Summary

Contents

Key Activities

Scope Development

Schedule

Progress Photos

12345

EXTERIOR DESIGN BUILD TEAM I JE DUNN I TREANOR ARCHITECTS I ADG

JULY 2016

OKLAHOMA STATE CAPITOL RESTORATION

Exterior Rehabilitation

EXTERIOR DESIGN BUILD TEAM I JE DUNN I TREANORHL ARCHITECTS I ADG

OKLAHOMA STATE CAPITOL RESTORATION

Exterior Rehabilitation

ContentsSummary

Safety

Progress Photos

Attachments

1234`

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

DECEMBER 2018

A STATE CAPITOL RESTORTATE CAPITOL RESTO

Page 2: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY, OK 73104 I P 405.302.4500 I WWW.JEDUNN.COM

RETURNS TO TABLE OF CONTENTSCLICK HERE

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

DECEMBER 2018

Summary: During the month of December on the Oklahoma Capitol Exterior Restoration Project, tunnel work has continued. The work at the center section of phase 1 was completed and the East Entry and East Parking Lot were re-opened. In early December the waterproofing removal on phase 2 began and completed, followed by new waterproofing installation. The new waterproofing will wrap up the first week in January. The entire phase 2 portion of the tunnel work should be complete in early January. Once this is complete, Lincoln Blvd. will re-open. The interior finishes in the tunnel will start in early 2019. However, the tunnel will remain closed until the new Visitor’s Center is complete. The final battlement work on the South Plaza Battlement completed in December.The South Portico door installation is on-going and should be complete in early January. The back sides of these doors were painted in December. This area will be complete in time for the Inauguration of the new Governor in January. The new lighted handrails were installed on the upper South Plaza. The handrails for the lower South Plaza will be installed after the inauguration of the new Governor in January. The Southwest Ramp handrails will be installed in late January with the Southwest Entry re-opening at the end of January. The temporary pedestrian protection was installed for the Southwest Entry in December. Once this entry opens, the Southeast entrance will be closed. The West Wing South Elevation (Juliette) final punchlist took place in December. The scaffolding started to be dismantled before Christmas and will complete in January. Once this scaffold is fully dismantled, it will be removed from the jobsite. The West Wing North Elevation (Lima) glass installation began on phase 1, starting on the 5th floor. The sealant installation is following the glass installation; both should be complete in January. The painters are working from the top down and have completed through the final coat of paint floors 5, 4 and 3 in December. The stone masons completed phase 1 and phase 2 stone repairs in December. The stone cleaning for both phases was completed in December. The phase 2 window frames were ultrasonic tested in December and the frame repairs started. The frame repairs will be complete in January. The installation of the copper gutter lining began in December and will be complete in February. The South Wing roofing work has continued. Golf and India gutterway framing has been completed. The South Wing substrate repair walk has been completed. The new roof drains are currently being installed. Copper removal from the skylights is on-going. The North Wing guardrails have been installed. Copper removal and North Wing gutterway framing will start in early January on the North Wing.

Page 3: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY, OK 73104 I P 405.302.4500 I WWW.JEDUNN.COM

RETURNS TO TABLE OF CONTENTSCLICK HERE

KeyActivities:

- Echo new historical replica door installation in progress - Echo restored light fixture installation complete - Tunnel phase one exterior work complete - Tunnel phase two exterior work in progress - Juliette scaffold demobilization in progress - Kilo scaffold demobilization complete - Lima gutter framing complete - Lima stone joint repointing complete - South wing re-roofing in progress - West wing clerestory window installation in progress - Lightwell excavation/concrete work for new sump pumps in progress - Delta balustrade stone restoration in progress - Alpha lightwell wall repairs in progress

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

DECEMBER 2018

Page 4: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY, OK 73104 I P 405.302.4500 I WWW.JEDUNN.COM

RETURNS TO TABLE OF CONTENTSCLICK HERE

Safety:The safety of our workforce and the general public during the course of construction is the most import-ant task that we must deliver. To that end, every craftsmen involved with the project receives a detailed project orientation, and prior to performing any task, the teams develop detailed task specific work plans. These work plans are often called Job Site Analysis (JSA) and assist project teams with analyzing different hazards associated with each work activity prior to beginning work.

Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

DECEMBER 2018

Safety Data and Metrics

Orientations Performed through 12.31.18 665

First Aid Incidents for the month of December 0

Recordable Incidents for the month of December 0

Trade Partner Incidents for the month of December 0

Total Man-Hours for the month of Dec. (hrs.) 7,121

Total Project Man-Hours (hrs.) 171,411

Page 5: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY, OK 73104 I P 405.302.4500 I WWW.JEDUNN.COM

RETURNS TO TABLE OF CONTENTSCLICK HERE

Safety Spotlight

DECEMBER 2018 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

We recently began the re-roofing work on the south wing of the Capitol building and will be moving to the north wing at the end of January. We have installed guardrails around the edge of the north and south wings for the roofing work that we are completing. These measures will help provide fall protection for our workers working on the roof.

Page 6: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY, OK 73104 I P 405.302.4500 I WWW.JEDUNN.COM

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2018 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Progress Photos & Field Reports

The photos and field reports attached in the subsequent pages represent progress photos taken during the month of December for the Oklahoma State Capitol Exterior Restoration project.

Page 7: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 109 - 2018_11-30.docx

Page 1 of 9

FIELD OBSERVATION REPORT REPORT NO: 109 DATE: 11/30/2018

TIME: 2:00 - 3:00 PM DAY OF WEEK: Friday

OWNER: OMES TEMP. RANGE: Low 60s

PROJECT: Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO: 15039DB

JE DUNN PROJECT NO: 15025800

ADG PROJECT NO: 15-007

TREANORHL PROJECT NO: HP 15.007.00B

ZFI PROJECT NO: 15071-01

ALVINE PROJECT NO: 2014-4286

SRB PROJECT NO: 114801

WEATHER: Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS: Clear Dusty Muddy Other ______________________

PERSONS CONTACTED: Lindsey Ross, Lynnsee Boyse - JE Dunn

WORK OBSERVED:

Sealant installation progressing at North Plaza stair.

Handrail installation progressing at East Plaza stair.

Waterproofing installation progressing at tunnel center section.

Sealant installation progressing at cheek walls on east elevation of south wing (Golf) and west

elevation of south wing (India).

Stone repairs progressing at South Plaza east battlement.

Sealant installation progressing at South Plaza upper stair.

Snow melt system installation progressing at South Plaza ramp.

Retaining wall progressing on southwest portion of site.

Door 203 installation progressing on south elevation of south wing (Hotel).

Lightning protection installation progressing at parapet on south elevation of west wing (Juliette).

Metal panel installation progressing at backside of parapet on south elevation of west wing (Juliette).

Cast iron frame painting progressing on north elevation of west wing (Lima).

Stone repairs progressing on north elevation of west wing (Lima).

ITEMS DISCUSSED:

Page 8: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 109 - 2018_11-30.docx

Page 2 of 9

None

ACTION REQUIRED:

None

ITEMS TO VERIFY:

None

REMARKS:

None

OBSERVED BY: Peter Breninger (ADG)

COPIES TO: Bobby Snyder (JE Dunn), Geoff Johnson (JE Dunn), Heath Glenn (JE Dunn), Lindsey Ross

(JE Dunn), Lynnsee Boyse (JE Dunn), Mark Maska (JE Dunn), Victor Mendoza (JE Dunn),

JC Witcher (ADG), Robert Meek (ADG), Amelia Hudspeth (TreanorHL), Julia Manglitz

(TreanorHL), Kelsey Liu (TreanorHL), Todd Renyer (TreanorHL), Vance Kelley

(TreanorHL), Mike Thompson (ZFI), Andy Wiese (Alvine), Ed Kongs (Alvine), Sam

Haberman (Alvine), Steve Alvine (Alvine), Gary Noland (Smith Roberts Baldischwiler)

Sealant installation in progress at North Plaza stair

Page 9: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 109 - 2018_11-30.docx

Page 3 of 9

Handrail installation progress at East Plaza stair

Waterproofing installation in progress at center section of tunnel

Page 10: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 109 - 2018_11-30.docx

Page 4 of 9

Sealant installation progress at cheek wall on east elevation of south wing (Golf)

Dutchman repair in progress at South Plaza east battlement

Page 11: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 109 - 2018_11-30.docx

Page 5 of 9

Sealant installation progress at southeast corner of South Plaza upper stair

Sealant installation progress at southwest corner of South Plaza upper stair

Page 12: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 109 - 2018_11-30.docx

Page 6 of 9

Conduit stub ups for handrail lighting at ramp on west side of South Plaza

Conduit installation and snow melt system installation in progress at ramp on west side of South Plaza

Page 13: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 109 - 2018_11-30.docx

Page 7 of 9

Retaining wall progress on southwest portion of site

Door 203 installation progress on south elevation of south wing (Golf)

Page 14: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 109 - 2018_11-30.docx

Page 8 of 9

Lightning protection installation progress at parapet on south elevation of west wing (Juliette)

Metal installation progress at backside of parapet on south elevation of west wing (Juliette)

Page 15: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 110 - 2018_12-04.docx

Page 1 of 11

FIELD OBSERVATION REPORT REPORT NO: 110 DATE: 12/4/2018

TIME: 1:30 - 2:30 PM DAY OF WEEK: Tuesday

OWNER: OMES TEMP. RANGE: Low 30s

PROJECT: Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO: 15039DB

JE DUNN PROJECT NO: 15025800

ADG PROJECT NO: 15-007

TREANORHL PROJECT NO: HP 15.007.00B

ZFI PROJECT NO: 15071-01

ALVINE PROJECT NO: 2014-4286

SRB PROJECT NO: 114801

WEATHER: Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS: Clear Dusty Muddy Other ______________________

PERSONS CONTACTED: Geoff Johnson, Lindsey Ross, Lynnsee Boyse, Mark Maska - JE Dunn

Julia Manglitz - TreanorHL

Gary Behm - St. Louis Antique Lighting Company

WORK OBSERVED:

Sealant installation progressing at North Plaza stair.

Light fixture installation progressing on east elevation of east wing (Echo).

Waterproofing installation progressing at tunnel center section.

Waterproofing removal progressing at tunnel at Lincoln Boulevard.

Stone repairs progressing at South Plaza east battlement.

Light fixture installation progressing on south elevation of south wing (Hotel).

Concrete formwork progressing for sidewalk on southwest portion of site.

Roof work progressing on west elevation of south wing (India).

Metal panel installation progressing at backside of parapet on north elevation of west wing (Lima).

Cast iron frame painting progressing on north elevation of west wing (Lima).

Stone cleaning progressing on north elevation of west wing (Lima).

ITEMS DISCUSSED:

Reviewed snow melt piping layout at top with ramp with Mark and Geoff. Piping will be routed to go

under concrete sidewalk only.

Page 16: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 110 - 2018_12-04.docx

Page 2 of 11

Reviewed joints between existing concrete slab, new concrete slab, and new concrete slab with Mark

and Geoff. Provide expansion joint filler between existing and new concrete.

Reviewed existing pavers to remain at north end of South Plaza on west end with Mark and Geoff.

Existing row of Radiant Red granite pavers to be removed prior to pouring adjacent concrete

sidewalk.

