    Dispatch Operation- Essar Oil LimitedVadinar Refinery

    Submitted by: Rajat Arora200436667

  • 7/28/2019 Rajat Arora PPT

    2/30

    DISPATCH AREA TRAINING SCHEDULE

    RAIL LOADING CONTROL BOARD (03/0912 to08/09/12)SOLID HANDLING (10/09/12 to 12/09/12)

    MCO ( 13/09/12 to 15/09/12)TANK FARM (17/09/12 to 22/09/12)ROAD LOADING (24/09/12 to 29/09/12)

    COASTAL (01/10/12 to 03/10/12)

  • 7/28/2019 Rajat Arora PPT

    3/30

    ALL PRODUCTS PROFILE

    White Oil Black Oil LPG Solid

    MS (BS III and BSIV)

    FO Pet coke

    HSD (BS III and BSIV)

    Bitumen Sulphur

    SKO

    ATF

  • 7/28/2019 Rajat Arora PPT

    4/30

    S No. Product Flash Point ( C) Density in (kg/m3) SpecificGravity LEL (%) UEL (%) AutoignitionTemp. ( C)

    1 LPG -60 to -104 500 - 579 0.53 - 0.58 1.9 9.5 >365

    2 MS -43 700 775 0.77 1.4 7.6 280

    3 SKO >38 750 800 0.75 0.8 0.7 6 228

    4 ATF >38 750 800 0.75 - 0.8 0.7 6 >230

    5 HSD 65 800 850 0.870 0.6 7.5 256

    6 FO 140 to 240 950 - 995 - - - -

    7 Bitumen 220 to 260 991 - - - -

    MATERIAL SAFETY DATA SHEET

  • 7/28/2019 Rajat Arora PPT

    5/30

    SAMPLING1. All level Sample - Uniformly drawn from the possible

    bottom of the surface2. TMB Sample

    Top 15 cm (from top surface)

    Middle Bottom 15 cm (from bottom of tank)

    3. UMB Sampleupper 1/6 (from top surface)

    middle Bottom 5/6 (from top surface)

    4. Bottom Sample

  • 7/28/2019 Rajat Arora PPT

    6/30

    RAILWAY OPERATIONS

    Functional Areas: There are mainly four functional areas in RailDispatch which are as follows:

    Control PanelRail Gantry

    Marketing Coordination Office (MCO)Track Maintenance

    Control Panel:

    Area from where all activities of the area are controlled andmonitored.Monitoring and control of Rail loading operation activities for

    effective and safe dispatch of product through Rail.Panel officer ensures the smooth coordination for a safe transfer

