Redevelopment Ferry Terminal Building RC.A.T FOR RESOURCE ...

17
KEY: STRUCTURAL ENGINEER: NAME : PH FAX PO BOX EMAIL SERVICES ENGINEER: NAME : PH FAX PO BOX EMAIL FIRE ENGINEER: NAME : Holmes Fire & Saftey PH FAX PO BOX EMAIL No. Description Date 1 : 1 @ A1 - Half Scale @A3 Drawing List 19-16 Waitohi Picton Ferry Precinct Redevelopment RC.A.T.00- 19 - 16 Waitohi Picton Ferry Precinct Redevelopment Ferry Terminal Building RC.A.T FOR RESOURCE CONSENT 22.07.2020 Resource Consent Drawing List Sheet Number Sheet Name Current Revision Description Current Revision Date Current Revision RC.A.T.00 Drawing List Resource Consent 22/07/2020 A RC.A.T.01 Site Plan Resource Consent 22/07/2020 A RC.A.T.02 Terminal Precinct Plan Resource Consent 22/07/2020 A RC.A.T.03 Terminal GA Plans Resource Consent 22/07/2020 A RC.A.T.04 Floor Plan Axonometrics Resource Consent 22/07/2020 A RC.A.T.05 Elevations Resource Consent 22/07/2020 A RC.A.T.06 Transverse Sections Resource Consent 22/07/2020 A RC.A.T.07 Longitudinal Sections Resource Consent 22/07/2020 A RC.A.T.08 Terminal Precinct Axonometric View Resource Consent 22/07/2020 A RC.A.T.09 EPW- Plan and Elevations Resource Consent 22/07/2020 A RC.A.T.10 EPW- Typical Section and Elevations Resource Consent 22/07/2020 A RC.A.T.11 3D View- Southeast corner Resource Consent 22/07/2020 A RC.A.T.12 3D View- Northeast Corner Resource Consent 22/07/2020 A RC.A.T.13 3D View- North-west Corner Resource Consent 22/07/2020 A RC.A.T.14 3D View- South-west corner Resource Consent 22/07/2020 A RC.A.T.15 3D View- Elevated Passenger Walkway Resource Consent 22/07/2020 A RC.A.T.16 Iwi/ Community artworks and markers Resource Consent 22/07/2020 A A Resource Consent 22/07/2020

Transcript of Redevelopment Ferry Terminal Building RC.A.T FOR RESOURCE ...

Page 1: Redevelopment Ferry Terminal Building RC.A.T FOR RESOURCE ...