ACTION REQUIRED:

None

ITEMS TO VERIFY:

None

REMARKS:

None

OBSERVED BY: Peter Breninger (ADG)

COPIES TO: Bobby Snyder (JE Dunn), Geoff Johnson (JE Dunn), Heath Glenn (JE Dunn), Lindsey Ross

(JE Dunn), Lynnsee Boyse (JE Dunn), Mark Maska (JE Dunn), Victor Mendoza (JE Dunn),

JC Witcher (ADG), Robert Meek (ADG), Amelia Hudspeth (TreanorHL), Julia Manglitz

(TreanorHL), Kelsey Liu (TreanorHL), Todd Renyer (TreanorHL), Vance Kelley

(TreanorHL), Mike Thompson (ZFI), Andy Wiese (Alvine), Ed Kongs (Alvine), Sam

Haberman (Alvine), Steve Alvine (Alvine), Gary Noland (Smith Roberts Baldischwiler)

Elastomeric coating mockup in light well on west elevation of north wing (Alpha)

Page 17: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 110 - 2018_12-04.docx

Page 3 of 11

Sealant installation progress at North Plaza stair

Light fixture installation in progress on east elevation of east wing (Echo)

Page 18: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 110 - 2018_12-04.docx

Page 4 of 11

Waterproofing installation in progress at center section of tunnel

Waterproofing removal in progress at tunnel at Lincoln Boulevard

Page 19: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 110 - 2018_12-04.docx

Page 5 of 11

Dutchman repair progress at South Plaza east battlement

Light fixture installation progress at east cheek wall on south elevation of south wing (Hotel)

Page 20: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 110 - 2018_12-04.docx

Page 6 of 11

Light fixture installation progress at inset of South Portico on south elevation of south wing (Hotel)

Light fixture installation progress at west cheek wall on south elevation of south wing (Hotel)

Page 21: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 110 - 2018_12-04.docx

Page 7 of 11

Concrete formwork in progress at sidewalk on southwest portion of site.

Roof work in progress on west elevation of south wing (India)

Page 22: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 110 - 2018_12-04.docx

Page 8 of 11

Concrete topping slab panel marked for replacement at West Plaza

Furring channel installation progress prior to metal panel installation at backside of parapet on north

elevation of west wing (Lima)

Page 23: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 110 - 2018_12-04.docx

Page 9 of 11

Cast iron frame painting progress at window on north elevation of west wing (Lima)

Micro abrasive media cleaning in progress at east portion on north elevation of west wing (Lima)

Page 24: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 110 - 2018_12-04.docx

Page 10 of 11

Snow melt piping at top of ramp. Piping to be routed under concrete sidewalk only.

Joint shown between existing concrete slab, new concrete slab, and new concrete sidewalk. Expansion

joint filler to be provided between existing and new concrete.

Page 25: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 110 - 2018_12-04.docx

Page 11 of 11

Existing layout of granite pavers at north edge on west side of South Plaza. Row of Radiant Red granite

pavers to be removed prior to pouring adjacent concrete sidewalk.

Page 26: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 111 - 2018_12-11.docx

Page 1 of 12

FIELD OBSERVATION REPORT REPORT NO: 111 DATE: 12/11/2018

TIME: 9:45 - 10:15 AM; 1:00 - 2:45 PM DAY OF WEEK: Tuesday

OWNER: OMES TEMP. RANGE: Upper 40s; Upper 50s

PROJECT: Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO: 15039DB

JE DUNN PROJECT NO: 15025800

ADG PROJECT NO: 15-007

TREANORHL PROJECT NO: HP 15.007.00B

ZFI PROJECT NO: 15071-01

ALVINE PROJECT NO: 2014-4286

SRB PROJECT NO: 114801

WEATHER: Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS: Clear Dusty Muddy Other ______________________

PERSONS CONTACTED: Eric Nordwald, Geoff Johnson, Lindsey Ross, Lynnsee Boyse, Mark Maska - JE

Dunn

Julia Manglitz - TreanorHL

Mike Thompson - ZFI

Jason Cady - Mass Architects

WORK OBSERVED:

Backfill installation progressing at tunnel center section.

Concrete repairs progressing at tunnel at Lincoln Boulevard.

Roof work progressing on west elevation of south wing (India).

Temporary protection progressing at sidewalk on west elevation of south wing (India).

Snow melt system and electrical equipment installation progressing on southwest portion of site.

Metal panel installation progressing at backside of parapet on north elevation of west wing (Lima).

Underlayment installation progressing at gutter on north elevation of west wing (Lima).

Cast iron frame painting progressing on north elevation of west wing (Lima).

Window component installation progressing on north elevation of west wing (Lima).

Stone repairs progressing on north elevation of west wing (Lima).

Pointing mortar installation progressing on north elevation of west wing (Lima).

Stone cleaning progressing on north elevation of west wing (Lima).

Page 27: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 111 - 2018_12-11.docx

Page 2 of 12

ITEMS DISCUSSED:

None

ACTION REQUIRED:

None

ITEMS TO VERIFY:

None

REMARKS:

South elevation of west wing (Juliette) metal panel punch list.

Concrete sidewalk on southwest portion of site punch list.

Concrete ramp on southwest portion of site punch list.

Concrete retaining wall on southwest portion of site punch list.

Elastomeric coating mockup in light well on west elevation of north wing (Alpha) reviewed.

Historic light fixtures punch list.

OBSERVED BY: Peter Breninger (ADG)

COPIES TO: Bobby Snyder (JE Dunn), Geoff Johnson (JE Dunn), Heath Glenn (JE Dunn), Lindsey Ross

(JE Dunn), Lynnsee Boyse (JE Dunn), Mark Maska (JE Dunn), Victor Mendoza (JE Dunn),

JC Witcher (ADG), Robert Meek (ADG), Amelia Hudspeth (TreanorHL), Julia Manglitz

(TreanorHL), Kelsey Liu (TreanorHL), Todd Renyer (TreanorHL), Vance Kelley

(TreanorHL), Mike Thompson (ZFI), Andy Wiese (Alvine), Ed Kongs (Alvine), Sam

Haberman (Alvine), Steve Alvine (Alvine), Gary Noland (Smith Roberts Baldischwiler)

Page 28: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 111 - 2018_12-11.docx

Page 3 of 12

Handrails and light fixtures at East Plaza

Backfill installation progress at center section of tunnel prior to concrete drive installation

Page 29: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 111 - 2018_12-11.docx

Page 4 of 12

Concrete repair progress at tunnel at Lincoln Boulevard

Gutterway framing in progress at roof on west elevation of south wing (India)

Page 30: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 111 - 2018_12-11.docx

Page 5 of 12

Snow melt system and electrical equipment installation progress on north end of ramp at southwest

portion of site

Metal panel installation progress at backside of parapet on north elevation of west wing (Lima)

Page 31: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 111 - 2018_12-11.docx

Page 6 of 12

Underlayment installation progress at gutter on north elevation of west wing (Lima)

Cast iron frame painting progress at third floor window at west portion on north elevation of west wing

(Lima)

Page 32: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 111 - 2018_12-11.docx

Page 7 of 12

Window component installation in progress at fifth floor window at west portion on north elevation of

west wing (Lima)

Stone removal in progress at base of column pilaster at second floor at west portion on north elevation of

west wing (Lima)

Page 33: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 111 - 2018_12-11.docx

Page 8 of 12

Full stone replacement in progress at sill of third floor cast iron frame at west portion on north elevation

of west wing (Lima)

Full stone replacement in progress at frieze panel at east portion on north elevation of west wing (Lima)

Page 34: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 111 - 2018_12-11.docx

Page 9 of 12

Pointing mortar installation in progress at third floor at west portion on north elevation of west wing

(Lima)

Micro abrasive media cleaning in progress at first floor at east portion on north elevation of west wing

(Lima)

Page 35: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 111 - 2018_12-11.docx

Page 10 of 12

South elevation of west wing (Juliette) metal wall panel punch list

Concrete ramp on southwest portion of site punch list

Page 36: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 111 - 2018_12-11.docx

Page 11 of 12

Elastomeric coating mockup review in light well on west elevation of north wing (Alpha)

Historic light fixture installation punch list. Light fixtures shown are at the granite pedestals on the east

elevation of the east wing (Echo).

Page 37: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 111 - 2018_12-11.docx

Page 12 of 12

Historic light fixtures, not installed, are currently being stored at the base of the tower crane. The fixtures

will move to the State’s storage building in the near future.

Page 38: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 112 - 2018_12-18.docx

Page 1 of 13

FIELD OBSERVATION REPORT REPORT NO: 112 DATE: 12/18/2018

TIME: 10:15 - 11:45 AM DAY OF WEEK: Tuesday

OWNER: OMES TEMP. RANGE: Upper 40s

PROJECT: Oklahoma Capitol Restoration - Exterior Rehabilitation

CAP PROJECT NO: 15039DB

JE DUNN PROJECT NO: 15025800

ADG PROJECT NO: 15-007

TREANORHL PROJECT NO: HP 15.007.00B

ZFI PROJECT NO: 15071-01

ALVINE PROJECT NO: 2014-4286

SRB PROJECT NO: 114801

WEATHER: Clear Overcast Rain Snow Cold

Warm Hot Foggy Windy Ice Other _________

SITE CONDITIONS: Clear Dusty Muddy Other ______________________

PERSONS CONTACTED: Geoff Johnson, Heath Glenn, Lindsey Ross, Mark Maska - JE Dunn

Lukasz Lesniak - Mark 1

WORK OBSERVED:

Sealant installation progressing at light well stair on west elevation of north wing (Alpha).

Concrete progressing at tunnel center section.

Waterproofing installation progressing at tunnel at Lincoln Boulevard.

Roof work progressing on east elevation of south wing (Golf).

Handrail installation progressing at upper stairs at South Plaza.

Roof work progressing on west elevation of south wing (India).

Scaffold removal progressing on south elevation of west wing (Juliette).

Waterproofing installation progressing at West Plaza.

Light fixture installation progressing on west elevation of west wing (Kilo).

Cast iron frame painting progressing on north elevation of west wing (Lima).

Window component installation progressing on north elevation of west wing (Lima).

Sealant installation progressing at windows on north elevation of west wing (Lima).

Stone repairs progressing on north elevation of west wing (Lima).

Pointing mortar installation progressing on north elevation of west wing (Lima).

Page 39: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 112 - 2018_12-18.docx

Page 2 of 13

Sealant installation progressing at stone on north elevation of west wing (Lima).

ITEMS DISCUSSED:

Reviewed difference in width of concrete retaining wall at west side of South Plaza. Granite pavers to

be slightly larger at this location to make up for retaining wall width difference.

Reviewed backfill at planter beds between South Plaza and ramp. Backfill to be level as shown in

section B1 on sheet A701.

Reviewed expansion joint between tunnel and east entry building. Expansion joint to be provided as

shown on sheet A121.

Reviewed extents of waterproofing at east entry building. Waterproofing to be provided on

uncovered vertical surfaces as indicated on sheet A105.

ACTION REQUIRED:

None

ITEMS TO VERIFY:

None

REMARKS:

Reviewed paint at door frames of Doors 202, 203, and 204.

OBSERVED BY: Peter Breninger (ADG)

COPIES TO: Bobby Snyder (JE Dunn), Geoff Johnson (JE Dunn), Heath Glenn (JE Dunn), Lindsey Ross

(JE Dunn), Lynnsee Boyse (JE Dunn), Mark Maska (JE Dunn), Victor Mendoza (JE Dunn),

JC Witcher (ADG), Robert Meek (ADG), Amelia Hudspeth (TreanorHL), Julia Manglitz

(TreanorHL), Kelsey Liu (TreanorHL), Todd Renyer (TreanorHL), Vance Kelley

(TreanorHL), Mike Thompson (ZFI), Andy Wiese (Alvine), Ed Kongs (Alvine), Sam

Haberman (Alvine), Steve Alvine (Alvine), Gary Noland (Smith Roberts Baldischwiler)

Page 40: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 112 - 2018_12-18.docx

Page 3 of 13

Sealant installation progress between treads at light well on west elevation of north wing (Alpha)

Concrete drive in place over tunnel center section (looking west)

Page 41: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 112 - 2018_12-18.docx

Page 4 of 13

Concrete drive in place over tunnel center section (looking east)

Waterproofing installation progress at tunnel at Lincoln Boulevard

Page 42: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 112 - 2018_12-18.docx

Page 5 of 13

Roof work in progress on east elevation of south wing (Golf)

Handrail installation in progress at upper stair at South Plaza

Page 43: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 112 - 2018_12-18.docx

Page 6 of 13

Paint progress at Door 201 on south elevation of south wing (Hotel)

Roof work in progress on west elevation of south wing (India)

Page 44: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 112 - 2018_12-18.docx

Page 7 of 13

Scaffold removal in progress down to fifth floor on south elevation of west wing (Juliette)

Waterproofing fix in progress at upper portion of south stair at West Plaza

Page 45: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 112 - 2018_12-18.docx

Page 8 of 13

Light fixture installation progress at granite pedestals on west elevation of west wing (Kilo)

Window component installation and cast iron frame painting progress at fourth floor window on north

elevation of west wing (Lima)

Page 46: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 112 - 2018_12-18.docx

Page 9 of 13

Sealant installation in progress at joint between cast iron spandrel panel and limestone on north elevation

of west wing (Lima)

Full stone replacement progress at frieze panel at east portion on north elevation of west wing (Lima)

Page 47: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 112 - 2018_12-18.docx

Page 10 of 13

Sealant installation in progress at fascia course on north elevation of west wing (Lima)

Backer rod installation in progress prior to sealant installation at third floor on north elevation of west

wing (Lima)

Page 48: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 112 - 2018_12-18.docx

Page 11 of 13

Difference in width between existing and new retaining walls. Pavers to be wider to accommodate width

difference.

