MINUTES OF 462ND MEETING OF OPERATION amp COORDINATION SUB-COMMITTEE OF WRPC

HELD ON 11TH AUGUST 2014 AT TARAPUR

The 462ND meeting of Operation amp Co-ordination Sub-Committee of WRPC was held on 11thAugust 2014 at Tarapur hosted by TAPS-1amp2 The list of participants is enclosed at Annexure-I

Shri V S Daniel Station Director TAPS-1amp2 welcomed Shri S D Taksande

Member Secretary WRPC amp all other distinguished delegates at Tarapur for attending

the 462nd OCC Meeting of WR He thanked WRPC Secretariat for giving opportunity

to TAPS-1amp2 for organizing this meeting and expressed pride in organizing the same

He mentioned that all operation related issues of the system are discussed in OCC

and important decisions are taken during the meeting which helps the system

operators

Shri S D Taksande Member Secretary WRPC extended warm welcome to the

members and participants of the 462nd OCCM He expressed his gratitude to TAPS-

1amp2 for agreeing to host 462ND OCCM at Tarapur He also thanked to Shri V S

Daniel Station Director TAPS-1amp2 Shri S M Maskey OS TAPS-1amp2 and his team for

making excellent arrangement for meeting transport and stay of the OCC members

participants attending the meeting

He informed that since last OCC meeting following important events had taken place

1 Implementation of Central Electricity Regulatory Commission (Terms and Conditions of Tariff) Regulations 2014-19 wef 01042014 and procedural change in Transmission system availability certification as per regulation 2014 -19 He further informed the availability certification for some transmission licensees has already been issued and for PGCIL the same is to be issued after effect on generation evacuation certificate from WRLDC is recieved The viewsconcerns of WR transmission licensees discussed in last OCC were informed to Honrsquoble CERC for positive consideration

2 RSD methodology framed for the low demand period which was implemented

for NTPC Mauda unit on 18072014 to 20072014

3 A meeting was held on 24072014 at WRPC Mumbai regarding technical

Minimum of CGPL units wherein most the beneficiaries were not present

therefore no concrete decision could be evolved

4 A letter to DD DNH amp GOA has been written from WRPC secretariat regarding

implementation of ADMS Load Forecasting amp telemetry status

2

462nd OCC MINUTES

5 Four important transmission elements have been added in WR grid viz 765 kV Wardha- Aurangabad Ckt I amp II and 765 kV Dharamjaigad-Jharsuguda Ckt I amp II(WR-ER interregional line) which may solve the problem of congestion at Wardha amp W-3 area

6 BDTCL has charged 400kV Bhopal (BDTCL) to Bhopal(MP) and entered as new transmission licensee in WR

He further informed that due to delayed monsoon amp critical power scenario in the

region the planning of generating unit outages is very crucial in this meeting

There after he requested to Shri SSatyanarayana SE WRPC to take up regular

agenda items in seriatim for discussion

ITEM No 1 CONFIRMATION OF THE MINUTES

Member Secretary WRPC stated that the Minutes of 461ST meeting of Operation

amp Coordination Sub-Committee of WRPC held on 10th July 2014 at Raipur were

forwarded vide letter No WRPCOPNOCC-Minutes2014-157024 dated 23072014

No comments have been received Therefore the minutes were confirmed without any modification

ITEM NO2 REVIEW OF SYSTEM OPERATION DURING THE MONTH OF JULY

2014 Member Secretary WRPC requested WRLDC to brief the Committee on Grid Operation

experiences during July 2014

Chief Manager WRLDC in the presentation ( copy attached at Annexure ndash 2 in soft

copy) concentrated broadly on the performance of the grid for month of July 2014 as

below

21 Frequency Particulars

The average frequency during the month of July 2014 was 4993 Hz The

maximum instantaneous frequency was 5036 Hz at 1304 hrs of 23rd July 2014

while minimum instantaneous frequency was 4941 Hz on 10th July (1950 hrs) as

well as on 25th July 2014 (1944 hrs) The frequency profile during July 2014 was

as under

01-July 2014 to 30-July 2014 time

IEGC band (499 lt f lt 5005 Hz) 5016 lt 499 Hz 3451 gt 5005 Hz 1533

The detailed frequency particulars are enclosed at Annex- 21

The Sub-Committee noted

3

462nd OCC MINUTES

22 Operational Discipline

There was a net inter-regional export of 356400 MUs by WR against net export

schedule of 335400 MUs

The Sub-Committee noted

23 Voltage Profile Voltage profile at some of 765400 kV sub-stations during the month of July

2014 furnished by WRLDC is enclosed at Annex-23

The Sub-Committee noted as above

24 UF Relay Operations

As per WRLDC records during July 2014 the system frequency didnrsquot touch 492 Hz

and no UF relay operation reported by any constituents The Sub-Committee noted as above

25 Power Cuts Load Restrictions

Details of Power Cuts and Regulatory measures during July 2014 as furnished by the

state utilities are given in Annex 25 The Sub-Committee noted as above

26 Details of Generating Units under Forced outages Details of generating units under forced outages during July 2014 are given in

Annex-26

The Sub-Committee noted as above 27 Details of Generating Units under Planned outages

The details of generating units under Planned Outages during July 2014 are given in Annex-27

The Sub-Committee noted as above

ITEM NO3 OPERATIONAL PLANNING 31 Proposed Planned maintenance programme of generating units

The maintenance programme of generating units for August 2014 amp September

2014 was discussed

4

462nd OCC MINUTES

Sub - committee discussed the matter amp suggested that outages of major coal fired

units(200MW amp above) amp hydro generating station shall be deferred till next OCC

meeting due to following reasons

1 Intermittent rain profile in the region amp Load generation balance requirements of

grid for secure operation

2 Coal shortage being faced by some important generating station of NTPC viz

Sipat amp Vindhyachal etc

3 Gas shortages being faced by Gas stations

4 Water shortage by Parli units of Maharashtra state power generating company

ltd(MSPGCL)

The finalized outage schedule of generating units for the above period and the

modified outages plan is placed at Annexure-31

The Sub-Committee agreed as above

32 Outage Programme of Transmission Lineselements The committee had received 275 nos of proposals for outage planning during Aug-Sep

2014 Further some proposals were received at the last moment of the meeting

The committee observed that -

1 There were repetitions in the proposals wherein the same line had been

requested for outage a no of times

2 The lines pertaining to STU were asked for outage As per 446th OCCM such

lines should be first approached to concerned STU and only in case of

problems faced in outages OCC-WR may like to review

3 Line detailsreasons in many cases were not already mentioned Committee

requested that while submitting outage planning data necessary care may

please be taken

4 All utilities were requested to avail outages as planned

The Sub-Committee agreed for the same

33 ANTICIPATED POWER SUPPLY POSITION FOR THE MONTHS ndash AUGUST 2014 amp SEPTEMBER 2014

Details of anticipated restricted amp un-restricted demands for the months of August 2014 amp

September 2014are given in Annex 33

The Sub-Committee noted the same

5

462nd OCC MINUTES

ITEM NO 4 OPERATIONAL STATISTICS FOR THE MONTH OF July 2014 The details of actual generation demand drawl of power from grid exchanges etc are given in the following Annexure Annex 41 - Actual Generation and Requirement for July 2014 Annex 42 - Peak Demand Schedule Vs Actual for July 2014 Annex 43 - Integrated Operation of the System and Operation of Inter State Tie lines

For July 2014 Annex 47 ndash Details of level of Major Reservoirs in Western Region for Month July

2014

The Sub-Committee noted ITEM NO 5 SYSTEM DISTURBANCES IN WESTERN REGION There was no major grid disturbance in the Western Region during the month The

tripping details during the month received from WRLDC is enclosed at Annexure-5

The Sub-Committee noted as above ITEM NO 6Healthiness status of SERsDRs of equipment in the system

Constituents have furnished the status of healthiness of SERDRs in their systems on the dates below

Sl No Name of

constituents Date of Receipt

1 PGCILWRTS-I 06082014 2 PGCILWRTS-II 07082014 3 MPPTCL 11082014 4 NTPC 04082014 5 CSPTCL 03082014 6 GETCO 07082014 7 MSETCL 11082014

Constituents of WR are requested to ensure healthiness and send the information to

this office regularly as per the recommendation of enquiry committee of Grid

disturbances on 25022007 and 28022007

ITEM NO 7 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS TRANSMISSION LINES AND GENERATING UNITS IN WR

71 Status of completion of ongoing Schemes for Commissioning of reactors The present status regarding schedule and commissioning of reactors is as below

6

462nd OCC MINUTES

S No

400 kV Substn

Size (MVAR)

Implementing agency

Expected commissioning date

1 Ranchodpura 125 MVAR GETCO Commd On 8th July 2013

2 Varsana 125 MVAR GETCO Commd On 25th July 2013

3 Rajkot 125 MVAR GETCO Commd On 5th August 2013

4 Amreli 125 MVAR GETCO Commd On 12072013

5 Jetpur 63 MVAR GETCO Commd on 11072013

6 Zerda 125 MVAR GETCO Commd in July 2013

7 Kosmba 80 MVAR GETCO Commissioned on 29112013

8 Limbdi (Chornia)

125 MVAR GETCO 25th July 2013

9 Jabalpur 125 MVAR PGCIL Commissioned on 26032014

10 Khandwa 125 MVAR PGCIL Commissioned on 28032014

11 India bulls 80 MVAR BR

MSETCL Commissioned 26112013

12 Nagda 50 MVAR MPPTCL Commissioned in Feb-2014

13 Sasan Line reactor-1

240 MVAR RELIANCE Commissioned on 16022014

14 Shujalpur 125 MVAR PGCIL July 2014 end

15 Bhatapara 125 MVAR PGCIL July 2014 end

16 Raigarh 125 MVAR PGCIL July 2014 end

17 Aurangabad 125 MVAR PGCIL 28042014

18 Nanded 125 MVAR MSETCL 2015

19 Sholapur 125 MVAR MSETCL Sept-2014

20 Kolhapur 125 MVAR MSETCL Sept-2014

7

462nd OCC MINUTES

21 Akola 125 MVAR MSETCL Sept-2014

22 Nagda 125 MVAR MPPTCL Oct 2014

23 Bhopal 80 MVAR MPPTCL Sept 2014

24 Damoh 125 MVAR PGCIL August 2014

25 Bachau 125 MVAR PGCIL August 2014

26 Pirana 125 MVAR PGCIL August 2014

27 Itarsi 2X125 MVAR

PGCIL August 2014

28 Seoni 125 MVAR PGCIL August 2014

29 Parli 125 MVAR PGCIL August 2014

30 Raipur 125 MVAR PGCIL August 2014

31 Gwalior 125 MVAR PGCIL Commissioned on 30062014

32 ISP 125 MVAR NHDC 2015

33 Satpura 50 MVAR MPPGCL March-2015

34 Sasan Line reactor-2

240 MVAR RELIANCE August -2014

35 Sasan Bus reactor

240 MVAR RELIANCE Sept-2014

72Status of completion of 765400 kV and above ongoing Transmission Schemes

being executedimplemented by Transmission Agencies The updated status on various ongoing transmission schemes for the current year as per the current information available is as follows - S No

Name of the Line Target Completion Date

Remarks

POWERGRID 1 400 kV Navsari ndash Kudus DC Line Sept- 2014 ROW problem 2 765kV SC Satna-Gwalior line

(359Km + 60Km DC Portion) Ckt-II August- 2014

3 765 kV Raigarh (Kotra) pooling Commissioned on

8

462nd OCC MINUTES

station -Champa Pooling station -Dharamjaygarh PS - 2nd ckt

21052014

4 765 kV Gwalior - Jaipur line (1st Ckt) SC

Dec 2014

5 765 kV Dharamjaygarh - Jabalpur Pooling Station DC line

Dec-2014

6 765 kV Wardha ndashNizamabad-Hyderabad DC

March-15

7 765 kV Narendra-Kolhapur DC March-15 8 HVDC Raigarh(Kotra)-Pugalur Bi-

pole March-15

9 400 kV Aurangabad - Boisar line DC line

Dec -2014

10 765 kV Aurangabad (PG) - Padghe (PG) DC

August-2014

11 800kV DC Champa ndash Kurukshetra Bipole

Jan 2015

12 765 kV DC Jharsuguda ndash Korba Dec 2014 13 2 X 765 kV SC Ranchi ndash Sipat Jan 2015 14 765 kV Wardha- Aurangabad DC

Line

Ckt I Commissioned on 010714 Ckt II Commissioned on 030714

15 765 kV Aurangabad- Solapur DC line

Dec 2014

16 765 kV Solapur-Pune line

Sept 2014

17 765KV Durg-Wardha DC Sept 2014 CHHATTISHGARH 1 LILO of 400 kV Korba west-

Khedamara at Marwa August 2014

2 400 kV DCDS Raipur(Raita)- Jagdalpur(DCDS)

March 2015

21 220 kV Korba-Bishrampur line (DCSS)

Sept 2014

22 220 kV DCDS lines Chhuri to Mopka (Bilaspur) (DCDS)

Nov 2014

26 LILO of 220 kV Raigarh-Budipadar at 400 kV PGCIL Ss Raigarh

Sept2014

28 LILO of 220 Korba (E)- Bishrampur line at 220 kV Churri Ss

Sept 2014

29 LILO of 220 kV Raigarh ndash Jindal (Tamnar) at Girwani 220 kV Ss

Sept 2014

GUJARAT 1 400 kV DC Kosamba-Chorania line

(Package I)(From Chorania SS to AP-54)

Aug -2014 Commissioned on 100314

9

462nd OCC MINUTES

2 400 kV DC Kosamba-Chorania line

(Package II)(From Kosamba SS to AP-54)

Aug -2014

3 400 kV DC Mundra-Zerda line No 1 Aug -2014 4 400 kV DC Mundra-Zerda line No 2 March-2015 5 400 kV DC Vadinar-Amreli line December -

2014

6 400kV Mundra-Hadala LILO to Halvad

August -2014

7 400 kV DC Amreli-Kasor line(Part-1) December-2014

8 400 kV Charanka- Veloda Oct 2014 MADHYA PRADESH 1 Chhegaon-Julwania 400 KV DCDS

Line OCT - 2014

2

Pithampur- Indore 400KV DCDS Line

August - 2014

Work of the line have been completed by MPPTCL feeder bay from Indore PGCIL is awaited

3 Satpura TPH-Ashta 400KV DCDS Line

December ndash 2014

MAHARASHTRA(STU)

1 400KV DC line from Koradi-II to Wardha SS(PG) DC

Oct- 2014

2 400 kV Akola-Taptiganga Sept 2014 3 400 kV Tiroda-Akola Dec - 2014 GUJARAT (IPTC route) by WR Transmission (Guj) Pvt Ltd

1 400 kV Rajgarh(PG)-Karamsad (GETCO) DC

Sept -2014

STERLITE (JTCL) 1 765 KvDhramjaygarh - Jabalpur (JTCL)

DC line May -2015 Severe ROW Problem

2 765 kV Jabalpur - Bina (JTCL) Sc May -2015 Severe ROW Problem STERLITE (BDTCL) 1 765 kV Bhopal - Indore (BDTCL) SC August-2014 2 765 kV Bhopal-Bhopal Commissioned on

160714 3 765 kV Dhule - Vadodara SC Oct - 2014 4 765 kV Vadodara - Dhule (BDTCL) SC Oct - 2014 5 765 kV Dhule - Aurangabad (BDTCL)

SC August-2014

RAICHUR SHOLAPUR TRANSMISSION CO LTD(RSTCL)

1 765 kV Raichur - Sholapur line 2nd SC

Commissioned on 29062014

10

462nd OCC MINUTES

It was suggested by WRLDC and constituents that important list of line will be sent by

each constituent to WRLDC and WRLDC will compile and furnish the list as per

priority of commissioning

The Sub-Committee noted and agreed as above

73 Commissioning of new Generating units in Western Region and the capacity expected to be commissioned during the current year 2014-15

The status regarding Generating units expected to be commissioned during the

current year 2014-15 is as below

Name of the Power Projects Unit No Capacity (MW)

Date of Commissioning Schedule Date

GUJARAT Bhavnagar Lignite TPP-JV I 250 August 2014 II 250 August 2014 UNO SUGEN 2 3825 July 2014 CHHATTISGARH Marwa 1 500 Sept 2014 2 500 Dec 2014 MAHARASHTRA Dhariwal 2 300 Synd On 23042014 CHANDRAPUR 8 500 Oct 2014 CHANDRAPUR 9 500 March 2015 KORADI 8 660 Oct 2014 KORADI 9 660 Jan 2015 PARLI 8 250 March 2015 MADHYA PRADESH Singhaji TPS 2 600 Oct-2014 Ms Jhabua Power Seoni 1 600 Dec ndash 2014 MB Power Anuppur 1 600 Sept ndash 2014 Jaiprakash Power Nigri 1 660 July 2014 Jaiprakash Power Nigri 2 660 Dec 2014 Moser Bear (Hindustan power) 1 600 Nov- 2014 Moser Bear (Hindustan power) 2 600 March 2015 Essar Concessional ampEssar Power 1 600 Oct 2014 Essar Concessional ampEssar Power 2 600 Dec 2014 BLA 2X4 90 March 15 Jhabua Power 1 600 Dec 2014 CENTRAL SECTORIPP KSK 2 600 August 2014 KSK 5 600 January 2015

11

462nd OCC MINUTES

ACBIL 1 300 March 2015 SASAN 5 660 July 2014 SASAN 6 660 August 2014 Sasan 4 660 Synchronized in May 2014

Sub-committee noted as above ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS (A) FOLLOW-UP ITEM NO 81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

All the constituents are requested to submit the CMP report for the First quarter

(April 2014 to June 2014) for the year 2014-15

The Sub-Committee members noted as above ITEM NO 82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR

Status of physical amp cyber security in Power Sector for the First quarter (April 2014 to

June 2014) for the year 2014-15 have not been received from some of the

constituents

The Sub-Committee members noted as above ITEM NO 83 PROCEDURE FOR CALCULATION OF TRANSMISSION SYSTEM

AVAILABILITY FACTOR FOR A MONTH AS PER CERC REGULATION 2014-19

Member Secretary WRPC informed that a procedure for calculation of

transmission system availability factor as envisaged in CERC Regulation 2014-15

was discussed in 461st OCC held at Raipur Various aspects were discussed and

finalized However there were concerns expressed by transmission licensee

regarding addition of 12 hrs to outage hrs after each tripping beyond admissible 2

tripping in a year as it will reduce availability below 95 Also concern was

expressed for multiplying outage hrs by 2 for line affecting generation Also

whether addition of 12 hrs is applicable to such lines affecting generation was

also expressed Whether these clauses are applicable to HVDC system was not

known Therefore all such concerns of transmission licenses have been taken up

with CERC for revision clarification

Meetings were held on 1st and 4th August 2014 with transmission licenses

regarding verification of data data formatting and sorting out various anomalies

and doubts for data from April to July 2014 for further processing at WRPC end

12

462nd OCC MINUTES

Member Secretary WRPC informed that certification for some transmission licensees

has already been done The certificate for PGCIL is to be issued as effect on

generation evacuation certificate from WRLDC is awaited

CM WRLDC requested all the transmission licensees to submit the data to WRLDC in

same format as submitted to WRPC

Representative from Transmission licensees agreed the same

The Sub-committee noted as above ITEM NO 84 IMPLEMENTATION OF RSD METHODOLOGY Shri Satyanarayan SE WRPC informed that GM (OSampC) NTPC HQ-I Mumbai vide letter dated 28072014 (copy enclosed at annexure 84) requested to call a meeting for resolvingclarification of methodology developed by WRPC The procedure for RSD framed by WRPC is enclosed at Annexure 84A SLDC MPPTCL Jabalpur informed that RSD was implemented for NTPC Mauda unit

on 18072014 but it was not more extended beyond 20072014 as no other major

beneficiaries agreed for extension

CE GETCO informed that intermittent rain profile in the different geographical area of

Gujarat amp increasing demand pattern didnrsquot permit them to take RSD of any NTPC

units as minimum of 3 days is required

Representative from SLDC Maharashtra also endorsed the Gujarat view points on

RSD

GM NTPC requested to the committee that if RSD wasnrsquot possible then at least

technical minimum schedule should be given

Member Secretary WRPC summarized the matter as follows

1 RSD was implemented for NTPC Mauda unit from 18072014 to 20072014

but it could not be extended due to increasing demand pattern amp uncertainty of

rain profile in the region

2 The method framed by WRPC shall be continued amp will be applied as and

when required

3 He requested constituents to schedule the NTPC generating units at its

technical minimum in case RSD is not feasible

The Sub-committee noted as above

13

462nd OCC MINUTES

ITEM NO 85 LOAD FORECASTING IN WESTERN REGION Background- As per the amended Indian Electricity Grid Code that is effective from 17th February 2014 the SLDCs SEB distribution licensees shall always restrict the net drawal of the State from the grid within the drawal schedule keeping the deviations from the schedule within the limits specified in the Deviation settlement mechanism regulations Therefore it is imperative that adequate attention may be paid towards load forecasting The matter was discussed in the past several OCC as well as in the 26th TCCWRPC board meeting wherein it was decided to create a task force for exploring development of a software for load forecasting A meeting was held on 03042014 under leadership of CE(SLDC) GETCO Gujarat at

Mumbai The outcome of the Meeting was as following

1 Short term action a) all the discoms were advised to provide maximum historical data b) Discoms have to bifurcate the geographical area in to zone and derive effect of temp rain festival on load

2 Long term action a) Provide computer base meters up to all the distribution feeders for close monitoring b) Provide weather sensors at various strategically important locations c) Formulation of forecasting desk (load amp RE) at SLDC level

The 2nd meeting regarding Load Forecasting Mechanism was held with members of WRPC WRLDC Western Region SLDCs amp State Discoms Forecasting Service Providers (FSPs) on 110614 at SLDC Vadodara Gujarat During the 460th OCC meeting CE SLDC GETCO informed that roadmap for implementation of pilot project amp main project has been prepared Budget proposal have already called from FSP amp they assured to submit till the end of the month For implementation of pilot project the Utility and their respective Pilot FSP are decided as tabulated below

Sr No STATE ndashSLDCDISCOM Pilot FSP

1 GUJARAT MS TESLA

2 MAHARASHTRA IIT MUMBAI

3 MADHYA PRADESH MS METEOLOGICA

4 CHHATISGARH MS SAS

5 GOA MS MARCADOS

6 DDDNH IITGANDHINAGAR

MP informed vide letter dated 27062014(copy enclosed at 85) that they have

already placed on order to Ms L amp T InfoTech on 12072013 for load forecasting

software project Therefore MP had requested to exclude them from pilot project

activities decided in earlier meetings

14

462nd OCC MINUTES

462nd OCC Discussions- State wise status is as under -

bull CE SLDC informed that Gujarat has prepared the NDA and forwarded to TESLA for signing and the same was signed by TESLA New Zealand office and their Mumbai office shall forward the same to SLDC Gujarat Thereafter Input data shall be provided and ID shall be provided to TESLA so as to start forecasting by them

bull SLDC Gujarat vide letter no SLDCCEMIST-6458 dtd 270614 has conveyed to all WR Nodal SLDC coordinators regarding progress of load forecasting pilot project Thereafter also e mailed on date 2082014 to all Nodal SLDC for submission of status Report on Pilot Load Forecasting Project However no proper response is received so far

bull MP SLDC conveyed that they have already awarded contract for load forecasting and the same is expected to be available by year end Therefore MP shall not participate in the present scheme

bull SLDC Chhattisgarh representative informed that matter has been taken with discom Chhattisgarh Discom were facing difficulties to contact with coordinator of Ms SAS

CE SLDC Gujarat being a group leader stated that Chhattisgarh shall intimate to them for further needful and would help them in this matter

bull Maharashtra SLDC informed that there was a meeting held on 09082014 with IIT Bombay where availability of data has been discussed amp one more meeting will be held on 22082014 outcome of the same will be intimated in next OCC meeting BEST amp TATA are already having such forecasting system

bull No one from GOA has attended last meeting even though GOA was forwarded copy of MOM Due to non availability of any coordinator details of GOA it was not possible to contact them However Ms Marcadose has also conveyed that he has not been contacted by Goa

bull No one from DDDNH has attended last meeting even though DD DNH was forwarded copy of MOM However IIT Gandhinagar conveyed that they were not been contacted by DD DNH

Member Secretary WRPC informed that a letter to DD DNH amp GOA has been written

from WRPC secretariat regarding implementation of ADMS Load Forecasting amp

telemetry status He further requested the constituents to implement the decision

taken in earlier meeting of load forecasting

OCC suggested that the next load forecasting meeting may be held at DDDNH

The Sub-committee noted as above

15

462nd OCC MINUTES

ITEM NO 86 NEED OF COOPERATION FROM WRLDC IN REAL TIME

bull CE SLDC informed that at present APL is under their control area and embedded scheduling model is used It may be noted that for units 78amp 9 at APL Gujarat has no share (all are for NR beneficiaries)There have been occasions when units 78amp 9 have tripped (given at annexure) Since APL is shown as embedded in Gujarat WRLDC requested Gujarat to reduce overdrawl when APL units 78amp 9 trips Hence Gujarat has to pick up state generationcostlier generation for no fault of Gujarat

bull Further lines are opened to curtail overdrawl when Gujarat is not faulty Gujarat is seen as overdrawing (due to embedded scheduling of APL) when APL trips

bull To complicate matters the scenario coupled with wind variations state generation has to be constantly varied to avoid overdrawl

Gujarat requested followings-

1 When large sized units (APL units 78amp 9) trips then scheduling of Gujarat should be changed with immediate effect OR Gujarat should not be pursued for deviation correction to the extent of schedule of units tripped at APL units 78amp 9 OR Schedule of Gujarat from other central sector stations should be changed as per their request with immediate effect

2 APL units 78amp 9 should be made a separate control area 3 Under above circumstances transmission lines should not be opened

due to default by APL as these affects Gujarat without any fault of their own Further this was done without informingtaking SLDC into confidence It was clear from the discussions that Gujarat Discoms are put to unnecessary financial implications WRLDC clarified that 220 KV Dehgam- Khanpur Line no1 was opened due to frequency touching 493 Hz and control of overdrawl was taken as security measure WRLDC agreed to inform CE SLDC whenever such discussions are taken and agreed to take care in future

The Sub-committee noted as above

ITEM NO 87 GUIDE LINES FOR SPLIT BUS OPERATION AT SSP RBPH SWITCHYARD CE SLDC Gujarat vide letter dated 07082014 informed that a meeting was held on

220514 at Kevadia Colony SSP regarding split bus arrangement at SSP RBPH

16

462nd OCC MINUTES

switchyard and subsequent discussions during 55th meeting of PSC of NCA held in

Vadodara on 140714 the guidelines for the same had been prepared in consultation

with GETCO protection wing and sent vide mail dated 23072014 However the same

has been attached herewith as Annexure-87 It was clarified during discussion that

split bus operation would be used only as per requirement and will not be a permanent

arrangement

The Sub-committee noted as above

ITEMS FROM WRLDC

1 OPERATION OF GRID AT HIGH FREQUENCY ( gt 505 HZ) The onsetrevival of monsoon in the last fortnight of July 2014 has reduced the demand in Western Region However the demand would pick up sharply during the dry spell in September and October months Presently the major State Central Sector IPP generators in Western Region that are facing coal shortage are tabulated as under S No Name of power

stations Unit Reason for

outage 1 VSTPS 2 (210 MW) Coal Shortage 2 VSTPS 5 (210 MW) Coal Shortage 3 Singhaji 1 (600 MW) Coal Shortage 4 SGTPS 4 (210 MW) Coal Shortage 5 JP Bina 2 (250 MW) Coal Shortage 6 Bhusawal 2 (210 MW) Coal Shortage 7 Parli 4 (210 MW) Coal Shortage 8 India Bulls 1 (270 MW) Coal Shortage Likewise several Gas Power Stations in Western Region are facing fuel shortage Under the above circumstances it is desirable that precious fuel optimally utilized to maintain adequate stock for the dry spell In the month of July 2014 the grid frequency remained above 5005 Hz for more than 15 of the time while it remained below 499 Hz for more than 34 of the time Operation of high frequency is unnecessary loss of fuel that could have been conserved and utilized during low frequency regime

The Sub Committee noted the same

17

462nd OCC MINUTES

2 OBSERVATION OF INTRA-PLANT MODE OF OSCILLATIONS (097 HZ) WITH POOR DAMPING ON 10TH AND 11TH JUNE 2014 AND LOSS OF 1800 MW IN MAHARASHTRA SYSTEM DUE TO POWER SWING UNDER N-1 CONTINGENCY ON 20TH MAY 2014 The issue of Intra plant mode of oscillations with poor damping as observed during the grid event on 10th and 11th June 2014 was discussed during the 461st OCC meeting Similar oscillations were again recorded on 11th July 2014 GM WRLDC informed that they have written to generators seeking details of MW fluctuations PSS status etc and requested constituents to share the dataHe requested that constituents may share PMU data also CESLDC Gujarat informed that they are proposing PSS tuning with consultants from IITs in their system EE SLDC Maharashtra informed that APL-Tiroda has recently tuned PSS at Tiroda units by OEM

