Contents
Key Activities
Scope Development
Schedule
Progress Photos
12345
EXTERIOR DESIGN BUILD TEAM I JE DUNN I TREANOR ARCHITECTS I ADG
JULY 2016
OKLAHOMA STATE CAPITOL RESTORATION
Exterior Rehabilitation
`
EXTERIOR DESIGN BUILD TEAM I JE DUNN I TREANORHL ARCHITECTS I ADG
OKLAHOMA STATE CAPITOL RESTORATION
Exterior Rehabilitation
ContentsSummary
Safety
Progress Photos
Stone Chimeras
Field Reports amp Attachments
12345
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
DECEMBER 2016
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Summary Work on the Exterior Oklahoma Capitol Restoration project during the month of December saw several different activities completed With the colder temperatures outside tarps have been installed on the Alpha Bravo and Charlie elevations and will continue over to Delta during the month of January The tarps are required for the temperature sensitive activities we are completing such as stone clean-ing stone repointing and repairs window abatement and window priming The temperature inside of the tarps is maintained typically anywhere between forty (40) and seventy (70) degrees Heating units with ductwork up to the second level of scaffold have been installed at each elevation to help maintain the required temperatures New entry and exit doors have also been installed to minimize the heat lost when moving to and from the scaffold Exhaust fans and return air ductwork are also present on each elevation to ensure fresh air is moving through the scaffold space The primary work activities completed this month include the completion of window abatement and removal on the Charlie elevation window repairs and stone cleaning on the Alpha elevation stone repairs and the completion of the Delta scaffold The subsequent pages of this report will highlight additional stone repair mock-ups stone repair walks progress photos and a schedule update
KeyActivities - Dutchman Repairs - Full Stone Replacements - Exterior Stone Cleaning on Alpha Elevation - Installation of tarps on Alpha Bravo and Charlie - Completion of Delta Scaffold Erection - Completion of Window Abatement on Charlie - Window Repairs on Alpha
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
SafetyThe safety of our workforce and the general public during the course of construction is the most import-ant task that we must deliver To that end every craftsmen involved with the project receives a detailed project orientation and prior to performing any task the teams develop detailed task specific work plans These work plans are often called Job Site Analysis (JSA) and assist project teams with analyzing different hazards associated with each work activity prior to beginning work
Safety Data and Metrics
Orientations Performed through 123016 137
First Aid Incidents 0
OSHA Recordable Incidents 0
Total Man-Hours for the month of December (hrs) 3426
Total Project Man-Hours (hrs) 15537
Man-hours have been updated to include all after-hour work and salaried employees working on the project
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Safety Spotlight
DECEMBER 2016
On December 9 2016 our exterior team met with Labor Commissioner Melissa Houston and her team to discuss the progress of the exterior resto-ration as well as how we promote safety on-site A few of the items discussed during this meeting include
1 100 glove policy We have recently required all trade partners to wear gloves at all times when working on-site2 Safety Meetings We hold an on-site safety meeting with all trade partners every Monday morning3 Orientations All new staff members or trade partners that work on-site are required to complete safety orientations before beginning work4 Right to Stop Work We encourage all on-site staff and trade partners to stop any unsafe work at any time while on-site5 BIM 360 Safety Walks We use a program called BIM 360 on iPads to track safety non-conforming and conforming items when walking the job site We are able to take photos of safety items and directly link it back to the respective trade partner
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Progress Photos
The photos attached in the subsequent pages represent progress photos taken during the month of November for the Exterior Rehabilitation of the State Capitol of Oklahoma
Drone Footage
December Drone Footage gt Click Here
DECEMBER 2016
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 1 of 8
FIELD OBSERVATION REPORT REPORT NO 14 DATE 1262016
TIME 1100 AM DAY OF WEEK Tuesday
OWNER OMES TEMP RANGE 40deg F
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _________
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Landon Heaton Project Engineer - JE Dunn Construction
Tony Talerico Project Engineer - JE Dunn Construction
WORK OBSERVED
The following was observed during this site visit
1 Scaffold erection progressing on north elevation of east wing (Delta)
2 Window abatement progressing on east elevation of north wing (Charlie)
3 Gutter work progressing on east elevation of north wing (Charlie)
4 Plywood moved to interior side of cast iron frames on north elevation of north wing (Bravo)
5 Tarp added to scaffold exterior on west elevation of north wing (Alpha)
6 Scaffold lateral ties in place at scaffold on west elevation of north wing (Alpha)
7 Scaffold lateral tie installation progressing at scaffold on east elevation of north wing (Charlie)
8 Thermometers in place at scaffold on west elevation of north wing (Alpha)
9 Stone repair progressing on west and north elevations of north wing (Alpha and Bravo)
10 Site fence added at South Plaza and southeast quadrant of project site
ITEMS DISCUSSED
None
ACTION REQUIRED
None
ITEMS TO VERIFY
None
REMARKS
None
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 2 of 8
OBSERVED BY Peter Breninger (ADG)
COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross
(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott
(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)
Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve
Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 4 of 8
Window abatement progressing on north elevation of north wing (Bravo)
Gutter masonry work progressing on west elevation of north wing (Alpha)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 5 of 8
Plywood moved to interior side of cast iron frames on east elevation of north wing (Charlie)
Tarp added to west elevation of north wing (Alpha)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 6 of 8
Scaffold lateral ties with danger tape in place at scaffold on west elevation of north wing (Alpha)
Scaffold lateral tie installation progressing at scaffold on east elevation of north wing (Charlie)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 7 of 8
Thermometer in place at scaffold on west elevation of north wing (Alpha)
Entire replacement of stone (RP2) on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 8 of 8
Fencing in place at South Plaza
Fencing in place at southeast quadrant of site
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 1 of 6
FIELD OBSERVATION REPORT REPORT NO 15 DATE 12132016
TIME 1030 AM DAY OF WEEK Tuesday
OWNER OMES TEMP RANGE 35deg F
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _________
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction
Landon Heaton Project Engineer - JE Dunn Construction
Tony Talerico Project Engineer - JE Dunn Construction
WORK OBSERVED
The following was observed during this site visit
1 Scaffold erection progressing on north elevation of east wing (Delta)
2 Window abatement progressing on east elevation of north wing (Charlie)
3 Scaffold tarp installation progressing on west elevation of north wing (Alpha)
4 Heater placed for scaffold on west elevation of north wing (Alpha)
5 Joint raking progressing on north elevation of north wing (Bravo)
ITEMS DISCUSSED
None
ACTION REQUIRED
None
ITEMS TO VERIFY
None
REMARKS
None
OBSERVED BY Peter Breninger (ADG)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 2 of 6
COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross
(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott
(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)
Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve
Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 3 of 6
Scaffold installation progressing on north elevation of east wing (Delta)
Scaffold installation progressing on north elevation of east wing (Delta)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 4 of 6
Window abatement progressing on north elevation of north wing (Bravo)
Scaffold tarp installation progressing on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 5 of 6
Scaffold tarp installation at parapet on west elevation of north wing (Alpha)
Scaffold tarp installation in progress on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 6 of 6
Heater at scaffold at west elevation of north wing (Alpha)
Joint raking progressing on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 16 DATE 12212016
TIME 330 AM DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE 55deg F
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _________
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction
Landon Heaton Project Engineer - JE Dunn Construction
Tony Talerico Project Engineer - JE Dunn Construction
WORK OBSERVED
The following was observed during this site visit
1 Scaffold erection progressing on north elevation of east wing (Delta)
2 Scaffold tarp installation progressing on east elevation of north wing (Charlie)
3 Cleaning progressing on west elevation of north wing (Alpha)
4 Joint raking progressing on north elevation of north wing (Bravo)
5 Parapet cap removal progressing on west elevation of north wing (Alpha)
ITEMS DISCUSSED
None
ACTION REQUIRED
None
ITEMS TO VERIFY
None
REMARKS
None
OBSERVED BY Peter Breninger (ADG)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 2 of 5
COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross
(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott
(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)
Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve
Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 3 of 5
Scaffold installation progressing on north elevation of east wing (Delta)
Scaffold installation progressing on north elevation of east wing (Delta)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 4 of 5
Scaffold tarp installation progressing on east elevation of north wing (Charlie)
Parapet cap removal progressing on west elevation of north wing (Alpha)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 5 of 5
Parapet cap removal progressing on west elevation of north wing (Alpha)
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Oklahoma State Capitol Stone ChimeraThe following report explains the history behind the stone Chimerarsquos (ldquogriffinsrdquo) that have sat atop the Oklahoma State Capitol for the last 100 years
Chimeras (Griffins) of the Oklahoma State Capitol
Report provided by TreanorHL
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Griffin A bird head and foreshybody and cat rear always with a beak
Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City
Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company
Mythological Cat Creature Examples
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (left side) summer of 1916 shy no chimeras present
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (right side) November 2 1916 shy chimeras set
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti
South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 1 of 4
FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016
TIME 900a to 530p DAY OF WEEK Tuesday
OWNER OMES TEMP RANGE Lo 40s to 60
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
Trait Thompson - OMES
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking on A206 (Alpha)
Demolition for RP2 repair NW-0A06
ITEMS DISCUSSED
With WJE reviewed masonry cleaning processes changes to biological cleaning that have been
necessary to achieve the same results as trial repairs raking and repointing mockups for limestone
and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an
injection repairs patching repairs to limestone and granite See meeting notes from 11302016
follow up meeting to discuss WJE observations regarding the work
With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work
that necessary to make the area complete
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 2 of 4
ACTION REQUIRED
Revisions to repairs on A206 due to discovered conditions (TreanorHL)
bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone
bull at NW-0501 due to condition uncovered by joint raking
ITEMS TO VERIFY
REMARKS
OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes
Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to
tour the scaffold Reviewed window and masonry related work
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A206 ndash Site tour with OMES and WJE
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 3 of 4
A209 (left) and A208 (right) ndash Scaffold construction continues
A206 ndash NW-0A06 demolition in progress
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 4 of 4
A206 ndash Stone salvaged from NW-0A06
A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016
TIME 1000a to 530p DAY OF WEEK Monday
OWNER OMES TEMP RANGE Mid 50s to Lo 60s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Lukasz Lesniak Field Superintendent ndash Mark 1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking and repointing on A206 (Alpha)
Roofing materials being hoisted to the north wing roof
ITEMS DISCUSSED
Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps
there is some cold soak left to perform and sealant removal at window perimeter Temperature
restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this
week to create heated enclosure Discussed the need to monitor temperature and record it not only
on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and
other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is
approximately 50 complete
Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece
(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)
Met with JE Dunn to organize field walk for WJE visit
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 2 of 5
Reviewed window sill conditions including additional condition involving lead sheet flashing at the
bottom of cast iron sills
Temporary protection for built-in gutter
Stone color no word on additional lighter shades to better match light colored existing stones Mark
1 will salvage pieces of usable material where possible from other locations in case it is needed
ACTION REQUIRED
Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation
(TreanorHL)
ITEMS TO VERIFY
REMARKS
Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been
effective overall but the drying times are quite variable Some areas that have not seen water in
over a week are still visibly damp
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 3 of 5
A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in
right photo ndash end of tape is against the window frame in both photos
A208 ndash Residual dampness on A208 from cleaning
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 4 of 5
A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital
A207 ndash Lead T-cap installation for mock up review
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 5 of 5
A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining
material is brittle in some locations Additional detail will be issued for condition as part of forthcoming
ASI Believe this is window 459 ndash type G
A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016
TIME 800a to 12 noon DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE Mid 30s to Lo 50s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Raking on A206 (Alpha)
Substrate and backing conditions at RP repair NW-0A06
Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were
found on the west end of the frieze stone The tie-wire was easily removed from the back up
construction No rivet was found the pocket (which had been cut through) appears to have been
slugged full with mortar as construction progressed
Tarps being hung on A206 (Alpha)
ITEMS DISCUSSED
Protection for weather and monitoring conditions within the enclosure
Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to
moderate efflorescence were noted The most prominent is at the location of the redressing on NE-
0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent
dampness during cleaning operations The scaling that was the impetus for the redressing is located
at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 2 of 5
area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material
the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to
indicate the sealer is present even at this depth Potential sources of salts identified backing
construction penetrating sealer applied to building Area was discussed with WJE personnel
Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the
bottom of the corbel molding Both locations are unique to this elevation
ACTION REQUIRED
Tarp installation on all facades placement and distribution of heating devices including monitoring
devices for temperature (Mark1 and JE Dunn)
Direction for spot cleaning on A208 (Charlie)
ITEMS TO VERIFY
Method for monitoring conditions inside the tarped area (JE Dunn)
REMARKS
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 3 of 5
A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter
round differs from those specified in 1914 but specifications do not mention attachment at concrete
This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over
and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed
A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above
is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 4 of 5
A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been
slugged full with mortar prior to setting course above tie wire pulled freely from backing construction
Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction
aides to plumb up the tall stones during setting
A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No
signs of distress observed but area was dusty and full of debris from demolition
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 5 of 5
A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze
stones
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Phasing amp Schedule Attachments The following documents are included in the subsequent pages
- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Phasing Plan
The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality
Trailer Compound
TUNNEL (will continue across Lincoln)
DELTA
FOX TROT
ECHO
KILO
ALPHA
CHARLIE
GOLF
INDIA
HOTEL
JULIETTE
LIMA
BRAVO
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Utilization Plan
Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices
Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment
The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment
JED
JEDBak
er
Mar
k 1
ProjectOklahoma StateCapitolRehabilitation
Date12072016
DrawingSite UtilizationPlan
Legend -JED Trailer Compound
-Phase 1 Site Fencing
-Gravel laydown
-Fence gate
-Future phases site fencing
-Future phases gravel laydown
EnvAct
Review
JED
Mark 1
JED
Faith
Dumpster
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Window Abatement Tracking Plan
DECEMBER 2016
Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Summary Work on the Exterior Oklahoma Capitol Restoration project during the month of December saw several different activities completed With the colder temperatures outside tarps have been installed on the Alpha Bravo and Charlie elevations and will continue over to Delta during the month of January The tarps are required for the temperature sensitive activities we are completing such as stone clean-ing stone repointing and repairs window abatement and window priming The temperature inside of the tarps is maintained typically anywhere between forty (40) and seventy (70) degrees Heating units with ductwork up to the second level of scaffold have been installed at each elevation to help maintain the required temperatures New entry and exit doors have also been installed to minimize the heat lost when moving to and from the scaffold Exhaust fans and return air ductwork are also present on each elevation to ensure fresh air is moving through the scaffold space The primary work activities completed this month include the completion of window abatement and removal on the Charlie elevation window repairs and stone cleaning on the Alpha elevation stone repairs and the completion of the Delta scaffold The subsequent pages of this report will highlight additional stone repair mock-ups stone repair walks progress photos and a schedule update
KeyActivities - Dutchman Repairs - Full Stone Replacements - Exterior Stone Cleaning on Alpha Elevation - Installation of tarps on Alpha Bravo and Charlie - Completion of Delta Scaffold Erection - Completion of Window Abatement on Charlie - Window Repairs on Alpha
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
SafetyThe safety of our workforce and the general public during the course of construction is the most import-ant task that we must deliver To that end every craftsmen involved with the project receives a detailed project orientation and prior to performing any task the teams develop detailed task specific work plans These work plans are often called Job Site Analysis (JSA) and assist project teams with analyzing different hazards associated with each work activity prior to beginning work
Safety Data and Metrics
Orientations Performed through 123016 137
First Aid Incidents 0
OSHA Recordable Incidents 0
Total Man-Hours for the month of December (hrs) 3426
Total Project Man-Hours (hrs) 15537
Man-hours have been updated to include all after-hour work and salaried employees working on the project
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Safety Spotlight
DECEMBER 2016
On December 9 2016 our exterior team met with Labor Commissioner Melissa Houston and her team to discuss the progress of the exterior resto-ration as well as how we promote safety on-site A few of the items discussed during this meeting include
1 100 glove policy We have recently required all trade partners to wear gloves at all times when working on-site2 Safety Meetings We hold an on-site safety meeting with all trade partners every Monday morning3 Orientations All new staff members or trade partners that work on-site are required to complete safety orientations before beginning work4 Right to Stop Work We encourage all on-site staff and trade partners to stop any unsafe work at any time while on-site5 BIM 360 Safety Walks We use a program called BIM 360 on iPads to track safety non-conforming and conforming items when walking the job site We are able to take photos of safety items and directly link it back to the respective trade partner
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Progress Photos
The photos attached in the subsequent pages represent progress photos taken during the month of November for the Exterior Rehabilitation of the State Capitol of Oklahoma
Drone Footage
December Drone Footage gt Click Here
DECEMBER 2016
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 1 of 8
FIELD OBSERVATION REPORT REPORT NO 14 DATE 1262016
TIME 1100 AM DAY OF WEEK Tuesday
OWNER OMES TEMP RANGE 40deg F
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _________
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Landon Heaton Project Engineer - JE Dunn Construction
Tony Talerico Project Engineer - JE Dunn Construction
WORK OBSERVED
The following was observed during this site visit
1 Scaffold erection progressing on north elevation of east wing (Delta)
2 Window abatement progressing on east elevation of north wing (Charlie)
3 Gutter work progressing on east elevation of north wing (Charlie)
4 Plywood moved to interior side of cast iron frames on north elevation of north wing (Bravo)
5 Tarp added to scaffold exterior on west elevation of north wing (Alpha)
6 Scaffold lateral ties in place at scaffold on west elevation of north wing (Alpha)
7 Scaffold lateral tie installation progressing at scaffold on east elevation of north wing (Charlie)
8 Thermometers in place at scaffold on west elevation of north wing (Alpha)
9 Stone repair progressing on west and north elevations of north wing (Alpha and Bravo)
10 Site fence added at South Plaza and southeast quadrant of project site
ITEMS DISCUSSED
None
ACTION REQUIRED
None
ITEMS TO VERIFY
None
REMARKS
None
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 2 of 8
OBSERVED BY Peter Breninger (ADG)
COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross
(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott
(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)
Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve
Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 4 of 8
Window abatement progressing on north elevation of north wing (Bravo)
Gutter masonry work progressing on west elevation of north wing (Alpha)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 5 of 8
Plywood moved to interior side of cast iron frames on east elevation of north wing (Charlie)
Tarp added to west elevation of north wing (Alpha)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 6 of 8
Scaffold lateral ties with danger tape in place at scaffold on west elevation of north wing (Alpha)
Scaffold lateral tie installation progressing at scaffold on east elevation of north wing (Charlie)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 7 of 8
Thermometer in place at scaffold on west elevation of north wing (Alpha)
Entire replacement of stone (RP2) on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 8 of 8
Fencing in place at South Plaza
Fencing in place at southeast quadrant of site
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 1 of 6
FIELD OBSERVATION REPORT REPORT NO 15 DATE 12132016
TIME 1030 AM DAY OF WEEK Tuesday
OWNER OMES TEMP RANGE 35deg F
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _________
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction
Landon Heaton Project Engineer - JE Dunn Construction
Tony Talerico Project Engineer - JE Dunn Construction
WORK OBSERVED
The following was observed during this site visit
1 Scaffold erection progressing on north elevation of east wing (Delta)
2 Window abatement progressing on east elevation of north wing (Charlie)
3 Scaffold tarp installation progressing on west elevation of north wing (Alpha)
4 Heater placed for scaffold on west elevation of north wing (Alpha)
5 Joint raking progressing on north elevation of north wing (Bravo)
ITEMS DISCUSSED
None
ACTION REQUIRED
None
ITEMS TO VERIFY
None
REMARKS
None
OBSERVED BY Peter Breninger (ADG)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 2 of 6
COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross
(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott
(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)
Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve
Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 3 of 6
Scaffold installation progressing on north elevation of east wing (Delta)
Scaffold installation progressing on north elevation of east wing (Delta)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 4 of 6
Window abatement progressing on north elevation of north wing (Bravo)
Scaffold tarp installation progressing on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 5 of 6
Scaffold tarp installation at parapet on west elevation of north wing (Alpha)
Scaffold tarp installation in progress on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 6 of 6
Heater at scaffold at west elevation of north wing (Alpha)
Joint raking progressing on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 16 DATE 12212016
TIME 330 AM DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE 55deg F
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _________
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction
Landon Heaton Project Engineer - JE Dunn Construction
Tony Talerico Project Engineer - JE Dunn Construction
WORK OBSERVED
The following was observed during this site visit
1 Scaffold erection progressing on north elevation of east wing (Delta)
2 Scaffold tarp installation progressing on east elevation of north wing (Charlie)
3 Cleaning progressing on west elevation of north wing (Alpha)
4 Joint raking progressing on north elevation of north wing (Bravo)
5 Parapet cap removal progressing on west elevation of north wing (Alpha)
ITEMS DISCUSSED
None
ACTION REQUIRED
None
ITEMS TO VERIFY
None
REMARKS
None
OBSERVED BY Peter Breninger (ADG)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 2 of 5
COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross
(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott
(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)
Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve
Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 3 of 5
Scaffold installation progressing on north elevation of east wing (Delta)
Scaffold installation progressing on north elevation of east wing (Delta)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 4 of 5
Scaffold tarp installation progressing on east elevation of north wing (Charlie)
Parapet cap removal progressing on west elevation of north wing (Alpha)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 5 of 5
Parapet cap removal progressing on west elevation of north wing (Alpha)
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Oklahoma State Capitol Stone ChimeraThe following report explains the history behind the stone Chimerarsquos (ldquogriffinsrdquo) that have sat atop the Oklahoma State Capitol for the last 100 years
Chimeras (Griffins) of the Oklahoma State Capitol
Report provided by TreanorHL
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Griffin A bird head and foreshybody and cat rear always with a beak
Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City
Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company
Mythological Cat Creature Examples
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (left side) summer of 1916 shy no chimeras present
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (right side) November 2 1916 shy chimeras set
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti
South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 1 of 4
FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016
TIME 900a to 530p DAY OF WEEK Tuesday
OWNER OMES TEMP RANGE Lo 40s to 60
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
Trait Thompson - OMES
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking on A206 (Alpha)
Demolition for RP2 repair NW-0A06
ITEMS DISCUSSED
With WJE reviewed masonry cleaning processes changes to biological cleaning that have been
necessary to achieve the same results as trial repairs raking and repointing mockups for limestone
and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an
injection repairs patching repairs to limestone and granite See meeting notes from 11302016
follow up meeting to discuss WJE observations regarding the work
With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work
that necessary to make the area complete
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 2 of 4
ACTION REQUIRED
Revisions to repairs on A206 due to discovered conditions (TreanorHL)
bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone
bull at NW-0501 due to condition uncovered by joint raking
ITEMS TO VERIFY
REMARKS
OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes
Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to
tour the scaffold Reviewed window and masonry related work
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A206 ndash Site tour with OMES and WJE
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 3 of 4
A209 (left) and A208 (right) ndash Scaffold construction continues
A206 ndash NW-0A06 demolition in progress
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 4 of 4
A206 ndash Stone salvaged from NW-0A06
A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016
TIME 1000a to 530p DAY OF WEEK Monday
OWNER OMES TEMP RANGE Mid 50s to Lo 60s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Lukasz Lesniak Field Superintendent ndash Mark 1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking and repointing on A206 (Alpha)
Roofing materials being hoisted to the north wing roof
ITEMS DISCUSSED
Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps
there is some cold soak left to perform and sealant removal at window perimeter Temperature
restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this
week to create heated enclosure Discussed the need to monitor temperature and record it not only
on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and
other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is
approximately 50 complete
Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece
(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)
Met with JE Dunn to organize field walk for WJE visit
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 2 of 5
Reviewed window sill conditions including additional condition involving lead sheet flashing at the
bottom of cast iron sills
Temporary protection for built-in gutter
Stone color no word on additional lighter shades to better match light colored existing stones Mark
1 will salvage pieces of usable material where possible from other locations in case it is needed
ACTION REQUIRED
Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation
(TreanorHL)
ITEMS TO VERIFY
REMARKS
Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been
effective overall but the drying times are quite variable Some areas that have not seen water in
over a week are still visibly damp
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 3 of 5
A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in
right photo ndash end of tape is against the window frame in both photos
A208 ndash Residual dampness on A208 from cleaning
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 4 of 5
A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital
A207 ndash Lead T-cap installation for mock up review
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 5 of 5
A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining
material is brittle in some locations Additional detail will be issued for condition as part of forthcoming
ASI Believe this is window 459 ndash type G
A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016
TIME 800a to 12 noon DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE Mid 30s to Lo 50s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Raking on A206 (Alpha)
Substrate and backing conditions at RP repair NW-0A06
Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were
found on the west end of the frieze stone The tie-wire was easily removed from the back up
construction No rivet was found the pocket (which had been cut through) appears to have been
slugged full with mortar as construction progressed
Tarps being hung on A206 (Alpha)
ITEMS DISCUSSED
Protection for weather and monitoring conditions within the enclosure
Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to
moderate efflorescence were noted The most prominent is at the location of the redressing on NE-
0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent
dampness during cleaning operations The scaling that was the impetus for the redressing is located
at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 2 of 5
area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material
the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to
indicate the sealer is present even at this depth Potential sources of salts identified backing
construction penetrating sealer applied to building Area was discussed with WJE personnel
Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the
bottom of the corbel molding Both locations are unique to this elevation
ACTION REQUIRED
Tarp installation on all facades placement and distribution of heating devices including monitoring
devices for temperature (Mark1 and JE Dunn)
Direction for spot cleaning on A208 (Charlie)
ITEMS TO VERIFY
Method for monitoring conditions inside the tarped area (JE Dunn)
REMARKS
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 3 of 5
A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter
round differs from those specified in 1914 but specifications do not mention attachment at concrete
This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over
and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed
A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above
is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 4 of 5
A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been
slugged full with mortar prior to setting course above tie wire pulled freely from backing construction
Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction
aides to plumb up the tall stones during setting
A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No
signs of distress observed but area was dusty and full of debris from demolition
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 5 of 5
A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze
stones
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Phasing amp Schedule Attachments The following documents are included in the subsequent pages
- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Phasing Plan
The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality
Trailer Compound
TUNNEL (will continue across Lincoln)
DELTA
FOX TROT
ECHO
KILO
ALPHA
CHARLIE
GOLF
INDIA
HOTEL
JULIETTE
LIMA
BRAVO
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Utilization Plan
Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices
Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment
The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment
JED
JEDBak
er
Mar
k 1
ProjectOklahoma StateCapitolRehabilitation
Date12072016
DrawingSite UtilizationPlan
Legend -JED Trailer Compound
-Phase 1 Site Fencing
-Gravel laydown
-Fence gate
-Future phases site fencing
-Future phases gravel laydown
EnvAct
Review
JED
Mark 1
JED
Faith
Dumpster
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Window Abatement Tracking Plan
DECEMBER 2016
Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
SafetyThe safety of our workforce and the general public during the course of construction is the most import-ant task that we must deliver To that end every craftsmen involved with the project receives a detailed project orientation and prior to performing any task the teams develop detailed task specific work plans These work plans are often called Job Site Analysis (JSA) and assist project teams with analyzing different hazards associated with each work activity prior to beginning work
Safety Data and Metrics
Orientations Performed through 123016 137
First Aid Incidents 0
OSHA Recordable Incidents 0
Total Man-Hours for the month of December (hrs) 3426
Total Project Man-Hours (hrs) 15537
Man-hours have been updated to include all after-hour work and salaried employees working on the project
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Safety Spotlight
DECEMBER 2016
On December 9 2016 our exterior team met with Labor Commissioner Melissa Houston and her team to discuss the progress of the exterior resto-ration as well as how we promote safety on-site A few of the items discussed during this meeting include
1 100 glove policy We have recently required all trade partners to wear gloves at all times when working on-site2 Safety Meetings We hold an on-site safety meeting with all trade partners every Monday morning3 Orientations All new staff members or trade partners that work on-site are required to complete safety orientations before beginning work4 Right to Stop Work We encourage all on-site staff and trade partners to stop any unsafe work at any time while on-site5 BIM 360 Safety Walks We use a program called BIM 360 on iPads to track safety non-conforming and conforming items when walking the job site We are able to take photos of safety items and directly link it back to the respective trade partner
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Progress Photos
The photos attached in the subsequent pages represent progress photos taken during the month of November for the Exterior Rehabilitation of the State Capitol of Oklahoma
Drone Footage
December Drone Footage gt Click Here
DECEMBER 2016
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 1 of 8
FIELD OBSERVATION REPORT REPORT NO 14 DATE 1262016
TIME 1100 AM DAY OF WEEK Tuesday
OWNER OMES TEMP RANGE 40deg F
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _________
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Landon Heaton Project Engineer - JE Dunn Construction
Tony Talerico Project Engineer - JE Dunn Construction
WORK OBSERVED
The following was observed during this site visit
1 Scaffold erection progressing on north elevation of east wing (Delta)
2 Window abatement progressing on east elevation of north wing (Charlie)
3 Gutter work progressing on east elevation of north wing (Charlie)
4 Plywood moved to interior side of cast iron frames on north elevation of north wing (Bravo)
5 Tarp added to scaffold exterior on west elevation of north wing (Alpha)
6 Scaffold lateral ties in place at scaffold on west elevation of north wing (Alpha)
7 Scaffold lateral tie installation progressing at scaffold on east elevation of north wing (Charlie)
8 Thermometers in place at scaffold on west elevation of north wing (Alpha)
9 Stone repair progressing on west and north elevations of north wing (Alpha and Bravo)
10 Site fence added at South Plaza and southeast quadrant of project site
ITEMS DISCUSSED
None
ACTION REQUIRED
None
ITEMS TO VERIFY
None
REMARKS
None
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 2 of 8
OBSERVED BY Peter Breninger (ADG)
COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross
(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott
(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)
Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve
Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 4 of 8
Window abatement progressing on north elevation of north wing (Bravo)
Gutter masonry work progressing on west elevation of north wing (Alpha)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 5 of 8
Plywood moved to interior side of cast iron frames on east elevation of north wing (Charlie)
Tarp added to west elevation of north wing (Alpha)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 6 of 8
Scaffold lateral ties with danger tape in place at scaffold on west elevation of north wing (Alpha)
Scaffold lateral tie installation progressing at scaffold on east elevation of north wing (Charlie)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 7 of 8
Thermometer in place at scaffold on west elevation of north wing (Alpha)
Entire replacement of stone (RP2) on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 8 of 8
Fencing in place at South Plaza
Fencing in place at southeast quadrant of site
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 1 of 6
FIELD OBSERVATION REPORT REPORT NO 15 DATE 12132016
TIME 1030 AM DAY OF WEEK Tuesday
OWNER OMES TEMP RANGE 35deg F
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _________
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction
Landon Heaton Project Engineer - JE Dunn Construction
Tony Talerico Project Engineer - JE Dunn Construction
WORK OBSERVED
The following was observed during this site visit
1 Scaffold erection progressing on north elevation of east wing (Delta)
2 Window abatement progressing on east elevation of north wing (Charlie)
3 Scaffold tarp installation progressing on west elevation of north wing (Alpha)
4 Heater placed for scaffold on west elevation of north wing (Alpha)
5 Joint raking progressing on north elevation of north wing (Bravo)
ITEMS DISCUSSED
None
ACTION REQUIRED
None
ITEMS TO VERIFY
None
REMARKS
None
OBSERVED BY Peter Breninger (ADG)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 2 of 6
COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross
(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott
(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)
Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve
Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 3 of 6
Scaffold installation progressing on north elevation of east wing (Delta)
Scaffold installation progressing on north elevation of east wing (Delta)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 4 of 6
Window abatement progressing on north elevation of north wing (Bravo)
Scaffold tarp installation progressing on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 5 of 6
Scaffold tarp installation at parapet on west elevation of north wing (Alpha)
Scaffold tarp installation in progress on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 6 of 6
Heater at scaffold at west elevation of north wing (Alpha)
Joint raking progressing on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 16 DATE 12212016
TIME 330 AM DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE 55deg F
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _________
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction
Landon Heaton Project Engineer - JE Dunn Construction
Tony Talerico Project Engineer - JE Dunn Construction
WORK OBSERVED
The following was observed during this site visit
1 Scaffold erection progressing on north elevation of east wing (Delta)
2 Scaffold tarp installation progressing on east elevation of north wing (Charlie)
3 Cleaning progressing on west elevation of north wing (Alpha)
4 Joint raking progressing on north elevation of north wing (Bravo)
5 Parapet cap removal progressing on west elevation of north wing (Alpha)
ITEMS DISCUSSED
None
ACTION REQUIRED
None
ITEMS TO VERIFY
None
REMARKS
None
OBSERVED BY Peter Breninger (ADG)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 2 of 5
COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross
(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott
(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)
Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve
Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 3 of 5
Scaffold installation progressing on north elevation of east wing (Delta)
Scaffold installation progressing on north elevation of east wing (Delta)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 4 of 5
Scaffold tarp installation progressing on east elevation of north wing (Charlie)
Parapet cap removal progressing on west elevation of north wing (Alpha)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 5 of 5
Parapet cap removal progressing on west elevation of north wing (Alpha)
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Oklahoma State Capitol Stone ChimeraThe following report explains the history behind the stone Chimerarsquos (ldquogriffinsrdquo) that have sat atop the Oklahoma State Capitol for the last 100 years
Chimeras (Griffins) of the Oklahoma State Capitol
Report provided by TreanorHL
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Griffin A bird head and foreshybody and cat rear always with a beak
Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City
Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company
Mythological Cat Creature Examples
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (left side) summer of 1916 shy no chimeras present
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (right side) November 2 1916 shy chimeras set
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti
South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 1 of 4
FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016
TIME 900a to 530p DAY OF WEEK Tuesday
OWNER OMES TEMP RANGE Lo 40s to 60
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
Trait Thompson - OMES
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking on A206 (Alpha)
Demolition for RP2 repair NW-0A06
ITEMS DISCUSSED
With WJE reviewed masonry cleaning processes changes to biological cleaning that have been
necessary to achieve the same results as trial repairs raking and repointing mockups for limestone
and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an
injection repairs patching repairs to limestone and granite See meeting notes from 11302016
follow up meeting to discuss WJE observations regarding the work
With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work
that necessary to make the area complete
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 2 of 4
ACTION REQUIRED
Revisions to repairs on A206 due to discovered conditions (TreanorHL)
bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone
bull at NW-0501 due to condition uncovered by joint raking
ITEMS TO VERIFY
REMARKS
OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes
Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to
tour the scaffold Reviewed window and masonry related work
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A206 ndash Site tour with OMES and WJE
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 3 of 4
A209 (left) and A208 (right) ndash Scaffold construction continues
A206 ndash NW-0A06 demolition in progress
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 4 of 4
A206 ndash Stone salvaged from NW-0A06
A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016
TIME 1000a to 530p DAY OF WEEK Monday
OWNER OMES TEMP RANGE Mid 50s to Lo 60s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Lukasz Lesniak Field Superintendent ndash Mark 1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking and repointing on A206 (Alpha)
Roofing materials being hoisted to the north wing roof
ITEMS DISCUSSED
Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps
there is some cold soak left to perform and sealant removal at window perimeter Temperature
restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this
week to create heated enclosure Discussed the need to monitor temperature and record it not only
on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and
other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is
approximately 50 complete
Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece
(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)
Met with JE Dunn to organize field walk for WJE visit
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 2 of 5
Reviewed window sill conditions including additional condition involving lead sheet flashing at the
bottom of cast iron sills
Temporary protection for built-in gutter
Stone color no word on additional lighter shades to better match light colored existing stones Mark
1 will salvage pieces of usable material where possible from other locations in case it is needed
ACTION REQUIRED
Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation
(TreanorHL)
ITEMS TO VERIFY
REMARKS
Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been
effective overall but the drying times are quite variable Some areas that have not seen water in
over a week are still visibly damp
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 3 of 5
A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in
right photo ndash end of tape is against the window frame in both photos
A208 ndash Residual dampness on A208 from cleaning
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 4 of 5
A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital
A207 ndash Lead T-cap installation for mock up review
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 5 of 5
A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining
material is brittle in some locations Additional detail will be issued for condition as part of forthcoming
ASI Believe this is window 459 ndash type G
A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016
TIME 800a to 12 noon DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE Mid 30s to Lo 50s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Raking on A206 (Alpha)
Substrate and backing conditions at RP repair NW-0A06
Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were
found on the west end of the frieze stone The tie-wire was easily removed from the back up
construction No rivet was found the pocket (which had been cut through) appears to have been
slugged full with mortar as construction progressed
Tarps being hung on A206 (Alpha)
ITEMS DISCUSSED
Protection for weather and monitoring conditions within the enclosure
Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to
moderate efflorescence were noted The most prominent is at the location of the redressing on NE-
0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent
dampness during cleaning operations The scaling that was the impetus for the redressing is located
at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 2 of 5
area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material
the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to
indicate the sealer is present even at this depth Potential sources of salts identified backing
construction penetrating sealer applied to building Area was discussed with WJE personnel
Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the
bottom of the corbel molding Both locations are unique to this elevation
ACTION REQUIRED
Tarp installation on all facades placement and distribution of heating devices including monitoring
devices for temperature (Mark1 and JE Dunn)
Direction for spot cleaning on A208 (Charlie)
ITEMS TO VERIFY
Method for monitoring conditions inside the tarped area (JE Dunn)
REMARKS
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 3 of 5
A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter
round differs from those specified in 1914 but specifications do not mention attachment at concrete
This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over
and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed
A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above