    of the products to the rake and further dispatch

  • 7/28/2019 Rajat Arora PPT

    7/30

    Block No. No of Loading Arms Products Individual No. of Loading Arms

    1 30 SKO, MS (BS III), HSD (BS III), HSD (BS IV) 10, 10, 10

    2 25 SKO, MS (BS III), HSD (BS III), HSD (BS IV) 10, 10, 5

    3 30 SKO, MS (BS III), HSD (BS III), HSD (BS IV) 10, 10, 10

    4 25 SKO, MS (BS III), HSD (BS III), HSD (BS IV) 10, 10, 5

    5 30 SKO, MS (BS III), HSD (BS III), HSD (BS IV) 10, 10, 10

    6 25 SKO, MS (BS III), HSD (BS III), HSD (BS IV) 10, 10, 5

    7 30 SKO, MS (BS III), HSD (BS III), HSD (BS IV) 10, 10, 10

    8 25 SKO, MS (BS III), HSD (BS III), HSD (BS IV) 10, 10, 5

    9 30 SKO, MS (BS III), HSD (BS III), HSD (BS IV) 10, 10, 10

    10 25 SKO, MS (BS III), HSD (BS III), HSD (BS IV) 10, 10, 5

    11 21 SKO, MS (BS III), HSD (BS III), HSD (BS IV) 8, 8, 5

    RAIL GANTRY SPECIFICATION FOR SPUR 1

  • 7/28/2019 Rajat Arora PPT

    8/30

    RAIL GANTRY SPECIFICATION FOR SPUR 2

    Block No. No of Loading Arms Products Individual No. of Loading Arms

    1 20 SKO, MS (BS III), HSD (BS III) 10, 10

    2 20 SKO, MS (BS III), HSD (BS III) 10, 10

    3 20 SKO, MS (BS III), HSD (BS III) 10, 10

    4 20 SKO, MS (BS III), HSD (BS III) 10, 10

    5 20 SKO, MS (BS III), HSD (BS III) 10, 10

    6 20 SKO, MS (BS III), HSD (BS III) 10, 10

    7 20 SKO, MS (BS III), HSD (BS III) 10, 10

    8 20 SKO, MS (BS III), HSD (BS III) 10, 10

    9 20 SKO, MS (BS III), HSD (BS III) 10, 10

    10 20 SKO, MS (BS III), HSD (BS III) 10, 10

    11 16 SKO, MS (BS III), HSD (BS III) 8, 8

  • 7/28/2019 Rajat Arora PPT

    9/30

    PROCEDURAL ACIVITY FLOWCHART

    Conversion from SAP toTAS

    Arrival Of RakeMCO Officer informs PanelOfficer about Rake Details

    Rake Placement

    Updating of Checklist inExcel Sheet

    Sales Order CheckAvailability of Material

    stock in SAP

    Generation of Load Memo Rake Authorization in TAS

    Rake LoadingCompletion of Rake

    LoadingDeclaration of Density &

    Temperature of Rake

    Transfer all data from TASto SAP ASTM Details Verification Update Loading Status

    Creation of Delivery Create Billing Document Create Excise Invoice

  • 7/28/2019 Rajat Arora PPT

    10/30

  • 7/28/2019 Rajat Arora PPT

    11/30

    RAIL MCO

    Follows up with railway for provision of rakes as per agreed state and to meet the same at the end of themonthFollowing up with PSU to avail industry Indents for rakePlanning and movement according to indents with, invoicing

    Calibration and Procedures

    The Central Tank wagon Calibration Committee is the authorized body to issue calibrated data The accepted norm is that 20% wagons from each group should be calibrated and for newly manufacturedonly 10% wagons from each group

    INVOICING

    Total Value of Goods = (Qty x Basic Price) + Terminal Charges + Excise Duties (like BED, Add. Duty, Spec.Add. Duty) + Education Cess + SHE. Cess + Sales Tax (VAT or CST)

  • 7/28/2019 Rajat Arora PPT

    12/30

    SOLID HANDLING

    Crude 600 c Pet Coke Cutting Winch Coke Pit

    lifted (bucket Crain) Crusher 1&2 Belt Conveyor Silo

    Pet coke production 4000 MT/daySilo Capacity 1000 MT each

    Procedure followed at Road Petcoke Weighbridge

    Firstly, Filling Authorization Note (FAN) is Received (Tare Wt. taken)Silo Loading DoneGross Wt. taken , Two Copies of invoices given to Driver

  • 7/28/2019 Rajat Arora PPT

    13/30

    Billing for Petcoke

    Pet coke billing done w.r.t its moisture content

    I. If Moisture < 8% Billing is done on full weight

    W [W x {(100 - moisture) / (100 - 8)}]

    II. Moisture = 8% Billing is done on full weight

    III.Moisture > 8% Billing is done on the actual weight of pet coke

    W + [W x {(100 moisture)/ (100 - 8)}]

  • 7/28/2019 Rajat Arora PPT

    14/30

    MARKETING CORDINATION OFFICE

    NE GATEProcess of truck loading starts here whereby the NE gate office is the entry gate for TTsto enter the Vadinar Refinery and a TREM card is issued to the driver/ cleaner whichcontains the Safety measures followed by ESSAR OIL LIMITED

    Window 1: Activity of creating database including TT Number, Name etc. takes place.

    The forms have been classified as :o Annexure 1A Form 1: IOCL, HPCL, BPCL, Shell Indiao Annexure 1B Form 2: ELL, Essar, Dairy, Gold Plus, Shah Alloyso Annexure 1C Form 3: Kotak, Vinergy, Ramdoot

    Window 2 & 3: Procedural activity of putting TTs in Vehicle Tracking System (VTS) isdone with the following checklist:

