Stationary Fuel Cell System Composite Data Products

27
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. Contract No. DE-AC36-08GO28308 This report is available at no cost from the National Renewable Energy Laboratory (NREL) at www.nrel.gov/publications. Stationary Fuel Cell System Composite Data Products Data through Quarter 4 of 2013 G. Saur, J. Kurtz, C. Ainscough, and M. Peters Technical Report NREL/TP-5400-61926 May 2014

Transcript of Stationary Fuel Cell System Composite Data Products

NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC.

Contract No. DE-AC36-08GO28308 This report is available at no cost from the National Renewable Energy Laboratory (NREL) at www.nrel.gov/publications.

Stationary Fuel Cell System Composite Data Products Data through Quarter 4 of 2013

G. Saur, J. Kurtz, C. Ainscough, and M. Peters

Technical Report NREL/TP-5400-61926 May 2014

NOTICE

This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States government or any agency thereof.

This report is available at no cost from the National Renewable Energy Laboratory (NREL) at www.nrel.gov/publications.

Available electronically at http://www.osti.gov/scitech

Available for a processing fee to U.S. Department of Energy and its contractors, in paper, from:

U.S. Department of Energy Office of Scientific and Technical Information P.O. Box 62 Oak Ridge, TN 37831-0062 phone: 865.576.8401 fax: 865.576.5728 email: mailto:[email protected]

Available for sale to the public, in paper, from:

U.S. Department of Commerce National Technical Information Service 5285 Port Royal Road Springfield, VA 22161 phone: 800.553.6847 fax: 703.605.6900 email: [email protected] online ordering: http://www.ntis.gov/help/ordermethods.aspx

Cover Photos: (left to right) photo by Pat Corkery, NREL 16416, photo from SunEdison, NREL 17423, photo by Pat Corkery, NREL 16560, photo by Dennis Schroeder, NREL 17613, photo by Dean Armstrong, NREL 17436, photo by Pat Corkery, NREL 17721.

Printed on paper containing at least 50% wastepaper, including 10% post consumer waste.

3

CDP-STAT-01 Fuel Cell Stationary Systems Deployed by Year

2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 20130

100

200

300

400

Proj

ect C

ount

Cumulative Deployment Count by Year*

Total = 317 units

TotalFuel Cell CHPFuel Cell Electric

2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 20130

50

100

150

Cap

acity

[MW

]

Cumulative Capacity by Year*

Total = 131 MW

TotalFuel Cell CHPFuel Cell Electric

NREL cdp_stat_01Created: Apr-29-14 2:08 PM | Data Range: 2001Q2-2013Q4 *Data from the California SGIP.

4

CDP-STAT-02 Stationary Fuel Cell System Count by Status

3%

4%

10%

11%64%

Deployment Count By Status*

Other Categories: ICF ReviewICF Technical ReviewICF Pending PaymentPPM Technical ReviewRRF ReviewRRF Technical Review

Definitions: RRF = Reservation Request Form, is the first step in the SGIP incentive claim process.PPM = Proof of Project Milestone; the applicant must prove progress and committment to the project.ICF = Incentive Claim Form is the step where the appliant, after meeting all SGIP requirements requests payment of the incentive.PBI = Performance Based Incentive is the way in which the incentive is paid out over time based on performance of the system.

OtherICF InspectionRRF ReservedPPM ConfirmedPayment PBI in ProcessPayment Completed

NREL cdp_stat_02Created: Apr-29-14 2:08 PM | Data Range: 2001Q2-2013Q4 *Data from the California SGIP.

5

CDP-STAT-03 Location of Stationary Fuel Cell Systems Analyzed

CA Stationary Fuel Cell Installations* (2001 - 2013)

ICF InspectionICF Pending PaymentICF ReviewICF Technical ReviewPPM ConfirmedPPM Technical ReviewPayment CompletedPayment PBI in ProcessRRF ReservedRRF ReviewRRF Technical Review

NREL cdp_stat_03Created: Apr-29-14 2:08 PM | Data Range: 2001Q2-2013Q4 *Data from the California SGIP.