is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 4 of 5
A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been
slugged full with mortar prior to setting course above tie wire pulled freely from backing construction
Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction
aides to plumb up the tall stones during setting
A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No
signs of distress observed but area was dusty and full of debris from demolition
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 5 of 5
A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze
stones
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Phasing amp Schedule Attachments The following documents are included in the subsequent pages
- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Phasing Plan
The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality
Trailer Compound
TUNNEL (will continue across Lincoln)
DELTA
FOX TROT
ECHO
KILO
ALPHA
CHARLIE
GOLF
INDIA
HOTEL
JULIETTE
LIMA
BRAVO
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Utilization Plan
Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices
Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment
The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment
JED
JEDBak
er
Mar
k 1
ProjectOklahoma StateCapitolRehabilitation
Date12072016
DrawingSite UtilizationPlan
Legend -JED Trailer Compound
-Phase 1 Site Fencing
-Gravel laydown
-Fence gate
-Future phases site fencing
-Future phases gravel laydown
EnvAct
Review
JED
Mark 1
JED
Faith
Dumpster
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Window Abatement Tracking Plan
DECEMBER 2016
Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Safety Spotlight
DECEMBER 2016
On December 9 2016 our exterior team met with Labor Commissioner Melissa Houston and her team to discuss the progress of the exterior resto-ration as well as how we promote safety on-site A few of the items discussed during this meeting include
1 100 glove policy We have recently required all trade partners to wear gloves at all times when working on-site2 Safety Meetings We hold an on-site safety meeting with all trade partners every Monday morning3 Orientations All new staff members or trade partners that work on-site are required to complete safety orientations before beginning work4 Right to Stop Work We encourage all on-site staff and trade partners to stop any unsafe work at any time while on-site5 BIM 360 Safety Walks We use a program called BIM 360 on iPads to track safety non-conforming and conforming items when walking the job site We are able to take photos of safety items and directly link it back to the respective trade partner
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Progress Photos
The photos attached in the subsequent pages represent progress photos taken during the month of November for the Exterior Rehabilitation of the State Capitol of Oklahoma
Drone Footage
December Drone Footage gt Click Here
DECEMBER 2016
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 1 of 8
FIELD OBSERVATION REPORT REPORT NO 14 DATE 1262016
TIME 1100 AM DAY OF WEEK Tuesday
OWNER OMES TEMP RANGE 40deg F
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _________
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Landon Heaton Project Engineer - JE Dunn Construction
Tony Talerico Project Engineer - JE Dunn Construction
WORK OBSERVED
The following was observed during this site visit
1 Scaffold erection progressing on north elevation of east wing (Delta)
2 Window abatement progressing on east elevation of north wing (Charlie)
3 Gutter work progressing on east elevation of north wing (Charlie)
4 Plywood moved to interior side of cast iron frames on north elevation of north wing (Bravo)
5 Tarp added to scaffold exterior on west elevation of north wing (Alpha)
6 Scaffold lateral ties in place at scaffold on west elevation of north wing (Alpha)
7 Scaffold lateral tie installation progressing at scaffold on east elevation of north wing (Charlie)
8 Thermometers in place at scaffold on west elevation of north wing (Alpha)
9 Stone repair progressing on west and north elevations of north wing (Alpha and Bravo)
10 Site fence added at South Plaza and southeast quadrant of project site
ITEMS DISCUSSED
None
ACTION REQUIRED
None
ITEMS TO VERIFY
None
REMARKS
None
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 2 of 8
OBSERVED BY Peter Breninger (ADG)
COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross
(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott
(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)
Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve
Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 4 of 8
Window abatement progressing on north elevation of north wing (Bravo)
Gutter masonry work progressing on west elevation of north wing (Alpha)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 5 of 8
Plywood moved to interior side of cast iron frames on east elevation of north wing (Charlie)
Tarp added to west elevation of north wing (Alpha)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 6 of 8
Scaffold lateral ties with danger tape in place at scaffold on west elevation of north wing (Alpha)
Scaffold lateral tie installation progressing at scaffold on east elevation of north wing (Charlie)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 7 of 8
Thermometer in place at scaffold on west elevation of north wing (Alpha)
Entire replacement of stone (RP2) on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 8 of 8
Fencing in place at South Plaza
Fencing in place at southeast quadrant of site
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 1 of 6
FIELD OBSERVATION REPORT REPORT NO 15 DATE 12132016
TIME 1030 AM DAY OF WEEK Tuesday
OWNER OMES TEMP RANGE 35deg F
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _________
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction
Landon Heaton Project Engineer - JE Dunn Construction
Tony Talerico Project Engineer - JE Dunn Construction
WORK OBSERVED
The following was observed during this site visit
1 Scaffold erection progressing on north elevation of east wing (Delta)
2 Window abatement progressing on east elevation of north wing (Charlie)
3 Scaffold tarp installation progressing on west elevation of north wing (Alpha)
4 Heater placed for scaffold on west elevation of north wing (Alpha)
5 Joint raking progressing on north elevation of north wing (Bravo)
ITEMS DISCUSSED
None
ACTION REQUIRED
None
ITEMS TO VERIFY
None
REMARKS
None
OBSERVED BY Peter Breninger (ADG)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 2 of 6
COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross
(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott
(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)
Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve
Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 3 of 6
Scaffold installation progressing on north elevation of east wing (Delta)
Scaffold installation progressing on north elevation of east wing (Delta)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 4 of 6
Window abatement progressing on north elevation of north wing (Bravo)
Scaffold tarp installation progressing on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 5 of 6
Scaffold tarp installation at parapet on west elevation of north wing (Alpha)
Scaffold tarp installation in progress on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 6 of 6
Heater at scaffold at west elevation of north wing (Alpha)
Joint raking progressing on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 16 DATE 12212016
TIME 330 AM DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE 55deg F
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _________
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction
Landon Heaton Project Engineer - JE Dunn Construction
Tony Talerico Project Engineer - JE Dunn Construction
WORK OBSERVED
The following was observed during this site visit
1 Scaffold erection progressing on north elevation of east wing (Delta)
2 Scaffold tarp installation progressing on east elevation of north wing (Charlie)
3 Cleaning progressing on west elevation of north wing (Alpha)
4 Joint raking progressing on north elevation of north wing (Bravo)
5 Parapet cap removal progressing on west elevation of north wing (Alpha)
ITEMS DISCUSSED
None
ACTION REQUIRED
None
ITEMS TO VERIFY
None
REMARKS
None
OBSERVED BY Peter Breninger (ADG)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 2 of 5
COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross
(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott
(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)
Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve
Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 3 of 5
Scaffold installation progressing on north elevation of east wing (Delta)
Scaffold installation progressing on north elevation of east wing (Delta)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 4 of 5
Scaffold tarp installation progressing on east elevation of north wing (Charlie)
Parapet cap removal progressing on west elevation of north wing (Alpha)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 5 of 5
Parapet cap removal progressing on west elevation of north wing (Alpha)
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Oklahoma State Capitol Stone ChimeraThe following report explains the history behind the stone Chimerarsquos (ldquogriffinsrdquo) that have sat atop the Oklahoma State Capitol for the last 100 years
Chimeras (Griffins) of the Oklahoma State Capitol
Report provided by TreanorHL
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Griffin A bird head and foreshybody and cat rear always with a beak
Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City
Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company
Mythological Cat Creature Examples
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (left side) summer of 1916 shy no chimeras present
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (right side) November 2 1916 shy chimeras set
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti
South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 1 of 4
FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016
TIME 900a to 530p DAY OF WEEK Tuesday
OWNER OMES TEMP RANGE Lo 40s to 60
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
Trait Thompson - OMES
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking on A206 (Alpha)
Demolition for RP2 repair NW-0A06
ITEMS DISCUSSED
With WJE reviewed masonry cleaning processes changes to biological cleaning that have been
necessary to achieve the same results as trial repairs raking and repointing mockups for limestone
and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an
injection repairs patching repairs to limestone and granite See meeting notes from 11302016
follow up meeting to discuss WJE observations regarding the work
With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work
that necessary to make the area complete
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 2 of 4
ACTION REQUIRED
Revisions to repairs on A206 due to discovered conditions (TreanorHL)
bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone
bull at NW-0501 due to condition uncovered by joint raking
ITEMS TO VERIFY
REMARKS
OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes
Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to
tour the scaffold Reviewed window and masonry related work
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A206 ndash Site tour with OMES and WJE
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 3 of 4
A209 (left) and A208 (right) ndash Scaffold construction continues
A206 ndash NW-0A06 demolition in progress
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 4 of 4
A206 ndash Stone salvaged from NW-0A06
A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016
TIME 1000a to 530p DAY OF WEEK Monday
OWNER OMES TEMP RANGE Mid 50s to Lo 60s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Lukasz Lesniak Field Superintendent ndash Mark 1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking and repointing on A206 (Alpha)
Roofing materials being hoisted to the north wing roof
ITEMS DISCUSSED
Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps
there is some cold soak left to perform and sealant removal at window perimeter Temperature
restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this
week to create heated enclosure Discussed the need to monitor temperature and record it not only
on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and
other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is
approximately 50 complete
Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece
(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)
Met with JE Dunn to organize field walk for WJE visit
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 2 of 5
Reviewed window sill conditions including additional condition involving lead sheet flashing at the
bottom of cast iron sills
Temporary protection for built-in gutter
Stone color no word on additional lighter shades to better match light colored existing stones Mark
1 will salvage pieces of usable material where possible from other locations in case it is needed
ACTION REQUIRED
Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation
(TreanorHL)
ITEMS TO VERIFY
REMARKS
Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been
effective overall but the drying times are quite variable Some areas that have not seen water in
over a week are still visibly damp
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 3 of 5
A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in
right photo ndash end of tape is against the window frame in both photos
A208 ndash Residual dampness on A208 from cleaning
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 4 of 5
A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital
A207 ndash Lead T-cap installation for mock up review
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 5 of 5
A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining
material is brittle in some locations Additional detail will be issued for condition as part of forthcoming
ASI Believe this is window 459 ndash type G
A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016
TIME 800a to 12 noon DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE Mid 30s to Lo 50s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Raking on A206 (Alpha)
Substrate and backing conditions at RP repair NW-0A06
Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were
found on the west end of the frieze stone The tie-wire was easily removed from the back up
construction No rivet was found the pocket (which had been cut through) appears to have been
slugged full with mortar as construction progressed
Tarps being hung on A206 (Alpha)
ITEMS DISCUSSED
Protection for weather and monitoring conditions within the enclosure
Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to
moderate efflorescence were noted The most prominent is at the location of the redressing on NE-
0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent
dampness during cleaning operations The scaling that was the impetus for the redressing is located
at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 2 of 5
area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material
the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to
indicate the sealer is present even at this depth Potential sources of salts identified backing
construction penetrating sealer applied to building Area was discussed with WJE personnel
Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the
bottom of the corbel molding Both locations are unique to this elevation
ACTION REQUIRED
Tarp installation on all facades placement and distribution of heating devices including monitoring
devices for temperature (Mark1 and JE Dunn)
Direction for spot cleaning on A208 (Charlie)
ITEMS TO VERIFY
Method for monitoring conditions inside the tarped area (JE Dunn)
REMARKS
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 3 of 5
A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter
round differs from those specified in 1914 but specifications do not mention attachment at concrete
This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over
and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed
A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above
is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 4 of 5
A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been
slugged full with mortar prior to setting course above tie wire pulled freely from backing construction
Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction
aides to plumb up the tall stones during setting
A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No
signs of distress observed but area was dusty and full of debris from demolition
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 5 of 5
A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze
stones
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Phasing amp Schedule Attachments The following documents are included in the subsequent pages
- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Phasing Plan
The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality
Trailer Compound
TUNNEL (will continue across Lincoln)
DELTA
FOX TROT
ECHO
KILO
ALPHA
CHARLIE
GOLF
INDIA
HOTEL
JULIETTE
LIMA
BRAVO
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Utilization Plan
Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices
Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment
The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment
JED
JEDBak
er
Mar
k 1
ProjectOklahoma StateCapitolRehabilitation
Date12072016
DrawingSite UtilizationPlan
Legend -JED Trailer Compound
-Phase 1 Site Fencing
-Gravel laydown
-Fence gate
-Future phases site fencing
-Future phases gravel laydown
EnvAct
Review
JED
Mark 1
JED
Faith
Dumpster
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Window Abatement Tracking Plan
DECEMBER 2016
Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Progress Photos
The photos attached in the subsequent pages represent progress photos taken during the month of November for the Exterior Rehabilitation of the State Capitol of Oklahoma
Drone Footage
December Drone Footage gt Click Here
DECEMBER 2016
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 1 of 8
FIELD OBSERVATION REPORT REPORT NO 14 DATE 1262016
TIME 1100 AM DAY OF WEEK Tuesday
OWNER OMES TEMP RANGE 40deg F
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _________
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Landon Heaton Project Engineer - JE Dunn Construction
Tony Talerico Project Engineer - JE Dunn Construction
WORK OBSERVED
The following was observed during this site visit
1 Scaffold erection progressing on north elevation of east wing (Delta)
2 Window abatement progressing on east elevation of north wing (Charlie)
3 Gutter work progressing on east elevation of north wing (Charlie)
4 Plywood moved to interior side of cast iron frames on north elevation of north wing (Bravo)
5 Tarp added to scaffold exterior on west elevation of north wing (Alpha)
6 Scaffold lateral ties in place at scaffold on west elevation of north wing (Alpha)
7 Scaffold lateral tie installation progressing at scaffold on east elevation of north wing (Charlie)
8 Thermometers in place at scaffold on west elevation of north wing (Alpha)
9 Stone repair progressing on west and north elevations of north wing (Alpha and Bravo)
10 Site fence added at South Plaza and southeast quadrant of project site
ITEMS DISCUSSED
None
ACTION REQUIRED
None
ITEMS TO VERIFY
None
REMARKS
None
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 2 of 8
OBSERVED BY Peter Breninger (ADG)
COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross
(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott
(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)
Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve
Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 4 of 8
Window abatement progressing on north elevation of north wing (Bravo)
Gutter masonry work progressing on west elevation of north wing (Alpha)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 5 of 8
Plywood moved to interior side of cast iron frames on east elevation of north wing (Charlie)
Tarp added to west elevation of north wing (Alpha)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 6 of 8
Scaffold lateral ties with danger tape in place at scaffold on west elevation of north wing (Alpha)
Scaffold lateral tie installation progressing at scaffold on east elevation of north wing (Charlie)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 7 of 8
Thermometer in place at scaffold on west elevation of north wing (Alpha)
Entire replacement of stone (RP2) on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 8 of 8
Fencing in place at South Plaza
Fencing in place at southeast quadrant of site
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 1 of 6
FIELD OBSERVATION REPORT REPORT NO 15 DATE 12132016
TIME 1030 AM DAY OF WEEK Tuesday
OWNER OMES TEMP RANGE 35deg F
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _________
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction
Landon Heaton Project Engineer - JE Dunn Construction
Tony Talerico Project Engineer - JE Dunn Construction
WORK OBSERVED
The following was observed during this site visit
1 Scaffold erection progressing on north elevation of east wing (Delta)
2 Window abatement progressing on east elevation of north wing (Charlie)
3 Scaffold tarp installation progressing on west elevation of north wing (Alpha)
4 Heater placed for scaffold on west elevation of north wing (Alpha)
5 Joint raking progressing on north elevation of north wing (Bravo)
ITEMS DISCUSSED
None
ACTION REQUIRED
None
ITEMS TO VERIFY
None
REMARKS
None
OBSERVED BY Peter Breninger (ADG)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 2 of 6
COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross
(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott
(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)
Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve
Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 3 of 6
Scaffold installation progressing on north elevation of east wing (Delta)
Scaffold installation progressing on north elevation of east wing (Delta)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 4 of 6
Window abatement progressing on north elevation of north wing (Bravo)
Scaffold tarp installation progressing on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 5 of 6
Scaffold tarp installation at parapet on west elevation of north wing (Alpha)
Scaffold tarp installation in progress on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 6 of 6
Heater at scaffold at west elevation of north wing (Alpha)
Joint raking progressing on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 16 DATE 12212016
TIME 330 AM DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE 55deg F
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _________
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction
Landon Heaton Project Engineer - JE Dunn Construction
Tony Talerico Project Engineer - JE Dunn Construction
WORK OBSERVED
The following was observed during this site visit
1 Scaffold erection progressing on north elevation of east wing (Delta)
2 Scaffold tarp installation progressing on east elevation of north wing (Charlie)
3 Cleaning progressing on west elevation of north wing (Alpha)
4 Joint raking progressing on north elevation of north wing (Bravo)
5 Parapet cap removal progressing on west elevation of north wing (Alpha)
ITEMS DISCUSSED
None
ACTION REQUIRED
None
ITEMS TO VERIFY
None
REMARKS
None
OBSERVED BY Peter Breninger (ADG)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 2 of 5
COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross
(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott
(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)
Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve
Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 3 of 5
Scaffold installation progressing on north elevation of east wing (Delta)
Scaffold installation progressing on north elevation of east wing (Delta)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 4 of 5
Scaffold tarp installation progressing on east elevation of north wing (Charlie)
Parapet cap removal progressing on west elevation of north wing (Alpha)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 5 of 5
Parapet cap removal progressing on west elevation of north wing (Alpha)
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Oklahoma State Capitol Stone ChimeraThe following report explains the history behind the stone Chimerarsquos (ldquogriffinsrdquo) that have sat atop the Oklahoma State Capitol for the last 100 years
Chimeras (Griffins) of the Oklahoma State Capitol
Report provided by TreanorHL
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Griffin A bird head and foreshybody and cat rear always with a beak
Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City
Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company
Mythological Cat Creature Examples
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (left side) summer of 1916 shy no chimeras present
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (right side) November 2 1916 shy chimeras set
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti
South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 1 of 4
FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016
TIME 900a to 530p DAY OF WEEK Tuesday
OWNER OMES TEMP RANGE Lo 40s to 60
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
Trait Thompson - OMES
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking on A206 (Alpha)
Demolition for RP2 repair NW-0A06
ITEMS DISCUSSED
With WJE reviewed masonry cleaning processes changes to biological cleaning that have been
necessary to achieve the same results as trial repairs raking and repointing mockups for limestone
and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an
injection repairs patching repairs to limestone and granite See meeting notes from 11302016
follow up meeting to discuss WJE observations regarding the work
With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work
that necessary to make the area complete
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 2 of 4
ACTION REQUIRED
Revisions to repairs on A206 due to discovered conditions (TreanorHL)
bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone
bull at NW-0501 due to condition uncovered by joint raking
ITEMS TO VERIFY
REMARKS
OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes
Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to
tour the scaffold Reviewed window and masonry related work
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A206 ndash Site tour with OMES and WJE
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 3 of 4
A209 (left) and A208 (right) ndash Scaffold construction continues
A206 ndash NW-0A06 demolition in progress
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 4 of 4
A206 ndash Stone salvaged from NW-0A06
A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016
TIME 1000a to 530p DAY OF WEEK Monday
OWNER OMES TEMP RANGE Mid 50s to Lo 60s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Lukasz Lesniak Field Superintendent ndash Mark 1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking and repointing on A206 (Alpha)
Roofing materials being hoisted to the north wing roof
ITEMS DISCUSSED
Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps
there is some cold soak left to perform and sealant removal at window perimeter Temperature
restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this
week to create heated enclosure Discussed the need to monitor temperature and record it not only
on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and
other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is
approximately 50 complete
Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece
(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)
Met with JE Dunn to organize field walk for WJE visit
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 2 of 5
Reviewed window sill conditions including additional condition involving lead sheet flashing at the
bottom of cast iron sills
Temporary protection for built-in gutter
Stone color no word on additional lighter shades to better match light colored existing stones Mark
1 will salvage pieces of usable material where possible from other locations in case it is needed
ACTION REQUIRED
Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation
(TreanorHL)
ITEMS TO VERIFY
REMARKS
Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been
effective overall but the drying times are quite variable Some areas that have not seen water in
over a week are still visibly damp
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 3 of 5
A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in
right photo ndash end of tape is against the window frame in both photos
A208 ndash Residual dampness on A208 from cleaning
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 4 of 5
A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital
A207 ndash Lead T-cap installation for mock up review
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 5 of 5
A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining
material is brittle in some locations Additional detail will be issued for condition as part of forthcoming
ASI Believe this is window 459 ndash type G
A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016
TIME 800a to 12 noon DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE Mid 30s to Lo 50s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Raking on A206 (Alpha)
Substrate and backing conditions at RP repair NW-0A06
Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were
found on the west end of the frieze stone The tie-wire was easily removed from the back up
construction No rivet was found the pocket (which had been cut through) appears to have been
slugged full with mortar as construction progressed
Tarps being hung on A206 (Alpha)
ITEMS DISCUSSED
Protection for weather and monitoring conditions within the enclosure
Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to
moderate efflorescence were noted The most prominent is at the location of the redressing on NE-
0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent
dampness during cleaning operations The scaling that was the impetus for the redressing is located
at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 2 of 5
area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material
the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to
indicate the sealer is present even at this depth Potential sources of salts identified backing
construction penetrating sealer applied to building Area was discussed with WJE personnel
Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the
bottom of the corbel molding Both locations are unique to this elevation
ACTION REQUIRED
Tarp installation on all facades placement and distribution of heating devices including monitoring
devices for temperature (Mark1 and JE Dunn)
Direction for spot cleaning on A208 (Charlie)
ITEMS TO VERIFY
Method for monitoring conditions inside the tarped area (JE Dunn)
REMARKS
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 3 of 5
A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter
round differs from those specified in 1914 but specifications do not mention attachment at concrete
This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over
and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed
A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above
is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 4 of 5
A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been
slugged full with mortar prior to setting course above tie wire pulled freely from backing construction
Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction
aides to plumb up the tall stones during setting
A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No
signs of distress observed but area was dusty and full of debris from demolition
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 5 of 5
A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze
stones
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Phasing amp Schedule Attachments The following documents are included in the subsequent pages
- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Phasing Plan
The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality
Trailer Compound
TUNNEL (will continue across Lincoln)
DELTA
FOX TROT
ECHO
KILO
ALPHA
CHARLIE
GOLF
INDIA
HOTEL
JULIETTE
LIMA
BRAVO
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Utilization Plan
Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices
Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment
The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment
JED
JEDBak
er
Mar
k 1
ProjectOklahoma StateCapitolRehabilitation
Date12072016
DrawingSite UtilizationPlan
Legend -JED Trailer Compound
-Phase 1 Site Fencing
-Gravel laydown
-Fence gate
-Future phases site fencing
-Future phases gravel laydown
EnvAct
Review
JED
Mark 1
JED
Faith
Dumpster
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Window Abatement Tracking Plan
DECEMBER 2016
Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 1 of 8
FIELD OBSERVATION REPORT REPORT NO 14 DATE 1262016
TIME 1100 AM DAY OF WEEK Tuesday
OWNER OMES TEMP RANGE 40deg F
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _________
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Landon Heaton Project Engineer - JE Dunn Construction
Tony Talerico Project Engineer - JE Dunn Construction
WORK OBSERVED
The following was observed during this site visit
1 Scaffold erection progressing on north elevation of east wing (Delta)
2 Window abatement progressing on east elevation of north wing (Charlie)
3 Gutter work progressing on east elevation of north wing (Charlie)
4 Plywood moved to interior side of cast iron frames on north elevation of north wing (Bravo)
5 Tarp added to scaffold exterior on west elevation of north wing (Alpha)
6 Scaffold lateral ties in place at scaffold on west elevation of north wing (Alpha)
7 Scaffold lateral tie installation progressing at scaffold on east elevation of north wing (Charlie)
8 Thermometers in place at scaffold on west elevation of north wing (Alpha)
9 Stone repair progressing on west and north elevations of north wing (Alpha and Bravo)
10 Site fence added at South Plaza and southeast quadrant of project site
ITEMS DISCUSSED
None
ACTION REQUIRED
None
ITEMS TO VERIFY
None
REMARKS
None
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 2 of 8
OBSERVED BY Peter Breninger (ADG)
COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross
(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott
(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)
Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve
Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 4 of 8
Window abatement progressing on north elevation of north wing (Bravo)
Gutter masonry work progressing on west elevation of north wing (Alpha)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 5 of 8
Plywood moved to interior side of cast iron frames on east elevation of north wing (Charlie)
Tarp added to west elevation of north wing (Alpha)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 6 of 8
Scaffold lateral ties with danger tape in place at scaffold on west elevation of north wing (Alpha)
Scaffold lateral tie installation progressing at scaffold on east elevation of north wing (Charlie)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 7 of 8
Thermometer in place at scaffold on west elevation of north wing (Alpha)
Entire replacement of stone (RP2) on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 8 of 8
Fencing in place at South Plaza
Fencing in place at southeast quadrant of site
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 1 of 6
FIELD OBSERVATION REPORT REPORT NO 15 DATE 12132016
TIME 1030 AM DAY OF WEEK Tuesday
OWNER OMES TEMP RANGE 35deg F
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _________
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction
Landon Heaton Project Engineer - JE Dunn Construction
Tony Talerico Project Engineer - JE Dunn Construction
WORK OBSERVED
The following was observed during this site visit
1 Scaffold erection progressing on north elevation of east wing (Delta)
2 Window abatement progressing on east elevation of north wing (Charlie)
3 Scaffold tarp installation progressing on west elevation of north wing (Alpha)
4 Heater placed for scaffold on west elevation of north wing (Alpha)
5 Joint raking progressing on north elevation of north wing (Bravo)
ITEMS DISCUSSED
None
ACTION REQUIRED
None
ITEMS TO VERIFY
None
REMARKS
None
OBSERVED BY Peter Breninger (ADG)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 2 of 6
COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross
(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott
(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)
Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve
Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 3 of 6
Scaffold installation progressing on north elevation of east wing (Delta)
Scaffold installation progressing on north elevation of east wing (Delta)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 4 of 6
Window abatement progressing on north elevation of north wing (Bravo)
Scaffold tarp installation progressing on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 5 of 6
Scaffold tarp installation at parapet on west elevation of north wing (Alpha)
Scaffold tarp installation in progress on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 6 of 6
Heater at scaffold at west elevation of north wing (Alpha)
Joint raking progressing on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 16 DATE 12212016
TIME 330 AM DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE 55deg F
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _________
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction
Landon Heaton Project Engineer - JE Dunn Construction
Tony Talerico Project Engineer - JE Dunn Construction
WORK OBSERVED
The following was observed during this site visit
1 Scaffold erection progressing on north elevation of east wing (Delta)
2 Scaffold tarp installation progressing on east elevation of north wing (Charlie)
3 Cleaning progressing on west elevation of north wing (Alpha)
4 Joint raking progressing on north elevation of north wing (Bravo)
5 Parapet cap removal progressing on west elevation of north wing (Alpha)
ITEMS DISCUSSED
None
ACTION REQUIRED
None
ITEMS TO VERIFY
None
REMARKS
None
OBSERVED BY Peter Breninger (ADG)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 2 of 5
COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross
(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott
(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)
Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve
Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 3 of 5
Scaffold installation progressing on north elevation of east wing (Delta)
Scaffold installation progressing on north elevation of east wing (Delta)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 4 of 5
Scaffold tarp installation progressing on east elevation of north wing (Charlie)
Parapet cap removal progressing on west elevation of north wing (Alpha)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 5 of 5
Parapet cap removal progressing on west elevation of north wing (Alpha)
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Oklahoma State Capitol Stone ChimeraThe following report explains the history behind the stone Chimerarsquos (ldquogriffinsrdquo) that have sat atop the Oklahoma State Capitol for the last 100 years
Chimeras (Griffins) of the Oklahoma State Capitol
Report provided by TreanorHL
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Griffin A bird head and foreshybody and cat rear always with a beak
Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City
Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company
Mythological Cat Creature Examples
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (left side) summer of 1916 shy no chimeras present
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (right side) November 2 1916 shy chimeras set
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti
South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 1 of 4
FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016
TIME 900a to 530p DAY OF WEEK Tuesday
OWNER OMES TEMP RANGE Lo 40s to 60
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
Trait Thompson - OMES
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking on A206 (Alpha)
Demolition for RP2 repair NW-0A06
ITEMS DISCUSSED
With WJE reviewed masonry cleaning processes changes to biological cleaning that have been
necessary to achieve the same results as trial repairs raking and repointing mockups for limestone
and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an
injection repairs patching repairs to limestone and granite See meeting notes from 11302016
follow up meeting to discuss WJE observations regarding the work
With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work
that necessary to make the area complete
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 2 of 4
ACTION REQUIRED
Revisions to repairs on A206 due to discovered conditions (TreanorHL)
bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone
bull at NW-0501 due to condition uncovered by joint raking
ITEMS TO VERIFY
REMARKS
OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes
Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to
tour the scaffold Reviewed window and masonry related work
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A206 ndash Site tour with OMES and WJE
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 3 of 4
A209 (left) and A208 (right) ndash Scaffold construction continues
A206 ndash NW-0A06 demolition in progress
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 4 of 4
A206 ndash Stone salvaged from NW-0A06
A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016
TIME 1000a to 530p DAY OF WEEK Monday
OWNER OMES TEMP RANGE Mid 50s to Lo 60s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Lukasz Lesniak Field Superintendent ndash Mark 1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking and repointing on A206 (Alpha)
Roofing materials being hoisted to the north wing roof
ITEMS DISCUSSED
Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps
there is some cold soak left to perform and sealant removal at window perimeter Temperature
restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this
week to create heated enclosure Discussed the need to monitor temperature and record it not only
on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and
other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is
approximately 50 complete
Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece
(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)
Met with JE Dunn to organize field walk for WJE visit
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 2 of 5
Reviewed window sill conditions including additional condition involving lead sheet flashing at the
bottom of cast iron sills
Temporary protection for built-in gutter
Stone color no word on additional lighter shades to better match light colored existing stones Mark
1 will salvage pieces of usable material where possible from other locations in case it is needed
ACTION REQUIRED
Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation
(TreanorHL)
ITEMS TO VERIFY
REMARKS
Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been
effective overall but the drying times are quite variable Some areas that have not seen water in
over a week are still visibly damp
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 3 of 5
A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in
right photo ndash end of tape is against the window frame in both photos
A208 ndash Residual dampness on A208 from cleaning
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 4 of 5
A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital
A207 ndash Lead T-cap installation for mock up review
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 5 of 5
A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining
material is brittle in some locations Additional detail will be issued for condition as part of forthcoming
ASI Believe this is window 459 ndash type G
A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016
TIME 800a to 12 noon DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE Mid 30s to Lo 50s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Raking on A206 (Alpha)
Substrate and backing conditions at RP repair NW-0A06
Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were
found on the west end of the frieze stone The tie-wire was easily removed from the back up
construction No rivet was found the pocket (which had been cut through) appears to have been
slugged full with mortar as construction progressed
Tarps being hung on A206 (Alpha)
ITEMS DISCUSSED
Protection for weather and monitoring conditions within the enclosure
Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to
moderate efflorescence were noted The most prominent is at the location of the redressing on NE-
0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent
dampness during cleaning operations The scaling that was the impetus for the redressing is located
at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 2 of 5
area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material
the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to
indicate the sealer is present even at this depth Potential sources of salts identified backing
construction penetrating sealer applied to building Area was discussed with WJE personnel
Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the
bottom of the corbel molding Both locations are unique to this elevation
ACTION REQUIRED
Tarp installation on all facades placement and distribution of heating devices including monitoring
devices for temperature (Mark1 and JE Dunn)
Direction for spot cleaning on A208 (Charlie)
ITEMS TO VERIFY
Method for monitoring conditions inside the tarped area (JE Dunn)
REMARKS
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 3 of 5
A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter
round differs from those specified in 1914 but specifications do not mention attachment at concrete
This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over
and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed
A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above
is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 4 of 5
A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been
slugged full with mortar prior to setting course above tie wire pulled freely from backing construction
Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction
aides to plumb up the tall stones during setting
A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No
signs of distress observed but area was dusty and full of debris from demolition
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 5 of 5
A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze
stones
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Phasing amp Schedule Attachments The following documents are included in the subsequent pages
- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Phasing Plan
The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality
Trailer Compound
TUNNEL (will continue across Lincoln)
DELTA
FOX TROT
ECHO
KILO
ALPHA
CHARLIE
GOLF
INDIA
HOTEL
JULIETTE
LIMA
BRAVO
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Utilization Plan
Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices
Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment
The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment
JED
JEDBak
er
Mar
k 1
ProjectOklahoma StateCapitolRehabilitation
Date12072016
DrawingSite UtilizationPlan
Legend -JED Trailer Compound
-Phase 1 Site Fencing
-Gravel laydown
-Fence gate
-Future phases site fencing
-Future phases gravel laydown
EnvAct
Review
JED
Mark 1
JED
Faith
Dumpster
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Window Abatement Tracking Plan
DECEMBER 2016
Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 2 of 8
OBSERVED BY Peter Breninger (ADG)
COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross
(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott
(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)
Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve
Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 4 of 8
Window abatement progressing on north elevation of north wing (Bravo)
Gutter masonry work progressing on west elevation of north wing (Alpha)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 5 of 8
Plywood moved to interior side of cast iron frames on east elevation of north wing (Charlie)
Tarp added to west elevation of north wing (Alpha)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 6 of 8
Scaffold lateral ties with danger tape in place at scaffold on west elevation of north wing (Alpha)
Scaffold lateral tie installation progressing at scaffold on east elevation of north wing (Charlie)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 7 of 8
Thermometer in place at scaffold on west elevation of north wing (Alpha)
Entire replacement of stone (RP2) on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 8 of 8
Fencing in place at South Plaza
Fencing in place at southeast quadrant of site
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 1 of 6
FIELD OBSERVATION REPORT REPORT NO 15 DATE 12132016
TIME 1030 AM DAY OF WEEK Tuesday
OWNER OMES TEMP RANGE 35deg F
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _________
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction
Landon Heaton Project Engineer - JE Dunn Construction
Tony Talerico Project Engineer - JE Dunn Construction
WORK OBSERVED
The following was observed during this site visit
1 Scaffold erection progressing on north elevation of east wing (Delta)
2 Window abatement progressing on east elevation of north wing (Charlie)
3 Scaffold tarp installation progressing on west elevation of north wing (Alpha)
4 Heater placed for scaffold on west elevation of north wing (Alpha)
5 Joint raking progressing on north elevation of north wing (Bravo)
ITEMS DISCUSSED
None
ACTION REQUIRED
None
ITEMS TO VERIFY
None
REMARKS
None
OBSERVED BY Peter Breninger (ADG)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 2 of 6
COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross
(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott
(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)
Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve
Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 3 of 6
Scaffold installation progressing on north elevation of east wing (Delta)
Scaffold installation progressing on north elevation of east wing (Delta)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 4 of 6
Window abatement progressing on north elevation of north wing (Bravo)
Scaffold tarp installation progressing on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 5 of 6
Scaffold tarp installation at parapet on west elevation of north wing (Alpha)
Scaffold tarp installation in progress on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 6 of 6
Heater at scaffold at west elevation of north wing (Alpha)
Joint raking progressing on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 16 DATE 12212016
TIME 330 AM DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE 55deg F
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _________
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction
Landon Heaton Project Engineer - JE Dunn Construction
Tony Talerico Project Engineer - JE Dunn Construction
WORK OBSERVED
The following was observed during this site visit
1 Scaffold erection progressing on north elevation of east wing (Delta)
2 Scaffold tarp installation progressing on east elevation of north wing (Charlie)
3 Cleaning progressing on west elevation of north wing (Alpha)
4 Joint raking progressing on north elevation of north wing (Bravo)
5 Parapet cap removal progressing on west elevation of north wing (Alpha)
ITEMS DISCUSSED
None
ACTION REQUIRED
None
ITEMS TO VERIFY
None
REMARKS
None
OBSERVED BY Peter Breninger (ADG)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 2 of 5
COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross
(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott
(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)
Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve
Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 3 of 5
Scaffold installation progressing on north elevation of east wing (Delta)
Scaffold installation progressing on north elevation of east wing (Delta)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 4 of 5
Scaffold tarp installation progressing on east elevation of north wing (Charlie)
Parapet cap removal progressing on west elevation of north wing (Alpha)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 5 of 5
Parapet cap removal progressing on west elevation of north wing (Alpha)
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Oklahoma State Capitol Stone ChimeraThe following report explains the history behind the stone Chimerarsquos (ldquogriffinsrdquo) that have sat atop the Oklahoma State Capitol for the last 100 years
Chimeras (Griffins) of the Oklahoma State Capitol
Report provided by TreanorHL
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Griffin A bird head and foreshybody and cat rear always with a beak
Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City
Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company
Mythological Cat Creature Examples
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (left side) summer of 1916 shy no chimeras present
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (right side) November 2 1916 shy chimeras set
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti
South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 1 of 4
FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016
TIME 900a to 530p DAY OF WEEK Tuesday
OWNER OMES TEMP RANGE Lo 40s to 60
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
Trait Thompson - OMES
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking on A206 (Alpha)
Demolition for RP2 repair NW-0A06
ITEMS DISCUSSED
With WJE reviewed masonry cleaning processes changes to biological cleaning that have been
necessary to achieve the same results as trial repairs raking and repointing mockups for limestone
and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an
injection repairs patching repairs to limestone and granite See meeting notes from 11302016
follow up meeting to discuss WJE observations regarding the work
With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work
that necessary to make the area complete
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 2 of 4
ACTION REQUIRED
Revisions to repairs on A206 due to discovered conditions (TreanorHL)
bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone
bull at NW-0501 due to condition uncovered by joint raking
ITEMS TO VERIFY
REMARKS
OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes
Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to
tour the scaffold Reviewed window and masonry related work
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A206 ndash Site tour with OMES and WJE
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 3 of 4
A209 (left) and A208 (right) ndash Scaffold construction continues
A206 ndash NW-0A06 demolition in progress
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 4 of 4
A206 ndash Stone salvaged from NW-0A06
A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016
TIME 1000a to 530p DAY OF WEEK Monday
OWNER OMES TEMP RANGE Mid 50s to Lo 60s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Lukasz Lesniak Field Superintendent ndash Mark 1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking and repointing on A206 (Alpha)
Roofing materials being hoisted to the north wing roof
ITEMS DISCUSSED
Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps
there is some cold soak left to perform and sealant removal at window perimeter Temperature
restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this
week to create heated enclosure Discussed the need to monitor temperature and record it not only
on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and
other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is
approximately 50 complete
Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece
(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)
Met with JE Dunn to organize field walk for WJE visit
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 2 of 5
Reviewed window sill conditions including additional condition involving lead sheet flashing at the
bottom of cast iron sills
Temporary protection for built-in gutter
Stone color no word on additional lighter shades to better match light colored existing stones Mark
1 will salvage pieces of usable material where possible from other locations in case it is needed
ACTION REQUIRED
Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation
(TreanorHL)
ITEMS TO VERIFY
REMARKS
Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been
effective overall but the drying times are quite variable Some areas that have not seen water in
over a week are still visibly damp
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 3 of 5
A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in
right photo ndash end of tape is against the window frame in both photos
A208 ndash Residual dampness on A208 from cleaning
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 4 of 5
A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital
A207 ndash Lead T-cap installation for mock up review
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 5 of 5
A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining
material is brittle in some locations Additional detail will be issued for condition as part of forthcoming
ASI Believe this is window 459 ndash type G
A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016
TIME 800a to 12 noon DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE Mid 30s to Lo 50s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Raking on A206 (Alpha)
Substrate and backing conditions at RP repair NW-0A06
Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were
found on the west end of the frieze stone The tie-wire was easily removed from the back up
construction No rivet was found the pocket (which had been cut through) appears to have been
slugged full with mortar as construction progressed
Tarps being hung on A206 (Alpha)
ITEMS DISCUSSED
Protection for weather and monitoring conditions within the enclosure
Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to
moderate efflorescence were noted The most prominent is at the location of the redressing on NE-
0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent
dampness during cleaning operations The scaling that was the impetus for the redressing is located
at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 2 of 5
area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material
the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to
indicate the sealer is present even at this depth Potential sources of salts identified backing
construction penetrating sealer applied to building Area was discussed with WJE personnel
Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the
bottom of the corbel molding Both locations are unique to this elevation
ACTION REQUIRED
Tarp installation on all facades placement and distribution of heating devices including monitoring
devices for temperature (Mark1 and JE Dunn)
Direction for spot cleaning on A208 (Charlie)
ITEMS TO VERIFY
Method for monitoring conditions inside the tarped area (JE Dunn)
REMARKS
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 3 of 5
A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter
round differs from those specified in 1914 but specifications do not mention attachment at concrete
This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over
and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed
A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above
is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 4 of 5
A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been
slugged full with mortar prior to setting course above tie wire pulled freely from backing construction
Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction
aides to plumb up the tall stones during setting
A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No
signs of distress observed but area was dusty and full of debris from demolition
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 5 of 5
A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze
stones
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Phasing amp Schedule Attachments The following documents are included in the subsequent pages
- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Phasing Plan
The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality
Trailer Compound
TUNNEL (will continue across Lincoln)
DELTA
FOX TROT
ECHO
KILO
ALPHA
CHARLIE
GOLF
INDIA
HOTEL
JULIETTE
LIMA
BRAVO
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Utilization Plan
Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices
Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment
The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment
JED
JEDBak
er
Mar
k 1
ProjectOklahoma StateCapitolRehabilitation
Date12072016
DrawingSite UtilizationPlan
Legend -JED Trailer Compound
-Phase 1 Site Fencing
-Gravel laydown
-Fence gate
-Future phases site fencing
-Future phases gravel laydown
EnvAct
Review
JED
Mark 1
JED
Faith
Dumpster
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Window Abatement Tracking Plan
DECEMBER 2016
Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 4 of 8
Window abatement progressing on north elevation of north wing (Bravo)
Gutter masonry work progressing on west elevation of north wing (Alpha)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 5 of 8
Plywood moved to interior side of cast iron frames on east elevation of north wing (Charlie)
Tarp added to west elevation of north wing (Alpha)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 6 of 8
Scaffold lateral ties with danger tape in place at scaffold on west elevation of north wing (Alpha)
Scaffold lateral tie installation progressing at scaffold on east elevation of north wing (Charlie)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 7 of 8
Thermometer in place at scaffold on west elevation of north wing (Alpha)
Entire replacement of stone (RP2) on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 8 of 8
Fencing in place at South Plaza
Fencing in place at southeast quadrant of site
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 1 of 6
FIELD OBSERVATION REPORT REPORT NO 15 DATE 12132016
TIME 1030 AM DAY OF WEEK Tuesday
OWNER OMES TEMP RANGE 35deg F
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _________
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction
Landon Heaton Project Engineer - JE Dunn Construction
Tony Talerico Project Engineer - JE Dunn Construction
WORK OBSERVED
The following was observed during this site visit
1 Scaffold erection progressing on north elevation of east wing (Delta)
2 Window abatement progressing on east elevation of north wing (Charlie)
3 Scaffold tarp installation progressing on west elevation of north wing (Alpha)
4 Heater placed for scaffold on west elevation of north wing (Alpha)
5 Joint raking progressing on north elevation of north wing (Bravo)
ITEMS DISCUSSED
None
ACTION REQUIRED
None
ITEMS TO VERIFY
None
REMARKS
None
OBSERVED BY Peter Breninger (ADG)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 2 of 6
COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross
(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott
(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)
Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve
Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 3 of 6
Scaffold installation progressing on north elevation of east wing (Delta)
Scaffold installation progressing on north elevation of east wing (Delta)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 4 of 6
Window abatement progressing on north elevation of north wing (Bravo)
Scaffold tarp installation progressing on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 5 of 6
Scaffold tarp installation at parapet on west elevation of north wing (Alpha)
Scaffold tarp installation in progress on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 6 of 6
Heater at scaffold at west elevation of north wing (Alpha)
Joint raking progressing on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 16 DATE 12212016
TIME 330 AM DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE 55deg F
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _________
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction
Landon Heaton Project Engineer - JE Dunn Construction
Tony Talerico Project Engineer - JE Dunn Construction
WORK OBSERVED
The following was observed during this site visit
1 Scaffold erection progressing on north elevation of east wing (Delta)
2 Scaffold tarp installation progressing on east elevation of north wing (Charlie)
3 Cleaning progressing on west elevation of north wing (Alpha)
4 Joint raking progressing on north elevation of north wing (Bravo)
5 Parapet cap removal progressing on west elevation of north wing (Alpha)
ITEMS DISCUSSED
None
ACTION REQUIRED
None
ITEMS TO VERIFY
None
REMARKS
None
OBSERVED BY Peter Breninger (ADG)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 2 of 5
COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross
(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott
(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)
Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve
Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 3 of 5
Scaffold installation progressing on north elevation of east wing (Delta)
Scaffold installation progressing on north elevation of east wing (Delta)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 4 of 5
Scaffold tarp installation progressing on east elevation of north wing (Charlie)
Parapet cap removal progressing on west elevation of north wing (Alpha)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 5 of 5
Parapet cap removal progressing on west elevation of north wing (Alpha)
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Oklahoma State Capitol Stone ChimeraThe following report explains the history behind the stone Chimerarsquos (ldquogriffinsrdquo) that have sat atop the Oklahoma State Capitol for the last 100 years
Chimeras (Griffins) of the Oklahoma State Capitol
Report provided by TreanorHL
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Griffin A bird head and foreshybody and cat rear always with a beak
Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City
Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company
Mythological Cat Creature Examples
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (left side) summer of 1916 shy no chimeras present
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (right side) November 2 1916 shy chimeras set
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti
South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 1 of 4
FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016
TIME 900a to 530p DAY OF WEEK Tuesday
OWNER OMES TEMP RANGE Lo 40s to 60
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
Trait Thompson - OMES
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking on A206 (Alpha)
Demolition for RP2 repair NW-0A06
ITEMS DISCUSSED
With WJE reviewed masonry cleaning processes changes to biological cleaning that have been
necessary to achieve the same results as trial repairs raking and repointing mockups for limestone
and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an
injection repairs patching repairs to limestone and granite See meeting notes from 11302016
follow up meeting to discuss WJE observations regarding the work
With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work
that necessary to make the area complete
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 2 of 4
ACTION REQUIRED
Revisions to repairs on A206 due to discovered conditions (TreanorHL)
bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone
bull at NW-0501 due to condition uncovered by joint raking
ITEMS TO VERIFY
REMARKS
OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes
Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to
tour the scaffold Reviewed window and masonry related work
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A206 ndash Site tour with OMES and WJE
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 3 of 4
A209 (left) and A208 (right) ndash Scaffold construction continues
A206 ndash NW-0A06 demolition in progress
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 4 of 4
A206 ndash Stone salvaged from NW-0A06
A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016
TIME 1000a to 530p DAY OF WEEK Monday
OWNER OMES TEMP RANGE Mid 50s to Lo 60s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Lukasz Lesniak Field Superintendent ndash Mark 1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking and repointing on A206 (Alpha)
Roofing materials being hoisted to the north wing roof
ITEMS DISCUSSED
Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps
there is some cold soak left to perform and sealant removal at window perimeter Temperature
restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this
week to create heated enclosure Discussed the need to monitor temperature and record it not only
on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and
other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is
approximately 50 complete
Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece
(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)
Met with JE Dunn to organize field walk for WJE visit
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 2 of 5
Reviewed window sill conditions including additional condition involving lead sheet flashing at the
bottom of cast iron sills
Temporary protection for built-in gutter
Stone color no word on additional lighter shades to better match light colored existing stones Mark
1 will salvage pieces of usable material where possible from other locations in case it is needed
ACTION REQUIRED
Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation
(TreanorHL)
ITEMS TO VERIFY
REMARKS
Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been
effective overall but the drying times are quite variable Some areas that have not seen water in
over a week are still visibly damp
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 3 of 5
A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in
right photo ndash end of tape is against the window frame in both photos
A208 ndash Residual dampness on A208 from cleaning
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 4 of 5
A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital
A207 ndash Lead T-cap installation for mock up review
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 5 of 5
A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining
material is brittle in some locations Additional detail will be issued for condition as part of forthcoming
ASI Believe this is window 459 ndash type G
A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016
TIME 800a to 12 noon DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE Mid 30s to Lo 50s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Raking on A206 (Alpha)
Substrate and backing conditions at RP repair NW-0A06
Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were
found on the west end of the frieze stone The tie-wire was easily removed from the back up
construction No rivet was found the pocket (which had been cut through) appears to have been
slugged full with mortar as construction progressed
Tarps being hung on A206 (Alpha)
ITEMS DISCUSSED
Protection for weather and monitoring conditions within the enclosure
Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to
moderate efflorescence were noted The most prominent is at the location of the redressing on NE-
0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent
dampness during cleaning operations The scaling that was the impetus for the redressing is located
at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 2 of 5
area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material
the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to
indicate the sealer is present even at this depth Potential sources of salts identified backing
construction penetrating sealer applied to building Area was discussed with WJE personnel
Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the
bottom of the corbel molding Both locations are unique to this elevation
ACTION REQUIRED
Tarp installation on all facades placement and distribution of heating devices including monitoring
devices for temperature (Mark1 and JE Dunn)
Direction for spot cleaning on A208 (Charlie)
ITEMS TO VERIFY
Method for monitoring conditions inside the tarped area (JE Dunn)
REMARKS
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 3 of 5
A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter
round differs from those specified in 1914 but specifications do not mention attachment at concrete
This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over
and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed
A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above
is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 4 of 5
A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been
slugged full with mortar prior to setting course above tie wire pulled freely from backing construction
Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction
aides to plumb up the tall stones during setting
A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No
signs of distress observed but area was dusty and full of debris from demolition
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 5 of 5
A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze
stones
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Phasing amp Schedule Attachments The following documents are included in the subsequent pages
- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Phasing Plan
The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality
Trailer Compound
TUNNEL (will continue across Lincoln)
DELTA
FOX TROT
ECHO
KILO
ALPHA
CHARLIE
GOLF
INDIA
HOTEL
JULIETTE
LIMA
BRAVO
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Utilization Plan
Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices
Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment
The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment
JED
JEDBak
er
Mar
k 1
ProjectOklahoma StateCapitolRehabilitation
Date12072016
DrawingSite UtilizationPlan
Legend -JED Trailer Compound
-Phase 1 Site Fencing
-Gravel laydown
-Fence gate
-Future phases site fencing
-Future phases gravel laydown
EnvAct
Review
JED
Mark 1
JED
Faith
Dumpster
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Window Abatement Tracking Plan
DECEMBER 2016
Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 5 of 8
Plywood moved to interior side of cast iron frames on east elevation of north wing (Charlie)
Tarp added to west elevation of north wing (Alpha)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 6 of 8
Scaffold lateral ties with danger tape in place at scaffold on west elevation of north wing (Alpha)
Scaffold lateral tie installation progressing at scaffold on east elevation of north wing (Charlie)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 7 of 8
Thermometer in place at scaffold on west elevation of north wing (Alpha)
Entire replacement of stone (RP2) on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 8 of 8
Fencing in place at South Plaza
Fencing in place at southeast quadrant of site
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 1 of 6
FIELD OBSERVATION REPORT REPORT NO 15 DATE 12132016
TIME 1030 AM DAY OF WEEK Tuesday
OWNER OMES TEMP RANGE 35deg F
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _________
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction
Landon Heaton Project Engineer - JE Dunn Construction
Tony Talerico Project Engineer - JE Dunn Construction
WORK OBSERVED
The following was observed during this site visit
1 Scaffold erection progressing on north elevation of east wing (Delta)
2 Window abatement progressing on east elevation of north wing (Charlie)
3 Scaffold tarp installation progressing on west elevation of north wing (Alpha)
4 Heater placed for scaffold on west elevation of north wing (Alpha)
5 Joint raking progressing on north elevation of north wing (Bravo)
ITEMS DISCUSSED
None
ACTION REQUIRED
None
ITEMS TO VERIFY
None
REMARKS
None
OBSERVED BY Peter Breninger (ADG)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 2 of 6
COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross
(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott
(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)
Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve
Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 3 of 6
Scaffold installation progressing on north elevation of east wing (Delta)
Scaffold installation progressing on north elevation of east wing (Delta)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 4 of 6
Window abatement progressing on north elevation of north wing (Bravo)
Scaffold tarp installation progressing on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 5 of 6
Scaffold tarp installation at parapet on west elevation of north wing (Alpha)
Scaffold tarp installation in progress on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 6 of 6
Heater at scaffold at west elevation of north wing (Alpha)
Joint raking progressing on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 16 DATE 12212016
TIME 330 AM DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE 55deg F
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _________
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction
Landon Heaton Project Engineer - JE Dunn Construction
Tony Talerico Project Engineer - JE Dunn Construction
WORK OBSERVED
The following was observed during this site visit
1 Scaffold erection progressing on north elevation of east wing (Delta)
2 Scaffold tarp installation progressing on east elevation of north wing (Charlie)
3 Cleaning progressing on west elevation of north wing (Alpha)
4 Joint raking progressing on north elevation of north wing (Bravo)
5 Parapet cap removal progressing on west elevation of north wing (Alpha)
ITEMS DISCUSSED
None
ACTION REQUIRED
None
ITEMS TO VERIFY
None
REMARKS
None
OBSERVED BY Peter Breninger (ADG)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 2 of 5
COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross
(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott
(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)
Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve
Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 3 of 5
Scaffold installation progressing on north elevation of east wing (Delta)
Scaffold installation progressing on north elevation of east wing (Delta)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 4 of 5
Scaffold tarp installation progressing on east elevation of north wing (Charlie)
Parapet cap removal progressing on west elevation of north wing (Alpha)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 5 of 5
Parapet cap removal progressing on west elevation of north wing (Alpha)
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Oklahoma State Capitol Stone ChimeraThe following report explains the history behind the stone Chimerarsquos (ldquogriffinsrdquo) that have sat atop the Oklahoma State Capitol for the last 100 years
Chimeras (Griffins) of the Oklahoma State Capitol
Report provided by TreanorHL
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Griffin A bird head and foreshybody and cat rear always with a beak
Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City
Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company
Mythological Cat Creature Examples
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (left side) summer of 1916 shy no chimeras present
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (right side) November 2 1916 shy chimeras set
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti
South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 1 of 4
FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016
TIME 900a to 530p DAY OF WEEK Tuesday
OWNER OMES TEMP RANGE Lo 40s to 60
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
Trait Thompson - OMES
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking on A206 (Alpha)
Demolition for RP2 repair NW-0A06
ITEMS DISCUSSED
With WJE reviewed masonry cleaning processes changes to biological cleaning that have been
necessary to achieve the same results as trial repairs raking and repointing mockups for limestone
and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an
injection repairs patching repairs to limestone and granite See meeting notes from 11302016
follow up meeting to discuss WJE observations regarding the work
With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work
that necessary to make the area complete
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 2 of 4
ACTION REQUIRED
Revisions to repairs on A206 due to discovered conditions (TreanorHL)
bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone
bull at NW-0501 due to condition uncovered by joint raking
ITEMS TO VERIFY
REMARKS
OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes
Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to
tour the scaffold Reviewed window and masonry related work
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A206 ndash Site tour with OMES and WJE
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 3 of 4
A209 (left) and A208 (right) ndash Scaffold construction continues
A206 ndash NW-0A06 demolition in progress
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 4 of 4
A206 ndash Stone salvaged from NW-0A06
A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016
TIME 1000a to 530p DAY OF WEEK Monday
OWNER OMES TEMP RANGE Mid 50s to Lo 60s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Lukasz Lesniak Field Superintendent ndash Mark 1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking and repointing on A206 (Alpha)
Roofing materials being hoisted to the north wing roof
ITEMS DISCUSSED
Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps
there is some cold soak left to perform and sealant removal at window perimeter Temperature
restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this
week to create heated enclosure Discussed the need to monitor temperature and record it not only
on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and
other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is
approximately 50 complete
Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece
(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)
Met with JE Dunn to organize field walk for WJE visit
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 2 of 5
Reviewed window sill conditions including additional condition involving lead sheet flashing at the
bottom of cast iron sills
Temporary protection for built-in gutter
Stone color no word on additional lighter shades to better match light colored existing stones Mark
1 will salvage pieces of usable material where possible from other locations in case it is needed
ACTION REQUIRED
Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation
(TreanorHL)
ITEMS TO VERIFY
REMARKS
Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been
effective overall but the drying times are quite variable Some areas that have not seen water in
over a week are still visibly damp
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 3 of 5
A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in
right photo ndash end of tape is against the window frame in both photos
A208 ndash Residual dampness on A208 from cleaning
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 4 of 5
A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital
A207 ndash Lead T-cap installation for mock up review
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 5 of 5
A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining
material is brittle in some locations Additional detail will be issued for condition as part of forthcoming
ASI Believe this is window 459 ndash type G
A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016
TIME 800a to 12 noon DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE Mid 30s to Lo 50s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Raking on A206 (Alpha)
Substrate and backing conditions at RP repair NW-0A06
Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were
found on the west end of the frieze stone The tie-wire was easily removed from the back up
construction No rivet was found the pocket (which had been cut through) appears to have been
slugged full with mortar as construction progressed
Tarps being hung on A206 (Alpha)
ITEMS DISCUSSED
Protection for weather and monitoring conditions within the enclosure
Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to
moderate efflorescence were noted The most prominent is at the location of the redressing on NE-
0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent
dampness during cleaning operations The scaling that was the impetus for the redressing is located
at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 2 of 5
area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material
the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to
indicate the sealer is present even at this depth Potential sources of salts identified backing
construction penetrating sealer applied to building Area was discussed with WJE personnel
Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the
bottom of the corbel molding Both locations are unique to this elevation
ACTION REQUIRED
Tarp installation on all facades placement and distribution of heating devices including monitoring
devices for temperature (Mark1 and JE Dunn)
Direction for spot cleaning on A208 (Charlie)
ITEMS TO VERIFY
Method for monitoring conditions inside the tarped area (JE Dunn)
REMARKS
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 3 of 5
A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter
round differs from those specified in 1914 but specifications do not mention attachment at concrete
This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over
and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed
A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above
is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 4 of 5
A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been
slugged full with mortar prior to setting course above tie wire pulled freely from backing construction
Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction
aides to plumb up the tall stones during setting
A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No
signs of distress observed but area was dusty and full of debris from demolition
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 5 of 5
A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze
stones
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Phasing amp Schedule Attachments The following documents are included in the subsequent pages
- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Phasing Plan
The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality
Trailer Compound
TUNNEL (will continue across Lincoln)
DELTA
FOX TROT
ECHO
KILO
ALPHA
CHARLIE
GOLF
INDIA
HOTEL
JULIETTE
LIMA
BRAVO
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Utilization Plan
Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices
Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment
The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment
JED
JEDBak
er
Mar
k 1
ProjectOklahoma StateCapitolRehabilitation
Date12072016
DrawingSite UtilizationPlan
Legend -JED Trailer Compound
-Phase 1 Site Fencing
-Gravel laydown
-Fence gate
-Future phases site fencing
-Future phases gravel laydown
EnvAct
Review
JED
Mark 1
JED
Faith
Dumpster
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Window Abatement Tracking Plan
DECEMBER 2016
Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 6 of 8
Scaffold lateral ties with danger tape in place at scaffold on west elevation of north wing (Alpha)
Scaffold lateral tie installation progressing at scaffold on east elevation of north wing (Charlie)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 7 of 8
Thermometer in place at scaffold on west elevation of north wing (Alpha)
Entire replacement of stone (RP2) on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 8 of 8
Fencing in place at South Plaza
Fencing in place at southeast quadrant of site
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 1 of 6
FIELD OBSERVATION REPORT REPORT NO 15 DATE 12132016
TIME 1030 AM DAY OF WEEK Tuesday
OWNER OMES TEMP RANGE 35deg F
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _________
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction
Landon Heaton Project Engineer - JE Dunn Construction
Tony Talerico Project Engineer - JE Dunn Construction
WORK OBSERVED
The following was observed during this site visit
1 Scaffold erection progressing on north elevation of east wing (Delta)
2 Window abatement progressing on east elevation of north wing (Charlie)
3 Scaffold tarp installation progressing on west elevation of north wing (Alpha)
4 Heater placed for scaffold on west elevation of north wing (Alpha)
5 Joint raking progressing on north elevation of north wing (Bravo)
ITEMS DISCUSSED
None
ACTION REQUIRED
None
ITEMS TO VERIFY
None
REMARKS
None
OBSERVED BY Peter Breninger (ADG)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 2 of 6
COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross
(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott
(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)
Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve
Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 3 of 6
Scaffold installation progressing on north elevation of east wing (Delta)
Scaffold installation progressing on north elevation of east wing (Delta)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 4 of 6
Window abatement progressing on north elevation of north wing (Bravo)
Scaffold tarp installation progressing on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 5 of 6
Scaffold tarp installation at parapet on west elevation of north wing (Alpha)
Scaffold tarp installation in progress on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 6 of 6
Heater at scaffold at west elevation of north wing (Alpha)
Joint raking progressing on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 16 DATE 12212016
TIME 330 AM DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE 55deg F
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _________
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction
Landon Heaton Project Engineer - JE Dunn Construction
Tony Talerico Project Engineer - JE Dunn Construction
WORK OBSERVED
The following was observed during this site visit
1 Scaffold erection progressing on north elevation of east wing (Delta)
2 Scaffold tarp installation progressing on east elevation of north wing (Charlie)
3 Cleaning progressing on west elevation of north wing (Alpha)
4 Joint raking progressing on north elevation of north wing (Bravo)
5 Parapet cap removal progressing on west elevation of north wing (Alpha)
ITEMS DISCUSSED
None
ACTION REQUIRED
None
ITEMS TO VERIFY
None
REMARKS
None
OBSERVED BY Peter Breninger (ADG)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 2 of 5
COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross
(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott
(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)
Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve
Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 3 of 5
Scaffold installation progressing on north elevation of east wing (Delta)
Scaffold installation progressing on north elevation of east wing (Delta)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 4 of 5
Scaffold tarp installation progressing on east elevation of north wing (Charlie)
Parapet cap removal progressing on west elevation of north wing (Alpha)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 5 of 5
Parapet cap removal progressing on west elevation of north wing (Alpha)
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Oklahoma State Capitol Stone ChimeraThe following report explains the history behind the stone Chimerarsquos (ldquogriffinsrdquo) that have sat atop the Oklahoma State Capitol for the last 100 years
Chimeras (Griffins) of the Oklahoma State Capitol
Report provided by TreanorHL
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Griffin A bird head and foreshybody and cat rear always with a beak
Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City
Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company
Mythological Cat Creature Examples
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (left side) summer of 1916 shy no chimeras present
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (right side) November 2 1916 shy chimeras set
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti
South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 1 of 4
FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016
TIME 900a to 530p DAY OF WEEK Tuesday
OWNER OMES TEMP RANGE Lo 40s to 60
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
Trait Thompson - OMES
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking on A206 (Alpha)
Demolition for RP2 repair NW-0A06
ITEMS DISCUSSED
With WJE reviewed masonry cleaning processes changes to biological cleaning that have been
necessary to achieve the same results as trial repairs raking and repointing mockups for limestone
and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an
injection repairs patching repairs to limestone and granite See meeting notes from 11302016
follow up meeting to discuss WJE observations regarding the work
With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work
that necessary to make the area complete
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 2 of 4
ACTION REQUIRED
Revisions to repairs on A206 due to discovered conditions (TreanorHL)
bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone
bull at NW-0501 due to condition uncovered by joint raking
ITEMS TO VERIFY
REMARKS
OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes
Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to
tour the scaffold Reviewed window and masonry related work
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A206 ndash Site tour with OMES and WJE
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 3 of 4
A209 (left) and A208 (right) ndash Scaffold construction continues
A206 ndash NW-0A06 demolition in progress
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 4 of 4
A206 ndash Stone salvaged from NW-0A06
A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016
TIME 1000a to 530p DAY OF WEEK Monday
OWNER OMES TEMP RANGE Mid 50s to Lo 60s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Lukasz Lesniak Field Superintendent ndash Mark 1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking and repointing on A206 (Alpha)
Roofing materials being hoisted to the north wing roof
ITEMS DISCUSSED
Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps
there is some cold soak left to perform and sealant removal at window perimeter Temperature
restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this
week to create heated enclosure Discussed the need to monitor temperature and record it not only
on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and
other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is
approximately 50 complete
Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece
(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)
Met with JE Dunn to organize field walk for WJE visit
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 2 of 5
Reviewed window sill conditions including additional condition involving lead sheet flashing at the
bottom of cast iron sills
Temporary protection for built-in gutter
Stone color no word on additional lighter shades to better match light colored existing stones Mark
1 will salvage pieces of usable material where possible from other locations in case it is needed
ACTION REQUIRED
Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation
(TreanorHL)
ITEMS TO VERIFY
REMARKS
Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been
effective overall but the drying times are quite variable Some areas that have not seen water in
over a week are still visibly damp
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 3 of 5
A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in
right photo ndash end of tape is against the window frame in both photos
A208 ndash Residual dampness on A208 from cleaning
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 4 of 5
A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital
A207 ndash Lead T-cap installation for mock up review
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 5 of 5
A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining
material is brittle in some locations Additional detail will be issued for condition as part of forthcoming
ASI Believe this is window 459 ndash type G
A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016
TIME 800a to 12 noon DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE Mid 30s to Lo 50s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Raking on A206 (Alpha)
Substrate and backing conditions at RP repair NW-0A06
Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were
found on the west end of the frieze stone The tie-wire was easily removed from the back up
construction No rivet was found the pocket (which had been cut through) appears to have been
slugged full with mortar as construction progressed
Tarps being hung on A206 (Alpha)
ITEMS DISCUSSED
Protection for weather and monitoring conditions within the enclosure
Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to
moderate efflorescence were noted The most prominent is at the location of the redressing on NE-
0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent
dampness during cleaning operations The scaling that was the impetus for the redressing is located
at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 2 of 5
area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material
the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to
indicate the sealer is present even at this depth Potential sources of salts identified backing
construction penetrating sealer applied to building Area was discussed with WJE personnel
Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the
bottom of the corbel molding Both locations are unique to this elevation
ACTION REQUIRED
Tarp installation on all facades placement and distribution of heating devices including monitoring
devices for temperature (Mark1 and JE Dunn)
Direction for spot cleaning on A208 (Charlie)
ITEMS TO VERIFY
Method for monitoring conditions inside the tarped area (JE Dunn)
REMARKS
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 3 of 5
A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter
round differs from those specified in 1914 but specifications do not mention attachment at concrete
This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over
and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed
A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above
is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 4 of 5
A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been
slugged full with mortar prior to setting course above tie wire pulled freely from backing construction
Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction
aides to plumb up the tall stones during setting
A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No
signs of distress observed but area was dusty and full of debris from demolition
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 5 of 5
A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze
stones
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Phasing amp Schedule Attachments The following documents are included in the subsequent pages
- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Phasing Plan
The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality
Trailer Compound
TUNNEL (will continue across Lincoln)
DELTA
FOX TROT
ECHO
KILO
ALPHA
CHARLIE
GOLF
INDIA
HOTEL
JULIETTE
LIMA
BRAVO
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Utilization Plan
Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices
Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment
The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment
JED
JEDBak
er
Mar
k 1
ProjectOklahoma StateCapitolRehabilitation
Date12072016
DrawingSite UtilizationPlan
Legend -JED Trailer Compound
-Phase 1 Site Fencing
-Gravel laydown
-Fence gate
-Future phases site fencing
-Future phases gravel laydown
EnvAct
Review
JED
Mark 1
JED
Faith
Dumpster
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Window Abatement Tracking Plan
DECEMBER 2016
Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 7 of 8
Thermometer in place at scaffold on west elevation of north wing (Alpha)
Entire replacement of stone (RP2) on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 8 of 8
Fencing in place at South Plaza
Fencing in place at southeast quadrant of site
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 1 of 6
FIELD OBSERVATION REPORT REPORT NO 15 DATE 12132016
TIME 1030 AM DAY OF WEEK Tuesday
OWNER OMES TEMP RANGE 35deg F
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _________
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction
Landon Heaton Project Engineer - JE Dunn Construction
Tony Talerico Project Engineer - JE Dunn Construction
WORK OBSERVED
The following was observed during this site visit
1 Scaffold erection progressing on north elevation of east wing (Delta)
2 Window abatement progressing on east elevation of north wing (Charlie)
3 Scaffold tarp installation progressing on west elevation of north wing (Alpha)
4 Heater placed for scaffold on west elevation of north wing (Alpha)
5 Joint raking progressing on north elevation of north wing (Bravo)
ITEMS DISCUSSED
None
ACTION REQUIRED
None
ITEMS TO VERIFY
None
REMARKS
None
OBSERVED BY Peter Breninger (ADG)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 2 of 6
COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross
(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott
(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)
Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve
Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 3 of 6
Scaffold installation progressing on north elevation of east wing (Delta)
Scaffold installation progressing on north elevation of east wing (Delta)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 4 of 6
Window abatement progressing on north elevation of north wing (Bravo)
Scaffold tarp installation progressing on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 5 of 6
Scaffold tarp installation at parapet on west elevation of north wing (Alpha)
Scaffold tarp installation in progress on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 6 of 6
Heater at scaffold at west elevation of north wing (Alpha)
Joint raking progressing on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 16 DATE 12212016
TIME 330 AM DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE 55deg F
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _________
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction
Landon Heaton Project Engineer - JE Dunn Construction
Tony Talerico Project Engineer - JE Dunn Construction
WORK OBSERVED
The following was observed during this site visit
1 Scaffold erection progressing on north elevation of east wing (Delta)
2 Scaffold tarp installation progressing on east elevation of north wing (Charlie)
3 Cleaning progressing on west elevation of north wing (Alpha)
4 Joint raking progressing on north elevation of north wing (Bravo)
5 Parapet cap removal progressing on west elevation of north wing (Alpha)
ITEMS DISCUSSED
None
ACTION REQUIRED
None
ITEMS TO VERIFY
None
REMARKS
None
OBSERVED BY Peter Breninger (ADG)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 2 of 5
COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross
(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott
(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)
Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve
Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 3 of 5
Scaffold installation progressing on north elevation of east wing (Delta)
Scaffold installation progressing on north elevation of east wing (Delta)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 4 of 5
Scaffold tarp installation progressing on east elevation of north wing (Charlie)
Parapet cap removal progressing on west elevation of north wing (Alpha)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 5 of 5
Parapet cap removal progressing on west elevation of north wing (Alpha)
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Oklahoma State Capitol Stone ChimeraThe following report explains the history behind the stone Chimerarsquos (ldquogriffinsrdquo) that have sat atop the Oklahoma State Capitol for the last 100 years
Chimeras (Griffins) of the Oklahoma State Capitol
Report provided by TreanorHL
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Griffin A bird head and foreshybody and cat rear always with a beak
Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City
Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company
Mythological Cat Creature Examples
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (left side) summer of 1916 shy no chimeras present
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (right side) November 2 1916 shy chimeras set
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti
South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 1 of 4
FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016
TIME 900a to 530p DAY OF WEEK Tuesday
OWNER OMES TEMP RANGE Lo 40s to 60
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
Trait Thompson - OMES
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking on A206 (Alpha)
Demolition for RP2 repair NW-0A06
ITEMS DISCUSSED
With WJE reviewed masonry cleaning processes changes to biological cleaning that have been
necessary to achieve the same results as trial repairs raking and repointing mockups for limestone
and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an
injection repairs patching repairs to limestone and granite See meeting notes from 11302016
follow up meeting to discuss WJE observations regarding the work
With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work
that necessary to make the area complete
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 2 of 4
ACTION REQUIRED
Revisions to repairs on A206 due to discovered conditions (TreanorHL)
bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone
bull at NW-0501 due to condition uncovered by joint raking