It was once again requested constituent to furnish information as designed by WRLDC The Sub Committee noted the same

3 FREQUENT TRIPPING OF 765 KV SATNA-SASAN LINE

WRLDC informed that 765 kV Sasan-Satna Line has tripped on three occasions

while 240 MVAr Bus Reactor at 765 kV Satna tripped on one occasion The

tripping occurred due to protection mal-operation at Satna end during stability test

for the 765 kV Bus-1 The details of the tripping is given below

The above OV at Sasan end could have been avoided if the Line Reactor of this line at Sasan end had been commissioned The restoration of the tripped circuit also was considerably delayed in the absence of Line Reactor at Sasan end

Elements Date and Time of Tripping

Date and Time of Restoration

Remarks Receipt of DREL at WRLDC Satna Sasan

765 kV Sasan-Satna 2

25-07-14 1026

25-07-14 1155

Protection Mal-Operation DT at Sasan End on OV as line remain hanging from Sasan end

No Yes

765 kV 240 MVAr Bus Reactor at Satna

25-07-14 1026

25-07-14 1139

Protection Mal-Operation DT at Sasan End on OV as line remain hanging from Sasan

No Yes

765 kV Sasan-Satna 2

25-07-14 1229

25-07-14 1342

Line got charged from Satna and synchronized at Sasan No Yes

18

462nd OCC MINUTES

end but immediately DT was received at Sasan from Satna and Line tripped Prior to tripping voltage at Sasan end was 796 kV

765 kV Sasan-Satna 2

25-07-14 1628 -

Charging attempt was taken from Satna end but line tripped before synchronization at Sasan end due to DT from Satna Open end voltage at Sasan 826 kV for the line

No Yes

Representative from Sasan UMPP informed that with regards to the 765 kv Line and

Bus reactors all the material required for completion of works have been received at

site

Line reactor and bus reactor would be commissioned by Aug14 and Sep 14

respectively

The Sub Committee noted the same 4 SPS AT SIPAT

The SPS scheme implemented at NTPC Sipat has been received at WRLDC It is observed that a time delay of 15sec is provided to unload units 1 2 4 amp5 each by 150MW if any ICT s load exceeds 130 of rated load It was conveyed that if ex-bus generation at Sipat is more than 2200 MW immediate unloading of units may be done and the intentional delay which is required to prevent mal-operation may be 45 second instead of 15 second

NTPC Sipat representative agreed to implement the same accordingly The Sub Committee noted the same

5 COMMISSIONING OF SPS AT 400220 KV VAPI During the special WRPC meeting on 18032013 at Dadra an SPS for automatic load shedding subsequent to tripping of 400220 kV ICT at Vapi was approved as under It was decided that POWERGRID would extend trip signal from Vapi ICTs to the requisite feeders

Contingency Envisaged SPS action

Identified Feeders

Tripping of any one ICT at 400200 Vapi Sub-Station

Automatic Load Shedding of 100MW

DNH 1) 66 kV-Kharadpara-Rakholi-I 50 MW 2) 66 kV Khadoli-Khadoli-3 30 MW DD 1) 66 kV Magarwada-Kachigam 60 MW

19

462nd OCC MINUTES

It was felt that due to change in topology loading in ICT is not critical however SPS may be in place as defense mechanism in case of any emergency

DD amp DNH representative were absent in the meeting The Sub Committee noted the same

6 ADDRESSING HIGH VOLTAGE CONDITION IN SSP amp NEARBY AREA

High voltage condition is being observed at SSP and nearby area in off peak period particularly between 2300 hrs at night to 0500 hrs in the morning Also on many occasions the system operator is compelled to hand trip the 400 kV lines emanating from SSP to control over voltage Summary for the month of Julyrsquo14 is given under

Sl No 400 kV Line DatailsFrom To

Time Date Time Date 1 SSP-RAJGARH-I 0009 19-Jul-14 0730 29-Jul-14 2 SSP - RAJGARH-II 0406 16-Jul-14 1016 18-Jul-14 3 SSP-DHULE-I 1310 22-Jul-14 0953 23-Jul-14 4 SSP - DHULE - II 1533 15-Jul-14 0734 18-Jul-14 5 SSP - DHULE - I 1703 10-Jul-14 1100 11-Jul-14 6 SSP-DHULE-I 1712 28-Jul-14 0933 31-Jul-14 7 SSP - DHULE - II 1730 19-Jul-14 0917 20-Jul-14 8 SSP - DHULE - I 1757 18-Jul-14 0935 19-Jul-14 9 SSP-DHULE-II 1809 21-Jul-14 0914 22-Jul-14 10 SSP-DHULE-I 1815 30-Jun-14 0542 1-Jul-14 11 SSP-DHULE-I 1819 20-Jul-14 0858 21-Jul-14 12 SSP-DHULE-II 1825 8-Jul-14 0949 9-Jul-14 13 SSP - DHULE - II 1831 11-Jul-14 1007 13-Jul-14 14 SSP - DHULE - I 1838 1-Jul-14 0556 2-Jul-14 15 SSP - DHULE - I 1848 9-Jul-14 0912 10-Jul-14 16 SSP - DHULE - I 2136 13-Jul-14 0850 14-Jul-14 17 SSP-DHULE-II 2201 23-Jul-14 0945 28-Jul-14

Also it has been observed that Wanakbori TPS injects around 60 MVAr per unit even when voltage at Wanakbori is above 420 kV for nearly 100 of the time Further envisaged bus reactors at Rajgarh amp Dhule are yet to be commissioned Hence in view of system reliability it is advisable to explore all possibilities to contain high voltage condition in SSP and nearby area The following actions need to be taken to address the situation

bull Operating RBPH machines at SSP in synchronous condenser mode bull Absorption of MVAr by Wanakbori (WTPS) units bull The commissioning of Reactors at 400 kV Rajgarh may be expedited by

WRTS-2

20

462nd OCC MINUTES

bull The commissioning of Reactors at 400 kV Dhule may be expedited by MSETCL CE SLDC GETCO agreed for looking into absorption of MVAR at Wanakbori

7 IMPLEMENTATION OF THE REVISED AUFLS IN DD AND DNH Representatives from the DD and DNH intimated during the 459th OCC meeting that the tendering process was stalled because of general elections (election code of conduct was in force) amp action would be initiated post the elections Member Secretary WRPC vide letter dated 01082014 took up the matter with Secretary (P) DDDNH (copy enclosed) DD amp DNH representative were absent in the meeting to comment

The Sub Committee noted the same 8 ADMS(AUTOMATIC DEMAND MANAGEMENT SCHEME) IMPLEMENTATION

AS PER SEC 542 OF IEGC The format for reporting the progress of implementation of the ADMS in Western Region States was given as part of MoM of the 461st OCC meeting All utilities may like to furnish the updated status to WRPCWRLDC as per the above format It is understood that MP has submitted its detailed action plan in the form of an affidavit to CERC for implementation of ADMS However SLDC MPPTCL is requested to furnish data to OCC forum in the above format

The Sub Committee noted the same

9 STATUS OF TELEMETRY IN WESTERN REGION

In the 460th amp 461st OCC meetings the status of telemetry in Western Region was discussed in detail It was also highlighted that the Honrsquoble CERC vide its order in petition SM0072014 issued Notice under section 142 on several constituents of Western Region All the constituents had assured to address the telemetry issues within a month or two The telemetry status as on 4th August 2014 is tabulated below

21

462nd OCC MINUTES

a Maharashtra The non-availability of telemetry is 583 for sub-stations amp 18

for generating stations This is a matter of serious concern The issue has been

discussed in several OCC meetings since last 8 months As per the information available with WRLDC telemetry is not available from the following generating stations at 400 kV level

bull Kaparkheda bull Deepnagar

Also telemetry is not available from the following sub-stations at 400 kV level bull Warora bull Lonikhand(New) bull Chandrapur-stg-II

As per the information available with WRLDC telemetry is intermittent at 4 generating stations viz

bull Jaigad bull Paras-extension bull Trombay bull Deepnagar GCR

Also telemetry is intermittent at following sub-stations at 400 kV level bull Bableswar-II bull Deepnagar SS bull Dhule bull Khaparkheda bull Kolhapur-3

22

462nd OCC MINUTES

bull Sholapur-3 SLDC MSETCL Maharashtra informed that telemetry has been established for 46 locations

a Chhattisgarh100 available b Madhya Pradesh As per the latest status telemetered data is available from

100 of the locations c Gujarat As per the latest information submitted to CERC the non-availability of

telemetry data from Gujarat as on date is 33 for substations As per the information available with WRLDC Telemetry is not available form 2 number of 220 kV sub-stations viz bull Bhatiya bull Mokha Gujarat intimated in 460th OCCM that these sub-stations were ready but lines were in construction phase Also telemetry is intermittent from the following SS in Gujarat bull 220 kV Navasari (GETCO) ss bull 400 kV Kasor ss

SLDC GETCO may expedite amp resolve the issue for the above stations at the

earliest d Goa As per the latest information telemetry is not available form 2 number of

220 kV sub-stations viz Amona amp Cuncolim Telemetry is intermittent from 220 kV Tivim Ponda Xeldam amp 110 kV Kadamba amp Verna Thus Non availability of telemetry from Goa is 100 Goa to resolve the issue on war footing

e DD Telemetry is not available form 1 number of 220 kV sub-station viz Magarwada Thus availability of telemetry from DD is NIL DD representative intimated in 460th OCCM that RTU was being installed at 220 kV Magarwada SS under the new SCADAEMS up gradation project amp it would take 3 months to complete the work DD representative was absent in 461st OCCM so information on progress in this matter is yet to be received from DD DD to expedite the issue for the above station(s) on war footing

f DNH Telemetry is not available form 2 number of 220 kV sub-station viz Kharadpara amp Khadoli Thus availability of telemetry from DNH is NIL DNH representative was absent in 460th amp 461st OCC meetings to comment on the issue DNH to resolve the issue for the above station(s) on war footing

g ISGS As per the latest information submitted to CERC the non-availability of telemetry data from ISGS generating stations as on date is 125 Telemetry is intermittent from 220 kV Kawas(NTPC) station Power Grid NTPC to expedite

23

462nd OCC MINUTES

NTPC amp Power Grid agreed to expedite the matter during 460th amp 461st OCC meetings of WRPC However no progress has been reported

h POWERGRID As per the latest information submitted to CERC the non-availability of telemetry data from Power Grid substations as on date is 111 Telemetry is intermittent from the following ss

o 765 kV Kotra SS o 765 kV Dharamjaigad o 765 kV Tamnar SS o 400 kV Navasari SS

Additional points

a) In the report available on the WRLDC website it is clearly indicated that Communication link between all SLDC to WRLDC is in radial mode (without redundancy) and any failure in any equipment Fibre leads to total data black out Power Grid to ensure that links are on two channels

i IPP As per the latest information submitted to CERC the non-availability of

telemetry data from IPP generating stations as on date is 15 Telemetry is intermittent from Jindal amp Essar Mahan GMR Raipur JPL ESSAR Mahan GMR Raipur to expedite

Additional Points

bull Adani(APL) Tiroda There is only one channel emanating from Adani Tiroda Recently there was a case when entire station was not visible due to non-Availability of that channel

bull CGPL Mundra There is only one channel emanating from CGPL Mundra In case of non-availability of data leads to non-visibility of 4000 MW generation which creates difficulty in Grid Operation

bull Sasan There is only one channel emanating from Sasan In case of non-availability of data leads to non-visibility of 2400 + MW generation which creates difficulty in Grid Operation

bull APL Mundra There is only one channel emanating from CGPL Mundra In case of non-availability of data leads to non-visibility of 4000 + MW generation which creates difficulty in Grid Operation

The above issue was already discussed in 460th OCCM The utilities (APL SASAN CGPL) may kindly update the progress in this matter

24

462nd OCC MINUTES

j PMU data Regarding Satna to WRLDC link WRTS II informed that work is under progress for laying of OPGW from Satna 220 kV (MPPTCL) to Satna 765 kV (PG) and it may take 3-4 monthsrsquo time It was suggested that till such time the OPGW operation is in place WRTS-II may explore leased line connectivity at the earliest Power Grid to expedite

The Sub-Committee noted the same amp agreed to make availability of telemetry in their concerns and the report be updated position in next meeting

The Sub Committee noted the same

10 BLACK OUT AT NTPC KAWAS POWER STATION On 11th July 2014 Kawas Gas generating complex got blackout due to tripping of evacuation lines one by one within a short span of 30 minutes The complete loss of evacuation lines occurred at 0117 Hrs The blackout has resulted in tripping of GT1A GT1B and ST causing 320 MW generation loss in the area It was reported that weather condition was foggy with slight drizzling was in the area

Line Time of Tripping Kawas End Remote

end Restoration Time

220 kV Kawas-Navsari 1 1246 AM R phase to EF Fault location 2 km R Phase to EF 122 AM

220 kV Kawas ndashNavsari 2 112 AM R phase to EF Fault location 2208 km

R Phase to EF 347 AM

220 kV Kawas-Haldarwa 1 107 AM R phase to EF Fault location 16 km

R Phase to EF 246 AM

220 kV Kawas-Haldarwa 2 108 AM R phase to EF Fault location 2 km

R Phase to EF 304 AM

220 kV Kawas-Icchapur 1 108 AM B phase to EF B Phase to EF 301 AM

220 kV Kawas-Icchapur 2 108 AM B phase to EF Fault location 356 km

B Phase to EF 331 AM

220 kV Kawas-Vav 1 117 AM No tripping Hand Tripped later Line Tripped 225 AM

220 kV Kawas Vav 2 117 AM Y Phase to EF Y Phase to EF 317 AM

Even the line restoration has failed on several attempt as the lines were not holding due to persisting fault Such an event of total loss of evacuation lines from a generating station resulting in blackout scenario is a matter of serious concern Representative from WRTS-II stated that being highly industrial corridor the said lines are suffering with smog and informed that they are in process of replacement of existing insulator with polymer type insulators Order has been already placed amp it may be completed within next two to three month The Sub Committee noted the same

25

462nd OCC MINUTES

11 OPERATING PROCEDURE OF WR-2014 As discussed in 460th OCCM of WRPC the operating procedure of Western Region 2014 has been updated on 31072014 and the same has been uploaded on WRLDC web site at the following link httpwwwwrldccomdocsWR_OPERATING_PROCEDURE_2014pdf

The Sub Committee noted the same 12 MOCK BLACK START EXERCISE

MP representative informed that DG set at Bargi will be ready within a week time amp mock black start exercise can be performed in October 2014

NTPC Gandhar has successfully performed the mock black start exercise on 27072014

The Sub Committee noted the same

13 REVIEW OF LIST OF FEEDERS IDENTIFIED FROM ISGS LEVEL IN CASE OF

THREAT OF GRID SECURITY DUE TO LARGE DEVIATION

During the 461st OCC it was decided that list of feeders identified for load

control under emergency measure for safeguarding grid security would be

reviewed in a special meeting The list is yet to be reviewed GM WRLDC

requested SLDC to review the same amp submit Till such time the existing list will

continue

The Sub Committee noted the same 14 IMPLEMENTATION OF VOLTAGE AND TIME GRADING ON OV RELAYS TO

PREVENT TRIPPING OF MULTIPLE EHV LINES EMANATING FROM SINGLE NODE ON HIGH VOLTAGE

During the 461st OCC it was informed by Power Grid representative that they have already implemented voltage grading in various line emanating from the same node (matter has not come in the MoM) Power Grid amp other utilities may kindly intimate the present status of voltage grading at their respective sub-stations Member Secretary WRPC suggested to take the matter in PCM

The Sub Committee noted the same

26

462nd OCC MINUTES

15 INADEQUATE PARTICIPATION OF GENERATORS ENVISAGED SPS FOR SR-NEW GRID OPERATION

The details of SPS operation from 1st July 2014 till 6th August 2014 is as under

Sl No Date SPS No Condition 1 01 July 2014 SPS-1 613 SholapurRaichur DC gt1000 MW 2 01 July 2014 SPS-1 1752 SholapurRaichur DC gt1000 MW 3 04 July 2014 SPS-1 0406 SholapurRaichur DC gt1000 MW 4 09 July 2014 SPS-1 350 SholapurRaichur DC gt1000 MW 5 14 July 2014 SPS-1 506 SholapurRaichur DC gt1000 MW 6 17 July 2014 SPS-1 2204 SholapurRaichur DC gt1000 MW 7 23 July 2014 SPS-1 547 SholapurRaichur DC gt1000 MW 8 26 July 2014 SPS-1 1201 SholapurRaichur DC gt1000 MW 9 30 July 2014 SPS-1 902 SholapurRaichur DC gt1000 MW 10 30 July 2014 SPS-1 1954 SholapurRaichur DC gt1000 MW

During the last OCC the matter was discussed and it was suggested by Member Secretary WRPC to have Special Protection Sub-Committee meeting to discuss progress of implementation of the revised SPS at Solapur (for WR-SR interconnection) amp extension of signal from Solapur to additional generators in WR so as to address the issue of inadequate participation of WR Member Secretary WRPC requested to all generators who are having more than one units shall participate in implementation of SPS for SR-NEW grid operation

The Sub-committee noted the same ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING OCC reviewed the meeting roaster and finalized sheet is enclosed at Annexure-10

Due to non-readiness of BDTCL to host the next meeting NTPC KawasGandhar

would host the 463rd OCC meeting The exact date amp venue details will be intimated

separately

SlNo Organisation Name amp Designation E-mail Mobile

I WRPC1 Shri SD Taksande MS ms-wrpcnicin 98208783842 Shri Satyanarayan S opc-wrpcnicin 92233999383 Shri LKS Rathore DD lksr_2000yahoocom 98333718444 Shri Ratnesh Kumar Yadav AD ratneshkumar7437gmailcom 8903929150

II MSETCL MSEDCLMahaGenco5 Shri VD Pande EE vasantpandemahasldcin 98207419416 Shri Ajit V Pachori EE ajitpachorimahagencocoin 9619461420

III MPPTCL MPPGCL7 Shri KK Prabhakar SE sldcmpjbpyahoocom 94258052678 Shri SK Mehta EE mehtasanjay67yahooin 9425805017

IV CSPTCL CSPGCL9 Shri BR Soni Addl CE balramsonirediffmailcom 942518880710 Shri Arvind Mukherjee gccraipurgmailcom 9429227699

V GETCO GSLDC GSECL11 Shri BB Mehta CE cesldcgujgmailcom 987920073612 Shri BM Shah DyEE demissldcgetcogebmailcom 9925212836

VI WRLDC POWERGRID13 Shri P Mukhopadhyay GM prithwishmukhopadhyayposocoin 986943807314 Shri VK Shrivastava AGM vkspowergridindiacom 986945022115 Smt Sachala Mishra CM mishrasachalagmailcom 986945022316 Smt Pushpa S CM pushpa_seshadrihotmailcom 986940448217 Shri Aditya P Das Dy Mgr aditya19227gmailcom 9869404569

POWERGRID REGION-I18 Shri Anil Darode 70207powergridindiacom 942230180519 Shri Manu Sinha 02457powergridindiacom 9425293864

POWERGRID RETION -II20 Shri Abhinav Verma stawr2gmailcom 942850406221 Shri Anand Dubey ananddubey_pgrediffmailcom 9428504065

VII NTPC22 Shri PB Behre GM pbbeherentpccoin 900449708823 Shri Hari Nath AGM harinath01ntpccoin 900449713324 Shri SK Shrivastava AGM sksrivastava09ntpccoin 942517806925 Shri Amir Kr Singh SM aksingh01ntpccoin 942414081426 Shri Amitabh Kumar amitabhkumarntpccoin 9425178122

VIII TATA POWER27 Shri RM Sankhe GM rmsankhetatapowercom 909900654128 Shri PR Gadave AGM prgadavetatapowercom 9223553341

IX NHDC 29 Shri Anurag Seth CE annu226hotmailcom 9425326135

LIST OF PARTICIPANTS OF 462nd OCC MEETING OF WRPC HELD ON 11082014 AT TARAPURAnnexure-I

30 Shri Vinod Kumar Singh vinodnhdcrediffmailcom 9425925251

X APL 31 Shri CS Bobade GM chandrashekharbobadeadanicom 8980802255

XI RINFRA32 Shri SG Zirpe GM sachinzirperelianceadacom 932260763033 Shri Sanil C Namboodiripad sanilnamboodiripadrelianceadacom932104697434 Shri Subrata Das subratakudasrelianceadacom 932093072235 Shri Ishan Roy Asst Mgr ishanroyrelianceadacom 9860027348

XII KSK Mahanadi36 Shri Sudarshan B Reddy sudarshanreddybkskcoin 9000377721

XIII NPCIL37 Shri Mandeep mandeepnpcil 904991887038 Shri JS Choubey jschoubeynpcilcoin 942882191839 Shri Ritesh Chandra Singh rcsinghnpcilcoin 8007991744

XIV ESSAR 40 Shri OJ Saxena Sr Mgr osaxenaessarcom 987910126841 Shri Kamlesh Garg kamleshgargessarcom 987910284942 Shri Sarabjeet Singh sarabjeetsinghessarcom 750957010543 Shri Ashwin Ande ashwinandeessarcom 9909993594

XV JPL44 Shri RK Srivastava AGM rkshrivastavajindalpowercom 9329445016

XVI TORRENT POWER45 Shri Kamal K Vyas kamalvyastorrentpowercom 997407965746 Shri Pramod G Patel AGM pramodpateltorrentpowercom 9824370005

XVII NCA47 Shri Naveen Nath Das emc_ncarediffmailcom 9425053309

XVIII STERLITE GRID LTD48 Shri Sachin S Deshpande GM sachindeshpandesterlitecom 8966903047

XIX LANCO AMARKANTAK POWER LTD49 Shri BN Panda pandabnlancogroupcom 769770301550 Shri Anil Sharma anilshlancogroupcom 9560258009

XX KWPCL51 Mis Smruti R Nayak DGM smrutinayakavanthapowercom 9424176680

XXI MB POWER LTD 52 Shri Sandeep Kumar Gupta sandeepguptahpplin 9582896418

Anaulagnak 21

maah jaUlaa[- 2014

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5020 Hz BETWEEN 1700 Hrs amp 1800 Hrs Hrs ON 27072014

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4962 Hz BETWEEN 1900 Hrs amp 2000 Hrs Hrs ON 25072014

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4993 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5036 Hz AT 130344 Hrs ON 23072014

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4939 Hz AT 194315 hrs Hrs ON 25072014

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS JULY 2014 JUNE 2014 MAY 2014

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 008 023 000

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 314 476 093 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 3129 3216 2155 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 5016 4536 5319

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1533 1749 2433

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING JULY 2014

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

Voltage Profile during the month of July 2014

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 420 402 420 404 433 411 424 424 417 400 420 403 422 407 408 3902 417 398 420 400 431 407 424 424 417 401 427 418 421 409 410 3943 417 393 419 397 432 408 420 396 417 400 425 419 422 408 407 3934 416 398 419 401 434 412 422 402 417 400 426 421 418 406 411 3965 417 400 419 403 433 414 424 424 417 403 424 419 417 406 410 3996 420 406 422 408 438 411 421 402 419 407 427 421 422 412 409 3897 412 396 419 402 428 413 420 399 414 401 423 419 417 409 409 3968 418 400 421 410 433 400 424 400 416 400 425 419 422 400 410 3949 418 412 421 410 433 413 424 410 416 408 425 419 422 412 410 394

10 415 399 417 403 435 415 400 400 418 404 424 421 422 414 410 41111

स नक Annex-23

िभलाईBhilai

धल असोज कासोरKarad Dhule Asoj Kasor

इदौर इटारसी कराडIndore Itarsi

जतपरJetpur

11 416 402 423 407 436 416 422 407 416 405 425 421 423 413 410 39712 419 400 422 406 436 417 400 400 419 403 426 422 423 413 410 39713 415 400 422 410 437 417 400 400 417 406 425 421 422 414 411 39514 416 398 423 409 439 416 400 400 419 404 424 421 422 413 412 39815 420 403 423 408 437 413 428 401 418 404 426 422 423 413 410 39816 423 408 426 411 437 413 429 403 421 406 428 424 423 415 413 40017 421 404 424 407 436 416 400 400 419 408 423 414 423 414 411 39818 421 404 424 407 436 416 400 400 420 406 427 423 423 414 411 39819 423 407 425 410 434 415 425 411 424 405 428 425 424 416 422 39520 421 407 424 410 420 420 427 410 421 407 427 424 423 416 417 39621 421 406 424 411 420 420 400 400 420 402 428 425 426 418 413 39222 421 407 426 413 420 420 400 400 419 401 428 425 428 420 412 39623 422 409 427 410 419 415 415 402 420 403 425 419 428 420 412 39624 420 406 425 409 420 420 400 400 420 404 429 426 427 416 409 39625 422 401 421 404 420 420 400 400 424 402 428 424 423 415 415 39726 420 402 421 406 431 419 400 400 422 403 428 423 422 413 415 40027 417 404 422 407 434 416 423 407 421 405 428 424 422 413 416 40128 419 403 421 407 437 416 431 408 423 406 428 426 423 415 415 40229 419 403 420 408 437 415 400 400 421 406 429 426 423 416 415 39930 421 404 422 406 438 415 400 400 423 404 430 426 426 415 420 40331 420 395 420 402 431 406 428 403 422 403 429 425 423 414 419 398

423 393 427 397 439 400 431 396 424 400 430 403 428 400 422 389

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 418 404 411 395 423 406 430 406 789 752 788 757 787 756 791 7662 419 397 411 393 423 403 431 404 772 748 791 756 786 750 793 7553 416 402 411 397 421 397 425 399 772 748 780 751 781 757 791 7634 417 404 409 396 420 415 428 406 772 748 786 757 780 755 791 7655 418 404 418 400 421 404 427 407 772 748 796 755 796 765 802 7726 419 408 416 402 424 410 429 413 789 752 797 768 796 765 799 7757 414 406 407 397 420 403 426 407 789 752 776 758 777 757 784 7658 418 408 411 388 422 400 429 400 789 752 786 767 783 746 790 7719 412 401 403 386 422 405 429 408 789 752 781 761 772 745 783 76010 413 403 402 394 420 404 424 406 789 752 792 764 774 755 785 765

Bina Gwalior Nagda Khandwa Sipat

बना वािलयरिसविननागदावािलयर बनाBina

िसपतखडवाseoni Gwalior

10 413 403 402 394 420 404 424 406 789 752 792 764 774 755 785 76511 415 407 403 395 421 407 426 410 789 752 790 774 785 758 790 77212 418 406 407 392 422 404 427 404 789 752 796 769 784 756 796 76913 418 406 407 392 421 408 427 411 789 752 796 769 784 756 796 76914 419 410 409 397 423 406 428 409 789 752 784 768 786 763 792 77415 419 404 408 391 424 407 429 408 789 752 789 763 786 750 791 76416 424 414 408 400 427 411 431 413 789 752 792 766 785 767 797 77917 421 410 411 399 424 407 432 409 789 752 788 762 789 766 795 77618 423 412 414 396 424 407 432 409 789 752 783 770 796 765 801 77719 424 411 410 396 426 411 431 413 789 752 791 770 788 764 803 77720 425 411 411 396 424 410 428 414 789 752 786 763 789 760 800 77221 422 412 410 395 424 409 428 413 789 752 784 760 788 763 796 77522 423 416 414 402 424 410 429 414 789 752 791 774 794 773 801 78423 425 413 418 402 424 410 430 412 787 750 785 770 798 780 804 78324 422 411 411 397 425 409 431 415 789 752 790 772 791 773 801 78125 421 410 405 396 423 403 429 409 789 752 784 770 794 767 798 77726 421 410 409 395 423 404 427 409 789 752 792 773 789 767 799 77827 423 412 413 399 420 404 428 409 789 752 794 766 797 770 808 78028 422 411 411 399 421 405 428 410 789 752 789 763 794 770 793 77029 419 409 411 397 423 406 430 414 789 752 794 771 795 767 796 77430 422 409 413 398 420 404 430 413 788 753 796 766 799 766 799 77331 420 404 409 395 421 397 429 411 789 752 787 764 792 759 795 767

425 397 418 386 427 397 432 399 789 748 797 751 799 745 808 755

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Jul-14 0 0 0 0 0 0 0 02 02-Jul-14 0 0 0 0 0 0 0 03 03-Jul-14 0 0 0 0 0 0 0 04 04-Jul-14 0 0 0 0 0 0 0 05 05-Jul-14 0 0 0 0 0 0 0 06 06-Jul-14 1 67 0 0 0 0 0 07 07-Jul-14 0 0 0 0 0 0 0 08 08-Jul-14 1 278 0 0 0 0 0 09 09-Jul-14 0 0 0 0 0 0 0 0

