Connecting The Dey Street Connector
Utilizing Microstation for Optimal Project Communication
| AECOM
![Page 2: Connecting The Dey Street Connector Utilizing Microstation for Optimal Project Communication | AECOM.](https://reader038.fdocuments.in/reader038/viewer/2022102900/551c2d22550346ad4f8b614a/html5/thumbnails/2.jpg)
Fulton Street Transit Center-Dey Street Connector - Overview
• Design and construction of a new pedestrian passageway connecting two new concourse levels by way of Cut & Cover construction and associated utility, sidewalk & roadway reconstruction
• Design and construction of two new concourse levels below existing track/platform levels of the R/W Cortlandt Street & 4/5 Fulton Street Stations
| AECOM
![Page 3: Connecting The Dey Street Connector Utilizing Microstation for Optimal Project Communication | AECOM.](https://reader038.fdocuments.in/reader038/viewer/2022102900/551c2d22550346ad4f8b614a/html5/thumbnails/3.jpg)
• Serve an Expected Commuter Traffic in the completed FSTC– 300,00 PPD
• Facilitate Connections to 12 NYC Transit Lines as part of the FSTC
• Provide a permanent below ground connection to the NJ PATH
www.lowermanhattan.info
Fulton Street Transit Center-Dey Street Connector - General Scope
| AECOM
![Page 4: Connecting The Dey Street Connector Utilizing Microstation for Optimal Project Communication | AECOM.](https://reader038.fdocuments.in/reader038/viewer/2022102900/551c2d22550346ad4f8b614a/html5/thumbnails/4.jpg)
Post 9/11
Temporary Economic Loss• Lower Manhattan – Comptrollers Assessment - $31 Billion• 30 million sq ft of office space• Private Sector Employment by October 2001– 51,000 jobs lost
Temporary Infrastructure loss• WTC PATH Station• R/W – Cortland St Station
• 1/9 Downtown Access• E – connection to PATH
7/22/01 PRE- 9/11 9/17/01 POST- 9/119/08/02 POST- 9/115/23/04 POST- 9/11
www.nycsubway.org/maps/historical.html#1980
| AECOM
![Page 5: Connecting The Dey Street Connector Utilizing Microstation for Optimal Project Communication | AECOM.](https://reader038.fdocuments.in/reader038/viewer/2022102900/551c2d22550346ad4f8b614a/html5/thumbnails/5.jpg)
Need #1- Post 9/11 - Access
Revitalized Business District• Decrease Congestion• Increase ADA accessibility
WTC Memorial Tourism• Millions of tourists expected • 85% generated through Subway • Need for Increased ADA accessibility• Need for Clear “connected” subway complex
www.mta.info/capconstr/fstc
| AECOM
![Page 6: Connecting The Dey Street Connector Utilizing Microstation for Optimal Project Communication | AECOM.](https://reader038.fdocuments.in/reader038/viewer/2022102900/551c2d22550346ad4f8b614a/html5/thumbnails/6.jpg)
NYC – Lower Manhattan Transportation Needs
Post 9/11 – Revitalization Plan• Improvement to regional transit access – essential to re-
strengthening business district
The Sustainability Challenge
• Enhance the level of service• WTC Memorial Access
• Ensuring 1 million more people can get to work , school, etc• Mass Transportation = Clean Air + Decreased Energy Consumption
www.mta.info/capconstr/fstc
| AECOM
![Page 7: Connecting The Dey Street Connector Utilizing Microstation for Optimal Project Communication | AECOM.](https://reader038.fdocuments.in/reader038/viewer/2022102900/551c2d22550346ad4f8b614a/html5/thumbnails/7.jpg)
NYC – Lower Manhattan Transportation Vision
PRE- 9/11 Connections +++
Future WTC, WTC Memorial and WTC Transportation HUB
Contract 3 ConnectorDey Street or Fulton St
www.lowermanhattan.info
| AECOM
