Pirani set final
Transcript of Pirani set final
PROJECT
DESCRIPTION
PROJ. NO. DWG. REV.
LOCATION
APP'D
REV. DATE DESCRIPTION
- DISCAIMER -
THIS DRAWING WAS PREPARED BYATLAS MERIDIAN FOR THE ACCOUNTOF THE CLIENT LISTED ON THISDRAWING. THE MATERIAL ON ITREFLECTS ATLAS MERIDIAN'S BESTJUDGEMENT IN THE LIGHT OF THEINFORMATION AVAILABLE AT THETIME OF PREPARATION. ANY USE BYA THIRD PARTY OF THIS DRAWING ISTHE RESPONSIBILITY OF SUCH THIRDPARTY. ATLAS MERIDIAN ACCEPTSNO RESPONSIBILITY FOR ANYDAMAGES SUFFERED BY THE THIRDPARTY AS A RESULT OF DECISIONSMADE OR ACTIONS BASED ON THISDRAWING. COPIES RESULTING FROMELECTRONIC TRANSFER ORREPRODUCTION OF THIS DRAWINGARE UNCONTROLLED AND MAY NOTBE THE MOST RECENT REVISION OFTHIS DRAWING.
ATLAS MERIDIAN
GLASS WORKS INC.
0-3798
1145 Ottaburn
Pirani Residence
Upward construction
-
8'-11" x 8'-0" (x2)sliding dr
D100
6'-0" x 9'-6"pivot dr
D101
W1025'-2" x 4'-3"
egress window
W1019'-10" x 9-6"
Basement plan
PROJECT
DESCRIPTION
PROJ. NO. DWG. REV.
LOCATION
APP'D
REV. DATE DESCRIPTION
- DISCAIMER -
THIS DRAWING WAS PREPARED BYATLAS MERIDIAN FOR THE ACCOUNTOF THE CLIENT LISTED ON THISDRAWING. THE MATERIAL ON ITREFLECTS ATLAS MERIDIAN'S BESTJUDGEMENT IN THE LIGHT OF THEINFORMATION AVAILABLE AT THETIME OF PREPARATION. ANY USE BYA THIRD PARTY OF THIS DRAWING ISTHE RESPONSIBILITY OF SUCH THIRDPARTY. ATLAS MERIDIAN ACCEPTSNO RESPONSIBILITY FOR ANYDAMAGES SUFFERED BY THE THIRDPARTY AS A RESULT OF DECISIONSMADE OR ACTIONS BASED ON THISDRAWING. COPIES RESULTING FROMELECTRONIC TRANSFER ORREPRODUCTION OF THIS DRAWINGARE UNCONTROLLED AND MAY NOTBE THE MOST RECENT REVISION OFTHIS DRAWING.
ATLAS MERIDIAN
GLASS WORKS INC.
0-3798
1145 Ottaburn
Pirani Residence
Upward construction
-
W2065'-2" x 7'-6"
D2008'-6" x 9'-0" (x2)
sliding doorsD202
6'-0" x 7'-6" (X2)sliding doors
D2016'-0" x 7'-6" (X2)
sliding doors
W2013'-1" x 6'-0"
W2056'-7" x 7'-6"
stained glass window 57" x 60"
Main floor plan
PROJECT
DESCRIPTION
PROJ. NO. DWG. REV.
LOCATION
APP'D
REV. DATE DESCRIPTION
- DISCAIMER -
THIS DRAWING WAS PREPARED BYATLAS MERIDIAN FOR THE ACCOUNTOF THE CLIENT LISTED ON THISDRAWING. THE MATERIAL ON ITREFLECTS ATLAS MERIDIAN'S BESTJUDGEMENT IN THE LIGHT OF THEINFORMATION AVAILABLE AT THETIME OF PREPARATION. ANY USE BYA THIRD PARTY OF THIS DRAWING ISTHE RESPONSIBILITY OF SUCH THIRDPARTY. ATLAS MERIDIAN ACCEPTSNO RESPONSIBILITY FOR ANYDAMAGES SUFFERED BY THE THIRDPARTY AS A RESULT OF DECISIONSMADE OR ACTIONS BASED ON THISDRAWING. COPIES RESULTING FROMELECTRONIC TRANSFER ORREPRODUCTION OF THIS DRAWINGARE UNCONTROLLED AND MAY NOTBE THE MOST RECENT REVISION OFTHIS DRAWING.
ATLAS MERIDIAN
GLASS WORKS INC.
0-3798
1145 Ottaburn
Pirani Residence
Upward construction
-
W30216'-7" x 8'-6"
6'-5" x 8'-6" (x3)sliding dr
D300
W3018'-3" x 7'-0"
W30618'-7" x 2'-0"
transom
W3054'-0" x 5'-5"
W3072'-8" x 7'-6"
W310
4'-6" x 7'-6"
W3095'-3" x 7'-6"
W30813'-8" x 7'-6"
D3033'-4" x 8'-0"
Upper floor plan
PROJECT
DESCRIPTION
PROJ. NO. DWG. REV.
