RETIREMENT + SOCIAL HOUSING infographic fina… · + RETIREMENT HOUSING PROBLEM ISSUE 01 POPULATION...

4
presents a summary for New Zealand’s Pipeline for RETIREMENT + SOCIAL HOUSING SOCIAL RETIREMENT PREFABNZ PrefabNZ is focused on information, education and advocacy. Levers for Prefab (2015) identified the three levers for prefab of scale, liability and show-and-tell. HOUSING With the current under supply of universal and lifetime design homes already at 140,000, it is estimated that this will grow to nearly a quarter of million homes by 2030. Coupled with this is the general housing shortage of 100,000 homes. INCREASE Forcast population changes will have huge impacts on the demand for retirement and social community housing. AGEING At the same time as increasing , the population is getting older. The social housing sector sees a future based on collaboration with the public and private sector. Having an ageing population results in higher demand for retirement homes. ACTION THINK EFFECT PROBLEM + +

Transcript of RETIREMENT + SOCIAL HOUSING infographic fina… · + RETIREMENT HOUSING PROBLEM ISSUE 01 POPULATION...

Page 1: RETIREMENT + SOCIAL HOUSING infographic fina… · + RETIREMENT HOUSING PROBLEM ISSUE 01 POPULATION INCREASE 2015 2021 5.1 million 4.9 million 4.6 million 2031 Largest population

presents a summary for

New Zealand’s Pipeline for

RETIREMENT + SOCIAL HOUSING

S O C I A L

R E T I R E M E N T

P R E F A B N Z

PrefabNZ is focused on information, education and advocacy. Levers for Prefab (2015) identified the three levers for prefab of scale, liability and show-and-tell.

H O U S I N G

With the current under supply of universal and lifetime design homes already at 140,000, it is estimated that this will grow to nearly a quarter of million homes by 2030. Coupled with this is the general housing shortage of 100,000 homes.

I N C R E A S E

Forcast population changes will have huge impacts on the demand for retirement and social community housing.

A G E I N G

At the same time as increasing , the population is getting older.

The social housing sector sees a future based on collaboration with the public and private sector.

Having an ageing population results in higher demand for retirement homes.

A C T I O NT H I N KE F F E C TP R O B L E M

+

+

Page 2: RETIREMENT + SOCIAL HOUSING infographic fina… · + RETIREMENT HOUSING PROBLEM ISSUE 01 POPULATION INCREASE 2015 2021 5.1 million 4.9 million 4.6 million 2031 Largest population

EFFECTL A C K O F S O C I A L

+ R E T I R E M E N T H O U S I N G

PROBLEM

ISSUE 01 P O P U L A T I O N I N C R E A S E

2 0 1 5 2 0 2 1

5.1million

4.9million

4.6million

2 0 3 1

Largest population growth in Auckland

+600,000 by 2031

53% of New Zealand

Auckland, Hamilton and Tauranga will likely house The issues of a larger and ageing

population have a large effect on housing in New Zealand.

2 0 5 0

ISSUE 02 P O P U L A T I O N A G E I N G

= 1 million

13%21%

2 0 1 5 2 0 3 1

Twice as many rental homes will be

headed by an older person than in 2015.

age 65+ will make up 25% of NZers

T H I S M E A N S . . .

R E Q U I R E D C U R R E N T S H O R T F A L L

5,000 3,800 1,200=

per annum per annum per annum

-

18,000

91%

shortfall of S + R homes by 2030

X1000 =

of the construction industry is firms of 1-5

people using traditional building methods

Auckland’s 15 year housing demand shortfall of 5,000 houses a year could be met ...

60% FASTER USING INCREASED PREFABRICATION.

T H E E Q U A T I O N

housing demand by 2030

Retirement Villages Sector (RVA)

30,000

75,000=

+ +Ministry of Social

Development

15,000

Community Housing Organisatons (CHO)

30,000

Page 3: RETIREMENT + SOCIAL HOUSING infographic fina… · + RETIREMENT HOUSING PROBLEM ISSUE 01 POPULATION INCREASE 2015 2021 5.1 million 4.9 million 4.6 million 2031 Largest population

ACTIONInformation Education Advocacy

S O C I A L H O U S I N G

69,000

5,000

87,400

13,400

THINK

PrefabNZ believes New Zealand can optimise the delivery of innovative, affordable and high-quality buildings through the use of innovative prefabrication technology, delivering measurable and

sustainable productivity outcomes to the New Zealand economy.

R E T I R E M E N T H O U S I N G

30,000

54%C O R P O R A T E

21%N O T - F O R - P R O F I T

25%I N D E P E N D A N T

( P R O F I T )

RVAR E T I R E M E N T

V I L L A G E S A S S O C I A T I O N

people live in the 330 registered retirement villages.

of those

266 / 330, are registered members of the RVA.

1/20 New Zealanders aged 65+ live in retirement villages. D E M A N D I S

I N C R E A S I N G . . .

1 9 9 8 2 0 1 0 2 0 2 0 2 0 3 0

Y O U A R E

H E R E

20,000

10,000

40,00030,000

Number of people in retirement

homes

Based on an increase from 2010 of 1200

dwellings per annum.

ISSUE 01 ISSUE 02

S C A L Ecollaborating to

improve consistency of workflow

L I A B I L I T Yclarifying the

regulatory compliance process

S H O W - A N D - T E L Lcommunicating prefab

benefits to change perceptions

A C L O S E R L O O K A T . . .

A N I M P O R T A N T S T E P F O R A C T I O N . . .

Prefab is part of solving the a�ordable housing puzzle – and the UNIpod is one of

those puzzle pieces.

HNZCHousing New Zealand

Corporation

CHOCommunity Housing

Organisations

supplied by

supplied by

GOVTLocal Government

supplied by

+

+

=

social housing unitssupplied in New zealand

Page 4: RETIREMENT + SOCIAL HOUSING infographic fina… · + RETIREMENT HOUSING PROBLEM ISSUE 01 POPULATION INCREASE 2015 2021 5.1 million 4.9 million 4.6 million 2031 Largest population

?

Prefab is about building better.It offers the following key benefits:

WHY PREFAB?

D E S I G N

prefab does not mean repetitive design or standardised housing outcomes.

PrefabNZ Value Case 2014

P R O D U C T I V I T Y

10% lift in construction industry productivity equates to a 1% lift in Gross Domestic Product.

PWC 2010

Price Waterhouse Coopers estimates a

10% 1 G.D.P%=

H E A L T H + S A F E T Y

Reducing time at height on site reduces health and safety incidents.

PrefabNZ Value Case 2014

Email Postal

| [email protected]

|

www.prefabnz.com

PO Box 19-063Courtenay PlaceWellington 6149New Zealand

Q U A L I T Y

91%

of new houses have defects

87%

of houses have quality defects

BRANZ SR316 2014

T I M E

60 %

of construction time can be reduced through offsite construction.

PrefabNZ Value Case 2014

C O S T

PrefabNZ Value Case 2014

15%saving

$32,000157m2

Prefab delivery can mean a saving of about 15% in total construction cost – $32,000 for a

157m2 house.

S U S T A I N A B I L I T Y

International research points to waste minimisation savings in the order of 2.5% of the traditional tender price.

%

PrefabNZ Value Case 2014

2.5