EnvironmentalMonitoring,
LiveImaging™
VFDRetrofits
EnergyBaseline
Air FlowBalancing &Remediation
Control & PUEImplementation
M&V forGovernment/Utility Rebate
Turnkey Approach to Energy Savings
TURNKEYSOLUTION
SynapSense OptimizationPlatform: A turnkey solution
C A S E S T U D Y : Fortune 50 Company
SYNAPSENSE SOLUTION DEPLOYED:
Monitoring, Optimization Services, SynapSense Active Control™
• 100,000 sq ft
• 3,674 sense points
• Project cost: $695K
• Annual energy savings• $766K • 8,244MWh
• $530K paid utility incentive
• Net customer cost: $165K
• Annual carbon abatement: 2,555,840 lbs CO2
LiveImaging™ at the Top of the Racks
C A S E S T U D Y : Fortune 50 Company
SYNAPSENSE SOLUTION DEPLOYED:
Monitoring, Optimization Services, SynapSense Active Control™
• 100,000 sq ft
• 3,674 sense points
• Project cost: $695K
• Annual energy savings• $766K • 8,244MWh
• $530K paid utility incentive
• Net customer cost: $165K
• Annual carbon abatement: 2,555,840 lbs CO2
LiveImaging™ at the Top of the Racks
C A S E S T U D Y : Wall Street Investment Bank
SYNAPSENSE SOLUTION DEPLOYED:
Environmental Monitoring and Optimization Services
5X higher pressure than before floor rebalancing using SynapSense System.
Savings and Payback Exceed Preliminary Estimate!
Projected Savings & ROI Analysis Projected Actual
Annual Energy Savings (MWh) 258 302Fan Energy (MWh) 168 209Chiller Energy (MWh) 90 93
Carbon Abatement (Metric Tons) 135 158.1
PUE Baseline (1.65) 1.57 1.56
Project Cost $70,500 $70,500
Annual Energy Savings $28,412 $33,263
Maximum NYSERDA Incentive $36,161 $48,382
Capped NYSERDA Incentive $35,268 $35,268
Simple Payback (Months) 14.9 12.7
Pressure 8:00AM Pressure 11:30AMBalance the floor
Pressure 12:15PM3 units o�
Pressure 5:45 PM all units back on to demonstrate much more e�cient air distribution and the amount of excessive pressure
0 0.03 0.06 0.09 0.12 0.15
C A S E S T U D Y : Wall Street Investment Bank
SYNAPSENSE SOLUTION DEPLOYED:
Environmental Monitoring and Optimization Services
5X higher pressure than before floor rebalancing using SynapSense System.
Savings and Payback Exceed Preliminary Estimate!
Projected Savings & ROI Analysis Projected Actual
Annual Energy Savings (MWh) 258 302Fan Energy (MWh) 168 209Chiller Energy (MWh) 90 93
Carbon Abatement (Metric Tons) 135 158.1
PUE Baseline (1.65) 1.57 1.56
Project Cost $70,500 $70,500
Annual Energy Savings $28,412 $33,263
Maximum NYSERDA Incentive $36,161 $48,382
Capped NYSERDA Incentive $35,268 $35,268
Simple Payback (Months) 14.9 12.7
Pressure 8:00AM Pressure 11:30AMBalance the floor
Pressure 12:15PM3 units o�
Pressure 5:45 PM all units back on to demonstrate much more e�cient air distribution and the amount of excessive pressure
0 0.03 0.06 0.09 0.12 0.15C A S E S T U D Y : Wall Street Investment Bank
SYNAPSENSE SOLUTION DEPLOYED:
Environmental Monitoring and Optimization Services
5X higher pressure than before floor rebalancing using SynapSense System.
Savings and Payback Exceed Preliminary Estimate!