LOCATION
APP'D
REV. DATE DESCRIPTION
- DISCAIMER -
THIS DRAWING WAS PREPARED BYATLAS MERIDIAN FOR THE ACCOUNTOF THE CLIENT LISTED ON THISDRAWING. THE MATERIAL ON ITREFLECTS ATLAS MERIDIAN'S BESTJUDGEMENT IN THE LIGHT OF THEINFORMATION AVAILABLE AT THETIME OF PREPARATION. ANY USE BYA THIRD PARTY OF THIS DRAWING ISTHE RESPONSIBILITY OF SUCH THIRDPARTY. ATLAS MERIDIAN ACCEPTSNO RESPONSIBILITY FOR ANYDAMAGES SUFFERED BY THE THIRDPARTY AS A RESULT OF DECISIONSMADE OR ACTIONS BASED ON THISDRAWING. COPIES RESULTING FROMELECTRONIC TRANSFER ORREPRODUCTION OF THIS DRAWINGARE UNCONTROLLED AND MAY NOTBE THE MOST RECENT REVISION OFTHIS DRAWING.
ATLAS MERIDIAN
GLASS WORKS INC.
0-3798
1145 Ottaburn
Pirani Residence
Upward construction
-
Shop drawing details
D 100
3MM- 3015
#12
FASTENER
DYMONIC
100
vapour retarder primer paint
5/8" gypsum wallboard
2x4 framing
8" exterior concrete wall
sealant (air barrier continuity)
line of finished bulkhead above
BACKING ROD AND CAULKING
tyvek commercial warp air barrier
7
1
2
"
exterior
Scale 3'':1'
PROJECT
DESCRIPTION
PROJ. NO. DWG. REV.
LOCATION
APP'D
REV. DATE DESCRIPTION
- DISCAIMER -
THIS DRAWING WAS PREPARED BYATLAS MERIDIAN FOR THE ACCOUNTOF THE CLIENT LISTED ON THISDRAWING. THE MATERIAL ON ITREFLECTS ATLAS MERIDIAN'S BESTJUDGEMENT IN THE LIGHT OF THEINFORMATION AVAILABLE AT THETIME OF PREPARATION. ANY USE BYA THIRD PARTY OF THIS DRAWING ISTHE RESPONSIBILITY OF SUCH THIRDPARTY. ATLAS MERIDIAN ACCEPTSNO RESPONSIBILITY FOR ANYDAMAGES SUFFERED BY THE THIRDPARTY AS A RESULT OF DECISIONSMADE OR ACTIONS BASED ON THISDRAWING. COPIES RESULTING FROMELECTRONIC TRANSFER ORREPRODUCTION OF THIS DRAWINGARE UNCONTROLLED AND MAY NOTBE THE MOST RECENT REVISION OFTHIS DRAWING.
ATLAS MERIDIAN
GLASS WORKS INC.
0-3798
1145 Ottaburn
Pirani Residence
Upward construction
-
Shop drawing details
D 100
3M
M- 3015
#12
FA
ST
EN
ER
DY
MO
NIC
100
exterior
R28 B
AS
F w
alltite sprayfoam
insulation
R28 B
AS
F w
alltite sprayfoam
insulation
2x back fram
ing
metal plate
sealant (air barrier continuity)
atlas reynaers C
S 77 standard flush faced H
I
atlas reynaers C
S 77 standard flush faced H
I
sealant (air barrier continuity)
peel and stick m
em
brane
5"concrete topping C
/W
hydronic heating tubing
6" m
il poly vapour barrier
R12 rigid underslab insulation
dim
ple drainage m
at
80 m
il E
-pro dam
p-proofing
5"
2"
3"
Scale 3'':1'
PROJECT
DESCRIPTION
PROJ. NO. DWG. REV.
LOCATION
APP'D
REV. DATE DESCRIPTION
- DISCAIMER -
THIS DRAWING WAS PREPARED BYATLAS MERIDIAN FOR THE ACCOUNTOF THE CLIENT LISTED ON THISDRAWING. THE MATERIAL ON ITREFLECTS ATLAS MERIDIAN'S BESTJUDGEMENT IN THE LIGHT OF THEINFORMATION AVAILABLE AT THETIME OF PREPARATION. ANY USE BYA THIRD PARTY OF THIS DRAWING ISTHE RESPONSIBILITY OF SUCH THIRDPARTY. ATLAS MERIDIAN ACCEPTSNO RESPONSIBILITY FOR ANYDAMAGES SUFFERED BY THE THIRDPARTY AS A RESULT OF DECISIONSMADE OR ACTIONS BASED ON THISDRAWING. COPIES RESULTING FROMELECTRONIC TRANSFER ORREPRODUCTION OF THIS DRAWINGARE UNCONTROLLED AND MAY NOTBE THE MOST RECENT REVISION OFTHIS DRAWING.
ATLAS MERIDIAN
GLASS WORKS INC.
0-3798
1145 Ottaburn
Pirani Residence
Upward construction
-
Shop drawing details
D101
exterior
interior
2x framing w/BASE WALLTITE
1/2" exterior grade plywood
tyvek commercial warp air barrier
2x strapping
exterior woodsiding
Scale 3'':1'
PROJECT
DESCRIPTION
PROJ. NO. DWG. REV.
LOCATION
APP'D
REV. DATE DESCRIPTION
- DISCAIMER -
THIS DRAWING WAS PREPARED BYATLAS MERIDIAN FOR THE ACCOUNTOF THE CLIENT LISTED ON THISDRAWING. THE MATERIAL ON ITREFLECTS ATLAS MERIDIAN'S BESTJUDGEMENT IN THE LIGHT OF THEINFORMATION AVAILABLE AT THETIME OF PREPARATION. ANY USE BYA THIRD PARTY OF THIS DRAWING ISTHE RESPONSIBILITY OF SUCH THIRDPARTY. ATLAS MERIDIAN ACCEPTSNO RESPONSIBILITY FOR ANYDAMAGES SUFFERED BY THE THIRDPARTY AS A RESULT OF DECISIONSMADE OR ACTIONS BASED ON THISDRAWING. COPIES RESULTING FROMELECTRONIC TRANSFER ORREPRODUCTION OF THIS DRAWINGARE UNCONTROLLED AND MAY NOTBE THE MOST RECENT REVISION OFTHIS DRAWING.