10 10-Jul-14 1 565 0 0 0 0 0 011 11-Jul-14 0 0 0 0 0 0 0 012 12-Jul-14 0 0 0 0 0 0 0 013 13-Jul-14 3 758 0 0 0 0 0 014 14-Jul-14 0 0 0 0 0 0 0 015 15-Jul-14 0 0 0 0 0 0 016 16-Jul-14 2 2127 NIL NIL NIL 017 17-Jul-14 0 0 0 0 0 0 0 018 18-Jul-14 1 08 0 0 0 0 0 019 19-Jul-14 0 0 0 0 0 0 0 020 20-Jul-14 0 0 0 0 0 0 0 021 21-Jul-14 0 0 0 0 0 0 0 022 22-Jul-14 0 0 0 0 0 0 0 023 23-Jul-14 0 0 0 0 0 0 0 024 24-Jul-14 0 0 0 0 0 0 0 025 25-Jul-14 0 0 0 0 0 0 0 026 26-Jul-14 0 0 0 0 0 0 0 027 27-Jul-14 0 0 0 0 0 0 0 028 28-Jul-14 0 0 0 0 0 0 0 029 29-Jul-14 0 0 0 0 0 0 0 030 30-Jul-14 0 0 0 0 0 0 0 031 31-Jul-14 0 0

Max 3 758 0 0 0 00 0 0Total 9 24917 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month July 2014

Recommonded Load relief at 492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE 25

POWER CUTRESTRICTIONS IN WESTERN REGION FOR THE MONTH OF JULY-2014

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply(DLF)

01072014 31072014 2343 2105 2300

21 Three-Phase Supply(Irrigation)

01072014 31072014 0953 0857 0933

21 Three-Phase Supply(Mixed)

01072014 31072014 2339 2055 2240

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01072014 31072014 2353 2325 2344 32 District Head Qtrs 01072014 31072014 2357 2330 2348 33 Tehsil Head Qtrs 01072014 31072014 2350 2230 2319

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 010714 to 310714

SaUnya Nil

0-470 MW

SaUnya Nil

0000

SaUnya Nil 2400

SaUnya Nil

19 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs) 21 Three-Phase Supply 01072014 31072014 1000 0800 0900

22 Single-Phase Supply 01072014 31072014 1800 1800 1800 3 Anya jaanakarI Any other information There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

8860 (Av) of 31days 0000(Av) 0000 (Av)

1Rural 7109(Av) for 23447 Hrs 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0532 - -

0537 -

3 HT Industries 8261 (Av) for 17270 Hrs 0357 Total Energy Cutday 1426 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01072014 to 310714 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 3172014 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil ca gaaovaa Goa SaUnya Nil

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-26 Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai अिनवाय यिनट आऊटज का जलाई2014का वःता रत यौरा

Details of forced unit outages during the month ofJuly2014

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 एःसार Essar-2

गरा विनिल GSECL

172 1212 22-Feb-13 अनपल ध Still out

अनपल ध Still out

Shortage of gas

2 यट पीएस UTPS-2

गरा विनिल GSECL

120 1951 17-Jun-14 अनपल ध Still out

अनपल ध Still out

Turbine tripped(RSD)

3 एःसार व डनार Essar vadinar-1

गरा विनिल GSECL

600 2335 3-Jul-14 1324 22-Jul-14 Coal shortage

4 डब यट पीएस WTPS-6

गरा विनिल GSECL

210 953 10-Jul-14 0707 14-Jul-14 BTL

5 एसट पीएस STPS-1

गरा विनिल GSECL

120 1220 10-Jul-14 0710 14-Jul-14 BTL

6 जीआईपीसीएल GIPCL-STG I-2

गरा विनिल GSECL

165 1744 14-Jul-14 अनपल ध Still out

अनपल ध Still out

C ampI problem

7 एएलट पीएस ALTPS-1

गरा विनिल GSECL

120 107 15-Jul-14 2037 19-Jul-14 BTL

8 िस का ट पीएस SIKATPS-1

गरा विनिल GSECL

120 1330 17-Jul-14 अनपल ध Still out

अनपल ध Still out

RSD

9 डब यट पीएस WTPS-4

गरा विनिल GSECL

210 858 18-Jul-14 अनपल ध Still out

अनपल ध Still out

RSD

10 डब यट पीएस WTPS-3

गरा विनिल GSECL

210 1046 18-Jul-14 अनपल ध Still out

अनपल ध Still out

RSD

11 डब यट पीएस WTPS-5

गरा विनिल GSECL

210 1818 18-Jul-14 000 21-Jul-14 RSD

12 डब यट पीएस WTPS-6

गरा विनिल GSECL

210 447 19-Jul-14 अनपल ध Still out

अनपल ध Still out

RSD

13 यट पीएस UTPS-3

गरा विनिल GSECL

200 1055 26-Jul-14 2328 1-Aug-14 RSD

14 एपीएल APL-6

अदानी ADANI

660 2146 5-Jul-14 1105 2-Aug-14 Heavy hydrogen leakage

15 एपीएमएल APML-4

अदानी ADANI

660 1132 10-Jul-14 1407 23-Jul-14 Coal shortage

16 एपीएल APL-1

अदानी ADANI

330 117 20-Jul-14 612 23-Jul-14 RSD

प म ऽय भार षण कि म बई णाली चालन-ISO-I

17 एपीएल APL-8

अदानी ADANI

660 2018 18-Jul-14 2209 21-Jul-14 BTL

18 एपीएल APL-2

गरा विनिल GSECL

330 0913 26-Jul-14 1714 29-Jul-14 Air pre heater problem

19 एपीएल APL-5

गरा विनिल GSECL

660 1910 29-Jul-14 1533 2-Aug-14 Heavy steam leakage

20 डब यपीसीएल WPCL-1

मारा वउकिल MSPGCL

135 1245 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Furnace press high

21 डब यपीसीएल WPCL-4

मारा वउकिल MSPGCL

135 001 3-Apr-14 2347 11-Jul-14 Less schedule

22 कोराड Koradi-5

मारा वउकिल MSPGCL

200 1030 17-Jun-14 अनपल ध Still out

अनपल ध Still out

ID fan bearing temperature high

23 इ डयाबल Indiabulls - 1

मारा वउकिल MSPGCL

270 546 26-Jun-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

24 पल Parli -4

मारा वउकिल MSPGCL

210 1019 29-Jun-14 अनपल ध Still out

अनपल ध Still out

water shortage

25 भसावल Bhusawal-2

मारा वउकिल MSPGCL

210 1117 6-Jul-14 544 10-Jul-14 Coal problem

26 चिपर Chandrapur-1

मारा वउकिल MSPGCL

210 2211 8-Jul-14 2106 13-Jul-14 BTL

27 चिपर Chandrapur-3

मारा वउकिल MSPGCL

210 2216 14-Jul-14 1452 18-Jul-14 Safety valve problem

28 उरण Uran-6 मारा वउकिल MSPGCL

108 1634 15-Jul-14 1407 22-Jul-14 Gas shortage

29 उरण Uran -5 मारा वउकिल MSPGCL

108 2338 17-Jul-14 1125 24-Jul-14 For rotor balancing work

30 उरण Uran -A0 मारा वउकिल MSPGCL

120 2340 17-Jul-14 2315 23-Jul-14 For rotor balancing work

31 भसावल Bhusawal-2

मारा वउकिल MSPGCL

210 2346 18-Jul-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

32 खापरखड़ा Khaparkeda-3

मारा वउकिल MSPGCL

210 1036 20-Jul-14 041 29-Jul-14 Flame failure

33 जयगड Jaigad-2 मारा वउकिल MSPGCL

300 000 20-Jul-14 Ready Ready Less requisition

34 वीआईपीएल VIPL-2

मारा वउकिल MSPGCL

300 2302 20-Jul-14 1716 26-Jul-14 Coal feeding problem

35 एपीएमएल APML-3

मारा वउकिल MSPGCL

660 0444 22-Jul-14 044 26-Jul-14 Pressure release valve operated

36 भसावल Bhusawal-4

मारा वउकिल MSPGCL

500 003 23-Jul-14 151 29-Jun-14 BTL

37 वीआईपीएल VIPL-1

मारा वउकिल MSPGCL

300 015 23-Jul-14 1300 31-Jul-14 Coal feeding problem

38 उरण Uran -8 मारा वउकिल MSPGCL

108 730 26-Jul-14 1700 29-Jul-14 Gas shortage

39 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 347 29-Jul-14 638 4-Aug-14 BTL

प म ऽय भार षण कि म बई णाली चालन-ISO-I

40 पल PARLI-5 मारा वउकिल MSPGCL

210 002 30-Jul-14 अनपल ध Still out

अनपल ध Still out

Water shortage

41 टाटा TATA-8

टाटा TATA

250 2255 9-Jan-14 अनपल ध Still out

अनपल ध Still out

HT due to fire near turbine generator desk

42 टाटा TATA-6

टाटा TATA

500 2134 31-Jul-14 Ready Ready Less requisition

43 आरजीपीपीएल RGPPL-3A

आरजीपीपीएल RGPPL

320 1857 17-Apr-14 Ready Ready Less requisition

44 आरजीपीपीएल RGPPL-2B

आरजीपीपीएल RGPPL

320 1915 17-Jun-14 अनपल ध Still out

अनपल ध Still out

Raw water problem

45 आरजीपीपीएल RGPPL-2A

आरजीपीपीएल RGPPL

320 1615 25-Jun-14 1200 21-Jul-14 Less requisition

46 आरजीपीपीएल RGPPL-1A

आरजीपीपीएल RGPPL

320 1330 8-Jul-14 Ready Ready Less requisition

47 अमरकनटक Amarkantak-4

म वउकिल MPPGCL

120 1113 30-Apr-14 अनपल ध Still out

अनपल ध Still out

TURBINE BEARING VIBRATION HIGH

48 सातपरा Satpura-6

म वउकिल MPPGCL

200 305 18-Jun-14 अनपल ध Still out

अनपल ध Still out

BTL

49 एसजीट पीएस SGTPS-3

म वउकिल MPPGCL

210 617 26-Jun-14 020 26-Jul-14 Conveyer belt problem

50 अमरकनटक Amarkantak-3

म वउकिल MPPGCL

120 1640 2-Jul-14 1623 11-Jul-14 BTL

51 सातपरा Satpura-9

म वउकिल MPPGCL

210 2200 5-Jul-14 855 15-Jul-14 Condenser tube cleaning

52 सातपरा Satpura-9

म वउकिल MPPGCL

210 1310 15-Jul-14 845 24-Jul-14 BTL

53 एसजीट पीएस SGTPS-4

म वउकिल MPPGCL

210 2233 19-Jul-14 1252 4-Aug-14 Coal shortage

54 सातपरा Satpura-7

म वउकिल MPPGCL

210 225 21-Jul-14 545 24-Jul-14 BTL

55 सातपरा Satpura-10

म वउकिल MPPGCL

250 2316 22-Jul-14 07082014 High vibration in generator winding

56 एसजीट पीएस SGTPS-3

म वउकिल MPPGCL

210 1857 28-Jul-14 1020 2-Aug-14 Drum level low

57 DSPM(K(E) extn)-2

छरा वउकिल CSPGCL

250 2310 21-Jul-14 2029 22-Jul-14 Coal shortage

58 कोरबा पव Korba(E)-3

छरा वउकिल CSPGCL

210 1030 22-Jul-14 1025 27-Jul-14 CTL

59 कोरबा पव Korba(E)-5

छरा वउकिल CSPGCL

120 1345 22-Jul-14 1140 26-Jul-14 Wet coal problem

60 कोरबा पव Korba(E)-5

छरा वउकिल CSPGCL

120 2320 30-Jul-14 155 2-Aug-14 Coal shortage

61 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

62 एःसार महान Essar-Mahan-1

एःसारESSAR 600 014 22-Jun-14 1255 11-Jul-14 Less schedule

63 एःसारमहानEssar Mahan-1

एःसार ESSAR 600 620 16-Jul-14 1252 28-Jul-14 Withdrawn due to tripping of evacuation

प म ऽय भार षण कि म बई णाली चालन-ISO-I

Lines

64 सीजीपीएल CGPL-50

सीजीपीएल CGPL

830 948 13-Jun-14 409 23-Jul-14 Ash hopper refractory damage

65 सीजीपीएल CGPL-10

सीजीपीएल CGPL

830 1332 1-Jul-14 1952 9-Jul-14 BTL

66 सीजीपीएल CGPL-20

सीजीपीएल CGPL

800 1214 24-Jul-14 13-aug-14

Bottom ash Hopper works

67 सीजीपीएल CGPL - 40

सीजीपीएल CGPL

830 1918 26-Jul-14 1020 2-Aug-14 GT electrical fault

68 जपीएल JPL STG-2 UNIT-1

जपीएल JPL 600 051 26-Jun-14 अनपल ध Still out

अनपल ध Still out

Turbine vibration

69 जपीएलJPL STG-2 UNIT-2

जपीएलJPL 600 000 5-Jul-14 1457 11-Jul-14 Less requisition

70 जपीएल JPL STG-2 UNIT-2

जपीएलJPL 600 748 21-Jul-14 1800 24-Jul-14 BTL

71 एसीबीआईएल ACBIL-1

एसीबीआईएल ACBIL

135 151 6-Jul-14 1753 9-Jul-14 Furnace draft high

72 ससान Sasan -3 आरईएल REL 660 1648 15-Jul-14 2248 4-Aug-14 Ash evacuation problem

73 ससान Sasan-4 आरईएल REL 660 1645 24-Jul-14 810 3-Aug-14 High press main steam tripped

74 एमको EMCO-I एमको EMCO 200 109 16-Jul-14 अनपल ध Still out

अनपल ध Still out

Turbine vibration high

75 एसीबीआईएल ACBIL-2

एसीबीआईएल ACBIL

135 1955 21-Jul-14 601 24-Jul-14 Furnace draft high

76 मौदा Mouda -1

एनट पीसीNTPC 500 1630 18-Jun-14 2042 14-Jul-14 Flame failure

77 कावास Kawas-1C

एनट पीसीNTPC 116 2311 2-Jul-14 2100 6-Jul-14 Heavy steam leakage from stop valve

78 कावास Kawas-1B

एनट पीसीNTPC 106 2323 2-Jul-14 632 7-Jul-14 Less requisition

79 कावास Kawas-2B एनट पीसीNTPC 164 1704 10-Jul-14 Ready Ready Less requisition

80 कावास Kawas-1A एनट पीसीNTPC 164 1200 12-Jul-14 745 22-Jul-14 Less requisition

81 वीएसट पीएस VSTPS-11

एनट पीसीNTPC 500 1204 13-Jul-14 000 16-Jul-14 Coal shortage

82 गाधारGandhar-1 एनट पीसीNTPC 144 149 16-Jul-14 1807 21-Jul-14 Less requisition

83 कावास Kawas-1B एनट पीसीNTPC 164 1027 18-Jul-14 442 23-Jul-14 Less requisition

84 मौदा Mouda-1 एनट पीसीNTPC 500 000 18-Jul-14 1745 24-Jul-14 Less requisition

85 िसपतSipat-1 एनट पीसीNTPC 660 000 21-Jul-14 955 24-Jul-14 Generator H2 gas leakage

86 गाधार Gandhar-3

एनट पीसीNTPC 144 1607 21-Jul-14 अनपल ध Still out

अनपल ध Still out

BB protection operatedatJhanor

87 गाधार Gandhar-4(ST)

एनट पीसीNTPC 224 1607 21-Jul-14 1320 26-Jul-14 BB protection operatedatJhanor

88 ट स TAPS-1

एनट पीसीNTPC 160 2227 21-Jul-14 1407 26-Jul-14 Maintenance

89 गाधार एनट पीसीNTPC 144 507 22-Jul-14 Ready Ready Less requisition

प म ऽय भार षण कि म बई णाली चालन-ISO-I

Gandhar -1

90 मौदा mouda-2 एनट पीसीNTPC 500 915 23-Jul-14 315 31-Jul-14 Coal feeding problem

91 कावास Kawas-1A

एनट पीसीNTPC 106 608 24-Jul-14 1309 27-Jul-14 Less requisition

92 गाधार Gandhar-2

एनट पीसीNTPC 144 2036 26-Jul-14 100814 Less requisition

93 वीएसट पीएस VSTPS-2

एनट पीसीNTPC 210 500 27-Jul-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

94 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 748 27-Jul-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

95 मौदा Mouda-2 एनट पीसीNTPC 500 315 31-Jul-14 210 3-Aug-14 Less requisition Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का जलाई2014 का वःता रत यौरा

Details of planned unit outages during the month of July2014 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

सo From

समय दनाक

कारण Reason

Time Date Time Date

1 एसएलपीपी SLPP-2

गरा विनिल GSECL

125 045 23-Jun-14 NA 17-Jul -14 AOH

2 डब यट पीएस WTPS-5

गरा विनिल GSECL

210 000 21-Jul-14 29-0814 COH

3 यट पीएस UTPS-4

गरा विनिल GSECL

200 000 21-Jul-14 240814 AOH

4 एसएलपीपी SLPP-3

गरा विनिल GSECL

125 130 22-Jul-14 060814 AOH

5 यट पीएस UTPS-1

गरा विनिल GSECL

120 000 29-Jul-14 28814 AOH

6 पल ParlI-3

मारा वउकिल MSPGCL

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

Water supply problem

7 चिपर Chandrapur-7

मारा वउकिल MSPGCL

500 600 19-Jun-14 1124 2-Aug-14 AOH

8 नािसक NASIK -3

मारा वउकिल MSPGCL

210 1410 10-Jul-14 अनपल ध Still out

100814 AOH

9 कोरबा प म Korba(W)-2

छरा वउकिल CSPGCL

210 936 26-Jun-14 140814 AOH

10 वदनाVandana-I वदना VANDANA 135 1940 17-Jul-14 अनपल ध Still out

अनपल ध Still out

ETL

11 वीएसट पीएस VSTPS-8

एनट पीसीNTPC 500 012 1-Jun-14 253 13-Jul-14 AOH

12 कएसट पीएस KSTPS-4

एनट पीसीNTPC 500 2335 20-Jun-14 180814 COH

13 कावास Kawas-2A

एनट पीसीNTPC 106 000 27-Jun-14 260814 RampM works

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

11 Akrimota 1 125 4-Aug-14 14-Aug-14 AOH12 WTPS 2 210 5-Aug-14 3-Sep-14 AOH13 SLPP 1 125 16-Aug-14 4-Sep-14 AOH14 DGB 1 107 20-Aug-14 27-Aug-14 CI15 GIPCL-I GT-3 48 22-Aug-14 27-Aug-14 HGPI16 GIPCL-I GT-2 48 29-Aug-14 3-Sep-14 HGPI17 GIPCL-I GT-2 48 12-Aug-14 24-Aug-14 HGPI18 UTPS 3 200 19-Aug-14 12-Sep-14 AOH19 GTPS 2 120 25-Aug-14 14-Sep-14 AOH110 STPS 1 120 19-Aug-14 30-Aug-14 AOH111 GTPS 3 210 24-Aug-14 13-Sep-14 AOH112 APL 9 660 1-Sep-14 20-Sep-14 AOH

221 SGTPS 4 210 010914 250914 AOH3 Craiva]kMila CSPGCL

31 Korba East-6 6 120 21-Aug-14 13-Sep-14 AOH32 Korba East-1 1 50 15-Aug-14 1-Sep-14 AOH33 Korba East-3 3 50 21-Aug-14 30-Sep-14 AOH34 Korba West-1 1 210 12-Sep-14 27-Sep-14 COH35 Korba West-5 5 500 15-Aug-14 30-Aug-14 AOH

4

41 PARAS 3 250 20914 151014 AOH42 RELIANCE 2 250 140814 160814 TURBINE VIBRATION

5 koMd``Iya xao~ Central Sector

51 SIPAT 1 600 050914 191014 BLR OH + HPT + IPT+LPT + GEN

52VINDHYACHAL

5 500 120814 200914 CAP+TG PED CKG+GEN+BLR CHEM CLNG+ESP RampM

53VINDHYACHAL

9 500 120814 150914 BLR OH + HPT + IPT+ GEN

54VINDHYACHAL

11 500 160714 170814 AOH

55CGPL

30 800 150814 050914 Bottom ash hopper Refractory repair and General maintainance work

56 CGPL 40 800 060914 300914 UT 40B repair work57 NSPCL 1 250 200814 110914 AOH

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING AUGUST 2014 AND SEPTEMBER 2014

Capacity Outage as per Annual Maintenance Plan

Date Time Date Time

1 400 400KV BUS-I at Bilaspur Ss 14-Aug-14 900 14-Aug-14 1800 DAILY For bus bar stability of LANCO bays amp jumpering work WRTS-I LANCO C

2 400kV 50 MVAR Bus Reactor-2 at Itarsi SS 14-Aug-14 800 15-Oct-14 1800 Continuo

us Installation of 125MVAR reactor WRTS-II WRTS-II C

3 765 Satna-Gwalior2 14-Aug-14 800 17-Aug-14 1800 DailyCompletion of 765kV Gwalior2 Main Bay Erection amp Testing works at Satna

PGCIL WRTS-II C

4 400 400kV JBP- JBP Pooling 2 Line 14-Aug-14 1000 14-Aug-14 1500 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

5 400 400KV BUS-II at Bilaspur Ss 16-Aug-14 900 16-Aug-14 1800 DAILY For bus bar stability of LANCO bays amp jumpering work WRTS-I LANCO C

6 765 Bus2 at satna 16-Aug-14 800 18-Aug-14 1800 DailyExtension of bus 2 for Gwalior2 bay amp completion of Main Bay Erection

PGCIL WRTS-II C

7 400 Khandwa-Dhule1 16-Aug-14 800 31-Aug-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WR-II C

8 400 Gandahr - Navsari DC 16-Aug-14 800 31-Aug-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WR-II R

PID testing of insulator strings

KV Line From To

Annexure-32

Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

9 400 Navsari - Vapi - Kala 16-Aug-14 800 31-Aug-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WR-II R

10 400 Satna - Bina Ckt 1amp2 16-Aug-14 800 31-Aug-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WR-II R

11 400 80 MVAR Bus Reactor at Kotra 16-Aug-14 900 17-Aug-14 1800 ContinuousTo attend isolator defects WRTS-I PGCIL C

12 400 400kV JBP- JBP Pooling 1 Line 17-Aug-14 1000 17-Aug-14 1500 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

13 765 ICT II at Bina 17-Aug-14 0900 17-Aug-14 1800 Daily Post Commissioning check of Fire-Fighting system at Bina PGCIL WRTS-II C

14 765 Bus-2 at Gwalior 17-Aug-2014 1000 18-Aug-2014 1800 Daily Busbar Jumpering ampStability test related to Bus reactor

POWERGRID WRTS-II C

15 765 Seoni 2 LR(704 LR) at Bilaspur Ss 18-Aug-14 900 18-Aug-14 1500 DAILY For taking Spare LR in service

first time WRTS-I PGCIL C

16 400 Bhadrawati-Ramagundam I 18-Aug-14 800 18-Aug-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

17 400 400kV Vchal - JBP 1 Line 18-Aug-14 1000 18-Aug-14 1200 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

18 400 400kV Vchal - JBP 2 Line 18-Aug-14 1400 18-Aug-14 1600 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

19 400 400KV BUS-II at Bilaspur Ss 19-Aug-14 900 19-Aug-14 1800 DAILY For bus bar stability of LANCO bays amp jumpering work WRTS-I LANCO C

20 400 Bhadrawati-Ramagundam II 19-Aug-14 800 19-Aug-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

21 765 ICT 1 at G alior 19 A g 14 10 00 20 A g 14 18 00 Continou SPARE ICT COMMISSIONING PGCIL WRTS II C21 765 ICT - 1 at Gwalior 19-Aug-14 1000 20-Aug-14 1800 s SPARE ICT COMMISSIONING PGCIL WRTS-II C

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

22 400 400kV JBP- Itarsi 1 Line 19-Aug-14 1000 19-Aug-14 1200 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

23 400 400kV JBP- Itarsi 2 Line 19-Aug-14 1400 19-Aug-14 1600 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

24 400 400 kV Sipat -Ranchi-1 19-Aug-14 900 20-Aug-14 1900 Continous 1 no of CT replacement NTPC NTPC

25 400 BUS-I at Aurangabad(PG) 19-Aug-14 600 20-Aug-14 1800 ContiBus-1 extn for commissioning of 400 kV Boisar-1amp2 bays with 80 MVAR Reactors

WRTS-I WRTS-I C

26 400kV 400kV SUGEN PIRANA Line (Line 2) 19-Aug-14 900 19-Aug-14 1700 Daily Corrective Maintenance of

Transfer Isolator TPL-SUGE TPL-SUG R

27 400kV 400kV PGCIL - PIRANA Feeder No 2 19-Aug-14 900 19-Aug-14 1700 Daily 400kV CT connectors replacementTPL-AHME TPL-AHM R

28 400 Bhadrawati-Parli 1amp 2 19-Aug-14 000 20-Oct-14 1800 DailyFor OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

29 400 Mundra - Jetpur line No1 19-Aug-14 800 19-Aug-14 1200 Daily protection logic checking work PGCIL GETCO30 400 Mundra - Jetpur line No 2 19-Aug-14 1400 19-Aug-14 1800 Daily protection logic checking work PGCIL GETCO

31 400 400KV BUS-I at Bilaspur Ss 20-Aug-14 900 20-Aug-14 1800 DAILY For bus bar stability of LANCO bays amp jumpering work WRTS-I LANCO C

32 400 KSK ndash Raigarh circuit 4 20-Aug-14 900 21-Aug-14 1800 CONT complete PLCC rectification works WRTS-I KSK C

33 HVDC HVDC POLE I AT BHADRAWATI 20 A 14 8 00 21 A 14 18 00 D il AMP WORKS WRTS I WRTS I R33 HVDC HVDC POLE-I AT BHADRAWATI 20-Aug-14 800 21-Aug-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

34 765kV Dharamjaygarh - Durg ckt-2 20-Aug-14 800 22-Aug-14 1800 daily CSD relay commissioning (M+T) WRTS-I PGCIL C

35 765 JBP - BINA 1 at Jabalpur Pooling Station 20-Aug-14 1000 21-Aug-14 1800 Daily Commissioning of CSD Relay for

765KV JBP - BINA Ckt 1 PGCIL WRTS-II C

36 400 Khandwa-Dhule1 20-Aug-14 1000 20-Aug-14 1500 Daily AMP PGCIL WRTS-II R

37 400 Bus-1 at Shujalpur 20-Aug-14 1000 20-Aug-14 1800 Daily AMP PGCIL WRTS-II R

38 400 Bus2 at Satna 20-Aug-14 900 20-Aug-14 1800 Daily For Bus Bar Stability and charging activity of 406 Bay PGCIL WRTS-II C

39 400 Bus1 at Indore 20-Aug-14 900 20-Aug-14 1800 Daily Jumper connection amp stability checking of Pitampur1 PGCIL WRTS-II C

40 400 400kV JBP- Itarsi 3 Line 20-Aug-14 1000 20-Aug-14 1200 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

41 765 Raigarh (Kotra) - Raigarh (Tamnar) 20-Aug-14 900 31-Aug-14 1800 ContinuousFor installation of Bird guards WRTS-I PGCIL C

42 400 Kansari - Kankroli line 20-Aug-14 800 20-Aug-14 1800 Daily PMU installation work and maintenPGCIL GETCO43 400 BUS-2 AT SOLAPUR 21-Aug-14 900 22-Aug-14 1800 Daily Pune bays extension works WRTS-I WRTS-I C

44 765 ICT 1 at Jabalpur Pooling Station 21-Aug-14 1000 21-Aug-14 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus for Spare ICT Phase

PGCIL WRTS-II C

45 400 Bina-Shujalpur1 21-Aug-14 900 21-Aug-14 1000 Daily

For Replacement of 390kV Reactor LA with 336kV LA Line will be taken in service without PGCIL WRTS-II Cj p g g y will be taken in service without Line Reactor at Shujalpur

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

46 400 Khandwa-Dhule2 21-Aug-14 1000 21-Aug-14 1800 DailyFor Replacement of 390kV Reactor LA with 336kV LA At Khandwa amp AMP

PGCIL WRTS-II C

47 220 Damoh-Sagar 21-Aug-14 1000 21-Aug-14 1500 Daily AMP of terminal equipment at Damoh SS MPPTCL WR-II R

48 765 ICT2 at Indore 21-Aug-14 900 22-Aug-14 1800 Continious

For Auxiliary bus erection at Indore PGCIL WRTS-II C

49 400 125MVAr BR at Shujalpur 21-Aug-14 900 21-Aug-14 1800 Daily Differential stability of tie bay (Under commissioning) PGCIL WRTS-II C

50 400 Raipur-Bhadrawati-III 21-Aug-14 900 21-Aug-14 1800 ContinuousBus split at Raipur WRTS-I PGCIL C51 400 Kansari - Bhinmal line 21-Aug-14 800 21-Aug-14 1800 Daily PMU installation work and maintenPGCIL GETCO

52 HVDC HVDC POLE-2 AT BHADRAWATI 22-Aug-14 800 23-Aug-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

53 765 ICT I at Bina 22-Aug-14 0900 23-Aug-14 1800 DailyCommissioning of CSD Relay for 400kV side of ICT- rescheduling of outage