KEY:STRUCTURAL ENGINEER:NAME : PHFAXPO BOXEMAIL

SERVICES ENGINEER:NAME : PHFAXPO BOXEMAIL

FIRE ENGINEER:NAME : Holmes Fire & SafteyPHFAXPO BOXEMAIL

No. Description Date

1 : 1 @ A1 - Half Scale @A3

Drawing List

19-16Waitohi Picton Ferry PrecinctRedevelopment

RC.A.T.00-

19-16Waitohi Picton Ferry PrecinctRedevelopment

Ferry Terminal BuildingRC.A.TFOR RESOURCE CONSENT22.07.2020

Resource Consent Drawing List

SheetNumber Sheet Name

Current RevisionDescription

CurrentRevisionDate

CurrentRevision

RC.A.T.00 Drawing List Resource Consent 22/07/2020 ARC.A.T.01 Site Plan Resource Consent 22/07/2020 ARC.A.T.02 Terminal Precinct Plan Resource Consent 22/07/2020 ARC.A.T.03 Terminal GA Plans Resource Consent 22/07/2020 ARC.A.T.04 Floor Plan Axonometrics Resource Consent 22/07/2020 ARC.A.T.05 Elevations Resource Consent 22/07/2020 ARC.A.T.06 Transverse Sections Resource Consent 22/07/2020 ARC.A.T.07 Longitudinal Sections Resource Consent 22/07/2020 ARC.A.T.08 Terminal Precinct Axonometric View Resource Consent 22/07/2020 ARC.A.T.09 EPW- Plan and Elevations Resource Consent 22/07/2020 ARC.A.T.10 EPW- Typical Section and Elevations Resource Consent 22/07/2020 ARC.A.T.11 3D View- Southeast corner Resource Consent 22/07/2020 ARC.A.T.12 3D View- Northeast Corner Resource Consent 22/07/2020 ARC.A.T.13 3D View- North-west Corner Resource Consent 22/07/2020 ARC.A.T.14 3D View- South-west corner Resource Consent 22/07/2020 ARC.A.T.15 3D View- Elevated Passenger Walkway Resource Consent 22/07/2020 ARC.A.T.16 Iwi/ Community artworks and markers Resource Consent 22/07/2020 A

A Resource Consent 22/07/2020

Page 2: Redevelopment Ferry Terminal Building RC.A.T FOR RESOURCE ...

B 85 V eh ic l e ( R ea li st i c mi n r a di us ) (2 0 0 4)

B85 V eh ic l e ( R ea li st i c mi n r a di us ) (2 0 0 4)

Semi-Trailer

Sem i-Trailer

Semi-Trailer

NOPARKING

HWC

N 828536362E 417163458

REFER TO ATHFIELD ARCHITECTS LIMITED DRAWINGS RC.A.T.01-14 & REPORT RC.A.TR.01 FOR TERMINAL AND TERMINAL PRECINCT

REFER TO ATHFIELD ARCHITECTS LIMITED REPORT RC.A.RSR FOR RAILWAY STATION CANOPIES

EXISTING PICTON RAILWAY STATION

REFER TO WSP DOCUMENTATION FOR VEHICLE MARSHALLING YARDS AND INFRASTRUCTURE

REFER TO ATHFIELD ARCHITECTS LIMITED DRAWINGS RC.A.A.01-13 FOR ANCILLARY BUILDINGS IN MARSHALLING YARD

REFER TO WSP DOCUMENTATION FOR RAIL CORRIDOR & RAILWAY STATION PLATFORM

REFER WSP DOCUMENTATION FOR WHARFS AND LINKSPANS

SURVEY POINT ELAINE CAIRN

REFER TO ATHFIELD ARCHITECTS LIMITED DRAWINGS FOR ELEVATED PASSENGER WALKWAY

REFER WSP DRAWINGS FOR WAITOHI CULVERT STRUCTURAL UPGRADES

KEY:STRUCTURAL ENGINEER:NAME : PHFAXPO BOXEMAIL

SERVICES ENGINEER:NAME : PHFAXPO BOXEMAIL

FIRE ENGINEER:NAME : Holmes Fire & SafteyPHFAXPO BOXEMAIL

No. Description Date

1 : 1000 @ A1 - Half Scale @A3

Site Plan

19-16Waitohi Picton Ferry PrecinctRedevelopment

RC.A.T.01-

N A Resource Consent 22/07/2020

Page 3: Redevelopment Ferry Terminal Building RC.A.T FOR RESOURCE ...

SemiT

Semi-Trailer

NOPARKING

NEW SHIP LINKSPAN

NO.1 WHARF

BACK-UP BERTH & LINKSPAN

COMMERCIAL JETTIES

harbo

ur ed

ge pr

omen

ade

upper carparkTERMINAL PRECINCT

staff/ service carpark

lower ca

rpark

railw

ay statio

n carpark

RAILWAY STATION PLATFORM AND CANOPY

RAIL CORRIDOR

PICTON FORSHORE

RENTAL CARS

TERMINAL BUILDING VEHICLE TRACKING FOR BACKUP LINKSPAN

VEHICLE OVERPASS TO UPPER LINKSPAN

EXISTING BULDINGS OUTSIDE OF PROJECT SCOPE

ELEVATED PASSENGER WALKWAY OVER SHOWN DASHED

WAITOHI CULVERT MOUTH-CULVERT SHOWN DASHED

KEY:STRUCTURAL ENGINEER:NAME : PHFAXPO BOXEMAIL

SERVICES ENGINEER:NAME : PHFAXPO BOXEMAIL

FIRE ENGINEER:NAME : Holmes Fire & SafteyPHFAXPO BOXEMAIL

No. Description Date

1 : 500 @ A1 - Half Scale @A3

Terminal Precinct Plan

19-16Waitohi Picton Ferry PrecinctRedevelopment

RC.A.T.02-

N A Resource Consent 22/07/2020

Page 4: Redevelopment Ferry Terminal Building RC.A.T FOR RESOURCE ...

