Item Description Unit Qty. Rate
ROAD AND HARDSTANDING
Excavate commencing from existing platform level, get out, part
return, fill in and ram deposit, spread in making up levels where
directed within site and remainder load and cart away
To reduce levels
A average 550mm deep (Provisional) m3 2,132
Trim, levelling and grading sub-grade; rolling to the required
chamber and gradient
B at road sub-grade level m2 3,877
imported fill materials; spreading, laying to gradients and chambers;
compacting in layers by mechanical means
Granular sub-base
C 50mm thick m2 3,877
Crusher run
D 375mm thick m2 3,877
Approved bituminous tack coat spread on top premix road
E generally m2 3,877
Premix surfacing
Premix 'Asphaltic concrete' surfacing compound wearing/ binder
course; spread, levelled and rolled to the required chambers and
gradient
F 75mm thick binder course (ACBC 28) m2 3,877
G 50mm thick wearing course (ACWC 14) m2 3,877
ROAD AND HARDSTANDING
To Collection RM
![Page 2: bq road](https://reader030.fdocuments.in/reader030/viewer/2022020519/577cc1c91a28aba71193de6b/html5/thumbnails/2.jpg)
Item Description Unit Qty. Rate
ROAD AND HARDSTANDING (Cont'd)
Road kerb
Cast in-situ concrete Grade 20 kerb including all necessary bend,
curves and intersection; finished fair on all exposed surfaces bedded
jointed in Grade 15 concrete haunching of 450mm width x 325mm
high including all necessary excavation, concrete & formwork etc, all
as detailed in Engineer's Drawing No.:PL/SJKC/101018/RD/DT/01
A 610mm x 150mm x 300mm high m 722
B
EXTRA OVER for cast in-situ concrete kerb with 290mm x
205mm oulet opening including all necessary formwork and
reinforcement
No 111
Prepare and apply one sealer coat and two finishing coat of acrylic
pint to concrete kerb
C 610mm x 300mm x 300mm high m 722
Glazed wire scupper pipe bedded and jointed in 150mm thick
concrete haunching semi surround to road side drain (In 111 No.)
D 225mm diameter m 227
Road Marking (Provisional)
Preparing; applying two coats of hot applied thermoplastic road
marking paint; on concrete / premix surfaces areas; all detailed in
Engineer's Drawing No. PL/SJKC/101018/RD/DT/04
E Straight ahead directional arrow No 25
F Right turn arrow sign No 1
G Straight and Left turn arrow sign No 1
H Left and Right turn arrow sign No 1
J 150mm wide road edge line marking m 722
K 100mm wide centre line marking m 518
L Double line marking each line 100mm wide m 147
ROAD AND HARDSTANDING
To Collection RM
![Page 3: bq road](https://reader030.fdocuments.in/reader030/viewer/2022020519/577cc1c91a28aba71193de6b/html5/thumbnails/3.jpg)
Item Description Unit Qty. Rate
ROAD AND HARDSTANDING (Cont'd)
Stop lines
A 200mm wide m 17
B 100mm wide m 11
C 83mm X 360mm x 12 Gauge galvanised steel guardrail as described
to profile fixed on and including 178mm x 76mm G. I. channel
section to 360mm length and 178mm x 76mm G. I. channel section
2.18m length embedded in 400mm diameter x 915mm high Garde
20/40 concrete at 1.9m centres, including all fixing screws, bolts and
nuts, flat plate washers and all incidental excavation, laid in straight
or curve on plan, all detailde in Engineer's drawings No.:
PL/SJKC/101018/RD/DT/06
m 189
Supply and instal road signages as described comprising 75mm
diameter galvanised iron post painted to local authority's
requirements embedded in Grade 15 mass concrete, all as detailed
in Engineer's Drawings No.: PL/SJKC/101018/RD/DT/04
(Provisional)
D Stop Sign (RP.1) No 3
E Yield Sign (RP.13) No 2
F Chevron Sign (WD.39a) No 6
G Left and Right Bends Sign (WD.10) No 2
H Chevron Sign (WD.44) No 2
J Speed Limit (RP.7) No 4
Making good
Allow for reinstatement of the public road and making good all works
disturbed after completion of the road works, to comply the
Authorities' requirement
1
K Generally Item - -
ROAD AND HARDSTANDING
![Page 4: bq road](https://reader030.fdocuments.in/reader030/viewer/2022020519/577cc1c91a28aba71193de6b/html5/thumbnails/4.jpg)
Item Description Unit Qty. Rate
ROAD AND HARDSTANDING (Cont'd)
Slope Protection by Close Turfing (Provisional)
A Approved 75mm thick coarse clean sand blanket with 50mm thick