PGCIL WRTS-II C

54 765 JBP - BINA 2 at Jabalpur Pooling Station 22-Aug-14 1000 23-Aug-14 1800 Daily Commissioning of CSD Relay for

765KV JBP - BINA Ckt 2 PGCIL WRTS-II C

55 400 Khandwa-Rajgarh1 22-Aug-14 800 23-Aug-14 1800 PM Continous

Rectification of damaged tower peak at locno83 due to collapse of MPPTCL tower which is under construction

PGCIL MPPTCL C

F j i amp h i th56 400 Pirana-Vadodara-Asoj DC 22-Aug-14 800 23-Aug-14 1800 Daily

For jumpering amp charging the future cirucit of line in multi-circuit towers to prevent conductor theft

PGCIL WRTS-II C

57 220 Damoh-Damoh2 22-Aug-14 1000 22-Aug-14 1500 Daily AMP of terminal equipment at Damoh SS MPPTCL WR-II R

58 400kV 400kV SUGEN VAPI Line 22-Aug-14 900 22-Aug-14 1400 Daily Corrective Maintenance amp Inspection Dropper of 5 Core CT

TPL-SUGE TPL-SUG R

59 765 Bus Reactor Kotra 22-Aug-14 900 23-Aug-14 1800 Daily WRTS-I PGCIL C

60 400 Vindhyachal-Jabalpur3 23-Aug-14 900 23-Aug-14 1800 Daily

For Replacement of 390kV Reactor LA with 336kV LA At Jabalpur Line will remain out of service due to less clearance of Reactor LA from Line conductor

PGCIL WRTS-II C

61 765 ICT1 at Indore 23-Aug-14 900 26-Aug-14 1800 Continious

re routing of cables in CMB for commissioning of spare unit at Indore

PGCIL WRTS-II C

62 765 Bus- 2 at Bina 23-Aug-2014 0900 23-Aug-2014 1800 DailyFor Bus stability required for 765kV Jabalpur 3 Bay- Rescheduling of outage

POWERGRID WRTS-II C

63 765 Bus-1 at Gwalior 24-Aug-14 1000 25-Aug-14 1800 Daily Busbar Jumpering ampStability test related to Jaipur 1 main bay PGCIL WRTS-II C

64 400 Navasari- Kala MC line 25-Aug-14 800 26-Aug-14 1800 DailyConstruction work of Navasari- Boisar line on same Multi ckt WRTS-II WRTS-I Ctower

65 765 765400 AT-1 AT SOLAPUR 25-Aug-14 900 26-Aug-14 1800 Daily Spare ICT unit Aux bus commisioning works WRTS-I WRTS-I C

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

66 220 Korba-Budhipadar Ckt-3 at CSPDCL Korba Ss 25-Aug-14 900 26-Aug-14 1800 DAILY For diversion of line for SE

Railway MCL project WRTS-I PGCIL C

67 765 765KV Bus 1 at Jabalpur Pooling Station 25-Aug-14 1000 25-Aug-14 1800 Daily

765KV Bus 1 Extension for Switchyard Extension for BINA 3 Line Dia

PGCIL WRTS-II C

68 765 765KV ICT 1 at Jabalpur Pooling Station 25-Aug-14 1000 25-Aug-14 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus Isolators for Spare ICT Phase - Heavy Induction

PGCIL WRTS-II C

69 400 Vindhyachal-Jabalpur4 25-Aug-14 900 25-Aug-14 1800 Daily

For Replacement of 390kV Reactor LA with 336kV LA At Jabalpur Line will remain out of service due to less clearance of Reactor LA from Line conductor

PGCIL WRTS-II C

70 400 Bus-I at satna 25-Aug-14 900 25-Aug-14 1800 DailyFor Changing of Jumper from Twin Moose To Quad Moose in 401 bay (jaypee nigrie line-1)

PGCIL WR-II C

71 400 Deepnagar-Thaptitanda 25-Aug-14 900 25-Aug-14 1700 Daily To attend Isolator alignment problem MSETCL MSETCL

72 765 BUS-II and 765 ICT-1 at Aurangabad (PG) 25-Aug-14 600 25-Aug-14 1800 Daily Commissioning of spare ICT unit

at Aurangabad (PG) WRTS-I WRTS-I CAurangabad (PG) at Aurangabad (PG)

73 765 Kotra-durg Ckt-2 along with line reactor 25-Aug-14 900 28-Aug-14 1800 ContinuousReplacement of spacer damper WRTS-I PGCIL C

74 765 Wardha-Aurangabad (PG)-2 and Padge-1 LReactor 26-Aug-14 600 26-Aug-14 1800 Daily Construction of up-coming

Padghe bay at Aurangabad (PG) WRTS-I WRTS-I C

75 765 Gwalior -Bina 1 26-Aug-14 1000 27-Aug-14 1800 Daily Spare reactor commissioning at Gwalior PGCIL WR-II C

76 765 1500MVA ICT 2 at Jabalpur Pooling Station 26-Aug-14 1000 26-Aug-14 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus Isolators for Spare ICT Phase - Heavy Induction

PGCIL WRTS-II C

77 400 Jabalpur-Itarsi4 26-Aug-14 900 26-Aug-14 1800 Daily

For Replacement of 390kV Reactor LA with 336kV LA At Jabalpur Line will remain out of service due to less clearance of Reactor LA from Line conductor

PGCIL WRTS-II C

78 400 Akola ll-Thaptitanda 27-Aug-14 900 27-Aug-14 1900 Daily To attend chattering noise on B-ph wave trap MSETCL MSETCL

79 400 Vapi- Kala MC Line 27-Aug-14 800 28-Aug-14 1800 DailyConstruction work of Navasari- Boisar line on same Multi ckt tower

WRTS-II WRTS-I C

80 765 Bus 1 at Jabalpur Pooling Station 27-Aug-14 1000 27-Aug-14 1800 Daily

765KV Bus 1 Extension Busbar Stability test related to BINA 3 Line Dia

PGCIL WRTS-II C

81 400 KORBA SIPAT 27 Aug 14 600 29 Aug 14 2200 CONT NORMALISED THE LILO AT PGCIL LANCO C81 400 KORBA -SIPAT 27-Aug-14 600 29-Aug-14 2200 RAMPUR PGCIL LANCO C

82 400 TARAPUR-PADGHE II 27-Aug-14 800 28-Aug-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

83 765 Gwalior-Satna1 28-Aug-14 800 28-Aug-14 1800 Daily For spare reactor commissioning works at Gwalior PGCIL WRTS-II C

84 765 BUS-II and Padge-2 LReactor at Aurangabad (PG) 28-Aug-14 600 28-Aug-14 1800 Daily

Commissioning of Padghe-2 upcoming bay at Aurangabad (PG)

WRTS-I WRTS-I C

85 765 Bilaspur 1 Main bay (710) at Seoni 28-Aug-14 800 29-Aug-14 1800 Daily AMP works WRTS-I WRTS-I R

86 765 765400 AT-2 AT SOLAPUR 28-Aug-14 900 28-Aug-14 1800 Daily Spare ICT unit Aux bus commisioning works WRTS-I WRTS-I C

87 765 Bus Reactor(706 BR) at Bilaspur Ss 28-Aug-14 900 01-Sep-14 1800 DAILY For replacement of unarmoured

cable by TBEA WRTS-I PGCIL C

88 765 Bus 2 at Jabalpur Pooling Station 28-Aug-14 1000 29-Aug-14 1800 Daily

765KV Bus 2 Extension for Switchyard Extension for BINA 3 Line Dia

PGCIL WRTS-II C

89 400 MOUDA 400KV BUS REACTOR 28-Aug-14 0900hrs 29-Aug-14 1800 ContionuouAnnual Maintainance NTPC NTPC

90 765 Satna - Bina 1 29-Aug-14 0900 31-Aug-14 1800 Daily

for erection of new TC amp TE tower forNHPTL at Bina-Rescheduling of outage

PGCIL WRTS-II C

91 765 Bus Reactor at Satna 29-Aug-14 900 30-Aug-14 1800 Continious Commissioning of spre reactor PGCIL WRTS-II Cus

92 400 125MVAr BR1 at Indore 29-Aug-14 900 29-Aug-14 1800 Daily Post Commissioning check of Fire-Fighting system at Indore PGCIL WRTS-II C

93 400 Chorania Hadala line 29-Aug-14 800 29-Aug-14 1800 Daily PMM WORK GETCO GETCO

94 765 Kotra-durg Ckt-2 along with line reactor 29-Aug-14 900 31-Aug-14 1800 Daily WRTS-I PGCIL C

95 765 765400 ICT-2 at Aurangabad (PG) 30-Aug-14 600 30-Aug-14 1800 Daily Altube erection in 400 kV Boisar-

1amp2 Tie bays WRTS-I WRTS-I C

96 765kV Dharamjaygarh - Bilaspur 30-Aug-14 800 30-Aug-14 1800 daily commissioning of JBP-1 bay (side) WRTS-I PGCIL C

97 765kV 330 MVAR Bus Rector-2 at Dharamjaygarh 30-Aug-14 800 30-Aug-14 1800 daily commissioning of JBP-1 bay

(side) WRTS-I PGCIL C

98 400 Mundra Hadala SC 30-Aug-14 800 30-Aug-14 1800 DailyPower Line Crossing of 400 KV DC Bhachau SS (PG) - Varsana SS (GETCO) TrL

GETCO WRTS-II C

99 220 Gwalior - Mahalgaon 1amp2 30-Aug-14 900 31-Aug-14 1800 Continuous

For crossing of 765kV Gwalior - Jaipur line PGCIL WRTS-II C

100 220 Gwalior - Malanpur 1amp2 30-Aug-14 900 31-Aug-14 1800 Continuous

For crossing of 765kV Gwalior - Jaipur line PGCIL WRTS-II C

101 400 400 kV Akola- Nandagaon peth sc 31-Aug-14 800 31-Aug-14 1600 Daily crossing works of 765 kV Koradi-AWRTS-I WRTS-I R

102 400 Bina-Shujalpur2 31-Aug-2014 900 31-Aug-2014 1000 DailyFor Replacement of 390kV Reactor LA with 336kV LA Line

ill b t k i i ith t

POWERGRID WRTS-II C

103 400 Mundra - Sami DC 01-Sep-14 800 01-Sep-14 1800 DailyPower Line Crossing of 400 KV DC Bhachau SS (PG) - Varsana SS (GETCO) TrL

ADANI WRTS-II C

104 400 Akola-Wardha 1amp 2 01-Sep-14 800 30-Sep-14 1800 Daily For Online PID Line in service with AR in non-auto mode WRTS-I WRTS-I For IOwith AR in non auto mode

105 765 Bilaspur 2 Main bay (716) at Seoni 01-Sep-14 800 02-Sep-14 1800 Daily AMP works WRTS-I WRTS-I R

106 400 400220 ICT-1 AT SOLAPUR 01-Sep-14 900 01-Sep-14 1500 Daily AMP WORK WRTS-I WRTS-I R

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

107 765 1000 MVA ICT I amp ICT II at Bina 01-Sep-14 0900 01-Sep-14 1800 Daily Commissioning of Master follower

scheme PGCIL WRTS-II C

108 765 Bus 1 at Jabalpur Pooling Station 01-Sep-14 100000 AM 01-Sep-14 60000 PM Daily

765KV Bus 1 Extension Busbar Stability test related to Bhopal 1 Line Dia

PGCIL WRTS-II C

109 400 Shujalpur - Bina 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

110 400 Birsinghpur-Damoh 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

111 400 Gandhar - Navsari 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

112 400 Khandwa - Rajgarh 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

113 400 Indore - Nagda 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

114 400 Jabalpur - Jabalpur Pool 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II Cnon auto mode

115 400 Khandwa - Dhule 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

116 400 Itarsi - Khandwa 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

117 220 Satna - Satna 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

118 765 Dehgam - Ranchhodpura 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

119 765 Shujalpur - Nagda 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

120 400 Asoj - SSP 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

121 400 Bhachau - Mundra 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

122 400 Bina - Gwalior 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

123 400 Satna - Gwalior 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in PGCIL WRTS-II Cnon auto mode

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

124 400 LILO portion of Vapi - Navi Mumbai at Kala(Vapi-Kala Line) 01-Sep-14 600 30-Sep-14 1800 Daily

Online replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

125 400400 kV Khandwa - Rajgarh

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

126 400400 kV Gandhar-Navsari

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

127 400400 kV Rajgarh ndash SSP

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

128 400400 kV SSP-Asoj

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

129 400 400 kV Shujalpur - Nagda (MPPTCL)

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

130 400400 kV Dehgam - Ranchodpura

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

131 400 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in PGCIL WRTS-II C

400 kV Ranchodpura ndash Bhachaup p y OPGW AR shall be kept in

non auto mode

132 400400 kV Mundra-Bhachau

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

133 400400 kV Vindhyachal NTPC -SASAN UMPP Ckt-1 01-Sep-14 600 30-Sep-14 1800 Daily

Online replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

134 400400 kV Vindhyachal Pooling -Vindhyachal NTPC 01-Sep-14 600 30-Sep-14 1800 Daily

Online replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

135 400 400 kV LILO at Kala (DNH) SS of Vapi-Navi Mumbai Line

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

136 765765 kV Bina - Gwalior

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

137 765765 kV Satna - Gwalior Ckt-I

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

138 400 Gandahr - Navsari DC 01-Sep-14 800 30-Sep-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

139 400 Navsari - Vapi - Kala 01-Sep-14 800 30-Sep-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

PID testing of insulator strings 140 400 Satna - Bina Ckt 1amp2 01-Sep-14 800 30-Sep-14 1800 Daily AR shall be kept In non auto

modePGCIL WRTS-II R

141 400 Nagda - Dehgam DC 01-Sep-14 800 30-Sep-14 1800 Daily PID testing of insulator strings AR h ll b k t I t

PGCIL WRTS-II R

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

142 220 Kakrapar - Vapi DC 01-Sep-14 800 30-Sep-14 1800 Daily PID testing of insulator strings PGCIL WRTS-II R

143

220 220 KV Jhanor - Haldrwa Line 1

01-Sep-14

800

05-Sep-14

000

Continous Replacement of existing CTCVT with 02 class CT amp CVT and for testing of the same NTPC NTPC

144 400 Akola-Aurangabad(PG) 2 01-Sep-14 800 02-Sep-14 1800 Conti commissioning of 50MVAR Lreactor at Aurangabad(PG) WRTS-I WRTS-I C

145 765 Bina-Satna 2 02-Sep-14 0900 03-Sep-14 1800 Daily Post Commissioning check of Fire-Fighting system at Bina PGCIL WRTS-II C

146 400 Vadavi-Chorania 1 02-Sep-14 800 02-Sep-14 1800 Daily PMM WORK WRTGPL GETCO147 400 BUS REACTOR AT SOLAPUR 02-Sep-14 900 02-Sep-14 1500 Daily AMP WORK WRTS-I WRTS-I R

148 765 Korba Line Main Bay (716) at Bilaspur Ss 02-Sep-14 900 02-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

149 765 Bus 2 at Jabalpur Pooling Station 02-Sep-14 100000 AM 02-Sep-14 60000 PM Daily

765KV Bus 2 Extension for Switchyard Extension for Bhopal 1 Line Dia

PGCIL WRTS-II C

150 400 Bus2 at Indore 02-Sep-14 900 02-Sep-14 1800 Daily Jumper connection amp stability checking of Pitampur1 PGCIL WRTS-II C

151 400 CGPL-Limbdi-1 02-Sep-14 2-Sep-14 8AM 6PM Daily routine maintenance and isolator aPGCIL CGPL

152400 Korba-Bhalai line -1

02-Sep-14 900 03-Sep-14 19002 days

continuous CVTs replacement

NTPC NTPC00 o ba a a e us C s ep ace e t

153 400 Sipat 400KV Bus-1 02-Sep-14 900 03-Sep-14 1900 Continous Annual Preventive maintenance NTPC NTPC

154 765 Bilaspur 2 Tie bay (717) at Seoni 03-Sep-14 800 04-Sep-14 1800 Daily AMP works WRTS-I WRTS-I R

155 400 400220 ICT-1 AT SOLAPUR 03-Sep-14 900 03-Sep-14 1500 Daily AMP WORK WRTS-I WRTS-I R

156 765 Sipat2 Main Bay (712) at Bilaspur Ss 03-Sep-14 900 03-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

157 765 Bina-Gwalior 2 03-Sep-14 0900 04-Sep-14 1800 Daily For spare reactor commissioning works at Gwalior PGCIL WRTS-II C

158 765 Bus 2 at Jabalpur Pooling Station 03-Sep-14 100000 AM 03-Sep-14 60000 PM Daily

765KV Bus 2 Extension for Switchyard Extension for Jumpering (Bus Extension) for Bhopal 1

PGCIL WRTS-II C

159 400 Indore-Asoj3 03-Sep-14 900 04-Sep-14 1800 Continuous

For checking protection transfer system at Indore (MPPTCL) PGCIL WRTS-II C

160 400 400 kv Nagda- Rajgarh ckt Pgcil ckt I 03-Sep-14 900 03-Sep-14 03092014 1800 daily Maintenan

ce Work PGCIL EHT- Mamp I

161 400 Vadavi-Chorania 2 04-Sep-14 800 04-Sep-14 1800 Daily PMM WORK WRTGPL GETCO162 220 SOLAPUR(PG)-Solapur(M) 04-Sep-14 900 04-Sep-14 1800 Daily AMP WORK MSETCL WRTS-I R

163 765 Bus 2 at Jabalpur Pooling Station 04-Sep-14 100000 AM 04-Sep-14 60000 PM Daily

765KV Bus 2 Extension Busbar Stability test related to Bhopal 1 Line Dia

PGCIL WRTS-II C

164 400 CGPL-Limbdi-2 04-Sep-14 4-Sep-14 8AM 6PM Daily routine maintenance and isolator aPGCIL CGPL

165 400 400 kv Nagda- Rajgarh ckt Pgcil ckt II 04-Sep-14 900 04-Sep-14 04092014 1800 daily Maintenan

ce Work PGCIL EHT- Mamp I

166400 Korba-Bhalai line -2

04-Sep-14 900 05-Sep-14 19002 days

continuous CVTs replacement

NTPC NTPC

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

167 400 BUS-1 AT SOLAPUR 05-Sep-14 900 05-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I C

168 400 Seoni-Khandwa 1 05-Sep-14 800 05-Sep-14 1800 Daily Line AMP works at Seoni WRTS-II WRTS-I R

169 400 400220 ICT-2 AT BOISAR 05-Sep-14 900 05-Sep-14 1500 Daily For Bushing oil DGA Testing WRTS-I WRTS-I R

170 765 Sipat2 Tie Bay (711) at Bilaspur Ss 05-Sep-14 900 05-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

171 765 Bina-Jabalpur I 05-Sep-14 0900 06-Sep-14 1800 Daily Post Commissioning check of Fire-Fighting system at Bina PGCIL WRTS-II C

172 400 Bus Reactor 1 at Jabalpur Pooling Station 05-Sep-14 100000 AM 05-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

173 220 Navsari - Nasik - 1 05-Sep-14 800 05-Sep-14 1800 Daily PMM WORK PGCIL GETCO174 400 Sipat 400KV Bus-2 05-Sep-14 900 06-Sep-14 1900 Continous Annual Preventive maintenance NTPC NTPC175 400 Akola-Wardha ckt 2 05-Sep-14 800 05-Sep-14 1700 Daily QMwork MSETCL MSETCL176 400 Kalwa-Kharghar 05-Sep-14 900 05-Sep-14 1700 Daily R amp M work MSETCL MSETCL177 400 Seoni-Khandwa 2 06-Sep-14 800 06-Sep-14 1800 Daily Line AMP works at Seoni WRTS-II WRTS-I R178 400 400220 ICT-1 AT BOISAR 06-Sep-14 900 06-Sep-14 1500 Daily For Bushing oil DGA Testing WRTS-I WRTS-I R

179 400 Bus Reactor 2 at Jabalpur Pooling Station 06-Sep-14 100000 AM 06-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

180 765 Gwalior-Satna2 06-Sep-14 800 06-Sep-14 1800 Daily For spare reactor commissioning works at Gwalior PGCIL WRTS-II C

181 400 Indore-Indore1 06-Sep-14 900 07-Sep-14 1800 Continuo For checking protection transfer t t I d (MPPTCL) PGCIL WRTS-II C181 400 Indore Indore1 06 Sep 14 900 07 Sep 14 1800 us system at Indore (MPPTCL) PGCIL WRTS II C

182 220 Navsari - Nasik - 2 06-Sep-14 800 06-Sep-14 1800 Daily PMM WORK PGCIL GETCO

183 400 VAPI-BOISAR 07-Sep-14 800 08-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

184 765 Satna-Gwalior-2 Reactor 07-Sep-14 900 07-Sep-14 1800 Daily For Commissioning of CSD relay in Gwalior-2 reactor bay at Satna PGCIL WRTS-II C

185 220 DC Welspun - Shivlakha amp Anjar shivlakha Trl 07-Sep-14 80000 AM 07-Sep-14 60000 PM Daily

Power Line Crossing of 400 KV DC Bhachau SS (PG) - Varsana SS (GETCO) TrL

GETCO WR-II C

186 765 Bilaspur 1 Tie bay (711) at Seoni 08-Sep-14 800 09-Sep-14 1800 Daily AMP works WRTS-I WRTS-I R

187 400kV Bus-1 at Itarsi SS 08-Sep-14 800 08-Sep-14 1800 Daily AMP amp Protection testing WRTS-II WRTS-II R

188 765 Seoni2 Main Bay (707) at Bilaspur Ss 08-Sep-14 900 08-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

189 765 Bina-Jabalpur II 08-Sep-14 0900 09-Sep-14 1800 Daily Post Commissioning check of Fire-Fighting system at Bina PGCIL WRTS-II C

190 765 ICT 1 at Jabalpur Pooling Station 08-Sep-14 100000 AM 08-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

191 765 Gwalior-Bina3 08-Sep-14 800 09-Sep-14 1800 Daily For spare reactor commissioning works at Gwalior PGCIL WRTS-II C

192 400 V-satna-1 08-Sep-14 900 09-Sep-14 1900 Continuous

Major OH of Line Circuit Breaker (For dismantling of poles) NTPC NTPC

193

220 220 KV Jhanor- Haldrwa Line 2

08-Sep-14

800

12-Sep-14

000

Continous Replacement of existing CTCVT with 02 class CT amp CVT and for testing of the same NTPC NTPC

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

194 400 Vadavi- Kansari- 1 09-Sep-14 800 09-Sep-14 1800 Daily PMM WORK WRTGPL GETCO195 400 Bus-1 at Damoh 09-Sep-14 1000 10-Sep-14 1800 Daily AMP PGCIL WRTS-II R

196 765 Bus Reactor 1 at Jabalpur Pooling Station 09-Sep-14 100000 AM 09-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

197 400 Bina - Shujalpur 1 09-Sep-14 1000 09-Sep-14 1400 Daily AMP PGCIL WRTS-II C

198 400 400 kv Katni- Damoh ckt 09-Sep-14 800 09-Sep-14 09092014 1800 daily Maintenance Work PGCIL EHT-

Mamp I

199 220 220 KV OMKARESHWAR -KHANDWA 09-Sep-14 900 09-Sep-14 09092014 1600 daily Maintenan

ce Work PGCIL EHT- Mamp I

200 220 220KV MALANPUR -AURAIYA 09-Sep-14 900 09-Sep-14 09092014 1700 daily Maintenance Work

EHT- Mamp I

201400 Korba 400 KV Bus coupler -1

09-Sep-14 900 10-Sep-14 19002 days

continuous Annual maintenance and testing

NTPC NTPC

202 400kV Bus-2 at Itarsi SS 10-Sep-14 800 10-Sep-14 1800 Daily AMP amp Protection testing WRTS-II WRTS-II R203 400 400220KV ICT-2 at Seoni 10-Sep-14 800 11-Sep-14 1800 Conti OLTC overhauling works WRTS-I WRTS-I R

204 400 VAPI-BOISAR 10-Sep-14 800 11-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

205 400 Parli 2 Tie Bay (417) at Solapur 10-Sep-14 900 10-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

206 765 330 MVAR Bus Rector-1 at Dharamjaygarh 10-Sep-14 800 11-Sep-14 1700 DAILY CSD relay commissioning in main

bay WRTS-I PGCIL C

207 765 ICT3 Tie Bay (717) at Bilaspur 10 S 14 9 00 10 S 14 18 00 DAILY F AMP k WRTS I PGCIL R207 765 ICT3 Tie Bay (717) at Bilaspur Ss 10-Sep-14 900 10-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

208 765 765kV Dharamjaygarh - Ranchi-2 l 10-Sep-14 900 15-Sep-14 1800 continous

For strining Jumpering of parallel ckt and Crossing of 765kV Dharamjaygarh-Jabalpur line

WRTS-I PGCIL C

209 765 ICT 2 at Jabalpur Pooling Station 10-Sep-14 100000 AM 10-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

210 400 Shujalpur-Nagda 1 10-Sep-14 1000 10-Sep-14 1400 Daily AMP PGCIL WRTS-II C211 400 Vadavi- Kansari- 2 10-Sep-14 800 10-Sep-14 1800 Daily PMM WORK WRTGPL GETCO

212 400 400 kv ISP - Nagda ckt 10-Sep-14 900 10-Sep-14 10092014 1800 daily Maintenance Work

EHT- Mamp I

213 220 220KV MALANPUR -AURAIYA 10-Sep-14 900 10-Sep-14 10092014 1700 daily Maintenance Work

EHT- Mamp I

214 220 220 KV DAMOH PGCIL IC - I 10-Sep-14 800 10-Sep-14 10092014 1800 daily Maintenance Work PGCIL EHT-

Mamp I

215765KV400K

VSipat 765KV400KV ICT-1 10-Sep-14 900 11-Sep-14

1900 Continous Annual Preventive maintenance NTPC NTPC216 400 New Koyna-Dabhol ckt 1 10-Sep-14 830 10-Sep-14 1730 Daily QMwork MSETCL MSETCL217 400 Akola-Aurangabad ckt 1 10-Sep-14 830 10-Sep-14 1730 Daily QMwork MSETCL MSETCL

218 400 TARAPUR-PADGHE I 11-Sep-14 800 12-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

219 400 ICT 2 Main Bay (409) at Mapusa 11-Sep-14 900 11-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

220 765 Korba LR (716 LR) at Bilaspur Ss 11-Sep-14 900 11-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

221 220 Bus-1 at Damoh 11-Sep-14 1000 12-Sep-14 1800 Daily AMP PGCIL WRTS-II R

222 765 Bus Reactor 2 at Jabalpur Pooling Station 11-Sep-14 100000 AM 11-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

223 220MC Bhimasar - Lalpar Bhimasar -Morbi amp Bhimasar - Mansar (on same tower)

11-Sep-14 80000 AM 11-Sep-14 60000 PM DailyPower Line Crossing of 400 KV DC Bhachau SS (PG) - Varsana SS (GETCO) TrL

GETCO WR-II C

224 220 Navsari - Dastan- 1 11-Sep-14 800 12-Sep-14 1800 Daily PMM WORK PGCIL GETCO

225 400 400 kv Rajgarh Pgcil - SSP CKT I 11-Sep-14 900 11-Sep-14 11092014 1800 daily Maintenance Work PGCIL EHT-

Mamp I

226 220 220K KV MEHGAON - AURAIYA 11-Sep-14 900 11-Sep-14 11092014 1700 daily Maintenance Work

EHT- Mamp I

227400 Korba Lanco

11-Sep-14 900 12-Sep-14 19002 days

continuous Annual maintenance and testing

NTPC NTPC

228 400 Lonikand II-Lonikand I 11-Sep-14 900 11-Sep-14 1700 Daily QMwork MSETCL MSETCL

229 400 Parali-Lonikand II ckt 2 11-Sep-14 900 11-Sep-14 1700 Daily QMwork MSETCL MSETCL

230 400 Waluj-Bableshwer 11-Sep-14 900 11-Sep-14 1700 Daily QMwork MSETCL MSETCL

231 400 Tie Transformer-II NTPC-Korba 11-Sep-14 900 12-Sep-14 1700 Maintenance NTPC NTPC

232 400kV Sipat-Raipur-2 12-Sep-14 000 12-Sep-14 1700 Daily Attending hot spots and SD nature defects WRTS-I PGCIL R

233 400 400220 ICT 1 AT WARDHA 12 Sep 14 9 00 12 Sep 14 15 00 Dail For B shing oil DGA Testing WRTS I WRTS I R233 400 400220 ICT-1 AT WARDHA 12-Sep-14 900 12-Sep-14 1500 Daily For Bushing oil DGA Testing WRTS-I WRTS-I R

234 400 Khandwa-Dhule 2 line reactor at Dhule 12-Sep-14 800 12-Sep-14 1800 Daily For Bushing oil DGA Testing

Line in service wo reactor WRTS-I WRTS-I R

235 400 BUS I AT MAPUSA 12-Sep-14 900 12-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

