSERVICE WITHOUT AUTHORIZATION OF DESIGN BUILDER.PROVIDE TEMPORARY CONNECTIONS AND SERVICE ASNECESSARY AND/OR WHERE DIRECTED TO DO SO BYDESIGN BUILDER.
F. REFERENCE SCHEDULES FOR WINDOW, DOOR, ANDMASONRY REPAIR WORK AT SPECIFIC LOCATIONINDICATED ON THE DRAWINGS. REFERENCE MASONRYREPAIR SCHEDULES FOR MASONRY REPAIR ID KEY.
G. REFERENCE GI SHEETS FOR BUILDING NOMENCLATURE,OVERALL DIMENSIONS, TYPICAL BAYS, AND MATERIALLOCATIONS AND LEGENDS.
H. FOR WINDOW RESTORATION ALL ADJACENTCONSTRUCTION SHALL BE PROTECTED WITH BOX OUTS,TARPS, OR SIMILAR MEANS ACCEPTABLE TO THEARCHITECT AND DESIGN BUILDER TO ENSURE THATWINDOW/PAINT/MEDIA DO NOT STAIN OR DAMAGEADJACENT SURFACES. IN ADDITION, PROTECTION ANDTEMPORARY INFILL MAY NEED TO BE PROVIDED TOELIMINATE DUST, AND MINIMIZE ODOR, AND PARTICLEMIGRATION INTO THE BUILDING THROUGH ADJACENTWINDOWS, LOUVERS, DOORS, ETC. DURINGCONSTRUCTION. ADDITIONALLY, TEMPORARY SHORING,BRACING, BLOCKING, ETC. SHALL BE PROVIDED ANYWHEREREMOVAL OF FASTENED COMPONENTS OCCUR.
I. 018126 KNOWN HAZARDOUS MATERIALS WILL BE REMOVEDBY OWNER BEFORE START OF WORK. IF MATERIALSSUSPECTED OF CONTAINING HAZARDOUS MATERIALS AREENCOUNTERED DO NOT DISTURB; IMMEDIATELY NOTIFYDESIGN BUILDER.
GENERAL PLAN & ELEVATION NOTES:
WINDOW INFILL PANEL
WINDOW SPANDREL PANEL
RUST
MATERIALS ELEVATION LEGEND
WATERPROOFING MATERIAL
Date:
ADG Project:
Sheet No.
Drawn By:
Checked By:
Revisions:
Approved By:
Copyright ADG, PC 2016
KEY PLAN
TA Project #
15-007
EXTERIOR
REHABILITATION
A360://HP15.007.00B Oklahoma State Capitol Exterior Rehabili/OSC_Exterior Rehab.rvt
6/28/2016 7:22:12 PM
A212
SOUTH WING
EAST ELEVATION
JUNE 30, 2016
MS / SCK
JEM / TGR / JCW
KVK
2300 NORTH
LINCOLN
BOULEVARD
OKLA
HOMA CITY, OK 73105
FINAL CONSTRUCTION SET
OFFICE O
F M
ANAGEMENT AND ENTERPRISE SERVICES
CAP PROJECT NO. 15039DB
HP15.007.00B
1/8" = 1'-0" A1SOUTH WING EAST ELEVATION
KEYNOTES
DN01 081113 DOOR, FRAME, AND TRANSOM, TO BE REPLACED,ALT #02
S01 040343 REPOINT WITH MORTAR, RE A1/A403
S02 040343 REPOINT AT JOINTS BETWEEN DISSIMILARMATERIALS WITH SEALANT, RE B1/A403
S03 040343 REPOINT WITH LEAD T-CAP, REF C1/A403
S05 040310 GENERAL AND PRELIMINARY CLEANING
S06 040310 SPOT TREATMENT BIOLOGICAL SOIL (CHEMICAL)
S07 040310 SPOT TREATMENT ATMOSPHERIC CRUSTS (COLDWATER SOAK)
S10 040310 SPOT TREATMENT ATMOSPHERIC SOILING (HOTWATER) FOR ORANGE/BROWN SOILING DISPERSEDOVER 25% OF FACADE
S12 079200 REMOVE EXISTING SEALANT(S), CLEAN TOBRIGHT, AND RESEAL REGLET, C3/A403
S14 040322 REMOVE EXISTING SEALANT AND/OR MORTAR,SALVAGE PARAPET CAP STONE, REINSTALL OVER THRUWALL FLASHING 076200, RE D1/A141, ALT #05
S15 040310 REMOVE SEALANT RESIDUE AT PERIMETER OFMASONRY OPENING
S16 079200 CLEAN, PRIME, AND RESEAL PERIMETER OFDOOR AND/OR WINDOW INCLUDING ASSOCIATED CASTIRON; RE C5/A403
S17 050383 WROUGHT IRON GUARD; DISMANTLE, SALVAGE,PREPARE, PAINT, AND REINSTALL ELEMENTS
S18 040343 REPOINT WITH SEALANT CONTINUOUS FROMTOP TO BOTTOM OF FACADE, RE B3/A403
S20 A3/A403 TYP AT GRANITE WATERTABLE
WE25 080351.23 MECHANICAL PENETRATION TO REMAIN -TEMPORARILY REMOVE AND TERMINATE MECHANICALSYSTEM - REINSTALL SUBSEQUENT TO WINDOWRESTORATION RE MECHANICAL, ALT #01
WE28 080351.23 INFILL PANEL
WE37 080351.23 ELECTRICAL PENETRATION TO BE REMOVEDAND TERMINATED FOR COMPLETE WINDOWRESTORATION - RE ELECTRICAL, ALT #01
WE44 080351.23 SECURITY CAMERA TO REMAIN TEMPORARILYREMOVE AND TERMINATE SYSTEM. REINSTALLSUBSEQUENT TO WINDOW RESTORATION. REELECTRICAL.ALT #01
4'0 8' 16'
A212/A1 SE-0A/01 DM 0.33 0.33 0.33 0.33 0.00 0.11 0.04 L A1/A407
A212/A1 SE-0A/02 CP1 0.00 0.00 0.00 0.00 2.00 0.00 0.00 L
A212/A1 SE-0A/03 RD 3.00 3.00 0.00 0.00 0.00 9.00 0.00 L
A212/A1 SE-0A/04 DM 0.50 0.50 0.00 0.50 0.00 0.25 0.13 L C1/A407
A212/A1 SE-0A/05 DM 1.00 0.50 0.00 0.67 0.00 0.50 0.34 L C1/A407
A212/A1 SE-0A/06 DM 0.67 0.67 0.50 0.50 0.00 0.45 0.22 L C3/A405
A212/A1 SE-01/02 CR2 0.00 0.00 0.00 0.00 1.00 0.00 0.00 G
A212/A1 SE-01/03 CR1 0.00 0.00 0.00 0.00 1.00 0.00 0.00 G
A212/A1 SE-01/04 CR1 0.00 0.00 0.00 0.00 1.00 0.00 0.00 G
A212/A1 SE-01/04 CR1 0.00 0.00 0.00 0.00 1.00 0.00 0.00 G
A212/A1 SE-02/01 CR1 0.00 0.00 0.00 0.00 2.00 0.00 0.00 L
A212/A1 SE-02/02 CR1 0.00 0.00 0.00 0.00 1.00 0.00 0.00 L
A212/A1 SE-02/03 DM 0.33 0.33 0.00 0.33 0.00 0.11 0.04 L C1/A407
A212/A1 SE-02/04 DM 0.67 0.33 0.00 0.33 0.00 0.22 0.07 L C1/A407
A212/A1 SE-05/01 RD 0.67 8.00 0.00 0.00 0.00 5.33 0.00 L
A212/A1 SE-05/02 DM 0.50 0.33 0.50 0.50 0.00 0.17 0.08 L C1/A407
A212/A1 SE-05/03 CP1 0.00 0.00 0.00 0.00 1.00 0.00 0.00 L A2/A404
A212/A1 SE-05/04 CR1 0.00 0.00 0.00 0.00 2.00 0.00 0.00 L
43 BR
To be donewith foxtrot
8-9-2016 gutter sub conditions walkJarek & Julia
102 head joints
Horiz brick joint3 3 3 18 1 23 5
Extra reglet6 18
9 pockets with wood to remove 1 ferrous fascia horizontal cramp
24" ferrouscramp 0.1.1 sq
10.10.0 ferrous0.1.1 sqMember is under tension
Conc exterior foundation wall,interior side of cheek wall issupported on a concrete beam
08.09.2017 Gutter sub conditions: J. Manglitz, J. Wolski
0 prep and paint exist anchors1 remove existing stone to stone crampsferrous cramp at corona course - treatment direction forthcomingferrous anchor at fascia course - treatment direction forthcoming 43 BR replacement
158 LF of repointing at brick24 LF additional of pointing at reglet
Remove wood plugs in stone @ 9 locations
SECOND FLOOR
100'-0"
THIRD FLOOR
114'-6"
FIRST FLOOR
88'-0"
FOURTH FLOOR
126'-3"
FIFTH FLOOR
137'-5"
ATTIC
150'-0"
201 205206a
TOP OF PARAPET
162'-2"
SS-04/01
SS-0A/23
SS-0A/20
SS-0A/22
SS-02/01
SS-02/04
SS-02/03 SS-02/05 SS-02/06
SS-0A/15
SS-05/08SS-05/07SS-05/06
SS-0A/14SS-0A/05
SS-0A/17SS-0A/06
SS-0R/01
SS-0A/07
SS-05/03 SS-05/04
SS-05/10
SS-03/01
SS-0A/03 SS-0A/19
SS-0A/02
SS-0A/04
SS-05/01
SS-02/02
SS-0R/02
SS-05/05
SS-0A/11
SS-0A/10
SS-0A/09
SS-0A/08
SS-0A/18SS-0A/16
SS-0A/13
SS-05/02
SS-0A/12
SS-0A/21SS-05/09
TYP AT PALMETTE
S11
S06
S07
BO WATERTABLE, TYP
S06 S03
S06
S07
S06
.