Definitions: RRF = Reservation Request Form, is the first step in the SGIP incentive claim process.PPM = Proof of Project Milestone; the applicant must prove progress and committment to the project.ICF = Incentive Claim Form is the step where the appliant, after meeting all SGIP requirements requests payment of the incentive.PBI = Performance Based Incentive is the way in which the incentive is paid out over time based on performance of the system.

6

CDP-STAT-04 Stationary Fuel Cell System Count and Capacity by Fuel Type

4%10%

11%

< 1%

74%

Site Count by Fuel Type*

Biomass

Digester Gas

Landfill Gas

N/A

Natural Gas

4%

16%

13%

< 1% 66%

Installed Capacity by Fuel Type

NREL cdp_stat_04Created: Apr-29-14 2:09 PM | Data Range: 2001Q2-2013Q4

Includes Status Categories:ICF InspectionICF Pending PaymentICF ReviewICF Technical ReviewPPM ConfirmedPPM Technical ReviewPayment CompletedPayment PBI in ProcessRRF ReservedRRF ReviewRRF Technical ReviewTotal Capacity: 131 MWTotal Sites: 317

Installations by Fuel Type(All Fuel Cell Systems)

Definitions: RRF = Reservation Request Form, is the first step in the SGIP incentive claim process.PPM = Proof of Project Milestone; the applicant must prove progress and committment to the project.ICF = Incentive Claim Form is the step where the appliant, after meeting all SGIP requirements requests payment of the incentive.PBI = Performance Based Incentive is the way in which the incentive is paid out over time based on performance of the system. *Data from the California SGIP.

7

CDP-STAT-05 Fuel Type Capacity

Biomass Digester Gas Landfill Gas Natural Gas0

100

200

300

400

500

600

700

Inst

alle

d C

apac

ity (k

W)

Installation Capacity Statistics by Fuel Type*

NREL cdp_stat_05Created: Apr-29-14 2:09 PM | Data Range: 2001Q2-2013Q4

75% Percentile

Median

25% Percentile

Mean

Insufficientdata toprotect

anonymity

*Data from the California SGIP.

8

CDP-STAT-06 Fuel Cell Stationary Capacity and Average Prices

0 200 400 600 800 1000 >10000

5

10

15

20

25

30Distribution of Capacity and Average Eligible Cost $2010/kW*

Capacity (kW)

% o

f sys

tem

s

0 200 400 600 800 1000 >10000

2,000

4,000

6,000

8,000

10,000

12,000

Avg

. $/k

W

$/kW w/o Incentive$/kW w/ Incentive2020 DOE Target†

0 200 400 600 800 1000 0

5

10

15

20

Capacity (kW)

% o

f sys

tem

s

Detailed Capacity Distribution

0 10 20 30 40 500

20406080

Capacity (kW)%

of s

yste

ms

<=50

kW

NREL cdp_stat_06Created: Apr-29-14 2:09 PM | Data Range: 2001Q2-2013Q4

†for the year 2020, operating on natural gas.*Data from the California SGIP.

Eligible Costs May Include: Planning & Feasibility Study, Engineering & Design, Permitting, Self-Generation Equipment, WasteHeat Recovery Costs, Construction & Installation Costs, Gas & Electric Interconnection, Warranty, Maintenance Contract,Metering, Monitoring & Data Acquisition System, Emission Control Equipment Capital, Gasline Installation, Fuel Gas Clean-upEquipment, Electricity Storage Devices, Bond to Certify Renewable Fuel, Sales Tax, Fuel Supply (digesters, gas gathering,etc.), Thermal Load, & Other Eligible Costs

9

CDP-STAT-07 Distribution of Stationary Fuel Cell Install Price With and Without Incentives

0

20

40

60

80

0

1000

20

00

3000

40

00

5000

60

00

7000

80

00

9000

1000

011

000

1200

013

000

1400

015

000

1600

017

000

1800

019

000

2000

021

000

proj

ect c

ount

Price without incentives [$2010/kW]

Installed Eligible Cost Per kW*Adjusted To 2010 Dollars

Avg** = $10,189 $/kW

CurrentDOE 2020 Target

0

20

40

60

0

1000

20

00

3000

40

00

5000

60

00

7000

80

00

9000

1000

011

000

1200

013

000

1400

015

000

1600

017

000

1800

019

000

2000

021

000

proj

ect c

ount

Price with incentives [$2010/kW]

Avg** = $6,722 $/kW

CurrentDOE 2020 Target

NREL cdp_stat_07Created: Apr-29-14 2:10 PM | Data Range: 2001Q2-2013Q4 *Data from the California SGIP.