ATLAS MERIDIAN
GLASS WORKS INC.
0-3798
1145 Ottaburn
Pirani Residence
Upward construction
-
Shop drawing details
W 101
5
1
2
"
6"
6"
sealant (air barrier continuity)
1/4"steel angled door stopper
minimal curtain wall
5/8"millwork
2x strapping
1/2"gypsum waalboard
2x framing
veneer millwork
base walltite sprafoam insulation to r21
minimal curtain wall
aluminium fixing angle w/peel and stick
exterior wood siding
tyvek commercial warp air barrier
10
1
2
"
interior
exterior
Scale 3'':1'
PROJECT
DESCRIPTION
PROJ. NO. DWG. REV.
LOCATION
APP'D
REV. DATE DESCRIPTION
- DISCAIMER -
THIS DRAWING WAS PREPARED BYATLAS MERIDIAN FOR THE ACCOUNTOF THE CLIENT LISTED ON THISDRAWING. THE MATERIAL ON ITREFLECTS ATLAS MERIDIAN'S BESTJUDGEMENT IN THE LIGHT OF THEINFORMATION AVAILABLE AT THETIME OF PREPARATION. ANY USE BYA THIRD PARTY OF THIS DRAWING ISTHE RESPONSIBILITY OF SUCH THIRDPARTY. ATLAS MERIDIAN ACCEPTSNO RESPONSIBILITY FOR ANYDAMAGES SUFFERED BY THE THIRDPARTY AS A RESULT OF DECISIONSMADE OR ACTIONS BASED ON THISDRAWING. COPIES RESULTING FROMELECTRONIC TRANSFER ORREPRODUCTION OF THIS DRAWINGARE UNCONTROLLED AND MAY NOTBE THE MOST RECENT REVISION OFTHIS DRAWING.
ATLAS MERIDIAN
GLASS WORKS INC.
0-3798
1145 Ottaburn
Pirani Residence
Upward construction
-
Shop drawing details
5"concrete slab c/w
hydronic heating tube
see structural draw
ings
6 m
il poly vapour barrier
alum
inium
fixing angle w
/peel and stick
peel and stick
backing rod and caulking
metal flashing
mero alum
inium
2400 w
indow
system
W 101
Scale 3'':1'
PROJECT
DESCRIPTION
PROJ. NO. DWG. REV.
LOCATION
APP'D
REV. DATE DESCRIPTION
- DISCAIMER -
THIS DRAWING WAS PREPARED BYATLAS MERIDIAN FOR THE ACCOUNTOF THE CLIENT LISTED ON THISDRAWING. THE MATERIAL ON ITREFLECTS ATLAS MERIDIAN'S BESTJUDGEMENT IN THE LIGHT OF THEINFORMATION AVAILABLE AT THETIME OF PREPARATION. ANY USE BYA THIRD PARTY OF THIS DRAWING ISTHE RESPONSIBILITY OF SUCH THIRDPARTY. ATLAS MERIDIAN ACCEPTSNO RESPONSIBILITY FOR ANYDAMAGES SUFFERED BY THE THIRDPARTY AS A RESULT OF DECISIONSMADE OR ACTIONS BASED ON THISDRAWING. COPIES RESULTING FROMELECTRONIC TRANSFER ORREPRODUCTION OF THIS DRAWINGARE UNCONTROLLED AND MAY NOTBE THE MOST RECENT REVISION OFTHIS DRAWING.
ATLAS MERIDIAN
GLASS WORKS INC.
0-3798
1145 Ottaburn
Pirani Residence
Upward construction
-
Shop drawing details
W 102
3MM- 3015
#12 FASTENER
DYMONIC 100
1
2
"
3
1
2
"
8"
5
1
2
"
1
1
2
"
vapour retarder primer paint
5/8" gypsum wallboard
2x4 framing
8" exterior concrete wall
2x6 wood blockout
sealant (air barrier continuity)
membrane
atlas reynaers CS 77 standard flush faced HI
BACKING ROD AND CAULKING
metal falshing
interior
exterior
Scale 3'':1'
PROJECT
DESCRIPTION
PROJ. NO. DWG. REV.
LOCATION
APP'D
REV. DATE DESCRIPTION
- DISCAIMER -
THIS DRAWING WAS PREPARED BYATLAS MERIDIAN FOR THE ACCOUNTOF THE CLIENT LISTED ON THISDRAWING. THE MATERIAL ON ITREFLECTS ATLAS MERIDIAN'S BESTJUDGEMENT IN THE LIGHT OF THEINFORMATION AVAILABLE AT THETIME OF PREPARATION. ANY USE BYA THIRD PARTY OF THIS DRAWING ISTHE RESPONSIBILITY OF SUCH THIRDPARTY. ATLAS MERIDIAN ACCEPTSNO RESPONSIBILITY FOR ANYDAMAGES SUFFERED BY THE THIRDPARTY AS A RESULT OF DECISIONSMADE OR ACTIONS BASED ON THISDRAWING. COPIES RESULTING FROMELECTRONIC TRANSFER ORREPRODUCTION OF THIS DRAWINGARE UNCONTROLLED AND MAY NOTBE THE MOST RECENT REVISION OFTHIS DRAWING.