1

D

2 3 4 5 6

A

7 8

E

9

C

B

1

D

2 3 4 5 6

A

7 8

E

9

C

B

1 2 3 4 5 6

A

7 8 9

B

NOTES:

KEY:

STRUCTURAL ENGINEER:NAMEPHFAXPO BOXEMAIL

SERVICES ENGINEER:NAMEPHFAXPO BOXEMAIL

FIRE ENGINEER:NAMEPHFAXPO BOXEMAIL

No. Desription Date

1 : 250 @ A1 - Half Scale @A3

Terminal GA Plans

19-16Waitohi Picton FerryPrecinct Redevelopment

RC.A.T.03-

N

1 : 250A0.0.01RC L.0G GA Plan1

1 : 250A0.0.01RC L.01 GA Plan2

1 : 250A0.0.01RC L.02 GA Plan3

A Resource Consent 22/07/2020

Page 5: Redevelopment Ferry Terminal Building RC.A.T FOR RESOURCE ...

NOTES:

KEY:

STRUCTURAL ENGINEER:NAMEPHFAXPO BOXEMAIL

SERVICES ENGINEER:NAMEPHFAXPO BOXEMAIL

FIRE ENGINEER:NAMEPHFAXPO BOXEMAIL

No. Desription Date

@ A1 - Half Scale @A3

Floor Plan Axonometrics

19-16Waitohi Picton FerryPrecinct Redevelopment

RC.A.T.04-

RC - Floor Plan Axo L.0G1

RC - Floor Plan Axo L.012

RC - Floor Plan Axo L.023

RC - Floor Plan Axo L.Roof4

A Resource Consent 22/07/2020

Page 6: Redevelopment Ferry Terminal Building RC.A.T FOR RESOURCE ...

