RESOURCES
PERT & CPM Resource Allocation
July Nov 2006
PERT CPM Resource Allocation By Prof. Nadpurohit
Slide 1 of 17
RESOURCESRESOURCES ARE ESSENTIAL TO PERFORM & COMPLETE THE ACTIVITIES IN A PROJECT MATERIALS are worked upon and converted to PROJECT DELIVERABLES by the assigned MANPOWER using its skills & efforts with or without help of EQUIPMENTJuly Nov 2006 PERT CPM Resource Allocation By Prof. Nadpurohit
Slide 2 of 17
RESOURCESRESOURCES ARE CATAGORISED ASDRIVING RESOURCES : Decide project schedule according to rate of output MANPOWER EQUIPMENT / MACHINERY NON DRIVING RESOURCES MATERIALS MONEY
July Nov 2006
PERT CPM Resource Allocation By Prof. Nadpurohit
Slide 3 of 17
RESOURCESRESOURCE SCHEDULING STEPS RESOURCE ESTIMATION: ESTIMATERESOURCES REQUIRED TO ACCOMPLISH INDIVIDUAL TASKS
RESOURCE LOADING: ASSESS RESOURCES TO
BE ORGANIZED FROM PERIOD TO PERIOD RESOURCE SMOOTHING: RESCHEDULE TASKS TO MINIMISE PERIOD TO PERIOD VARIATION IN RESOURCES WITHOUT AFFECTING COMPLETION DATE RESOURCE LEVELLING: RESCHEDULE TASKS TO REMAIN WITHIN RESOURCE CONSTRAINTS WITH OR WITHOUT PROJECT DELAYJuly Nov 2006 PERT CPM Resource Allocation By Prof. Nadpurohit
Slide 4 of 17
RESOURCESRESOURCE SMOOTHING EARLY START SCHEDULE
July Nov 2006
PERT CPM Resource Allocation By Prof. Nadpurohit
Slide 5 of 17
RESOURCESRESOURCE GRAPH FOR EARLY SCHEDULED-1 25 D1 D2 D3 D4 D5 D6 D7 D8 D9 D10 D11 D12 D13
20
15
10
5
Peak Units:
22
22 Ov erallocated:
24
24
10 Allocated:
2
2
1
1
1
1
Men
PEAK RESOURCE REQUIREMENT IS 24 & MINIMUM 1July Nov 2006 PERT CPM Resource Allocation By Prof. Nadpurohit
Slide 6 of 17
RESOURCESINITIAL RULES FOR SMOOTHING
INITIAL RESOURCE LOADING TO BE BASED ON NORMAL WORK RATES & NORMAL COSTS ACTIVITIES TO BE SHIFTED WITHIN AVAILABLE FLOAT WITHOUT CHANGING THEIR NORMAL DURATIONS ACTIVITIES ONCE STARTED CAN OT BE INTERRUPTEDPERT CPM Resource Allocation By Prof. Nadpurohit
July Nov 2006
Slide 7 of 17
RESOURCESRESOURCE SMOOTHING STAGE 1
D1 15
D2
D3
D4
D5
D6
D7
D8
D9
D10
D11
D12
D13
SHIFT ACTIVITY APEAK RESOURCE REQUIREMENT REDUCES TO 15 MINIMUM REQUIREMENT 2
10
5
Peak Units: 13
13
15 Overallocated:
15
10
2 Allocated:
2
10
10
10
10
Men
July Nov 2006
PERT CPM Resource Allocation By Prof. Nadpurohit
Slide 8 of 17
RESOURCESRESOURCE SMOOTHING STAGE 2
D-1 15
D1
D2
D3
D4
D5
D6
D7
D8
D9
D10
D11
D12
D13
SHIFT ACTIVITY EPEAK RESOURCE REQUIREMENT REDUCES TO 13, MINIMUM REQUIREMENT OF 7
10
5
Peak Units:
13
13
7
7
10 Allocated:
10
10
10
10
10
10
Men
Overallocated:
July Nov 2006
PERT CPM Resource Allocation By Prof. Nadpurohit
Slide 9 of 17
RESOURCESRESOURCE SMOOTHING STAGE 3
D-1 10
D1
D2
D3
D4
D5
D6
D7
D8
D9
D10
D11
D12
D13
SHIFT ACTIVITY BRESOURCE REQUIREMENT IS UNIFORM AT 10
8 6 4 2
Peak Units:
10
10
10
10
10
10
10
10
10
10
10
July Nov 2006
PERT CPM Resource Allocation By Prof. Nadpurohit
Men
Overallocated:
Allocated:
Slide 10 of 17
RESOURCESPRIORITY RULES FOR RESOURCE LEVELLING MINIMUM SLACK FIRST: ALLOCATERESOURCES TO CRITICAL & NEAR- CRITICAL ACTIVITIES ON PRIORITY. SHORTEST TASK FIRST: ENSURES THAT MAXIMISES NUMBER OF TASKS CAN BE COMPLETED IN CERTAIN TIME PERIOD. MOST RESOURCES FIRST: ON PRESUMPTION THAT MORE IMPORTANT TASKS DEMAND MORE RESOURCES
MOST CRITICAL FOLLOWERS: TASKSPRECEDING MAXIMUM NUMBERS OF CRITICAL TASKS WILL GET PRIORITY FOR RESOURCES.