ATLAS MERIDIAN
GLASS WORKS INC.
0-3798
1145 Ottaburn
Pirani Residence
Upward construction
-
Shop drawing details
W 102
3M
M-
3015
#12
FA
ST
EN
ER
DY
MO
NIC
100
3M
M- 3015
#12 F
AS
TE
NE
R
DY
MO
NIC
100
5
1
2
"
1"
1
1
2
" 1
1
2
"
2 5/8"
vapour retarder prim
er paint
5/8" gypsum
w
allboard
2x fram
ing
1/2" exterior grade plyw
ood
tyvek com
mercial w
arp air barrier
3/8" rainscreen drainage m
at
1/4" stucco and 1/2" yellow
board
alum
inium
fixing angle
sealant (air barrier continuity)
metal falshing
atlas reynaers C
S 77 standard flush faced H
I
interior
exterior
metal falshing
atlas reynaers C
S 77 standard flush faced H
I
BA
CK
IN
G R
OD
A
ND
C
AU
LK
IN
G
sealant (air barrier continuity)
8" exterior concrete w
all
vapour retarder prim
er paint
5/8" gypsum
w
allboard
2x4 fram
ing
1/2" exterior grade plyw
ood
Scale 3'':1'
PROJECT
DESCRIPTION
PROJ. NO. DWG. REV.
LOCATION
APP'D
REV. DATE DESCRIPTION
- DISCAIMER -
THIS DRAWING WAS PREPARED BYATLAS MERIDIAN FOR THE ACCOUNTOF THE CLIENT LISTED ON THISDRAWING. THE MATERIAL ON ITREFLECTS ATLAS MERIDIAN'S BESTJUDGEMENT IN THE LIGHT OF THEINFORMATION AVAILABLE AT THETIME OF PREPARATION. ANY USE BYA THIRD PARTY OF THIS DRAWING ISTHE RESPONSIBILITY OF SUCH THIRDPARTY. ATLAS MERIDIAN ACCEPTSNO RESPONSIBILITY FOR ANYDAMAGES SUFFERED BY THE THIRDPARTY AS A RESULT OF DECISIONSMADE OR ACTIONS BASED ON THISDRAWING. COPIES RESULTING FROMELECTRONIC TRANSFER ORREPRODUCTION OF THIS DRAWINGARE UNCONTROLLED AND MAY NOTBE THE MOST RECENT REVISION OFTHIS DRAWING.
ATLAS MERIDIAN
GLASS WORKS INC.
0-3798
1145 Ottaburn
Pirani Residence
Upward construction
-
Shop drawing details
D 200
3MM- 3015
#12 FASTENER
DYMONIC 100
2"
1
1
2
"
2
1
2
"
INTERIOR
EXTERIOR
EXTERIOR
5/8'' gypsum wallbaord
2x framing
1/2"exterior grade plywood
tyvek commercial warp air barrier
3/8" rain screen drainage mat
1/2"exterior grade plywood
1/4"stucco and 1/2" yellow board
panel
3 1/2"x3 1/2" HSS
sealant
atlas reynaersCP 155-LSHI VARIANT D
aluminium cover plate
1
1
2
"
tiletile
1/2" denshield tile backer
1
1
2
"
5
1
2
"
3
1
2
"
3
1
2
"
2"
2x framing
2x strapping
wood siding
5
1
2
"
3
1
2
"
3
1
2
"
5
1
2
"
Scale 3'':1'
PROJECT
DESCRIPTION
PROJ. NO. DWG. REV.
LOCATION
APP'D
REV. DATE DESCRIPTION
- DISCAIMER -
THIS DRAWING WAS PREPARED BYATLAS MERIDIAN FOR THE ACCOUNTOF THE CLIENT LISTED ON THISDRAWING. THE MATERIAL ON ITREFLECTS ATLAS MERIDIAN'S BESTJUDGEMENT IN THE LIGHT OF THEINFORMATION AVAILABLE AT THETIME OF PREPARATION. ANY USE BYA THIRD PARTY OF THIS DRAWING ISTHE RESPONSIBILITY OF SUCH THIRDPARTY. ATLAS MERIDIAN ACCEPTSNO RESPONSIBILITY FOR ANYDAMAGES SUFFERED BY THE THIRDPARTY AS A RESULT OF DECISIONSMADE OR ACTIONS BASED ON THISDRAWING. COPIES RESULTING FROMELECTRONIC TRANSFER ORREPRODUCTION OF THIS DRAWINGARE UNCONTROLLED AND MAY NOTBE THE MOST RECENT REVISION OFTHIS DRAWING.
ATLAS MERIDIAN
GLASS WORKS INC.
0-3798
1145 Ottaburn
Pirani Residence
Upward construction
-
Shop drawing details
D 200
3M
M- 3
01
5
#1
2
FA
ST
EN
ER
DY
MO
NIC
10
0
panel
sealant
atlas reynaersC
P 155-LS
HI V
AR
IA
NT
D
3/4" prefinished engineered glued dow
n flooring
1 1/2" concrete topping c/w
hydronic heating tubing
5/8'' t&
g plyw
ood subfloor
vapour retarder prim
er paint
w10 x30 steel beam
2x10 @
16"o/c fram
ing
closure 1/2"
atlas reynaers cp 155 ls hi variant D
IN
TE
RIO
R
1 1/2" A
CC
OY
A D
EC
KIN
G
2-P
LY
M
OD
IF
IE
D B
IT
UM
IN
OU
S M
EM
BR
AN
E
5/8" T
&G
E
BT
ER
IO
R G
RA
DE
P
LY
WO
OD
S
HE
AT
IN
G
1/4"stucco and 1/2" yellow
board
5"x5" w
indow
blind pocket
2x10 @
16" o/c
Scale 3'':1'
PROJECT
DESCRIPTION
PROJ. NO. DWG. REV.