Eligible Costs May Include: Planning & Feasibility Study, Engineering & Design, Permitting, Self-Generation Equipment, WasteHeat Recovery Costs, Construction & Installation Costs, Gas & Electric Interconnection, Warranty, Maintenance Contract,Metering, Monitoring & Data Acquisition System, Emission Control Equipment Capital, Gasline Installation, Fuel Gas Clean-upEquipment, Electricity Storage Devices, Bond to Certify Renewable Fuel, Sales Tax, Fuel Supply (digesters, gas gathering,etc.), Thermal Load, & Other Eligible Costs

**Data points with less than 2projects filtered.

10

CDP-STAT-08 Stationary Fuel Cell Install Price Over Time With and Without Incentives

2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 20130

5

10

15

Ave

rage

$20

10/W

of In

stal

led

Cap

acity

Average Eligible Cost $2010/W Trend for Overall Deployments*

Without IncentiveWith IncentiveDOE 2020 Target

0

5

10

15

200120

0220

0320

0420

0520

0620

0720

0820

0920

1020

1120

1220

13

Capacity < 500 kW

Ave

rage

$20

10/W

of In

stal

led

Cap

acity

0

5

10

15

200120

0220

0320

0420

0520

0620

0720

0820

0920

1020

1120

1220

13

500 kW <= Capacity < 1000 kW

0

5

10

15

200120

0220

0320

0420

0520

0620

0720

0820

0920

1020

1120

1220

13

Capacity >= 1000 kW

NREL cdp_stat_08Created: Apr-29-14 2:11 PM | Data Range: 2001Q2-2013Q4 *Data from the California SGIP.

Eligible Costs May Include: Planning & Feasibility Study, Engineering & Design, Permitting, Self-Generation Equipment, WasteHeat Recovery Costs, Construction & Installation Costs, Gas & Electric Interconnection, Warranty, Maintenance Contract,Metering, Monitoring & Data Acquisition System, Emission Control Equipment Capital, Gasline Installation, Fuel Gas Clean-upEquipment, Electricity Storage Devices, Bond to Certify Renewable Fuel, Sales Tax, Fuel Supply (digesters, gas gathering,etc.), Thermal Load, & Other Eligible Costs

11

CDP-STAT-09 Stationary Fuel Cell Install Price by Fuel Type With and Without Incentives

Biomass Digester Gas Landfill Gas Natural Gas

4000

6000

8000

10000

12000

$201

0/kW

of In

stal

led

Cap

acity

Eligible Cost $2010/kW of Installed Capacity by Fuel Type*

Avg. Without IncentiveAvg. With Incentive

NREL cdp_stat_09Created: Apr-29-14 2:11 PM | Data Range: 2001Q2-2013Q4

75% Percentile

Median

25% Percentile

Mean

*Data from the California SGIP.

Eligible Costs May Include: Planning & Feasibility Study, Engineering & Design, Permitting, Self-Generation Equipment, WasteHeat Recovery Costs, Construction & Installation Costs, Gas & Electric Interconnection, Warranty, Maintenance Contract,Metering, Monitoring & Data Acquisition System, Emission Control Equipment Capital, Gasline Installation, Fuel Gas Clean-upEquipment, Electricity Storage Devices, Bond to Certify Renewable Fuel, Sales Tax, Fuel Supply (digesters, gas gathering,etc.), Thermal Load, & Other Eligible Costs

12

CDP-STAT-10 Installed Capacity and Fuel Type

0 200 400 600 800 1000 >10000

5

10

15

20

25

30

35

40

45

50

System Size (kW)

Tota

l Ins

talle

d C

apac

ity (M

W)

Installed Capacity And Fuel Type*

BiomassDigester GasLandfill GasNatural Gas

NREL cdp_stat_10Created: Apr-29-14 2:11 PM | Data Range: 2001Q2-2013Q4 *Data from the California SGIP.