R.L. 8400 L.01

R.L. 0 NZVD

R.L. 3500 L.0G

R.L. 14000 L.02

D AE C B

R.L. 18000 L.0R

R.L. 2000 Ex Ground

New Terminal ASSL 0

Lower Roof ASSL 9500

Main Roof ASSL 13300

Upper Roof ASSL 16600

ExRL 0

ExRL 11000

ExRL 14800

ExRL 18100

RT-A

WT-A / LT-A

S-B

CW-A

CW-C

WT-C

CW-E

RT-B

LT-BWT-ACW-A

RT-D / S-A

WT-G

RT-C

LT-A

CW-E

R.L. 8400 L.01

R.L. 0 NZVD

R.L. 3500 L.0G

R.L. 14000 L.02

DA ECB

R.L. 18000 L.0R

R.L. 2000 Ex Ground

RT-A

WT-A

S-B

WT-B WT-C

WT-C

RT-B

RT-B

RT-C / S-ART-C / S-A

CW-A

RT-C

RT-C

RT-D / LT-C

R.L. 8400 L.01

R.L. 0 NZVD

R.L. 3500 L.0G

R.L. 14000 L.02

1 2 3 4 5 6 7 8 9

R.L. 18000 L.0R

CW-A

WT-CRT-A

R.L. 2000 Ex Ground

New Terminal ASSL 0

Lower Roof ASSL 9500

Main Roof ASSL 13300

Upper Roof ASSL 16600

New Wharf ExRL 2100

ExRL 0

ExRL 11000

ExRL 14800

ExRL 18100RT-B

WT-A

RT-D

WT-A CW-AWT-C RT-C CW-D

WT-CCW-E

S-B

RT-C

CW-B

RT-C

WT-G

LT-C

LT-A

LT-B

WT-D

R.L. 8400 L.01

R.L. 0 NZVD

R.L. 3500 L.0G

R.L. 14000 L.02

123456789

R.L. 18000 L.0R

R.L. 2000 Ex Ground

New Terminal ASSL 0

Lower Roof ASSL 9500

Main Roof ASSL 13300

Upper Roof ASSL 16600

New Wharf ExRL 2100

ExRL 0

ExRL 11000

ExRL 14800

ExRL 18100WT-C RT-B CW-EWT-GCW-B

WT-B WT-BWT-D WT-CCW-E

RT-B RT-A S-B

RT-C

RT-C / S-A S-A

RT-DRT-C

LT-C

EXTERNAL WALL TYPESWT-AMetal cassette cladding

WT-BPrecast concrete panels

WT-CExtruded aluminium plan cladding

WT-D Exterior concrete nibs

WT-EProfiled Metal cladding

WT-F150mm unitised curtain wall system

WT-GInsulated panel cladding

CURTAIN WALL TYPESCW-A unitised curtainwall suite aluminium joinery, seismic frames.

CW-B 40mm commercial suite aluminium joinery, seismic frames.

CW-C External sliding doors, 100mm suite aluminium joinery.

CW-D 2 sided framed automatic entry & wind lobby doorsets. Single glazed units.

CW-E 100mm architectural suite aluminium joinery.

ROOF TYPESRT-A Membrane warm roof system.

RT-B Profiled Metal warm roof system.

RT-C External Canopy. membrane roof system

RT-D External plant roof deck membrane roof system

SOFFIT TYPES:S-A Fibrecement sheet soffit

S-B Timber board & batten lined soffits to feature areas.

S-C External Canopy Soffit

LOUVRE TYPES:LT-A Feature Facade louvres, vertical steel slatted screening to primary elevations.

LT-B Feature Balustrade, primary steel structure and vertical timber battens.

LT-C Aluminium Louvre enclosure to screen Plant Deck from view.

RC LEVELSALL LEVELS SHOWN BY THE SYMBOL

ARE MEASURED ABOVE STRUCTURAL SLAB LEVEL (ASSL) OF PROPOSED TERMINAL (NZVD 2016 DATUM RL+3500 )

ALL LEVELS SHOWN BY THE SYMBOL

ARE MEASURED ABOVE THE AVERAGE EXISTING GROUND LEVEL (NZVD 2016 DATUM RL+2000 )

ASSL

ExRL

KEY:STRUCTURAL ENGINEER:NAME : PHFAXPO BOXEMAIL

SERVICES ENGINEER:NAME : PHFAXPO BOXEMAIL

FIRE ENGINEER:NAME : Holmes Fire & SafteyPHFAXPO BOXEMAIL

No. Description Date

As indicated @ A1 - Half Scale@A3

Elevations

19-16Waitohi Picton Ferry PrecinctRedevelopment

RC.A.T.05-

1 : 250RC - North East Elevation1

1 : 250RC - South West Elevation2

1 : 250RC - South East Elevation3

1 : 250RC - North West Elevation4

A Resource Consent 22/07/2020

Page 7: Redevelopment Ferry Terminal Building RC.A.T FOR RESOURCE ...