LOCATION
APP'D
REV. DATE DESCRIPTION
- DISCAIMER -
THIS DRAWING WAS PREPARED BYATLAS MERIDIAN FOR THE ACCOUNTOF THE CLIENT LISTED ON THISDRAWING. THE MATERIAL ON ITREFLECTS ATLAS MERIDIAN'S BESTJUDGEMENT IN THE LIGHT OF THEINFORMATION AVAILABLE AT THETIME OF PREPARATION. ANY USE BYA THIRD PARTY OF THIS DRAWING ISTHE RESPONSIBILITY OF SUCH THIRDPARTY. ATLAS MERIDIAN ACCEPTSNO RESPONSIBILITY FOR ANYDAMAGES SUFFERED BY THE THIRDPARTY AS A RESULT OF DECISIONSMADE OR ACTIONS BASED ON THISDRAWING. COPIES RESULTING FROMELECTRONIC TRANSFER ORREPRODUCTION OF THIS DRAWINGARE UNCONTROLLED AND MAY NOTBE THE MOST RECENT REVISION OFTHIS DRAWING.
ATLAS MERIDIAN
GLASS WORKS INC.
0-3798
1145 Ottaburn
Pirani Residence
Upward construction
-
Shop drawing details
3MM- 3015
#12
FASTENER
DYMONIC
100
3MM- 3015
#12
FASTENER
DYMONIC
100
3
1
2
"
5/8" gypsum wallboard
sealant (air barrier continuity)
atlas reynaers CS 77 standard flush faced HI
2x framing
aluminium cover plate
2x blocking
D 201
Scale 3'':1'
PROJECT
DESCRIPTION
PROJ. NO. DWG. REV.
LOCATION
APP'D
REV. DATE DESCRIPTION
- DISCAIMER -
THIS DRAWING WAS PREPARED BYATLAS MERIDIAN FOR THE ACCOUNTOF THE CLIENT LISTED ON THISDRAWING. THE MATERIAL ON ITREFLECTS ATLAS MERIDIAN'S BESTJUDGEMENT IN THE LIGHT OF THEINFORMATION AVAILABLE AT THETIME OF PREPARATION. ANY USE BYA THIRD PARTY OF THIS DRAWING ISTHE RESPONSIBILITY OF SUCH THIRDPARTY. ATLAS MERIDIAN ACCEPTSNO RESPONSIBILITY FOR ANYDAMAGES SUFFERED BY THE THIRDPARTY AS A RESULT OF DECISIONSMADE OR ACTIONS BASED ON THISDRAWING. COPIES RESULTING FROMELECTRONIC TRANSFER ORREPRODUCTION OF THIS DRAWINGARE UNCONTROLLED AND MAY NOTBE THE MOST RECENT REVISION OFTHIS DRAWING.
ATLAS MERIDIAN
GLASS WORKS INC.
0-3798
1145 Ottaburn
Pirani Residence
Upward construction
-
Shop drawing details
D 201
3MM- 3015
#12 FASTENER
DYMONIC 100
interior
5/8" gypsum wallboard
sealant (air barrier continuity)
atlas reynaers CS 77 standard flush faced HI
BASF WALLTITE SPRAYFOAM
Scale 3'':1'
PROJECT
DESCRIPTION
PROJ. NO. DWG. REV.
LOCATION
APP'D
REV. DATE DESCRIPTION
- DISCAIMER -
THIS DRAWING WAS PREPARED BYATLAS MERIDIAN FOR THE ACCOUNTOF THE CLIENT LISTED ON THISDRAWING. THE MATERIAL ON ITREFLECTS ATLAS MERIDIAN'S BESTJUDGEMENT IN THE LIGHT OF THEINFORMATION AVAILABLE AT THETIME OF PREPARATION. ANY USE BYA THIRD PARTY OF THIS DRAWING ISTHE RESPONSIBILITY OF SUCH THIRDPARTY. ATLAS MERIDIAN ACCEPTSNO RESPONSIBILITY FOR ANYDAMAGES SUFFERED BY THE THIRDPARTY AS A RESULT OF DECISIONSMADE OR ACTIONS BASED ON THISDRAWING. COPIES RESULTING FROMELECTRONIC TRANSFER ORREPRODUCTION OF THIS DRAWINGARE UNCONTROLLED AND MAY NOTBE THE MOST RECENT REVISION OFTHIS DRAWING.
ATLAS MERIDIAN
GLASS WORKS INC.
0-3798
1145 Ottaburn
Pirani Residence
Upward construction
-
Shop drawing details
3M
M- 3
01
5
#1
2
FA
ST
EN
ER
DY
MO
NIC
1
00
4
1
2
"
5
1
2
"
1
1
2
"
2
1
2
"
5/8"gypsum wallwork
interior
exterior
backing rod and caulking
metal flashing
atlas reynaers CS 77 standard flush faced HI
sealant (air barrier continuity)
3 1/2" x3 1/2" HSS
1/2" shear plywood
2x framing
1/2"denshield tile backer
1/2" tile
1/2"exterior grade plywood
1/2"denshield tile backer
1/2" tile
tyvek commercial warp air barrier
3/8" rain screen drainage mat
1/4" stucco and 1/2"yellow board
3 1/2" rigid insulation
8"exterior concret wall
2"x6" wood blocket
5/8"gypsum wallboard
2x4 framing
5/8"gypsum wallboard
backing rod and caulking
sealant (air barrier continuity)
atlas reynaers CS 77 standard flush faced HI
W 205
Scale 3'':1'
PROJECT
DESCRIPTION
PROJ. NO. DWG. REV.