ITEMS TO VERIFY
REMARKS
OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes
Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to
tour the scaffold Reviewed window and masonry related work
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A206 ndash Site tour with OMES and WJE
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 3 of 4
A209 (left) and A208 (right) ndash Scaffold construction continues
A206 ndash NW-0A06 demolition in progress
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 4 of 4
A206 ndash Stone salvaged from NW-0A06
A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016
TIME 1000a to 530p DAY OF WEEK Monday
OWNER OMES TEMP RANGE Mid 50s to Lo 60s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Lukasz Lesniak Field Superintendent ndash Mark 1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking and repointing on A206 (Alpha)
Roofing materials being hoisted to the north wing roof
ITEMS DISCUSSED
Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps
there is some cold soak left to perform and sealant removal at window perimeter Temperature
restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this
week to create heated enclosure Discussed the need to monitor temperature and record it not only
on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and
other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is
approximately 50 complete
Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece
(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)
Met with JE Dunn to organize field walk for WJE visit
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 2 of 5
Reviewed window sill conditions including additional condition involving lead sheet flashing at the
bottom of cast iron sills
Temporary protection for built-in gutter
Stone color no word on additional lighter shades to better match light colored existing stones Mark
1 will salvage pieces of usable material where possible from other locations in case it is needed
ACTION REQUIRED
Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation
(TreanorHL)
ITEMS TO VERIFY
REMARKS
Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been
effective overall but the drying times are quite variable Some areas that have not seen water in
over a week are still visibly damp
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 3 of 5
A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in
right photo ndash end of tape is against the window frame in both photos
A208 ndash Residual dampness on A208 from cleaning
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 4 of 5
A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital
A207 ndash Lead T-cap installation for mock up review
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 5 of 5
A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining
material is brittle in some locations Additional detail will be issued for condition as part of forthcoming
ASI Believe this is window 459 ndash type G
A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016
TIME 800a to 12 noon DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE Mid 30s to Lo 50s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Raking on A206 (Alpha)
Substrate and backing conditions at RP repair NW-0A06
Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were
found on the west end of the frieze stone The tie-wire was easily removed from the back up
construction No rivet was found the pocket (which had been cut through) appears to have been
slugged full with mortar as construction progressed
Tarps being hung on A206 (Alpha)
ITEMS DISCUSSED
Protection for weather and monitoring conditions within the enclosure
Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to
moderate efflorescence were noted The most prominent is at the location of the redressing on NE-
0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent
dampness during cleaning operations The scaling that was the impetus for the redressing is located
at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 2 of 5
area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material
the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to
indicate the sealer is present even at this depth Potential sources of salts identified backing
construction penetrating sealer applied to building Area was discussed with WJE personnel
Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the
bottom of the corbel molding Both locations are unique to this elevation
ACTION REQUIRED
Tarp installation on all facades placement and distribution of heating devices including monitoring
devices for temperature (Mark1 and JE Dunn)
Direction for spot cleaning on A208 (Charlie)
ITEMS TO VERIFY
Method for monitoring conditions inside the tarped area (JE Dunn)
REMARKS
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 3 of 5
A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter
round differs from those specified in 1914 but specifications do not mention attachment at concrete
This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over
and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed
A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above
is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 4 of 5
A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been
slugged full with mortar prior to setting course above tie wire pulled freely from backing construction
Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction
aides to plumb up the tall stones during setting
A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No
signs of distress observed but area was dusty and full of debris from demolition
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 5 of 5
A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze
stones
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Phasing amp Schedule Attachments The following documents are included in the subsequent pages
- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Phasing Plan
The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality
Trailer Compound
TUNNEL (will continue across Lincoln)
DELTA
FOX TROT
ECHO
KILO
ALPHA
CHARLIE
GOLF
INDIA
HOTEL
JULIETTE
LIMA
BRAVO
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Utilization Plan
Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices
Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment
The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment
JED
JEDBak
er
Mar
k 1
ProjectOklahoma StateCapitolRehabilitation
Date12072016
DrawingSite UtilizationPlan
Legend -JED Trailer Compound
-Phase 1 Site Fencing
-Gravel laydown
-Fence gate
-Future phases site fencing
-Future phases gravel laydown
EnvAct
Review
JED
Mark 1
JED
Faith
Dumpster
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Window Abatement Tracking Plan
DECEMBER 2016
Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 14 - 2016_12-06docx
Page 8 of 8
Fencing in place at South Plaza
Fencing in place at southeast quadrant of site
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 1 of 6
FIELD OBSERVATION REPORT REPORT NO 15 DATE 12132016
TIME 1030 AM DAY OF WEEK Tuesday
OWNER OMES TEMP RANGE 35deg F
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _________
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction
Landon Heaton Project Engineer - JE Dunn Construction
Tony Talerico Project Engineer - JE Dunn Construction
WORK OBSERVED
The following was observed during this site visit
1 Scaffold erection progressing on north elevation of east wing (Delta)
2 Window abatement progressing on east elevation of north wing (Charlie)
3 Scaffold tarp installation progressing on west elevation of north wing (Alpha)
4 Heater placed for scaffold on west elevation of north wing (Alpha)
5 Joint raking progressing on north elevation of north wing (Bravo)
ITEMS DISCUSSED
None
ACTION REQUIRED
None
ITEMS TO VERIFY
None
REMARKS
None
OBSERVED BY Peter Breninger (ADG)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 2 of 6
COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross
(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott
(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)
Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve
Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 3 of 6
Scaffold installation progressing on north elevation of east wing (Delta)
Scaffold installation progressing on north elevation of east wing (Delta)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 4 of 6
Window abatement progressing on north elevation of north wing (Bravo)
Scaffold tarp installation progressing on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 5 of 6
Scaffold tarp installation at parapet on west elevation of north wing (Alpha)
Scaffold tarp installation in progress on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 6 of 6
Heater at scaffold at west elevation of north wing (Alpha)
Joint raking progressing on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 16 DATE 12212016
TIME 330 AM DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE 55deg F
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _________
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction
Landon Heaton Project Engineer - JE Dunn Construction
Tony Talerico Project Engineer - JE Dunn Construction
WORK OBSERVED
The following was observed during this site visit
1 Scaffold erection progressing on north elevation of east wing (Delta)
2 Scaffold tarp installation progressing on east elevation of north wing (Charlie)
3 Cleaning progressing on west elevation of north wing (Alpha)
4 Joint raking progressing on north elevation of north wing (Bravo)
5 Parapet cap removal progressing on west elevation of north wing (Alpha)
ITEMS DISCUSSED
None
ACTION REQUIRED
None
ITEMS TO VERIFY
None
REMARKS
None
OBSERVED BY Peter Breninger (ADG)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 2 of 5
COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross
(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott
(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)
Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve
Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 3 of 5
Scaffold installation progressing on north elevation of east wing (Delta)
Scaffold installation progressing on north elevation of east wing (Delta)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 4 of 5
Scaffold tarp installation progressing on east elevation of north wing (Charlie)
Parapet cap removal progressing on west elevation of north wing (Alpha)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 5 of 5
Parapet cap removal progressing on west elevation of north wing (Alpha)
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Oklahoma State Capitol Stone ChimeraThe following report explains the history behind the stone Chimerarsquos (ldquogriffinsrdquo) that have sat atop the Oklahoma State Capitol for the last 100 years
Chimeras (Griffins) of the Oklahoma State Capitol
Report provided by TreanorHL
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Griffin A bird head and foreshybody and cat rear always with a beak
Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City
Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company
Mythological Cat Creature Examples
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (left side) summer of 1916 shy no chimeras present
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (right side) November 2 1916 shy chimeras set
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti
South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 1 of 4
FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016
TIME 900a to 530p DAY OF WEEK Tuesday
OWNER OMES TEMP RANGE Lo 40s to 60
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
Trait Thompson - OMES
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking on A206 (Alpha)
Demolition for RP2 repair NW-0A06
ITEMS DISCUSSED
With WJE reviewed masonry cleaning processes changes to biological cleaning that have been
necessary to achieve the same results as trial repairs raking and repointing mockups for limestone
and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an
injection repairs patching repairs to limestone and granite See meeting notes from 11302016
follow up meeting to discuss WJE observations regarding the work
With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work
that necessary to make the area complete
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 2 of 4
ACTION REQUIRED
Revisions to repairs on A206 due to discovered conditions (TreanorHL)
bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone
bull at NW-0501 due to condition uncovered by joint raking
ITEMS TO VERIFY
REMARKS
OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes
Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to
tour the scaffold Reviewed window and masonry related work
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A206 ndash Site tour with OMES and WJE
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 3 of 4
A209 (left) and A208 (right) ndash Scaffold construction continues
A206 ndash NW-0A06 demolition in progress
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 4 of 4
A206 ndash Stone salvaged from NW-0A06
A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016
TIME 1000a to 530p DAY OF WEEK Monday
OWNER OMES TEMP RANGE Mid 50s to Lo 60s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Lukasz Lesniak Field Superintendent ndash Mark 1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking and repointing on A206 (Alpha)
Roofing materials being hoisted to the north wing roof
ITEMS DISCUSSED
Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps
there is some cold soak left to perform and sealant removal at window perimeter Temperature
restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this
week to create heated enclosure Discussed the need to monitor temperature and record it not only
on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and
other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is
approximately 50 complete
Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece
(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)
Met with JE Dunn to organize field walk for WJE visit
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 2 of 5
Reviewed window sill conditions including additional condition involving lead sheet flashing at the
bottom of cast iron sills
Temporary protection for built-in gutter
Stone color no word on additional lighter shades to better match light colored existing stones Mark
1 will salvage pieces of usable material where possible from other locations in case it is needed
ACTION REQUIRED
Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation
(TreanorHL)
ITEMS TO VERIFY
REMARKS
Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been
effective overall but the drying times are quite variable Some areas that have not seen water in
over a week are still visibly damp
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 3 of 5
A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in
right photo ndash end of tape is against the window frame in both photos
A208 ndash Residual dampness on A208 from cleaning
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 4 of 5
A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital
A207 ndash Lead T-cap installation for mock up review
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 5 of 5
A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining
material is brittle in some locations Additional detail will be issued for condition as part of forthcoming
ASI Believe this is window 459 ndash type G
A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016
TIME 800a to 12 noon DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE Mid 30s to Lo 50s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Raking on A206 (Alpha)
Substrate and backing conditions at RP repair NW-0A06
Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were
found on the west end of the frieze stone The tie-wire was easily removed from the back up
construction No rivet was found the pocket (which had been cut through) appears to have been
slugged full with mortar as construction progressed
Tarps being hung on A206 (Alpha)
ITEMS DISCUSSED
Protection for weather and monitoring conditions within the enclosure
Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to
moderate efflorescence were noted The most prominent is at the location of the redressing on NE-
0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent
dampness during cleaning operations The scaling that was the impetus for the redressing is located
at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 2 of 5
area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material
the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to
indicate the sealer is present even at this depth Potential sources of salts identified backing
construction penetrating sealer applied to building Area was discussed with WJE personnel
Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the
bottom of the corbel molding Both locations are unique to this elevation
ACTION REQUIRED
Tarp installation on all facades placement and distribution of heating devices including monitoring
devices for temperature (Mark1 and JE Dunn)
Direction for spot cleaning on A208 (Charlie)
ITEMS TO VERIFY
Method for monitoring conditions inside the tarped area (JE Dunn)
REMARKS
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 3 of 5
A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter
round differs from those specified in 1914 but specifications do not mention attachment at concrete
This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over
and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed
A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above
is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 4 of 5
A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been
slugged full with mortar prior to setting course above tie wire pulled freely from backing construction
Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction
aides to plumb up the tall stones during setting
A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No
signs of distress observed but area was dusty and full of debris from demolition
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 5 of 5
A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze
stones
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Phasing amp Schedule Attachments The following documents are included in the subsequent pages
- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Phasing Plan
The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality
Trailer Compound
TUNNEL (will continue across Lincoln)
DELTA
FOX TROT
ECHO
KILO
ALPHA
CHARLIE
GOLF
INDIA
HOTEL
JULIETTE
LIMA
BRAVO
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Utilization Plan
Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices
Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment
The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment
JED
JEDBak
er
Mar
k 1
ProjectOklahoma StateCapitolRehabilitation
Date12072016
DrawingSite UtilizationPlan
Legend -JED Trailer Compound
-Phase 1 Site Fencing
-Gravel laydown
-Fence gate
-Future phases site fencing
-Future phases gravel laydown
EnvAct
Review
JED
Mark 1
JED
Faith
Dumpster
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Window Abatement Tracking Plan
DECEMBER 2016
Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 1 of 6
FIELD OBSERVATION REPORT REPORT NO 15 DATE 12132016
TIME 1030 AM DAY OF WEEK Tuesday
OWNER OMES TEMP RANGE 35deg F
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _________
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction
Landon Heaton Project Engineer - JE Dunn Construction
Tony Talerico Project Engineer - JE Dunn Construction
WORK OBSERVED
The following was observed during this site visit
1 Scaffold erection progressing on north elevation of east wing (Delta)
2 Window abatement progressing on east elevation of north wing (Charlie)
3 Scaffold tarp installation progressing on west elevation of north wing (Alpha)
4 Heater placed for scaffold on west elevation of north wing (Alpha)
5 Joint raking progressing on north elevation of north wing (Bravo)
ITEMS DISCUSSED
None
ACTION REQUIRED
None
ITEMS TO VERIFY
None
REMARKS
None
OBSERVED BY Peter Breninger (ADG)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 2 of 6
COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross
(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott
(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)
Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve
Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 3 of 6
Scaffold installation progressing on north elevation of east wing (Delta)
Scaffold installation progressing on north elevation of east wing (Delta)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 4 of 6
Window abatement progressing on north elevation of north wing (Bravo)
Scaffold tarp installation progressing on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 5 of 6
Scaffold tarp installation at parapet on west elevation of north wing (Alpha)
Scaffold tarp installation in progress on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 6 of 6
Heater at scaffold at west elevation of north wing (Alpha)
Joint raking progressing on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 16 DATE 12212016
TIME 330 AM DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE 55deg F
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _________
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction
Landon Heaton Project Engineer - JE Dunn Construction
Tony Talerico Project Engineer - JE Dunn Construction
WORK OBSERVED
The following was observed during this site visit
1 Scaffold erection progressing on north elevation of east wing (Delta)
2 Scaffold tarp installation progressing on east elevation of north wing (Charlie)
3 Cleaning progressing on west elevation of north wing (Alpha)
4 Joint raking progressing on north elevation of north wing (Bravo)
5 Parapet cap removal progressing on west elevation of north wing (Alpha)
ITEMS DISCUSSED
None
ACTION REQUIRED
None
ITEMS TO VERIFY
None
REMARKS
None
OBSERVED BY Peter Breninger (ADG)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 2 of 5
COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross
(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott
(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)
Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve
Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 3 of 5
Scaffold installation progressing on north elevation of east wing (Delta)
Scaffold installation progressing on north elevation of east wing (Delta)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 4 of 5
Scaffold tarp installation progressing on east elevation of north wing (Charlie)
Parapet cap removal progressing on west elevation of north wing (Alpha)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 5 of 5
Parapet cap removal progressing on west elevation of north wing (Alpha)
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Oklahoma State Capitol Stone ChimeraThe following report explains the history behind the stone Chimerarsquos (ldquogriffinsrdquo) that have sat atop the Oklahoma State Capitol for the last 100 years
Chimeras (Griffins) of the Oklahoma State Capitol
Report provided by TreanorHL
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Griffin A bird head and foreshybody and cat rear always with a beak
Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City
Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company
Mythological Cat Creature Examples
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (left side) summer of 1916 shy no chimeras present
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (right side) November 2 1916 shy chimeras set
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti
South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 1 of 4
FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016
TIME 900a to 530p DAY OF WEEK Tuesday
OWNER OMES TEMP RANGE Lo 40s to 60
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
Trait Thompson - OMES
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking on A206 (Alpha)
Demolition for RP2 repair NW-0A06
ITEMS DISCUSSED
With WJE reviewed masonry cleaning processes changes to biological cleaning that have been
necessary to achieve the same results as trial repairs raking and repointing mockups for limestone
and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an
injection repairs patching repairs to limestone and granite See meeting notes from 11302016
follow up meeting to discuss WJE observations regarding the work
With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work
that necessary to make the area complete
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 2 of 4
ACTION REQUIRED
Revisions to repairs on A206 due to discovered conditions (TreanorHL)
bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone
bull at NW-0501 due to condition uncovered by joint raking
ITEMS TO VERIFY
REMARKS
OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes
Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to
tour the scaffold Reviewed window and masonry related work
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A206 ndash Site tour with OMES and WJE
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 3 of 4
A209 (left) and A208 (right) ndash Scaffold construction continues
A206 ndash NW-0A06 demolition in progress
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 4 of 4
A206 ndash Stone salvaged from NW-0A06
A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016
TIME 1000a to 530p DAY OF WEEK Monday
OWNER OMES TEMP RANGE Mid 50s to Lo 60s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Lukasz Lesniak Field Superintendent ndash Mark 1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking and repointing on A206 (Alpha)
Roofing materials being hoisted to the north wing roof
ITEMS DISCUSSED
Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps
there is some cold soak left to perform and sealant removal at window perimeter Temperature
restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this
week to create heated enclosure Discussed the need to monitor temperature and record it not only
on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and
other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is
approximately 50 complete
Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece
(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)
Met with JE Dunn to organize field walk for WJE visit
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 2 of 5
Reviewed window sill conditions including additional condition involving lead sheet flashing at the
bottom of cast iron sills
Temporary protection for built-in gutter
Stone color no word on additional lighter shades to better match light colored existing stones Mark
1 will salvage pieces of usable material where possible from other locations in case it is needed
ACTION REQUIRED
Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation
(TreanorHL)
ITEMS TO VERIFY
REMARKS
Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been
effective overall but the drying times are quite variable Some areas that have not seen water in
over a week are still visibly damp
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 3 of 5
A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in
right photo ndash end of tape is against the window frame in both photos
A208 ndash Residual dampness on A208 from cleaning
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 4 of 5
A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital
A207 ndash Lead T-cap installation for mock up review
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 5 of 5
A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining
material is brittle in some locations Additional detail will be issued for condition as part of forthcoming
ASI Believe this is window 459 ndash type G
A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016
TIME 800a to 12 noon DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE Mid 30s to Lo 50s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Raking on A206 (Alpha)
Substrate and backing conditions at RP repair NW-0A06
Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were
found on the west end of the frieze stone The tie-wire was easily removed from the back up
construction No rivet was found the pocket (which had been cut through) appears to have been
slugged full with mortar as construction progressed
Tarps being hung on A206 (Alpha)
ITEMS DISCUSSED
Protection for weather and monitoring conditions within the enclosure
Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to
moderate efflorescence were noted The most prominent is at the location of the redressing on NE-
0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent
dampness during cleaning operations The scaling that was the impetus for the redressing is located
at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 2 of 5
area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material
the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to
indicate the sealer is present even at this depth Potential sources of salts identified backing
construction penetrating sealer applied to building Area was discussed with WJE personnel
Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the
bottom of the corbel molding Both locations are unique to this elevation
ACTION REQUIRED
Tarp installation on all facades placement and distribution of heating devices including monitoring
devices for temperature (Mark1 and JE Dunn)
Direction for spot cleaning on A208 (Charlie)
ITEMS TO VERIFY
Method for monitoring conditions inside the tarped area (JE Dunn)
REMARKS
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 3 of 5
A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter
round differs from those specified in 1914 but specifications do not mention attachment at concrete
This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over
and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed
A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above
is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 4 of 5
A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been
slugged full with mortar prior to setting course above tie wire pulled freely from backing construction
Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction
aides to plumb up the tall stones during setting
A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No
signs of distress observed but area was dusty and full of debris from demolition
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 5 of 5
A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze
stones
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Phasing amp Schedule Attachments The following documents are included in the subsequent pages
- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Phasing Plan
The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality
Trailer Compound
TUNNEL (will continue across Lincoln)
DELTA
FOX TROT
ECHO
KILO
ALPHA
CHARLIE
GOLF
INDIA
HOTEL
JULIETTE
LIMA
BRAVO
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Utilization Plan
Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices
Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment
The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment
JED
JEDBak
er
Mar
k 1
ProjectOklahoma StateCapitolRehabilitation
Date12072016
DrawingSite UtilizationPlan
Legend -JED Trailer Compound
-Phase 1 Site Fencing
-Gravel laydown
-Fence gate
-Future phases site fencing
-Future phases gravel laydown
EnvAct
Review
JED
Mark 1
JED
Faith
Dumpster
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Window Abatement Tracking Plan
DECEMBER 2016
Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 2 of 6
COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross
(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott
(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)
Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve
Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 3 of 6
Scaffold installation progressing on north elevation of east wing (Delta)
Scaffold installation progressing on north elevation of east wing (Delta)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 4 of 6
Window abatement progressing on north elevation of north wing (Bravo)
Scaffold tarp installation progressing on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 5 of 6
Scaffold tarp installation at parapet on west elevation of north wing (Alpha)
Scaffold tarp installation in progress on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 6 of 6
Heater at scaffold at west elevation of north wing (Alpha)
Joint raking progressing on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 16 DATE 12212016
TIME 330 AM DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE 55deg F
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _________
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction
Landon Heaton Project Engineer - JE Dunn Construction
Tony Talerico Project Engineer - JE Dunn Construction
WORK OBSERVED
The following was observed during this site visit
1 Scaffold erection progressing on north elevation of east wing (Delta)
2 Scaffold tarp installation progressing on east elevation of north wing (Charlie)
3 Cleaning progressing on west elevation of north wing (Alpha)
4 Joint raking progressing on north elevation of north wing (Bravo)
5 Parapet cap removal progressing on west elevation of north wing (Alpha)
ITEMS DISCUSSED
None
ACTION REQUIRED
None
ITEMS TO VERIFY
None
REMARKS
None
OBSERVED BY Peter Breninger (ADG)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 2 of 5
COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross
(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott
(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)
Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve
Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 3 of 5
Scaffold installation progressing on north elevation of east wing (Delta)
Scaffold installation progressing on north elevation of east wing (Delta)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 4 of 5
Scaffold tarp installation progressing on east elevation of north wing (Charlie)
Parapet cap removal progressing on west elevation of north wing (Alpha)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 5 of 5
Parapet cap removal progressing on west elevation of north wing (Alpha)
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Oklahoma State Capitol Stone ChimeraThe following report explains the history behind the stone Chimerarsquos (ldquogriffinsrdquo) that have sat atop the Oklahoma State Capitol for the last 100 years
Chimeras (Griffins) of the Oklahoma State Capitol
Report provided by TreanorHL
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Griffin A bird head and foreshybody and cat rear always with a beak
Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City
Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company
Mythological Cat Creature Examples
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (left side) summer of 1916 shy no chimeras present
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (right side) November 2 1916 shy chimeras set
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti
South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 1 of 4
FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016
TIME 900a to 530p DAY OF WEEK Tuesday
OWNER OMES TEMP RANGE Lo 40s to 60
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
Trait Thompson - OMES
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking on A206 (Alpha)
Demolition for RP2 repair NW-0A06
ITEMS DISCUSSED
With WJE reviewed masonry cleaning processes changes to biological cleaning that have been
necessary to achieve the same results as trial repairs raking and repointing mockups for limestone
and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an
injection repairs patching repairs to limestone and granite See meeting notes from 11302016
follow up meeting to discuss WJE observations regarding the work
With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work
that necessary to make the area complete
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 2 of 4
ACTION REQUIRED
Revisions to repairs on A206 due to discovered conditions (TreanorHL)
bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone
bull at NW-0501 due to condition uncovered by joint raking
ITEMS TO VERIFY
REMARKS
OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes
Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to
tour the scaffold Reviewed window and masonry related work
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A206 ndash Site tour with OMES and WJE
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 3 of 4
A209 (left) and A208 (right) ndash Scaffold construction continues
A206 ndash NW-0A06 demolition in progress
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 4 of 4
A206 ndash Stone salvaged from NW-0A06
A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016
TIME 1000a to 530p DAY OF WEEK Monday
OWNER OMES TEMP RANGE Mid 50s to Lo 60s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Lukasz Lesniak Field Superintendent ndash Mark 1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking and repointing on A206 (Alpha)
Roofing materials being hoisted to the north wing roof
ITEMS DISCUSSED
Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps
there is some cold soak left to perform and sealant removal at window perimeter Temperature
restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this
week to create heated enclosure Discussed the need to monitor temperature and record it not only
on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and
other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is
approximately 50 complete
Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece
(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)
Met with JE Dunn to organize field walk for WJE visit
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 2 of 5
Reviewed window sill conditions including additional condition involving lead sheet flashing at the
bottom of cast iron sills
Temporary protection for built-in gutter
Stone color no word on additional lighter shades to better match light colored existing stones Mark
1 will salvage pieces of usable material where possible from other locations in case it is needed
ACTION REQUIRED
Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation
(TreanorHL)
ITEMS TO VERIFY
REMARKS
Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been
effective overall but the drying times are quite variable Some areas that have not seen water in
over a week are still visibly damp
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 3 of 5
A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in
right photo ndash end of tape is against the window frame in both photos
A208 ndash Residual dampness on A208 from cleaning
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 4 of 5
A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital
A207 ndash Lead T-cap installation for mock up review
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 5 of 5
A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining
material is brittle in some locations Additional detail will be issued for condition as part of forthcoming
ASI Believe this is window 459 ndash type G
A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016
TIME 800a to 12 noon DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE Mid 30s to Lo 50s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Raking on A206 (Alpha)
Substrate and backing conditions at RP repair NW-0A06
Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were
found on the west end of the frieze stone The tie-wire was easily removed from the back up
construction No rivet was found the pocket (which had been cut through) appears to have been
slugged full with mortar as construction progressed
Tarps being hung on A206 (Alpha)
ITEMS DISCUSSED
Protection for weather and monitoring conditions within the enclosure
Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to
moderate efflorescence were noted The most prominent is at the location of the redressing on NE-
0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent
dampness during cleaning operations The scaling that was the impetus for the redressing is located
at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 2 of 5
area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material
the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to
indicate the sealer is present even at this depth Potential sources of salts identified backing
construction penetrating sealer applied to building Area was discussed with WJE personnel
Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the
bottom of the corbel molding Both locations are unique to this elevation
ACTION REQUIRED
Tarp installation on all facades placement and distribution of heating devices including monitoring
devices for temperature (Mark1 and JE Dunn)
Direction for spot cleaning on A208 (Charlie)
ITEMS TO VERIFY
Method for monitoring conditions inside the tarped area (JE Dunn)
REMARKS
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 3 of 5
A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter
round differs from those specified in 1914 but specifications do not mention attachment at concrete
This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over
and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed
A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above
is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 4 of 5
A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been
slugged full with mortar prior to setting course above tie wire pulled freely from backing construction
Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction
aides to plumb up the tall stones during setting
A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No
signs of distress observed but area was dusty and full of debris from demolition
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 5 of 5
A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze
stones
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Phasing amp Schedule Attachments The following documents are included in the subsequent pages
- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Phasing Plan
The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality
Trailer Compound
TUNNEL (will continue across Lincoln)
DELTA
FOX TROT
ECHO
KILO
ALPHA
CHARLIE
GOLF
INDIA
HOTEL
JULIETTE
LIMA
BRAVO
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Utilization Plan
Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices
Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment
The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment
JED
JEDBak
er
Mar
k 1
ProjectOklahoma StateCapitolRehabilitation
Date12072016
DrawingSite UtilizationPlan
Legend -JED Trailer Compound
-Phase 1 Site Fencing
-Gravel laydown
-Fence gate
-Future phases site fencing
-Future phases gravel laydown
EnvAct
Review
JED
Mark 1
JED
Faith
Dumpster
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Window Abatement Tracking Plan
DECEMBER 2016
Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 3 of 6
Scaffold installation progressing on north elevation of east wing (Delta)
Scaffold installation progressing on north elevation of east wing (Delta)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 4 of 6
Window abatement progressing on north elevation of north wing (Bravo)
Scaffold tarp installation progressing on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 5 of 6
Scaffold tarp installation at parapet on west elevation of north wing (Alpha)
Scaffold tarp installation in progress on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 6 of 6
Heater at scaffold at west elevation of north wing (Alpha)
Joint raking progressing on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 16 DATE 12212016
TIME 330 AM DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE 55deg F
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _________
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction
Landon Heaton Project Engineer - JE Dunn Construction
Tony Talerico Project Engineer - JE Dunn Construction
WORK OBSERVED
The following was observed during this site visit
1 Scaffold erection progressing on north elevation of east wing (Delta)
2 Scaffold tarp installation progressing on east elevation of north wing (Charlie)
3 Cleaning progressing on west elevation of north wing (Alpha)
4 Joint raking progressing on north elevation of north wing (Bravo)
5 Parapet cap removal progressing on west elevation of north wing (Alpha)
ITEMS DISCUSSED
None
ACTION REQUIRED
None
ITEMS TO VERIFY
None
REMARKS
None
OBSERVED BY Peter Breninger (ADG)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 2 of 5
COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross
(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott
(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)
Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve
Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 3 of 5
Scaffold installation progressing on north elevation of east wing (Delta)
Scaffold installation progressing on north elevation of east wing (Delta)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 4 of 5
Scaffold tarp installation progressing on east elevation of north wing (Charlie)
Parapet cap removal progressing on west elevation of north wing (Alpha)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 5 of 5
Parapet cap removal progressing on west elevation of north wing (Alpha)
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Oklahoma State Capitol Stone ChimeraThe following report explains the history behind the stone Chimerarsquos (ldquogriffinsrdquo) that have sat atop the Oklahoma State Capitol for the last 100 years
Chimeras (Griffins) of the Oklahoma State Capitol
Report provided by TreanorHL
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Griffin A bird head and foreshybody and cat rear always with a beak
Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City
Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company
Mythological Cat Creature Examples
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (left side) summer of 1916 shy no chimeras present
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (right side) November 2 1916 shy chimeras set
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti
South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 1 of 4
FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016
TIME 900a to 530p DAY OF WEEK Tuesday
OWNER OMES TEMP RANGE Lo 40s to 60
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
Trait Thompson - OMES
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking on A206 (Alpha)
Demolition for RP2 repair NW-0A06
ITEMS DISCUSSED
With WJE reviewed masonry cleaning processes changes to biological cleaning that have been
necessary to achieve the same results as trial repairs raking and repointing mockups for limestone
and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an
injection repairs patching repairs to limestone and granite See meeting notes from 11302016
follow up meeting to discuss WJE observations regarding the work
With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work
that necessary to make the area complete
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 2 of 4
ACTION REQUIRED
Revisions to repairs on A206 due to discovered conditions (TreanorHL)
bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone
bull at NW-0501 due to condition uncovered by joint raking
ITEMS TO VERIFY
REMARKS
OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes
Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to
tour the scaffold Reviewed window and masonry related work
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A206 ndash Site tour with OMES and WJE
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 3 of 4
A209 (left) and A208 (right) ndash Scaffold construction continues
A206 ndash NW-0A06 demolition in progress
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 4 of 4
A206 ndash Stone salvaged from NW-0A06
A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016
TIME 1000a to 530p DAY OF WEEK Monday
OWNER OMES TEMP RANGE Mid 50s to Lo 60s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Lukasz Lesniak Field Superintendent ndash Mark 1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking and repointing on A206 (Alpha)
Roofing materials being hoisted to the north wing roof
ITEMS DISCUSSED
Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps
there is some cold soak left to perform and sealant removal at window perimeter Temperature
restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this
week to create heated enclosure Discussed the need to monitor temperature and record it not only
on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and
other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is
approximately 50 complete
Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece
(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)
Met with JE Dunn to organize field walk for WJE visit
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 2 of 5
Reviewed window sill conditions including additional condition involving lead sheet flashing at the
bottom of cast iron sills
Temporary protection for built-in gutter
Stone color no word on additional lighter shades to better match light colored existing stones Mark
1 will salvage pieces of usable material where possible from other locations in case it is needed
ACTION REQUIRED
Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation
(TreanorHL)
ITEMS TO VERIFY
REMARKS
Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been
effective overall but the drying times are quite variable Some areas that have not seen water in
over a week are still visibly damp
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 3 of 5
A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in
right photo ndash end of tape is against the window frame in both photos
A208 ndash Residual dampness on A208 from cleaning
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 4 of 5
A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital
A207 ndash Lead T-cap installation for mock up review
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 5 of 5
A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining
material is brittle in some locations Additional detail will be issued for condition as part of forthcoming
ASI Believe this is window 459 ndash type G
A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016
TIME 800a to 12 noon DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE Mid 30s to Lo 50s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Raking on A206 (Alpha)
Substrate and backing conditions at RP repair NW-0A06
Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were
found on the west end of the frieze stone The tie-wire was easily removed from the back up
construction No rivet was found the pocket (which had been cut through) appears to have been
slugged full with mortar as construction progressed
Tarps being hung on A206 (Alpha)
ITEMS DISCUSSED
Protection for weather and monitoring conditions within the enclosure
Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to
moderate efflorescence were noted The most prominent is at the location of the redressing on NE-
0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent
dampness during cleaning operations The scaling that was the impetus for the redressing is located
at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 2 of 5
area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material
the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to
indicate the sealer is present even at this depth Potential sources of salts identified backing
construction penetrating sealer applied to building Area was discussed with WJE personnel
Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the
bottom of the corbel molding Both locations are unique to this elevation
ACTION REQUIRED
Tarp installation on all facades placement and distribution of heating devices including monitoring
devices for temperature (Mark1 and JE Dunn)
Direction for spot cleaning on A208 (Charlie)
ITEMS TO VERIFY
Method for monitoring conditions inside the tarped area (JE Dunn)
REMARKS
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 3 of 5
A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter
round differs from those specified in 1914 but specifications do not mention attachment at concrete
This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over
and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed
A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above
is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 4 of 5
A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been
slugged full with mortar prior to setting course above tie wire pulled freely from backing construction
Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction
aides to plumb up the tall stones during setting
A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No
signs of distress observed but area was dusty and full of debris from demolition
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 5 of 5
A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze
stones
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Phasing amp Schedule Attachments The following documents are included in the subsequent pages
- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Phasing Plan
The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality
Trailer Compound
TUNNEL (will continue across Lincoln)
DELTA
FOX TROT
ECHO
KILO
ALPHA
CHARLIE
GOLF
INDIA