approved black vegetable soil, spread, levelled, well rolled and
compacted to receive turfing (measured separately)
m2 3,000
B Close turfing to flat or sloping surfaces with approved good grade
cow grass with an approximate turf size of 225mm x 225mm as
described nailing with and including 10mm diameter 300mm long
hardwood laid on 50mm thick approved semi compacted black
vegetable soil (measured separately) and including watering, rolling,
weeding and tending until firmly established, replacing badly ground
areas as directed and preparation works consisting of levelling and
trimming surfaces
m2 3,000
C Allow for labour, plant, materials and everything else necessary to
provide 12 months of full time intensive maintenance of all planted
turfing within boundary including watering, weeding on continous
basis, fertilising on monthly intervals using compound fertiliser,
mowing at 3 weeks intervals and top dressing to level the ground on
continous basis. Contractor shall replace any wilted grass at his own
cost
item - -
……………………………………….
Allow for all other works not listed above but shown on the drawing
or referred to in the Specification or Preambles or which are
necessary to ensure completion of the works in this bill (item to be
specified)
…………………………………………………………………………
…………………………………………………………………………
………………………………………………………………………….
ROAD AND HARDSTANDING
RMTo Collection
![Page 5: bq road](https://reader030.fdocuments.in/reader030/viewer/2022020519/577cc1c91a28aba71193de6b/html5/thumbnails/5.jpg)
Item Description Unit Qty. Rate
ROAD AND HARDSTANDING (Cont'd)
COLLECTION
Page No. 1/1 ………………………………………………… ……. ………
Page No. 1/2 ………………………………………………… ……. ………
Page No. 1/3 ………………………………………………… ……. ………
Page No. 1/4 ………………………………………………… ……. ………
ROAD AND HARDSTANDING
RMTo Collection
![Page 6: bq road](https://reader030.fdocuments.in/reader030/viewer/2022020519/577cc1c91a28aba71193de6b/html5/thumbnails/6.jpg)
Item Description Unit Qty. Rate
STORM WATER DRAINAGE SYSTEM
Precast concrete box culvert with cover
Precast concrete box culvert G40; collar joints; jointing in cement
mortar (1:2); with and including 200mm thick hardcore, excavation,
getting out; part returning and compacting; removing surplus
excavated materials from site, as detailed in Engineer's Drawing No.:
PL/SJKC/101018/RD/DT/02
A 900mm x 1200mm depth laid in trench m 12
Reinforced concrete drain
Construct reinforced concrete drain consist of 150mm thick wall and
base with 2 layer of BRC A8; complete with 50mm thick lean
concrete, 200mm x 150 mm concrete beam on top at 4m centre to
centre and 50mm diameter PVC pipe with 10mm sized aggregate
wrapped with filter cloth at 4m centre to centre at both side of walls;
with and including excavation, getting out; part returning and
compacting; removing surplus excavated materials from site, as
detailed in Engineer's Drawing No.: PL/SJKC/101018/RD/DT/04
750mm x 750mm depth internally
B not exceeding 1000mm deep m 156
C exceeding 1000mm but not exceeding 1500mm deep m 89
cascasing drain of size
D 750mm / 1050mm x 1050mm depth internally m 63
E 1200mm / 1500mm x 1200mm depth internally m 147
Sump
Reinforced concrete sump; construct of 150mm thick wall and base
with Y10-150 c/c both way; with and including 50mm thick lean
concrete, formwork, excavating pits, part returning and compacting;
removing surplus excavated materials from site and building in ends
of drains and culvert; as detailed in Engineer's Drawing No.:
PL/SJKC/101018/RD/DT/03
1500mm x 1500mm internally
F not exceeding 1500mm deep to invert No 3
To Final Summary RM
STORM WATER DRAINAGE SYSTEM
![Page 7: bq road](https://reader030.fdocuments.in/reader030/viewer/2022020519/577cc1c91a28aba71193de6b/html5/thumbnails/7.jpg)
Item Description Unit Qty. Rate
STORM WATER DRAINAGE SYSTEM (Cont'd)
Mild steel sump grating
Sump cover gratings complete with hinges; all welded together;
painting with two coats biuminous paint; placing in position; as
detailed in Engineering's Drawing No.: PL/SJKC/101018/RD/DT/02
A 1500mm x 1500mm wide No 3
Trash screen
Trash screen consisting of top & side member 50mm x 12mm thk.