13

CDP-STAT-11 Total Incentive Spending ($2010) per kW by Year

2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 20130

20

40

60

80

100

120

140

Cap

acity

[MW

]

Year2000

2500

3000

3500

4000

4500

5000

5500

Ince

ntiv

e Sp

endi

ng ($

2010

) Per

kW

Inst

alle

d

Total Incentive ($2010) per kW by Year*

NREL cdp_stat_11Created: Apr-29-14 2:12 PM | Data Range: 2001Q2-2013Q4 *Data from the California SGIP.

14

CDP-STAT-12 Average System Size Installed Per Year (kW)

2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 20130

100

200

300

400

500

600

700

800

Ave

rage

Sys

tem

Siz

e In

stal

led

Per Y

ear (

kW)

Year

Average System Size Installed Per Year (kW)*

Overall Average Capacity = 462 kW

NREL cdp_stat_12Created: Apr-29-14 2:12 PM | Data Range: 2001Q2-2013Q4 *Data from the California SGIP.

15

CDP-STAT-13 Installed Annual Capacity by Fuel Type

2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 20130

10

20

30

40

50

60

Year

Tota

l Ann

ual I

nsta

lled

Cap

acity

(MW

)

Installed Fuel Type By Year*

BiomassDigester GasLandfill GasNatural Gas

NREL cdp_stat_13Created: Apr-29-14 2:12 PM | Data Range: 2001Q2-2013Q4 *Data from the California SGIP.

16

CDP-STAT-14 Distribution of Capacity by Equipment Type

0 200 400 600 800 1000 1200 1400 1600 1800 2000 >20000

50

100

150

200

250Distribution of Capacity by Equipment Type*

Capacity (kW)

Tota

l # o

f Sys

tem

s

Fuel Cell CHPFuel Cell ElectricGas TurbineInternal CombustionMicroturbinePressure Reduction Turbine

NREL cdp_stat_14Created: Apr-29-14 2:13 PM | Data Range: 2001Q2-2013Q4 *Data from the California SGIP.

17

CDP-STAT-15 Average Eligible Cost by Equipment Type, Including Other DG

2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 20130

5

10

15

20

25

Ave

rage

$20

10/W

of In

stal

led

Cap

acity

Average Eligible Cost $2010/W Trend for Overall Deployments*Without Incentives

2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 20130

5

10

15

20

25

Average Eligible Cost $2010/W Trend for Overall Deployments*With Incentives

Ave

rage

$20

10/W

of In

stal

led

Cap

acity

Fuel Cell CHPFuel Cell ElectricGas TurbineInternal CombustionMicroturbinePressure Reduction Turbine

NREL cdp_stat_15Created: Apr-29-14 2:13 PM | Data Range: 2001Q2-2013Q4 *Data from the California SGIP.

Eligible Costs May Include: Planning & Feasibility Study, Engineering & Design, Permitting, Self-Generation Equipment, WasteHeat Recovery Costs, Construction & Installation Costs, Gas & Electric Interconnection, Warranty, Maintenance Contract,Metering, Monitoring & Data Acquisition System, Emission Control Equipment Capital, Gasline Installation, Fuel Gas Clean-upEquipment, Electricity Storage Devices, Bond to Certify Renewable Fuel, Sales Tax, Fuel Supply (digesters, gas gathering,etc.), Thermal Load, & Other Eligible Costs

18

CDP-STAT-16 Average Eligible Cost for Biogas Sources

0 200 400 600 800 1000 >10000

2000

4000

6000

8000

10000

12000

Average Eligible Cost $2010/kW Biogas Source*Without Incentives

System Size (kW)

$201

0/kW

of In

stal

led

Cap

acity

DirectedOnsite

0 200 400 600 800 1000 >10000

2000

4000

6000

8000

Average Eligible Cost $2010/kW Biogas Source*With Incentives

System Size (kW)

$201

0/kW

of In

stal

led

Cap

acity

DirectedOnsite

NREL cdp_stat_16Created: Apr-29-14 2:13 PM | Data Range: 2001Q2-2013Q4 *Data from the California SGIP.