Projected Savings & ROI Analysis Projected Actual
Annual Energy Savings (MWh) 258 302Fan Energy (MWh) 168 209Chiller Energy (MWh) 90 93
Carbon Abatement (Metric Tons) 135 158.1
PUE Baseline (1.65) 1.57 1.56
Project Cost $70,500 $70,500
Annual Energy Savings $28,412 $33,263
Maximum NYSERDA Incentive $36,161 $48,382
Capped NYSERDA Incentive $35,268 $35,268
Simple Payback (Months) 14.9 12.7
Pressure 8:00AM Pressure 11:30AMBalance the floor
Pressure 12:15PM3 units o�
Pressure 5:45 PM all units back on to demonstrate much more e�cient air distribution and the amount of excessive pressure
0 0.03 0.06 0.09 0.12 0.15
Rack/Cabinet Monitoring with subfloor reference temperature
Pressure Monitoring (Static Pressure Di�erential)
LiveImaging™ Thermanode
SynapSense Gateway Device
SynapSense Modbus Gateway Device
Energy Monitoring – Power Meter
Single CRAC/CRAH Monitoring (Temp. & RH) – one node with two external thermistors
C A S E S T U D Y : Communications Company
SYNAPSENSE SOLUTION DEPLOYED:
Monitoring, Optimization with PUEand SynapSense Active Control™
• 60,000 sq ft
• 4,300 sense points
• Project Cost: $630,000
• Annual Energy Savings: $186K• Reduced Cooling Energy by 23%
• Received Oncor Rebate of $75K
• Simple payback (months): 26 monthsRack/Cabinet Monitoring with subfloor reference temperature
Pressure Monitoring (Static Pressure Di�erential)
LiveImaging™ Thermanode
SynapSense Gateway Device
SynapSense Modbus Gateway Device
Energy Monitoring – Power Meter
Single CRAC/CRAH Monitoring (Temp. & RH) – one node with two external thermistors
C A S E S T U D Y : Communications Company
SYNAPSENSE SOLUTION DEPLOYED:
Monitoring, Optimization with PUEand SynapSense Active Control™
• 60,000 sq ft
• 4,300 sense points
• Project Cost: $630,000
• Annual Energy Savings: $186K• Reduced Cooling Energy by 23%
• Received Oncor Rebate of $75K
• Simple payback (months): 26 months
CRAH fan energy reduced from 8kW to <1kW
Corresponding increase in CRAH delta Tof 10° to 16°
C A S E S T U D Y : Colocation Project
First Data Center
SYNAPSENSE SOLUTION DEPLOYED:
Monitoring, Optimization Services, SynapSense Active Control™
• >75K sq ft; 3,119 sense points
• Installed VFD’s on 54 CRAH units
Second Data Center
SYNAPSENSE SOLUTION DEPLOYED:
Monitoring, Optimization Services, SynapSense Active Control™
• Project Cost: $1.5M
• 55,000 sq ft data center
• Total Project cost: $1.1M
• Annual kWh savings: 3.5M kWh
• Total Energy Savings: $597K; 11.5%
• Utility Incentive: $600K
• Simple payback (months): <1 year
• Energy Savings 4.9M kWh
• Utility Incentive: $669,000
CRAH fan energy reduced from 8kW to <1kW
Corresponding increase in CRAH delta Tof 10° to 16°
C A S E S T U D Y : Colocation Project
First Data Center
SYNAPSENSE SOLUTION DEPLOYED:
Monitoring, Optimization Services, SynapSense Active Control™
• >75K sq ft; 3,119 sense points
• Installed VFD’s on 54 CRAH units
Second Data Center
SYNAPSENSE SOLUTION DEPLOYED:
Monitoring, Optimization Services, SynapSense Active Control™
• Project Cost: $1.5M
• 55,000 sq ft data center
• Total Project cost: $1.1M
• Annual kWh savings: 3.5M kWh
• Total Energy Savings: $597K; 11.5%
• Utility Incentive: $600K
• Simple payback (months): <1 year
• Energy Savings 4.9M kWh
• Utility Incentive: $669,000
CRAH fan energy reduced from 8kW to <1kW
Corresponding increase in CRAH delta Tof 10° to 16°
C A S E S T U D Y : Colocation Project
First Data Center
SYNAPSENSE SOLUTION DEPLOYED:
Monitoring, Optimization Services, SynapSense Active Control™
• >75K sq ft; 3,119 sense points
• Installed VFD’s on 54 CRAH units
Second Data Center
SYNAPSENSE SOLUTION DEPLOYED:
Monitoring, Optimization Services, SynapSense Active Control™
• Project Cost: $1.5M
• 55,000 sq ft data center
• Total Project cost: $1.1M
• Annual kWh savings: 3.5M kWh
• Total Energy Savings: $597K; 11.5%
• Utility Incentive: $600K
• Simple payback (months): <1 year
• Energy Savings 4.9M kWh
• Utility Incentive: $669,000