FERRY TERMINAL - idec · FERRY TERMINAL McConnell Dowell idec were contracted to fabricate and...

1
FERRY TERMINAL McConnell Dowell idec were contracted to fabricate and install steelwork for the on land section of the North Quay ferry terminal precinct. idec’s scope of work included: Fabrication of the lift shaft as two fully welded sections Fabrication of the plaza steel and weathering screen supports Protective coating application Erection of the lift shaft, plaza steel and weathering screens This project was part of the rebuilding of Brisbane City Council ferry terminals that were damaged during the 2014 Brisbane floods. idec were involved in the steel install of seven other ferry terminal sites. Steel fabrication and erection $600,000 12 Weeks

Transcript of FERRY TERMINAL - idec · FERRY TERMINAL McConnell Dowell idec were contracted to fabricate and...

Page 1: FERRY TERMINAL - idec · FERRY TERMINAL McConnell Dowell idec were contracted to fabricate and install steelwork for the on land section of the North Quay ferry terminal precinct.

FERRY TERMINALMcConnell Dowell

idec were contracted to fabricate and install steelwork for the on land section of the North Quay ferry terminal precinct. idec’s scope of work included:

Fabrication of the lift shaft as two fully welded sections

Fabrication of the plaza steel and weathering screen supports

Protective coating application

Erection of the lift shaft, plaza steel and weathering screens This project was part of the rebuilding of Brisbane City Council ferry terminals that were damaged during the 2014 Brisbane floods. idec were involved in the steel install of seven other ferry terminal sites.

Steel fabrication and erection

$600,000

12 Weeks