![Page 8: Connecting The Dey Street Connector Utilizing Microstation for Optimal Project Communication | AECOM.](https://reader038.fdocuments.in/reader038/viewer/2022102900/551c2d22550346ad4f8b614a/html5/thumbnails/8.jpg)
The Fulton Street Transit Center
Transit = Access
www.mta.info/capconstr/fstc
| AECOM
![Page 9: Connecting The Dey Street Connector Utilizing Microstation for Optimal Project Communication | AECOM.](https://reader038.fdocuments.in/reader038/viewer/2022102900/551c2d22550346ad4f8b614a/html5/thumbnails/9.jpg)
The Fulton Street Transit Center
Transit = Access
www.mta.info/capconstr/fstc
| AECOM
![Page 10: Connecting The Dey Street Connector Utilizing Microstation for Optimal Project Communication | AECOM.](https://reader038.fdocuments.in/reader038/viewer/2022102900/551c2d22550346ad4f8b614a/html5/thumbnails/10.jpg)
The Fulton Street Transit Center
Transit = Access
www.mta.info/capconstr/fstc
| AECOM
![Page 11: Connecting The Dey Street Connector Utilizing Microstation for Optimal Project Communication | AECOM.](https://reader038.fdocuments.in/reader038/viewer/2022102900/551c2d22550346ad4f8b614a/html5/thumbnails/11.jpg)
The Fulton Street Transit Center – Dey Street Connector
www.mta.info/capconstr/fstc
| AECOM
![Page 12: Connecting The Dey Street Connector Utilizing Microstation for Optimal Project Communication | AECOM.](https://reader038.fdocuments.in/reader038/viewer/2022102900/551c2d22550346ad4f8b614a/html5/thumbnails/12.jpg)
Sub-Consultants
New York Office
Boston Office Dey Street Structural Box
Owner
Design-Build Team
The Fulton Street Transit Center – Dey Street Connector
| AECOM
![Page 13: Connecting The Dey Street Connector Utilizing Microstation for Optimal Project Communication | AECOM.](https://reader038.fdocuments.in/reader038/viewer/2022102900/551c2d22550346ad4f8b614a/html5/thumbnails/13.jpg)
Owner
Design-Build Team
The Fulton Street Transit Center – Dey Street Connector| AECOM
![Page 14: Connecting The Dey Street Connector Utilizing Microstation for Optimal Project Communication | AECOM.](https://reader038.fdocuments.in/reader038/viewer/2022102900/551c2d22550346ad4f8b614a/html5/thumbnails/14.jpg)
Sub-Consultants
New York Office
Boston Office Dey Street Structural Box
Owner
Design-Build Team
The Fulton Street Transit Center – Dey Street Connector
Civil - Roadway
Civil - Utilities
Structural
CPS
| AECOM
![Page 15: Connecting The Dey Street Connector Utilizing Microstation for Optimal Project Communication | AECOM.](https://reader038.fdocuments.in/reader038/viewer/2022102900/551c2d22550346ad4f8b614a/html5/thumbnails/15.jpg)
Owner
Design-Build Team
STAAD
Inroads
Microstation V8
The Fulton Street Transit Center – Dey Street Connector
Geospatial Referencing
Pre-BIM Ingenuity
Base & Sheet File Management
| AECOM
![Page 16: Connecting The Dey Street Connector Utilizing Microstation for Optimal Project Communication | AECOM.](https://reader038.fdocuments.in/reader038/viewer/2022102900/551c2d22550346ad4f8b614a/html5/thumbnails/16.jpg)
Owner
Design-Build Team
The Fulton Street Transit Center – Dey Street Connector
| AECOM
![Page 17: Connecting The Dey Street Connector Utilizing Microstation for Optimal Project Communication | AECOM.](https://reader038.fdocuments.in/reader038/viewer/2022102900/551c2d22550346ad4f8b614a/html5/thumbnails/17.jpg)
Owner
Design-Build Team
STAAD
Inroads
Microstation V8
The Fulton Street Transit Center – Dey Street Connector
Geospatial Referencing
Pre-BIM Ingenuity
Base & Sheet File Management
| AECOM