S01
S05
S09
UNO
BO WATERTABLE, TYP
S07
S03
S03
TYP THISCOURSE
S03
S06
S07
TYP THESECOURSES
FO
R A
DJA
CE
NT
ELE
VA
TIO
N S
EE
FO
R A
DJA
CE
NT
ELE
VA
TIO
N S
EE
A1/A
202
A1/A
212
.
.
S07
.1
0'-
2 1
7/1
28
"
.
.
.
S06
S07
TYP AT GRIFFIN
S07
BOCORNICETYP
S02TYP AT JT W/ HORIZTRAFFIC SURFACES
FOR DOME PLATFORMSOUTH ELEVATIONSEE B1/A216
SS-0A/01
206b
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
S18
S17
S18
S17
. .
FOR EAST WING SOUTHELEVATION SEE
FOR WEST WING SOUTHELEVATION SEE
A1/A211A1/A203
DISMANTLESALVAGE ANDREINSTALLLIGHT FIXTURE;RE ELECTRICALFOR ALTS
DISMANTLESALVAGE &REINSTALLLIGHT FIXTURE;RE ELECTRICALFOR ALTS
TYP THISCOURSE
S19
S19
P08 TYP THIS ELEV.
S20
S20
S07
SS-02/07A202
B1
LIGHT FIXTURE PROVIDEDIN THIS CONTRACT; REELECTRICAL FOR ALTS
A. PROTECT ALL ADJACENT MATERIALS AND ASSEMBLIESFROM DAMAGE DURING THE WORK. ERECT AND MAINTAINTEMPORARY BARRIERS AND COVERS THAT AREAPPROPRIATE TO PROTECT FROM INCIDENTAL DAMAGE.REFERENCE 013591 FOR HISTORIC TREATMENTPROCEDURES.
B. PROTECT ROOFING AND ROOF DRAINAGE. PREVENTDEBRIS FROM ENTERING THE ROOF DRAINAGE SYSTEM. DONOT RINSE CHEMICALS OR DEBRIS FROM CLEANING ANDCONSTRUCTION ACTIVITIES INTO ROOF DRAIN PIPINGWITHOUT WRITTEN CONSENT OF DESIGN BUILDER.CAPTURE OR REROUTE DRAINAGE FROM CLEANINGACTIVITIES AND CONVEY IT TO GRADE WITHOUT DAMAGETO BUILDING FACADES OR TO LANDSCAPE AND GROUNDSURFACES BELOW.
C. PROTECT LIGHT WELL DRAINAGE AND ASSOCIATED PIPING.PREVENT DEBRIS FROM ENTERING THE SYSTEM. DO NOTRINSE CHEMICALS OR DEBRIS FROM CLEANING ANDCONSTRUCTION ACTIVITIES INTO PIPING WITHOUTWRITTEN CONSENT OF DESIGN BUILDER. CAPTURE ORREROUTE DRAINAGE FROM CLEANING ACTIVITIES ANDCONVEY IT TO GRADE WITHOUT DAMAGE TO BUILDINGFACADES OR TO LANDSCAPE AND GROUND SURFACES.
D. MAINTAIN BUILDING IN A WEATHER-TIGHT CONDITION.PROVIDE TEMPORARY COVERS AND CLOSURES ATOPENINGS IN THE WALL OR ROOF SYSTEMS THAT AREWIND AND PRECIPITATION RESISTANT. DO NOT REMOVEMORE WINDOWS, DOORS, CLADDING, OR COVERINGS THANCAN BE PROTECTED IN THE SAME WORKDAY. MONITORWEATHER CONDITIONS AND PROVIDE ADEQUATE NOTICEWHEN CONDITIONS NECESSITATE WORK SHUT DOWNPRIOR TO TYPICAL WORK HOURS.
E. WHERE EXTERIOR LIGHTING/CONDUIT, SECURITYCAMERAS/CONDUIT, LIGHTNING PROTECTION AIRTERMINALS/DOWN LEADERS, AND ASSOCIATEDFASTENERS, OR OTHER MEP ITEMS NEED TO BE REMOVEDAND REINSTALLED FOR THE WORK, DO NOT INTERRUPTSERVICE WITHOUT AUTHORIZATION OF DESIGN BUILDER.PROVIDE TEMPORARY CONNECTIONS AND SERVICE ASNECESSARY AND/OR WHERE DIRECTED TO DO SO BYDESIGN BUILDER.
F. REFERENCE SCHEDULES FOR WINDOW, DOOR, ANDMASONRY REPAIR WORK AT SPECIFIC LOCATIONINDICATED ON THE DRAWINGS. REFERENCE MASONRYREPAIR SCHEDULES FOR MASONRY REPAIR ID KEY.
G. REFERENCE GI SHEETS FOR BUILDING NOMENCLATURE,OVERALL DIMENSIONS, TYPICAL BAYS, AND MATERIALLOCATIONS AND LEGENDS.
H. FOR WINDOW RESTORATION ALL ADJACENTCONSTRUCTION SHALL BE PROTECTED WITH BOX OUTS,TARPS, OR SIMILAR MEANS ACCEPTABLE TO THEARCHITECT AND DESIGN BUILDER TO ENSURE THATWINDOW/PAINT/MEDIA DO NOT STAIN OR DAMAGEADJACENT SURFACES. IN ADDITION, PROTECTION ANDTEMPORARY INFILL MAY NEED TO BE PROVIDED TOELIMINATE DUST, AND MINIMIZE ODOR, AND PARTICLEMIGRATION INTO THE BUILDING THROUGH ADJACENTWINDOWS, LOUVERS, DOORS, ETC. DURINGCONSTRUCTION. ADDITIONALLY, TEMPORARY SHORING,BRACING, BLOCKING, ETC. SHALL BE PROVIDED ANYWHEREREMOVAL OF FASTENED COMPONENTS OCCUR.
I. 018126 KNOWN HAZARDOUS MATERIALS WILL BE REMOVEDBY OWNER BEFORE START OF WORK. IF MATERIALSSUSPECTED OF CONTAINING HAZARDOUS MATERIALS AREENCOUNTERED DO NOT DISTURB; IMMEDIATELY NOTIFYDESIGN BUILDER.
GENERAL PLAN & ELEVATION NOTES:
201 205202 203 204 DE01DN02
DE03
S01
S05
S09
S11
S07
S07
S07
BOHEADER
BO HEADER
BOHEADER
.
.
S06
.
S11
S07
S07
S16
S02
TYP AT JT W/HORIZ TRAFFICSURFACES
S16S16
DE01
TYP OF 2DOORHEADER
040342 CUTMASONRYFOR ELEC;FIXTURE REELEC
S01 S05S09S07 S11
TYP AT CEILING& COFFERS
.