LOCATION
APP'D
REV. DATE DESCRIPTION
- DISCAIMER -
THIS DRAWING WAS PREPARED BYATLAS MERIDIAN FOR THE ACCOUNTOF THE CLIENT LISTED ON THISDRAWING. THE MATERIAL ON ITREFLECTS ATLAS MERIDIAN'S BESTJUDGEMENT IN THE LIGHT OF THEINFORMATION AVAILABLE AT THETIME OF PREPARATION. ANY USE BYA THIRD PARTY OF THIS DRAWING ISTHE RESPONSIBILITY OF SUCH THIRDPARTY. ATLAS MERIDIAN ACCEPTSNO RESPONSIBILITY FOR ANYDAMAGES SUFFERED BY THE THIRDPARTY AS A RESULT OF DECISIONSMADE OR ACTIONS BASED ON THISDRAWING. COPIES RESULTING FROMELECTRONIC TRANSFER ORREPRODUCTION OF THIS DRAWINGARE UNCONTROLLED AND MAY NOTBE THE MOST RECENT REVISION OFTHIS DRAWING.
ATLAS MERIDIAN
GLASS WORKS INC.
0-3798
1145 Ottaburn
Pirani Residence
Upward construction
-
Shop drawing details
2
1
2
"2
1
2
"
interior
exterior
backing rod and caulking
metal flashing
atlas reynaers C
S 77 standard flush faced H
I
sealant (air barrier continuity)
vapour retarder prim
er paint
5/8"gypsum
w
allw
ork
2x fram
ing
1/2"extrior grade plyw
ood
tyvek com
mercial w
arp air barrier
3/8" rain screen drainage m
at
1/4" stucco and 1/2"yellow
board
vapour retarder prim
er paint
5/8"gypsum
w
allw
ork
2x fram
ing
1/2"extrior grade plyw
ood
tyvek com
mercial w
arp air barrier
3/8" rain screen drainage m
at
1/4" stucco and 1/2"yellow
board
metal flashing
atlas reynaers C
S 77 standard flush faced H
I
sealant (air barrier continuity)
3/4" prefinishedglued dow
n flooring
1 1/2" concrete toppng c/w
hydronic heating tubing
5/8" t&
g plyw
ood subfloor
w 10x22 steel beam
2x10 @
16" o/c
5/8"gypsum
w
allboard
vapour retarder prim
er paint
w 12x30 steel beam
W 205
Scale 3'':1'
PROJECT
DESCRIPTION
PROJ. NO. DWG. REV.
LOCATION
APP'D
REV. DATE DESCRIPTION
- DISCAIMER -
THIS DRAWING WAS PREPARED BYATLAS MERIDIAN FOR THE ACCOUNTOF THE CLIENT LISTED ON THISDRAWING. THE MATERIAL ON ITREFLECTS ATLAS MERIDIAN'S BESTJUDGEMENT IN THE LIGHT OF THEINFORMATION AVAILABLE AT THETIME OF PREPARATION. ANY USE BYA THIRD PARTY OF THIS DRAWING ISTHE RESPONSIBILITY OF SUCH THIRDPARTY. ATLAS MERIDIAN ACCEPTSNO RESPONSIBILITY FOR ANYDAMAGES SUFFERED BY THE THIRDPARTY AS A RESULT OF DECISIONSMADE OR ACTIONS BASED ON THISDRAWING. COPIES RESULTING FROMELECTRONIC TRANSFER ORREPRODUCTION OF THIS DRAWINGARE UNCONTROLLED AND MAY NOTBE THE MOST RECENT REVISION OFTHIS DRAWING.
ATLAS MERIDIAN
GLASS WORKS INC.
0-3798
1145 Ottaburn
Pirani Residence
Upward construction
-
Shop drawing details
W 206
5
1
2
"
interior
exterior
interior
exterior
5/8" m
illw
ork
1/2" gypsum
w
allboard
3"rigid insulation (R
20)
1/2" veneer m
illw
ork
sealant (airbarrier continuity
8"exterior concrete w
all
tyvek com
mercial w
arp air barrier
metal flashing
backing rod and caulking
sealant (airbarrier continuity
backing rod and caulking
atlas reynaers C
S 77 standard flush faced H
I
tyvek com
mercial w
arp air barrier
flush faced H
I
5/8"gypsum
w
allboard
vapour retarder prim
er paint
1/2"exterior grade plyw
ood
3/8"rainscreen drainage m
at
1/4"stucco and 1/2""yellow
board
Scale 3'':1'
PROJECT
DESCRIPTION
PROJ. NO. DWG. REV.