R.L. 8400 L.01

R.L. 0 NZVD

R.L. 3500 L.0G

R.L. 14000 L.02

DA ECB

R.L. 18000 L.0R

1RC.A.T.07

2RC.A.T.07

3RC.A.T.07

New Terminal ASSL 0

Lower Roof ASSL 9500

Main Roof ASSL 13300

Upper Roof ASSL 16600

ExRL 0

ExRL 11000

ExRL 14800

ExRL 18100

R.L. 8400 L.01

R.L. 0 NZVD

R.L. 3500 L.0G

R.L. 14000 L.02

DA ECB

R.L. 18000 L.0R

1RC.A.T.07

2RC.A.T.07

3RC.A.T.07

New Terminal ASSL 0

Lower Roof ASSL 9500

Main Roof ASSL 13300

Upper Roof ASSL 16600

ExRL 0

ExRL 11000

ExRL 14800

ExRL 18100

R.L. 8400 L.01

R.L. 0 NZVD

R.L. 3500 L.0G

R.L. 14000 L.02

DA ECB

R.L. 18000 L.0R

1RC.A.T.07

2RC.A.T.07

3RC.A.T.07

New Terminal ASSL 0

Lower Roof ASSL 9500

Main Roof ASSL 13300

Upper Roof ASSL 16600

ExRL 0

ExRL 11000

ExRL 14800

ExRL 18100

R.L. 8400 L.01

R.L. 0 NZVD

R.L. 3500 L.0G

R.L. 14000 L.02

DA ECB

R.L. 18000 L.0R

1RC.A.T.07

2RC.A.T.07

3RC.A.T.07

New Terminal ASSL 0

Lower Roof ASSL 9500

Main Roof ASSL 13300

Upper Roof ASSL 16600

ExRL 0

ExRL 11000

ExRL 14800

ExRL 18100

RC LEVELSALL LEVELS SHOWN BY THE SYMBOL

ARE MEASURED ABOVE STRUCTURAL SLAB LEVEL (ASSL) OF PROPOSED TERMINAL (NZVD 2016 DATUM RL+3500 )

ALL LEVELS SHOWN BY THE SYMBOL

ARE MEASURED ABOVE THE AVERAGE EXISTING GROUND LEVEL (NZVD 2016 DATUM RL+2000 )

ASSL

ExRL

KEY:STRUCTURAL ENGINEER:NAME : PHFAXPO BOXEMAIL

SERVICES ENGINEER:NAME : PHFAXPO BOXEMAIL

FIRE ENGINEER:NAME : Holmes Fire & SafteyPHFAXPO BOXEMAIL

No. Description Date

As indicated @ A1 - Half Scale@A3

Transverse Sections

19-16Waitohi Picton Ferry PrecinctRedevelopment

RC.A.T.06-

1 : 250A5.3.00RC - Section S11

1 : 250RC.A.T.07RC - Section S22

1 : 250RC.A.T.07RC - Section S33

1 : 250RC.A.T.07RC - Section S44

A Resource Consent 22/07/2020

Page 8: Redevelopment Ferry Terminal Building RC.A.T FOR RESOURCE ...

R.L. 8400 L.01

R.L. 0 NZVD

R.L. 3500 L.0G

R.L. 14000 L.02

1 2 3 4 5 6 7 8 9

R.L. 18000 L.0R

2RC.A.T.06

3RC.A.T.06

4RC.A.T.06

1RC.A.T.06

New Terminal ASSL 0

Lower Roof ASSL 9500

Main Roof ASSL 13300

Upper Roof ASSL 16600

New Wharf ExRL 2100

ExRL 0

ExRL 11000

ExRL 14800

ExRL 18100

R.L. 8400 L.01

R.L. 0 NZVD

R.L. 3500 L.0G

R.L. 14000 L.02

1 2 3 4 5 6 7 8 9

R.L. 18000 L.0R

2RC.A.T.06

3RC.A.T.06

4RC.A.T.06

1RC.A.T.06

New Terminal ASSL 0

Lower Roof ASSL 9500

Main Roof ASSL 13300

Upper Roof ASSL 16600

New Wharf ExRL 2100

ExRL 0

ExRL 11000

ExRL 14800

ExRL 18100

R.L. 8400 L.01

R.L. 0 NZVD

R.L. 3500 L.0G

R.L. 14000 L.02

1 2 3 4 5 6 7 8 9

R.L. 18000 L.0R

2RC.A.T.06

3RC.A.T.06

4RC.A.T.06

1RC.A.T.06

New Terminal ASSL 0

Lower Roof ASSL 9500

Main Roof ASSL 13300

Upper Roof ASSL 16600

New Wharf ExRL 2100

ExRL 0

ExRL 11000

ExRL 14800

ExRL 18100

RC LEVELSALL LEVELS SHOWN BY THE SYMBOL

ARE MEASURED ABOVE STRUCTURAL SLAB LEVEL (ASSL) OF PROPOSED TERMINAL (NZVD 2016 DATUM RL+3500 )