TYP AT JT W/HORIZ TRAFFICSURFACES
DISMANTLESALVAGE &REINSTALL LIGHTFIXTURE;RE ELECTRICALFOR ALTS
S02
S06
S11
S11
S01
S05
S09
.
.
.
TYP OF BOTH SIDES
S07
S07
TYP ATNICHE ANDGARLAND
WINDOW INFILL PANEL
WINDOW SPANDREL PANEL
RUST
MATERIALS ELEVATION LEGEND
WATERPROOFING MATERIAL
Date:
ADG Project:
Sheet No.
Drawn By:
Checked By:
Revisions:
Approved By:
Copyright ADG, PC 2016
KEY PLAN
TA Project #
15-007
EXTERIOR
REHABILITATION
A360://HP15.007.00B Oklahoma State Capitol Exterior Rehabili/OSC_Exterior Rehab.rvt
6/28/2016 7:21:46 PM
A201
SOUTH WING
SOUTH
ELEVATION
JUNE 30, 2016
MS / SCK
JEM / TGR / JCW
KVK
2300 NORTH
LINCOLN
BOULEVARD
OKLA
HOMA CITY, OK 73105
FINAL CONSTRUCTION SET
OFFICE O
F M
ANAGEMENT AND ENTERPRISE SERVICES
CAP PROJECT NO. 15039DB
HP15.007.00B
1/8" = 1'-0" A1SOUTH WING SOUTH ELEVATION
KEYNOTES
DE01 080311 DOOR AND FRAME TO BE RESTORED, ALT #02
DE03 DOOR CANNOT BE OPENED DUE TO INTERIORCONDITIONS. RESTORATION LIMITED TO EXTERIORSIDE OF DOOR AND FRAME, ALT #02
DN02 081113 ROTATING DOOR AND FRAME, TO BE REPLACEDWITH PAIR OF DOORS, ALT #02
P08 REINSTALL SALVAGED LIGHTNING PROTECTIONSYSTEM, FOR THE ENTIRE LENGTH OF THE PARAPET,RE ELECTRICAL ALT #05
S01 040343 REPOINT WITH MORTAR, RE A1/A403
S02 040343 REPOINT AT JOINTS BETWEEN DISSIMILARMATERIALS WITH SEALANT, RE B1/A403
S03 040343 REPOINT WITH LEAD T-CAP, REF C1/A403
S05 040310 GENERAL AND PRELIMINARY CLEANING
S06 040310 SPOT TREATMENT BIOLOGICAL SOIL (CHEMICAL)
S07 040310 SPOT TREATMENT ATMOSPHERIC CRUSTS(COLD WATER SOAK)
S09 040310 SPOT TREATMENT ATMOSPHERIC SOILING(MICRO-ABRASION)
S11 028716.13 REMOVE BIRD EXCREMENT
S16 079200 CLEAN, PRIME, AND RESEAL PERIMETER OFDOOR AND/OR WINDOW INCLUDING ASSOCIATED CASTIRON; RE C5/A403
S17 050383 WROUGHT IRON GUARD; DISMANTLE, SALVAGE,PREPARE, PAINT, AND REINSTALL ELEMENTS
S18 040343 REPOINT WITH SEALANT CONTINUOUS FROMTOP TO BOTTOM OF FACADE, RE B3/A403
S19 040343 REPOINT WITH SEALANT FROM TOP TO BOTTOMOF ENGAGED COLUMN, RE B1/A403
S20 A3/A403 TYP AT GRANITE WATERTABLE
1/8" = 1'-0" D3SOUTH PORTICO ELEVATION
4'0 8' 16'
4'0 8' 16' 1/8" = 1'-0" D2RCP SOUTH PORTICO
4'0 8' 16' 4'0 8' 16' 1/8" = 1'-0" D1PORTICO INTERIOR
Masonry Schedule A201 - A207
Elevation Repair IDRepairCode
Dimensions (ft) Calculations
NotesMasonry
TypeDETAIL
REFERENCE AlternateH W1 W2 D LAREA(sq-ft)
VOL(cu-ft)
A201/A1 SS-0A/01 DM 0.33 0.66 0.50 0.50 0.00 0.22 0.11 L C3/A405
A201/A1 SS-0A/02 RP2 3.66 5.33 1.00 1.00 0.00 19.52 19.52 8 L C1/A404
A201/A1 SS-0A/03 DM 1.33 0.67 0.00 0.50 0.00 0.89 0.44 L C3/A405
A201/A1 SS-0A/04 RP2 3.66 7.33 0.00 0.33 0.00 26.84 8.86 8 L A1/A404
A201/A1 SS-0A/05 RP2 3.66 6.00 0.00 0.33 0.00 21.96 7.25 8 L A1/A404
A201/A1 SS-0A/06 DM 0.33 0.50 0.00 0.33 0.00 0.17 0.06 L C1/A407
A201/A1 SS-0A/07 PA 0.33 0.33 0.00 0.00 0.00 0.11 0.00 L
A201/A1 SS-0A/08 DM 0.67 0.50 0.00 0.67 0.00 0.33 0.22 L A1/A407
A201/A1 SS-0A/09 DM 1.67 0.67 0.00 2.50 0.00 1.11 2.78 L A3/A407
A201/A1 SS-0A/10 PA 0.33 0.33 0.00 0.00 0.00 0.11 0.00 L
A201/A1 SS-0A/11 DM 0.33 0.50 0.00 0.33 0.00 0.17 0.06 L C1/A407
A201/A1 SS-0A/12 CR1 0.00 0.00 0.00 0.00 2.50 0.00 0.00 L
A201/A1 SS-0A/13 CR1 0.00 0.00 0.00 0.00 2.00 0.00 0.00 L
A201/A1 SS-0A/14 CR1 0.00 0.00 0.00 0.00 1.00 0.00 0.00 2 L
A201/A1 SS-0A/14 CR1 0.00 0.00 0.00 0.00 1.17 0.00 0.00 2 L
A201/A1 SS-0A/15 CR1 0.00 0.00 0.00 0.00 1.00 0.00 0.00 L
A201/A1 SS-0A/16 CP1 0.00 0.00 0.00 0.00 1.67 0.00 0.00 L
A201/A1 SS-0A/17 DM 0.33 0.50 0.00 0.33 0.00 0.17 0.06 L C1/A407
A201/A1 SS-0A/18 DM 1.67 0.67 0.00 1.00 0.00 1.11 1.11 L C1/A407
A201/A1 SS-0A/19 DM 1.00 1.00 0.50 0.53 0.00 1.00 0.53 L C3/A405
A201/A1 SS-0A/20 RP2 3.66 7.33 0.00 0.33 0.00 26.84 8.95 8 L A1/A404
A201/A1 SS-0A/21 RP2 3.66 5.33 1.00 1.00 0.00 19.52 19.52 8 L C1/A404
A201/A1 SS-0A/22 PA 0.33 0.33 0.00 0.00 0.00 0.11 0.00 L
A201/A1 SS-0A/23 PA 0.33 0.33 0.00 0.00 0.00 0.11 0.00 L
A201/A1 SS-0A/23 CP1 0.00 0.00 0.00 0.00 1.00 0.00 0.00 L
A201/A1 SS-0R/01 DM 0.33 0.33 0.00 0.33 0.00 0.11 0.04 L A1/A407
A201/A1 SS-0R/02 DM 0.33 1.50 0.00 0.33 0.00 0.50 0.17 L C1/A407
A201/A1 SS-02/01 CR1 0.00 0.00 0.00 0.00 1.50 0.00 0.00 2 L
A201/A1 SS-02/01 CR1 0.00 0.00 0.00 0.00 1.50 0.00 0.00 2 L
A201/A1 SS-02/02 CR1 0.00 0.00 0.00 0.00 2.00 0.00 0.00 L
A201/A1 SS-02/03 CR1 0.00 0.00 0.00 0.00 2.00 0.00 0.00 L
A201/A1 SS-02/04 CR1 0.00 0.00 0.00 0.00 2.00 0.00 0.00 2 L
A201/A1 SS-02/04 CR1 0.00 0.00 0.00 0.00 2.00 0.00 0.00 2 L
A201/A1 SS-02/05 CP2 0.00 0.00 0.00 0.00 1.50 0.00 0.00 4 L
A201/A1 SS-02/05 CP2 0.00 0.00 0.00 0.00 1.50 0.00 0.00 4 L
A201/A1 SS-02/06 DM 0.50 1.00 0.33 0.67 0.00 0.50 0.33 6 L C1/A407
A201/A1 SS-02/07 CP1 0.00 0.00 0.00 0.00 1.50 0.00 0.00 4 L
A201/A1 SS-03/01 PA 0.33 0.33 0.00 0.00 0.00 0.11 0.00 L
A201/A1 SS-04/01 CP1 0.00 0.00 0.00 0.00 1.00 0.00 0.00 L