LOCATION
APP'D
REV. DATE DESCRIPTION
- DISCAIMER -
THIS DRAWING WAS PREPARED BYATLAS MERIDIAN FOR THE ACCOUNTOF THE CLIENT LISTED ON THISDRAWING. THE MATERIAL ON ITREFLECTS ATLAS MERIDIAN'S BESTJUDGEMENT IN THE LIGHT OF THEINFORMATION AVAILABLE AT THETIME OF PREPARATION. ANY USE BYA THIRD PARTY OF THIS DRAWING ISTHE RESPONSIBILITY OF SUCH THIRDPARTY. ATLAS MERIDIAN ACCEPTSNO RESPONSIBILITY FOR ANYDAMAGES SUFFERED BY THE THIRDPARTY AS A RESULT OF DECISIONSMADE OR ACTIONS BASED ON THISDRAWING. COPIES RESULTING FROMELECTRONIC TRANSFER ORREPRODUCTION OF THIS DRAWINGARE UNCONTROLLED AND MAY NOTBE THE MOST RECENT REVISION OFTHIS DRAWING.
ATLAS MERIDIAN
GLASS WORKS INC.
0-3798
1145 Ottaburn
Pirani Residence
Upward construction
-
Shop drawing details
W 206
interior
exterior
5/8"gypsum
w
allboard
tyvek com
mercial w
arp air barrier
sealant (airbarrier continuity
backing rod and caulking
backing rod and caulking
atlas reynaers C
S 77 standard flush faced H
I
vapour retarder prim
er paint
5/8"gypsum
w
allboard
tyvek com
mercial w
arp air barrier
1/2"exterior grade plyw
ood
2x fram
ing
3/4" prefinishedglued dow
n flooring
Scale 3'':1'
PROJECT
DESCRIPTION
PROJ. NO. DWG. REV.
LOCATION
APP'D
REV. DATE DESCRIPTION
- DISCAIMER -
THIS DRAWING WAS PREPARED BYATLAS MERIDIAN FOR THE ACCOUNTOF THE CLIENT LISTED ON THISDRAWING. THE MATERIAL ON ITREFLECTS ATLAS MERIDIAN'S BESTJUDGEMENT IN THE LIGHT OF THEINFORMATION AVAILABLE AT THETIME OF PREPARATION. ANY USE BYA THIRD PARTY OF THIS DRAWING ISTHE RESPONSIBILITY OF SUCH THIRDPARTY. ATLAS MERIDIAN ACCEPTSNO RESPONSIBILITY FOR ANYDAMAGES SUFFERED BY THE THIRDPARTY AS A RESULT OF DECISIONSMADE OR ACTIONS BASED ON THISDRAWING. COPIES RESULTING FROMELECTRONIC TRANSFER ORREPRODUCTION OF THIS DRAWINGARE UNCONTROLLED AND MAY NOTBE THE MOST RECENT REVISION OFTHIS DRAWING.
ATLAS MERIDIAN
GLASS WORKS INC.
0-3798
1145 Ottaburn
Pirani Residence
Upward construction
-
Shop drawing details
1/8" metal plate
rigid underboard
sealant air barrier continuity
atlas reynaers CS 77
wood veneer
2x framing
R28 BASF walltite sprayfoam insulation
1/2" exterior grade plywood sheating
tyvek commercial warp air barrier
2-ply modified bitumunous roofing membrane
rigid underlayment board
pre -cut taper package to form roof slope
W 301
Scale 3'':1'
PROJECT
DESCRIPTION
PROJ. NO. DWG. REV.
LOCATION
APP'D
REV. DATE DESCRIPTION
- DISCAIMER -
THIS DRAWING WAS PREPARED BYATLAS MERIDIAN FOR THE ACCOUNTOF THE CLIENT LISTED ON THISDRAWING. THE MATERIAL ON ITREFLECTS ATLAS MERIDIAN'S BESTJUDGEMENT IN THE LIGHT OF THEINFORMATION AVAILABLE AT THETIME OF PREPARATION. ANY USE BYA THIRD PARTY OF THIS DRAWING ISTHE RESPONSIBILITY OF SUCH THIRDPARTY. ATLAS MERIDIAN ACCEPTSNO RESPONSIBILITY FOR ANYDAMAGES SUFFERED BY THE THIRDPARTY AS A RESULT OF DECISIONSMADE OR ACTIONS BASED ON THISDRAWING. COPIES RESULTING FROMELECTRONIC TRANSFER ORREPRODUCTION OF THIS DRAWINGARE UNCONTROLLED AND MAY NOTBE THE MOST RECENT REVISION OFTHIS DRAWING.
ATLAS MERIDIAN
GLASS WORKS INC.
0-3798
1145 Ottaburn
Pirani Residence
Upward construction
-
Shop drawing details
6
1
2
"
3"
3"
1/2" shear plyw
ood
metal cover plate (m
atch fireplace)
2x fram
ing
4"x4" H
SS
1/2"exterior grade plyw
ood
tyvek com
mercial w
arp air barrier
1/2" shear plyw
ood
sealant air barrier continuity
atlas reynaers
standard flush faced H
I
tyvek com
mercial w
arp air barrier
1/2"exterior grade plyw
ood
1/8" m
etal plate
3/8" rain screen drainage m
at
1x4 strapping
interior
exterior
interior
exterior
W 301
Scale 3'':1'
PROJECT
DESCRIPTION
PROJ. NO. DWG. REV.