  • 7/28/2019 Rajat Arora PPT

    15/30

    S.NO CERTIFICATE VALIDITY WO BO LPG PET COKE

    1. Vehicle insurance 1 Year Yes Yes Yes Yes

    2. Fitness Certificate 1 Year Yes Yes Yes Yes

    3. PUC Certificate 6 Month Yes Yes Yes Yes

    4. Registration Certif icate 1 Year Yes Yes Yes Yes

    5. Hydro test (Rule - 19) 5 Year No No Yes No

    6. Yearly Test (Rule - 18) 1 Year No No Yes No

    7. Half Yearly Test 44(4) 6 Month No No Yes No

    8. Transport of Compressedgas(Rule 43)

    6 Month No No Yes No

    9. Hazardous Training guardby road

    No No Yes No

    10. Explosive License 5 Years Yes No Yes No

    11. Calibration Certificate 1 Year Yes FO No No

    12. Engine number - Yes Yes Yes Yes

    13. Chases number - Yes Yes Yes Yes

  • 7/28/2019 Rajat Arora PPT

    16/30

  • 7/28/2019 Rajat Arora PPT

    17/30

    MCO OFFICE

    MCO office prepares the Excise Invoices and other related documentsAfter receiving the documents the TTs will be allowed to enter, fill and then go out to their destination

    The MCO office takes charge for the full planning and coordination from the entry point until the exit of theTTs

    SAP Codes at MCO

    Creation of Sales Order: VA01Creation of Outbound Delivery: VL01N/VL01D

    Creation of Purchase Order: ME21NCreation of Shipment: O4F1Change Loading Confirmation: O4G1

    Create Billing Document: VF01Creation of Excise Invoice: J1iin Printing of Excise Invoice: ZEXIN/ ZESTOEXIN

    TT in/ out in SAP: ZMMGP2

  • 7/28/2019 Rajat Arora PPT

    18/30

    PROCEDURAL ACTIVITY FLOWCHART AT MCO/TO/NE GATE

    TT Exit at Dispatch NE gate

    TT exit at Dispatch Gate

    Barrier Gate for TT ExitBilling/ Invoicing

    Sealing of TT

    Weigh Bridge Operation for Gross Weight

    Loading of TT

    Weigh Bridge Operation for Tare Weight

    Barrier Gate TT in for Loading

    FAN Generation/ Loading advice on REP

    Preparation of Road Entry Permit

    Intimation to Security

    Indent

  • 7/28/2019 Rajat Arora PPT

    19/30

    TANK FARM

    SNO TYPE OF TANK PARAMETRS OF SELECTION

    1 Cone Roof Vapour Pressure < 0.05 kg/cm 2

    2 Floating Roof Vapour Pressure >0.05 and < 0.85 kg/cm 2

    3 Internal Floating Roof Vapour Pressure > 0.85 and < 1.25 kg/cm 2

    4 Horton Sphere Vapour Pressure > 1.25 kg/cm 2

  • 7/28/2019 Rajat Arora PPT

    20/30

    PRODUCT TANKAGE SPECIFICATION AT TANK FARM

    SNO Tank No. Product Tank Type Diameter (m) Height ( M) Nominal Capacity

    ( M3

    )1 77T-200A MS (BS-III) Floating Roof 20 13.5 4,000

    2 77T-200B MS (BS-III) Floating Roof 20 13.5 4,000

    3 77T-400A HSD (BS IV) Floating Roof 30 15 10,000

    4 77T-400B HSD (BS III) Floating Roof 30 15 10,000

    5 61T-350A SKO Floating Roof 30 15 10,000

    6 61T 350B SKO Floating Roof 30 15 10,000

    7 61T 350C SKO Floating Roof 30 15 10,000

    8 61T 350D SKO Floating Roof 30 15 10,000

    9 77T 500A FO Cone Roof 20 13.5 4,000

    10 77T 500B FO Cone Roof 20 13.5 4,000

    11 177T 500C HSD IV Fixed Roof 18 20 5,000

    12 177T 302 B MS (BS-III) Internal Floating Roof 18 20 5,000

    13 177 T 302 C ATF Floating Roof 18 20 5,000

  • 7/28/2019 Rajat Arora PPT

    21/30

    NFPA SYSTEM FOR HAZARD IDENTIFICATION AND MSDS OF PRODUCT

    The National Fire Protection Association is the authorized body which hasconstituted the hazard level for the operations in an Oil Refinery

    Red = Flammable Hazard

    Yellow = Reactivity Hazard

    White = Special Hazard

    Blue = Health Hazard

  • 7/28/2019 Rajat Arora PPT

    22/30

    ACCESSORIES AT TANK FARM

    Inlet and Outlet NozzlesStairwayOpen VentPV ValveSteam CoilsLevel IndicatorFoam ChambersTank Cooling ArrangementWater DrawEarthling ConnectionsBound WallsManholesLightening ArrestorGauge Pipe

    Jet MixersClean Out DoorsCathodic ProtectionAuto Bleeder VentReference PointDatum Plate