Sloped backfill at planter beds between South Plaza and ramp. Backfill slope to match section B1 on sheet

A701.

Page 49: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 112 - 2018_12-18.docx

Page 12 of 13

Expansion joint between tunnel and east entry building. Expansion joint to be provided as shown on

sheet A121.

Excavated portion of east entry building. Waterproofing to be provided on uncovered vertical surfaces

and to top of concrete shelf shown in picture.

Page 50: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 112 - 2018_12-18.docx

Page 13 of 13

Review of paint at door frames of Doors 202, 203, and 204.

Page 51: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

ZFI Engineering Co.

8411 S. Walker Ave.

OKC, OK 73139

Ph: 405.634.3393

Fx: 405.634.6414

www.zfiengr.com

Tunnel Repair Walk #6 (12-06-2018) – Preliminary Information

Work in Progress: Striping of existing materials from tunnel walls Present at Site: JE Dunn, Chamberlin, ZFI The following structural repairs were identified during our tunnel inspection. Refer Structural Sheets ST100 and ST101 for additional repair information.

Photo 1 – Existing Expansion Joint in South wall of tunnel Location: East portion of tunnel (Phase 2), south wall; expansion joint between tunnel and the east tunnel entrance structure. Observation: At the south wall, the expansion joint (EJ) needs to be rehabilitated. Repair Comments: Refer architectural drawings for joint preparation and rehabilitation at existing expansion joint.

Project: Oklahoma Capitol Restoration – Exterior Rehabilitation Project #: 15071-01 Date / Time: December 6, 2018/ 2.00p-3.15p Temperature: 47ᵒF Weather: Cloudy

Existing Expansion Joint

Page 52: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

Tunnel Repair Walk #6 – Preliminary Memo ZFI Project #: 15071-01 December 6, 2018 Page 2

Photo 2 – Existing Expansion Joint in North wall of tunnel Location: East portion of tunnel (Phase 2), north wall; expansion joint between tunnel and the east tunnel entrance structure. Observation: At the north wall, the expansion joint (EJ) needs to be rehabilitated. Repair Comments: Refer architectural drawings for joint preparation and rehabilitation at existing expansion joint.

Existing Expansion Joint

Page 53: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

Tunnel Repair Walk #6 – Preliminary Memo ZFI Project #: 15071-01 December 6, 2018 Page 3

Photo 3 – Existing Construction Joint in North wall of tunnel Location: East portion of tunnel (Phase 2), north wall; construction joint is approx. 72.58 ft. from west end of the excavation. Observation: At the north wall, the construction joint (CJ) needs to be rehabilitated. Repair Comments: Epoxy inject crack at CJ per Repair Type 2 on ST101: ~10’-0” (base of wall to top of wall). Some re-profiling (grinding) may be necessary at the joint.

Existing CJ

Page 54: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

Tunnel Repair Walk #6 – Preliminary Memo ZFI Project #: 15071-01 December 6, 2018 Page 4

Photo 4 – Existing Construction Joint in South wall of tunnel Location: East portion of tunnel (Phase 2), south wall; construction joint is approx. 72.58 ft. from west end of the excavation. Observation: At the south wall, the construction joint (CJ) needs to be rehabilitated. On the east side of the CJ, concrete damage was observed parallel to the CJ. The cracking observed doesn’t appear to be significant, but during CJ re-profiling the concrete will likely break up. Repair Comments: Epoxy inject crack at CJ per Repair Type 2 on ST101: ~10’-0” (base of wall to top of wall). Some re-profiling (grinding) may be necessary at the joint. For the concrete damage along the edge of the CJ, remove loose and unsound concrete and restore to original profile per Repair Type 1 on ST101: ~2.0 sq ft. (6”x4’-0”).

Existing CJ

Concrete Damage

Page 55: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

Tunnel Repair Walk #6 – Preliminary Memo ZFI Project #: 15071-01 December 6, 2018 Page 5

Photo 5 – Existing Construction Joint in South wall of tunnel Location: East portion of tunnel (Phase 2), south wall; construction joint is approx. 11.5 ft. from west end of the excavation. Observation: At the south wall, the construction joint (CJ) needs to be rehabilitated. Repair Comments: Epoxy inject crack at CJ per Repair Type 2 on ST101: ~10’-0” (base of wall to top of wall). Some re-profiling (grinding) may be necessary at the joint.

Existing CJ

Page 56: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

Tunnel Repair Walk #6 – Preliminary Memo ZFI Project #: 15071-01 December 6, 2018 Page 6

Photo 6 – Existing Construction Joint in North wall of tunnel Location: East portion of tunnel (Phase 2), south wall; construction joint is approx. 11.5 ft. from west end of the excavation. Observation: At the north wall, the construction joint (CJ) needs to be rehabilitated. Repair Comments: Epoxy inject crack at CJ per Repair Type 2 on ST101: ~10’-0” (base of wall to top of wall). Some re-profiling (grinding) may be necessary at the joint.

Existing CJ

Page 57: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

Tunnel Repair Walk #6 – Preliminary Memo ZFI Project #: 15071-01 December 6, 2018 Page 7

Photo 7 – Significant Honeycomb at North wall of tunnel Location: East portion of tunnel (Phase 2), North Wall, approx. 56 ft. from west end of excavation. Observation: Significant honeycombing of the concrete near the bottom of the north wall. The depth of the honeycomb was in excess of 1” and very little cement paste was present between the exposed aggregate. This condition has significantly reduced the concrete cover for the existing reinforcing in the wall. Repair Comments: Remove loose or unsound concrete and restore original profile per Repair Type 1 on ST101: ~2.0 sq ft. (16”x18”).

Significant Honeycombing

Page 58: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

Tunnel Repair Walk #6 – Preliminary Memo ZFI Project #: 15071-01 December 6, 2018 Page 8

Photo 7 – Honeycomb at South wall of tunnel Location: East portion of tunnel (Phase 2), South Wall, near middle of excavation. Observation: Horizontal vein of honeycomb was observed near the mid-height of the south wall. The depth of the honeycomb was in excess of 1”. This condition has significantly reduced the concrete cover for the existing reinforcing in the wall. Repair Comments: Remove loose or unsound concrete and restore original profile per Repair Type 1 on ST101: ~1.5 sq ft. (6”x36”). Important Repair Information: With the colder temperatures, the contractor shall take all necessary precautions (including postponing application until the temperature is more favorable) during any material installation (concrete patching, epoxy injection, anti-corrosion coating, etc.). Contractor shall confirm that the surface temperature at any repair area is 40ᵒF and rising by testing at least three spots in the vicinity of the repair with an infrared thermometer gun. In addition, the ambient temperature shall be 40ᵒF and rising at the time of material application. No material shall be installed if the overnight temperature is forecasted to drop below 40ᵒF.

Honeycombing

Page 59: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

Tunnel Repair Walk #6 – Preliminary Memo ZFI Project #: 15071-01 December 6, 2018 Page 9

Additional Inspection Comments: While on site, non-structural items such as irregular construction joints and surface holes (Photos 9 and 10 below) were observed and discussed among those present. JE Dunn documented the locations and quantities associated with these non-structural items. It is anticipated that these areas would be addressed as part of the surface preparation necessary to install the new waterproofing system.

Photo 9 – Cold joints between walls and foundation of tunnel

Photo 10 – Surface holes in walls of tunnel

Page 60: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.139 - 2018_12_04.docx Page 1 of 6

FIELD OBSERVATION REPORT REPORT NO: 139 DATE: 12/04/2018 TIME: 7:30 am – 4:00 pm DAY OF WEEK: Tuesday OWNER: OMES TEMP. RANGE: Mid 20s – Mid 30s PROJECT: Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO: 15039DB JE DUNN PROJECT NO: 15025800 ADG PROJECT NO: 15-007 TREANOR PROJECT NO: HP 15.007.00B ZFI PROJECT NO: 15071-01 ALVINE PROJECT NO: 2014-4286 SRB PROJECT NO: 114801 WEATHER: Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other _Flurries__ SITE CONDITIONS: Clear Dusty Muddy Other _________________ PERSONS CONTACTED:

Lynnsee Boyse, Mark Maska, Lindsey Ross, Geoffrey Johnson, Victor Mendoza (JE Dunn) Lukasz Lesniak (Mark 1) Trait Thompson (OMES) Lacey Lett (KFOR news) Brad Finch (f-stop photography) Gary Behm (St. Louis Antique Lighting) Michael Conway, Eddie Pait (Baker Roofing) Guenther Huber Delle (Ornametals) via phone

WORK OBSERVED:

Stone repairs and cleaning on A205 (Lima) elevation.

Window restoration/painting in progress on A205 (Lima) elevation.

Restored historic exterior lighting reinstallation in progress at the south portico and east and west entries.

Roofing substrate reconstruction and repair in progress on the south wing west slope.

ITEMS DISCUSSED:

Gutterway carpentry (JED, Baker): Area at drain is not constructed level in both directions as indicated in the details. All fasteners should be countersunk, and edges should be flush to provide a smooth substrate for the underlayment.

Page 61: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.139 - 2018_12_04.docx Page 2 of 6

Roof drain mounting flange needs to be set level with the surrounding plywood, as was done with the built in gutterways. If the plywood leaves greater than 1/8-inch gap apply polyurethane sealant to the joint to support the underlayment.

Add 1-inch wood cant strip to the gutterway/parapet corner to help ease the 90-degree turn.

Southern gutterway cricket ridge is not located per discussions on site during November field visit or per supplemental detail sent Nov. 15.

Selective demolition of roof substrate elements (JED): Very little of this work in the main slope has been completed. Removal of existing plywood over decking is necessary to review condition of original board decking and to ensure a clean, sound surface for underlayment attachment. Circular saw being used to section the plywood is improperly set and is overcutting and damaging the original decking that was intended to remain. Removal work needs to be performed in an orderly and controlled manner. Review of exposed substrate should be coordinated with ZFI Engineering.

Skylight details (JED, Baker, Ornametals): Conference call to discuss detailing and interaction with movement of the roof panels, particularly at the upslope corners. Daniel Delle will be on site the following week to review field conditions and assist in refinement of ground-based mockups.

Newel post at the north end of the A206 (Alpha) light well has been displaced. This element needs to be reset. (JED)

ACTION REQUIRED:

Remove and reconstruct the gutterway to conform to the contract documents, slope, elevation heights and run. Add cant strip. (JED)

Remove existing plywood over decking and coordinate review by ZFI. (JED)

Confirm travel arrangements for Daniel Delle. (Baker, Ornametals)

Plumbing lines for new roof drain locations need to be completed. (JED) ITEMS TO VERIFY:

REMARKS:

Filmed segment for KFOR news regarding the carving work that has been done on the project.

Afternoon with professional photographer to document the project.

OBSERVED BY: Julia Manglitz, Associate Principal (TreanorHL) COPIES TO: David Mihm (OMES), Doug Kellogg (OMES), Mike Jones (OMES), Trait Thompson

(OMES), Duane Mass (MAI), Jason Cady (MAI), Matthew Radcliffe (MAI), Mark Maska (JE Dunn), Bobby Snyder (JE Dunn), Lindsey Ross (JE Dunn), Lynnsee Boyse (JE Dunn), Geoffrey Johnson (JE Dunn), JC Witcher (ADG), Robert Meek (ADG), Julia Manglitz (TreanorHL), Todd Renyer (TreanorHL), Vance Kelley (TreanorHL), Mike Thompson (ZFI), Steve Ford (ZFI), Andy Wiese (Alvine), Ed Kongs (Alvine), Sam Haberman (Alvine), Steve Alvine (Alvine), Gary Noland (Smith Roberts Baldischwiler)

Page 62: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.139 - 2018_12_04.docx Page 3 of 6

S wing west gutterway center section looking south to cricket.