July Nov 2006
PERT CPM Resource Allocation By Prof. Nadpurohit
Slide 11 of 17
RESOURCESExample:Draw a Gantt chart and Resource Graph for the Project Schedule based on the table given below and find out the following. a) Total Time for completion. b) Days of aver allocation of resources if maximum workers available are 20.Activity A B C D E F G H I JJuly Nov 2006
Immediate Predecessor A B B B C,D E F G,H,I
Duration 8 7 6 8 4 8 5 6 6 10
Allocated Workers 4 8 5 4 8 6 5 4 5 6
PERT CPM Resource Allocation By Prof. Nadpurohit
Slide 12 of 17
RESOURCESA(8) 2 8 10 D(8) H(6) 3 8,11,7 I(6) F(8) 6 15 15 7 7 E(4) 5 11 15 7 21 21 C(6) 4 8,15 15 16 G(5) 20,17,21 B(7) J(10) 8 31 31
1 2,0
0 0
Resource Allocation Problem, university 2009.xls
July Nov 2006
PERT CPM Resource Allocation By Prof. Nadpurohit
Slide 13 of 17
RESOURCESExample:Given below are the manpower requirement for each activity in a Project. a) Draw the network and find out Total Float and Free Float for every activity. b) The contractor stipulates that during the 1st 26 days only 4 to 5 men and during the remaining days 8 to 11 men can be made available. Rearrange the activities suitably for Leveling the manpower resource, satisfying the above condition.Activity 1-2 1-3 2-4 2-6 3-4 4-5 46 5-7 6-7 7-8July Nov 2006
Normal Times days 10 11 13 14 10 7 17 13 9PERT CPM Resource Allocation By Prof. Nadpurohit
Manpower / Day 2 3 4 3 1 3 3 5 8 11
1
Slide 14 of 17
RESOURCES210 10 10 13 0 0 11 10 14
617
40 40 9
1
4
23 23 7
713
49 49
1
8
50 50
3
11 13
5
30 36
Non Critical Activity Scheduling Times and FloatActivity 1-3 2-6 3-4 4-5 5-7 Normal Time Days 11 14 10 7 13 Earliest Time Start 0 11 11 23 30 Finish 11 24 21 30 43 Latest Time Start 2 26 13 19 36 Finish 13 40 23 36 49 Total Float = Lj Ei - t 2 16 2 6 6 Free Float = Ej Ei - t 0 16 2 0 6
July Nov 2006
PERT CPM Resource Allocation By Prof. Nadpurohit
Slide 15 of 17
RESOURCESNon Critical Activity Scheduling Times and Float 2 10 1 0 0 11 3 11 13 10 10 13 4 10 23 23 7 5 30 36 14 6 17 40 40 9 7 49 49 13 1 8 50 50 Activi ty 1-3 2-6 3-4 4-5 5-7 Norm al Time Days 11 14 10 7 13 Earliest Time Start Finish Latest Time Start Finish Total Float = Lj Ei - t 2 16 2 6 6 Free Float = Ej Ei - t 0 16 2 0 6
0 11 11 23 30
11 24 21 30 43
2 26 13 29 36
13 40 23 36 49
Resource Levelling Pr, uni 2010.xls
July Nov 2006
PERT CPM Resource Allocation By Prof. Nadpurohit
Slide 16 of 17
RESOURCESRESOURCE LEVELLING ALGORITHM BASED ON CRITICAL TASKS FIRST RULE
July Nov 2006
PERT CPM Resource Allocation By Prof. Nadpurohit
Slide 17 of 17
RESOURCES
July Nov 2006
PERT CPM Resource Allocation By Prof. Nadpurohit
Slide 18 of 17