236 765 JBP - Dharmjaygarh Reactor Line 1 Reactor at Jabalpur Pooling Station

12-Sep-14 100000 AM 12-Sep-14 60000 PM Daily Installation amp Commissioning of CSD Relay PGCIL WRTS-II C

237 400 400 kv Rajgarh Pgcil - SSP CKT II 12-Sep-14 900 12-Sep-14 12092014 1800 daily Maintenan

ce Work PGCIL EHT- Mamp I

238 400 400 kv Indore - Nagda ckt 12-Sep-14 900 12-Sep-14 12092014 1800 daily Maintenance Work

EHT- Mamp I

239 220 220K KV MEHGAON - AURAIYA 12-Sep-14 900 12-Sep-14 12092014 1700 daily Maintenance Work

EHT- Mamp I

240 400 Lonikand-Stage IV 12-Sep-14 900 12-Sep-14 1700 Daily QMwork MSETCL MSETCL

241 400 Aurangabad(PG)-Aurangabad (Waluj)-1 12-Sep-14 800 15-Sep-14 1800 Conti Augmentation works at MSETCL

Waluj 400kV SSWRTS-I WRTS-I C

242 400 TARAPUR-PADGHE I 13-Sep-14 800 14-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

243 400 Karad-Lonikand 13-Sep-14 900 13-Sep-14 1700 Daily QMwork MSETCL MSETCL

244 400kV Sipat-Raipur-1 13-Sep-14 000 13-Sep-14 1700 Daily Attending hot spots and SD nature defects WRTS-I PGCIL R

245 400 BOISAR-PADGHE 13-Sep-14 800 14-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

246 400 400220 ICT-2 AT WARDHA 13-Sep-14 900 13-Sep-14 1500 Daily For Bushing oil DGA Testing WRTS-I WRTS-I R

247 400 Khandwa-Dhule 1 line reactor at Dhule 13-Sep-14 800 13-Sep-14 1800 Daily For Bushing oil DGA Testing

Line in service wo reactor WRTS-I WRTS-I R

248 220 BUS I AT MAPUSA 13-Sep-14 900 13-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R248 220 BUS I AT MAPUSA 13-Sep-14 900 13-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

249 765 Korba Line Main Bay (716) at Bilaspur Ss 13-Sep-14 900 13-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

250 400 Dhule-Babhleswar ckt 2 13-Sep-14 900 13-Sep-14 1700 Daily QMwork MSETCL MSETCL

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

251 400 Kolhapur-Mapusa 1 13-Sep-14 800 17-Sep-14 1800 Daily Insulator replacement due to polluted streaches

WRTS-I WRTS-I R

252 400 Kolhapur-Mapusa 1 13-Sep-14 800 17-Sep-14 1800 Daily Insulator replacement due to polluted streaches

WRTS-I WRTS-I R

253 400 Bhachau - Ranchodpura DC(Subject to SLDC consent) 14-Sep-14 80000 AM 20-Sep-14 60000 PM Continuo

us

Shifting of towers to maintain clearance for SSNL canal crossing (Loc 26-33 amp 78-84)

PGCIL WRTS-II C

254 400kV Bhilai-koradi line 15-Sep-14 000 16-Sep-14 000 Daily Attending hot spots and SD nature defects WRTS-I PGCIL R

255 400 Navasari- Kala MC line 15-Sep-14 800 16-Sep-14 1800 DailyConstruction work of Navasari- Boisar line on same Multi ckt tower

WRTS-II WRTS-I C

256 400 SOLAPUR(PG)-KARAD 15-Sep-14 900 20-Sep-14 1800 Conti Tower Erection of Line Reactor gantry of Karad Line at Solapur MSETCL WRTS-I R

257 765 WARDHA-AURANGABAD(PG) 2 15-Sep-14 800 15-Sep-14 1800 Daily

For replacement of Rph reactor unit at Wardha Line in service wo reactor Taking out reactor out of service

WRTS-I WRTS-I R

258 400 Chandrapur 3 Main Bay (420) at Bhadrawati 15-Sep-14 900 15-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

259 765 Seoni1 Main Bay (704 ) at Bilaspur Ss 15-Sep-14 900 15-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL RBilaspur Ss

260 220 Kakrapar-Haldarwa1 15-Sep-14 900 15-Sep-14 1800 DailyReplacement of existing 220kV CTs with High Fault current CTs at Haldarwa SS

PGCIL WRTS-II C

261 400 SSP - Rajgarh - 1 15-Sep-14 800 17-Sep-14 1800 Daily PMM WORK PGCIL GETCO

262

220 Jhanor 220 KV Bus1

15-Sep-14

800

16-Sep-14

000

Continous Replacement of existing CTCVT with 02 class CT amp CVT and for testing of the same NTPC NTPC

263 400 BOISAR-PADGHE 16-Sep-14 800 17-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

264 400 Chandrapur 3Tie Bay (421) at Bhadrawati 16-Sep-14 900 16-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

265 400 Indore-Asoj2 16-Sep-14 80000 AM 16-Sep-14 60000 PM Daily Replacement of broken insulators PGCIL WRTS-II R

266 765 Sasan-Satna2 16-Sep-14 900 17-Sep-14 1800 Daily Power line crossing for stringing of of 765Kv Vin pool- satna ck2 PGCIL WRTS-II C

267 400 315MVA ICT1 at Shujalpur 16-Sep-14 1000 16-Sep-14 1400 Daily AMP PGCIL WRTS-II R

268 220 Kakrapar-Haldarwa2 16-Sep-14 900 16-Sep-14 1800 DailyReplacement of existing 220kV CTs with High Fault current CTs at Haldarwa SS

PGCIL WRTS-II C

269 220 220 KV PITHAMPUR - RAJGARH PG CKT - I 16-Sep-14 900 16-Sep-14 16092014 1600 daily Maintenan

ce Work PGCIL EHT- Mamp I

270 400 V-satna-1 16-Sep-14 900 16-Sep-14 1900 Daily basis For erection of Breaker after OH NTPC NTPC

Construction work of Navasari- 271 400 Vapi- Kala MC Line 17-Sep-14 800 18-Sep-14 1800 Daily Boisar line on same Multi ckt

towerWRTS-II WRTS-I C

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

272 400 HVDC IBay (403) at Bhadrawati 17-Sep-14 900 17-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

273

220 Jhanor 220 KV Bus2

17-Sep-14

800

18-Sep-14

000

Continous Replacement of existing CTCVT with 02 class CT amp CVT and for testing of the same NTPC NTPC

274 400 Parli 1 Main Bay (423) at Bhadrawati 18-Sep-14 900 18-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

275 220 Kawas-Haldarwa1 18-Sep-14 900 18-Sep-14 1800 DailyReplacement of existing 220kV CTs with High Fault current CTs at Haldarwa SS

PGCIL WRTS-II C

276 400 SSP - Rajgarh - 2 18-Sep-14 800 20-Sep-14 1800 Daily PMM WORK PGCIL GETCO

277 400 400 KV Sarni - Seoni ckt 18-Sep-14 800 18-Sep-14 18092014 1800 daily Maintenance Work PGCIL EHT-

Mamp I

278 220 220 KV PITHAMPUR - RAJGARH PG CKT - II 18-Sep-14 900 18-Sep-14 18092014 1600 daily Maintenan

ce Work PGCIL EHT- Mamp I

279 220 220 KV DAMOH PG - TIKAMGARH CKT I 18-Sep-14 800 18-Sep-14 18092014 1800 daily Maintenan

ce Work PGCIL EHT- Mamp I

280 400Sipat 400KV Bay-9 (Raipur-1 Main bay) 18-Sep-14 900 19-Sep-14 1900 Continous Annual Preventive maintenance NTPC NTPC

281 400 Kolhapur-Mapusa 2 18-Sep-14 800 22-Sep-14 1800 Daily Insulator replacement due to polluted streaches

WRTS-I WRTS-I R

282 400 Khandwa 2 Tie bay (423) at 19 S 14 8 00 20 S 14 18 00 D il AMP k WRTS I WRTS I R282 400 Khandwa 2 Tie bay (423) at Seoni 19-Sep-14 800 20-Sep-14 1800 Daily AMP works WRTS-I WRTS-I R

283 400 BOISAR-PADGHE 19-Sep-14 800 20-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

284 400 Parli 1 Tie Bay (424) at Bhadrawati 19-Sep-14 900 19-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

285 220 Kawas-Haldarwa2 19-Sep-14 900 19-Sep-14 1800 DailyReplacement of existing 220kV CTs with High Fault current CTs at Haldarwa SS

PGCIL WRTS-II C

286 400 V-satna-2 19-Sep-14 900 20-Sep-14 1900 Continuous

Major OH of Line Circuit Breaker (For dismantling of poles) NTPC NTPC

287 400 Aurangabad(PG)-Aurangabad (Waluj)-2 19-Sep-14 800 22-Sep-14 1800 Conti Augmentation works at MSETCL

Waluj 400kV SSWRTS-I WRTS-I C

288 400 Parli 2 Main Bay (416) at Solapur 20-Sep-14 900 20-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

289 400 400220 ICT-3 AT MAPUSA 20-Sep-14 900 20-Sep-14 1500 Daily AMP WORKS WRTS-I WRTS-I R

Anaulagnak 33

Agast 2014 AaOr isatmbar 2014 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR AUGUST 2014 AND SEPTEMBER 2014

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)Agast 2014 isatmbar 2014 Agast 2014 isatmbar 2014

AUGUST 2014 SEPTEMBER 2014 AUGUST 2014 SEPTEMBER 2014

1 gaujarat

saIimat 12500 13900 7750 8500

AsaIimat 12540 13940 7760 8510

2 maQya p`doSa

saIimat 6200 6500 3800 4100

AsaIimat 6250 6500 3800 4100

3 CltaIsagaZ

saIimat 3030 3199 16425195 172052635

AsaIimat 3160 3269 172031 169036025

4 maharaYT

saIimat 16050 17750 10700 10800

AsaIimat 16100 17800 10750 10850

5 gaaovaa

saIimat 410 415 290 285

AsaIimat 425 425 300 290

6 dmana dIva

saIimat 315 320 205 200

AsaIimat 320 325 210 210

7 DI ena eca

saIimat 645 640 425 420

AsaIimat 650 645 430 425

8 piScama xao~

saIimat 37614 41048 25600 26080

AsaIimat 37898 41254 26450 27900

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah jaUlaa[- 2014

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 2236 75

]k[- Ukai - 2 529 75]k[- Ukai - 3 000 0]k[- Ukai - 4 2023 75]k[- Ukai (Total) 4788 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 094 2]k[- ela baI saI eca Ukai LBCH - 2 028 2]k[- ela baI saI eca Ukai LBCH (Total) 123 1 0018

3 kDanaa Kadana - 1 699 61 0010kDanaa Kadana - 2 910 57 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 1115 62 0000kDanaa Kadana (Total) 2724 62 0010

4 pnama PANAM amp Madhuban Dam 1 amp 2 160 8 0017 6 kula jalaIya TOTAL(H) 7794 225 0390

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 3339 57 34582 TaoronT pavar ilaimaToD yauinaT DI 6957 122 64083 TaoronT pavar ilaimaToD yauinaT [- 8082 122 67664 TaoronT pavar ilaimaToD yauinaT ef 8380 124 73285 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 037511 Qauvarna tapIya Dhuvaran - GT 2 000 0 116012 Qauvarna tapIya Dhuvaran - STG 1783 10113 ]ka[- yauinaT 1 Ukai -1 000 0 019714 ]ka[- yauinaT 2 Ukai -2 000 0 019315 ]ka[- yauinaT 3 Ukai -3 10038 202 922016 ]ka[- yauinaT 4 Ukai -4 6930 202 697517 ]ka[- yauinaT 5 Ukai -5 11833 212 1138718 ]ka[- yauinaT 6 Ukai -6 30277 507 2287219 gaaMQaInagar 1 Gandhinagar - 1 000 0 008220 gaaMQaInagar 2 Gandhinagar - 2 000 0 009221 gaaMQaInagar 3 Gandhinagar - 3 6275 213 669022 gaaMQaInagar 4 Gandhinagar - 4 6060 212 706523 gaaMQaInagar 5 Gandhinagar - 5 13495 215 1331024 vaNakbaaorI 1 Wanakbori - 1 12142 209 000025 vaaNakbaaOrI 2 Wanakbori - 2 12364 21026 vaaNakbaaOrI 3 Wanakbori - 3 6669 20227 vaaNakbaaOrI 4 Wanakbori - 4 7244 21128 vaaNakbaaOrI 5 Wanakbori - 5 6198 21029 vaaNakbaaOrI 6 Wanakbori - 6 5924 21230 vaaNakbaaOrI 7 Wanakbori - 7 9489 21031 ]trna Utran GT 1 000 0 026832 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 1200 221 024735 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 819 143 1098

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

Anaulagnak 41

ACTUAL GENERATION amp AVALABILITY FOR JULY 2014Actual vaastivak

Actual vaastivak

37 isaka Sikka - 1 1326 107 179438 isaka Sikka - 2 3489 114 401539 kcC ilagnaa[-T Kutch Lignite - 1 5092 71 859040 kcC ilagnaa[-T Kutch Lignite - 2 4929 7141 kcC ilagnaa[-T Kutch Lignite - 3 000 042 kcC ilagnaa[-T Kutch Lignite - 4 2388 68 571043 saUrt ilagnaa[-T Surat Lignite - 1 8775 130 874544 saUrt ilagnaa[-T Surat Lignite - 2 3966 130 445845 saUrt ilagnaa[-T Surat Lignite - 3 5411 130 524346 saUrt ilagnaa[-T Surat Lignite - 4 8973 130 883347 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5446 103 859048 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 6057 10749 jaI Aa[- pI saI ela GIPCL GT - 1 1123 33 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1510 3251 jaI Aa[- pI saI ela GIPCL GT - 3 598 3052 jaI Aa[- pI saI ela GIPCL ST - 1 1846 4553 jaI Aa[- pI saI ela GIPCL GT - 4 357 98 000054 jaI Aa[- pI saI ela GIPCL ST - 2 186 5055 [- esa esa e Aar ESSAR GT - 1 000 0 029356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 083 146 002860 jaI pI [- saI GPEC GT - 2 148 153 023361 jaI pI [- saI GPEC GT - 3 1387 145 028462 jaI pI [- saI GPEC STG 521 7563 jaI esa [- jaI GSEG GT - 1 206 51 112164 jaI esa [- jaI GSEG GT - 2 1079 4765 jaI esa [- jaI GSEG STG 613 2466 Sugen (GT 1 + GT 2) 000 0 693867 saIpIpI sao Aayaat Imp from CPP+MUNDRA 249228 6777

kula tapIya Total (T) 511604 7860 431554kula jalaIya+tapIya Total (H+T) 519398 8078 431944ivaMD [najaI- Wind Energy 94980kula jalaIya+tapIya+hvaa Total (H+T+Wind) 614378 9539ivainamaya Exchanges 150828 saIimat jaa- maaMga Restricted Energy Req 765205

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 767 135

11 gaaMQaI saagar Gandhi Sagar 998 117 008012 raNaa p`tap sagar RPSagar 096 86 004013 javaahr sagar Jawahar Sagar 439 66 0020

2 ponca Pench 1381 160 01003 baargaI Bargi 712 33 00704 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 5724 309 02906 banasaagar Bansagar-2 (Deolondh) 104 407 banasaagar Bansagar-3 (Silpara) 565 31 00608 banasaagar Bansagar-4 (Zinaha) 425 20 00309 maoDIKoDa Medikheda 096 58

10 ibarisaMGapur Birsingpur 680 20 002011 Tavaa Tawa 000 012 rajaGaaT Rajghat 001 7 007013 Omkareshwar 4226 340 14 [Midra saagar Indira Sagar 6679 679 0598

kula jalaIya TOTAL(H) MPPGCL 19979 2031 1152

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 2223 84 179302 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 14496 216 0

Actual vaastivak

4 satpura I Satpura-I(60Share) 000 0 00005 satpura II Satpura-II Unit 6 000 0 83106 satpura II Satpura-II Unit 7 7549 1857 satpura II Satpura-II Unit 8 12446 195 173908 satpura II Satpura-II Unit 9 4038 1759 satpura III Satpura-III Unit 10 9508 219 23440

10 satpura III Satpura-III Unit 11 8675 167 2096011 esajaITIpIesa 1 SGTPS Unit - 1 8675 167 2096012 esajaITIpIesa 2 SGTPS Unit - 2 9354 16013 esajaITIpIesa 3 SGTPS Unit - 3 1129 165 1642014 esajaITIpIesa 4 SGTPS Unit - 4 6022 16015 esajaITIpIesa 5 SGTPS Unit - 5 27597 50816 SSTPS 7895 309 9910

kula tapIya Total (T) 117479 2427 115480kula jalaIya+tapIya Total (H+T) 137458 4759 116632Injection from WIND 14572 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 152030 4759ivainamaya Exchanges 271419 saIimat jaa- maaMga Rest En Req 423449

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 606 120 01102 Gangrel 039 10 00203 Mini Micro KWB 039 7

kula jalaIya TOTAL(H) CSEB 684 137 0520tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 40 125902 kaorbaa (pU) Korba (E) Unit-2 2764 383 kaorbaa (pU) Korba (E) Unit-3 2764 384 kaorbaa (pU) Korba (E) Unit-4 2784 405 kaorbaa (pU) Korba (E) Unit -5 3685 120 244406 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 154608 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 24740

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 13343 243 1124012 KORBA(EB) Extn - 2 14104 248 11250

kula tapIya Total (T) 119955 1644 10189013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 119955 1644kula jalaIya+tapIya Total (H+T) 120639 1781 102410ivainamaya Exchanges 59759 0saIimat jaa- maaMga Rest En Req 180398 1781

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 5228 585 06952 kaoyanaa III Koyna III 3695 3203 kaoyanaa IV Koyna IV 371 11204 kaoyanaa DIpIeca Koyna DPH 414 385 TaTa jalaIya TATA Hydro 10123 741 44976 vaOtrNaa Vaitarna 1151 617 eladarI Eldari 000 168 BaTgar AaOr vaIr Bhatgar amp Vir 036 49 pOzana Paithan 976 49

10 itlaarI Tillari 1036 6511 BaIra Tola rosa Bhira Tail Race 846 4112 GaTGar Ghatghar 3639 25013 Anya CaoTo jalaIya Small Hydro (others) 1041 0

kula jalaIya TOTAL(H) 28404 -1073 5192

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL

Actual vaastivak

3 naaisak 3 Nasik Unit -3 4157 1954 naaisak 4 Nasik Unit -4 12489 1985 naaisak 5 Nasik Unit -5 12480 2006 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 30718 5038 Tambao 6 Trombay Unit -6 6619 5009 Tambao 8 Trombay Unit -8 000 0

10 Tambao 7A gaOsa Trombay -7A (Gas) 7476 127 288611 Tambao 7ba Trombay -7B (WHR) 4373 6912 kaoraDI 5 Koradi Unit -5 000 013 kaoraDI 6 Koradi Unit -6 8448 16714 kaoraDI 7 Koradi Unit -7 10994 19415 Bausaavala 2 Bhusawal Unit -2 4715 16516 Bausaavala 3 Bhusawal Unit -3 6454 16517 Bausaavala 4 Bhusawal Unit -4 20419 50518 Bausaavala 4 Bhusawal Unit -5 23286 43519 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 000 021 parlaI 5 Parli Unit -5 9315 17522 parlaI 6 Parli Unit -6 14237 25323 parlaI 7 Parli Unit -7 14028 25024 KaprKoDa 1 Khaperkheda Unit -1 8108 20025 KaprKoDa 2 Khaperkheda Unit -2 10924 19026 KaprKoDa 3 Khaperkheda Unit -3 7917 20627 KaprKoDa 4 Khaperkheda Unit -4 10446 21028 KaprKoDa 5 Khaperkheda Unit -5 24555 50030 parsa Paras-3 11676 21831 parsa Paras-4 10326 24032 ]rna Uran (Gas) 18771 40133 ]rna Uran (WHR) 10760 138 586234 caMd`pur 1 Chandrapur Unit -1 7526 16535 caMd`pur 2 Chandrapur Unit -2 9375 19936 caMd`pur 3 Chandrapur Unit -3 8728 20037 caMd`pur 4 Chandrapur Unit - 4 12276 47038 caMd`pur 5 Chandrapur Unit -5 29203 41039 caMd`pur 6 Chandrapur Unit -6 26351 040 caMd`pur 7 Chandrapur Unit -7 000 041 DhaNaU 1 Dahanu Unit-1 16882 250 1563042 DhaNaU 2 Dahanu Unit-2 19263 250 1660143 CPP 258820 41160044 RGPPL Share 000 0

kula tapIya Total (T) 692115 14094 350211MAH Wind + Solar Generation 110432 0kula jalaIya +tapIya Total (H+T+Wind) 830951 16176 396382

TOTAivainamaya Exchanges 274116saIimat jaa- maaMga Rest En Req 1105066

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1173 17ivainamaya Exchanges 33083saIimat jaa- maaMga Rest En Req 34256 459

C (F) dmana AaOr dIva DAMAN amp DIU 17467 298ja (G) dadra nagar hvaolaI DNH 43779 673

kula DD ampDNH (T) 61246 970

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 9731 160 1564312 tara`pur 2 TAPS Unit -2 11531 16013 tara`pur 3 TAPS Unit -3 40214 545 7288014 tara`pur 4 TAPS Unit -4 39284 53715 kakrapr 1 KAPS Unit -1 16048 545 3195016 kakrapr 2 KAPS Unit -2 14903 537

kula ena pI saI NPC Total 131710 24842 ena TI pI saI NTPC

Actual vaastivak

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15236 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14181 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14568 214 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 000 025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 32338 51326 kaorbaa esaTIpIesa 6 KSTPS Unit-6 33493 51427 kaorbaa esaTIpIesa 7 KSTPS Unit-7 30558 516

kula kaorbaa KSTPS Total 140373 2548 9318427 ivanQa esaTIpIesa 1 VSTPS Unit-1 13430 21528 ivanQa esaTIpIesa 2 VSTPS Unit-2 11930 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 13695 212210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14017 214211 ivanQa esaTIpIesa 5 VSTPS Unit-5 11952 215212 ivanQa esaTIpIesa 6 VSTPS Unit-6 8991 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 32786 515214 ivanQa esaTIpIesa 8 VSTPS Unit-8 19668 514215 ivanQa esaTIpIesa 9 VSTPS Unit-9 31796 516216 ivanQa esaTIpIesa 10 VSTPS Unit-10 31597 515217 ivanQa esaTIpIesa 11 VSTPS Unit-11 13881 512

kula ivanQayaacala VSTPS Total 233445 REF 16238 31 saIpt -1 -SIPAT-1 38555 66600 32 saIpt -2 -SIPAT-2 16033 66500 33 saIpt -3 -SIPAT-3 43240 66800 34 saIpt -4 -SIPAT-4 25865 51200 35 saIpt -5 SIPAT-5 33302 51500

kula saIpt -SIPAT TOTAL 156995 280100 920541 kvaasa gaOsa 1e Kawas GT-1A 2605 10442 kvaasa gaOsa 1baI Kawas GT-1B 4355 10643 kvaasa esaTI 1saI Kawas ST-1C 3365 11744 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 044 9846 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 10369 309 245151 gaMQaar gaOsa 1 Gandhar GT-1 2177 14352 gaMQaar gaOsa 2 Gandhar GT-2 3014 14553 gaMQaar gaOsa 3 Gandhar GT-3 5333 14754 gaMQaar esaTI 4 Gandhar ST-4 5586 158

kula gaMQaar GGPS Total 16109 437 475161 maaOda 1 Mauda -1 5368 514 000062 maaOda 2 Mauda -2 16240 513 0000

kula maaOda MAUDA Total 21608 756 2258161 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 000 31 000071 esa esa pI SSP RBPH - 1 1265 18872 esa esa pI SSP RBPH - 2 1102 18673 esa esa pI SSP RBPH - 3 1197 18774 esa esa pI SSP RBPH - 4 1116 18675 esa esa pI SSP RBPH - 5 1432 18676 esa esa pI SSP RBPH - 6 1653 18677 esa esa pI SSP CHPH - 1 422 3578 esa esa pI SSP CHPH - 2 384 3079 esa esa pI SSP CHPH - 3 179 34710 esa esa pI SSP CHPH - 4 1012 36711 esa esa pI SSP CHPH - 5 340 30

kula esa esa pI SSP Total 10101 1283 101081 kula poMca Pench Total 1381 160 010082 Jindal Injection 50805 083 Amarkantak Lanco 16857 0

(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2508924

(J) ]plabQata Availability 2439102 naoT ivainamaya Net Exchanges -311541 ]plabQa jaa- Energy Availability 2127561

maah jaUlaa[- 2014 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR JULY 2014 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 13833 - - - 13833 070714 1500 4972

saIimat Restricted 12500

AsaIimat Unrestricted 12540 13833 0 136 0 13969 070714 1500 4972

nyaUnatma pMjaIkRt maaMga Min Registered Demand 7617 7617 250714 0400 4999

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 7090 - - - 7090 020714 2015 4985

saIimat Restricted 6040

AsaIimat Unrestricted 6040 7090 0 31 0 7121 020714 2015 4985

nyaUnatma pMjaIkRt maaMga Min Registered Demand 3895 3895 230714 1500

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3118 3118 050714 2100 4985

saIimat Restricted 3150

AsaIimat Unrestricted 3250 2972 41792 24 0 3414 030714 2000 4977

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1336 1336 220714 1300 4995

maharaYT MAHARASHTRApMjaIkRt Registered 19283 - - - 19283 010714 1600 4994

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19283 62 40 0 19385 010714 1600 4994

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11936 11936 300714 0500 5000

gaaovaa GOApMjaIkRt Registered 405 459 - - 459 260714 2000 4967

AsaIimat Unrestricted 405 459 0 5 - 464 260714 2000 4967

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 532 - - 532 290714 0900 4998

AsaIimat Unrestricted 532 0 0 - 532 290714 0900 4998

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 287 - - 287 060714 1000 4991

AsaIimat Unrestricted 287 0 1 - 288 060714 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 721 - - 721 050714 1700 4983

AsaIimat Unrestricted 721 0 - 721 050714 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 400 435 290714

piScama xao~ WESTERN REGIONpMjaIkRt Registered 43034 - - - 43034 010714 1600 4994

saIimat Restricted 40703

AsaIimat Unrestricted 40905 43034 295 90 0 43419 010714 1600 4994

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28431 28431 240714 0500 5000 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

माह जलाई 2014Jul-14

अनब समातरवतीय चालन PARALLELRADIAL OPERATION TOTAL OPERATING HOURS

1 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-NR)

2 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-SR) 7424400

टाई लाईन TIE LINE

1 765 कवी िसवनी स वधा-I 765kV Soni to Wardha 6780100

2 765 कवी िसवनी स वधा-II 765kV Seoni to Wardha 2043700

3 400 कवी िभलाई स कोराड 400kV Bhilai to Koradi 7440000

4 400 कवी िभलाई स भिावती 400kV Bhilai to Bhadravati 7440000

5 400 कवी रायपर स भिावती -I 400kV Raipur to Bhadravati-I 7440000

6 400 कवी रायपर स भिावती ndashII 400kV Raipur to Bhadravati-II 7440000

7 400 कवी रायपर स भिावती ndashIII 400kV Raipur to Bhadravati-III 7440000

8 400 कवी सातपरा स कोराड 400kV Satpura to Koradi 7060200

9 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7440000

10 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 7440000

11 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7225100

12 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 7082500

13 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 5361200

14 400 कवी को हापर स मापसा-I 400kV Kolhapur-Mapusa-I 4561600

15 400 कवी को हापर स मापसा-II 400kV Kolhapur-Mapusa-II 4793700

16 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7440000

17 400 कवी रायगढ़ स ःटरलाइट-I 400kV Raigarh to Sterlight-I 7371100

18 400 कवी रायगढ़ स ःटरलाइट-II 400kV Raigarh to Sterlight -II 7440000

19 400 कवी रायगढ़ स झरसगड़ा-I 400kV Raigarh to Jharsuguda-I 7302900

20 400 कवी रायगढ़ स झरसगड़ा-II 400kV Raigarh to Jharsuguda-II 7303700

21 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 5400900

22 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7292200

23 400 कवी रायपर स वधाndashI 400kV Raipur to Wardha-I 7440000

24 400 कवी रायपर स वधाndashII 400kV Raipur to Wardha-II 7440000

25 220 कवी कोरबा पव स ब पादर-III 220kV K(E) to Budhipadar-III 7361200

ANNEXURE 43

maah jaUlaa[- 2014 ko daOrana pa~ta iSaDyaUla GaTkaoM Wara koMd`Iya xao~ ko sToSanaaoMM sao D`avala AaOr ivainamayaaoM ka ivavarNa

1 koMd`Iya sToSanaaoMM samaip-t koMd`Iya sToSanaoMa saMyaut inajaI sToSanaaoM kI GaaoiYat xamata (basa pr) AaOr laaBaaiqa-yaaMo kI pa~ta1 Declared Capcity (ex-bus) of Central Gen StnsDedicated CG StnsJointly owned Stns amp entitlement of beneficieries (MUs)