ALL LEVELS SHOWN BY THE SYMBOL

ARE MEASURED ABOVE THE AVERAGE EXISTING GROUND LEVEL (NZVD 2016 DATUM RL+2000 )

ASSL

ExRL

KEY:STRUCTURAL ENGINEER:NAME : PHFAXPO BOXEMAIL

SERVICES ENGINEER:NAME : PHFAXPO BOXEMAIL

FIRE ENGINEER:NAME : Holmes Fire & SafteyPHFAXPO BOXEMAIL

No. Description Date

As indicated @ A1 - Half Scale@A3

Longitudinal Sections

19-16Waitohi Picton Ferry PrecinctRedevelopment

RC.A.T.07-

1 : 250RC.A.T.06RC - Section A22

1 : 250RC.A.T.06RC - Section A33

1 : 250RC.A.T.06RC - Section A11

A Resource Consent 22/07/2020

Page 9: Redevelopment Ferry Terminal Building RC.A.T FOR RESOURCE ...

KEY:STRUCTURAL ENGINEER:NAME : PHFAXPO BOXEMAIL

SERVICES ENGINEER:NAME : PHFAXPO BOXEMAIL

FIRE ENGINEER:NAME : Holmes Fire & SafteyPHFAXPO BOXEMAIL

No. Description Date

@ A1 - Half Scale @A3

Terminal Precinct Axonometric View

19-16Waitohi Picton Ferry PrecinctRedevelopment

RC.A.T.08-

N A Resource Consent 22/07/2020

Page 10: Redevelopment Ferry Terminal Building RC.A.T FOR RESOURCE ...

Semi-Trailer

NOPARKING

3RC

.A.T.09

2 RC.A.T.09

1:211:211:211:211:211:211:21

1:21

TERMINAL BUILDING

seismic "bridge"

L.02 terminal

cLElevated passenger walkway

Fire Egress Stair 2

No.1 Wharf

Fire Egress Stair 1

centreline of ship boarding pod

ship boarding pod

boarding pod bridge

outline of ship

void

1A2.1.01

2 A2.1.01

3A2

.1.01

4A2.1.01

1A.9.5.00

2 A.9.5.00

4A5

.3.00

4RC.A.T.10

ship boarding pod

boarding pod bridge

structural tower

fire egress stair 1structural tower

fire egress stair 1 structural towerstructural tower

terminal building

seismic bridge

marine fire fighting water cannon marine fire fighting

water cannon marine fire fighting water cannon

2A.9.5.01

R.L. 8400 L.01

R.L. 0 NZVD

R.L. 3500 L.0G

R.L. 14000 L.02

R.L. 18000 L.0R

1RC.A.T.10

ship boarding pod

boarding pod bridge

structural tower

fire egress stair 1structural towerfire egress stair 1structural tower

structural tower

terminal building

seismic bridge

marine fire fighting water cannon

marine fire fighting water cannonmarine fire fighting

water cannon

ASSL 23000 ExRL 24500

ExRL 16900ASSL 15400

1A.9.5.01

RC LEVELSALL LEVELS SHOWN BY THE SYMBOL

ARE MEASURED ABOVE STRUCTURAL SLAB LEVEL (ASSL) OF PROPOSED TERMINAL (NZVD 2016 DATUM RL+3500 )

ALL LEVELS SHOWN BY THE SYMBOL

ARE MEASURED ABOVE THE AVERAGE EXISTING GROUND LEVEL (NZVD 2016 DATUM RL+2000 )