Target area around the drain was not constructed flat, flange of drain does not sit down into the plywood.

(Outline traced on plywood is the flange).

Page 63: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.139 - 2018_12_04.docx Page 4 of 6

Roof drain flange.

Removal of existing plywood overdecking begins to reveal substrate conditions – board decking should be selectively replaced in kind and boards in good condition may remain. Overcutting (visible on the left side

of the opening) is not acceptable.

Page 64: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.139 - 2018_12_04.docx Page 5 of 6

Electricians installing restored lighting on the west cheek wall of the south portico.

Reinstalled lighting at the south portico.

Page 65: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.139 - 2018_12_04.docx Page 6 of 6

Filming TV segment for KFOR about the stone carving techniques used during restoration.

Displaced newel post that needs to be reset.

Page 66: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.140 - 2018_12_05.docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO: 140 DATE: 12/05/2018 TIME: 7:30 am – 4:00 pm DAY OF WEEK: Wednesday OWNER: OMES TEMP. RANGE: Hi 20s – Lo 50s PROJECT: Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO: 15039DB JE DUNN PROJECT NO: 15025800 ADG PROJECT NO: 15-007 TREANOR PROJECT NO: HP 15.007.00B ZFI PROJECT NO: 15071-01 ALVINE PROJECT NO: 2014-4286 SRB PROJECT NO: 114801 WEATHER: Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other ___ SITE CONDITIONS: Clear Dusty Muddy Other _________________ PERSONS CONTACTED:

Lynnsee Boyse, Mark Maska, Lindsey Ross, Geoffrey Johnson, Victor Mendoza (JE Dunn) Lukasz Lesniak (Mark 1) Buddy (ReView) Brad Finch (f-stop photography) Eddie Pait (Baker Roofing)

WORK OBSERVED:

Stone repairs continue on A205 (Lima).

Corrections to south gutterway west started.

Sheet metal installation on the back of A203 (Juliette), including tie in with through wall flashing at the top of the rain screen.

ITEMS DISCUSSED:

Gutterway construction requirements (started on 12/4/18) discussion continued. (JED)

Schedule for next week and upcoming roofing work. (JED)

Soldering certification for Baker, number of workers capable of doing all soldering. More than one worker may work on a section, but each is limited to doing the sort of soldering that they are approved for. (JED, Baker)

Caps for through wall flashing to rain screen cladding were reviewed. Butyl sealant should be used if butyl tape will not contact both sides. Caps on Delta and Foxtrot low roof should be corrected to be like those on Juliette low roof. Lima low roof caps should be installed per Juliette.

Page 67: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.140 - 2018_12_05.docx Page 2 of 4

Removal of over decking on south wing roof at pediment rake reveals a second, abandoned reglet and that over deck laps over stone.

ACTION REQUIRED:

ITEMS TO VERIFY:

REMARKS:

Punchlist conducted on A203 (Juliette) full length of the façade and Juliette low roof copper gutter.

Professional photographer on site to document the project.

OBSERVED BY: Julia Manglitz, Associate Principal (TreanorHL) COPIES TO: David Mihm (OMES), Doug Kellogg (OMES), Mike Jones (OMES), Trait Thompson

(OMES), Duane Mass (MAI), Jason Cady (MAI), Matthew Radcliffe (MAI), Mark Maska (JE Dunn), Bobby Snyder (JE Dunn), Lindsey Ross (JE Dunn), Lynnsee Boyse (JE Dunn), Geoffrey Johnson (JE Dunn), JC Witcher (ADG), Robert Meek (ADG), Julia Manglitz (TreanorHL), Todd Renyer (TreanorHL), Vance Kelley (TreanorHL), Mike Thompson (ZFI), Steve Ford (ZFI), Andy Wiese (Alvine), Ed Kongs (Alvine), Sam Haberman (Alvine), Steve Alvine (Alvine), Gary Noland (Smith Roberts Baldischwiler)

A203 (Juliette) punchlist – repaired eagle.

Page 68: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.140 - 2018_12_05.docx Page 3 of 4

A203 (Juliette) punchlist; view of the top of the parapet wall looking north.

Modification of gutterway at roof drain; south wing west gutterway.

Page 69: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.140 - 2018_12_05.docx Page 4 of 4

South wing roof, west pediment rake. Abandoned reglet found (pointed to in photo); gap between back

of stone and concrete/wood roof deck visible to the left.

Page 70: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.141 - 2018_12_06.docx Page 1 of 4

FIELD OBSERVATION REPORT REPORT NO: 141 DATE: 12/06/2018 TIME: 8:30 am – 4:00 pm DAY OF WEEK: Thursday OWNER: OMES TEMP. RANGE: Mid 40s – Hi 40s PROJECT: Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO: 15039DB JE DUNN PROJECT NO: 15025800 ADG PROJECT NO: 15-007 TREANOR PROJECT NO: HP 15.007.00B ZFI PROJECT NO: 15071-01 ALVINE PROJECT NO: 2014-4286 SRB PROJECT NO: 114801 WEATHER: Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other ___ SITE CONDITIONS: Clear Dusty Muddy Other _________________ PERSONS CONTACTED:

Lynnsee Boyse, Mark Maska, Lindsey Ross, Geoffrey Johnson, Victor Mendoza, Frank Jakofcich (JE Dunn) Lukasz Lesniak (Mark 1) Mike Thompson (ZFI Engineering) Eddie Pait (Baker Roofing)

WORK OBSERVED:

Stone repairs and final pointing continue on A205 (Lima). Masonry cleaning is finishing on the east end, lower stories.

Window repairs continue on A205 (Lima)

Built-in gutter framing complete on A205 (Lima). Gutter is not blacked in for the full length. Underlayment is loose and not well adhered at the western most segment of the gutter.

Reconstruction of south wing west gutterway continues. Reviewed conditions and small are of substrate with ZFI.

ITEMS DISCUSSED:

Gutterway carpentry and requirements for substrate. (JED, ZFI)

Access to monitor roof framing on the west wing – provisions are planned to be in place next week. (JED)

Page 71: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.141 - 2018_12_06.docx Page 2 of 4

Temperature control and requirements for work both inside and outside the tarps for masonry. (JED, Mark1)

Removal of temporary protection at demolished revolving door reveals inserts and other attachments that pose trip hazard. Remedial repair or treatment of marble flooring should be undertaken. Coordination item with interior team. (JED)

ACTION REQUIRED:

ITEMS TO VERIFY:

REMARKS:

Storm expected to move in.

OBSERVED BY: Julia Manglitz, Associate Principal (TreanorHL) COPIES TO: David Mihm (OMES), Doug Kellogg (OMES), Mike Jones (OMES), Trait Thompson

(OMES), Duane Mass (MAI), Jason Cady (MAI), Matthew Radcliffe (MAI), Mark Maska (JE Dunn), Bobby Snyder (JE Dunn), Lindsey Ross (JE Dunn), Lynnsee Boyse (JE Dunn), Geoffrey Johnson (JE Dunn), JC Witcher (ADG), Robert Meek (ADG), Julia Manglitz (TreanorHL), Todd Renyer (TreanorHL), Vance Kelley (TreanorHL), Mike Thompson (ZFI), Steve Ford (ZFI), Andy Wiese (Alvine), Ed Kongs (Alvine), Sam Haberman (Alvine), Steve Alvine (Alvine), Gary Noland (Smith Roberts Baldischwiler)

View looking northwest as the south façade.

Page 72: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.141 - 2018_12_06.docx Page 3 of 4

Doors reinstalled/replaced at the south ceremonial entry. Repairs to the marble should be made.

Painting scheduled for the following week.

West gutterway, south wing, looking north.

Page 73: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.141 - 2018_12_06.docx Page 4 of 4

Looking northwest along the west slope of the south wing.

Looking northeast along the east slope of the south wing.

Page 74: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.142 - 2018_12_10.docx Page 1 of 3

FIELD OBSERVATION REPORT REPORT NO: 142 DATE: 12/10/2018 TIME: 8:00 am – 4:00 pm DAY OF WEEK: Monday OWNER: OMES TEMP. RANGE: Lo 40s – 50 PROJECT: Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO: 15039DB JE DUNN PROJECT NO: 15025800 ADG PROJECT NO: 15-007 TREANOR PROJECT NO: HP 15.007.00B ZFI PROJECT NO: 15071-01 ALVINE PROJECT NO: 2014-4286 SRB PROJECT NO: 114801 WEATHER: Clear Overcast Rain Snow Cold Warm Hot Foggy Windy Ice Other ___ SITE CONDITIONS: Clear Dusty Muddy Other _________________ PERSONS CONTACTED:

Lynnsee Boyse, Mark Maska, Lindsey Ross, Geoffrey Johnson, Victor Mendoza (JE Dunn) Mike Thompson (ZFI Engineering)

WORK OBSERVED:

Rain screen and associated sheet metal work is ongoing on Lima low roof area (northwest flat roof).

Installation of temporary access under the north slope of the west monitor roof is completed.

ITEMS DISCUSSED:

Access to various attic areas, particularly east wing from the east end.

ACTION REQUIRED:

ITEMS TO VERIFY:

REMARKS:

Morning spent in the east wing attic and on the low roofs documenting conditions and verifying construction for forthcoming ASI for copper roofing work.

Page 75: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.142 - 2018_12_10.docx Page 2 of 3

Afternoon spent in the west wing attic documenting monitor construction and detailing in preparation for forthcoming AST for copper roofing work.

OBSERVED BY: Julia Manglitz, Associate Principal (TreanorHL) COPIES TO: David Mihm (OMES), Doug Kellogg (OMES), Mike Jones (OMES), Trait Thompson

(OMES), Duane Mass (MAI), Jason Cady (MAI), Matthew Radcliffe (MAI), Mark Maska (JE Dunn), Bobby Snyder (JE Dunn), Lindsey Ross (JE Dunn), Lynnsee Boyse (JE Dunn), Geoffrey Johnson (JE Dunn), JC Witcher (ADG), Robert Meek (ADG), Julia Manglitz (TreanorHL), Todd Renyer (TreanorHL), Vance Kelley (TreanorHL), Mike Thompson (ZFI), Steve Ford (ZFI), Andy Wiese (Alvine), Ed Kongs (Alvine), Sam Haberman (Alvine), Steve Alvine (Alvine), Gary Noland (Smith Roberts Baldischwiler)

Looking northeast across the east attic.

Page 76: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.142 - 2018_12_10.docx Page 3 of 3

West attic.

Temporary access to west attic monitor

Page 77: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.143 - 2018_12_11.docx Page 1 of 3

FIELD OBSERVATION REPORT REPORT NO: 143 DATE: 12/11/2018 TIME: 8:00 am – 5:00 pm DAY OF WEEK: Tuesday OWNER: OMES TEMP. RANGE: Lo 30s – 60 PROJECT: Oklahoma Capitol Restoration - Exterior Rehabilitation CAP PROJECT NO: 15039DB JE DUNN PROJECT NO: 15025800 ADG PROJECT NO: 15-007 TREANOR PROJECT NO: HP 15.007.00B ZFI PROJECT NO: 15071-01 ALVINE PROJECT NO: 2014-4286 SRB PROJECT NO: 114801 WEATHER: ClearAM OvercastPM Rain Snow Cold Warm Hot Foggy Windy Ice Other ___ SITE CONDITIONS: Clear Dusty Muddy Other _________________ PERSONS CONTACTED:

Lynnsee Boyse, Mark Maska, Lindsey Ross, Geoffrey Johnson, Victor Mendoza (JE Dunn) Michael Conway, Eddie Pait, Allen Hinson, Jerry Barker (Baker Roofing) Daniel Delle (Ornametals) Doug Kellogg (OMES)

WORK OBSERVED:

Rain screen and associated sheet metal work is ongoing on Lima low roof area (northwest flat roof).