GaaoiYat xamata gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI + ecaDblyaubaI kula

(A) koMd`Iya ibajalaIGar A Central Gen Stns Dec Cap GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC+HWB TOTAL

kaorbaa esaTIpIesa Korba STPS 1017635 174452 237891 103616 324281 102699 23918 26164 1017635kaorbaa esaTIpIesa -III Korba STPS-III 283431 54419 44422 85553 76649 3066 3405 13029 283431ivanQa esaTIpIesa I Vindhyachal STPS-I 674012 123034 240046 1253 246970 19644 7141 23669 12255 674012ivanQa esaTIpIesa II Vindhyachal STPS-II 491154 117386 158375 0909 175903 6532 4569 16539 491154ivanQa esaTIpIesa III Vindhyachal STPS-III 627679 166963 156579 67068 186511 7093 7097 22387 627679ivanQa esaTIpIesa IV Vindhyachal STPS-IV 411100 98631 118464 26475 133406 5356 5241 19338 411100kvaasa gaOsa Kawas GPP 306920 87464 65557 0000 95562 5791 14520 37998 306920gaMQaar gaOsa Gandhar GPP 406294 146476 72428 0000 123833 7814 19389 36310 406294saIpt Sipat 1665864 454494 301337 266370 509047 19436 19662 68224 1665864kakrapar Kakrapar APS 275783 78347 69731 0000 94368 9698 5200 8018 10420 275783tara`pur 3 AaOr 4 Tarapur APS 3amp4 721903 183150 155921 32084 295823 8510 8953 31049 721903

(ba) samaip-t koMd`Iya ibajalaIGar B Dedicated CG Stations Actual injection vaasaivak [njaoSana [Midra saagar Indira Sagar 245570 245570 245570

(sa) saMyaut inajaI sToSana C Jointly owned Stationstara`pur 1 AaOr 2 Tarapur APS 1amp2 196640 98320 0000 0000 98320 0000 0000 0000 196640esaesapI SSP 97965 15674 55840 0000 26450 0000 0000 0000 97965ponca Pench 13620 9080 0000 4540 0000 0000 0000 13620

kula ([M saagar kao CaoD kr) Total (excl Indira Sagar) 11988065 2808880 2297269 640720 3692105 208667 173093 400816 1766516 11988065 Actual injection

2 koMd`Iya sToSanaaoMM samaip-t koMd`Iya sToSanaoMa saMyaut inajaI sToSanaaoM kI ]padna SaoDyaUla AaOr laaBaaiqa-yaaoM kI D`avala SaoDyaUla2 Generation Schedule (ex-bus) of Central Gen StationsDedicated CG StationsJointly owned Stations amp schedule of benificieries (MUs)

SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI+ ecaDblyaubaI kula

(A) koMd`Iya ibajalaIGar A Central Gen Stns Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH

HVDC+HWB Outside region(NR

amp SR) TOTALkaorbaa esaTIpIesa Korba STPS 1015070 174452 238276 103310 321801 102699 23918 26164 1015070kaorbaa esaTIpIesa -III $ Korba STPS-III $ 282671 54342 44422 85185 76334 3066 3405 13029 282671ivanQa esaTIpIesa I Vindhyachal STPS-I 660248 120064 239050 1253 237415 19644 7141 23473 12209 660248ivanQa esaTIpIesa II Vindhyachal STPS-II 488287 117160 156978 0909 174700 6532 4569 16539 488287ivanQa esaTIpIesa III Vindhyachal STPS- III 600504 134916 160349 67878 186319 7093 7227 22827 600504ivanQa esaTIpIesa IV Vindhyachal STPS- IV 409072 98719 118259 24888 133048 5356 5241 19374 409072kvaasa gaOsa Kawas GPP 99574 27083 25459 0000 23510 2678 5916 14915 0000 99574gaMQaar gaOsa Gandhar GPP 154677 55634 30257 0000 41633 3783 8217 15131 0000 154677saIpt Sipat 1448506 290983 323024 258111 436177 19418 23860 69790 1448506kakrapar Kakrapar APS 275783 78347 69731 0000 94368 9698 5200 8018 10420 275783tara`pur 3 AaOr 4 Tarapur APS 3amp4 721903 183150 155921 32084 295823 8510 8953 31049 721903

(ba) samaip-t koMd`Iya ibajalaIGar B Dedicated CG Stations[Midra saagar Indira Sagar 245570 245570 245570

RPPC(NVVNL) 0000

0000

0000

(sa) saMyaut inajaI sToSana C Jointly owned Stations Actual injection vaasaivak [njaoSana tara`pur 1 AaOr 2 Tarapur APS 1amp2 196640 98320 0000 0000 98320 0000 0000 0000 196640esaesapI SSP 97965 15674 55840 0000 26450 0000 0000 0000 97965ponca Pench 13620 0000 9080 0000 4540 0000 0000 0000 13620kula [M saagar kao CaoD kr Total (excl Ind Sagar) 10173905 2352674 2217883 625946 2591731 193349 149578 336130 1706614 10173905

Actual injectionNote- $ These Scheduled Transactions are done by WRLDC under STOA

3 AMtrxao~Iya ivainamayaaoM iWpxaIya ivanamayaaoM kI SaoDyaUla (ima yauinaTsa)3 Schedule for interregional exchangesbilateral exchanges (MUs)

SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kulaxao~ rajya RegionState Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL

k pUvaI- xao~ ko rasto Import SDLs through ER -110482Aayaat SaoDyaUla Indian Energy Exchange (WR to ER) 0000 0000 0000 0000 0000 0000 0000 139465

Power Exchange of India (ER to WR) 0000 0000 0000 0000 0000 0000 0000 3671ER (NTPC) 47912 28298 11592 52018 0000 0786 1209 93903

DVC to MPPTCL (Long Term Open Access) 0000 201316 0000 0000 0000 0000 0000 201316Hirakud to CSEB 0000 0000 1354 0000 0000 0000 0000 1354

APL2 GUVNL to APPCC ( AEL) -0918 0000 0000 0000 0000 0000 0000 -0918APL3 GUVNL to APPCC ( AEL) -0924 0000 0000 0000 0000 0000 0000 -0924

CSEB to APPCC ( NVVNL) 0000 0000 -44813 0000 0000 0000 0000 -44813DBPOWER to APPCC ( GMRETL) 0000 0000 -1828 0000 0000 0000 0000 -1828

JPL to APPCC ( KISPL) 0000 0000 -15225 0000 0000 0000 0000 -15225JPL-II to APPCC ( KISPL) 0000 0000 -11376 0000 0000 0000 0000 -11376

Anaulagnak 45

DETAILS OF ENTITLEMENTSCHEDULEDRAWAL BY THE CONSTITUENTS FROM CENTRAL SECTOR STATIONS AND EXCHANGES FOR THE MONTH OF JULY 2014

(pxaoivasa` Wara jaarI xao~Iya jaa- laoKa ko AaQaar pr)

13896KAWAS(RLNG)

GANDHAR(RLNG)

JPL-II to APPCC ( NVVNL) 0000 0000 -11414 0000 0000 0000 0000 -11414JPL-II to APPCC ( PTC LTD) 0000 0000 -14853 0000 0000 0000 0000 -14853

CSEB to ASEB ( PTC LTD) 0000 0000 -0575 0000 0000 0000 0000 -0575MPPMCL MPSEB to ASEB ( IEXL) 0000 -0575 0000 0000 0000 0000 0000 -0575

APL1 GUVNL to BIHAR ( AEL) -106185 0000 0000 0000 0000 0000 0000 -106185APL2 GUVNL to BIHAR ( AEL) -72520 0000 0000 0000 0000 0000 0000 -72520APL3 GUVNL to BIHAR ( AEL) -51827 0000 0000 0000 0000 0000 0000 -51827

DBPOWER to BIHAR ( MANIKARAN) 0000 0000 -0350 0000 0000 0000 0000 -0350EMCO to BIHAR ( PXIL) 0000 0000 0000 -0413 0000 0000 0000 -0413

GUVNL to BIHAR ( PXIL) -0200 0000 0000 0000 0000 0000 0000 -0200MSEB to BIHAR ( PXIL) 0000 0000 0000 -0100 0000 0000 0000 -0100

MPPMCL MPSEB to BIHAR ( PXIL) 0000 -0150 0000 0000 0000 0000 0000 -0150GUVNL to BESCOM ( GUVNL) -14041 0000 0000 0000 0000 0000 0000 -14041

ESSAR_MAHAN to BESCOM ( ESSAR_MAHAN) 0000 -4353 0000 0000 0000 0000 0000 -4353ADHUNIK to BALCO ( BALCO) 0000 0000 0064 0000 0000 0000 0000 0064

ADHUNIK to BALCO ( MANIKARAN) 0000 0000 7200 0000 0000 0000 0000 7200JSEB(ER) to BALCO ( MPPL) 0000 0000 1481 0000 0000 0000 0000 1481

JSEB(ER) to BALCO ( MANIKARAN) 0000 0000 1200 0000 0000 0000 0000 1200JITPL to BALCO ( BALCO) 0000 0000 1200 0000 0000 0000 0000 1200

STERLITE to BALCO ( BALCO) 0000 0000 18603 0000 0000 0000 0000 18603JSEB(ER) to ESIL_WR ( MPPL) 0600 0000 0000 0000 0000 0000 0000 0600STERLITE to ESIL_WR ( PXIL) 1900 0000 0000 0000 0000 0000 0000 1900

NSPCL to SAIL ROURKELA ( SAIL ROURKELA) 0000 0000 -23994 0000 0000 0000 0000 -23994APL2 GUVNL to TGPCC ( AEL) -1074 0000 0000 0000 0000 0000 0000 -1074APL3 GUVNL to TGPCC ( AEL) -1081 0000 0000 0000 0000 0000 0000 -1081

CSEB to TGPCC ( NVVNL) 0000 0000 -52359 0000 0000 0000 0000 -52359JPL to TGPCC ( KISPL) 0000 0000 -17792 0000 0000 0000 0000 -17792

JPL-II to TGPCC ( KISPL) 0000 0000 -13295 0000 0000 0000 0000 -13295JPL-II to TGPCC ( NVVNL) 0000 0000 -13342 0000 0000 0000 0000 -13342

JPL-II to TGPCC ( PTC LTD) 0000 0000 -17335 0000 0000 0000 0000 -17335TISCO to VFL MPSEB ( TPTCL) 0000 0000 0268 0000 0000 0000 0000 0268

BLAPPL MPSEB to WBSEB ( IEXL) 0000 -0016 0000 0000 0000 0000 0000 -0016DBPOWER to WBSEB ( PTC LTD) 0000 0000 -0595 0000 0000 0000 0000 -0595

MPPMCL MPSEB to WBSEB ( PTC LTD) 0000 -89184 0000 0000 0000 0000 0000 -89184

SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kulaxao~ rajya RegionState Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL

K dixaNa xao~ ko rasto Import SDLs through SR 10967

Aayaat SaoDyaUla Indian Energy Exchange (SR to WR) 0000 0000 0000 0000 0000 0000 0000 0169Power Exchange of India (SR to WR) 0000 0000 0000 0000 0000 0000 0000 0000RSTPS-SR to GOA ( BILATERAL) 0000 0000 0000 0000 2186 0000 0000 2186RSTPS-SR to GOA ( WHEELING) 0000 0000 0000 0000 3118 0000 0000 3118

RSTPS-SR to GOA ( WHEELING GOA) 0000 0000 0000 0000 5494 0000 0000 5494

ga ]trI xao~ ko rasto Import SDLs through NR -321127Aayaat SaoDyaUla Indian Energy Exchange (NR to WR) 0000 0000 0000 0000 0000 0000 0000 -164961

Power Exchange of India (NR to WR) 0000 0000 0000 0000 0000 0000 0000 -3367Rihand (Hydro) to MPPTCL (Long Term Open Access) 0000 7970 0000 0000 0000 0000 0000 7970

Matathilla (Hydro) to MPPTCL (Long Term Open Access) 0000 0000 0000 0000 0000 0000 0000 0000EMCO to BIHAR ( PXIL) 0000 0000 0000 -0188 0000 0000 0000 -0188MSEB to BIHAR ( IEXL) 0000 0000 0000 -0400 0000 0000 0000 -0400

MPPMCL MPSEB to BSES_RAJ ( MPPL) 0000 -7000 0000 0000 0000 0000 0000 -7000ADHUNIK to BALCO ( MANIKARAN) 0000 0000 5198 0000 0000 0000 0000 5198

HIMACHAL to ESIL_WR ( IEXL) 0050 0000 0000 0000 0000 0000 0000 0050HARIYANA to ESIL_WR ( IEXL) 1525 0000 0000 0000 0000 0000 0000 1525HARIYANA to ESIL_WR ( PXIL) 5610 0000 0000 0000 0000 0000 0000 5610

KWHEPS to ESIL_WR ( PXIL) 0150 0000 0000 0000 0000 0000 0000 0150SCL to ESIL_WR ( IEXL) 0610 0000 0000 0000 0000 0000 0000 0610SCL to ESIL_WR ( PXIL) 0090 0000 0000 0000 0000 0000 0000 0090

MPPMCL MPSEB to HARIYANA ( HARIYANA) 0000 -126636 0000 0000 0000 0000 0000 -126636SCL to HRJIL MSEB ( SCL) 0000 0000 0000 1993 0000 0000 0000 1993

APL3 GUVNL to JVVNL-NR ( IEXL) -0120 0000 0000 0000 0000 0000 0000 -0120APL3 GUVNL to JVVNL-NR ( PXIL) -0122 0000 0000 0000 0000 0000 0000 -0122

BLAPPL MPSEB to JVVNL-NR ( IEXL) 0000 -0250 0000 0000 0000 0000 0000 -0250EMCO to JVVNL-NR ( IEXL) 0000 0000 0000 -0720 0000 0000 0000 -0720MSEB to JVVNL-NR ( PXIL) 0000 0000 0000 -0300 0000 0000 0000 -0300

MPSEB to NDPL(DTL)-NR ( PTC LTD) 0000 -1626 0000 0000 0000 0000 0000 -1626MPPMCL MPSEB to NDPL(DTL)-NR ( PTC LTD) 0000 -35052 0000 0000 0000 0000 0000 -35052

MPPMCL MPSEB to RPPC ( RPPC) 0000 -3562 0000 0000 0000 0000 0000 -3562EMCO to TRIPURA ( IEXL) 0000 0000 0000 -0070 0000 0000 0000 -0070

ADHPL to TORRAHM GUVNL ( IEXL) 0051 0000 0000 0000 0000 0000 0000 0051

Ga iWpxaIya SaoDyaUlsa Exchanges within WRMundra APL to Gujarat (LTOA) 0000 0000 0000 0000 0000 0000 0000 0000

JPL to ARVIND GUVNL ( MPPL) 4464 0000 0000 0000 0000 0000 0000 4464JPL to AIGL MSEB ( AIGL MSEB) 0000 0000 0000 0789 0000 0000 0000 0789

JPL to ARPIPL MSEB ( ARPIPL MSEB) 0000 0000 0000 0771 0000 0000 0000 0771JPL to ACCIL MSEB ( ACCIL MSEB) 0000 0000 0000 2380 0000 0000 0000 2380

APL1 GUVNL to AWLD GUVNL ( AEL) 3874 0000 0000 0000 0000 0000 0000 3874DBPOWER to BALCO ( BALCO) 0000 0000 0120 0000 0000 0000 0000 0120

DBPOWER to BALCO ( DBPOWER) 0000 0000 15887 0000 0000 0000 0000 15887EMCO to BALCO ( EMCO) 0000 0000 0080 0000 0000 0000 0000 0080

JPL to BOSCH MSEB ( BOSCH MSEB) 0000 0000 0000 1552 0000 0000 0000 1552JPL to BCSIL MSEB ( BCSIL MSEB) 0000 0000 0000 0720 0000 0000 0000 0720JPL-II to CSEB ( CSPTRDCL CSEB) 0000 0000 12569 0000 0000 0000 0000 12569

SPECT ACBIL to CSEB ( CSPTRDCL CSEB) 0000 0000 0720 0000 0000 0000 0000 0720ACBIL to CSPTRDCL CSEB ( CSPTRDCL CSEB) 0000 0000 5374 0000 0000 0000 0000 5374

JPL to CLASSIC MSEB ( CLASSIC MSEB) 0000 0000 0000 1309 0000 0000 0000 1309JPL to CIPLA MSEB ( CIPLA MSEB) 0000 0000 0000 0610 0000 0000 0000 0610

JPL to CEAT MSEB ( MPPL) 0000 0000 0000 2921 0000 0000 0000 2921APL1 GUVNL to CHLM GUVNL ( AEL) 2187 0000 0000 0000 0000 0000 0000 2187

NSPCL to DD ( DD) 0000 0000 0000 0000 0000 13156 0000 13156EMCO to DNH ( EMCO) 0000 0000 0000 0000 0000 0000 28097 28097

JPL to DNL MSEB ( DNL MSEB) 0000 0000 0000 0870 0000 0000 0000 0870JPL to ETLC MSEB ( ETL) 0000 0000 0000 0758 0000 0000 0000 0758JPL to ETLT MSEB ( ETL) 0000 0000 0000 0758 0000 0000 0000 0758

APL2 GUVNL to ESIL_WR ( PXIL) 0283 0000 0000 0000 0000 0000 0000 0283APL3 GUVNL to ESIL_WR ( PXIL) 8355 0000 0000 0000 0000 0000 0000 8355

DBPOWER to ESIL_WR ( MANIKARAN) 0000 0000 0000 0000 0000 0000 0000 0345EOL GUVNL to ESIL_WR ( ESIL_WR) -19578 0000 0000 0000 0000 0000 0000 0000

EPGL GUVNL to ESIL_WR ( ESIL_WR) -2866 0000 0000 0000 0000 0000 0000 0000JPL to ESIL_WR ( JPL) 0000 0000 0000 0000 0000 0000 0000 45641

JSWEL(RTNGIRI) MSEB to ESIL_WR ( PXIL) 0000 0000 0000 -2328 0000 0000 0000 0000MSEB to ESIL_WR ( PXIL) 0000 0000 0000 -1705 0000 0000 0000 0000

ESSAR_MAHAN to ESIL_WR ( ESIL_WR) 0000 0000 0000 0000 0000 0000 0000 52250VANDANA to ESIL_WR ( PXIL) 0000 0000 0000 0000 0000 0000 0000 0480

JPL to ESIL MSEB ( JPL) 0000 0000 0000 0108 0000 0000 0000 0108ESSAR_MAHAN to ESIL MSEB ( ESIL_WR) 0000 0000 0000 1244 0000 0000 0000 1244

JPL to ETLW MSEB ( ETL) 0000 0000 0000 0732 0000 0000 0000 0732JPL to ETLB MSEB ( ETL) 0000 0000 0000 0866 0000 0000 0000 0866

JPL to EILR MSEB ( MPPL) 0000 0000 0000 1049 0000 0000 0000 1049JPL to ETLK MSEB ( ETL) 0000 0000 0000 0643 0000 0000 0000 0643

JPL to EXIDE MSEB ( EXIDE MSEB) 0000 0000 0000 1239 0000 0000 0000 1239CSEB to GOA ( PTC LTD) 0000 0000 -0400 0000 0400 0000 0000 0000

DBPOWER to GOA ( PTC LTD) 0000 0000 0000 0000 17390 0000 0000 17390JPL to GSL MSEB ( GSL MSEB) 0000 0000 0000 0870 0000 0000 0000 0870

EMCO to GCEL ( EMCO) 0000 0000 3394 0000 0000 0000 0000 3394JPL to HINDMOUDA MSEB ( HINDMOUDA MSEB) 0000 0000 0000 2249 0000 0000 0000 2249

HINDAHEJ GUVNL to HINDTALOJ MSEB ( HINDTALOJ MSEB) -2962 0000 0000 2962 0000 0000 0000 0000EMCO to DNH ( EMCO) 0000 0000 0000 0000 0000 0000 119290 119290

JPL to HNGIL MSEB ( HNGIL MSEB) 0000 0000 0000 5156 0000 0000 0000 5156LANCO TO MP 0000 191431 0000 0000 0000 0000 0000 191431

IEE 103711 47279 -413725 163201 0000 26840 0000 31054PEI 3561 7107 0000 -0214 0000 0000 0000 17561

ca kula Aayaat Total Import 781888 184933 483401 86303 247768 28588 40782 148596 781888kula inayaa-t Total Export 1202530 274418 268404 653270 6437 0000 0000 0000 1202530naoT Aayaat inayaa-t Net Imp (+)Exp (-) -420642 -89485 214997 -566968 241330 28588 40782 148596 -420642

4 kula gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kula

Total GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL11567423 2719395 2512265 73752 3933435 237255 213875 549412 12255 11567424

5 kI kula iSaDUyala Total Sdl incl IR bi-lateral exch Sdl 9753264 2263189 2432879 58978 2833062 221937 190360 484727 12209 97532646 ibanaa xait ko kula D`avala Total Drl excl Tr Loss 9388390 2433257 2716560 597587 2741156 286430 174671 437785 0944 93883907 xait imalaakr kula D`avala Total Drl incl Tr Loss 9703552 2433257 2716560 597587 2741156 286430 174671 437785 0976 93884228 p p`NaalaI maoM kula pUla xait Pooled loss in WR System 3151629 p xao`~ sToSanaaoM sao kaorbaa ivanQa 1 AaOr 2 ivanQa 3 kvaasa gaMQaar kakrapar tara`pur esaesapI ponca kula

vaastivak [njaoSana Actual Inj - WR Stns KSTPS VSTPS-1amp 2 VSTPS-3 KGPS GGPS KAPS TAPS SSP PENCH TOTAL (ima yauinaTsa) (MUs) 1310550 1162242 1009828 99928 156340 275783 918544 97965 13620 12860991

] xao~ Aa ]xao kao ina ] xao naoT d xao Aa d xao inayaa-t d xao naoT pU xao Aa pU xao inayaa-t pU xao naoT kula naoT10 vaasaivak AMtrxao~Iya Actual IR Exchanges NR Imp NR Exp NR Net SR Imp SR Exp SR Net ER Imp ER Exp ER Net Total Net

ivainamaya (ima yauinaTsa) (MUs) 0347 2303947 -2303600 0000 737616 -737616 73271 189494 -116223 -3157439 AMtrxao~Iya ivainamaya IR Exchange Schedule NRI sdl NRE sdl Net NR sdl SRI sdl SREsdl Net SR sdl ERI sdl ERE sdl Net ER sdl Net WR sdl iSaDyaUla (ima yauinaTsa) (MUs) 2987 714531 -711544 404371 0000 404371 0000 113469 -113469 -420642

Total Entitlement incl IR and bi-lateral exchange schedule

11

AMtrxao~Iya AaOr iWpxaIya ivanamayaaoM kI iSaDyaUla imalaakr kula pa~ta

maah jaUlaa[- 2014 ko AMtr-ajyaIya AMtrxao~Iya ivainamayaaoM ka ivavarNa Anaulagnak 46DETAILS OF INTERSTATEINTER-REGIONAL EXCHANGES FOR THE MONTH OF JULY 2014 Annex-46

k`maaMkFrom To

gauivainaila map`iva]kMila Craivabaao maraiva]kMila gaaovaa dmana dIva da na h [ssaar ] xao~ d xao~ pU xao~ piScama xao~ kulaA InterstateInter-regional Schedules

included in ISGSGUVNL MPPGCL CSEB MSPGCL GOA DD DNH ESIL NR SR ER WR TOTAL

1 gauivainaila GUVNL 2962 31082 34044

2 map`iva]kMila MPPGCL 0000

3 Craivabaao CSEB04

0400

4 maraiva]kM ila MSPGCL 4033 4033

5 gaaovaa GOA 0000

6da na h DNH 0000

7kaorbaa KORBA-III 0000

8 iMjadla pavar JPL 4464 12569 26349 45641 89023

9 ADanaI pavar APL 6061 6061

10 ESSAR MAHAN 1244 52250 53494

11 laonakao Lanco -Pathadi 0000

12 esaIbaIAa[-ela -ACBIL 6093 6093

13 KSK MAHANADI14 DB POWER 16008 17390 0345

15 VANDANA 0480

16 EMCO 3473

17 ESIL18 ena esa pI saI ela NSPCL 13157 28097 41254

19 ]ltarI xao~ NRegion (WR end) 0347 0347

20 dixaNaI xao~ S Region (S Bus) 0000 0000

21 pUvaI- xao~ E Region (WR end) 73271 73271

22 p xao~ WRegion (WR end) 737616 189494 3231057

23 enaTIpIsaI NTPC Injection 5216788

24 enapIsaI NPC Injection 1194327

25 Total ISGS drawal from the Grid incl interregional bi-lateral

2433257 2716560 597587 2741156 286430 174671 437785

B InterstateIR Exchanges not included in ISGS

20 knaa-Tk Karnataka 444 44400

21 yaUpIpIsaIela UPPCL 0000 0000

22 AarvaIpIenaela RVPNL -237 -2370

23 UPPCL ( Excess Drawn From Rajghat 0000 0000

24 kaoTa ]jjaOna Kota - Ujjain 0000 0000

25 kula ba Total B (13 to 17) 0000 -2370 0000 0000 44400 0000 0000 42030

C inavala ivainamaya Net Exchange (12+18) 2433257 2714190 597587 2741156 330830 174671 437785 9429476

D kula Aayaat Total Imp by WR 115648

E kula inayaa-t Total Export by WR 3231057

F inavala ivainamaya Net Exchange (D-E) -3115409

G p xao~ Wara vaIlD jaa- Energy wheeled by WR

26 pU xao~ sao d xao~ kao inayaa-t ER export to SR0000

0000

27 d xao~ sao ] xao~ kao inayaa-t pUxao pxao sao haokr SR export to NR via ERWR0000

0000

28 d xao~ sao ] xao~ kao inayaa-t pxao sao haokr SR export to NR via WR0000

0000

29 pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr ER export to NR via WR0000

0000

30 ] xao~ sao d xao~ kao inayaa-t pxao sao haokr NR export to SR via WR393404

393404

31 pU xao~ sao d xao~ kao inayaa-t pxao sao haokr ER export to SR via WR0000

0000

32 pU xao~ sao d xao~ kao inayaa-t ]xao pxao sao haokr ER export to SR via NRWR0000 0000

0000

33 ]pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr NER export to NR via WR0000

0000

Anaulagnak 47Annex-47

maah jaUlaa[- 2014 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39697 65459

9964 39521

Levels in Mtrs str maITr maoM

]ka[- Ukai

64932

10110

25501

25801

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF JULY 2014

ivavarNa Particulars

Sr No Details of incident (Elements Generation Tripped) Owner Utility Date TimeEffect (Loss of generation Load) if

anyCategory as per

Standards1 Bus Fault at Lonikhand 400 kV Bus 1 MSETCL 04Jul14 315 Nil GI‐22 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 06Jul14 433 load Loss 277 MW GD‐13 Tripping of Multiple Elements from 400220 kV Parli (MSETCL) Ss MSETCL 08Jul14 2359 Nil GI‐24 Poles tripping of HVDC Bhadarwati PGCIL 09Jul14 0350 amp 0504 Nil GI‐25 Tripping in Jejuri and Loanand Area MSETCL 10Jul14 126 Load Loss 400 MW GD‐16 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 11Jul14 349 load Loss 335 MW GD‐17 Blackout at Kawas Ss NTPC 11Jul14 117 Gen Loss 320 MW GD‐18 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 13Jul14 642 load Loss 263 MW GD‐19 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 15Jul14 611 load Loss 264 MW GD‐110 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 16Jul14 334 load Loss 200 MW GD‐111 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 17Jul14 417 load Loss 150 MW GD‐112 Tripping at Gandhar Ss NTPC 21Jul14 1607 Gen Loss 180 MW GD‐113 Multiple time tripping of 765 kV Sasan ‐Satna 2 ckt on Protection Mal‐operation PGCILSASAN 7252014 1026 amp 1229 Hrs Nil GI‐2

List of Grid Disturbances and Grid incidents (GDGI) in July-2014 Western RegionANNEXURE-5

SR NO UTILITIES OCC NO MONTH STATUS REMARK 1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14 HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314 AT MUMBAI BY NTPC MUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514 AT MUMBAI BY WRPC AT RELIANCE

7 WRTS-I 460 Jun-14 HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714 AT RAIPUR BY KWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-1411 RELIANCE SASAN 464 Oct-1412 MADHYA PRADESH 465 Nov-1413 BDTCLJBTCL 466 Dec-1414 NTPC Vindhyachal 467 Jan-1515 ESSAR TRANSMISSIOM 468 Feb-1516 TATA POWER 469 Mar-1517 SUGEN (TPL) 470 Apr-1518 TORRENT POWER 471 May-1519 CGPL 472 Jun-1520 NTPC Korba 473 Jul-1521 NCA 474 Aug-1522 NHDC 475 Sep-1523 NTPC Mouda 476 Oct-1524 KSK 477 Nov-1525 RELIANCE 478 Dec-1526 NTPC SIPAT CG 479 Jan-1627 TAPS-3amp4 480 Feb-1628 ESSAR ESIL 481 Mar-1629 GOA 482 Apr-1630 KAPS 483 May-1631 JPL 484 Jun-1632 DNH 485 Jul-1633 NTPC Mumbai 486 Aug-1634 ADANI TRANSMISSION 487 Sep-1635 INDIAN RAILWAY 488 Oct-1636 WRTS-II 489 Nov-16