ASSL

ExRL

KEY:STRUCTURAL ENGINEER:NAME : PHFAXPO BOXEMAIL

SERVICES ENGINEER:NAME : PHFAXPO BOXEMAIL

FIRE ENGINEER:NAME : Holmes Fire & SafteyPHFAXPO BOXEMAIL

No. Description Date

As indicated @ A1 - Half Scale@A3

EPW- Plan and Elevations

19-16Waitohi Picton Ferry PrecinctRedevelopment

RC.A.T.09-

N

1 : 400A0.0.01RC EPW GA Plan1

1 : 400A.9.5.00RC Elevation_EPW West2

1 : 400A.9.5.00RC Elevation_EPW East3

A Resource Consent 22/07/2020

Page 11: Redevelopment Ferry Terminal Building RC.A.T FOR RESOURCE ...

100% glazing

CW-B

RT-A

S-Astructural tower

fire egress stair 1

marine fire fighting water cannon

structural tower

fire egress stair 1

marine fire fighting water cannon

floor slab to falls, TBC

full height curtainwall, 100% glazed

soffit

250SHS structural frame/ truss

acoustic ceiling

wall/ roof buildup

wall build-up allow 30% surface area for vertical glazing strips

CW-B

RT-A

S-A

WT-G

EXTERNAL WALL TYPESWT-AMetal cassette cladding

WT-BPrecast concrete panels

WT-CExtruded aluminium plan cladding

WT-D Exterior concrete nibs

WT-EProfiled Metal cladding

WT-F150mm unitised curtain wall system

WT-GInsulated panel cladding

CURTAIN WALL TYPESCW-A unitised curtainwall suite aluminium joinery, seismic frames.

CW-B 40mm commercial suite aluminium joinery, seismic frames.

CW-C External sliding doors, 100mm suite aluminium joinery.

CW-D 2 sided framed automatic entry & wind lobby doorsets. Single glazed units.

CW-E 100mm architectural suite aluminium joinery.

ROOF TYPESRT-A Membrane warm roof system.

RT-B Profiled Metal warm roof system.

RT-C External Canopy. membrane roof system

RT-D External plant roof deck membrane roof system

SOFFIT TYPES:S-A Fibrecement sheet soffit

S-B Timber board & batten lined soffits to feature areas.

S-C External Canopy Soffit

LOUVRE TYPES:LT-A Feature Facade louvres, vertical steel slatted screening to primary elevations.

LT-B Feature Balustrade, primary steel structure and vertical timber battens.

LT-C Aluminium Louvre enclosure to screen Plant Deck from view.

KEY:STRUCTURAL ENGINEER:NAME : PHFAXPO BOXEMAIL

SERVICES ENGINEER:NAME : PHFAXPO BOXEMAIL

FIRE ENGINEER:NAME : Holmes Fire & SafteyPHFAXPO BOXEMAIL

No. Description Date

As indicated @ A1 - Half Scale@A3

EPW- Typical Section andElevations

19-16Waitohi Picton Ferry PrecinctRedevelopment

RC.A.T.10-

1 : 200RC.A.T.09RC Elevation_EPW East - Typical Bay1

1 : 50RC EPW Typical Section3

1 : 200RC.A.T.09RC Elevation_EPW West - Typical Bay4

A Resource Consent 22/07/2020

Page 12: Redevelopment Ferry Terminal Building RC.A.T FOR RESOURCE ...

KEY:STRUCTURAL ENGINEER:NAME : PHFAXPO BOXEMAIL

SERVICES ENGINEER:NAME : PHFAXPO BOXEMAIL

FIRE ENGINEER:NAME : Holmes Fire & SafteyPHFAXPO BOXEMAIL

No. Description Date

1 : 1 @ A1 - Half Scale @A3

3D View- Southeast corner

19-16Waitohi Picton Ferry PrecinctRedevelopment

RC.A.T.11-

1 : 1RC - South Corner Perspective2

A Resource Consent 22/07/2020

Page 13: Redevelopment Ferry Terminal Building RC.A.T FOR RESOURCE ...