A201/A1 SS-05/02 RD 0.67 7.33 0.00 0.00 0.00 4.89 0.00 L
A201/A1 SS-05/03 DM 1.33 0.67 0.00 0.67 0.00 0.89 0.59 4 L A1/A407
A201/A1 SS-05/04 CP2 0.00 0.00 0.00 0.00 4.00 0.00 0.00 4 L A2/A404
A201/A1 SS-05/05 CP2 0.00 0.00 0.00 0.00 1.00 0.00 0.00 4 L
A201/A1 SS-05/06 CP2 0.00 0.00 0.00 0.00 1.67 0.00 0.00 2, 4 L A2/A404
A201/A1 SS-05/06 CP2 0.00 0.00 0.00 0.00 1.83 0.00 0.00 2, 4 L A2/A404
A201/A1 SS-05/07 CP2 0.00 0.00 0.00 0.00 2.00 0.00 0.00 4 L A2/A404
A201/A1 SS-05/07 CP2 0.00 0.00 0.00 0.00 2.00 0.00 0.00 4 L A2/A404
A201/A1 SS-05/08 DM 2.50 0.67 0.67 1.33 0.00 1.67 2.22 4 L B1/A404
A201/A1 SS-05/08 RD 0.67 4.00 0.00 0.00 0.00 2.67 0.00 L
A201/A1 SS-05/09 RD 0.67 7.33 0.00 0.00 0.00 4.89 0.00 L
A201/A1 SS-05/10 DM 0.50 0.50 0.50 0.50 0.00 0.25 0.13 10 L B1/A405 SIM
A201/A1 SS-05/10 PA 0.33 0.33 0.00 0.00 0.00 0.11 0.00 10 L
2.0
FPRAx4PAX2
PAx2PAx2PAx2PAx2
PAx2
PAx2 PAx2 PAx2CR1 0.5
PAx2
PA PA
PA
PAx2
PAx3
PA
0.83 1.25 D2 2 helical @ 1/3points
PA
FP
RAx9 back sideRAx4 front
FPx2PAx2 back, PA near tailDM 0.5,0.5,0.33 at roof side foot - lightning anchor
PA
PAx4
PAx2PAPAx2DM 0.25, 7.0,1.0Top leading edge
PAx2 Anchor front and bottom patches
RAx4
DM 0.25, 0.25,0.5
Check chimeraAnd rake from India side
PA Place insul or shim, do not anchor
PA
PA
Place insul or shim, do not anchor
Place insul or shim, do not anchor
Install backer& seal joint
CR1 1.0
1.75
CR1 3.0PA
1.25 0.5
CP1 1.67
CR1 3.0
CR2 1.0 Fill existing DM jointNR
DM 0.33 0.75
Anchored PADM 0.25,0.5,0.25
1.0 0.5
NR 1.75
SS-05/06Use one hole for bothdirections
2.752.33
See pinningphoto above
0.75
CR1 0.75
DM 2.330.33 0.75DM face - pending detail review with ZFI
These two must be supported by pinson the sides to do face DM below
DM 0.33, 3.0,0.75
CR1 0.5
0.33 0.33CR1 0.5
PA PA
PA
PAPA
PAx3
PAx3
PA
PA
CR1 1.0 exist DMPA
DM 0.25,1.25,0.33
PAx2
CR1 0.75
CR1 0.5
PA
PA
DM 0.33,0.33, 0.5
DM 0.66,0.5,0.5
RAx4
PA ret
3.33DM 0.33,0.33, 0.5DM 0.33,0.5,0.5
CR1 0.33
DM 0.5,0.5,0.5
4.25
CP1 3.25
CR1 2.0 (2cracksback)
DM 0.5,0.17,0.17
CP1 1.25
CR1 1.0
CP1 0.66
CP1 0.33CR1 0.25
0.331.25 (2 CR @ face)
CP1 0.33
CP1 3.0CP2
1.5
CP2 0.66 ret
PAx2CR too tight to inject
2.67 0.5 1.0
11.01 and 02.2017 - Repair confirmation walk: J. Manglitz, L. Lesniak
Indicates that protection for window abatement was in place and obscured portionof facade
FP = fill pocket - typically a slot in the top of the stone used for hoisting the stoneinto place. fill with setting mortar
RA = remove anchor and patch
NR = no repair
* = following repair means the repair may need to be changed if field conditionswarrant (redressing and damage is deeper, or similar)
Where repair sizes changed - see schedule edits
Red dashed lines approximate scaffold levels during walk
see "Hotel inside" for portico interior, including returns andceiling
see "Hotel inside" forportico interior, including
returns and ceiling
see "Hotel inside" for porticointerior, including returns and
ceiling
SS-05/09Move this back so it's 5"at bottom = 1/2 thethickness at the bottom
RAx2
DM 0.25,1.0,0.33CR1 0.5 ret
NR
CP1 2.25
additional CP1repair, see schedule
DMR, seeschedule
DMR 0.66,3.0,0.66Use piece
DM 0.33,0.33,0.33PA top
Lower pin on angle tointercept east westcrack
Upper pin tointercept northsouth crack
SS-0A/X12 to X32SS-05/X06 to X10 SS-04/X09 to X15SS-03/X10 to X12SS-02/X24 to X40
SS-0A/X12
SS-0A/X13
SS-0A/X14
SS-0A/X15
SS-0A/X16
SS-0A/X17
SS-0A/X18
SS-0A/X19
SS-0A/X20
SS-0A/X21
SS-0A/X22
SS-0A/X23
SS-0A/X24
SS-0A/X25
SS-0A/X26
SS-0A/X27
SS-0A/X28
SS-0A/X29
SS-0A/X30
SS-0A/X31
SS-0A/X32
SS-0A/X33
SS-0A/X34
SS-0A/X35
SS-0A/X36
SS-0A/X37
SS-0A/X38
SS-0A/X39
SS-0A/X40
SS-0A/X41
SS-0A/X42
SS-05/X06
SS-05/X07
SS-05/X08
SS-05/X09
SS-05/X10
SS-04/X09 SS-04/X10
SS-04/X11SS-04/X12
SS-04/X13
SS-04/X14
SS-04/X15
SS-03/X10
SS-03/X11
SS-03/X12
SS-02/X24
SS-02/X25
SS-02/X26
SS-02/X27
SS-02/X28
SS-02/X29
SS-02/X30
SS-02/X31
SS-02/X32
SS-02/X33
SS-02/X34
SS-02/X35
SS-02/X36
SS-02/X37
SS-02/X37
SS-02/X37
SS-02/X37
SS-02/X38
SS-02/X39
SS-02/X40
SECOND FLOOR
100'-0"
THIRD FLOOR
114'-6"
FIRST FLOOR
88'-0"
FOURTH FLOOR
126'-3"
FIFTH FLOOR
137'-5"
ATTIC
150'-0"
201 205206a
TOP OF PARAPET
162'-2"
SS-04/01
SS-0A/23
SS-0A/20
SS-0A/22
SS-02/01
SS-02/04
SS-02/03 SS-02/05 SS-02/06
SS-0A/15
SS-05/08SS-05/07SS-05/06
SS-0A/14SS-0A/05
SS-0A/17SS-0A/06
SS-0R/01
SS-0A/07
SS-05/03 SS-05/04
SS-05/10
SS-03/01
SS-0A/03 SS-0A/19
SS-0A/02
SS-0A/04
SS-05/01
SS-02/02
SS-0R/02
SS-05/05
SS-0A/11
SS-0A/10
SS-0A/09
SS-0A/08
SS-0A/18SS-0A/16
SS-0A/13
SS-05/02
SS-0A/12
SS-0A/21SS-05/09
TYP AT PALMETTE
S11
S06
S07
BO WATERTABLE, TYP
S06 S03
S06
S07
S06
.
S01
S05
S09
UNO
BO WATERTABLE, TYP
S07
S03
S03
TYP THISCOURSE
S03
S06
S07
TYP THESECOURSES
FO
R A
DJA
CE
NT
ELE
VA
TIO
N S
EE
FO
R A
DJA
CE
NT
ELE
VA
TIO
N S
EE
A1/A
202
A1/A
212
.