![Page 18: Connecting The Dey Street Connector Utilizing Microstation for Optimal Project Communication | AECOM.](https://reader038.fdocuments.in/reader038/viewer/2022102900/551c2d22550346ad4f8b614a/html5/thumbnails/18.jpg)
Owner
Design-Build Team
The Fulton Street Transit Center – Dey Street Connector
BASE FILES .BSE
• Existing Structure Reference
• Existing Utility Reference
• Gridlines – 4 phase project
• Secant Pile Coordinated & Final Position
DESIGN FILES .DGN
• Design Files
• AutoCAD Design Files
SHEET FILES .SHT
• Production Drawings
| AECOM
![Page 19: Connecting The Dey Street Connector Utilizing Microstation for Optimal Project Communication | AECOM.](https://reader038.fdocuments.in/reader038/viewer/2022102900/551c2d22550346ad4f8b614a/html5/thumbnails/19.jpg)
A
C
R/W DEY ST High Roof &
Option 1
4/5
| AECOM
![Page 20: Connecting The Dey Street Connector Utilizing Microstation for Optimal Project Communication | AECOM.](https://reader038.fdocuments.in/reader038/viewer/2022102900/551c2d22550346ad4f8b614a/html5/thumbnails/20.jpg)
A
C
The Fulton Street Transit Center – Dey Street Connector
| AECOM
![Page 21: Connecting The Dey Street Connector Utilizing Microstation for Optimal Project Communication | AECOM.](https://reader038.fdocuments.in/reader038/viewer/2022102900/551c2d22550346ad4f8b614a/html5/thumbnails/21.jpg)
A
C
The Fulton Street Transit Center – Dey Street Connector
| AECOM
![Page 22: Connecting The Dey Street Connector Utilizing Microstation for Optimal Project Communication | AECOM.](https://reader038.fdocuments.in/reader038/viewer/2022102900/551c2d22550346ad4f8b614a/html5/thumbnails/22.jpg)
A
C
R/W
The Fulton Street Transit Center – Dey Street Connector
| AECOM
![Page 23: Connecting The Dey Street Connector Utilizing Microstation for Optimal Project Communication | AECOM.](https://reader038.fdocuments.in/reader038/viewer/2022102900/551c2d22550346ad4f8b614a/html5/thumbnails/23.jpg)
The Fulton Street Transit Center – Dey Street Connector
| AECOM
![Page 24: Connecting The Dey Street Connector Utilizing Microstation for Optimal Project Communication | AECOM.](https://reader038.fdocuments.in/reader038/viewer/2022102900/551c2d22550346ad4f8b614a/html5/thumbnails/24.jpg)
The Fulton Street Transit Center – Dey Street Connector
| AECOM
![Page 25: Connecting The Dey Street Connector Utilizing Microstation for Optimal Project Communication | AECOM.](https://reader038.fdocuments.in/reader038/viewer/2022102900/551c2d22550346ad4f8b614a/html5/thumbnails/25.jpg)
The Fulton Street Transit Center – Dey Street Connector
| AECOM
![Page 26: Connecting The Dey Street Connector Utilizing Microstation for Optimal Project Communication | AECOM.](https://reader038.fdocuments.in/reader038/viewer/2022102900/551c2d22550346ad4f8b614a/html5/thumbnails/26.jpg)
The Fulton Street Transit Center – Dey Street Connector
| AECOM
![Page 27: Connecting The Dey Street Connector Utilizing Microstation for Optimal Project Communication | AECOM.](https://reader038.fdocuments.in/reader038/viewer/2022102900/551c2d22550346ad4f8b614a/html5/thumbnails/27.jpg)
| AECOM
![Page 28: Connecting The Dey Street Connector Utilizing Microstation for Optimal Project Communication | AECOM.](https://reader038.fdocuments.in/reader038/viewer/2022102900/551c2d22550346ad4f8b614a/html5/thumbnails/28.jpg)
| AECOM
![Page 29: Connecting The Dey Street Connector Utilizing Microstation for Optimal Project Communication | AECOM.](https://reader038.fdocuments.in/reader038/viewer/2022102900/551c2d22550346ad4f8b614a/html5/thumbnails/29.jpg)
A
C
R/W DEY ST
The Fulton Street Transit Center – Dey Street Connector
DEY ST
| AECOM