Galvanised m.s flat, bottom member 75mm x 12mm thk. Galvanised
m.s flat and verical member consisting of T12 diameter galvanised
m.s bar welded to galvanised m.s flat at 50mm c/c with 250mm high
x 150mm width x 100mm thk. 1:3:6 concrete mix stopper at both
ends : as detailed in Engineer's Drawing No.
PL/SJKC/101018/RD/DT/05
B overall size 1500mm x 600mm high No 1
…………………………………………
CAllow for new drainage connection to the existing main drain / sump;
including all necessary fitting, excavation, backfilling, etc; making
good all work disturbed; all as per Engineer's specification
item - -
Testing
D Allow for testing, cleaning and disinfecting the whole Storm
water Drainage System to the satisfaction of the Engineer
and/or Local Authorities and make good all defects
item - -
……………………………………………..
Allow for all other works not listed above but shown on the drawings
or referred to in the Specification or Preambles or which are
necessary to ensure completion of the works in this bill (item to be
specified)
…………………………………………………………………….
…………………………………………………………………….
…………………………………………………………………….
To Collection RM
STORM WATER DRAINAGE SYSTEM
![Page 8: bq road](https://reader030.fdocuments.in/reader030/viewer/2022020519/577cc1c91a28aba71193de6b/html5/thumbnails/8.jpg)
Item Description Unit Qty. Rate
STORM WATER DRAINAGE SYSTEM (Cont'd)
COLLECTION
Page No. 2/1 ………………………………………………… ……. ………
Page No. 2/2 ………………………………………………… ……. ………
STORM WATER DRAINAGE SYSTEM
To Collection RM
![Page 9: bq road](https://reader030.fdocuments.in/reader030/viewer/2022020519/577cc1c91a28aba71193de6b/html5/thumbnails/9.jpg)
Item Description Unit Qty. Rate
RETAINING STRUCTURE (CH 225.00 TO CH 275.00)
PILING WORKS (PROVISIONAL
Notes:
1 This Bill is to be read in conjunction with the foregoing General
Conditions, Preliminaries and Specifications
2 The words "as described" where used in tis Bill mean as described
in the above documents
3The quantities given for piling works are Provisional and Payment
sall be made based on site measurement of actual work done
4The Contractor may carry out his own soil investigation in addition to
the information that may be given. All cost in connection there with
shall be deemed to be included in the piling rates
5 Payable length for piles shall be as follows
(a) Driving of piles shall be measured and paid for in linear metre
measured from the toe of the pile when pitched to the toe of the
pile when driven
(b) The supply of piles shall be measured and paid for in linear
metre measured from the toe of the pile when pitched to the toe of
the pile when driven
Piling Equipment
Provide all necessary plant, equipment and tools; including
transporting to the site, assembling, dismantling and removing from
site after conmpletion of the works
A hydraulic hammer system item - -
handling and moving piling plant and equipment about the site;
including all necessary temporary work in conection therewith
B hydraulic hammer system item - -
Piling records
submit piling records in triplicate duly signed by the Contractor and
the Engineer's representative and delivered to the Engineer as work
proceeds
C reinforced concrete piling system item - -
RETAINING STRUCTURE (CH 225.00 TO CH 275.00)
To Final Summary RM
![Page 10: bq road](https://reader030.fdocuments.in/reader030/viewer/2022020519/577cc1c91a28aba71193de6b/html5/thumbnails/10.jpg)