.
S07
.10
'-2 17
/128"
.
.
.
S06
S07
TYP AT GRIFFIN
S07
BOCORNICETYP
S02TYP AT JT W/ HORIZTRAFFIC SURFACES
FOR DOME PLATFORMSOUTH ELEVATIONSEE B1/A216
SS-0A/01
206b
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
S18
S17
S18
S17
. .
FOR EAST WING SOUTHELEVATION SEE
FOR WEST WING SOUTHELEVATION SEE
A1/A211A1/A203
DISMANTLESALVAGE ANDREINSTALLLIGHT FIXTURE;RE ELECTRICALFOR ALTS
DISMANTLESALVAGE &REINSTALLLIGHT FIXTURE;RE ELECTRICALFOR ALTS
TYP THISCOURSE
S19
S19
P08 TYP THIS ELEV.
S20
S20
S07
SS-02/07A202
B1
LIGHT FIXTURE PROVIDEDIN THIS CONTRACT; REELECTRICAL FOR ALTS
A. PROTECT ALL ADJACENT MATERIALS AND ASSEMBLIESFROM DAMAGE DURING THE WORK. ERECT AND MAINTAINTEMPORARY BARRIERS AND COVERS THAT AREAPPROPRIATE TO PROTECT FROM INCIDENTAL DAMAGE.REFERENCE 013591 FOR HISTORIC TREATMENTPROCEDURES.
B. PROTECT ROOFING AND ROOF DRAINAGE. PREVENTDEBRIS FROM ENTERING THE ROOF DRAINAGE SYSTEM. DONOT RINSE CHEMICALS OR DEBRIS FROM CLEANING ANDCONSTRUCTION ACTIVITIES INTO ROOF DRAIN PIPINGWITHOUT WRITTEN CONSENT OF DESIGN BUILDER.CAPTURE OR REROUTE DRAINAGE FROM CLEANINGACTIVITIES AND CONVEY IT TO GRADE WITHOUT DAMAGETO BUILDING FACADES OR TO LANDSCAPE AND GROUNDSURFACES BELOW.
C. PROTECT LIGHT WELL DRAINAGE AND ASSOCIATED PIPING.PREVENT DEBRIS FROM ENTERING THE SYSTEM. DO NOTRINSE CHEMICALS OR DEBRIS FROM CLEANING ANDCONSTRUCTION ACTIVITIES INTO PIPING WITHOUTWRITTEN CONSENT OF DESIGN BUILDER. CAPTURE ORREROUTE DRAINAGE FROM CLEANING ACTIVITIES ANDCONVEY IT TO GRADE WITHOUT DAMAGE TO BUILDINGFACADES OR TO LANDSCAPE AND GROUND SURFACES.
D. MAINTAIN BUILDING IN A WEATHER-TIGHT CONDITION.PROVIDE TEMPORARY COVERS AND CLOSURES ATOPENINGS IN THE WALL OR ROOF SYSTEMS THAT AREWIND AND PRECIPITATION RESISTANT. DO NOT REMOVEMORE WINDOWS, DOORS, CLADDING, OR COVERINGS THANCAN BE PROTECTED IN THE SAME WORKDAY. MONITORWEATHER CONDITIONS AND PROVIDE ADEQUATE NOTICEWHEN CONDITIONS NECESSITATE WORK SHUT DOWNPRIOR TO TYPICAL WORK HOURS.
E. WHERE EXTERIOR LIGHTING/CONDUIT, SECURITYCAMERAS/CONDUIT, LIGHTNING PROTECTION AIRTERMINALS/DOWN LEADERS, AND ASSOCIATEDFASTENERS, OR OTHER MEP ITEMS NEED TO BE REMOVEDAND REINSTALLED FOR THE WORK, DO NOT INTERRUPTSERVICE WITHOUT AUTHORIZATION OF DESIGN BUILDER.PROVIDE TEMPORARY CONNECTIONS AND SERVICE ASNECESSARY AND/OR WHERE DIRECTED TO DO SO BYDESIGN BUILDER.
F. REFERENCE SCHEDULES FOR WINDOW, DOOR, ANDMASONRY REPAIR WORK AT SPECIFIC LOCATIONINDICATED ON THE DRAWINGS. REFERENCE MASONRYREPAIR SCHEDULES FOR MASONRY REPAIR ID KEY.
G. REFERENCE GI SHEETS FOR BUILDING NOMENCLATURE,OVERALL DIMENSIONS, TYPICAL BAYS, AND MATERIALLOCATIONS AND LEGENDS.
H. FOR WINDOW RESTORATION ALL ADJACENTCONSTRUCTION SHALL BE PROTECTED WITH BOX OUTS,TARPS, OR SIMILAR MEANS ACCEPTABLE TO THEARCHITECT AND DESIGN BUILDER TO ENSURE THATWINDOW/PAINT/MEDIA DO NOT STAIN OR DAMAGEADJACENT SURFACES. IN ADDITION, PROTECTION ANDTEMPORARY INFILL MAY NEED TO BE PROVIDED TOELIMINATE DUST, AND MINIMIZE ODOR, AND PARTICLEMIGRATION INTO THE BUILDING THROUGH ADJACENTWINDOWS, LOUVERS, DOORS, ETC. DURINGCONSTRUCTION. ADDITIONALLY, TEMPORARY SHORING,BRACING, BLOCKING, ETC. SHALL BE PROVIDED ANYWHEREREMOVAL OF FASTENED COMPONENTS OCCUR.
I. 018126 KNOWN HAZARDOUS MATERIALS WILL BE REMOVEDBY OWNER BEFORE START OF WORK. IF MATERIALSSUSPECTED OF CONTAINING HAZARDOUS MATERIALS AREENCOUNTERED DO NOT DISTURB; IMMEDIATELY NOTIFYDESIGN BUILDER.
GENERAL PLAN & ELEVATION NOTES:
201 205202 203 204 DE01DN02
DE03
S01
S05
S09
S11
S07
S07
S07
BOHEADER
BO HEADER
BOHEADER
.
.
S06
.
S11
S07
S07
S16
S02
TYP AT JT W/HORIZ TRAFFICSURFACES
S16S16
DE01
TYP OF 2DOORHEADER
040342 CUTMASONRYFOR ELEC;FIXTURE REELEC
S01 S05S09S07 S11
TYP AT CEILING& COFFERS
.
TYP AT JT W/HORIZ TRAFFICSURFACES
DISMANTLESALVAGE &REINSTALL LIGHTFIXTURE;RE ELECTRICALFOR ALTS
S02
S06
S11
S11
S01
S05
S09
.
.
.
TYP OF BOTH SIDES
S07
S07
TYP ATNICHE ANDGARLAND
WINDOW INFILL PANEL
WINDOW SPANDREL PANEL
RUST
MATERIALS ELEVATION LEGEND
WATERPROOFING MATERIAL
Date:
ADG Project:
Sheet No.