HOTEL
JULIETTE
LIMA
BRAVO
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Utilization Plan
Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices
Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment
The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment
JED
JEDBak
er
Mar
k 1
ProjectOklahoma StateCapitolRehabilitation
Date12072016
DrawingSite UtilizationPlan
Legend -JED Trailer Compound
-Phase 1 Site Fencing
-Gravel laydown
-Fence gate
-Future phases site fencing
-Future phases gravel laydown
EnvAct
Review
JED
Mark 1
JED
Faith
Dumpster
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Window Abatement Tracking Plan
DECEMBER 2016
Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 4 of 6
Window abatement progressing on north elevation of north wing (Bravo)
Scaffold tarp installation progressing on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 5 of 6
Scaffold tarp installation at parapet on west elevation of north wing (Alpha)
Scaffold tarp installation in progress on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 6 of 6
Heater at scaffold at west elevation of north wing (Alpha)
Joint raking progressing on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 16 DATE 12212016
TIME 330 AM DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE 55deg F
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _________
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction
Landon Heaton Project Engineer - JE Dunn Construction
Tony Talerico Project Engineer - JE Dunn Construction
WORK OBSERVED
The following was observed during this site visit
1 Scaffold erection progressing on north elevation of east wing (Delta)
2 Scaffold tarp installation progressing on east elevation of north wing (Charlie)
3 Cleaning progressing on west elevation of north wing (Alpha)
4 Joint raking progressing on north elevation of north wing (Bravo)
5 Parapet cap removal progressing on west elevation of north wing (Alpha)
ITEMS DISCUSSED
None
ACTION REQUIRED
None
ITEMS TO VERIFY
None
REMARKS
None
OBSERVED BY Peter Breninger (ADG)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 2 of 5
COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross
(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott
(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)
Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve
Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 3 of 5
Scaffold installation progressing on north elevation of east wing (Delta)
Scaffold installation progressing on north elevation of east wing (Delta)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 4 of 5
Scaffold tarp installation progressing on east elevation of north wing (Charlie)
Parapet cap removal progressing on west elevation of north wing (Alpha)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 5 of 5
Parapet cap removal progressing on west elevation of north wing (Alpha)
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Oklahoma State Capitol Stone ChimeraThe following report explains the history behind the stone Chimerarsquos (ldquogriffinsrdquo) that have sat atop the Oklahoma State Capitol for the last 100 years
Chimeras (Griffins) of the Oklahoma State Capitol
Report provided by TreanorHL
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Griffin A bird head and foreshybody and cat rear always with a beak
Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City
Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company
Mythological Cat Creature Examples
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (left side) summer of 1916 shy no chimeras present
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (right side) November 2 1916 shy chimeras set
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti
South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 1 of 4
FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016
TIME 900a to 530p DAY OF WEEK Tuesday
OWNER OMES TEMP RANGE Lo 40s to 60
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
Trait Thompson - OMES
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking on A206 (Alpha)
Demolition for RP2 repair NW-0A06
ITEMS DISCUSSED
With WJE reviewed masonry cleaning processes changes to biological cleaning that have been
necessary to achieve the same results as trial repairs raking and repointing mockups for limestone
and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an
injection repairs patching repairs to limestone and granite See meeting notes from 11302016
follow up meeting to discuss WJE observations regarding the work
With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work
that necessary to make the area complete
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 2 of 4
ACTION REQUIRED
Revisions to repairs on A206 due to discovered conditions (TreanorHL)
bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone
bull at NW-0501 due to condition uncovered by joint raking
ITEMS TO VERIFY
REMARKS
OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes
Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to
tour the scaffold Reviewed window and masonry related work
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A206 ndash Site tour with OMES and WJE
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 3 of 4
A209 (left) and A208 (right) ndash Scaffold construction continues
A206 ndash NW-0A06 demolition in progress
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 4 of 4
A206 ndash Stone salvaged from NW-0A06
A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016
TIME 1000a to 530p DAY OF WEEK Monday
OWNER OMES TEMP RANGE Mid 50s to Lo 60s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Lukasz Lesniak Field Superintendent ndash Mark 1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking and repointing on A206 (Alpha)
Roofing materials being hoisted to the north wing roof
ITEMS DISCUSSED
Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps
there is some cold soak left to perform and sealant removal at window perimeter Temperature
restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this
week to create heated enclosure Discussed the need to monitor temperature and record it not only
on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and
other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is
approximately 50 complete
Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece
(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)
Met with JE Dunn to organize field walk for WJE visit
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 2 of 5
Reviewed window sill conditions including additional condition involving lead sheet flashing at the
bottom of cast iron sills
Temporary protection for built-in gutter
Stone color no word on additional lighter shades to better match light colored existing stones Mark
1 will salvage pieces of usable material where possible from other locations in case it is needed
ACTION REQUIRED
Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation
(TreanorHL)
ITEMS TO VERIFY
REMARKS
Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been
effective overall but the drying times are quite variable Some areas that have not seen water in
over a week are still visibly damp
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 3 of 5
A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in
right photo ndash end of tape is against the window frame in both photos
A208 ndash Residual dampness on A208 from cleaning
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 4 of 5
A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital
A207 ndash Lead T-cap installation for mock up review
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 5 of 5
A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining
material is brittle in some locations Additional detail will be issued for condition as part of forthcoming
ASI Believe this is window 459 ndash type G
A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016
TIME 800a to 12 noon DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE Mid 30s to Lo 50s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Raking on A206 (Alpha)
Substrate and backing conditions at RP repair NW-0A06
Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were
found on the west end of the frieze stone The tie-wire was easily removed from the back up
construction No rivet was found the pocket (which had been cut through) appears to have been
slugged full with mortar as construction progressed
Tarps being hung on A206 (Alpha)
ITEMS DISCUSSED
Protection for weather and monitoring conditions within the enclosure
Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to
moderate efflorescence were noted The most prominent is at the location of the redressing on NE-
0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent
dampness during cleaning operations The scaling that was the impetus for the redressing is located
at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 2 of 5
area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material
the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to
indicate the sealer is present even at this depth Potential sources of salts identified backing
construction penetrating sealer applied to building Area was discussed with WJE personnel
Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the
bottom of the corbel molding Both locations are unique to this elevation
ACTION REQUIRED
Tarp installation on all facades placement and distribution of heating devices including monitoring
devices for temperature (Mark1 and JE Dunn)
Direction for spot cleaning on A208 (Charlie)
ITEMS TO VERIFY
Method for monitoring conditions inside the tarped area (JE Dunn)
REMARKS
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 3 of 5
A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter
round differs from those specified in 1914 but specifications do not mention attachment at concrete
This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over
and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed
A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above
is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 4 of 5
A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been
slugged full with mortar prior to setting course above tie wire pulled freely from backing construction
Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction
aides to plumb up the tall stones during setting
A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No
signs of distress observed but area was dusty and full of debris from demolition
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 5 of 5
A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze
stones
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Phasing amp Schedule Attachments The following documents are included in the subsequent pages
- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Phasing Plan
The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality
Trailer Compound
TUNNEL (will continue across Lincoln)
DELTA
FOX TROT
ECHO
KILO
ALPHA
CHARLIE
GOLF
INDIA
HOTEL
JULIETTE
LIMA
BRAVO
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Utilization Plan
Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices
Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment
The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment
JED
JEDBak
er
Mar
k 1
ProjectOklahoma StateCapitolRehabilitation
Date12072016
DrawingSite UtilizationPlan
Legend -JED Trailer Compound
-Phase 1 Site Fencing
-Gravel laydown
-Fence gate
-Future phases site fencing
-Future phases gravel laydown
EnvAct
Review
JED
Mark 1
JED
Faith
Dumpster
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Window Abatement Tracking Plan
DECEMBER 2016
Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 5 of 6
Scaffold tarp installation at parapet on west elevation of north wing (Alpha)
Scaffold tarp installation in progress on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 6 of 6
Heater at scaffold at west elevation of north wing (Alpha)
Joint raking progressing on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 16 DATE 12212016
TIME 330 AM DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE 55deg F
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _________
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction
Landon Heaton Project Engineer - JE Dunn Construction
Tony Talerico Project Engineer - JE Dunn Construction
WORK OBSERVED
The following was observed during this site visit
1 Scaffold erection progressing on north elevation of east wing (Delta)
2 Scaffold tarp installation progressing on east elevation of north wing (Charlie)
3 Cleaning progressing on west elevation of north wing (Alpha)
4 Joint raking progressing on north elevation of north wing (Bravo)
5 Parapet cap removal progressing on west elevation of north wing (Alpha)
ITEMS DISCUSSED
None
ACTION REQUIRED
None
ITEMS TO VERIFY
None
REMARKS
None
OBSERVED BY Peter Breninger (ADG)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 2 of 5
COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross
(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott
(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)
Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve
Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 3 of 5
Scaffold installation progressing on north elevation of east wing (Delta)
Scaffold installation progressing on north elevation of east wing (Delta)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 4 of 5
Scaffold tarp installation progressing on east elevation of north wing (Charlie)
Parapet cap removal progressing on west elevation of north wing (Alpha)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 5 of 5
Parapet cap removal progressing on west elevation of north wing (Alpha)
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Oklahoma State Capitol Stone ChimeraThe following report explains the history behind the stone Chimerarsquos (ldquogriffinsrdquo) that have sat atop the Oklahoma State Capitol for the last 100 years
Chimeras (Griffins) of the Oklahoma State Capitol
Report provided by TreanorHL
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Griffin A bird head and foreshybody and cat rear always with a beak
Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City
Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company
Mythological Cat Creature Examples
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (left side) summer of 1916 shy no chimeras present
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (right side) November 2 1916 shy chimeras set
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti
South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 1 of 4
FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016
TIME 900a to 530p DAY OF WEEK Tuesday
OWNER OMES TEMP RANGE Lo 40s to 60
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
Trait Thompson - OMES
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking on A206 (Alpha)
Demolition for RP2 repair NW-0A06
ITEMS DISCUSSED
With WJE reviewed masonry cleaning processes changes to biological cleaning that have been
necessary to achieve the same results as trial repairs raking and repointing mockups for limestone
and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an
injection repairs patching repairs to limestone and granite See meeting notes from 11302016
follow up meeting to discuss WJE observations regarding the work
With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work
that necessary to make the area complete
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 2 of 4
ACTION REQUIRED
Revisions to repairs on A206 due to discovered conditions (TreanorHL)
bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone
bull at NW-0501 due to condition uncovered by joint raking
ITEMS TO VERIFY
REMARKS
OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes
Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to
tour the scaffold Reviewed window and masonry related work
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A206 ndash Site tour with OMES and WJE
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 3 of 4
A209 (left) and A208 (right) ndash Scaffold construction continues
A206 ndash NW-0A06 demolition in progress
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 4 of 4
A206 ndash Stone salvaged from NW-0A06
A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016
TIME 1000a to 530p DAY OF WEEK Monday
OWNER OMES TEMP RANGE Mid 50s to Lo 60s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Lukasz Lesniak Field Superintendent ndash Mark 1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking and repointing on A206 (Alpha)
Roofing materials being hoisted to the north wing roof
ITEMS DISCUSSED
Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps
there is some cold soak left to perform and sealant removal at window perimeter Temperature
restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this
week to create heated enclosure Discussed the need to monitor temperature and record it not only
on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and
other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is
approximately 50 complete
Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece
(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)
Met with JE Dunn to organize field walk for WJE visit
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 2 of 5
Reviewed window sill conditions including additional condition involving lead sheet flashing at the
bottom of cast iron sills
Temporary protection for built-in gutter
Stone color no word on additional lighter shades to better match light colored existing stones Mark
1 will salvage pieces of usable material where possible from other locations in case it is needed
ACTION REQUIRED
Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation
(TreanorHL)
ITEMS TO VERIFY
REMARKS
Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been
effective overall but the drying times are quite variable Some areas that have not seen water in
over a week are still visibly damp
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 3 of 5
A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in
right photo ndash end of tape is against the window frame in both photos
A208 ndash Residual dampness on A208 from cleaning
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 4 of 5
A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital
A207 ndash Lead T-cap installation for mock up review
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 5 of 5
A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining
material is brittle in some locations Additional detail will be issued for condition as part of forthcoming
ASI Believe this is window 459 ndash type G
A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016
TIME 800a to 12 noon DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE Mid 30s to Lo 50s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Raking on A206 (Alpha)
Substrate and backing conditions at RP repair NW-0A06
Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were
found on the west end of the frieze stone The tie-wire was easily removed from the back up
construction No rivet was found the pocket (which had been cut through) appears to have been
slugged full with mortar as construction progressed
Tarps being hung on A206 (Alpha)
ITEMS DISCUSSED
Protection for weather and monitoring conditions within the enclosure
Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to
moderate efflorescence were noted The most prominent is at the location of the redressing on NE-
0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent
dampness during cleaning operations The scaling that was the impetus for the redressing is located
at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 2 of 5
area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material
the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to
indicate the sealer is present even at this depth Potential sources of salts identified backing
construction penetrating sealer applied to building Area was discussed with WJE personnel
Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the
bottom of the corbel molding Both locations are unique to this elevation
ACTION REQUIRED
Tarp installation on all facades placement and distribution of heating devices including monitoring
devices for temperature (Mark1 and JE Dunn)
Direction for spot cleaning on A208 (Charlie)
ITEMS TO VERIFY
Method for monitoring conditions inside the tarped area (JE Dunn)
REMARKS
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 3 of 5
A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter
round differs from those specified in 1914 but specifications do not mention attachment at concrete
This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over
and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed
A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above
is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 4 of 5
A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been
slugged full with mortar prior to setting course above tie wire pulled freely from backing construction
Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction
aides to plumb up the tall stones during setting
A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No
signs of distress observed but area was dusty and full of debris from demolition
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 5 of 5
A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze
stones
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Phasing amp Schedule Attachments The following documents are included in the subsequent pages
- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Phasing Plan
The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality
Trailer Compound
TUNNEL (will continue across Lincoln)
DELTA
FOX TROT
ECHO
KILO
ALPHA
CHARLIE
GOLF
INDIA
HOTEL
JULIETTE
LIMA
BRAVO
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Utilization Plan
Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices
Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment
The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment
JED
JEDBak
er
Mar
k 1
ProjectOklahoma StateCapitolRehabilitation
Date12072016
DrawingSite UtilizationPlan
Legend -JED Trailer Compound
-Phase 1 Site Fencing
-Gravel laydown
-Fence gate
-Future phases site fencing
-Future phases gravel laydown
EnvAct
Review
JED
Mark 1
JED
Faith
Dumpster
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Window Abatement Tracking Plan
DECEMBER 2016
Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 15 - 2016_12-13docx
Page 6 of 6
Heater at scaffold at west elevation of north wing (Alpha)
Joint raking progressing on north elevation of north wing (Bravo)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 16 DATE 12212016
TIME 330 AM DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE 55deg F
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _________
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction
Landon Heaton Project Engineer - JE Dunn Construction
Tony Talerico Project Engineer - JE Dunn Construction
WORK OBSERVED
The following was observed during this site visit
1 Scaffold erection progressing on north elevation of east wing (Delta)
2 Scaffold tarp installation progressing on east elevation of north wing (Charlie)
3 Cleaning progressing on west elevation of north wing (Alpha)
4 Joint raking progressing on north elevation of north wing (Bravo)
5 Parapet cap removal progressing on west elevation of north wing (Alpha)
ITEMS DISCUSSED
None
ACTION REQUIRED
None
ITEMS TO VERIFY
None
REMARKS
None
OBSERVED BY Peter Breninger (ADG)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 2 of 5
COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross
(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott
(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)
Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve
Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 3 of 5
Scaffold installation progressing on north elevation of east wing (Delta)
Scaffold installation progressing on north elevation of east wing (Delta)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 4 of 5
Scaffold tarp installation progressing on east elevation of north wing (Charlie)
Parapet cap removal progressing on west elevation of north wing (Alpha)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 5 of 5
Parapet cap removal progressing on west elevation of north wing (Alpha)
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Oklahoma State Capitol Stone ChimeraThe following report explains the history behind the stone Chimerarsquos (ldquogriffinsrdquo) that have sat atop the Oklahoma State Capitol for the last 100 years
Chimeras (Griffins) of the Oklahoma State Capitol
Report provided by TreanorHL
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Griffin A bird head and foreshybody and cat rear always with a beak
Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City
Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company
Mythological Cat Creature Examples
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (left side) summer of 1916 shy no chimeras present
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (right side) November 2 1916 shy chimeras set
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti
South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 1 of 4
FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016
TIME 900a to 530p DAY OF WEEK Tuesday
OWNER OMES TEMP RANGE Lo 40s to 60
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
Trait Thompson - OMES
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking on A206 (Alpha)
Demolition for RP2 repair NW-0A06
ITEMS DISCUSSED
With WJE reviewed masonry cleaning processes changes to biological cleaning that have been
necessary to achieve the same results as trial repairs raking and repointing mockups for limestone
and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an
injection repairs patching repairs to limestone and granite See meeting notes from 11302016
follow up meeting to discuss WJE observations regarding the work
With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work
that necessary to make the area complete
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 2 of 4
ACTION REQUIRED
Revisions to repairs on A206 due to discovered conditions (TreanorHL)
bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone
bull at NW-0501 due to condition uncovered by joint raking
ITEMS TO VERIFY
REMARKS
OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes
Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to
tour the scaffold Reviewed window and masonry related work
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A206 ndash Site tour with OMES and WJE
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 3 of 4
A209 (left) and A208 (right) ndash Scaffold construction continues
A206 ndash NW-0A06 demolition in progress
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 4 of 4
A206 ndash Stone salvaged from NW-0A06
A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016
TIME 1000a to 530p DAY OF WEEK Monday
OWNER OMES TEMP RANGE Mid 50s to Lo 60s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Lukasz Lesniak Field Superintendent ndash Mark 1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking and repointing on A206 (Alpha)
Roofing materials being hoisted to the north wing roof
ITEMS DISCUSSED
Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps
there is some cold soak left to perform and sealant removal at window perimeter Temperature
restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this
week to create heated enclosure Discussed the need to monitor temperature and record it not only
on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and
other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is
approximately 50 complete
Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece
(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)
Met with JE Dunn to organize field walk for WJE visit
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 2 of 5
Reviewed window sill conditions including additional condition involving lead sheet flashing at the
bottom of cast iron sills
Temporary protection for built-in gutter
Stone color no word on additional lighter shades to better match light colored existing stones Mark
1 will salvage pieces of usable material where possible from other locations in case it is needed
ACTION REQUIRED
Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation
(TreanorHL)
ITEMS TO VERIFY
REMARKS
Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been
effective overall but the drying times are quite variable Some areas that have not seen water in
over a week are still visibly damp
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 3 of 5
A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in
right photo ndash end of tape is against the window frame in both photos
A208 ndash Residual dampness on A208 from cleaning
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 4 of 5
A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital
A207 ndash Lead T-cap installation for mock up review
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 5 of 5
A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining
material is brittle in some locations Additional detail will be issued for condition as part of forthcoming
ASI Believe this is window 459 ndash type G
A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016
TIME 800a to 12 noon DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE Mid 30s to Lo 50s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Raking on A206 (Alpha)
Substrate and backing conditions at RP repair NW-0A06
Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were
found on the west end of the frieze stone The tie-wire was easily removed from the back up
construction No rivet was found the pocket (which had been cut through) appears to have been
slugged full with mortar as construction progressed
Tarps being hung on A206 (Alpha)
ITEMS DISCUSSED
Protection for weather and monitoring conditions within the enclosure
Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to
moderate efflorescence were noted The most prominent is at the location of the redressing on NE-
0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent
dampness during cleaning operations The scaling that was the impetus for the redressing is located
at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 2 of 5
area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material
the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to
indicate the sealer is present even at this depth Potential sources of salts identified backing
construction penetrating sealer applied to building Area was discussed with WJE personnel
Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the
bottom of the corbel molding Both locations are unique to this elevation
ACTION REQUIRED
Tarp installation on all facades placement and distribution of heating devices including monitoring
devices for temperature (Mark1 and JE Dunn)
Direction for spot cleaning on A208 (Charlie)
ITEMS TO VERIFY
Method for monitoring conditions inside the tarped area (JE Dunn)
REMARKS
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 3 of 5
A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter
round differs from those specified in 1914 but specifications do not mention attachment at concrete
This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over
and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed
A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above
is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 4 of 5
A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been
slugged full with mortar prior to setting course above tie wire pulled freely from backing construction
Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction
aides to plumb up the tall stones during setting
A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No
signs of distress observed but area was dusty and full of debris from demolition
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 5 of 5
A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze
stones
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Phasing amp Schedule Attachments The following documents are included in the subsequent pages
- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Phasing Plan
The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality
Trailer Compound
TUNNEL (will continue across Lincoln)
DELTA
FOX TROT
ECHO
KILO
ALPHA
CHARLIE
GOLF
INDIA
HOTEL
JULIETTE
LIMA
BRAVO
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Utilization Plan
Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices
Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment
The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment
JED
JEDBak
er
Mar
k 1
ProjectOklahoma StateCapitolRehabilitation
Date12072016
DrawingSite UtilizationPlan
Legend -JED Trailer Compound
-Phase 1 Site Fencing
-Gravel laydown
-Fence gate
-Future phases site fencing
-Future phases gravel laydown
EnvAct
Review
JED
Mark 1
JED
Faith
Dumpster
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Window Abatement Tracking Plan
DECEMBER 2016
Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 16 DATE 12212016
TIME 330 AM DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE 55deg F
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _________
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent - JE Dunn Construction
Landon Heaton Project Engineer - JE Dunn Construction
Tony Talerico Project Engineer - JE Dunn Construction
WORK OBSERVED
The following was observed during this site visit
1 Scaffold erection progressing on north elevation of east wing (Delta)
2 Scaffold tarp installation progressing on east elevation of north wing (Charlie)
3 Cleaning progressing on west elevation of north wing (Alpha)
4 Joint raking progressing on north elevation of north wing (Bravo)
5 Parapet cap removal progressing on west elevation of north wing (Alpha)
ITEMS DISCUSSED
None
ACTION REQUIRED
None
ITEMS TO VERIFY
None
REMARKS
None
OBSERVED BY Peter Breninger (ADG)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 2 of 5
COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross
(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott
(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)
Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve
Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 3 of 5
Scaffold installation progressing on north elevation of east wing (Delta)
Scaffold installation progressing on north elevation of east wing (Delta)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 4 of 5
Scaffold tarp installation progressing on east elevation of north wing (Charlie)
Parapet cap removal progressing on west elevation of north wing (Alpha)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 5 of 5
Parapet cap removal progressing on west elevation of north wing (Alpha)
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Oklahoma State Capitol Stone ChimeraThe following report explains the history behind the stone Chimerarsquos (ldquogriffinsrdquo) that have sat atop the Oklahoma State Capitol for the last 100 years
Chimeras (Griffins) of the Oklahoma State Capitol
Report provided by TreanorHL
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Griffin A bird head and foreshybody and cat rear always with a beak
Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City
Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company
Mythological Cat Creature Examples
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (left side) summer of 1916 shy no chimeras present
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (right side) November 2 1916 shy chimeras set
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti
South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 1 of 4
FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016
TIME 900a to 530p DAY OF WEEK Tuesday
OWNER OMES TEMP RANGE Lo 40s to 60
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
Trait Thompson - OMES
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking on A206 (Alpha)
Demolition for RP2 repair NW-0A06
ITEMS DISCUSSED
With WJE reviewed masonry cleaning processes changes to biological cleaning that have been
necessary to achieve the same results as trial repairs raking and repointing mockups for limestone
and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an
injection repairs patching repairs to limestone and granite See meeting notes from 11302016
follow up meeting to discuss WJE observations regarding the work
With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work
that necessary to make the area complete
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 2 of 4
ACTION REQUIRED
Revisions to repairs on A206 due to discovered conditions (TreanorHL)
bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone
bull at NW-0501 due to condition uncovered by joint raking
ITEMS TO VERIFY
REMARKS
OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes
Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to
tour the scaffold Reviewed window and masonry related work
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A206 ndash Site tour with OMES and WJE
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 3 of 4
A209 (left) and A208 (right) ndash Scaffold construction continues
A206 ndash NW-0A06 demolition in progress
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 4 of 4
A206 ndash Stone salvaged from NW-0A06
A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016
TIME 1000a to 530p DAY OF WEEK Monday
OWNER OMES TEMP RANGE Mid 50s to Lo 60s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Lukasz Lesniak Field Superintendent ndash Mark 1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking and repointing on A206 (Alpha)
Roofing materials being hoisted to the north wing roof
ITEMS DISCUSSED
Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps
there is some cold soak left to perform and sealant removal at window perimeter Temperature
restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this
week to create heated enclosure Discussed the need to monitor temperature and record it not only
on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and
other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is
approximately 50 complete
Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece
(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)
Met with JE Dunn to organize field walk for WJE visit
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 2 of 5
Reviewed window sill conditions including additional condition involving lead sheet flashing at the
bottom of cast iron sills
Temporary protection for built-in gutter
Stone color no word on additional lighter shades to better match light colored existing stones Mark
1 will salvage pieces of usable material where possible from other locations in case it is needed
ACTION REQUIRED
Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation
(TreanorHL)
ITEMS TO VERIFY
REMARKS
Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been
effective overall but the drying times are quite variable Some areas that have not seen water in
over a week are still visibly damp
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 3 of 5
A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in
right photo ndash end of tape is against the window frame in both photos
A208 ndash Residual dampness on A208 from cleaning
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 4 of 5
A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital
A207 ndash Lead T-cap installation for mock up review
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 5 of 5
A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining
material is brittle in some locations Additional detail will be issued for condition as part of forthcoming
ASI Believe this is window 459 ndash type G
A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016
TIME 800a to 12 noon DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE Mid 30s to Lo 50s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Raking on A206 (Alpha)
Substrate and backing conditions at RP repair NW-0A06
Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were
found on the west end of the frieze stone The tie-wire was easily removed from the back up
construction No rivet was found the pocket (which had been cut through) appears to have been
slugged full with mortar as construction progressed
Tarps being hung on A206 (Alpha)
ITEMS DISCUSSED
Protection for weather and monitoring conditions within the enclosure
Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to
moderate efflorescence were noted The most prominent is at the location of the redressing on NE-
0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent
dampness during cleaning operations The scaling that was the impetus for the redressing is located
at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 2 of 5
area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material
the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to
indicate the sealer is present even at this depth Potential sources of salts identified backing
construction penetrating sealer applied to building Area was discussed with WJE personnel
Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the
bottom of the corbel molding Both locations are unique to this elevation
ACTION REQUIRED
Tarp installation on all facades placement and distribution of heating devices including monitoring
devices for temperature (Mark1 and JE Dunn)
Direction for spot cleaning on A208 (Charlie)
ITEMS TO VERIFY
Method for monitoring conditions inside the tarped area (JE Dunn)
REMARKS
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 3 of 5
A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter
round differs from those specified in 1914 but specifications do not mention attachment at concrete
This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over
and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed
A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above
is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 4 of 5
A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been
slugged full with mortar prior to setting course above tie wire pulled freely from backing construction
Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction
aides to plumb up the tall stones during setting
A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No
signs of distress observed but area was dusty and full of debris from demolition
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 5 of 5
A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze
stones
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Phasing amp Schedule Attachments The following documents are included in the subsequent pages
- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Phasing Plan
The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality
Trailer Compound
TUNNEL (will continue across Lincoln)
DELTA
FOX TROT
ECHO
KILO
ALPHA
CHARLIE
GOLF
INDIA
HOTEL
JULIETTE
LIMA
BRAVO
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Utilization Plan
Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices
Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment
The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment
JED
JEDBak
er
Mar
k 1
ProjectOklahoma StateCapitolRehabilitation
Date12072016
DrawingSite UtilizationPlan
Legend -JED Trailer Compound
-Phase 1 Site Fencing
-Gravel laydown
-Fence gate
-Future phases site fencing
-Future phases gravel laydown
EnvAct
Review
JED
Mark 1
JED
Faith
Dumpster
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Window Abatement Tracking Plan
DECEMBER 2016
Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 2 of 5
COPIES TO Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE Dunn) Lindsey Ross
(JE Dunn) Lynnsee Boyse (JE Dunn) Mark Maska (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (TreanorHL) Mariah Scott
(TreanorHL) Todd Renyer (TreanorHL) Vance Kelley (TreanorHL) Mike Thompson (ZFI)
Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs (Alvine) Sam Haberman (Alvine) Steve
Alvine (Alvine) Gary Noland (Smith Roberts Baldischwiler)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 3 of 5
Scaffold installation progressing on north elevation of east wing (Delta)
Scaffold installation progressing on north elevation of east wing (Delta)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 4 of 5
Scaffold tarp installation progressing on east elevation of north wing (Charlie)
Parapet cap removal progressing on west elevation of north wing (Alpha)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 5 of 5
Parapet cap removal progressing on west elevation of north wing (Alpha)
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Oklahoma State Capitol Stone ChimeraThe following report explains the history behind the stone Chimerarsquos (ldquogriffinsrdquo) that have sat atop the Oklahoma State Capitol for the last 100 years
Chimeras (Griffins) of the Oklahoma State Capitol
Report provided by TreanorHL
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Griffin A bird head and foreshybody and cat rear always with a beak
Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City
Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company
Mythological Cat Creature Examples
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (left side) summer of 1916 shy no chimeras present
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (right side) November 2 1916 shy chimeras set
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti
South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 1 of 4
FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016
TIME 900a to 530p DAY OF WEEK Tuesday
OWNER OMES TEMP RANGE Lo 40s to 60
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
Trait Thompson - OMES
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking on A206 (Alpha)
Demolition for RP2 repair NW-0A06
ITEMS DISCUSSED
With WJE reviewed masonry cleaning processes changes to biological cleaning that have been
necessary to achieve the same results as trial repairs raking and repointing mockups for limestone
and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an
injection repairs patching repairs to limestone and granite See meeting notes from 11302016
follow up meeting to discuss WJE observations regarding the work
With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work
that necessary to make the area complete
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 2 of 4
ACTION REQUIRED
Revisions to repairs on A206 due to discovered conditions (TreanorHL)
bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone
bull at NW-0501 due to condition uncovered by joint raking
ITEMS TO VERIFY
REMARKS
OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes
Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to
tour the scaffold Reviewed window and masonry related work
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A206 ndash Site tour with OMES and WJE
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 3 of 4
A209 (left) and A208 (right) ndash Scaffold construction continues
A206 ndash NW-0A06 demolition in progress
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 4 of 4
A206 ndash Stone salvaged from NW-0A06
A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016
TIME 1000a to 530p DAY OF WEEK Monday
OWNER OMES TEMP RANGE Mid 50s to Lo 60s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Lukasz Lesniak Field Superintendent ndash Mark 1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking and repointing on A206 (Alpha)
Roofing materials being hoisted to the north wing roof
ITEMS DISCUSSED
Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps
there is some cold soak left to perform and sealant removal at window perimeter Temperature
restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this
week to create heated enclosure Discussed the need to monitor temperature and record it not only
on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and
other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is
approximately 50 complete
Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece
(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)
Met with JE Dunn to organize field walk for WJE visit
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 2 of 5
Reviewed window sill conditions including additional condition involving lead sheet flashing at the
bottom of cast iron sills
Temporary protection for built-in gutter
Stone color no word on additional lighter shades to better match light colored existing stones Mark
1 will salvage pieces of usable material where possible from other locations in case it is needed
ACTION REQUIRED
Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation
(TreanorHL)
ITEMS TO VERIFY
REMARKS
Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been
effective overall but the drying times are quite variable Some areas that have not seen water in
over a week are still visibly damp
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 3 of 5
A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in
right photo ndash end of tape is against the window frame in both photos
A208 ndash Residual dampness on A208 from cleaning
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 4 of 5
A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital
A207 ndash Lead T-cap installation for mock up review
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 5 of 5
A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining
material is brittle in some locations Additional detail will be issued for condition as part of forthcoming
ASI Believe this is window 459 ndash type G
A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016
TIME 800a to 12 noon DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE Mid 30s to Lo 50s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Raking on A206 (Alpha)
Substrate and backing conditions at RP repair NW-0A06
Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were
found on the west end of the frieze stone The tie-wire was easily removed from the back up
construction No rivet was found the pocket (which had been cut through) appears to have been
slugged full with mortar as construction progressed
Tarps being hung on A206 (Alpha)
ITEMS DISCUSSED
Protection for weather and monitoring conditions within the enclosure
Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to
moderate efflorescence were noted The most prominent is at the location of the redressing on NE-
0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent
dampness during cleaning operations The scaling that was the impetus for the redressing is located
at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 2 of 5
area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material
the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to
indicate the sealer is present even at this depth Potential sources of salts identified backing
construction penetrating sealer applied to building Area was discussed with WJE personnel
Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the
bottom of the corbel molding Both locations are unique to this elevation
ACTION REQUIRED
Tarp installation on all facades placement and distribution of heating devices including monitoring
devices for temperature (Mark1 and JE Dunn)
Direction for spot cleaning on A208 (Charlie)
ITEMS TO VERIFY
Method for monitoring conditions inside the tarped area (JE Dunn)
REMARKS
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 3 of 5
A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter
round differs from those specified in 1914 but specifications do not mention attachment at concrete
This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over
and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed
A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above
is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 4 of 5
A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been
slugged full with mortar prior to setting course above tie wire pulled freely from backing construction
Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction
aides to plumb up the tall stones during setting
A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No
signs of distress observed but area was dusty and full of debris from demolition
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 5 of 5
A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze
stones
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Phasing amp Schedule Attachments The following documents are included in the subsequent pages
- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Phasing Plan
The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality
Trailer Compound
TUNNEL (will continue across Lincoln)
DELTA
FOX TROT
ECHO
KILO
ALPHA
CHARLIE
GOLF
INDIA
HOTEL
JULIETTE
LIMA
BRAVO
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Utilization Plan
Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices
Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment
The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment
JED
JEDBak
er
Mar
k 1
ProjectOklahoma StateCapitolRehabilitation
Date12072016
DrawingSite UtilizationPlan
Legend -JED Trailer Compound
-Phase 1 Site Fencing
-Gravel laydown
-Fence gate
-Future phases site fencing
-Future phases gravel laydown
EnvAct
Review
JED
Mark 1
JED
Faith
Dumpster
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Window Abatement Tracking Plan
DECEMBER 2016
Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 3 of 5
Scaffold installation progressing on north elevation of east wing (Delta)
Scaffold installation progressing on north elevation of east wing (Delta)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 4 of 5
