www.construction.murrob.com BLINKWATER Mokopane, Mogalakwena Mine PROJECT TYPE: EARTHWORKS CLIENT: Anglo Platinum VALUE: R 129 Million CONSULTANTS: None PROJECT DURATION: 36 Months DATE OF PROJECT: January 2013 PROJECT DESCRIPTION: Load & Haul of waste material to construct tailings impoundment dam. Approximate volumes mined for the project:- Topsoil Stripped 379,254m³ Dam wall 2,322,515m³ Interface 580,000m³

description

Opencast Contract Mining, Load, Haul, TSF

Transcript of Project-sheet Blinkwater TSF

Page 1: Project-sheet Blinkwater TSF

www.construction.murrob.com

BLINKWATER Mokopane, Mogalakwena Mine

PROJECT TYPE: EARTHWORKS

CLIENT:

Anglo Platinum

VALUE:

R 129 Million

CONSULTANTS:

None

PROJECT DURATION:

36 Months

DATE OF PROJECT:

January 2013

PROJECT DESCRIPTION:

Load & Haul of waste material to construct

tailings impoundment dam.

Approximate volumes mined for the project:-

• Topsoil Stripped 379,254m³

• Dam wall 2,322,515m³

• Interface 580,000m³