Item Description Unit Qty. Rate
RETAINING STRUCTURE (Cont'd)
Reinforced Concrete Piling; Grade 45
Supplying and delivering to site reinforced concrete pile
A 150mm x150mm; initial pile in 6.00m length No 125
B 150mm x150mm; extension pile in 6.00m length No 125
C 150mm x150mm; extension pile in 3.00m length No 250
Unloading, transporting, handling and pitching for driving
D 150mm x150mm; initial pile in 6.00m length No 125
E 150mm x150mm; extension pile in 6.00m length No 125
F 150mm x150mm; extension pile in 3.00m length No 250
Drive by hydraulic hammer vertical Precast Reinforced Concrete
Sirim approved piles singly orin cluster
G 150mm x 150mm pile m 2,250
Mild steel connection plates; butt welding plates
H extension joints; to 150mm x 150mm R.C. Pile No 375
Cutting off pile head to specified depths; include for out-of-sequence
working and returning at a later stage to complete operation and
preparing reinforcement for connection and removing surplus
lengths from site
J 150mm x 150mm pile No 125
Pile Dynamic Load Test (PDA)
Supply all necessary equipment to conduct dynamic load tests using
pile driver analyser (PDA) on selected 200mm x200mm piles to
determine pile integrity and load carrying capacity including
mobilisation and demobilisation of all equipment and submission of 3
sets of reports to the S.O.
K 150mm x 150mm pile No 2
RETAINING STRUCTURE (CH 225.00 TO CH 275.00)
To Collection RM
![Page 11: bq road](https://reader030.fdocuments.in/reader030/viewer/2022020519/577cc1c91a28aba71193de6b/html5/thumbnails/11.jpg)
Item Description Unit Qty. Rate
RETAINING STRUCTURE (Cont'd)
Excavate; commencing from finished ground levels; get out, part
return, fill in and ram deposit, sread in making levels where directed
within site and remainder load and cart away
Retaining walls base
A not exceeding 1.50m deep m3 379
B 1.51m - 3.00m deep m3 253
Imported fill materials; spreading, leveling and compacting in layer;
20mm diameter aggregate
Back of retaining walls
C 1000mm thick m2 319
Hardcore bed consisting of hard, dry broken brick or stone, spread
and levelled and well consolidated
150mm thick
D retaining wall base m2 208
Concrete Grade 15 spread and levelled as described
Blindings; 50mm thick
E retaining base m2 208
Vibrated reinforced concrete Grade C30 as descibed
Retaining wall base
F generally m3 65
Retaining walls
G 225mm thick m2 334
RETAINING STRUCTURE (CH 225.00 TO CH 275.00)
To Collection RM
![Page 12: bq road](https://reader030.fdocuments.in/reader030/viewer/2022020519/577cc1c91a28aba71193de6b/html5/thumbnails/12.jpg)
Item Description Unit Qty. Rate
RETAINING STRUCTURE (Cont'd)
High tensile steel bar reinforcement
Retaining wall bases
A 16mm diameter bar kg 5,979
B 10mm diameter bar kg 2,083
Retaining walls
C 16mm diameter bar kg 12,681
D 10mm diameter bar kg 2,074
Sawn formwork as described
Sides; vertically
E edge of base; 300mm high m 300
F retaining walls m2 668
Weep hole
To supply and install 75mm diameter weep hole comlete with
300mm x 300mm x 300mm agregate wrapped with 1 layer of
geotextile; all detailed in Enginner's Drawing No.:
PL/SJKC/101018/EW/DT/04
G 225mm long No 130
Allow for all other works not listed above but shown on the drawings
or referred to in the Specifications or Preambles or which are
necessary to ensure completion of the works in this bill (items to be
specified)
…………………………………………………………………….