Scaffold tarp installation progressing on east elevation of north wing (Charlie)
Parapet cap removal progressing on west elevation of north wing (Alpha)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 5 of 5
Parapet cap removal progressing on west elevation of north wing (Alpha)
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Oklahoma State Capitol Stone ChimeraThe following report explains the history behind the stone Chimerarsquos (ldquogriffinsrdquo) that have sat atop the Oklahoma State Capitol for the last 100 years
Chimeras (Griffins) of the Oklahoma State Capitol
Report provided by TreanorHL
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Griffin A bird head and foreshybody and cat rear always with a beak
Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City
Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company
Mythological Cat Creature Examples
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (left side) summer of 1916 shy no chimeras present
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (right side) November 2 1916 shy chimeras set
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti
South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 1 of 4
FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016
TIME 900a to 530p DAY OF WEEK Tuesday
OWNER OMES TEMP RANGE Lo 40s to 60
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
Trait Thompson - OMES
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking on A206 (Alpha)
Demolition for RP2 repair NW-0A06
ITEMS DISCUSSED
With WJE reviewed masonry cleaning processes changes to biological cleaning that have been
necessary to achieve the same results as trial repairs raking and repointing mockups for limestone
and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an
injection repairs patching repairs to limestone and granite See meeting notes from 11302016
follow up meeting to discuss WJE observations regarding the work
With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work
that necessary to make the area complete
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 2 of 4
ACTION REQUIRED
Revisions to repairs on A206 due to discovered conditions (TreanorHL)
bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone
bull at NW-0501 due to condition uncovered by joint raking
ITEMS TO VERIFY
REMARKS
OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes
Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to
tour the scaffold Reviewed window and masonry related work
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A206 ndash Site tour with OMES and WJE
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 3 of 4
A209 (left) and A208 (right) ndash Scaffold construction continues
A206 ndash NW-0A06 demolition in progress
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 4 of 4
A206 ndash Stone salvaged from NW-0A06
A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016
TIME 1000a to 530p DAY OF WEEK Monday
OWNER OMES TEMP RANGE Mid 50s to Lo 60s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Lukasz Lesniak Field Superintendent ndash Mark 1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking and repointing on A206 (Alpha)
Roofing materials being hoisted to the north wing roof
ITEMS DISCUSSED
Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps
there is some cold soak left to perform and sealant removal at window perimeter Temperature
restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this
week to create heated enclosure Discussed the need to monitor temperature and record it not only
on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and
other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is
approximately 50 complete
Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece
(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)
Met with JE Dunn to organize field walk for WJE visit
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 2 of 5
Reviewed window sill conditions including additional condition involving lead sheet flashing at the
bottom of cast iron sills
Temporary protection for built-in gutter
Stone color no word on additional lighter shades to better match light colored existing stones Mark
1 will salvage pieces of usable material where possible from other locations in case it is needed
ACTION REQUIRED
Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation
(TreanorHL)
ITEMS TO VERIFY
REMARKS
Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been
effective overall but the drying times are quite variable Some areas that have not seen water in
over a week are still visibly damp
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 3 of 5
A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in
right photo ndash end of tape is against the window frame in both photos
A208 ndash Residual dampness on A208 from cleaning
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 4 of 5
A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital
A207 ndash Lead T-cap installation for mock up review
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 5 of 5
A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining
material is brittle in some locations Additional detail will be issued for condition as part of forthcoming
ASI Believe this is window 459 ndash type G
A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016
TIME 800a to 12 noon DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE Mid 30s to Lo 50s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Raking on A206 (Alpha)
Substrate and backing conditions at RP repair NW-0A06
Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were
found on the west end of the frieze stone The tie-wire was easily removed from the back up
construction No rivet was found the pocket (which had been cut through) appears to have been
slugged full with mortar as construction progressed
Tarps being hung on A206 (Alpha)
ITEMS DISCUSSED
Protection for weather and monitoring conditions within the enclosure
Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to
moderate efflorescence were noted The most prominent is at the location of the redressing on NE-
0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent
dampness during cleaning operations The scaling that was the impetus for the redressing is located
at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 2 of 5
area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material
the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to
indicate the sealer is present even at this depth Potential sources of salts identified backing
construction penetrating sealer applied to building Area was discussed with WJE personnel
Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the
bottom of the corbel molding Both locations are unique to this elevation
ACTION REQUIRED
Tarp installation on all facades placement and distribution of heating devices including monitoring
devices for temperature (Mark1 and JE Dunn)
Direction for spot cleaning on A208 (Charlie)
ITEMS TO VERIFY
Method for monitoring conditions inside the tarped area (JE Dunn)
REMARKS
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 3 of 5
A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter
round differs from those specified in 1914 but specifications do not mention attachment at concrete
This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over
and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed
A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above
is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 4 of 5
A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been
slugged full with mortar prior to setting course above tie wire pulled freely from backing construction
Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction
aides to plumb up the tall stones during setting
A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No
signs of distress observed but area was dusty and full of debris from demolition
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 5 of 5
A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze
stones
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Phasing amp Schedule Attachments The following documents are included in the subsequent pages
- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Phasing Plan
The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality
Trailer Compound
TUNNEL (will continue across Lincoln)
DELTA
FOX TROT
ECHO
KILO
ALPHA
CHARLIE
GOLF
INDIA
HOTEL
JULIETTE
LIMA
BRAVO
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Utilization Plan
Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices
Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment
The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment
JED
JEDBak
er
Mar
k 1
ProjectOklahoma StateCapitolRehabilitation
Date12072016
DrawingSite UtilizationPlan
Legend -JED Trailer Compound
-Phase 1 Site Fencing
-Gravel laydown
-Fence gate
-Future phases site fencing
-Future phases gravel laydown
EnvAct
Review
JED
Mark 1
JED
Faith
Dumpster
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Window Abatement Tracking Plan
DECEMBER 2016
Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 4 of 5
Scaffold tarp installation progressing on east elevation of north wing (Charlie)
Parapet cap removal progressing on west elevation of north wing (Alpha)
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 5 of 5
Parapet cap removal progressing on west elevation of north wing (Alpha)
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Oklahoma State Capitol Stone ChimeraThe following report explains the history behind the stone Chimerarsquos (ldquogriffinsrdquo) that have sat atop the Oklahoma State Capitol for the last 100 years
Chimeras (Griffins) of the Oklahoma State Capitol
Report provided by TreanorHL
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Griffin A bird head and foreshybody and cat rear always with a beak
Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City
Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company
Mythological Cat Creature Examples
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (left side) summer of 1916 shy no chimeras present
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (right side) November 2 1916 shy chimeras set
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti
South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 1 of 4
FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016
TIME 900a to 530p DAY OF WEEK Tuesday
OWNER OMES TEMP RANGE Lo 40s to 60
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
Trait Thompson - OMES
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking on A206 (Alpha)
Demolition for RP2 repair NW-0A06
ITEMS DISCUSSED
With WJE reviewed masonry cleaning processes changes to biological cleaning that have been
necessary to achieve the same results as trial repairs raking and repointing mockups for limestone
and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an
injection repairs patching repairs to limestone and granite See meeting notes from 11302016
follow up meeting to discuss WJE observations regarding the work
With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work
that necessary to make the area complete
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 2 of 4
ACTION REQUIRED
Revisions to repairs on A206 due to discovered conditions (TreanorHL)
bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone
bull at NW-0501 due to condition uncovered by joint raking
ITEMS TO VERIFY
REMARKS
OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes
Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to
tour the scaffold Reviewed window and masonry related work
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A206 ndash Site tour with OMES and WJE
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 3 of 4
A209 (left) and A208 (right) ndash Scaffold construction continues
A206 ndash NW-0A06 demolition in progress
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 4 of 4
A206 ndash Stone salvaged from NW-0A06
A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016
TIME 1000a to 530p DAY OF WEEK Monday
OWNER OMES TEMP RANGE Mid 50s to Lo 60s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Lukasz Lesniak Field Superintendent ndash Mark 1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking and repointing on A206 (Alpha)
Roofing materials being hoisted to the north wing roof
ITEMS DISCUSSED
Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps
there is some cold soak left to perform and sealant removal at window perimeter Temperature
restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this
week to create heated enclosure Discussed the need to monitor temperature and record it not only
on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and
other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is
approximately 50 complete
Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece
(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)
Met with JE Dunn to organize field walk for WJE visit
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 2 of 5
Reviewed window sill conditions including additional condition involving lead sheet flashing at the
bottom of cast iron sills
Temporary protection for built-in gutter
Stone color no word on additional lighter shades to better match light colored existing stones Mark
1 will salvage pieces of usable material where possible from other locations in case it is needed
ACTION REQUIRED
Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation
(TreanorHL)
ITEMS TO VERIFY
REMARKS
Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been
effective overall but the drying times are quite variable Some areas that have not seen water in
over a week are still visibly damp
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 3 of 5
A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in
right photo ndash end of tape is against the window frame in both photos
A208 ndash Residual dampness on A208 from cleaning
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 4 of 5
A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital
A207 ndash Lead T-cap installation for mock up review
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 5 of 5
A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining
material is brittle in some locations Additional detail will be issued for condition as part of forthcoming
ASI Believe this is window 459 ndash type G
A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016
TIME 800a to 12 noon DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE Mid 30s to Lo 50s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Raking on A206 (Alpha)
Substrate and backing conditions at RP repair NW-0A06
Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were
found on the west end of the frieze stone The tie-wire was easily removed from the back up
construction No rivet was found the pocket (which had been cut through) appears to have been
slugged full with mortar as construction progressed
Tarps being hung on A206 (Alpha)
ITEMS DISCUSSED
Protection for weather and monitoring conditions within the enclosure
Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to
moderate efflorescence were noted The most prominent is at the location of the redressing on NE-
0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent
dampness during cleaning operations The scaling that was the impetus for the redressing is located
at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 2 of 5
area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material
the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to
indicate the sealer is present even at this depth Potential sources of salts identified backing
construction penetrating sealer applied to building Area was discussed with WJE personnel
Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the
bottom of the corbel molding Both locations are unique to this elevation
ACTION REQUIRED
Tarp installation on all facades placement and distribution of heating devices including monitoring
devices for temperature (Mark1 and JE Dunn)
Direction for spot cleaning on A208 (Charlie)
ITEMS TO VERIFY
Method for monitoring conditions inside the tarped area (JE Dunn)
REMARKS
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 3 of 5
A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter
round differs from those specified in 1914 but specifications do not mention attachment at concrete
This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over
and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed
A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above
is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 4 of 5
A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been
slugged full with mortar prior to setting course above tie wire pulled freely from backing construction
Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction
aides to plumb up the tall stones during setting
A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No
signs of distress observed but area was dusty and full of debris from demolition
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 5 of 5
A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze
stones
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Phasing amp Schedule Attachments The following documents are included in the subsequent pages
- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Phasing Plan
The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality
Trailer Compound
TUNNEL (will continue across Lincoln)
DELTA
FOX TROT
ECHO
KILO
ALPHA
CHARLIE
GOLF
INDIA
HOTEL
JULIETTE
LIMA
BRAVO
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Utilization Plan
Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices
Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment
The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment
JED
JEDBak
er
Mar
k 1
ProjectOklahoma StateCapitolRehabilitation
Date12072016
DrawingSite UtilizationPlan
Legend -JED Trailer Compound
-Phase 1 Site Fencing
-Gravel laydown
-Fence gate
-Future phases site fencing
-Future phases gravel laydown
EnvAct
Review
JED
Mark 1
JED
Faith
Dumpster
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Window Abatement Tracking Plan
DECEMBER 2016
Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
POklahoma State Capitol15-007 Capitol Renovation ExteriorConstruction AdministrationField
ReportsOSCR FR 16 - 2016_12-21docx
Page 5 of 5
Parapet cap removal progressing on west elevation of north wing (Alpha)
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Oklahoma State Capitol Stone ChimeraThe following report explains the history behind the stone Chimerarsquos (ldquogriffinsrdquo) that have sat atop the Oklahoma State Capitol for the last 100 years
Chimeras (Griffins) of the Oklahoma State Capitol
Report provided by TreanorHL
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Griffin A bird head and foreshybody and cat rear always with a beak
Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City
Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company
Mythological Cat Creature Examples
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (left side) summer of 1916 shy no chimeras present
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (right side) November 2 1916 shy chimeras set
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti
South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 1 of 4
FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016
TIME 900a to 530p DAY OF WEEK Tuesday
OWNER OMES TEMP RANGE Lo 40s to 60
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
Trait Thompson - OMES
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking on A206 (Alpha)
Demolition for RP2 repair NW-0A06
ITEMS DISCUSSED
With WJE reviewed masonry cleaning processes changes to biological cleaning that have been
necessary to achieve the same results as trial repairs raking and repointing mockups for limestone
and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an
injection repairs patching repairs to limestone and granite See meeting notes from 11302016
follow up meeting to discuss WJE observations regarding the work
With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work
that necessary to make the area complete
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 2 of 4
ACTION REQUIRED
Revisions to repairs on A206 due to discovered conditions (TreanorHL)
bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone
bull at NW-0501 due to condition uncovered by joint raking
ITEMS TO VERIFY
REMARKS
OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes
Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to
tour the scaffold Reviewed window and masonry related work
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A206 ndash Site tour with OMES and WJE
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 3 of 4
A209 (left) and A208 (right) ndash Scaffold construction continues
A206 ndash NW-0A06 demolition in progress
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 4 of 4
A206 ndash Stone salvaged from NW-0A06
A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016
TIME 1000a to 530p DAY OF WEEK Monday
OWNER OMES TEMP RANGE Mid 50s to Lo 60s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Lukasz Lesniak Field Superintendent ndash Mark 1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking and repointing on A206 (Alpha)
Roofing materials being hoisted to the north wing roof
ITEMS DISCUSSED
Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps
there is some cold soak left to perform and sealant removal at window perimeter Temperature
restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this
week to create heated enclosure Discussed the need to monitor temperature and record it not only
on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and
other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is
approximately 50 complete
Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece
(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)
Met with JE Dunn to organize field walk for WJE visit
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 2 of 5
Reviewed window sill conditions including additional condition involving lead sheet flashing at the
bottom of cast iron sills
Temporary protection for built-in gutter
Stone color no word on additional lighter shades to better match light colored existing stones Mark
1 will salvage pieces of usable material where possible from other locations in case it is needed
ACTION REQUIRED
Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation
(TreanorHL)
ITEMS TO VERIFY
REMARKS
Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been
effective overall but the drying times are quite variable Some areas that have not seen water in
over a week are still visibly damp
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 3 of 5
A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in
right photo ndash end of tape is against the window frame in both photos
A208 ndash Residual dampness on A208 from cleaning
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 4 of 5
A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital
A207 ndash Lead T-cap installation for mock up review
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 5 of 5
A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining
material is brittle in some locations Additional detail will be issued for condition as part of forthcoming
ASI Believe this is window 459 ndash type G
A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016
TIME 800a to 12 noon DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE Mid 30s to Lo 50s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Raking on A206 (Alpha)
Substrate and backing conditions at RP repair NW-0A06
Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were
found on the west end of the frieze stone The tie-wire was easily removed from the back up
construction No rivet was found the pocket (which had been cut through) appears to have been
slugged full with mortar as construction progressed
Tarps being hung on A206 (Alpha)
ITEMS DISCUSSED
Protection for weather and monitoring conditions within the enclosure
Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to
moderate efflorescence were noted The most prominent is at the location of the redressing on NE-
0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent
dampness during cleaning operations The scaling that was the impetus for the redressing is located
at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 2 of 5
area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material
the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to
indicate the sealer is present even at this depth Potential sources of salts identified backing
construction penetrating sealer applied to building Area was discussed with WJE personnel
Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the
bottom of the corbel molding Both locations are unique to this elevation
ACTION REQUIRED
Tarp installation on all facades placement and distribution of heating devices including monitoring
devices for temperature (Mark1 and JE Dunn)
Direction for spot cleaning on A208 (Charlie)
ITEMS TO VERIFY
Method for monitoring conditions inside the tarped area (JE Dunn)
REMARKS
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 3 of 5
A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter
round differs from those specified in 1914 but specifications do not mention attachment at concrete
This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over
and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed
A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above
is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 4 of 5
A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been
slugged full with mortar prior to setting course above tie wire pulled freely from backing construction
Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction
aides to plumb up the tall stones during setting
A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No
signs of distress observed but area was dusty and full of debris from demolition
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 5 of 5
A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze
stones
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Phasing amp Schedule Attachments The following documents are included in the subsequent pages
- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Phasing Plan
The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality
Trailer Compound
TUNNEL (will continue across Lincoln)
DELTA
FOX TROT
ECHO
KILO
ALPHA
CHARLIE
GOLF
INDIA
HOTEL
JULIETTE
LIMA
BRAVO
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Utilization Plan
Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices
Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment
The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment
JED
JEDBak
er
Mar
k 1
ProjectOklahoma StateCapitolRehabilitation
Date12072016
DrawingSite UtilizationPlan
Legend -JED Trailer Compound
-Phase 1 Site Fencing
-Gravel laydown
-Fence gate
-Future phases site fencing
-Future phases gravel laydown
EnvAct
Review
JED
Mark 1
JED
Faith
Dumpster
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Window Abatement Tracking Plan
DECEMBER 2016
Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Oklahoma State Capitol Stone ChimeraThe following report explains the history behind the stone Chimerarsquos (ldquogriffinsrdquo) that have sat atop the Oklahoma State Capitol for the last 100 years
Chimeras (Griffins) of the Oklahoma State Capitol
Report provided by TreanorHL
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Griffin A bird head and foreshybody and cat rear always with a beak
Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City
Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company
Mythological Cat Creature Examples
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (left side) summer of 1916 shy no chimeras present
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (right side) November 2 1916 shy chimeras set
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti
South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 1 of 4
FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016
TIME 900a to 530p DAY OF WEEK Tuesday
OWNER OMES TEMP RANGE Lo 40s to 60
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
Trait Thompson - OMES
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking on A206 (Alpha)
Demolition for RP2 repair NW-0A06
ITEMS DISCUSSED
With WJE reviewed masonry cleaning processes changes to biological cleaning that have been
necessary to achieve the same results as trial repairs raking and repointing mockups for limestone
and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an
injection repairs patching repairs to limestone and granite See meeting notes from 11302016
follow up meeting to discuss WJE observations regarding the work
With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work
that necessary to make the area complete
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 2 of 4
ACTION REQUIRED
Revisions to repairs on A206 due to discovered conditions (TreanorHL)
bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone
bull at NW-0501 due to condition uncovered by joint raking
ITEMS TO VERIFY
REMARKS
OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes
Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to
tour the scaffold Reviewed window and masonry related work
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A206 ndash Site tour with OMES and WJE
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 3 of 4
A209 (left) and A208 (right) ndash Scaffold construction continues
A206 ndash NW-0A06 demolition in progress
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 4 of 4
A206 ndash Stone salvaged from NW-0A06
A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016
TIME 1000a to 530p DAY OF WEEK Monday
OWNER OMES TEMP RANGE Mid 50s to Lo 60s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Lukasz Lesniak Field Superintendent ndash Mark 1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking and repointing on A206 (Alpha)
Roofing materials being hoisted to the north wing roof
ITEMS DISCUSSED
Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps
there is some cold soak left to perform and sealant removal at window perimeter Temperature
restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this
week to create heated enclosure Discussed the need to monitor temperature and record it not only
on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and
other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is
approximately 50 complete
Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece
(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)
Met with JE Dunn to organize field walk for WJE visit
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 2 of 5
Reviewed window sill conditions including additional condition involving lead sheet flashing at the
bottom of cast iron sills
Temporary protection for built-in gutter
Stone color no word on additional lighter shades to better match light colored existing stones Mark
1 will salvage pieces of usable material where possible from other locations in case it is needed
ACTION REQUIRED
Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation
(TreanorHL)
ITEMS TO VERIFY
REMARKS
Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been
effective overall but the drying times are quite variable Some areas that have not seen water in
over a week are still visibly damp
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 3 of 5
A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in
right photo ndash end of tape is against the window frame in both photos
A208 ndash Residual dampness on A208 from cleaning
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 4 of 5
A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital
A207 ndash Lead T-cap installation for mock up review
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 5 of 5
A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining
material is brittle in some locations Additional detail will be issued for condition as part of forthcoming
ASI Believe this is window 459 ndash type G
A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016
TIME 800a to 12 noon DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE Mid 30s to Lo 50s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Raking on A206 (Alpha)
Substrate and backing conditions at RP repair NW-0A06
Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were
found on the west end of the frieze stone The tie-wire was easily removed from the back up
construction No rivet was found the pocket (which had been cut through) appears to have been
slugged full with mortar as construction progressed
Tarps being hung on A206 (Alpha)
ITEMS DISCUSSED
Protection for weather and monitoring conditions within the enclosure
Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to
moderate efflorescence were noted The most prominent is at the location of the redressing on NE-
0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent
dampness during cleaning operations The scaling that was the impetus for the redressing is located
at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 2 of 5
area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material
the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to
indicate the sealer is present even at this depth Potential sources of salts identified backing
construction penetrating sealer applied to building Area was discussed with WJE personnel
Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the
bottom of the corbel molding Both locations are unique to this elevation
ACTION REQUIRED
Tarp installation on all facades placement and distribution of heating devices including monitoring
devices for temperature (Mark1 and JE Dunn)
Direction for spot cleaning on A208 (Charlie)
ITEMS TO VERIFY
Method for monitoring conditions inside the tarped area (JE Dunn)
REMARKS
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 3 of 5
A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter
round differs from those specified in 1914 but specifications do not mention attachment at concrete
This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over
and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed
A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above
is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 4 of 5
A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been
slugged full with mortar prior to setting course above tie wire pulled freely from backing construction
Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction
aides to plumb up the tall stones during setting
A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No
signs of distress observed but area was dusty and full of debris from demolition
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 5 of 5
A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze
stones
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Phasing amp Schedule Attachments The following documents are included in the subsequent pages
- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Phasing Plan
The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality
Trailer Compound
TUNNEL (will continue across Lincoln)
DELTA
FOX TROT
ECHO
KILO
ALPHA
CHARLIE
GOLF
INDIA
HOTEL
JULIETTE
LIMA
BRAVO
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Utilization Plan
Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices
Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment
The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment
JED
JEDBak
er
Mar
k 1
ProjectOklahoma StateCapitolRehabilitation
Date12072016
DrawingSite UtilizationPlan
Legend -JED Trailer Compound
-Phase 1 Site Fencing
-Gravel laydown
-Fence gate
-Future phases site fencing
-Future phases gravel laydown
EnvAct
Review
JED
Mark 1
JED
Faith
Dumpster
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Window Abatement Tracking Plan
DECEMBER 2016
Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Griffin A bird head and foreshybody and cat rear always with a beak
Sphinx A cat usually with a human face This is a sphinx produced by the Sheaamp Donnelly Company for the Liberty Memorial in Kansas City
Chimera A winged cat or any other fanciful combination of animals Previousreports have called this element a griffin and we have continued the use of thatterm for consistency in the documentation The chimera at the Oklahoma StateCapitol were produced by the Shea Donnelly amp Gilberson Company
Mythological Cat Creature Examples
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (left side) summer of 1916 shy no chimeras present
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (right side) November 2 1916 shy chimeras set
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti
South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 1 of 4
FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016
TIME 900a to 530p DAY OF WEEK Tuesday
OWNER OMES TEMP RANGE Lo 40s to 60
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
Trait Thompson - OMES
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking on A206 (Alpha)
Demolition for RP2 repair NW-0A06
ITEMS DISCUSSED
With WJE reviewed masonry cleaning processes changes to biological cleaning that have been
necessary to achieve the same results as trial repairs raking and repointing mockups for limestone
and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an
injection repairs patching repairs to limestone and granite See meeting notes from 11302016
follow up meeting to discuss WJE observations regarding the work
With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work
that necessary to make the area complete
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 2 of 4
ACTION REQUIRED
Revisions to repairs on A206 due to discovered conditions (TreanorHL)
bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone
bull at NW-0501 due to condition uncovered by joint raking
ITEMS TO VERIFY
REMARKS
OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes
Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to
tour the scaffold Reviewed window and masonry related work
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A206 ndash Site tour with OMES and WJE
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 3 of 4
A209 (left) and A208 (right) ndash Scaffold construction continues
A206 ndash NW-0A06 demolition in progress
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 4 of 4
A206 ndash Stone salvaged from NW-0A06
A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016
TIME 1000a to 530p DAY OF WEEK Monday
OWNER OMES TEMP RANGE Mid 50s to Lo 60s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Lukasz Lesniak Field Superintendent ndash Mark 1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking and repointing on A206 (Alpha)
Roofing materials being hoisted to the north wing roof
ITEMS DISCUSSED
Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps
there is some cold soak left to perform and sealant removal at window perimeter Temperature
restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this
week to create heated enclosure Discussed the need to monitor temperature and record it not only
on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and
other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is
approximately 50 complete
Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece
(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)
Met with JE Dunn to organize field walk for WJE visit
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 2 of 5
Reviewed window sill conditions including additional condition involving lead sheet flashing at the
bottom of cast iron sills
Temporary protection for built-in gutter
Stone color no word on additional lighter shades to better match light colored existing stones Mark
1 will salvage pieces of usable material where possible from other locations in case it is needed
ACTION REQUIRED
Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation
(TreanorHL)
ITEMS TO VERIFY
REMARKS
Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been
effective overall but the drying times are quite variable Some areas that have not seen water in
over a week are still visibly damp
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 3 of 5
A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in
right photo ndash end of tape is against the window frame in both photos
A208 ndash Residual dampness on A208 from cleaning
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 4 of 5
A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital
A207 ndash Lead T-cap installation for mock up review
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 5 of 5
A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining
material is brittle in some locations Additional detail will be issued for condition as part of forthcoming
ASI Believe this is window 459 ndash type G
A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016
TIME 800a to 12 noon DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE Mid 30s to Lo 50s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Raking on A206 (Alpha)
Substrate and backing conditions at RP repair NW-0A06
Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were
found on the west end of the frieze stone The tie-wire was easily removed from the back up
construction No rivet was found the pocket (which had been cut through) appears to have been
slugged full with mortar as construction progressed
Tarps being hung on A206 (Alpha)
ITEMS DISCUSSED
Protection for weather and monitoring conditions within the enclosure
Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to
moderate efflorescence were noted The most prominent is at the location of the redressing on NE-
0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent
dampness during cleaning operations The scaling that was the impetus for the redressing is located
at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 2 of 5
area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material
the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to
indicate the sealer is present even at this depth Potential sources of salts identified backing
construction penetrating sealer applied to building Area was discussed with WJE personnel
Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the
bottom of the corbel molding Both locations are unique to this elevation
ACTION REQUIRED
Tarp installation on all facades placement and distribution of heating devices including monitoring
devices for temperature (Mark1 and JE Dunn)
Direction for spot cleaning on A208 (Charlie)
ITEMS TO VERIFY
Method for monitoring conditions inside the tarped area (JE Dunn)
REMARKS
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 3 of 5
A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter
round differs from those specified in 1914 but specifications do not mention attachment at concrete
This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over
and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed
A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above
is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 4 of 5
A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been
slugged full with mortar prior to setting course above tie wire pulled freely from backing construction
Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction
aides to plumb up the tall stones during setting
A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No
signs of distress observed but area was dusty and full of debris from demolition
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 5 of 5
A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze
stones
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Phasing amp Schedule Attachments The following documents are included in the subsequent pages
- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Phasing Plan
The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality
Trailer Compound
TUNNEL (will continue across Lincoln)
DELTA
FOX TROT
ECHO
KILO
ALPHA
CHARLIE
GOLF
INDIA
HOTEL
JULIETTE
LIMA
BRAVO
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Utilization Plan
Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices
Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment
The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment
JED
JEDBak
er
Mar
k 1
ProjectOklahoma StateCapitolRehabilitation
Date12072016
DrawingSite UtilizationPlan
Legend -JED Trailer Compound
-Phase 1 Site Fencing
-Gravel laydown
-Fence gate
-Future phases site fencing
-Future phases gravel laydown
EnvAct
Review
JED
Mark 1
JED
Faith
Dumpster
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Window Abatement Tracking Plan
DECEMBER 2016
Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
There are 8 (eight) chimeras on the Oklahoma State Capitol building These pieces are 6 feet tall Of theeight we have found two have initials cut into the stone that we believe are original and may be the initialsof the stonecutter who carved them Stone for this building was fabricated by Shea amp Donnelly of BedfordIndiana Stone was installed starting in 1916 and completed in 1917 Each chimera will be cleaned andrestored as we progress to each elevation of the building
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (left side) summer of 1916 shy no chimeras present
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (right side) November 2 1916 shy chimeras set
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti
South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 1 of 4
FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016
TIME 900a to 530p DAY OF WEEK Tuesday
OWNER OMES TEMP RANGE Lo 40s to 60
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
Trait Thompson - OMES
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking on A206 (Alpha)
Demolition for RP2 repair NW-0A06
ITEMS DISCUSSED
With WJE reviewed masonry cleaning processes changes to biological cleaning that have been
necessary to achieve the same results as trial repairs raking and repointing mockups for limestone
and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an
injection repairs patching repairs to limestone and granite See meeting notes from 11302016
follow up meeting to discuss WJE observations regarding the work
With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work
that necessary to make the area complete
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 2 of 4
ACTION REQUIRED
Revisions to repairs on A206 due to discovered conditions (TreanorHL)
bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone
bull at NW-0501 due to condition uncovered by joint raking
ITEMS TO VERIFY
REMARKS
OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes
Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to
tour the scaffold Reviewed window and masonry related work
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A206 ndash Site tour with OMES and WJE
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 3 of 4
A209 (left) and A208 (right) ndash Scaffold construction continues
A206 ndash NW-0A06 demolition in progress
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 4 of 4
A206 ndash Stone salvaged from NW-0A06
A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016
TIME 1000a to 530p DAY OF WEEK Monday
OWNER OMES TEMP RANGE Mid 50s to Lo 60s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Lukasz Lesniak Field Superintendent ndash Mark 1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking and repointing on A206 (Alpha)
Roofing materials being hoisted to the north wing roof
ITEMS DISCUSSED
Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps
there is some cold soak left to perform and sealant removal at window perimeter Temperature
restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this
week to create heated enclosure Discussed the need to monitor temperature and record it not only
on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and
other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is
approximately 50 complete
Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece
(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)
Met with JE Dunn to organize field walk for WJE visit
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 2 of 5
Reviewed window sill conditions including additional condition involving lead sheet flashing at the
bottom of cast iron sills
Temporary protection for built-in gutter
Stone color no word on additional lighter shades to better match light colored existing stones Mark
1 will salvage pieces of usable material where possible from other locations in case it is needed
ACTION REQUIRED
Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation
(TreanorHL)
ITEMS TO VERIFY
REMARKS
Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been
effective overall but the drying times are quite variable Some areas that have not seen water in
over a week are still visibly damp
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 3 of 5
A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in
right photo ndash end of tape is against the window frame in both photos
A208 ndash Residual dampness on A208 from cleaning
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 4 of 5
A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital
A207 ndash Lead T-cap installation for mock up review
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 5 of 5
A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining
material is brittle in some locations Additional detail will be issued for condition as part of forthcoming
ASI Believe this is window 459 ndash type G
A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016
TIME 800a to 12 noon DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE Mid 30s to Lo 50s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Raking on A206 (Alpha)
Substrate and backing conditions at RP repair NW-0A06
Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were
found on the west end of the frieze stone The tie-wire was easily removed from the back up
construction No rivet was found the pocket (which had been cut through) appears to have been
slugged full with mortar as construction progressed
Tarps being hung on A206 (Alpha)
ITEMS DISCUSSED
Protection for weather and monitoring conditions within the enclosure
Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to
moderate efflorescence were noted The most prominent is at the location of the redressing on NE-
0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent
dampness during cleaning operations The scaling that was the impetus for the redressing is located
at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 2 of 5
area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material
the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to
indicate the sealer is present even at this depth Potential sources of salts identified backing
construction penetrating sealer applied to building Area was discussed with WJE personnel
Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the
bottom of the corbel molding Both locations are unique to this elevation
ACTION REQUIRED
Tarp installation on all facades placement and distribution of heating devices including monitoring
devices for temperature (Mark1 and JE Dunn)
Direction for spot cleaning on A208 (Charlie)
ITEMS TO VERIFY
Method for monitoring conditions inside the tarped area (JE Dunn)
REMARKS
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 3 of 5
A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter
round differs from those specified in 1914 but specifications do not mention attachment at concrete
This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over
and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed
A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above
is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 4 of 5
A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been
slugged full with mortar prior to setting course above tie wire pulled freely from backing construction
Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction
aides to plumb up the tall stones during setting
A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No
signs of distress observed but area was dusty and full of debris from demolition
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 5 of 5
A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze
stones
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Phasing amp Schedule Attachments The following documents are included in the subsequent pages
- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Phasing Plan
The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality
Trailer Compound
TUNNEL (will continue across Lincoln)
DELTA
FOX TROT
ECHO
KILO
ALPHA
CHARLIE
GOLF
INDIA
HOTEL
JULIETTE
LIMA
BRAVO
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Utilization Plan
Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices
Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment
The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment
JED
JEDBak
er
Mar
k 1
ProjectOklahoma StateCapitolRehabilitation
Date12072016
DrawingSite UtilizationPlan
Legend -JED Trailer Compound
-Phase 1 Site Fencing
-Gravel laydown
-Fence gate
-Future phases site fencing
-Future phases gravel laydown
EnvAct
Review
JED
Mark 1
JED
Faith
Dumpster
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Window Abatement Tracking Plan
DECEMBER 2016
Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (left side) summer of 1916 shy no chimeras present
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (right side) November 2 1916 shy chimeras set
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti
South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 1 of 4
FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016
TIME 900a to 530p DAY OF WEEK Tuesday
OWNER OMES TEMP RANGE Lo 40s to 60