  • 7/28/2019 Rajat Arora PPT

    23/30

    SAFETY SSYTEMSEmergency Shutdown System (ESD )

    o Each Tank 2o Each Sphere 10

    Manual call point (MCP) Total 18Combustible Gas Detector (DGC) Total 17Level Switch

    o High level switcho High high level switcho Low level switcho Low low level switch

    Cathode ProtectionFoam pourerFoam monitorFire hydrantDeluge valve

    o sprinkler System

  • 7/28/2019 Rajat Arora PPT

    24/30

    Road Loading Area

    Gantry 1Bay 1 to 8 - MS (BS III) and HSD (BS III)

    Gantry 2Bay 1 & 2 SKO and ATFBay 3 to 5 SKO and HSD (BS III)Bay 6 to 8 MS (BS IV) and HSD (BS IV)

    Gantry 3 & 4Bay 1 to 8 LPG

    Gantry 5Bay 1 FOBay 2 to 7 FO and Bitumen

    Bay 8 to 10 FOBay 11 & 12 Bitumen

    Gantry 6Bay 1 to 8 HSD (BS III)

  • 7/28/2019 Rajat Arora PPT

    25/30

    Routine Activities List:For Quality

    o Retention Sample Booko Two hours density book/ register

    For Quantityo Dip checking register

    o Shift Log Booko Tool Box Registero Water Checking Registero Surprise Check List

    Standard Operating Procedures for Loading/ Unloading Dip Check whereby every compartment of the TT has its own Dip Rod Water checking is done for all TTs

  • 7/28/2019 Rajat Arora PPT

    26/30

    Safety system

    4 Emergency Shut Down - Each gantry1 Public Announcer System - Each gantry

    1 Deluge Valve ( Sprinkler System) - Each LPG gantry1 Manual Call Point - Each gantry2 Fire hydrant2 - Foam purer Each gantrySafety Interlocks

    o Proximity switcho Earthing

  • 7/28/2019 Rajat Arora PPT

    27/30

    COASTAL Loading Advice Note : Issued by PSUs containing the following details:

    o Vessel Nameo Lay Dayso Product being dispatchedo Next Port of Callo Destinationo Quantity and Quantity Adjustment

    Proforma Invoice: It holds the provision of rate and amount of products containing the following details:o Proforma Invoice No.o Dateo Addresso Vessel Nameo Port of Loadingo Place of deliveryo Port of dischargeo Product Quality

    Wharfage Charges: Based on LAN & Proforma Invoice it constitutes of the Coastal Charge paid to Kandla Port trusto A fixed rate of 13.5 % is charged per MTo Service Tax of 12.36% is also added further

  • 7/28/2019 Rajat Arora PPT

    28/30

    Port Due Notes (PDN) : These are the port charges paid by PSUs to Kandla Port Trust o HPCL and BPCL pay these charges to Vadinar Oil Terminal Limited whereby IOCL pays them directly to KPTo PDN contains the following:

    Port DuesPilot chargeBerth chargeMooring feesFull back chargesPilot attendance charges

    Quality Certificate Report: It is the report received from the PIT which is further sent to PSUs

    Berthing Plan: It has the following information:Vessel Name As per LANNPOC As per LANCargo Details As per LAN

    Berth ScheduleNominated tank details from PIT

    Bill of Lading: it contains the details of adjustable product quantity

    Co-ordination with various departments : Essar coastal officers regularly follows up with Jetty, PIT dept. , and ensures theExpected Time of Completion

  • 7/28/2019 Rajat Arora PPT

    29/30

    Documentation :o Out Turn Report (OTR) is received from PITo Vessel Master signs the OTR, LAN and bill of Ladingo Customer shipping bill contains vessel master stamp and signatureso Ullage tank report (UTR) signed by VOTL, Surveyor & Chief Officero Loading logo Letter of Protesto Notice of readiness

    SAP Codes for Billing:o MBIBo M1GOo Excise Invoice

    Create Outbound Delivery VLO1NCreate Shipment - O4F1Lading Confirmation - O4G1Create Billing Document VF01

    Excise Invoice J1IIN

    Post Documentation:o PSU Fileo Office File

  • 7/28/2019 Rajat Arora PPT

    30/30

    Ship Tank Composite:o A sample of the product is taken and is sent to Lab for verificationo If found verified with standard specifications , it is further sent to PSU

    MIS Updation:o

    A MIS is updated manually as per the details derived from the Quality Certif icate (QC) and Ship Tank Composite