Installation of temporary access under the north slope of the west monitor roof is completed.

Gutterway framing has been altered per direction from last week site visit.

Sheet metal punchlist items on A203 (Juliette) are being corrected.

ITEMS DISCUSSED:

Access to various attic areas, particularly east wing from the east end.

Gutterway mockup and sheet metal layout, coordination and installation with the roof drain (west gutterway central section, south wing). (Baker, JED)

South wing skylight details and integration with panel installation: Move fixed location for panels down in line with the bottom of the upper skylights. Folded construction should work better at both. Change in fixed point will also require change in ridge detail. Discussed proposed detail revisions to the ridge on the large skylights. Discussed slight detail revisions proposed for attaching the top of the skylight cap to the upslope, side and downslope perimeters. Reviewed conditions on the roof with Ornametals to look at panel layout with the skylights (upper and lower). Discussed revision to the

Page 78: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.143 - 2018_12_11.docx Page 2 of 3

standing seam panel termination at the stone pediment rake to adjust for field conditions and allow more movement for the long pan. (JED, Baker, Ornametals)

ACTION REQUIRED:

Revise detail for the main panel ridge. Revise detail for the panel termination the pediment. (TreanorHL)

Execute mockup of proposed skylight details on ground. (Baker, Ornametals) ITEMS TO VERIFY:

REMARKS:

Late afternoon spent in the east wing attic to document conditions from the east end.

OBSERVED BY: Julia Manglitz, Associate Principal (TreanorHL) COPIES TO: David Mihm (OMES), Doug Kellogg (OMES), Mike Jones (OMES), Trait Thompson

(OMES), Duane Mass (MAI), Jason Cady (MAI), Matthew Radcliffe (MAI), Mark Maska (JE Dunn), Bobby Snyder (JE Dunn), Lindsey Ross (JE Dunn), Lynnsee Boyse (JE Dunn), Geoffrey Johnson (JE Dunn), JC Witcher (ADG), Robert Meek (ADG), Julia Manglitz (TreanorHL), Todd Renyer (TreanorHL), Vance Kelley (TreanorHL), Mike Thompson (ZFI), Steve Ford (ZFI), Andy Wiese (Alvine), Ed Kongs (Alvine), Sam Haberman (Alvine), Steve Alvine (Alvine), Gary Noland (Smith Roberts Baldischwiler)

Discussing and executing trial layout of gutterway panels.

Page 79: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

C:\Users\jmanglitz\Dropbox (Personal)\oklahoma - julia\CA\OSCR FR TA.143 - 2018_12_11.docx Page 3 of 3

Corrections to built in gutter edge flashing on A203 (Juliette).

Looking west along catwalk in east wing attic.

Page 80: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

P:\Oklahoma State Capitol\15-007 Capitol Renovation Exterior\Construction Administration\Field

Reports\ADG\OSCR FR 109 - 2018_11-30.docx

Page 9 of 9

Cast iron frame painting progress at window on north elevation of west wing (Lima)

Dutchman repair and full stone replacement progress at corbel course and frieze, respectively, on north

elevation of west wing (Lima)

Page 81: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY, OK 73104 I P 405.302.4500 I WWW.JEDUNN.COM

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2018 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Phasing & Schedule Attachments: The following documents are included in the subsequent pages:

- Site Phasing Plan - Site Utilization Plan - Six (6) Week Look Ahead Schedule

Page 82: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY, OK 73104 I P 405.302.4500 I WWW.JEDUNN.COM

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2018 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Phasing Plan:

The site phasing plan is a broad representation of the work flow for the Capitol exterior rehabilitation. Beginning with Alpha (west elevation of the north wing), scaffolding was constructed continuing on to Bravo, Charlie, Delta and Echo. We construct a phase of scaffolding at a time, which is followed by hazardous material removal, window restoration, and stone and lighting repair. As each phase is complet-ed, the scaffolding will be disassembled and reassembled on similar elevations. This site phasing will occur for the duration of the rehabilitation until all work is complete, and the State Capitol is back to its original beauty and functionality.

Page 83: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

Trailer Compound

TUNNEL (will continue across Lincoln)

DELTA

FOX TROT

ECHO

KILO

ALPHA

CHARLIE

GOLF

INDIA

HOTEL

JULIETTE

LIMA

BRAVO

ACTIVE ELEVATIONS

COMPLETED

CO

MPLETED

CO

MPLE

TED

COMPLETED

CO

MPLETED

CO

MPLETED

ACTIVE ELEVATIONS

COMPLETED

CO

MPLE

TED

COMPLETED

CO

MPLE

TED

Page 84: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

1503

9DB

MON

THLY

CON

STRU

CTIO

N PR

OGRE

SS R

EPOR

T

4 E SHERIDAN AVE SUITE 200 I OKLAHOMA CITY, OK 73104 I P 405.302.4500 I WWW.JEDUNN.COM

RETURNS TO TABLE OF CONTENTSCLICK HERE

DECEMBER 2018 Exterior RehabilitationJE DUNN I TREANORHL ARCHITECTS I ADG

Site Utilization Plan:

Per our site utilization plan, the JE Dunn trailer compound is the designated area for our staff members,trade partners, and material storage areas. It currently houses four field offices.

Our site fencing is a revolving system that isolates our work area from the public as we move around the Capitol building, helping to ensure a safe work environment.

The gravel lay-down areas are designated paths where machinery, supplies, and equipment are stored and provide a roadway for machinery to move supplies to and from the job site. The gravel will also serve as a protective barrier of the subsurface. Fence gates mark all areas where access can be gained to the job site for material and/or equipmentdeliveries, emergency access, or personnel access. These gates remain closed and are locked every night to ensure a safe work environment.

Page 85: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

JED

JED

Page 86: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

Activity ID Activity Name Start Finish Actual Start Actual Finish RemDur

Calendar

Oklahoma Legislative SessionsOklahoma Legislative Sessions 04-Feb-19 03-Jun-19 85 JOB - Standard 5 Day Workweek

.. 04-Feb-19 03-Jun-19 85 JOB - Standard 5 Day Workweek

.. 04-Feb-19 03-Jun-19 85 JOB - Standard 5 Day Workweek

CON-30300 2019 Session 04-Feb-19* 03-Jun-19 85 JOB - Standard 5 Day Workweek

Construction SummaryConstruction Summary 03-Jan-18 A 15-Apr-19 03-Jan-18 127 JOB - 365 Day Workweek

.. 03-Jan-18 A 15-Apr-19 03-Jan-18 127 JOB - 365 Day Workweek

.. 03-Jan-18 A 15-Apr-19 03-Jan-18 127 JOB - 365 Day Workweek

CON-10990 Kilo Facade Repair Duration 03-Jan-18 A 13-Dec-18 03-Jan-18 4 JOB - 365 Day Workweek

CON-10980 Juliette Facade Repair Duration 26-Feb-18 A 10-Jan-19 26-Feb-18 32 JOB - 365 Day Workweek

CON-11000 Lima Facade Repair Duration 21-May-18 A 15-Apr-19 21-May-18 127 JOB - 365 Day Workweek

ElevationsElevations 29-Oct-18 A 15-Apr-19 29-Oct-18 89

Juliette- West Wing South FaceJuliette- West Wing South Face 05-Nov-18 A 10-Jan-19 05-Nov-18 22

ScaffoldScaffold 17-Dec-18 10-Jan-19 17

CON-19590 Juliette-Ph 2-Demobilize scaffold and tarp 17-Dec-18 08-Jan-19 12 OSCR-4 Day

CON-30800 Juliette-Ph 2-Scaffold Demobilization Start 17-Dec-18* 0 JOB - Standard 5 Day Workweek

CON-19600 Juliette-Patch scaffold anchor holes 09-Jan-19 10-Jan-19 2 OSCR-4 Day

InteriorInterior 05-Nov-18 A 31-Dec-18 05-Nov-18 15 JOB - Standard 5 Day Workweek

CON-19640 Juliette-Interior storm windows 05-Nov-18 A 31-Dec-18 05-Nov-18 15 JOB - Standard 5 Day Workweek

CON-19630 Juliette-Interior Wall Finishes 12-Nov-18 A 19-Dec-18 12-Nov-18 8 JOB - Standard 5 Day Workweek

Punch & CompletePunch & Complete 06-Dec-18 A 17-Dec-18 06-Dec-18 6 JOB - Standard 5 Day Workweek

CON-22930 Juliette-Complete punchlist 06-Dec-18 A 17-Dec-18 06-Dec-18 6 JOB - Standard 5 Day Workweek

Kilo- West Wing West FaceKilo- West Wing West Face 09-Nov-18 A 12-Dec-18 09-Nov-18 3 JOB - Standard 5 Day Workweek

Window FinishesWindow Finishes 09-Nov-18 A 12-Dec-18 09-Nov-18 3 JOB - Standard 5 Day Workweek

CON-18220 Kilo-Re-install HVAC louvers 09-Nov-18 A 12-Dec-18 09-Nov-18 3 JOB - Standard 5 Day Workweek

Lima- West Wing North FaceLima- West Wing North Face 29-Oct-18 A 15-Apr-19 29-Oct-18 89

ScaffoldScaffold 15-Mar-19 15-Apr-19 22

CON-20170 Lima-Ph 2-Remove temp HVAC in scaffold 15-Mar-19 15-Mar-19 1 JOB - Standard 5 Day Workweek

CON-20180 Lima-Ph 2-Remove temp power in scaffold 15-Mar-19 18-Mar-19 2 JOB - Standard 5 Day Workweek

CON-30820 Lima-Ph 2-Scaffold Demobilization Start 19-Mar-19 0 JOB - Standard 5 Day Workweek

CON-20190 Lima-Ph 2-Demobilize scaffold and tarp 26-Mar-19 15-Apr-19 12 OSCR-4 Day

CON-20200 Lima-Patch scaffold anchor holes 15-Apr-19 15-Apr-19 1 OSCR-4 Day

InteriorInterior 14-Jan-19 27-Mar-19 53 JOB - Standard 5 Day Workweek

CON-20230 Lima-Interior Wall Finishes 14-Jan-19* 01-Feb-19 15 JOB - Standard 5 Day Workweek

CON-20240 Lima-Interior storm windows 28-Feb-19 27-Mar-19 20 JOB - Standard 5 Day Workweek

CON-20250 Lima-Remove interior partitions 28-Feb-19 20-Mar-19 15 JOB - Standard 5 Day Workweek

Window Removal/AbatementWindow Removal/Abatement 29-Oct-18 A 24-Jan-19 29-Oct-18 32 JOB - Standard 5 Day Workweek

CON-20370 Lima-Ph 1-Frame Repair/Prep/Prime 29-Oct-18 A 15-Jan-19 29-Oct-18 25 JOB - Standard 5 Day Workweek

A1390 Lima-Ph 2-Frame Testing 12-Dec-18 18-Dec-18 5 JOB - Standard 5 Day Workweek

CON-24780 Lima-Ph 2-Frame Repair/Prep/Prime 19-Dec-18 24-Jan-19 25 JOB - Standard 5 Day Workweek

Early StoneEarly Stone 05-Nov-18 A 03-Jan-19 05-Nov-18 14 OSCR-4 Day

CON-20480 Lima-Ph 2-Micro-Abrasion Cleaning 05-Nov-18 A 11-Dec-18 05-Nov-18 2 OSCR-4 Day

CON-20520 Lima-Stone repairs 07-Nov-18 A 03-Jan-19 07-Nov-18 8 OSCR-4 Day

CON-20490 Lima-Ph 2-Spot cleaning 10-Dec-18 A 13-Dec-18 10-Dec-18 2 OSCR-4 Day

Tuck & RepairTuck & Repair 12-Dec-18 26-Dec-18 8 OSCR-4 Day

CON-20530 Lima-Final Re-Pointing 12-Dec-18 26-Dec-18 8 OSCR-4 Day

Window FinishesWindow Finishes 04-Dec-18 A 06-Mar-19 04-Dec-18 61 JOB - Standard 5 Day Workweek

CON-20540 Lima-Ph 1-Re-install window sashes, panels, and trim 04-Dec-18 A 08-Jan-19 04-Dec-18 20 JOB - Standard 5 Day Workweek