Drawn By:
Checked By:
Revisions:
Approved By:
Copyright ADG, PC 2016
KEY PLAN
TA Project #
15-007
EXTERIOR
REHABILITATION
A360://HP15.007.00B Oklahoma State Capitol Exterior Rehabili/OSC_Exterior Rehab.rvt
6/28/2016 7:21:46 PM
A201
SOUTH WING
SOUTH
ELEVATION
JUNE 30, 2016
MS / SCK
JEM / TGR / JCW
KVK
2300 NORTH
LINCOLN
BOULEVARD
OKLA
HOMA CITY, OK 73105
FINAL CONSTRUCTION SET
OFFICE O
F M
ANAGEMENT AND ENTERPRISE SERVICES
CAP PROJECT NO. 15039DB
HP15.007.00B
1/8" = 1'-0" A1SOUTH WING SOUTH ELEVATION
KEYNOTES
DE01 080311 DOOR AND FRAME TO BE RESTORED, ALT #02
DE03 DOOR CANNOT BE OPENED DUE TO INTERIORCONDITIONS. RESTORATION LIMITED TO EXTERIORSIDE OF DOOR AND FRAME, ALT #02
DN02 081113 ROTATING DOOR AND FRAME, TO BE REPLACEDWITH PAIR OF DOORS, ALT #02
P08 REINSTALL SALVAGED LIGHTNING PROTECTIONSYSTEM, FOR THE ENTIRE LENGTH OF THE PARAPET,RE ELECTRICAL ALT #05
S01 040343 REPOINT WITH MORTAR, RE A1/A403
S02 040343 REPOINT AT JOINTS BETWEEN DISSIMILARMATERIALS WITH SEALANT, RE B1/A403
S03 040343 REPOINT WITH LEAD T-CAP, REF C1/A403
S05 040310 GENERAL AND PRELIMINARY CLEANING
S06 040310 SPOT TREATMENT BIOLOGICAL SOIL (CHEMICAL)
S07 040310 SPOT TREATMENT ATMOSPHERIC CRUSTS(COLD WATER SOAK)
S09 040310 SPOT TREATMENT ATMOSPHERIC SOILING(MICRO-ABRASION)
S11 028716.13 REMOVE BIRD EXCREMENT
S16 079200 CLEAN, PRIME, AND RESEAL PERIMETER OFDOOR AND/OR WINDOW INCLUDING ASSOCIATED CASTIRON; RE C5/A403
S17 050383 WROUGHT IRON GUARD; DISMANTLE, SALVAGE,PREPARE, PAINT, AND REINSTALL ELEMENTS
S18 040343 REPOINT WITH SEALANT CONTINUOUS FROMTOP TO BOTTOM OF FACADE, RE B3/A403
S19 040343 REPOINT WITH SEALANT FROM TOP TO BOTTOMOF ENGAGED COLUMN, RE B1/A403
S20 A3/A403 TYP AT GRANITE WATERTABLE
1/8" = 1'-0" D3SOUTH PORTICO ELEVATION
4'0 8' 16'
4'0 8' 16' 1/8" = 1'-0" D2RCP SOUTH PORTICO
4'0 8' 16' 4'0 8' 16' 1/8" = 1'-0" D1PORTICO INTERIOR
TYP AT JT W/
HORIZ TRAFFIC
SURFACES
DISMANTLE
SALVAGE &
REINSTALL LIGHT
FIXTURE;
RE ELECTRICAL
FOR ALTS
S02
S06
S11S11
S01
S05
S09
.
.
.
TYP OF BOTH SIDES
S07
S07
TYP AT
NICHE AND
GARLAND
4' 08'16'
1/8" = 1'-0"D1 PORTICO INTERIOR 201 205202 203 204 DE01DN02
DE03
S01
S05
S09
S11
S07
S07
S07
BOHEADER
BO HEADER
BOHEADER
.
.
S06
.
S11
S07
S07
S16
S02
TYP AT JT W/HORIZ TRAFFICSURFACES
S16S16
DE01
TYP OF 2DOORHEADER
040342 CUTMASONRYFOR ELEC;FIXTURE REELEC
1/8" = 1'-0" D3SOUTH PORTICO ELEVATION4'0 8' 16'
PA
DM0.83,0.5,0.33,0.33
DM 0.33,0.25,0.25,0.25
CP2 0.66on cofferwall
DM 0.5,0.33,0.66Helical on angle from side
DM 0.5, 0.66, 0.5Helical on angle from side
CR1 0.5Coffer wall
CR1 0.5Coffer wall
CR1 0.5On coffer wall
PA
CP2 3.0 All pins from east, 3 total
CR1 1.0 coffer wall
RD 0.5,8.0full ht of molding all the way across
PA
PA
DM 0.17, 1.0, 0.25
PA
PA
CR1 0.25
PAPAx2
CR1 0.66
PAx6
PA
PA
PA
PA
PA
PA
PAx2
PA
PA
DM 0.25,0.33,0.33
PA
RAx4
RAx13CP1 1.0 1/8 pin
CP1 0.66
RA
DM 0.17, 0.5,0.25Granite base as one pieceRA south retRAx4
PA s ret
DM 0.5,0.66,0.0.33
CP1 0.75; PA
RAx9
DM 0.25,0.33,0.25RAx2
BUILDING PROPER WALL
FREE STANDING COLUMNS
CP1 1.75DM 0.17,0.5,0.17
PA
PA
CP1 1.75
DM0.17,0.33,0.25,0.25
RAx3
CP1 1.25SS-05/X01
SS-05/X02
SS-05/X03
SS-04/X01
SS-04/X02
SS-04/X03
SS-04/X04
SS-04/X05
SS-03/X01
SS-03/X02
SS-03/X03
SS-03/X04
SS-02/X05
SS-02/X06
SS-02/X01
SS-02/X02
SS-02/X03
SS-02/X04
SS-02/X07SS-05/X01 to X03SS-04/X01 to X05SS-03/X01 to X04SS-02/X01 to X07
SS-0A/X01 to X11
SS-0A/X01
SS-0A/X02
SS-0A/X03
SS-0A/X04
SS-0A/X05
SS-0A/X06
SS-0A/X07SS-0A/X08
SS-0A/X09
SS-0A/X10
SS-0A/X11
DM 0.33,0.33,0.33
RA on granite door return
SS-05/X04 to X04SS-04/X06 to X06SS-03/X05 to X07SS-02/X08 to X17
SS-05/X04
SS-04/X06
SS-03/X05
SS-03/X06
SS-03/X07
SS-02/X08
SS-02/X09
SS-02/X10
SS-02/X11
SS-02/X12
SS-02/X13
SS-02/X14
SS-02/X15
SS-02/X16
SS-02/X17
SS-05/X05 to X05SS-04/X07 to X07SS-03/X08 to X08SS-02/X18 to X22
SS-05/X05
SS-03/X08
SS-04/X07
SS-02/X18
SS-02/X19
SS-02/X20
SS-02/X21
SS-05/SS-04/X08 to X08SS-03/X09 to X09SS-02/X23 to X23
RAx4SS-02/X22
SS-04/X08
SS-04/X09
SS-02/X23
11.01 and 02.2017 - Repair confirmation walk: J. Manglitz, L. Lesniak
Indicates that protection for window abatement was in place and obscured portionof facade
FP = fill pocket - typically a slot in the top of the stone used for hoisting the stoneinto place. fill with setting mortar
RA = remove anchor and patch
NR = no repair
* = following repair means the repair may need to be changed if field conditionswarrant (redressing and damage is deeper, or similar)
Where repair sizes changed - see schedule edits
Red dashed lines approximate scaffold level
SECOND FLOOR
100'-0"
THIRD FLOOR
114'-6"
FIRST FLOOR
88'-0"
BASEMENT
74'-0"
FOURTH FLOOR
126'-3"
FIFTH FLOOR
137'-5"
ATTIC
150'-0"
113A2
114A2
115A2
215A1
214A1
213A1
101
TOP OF PARAPET
162'-2"
SW-0A/01 SW-0A/02 SW-0A/03 SW-0A/04 SW-0A/05
SW-04/01
SW-03/03
SW-03/04
SW-03/02
SW-03/01
SW-02/01 SW-02/02 SW-02/03
SW-01/04SW-01/03
S18
.
.
S03S06
S03S06
.
S03
S01
S05
S10
UNO
S18
S07
TYP BOCORNICE
DN01 S07 S08
BO DOORHEADER
S07
BO HEADERTYP OF 3TYPE A2OPENINGS
S07
BO WATERTABLE TYP
FO
R W
ES
T W
ING
SO
UT
H E
LE
VA
TIO
N S
EE
.
A1/A
203
S15
TO PEDESTALS02
TYP AT JTW/ CONC
S08S08 S02
FO
R S
OU
TH
WIN
G S
OU
TH
ELE
VA
TIO
N S
EE
A1/A
201
.
S06
S07
FOR WEST WING WESTELEVATION SEE A1/A204
S17
.
S16
TYP OF 3TYPE A1OPENINGS
WE25
WE28 WE28
WE25
WE44
S15
48"
.
TYP OF 3TYPE A2OPENINGS
S15
S16S16
BO HEADERTYP OF 3TYPE A1OPENINGS
S07
DISMANTLESALVAGE &REINSTALL
LIGHT FIXTURE;RE ELECTRICAL
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP
S12
TYP ATSTONEGUTTER
S14
NEW LIGHTFIXTURE, REELECTRICAL
S20
.
S02
AT JT W/ HORIZTRAFFIC SURFACES
.
AT JT W/ HORIZTRAFFIC SURFACES
S07
TYP THISELEMENT
A. PROTECT ALL ADJACENT MATERIALS AND ASSEMBLIESFROM DAMAGE DURING THE WORK. ERECT AND MAINTAINTEMPORARY BARRIERS AND COVERS THAT AREAPPROPRIATE TO PROTECT FROM INCIDENTAL DAMAGE.REFERENCE 013591 FOR HISTORIC TREATMENTPROCEDURES.