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
Trait Thompson - OMES
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking on A206 (Alpha)
Demolition for RP2 repair NW-0A06
ITEMS DISCUSSED
With WJE reviewed masonry cleaning processes changes to biological cleaning that have been
necessary to achieve the same results as trial repairs raking and repointing mockups for limestone
and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an
injection repairs patching repairs to limestone and granite See meeting notes from 11302016
follow up meeting to discuss WJE observations regarding the work
With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work
that necessary to make the area complete
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 2 of 4
ACTION REQUIRED
Revisions to repairs on A206 due to discovered conditions (TreanorHL)
bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone
bull at NW-0501 due to condition uncovered by joint raking
ITEMS TO VERIFY
REMARKS
OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes
Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to
tour the scaffold Reviewed window and masonry related work
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A206 ndash Site tour with OMES and WJE
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 3 of 4
A209 (left) and A208 (right) ndash Scaffold construction continues
A206 ndash NW-0A06 demolition in progress
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 4 of 4
A206 ndash Stone salvaged from NW-0A06
A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016
TIME 1000a to 530p DAY OF WEEK Monday
OWNER OMES TEMP RANGE Mid 50s to Lo 60s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Lukasz Lesniak Field Superintendent ndash Mark 1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking and repointing on A206 (Alpha)
Roofing materials being hoisted to the north wing roof
ITEMS DISCUSSED
Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps
there is some cold soak left to perform and sealant removal at window perimeter Temperature
restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this
week to create heated enclosure Discussed the need to monitor temperature and record it not only
on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and
other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is
approximately 50 complete
Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece
(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)
Met with JE Dunn to organize field walk for WJE visit
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 2 of 5
Reviewed window sill conditions including additional condition involving lead sheet flashing at the
bottom of cast iron sills
Temporary protection for built-in gutter
Stone color no word on additional lighter shades to better match light colored existing stones Mark
1 will salvage pieces of usable material where possible from other locations in case it is needed
ACTION REQUIRED
Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation
(TreanorHL)
ITEMS TO VERIFY
REMARKS
Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been
effective overall but the drying times are quite variable Some areas that have not seen water in
over a week are still visibly damp
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 3 of 5
A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in
right photo ndash end of tape is against the window frame in both photos
A208 ndash Residual dampness on A208 from cleaning
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 4 of 5
A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital
A207 ndash Lead T-cap installation for mock up review
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 5 of 5
A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining
material is brittle in some locations Additional detail will be issued for condition as part of forthcoming
ASI Believe this is window 459 ndash type G
A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016
TIME 800a to 12 noon DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE Mid 30s to Lo 50s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Raking on A206 (Alpha)
Substrate and backing conditions at RP repair NW-0A06
Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were
found on the west end of the frieze stone The tie-wire was easily removed from the back up
construction No rivet was found the pocket (which had been cut through) appears to have been
slugged full with mortar as construction progressed
Tarps being hung on A206 (Alpha)
ITEMS DISCUSSED
Protection for weather and monitoring conditions within the enclosure
Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to
moderate efflorescence were noted The most prominent is at the location of the redressing on NE-
0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent
dampness during cleaning operations The scaling that was the impetus for the redressing is located
at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 2 of 5
area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material
the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to
indicate the sealer is present even at this depth Potential sources of salts identified backing
construction penetrating sealer applied to building Area was discussed with WJE personnel
Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the
bottom of the corbel molding Both locations are unique to this elevation
ACTION REQUIRED
Tarp installation on all facades placement and distribution of heating devices including monitoring
devices for temperature (Mark1 and JE Dunn)
Direction for spot cleaning on A208 (Charlie)
ITEMS TO VERIFY
Method for monitoring conditions inside the tarped area (JE Dunn)
REMARKS
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 3 of 5
A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter
round differs from those specified in 1914 but specifications do not mention attachment at concrete
This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over
and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed
A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above
is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 4 of 5
A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been
slugged full with mortar prior to setting course above tie wire pulled freely from backing construction
Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction
aides to plumb up the tall stones during setting
A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No
signs of distress observed but area was dusty and full of debris from demolition
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 5 of 5
A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze
stones
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Phasing amp Schedule Attachments The following documents are included in the subsequent pages
- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Phasing Plan
The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality
Trailer Compound
TUNNEL (will continue across Lincoln)
DELTA
FOX TROT
ECHO
KILO
ALPHA
CHARLIE
GOLF
INDIA
HOTEL
JULIETTE
LIMA
BRAVO
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Utilization Plan
Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices
Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment
The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment
JED
JEDBak
er
Mar
k 1
ProjectOklahoma StateCapitolRehabilitation
Date12072016
DrawingSite UtilizationPlan
Legend -JED Trailer Compound
-Phase 1 Site Fencing
-Gravel laydown
-Fence gate
-Future phases site fencing
-Future phases gravel laydown
EnvAct
Review
JED
Mark 1
JED
Faith
Dumpster
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Window Abatement Tracking Plan
DECEMBER 2016
Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing (right side) November 2 1916 shy chimeras set
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti
South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 1 of 4
FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016
TIME 900a to 530p DAY OF WEEK Tuesday
OWNER OMES TEMP RANGE Lo 40s to 60
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
Trait Thompson - OMES
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking on A206 (Alpha)
Demolition for RP2 repair NW-0A06
ITEMS DISCUSSED
With WJE reviewed masonry cleaning processes changes to biological cleaning that have been
necessary to achieve the same results as trial repairs raking and repointing mockups for limestone
and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an
injection repairs patching repairs to limestone and granite See meeting notes from 11302016
follow up meeting to discuss WJE observations regarding the work
With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work
that necessary to make the area complete
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 2 of 4
ACTION REQUIRED
Revisions to repairs on A206 due to discovered conditions (TreanorHL)
bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone
bull at NW-0501 due to condition uncovered by joint raking
ITEMS TO VERIFY
REMARKS
OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes
Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to
tour the scaffold Reviewed window and masonry related work
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A206 ndash Site tour with OMES and WJE
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 3 of 4
A209 (left) and A208 (right) ndash Scaffold construction continues
A206 ndash NW-0A06 demolition in progress
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 4 of 4
A206 ndash Stone salvaged from NW-0A06
A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016
TIME 1000a to 530p DAY OF WEEK Monday
OWNER OMES TEMP RANGE Mid 50s to Lo 60s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Lukasz Lesniak Field Superintendent ndash Mark 1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking and repointing on A206 (Alpha)
Roofing materials being hoisted to the north wing roof
ITEMS DISCUSSED
Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps
there is some cold soak left to perform and sealant removal at window perimeter Temperature
restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this
week to create heated enclosure Discussed the need to monitor temperature and record it not only
on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and
other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is
approximately 50 complete
Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece
(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)
Met with JE Dunn to organize field walk for WJE visit
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 2 of 5
Reviewed window sill conditions including additional condition involving lead sheet flashing at the
bottom of cast iron sills
Temporary protection for built-in gutter
Stone color no word on additional lighter shades to better match light colored existing stones Mark
1 will salvage pieces of usable material where possible from other locations in case it is needed
ACTION REQUIRED
Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation
(TreanorHL)
ITEMS TO VERIFY
REMARKS
Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been
effective overall but the drying times are quite variable Some areas that have not seen water in
over a week are still visibly damp
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 3 of 5
A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in
right photo ndash end of tape is against the window frame in both photos
A208 ndash Residual dampness on A208 from cleaning
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 4 of 5
A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital
A207 ndash Lead T-cap installation for mock up review
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 5 of 5
A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining
material is brittle in some locations Additional detail will be issued for condition as part of forthcoming
ASI Believe this is window 459 ndash type G
A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016
TIME 800a to 12 noon DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE Mid 30s to Lo 50s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Raking on A206 (Alpha)
Substrate and backing conditions at RP repair NW-0A06
Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were
found on the west end of the frieze stone The tie-wire was easily removed from the back up
construction No rivet was found the pocket (which had been cut through) appears to have been
slugged full with mortar as construction progressed
Tarps being hung on A206 (Alpha)
ITEMS DISCUSSED
Protection for weather and monitoring conditions within the enclosure
Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to
moderate efflorescence were noted The most prominent is at the location of the redressing on NE-
0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent
dampness during cleaning operations The scaling that was the impetus for the redressing is located
at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 2 of 5
area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material
the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to
indicate the sealer is present even at this depth Potential sources of salts identified backing
construction penetrating sealer applied to building Area was discussed with WJE personnel
Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the
bottom of the corbel molding Both locations are unique to this elevation
ACTION REQUIRED
Tarp installation on all facades placement and distribution of heating devices including monitoring
devices for temperature (Mark1 and JE Dunn)
Direction for spot cleaning on A208 (Charlie)
ITEMS TO VERIFY
Method for monitoring conditions inside the tarped area (JE Dunn)
REMARKS
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 3 of 5
A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter
round differs from those specified in 1914 but specifications do not mention attachment at concrete
This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over
and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed
A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above
is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 4 of 5
A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been
slugged full with mortar prior to setting course above tie wire pulled freely from backing construction
Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction
aides to plumb up the tall stones during setting
A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No
signs of distress observed but area was dusty and full of debris from demolition
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 5 of 5
A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze
stones
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Phasing amp Schedule Attachments The following documents are included in the subsequent pages
- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Phasing Plan
The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality
Trailer Compound
TUNNEL (will continue across Lincoln)
DELTA
FOX TROT
ECHO
KILO
ALPHA
CHARLIE
GOLF
INDIA
HOTEL
JULIETTE
LIMA
BRAVO
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Utilization Plan
Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices
Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment
The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment
JED
JEDBak
er
Mar
k 1
ProjectOklahoma StateCapitolRehabilitation
Date12072016
DrawingSite UtilizationPlan
Legend -JED Trailer Compound
-Phase 1 Site Fencing
-Gravel laydown
-Fence gate
-Future phases site fencing
-Future phases gravel laydown
EnvAct
Review
JED
Mark 1
JED
Faith
Dumpster
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Window Abatement Tracking Plan
DECEMBER 2016
Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
North Wing shy rear of east chimera initials CW cut into piece Other inspectionsare likely later graffiti
South Wing shy rear of west chimera initials CW cut into piece Other inspectionsare likely later graffiti
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 1 of 4
FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016
TIME 900a to 530p DAY OF WEEK Tuesday
OWNER OMES TEMP RANGE Lo 40s to 60
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
Trait Thompson - OMES
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking on A206 (Alpha)
Demolition for RP2 repair NW-0A06
ITEMS DISCUSSED
With WJE reviewed masonry cleaning processes changes to biological cleaning that have been
necessary to achieve the same results as trial repairs raking and repointing mockups for limestone
and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an
injection repairs patching repairs to limestone and granite See meeting notes from 11302016
follow up meeting to discuss WJE observations regarding the work
With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work
that necessary to make the area complete
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 2 of 4
ACTION REQUIRED
Revisions to repairs on A206 due to discovered conditions (TreanorHL)
bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone
bull at NW-0501 due to condition uncovered by joint raking
ITEMS TO VERIFY
REMARKS
OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes
Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to
tour the scaffold Reviewed window and masonry related work
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A206 ndash Site tour with OMES and WJE
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 3 of 4
A209 (left) and A208 (right) ndash Scaffold construction continues
A206 ndash NW-0A06 demolition in progress
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 4 of 4
A206 ndash Stone salvaged from NW-0A06
A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016
TIME 1000a to 530p DAY OF WEEK Monday
OWNER OMES TEMP RANGE Mid 50s to Lo 60s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Lukasz Lesniak Field Superintendent ndash Mark 1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking and repointing on A206 (Alpha)
Roofing materials being hoisted to the north wing roof
ITEMS DISCUSSED
Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps
there is some cold soak left to perform and sealant removal at window perimeter Temperature
restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this
week to create heated enclosure Discussed the need to monitor temperature and record it not only
on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and
other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is
approximately 50 complete
Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece
(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)
Met with JE Dunn to organize field walk for WJE visit
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 2 of 5
Reviewed window sill conditions including additional condition involving lead sheet flashing at the
bottom of cast iron sills
Temporary protection for built-in gutter
Stone color no word on additional lighter shades to better match light colored existing stones Mark
1 will salvage pieces of usable material where possible from other locations in case it is needed
ACTION REQUIRED
Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation
(TreanorHL)
ITEMS TO VERIFY
REMARKS
Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been
effective overall but the drying times are quite variable Some areas that have not seen water in
over a week are still visibly damp
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 3 of 5
A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in
right photo ndash end of tape is against the window frame in both photos
A208 ndash Residual dampness on A208 from cleaning
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 4 of 5
A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital
A207 ndash Lead T-cap installation for mock up review
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 5 of 5
A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining
material is brittle in some locations Additional detail will be issued for condition as part of forthcoming
ASI Believe this is window 459 ndash type G
A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016
TIME 800a to 12 noon DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE Mid 30s to Lo 50s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Raking on A206 (Alpha)
Substrate and backing conditions at RP repair NW-0A06
Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were
found on the west end of the frieze stone The tie-wire was easily removed from the back up
construction No rivet was found the pocket (which had been cut through) appears to have been
slugged full with mortar as construction progressed
Tarps being hung on A206 (Alpha)
ITEMS DISCUSSED
Protection for weather and monitoring conditions within the enclosure
Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to
moderate efflorescence were noted The most prominent is at the location of the redressing on NE-
0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent
dampness during cleaning operations The scaling that was the impetus for the redressing is located
at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 2 of 5
area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material
the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to
indicate the sealer is present even at this depth Potential sources of salts identified backing
construction penetrating sealer applied to building Area was discussed with WJE personnel
Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the
bottom of the corbel molding Both locations are unique to this elevation
ACTION REQUIRED
Tarp installation on all facades placement and distribution of heating devices including monitoring
devices for temperature (Mark1 and JE Dunn)
Direction for spot cleaning on A208 (Charlie)
ITEMS TO VERIFY
Method for monitoring conditions inside the tarped area (JE Dunn)
REMARKS
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 3 of 5
A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter
round differs from those specified in 1914 but specifications do not mention attachment at concrete
This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over
and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed
A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above
is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 4 of 5
A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been
slugged full with mortar prior to setting course above tie wire pulled freely from backing construction
Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction
aides to plumb up the tall stones during setting
A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No
signs of distress observed but area was dusty and full of debris from demolition
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 5 of 5
A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze
stones
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Phasing amp Schedule Attachments The following documents are included in the subsequent pages
- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Phasing Plan
The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality
Trailer Compound
TUNNEL (will continue across Lincoln)
DELTA
FOX TROT
ECHO
KILO
ALPHA
CHARLIE
GOLF
INDIA
HOTEL
JULIETTE
LIMA
BRAVO
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Utilization Plan
Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices
Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment
The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment
JED
JEDBak
er
Mar
k 1
ProjectOklahoma StateCapitolRehabilitation
Date12072016
DrawingSite UtilizationPlan
Legend -JED Trailer Compound
-Phase 1 Site Fencing
-Gravel laydown
-Fence gate
-Future phases site fencing
-Future phases gravel laydown
EnvAct
Review
JED
Mark 1
JED
Faith
Dumpster
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Window Abatement Tracking Plan
DECEMBER 2016
Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 1 of 4
FIELD OBSERVATION REPORT REPORT NO 018 DATE 11292016
TIME 900a to 530p DAY OF WEEK Tuesday
OWNER OMES TEMP RANGE Lo 40s to 60
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
Trait Thompson - OMES
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking on A206 (Alpha)
Demolition for RP2 repair NW-0A06
ITEMS DISCUSSED
With WJE reviewed masonry cleaning processes changes to biological cleaning that have been
necessary to achieve the same results as trial repairs raking and repointing mockups for limestone
and granite sealant and lead T-cap mockups replacement and Dutchman repairs crack pinning an
injection repairs patching repairs to limestone and granite See meeting notes from 11302016
follow up meeting to discuss WJE observations regarding the work
With JE Dunn temporary protection at the built-in gutter and coordination to accommodate all work
that necessary to make the area complete
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 2 of 4
ACTION REQUIRED
Revisions to repairs on A206 due to discovered conditions (TreanorHL)
bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone
bull at NW-0501 due to condition uncovered by joint raking
ITEMS TO VERIFY
REMARKS
OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes
Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to
tour the scaffold Reviewed window and masonry related work
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A206 ndash Site tour with OMES and WJE
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 3 of 4
A209 (left) and A208 (right) ndash Scaffold construction continues
A206 ndash NW-0A06 demolition in progress
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 4 of 4
A206 ndash Stone salvaged from NW-0A06
A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016
TIME 1000a to 530p DAY OF WEEK Monday
OWNER OMES TEMP RANGE Mid 50s to Lo 60s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Lukasz Lesniak Field Superintendent ndash Mark 1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking and repointing on A206 (Alpha)
Roofing materials being hoisted to the north wing roof
ITEMS DISCUSSED
Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps
there is some cold soak left to perform and sealant removal at window perimeter Temperature
restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this
week to create heated enclosure Discussed the need to monitor temperature and record it not only
on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and
other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is
approximately 50 complete
Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece
(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)
Met with JE Dunn to organize field walk for WJE visit
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 2 of 5
Reviewed window sill conditions including additional condition involving lead sheet flashing at the
bottom of cast iron sills
Temporary protection for built-in gutter
Stone color no word on additional lighter shades to better match light colored existing stones Mark
1 will salvage pieces of usable material where possible from other locations in case it is needed
ACTION REQUIRED
Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation
(TreanorHL)
ITEMS TO VERIFY
REMARKS
Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been
effective overall but the drying times are quite variable Some areas that have not seen water in
over a week are still visibly damp
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 3 of 5
A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in
right photo ndash end of tape is against the window frame in both photos
A208 ndash Residual dampness on A208 from cleaning
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 4 of 5
A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital
A207 ndash Lead T-cap installation for mock up review
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 5 of 5
A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining
material is brittle in some locations Additional detail will be issued for condition as part of forthcoming
ASI Believe this is window 459 ndash type G
A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016
TIME 800a to 12 noon DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE Mid 30s to Lo 50s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Raking on A206 (Alpha)
Substrate and backing conditions at RP repair NW-0A06
Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were
found on the west end of the frieze stone The tie-wire was easily removed from the back up
construction No rivet was found the pocket (which had been cut through) appears to have been
slugged full with mortar as construction progressed
Tarps being hung on A206 (Alpha)
ITEMS DISCUSSED
Protection for weather and monitoring conditions within the enclosure
Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to
moderate efflorescence were noted The most prominent is at the location of the redressing on NE-
0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent
dampness during cleaning operations The scaling that was the impetus for the redressing is located
at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 2 of 5
area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material
the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to
indicate the sealer is present even at this depth Potential sources of salts identified backing
construction penetrating sealer applied to building Area was discussed with WJE personnel
Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the
bottom of the corbel molding Both locations are unique to this elevation
ACTION REQUIRED
Tarp installation on all facades placement and distribution of heating devices including monitoring
devices for temperature (Mark1 and JE Dunn)
Direction for spot cleaning on A208 (Charlie)
ITEMS TO VERIFY
Method for monitoring conditions inside the tarped area (JE Dunn)
REMARKS
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 3 of 5
A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter
round differs from those specified in 1914 but specifications do not mention attachment at concrete
This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over
and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed
A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above
is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 4 of 5
A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been
slugged full with mortar prior to setting course above tie wire pulled freely from backing construction
Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction
aides to plumb up the tall stones during setting
A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No
signs of distress observed but area was dusty and full of debris from demolition
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 5 of 5
A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze
stones
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Phasing amp Schedule Attachments The following documents are included in the subsequent pages
- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Phasing Plan
The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality
Trailer Compound
TUNNEL (will continue across Lincoln)
DELTA
FOX TROT
ECHO
KILO
ALPHA
CHARLIE
GOLF
INDIA
HOTEL
JULIETTE
LIMA
BRAVO
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Utilization Plan
Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices
Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment
The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment
JED
JEDBak
er
Mar
k 1
ProjectOklahoma StateCapitolRehabilitation
Date12072016
DrawingSite UtilizationPlan
Legend -JED Trailer Compound
-Phase 1 Site Fencing
-Gravel laydown
-Fence gate
-Future phases site fencing
-Future phases gravel laydown
EnvAct
Review
JED
Mark 1
JED
Faith
Dumpster
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Window Abatement Tracking Plan
DECEMBER 2016
Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 2 of 4
ACTION REQUIRED
Revisions to repairs on A206 due to discovered conditions (TreanorHL)
bull at NW-0A07 due to hidden damage uncovered during the demolition of adjacent stone
bull at NW-0501 due to condition uncovered by joint raking
ITEMS TO VERIFY
REMARKS
OAC meeting in the trailer during the morning ndash OMES and WJE in attendance See meeting notes
Toured the scaffold with OMES and WJE to lunchtime lunch in the trailer afternoon continued to
tour the scaffold Reviewed window and masonry related work
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A206 ndash Site tour with OMES and WJE
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 3 of 4
A209 (left) and A208 (right) ndash Scaffold construction continues
A206 ndash NW-0A06 demolition in progress
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 4 of 4
A206 ndash Stone salvaged from NW-0A06
A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016
TIME 1000a to 530p DAY OF WEEK Monday
OWNER OMES TEMP RANGE Mid 50s to Lo 60s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Lukasz Lesniak Field Superintendent ndash Mark 1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking and repointing on A206 (Alpha)
Roofing materials being hoisted to the north wing roof
ITEMS DISCUSSED
Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps
there is some cold soak left to perform and sealant removal at window perimeter Temperature
restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this
week to create heated enclosure Discussed the need to monitor temperature and record it not only
on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and
other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is
approximately 50 complete
Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece
(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)
Met with JE Dunn to organize field walk for WJE visit
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 2 of 5
Reviewed window sill conditions including additional condition involving lead sheet flashing at the
bottom of cast iron sills
Temporary protection for built-in gutter
Stone color no word on additional lighter shades to better match light colored existing stones Mark
1 will salvage pieces of usable material where possible from other locations in case it is needed
ACTION REQUIRED
Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation
(TreanorHL)
ITEMS TO VERIFY
REMARKS
Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been
effective overall but the drying times are quite variable Some areas that have not seen water in
over a week are still visibly damp
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 3 of 5
A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in
right photo ndash end of tape is against the window frame in both photos
A208 ndash Residual dampness on A208 from cleaning
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 4 of 5
A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital
A207 ndash Lead T-cap installation for mock up review
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 5 of 5
A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining
material is brittle in some locations Additional detail will be issued for condition as part of forthcoming
ASI Believe this is window 459 ndash type G
A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016
TIME 800a to 12 noon DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE Mid 30s to Lo 50s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Raking on A206 (Alpha)
Substrate and backing conditions at RP repair NW-0A06
Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were
found on the west end of the frieze stone The tie-wire was easily removed from the back up
construction No rivet was found the pocket (which had been cut through) appears to have been
slugged full with mortar as construction progressed
Tarps being hung on A206 (Alpha)
ITEMS DISCUSSED
Protection for weather and monitoring conditions within the enclosure
Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to
moderate efflorescence were noted The most prominent is at the location of the redressing on NE-
0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent
dampness during cleaning operations The scaling that was the impetus for the redressing is located
at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 2 of 5
area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material
the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to
indicate the sealer is present even at this depth Potential sources of salts identified backing
construction penetrating sealer applied to building Area was discussed with WJE personnel
Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the
bottom of the corbel molding Both locations are unique to this elevation
ACTION REQUIRED
Tarp installation on all facades placement and distribution of heating devices including monitoring
devices for temperature (Mark1 and JE Dunn)
Direction for spot cleaning on A208 (Charlie)
ITEMS TO VERIFY
Method for monitoring conditions inside the tarped area (JE Dunn)
REMARKS
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 3 of 5
A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter
round differs from those specified in 1914 but specifications do not mention attachment at concrete
This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over
and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed
A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above
is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 4 of 5
A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been
slugged full with mortar prior to setting course above tie wire pulled freely from backing construction
Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction
aides to plumb up the tall stones during setting
A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No
signs of distress observed but area was dusty and full of debris from demolition
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 5 of 5
A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze
stones
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Phasing amp Schedule Attachments The following documents are included in the subsequent pages
- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Phasing Plan
The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality
Trailer Compound
TUNNEL (will continue across Lincoln)
DELTA
FOX TROT
ECHO
KILO
ALPHA
CHARLIE
GOLF
INDIA
HOTEL
JULIETTE
LIMA
BRAVO
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Utilization Plan
Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices
Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment
The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment
JED
JEDBak
er
Mar
k 1
ProjectOklahoma StateCapitolRehabilitation
Date12072016
DrawingSite UtilizationPlan
Legend -JED Trailer Compound
-Phase 1 Site Fencing
-Gravel laydown
-Fence gate
-Future phases site fencing
-Future phases gravel laydown
EnvAct
Review
JED
Mark 1
JED
Faith
Dumpster
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Window Abatement Tracking Plan
DECEMBER 2016
Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 3 of 4
A209 (left) and A208 (right) ndash Scaffold construction continues
A206 ndash NW-0A06 demolition in progress
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 4 of 4
A206 ndash Stone salvaged from NW-0A06
A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016
TIME 1000a to 530p DAY OF WEEK Monday
OWNER OMES TEMP RANGE Mid 50s to Lo 60s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Lukasz Lesniak Field Superintendent ndash Mark 1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking and repointing on A206 (Alpha)
Roofing materials being hoisted to the north wing roof
ITEMS DISCUSSED
Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps
there is some cold soak left to perform and sealant removal at window perimeter Temperature
restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this
week to create heated enclosure Discussed the need to monitor temperature and record it not only
on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and
other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is
approximately 50 complete
Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece
(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)
Met with JE Dunn to organize field walk for WJE visit
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 2 of 5
Reviewed window sill conditions including additional condition involving lead sheet flashing at the
bottom of cast iron sills
Temporary protection for built-in gutter
Stone color no word on additional lighter shades to better match light colored existing stones Mark
1 will salvage pieces of usable material where possible from other locations in case it is needed
ACTION REQUIRED
Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation
(TreanorHL)
ITEMS TO VERIFY
REMARKS
Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been
effective overall but the drying times are quite variable Some areas that have not seen water in
over a week are still visibly damp
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 3 of 5
A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in
right photo ndash end of tape is against the window frame in both photos
A208 ndash Residual dampness on A208 from cleaning
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 4 of 5
A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital
A207 ndash Lead T-cap installation for mock up review
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 5 of 5
A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining
material is brittle in some locations Additional detail will be issued for condition as part of forthcoming
ASI Believe this is window 459 ndash type G
A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016
TIME 800a to 12 noon DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE Mid 30s to Lo 50s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Raking on A206 (Alpha)
Substrate and backing conditions at RP repair NW-0A06
Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were
found on the west end of the frieze stone The tie-wire was easily removed from the back up
construction No rivet was found the pocket (which had been cut through) appears to have been
slugged full with mortar as construction progressed
Tarps being hung on A206 (Alpha)
ITEMS DISCUSSED
Protection for weather and monitoring conditions within the enclosure
Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to
moderate efflorescence were noted The most prominent is at the location of the redressing on NE-
0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent
dampness during cleaning operations The scaling that was the impetus for the redressing is located
at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 2 of 5
area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material
the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to
indicate the sealer is present even at this depth Potential sources of salts identified backing
construction penetrating sealer applied to building Area was discussed with WJE personnel
Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the
bottom of the corbel molding Both locations are unique to this elevation
ACTION REQUIRED
Tarp installation on all facades placement and distribution of heating devices including monitoring
devices for temperature (Mark1 and JE Dunn)
Direction for spot cleaning on A208 (Charlie)
ITEMS TO VERIFY
Method for monitoring conditions inside the tarped area (JE Dunn)
REMARKS
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 3 of 5
A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter
round differs from those specified in 1914 but specifications do not mention attachment at concrete
This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over
and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed
A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above
is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 4 of 5
A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been
slugged full with mortar prior to setting course above tie wire pulled freely from backing construction
Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction
aides to plumb up the tall stones during setting
A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No
signs of distress observed but area was dusty and full of debris from demolition
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 5 of 5
A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze
stones
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Phasing amp Schedule Attachments The following documents are included in the subsequent pages
- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Phasing Plan
The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality
Trailer Compound
TUNNEL (will continue across Lincoln)
DELTA
FOX TROT
ECHO
KILO
ALPHA
CHARLIE
GOLF
INDIA
HOTEL
JULIETTE
LIMA
BRAVO
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Utilization Plan
Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices
Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment
The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment
JED
JEDBak
er
Mar
k 1
ProjectOklahoma StateCapitolRehabilitation
Date12072016
DrawingSite UtilizationPlan
Legend -JED Trailer Compound
-Phase 1 Site Fencing
-Gravel laydown
-Fence gate
-Future phases site fencing
-Future phases gravel laydown
EnvAct
Review
JED
Mark 1
JED
Faith
Dumpster
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Window Abatement Tracking Plan
DECEMBER 2016
Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
DDropboxoklahoma - juliaCAOSCR FR TA018 - 2016_11-29docx
Page 4 of 4
A206 ndash Stone salvaged from NW-0A06
A206 ndash NW-0A07 south return showing crack starting at pocket for a horizontal strap anchor
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016
TIME 1000a to 530p DAY OF WEEK Monday
OWNER OMES TEMP RANGE Mid 50s to Lo 60s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Lukasz Lesniak Field Superintendent ndash Mark 1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking and repointing on A206 (Alpha)
Roofing materials being hoisted to the north wing roof
ITEMS DISCUSSED
Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps
there is some cold soak left to perform and sealant removal at window perimeter Temperature
restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this
week to create heated enclosure Discussed the need to monitor temperature and record it not only
on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and
other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is
approximately 50 complete
Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece
(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)
Met with JE Dunn to organize field walk for WJE visit
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 2 of 5
Reviewed window sill conditions including additional condition involving lead sheet flashing at the
bottom of cast iron sills
Temporary protection for built-in gutter
Stone color no word on additional lighter shades to better match light colored existing stones Mark
1 will salvage pieces of usable material where possible from other locations in case it is needed
ACTION REQUIRED
Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation
(TreanorHL)
ITEMS TO VERIFY
REMARKS
Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been
effective overall but the drying times are quite variable Some areas that have not seen water in
over a week are still visibly damp
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 3 of 5
A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in
right photo ndash end of tape is against the window frame in both photos
A208 ndash Residual dampness on A208 from cleaning
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 4 of 5
A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital
A207 ndash Lead T-cap installation for mock up review
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 5 of 5
A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining
material is brittle in some locations Additional detail will be issued for condition as part of forthcoming
ASI Believe this is window 459 ndash type G
A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016
TIME 800a to 12 noon DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE Mid 30s to Lo 50s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Raking on A206 (Alpha)
Substrate and backing conditions at RP repair NW-0A06
Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were
found on the west end of the frieze stone The tie-wire was easily removed from the back up
construction No rivet was found the pocket (which had been cut through) appears to have been
slugged full with mortar as construction progressed
Tarps being hung on A206 (Alpha)
ITEMS DISCUSSED
Protection for weather and monitoring conditions within the enclosure
Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to
moderate efflorescence were noted The most prominent is at the location of the redressing on NE-
0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent
dampness during cleaning operations The scaling that was the impetus for the redressing is located
at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 2 of 5
area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material
the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to
indicate the sealer is present even at this depth Potential sources of salts identified backing
construction penetrating sealer applied to building Area was discussed with WJE personnel
Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the
bottom of the corbel molding Both locations are unique to this elevation
ACTION REQUIRED
Tarp installation on all facades placement and distribution of heating devices including monitoring
devices for temperature (Mark1 and JE Dunn)
Direction for spot cleaning on A208 (Charlie)
ITEMS TO VERIFY
Method for monitoring conditions inside the tarped area (JE Dunn)
REMARKS
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 3 of 5
A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter
round differs from those specified in 1914 but specifications do not mention attachment at concrete
This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over
and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed
A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above
is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 4 of 5
A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been
slugged full with mortar prior to setting course above tie wire pulled freely from backing construction
Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction
aides to plumb up the tall stones during setting
A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No
signs of distress observed but area was dusty and full of debris from demolition
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 5 of 5
A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze
stones
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Phasing amp Schedule Attachments The following documents are included in the subsequent pages
- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Phasing Plan
The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality
Trailer Compound
TUNNEL (will continue across Lincoln)
DELTA
FOX TROT
ECHO
KILO
ALPHA
CHARLIE
GOLF
INDIA
HOTEL
JULIETTE
LIMA
BRAVO
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Utilization Plan
Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices
Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment
The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment
JED
JEDBak
er
Mar
k 1
ProjectOklahoma StateCapitolRehabilitation
Date12072016
DrawingSite UtilizationPlan
Legend -JED Trailer Compound
-Phase 1 Site Fencing
-Gravel laydown
-Fence gate
-Future phases site fencing
-Future phases gravel laydown
EnvAct
Review
JED
Mark 1
JED
Faith
Dumpster
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Window Abatement Tracking Plan
DECEMBER 2016
Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 017 DATE 11282016
TIME 1000a to 530p DAY OF WEEK Monday
OWNER OMES TEMP RANGE Mid 50s to Lo 60s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Lukasz Lesniak Field Superintendent ndash Mark 1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Abatement at windows is in progress on A208 (Charlie)
Raking and repointing on A206 (Alpha)
Roofing materials being hoisted to the north wing roof
ITEMS DISCUSSED
Masonry cleaning General progress ndash most of A208Charlie has been cleaned with all three steps
there is some cold soak left to perform and sealant removal at window perimeter Temperature
restrictions were reviewed as the forecast calls for lows below 40 deg F Tarps will be installed this
week to create heated enclosure Discussed the need to monitor temperature and record it not only
on the masonry surface but within the enclosure Work will need to be coordinated with JE Dunn and
other sub-contractorsrsquo requirements Sealant removal at perimeter of windows on Alpha is
approximately 50 complete
Reviewed progress on mock-ups for granite patching (PA) redressing (RD) Dutchman at carved piece
(DM) crack pinning and injection (CP2) lead T-cap installation and full-depth replacement (RP2)
Met with JE Dunn to organize field walk for WJE visit
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 2 of 5
Reviewed window sill conditions including additional condition involving lead sheet flashing at the
bottom of cast iron sills
Temporary protection for built-in gutter
Stone color no word on additional lighter shades to better match light colored existing stones Mark
1 will salvage pieces of usable material where possible from other locations in case it is needed
ACTION REQUIRED
Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation
(TreanorHL)