…………………………………………………………………….
…………………………………………………………………….
RETAINING STRUCTURE (CH 225.00 TO CH 275.00)
To Collection RM
![Page 13: bq road](https://reader030.fdocuments.in/reader030/viewer/2022020519/577cc1c91a28aba71193de6b/html5/thumbnails/13.jpg)
Item Description Unit Qty. Rate
RETAINING STRUCTURE (Cont'd)
COLLECTION
Page No. 3/1 ………………………………………………… ……. ………
Page No. 3/2 ………………………………………………… ……. ………
Page No. 3/3 ………………………………………………… ……. ………
Page No. 3/4 ………………………………………………… ……. ………
RETAINING STRUCTURE (CH 225.00 TO CH 275.00)
To Collection RM
![Page 14: bq road](https://reader030.fdocuments.in/reader030/viewer/2022020519/577cc1c91a28aba71193de6b/html5/thumbnails/14.jpg)
Item Description Unit Qty. Rate
RETAINING STRUCTURE (CH 0.00 TO CH 25.00)
PILING WORKS (PROVISIONAL
Notes:
1 This Bill is to be read in conjunction with the foregoing General
Conditions, Preliminaries and Specifications
2 The words "as described" where used in tis Bill mean as described
in the above documents
3The quantities given for piling works are Provisional and Payment
sall be made based on site measurement of actual work done
4The Contractor may carry out his own soil investigation in addition to
the information that may be given. All cost in connection there with
shall be deemed to be included in the piling rates
5 Payable length for piles shall be as follows
(a) Driving of piles shall be measured and paid for in linear metre
measured from the toe of the pile when pitched to the toe of the
pile when driven
(b) The supply of piles shall be measured and paid for in linear
metre measured from the toe of the pile when pitched to the toe of
the pile when driven
Piling Equipment
Provide all necessary plant, equipment and tools; including
transporting to the site, assembling, dismantling and removing from
site after conmpletion of the works
A hydraulic hammer system item - -
handling and moving piling plant and equipment about the site;
including all necessary temporary work in conection therewith
B hydraulic hammer system item - -
Piling records
submit piling records in triplicate duly signed by the Contractor and
the Engineer's representative and delivered to the Engineer as work
proceeds
C reinforced concrete piling system item - -
To Collection RM
RETAINING STRUCTURE (CH 0.00 TO CH 25.00)
![Page 15: bq road](https://reader030.fdocuments.in/reader030/viewer/2022020519/577cc1c91a28aba71193de6b/html5/thumbnails/15.jpg)
Item Description Unit Qty. Rate
RETAINING STRUCTURE (Cont'd)
Reinforced Concrete Piling; Grade 45
Supplying and delivering to site reinforced concrete pile
A 240mm x 240mm; initial pile in 6.00m length No 78
B 240mm x 240mm; extension pile in 6.00m length No 78
C 240mm x 240mm; extension pile in 3.00m length No 156
Unloading, transporting, handling and pitching for driving
D 240mm x 240mm; initial pile in 6.00m length No 78
E 240mm x 240mm; extension pile in 6.00m length No 78 -
F 240mm x 240mm; extension pile in 3.00m length No 156
Drive by hydraulic hammer vertical Precast Reinforced Concrete
Sirim approved piles singly orin cluster
-
G 240mm x 240mm pile m 1,404
Mild steel connection plates; butt welding plates
H extension joints; to 240mm x 240mm R.C. Pile No 234
Cutting off pile head to specified depths; include for out-of-sequence
working and returning at a later stage to complete operation and
preparing reinforcement for connection and removing surplus
lengths from site
J 240mm x 240mm pile No 78
Pile Dynamic Load Test (PDA)
Supply all necessary equipment to conduct dynamic load tests using
pile driver analyser (PDA) on selected 200mm x200mm piles to
determine pile integrity and load carrying capacity including
mobilisation and demobilisation of all equipment and submission of 3
sets of reports to the S.O.