CON-32580 Lima-Ph 1-Final Paint Window Frame 12-Dec-18 10-Jan-19 20 JOB - Standard 5 Day Workweek

Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

2019

2019 Session

Kilo Facade Repair Duration

Juliette Facade Repair Duration

Lima Facade Repair Duration

Juliette-Ph 2-Demobilize scaffold and tarp

Juliette-Ph 2-Scaffold Demobilization Start

Juliette-Patch scaffold anchor holes

Juliette-Interior storm windows

Juliette-Interior Wall Finishes

Juliette-Complete punchlist

Kilo-Re-install HVAC louvers

Lima-Ph 2-Remove temp HVAC in scaffold

Lima-Ph 2-Remove temp power in scaffold

Lima-Ph 2-Scaffold Demobilization Start

Lima-Ph 2-Demobilize scaffold and tarp

Lima-Patch scaffold anchor holes

Lima-Interior Wall Finishes

Lima-Interior storm windows

Lima-Remove interior partitions

Lima-Ph 1-Frame Repair/Prep/Prime

Lima-Ph 2-Frame Testing

Lima-Ph 2-Frame Repair/Prep/Prime

Lima-Ph 2-Micro-Abrasion Cleaning

Lima-Stone repairs

Lima-Ph 2-Spot cleaning

Lima-Final Re-Pointing

Lima-Ph 1-Re-install window sashes, panels, and trim

Lima-Ph 1-Final Paint Window Frame

Remaining Construction

Data Date: 10-Dec-18

Run Date: 10-Dec-18; 16:52

Oklahoma State Capitol Exterior Renovation

Page 1 of 5

 

Page 87: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

Activity ID Activity Name Start Finish Actual Start Actual Finish RemDur

Calendar

CON-32590 Lima-Ph 1-Caulk window frames to stone 14-Dec-18 14-Jan-19 20 JOB - Standard 5 Day Workweek

CON-32600 Lima-Ph 1-Re-install HVAC louvers 15-Jan-19 21-Jan-19 5 JOB - Standard 5 Day Workweek

CON-24860 Lima-Ph 2-Re-install window sashes, panels, and trim 25-Jan-19 21-Feb-19 20 JOB - Standard 5 Day Workweek

CON-20580 Lima-Ph 2-Final Paint Window Frame 29-Jan-19 25-Feb-19 20 JOB - Standard 5 Day Workweek

CON-20600 Lima-Ph 2-Caulk window frames to stone 31-Jan-19 27-Feb-19 20 JOB - Standard 5 Day Workweek

CON-20620 Lima-Ph 2-Re-install HVAC louvers 28-Feb-19 06-Mar-19 5 JOB - Standard 5 Day Workweek

CON-20630 Lima-Window Spray Test 28-Feb-19 01-Mar-19 2 JOB - Standard 5 Day Workweek

Stone Cleaning & SealantsStone Cleaning & Sealants 22-Jan-19 13-Mar-19 30 OSCR-4 Day

CON-32620 Lima-Ph 1-Wash down brick and stone 22-Jan-19 28-Jan-19 4 OSCR-4 Day

CON-20640 Lima-Ph 2-Wash down brick and stone 07-Mar-19 13-Mar-19 4 OSCR-4 Day

Gutter/ParapetGutter/Parapet 19-Nov-18 A 08-Mar-19 19-Nov-18 63

CON-29990 Lima-Fabricate/Ship Gutter Liner & Scuppers 19-Nov-18 A 08-Jan-19 19-Nov-18 20 JOB - Standard 5 Day Workweek

CON-30050 Lima-Install Underlayment 09-Jan-19 10-Jan-19 2 JOB - Standard 5 Day Workweek

CON-30120 Lima-Install Hanging Gutter 09-Jan-19 22-Jan-19 10 JOB - Standard 5 Day Workweek

CON-30060 Lima-Install Gutter Liner 11-Jan-19 28-Feb-19 35 JOB - Standard 5 Day Workweek

CON-30140 Lima-Install Metal Wall Panels 23-Jan-19 12-Feb-19 15 JOB - Standard 5 Day Workweek

CON-30150 Lima-Install Metal Wall Panel Trim 13-Feb-19 21-Feb-19 7 JOB - Standard 5 Day Workweek

CON-30170 Lima-Install Lead Tees 25-Feb-19 25-Feb-19 1 OSCR-4 Day

CON-30240 Lima-Flood-Test Gutter 01-Mar-19 01-Mar-19 1 JOB - Standard 5 Day Workweek

CON-30200 Lima-Re-Install Lightning Protection 04-Mar-19 05-Mar-19 2 OSCR-4 Day

CON-30220 Lima-Re-install Electrical 06-Mar-19 08-Mar-19 3 JOB - Standard 5 Day Workweek

Punch & CompletePunch & Complete 01-Mar-19 19-Mar-19 12 JOB - Standard 5 Day Workweek

CON-30850 Lima-Window Restoration Complete 01-Mar-19 0 JOB - Standard 5 Day Workweek

CON-22800 Lima Pre-punch 04-Mar-19 04-Mar-19 1 JOB - Standard 5 Day Workweek

CON-22810 Lima Complete pre-punch list 05-Mar-19 05-Mar-19 1 JOB - Standard 5 Day Workweek

CON-22820 Lima Punchlist 14-Mar-19 14-Mar-19 1 JOB - Standard 5 Day Workweek

CON-22830 Lima-Ph 2-Complete punchlist 15-Mar-19 19-Mar-19 3 JOB - Standard 5 Day Workweek

Clerestory-SouthWestClerestory-SouthWest 07-Jan-19 11-Jan-19 5 JOB - Standard 5 Day Workweek

Window ReplacementWindow Replacement 07-Jan-19 11-Jan-19 5 JOB - Standard 5 Day Workweek

CON-21670 Cler.SW-Remove Roof Protection 07-Jan-19 11-Jan-19 5 JOB - Standard 5 Day Workweek

Clerestory- NorthWestClerestory- NorthWest 19-Mar-19 25-Mar-19 5 JOB - Standard 5 Day Workweek

Window ReplacementWindow Replacement 19-Mar-19 25-Mar-19 5 JOB - Standard 5 Day Workweek

CON-21890 Cler.NW-Remove Roof Protection 19-Mar-19 25-Mar-19 5 JOB - Standard 5 Day Workweek

Drum-Base WestDrum-Base West 10-Dec-18 12-Dec-18 3 JOB - Standard 5 Day Workweek

Wall RepairWall Repair 10-Dec-18 12-Dec-18 3 JOB - Standard 5 Day Workweek

CON-22490 DB.W-Clean, Prime & Paint Door Frames (Weather Dependent) 10-Dec-18 12-Dec-18 3 JOB - Standard 5 Day Workweek

DoorsDoors 26-Nov-18 A 11-Mar-19 26-Nov-18 64 FOR COPY ONLY:Standard 5 Day Workweek

Alpha- North Wing West FaceAlpha- North Wing West Face 10-Dec-18 A 21-Dec-18 10-Dec-18 10 FOR COPY ONLY:Standard 5 Day Workweek

New Door SequenceNew Door Sequence 10-Dec-18 A 21-Dec-18 10-Dec-18 10 FOR COPY ONLY:Standard 5 Day Workweek

CON-27410 Alpha.D1-Install New Door/Hardware 10-Dec-18 A 21-Dec-18 10-Dec-18 3 FOR COPY ONLY:Standard 5 Day Workweek

CON-27350 Alpha.D1-Procure Doors 10-Dec-18* 0 FOR COPY ONLY:Standard 5 Day Workweek

CON-27370 Alpha.D1-Remove Door/Hardware 10-Dec-18 12-Dec-18 3 FOR COPY ONLY:Standard 5 Day Workweek

CON-27390 Alpha.D1-Remove Frame 13-Dec-18 14-Dec-18 2 FOR COPY ONLY:Standard 5 Day Workweek

CON-27400 Alpha.D1-Install New Frame 17-Dec-18 18-Dec-18 2 FOR COPY ONLY:Standard 5 Day Workweek

Bravo- North Wing North FaceBravo- North Wing North Face 17-Dec-18 21-Dec-18 5 FOR COPY ONLY:Standard 5 Day Workweek

New Door SequenceNew Door Sequence 17-Dec-18 21-Dec-18 5 FOR COPY ONLY:Standard 5 Day Workweek

CON-27490 Bravo.D106-Install New Frame 17-Dec-18 18-Dec-18 2 FOR COPY ONLY:Standard 5 Day Workweek

CON-27500 Bravo.D106-Install New Door/Hardware 19-Dec-18 21-Dec-18 3 FOR COPY ONLY:Standard 5 Day Workweek

Echo- East Wing East FaceEcho- East Wing East Face 12-Dec-18 11-Jan-19 21 FOR COPY ONLY:Standard 5 Day Workweek

Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

2019

Lima-Ph 1-Caulk window frames to stone

Lima-Ph 1-Re-install HVAC louvers

Lima-Ph 2-Re-install window sashes, panels, and trim

Lima-Ph 2-Final Paint Window Frame

Lima-Ph 2-Caulk window frames to stone

Lima-Ph 2-Re-install HVAC louvers

Lima-Window Spray Test

Lima-Ph 1-Wash down brick and stone

Lima-Ph 2-Wash down brick and stone

Lima-Fabricate/Ship Gutter Liner & Scuppers

Lima-Install Underlayment

Lima-Install Hanging Gutter

Lima-Install Gutter Liner

Lima-Install Metal Wall Panels

Lima-Install Metal Wall Panel Trim

Lima-Install Lead Tees

Lima-Flood-Test Gutter

Lima-Re-Install Lightning Protection

Lima-Re-install Electrical

Lima-Window Restoration Complete

Lima Pre-punch

Lima Complete pre-punch list

Lima Punchlist

Lima-Ph 2-Complete punchlist

Cler.SW-Remove Roof Protection

Cler.NW-Remove Roof Protection

DB.W-Clean, Prime & Paint Door Frames (Weather Dependent)

Alpha.D1-Install New Door/Hardware

Alpha.D1-Procure Doors

Alpha.D1-Remove Door/Hardware

Alpha.D1-Remove Frame

Alpha.D1-Install New Frame

Bravo.D106-Install New Frame

Bravo.D106-Install New Door/Hardware

Remaining Construction

Data Date: 10-Dec-18

Run Date: 10-Dec-18; 16:52

Oklahoma State Capitol Exterior Renovation

Page 2 of 5

 

Page 88: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

Activity ID Activity Name Start Finish Actual Start Actual Finish RemDur

Calendar

New Door SequenceNew Door Sequence 12-Dec-18 11-Jan-19 21 FOR COPY ONLY:Standard 5 Day Workweek

CON-27550 Echo.D103-Remove Door/Hardware 12-Dec-18* 21-Dec-18 8 FOR COPY ONLY:Standard 5 Day Workweek

CON-27570 Echo.D103-Remove Frame 24-Dec-18 26-Dec-18 2 FOR COPY ONLY:Standard 5 Day Workweek

CON-27640 Echo.D104-Remove Door/Hardware 24-Dec-18 27-Dec-18 3 FOR COPY ONLY:Standard 5 Day Workweek

CON-27580 Echo.D103-Install New Frame 27-Dec-18 28-Dec-18 2 FOR COPY ONLY:Standard 5 Day Workweek

CON-27660 Echo.D104-Remove Frame 28-Dec-18 31-Dec-18 2 FOR COPY ONLY:Standard 5 Day Workweek

CON-27730 Echo.D105-Remove Door/Hardware 28-Dec-18 02-Jan-19 3 FOR COPY ONLY:Standard 5 Day Workweek

CON-27590 Echo.D103-Install New Door/Hardware 31-Dec-18 03-Jan-19 3 FOR COPY ONLY:Standard 5 Day Workweek

CON-27670 Echo.D104-Install New Frame 02-Jan-19 03-Jan-19 2 FOR COPY ONLY:Standard 5 Day Workweek

CON-27750 Echo.D105-Remove Frame 03-Jan-19 04-Jan-19 2 FOR COPY ONLY:Standard 5 Day Workweek

