Project-sheet Blinkwater TSF

Post on 03-Jul-2015

32 views 0 download

description

Opencast Contract Mining, Load, Haul, TSF

Transcript of Project-sheet Blinkwater TSF

www.construction.murrob.com

BLINKWATER Mokopane, Mogalakwena Mine

PROJECT TYPE: EARTHWORKS

CLIENT:

Anglo Platinum

VALUE:

R 129 Million

CONSULTANTS:

None

PROJECT DURATION:

36 Months

DATE OF PROJECT:

January 2013

PROJECT DESCRIPTION:

Load & Haul of waste material to construct

tailings impoundment dam.

Approximate volumes mined for the project:-

• Topsoil Stripped 379,254m³

• Dam wall 2,322,515m³

• Interface 580,000m³