KEY:STRUCTURAL ENGINEER:NAME : PHFAXPO BOXEMAIL

SERVICES ENGINEER:NAME : PHFAXPO BOXEMAIL

FIRE ENGINEER:NAME : Holmes Fire & SafteyPHFAXPO BOXEMAIL

No. Description Date

1 : 1 @ A1 - Half Scale @A3

3D View- Northeast Corner

19-16Waitohi Picton Ferry PrecinctRedevelopment

RC.A.T.12-

1 : 1RC - East Perspective2

A Resource Consent 22/07/2020

Page 14: Redevelopment Ferry Terminal Building RC.A.T FOR RESOURCE ...

KEY:STRUCTURAL ENGINEER:NAME : PHFAXPO BOXEMAIL

SERVICES ENGINEER:NAME : PHFAXPO BOXEMAIL

FIRE ENGINEER:NAME : Holmes Fire & SafteyPHFAXPO BOXEMAIL

No. Description Date

1 : 1 @ A1 - Half Scale @A3

3D View- North-west Corner

19-16Waitohi Picton Ferry PrecinctRedevelopment

RC.A.T.13-

1 : 1RC - North Perspective2

A Resource Consent 22/07/2020

Page 15: Redevelopment Ferry Terminal Building RC.A.T FOR RESOURCE ...

KEY:STRUCTURAL ENGINEER:NAME : PHFAXPO BOXEMAIL

SERVICES ENGINEER:NAME : PHFAXPO BOXEMAIL

FIRE ENGINEER:NAME : Holmes Fire & SafteyPHFAXPO BOXEMAIL

No. Description Date

1 : 1 @ A1 - Half Scale @A3

3D View- South-west corner

19-16Waitohi Picton Ferry PrecinctRedevelopment

RC.A.T.14-

1 : 1RC - South Perspective2

A Resource Consent 22/07/2020

Page 16: Redevelopment Ferry Terminal Building RC.A.T FOR RESOURCE ...

KEY:STRUCTURAL ENGINEER:NAME : PHFAXPO BOXEMAIL

SERVICES ENGINEER:NAME : PHFAXPO BOXEMAIL

FIRE ENGINEER:NAME : Holmes Fire & SafteyPHFAXPO BOXEMAIL

No. Description Date

1 : 1 @ A1 - Half Scale @A3

3D View- Elevated PassengerWalkway

19-16Waitohi Picton Ferry PrecinctRedevelopment

RC.A.T.15-

1 : 1RC - Elevated Passenger Walkway Perspective1

A Resource Consent 22/07/2020

Page 17: Redevelopment Ferry Terminal Building RC.A.T FOR RESOURCE ...

B85 Vehic le ( Realistic min radiu s) (2 00 4)

B8 5 Ve hic le ( Realistic m in ra diu s) (2 00 4)

Semi-Trailer

Semi-T rai ler

Semi-Trail er

NOPARKING

HWC2

1

8

4

3

5

7

6

1 Site entry marker- south- possible pou/ marker position

Internal site marker- centered on site at key decision point

Passenger arrival/departures marker - at threshold point

Waitohi Pa marker - position would need to be considered, close proximity to harbour edge, would require associated interpretation & history information

Site blessing & location of Mauri stone - position would need to be agreed, but central to building location/ life/ activity

Building name- potential Te Atiawa to consider an appropriate name and gift to the project

Integrated artworks - potential for these to be incorporated throughout the building.

Waitohi Awa markers

2

3

4

5

6

7

8

Iwi and Community artworks and markers

KEY:STRUCTURAL ENGINEER:NAME : PHFAXPO BOXEMAIL

SERVICES ENGINEER:NAME : PHFAXPO BOXEMAIL

FIRE ENGINEER:NAME : Holmes Fire & SafteyPHFAXPO BOXEMAIL

No. Description Date

As indicated @ A1 - Half Scale@A3

Iwi/ Community artworks andmarkers

19-16Waitohi Picton Ferry PrecinctRedevelopment

RC.A.T.16-

N A Resource Consent 22/07/2020