Ferry boat terminal
description
Transcript of Ferry boat terminal
FERRY BOAT TERMINAL
DARYL TOYRENSSELAER POLYTECHNIC INSTITUTEFALL 2013
URBAN & HISTORICAL CONTEXTPons Aemilius - 1st stone bridge built across the Tiber River: 181 BC
Ponte Palatino built in 1886 AD
SITE
SITE
SITE
OVERVIEW
OVERVIEW
TICKETINGWAITING AREA
ENTRANCE
DOCKING AREA
PATHWAY
A. CORNER EXPERIENCE
B. VIEW ASCENDING RAMP
A.
B.
PATHWAY
A. SIDE VIEW
B. VIEW FROM WAITING AREA
A. B.
PATHWAY & RAMP
A. ASCENDING LOWER RAMP
B. WATER CHANGE & MOBILITY OF RAMPWAYS
A.
B.
.
RAMP AND CHANGING WATER LEVELS
LOW WATER
HIGH WATER
HORIZONTAL SHIFT
UPPER TRACK SYSTEM
HANDRAIL DETAIL
PLAN
HORIZONTAL SHIFTS
HORIZONTAL SHIFTS
RAMP DETAIL
EXPLODED AXON RAMP DETAIL
RIGID SUSPENSION MEM
BER DETAIL
RAMP SECTION
BEAM DESIGN
SCALE
GENERATIVE DESIGN
EXISTING BEARING CONDITIONS
TRUS
S &
SKIN
STRUCTURAL DIAGRAM
ELEVATION
SECTION