CON-27680 Echo.D104-Install New Door/Hardware 04-Jan-19 08-Jan-19 3 FOR COPY ONLY:Standard 5 Day Workweek

CON-27760 Echo.D105-Install New Frame 07-Jan-19 08-Jan-19 2 FOR COPY ONLY:Standard 5 Day Workweek

CON-27770 Echo.D105-Install New Door/Hardware 09-Jan-19 11-Jan-19 3 FOR COPY ONLY:Standard 5 Day Workweek

Golf- South Wing West FaceGolf- South Wing West Face 03-Jan-19 16-Jan-19 10 FOR COPY ONLY:Standard 5 Day Workweek

New Door SequenceNew Door Sequence 03-Jan-19 16-Jan-19 10 FOR COPY ONLY:Standard 5 Day Workweek

CON-27820 Golf.D102-Remove Door/Hardware 03-Jan-19* 07-Jan-19 3 FOR COPY ONLY:Standard 5 Day Workweek

CON-27840 Golf.D102-Remove Frame 08-Jan-19 09-Jan-19 2 FOR COPY ONLY:Standard 5 Day Workweek

CON-27850 Golf.D102-Install New Frame 10-Jan-19 11-Jan-19 2 FOR COPY ONLY:Standard 5 Day Workweek

CON-27860 Golf.D102-Install New Door/Hardware 14-Jan-19 16-Jan-19 3 FOR COPY ONLY:Standard 5 Day Workweek

Hotel- South Wing South FaceHotel- South Wing South Face 26-Nov-18 A 11-Mar-19 26-Nov-18 60 FOR COPY ONLY:Standard 5 Day Workweek

Refurbish Door SequenceRefurbish Door Sequence 26-Nov-18 A 11-Mar-19 26-Nov-18 60 FOR COPY ONLY:Standard 5 Day Workweek

CON-26560 Hotel.D203-Reinstall Door/Hardware 26-Nov-18 A 21-Jan-19 26-Nov-18 5 FOR COPY ONLY:Standard 5 Day Workweek

CON-26380 Hotel.D201-Refurbish Door and Frame 14-Dec-18* 28-Dec-18 10 FOR COPY ONLY:Standard 5 Day Workweek

CON-26460 Hotel.D202-Refurbish Door and Frame 31-Dec-18 14-Jan-19 10 FOR COPY ONLY:Standard 5 Day Workweek

CON-26620 Hotel.D204-Refurbish Door and Frame 15-Jan-19 28-Jan-19 10 FOR COPY ONLY:Standard 5 Day Workweek

CON-26700 Hotel.D205-Refurbish Door and Frame 29-Jan-19 11-Feb-19 10 FOR COPY ONLY:Standard 5 Day Workweek

CON-26780 Hotel.D206A-Refurbish Door and Frame 12-Feb-19 25-Feb-19 10 FOR COPY ONLY:Standard 5 Day Workweek

CON-26860 Hotel.D206B-Refurbish Door and Frame 26-Feb-19 11-Mar-19 10 FOR COPY ONLY:Standard 5 Day Workweek

India- South Wing East FaceIndia- South Wing East Face 03-Jan-19 16-Jan-19 10 FOR COPY ONLY:Standard 5 Day Workweek

New Door SequenceNew Door Sequence 03-Jan-19 16-Jan-19 10 FOR COPY ONLY:Standard 5 Day Workweek

CON-26920 India.D101-Remove Door/Hardware 03-Jan-19* 07-Jan-19 3 FOR COPY ONLY:Standard 5 Day Workweek

CON-26940 India.D101-Remove Frame 08-Jan-19 09-Jan-19 2 FOR COPY ONLY:Standard 5 Day Workweek

CON-26950 India.D101-Install New Frame 10-Jan-19 11-Jan-19 2 FOR COPY ONLY:Standard 5 Day Workweek

CON-26960 India.D101-Install New Door/Hardware 14-Jan-19 16-Jan-19 3 FOR COPY ONLY:Standard 5 Day Workweek

Kilo- West Wing West FaceKilo- West Wing West Face 08-Jan-19 31-Jan-19 18 FOR COPY ONLY:Standard 5 Day Workweek

New Door SequenceNew Door Sequence 08-Jan-19 31-Jan-19 18 FOR COPY ONLY:Standard 5 Day Workweek

CON-27280 Kilo.D601-Remove Door/Hardware 08-Jan-19* 10-Jan-19 3 FOR COPY ONLY:Standard 5 Day Workweek

CON-27290 Kilo.D601-Abate Frame 11-Jan-19 14-Jan-19 2 FOR COPY ONLY:Standard 5 Day Workweek

CON-27300 Kilo.D601-Remove Frame 15-Jan-19 16-Jan-19 2 FOR COPY ONLY:Standard 5 Day Workweek

CON-27310 Kilo.D601-Install New Frame 17-Jan-19 18-Jan-19 2 FOR COPY ONLY:Standard 5 Day Workweek

CON-27220 Kilo.D107-Install New Frame 21-Jan-19 22-Jan-19 2 FOR COPY ONLY:Standard 5 Day Workweek

CON-27320 Kilo.D601-Install New Door/Hardware 21-Jan-19 23-Jan-19 3 FOR COPY ONLY:Standard 5 Day Workweek

CON-27130 Kilo.D108-Install New Frame 23-Jan-19 24-Jan-19 2 FOR COPY ONLY:Standard 5 Day Workweek

CON-27230 Kilo.D107-Install New Door/Hardware 23-Jan-19 25-Jan-19 3 FOR COPY ONLY:Standard 5 Day Workweek

CON-27040 Kilo.D109-Install New Frame 25-Jan-19 28-Jan-19 2 FOR COPY ONLY:Standard 5 Day Workweek

CON-27140 Kilo.D108-Install New Door/Hardware 25-Jan-19 29-Jan-19 3 FOR COPY ONLY:Standard 5 Day Workweek

CON-27050 Kilo.D109-Install New Door/Hardware 29-Jan-19 31-Jan-19 3 FOR COPY ONLY:Standard 5 Day Workweek

SiteSite 29-Oct-18 A 11-Jun-19 29-Oct-18 129 JOB - Standard 5 Day Workweek

TunnelTunnel 29-Oct-18 A 24-May-19 29-Oct-18 118 JOB - Standard 5 Day Workweek

Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

2019

Echo.D103-Remove Door/Hardware

Echo.D103-Remove Frame

Echo.D104-Remove Door/Hardware

Echo.D103-Install New Frame

Echo.D104-Remove Frame

Echo.D105-Remove Door/Hardware

Echo.D103-Install New Door/Hardware

Echo.D104-Install New Frame

Echo.D105-Remove Frame

Echo.D104-Install New Door/Hardware

Echo.D105-Install New Frame

Echo.D105-Install New Door/Hardware

Golf.D102-Remove Door/Hardware

Golf.D102-Remove Frame

Golf.D102-Install New Frame

Golf.D102-Install New Door/Hardware

Hotel.D203-Reinstall Door/Hardware

Hotel.D201-Refurbish Door and Frame

Hotel.D202-Refurbish Door and Frame

Hotel.D204-Refurbish Door and Frame

Hotel.D205-Refurbish Door and Frame

Hotel.D206A-Refurbish Door and Frame

Hotel.D206B-Refurbish Door and Frame

India.D101-Remove Door/Hardware

India.D101-Remove Frame

India.D101-Install New Frame

India.D101-Install New Door/Hardware

Kilo.D601-Remove Door/Hardware

Kilo.D601-Abate Frame

Kilo.D601-Remove Frame

Kilo.D601-Install New Frame

Kilo.D107-Install New Frame

Kilo.D601-Install New Door/Hardware

Kilo.D108-Install New Frame

Kilo.D107-Install New Door/Hardware

Kilo.D109-Install New Frame

Kilo.D108-Install New Door/Hardware

Kilo.D109-Install New Door/Hardware

Remaining Construction

Data Date: 10-Dec-18

Run Date: 10-Dec-18; 16:52

Oklahoma State Capitol Exterior Renovation

Page 3 of 5

 

Page 89: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

Activity ID Activity Name Start Finish Actual Start Actual Finish RemDur

Calendar

Tunnel RepairsTunnel Repairs 29-Oct-18 A 29-Jan-19 29-Oct-18 35 JOB - Standard 5 Day Workweek

CON-33610 Remaining Phase 1 Tunnel sc ope (crane access area) 29-Oct-18 A 14-Dec-18 29-Oct-18 5 JOB - Standard 5 Day Workweek

CON-31370 Clean/Patch Tunnel Concrete Walls & Roof 07-Dec-18 A 14-Dec-18 07-Dec-18 5 JOB - Standard 5 Day Workweek

CON-31550 Phase 1 Complete 14-Dec-18 0 JOB - Standard 5 Day Workweek

CON-31390 Install Waterproofing, Sheet Waterproofing & Drainage Panel 17-Dec-18 21-Dec-18 5 JOB - Standard 5 Day Workweek

CON-31410 Foundation Drain w/ Filter Fabric 17-Dec-18 18-Dec-18 2 JOB - Standard 5 Day Workweek

CON-31430 Test WP Systems 24-Dec-18 24-Dec-18 1 JOB - Standard 5 Day Workweek

CON-31450 ODOT Type-A Compacted Backfill/Remove Lagging 26-Dec-18 02-Jan-19 5 JOB - Standard 5 Day Workweek

CON-31470 3rd Party Inspections-Rebar 03-Jan-19 03-Jan-19 1 JOB - Standard 5 Day Workweek

CON-31480 Lincoln Blvd Concrete Prep (rebar) 03-Jan-19 04-Jan-19 2 JOB - Standard 5 Day Workweek

CON-31490 Place & Finish Paving 07-Jan-19 07-Jan-19 1 JOB - Standard 5 Day Workweek

CON-31500 Concrete Prep for Sidewalks 08-Jan-19 08-Jan-19 1 JOB - Standard 5 Day Workweek

CON-31510 Place & Finish Sidewalks 09-Jan-19 09-Jan-19 1 JOB - Standard 5 Day Workweek

CON-31530 Remove Barriers and Re-Open Lincoln 10-Jan-19 11-Jan-19 2 JOB - Standard 5 Day Workweek

CON-33390 Stripings & Markings 11-Jan-19 14-Jan-19 2 JOB - Standard 5 Day Workweek

CON-33380 Remove Temp. Road 14-Jan-19 18-Jan-19 5 JOB - Standard 5 Day Workweek

CON-31540 Phase 2 Complete 18-Jan-19 0 JOB - Standard 5 Day Workweek

CON-31570 Replace Plants, Trees & Sod 21-Jan-19 29-Jan-19 7 JOB - Standard 5 Day Workweek

CON-31580 Tunnel Repairs Complete 29-Jan-19 0 JOB - Standard 5 Day Workweek

Tunnel FinishesTunnel Finishes 17-Dec-18 24-May-19 113 JOB - Standard 5 Day Workweek

CON-32950 Begin Tunnel Interior Work 17-Dec-18 0 JOB - Standard 5 Day Workweek

CON-33400 Expansion Joints 17-Dec-18 31-Dec-18 10 JOB - Standard 5 Day Workweek

CON-32740 Waterproof Slab/Epoxy Coating 24-Dec-18 15-Jan-19 15 JOB - Standard 5 Day Workweek

CON-32750 Frame Walls 16-Jan-19 05-Feb-19 15 JOB - Standard 5 Day Workweek

CON-32770 OH Rough-In 16-Jan-19 29-Jan-19 10 JOB - Standard 5 Day Workweek

CON-32780 Sump Pump 16-Jan-19 22-Jan-19 5 JOB - Standard 5 Day Workweek

CON-32760 In-Wall Rough-In/Wood Bloc king 30-Jan-19 12-Feb-19 10 JOB - Standard 5 Day Workweek