K 240mm x 240mm pile No 2
RETAINING STRUCTURE (CH 0.00 TO CH 25.00)
To Collection RM
![Page 16: bq road](https://reader030.fdocuments.in/reader030/viewer/2022020519/577cc1c91a28aba71193de6b/html5/thumbnails/16.jpg)
Item Description Unit Qty. Rate
RETAINING STRUCTURE (Cont'd)
Excavate; commencing from finished ground levels; get out, part
return, fill in and ram deposit, sread in making levels where directed
within site and remainder load and cart away
Retaining walls base
A not exceeding 1.50m deep m3 569
B 1.51m - 3.00m deep m3 2,788
Imported fill materials; spreading, leveling and compacting in layer;
20mm diameter aggregate
Back of retaining walls
C 1000mm thick m2 583
Hardcore bed consisting of hard, dry broken brick or stone, spread
and levelled and well consolidated
150mm thick
D retaining wall base m2 358
Concrete Grade 15 spread and levelled as described
Blindings; 50mm thick
E retaining base m2 358
Vibrated reinforced concrete Grade C30 as descibed
Retaining wall base
F generally m3 288
Retaining walls
G 225mm thick m2 583
RETAINING STRUCTURE (CH 0.00 TO CH 25.00)
To Collection RM
![Page 17: bq road](https://reader030.fdocuments.in/reader030/viewer/2022020519/577cc1c91a28aba71193de6b/html5/thumbnails/17.jpg)
Item Description Unit Qty. Rate
RETAINING STRUCTURE (Cont'd)
High tensile steel bar reinforcement
Retaining wall bases
A 32mm diameter bar kg 24,363
B 25mm diameter bar kg 7,432
C 16mm diameter bar kg 7,507
Retaining walls
D 32mm diameter bar kg 37,549
E 25mm diameter bar kg 11,543
F 16mm diameter bar kg 9,517
G 10mm diameter bar kg 380
Sawn formwork as described
Sides; vertically
H edge of base; 300mm high m 143
J retaining walls m2 1,289
Weep hole
To supply and install 75mm diameter weep hole comlete with
300mm x 300mm x 300mm agregate wrapped with 1 layer of
geotextile; all detailed in Enginner's Drawing No.:
PL/SJKC/10108/EW/DT/04
K 225mm long No 99
Allow for all other works not listed above but shown on the drawings
or referred to in the Specifications or Preambles or which are
necessary to ensure completion of the works in this bill (items to be
specified)
…………………………………………………………………….
…………………………………………………………………….
…………………………………………………………………….
RETAINING STRUCTURE (CH 0.00 TO CH 25.00)
To Collection RM
![Page 18: bq road](https://reader030.fdocuments.in/reader030/viewer/2022020519/577cc1c91a28aba71193de6b/html5/thumbnails/18.jpg)
Item Description Unit Qty. Rate
RETAINING STRUCTURE (Cont'd)
COLLECTION
Page No. 4/1 ………………………………………………… ……. ………
Page No. 4/2 ………………………………………………… ……. ………
Page No. 4/3 ………………………………………………… ……. ………
Page No. 4/4 ………………………………………………… ……. ………
RETAINING STRUCTURE (CH 0.00 TO CH 25.00)
To Collection RM
![Page 19: bq road](https://reader030.fdocuments.in/reader030/viewer/2022020519/577cc1c91a28aba71193de6b/html5/thumbnails/19.jpg)
To Final Summary RM
![Page 20: bq road](https://reader030.fdocuments.in/reader030/viewer/2022020519/577cc1c91a28aba71193de6b/html5/thumbnails/20.jpg)
1/1
Amount
ROAD AND HARDSTANDING
![Page 21: bq road](https://reader030.fdocuments.in/reader030/viewer/2022020519/577cc1c91a28aba71193de6b/html5/thumbnails/21.jpg)