LOCATION
APP'D
REV. DATE DESCRIPTION
- DISCAIMER -
THIS DRAWING WAS PREPARED BYATLAS MERIDIAN FOR THE ACCOUNTOF THE CLIENT LISTED ON THISDRAWING. THE MATERIAL ON ITREFLECTS ATLAS MERIDIAN'S BESTJUDGEMENT IN THE LIGHT OF THEINFORMATION AVAILABLE AT THETIME OF PREPARATION. ANY USE BYA THIRD PARTY OF THIS DRAWING ISTHE RESPONSIBILITY OF SUCH THIRDPARTY. ATLAS MERIDIAN ACCEPTSNO RESPONSIBILITY FOR ANYDAMAGES SUFFERED BY THE THIRDPARTY AS A RESULT OF DECISIONSMADE OR ACTIONS BASED ON THISDRAWING. COPIES RESULTING FROMELECTRONIC TRANSFER ORREPRODUCTION OF THIS DRAWINGARE UNCONTROLLED AND MAY NOTBE THE MOST RECENT REVISION OFTHIS DRAWING.
ATLAS MERIDIAN
GLASS WORKS INC.
0-3798
1145 Ottaburn
Pirani Residence
Upward construction
-
Shop drawing details
W 302
3MM- 3015
#12 FASTENER
DYMONIC 100
1/2" shear plywood
tyvek commercial warp air barrier
1/2"exterior grade plywood
1/8" metal plate
3/8" rain screen drainage mat
1x4 strapping
atlas reynaers CS77
sealant
backing rod and caulking
1/8" metal plate
metal flashing
backing rod and caulking
exterior
Scale 3'':1'
PROJECT
DESCRIPTION
PROJ. NO. DWG. REV.
LOCATION
APP'D
REV. DATE DESCRIPTION
- DISCAIMER -
THIS DRAWING WAS PREPARED BYATLAS MERIDIAN FOR THE ACCOUNTOF THE CLIENT LISTED ON THISDRAWING. THE MATERIAL ON ITREFLECTS ATLAS MERIDIAN'S BESTJUDGEMENT IN THE LIGHT OF THEINFORMATION AVAILABLE AT THETIME OF PREPARATION. ANY USE BYA THIRD PARTY OF THIS DRAWING ISTHE RESPONSIBILITY OF SUCH THIRDPARTY. ATLAS MERIDIAN ACCEPTSNO RESPONSIBILITY FOR ANYDAMAGES SUFFERED BY THE THIRDPARTY AS A RESULT OF DECISIONSMADE OR ACTIONS BASED ON THISDRAWING. COPIES RESULTING FROMELECTRONIC TRANSFER ORREPRODUCTION OF THIS DRAWINGARE UNCONTROLLED AND MAY NOTBE THE MOST RECENT REVISION OFTHIS DRAWING.
ATLAS MERIDIAN
GLASS WORKS INC.
0-3798
1145 Ottaburn
Pirani Residence
Upward construction
-
Shop drawing details
1/4" stucco and 1/2"yellow
board
backing rod and caulking
3/8" rain screen drainage m
at
tyvek com
mercial w
arp air barrier
1/2"extrior grade plyw
ood
w 12x30 steel beam
sealant (air barrier continuity)
metal flashing
atlas reynaers C
S 77 standard flush faced H
I
alum
unium
fixing angle
sealant (air barrier continuity)
5"x5" w
indow
blind pocket
metal closure
interior
exterior
3/4" stucco panel
3/8"rainscreen drainage m
at
tyvek com
mercial w
arp air barrier
1/2"exterior grade plyw
ood
2x fram
ing w
ith B
AS
F W
ALLT
IT
E S
PR
AY
FO
AM
IN
SU
LA
TIO
N
5/8" gypsum
w
allboard
3/4" prefinished engineered glued dow
n flooring
1 1/2" concrete topping c/w
hydronic heating tubing
W 302
Scale 3'':1'
PROJECT
DESCRIPTION
PROJ. NO. DWG. REV.
LOCATION
APP'D
REV. DATE DESCRIPTION
- DISCAIMER -
THIS DRAWING WAS PREPARED BYATLAS MERIDIAN FOR THE ACCOUNTOF THE CLIENT LISTED ON THISDRAWING. THE MATERIAL ON ITREFLECTS ATLAS MERIDIAN'S BESTJUDGEMENT IN THE LIGHT OF THEINFORMATION AVAILABLE AT THETIME OF PREPARATION. ANY USE BYA THIRD PARTY OF THIS DRAWING ISTHE RESPONSIBILITY OF SUCH THIRDPARTY. ATLAS MERIDIAN ACCEPTSNO RESPONSIBILITY FOR ANYDAMAGES SUFFERED BY THE THIRDPARTY AS A RESULT OF DECISIONSMADE OR ACTIONS BASED ON THISDRAWING. COPIES RESULTING FROMELECTRONIC TRANSFER ORREPRODUCTION OF THIS DRAWINGARE UNCONTROLLED AND MAY NOTBE THE MOST RECENT REVISION OFTHIS DRAWING.
ATLAS MERIDIAN
GLASS WORKS INC.
0-3798
1145 Ottaburn
Pirani Residence
Upward construction
-
Shop drawing details
3/8" rain screen drainage m
at
tyvek com
mercial w
arp air barrier
1/2"exterior grade plyw
ood
2x fram
ing
5/8" gypsum
w
allboard
sealant
backing rod and caulking
metal flashing
atlas reynaers cs 77
exterior
interior
atlas reynaers cs 77
standard flush faced H
I
backing rod and caulk
alum
inium
fixing strap
sealant
vapour retarder prim
er paint
5/8" gypsum
w
allboard
2x fram
ing
exterior
interior
1/2" exterior grade plyw
ood
tyvek com
mercial w
arp air barrier
1/4" stucco and 1/2" yellow
board
3/8" rainscreen drainage m
at
5/8" gypsum
w
allboard
vapour retarder prim
er paint
2x fram
ing
Scale 3'':1'