ANNEXURE 10

8212014

1

OCC MEETING (462nd )

Power system Operation Corporation Ltd

OPERATIONAL HIGHLIGHTS amp ISSUES

Date 11082014Venue ndash Tarapur

MonthsIEGC Band

FVIlt499 499‐5005 gt5005

March14 1291 4783 3927 012

April14 3064 5233 1703 016

May14 2248 5319 2433 013

Junersquo14 3715 4536 1749 02460

80

100

120Frequency Profile for July 2014Frequency Profile for July 2014

Maximum instantaneous frequency

5036 Hz

on 23rd July 2014 at 1304 hrs

Minimum instantaneous frequency

4941 Hz

on 10th July and 25th July 2014 at 1950 hrs and 1944 hrs respectively

Julyrsquo14 3451 5016 1533 020

0

20

40

60

1‐Jul

2‐Jul

3‐Jul

4‐Jul

5‐Jul

6‐Jul

7‐Jul

8‐Jul

9‐Jul

10‐Jul

11‐Jul

12‐Jul

13‐Jul

14‐Jul

15‐Jul

16‐Jul

17‐Jul

18‐Jul

19‐Jul

20‐Jul

21‐Jul

22‐Jul

23‐Jul

24‐Jul

25‐Jul

26‐Jul

27‐Jul

28‐Jul

29‐Jul

30‐Jul

31‐Jul

Avg Frequency of the month

4993 Hz

1High frequency day due to heavy rain in almost all places in the country low demand was observed(117 GW) Heavy underdrawal by all constituents of WR around 700‐1000 MW during 1300 hrs2 Low frequency day Demand was high and Od by constituents Od by NR

lt499 499‐5005 gt5005

8212014

2

501

502

503

504

Frequency for July 2014

496

497

498

499

50

494

495

1 60 119

178

237

296

355

414

473

532

591

650

709

768

827

886

945

1004

1063

1122

1181

1240

1299

1358

1417

1476

1535

1594

1653

1712

1771

1830

1889

1948

2007

2066

2125

2184

2243

2302

2361

2420

2479

2538

2597

2656

2715

2774

2833

2892

2951

3010

3069

3128

3187

3246

3305

3364

3423

3482

3541

3600

3659

3718

3777

3836

3895

3954

4013

4072

4131

4190

4249

4308

Frequency 499 5005

26000

28000

Unit Outage‐ JULY‐14 Max 26128 MW on 26072014JUNE14 Max 20818 MW on 210714

PLANNED OUTAGE FORCED OUTAGE TOTAL OUTAGE‐JULY14 TOTAL OUTAGE‐JUNE14

10000

12000

14000

16000

18000

20000

22000

24000

26000

MW

0

2000

4000

6000

8000

10000

1‐Jul‐14 6‐Jul‐14 11‐Jul‐14 16‐Jul‐14 21‐Jul‐14 26‐Jul‐14 31‐Jul‐14Date

8212014

3

Energy ConsumptionMax

986 Mus on 2nd July+2975 as compared

to last year900

1000

1100

IN M

Us ‐‐‐‐gt

DAILY CONSUMPTION OF WESTERN REGION(2010‐11 TO 2014‐15)

Min749 Mus on 24th July

500

600

700

800

CONSU

MPT

ION

Apr

May Jun

Jul

Aug Sep

Oct

Nov Dec Jan

Feb

Mar

MONTHS ‐‐‐‐gt2010‐11 2011‐12 2012‐13 2013‐14 2014‐15

Energy Consumption MUDay

Jul‐14 Jun‐14 Jul‐13 Change wrt last month

Change wrt last Year

Average 848 927 712 ‐845 1909Max 986 971 760 156 2975Date 2‐Jul‐14 30‐Jun‐14 2‐Jul‐13 ~ ~

PEAK DEMAND (this month vis-agrave-vis last month)

STATE

CATERED(MW) UNRESTRICTED(MW)

Julyrsquo14 Junrsquo14 Julyrsquo14 Junrsquo14

GUJARAT 13833 13755 13969 13906

MP 7090 7120 7121 7434

CHATTISGARH 3118 3472 3414 3473

Regional Demand met

Max 43034 MW(1st July 1600 hrs)

2540 more than the l

MAHARASHTRA 19283 19452 19385 19755

GOA 459 475 459 482

DD 287 298 287 298

DNH 721 677 721 685

ESIL 532 535 532 535

43034 42934 43419 43802

last year

Min 28431 MW(24th July0500 hrs)

WR TOTAL 43034 42934 43419 43802

Figures shown are Maximums in the month

Demand Met Jul‐14 Jun‐14 Jul‐13 Change wrt last month

Change wrt last Year

Average 35215 40463 32253 ‐1297 918Max 43034 42934 34317 023 2540

Date when Max 1‐Jul‐14 30‐Jun‐14 2‐Jul‐13 ~ ~

8212014

4

Constituents Total Time Block Noof time block Violation of Compilance Violation of Compilancein the month of July Type ‐1 Type‐2

Chhattisgarh 2976 983 6697 927 6885Guajrat 2976 681 77 12 222 92 54

DSM Violation for the Month of July 2014

Guajrat 2976 681 7712 222 9254Madhya Pradesh 2976 528 8226 594 8004Maharashtra 2976 1045 6489 442 8515

Goa 2976 712 7608 1868 3723Daman and Diu 2976 1720 4220 2506 1579

Dadar Nagar Haveli 2976 23 9923 1299 5635

Violation Type‐2 When The drawl does not change sign in 12 consecutive time block

Violation Type‐1 When The drawl is more or less than 12 schedule or 150 MW whichever lesser

Total No of Blocks ‐ 2976

New Elements July 2014a) COMMISSIONING OF NEW GENERATING UNITSSLNO CONSTITUENT UNIT NAME UNIT NO C`ty(MW) DATE TIME

1 IPP(Jay Prakash Nigrie) JNSTPP I 660 150714(sync) 845

b) COMMISSIONING OF NEW TRANSMISSION LINES

SLNO CONSTITUENT LINE NAME CKT NO KV DATE TIME Line length( in km)

1 POWERGRID Wardha‐Aurangabad II 765 372014 2300 347 581 POWERGRID Wardha Aurangabad II 765 372014 2300 34758

2 POWERGRID Wardha‐Aurangabad I 765 572014 1900 34758

3 GETCO Kosamba‐Chorania I 400 572014 2035 230

4 GETCO Kosamba‐Chorania II 400 572014 2105 230

5 BDTCL BDTCL‐Bhopal(MP) I 400 16714 1833 864

6 POWERGRIDLILO of Raipur‐Raigarh‐4

IV 400 1872014 2200 2826 POWERGRIDat KSK

IV 400 1872014 2200 282

7 MPPTCL Indore‐Pithampura II 400 210714 1625 150

8 POWERGRIDDharamjaygarh‐Jharsuguda

I 765 29714 000 14893

9 POWERGRIDDharamjaygarh‐Jharsuguda

II 765 28714 2125 14893

Total ckt Km 189366

8212014

5

c) COMMISSIONING OF NEW ICTS

SLNO CONSTITUENT STATION NAME KV RATIOCAPACITY (MVA) DATE

TIME

1 BDTCL BDTCL(Bhopal)ICT 1 765400 3x500 372014 1657

2 POWERGRID Dharamjaygarh(ICT 1) 765400 3x500 772014 22593 POWERGRID Navasari(ICT 3) 400220 500 872014 1959

d)CO SS O G O C O Sd)COMMISSIONING OF LINE REACTORS

SLNO CONSTITUENT STATION NAME Line Name KVCty(MVAR

) DATETIME

1 BDTCL BDTCL Indore‐BDTCL I 765 3x80 23714 1935

2 POWERGRID DharamjaygarhDharamjaygarh‐Jharsuguda II

765 3x110 280714 2125

3 POWERGRID DharamjaygarhDharamjaygarh‐Jharsuguda I

765 3x110 29714 000

4 POWERGRID Satna Satna‐Gwalior‐II 765 3x80 29714 10005 POWERGRID Aurangabad Padghe Aurangabad 1 765 3x80 310714 22 475 POWERGRID Aurangabad Padghe‐Aurangabad‐1 765 3x80 310714 2247

e)COMMISSIONING OF BUS REACTORS

SLNO CONSTITUENT STATION NAME KVCty(MVA

R) DATETIME

1 POWERGRID Bhatapara 400 125 24714 19562 POWERGRID Indore 765 3x80 31714 18273 POWERGRID Sujalpur 400 125 31714 1205

Congestion Charge was applied 3 times in July 2014 on WR‐NR path ie on12th 14th amp 15th July 2014

8212014

6

5515 5484

5200

5400

5600

Congestion Charge applied on WR‐NR path Dt12714 (Block 3 ‐16)

4200

4400

4600

4800

5000WR‐NR TTC(4900 MW)

WR‐NR ATC(4400 MW)

4000

4200

030

034

038

042

046

050

054

058

102

106

110

114

118

122

126

130

134

138

142

146

150

154

158

202

206

210

214

218

222

226

230

234

238

242

246

250

254

258

302

306

310

314

318

322

326

330

WR‐NR_Act(MW) WR‐NR_TTC(4900 MW) WR_NR_ATC(4400 MW)

2200 00

240000

260000

280000

300000

320000

MW

Maharashtra Sch Vs Drawal‐12714(Block 3‐16)

140000

160000

180000

200000

220000

240000

MW

Gujarat Sch Vs Drawal_12714

200000

220000

3 4 5 6 7 8 9 10 11 12 13 14 15 16

TIme Block

Maharashtra_Sch Maharashtra_Drawal

340000

350000

W

MP Sch Vs Drawal_12714(Block 3‐16)

120000

3 4 5 6 7 8 9 10 11 12 13 14 15 16Time Block

GETCO_Sch(MW) GETCO_Drawal(MW)

750008000085000

CSPTCL‐12714(3‐16)

310000

320000

330000

3 4 5 6 7 8 9 10 11 12 13 14 15 16

MW

TIme Block

MP_Sch MP_Drawal

450005000055000600006500070000

3 4 5 6 7 8 9 10 11 12 13 14 15 16

MW

Time Block

CG_Sch CG_Drawal

Under Drawal By WR constituents during the imposition of Congestion on WR‐NR on 12714

8212014

7

5292

5100

5300

Congestion Charge applied on WR‐NR path Dt14714 (Block 57 ‐71)

4638

4300

4500

4700

4900

5100

WR‐NR TTC(4900 MW)

WR‐NR ATC(4400 MW)

3900

4100

1330

1336

1342

1348

1354

1400

1406

1412

1418

1424

1430

1436

1442

1448

1454

1500

1506

1512

1518

1524

1530

1536

1542

1548

1554

1600

1606

1612

1618

1624

1630

1636

1642

1648

1654

1700

1706

1712

1718

1724

1730

1736

1742

1748

1754

1800

WR‐NR_Act(MW) WR‐NR_TTC(4900 MW) WR_NR_ATC(4400 MW)

3600380040004200440046004800

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

MW

Maharashtra Sch Vs Drawal‐14714(Block 57‐71)

1900

2000

2100

2200

2300

2400

2500

2600

MW

Gujarat Sch Vs Drawal_14714

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

TIme Block

Maharashtra_Sch Maharashtra_Drawal

1800

1900

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

Time Block

GETCO_Sch(MW) GETCO_Drawal(MW)

700

750

800

Chhattisgarh Sch Vs Drawal_141714(Block57‐71)

2600

2700

2800

2900

MW

MP Sch Vs Drawal‐14714(57‐71)

500

550

600

650

700

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

MW

Time Block

CG_Sch CG_Drawal

2400

2500

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

Time Block

MP_Sch MP_Drawal

8212014

8

4630

45004700

Congestion Charge applied on WR‐NR path Dt15714 (Block 50 ‐96)

4463

350037003900410043004500

WR‐NR TTC(4150 MW)

WR‐NR ATC(3650 MW)

31003300

1215

1234

1253

1312

1331

1350

1409

1428

1447

1506

1525

1544

1603

1622

1641

1700

1719

1738

1757

1816

1835

1854

1913

1932

1951

2010

2029

2048

2107

2126

2145

2204

2223

2242

2301

2320

2339

2358

WR‐NR_Act(MW) WR‐NR_TTC(4150 MW) WR_NR_ATC(3650 MW)

3800

4000

4200

4400

4600

4800

MW

Maharashtra Sch Ve Actual on 15714(50‐96)

130015001700190021002300250027002900

MW

Gujarat Sch Vs Actual on 15714(50‐96)

3600

50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96

Time Block

Maharashtra_Sch Maharashtra_Drawal

1300

50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96

Time BLock

GETCO_Sch(MW) GETCO_Drawal(MW)

3500

3700

MP Sch Vs Actual for 15714(50‐96)

850

950

1050

Chhattisgarh Sch Vs Actual‐15714(50‐96)

2700

2900

3100

3300

50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96

MW

Time Block

MP_Sch MP_Drawal

350

450

550

650

750

850

50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96

MW

Time BLock

CG_Sch CG_Drawal

8212014

9

Summary of Grid Events (GD amp GI) in July 2014

Sr No

Details of incident (Elements Generation Tripped) Owner Utility Date TimeEffect (Loss of

generation Load) if any

Category as per

Standards

1 Bus Fault at Lonikhand 400 kV Bus 1 MSETCL 04Jul14 315 Nil GI‐2

2 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 06Jul14 433 load Loss 277 MW GD‐1

3Tripping of Multiple Elements from 400220 kV Parli

MSETCL 08Jul14 Nil GI 23(MSETCL) Ss

MSETCL 08Jul142359

Nil GI‐2

4 Poles tripping of HVDC Bhadarwati PGCIL 09Jul140350 amp 0504

Nil GI‐2

5 Tripping in Jejuri and Loanand Area MSETCL 10Jul14 126 Load Loss 400 MW GD‐1

6 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 11Jul14 349 load Loss 335 MW GD‐1

7 Blackout at Kawas Ss NTPC 11Jul14 117 Gen Loss 320 MW GD‐1

8 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 13Jul14 642 load Loss 263 MW GD‐1

9 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 15Jul14 611 load Loss 264 MW GD‐1

10 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 16Jul14 334 load Loss 200 MW GD‐1

11 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 17Jul14 417 load Loss 150 MW GD‐1

12 Tripping at Gandhar Ss NTPC 21Jul14 1607 Gen Loss 180 MW GD‐1

13Multiple time tripping of 765 kV Sasan ‐Satna 2 ckt on

Protection Mal‐operation PGCILSASAN 7252014

1026 amp 1229 Hrs

Nil GI‐2

S No Name of power

stations

Unit Reason for

outage

1 VSTPS 2 (210 MW) Coal Shortage

91 Operation of grid at high frequency ( gt 505 Hz) even under fuel shortage condition

Issues1 Major ISGSIPP are facing fuel

shortage1 VSTPS 2 (210 MW) Coal Shortage

2 VSTPS 5 (210 MW) Coal Shortage

3 Singhaji 1 (600 MW) Coal Shortage

4 SGTPS 4 (210 MW) Coal Shortage

5 JP Bina 2 (250 MW) Coal Shortage

6 Bhusawal 2 (210 MW) Coal Shortage

shortage2 Expected High Demand during dry

spell in September amp October3 Optimal use of precious fuel is

necessary to tackle the high demand in dry spell

7 Parli 4 (210 MW) Coal Shortage

8 India Bulls 1 (270 MW) Coal Shortage

8212014

10

Agenda 92 Insecure operation Oscillations Power Swingbull N‐1 contingency of 765 kV Tirora‐Akola2 on 10th and 11th June 2014

bull Tirora gen gt 1500 MW AR not operatedbull Intra plant mode of oscillations (097 Hz) with poor damping

bull N‐1 contingency of 400 kV Tirora‐Warora‐1 on 20th May 2014N 1 contingency of 400 kV Tirora Warora 1 on 20 May 2014bull Tirora gen gt 1500 MW 765 kV Tirora‐Akola2 out of servicebull SPS bull Power Swing and loss of complete power station GD‐1

bull The need for transmission augmentation as well as PSS tuning at APML Tirodawas discussed in the 461st OCC meeting

bull Member Secretary WRPC suggested that APML would send details of PSSMember Secretary WRPC suggested that APML would send details of PSS tuning studies to WRPC and they may consult IIT‐Mumbai for assistance and expedite

bull Representative from SLDC Kalwa APL may like to update the progress

Events at APML TiroraCase 3 Date 11‐07‐14 1529 hrsbull Line tripped on Y Phase to earth fault AR was unsuccessful due to persisting faultbull Sudden power transfer through 400 kV System resulted in swing Oscillation of 097 Hz observed across WR and

East West generation in Western region oscillatedO ill i i d f 10 dbull Oscillation persisted for 10 seconds

bull Damping ratio was 257

8212014

11

Events at APML TiroraCase 4 Date 23‐07‐14 0227 hrsbull 765400 kV APML Tirora ICT trippedbull Sudden power transfer through 400 kV System resulted in swing Oscillation of 097 Hz observed across WR

and East West generation in Western region oscillatedO ill i i d f 17 dbull Oscillation persisted for 17 seconds

bull Damping ratio was 7

bull Need for transmission augmentation as well as PSS tunning at APML Tiroda required

bull It has been decided in 461th OCC thatAPML would send details of PSS

Expected date of

tuning studies to WRPC and they may consult IIT‐Mumbai for assistance and expedite Representative from SLDC Kalwa APL may like to update the progress

Expected date of bull 2nd ckt of 765 kV Tirora‐Akola2bull 220 kV network from 400220 kV Warorabull 220 kV network from 765400 kV Akola2 and 765400 kV Taptithandabull 220 kV network from 765400 kV Aurangabad‐PG 400220 kV Pune

Redistribution of Load within Maharashtra system

8212014

12

Elements Date and

Time of

Tripping

Date and

Time of

Restoratio

n

Remarks Receipt of

DREL at WRLDC

Satna Sasan

765 kV Sasan‐Satna 225‐07‐14

1026

25‐07‐14

1155

Protection Mal‐Operation DT at Sasan End

on OV as line remain hanging from Sasan No Yes

Agenda 93 Frequent Tripping of 765 kV Satna‐Sasan line

Issues

1Expedite commissioning of Line Reactor at 765 kV Sasanend

2 Submission of DREL for1026 1155end

765 kV 240 MVAr

Bus Reactor at Satna

25‐07‐14

1026

25‐07‐14

1139

Protection Mal‐Operation DT at Sasan End

on OV as line remain hanging from SasanNo Yes

765 kV Sasan‐Satna 225‐07‐14

1342

25‐07‐14

1342

Line got charged from Satna and

synchronized at Sasan end but immediately

DT was received at Sasan from Satna and

Line tripped Prior to tripping voltage at

No Yes

2 Submission of DREL for event analysis in line with CEA standards IEGC

3 Threat to grid security and constraints in evacuation from large generation complexarising from frequent undesirable tripping particularily

Sasan end was 796 kV

765 kV Sasan‐Satna 225‐07‐14

1628‐

Charging attempt was taken from Satna end

but line tripped before synchronization at

Sasan end due to DT from Satna Open end

voltage at Sasan 826 kV for the line

No Yes

The above was a narrow miss because the tripping occurred when one of the bus was under shutdown Fortunately during theabove period only two units of Sasan were in service and the second 765 kV bus remained in service else the situation would havebeen a serious threat to the system security

during protection testing construction activities

The progress of reactor commissioning at Sasan over the last 8 months is given under

Schedule in formed in meetings

SN 451st OCC 455th

OCC

456th OCC 457th 458th 459th 460th 461st

1 Line reactor By Dec By April By May By June End of June End of By By

of 765 kV

Sasan‐Satna

ckt‐2

y

2013

y p

2014

y y

2014

y

2014(Testing under

progress)

2014 (As per

joint report

post site visit

on 26314)

June 2014

y

Aug‐

2014

y

Aug‐2014

2 765kV Bus‐1

Reactor

Jan 2014 By Mar

2014

By June

2014

By June

2014(Testing under

)

End of July

2014(As per

j i t t

End of July

2014

By

Sep‐

2014

By

Sep‐2014

Sasan may intimate the progress in reactor commissioning to the sub-committee

progress) joint report

post site visit

on 26314)

2014

8212014

13

Item no94 SPS at Sipat

bull The SPS scheme implemented at NTPC Sipat received at WRLDC

bull It is observed that a time delay of 15sec is provided to unload units 1 2 4 amp5 each by 150MW if ICT l d d 130 f t d l dany ICT s load exceeds 130 of rated load

bull As per decision of WRPC meeting on 18314 if ex‐bus generation at Sipat is more than 2200 MW immediate unloading of units were decided and the intentional delay provided needs to be re‐ examined (Maximum 2‐3 sec delay may be appropriate) as unloading by 150MW would also take another 4‐5sec

8212014

14

Contingency Envisaged SPS action Identified FeedersTripping of any oneICT at 400200 VapiSub‐Station

Automatic LoadShedding of 100MW

DNH 1) 66 kV‐Kharadpara‐Rakholi‐I 50 MW2) 66 kV Khadoli‐Khadoli‐3 30 MW

Item No95 SPS at 400220 kV Vapi(PGCIL) Item No912

DD1) 66 kV Magarwada‐Kachigam 60 MW

It was apprised by representatives from DD amp DNH in the 459th OCC meeting that the above scheme shall be implemented within a month

UT DDDNHmay apprise the status of commissioning of the envisaged SPSUT‐DDDNH may apprise the status of commissioning of the envisaged SPS

Item no96 Addressing High Voltage condition in SSP amp nearby area Sl No Line No of Times tripped in Julrsquo141 400 kV SSP‐Dhule‐I 32 400 kV SSP ‐ Rajgarh‐ I 2

Issues1 Multiple tripping of

feeders emanating from SSP

2 S l tiSl No Line No of occasions kept open on HV 2 Several emanating feeders being kept open on high voltage in SSP amp nearby area

Sl No Line No of occasions kept open on HV

1 400 kV SSP‐Dhule‐I 9

2 400 kV SSP‐Dhule‐II 6

3 400 kV SSP ‐ Rajgarh‐ I 1

4 400 kV SSP ‐ Rajgarh‐ II 1

bull Operating RBPH machines in synchronous condenser mode during offOperating RBPH machines in synchronous condenser mode during off peak hours

bull Reactor commissioning at Rajgarh amp Dhule to be expedited by WRTS‐II(PGCIL) amp MSETCL

bull Absorption of MVAr by Wanakbori WTS

8212014

15

1 Voltage at Wanakbori was gt420 kV for 100 the time during Julrsquo14

2 WTPS units 567 are injecting MVAR (~ 60 MVAR) at Voltage gt 420 kV

3 Absorption of MVAR by WTPS units is expected during the high voltage condition at WTPS amp nearby area

97Status of implementation of UFRWestern Region

States Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Stage - I 492 Hz Stage - II 490 Hz Stage - III 488 Hz Stage - IV 486 Hz

relief GUJARAT 580 773 580 726 580 1117 590 1025MADHYA PRADESH 460 468 460 450 460 460 465 490CHATTISGARH 150 110 150 114 155 117 155 91MAHARASHTRA 805 1108 810 1200 815 765 820 851GOA 25 25 25 25 25 25 25 25UT DD 10 15 15 15 UT DNH 30 30 35 35 Total load relief 2060 2484 2070 2515 2085 2485 2105 2482

Not received

DD and DNH have not implemented any stage of AUFLS

DD and DNH may appraise the status

Real‐time monitoring of the likely relief available from AUFLS at any given instant mandated by CERC

Telemetry to be provided at SLDC amp RLDC

Not received

8212014

16

Agenda 98 ADMS (Automatic Demand Management Scheme) Implementation as per Sec 542 of IEGC

As per CERC order dt06062014 the target of fully implementation of scheme is by January2015Constituents have to submit bi‐monthly progress report to WRPC Secretariat with a copy to the Commission and WRLDCMP has submitted its detailed action plan in the form of an affidavit to CERC for implementation of ADMS However SLDC MPPTCL is requested to furnish data to OCC forum in the above format

Item No 99 Status of Telemetry in WR

Telemetry Issuesdoc

8212014

17

Item No 910 Black Out at NTPC Kawas Power Station

bull On 11th July 2014 Kawas Gas generating complex got blackout due to tripping of evacuation lines one by one

within a short span of 30 minutes

bull The complete loss of evacuation lines occurred at 0117 Hrs The blackout has resulted in tripping of GT1A

GT1B and ST causing 320 MW generation loss in the area It was reported that weather condition was foggy with

slight drizzling was in the area

LineTime of Tripping

Kawas End Remote endRestoration Time

220 kV Kawas‐Navsari1

1246 AM

R phase to EF

Fault location 2 km

R Phase to EF

122 AM

220 kV Kawas ndashNavsari2

112 AMR phase to EF

Fault location 2208 km

R Phase to EF 347 AM

220 kV Kawas‐Haldarwa 1

107 AMR phase to EF

Fault location 16 km

R Phase to EF 246 AM

220 kV Kawas‐ R phase to EF R Phase to

bull Line restoration has failed on several attempt as the lines

were not holding due to persisting fault

bull Such an event of total loss of evacuation lines from a

generating station resulting in blackout scenario is a

matter of serious concern

bull WRTS-2 may kindly send the reasons for such faults

which has caused the incidence and the remedial action

taken in this regard220 kV Kawas‐Haldarwa 2

108 AMp

Fault location 2 kmEF 304 AM

220 kV Kawas‐Icchapur1

108 AM B phase to EFB Phase to EF

301 AM

220 kV Kawas‐Icchapur2

108 AMB phase to EF Faultlocation 356 km

B Phase to EF

331 AM

220 kV Kawas‐Vav 1 117 AMNo tripping

Hand Tripped laterLine Tripped 225 AM

220 kV Kawas Vav 2 117 AM Y Phase to EFY Phase to EF

317 AM

taken in this regard

bull Disturbance Recorder (DR) and Event Logger(EL) out

puts are yet to be received from WRTS-2

bull As per IEGC the information like DREL output relay

indications amp sequence of events etc must be sent to

RLDCRPC by 24 hrs of the event WRTS-2 may kindly

expedite amp furnish the information to WRLDC amp WRPC

Item No 911 Operating Procedure of WR-2014

The operating procedure of Western Region 2014 has been updated on 31072014 and the p g p g psame has been uploaded on WRLDC web site at the following link

httpwwwwrldccomdocsWR_OPERATING_PROCEDURE_2014pdf

8212014

18

Item No 12 Mock Black start Exercise

Station Name Date Proposed Remarks

Mock Black Start Plan for the following stations has been received by WRLDC

CLPIPL Gas Power Plant 29‐Jun‐2014 ‐

Gandhar Gas Power Plant 27‐July‐2014 ‐

Other Utilities may update the sub‐committee regarding their plan for black start exercise

SL No Name of the Station Remarks

1 Bargi DG set under outage

2 TONS Governor Problem

3 Birsinghpur Governor Problem

Healthiness of DG sets

3 Birsinghpur Governor Problem

4 Medikheda Governor Problem

5 Rajghat Governor Problem

1 Outage of DG set for longer period is matter of serious concern 2 SLDC Jabalpur may apprise the present status2 SLDC‐Jabalpur may apprise the present status3 Possibility of procurement of stand‐by DG sets to be examined to take care of such prolonged outage of DG sets which virtually renders the black start facility sterile4 There is need for blackstart generator planning in W3 area Thermal IPP generators are disconnected from state grid and there is no hydro station So with only UHV lines and large thermal units system restoration post disturbance would be extremely challenging for Chattisgarh

8212014

19

Maharashtra

Madhya Pradesh

Item No13 Review of list of feeders for load regulation in emergency

Gujarat

DD amp DNHChattisgarh

Goa

bull Decided during the 461st OCC that list ofDecided during the 461st OCC that list of

feeders identified for load control under

emergency measure for safeguarding grid

security would be reviewed in a special

meeting The list is yet to be reviewed

8212014

20

Item No 14 Implementation of voltage and time grading on OV relays to prevent tripping of multiple EHV lines emanating from single node on high voltage

bull During the 461st OCC it was informed by Power Grid representative that they have already implemented voltage grading in various line emanating from the same node (matter has not come in the MoM)

bull Power Grid amp other utilities may kindly intimate the present status of voltage grading at their respective sub‐stations

Power Station Number of instances

when the SPS signal

was received at the

station

Number of instances

when the action by

the generators was

adequate

Number of instances

when the automatic

generation reduction was

done partially

JPL 53 0 50

Item No 15 SPS for SR‐WR Inter Connection Inadequate Participation by Generators

Issues

1 10 times operation of SPS‐1 causing backing down at JPL amp KSK during 1714 to 7 8 14JPL 53 0 50