B. PROTECT ROOFING AND ROOF DRAINAGE. PREVENTDEBRIS FROM ENTERING THE ROOF DRAINAGE SYSTEM. DONOT RINSE CHEMICALS OR DEBRIS FROM CLEANING ANDCONSTRUCTION ACTIVITIES INTO ROOF DRAIN PIPINGWITHOUT WRITTEN CONSENT OF DESIGN BUILDER.CAPTURE OR REROUTE DRAINAGE FROM CLEANINGACTIVITIES AND CONVEY IT TO GRADE WITHOUT DAMAGETO BUILDING FACADES OR TO LANDSCAPE AND GROUNDSURFACES BELOW.
C. PROTECT LIGHT WELL DRAINAGE AND ASSOCIATED PIPING.PREVENT DEBRIS FROM ENTERING THE SYSTEM. DO NOTRINSE CHEMICALS OR DEBRIS FROM CLEANING ANDCONSTRUCTION ACTIVITIES INTO PIPING WITHOUTWRITTEN CONSENT OF DESIGN BUILDER. CAPTURE ORREROUTE DRAINAGE FROM CLEANING ACTIVITIES ANDCONVEY IT TO GRADE WITHOUT DAMAGE TO BUILDINGFACADES OR TO LANDSCAPE AND GROUND SURFACES.
D. MAINTAIN BUILDING IN A WEATHER-TIGHT CONDITION.PROVIDE TEMPORARY COVERS AND CLOSURES ATOPENINGS IN THE WALL OR ROOF SYSTEMS THAT AREWIND AND PRECIPITATION RESISTANT. DO NOT REMOVEMORE WINDOWS, DOORS, CLADDING, OR COVERINGS THANCAN BE PROTECTED IN THE SAME WORKDAY. MONITORWEATHER CONDITIONS AND PROVIDE ADEQUATE NOTICEWHEN CONDITIONS NECESSITATE WORK SHUT DOWNPRIOR TO TYPICAL WORK HOURS.
E. WHERE EXTERIOR LIGHTING/CONDUIT, SECURITYCAMERAS/CONDUIT, LIGHTNING PROTECTION AIRTERMINALS/DOWN LEADERS, AND ASSOCIATEDFASTENERS, OR OTHER MEP ITEMS NEED TO BE REMOVEDAND REINSTALLED FOR THE WORK, DO NOT INTERRUPTSERVICE WITHOUT AUTHORIZATION OF DESIGN BUILDER.PROVIDE TEMPORARY CONNECTIONS AND SERVICE ASNECESSARY AND/OR WHERE DIRECTED TO DO SO BYDESIGN BUILDER.
F. REFERENCE SCHEDULES FOR WINDOW, DOOR, ANDMASONRY REPAIR WORK AT SPECIFIC LOCATIONINDICATED ON THE DRAWINGS. REFERENCE MASONRYREPAIR SCHEDULES FOR MASONRY REPAIR ID KEY.
G. REFERENCE GI SHEETS FOR BUILDING NOMENCLATURE,OVERALL DIMENSIONS, TYPICAL BAYS, AND MATERIALLOCATIONS AND LEGENDS.
H. FOR WINDOW RESTORATION ALL ADJACENTCONSTRUCTION SHALL BE PROTECTED WITH BOX OUTS,TARPS, OR SIMILAR MEANS ACCEPTABLE TO THEARCHITECT AND DESIGN BUILDER TO ENSURE THATWINDOW/PAINT/MEDIA DO NOT STAIN OR DAMAGEADJACENT SURFACES. IN ADDITION, PROTECTION ANDTEMPORARY INFILL MAY NEED TO BE PROVIDED TOELIMINATE DUST, AND MINIMIZE ODOR, AND PARTICLEMIGRATION INTO THE BUILDING THROUGH ADJACENTWINDOWS, LOUVERS, DOORS, ETC. DURINGCONSTRUCTION. ADDITIONALLY, TEMPORARY SHORING,BRACING, BLOCKING, ETC. SHALL BE PROVIDED ANYWHEREREMOVAL OF FASTENED COMPONENTS OCCUR.
I. 018126 KNOWN HAZARDOUS MATERIALS WILL BE REMOVEDBY OWNER BEFORE START OF WORK. IF MATERIALSSUSPECTED OF CONTAINING HAZARDOUS MATERIALS AREENCOUNTERED DO NOT DISTURB; IMMEDIATELY NOTIFYDESIGN BUILDER.
GENERAL PLAN & ELEVATION NOTES:
WINDOW INFILL PANEL
WINDOW SPANDREL PANEL
RUST
MATERIALS ELEVATION LEGEND
WATERPROOFING MATERIAL
SIM. LEFT SIDE OF PORTICO
CLE
AR
TO
B.O
. F
IXT
UR
E
7'-6"
EQ EQ
040342 CUT MASONRY FORELEC; FIXTURE RE ELEC
+/- 14'-4"
Date:
ADG Project:
Sheet No.
Drawn By:
Checked By:
Revisions:
Approved By:
Copyright ADG, PC 2016
KEY PLAN
TA Project #
15-007
EXTERIOR
REHABILITATION
A360://HP15.007.00B Oklahoma State Capitol Exterior Rehabili/OSC_Exterior Rehab.rvt
6/28/2016 7:21:49 PM
A202
SOUTH WING
WEST ELEVATION
JUNE 30, 2016
MS / SCK
JEM / TGR / JCW
KVK
2300 NORTH
LINCOLN
BOULEVARD
OKLA
HOMA CITY, OK 73105
FINAL CONSTRUCTION SET
OFFICE O
F M
ANAGEMENT AND ENTERPRISE SERVICES
CAP PROJECT NO. 15039DB
HP15.007.00B
1/8" = 1'-0" A1SOUTH WING WEST ELEVATION4'0 8' 16'
KEYNOTES
DN01 081113 DOOR, FRAME, AND TRANSOM, TO BE REPLACED,ALT #02
S01 040343 REPOINT WITH MORTAR, RE A1/A403
S02 040343 REPOINT AT JOINTS BETWEEN DISSIMILARMATERIALS WITH SEALANT, RE B1/A403
S03 040343 REPOINT WITH LEAD T-CAP, REF C1/A403
S05 040310 GENERAL AND PRELIMINARY CLEANING
S06 040310 SPOT TREATMENT BIOLOGICAL SOIL (CHEMICAL)
S07 040310 SPOT TREATMENT ATMOSPHERIC CRUSTS (COLDWATER SOAK)
S08 040310 TREAT FERROUS STAIN (CHEMICAL) 1SF/LOCATION UNO
S10 040310 SPOT TREATMENT ATMOSPHERIC SOILING (HOTWATER) FOR ORANGE/BROWN SOILING DISPERSEDOVER 25% OF FACADE
S12 079200 REMOVE EXISTING SEALANT(S), CLEAN TOBRIGHT, AND RESEAL REGLET, C3/A403
S14 040322 REMOVE EXISTING SEALANT AND/OR MORTAR,SALVAGE PARAPET CAP STONE, REINSTALL OVER THRUWALL FLASHING 076200, RE D1/A141, ALT #05
S15 040310 REMOVE SEALANT RESIDUE AT PERIMETER OFMASONRY OPENING
S16 079200 CLEAN, PRIME, AND RESEAL PERIMETER OFDOOR AND/OR WINDOW INCLUDING ASSOCIATED CASTIRON; RE C5/A403
S17 050383 WROUGHT IRON GUARD; DISMANTLE, SALVAGE,PREPARE, PAINT, AND REINSTALL ELEMENTS
S18 040343 REPOINT WITH SEALANT CONTINUOUS FROMTOP TO BOTTOM OF FACADE, RE B3/A403
S20 A3/A403 TYP AT GRANITE WATERTABLE
WE25 080351.23 MECHANICAL PENETRATION TO REMAIN -TEMPORARILY REMOVE AND TERMINATE MECHANICALSYSTEM - REINSTALL SUBSEQUENT TO WINDOWRESTORATION RE MECHANICAL, ALT #01
WE28 080351.23 INFILL PANEL
WE44 080351.23 SECURITY CAMERA TO REMAIN TEMPORARILYREMOVE AND TERMINATE SYSTEM. REINSTALLSUBSEQUENT TO WINDOW RESTORATION. REELECTRICAL.ALT #01