![Page 30: Connecting The Dey Street Connector Utilizing Microstation for Optimal Project Communication | AECOM.](https://reader038.fdocuments.in/reader038/viewer/2022102900/551c2d22550346ad4f8b614a/html5/thumbnails/30.jpg)
| AECOM
![Page 31: Connecting The Dey Street Connector Utilizing Microstation for Optimal Project Communication | AECOM.](https://reader038.fdocuments.in/reader038/viewer/2022102900/551c2d22550346ad4f8b614a/html5/thumbnails/31.jpg)
| AECOM
![Page 32: Connecting The Dey Street Connector Utilizing Microstation for Optimal Project Communication | AECOM.](https://reader038.fdocuments.in/reader038/viewer/2022102900/551c2d22550346ad4f8b614a/html5/thumbnails/32.jpg)
| AECOM
![Page 33: Connecting The Dey Street Connector Utilizing Microstation for Optimal Project Communication | AECOM.](https://reader038.fdocuments.in/reader038/viewer/2022102900/551c2d22550346ad4f8b614a/html5/thumbnails/33.jpg)
| AECOM
![Page 34: Connecting The Dey Street Connector Utilizing Microstation for Optimal Project Communication | AECOM.](https://reader038.fdocuments.in/reader038/viewer/2022102900/551c2d22550346ad4f8b614a/html5/thumbnails/34.jpg)
A
C
R/W DEY STHigh Roof
&Option 1
| AECOM
![Page 35: Connecting The Dey Street Connector Utilizing Microstation for Optimal Project Communication | AECOM.](https://reader038.fdocuments.in/reader038/viewer/2022102900/551c2d22550346ad4f8b614a/html5/thumbnails/35.jpg)
Option 1
High Roof
| AECOM
![Page 36: Connecting The Dey Street Connector Utilizing Microstation for Optimal Project Communication | AECOM.](https://reader038.fdocuments.in/reader038/viewer/2022102900/551c2d22550346ad4f8b614a/html5/thumbnails/36.jpg)
| AECOM
![Page 37: Connecting The Dey Street Connector Utilizing Microstation for Optimal Project Communication | AECOM.](https://reader038.fdocuments.in/reader038/viewer/2022102900/551c2d22550346ad4f8b614a/html5/thumbnails/37.jpg)
MTA New York City Transit CM-1349 PresentationEngineering Design and Construction Support Services for Emergency Ventilation Plants
| AECOM
![Page 38: Connecting The Dey Street Connector Utilizing Microstation for Optimal Project Communication | AECOM.](https://reader038.fdocuments.in/reader038/viewer/2022102900/551c2d22550346ad4f8b614a/html5/thumbnails/38.jpg)
A
C
R/W DEY ST High Roof &
Option 1
4/5
| AECOM
![Page 39: Connecting The Dey Street Connector Utilizing Microstation for Optimal Project Communication | AECOM.](https://reader038.fdocuments.in/reader038/viewer/2022102900/551c2d22550346ad4f8b614a/html5/thumbnails/39.jpg)
| AECOM
![Page 40: Connecting The Dey Street Connector Utilizing Microstation for Optimal Project Communication | AECOM.](https://reader038.fdocuments.in/reader038/viewer/2022102900/551c2d22550346ad4f8b614a/html5/thumbnails/40.jpg)
| AECOM
![Page 41: Connecting The Dey Street Connector Utilizing Microstation for Optimal Project Communication | AECOM.](https://reader038.fdocuments.in/reader038/viewer/2022102900/551c2d22550346ad4f8b614a/html5/thumbnails/41.jpg)
| AECOM
![Page 42: Connecting The Dey Street Connector Utilizing Microstation for Optimal Project Communication | AECOM.](https://reader038.fdocuments.in/reader038/viewer/2022102900/551c2d22550346ad4f8b614a/html5/thumbnails/42.jpg)
| AECOM
![Page 43: Connecting The Dey Street Connector Utilizing Microstation for Optimal Project Communication | AECOM.](https://reader038.fdocuments.in/reader038/viewer/2022102900/551c2d22550346ad4f8b614a/html5/thumbnails/43.jpg)
Connecting The Dey Street Connector
Utilizing Microstation for Optimal Project Communication