Eligible Costs May Include: Planning & Feasibility Study, Engineering & Design, Permitting, Self-Generation Equipment, WasteHeat Recovery Costs, Construction & Installation Costs, Gas & Electric Interconnection, Warranty, Maintenance Contract,Metering, Monitoring & Data Acquisition System, Emission Control Equipment Capital, Gasline Installation, Fuel Gas Clean-upEquipment, Electricity Storage Devices, Bond to Certify Renewable Fuel, Sales Tax, Fuel Supply (digesters, gas gathering,etc.), Thermal Load, & Other Eligible Costs

19

CDP-STAT-20 Installations By Fuel Type (CHP Fuel Cells)

8%

4%

88%

Site Count by Fuel Type*

Digester Gas

Landfill Gas

Natural Gas

32%

13%

55%

Installed Capacity by Fuel Type

NREL cdp_stat_20Created: Apr-29-14 3:30 PM | Data Range: 2001Q2-2013Q4

Includes Status Categories:ICF Technical ReviewPPM ConfirmedPPM Technical ReviewPayment CompletedPayment PBI in ProcessRRF ReservedRRF Technical Review

Total Capacity: 28 MWTotal Sites: 112

Installations by Fuel Type(CHP Fuel Cell Systems)

Definitions: RRF = Reservation Request Form, is the first step in the SGIP incentive claim process.PPM = Proof of Project Milestone; the applicant must prove progress and committment to the project.ICF = Incentive Claim Form is the step where the appliant, after meeting all SGIP requirements requests payment of the incentive.PBI = Performance Based Incentive is the way in which the incentive is paid out over time based on performance of the system. *Data from the California SGIP.

20

CDP-STAT-21 Installation Capacity by Fuel Type (CHP Fuel Cells)

Digester Gas Landfill Gas Natural Gas0

100

200

300

400

500

600

700

800

900

1000

1100

1200

1300

Inst

alle

d C

apac

ity (k

W)

Installation Capacity Statistics by Fuel Type (CHP)*

NREL cdp_stat_21Created: Apr-29-14 2:13 PM | Data Range: 2001Q2-2013Q4

75% Percentile

Median

25% Percentile

Mean

Insufficientdata toprotect

anonymity

*Data from the California SGIP.

21

CDP-STAT-22 Distribution of Capacity and Eligible Cost (CHP Fuel Cells)

0 200 400 600 800 1000 >10000

10

20

30

40

50

60

70Distribution of Capacity and Average Eligible Cost $2010/kW (CHP Fuel Cell)*

Capacity (kW)

% o

f sys

tem

s

0 200 400 600 800 1000 >10000

2,000

4,000

6,000

8,000

10,000

Avg

. $/k

W

$/kW w/o Incentive$/kW w/ Incentive2020 DOE Target†

0 200 400 600 800 1000 0

10

20

30

40

50

Capacity (kW)

% o

f sys

tem

s

Detailed Capacity Distribution

0 10 20 30 40 500

20406080

Capacity (kW)%

of s

yste

ms

<=50

kW

NREL cdp_stat_22Created: Apr-29-14 2:13 PM | Data Range: 2001Q2-2013Q4

†for the year 2020, operating on natural gas.*Data from the California SGIP.

Eligible Costs May Include: Planning & Feasibility Study, Engineering & Design, Permitting, Self-Generation Equipment, WasteHeat Recovery Costs, Construction & Installation Costs, Gas & Electric Interconnection, Warranty, Maintenance Contract,Metering, Monitoring & Data Acquisition System, Emission Control Equipment Capital, Gasline Installation, Fuel Gas Clean-upEquipment, Electricity Storage Devices, Bond to Certify Renewable Fuel, Sales Tax, Fuel Supply (digesters, gas gathering,etc.), Thermal Load, & Other Eligible Costs

22

CDP-STAT-23 Distribution of Eligible Cost With and Without Incentives (CHP Fuel Cells)

0

10

20

30

0

1000

20

00

3000

40

00

5000

60

00

7000

80

00

9000

1000

011

000

1200

013

000

1400

015

000

1600

017

000

1800

019

000

2000

021

000

proj

ect c

ount

Price without incentives [$2010/kW]

Installed Eligible Cost Per kW (CHP Fuel Cell)*Adjusted To 2010 Dollars

Avg** = $9,997 $/kW

CurrentDOE 2020 Target

0

10

20

30

40

0

1000

20

00

3000

40

00

5000

60

00

7000

80

00

9000

1000

011

000

1200

013

000

1400

015

000

1600

017

000

1800

019

000

2000

021

000

proj

ect c

ount

Price with incentives [$2010/kW]

Avg** = $7,107 $/kW

CurrentDOE 2020 Target

NREL cdp_stat_23Created: Apr-29-14 2:14 PM | Data Range: 2001Q2-2013Q4 *Data from the California SGIP.