1/4" = 1'-0" B1PORTICO LIGHT ELEVATION0 2' 4' 8'
A202/A1 SW-0A/01 DM 0.67 0.50 0.50 0.50 0.00 0.34 0.17 L C3/A405
A202/A1 SW-0A/02 DM 0.33 0.33 0.00 0.33 0.00 0.11 0.04 L B3/A404
A202/A1 SW-0A/03 DM 0.67 0.50 0.50 0.50 0.00 0.34 0.17 L C3/A405
A202/A1 SW-0A/04 RD 3.66 7.00 0.00 0.00 0.00 25.62 0.00 L
A202/A1 SW-0A/05 DM 0.50 0.50 0.00 0.33 0.00 0.25 0.08 L B3/A404
A202/A1 SW-01/03 CR1 0.00 0.00 0.00 0.00 1.00 0.00 0.00 G
A202/A1 SW-01/04 CR1 0.00 0.00 0.00 0.00 1.00 0.00 0.00 G
A202/A1 SW-02/01 CR1 0.00 0.00 0.00 0.00 1.50 0.00 0.00 L
A202/A1 SW-02/02 DM 0.33 0.67 0.50 0.50 0.00 0.22 0.11 L A1/A407
A202/A1 SW-02/03 CR2 0.00 0.00 0.00 0.00 2.00 0.00 0.00 L
A202/A1 SW-03/01 DM 0.67 0.50 0.33 0.33 0.00 0.33 0.11 L C1/A407
A202/A1 SW-03/02 DM 0.33 0.67 0.00 0.33 0.00 0.22 0.07 L C1/A407
A202/A1 SW-03/03 CR1 0.00 0.00 0.00 0.00 2.00 0.00 0.00 L
A202/A1 SW-03/04 CR1 0.00 0.00 0.00 0.00 2.00 0.00 0.00 L
A202/A1 SW-04/01 CR2 0.00 0.00 0.00 0.00 2.00 0.00 0.00 4 L
Masonry Schedule A201 - A207
Elevation Repair IDRepairCode
Dimensions (ft) Calculations
NotesMasonry
TypeDETAIL
REFERENCE AlternateH W1 W2 D LAREA(sq-ft)
VOL(cu-ft)
01. 2018 - Repair confirmation walk:
Indicates that protection for window abatement was in place and obscured portionof facade
FP = fill pocket - typically a slot in the top of the stone used for hoisting the stoneinto place. fill with setting mortar
RA = remove anchor (per specs) and patchRA* = remove anchor and patch, if conduit is to be removed
NR = no repair
* = following repair means the repair may need to be changed if field conditionswarrant (redressing and damage is deeper, or similar)
Where repair sizes changed - see schedule edits
17. L.lesniak and j Manglitz
GUTTER REPAIRS
Stone joints to point: 26 LF (6.8.0 reglet at end, 18.6.0 second reglet on corona)Brick joints to repoint: 163 LF (11.2.0, 2.0, 150 head joints)BR (Bricks to replace) : 59Remove one wood anchor Remove one ferrousPrep and paint one ferrous anchor
RA
Prep & paint
Ferrous Metal anchor in gutter
Prep, paint, protect anchor; forthcoming ASI
Ferrous Metal anchor in corona
PAx2
Temp protection obscures cap stone -count RA repairs later
PAx6
PA
PAx2
CP1 2.75, PA
PAPA
CP1 2.75
PAPA at reglet
CP1 2.75 first cap onJuliette
PAx2 on first ashlar onJuliette
PA
CR1x2 0.66, 1.0
CP1 1.66; forthcoming ASI
CP1 1.0, CR1 0.66, PA; forthcoming ASI
PA, CR1 0.75, CR1 0.5
DM 0.5,0.5,0.5
PA x4 anchoredPA anchored
0.5 0.33
PA0.5
PA
DM 0.25,0.66,0.33
DM 1.0,0.33, 0.5DM 0.33, 0.5, 0.5
CR1 0.75
PAHighlighted area to be donewith A203 / Juliette
PA
DM (upper)1.0,0.75,1.0 thru pin from south, slide up into place DM (lower) 0.66,0.75,0.1.0
PA
PA
RP2 3.5,7.17,0.33RP2 3.5,7.17, 0.33
RP2 0.33
RP2 3.5,7.17, 0.33PA
RP2 3.5,4.5,1.0,0.33
RP2 3.5,2.66,0.33
PA, DM 2.5,1.17,1.75
DM 0.33,0.5,0.5 headDM 0.33, 0.33, 0.5 wing tip (scaling, erosion)DM 0.75,0.75,0.75 at leaf/perchRD 0.33,0.33 top of lower leaf
PA
DM upper 0.66, 6.25, 0.83DM lower 1.66, 5.25,0.66
DM 0.66, 4.0, 0.83
RD 1.5,0.75 top of cap andwing, see photo above
DM 2.5, 7.0, 0.83 (3" thick at bottom), PA
DM 0.33,0.5,0.33
PA, fret
PA
CR1 2.33
PAx3
DM 0.5, 1.33,0.33
PA
PAPA
PA
PAPA ret
PA ret
CR1 0.5
PAPA
PA
PAPA
PAx2
Remove striping as part ofrepair
PA ret
PA
PA
CP1
0.5 0.25 0.250.07PA
0.25 0.83PA
PA
PA
PA
PA ret
CP1 0.75
CR1 0.33
PA
0.5
CR1 0.66
RAx3
PA
0.5 0.83 0.66
PA
CP1
Remove striping
PACP1 2.0
CR1 0.83, PA ret
PA ret
PAx2
RAsoffit
RA retDM 0.66, 1.0, 0.25
RA ret
PA
CR1x2 0.66, 0.66 PA
CR1 1.33
CR1 1.75
DM 0.5,0.83, 0.5
End of tarp
RA back
RA back
RAx2 back
DM 0.5, 0.5, 0.42
PA
Reds to be reviewed, stored materials, scaffold but no planksCR1 1.25
CR1 0.5
CR1 0.75 (1.5 more still hassilicone)
PA
RA
RA
RA
PA
Rust stain
RAx4 sill
PA
PA
PA retPAx4
PA
PA
WS-0A/X01
WS-0A/X02
RA
SW-0A/X01
SW-0A/X02
SW-0A/X03SW-0A/X04
SW-0A/X05SW-0A/X06
SW-0A/X07
SW-0A/X08
SW-0A/X09 SW-0A/X11
SW-0A/X10
SW-0A/X12
SW-0A/X12
SW-0A/X13
SW-0A/X14
SW-0A/X16
SW-0A/X15
SW-0A/X17
SW-0A/X18
SW-0A/X19
SW-0A/X20
SW-0A/X21
SW-0A/X22
SW-0A/X23
SW-0A/X24
SW-0A/X25
SW-0A/X26
SW-0A/X27
SW-0A/X28
SW-0A/X29
SW-05/X14
SW-05/X15
SW-05/X01
SW-05/X02
SW-05/X03
SW-05/X04
SW-05/X07
SW-05/X07
SW-05/X05
SW-05/X06
SW-05/X08
SW-05/X09
SW-05/X10
SW-05/X11
SW-05/X12
SW-05/X13
SW-05/X16
SW-05/X17
SW-05/X18
SW-04/X01
SW-04/X02
SW-04/X03
SW-04/X04SW-04/X05
SW-04/X06
SW-04/X07
SW-04/X08
SW-04/X09
SW-04/X10
SW-04/X11
SW-04/X12
SW-03/X01
SW-03/X02
SW-03/X03
SW-02/X01
SW-02/X02
SW-02/X03
SW-02/X04
SW-02/X05
SW-02/X06
SW-02/X07
SW-02/X08
SW-02/X09
SW-02/X10
SW-02/X11
SW-02/X12
SW-02/X13
SW-02/X14
SW-02/X15
SW-02/X16
SW-02/X17
SW-02/X18
SW-02/X19
SW-02/X20
SW-02/X21
SW-01/X01
SW-01/X02
SW-01/X03
SW-01/X04
SW-01/X05
SW-01/X06
SW-01/X07
SW-01/X08
SW-01/X09
SW-01/X10
SW-01/X11
SW-01/X12 SW-01/X13
SW-01/X14
SW-01/X15
SW-01/X16
SW-01/X17SW-01/X18
SW-01/X19
SW-01/X20
SW-01/X21
SW-01/X22