CON-32790 Frame Ceilings 06-Feb-19 26-Feb-19 15 JOB - Standard 5 Day Workweek

CON-32820 Hang Walls 13-Feb-19 26-Feb-19 10 JOB - Standard 5 Day Workweek

CON-32800 Light Fixtures 27-Feb-19 12-Mar-19 10 JOB - Standard 5 Day Workweek

CON-32810 Hang Ceilings 13-Mar-19 19-Mar-19 5 JOB - Standard 5 Day Workweek

CON-32830 Tape/Mud/Paint 13-Mar-19 02-Apr-19 15 JOB - Standard 5 Day Workweek

CON-32840 Ceiling Grid 03-Apr-19 09-Apr-19 5 JOB - Standard 5 Day Workweek

CON-32850 Handrails 03-Apr-19 09-Apr-19 5 JOB - Standard 5 Day Workweek

CON-32860 Acoustical Panels 03-Apr-19 16-Apr-19 10 JOB - Standard 5 Day Workweek

CON-32870 Millwork 03-Apr-19 30-Apr-19 20 JOB - Standard 5 Day Workweek

CON-32920 Ceiling Grid Rough-In 10-Apr-19 16-Apr-19 5 JOB - Standard 5 Day Workweek

CON-32930 Drop Tile 17-Apr-19 23-Apr-19 5 JOB - Standard 5 Day Workweek

CON-32880 Rubber Stair Treads & Ris ers 24-Apr-19 26-Apr-19 3 JOB - Standard 5 Day Workweek

CON-32890 Flooring Tile 24-Apr-19 14-May-19 15 JOB - Standard 5 Day Workweek

CON-32900 Carpet 15-May-19 21-May-19 5 JOB - Standard 5 Day Workweek

CON-32910 Final Clean 22-May-19 24-May-19 3 JOB - Standard 5 Day Workweek

CON-32940 Tunnel Finishes Complete 24-May-19 0 JOB - Standard 5 Day Workweek

Site-LightwellsSite-Lightwells 10-Dec-18 A 23-Apr-19 10-Dec-18 95 JOB - Standard 5 Day Workweek

HardscapeHardscape 10-Dec-18 A 23-Apr-19 10-Dec-18 95 JOB - Standard 5 Day Workweek

CON-33150 Lightwells-Ph 1 (Charlie, Delta, Golf, Foxtrot) -Demo Lightwells (tentative) 10-Dec-18 A 31-Dec-18 10-Dec-18 15 JOB - Standard 5 Day Workweek

CON-33180 Lightwells-Ph 1 (Charlie, Delta, Golf, Foxtrot) -Form/Pour Concrete 02-Jan-19 22-Jan-19 15 JOB - Standard 5 Day Workweek

CON-33510 Lightwells-Ph 2 (Alpha, Lima, Juliette) -Demo Lightwells 09-Jan-19 29-Jan-19 15 JOB - Standard 5 Day Workweek

CON-33170 Lightwells-Ph 1 (Charlie, Delta, Golf, Foxtrot) -Install Sump Pumps 23-Jan-19 05-Feb-19 10 JOB - Standard 5 Day Workweek

Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

2019

Remaining Phase 1 Tunnel sc ope (crane access area)

Clean/Patch Tunnel Concrete Walls & Roof

Phase 1 Complete

Install Waterproofing, Sheet Waterproofing & Drainage Panel

Foundation Drain w/ Filter Fabric

Test WP Systems

ODOT Type-A Compacted Backfill/Remove Lagging

3rd Party Inspections-Rebar

Lincoln Blvd Concrete Prep (rebar)

Place & Finish Paving

Concrete Prep for Sidewalks

Place & Finish Sidewalks

Remove Barriers and Re-Open Lincoln

Stripings & Markings

Remove Temp. Road

Phase 2 Complete

Replace Plants, Trees & Sod

Tunnel Repairs Complete

Begin Tunnel Interior Work

Expansion Joints

Waterproof Slab/Epoxy Coating

Frame Walls

OH Rough-In

Sump Pump

In-Wall Rough-In/Wood Bloc king

Frame Ceilings

Hang Walls

Light Fixtures

Hang Ceilings

Tape/Mud/Paint

Ceiling Grid

Handrails

Acoustical Panels

Millwork

Ceiling Grid Rough-In

Drop Tile

Rubber Stair Treads & Ris ers

Flooring Tile

Carpet

Final Clean

Tunnel Finishes Complete

Lightwells-Ph 1 (Charlie, Delta, Golf, Foxtrot) -Demo Lightwells (tentative)

Lightwells-Ph 1 (Charlie, Delta, Golf, Foxtrot) -Form/Pour Concrete

Lightwells-Ph 2 (Alpha, Lima, Juliette) -Demo Lightwells

Lightwells-Ph 1 (Charlie, Delta, Golf, Foxtrot) -Install Sump Pumps

Remaining Construction

Data Date: 10-Dec-18

Run Date: 10-Dec-18; 16:52

Oklahoma State Capitol Exterior Renovation

Page 4 of 5

 

Page 90: ContentsSummary MONTHLY CONSTRUCTION PROGRESS REPORTcapitolrestore.ok.gov/wp-content/uploads/2019/02/12312018-OSCR-… · Conduit stub ups for handrail lighting at ramp on west side

Activity ID Activity Name Start Finish Actual Start Actual Finish RemDur

Calendar

CON-33520 Lightwells-Ph 2 (Alpha, Lima, Juliette)-Form/Pour Concrete 30-Jan-19 19-Feb-19 15 JOB - Standard 5 Day Workweek

CON-33480 Lightwells-Ph 1 (Charlie, Delta, Golf, Foxtrot) -Waterproofing 06-Feb-19 19-Feb-19 10 JOB - Standard 5 Day Workweek

CON-33490 Lightwells-Ph 1 (Charlie, Delta, Golf, Foxtrot) -Topping Slab 20-Feb-19 05-Mar-19 10 JOB - Standard 5 Day Workweek

CON-33530 Lightwells-Ph 2 (Alpha, Lima, Juliette)-Install Sump Pumps 20-Feb-19 05-Mar-19 10 JOB - Standard 5 Day Workweek

CON-33500 Lightwells-Ph 1 (Charlie, Delta, Golf, Foxtrot) -Wall Coating 06-Mar-19 26-Mar-19 15 JOB - Standard 5 Day Workweek

CON-33540 Lightwells-Ph 2 (Alpha, Lima, Juliette)-Waterproofing 06-Mar-19 19-Mar-19 10 JOB - Standard 5 Day Workweek

CON-33550 Lightwells-Ph 2 (Alpha, Lima, Juliette)-Topping Slab 20-Mar-19 02-Apr-19 10 JOB - Standard 5 Day Workweek

CON-33560 Lightwells-Ph 2 (Alpha, Lima, Juliette)-Wall Coating 03-Apr-19 23-Apr-19 15 JOB - Standard 5 Day Workweek

Site-South RampSite-South Ramp 10-Jan-19 16-Jan-19 5 JOB - Standard 5 Day Workweek

HardscapeHardscape 10-Jan-19 16-Jan-19 5 JOB - Standard 5 Day Workweek

CON-33670 Install Handrails & Guardrails 10-Jan-19 16-Jan-19 5 JOB - Standard 5 Day Workweek

Site-Northeast Ret Wall/LandscapeSite-Northeast Ret Wall/Landscape 13-Dec-18 11-Jun-19 126 JOB - Standard 5 Day Workweek

LandscapeLandscape 13-Dec-18 11-Jun-19 126 JOB - Standard 5 Day Workweek

CON-23240 NE Wall-Demo Retaining Walls 13-Dec-18* 19-Dec-18 5 JOB - Standard 5 Day Workweek

CON-33590 NE Wall-Form/Place New Retaining Wall 07-May-19 20-May-19 10 JOB - Standard 5 Day Workweek

CON-23250 NE Wall-Grading & Landscaping 21-May-19 11-Jun-19 15 JOB - Standard 5 Day Workweek

CON-33190 NE Wall-Sump Pump Piping Daylighting 21-May-19 28-May-19 5 JOB - Standard 5 Day Workweek

Site-Southwest Ret Wall/LandscapeSite-Southwest Ret Wall/Landscape 09-Apr-19 20-May-19 30 JOB - Standard 5 Day Workweek

LandscapeLandscape 09-Apr-19 20-May-19 30 JOB - Standard 5 Day Workweek

CON-33200 SW Wall-Demo Retaining Walls 09-Apr-19 15-Apr-19 5 JOB - Standard 5 Day Workweek

CON-33570 SW Wall-Form/Place New Retaining Wall 16-Apr-19 29-Apr-19 10 JOB - Standard 5 Day Workweek

CON-33220 SW Wall-Grading & Landscaping 30-Apr-19 20-May-19 15 JOB - Standard 5 Day Workweek

CON-33210 SW Wall-Sump Pump Piping Daylighting 30-Apr-19 06-May-19 5 JOB - Standard 5 Day Workweek

Site-Northwest Ret Wall/LandscapeSite-Northwest Ret Wall/Landscape 16-Apr-19 04-Jun-19 35 JOB - Standard 5 Day Workweek

LandscapeLandscape 16-Apr-19 04-Jun-19 35 JOB - Standard 5 Day Workweek

CON-33230 NW Wall-Demo Retaining Walls 16-Apr-19 22-Apr-19 5 JOB - Standard 5 Day Workweek

CON-33580 NW Wall-Form/Place New Retaining Wall 23-Apr-19 06-May-19 10 JOB - Standard 5 Day Workweek

CON-33240 NW Wall-Sump Pump Piping Daylighting 07-May-19 13-May-19 5 JOB - Standard 5 Day Workweek

CON-33250 NW Wall-Grading & Landscaping 14-May-19 04-Jun-19 15 JOB - Standard 5 Day Workweek

Closeout & WarrantyCloseout & Warranty 16-Apr-19 12-Jun-20 297

.. 16-Apr-19 10-Jul-19 60

.. 16-Apr-19 10-Jul-19 60

CON-10760 Base Job Demobillization 16-Apr-19 10-Jul-19 60 OKC-Cap. 5 Day Rain & Wind

JED-0600 Substantial Completion 11-Jun-19 0 JOB - Standard 5 Day Workweek

Warranty Review sWarranty Review s 06-Sep-19 12-Jun-20 197 JOB - Standard 5 Day Workweek

.. 06-Sep-19 12-Jun-20 197 JOB - Standard 5 Day Workweek

CON-2840 Quarterly Warranty Review #1 06-Sep-19 09-Sep-19 2 JOB - Standard 5 Day Workweek

CON-2850 Quarterly Warranty Review #2 02-Dec-19 03-Dec-19 2 JOB - Standard 5 Day Workweek

CON-2860 Quarterly Warranty Review #3 26-Feb-20 27-Feb-20 2 JOB - Standard 5 Day Workweek

CON-2870 1 Year Warranty Review 11-Jun-20 12-Jun-20 2 JOB - Standard 5 Day Workweek

Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

2019

Lightwells-Ph 2 (Alpha, Lima, Juliette)-Form/Pour Concrete

Lightwells-Ph 1 (Charlie, Delta, Golf, Foxtrot) -Waterproofing

Lightwells-Ph 1 (Charlie, Delta, Golf, Foxtrot) -Topping Slab

Lightwells-Ph 2 (Alpha, Lima, Juliette)-Install Sump Pumps

Lightwells-Ph 1 (Charlie, Delta, Golf, Foxtrot) -Wall Coating

Lightwells-Ph 2 (Alpha, Lima, Juliette)-Waterproofing

Lightwells-Ph 2 (Alpha, Lima, Juliette)-Topping Slab

Lightwells-Ph 2 (Alpha, Lima, Juliette)-Wall Coating

Install Handrails & Guardrails

NE Wall-Demo Retaining Walls

NE Wall-Form/Place New Retaining Wall

NE Wall-Grading & Landscaping

NE Wall-Sump Pump Piping Daylighting

SW Wall-Demo Retaining Walls

SW Wall-Form/Place New Retaining Wall

SW Wall-Grading & Landscaping

SW Wall-Sump Pump Piping Daylighting

NW Wall-Demo Retaining Walls

NW Wall-Form/Place New Retaining Wall

NW Wall-Sump Pump Piping Daylighting

NW Wall-Grading & Landscaping

Base Job Demobillization

Substantial Completion

Quarterly Warranty Review #1

Quarterly W

Remaining Construction

Data Date: 10-Dec-18

Run Date: 10-Dec-18; 16:52

Oklahoma State Capitol Exterior Renovation

Page 5 of 5