Eligible Costs May Include: Planning & Feasibility Study, Engineering & Design, Permitting, Self-Generation Equipment, WasteHeat Recovery Costs, Construction & Installation Costs, Gas & Electric Interconnection, Warranty, Maintenance Contract,Metering, Monitoring & Data Acquisition System, Emission Control Equipment Capital, Gasline Installation, Fuel Gas Clean-upEquipment, Electricity Storage Devices, Bond to Certify Renewable Fuel, Sales Tax, Fuel Supply (digesters, gas gathering,etc.), Thermal Load, & Other Eligible Costs

**Data points with less than 2projects filtered.

23

CDP-STAT-24 Eligible Cost By Fuel Type With and Without Incentives (CHP Fuel Cells)

Digester Gas Landfill Gas Natural Gas

2000

4000

6000

8000

10000

12000

$201

0/kW

of In

stal

led

Cap

acity

Eligible Cost $2010/kW of Installed Capacity by Fuel Type (CHP Fuel Cell)*

Avg. Without IncentiveAvg. With Incentive

NREL cdp_stat_24Created: Apr-29-14 2:14 PM | Data Range: 2001Q2-2013Q4

75% Percentile

Median

25% Percentile

Mean

*Data from the California SGIP.

Eligible Costs May Include: Planning & Feasibility Study, Engineering & Design, Permitting, Self-Generation Equipment, WasteHeat Recovery Costs, Construction & Installation Costs, Gas & Electric Interconnection, Warranty, Maintenance Contract,Metering, Monitoring & Data Acquisition System, Emission Control Equipment Capital, Gasline Installation, Fuel Gas Clean-upEquipment, Electricity Storage Devices, Bond to Certify Renewable Fuel, Sales Tax, Fuel Supply (digesters, gas gathering,etc.), Thermal Load, & Other Eligible Costs

24

CDP-STAT-25 Cumulative Deployment Count by Category and Year

2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 20130

500

1000

1500

Proj

ect C

ount

Cumulative Deployment Count by Category and Year*

Total = 1493 units

TotalFuel Cell CHPFuel Cell ElectricGas TurbineInternal CombustionMicroturbinePressure Reduction Turbine

2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 20130

100

200

300

400

500

Cap

acity

[MW

]

Cumulative Capacity by Category and Year*

Total = 460 MW

TotalFuel Cell CHPFuel Cell ElectricGas TurbineInternal CombustionMicroturbinePressure Reduction Turbine

NREL cdp_stat_25Created: Apr-29-14 2:14 PM | Data Range: 2001Q2-2013Q4 *Data from the California SGIP.

25

CDP-STAT-26 Installed Eligible Cost per kW By Capacity

0

10

20

30

Average Prices No Incentive, Incentive0-50 kW = $10,808/kW, $8,299/kWAverage Prices No Incentive, Incentive

51-200 kW = $10,932/kW, $6,725/kW

Average Prices No Incentive, Incentive

201-400 kW = $9,950/kW, $6,046/kW

Average Prices No Incentive, Incentive

401+ kW = $9,524/kW, $5,587/kWData points with less than 2 projects filtered.

0 10

00 20

00 30

00 40

00 50

00 60

00 70

00 80

00 90

00

1000

011

00012

00013

00014

00015

00016

00017

00018

00019

00020

00021

000

proj

ect c

ount

Price [$2010/kW] No Incentive

Installed Eligible Cost Per kW By Capacity*Adjusted To 2010 Dollars

0-50kW

51-200 kW

201-400 kW

>400 kW

DOE 2020 Target

0

10

20

30

0 10

00 20

00 30

00 40

00 50

00 60

00 70

00 80

00 90

00

1000

011

00012

00013

00014

00015

00016

00017

00018

00019

00020

00021

000

proj

ect c

ount

Price [$2010/kW] With IncentiveNREL cdp_stat_26Created: Apr-29-14 2:15 PM | Data Range: 2001Q2-2013Q4 *Data from the California SGIP.