ITEMS TO VERIFY
REMARKS
Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been
effective overall but the drying times are quite variable Some areas that have not seen water in
over a week are still visibly damp
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 3 of 5
A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in
right photo ndash end of tape is against the window frame in both photos
A208 ndash Residual dampness on A208 from cleaning
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 4 of 5
A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital
A207 ndash Lead T-cap installation for mock up review
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 5 of 5
A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining
material is brittle in some locations Additional detail will be issued for condition as part of forthcoming
ASI Believe this is window 459 ndash type G
A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016
TIME 800a to 12 noon DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE Mid 30s to Lo 50s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Raking on A206 (Alpha)
Substrate and backing conditions at RP repair NW-0A06
Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were
found on the west end of the frieze stone The tie-wire was easily removed from the back up
construction No rivet was found the pocket (which had been cut through) appears to have been
slugged full with mortar as construction progressed
Tarps being hung on A206 (Alpha)
ITEMS DISCUSSED
Protection for weather and monitoring conditions within the enclosure
Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to
moderate efflorescence were noted The most prominent is at the location of the redressing on NE-
0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent
dampness during cleaning operations The scaling that was the impetus for the redressing is located
at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 2 of 5
area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material
the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to
indicate the sealer is present even at this depth Potential sources of salts identified backing
construction penetrating sealer applied to building Area was discussed with WJE personnel
Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the
bottom of the corbel molding Both locations are unique to this elevation
ACTION REQUIRED
Tarp installation on all facades placement and distribution of heating devices including monitoring
devices for temperature (Mark1 and JE Dunn)
Direction for spot cleaning on A208 (Charlie)
ITEMS TO VERIFY
Method for monitoring conditions inside the tarped area (JE Dunn)
REMARKS
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 3 of 5
A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter
round differs from those specified in 1914 but specifications do not mention attachment at concrete
This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over
and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed
A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above
is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 4 of 5
A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been
slugged full with mortar prior to setting course above tie wire pulled freely from backing construction
Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction
aides to plumb up the tall stones during setting
A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No
signs of distress observed but area was dusty and full of debris from demolition
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 5 of 5
A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze
stones
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Phasing amp Schedule Attachments The following documents are included in the subsequent pages
- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Phasing Plan
The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality
Trailer Compound
TUNNEL (will continue across Lincoln)
DELTA
FOX TROT
ECHO
KILO
ALPHA
CHARLIE
GOLF
INDIA
HOTEL
JULIETTE
LIMA
BRAVO
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Utilization Plan
Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices
Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment
The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment
JED
JEDBak
er
Mar
k 1
ProjectOklahoma StateCapitolRehabilitation
Date12072016
DrawingSite UtilizationPlan
Legend -JED Trailer Compound
-Phase 1 Site Fencing
-Gravel laydown
-Fence gate
-Future phases site fencing
-Future phases gravel laydown
EnvAct
Review
JED
Mark 1
JED
Faith
Dumpster
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Window Abatement Tracking Plan
DECEMBER 2016
Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 2 of 5
Reviewed window sill conditions including additional condition involving lead sheet flashing at the
bottom of cast iron sills
Temporary protection for built-in gutter
Stone color no word on additional lighter shades to better match light colored existing stones Mark
1 will salvage pieces of usable material where possible from other locations in case it is needed
ACTION REQUIRED
Issue mock up comments on CP2 DM-fragment repair DM-lateral pin repair lead T-cap installation
(TreanorHL)
ITEMS TO VERIFY
REMARKS
Faccedilade exhibits residual wetnessdampness in multiple locations on A208 Cleaning has been
effective overall but the drying times are quite variable Some areas that have not seen water in
over a week are still visibly damp
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
A209 ndash Scaffold building continues crane at the left edge of the frame is hoisting roofing materials
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 3 of 5
A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in
right photo ndash end of tape is against the window frame in both photos
A208 ndash Residual dampness on A208 from cleaning
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 4 of 5
A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital
A207 ndash Lead T-cap installation for mock up review
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 5 of 5
A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining
material is brittle in some locations Additional detail will be issued for condition as part of forthcoming
ASI Believe this is window 459 ndash type G
A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016
TIME 800a to 12 noon DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE Mid 30s to Lo 50s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Raking on A206 (Alpha)
Substrate and backing conditions at RP repair NW-0A06
Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were
found on the west end of the frieze stone The tie-wire was easily removed from the back up
construction No rivet was found the pocket (which had been cut through) appears to have been
slugged full with mortar as construction progressed
Tarps being hung on A206 (Alpha)
ITEMS DISCUSSED
Protection for weather and monitoring conditions within the enclosure
Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to
moderate efflorescence were noted The most prominent is at the location of the redressing on NE-
0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent
dampness during cleaning operations The scaling that was the impetus for the redressing is located
at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 2 of 5
area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material
the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to
indicate the sealer is present even at this depth Potential sources of salts identified backing
construction penetrating sealer applied to building Area was discussed with WJE personnel
Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the
bottom of the corbel molding Both locations are unique to this elevation
ACTION REQUIRED
Tarp installation on all facades placement and distribution of heating devices including monitoring
devices for temperature (Mark1 and JE Dunn)
Direction for spot cleaning on A208 (Charlie)
ITEMS TO VERIFY
Method for monitoring conditions inside the tarped area (JE Dunn)
REMARKS
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 3 of 5
A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter
round differs from those specified in 1914 but specifications do not mention attachment at concrete
This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over
and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed
A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above
is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 4 of 5
A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been
slugged full with mortar prior to setting course above tie wire pulled freely from backing construction
Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction
aides to plumb up the tall stones during setting
A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No
signs of distress observed but area was dusty and full of debris from demolition
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 5 of 5
A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze
stones
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Phasing amp Schedule Attachments The following documents are included in the subsequent pages
- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Phasing Plan
The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality
Trailer Compound
TUNNEL (will continue across Lincoln)
DELTA
FOX TROT
ECHO
KILO
ALPHA
CHARLIE
GOLF
INDIA
HOTEL
JULIETTE
LIMA
BRAVO
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Utilization Plan
Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices
Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment
The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment
JED
JEDBak
er
Mar
k 1
ProjectOklahoma StateCapitolRehabilitation
Date12072016
DrawingSite UtilizationPlan
Legend -JED Trailer Compound
-Phase 1 Site Fencing
-Gravel laydown
-Fence gate
-Future phases site fencing
-Future phases gravel laydown
EnvAct
Review
JED
Mark 1
JED
Faith
Dumpster
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Window Abatement Tracking Plan
DECEMBER 2016
Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 3 of 5
A206 - Sealant removal at window perimeter (keynote S15) ndash untreated area in left photo treated area in
right photo ndash end of tape is against the window frame in both photos
A208 ndash Residual dampness on A208 from cleaning
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 4 of 5
A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital
A207 ndash Lead T-cap installation for mock up review
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 5 of 5
A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining
material is brittle in some locations Additional detail will be issued for condition as part of forthcoming
ASI Believe this is window 459 ndash type G
A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016
TIME 800a to 12 noon DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE Mid 30s to Lo 50s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Raking on A206 (Alpha)
Substrate and backing conditions at RP repair NW-0A06
Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were
found on the west end of the frieze stone The tie-wire was easily removed from the back up
construction No rivet was found the pocket (which had been cut through) appears to have been
slugged full with mortar as construction progressed
Tarps being hung on A206 (Alpha)
ITEMS DISCUSSED
Protection for weather and monitoring conditions within the enclosure
Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to
moderate efflorescence were noted The most prominent is at the location of the redressing on NE-
0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent
dampness during cleaning operations The scaling that was the impetus for the redressing is located
at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 2 of 5
area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material
the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to
indicate the sealer is present even at this depth Potential sources of salts identified backing
construction penetrating sealer applied to building Area was discussed with WJE personnel
Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the
bottom of the corbel molding Both locations are unique to this elevation
ACTION REQUIRED
Tarp installation on all facades placement and distribution of heating devices including monitoring
devices for temperature (Mark1 and JE Dunn)
Direction for spot cleaning on A208 (Charlie)
ITEMS TO VERIFY
Method for monitoring conditions inside the tarped area (JE Dunn)
REMARKS
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 3 of 5
A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter
round differs from those specified in 1914 but specifications do not mention attachment at concrete
This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over
and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed
A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above
is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 4 of 5
A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been
slugged full with mortar prior to setting course above tie wire pulled freely from backing construction
Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction
aides to plumb up the tall stones during setting
A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No
signs of distress observed but area was dusty and full of debris from demolition
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 5 of 5
A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze
stones
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Phasing amp Schedule Attachments The following documents are included in the subsequent pages
- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Phasing Plan
The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality
Trailer Compound
TUNNEL (will continue across Lincoln)
DELTA
FOX TROT
ECHO
KILO
ALPHA
CHARLIE
GOLF
INDIA
HOTEL
JULIETTE
LIMA
BRAVO
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Utilization Plan
Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices
Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment
The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment
JED
JEDBak
er
Mar
k 1
ProjectOklahoma StateCapitolRehabilitation
Date12072016
DrawingSite UtilizationPlan
Legend -JED Trailer Compound
-Phase 1 Site Fencing
-Gravel laydown
-Fence gate
-Future phases site fencing
-Future phases gravel laydown
EnvAct
Review
JED
Mark 1
JED
Faith
Dumpster
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Window Abatement Tracking Plan
DECEMBER 2016
Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 4 of 5
A208 on left A207 on right ndash comparison of cleaned versus uncleaned area at corner pilaster capital
A207 ndash Lead T-cap installation for mock up review
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 5 of 5
A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining
material is brittle in some locations Additional detail will be issued for condition as part of forthcoming
ASI Believe this is window 459 ndash type G
A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016
TIME 800a to 12 noon DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE Mid 30s to Lo 50s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Raking on A206 (Alpha)
Substrate and backing conditions at RP repair NW-0A06
Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were
found on the west end of the frieze stone The tie-wire was easily removed from the back up
construction No rivet was found the pocket (which had been cut through) appears to have been
slugged full with mortar as construction progressed
Tarps being hung on A206 (Alpha)
ITEMS DISCUSSED
Protection for weather and monitoring conditions within the enclosure
Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to
moderate efflorescence were noted The most prominent is at the location of the redressing on NE-
0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent
dampness during cleaning operations The scaling that was the impetus for the redressing is located
at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 2 of 5
area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material
the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to
indicate the sealer is present even at this depth Potential sources of salts identified backing
construction penetrating sealer applied to building Area was discussed with WJE personnel
Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the
bottom of the corbel molding Both locations are unique to this elevation
ACTION REQUIRED
Tarp installation on all facades placement and distribution of heating devices including monitoring
devices for temperature (Mark1 and JE Dunn)
Direction for spot cleaning on A208 (Charlie)
ITEMS TO VERIFY
Method for monitoring conditions inside the tarped area (JE Dunn)
REMARKS
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 3 of 5
A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter
round differs from those specified in 1914 but specifications do not mention attachment at concrete
This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over
and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed
A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above
is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 4 of 5
A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been
slugged full with mortar prior to setting course above tie wire pulled freely from backing construction
Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction
aides to plumb up the tall stones during setting
A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No
signs of distress observed but area was dusty and full of debris from demolition
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 5 of 5
A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze
stones
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Phasing amp Schedule Attachments The following documents are included in the subsequent pages
- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Phasing Plan
The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality
Trailer Compound
TUNNEL (will continue across Lincoln)
DELTA
FOX TROT
ECHO
KILO
ALPHA
CHARLIE
GOLF
INDIA
HOTEL
JULIETTE
LIMA
BRAVO
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Utilization Plan
Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices
Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment
The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment
JED
JEDBak
er
Mar
k 1
ProjectOklahoma StateCapitolRehabilitation
Date12072016
DrawingSite UtilizationPlan
Legend -JED Trailer Compound
-Phase 1 Site Fencing
-Gravel laydown
-Fence gate
-Future phases site fencing
-Future phases gravel laydown
EnvAct
Review
JED
Mark 1
JED
Faith
Dumpster
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Window Abatement Tracking Plan
DECEMBER 2016
Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
DDropboxoklahoma - juliaCAOSCR FR TA017 - 2016_11-28docx
Page 5 of 5
A206 ndash Cast iron sill with lead flashing below Portions of lead are missing or damaged remaining
material is brittle in some locations Additional detail will be issued for condition as part of forthcoming
ASI Believe this is window 459 ndash type G
A206 ndash Masonry conditions at removed sill Window 349 or 457 ndash type A3
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016
TIME 800a to 12 noon DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE Mid 30s to Lo 50s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Raking on A206 (Alpha)
Substrate and backing conditions at RP repair NW-0A06
Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were
found on the west end of the frieze stone The tie-wire was easily removed from the back up
construction No rivet was found the pocket (which had been cut through) appears to have been
slugged full with mortar as construction progressed
Tarps being hung on A206 (Alpha)
ITEMS DISCUSSED
Protection for weather and monitoring conditions within the enclosure
Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to
moderate efflorescence were noted The most prominent is at the location of the redressing on NE-
0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent
dampness during cleaning operations The scaling that was the impetus for the redressing is located
at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 2 of 5
area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material
the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to
indicate the sealer is present even at this depth Potential sources of salts identified backing
construction penetrating sealer applied to building Area was discussed with WJE personnel
Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the
bottom of the corbel molding Both locations are unique to this elevation
ACTION REQUIRED
Tarp installation on all facades placement and distribution of heating devices including monitoring
devices for temperature (Mark1 and JE Dunn)
Direction for spot cleaning on A208 (Charlie)
ITEMS TO VERIFY
Method for monitoring conditions inside the tarped area (JE Dunn)
REMARKS
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 3 of 5
A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter
round differs from those specified in 1914 but specifications do not mention attachment at concrete
This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over
and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed
A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above
is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 4 of 5
A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been
slugged full with mortar prior to setting course above tie wire pulled freely from backing construction
Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction
aides to plumb up the tall stones during setting
A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No
signs of distress observed but area was dusty and full of debris from demolition
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 5 of 5
A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze
stones
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Phasing amp Schedule Attachments The following documents are included in the subsequent pages
- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Phasing Plan
The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality
Trailer Compound
TUNNEL (will continue across Lincoln)
DELTA
FOX TROT
ECHO
KILO
ALPHA
CHARLIE
GOLF
INDIA
HOTEL
JULIETTE
LIMA
BRAVO
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Utilization Plan
Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices
Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment
The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment
JED
JEDBak
er
Mar
k 1
ProjectOklahoma StateCapitolRehabilitation
Date12072016
DrawingSite UtilizationPlan
Legend -JED Trailer Compound
-Phase 1 Site Fencing
-Gravel laydown
-Fence gate
-Future phases site fencing
-Future phases gravel laydown
EnvAct
Review
JED
Mark 1
JED
Faith
Dumpster
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Window Abatement Tracking Plan
DECEMBER 2016
Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 1 of 5
FIELD OBSERVATION REPORT REPORT NO 019 DATE 11302016
TIME 800a to 12 noon DAY OF WEEK Wednesday
OWNER OMES TEMP RANGE Mid 30s to Lo 50s
PROJECT Oklahoma Capitol Restoration - Exterior Rehabilitation
CAP PROJECT NO 15039DB
JE DUNN PROJECT NO 15025800
ADG PROJECT NO 15-007
TREANOR PROJECT NO HP 1500700B
ZFI PROJECT NO 15071-01
ALVINE PROJECT NO 2014-4286
SRB PROJECT NO 114801
WEATHER Clear Overcast Rain Snow Cold
Warm Hot Foggy Windy Ice Other _ ___
SITE CONDITIONS Clear Dusty Muddy Other ______________________
PERSONS CONTACTED Mark Maska Superintendent ndash JE Dunn Construction
Heath Glenn Superintendent ndash JE Dunn Construction
Lynnsee Boyse Project Manager ndash JE Dunn Construction
Landon Heaton Project Engineer ndash JE Dunn Construction
Jason Cady ndash Mass Architects AE-1
S Naggatz J Freedland ndash WJE AE-1
WORK OBSERVED
Scaffold erection on A209 (Delta) on going
Raking on A206 (Alpha)
Substrate and backing conditions at RP repair NW-0A06
Demolition for RP2 repair NN-0A03 on A207 (Bravo) Evidence of a rivet and tie wire anchor were
found on the west end of the frieze stone The tie-wire was easily removed from the back up
construction No rivet was found the pocket (which had been cut through) appears to have been
slugged full with mortar as construction progressed
Tarps being hung on A206 (Alpha)
ITEMS DISCUSSED
Protection for weather and monitoring conditions within the enclosure
Efflorescence bloom in limited locations on the frieze course of A208 (Charlie) A few areas of light to
moderate efflorescence were noted The most prominent is at the location of the redressing on NE-
0A06 Above this location is evidence of a gutter leak This area is one that has exhibited persistent
dampness during cleaning operations The scaling that was the impetus for the redressing is located
at the portion of the stone that stays damp The penetrating sealer has likely prevented drying in this
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 2 of 5
area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material
the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to
indicate the sealer is present even at this depth Potential sources of salts identified backing
construction penetrating sealer applied to building Area was discussed with WJE personnel
Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the
bottom of the corbel molding Both locations are unique to this elevation
ACTION REQUIRED
Tarp installation on all facades placement and distribution of heating devices including monitoring
devices for temperature (Mark1 and JE Dunn)
Direction for spot cleaning on A208 (Charlie)
ITEMS TO VERIFY
Method for monitoring conditions inside the tarped area (JE Dunn)
REMARKS
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 3 of 5
A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter
round differs from those specified in 1914 but specifications do not mention attachment at concrete
This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over
and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed
A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above
is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 4 of 5
A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been
slugged full with mortar prior to setting course above tie wire pulled freely from backing construction
Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction
aides to plumb up the tall stones during setting
A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No
signs of distress observed but area was dusty and full of debris from demolition
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 5 of 5
A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze
stones
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Phasing amp Schedule Attachments The following documents are included in the subsequent pages
- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Phasing Plan
The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality
Trailer Compound
TUNNEL (will continue across Lincoln)
DELTA
FOX TROT
ECHO
KILO
ALPHA
CHARLIE
GOLF
INDIA
HOTEL
JULIETTE
LIMA
BRAVO
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Utilization Plan
Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices
Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment
The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment
JED
JEDBak
er
Mar
k 1
ProjectOklahoma StateCapitolRehabilitation
Date12072016
DrawingSite UtilizationPlan
Legend -JED Trailer Compound
-Phase 1 Site Fencing
-Gravel laydown
-Fence gate
-Future phases site fencing
-Future phases gravel laydown
EnvAct
Review
JED
Mark 1
JED
Faith
Dumpster
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Window Abatement Tracking Plan
DECEMBER 2016
Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 2 of 5
area resulting in a build-up of salts While redressing has removed approximately frac14rdquo of stone material
the redressed area remains damp longer than adjacent portions of the faccedilade which would seem to
indicate the sealer is present even at this depth Potential sources of salts identified backing
construction penetrating sealer applied to building Area was discussed with WJE personnel
Additional spot cleaning on Charlie biological on molding at the bottom of the fret and crusts on the
bottom of the corbel molding Both locations are unique to this elevation
ACTION REQUIRED
Tarp installation on all facades placement and distribution of heating devices including monitoring
devices for temperature (Mark1 and JE Dunn)
Direction for spot cleaning on A208 (Charlie)
ITEMS TO VERIFY
Method for monitoring conditions inside the tarped area (JE Dunn)
REMARKS
OBSERVED BY Julia Manglitz (TreanorHL)
COPIES TO David Mihm (OMES) Doug Kellogg (OMES) Mike Jones (OMES) Trait Thompson
(OMES) Duane Mass (MAI) Elizabeth Williams (MAI) Jason Cady (MAI) Matthew
Radcliffe (MAI) Heath Glenn (JE Dunn) Josh Martin (JE Dunn) Landon Heaton (JE
Dunn) Lindsey Ross (JE Dunn) Lynnsee Boyse (JE Dunn) Tony Talerico (JE Dunn) JC
Witcher (ADG) Robert Meek (ADG) Julia Manglitz (Treanor Architects) Mariah Scott
(Treanor Architects) Todd Renyer (Treanor Architects) Vance Kelley (Treanor
Architects) Mike Thompson (ZFI) Steve Ford (ZFI) Andy Wiese (Alvine) Ed Kongs
(Alvine) Sam Haberman (Alvine) Steve Alvine (Alvine) Gary Noland (Smith Roberts
Baldischwiler)
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 3 of 5
A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter
round differs from those specified in 1914 but specifications do not mention attachment at concrete
This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over
and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed
A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above
is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 4 of 5
A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been
slugged full with mortar prior to setting course above tie wire pulled freely from backing construction
Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction
aides to plumb up the tall stones during setting
A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No
signs of distress observed but area was dusty and full of debris from demolition
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 5 of 5
A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze
stones
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Phasing amp Schedule Attachments The following documents are included in the subsequent pages
- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Phasing Plan
The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality
Trailer Compound
TUNNEL (will continue across Lincoln)
DELTA
FOX TROT
ECHO
KILO
ALPHA
CHARLIE
GOLF
INDIA
HOTEL
JULIETTE
LIMA
BRAVO
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Utilization Plan
Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices
Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment
The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment
JED
JEDBak
er
Mar
k 1
ProjectOklahoma StateCapitolRehabilitation
Date12072016
DrawingSite UtilizationPlan
Legend -JED Trailer Compound
-Phase 1 Site Fencing
-Gravel laydown
-Fence gate
-Future phases site fencing
-Future phases gravel laydown
EnvAct
Review
JED
Mark 1
JED
Faith
Dumpster
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Window Abatement Tracking Plan
DECEMBER 2016
Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 3 of 5
A206 ndash NW-0A06 existing anchor in course below found in good condition Anchor type frac12rdquo diameter
round differs from those specified in 1914 but specifications do not mention attachment at concrete
This anchor may attach to the concrete beam which is just below the brick backup Anchor is bent over
and secured into the top of the architrave course in a mortar pocket no distress or corrosion observed
A206 ndash NW-0A06 existing brick backing construction and pocket at removed anchor Corbel course above
is an L-shaped stone with 12rdquo of overall depth on the bottom bed of the stone
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 4 of 5
A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been
slugged full with mortar prior to setting course above tie wire pulled freely from backing construction
Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction
aides to plumb up the tall stones during setting
A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No
signs of distress observed but area was dusty and full of debris from demolition
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 5 of 5
A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze
stones
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Phasing amp Schedule Attachments The following documents are included in the subsequent pages
- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Phasing Plan
The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality
Trailer Compound
TUNNEL (will continue across Lincoln)
DELTA
FOX TROT
ECHO
KILO
ALPHA
CHARLIE
GOLF
INDIA
HOTEL
JULIETTE
LIMA
BRAVO
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Utilization Plan
Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices
Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment
The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment
JED
JEDBak
er
Mar
k 1
ProjectOklahoma StateCapitolRehabilitation
Date12072016
DrawingSite UtilizationPlan
Legend -JED Trailer Compound
-Phase 1 Site Fencing
-Gravel laydown
-Fence gate
-Future phases site fencing
-Future phases gravel laydown
EnvAct
Review
JED
Mark 1
JED
Faith
Dumpster
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Window Abatement Tracking Plan
DECEMBER 2016
Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 4 of 5
A207 ndash NN-0A03 demolition in progress Rivet anchor location at top of the stone appears to have been
slugged full with mortar prior to setting course above tie wire pulled freely from backing construction
Rivet ties were encountered during investigations the summer of 2015 ndash these anchors were construction
aides to plumb up the tall stones during setting
A207 -NN-0A03 stone to stone horizontal anchor in architrave course below revealed by demolition No
signs of distress observed but area was dusty and full of debris from demolition
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 5 of 5
A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze
stones
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Phasing amp Schedule Attachments The following documents are included in the subsequent pages
- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Phasing Plan
The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality
Trailer Compound
TUNNEL (will continue across Lincoln)
DELTA
FOX TROT
ECHO
KILO
ALPHA
CHARLIE
GOLF
INDIA
HOTEL
JULIETTE
LIMA
BRAVO
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Utilization Plan
Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices
Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment
The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment
JED
JEDBak
er
Mar
k 1
ProjectOklahoma StateCapitolRehabilitation
Date12072016
DrawingSite UtilizationPlan
Legend -JED Trailer Compound
-Phase 1 Site Fencing
-Gravel laydown
-Fence gate
-Future phases site fencing
-Future phases gravel laydown
EnvAct
Review
JED
Mark 1
JED
Faith
Dumpster
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Window Abatement Tracking Plan
DECEMBER 2016
Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
DDropboxoklahoma - juliaCAOSCR FR TA019 - 2016_11-30docx
Page 5 of 5
A208 ndash Efflorescence bloom in area of uneven drying at NW-0A06 Small blooms found at other frieze
stones
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Phasing amp Schedule Attachments The following documents are included in the subsequent pages
- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Phasing Plan
The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality
Trailer Compound
TUNNEL (will continue across Lincoln)
DELTA
FOX TROT
ECHO
KILO
ALPHA
CHARLIE
GOLF
INDIA
HOTEL
JULIETTE
LIMA
BRAVO
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Utilization Plan
Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices
Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment
The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment
JED
JEDBak
er
Mar
k 1
ProjectOklahoma StateCapitolRehabilitation
Date12072016
DrawingSite UtilizationPlan
Legend -JED Trailer Compound
-Phase 1 Site Fencing
-Gravel laydown
-Fence gate
-Future phases site fencing
-Future phases gravel laydown
EnvAct
Review
JED
Mark 1
JED
Faith
Dumpster
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Window Abatement Tracking Plan
DECEMBER 2016
Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Phasing amp Schedule Attachments The following documents are included in the subsequent pages
- Site Phasing Plan - Site Utilization Plan - Window Abatement Tracking Plan - Four (4) Week Look Ahead Schedule
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Phasing Plan
The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality
Trailer Compound
TUNNEL (will continue across Lincoln)
DELTA
FOX TROT
ECHO
KILO
ALPHA
CHARLIE
GOLF
INDIA
HOTEL
JULIETTE
LIMA
BRAVO
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Utilization Plan
Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices
Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment
The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment
JED
JEDBak
er
Mar
k 1
ProjectOklahoma StateCapitolRehabilitation
Date12072016
DrawingSite UtilizationPlan
Legend -JED Trailer Compound
-Phase 1 Site Fencing
-Gravel laydown
-Fence gate
-Future phases site fencing
-Future phases gravel laydown
EnvAct
Review
JED
Mark 1
JED
Faith
Dumpster
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Window Abatement Tracking Plan
DECEMBER 2016
Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Phasing Plan
The site phasing plan is a broad representation of the work flow for the capitol exterior rehabilitation Beginning with Alpha (west elevation of the north wing) scaffolding has been constructed continuing on to Beta Charlie and Delta We construct two phases of scaffolding at a time which is followed by haz-ardous material removal window restoration and stone and lighting repair As each phase is completed the scaffolding will be disassembled and reassembled on the subsequent phases This site phasing will occur for the duration of the rehabilitation until all work is complete and the State Capitol is back to its original beauty and functionality
Trailer Compound
TUNNEL (will continue across Lincoln)
DELTA
FOX TROT
ECHO
KILO
ALPHA
CHARLIE
GOLF
INDIA
HOTEL
JULIETTE
LIMA
BRAVO
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Utilization Plan
Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices
Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment
The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment
JED
JEDBak
er
Mar
k 1
ProjectOklahoma StateCapitolRehabilitation
Date12072016
DrawingSite UtilizationPlan
Legend -JED Trailer Compound
-Phase 1 Site Fencing
-Gravel laydown
-Fence gate
-Future phases site fencing
-Future phases gravel laydown
EnvAct
Review
JED
Mark 1
JED
Faith
Dumpster
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Window Abatement Tracking Plan
DECEMBER 2016
Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
Trailer Compound
TUNNEL (will continue across Lincoln)
DELTA
FOX TROT
ECHO
KILO
ALPHA
CHARLIE
GOLF
INDIA
HOTEL
JULIETTE
LIMA
BRAVO
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
ACTIVE ELEVATIONS
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Utilization Plan
Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices
Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment
The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment
JED
JEDBak
er
Mar
k 1
ProjectOklahoma StateCapitolRehabilitation
Date12072016
DrawingSite UtilizationPlan
Legend -JED Trailer Compound
-Phase 1 Site Fencing
-Gravel laydown
-Fence gate
-Future phases site fencing
-Future phases gravel laydown
EnvAct
Review
JED
Mark 1
JED
Faith
Dumpster
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Window Abatement Tracking Plan
DECEMBER 2016
Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
DECEMBER 2016
Site Utilization Plan
Per our site utilization plan the JE Dunn trailer compound is the designated area for our staff memberstrade partners and material storage areas It currently houses four field offices
Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building helping to ensure a safe work environment
The gravel lay-down areas are designated paths where machinery supplies and equipment are stored and provide a roadway for machinery to move supplies to and from the job site The gravel will also serve as a protective barrier of the subsurface Fence gates mark all areas where access can be gained to the job site for material andor equipmentdeliveries emergency access or personnel access These gates remain closed and are locked every night to ensure a safe work environment
JED
JEDBak
er
Mar
k 1
ProjectOklahoma StateCapitolRehabilitation
Date12072016
DrawingSite UtilizationPlan
Legend -JED Trailer Compound
-Phase 1 Site Fencing
-Gravel laydown
-Fence gate
-Future phases site fencing
-Future phases gravel laydown
EnvAct
Review
JED
Mark 1
JED
Faith
Dumpster
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Window Abatement Tracking Plan
DECEMBER 2016
Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
JED
JEDBak
er
Mar
k 1
ProjectOklahoma StateCapitolRehabilitation
Date12072016
DrawingSite UtilizationPlan
Legend -JED Trailer Compound
-Phase 1 Site Fencing
-Gravel laydown
-Fence gate
-Future phases site fencing
-Future phases gravel laydown
EnvAct
Review
JED
Mark 1
JED
Faith
Dumpster
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Window Abatement Tracking Plan
DECEMBER 2016
Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
1503
9DB
MON
THLY
CON
STRU
CTIO
N PR
OGRE
SS R
EPOR
T
Exterior Rehabilitation
4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY OK 73104 I P 4053024500 I WWWJEDUNNCOM
JE DUNN I TREANOR ARCHITECTS I ADG
RETURNS TO TABLE OF CONTENTSCLICK HERE
Window Abatement Tracking Plan
DECEMBER 2016
Our team is currently performing hazardous material abatement glass removal and historic preservation and restoration The following document shows the progress we have made thus far
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
SECOND FLOOR
100-0
THIRD FLOOR
114-6
FIRST FLOOR
88-0
BASEMENT
74-0
FOURTH FLOOR
126-3
FIFTH FLOOR
137-5
ATTIC
150-0
257A3
343A3
254C
256C
448G
449G
450G
538G
537G
536G
451A3
032L
033L
034A2
031L
154A2
153B
152B
151B
TOP OF PARAPET
162-2
255C
NE-0A08
NE-0A04NE-0A03 NE-0A09NE-0A01
NE-0501
NE-0203
NE-0202
NE-0A07
NE-0201
NE-0303
NE-0301
NE-0302
NE-0502
0
S01
S10
S05
S03
S06
S07
S07
S06
S03
S18
UNO
BO CORNICE TYP
S06
S07
BO WATERTABLE TYP
S07
FO
R N
OR
TH
WIN
G N
OR
TH
ELE
VA
TIO
N S
EE
A1A
207
WE25
WE25
WE25
WE25
WE28
WE28
WE28
S16
S18
S02
TYP AT JTW CONC
FO
R E
AS
T W
ING
NO
RT
H E
LE
VA
TIO
N S
EE
A1A
209
FOR EAST WINGEAST ELEVATION
SEE A1A210
NE-0A02
NE-0A06NE-0A05
WE44
WE28
S15
BO HEADERTYP OF 2 TYPEA2 OPENINGS
TYP OF 2 TYPEA2 OPENINGS
BO HEADERTYP OF 3TYPE BOPENINGS
TYP OF 3TYPE BOPENINGS
BO HEADERTYP OF 3TYPE COPENINGS
TYP OF 3TYPE COPENINGS
S07
S15
S16
S07S15
S16
BO HEADER TYPOF 3 TYPE A3OPENINGS
TYP OF 3TYPE A3OPENINGS
BO HEADERTYP OF 3TYPE GOPENINGS
TYP OF 6TYPE GOPENINGS
S16
S16
S07
S07
S15
S15
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
TYP THISCOURSE
WE28
WE28
WE25
WE27
2-8 18
7-3 1
8
S14
S12TYP ATSTONEGUTTER
S20
S07
TYP THISELEMENT
18 = 1-0
NORTH WING EAST ELEVATION40 8 16
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Asbestos Removed
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
Historic Window RestorationProgress Legend
Lead Paint RemovedFrom Screw Heads
Storm WindowRemoved
Historic GlassRemoved
Lead Paint RemovedFrom Window Frame
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
ElevationsElevationsElevations 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Alpha- North Wing West FaceAlpha- North Wing West FaceAlpha- North Wing West Face 22-Sep-16 A 13-Mar-17 22-Sep-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 22-Sep-16 A 16-Jan-17 22-Sep-16 14
22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1140 Alpha-Shop restoration of windows 02 Wind 22-Sep-16 A 16-Jan-17 22-Sep-16 14
Typ-1010 Alpha-Engineering approval of scaffold design SCAFF 11-Nov-16 A 03-Jan-17 11-Nov-16 5
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 21-Nov-16 A 24-Jan-17 21-Nov-16 20
21-Nov-16 A 24-Jan-17 21-Nov-16 20
CON-11130 Alpha-Bay 1-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11180 Alpha-Bay 2-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11230 Alpha-Bay 3-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11280 Alpha-Bay 4-Frame Testing amp Repairs 02 Wind 21-Nov-16 A 06-Jan-17 21-Nov-16 8
CON-11140 Alpha- Bay 1-Frame PrepPrime 02 Wind 09-Jan-17 12-Jan-17 4
CON-11190 Alpha-Bay 2-Frame PrepPrime 02 Wind 13-Jan-17 18-Jan-17 4
CON-11240 Alpha-Bay 3-Frame PrepPrime 02 Wind 19-Jan-17 24-Jan-17 4
ParapetParapetParapet 19-Dec-16 A 24-Jan-17 19-Dec-16 20
19-Dec-16 A 24-Jan-17 19-Dec-16 20
CON-11610 Alpha-Remove Coping Stones 01 Maso 19-Dec-16 A 03-Jan-17 19-Dec-16 5
CON-11620 Alpha-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-11730 Alpha-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-11731 Alpha-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 1Door 1Door 1 03-Jan-17 13-Mar-17 50
CON-27350 Alpha-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Bravo- North Wing North FaceBravo- North Wing North FaceBravo- North Wing North Face 20-Oct-16 A 13-Mar-17 20-Oct-16 54
Submittals (E1)Submittals (E1)Submittals (E1) 20-Oct-16 A 24-Jan-17 20-Oct-16 20
20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15880 Bravo-Shop restoration of windows 02 Wind 20-Oct-16 A 24-Jan-17 20-Oct-16 20
CON-15870 Bravo-Engineering approval of scaffold design SCAFF 11-Nov-16 A 04-Jan-17 11-Nov-16 6
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 09-Jan-17 24-Jan-17 12
09-Jan-17 24-Jan-17 12
CON-16170 Bravo-Bay 1-Frame Testing amp Repairs 02 Wind 09-Jan-17 11-Jan-17 3
CON-16190 Bravo-Bay 2-Frame Testing amp Repairs 02 Wind 12-Jan-17 16-Jan-17 3
CON-16210 Bravo-Bay 3-Frame Testing amp Repairs 02 Wind 17-Jan-17 19-Jan-17 3
CON-16230 Bravo-Bay 4-Frame Testing amp Repairs 02 Wind 20-Jan-17 24-Jan-17 3
Early StoneEarly StoneEarly Stone 28-Nov-16 A 12-Jan-17 28-Nov-16 12
28-Nov-16 A 12-Jan-17 28-Nov-16 12
CON-16260 Bravo-Grinding and pointing step 1 01 Maso 28-Nov-16 A 12-Jan-17 28-Nov-16 12
New Door SequenceNew Door SequenceNew Door Sequence 03-Jan-17 13-Mar-17 50
Door 106Door 106Door 106 03-Jan-17 13-Mar-17 50
CON-27440 Bravo-Field Measure and Procure Door 03-Jan-17 13-Mar-17 50
Charlie- North Wing East FaceCharlie- North Wing East FaceCharlie- North Wing East Face 27-Dec-16 21-Feb-17 40
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 21-Feb-17 40
27-Dec-16 21-Feb-17 40
CON-12670 Charlie-Shop restoration of windows 02 Wind 27-Dec-16 21-Feb-17 40
ParapetParapetParapet 27-Dec-16 24-Jan-17 20
27-Dec-16 24-Jan-17 20
CON-13500 Charlie-Remove Coping Stones 01 Maso 27-Dec-16 03-Jan-17 5
CON-13510 Charlie-Fill Voids amp Reset Loose Brick(s) 01 Maso 04-Jan-17 10-Jan-17 5
CON-13520 Charlie-Install Cramp amp Pin Anchors 01 Maso 11-Jan-17 17-Jan-17 5
CON-13530 Charlie-Fabricate Through-Wall Flashing 08 MWP 18-Jan-17 24-Jan-17 5
Delta- East Wing North FaceDelta- East Wing North FaceDelta- East Wing North Face 12-Dec-16 A 28-Feb-17 12-Dec-16 45
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 28-Feb-17 45
27-Dec-16 28-Feb-17 45
CON-18260 Delta-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-18270 Delta-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
CON-18280 Delta-Shop restoration of windows 02 Wind 04-Jan-17 28-Feb-17 40
CON-18300 Delta-Field measure glass from the exterior face 02 Wind 11-Jan-17 17-Jan-17 5
ScaffoldScaffoldScaffold 29-Dec-16 19-Jan-17 15
29-Dec-16 19-Jan-17 15
CON-18360 Delta-Install temporary louversfresh air intake JED 29-Dec-16 30-Dec-16 2
CON-18340 Delta-Cover scaffolding with tarp 01 Maso 11-Jan-17 19-Jan-17 7
CON-18330 Delta-Install scaffold temporary power 06 Elec 11-Jan-17 13-Jan-17 3
CON-18350 Delta-Install scaffold temporary HVAC 05 MP 16-Jan-17 18-Jan-17 3
Window RemovalAbatementWindow RemovalAbatementWindow RemovalAbatement 12-Dec-16 A 24-Jan-17 12-Dec-16 20
12-Dec-16 A 24-Jan-17 12-Dec-16 20
CON-18470 Delta-Bay 1-WindowTrim Removal 02 Wind 12-Dec-16 A 03-Jan-17 12-Dec-16 3
CON-18500 Delta-Bay 2-WindowTrim Removal 02 Wind 12-Dec-16 A 06-Jan-17 12-Dec-16 3
CON-18530 Delta-Bay 3-WindowTrim Removal 02 Wind 12-Dec-16 A 11-Jan-17 12-Dec-16 3
CON-18560 Delta-Bay 4-WindowTrim Removal 02 Wind 12-Dec-16 A 16-Jan-17 12-Dec-16 3
CON-24880 Delta-Bay 5-WindowTrim Removal 02 Wind 12-Dec-16 A 19-Jan-17 12-Dec-16 3
CON-24910 Delta-Bay 6-WindowTrim Removal 02 Wind 12-Dec-16 A 24-Jan-17 12-Dec-16 3
CON-18460 Delta-Bay 1-Ext Abatement Envi 27-Dec-16 28-Dec-16 2
CON-18480 Delta-Bay 2-Ext Abatement Envi 29-Dec-16 30-Dec-16 2
CON-18510 Delta-Bay 3-Ext Abatement Envi 03-Jan-17 04-Jan-17 2
CON-18490 Delta-Bay 1-Lead paint removal from window frames Envi 04-Jan-17 06-Jan-17 3
CON-18540 Delta-Bay 4-Ext Abatement Envi 05-Jan-17 06-Jan-17 2
CON-18520 Delta-Bay 2-Lead paint removal from window frames Envi 09-Jan-17 11-Jan-17 3
CON-24870 Delta-Bay 5-Ext Abatement Envi 09-Jan-17 10-Jan-17 2
CON-24890 Delta-Bay 6-Ext Abatement Envi 11-Jan-17 12-Jan-17 2
CON-18550 Delta-Bay 3-Lead paint removal from window frames Envi 12-Jan-17 16-Jan-17 3
CON-24920 Delta-Bay 7-Ext Abatement Envi 13-Jan-17 16-Jan-17 2
CON-18580 Delta-Bay 4-Lead paint removal from window frames Envi 17-Jan-17 19-Jan-17 3
CON-24950 Delta-Bay 8-Ext Abatement Envi 17-Jan-17 18-Jan-17 2
CON-24990 Delta-Bay 9-Ext Abatement Envi 19-Jan-17 20-Jan-17 2
CON-24900 Delta-Bay 5-Lead paint removal from window frames Envi 20-Jan-17 24-Jan-17 3
GutterParapetGutterParapetGutterParapet 16-Jan-17 20-Jan-17 5
16-Jan-17 20-Jan-17 5
CON-27890 Delta-Remove Electrical 06 Elec 16-Jan-17 17-Jan-17 2
CON-27900 Delta-Remove Lightning Protection 01 Maso 16-Jan-17 16-Jan-17 1
CON-28480 Delta-GutterParapet Start JED 16-Jan-17 0
CON-28490 Delta-Scaffold Back of Parapet 01 Maso 16-Jan-17 20-Jan-17 5
Echo- East Wing East FaceEcho- East Wing East FaceEcho- East Wing East Face 27-Dec-16 07-Feb-17 30
Submittals (E1)Submittals (E1)Submittals (E1) 27-Dec-16 10-Jan-17 10
27-Dec-16 10-Jan-17 10
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Alpha-Shop restoration of windows
Alpha-Engineering approval of scaffold design
Alpha-Bay 1-Frame Testing amp Repairs
Alpha-Bay 2-Frame Testing amp Repairs
Alpha-Bay 3-Frame Testing amp Repairs
Alpha-Bay 4-Frame Testing amp Repairs
Alpha- Bay 1-Frame PrepPrime
Alpha-Bay 2-Frame PrepPrime
Alpha-Bay 3-Frame PrepPrime
Alpha-Remove Coping Stones
Alpha-Fill Voids amp Reset Loose Brick(s)
Alpha-Install Cramp amp Pin Anchors
Alpha-Fabricate Through-Wall Flashing
Alpha-Field Mea
Bravo-Shop restoration of windows
Bravo-Engineering approval of scaffold design
Bravo-Bay 1-Frame Testing amp Repairs
Bravo-Bay 2-Frame Testing amp Repairs
Bravo-Bay 3-Frame Testing amp Repairs
Bravo-Bay 4-Frame Testing amp Repairs
Bravo-Grinding and pointing step 1
Bravo-Field Mea
Charlie-Shop restoration of windows
Charlie-Remove Coping Stones
Charlie-Fill Voids amp Reset Loose Brick(s)
Charlie-Install Cramp amp Pin Anchors
Charlie-Fabricate Through-Wall Flashing
Delta-Submit Scaffold Engineering
Delta-Engineering approval of scaffold design
Delta-Shop restoration of windows
Delta-Field measure glass from the exterior face
Delta-Install temporary louversfresh air intake
Delta-Cover scaffolding with tarp
Delta-Install scaffold temporary power
Delta-Install scaffold temporary HVAC
Delta-Bay 1-WindowTrim Removal
Delta-Bay 2-WindowTrim Removal
Delta-Bay 3-WindowTrim Removal
Delta-Bay 4-WindowTrim Removal
Delta-Bay 5-WindowTrim Removal
Delta-Bay 6-WindowTrim Removal
Delta-Bay 1-Ext Abatement
Delta-Bay 2-Ext Abatement
Delta-Bay 3-Ext Abatement
Delta-Bay 1-Lead paint removal from window frames
Delta-Bay 4-Ext Abatement
Delta-Bay 2-Lead paint removal from window frames
Delta-Bay 5-Ext Abatement
Delta-Bay 6-Ext Abatement
Delta-Bay 3-Lead paint removal from window frames
Delta-Bay 7-Ext Abatement
Delta-Bay 4-Lead paint removal from window frames
Delta-Bay 8-Ext Abatement
Delta-Bay 9-Ext Abatement
Delta-Bay 5-Lead paint removal from window frames
Delta-Remove Electrical
Delta-Remove Lightning Protection
Delta-GutterParapet Start
Delta-Scaffold Back of Parapet
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 1 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2
Activity ID Activity Name ContractorBP Start Finish Actual Start Actual Finish RemDur
CON-16460 Echo-Submit Scaffold Engineering 01 Maso 27-Dec-16 03-Jan-17 5
CON-16470 Echo-Engineering approval of scaffold design SCAFF 04-Jan-17 10-Jan-17 5
ScaffoldScaffoldScaffold 11-Jan-17 07-Feb-17 20
11-Jan-17 07-Feb-17 20
CON-16520 Echo-Erect Scaffold 01 Maso 11-Jan-17 07-Feb-17 20
CON-16510 Echo-Install Overhead Protection Entrances JED 11-Jan-17 17-Jan-17 5
InteriorInteriorInterior 11-Jan-17 17-Jan-17 5
11-Jan-17 17-Jan-17 5
CON-16610 Echo-Asbestos containing material initial survey Envi 11-Jan-17 17-Jan-17 5
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Dec 25 Jan 01 Jan 08 Jan 15 Jan 22 Jan 29 Feb 05 Feb 12 Feb 19 Feb 26 Mar 05 Mar 12
Echo-Submit Scaffold Engineering
Echo-Engineering approval of scaffold design
Echo-Erect Scaffold
Echo-Install Overhead Protection Entrances
Echo-Asbestos containing material initial survey
4 -Week Look-Ahead
Data Date 26-Dec-16
Run Date 23-Dec-16 1302
Oklahoma State Capitol Exterior Renovation
Page 2 of 2