1/2
Amount
ROAD AND HARDSTANDING
![Page 22: bq road](https://reader030.fdocuments.in/reader030/viewer/2022020519/577cc1c91a28aba71193de6b/html5/thumbnails/22.jpg)
1/3
Amount
ROAD AND HARDSTANDING
![Page 23: bq road](https://reader030.fdocuments.in/reader030/viewer/2022020519/577cc1c91a28aba71193de6b/html5/thumbnails/23.jpg)
1/4
Amount
ROAD AND HARDSTANDING
![Page 24: bq road](https://reader030.fdocuments.in/reader030/viewer/2022020519/577cc1c91a28aba71193de6b/html5/thumbnails/24.jpg)
1/5
Amount
ROAD AND HARDSTANDING
![Page 25: bq road](https://reader030.fdocuments.in/reader030/viewer/2022020519/577cc1c91a28aba71193de6b/html5/thumbnails/25.jpg)
2/1
Amount
STORM WATER DRAINAGE SYSTEM
![Page 26: bq road](https://reader030.fdocuments.in/reader030/viewer/2022020519/577cc1c91a28aba71193de6b/html5/thumbnails/26.jpg)
2/2
Amount
STORM WATER DRAINAGE SYSTEM
![Page 27: bq road](https://reader030.fdocuments.in/reader030/viewer/2022020519/577cc1c91a28aba71193de6b/html5/thumbnails/27.jpg)
2/3
Amount
STORM WATER DRAINAGE SYSTEM
![Page 28: bq road](https://reader030.fdocuments.in/reader030/viewer/2022020519/577cc1c91a28aba71193de6b/html5/thumbnails/28.jpg)
3/1
Amount
RETAINING STRUCTURE (CH 225.00 TO CH 275.00)
![Page 29: bq road](https://reader030.fdocuments.in/reader030/viewer/2022020519/577cc1c91a28aba71193de6b/html5/thumbnails/29.jpg)
3/2
Amount
RETAINING STRUCTURE (CH 225.00 TO CH 275.00)
![Page 30: bq road](https://reader030.fdocuments.in/reader030/viewer/2022020519/577cc1c91a28aba71193de6b/html5/thumbnails/30.jpg)
3/3
Amount
RETAINING STRUCTURE (CH 225.00 TO CH 275.00)
![Page 31: bq road](https://reader030.fdocuments.in/reader030/viewer/2022020519/577cc1c91a28aba71193de6b/html5/thumbnails/31.jpg)
3/4
Amount
RETAINING STRUCTURE (CH 225.00 TO CH 275.00)
![Page 32: bq road](https://reader030.fdocuments.in/reader030/viewer/2022020519/577cc1c91a28aba71193de6b/html5/thumbnails/32.jpg)
3/5
Amount
RETAINING STRUCTURE (CH 225.00 TO CH 275.00)
![Page 33: bq road](https://reader030.fdocuments.in/reader030/viewer/2022020519/577cc1c91a28aba71193de6b/html5/thumbnails/33.jpg)
4/1
Amount
RETAINING STRUCTURE (CH 0.00 TO CH 25.00)
![Page 34: bq road](https://reader030.fdocuments.in/reader030/viewer/2022020519/577cc1c91a28aba71193de6b/html5/thumbnails/34.jpg)
4/2
Amount
RETAINING STRUCTURE (CH 0.00 TO CH 25.00)
![Page 35: bq road](https://reader030.fdocuments.in/reader030/viewer/2022020519/577cc1c91a28aba71193de6b/html5/thumbnails/35.jpg)
4/3
Amount
RETAINING STRUCTURE (CH 0.00 TO CH 25.00)
![Page 36: bq road](https://reader030.fdocuments.in/reader030/viewer/2022020519/577cc1c91a28aba71193de6b/html5/thumbnails/36.jpg)
4/4
Amount
RETAINING STRUCTURE (CH 0.00 TO CH 25.00)
![Page 37: bq road](https://reader030.fdocuments.in/reader030/viewer/2022020519/577cc1c91a28aba71193de6b/html5/thumbnails/37.jpg)
4/5
Amount
RETAINING STRUCTURE (CH 0.00 TO CH 25.00)
![Page 38: bq road](https://reader030.fdocuments.in/reader030/viewer/2022020519/577cc1c91a28aba71193de6b/html5/thumbnails/38.jpg)