Eligible Costs May Include: Planning & Feasibility Study,Engineering & Design, Permitting, Self-GenerationEquipment, Waste Heat Recovery Costs, Construction &Installation Costs, Gas & Electric Interconnection, Warranty,Maintenance Contract, Metering, Monitoring & DataAcquisition System, Emission Control Equipment Capital,Gasline Installation, Fuel Gas Clean-up Equipment,Electricity Storage Devices, Bond to Certify RenewableFuel, Sales Tax, Fuel Supply (digesters, gas gathering, etc.),Thermal Load, & Other Eligible Costs

26

CDP-STAT-27 Installed Eligible Cost per kW By Capacity (CHP Fuel Cell)

0

10

20

30

Average Prices No Incentive, Incentive0-50 kW = $10,830/kW, $8,320/kWAverage Prices No Incentive, Incentive

51-200 kW = $NaN/kW, $NaN/kW

Average Prices No Incentive, Incentive

201-400 kW = $8,817/kW, $5,330/kW

Average Prices No Incentive, Incentive

401+ kW = $7,582/kW, $3,647/kWData points with less than 2 projects filtered.

0 10

00 20

00 30

00 40

00 50

00 60

00 70

00 80

00 90

00

1000

011

00012

00013

00014

00015

00016

00017

00018

00019

00020

00021

000

proj

ect c

ount

Price [$2010/kW] No Incentive

Installed Eligible Cost Per kW By Capacity (CHP Fuel Cell)*Adjusted To 2010 Dollars

0-50kW

51-200 kW

201-400 kW

>400 kW

DOE 2020 Target

0

10

20

30

0 10

00 20

00 30

00 40

00 50

00 60

00 70

00 80

00 90

00

1000

011

00012

00013

00014

00015

00016

00017

00018

00019

00020

00021

000

proj

ect c

ount

Price [$2010/kW] With IncentiveNREL cdp_stat_27Created: Apr-29-14 2:15 PM | Data Range: 2001Q2-2013Q4 *Data from the California SGIP.

Eligible Costs May Include: Planning & Feasibility Study,Engineering & Design, Permitting, Self-GenerationEquipment, Waste Heat Recovery Costs, Construction &Installation Costs, Gas & Electric Interconnection, Warranty,Maintenance Contract, Metering, Monitoring & DataAcquisition System, Emission Control Equipment Capital,Gasline Installation, Fuel Gas Clean-up Equipment,Electricity Storage Devices, Bond to Certify RenewableFuel, Sales Tax, Fuel Supply (digesters, gas gathering, etc.),Thermal Load, & Other Eligible Costs

27

CDP-STAT-28 Range of Installed Eligible Cost per kW Biogas Sources by Capacity

0 200 400 600 800 1000 >10000

3000

6000

9000

12000

15000

18000

System Size (kW)

$201

0/kW

of In

stal

led

Cap

acity

Range of Installed Eligible Cost Per kW Biogas Sources by Capacity

Biogas Sources with Incentive 25th/75th percentileBiogas Sources without Incentive 25th/75th percentileMean with IncentiveMedian with IncentiveMean without IncentiveMedian without Incentive

NREL cdp_stat_28Created: Apr-29-14 2:15 PM | Data Range: 2001Q2-2013Q4

Insufficientdata toprotect

anonymity

Insufficientdata toprotect

anonymity

*Data from the California SGIP.

Eligible Costs May Include: Planning & Feasibility Study, Engineering & Design, Permitting, Self-Generation Equipment, Waste HeatRecovery Costs, Construction & Installation Costs, Gas & Electric Interconnection, Warranty, Maintenance Contract, Metering, Monitoring &Data Acquisition System, Emission Control Equipment Capital, Gasline Installation, Fuel Gas Clean-up Equipment, Electricity StorageDevices, Bond to Certify Renewable Fuel, Sales Tax, Fuel Supply (digesters, gas gathering, etc.), Thermal Load, & Other Eligible Costs