KSK 53 0 36

APML 35 0 30

Mouda 35 0 0

Koyna 0 0 0

Koradi 0 0 0

Khaparkheda 0 0 0

Chandrapur 0 0 0

to 78142 Participation by other envisaged

generators to be expedited3 PGCIL may update status of Extention of

SPS signal from Solapur(PG) to the additional generators identified for participation

4 Decided in 461st OCC to have special Chandrapur 0 0 0

DB Power 0 0 0

NSPCL 0 0 0

Balco 0 0 0

Lanco 0 0 0

KWPCL 0 0 0

pProtection Sub‐Committee meeting to discuss progress of implementation of the revised SPS at Solapur (for WR‐SR interconnection) amp extension of signal from Sholapur to additional generators in WR

8212014

21

Thank you

DiscussionhelliphelliphellipDiscussionhelliphelliphellip

  • 462 occ_minutepdf
  • participants list_462 OCC meeting 110814pdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 26-7pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 45pdf
  • 46pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84pdf
  • 84apdf
    • 26wrpc_minute 107pdf
    • 26wrpc_minute 108pdf
    • 26wrpc_minute 109pdf
    • 26wrpc_minute 110pdf
    • 26wrpc_minute 111pdf
    • 26wrpc_minute 112pdf
    • 26wrpc_minute 113pdf
      • 85pdf
      • 87pdf
      • 98pdf
      • 913pdf
      • 10pdf
Page 2: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR

2

462nd OCC MINUTES

5 Four important transmission elements have been added in WR grid viz 765 kV Wardha- Aurangabad Ckt I amp II and 765 kV Dharamjaigad-Jharsuguda Ckt I amp II(WR-ER interregional line) which may solve the problem of congestion at Wardha amp W-3 area

6 BDTCL has charged 400kV Bhopal (BDTCL) to Bhopal(MP) and entered as new transmission licensee in WR

He further informed that due to delayed monsoon amp critical power scenario in the

region the planning of generating unit outages is very crucial in this meeting

There after he requested to Shri SSatyanarayana SE WRPC to take up regular

agenda items in seriatim for discussion

ITEM No 1 CONFIRMATION OF THE MINUTES

Member Secretary WRPC stated that the Minutes of 461ST meeting of Operation

amp Coordination Sub-Committee of WRPC held on 10th July 2014 at Raipur were

forwarded vide letter No WRPCOPNOCC-Minutes2014-157024 dated 23072014

No comments have been received Therefore the minutes were confirmed without any modification

ITEM NO2 REVIEW OF SYSTEM OPERATION DURING THE MONTH OF JULY

2014 Member Secretary WRPC requested WRLDC to brief the Committee on Grid Operation

experiences during July 2014

Chief Manager WRLDC in the presentation ( copy attached at Annexure ndash 2 in soft

copy) concentrated broadly on the performance of the grid for month of July 2014 as

below

21 Frequency Particulars

The average frequency during the month of July 2014 was 4993 Hz The

maximum instantaneous frequency was 5036 Hz at 1304 hrs of 23rd July 2014

while minimum instantaneous frequency was 4941 Hz on 10th July (1950 hrs) as

well as on 25th July 2014 (1944 hrs) The frequency profile during July 2014 was

as under

01-July 2014 to 30-July 2014 time

IEGC band (499 lt f lt 5005 Hz) 5016 lt 499 Hz 3451 gt 5005 Hz 1533

The detailed frequency particulars are enclosed at Annex- 21

The Sub-Committee noted

3

462nd OCC MINUTES

22 Operational Discipline

There was a net inter-regional export of 356400 MUs by WR against net export

schedule of 335400 MUs

The Sub-Committee noted

23 Voltage Profile Voltage profile at some of 765400 kV sub-stations during the month of July

2014 furnished by WRLDC is enclosed at Annex-23

The Sub-Committee noted as above

24 UF Relay Operations

As per WRLDC records during July 2014 the system frequency didnrsquot touch 492 Hz

and no UF relay operation reported by any constituents The Sub-Committee noted as above

25 Power Cuts Load Restrictions

Details of Power Cuts and Regulatory measures during July 2014 as furnished by the

state utilities are given in Annex 25 The Sub-Committee noted as above

26 Details of Generating Units under Forced outages Details of generating units under forced outages during July 2014 are given in

Annex-26

The Sub-Committee noted as above 27 Details of Generating Units under Planned outages

The details of generating units under Planned Outages during July 2014 are given in Annex-27

The Sub-Committee noted as above

ITEM NO3 OPERATIONAL PLANNING 31 Proposed Planned maintenance programme of generating units

The maintenance programme of generating units for August 2014 amp September

2014 was discussed

4

462nd OCC MINUTES

Sub - committee discussed the matter amp suggested that outages of major coal fired

units(200MW amp above) amp hydro generating station shall be deferred till next OCC

meeting due to following reasons

1 Intermittent rain profile in the region amp Load generation balance requirements of

grid for secure operation

2 Coal shortage being faced by some important generating station of NTPC viz

Sipat amp Vindhyachal etc

3 Gas shortages being faced by Gas stations

4 Water shortage by Parli units of Maharashtra state power generating company

ltd(MSPGCL)

The finalized outage schedule of generating units for the above period and the

modified outages plan is placed at Annexure-31

The Sub-Committee agreed as above

32 Outage Programme of Transmission Lineselements The committee had received 275 nos of proposals for outage planning during Aug-Sep

2014 Further some proposals were received at the last moment of the meeting

The committee observed that -

1 There were repetitions in the proposals wherein the same line had been

requested for outage a no of times

2 The lines pertaining to STU were asked for outage As per 446th OCCM such

lines should be first approached to concerned STU and only in case of

problems faced in outages OCC-WR may like to review

3 Line detailsreasons in many cases were not already mentioned Committee

requested that while submitting outage planning data necessary care may

please be taken

4 All utilities were requested to avail outages as planned

The Sub-Committee agreed for the same

33 ANTICIPATED POWER SUPPLY POSITION FOR THE MONTHS ndash AUGUST 2014 amp SEPTEMBER 2014

Details of anticipated restricted amp un-restricted demands for the months of August 2014 amp

September 2014are given in Annex 33

The Sub-Committee noted the same

5

462nd OCC MINUTES

ITEM NO 4 OPERATIONAL STATISTICS FOR THE MONTH OF July 2014 The details of actual generation demand drawl of power from grid exchanges etc are given in the following Annexure Annex 41 - Actual Generation and Requirement for July 2014 Annex 42 - Peak Demand Schedule Vs Actual for July 2014 Annex 43 - Integrated Operation of the System and Operation of Inter State Tie lines

For July 2014 Annex 47 ndash Details of level of Major Reservoirs in Western Region for Month July

2014

The Sub-Committee noted ITEM NO 5 SYSTEM DISTURBANCES IN WESTERN REGION There was no major grid disturbance in the Western Region during the month The

tripping details during the month received from WRLDC is enclosed at Annexure-5

The Sub-Committee noted as above ITEM NO 6Healthiness status of SERsDRs of equipment in the system

Constituents have furnished the status of healthiness of SERDRs in their systems on the dates below

Sl No Name of

constituents Date of Receipt

1 PGCILWRTS-I 06082014 2 PGCILWRTS-II 07082014 3 MPPTCL 11082014 4 NTPC 04082014 5 CSPTCL 03082014 6 GETCO 07082014 7 MSETCL 11082014

Constituents of WR are requested to ensure healthiness and send the information to

this office regularly as per the recommendation of enquiry committee of Grid

disturbances on 25022007 and 28022007

ITEM NO 7 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS TRANSMISSION LINES AND GENERATING UNITS IN WR

71 Status of completion of ongoing Schemes for Commissioning of reactors The present status regarding schedule and commissioning of reactors is as below

6

462nd OCC MINUTES

S No

400 kV Substn

Size (MVAR)

Implementing agency

Expected commissioning date

1 Ranchodpura 125 MVAR GETCO Commd On 8th July 2013

2 Varsana 125 MVAR GETCO Commd On 25th July 2013

3 Rajkot 125 MVAR GETCO Commd On 5th August 2013

4 Amreli 125 MVAR GETCO Commd On 12072013

5 Jetpur 63 MVAR GETCO Commd on 11072013

6 Zerda 125 MVAR GETCO Commd in July 2013

7 Kosmba 80 MVAR GETCO Commissioned on 29112013

8 Limbdi (Chornia)

125 MVAR GETCO 25th July 2013

9 Jabalpur 125 MVAR PGCIL Commissioned on 26032014

10 Khandwa 125 MVAR PGCIL Commissioned on 28032014

11 India bulls 80 MVAR BR

MSETCL Commissioned 26112013

12 Nagda 50 MVAR MPPTCL Commissioned in Feb-2014

13 Sasan Line reactor-1

240 MVAR RELIANCE Commissioned on 16022014

14 Shujalpur 125 MVAR PGCIL July 2014 end

15 Bhatapara 125 MVAR PGCIL July 2014 end

16 Raigarh 125 MVAR PGCIL July 2014 end

17 Aurangabad 125 MVAR PGCIL 28042014

18 Nanded 125 MVAR MSETCL 2015

19 Sholapur 125 MVAR MSETCL Sept-2014

20 Kolhapur 125 MVAR MSETCL Sept-2014

7

462nd OCC MINUTES

21 Akola 125 MVAR MSETCL Sept-2014

22 Nagda 125 MVAR MPPTCL Oct 2014

23 Bhopal 80 MVAR MPPTCL Sept 2014

24 Damoh 125 MVAR PGCIL August 2014

25 Bachau 125 MVAR PGCIL August 2014

26 Pirana 125 MVAR PGCIL August 2014

27 Itarsi 2X125 MVAR

PGCIL August 2014

28 Seoni 125 MVAR PGCIL August 2014

29 Parli 125 MVAR PGCIL August 2014

30 Raipur 125 MVAR PGCIL August 2014

31 Gwalior 125 MVAR PGCIL Commissioned on 30062014

32 ISP 125 MVAR NHDC 2015

33 Satpura 50 MVAR MPPGCL March-2015

34 Sasan Line reactor-2

240 MVAR RELIANCE August -2014

35 Sasan Bus reactor

240 MVAR RELIANCE Sept-2014

72Status of completion of 765400 kV and above ongoing Transmission Schemes

being executedimplemented by Transmission Agencies The updated status on various ongoing transmission schemes for the current year as per the current information available is as follows - S No

Name of the Line Target Completion Date

Remarks

POWERGRID 1 400 kV Navsari ndash Kudus DC Line Sept- 2014 ROW problem 2 765kV SC Satna-Gwalior line

(359Km + 60Km DC Portion) Ckt-II August- 2014

3 765 kV Raigarh (Kotra) pooling Commissioned on

8

462nd OCC MINUTES

station -Champa Pooling station -Dharamjaygarh PS - 2nd ckt

21052014

4 765 kV Gwalior - Jaipur line (1st Ckt) SC

Dec 2014

5 765 kV Dharamjaygarh - Jabalpur Pooling Station DC line

Dec-2014

6 765 kV Wardha ndashNizamabad-Hyderabad DC

March-15

7 765 kV Narendra-Kolhapur DC March-15 8 HVDC Raigarh(Kotra)-Pugalur Bi-

pole March-15

9 400 kV Aurangabad - Boisar line DC line

Dec -2014

10 765 kV Aurangabad (PG) - Padghe (PG) DC

August-2014

11 800kV DC Champa ndash Kurukshetra Bipole

Jan 2015

12 765 kV DC Jharsuguda ndash Korba Dec 2014 13 2 X 765 kV SC Ranchi ndash Sipat Jan 2015 14 765 kV Wardha- Aurangabad DC

Line

Ckt I Commissioned on 010714 Ckt II Commissioned on 030714

15 765 kV Aurangabad- Solapur DC line

Dec 2014

16 765 kV Solapur-Pune line

Sept 2014

17 765KV Durg-Wardha DC Sept 2014 CHHATTISHGARH 1 LILO of 400 kV Korba west-

Khedamara at Marwa August 2014

2 400 kV DCDS Raipur(Raita)- Jagdalpur(DCDS)

March 2015

21 220 kV Korba-Bishrampur line (DCSS)

Sept 2014

22 220 kV DCDS lines Chhuri to Mopka (Bilaspur) (DCDS)

Nov 2014

26 LILO of 220 kV Raigarh-Budipadar at 400 kV PGCIL Ss Raigarh

Sept2014

28 LILO of 220 Korba (E)- Bishrampur line at 220 kV Churri Ss

Sept 2014

29 LILO of 220 kV Raigarh ndash Jindal (Tamnar) at Girwani 220 kV Ss

Sept 2014

GUJARAT 1 400 kV DC Kosamba-Chorania line

(Package I)(From Chorania SS to AP-54)

Aug -2014 Commissioned on 100314

9

462nd OCC MINUTES

2 400 kV DC Kosamba-Chorania line

(Package II)(From Kosamba SS to AP-54)

Aug -2014

3 400 kV DC Mundra-Zerda line No 1 Aug -2014 4 400 kV DC Mundra-Zerda line No 2 March-2015 5 400 kV DC Vadinar-Amreli line December -

2014

6 400kV Mundra-Hadala LILO to Halvad

August -2014

7 400 kV DC Amreli-Kasor line(Part-1) December-2014

8 400 kV Charanka- Veloda Oct 2014 MADHYA PRADESH 1 Chhegaon-Julwania 400 KV DCDS

Line OCT - 2014

2

Pithampur- Indore 400KV DCDS Line

August - 2014

Work of the line have been completed by MPPTCL feeder bay from Indore PGCIL is awaited

3 Satpura TPH-Ashta 400KV DCDS Line

December ndash 2014

MAHARASHTRA(STU)

1 400KV DC line from Koradi-II to Wardha SS(PG) DC

Oct- 2014

2 400 kV Akola-Taptiganga Sept 2014 3 400 kV Tiroda-Akola Dec - 2014 GUJARAT (IPTC route) by WR Transmission (Guj) Pvt Ltd

1 400 kV Rajgarh(PG)-Karamsad (GETCO) DC

Sept -2014

STERLITE (JTCL) 1 765 KvDhramjaygarh - Jabalpur (JTCL)

DC line May -2015 Severe ROW Problem

2 765 kV Jabalpur - Bina (JTCL) Sc May -2015 Severe ROW Problem STERLITE (BDTCL) 1 765 kV Bhopal - Indore (BDTCL) SC August-2014 2 765 kV Bhopal-Bhopal Commissioned on

160714 3 765 kV Dhule - Vadodara SC Oct - 2014 4 765 kV Vadodara - Dhule (BDTCL) SC Oct - 2014 5 765 kV Dhule - Aurangabad (BDTCL)

SC August-2014

RAICHUR SHOLAPUR TRANSMISSION CO LTD(RSTCL)

1 765 kV Raichur - Sholapur line 2nd SC

Commissioned on 29062014

10

462nd OCC MINUTES

It was suggested by WRLDC and constituents that important list of line will be sent by

each constituent to WRLDC and WRLDC will compile and furnish the list as per

priority of commissioning

The Sub-Committee noted and agreed as above

73 Commissioning of new Generating units in Western Region and the capacity expected to be commissioned during the current year 2014-15

The status regarding Generating units expected to be commissioned during the

current year 2014-15 is as below

Name of the Power Projects Unit No Capacity (MW)

Date of Commissioning Schedule Date

GUJARAT Bhavnagar Lignite TPP-JV I 250 August 2014 II 250 August 2014 UNO SUGEN 2 3825 July 2014 CHHATTISGARH Marwa 1 500 Sept 2014 2 500 Dec 2014 MAHARASHTRA Dhariwal 2 300 Synd On 23042014 CHANDRAPUR 8 500 Oct 2014 CHANDRAPUR 9 500 March 2015 KORADI 8 660 Oct 2014 KORADI 9 660 Jan 2015 PARLI 8 250 March 2015 MADHYA PRADESH Singhaji TPS 2 600 Oct-2014 Ms Jhabua Power Seoni 1 600 Dec ndash 2014 MB Power Anuppur 1 600 Sept ndash 2014 Jaiprakash Power Nigri 1 660 July 2014 Jaiprakash Power Nigri 2 660 Dec 2014 Moser Bear (Hindustan power) 1 600 Nov- 2014 Moser Bear (Hindustan power) 2 600 March 2015 Essar Concessional ampEssar Power 1 600 Oct 2014 Essar Concessional ampEssar Power 2 600 Dec 2014 BLA 2X4 90 March 15 Jhabua Power 1 600 Dec 2014 CENTRAL SECTORIPP KSK 2 600 August 2014 KSK 5 600 January 2015

11

462nd OCC MINUTES

ACBIL 1 300 March 2015 SASAN 5 660 July 2014 SASAN 6 660 August 2014 Sasan 4 660 Synchronized in May 2014

Sub-committee noted as above ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS (A) FOLLOW-UP ITEM NO 81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

All the constituents are requested to submit the CMP report for the First quarter

(April 2014 to June 2014) for the year 2014-15

The Sub-Committee members noted as above ITEM NO 82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR

Status of physical amp cyber security in Power Sector for the First quarter (April 2014 to

June 2014) for the year 2014-15 have not been received from some of the

constituents

The Sub-Committee members noted as above ITEM NO 83 PROCEDURE FOR CALCULATION OF TRANSMISSION SYSTEM

AVAILABILITY FACTOR FOR A MONTH AS PER CERC REGULATION 2014-19

Member Secretary WRPC informed that a procedure for calculation of

transmission system availability factor as envisaged in CERC Regulation 2014-15

was discussed in 461st OCC held at Raipur Various aspects were discussed and

finalized However there were concerns expressed by transmission licensee

regarding addition of 12 hrs to outage hrs after each tripping beyond admissible 2

tripping in a year as it will reduce availability below 95 Also concern was

expressed for multiplying outage hrs by 2 for line affecting generation Also

whether addition of 12 hrs is applicable to such lines affecting generation was

also expressed Whether these clauses are applicable to HVDC system was not

known Therefore all such concerns of transmission licenses have been taken up

with CERC for revision clarification

Meetings were held on 1st and 4th August 2014 with transmission licenses

regarding verification of data data formatting and sorting out various anomalies

and doubts for data from April to July 2014 for further processing at WRPC end

12

462nd OCC MINUTES

Member Secretary WRPC informed that certification for some transmission licensees

has already been done The certificate for PGCIL is to be issued as effect on

generation evacuation certificate from WRLDC is awaited

CM WRLDC requested all the transmission licensees to submit the data to WRLDC in

same format as submitted to WRPC

Representative from Transmission licensees agreed the same

The Sub-committee noted as above ITEM NO 84 IMPLEMENTATION OF RSD METHODOLOGY Shri Satyanarayan SE WRPC informed that GM (OSampC) NTPC HQ-I Mumbai vide letter dated 28072014 (copy enclosed at annexure 84) requested to call a meeting for resolvingclarification of methodology developed by WRPC The procedure for RSD framed by WRPC is enclosed at Annexure 84A SLDC MPPTCL Jabalpur informed that RSD was implemented for NTPC Mauda unit

on 18072014 but it was not more extended beyond 20072014 as no other major

beneficiaries agreed for extension

CE GETCO informed that intermittent rain profile in the different geographical area of

Gujarat amp increasing demand pattern didnrsquot permit them to take RSD of any NTPC

units as minimum of 3 days is required

Representative from SLDC Maharashtra also endorsed the Gujarat view points on

RSD

GM NTPC requested to the committee that if RSD wasnrsquot possible then at least

technical minimum schedule should be given

Member Secretary WRPC summarized the matter as follows

1 RSD was implemented for NTPC Mauda unit from 18072014 to 20072014

but it could not be extended due to increasing demand pattern amp uncertainty of

rain profile in the region

2 The method framed by WRPC shall be continued amp will be applied as and

when required

3 He requested constituents to schedule the NTPC generating units at its

technical minimum in case RSD is not feasible

The Sub-committee noted as above

13

462nd OCC MINUTES

ITEM NO 85 LOAD FORECASTING IN WESTERN REGION Background- As per the amended Indian Electricity Grid Code that is effective from 17th February 2014 the SLDCs SEB distribution licensees shall always restrict the net drawal of the State from the grid within the drawal schedule keeping the deviations from the schedule within the limits specified in the Deviation settlement mechanism regulations Therefore it is imperative that adequate attention may be paid towards load forecasting The matter was discussed in the past several OCC as well as in the 26th TCCWRPC board meeting wherein it was decided to create a task force for exploring development of a software for load forecasting A meeting was held on 03042014 under leadership of CE(SLDC) GETCO Gujarat at

Mumbai The outcome of the Meeting was as following

1 Short term action a) all the discoms were advised to provide maximum historical data b) Discoms have to bifurcate the geographical area in to zone and derive effect of temp rain festival on load

2 Long term action a) Provide computer base meters up to all the distribution feeders for close monitoring b) Provide weather sensors at various strategically important locations c) Formulation of forecasting desk (load amp RE) at SLDC level

The 2nd meeting regarding Load Forecasting Mechanism was held with members of WRPC WRLDC Western Region SLDCs amp State Discoms Forecasting Service Providers (FSPs) on 110614 at SLDC Vadodara Gujarat During the 460th OCC meeting CE SLDC GETCO informed that roadmap for implementation of pilot project amp main project has been prepared Budget proposal have already called from FSP amp they assured to submit till the end of the month For implementation of pilot project the Utility and their respective Pilot FSP are decided as tabulated below

Sr No STATE ndashSLDCDISCOM Pilot FSP

1 GUJARAT MS TESLA

2 MAHARASHTRA IIT MUMBAI

3 MADHYA PRADESH MS METEOLOGICA

4 CHHATISGARH MS SAS

5 GOA MS MARCADOS

6 DDDNH IITGANDHINAGAR

MP informed vide letter dated 27062014(copy enclosed at 85) that they have

already placed on order to Ms L amp T InfoTech on 12072013 for load forecasting

software project Therefore MP had requested to exclude them from pilot project

activities decided in earlier meetings

14

462nd OCC MINUTES

462nd OCC Discussions- State wise status is as under -

bull CE SLDC informed that Gujarat has prepared the NDA and forwarded to TESLA for signing and the same was signed by TESLA New Zealand office and their Mumbai office shall forward the same to SLDC Gujarat Thereafter Input data shall be provided and ID shall be provided to TESLA so as to start forecasting by them

bull SLDC Gujarat vide letter no SLDCCEMIST-6458 dtd 270614 has conveyed to all WR Nodal SLDC coordinators regarding progress of load forecasting pilot project Thereafter also e mailed on date 2082014 to all Nodal SLDC for submission of status Report on Pilot Load Forecasting Project However no proper response is received so far

bull MP SLDC conveyed that they have already awarded contract for load forecasting and the same is expected to be available by year end Therefore MP shall not participate in the present scheme

bull SLDC Chhattisgarh representative informed that matter has been taken with discom Chhattisgarh Discom were facing difficulties to contact with coordinator of Ms SAS

CE SLDC Gujarat being a group leader stated that Chhattisgarh shall intimate to them for further needful and would help them in this matter

bull Maharashtra SLDC informed that there was a meeting held on 09082014 with IIT Bombay where availability of data has been discussed amp one more meeting will be held on 22082014 outcome of the same will be intimated in next OCC meeting BEST amp TATA are already having such forecasting system

bull No one from GOA has attended last meeting even though GOA was forwarded copy of MOM Due to non availability of any coordinator details of GOA it was not possible to contact them However Ms Marcadose has also conveyed that he has not been contacted by Goa

bull No one from DDDNH has attended last meeting even though DD DNH was forwarded copy of MOM However IIT Gandhinagar conveyed that they were not been contacted by DD DNH

Member Secretary WRPC informed that a letter to DD DNH amp GOA has been written

from WRPC secretariat regarding implementation of ADMS Load Forecasting amp

telemetry status He further requested the constituents to implement the decision

taken in earlier meeting of load forecasting

OCC suggested that the next load forecasting meeting may be held at DDDNH

The Sub-committee noted as above

15

462nd OCC MINUTES

ITEM NO 86 NEED OF COOPERATION FROM WRLDC IN REAL TIME

bull CE SLDC informed that at present APL is under their control area and embedded scheduling model is used It may be noted that for units 78amp 9 at APL Gujarat has no share (all are for NR beneficiaries)There have been occasions when units 78amp 9 have tripped (given at annexure) Since APL is shown as embedded in Gujarat WRLDC requested Gujarat to reduce overdrawl when APL units 78amp 9 trips Hence Gujarat has to pick up state generationcostlier generation for no fault of Gujarat

bull Further lines are opened to curtail overdrawl when Gujarat is not faulty Gujarat is seen as overdrawing (due to embedded scheduling of APL) when APL trips

bull To complicate matters the scenario coupled with wind variations state generation has to be constantly varied to avoid overdrawl

Gujarat requested followings-

1 When large sized units (APL units 78amp 9) trips then scheduling of Gujarat should be changed with immediate effect OR Gujarat should not be pursued for deviation correction to the extent of schedule of units tripped at APL units 78amp 9 OR Schedule of Gujarat from other central sector stations should be changed as per their request with immediate effect

2 APL units 78amp 9 should be made a separate control area 3 Under above circumstances transmission lines should not be opened

due to default by APL as these affects Gujarat without any fault of their own Further this was done without informingtaking SLDC into confidence It was clear from the discussions that Gujarat Discoms are put to unnecessary financial implications WRLDC clarified that 220 KV Dehgam- Khanpur Line no1 was opened due to frequency touching 493 Hz and control of overdrawl was taken as security measure WRLDC agreed to inform CE SLDC whenever such discussions are taken and agreed to take care in future

The Sub-committee noted as above

ITEM NO 87 GUIDE LINES FOR SPLIT BUS OPERATION AT SSP RBPH SWITCHYARD CE SLDC Gujarat vide letter dated 07082014 informed that a meeting was held on

220514 at Kevadia Colony SSP regarding split bus arrangement at SSP RBPH

16

462nd OCC MINUTES

switchyard and subsequent discussions during 55th meeting of PSC of NCA held in

Vadodara on 140714 the guidelines for the same had been prepared in consultation

with GETCO protection wing and sent vide mail dated 23072014 However the same

has been attached herewith as Annexure-87 It was clarified during discussion that

split bus operation would be used only as per requirement and will not be a permanent

arrangement

The Sub-committee noted as above

ITEMS FROM WRLDC

1 OPERATION OF GRID AT HIGH FREQUENCY ( gt 505 HZ) The onsetrevival of monsoon in the last fortnight of July 2014 has reduced the demand in Western Region However the demand would pick up sharply during the dry spell in September and October months Presently the major State Central Sector IPP generators in Western Region that are facing coal shortage are tabulated as under S No Name of power

stations Unit Reason for

outage 1 VSTPS 2 (210 MW) Coal Shortage 2 VSTPS 5 (210 MW) Coal Shortage 3 Singhaji 1 (600 MW) Coal Shortage 4 SGTPS 4 (210 MW) Coal Shortage 5 JP Bina 2 (250 MW) Coal Shortage 6 Bhusawal 2 (210 MW) Coal Shortage 7 Parli 4 (210 MW) Coal Shortage 8 India Bulls 1 (270 MW) Coal Shortage Likewise several Gas Power Stations in Western Region are facing fuel shortage Under the above circumstances it is desirable that precious fuel optimally utilized to maintain adequate stock for the dry spell In the month of July 2014 the grid frequency remained above 5005 Hz for more than 15 of the time while it remained below 499 Hz for more than 34 of the time Operation of high frequency is unnecessary loss of fuel that could have been conserved and utilized during low frequency regime

The Sub Committee noted the same

17

462nd OCC MINUTES

2 OBSERVATION OF INTRA-PLANT MODE OF OSCILLATIONS (097 HZ) WITH POOR DAMPING ON 10TH AND 11TH JUNE 2014 AND LOSS OF 1800 MW IN MAHARASHTRA SYSTEM DUE TO POWER SWING UNDER N-1 CONTINGENCY ON 20TH MAY 2014 The issue of Intra plant mode of oscillations with poor damping as observed during the grid event on 10th and 11th June 2014 was discussed during the 461st OCC meeting Similar oscillations were again recorded on 11th July 2014 GM WRLDC informed that they have written to generators seeking details of MW fluctuations PSS status etc and requested constituents to share the dataHe requested that constituents may share PMU data also CESLDC Gujarat informed that they are proposing PSS tuning with consultants from IITs in their system EE SLDC Maharashtra informed that APL-Tiroda has recently tuned PSS at Tiroda units by OEM

It was once again requested constituent to furnish information as designed by WRLDC The Sub Committee noted the same

3 FREQUENT TRIPPING OF 765 KV SATNA-SASAN LINE

WRLDC informed that 765 kV Sasan-Satna Line has tripped on three occasions

while 240 MVAr Bus Reactor at 765 kV Satna tripped on one occasion The

tripping occurred due to protection mal-operation at Satna end during stability test

for the 765 kV Bus-1 The details of the tripping is given below

The above OV at Sasan end could have been avoided if the Line Reactor of this line at Sasan end had been commissioned The restoration of the tripped circuit also was considerably delayed in the absence of Line Reactor at Sasan end

Elements Date and Time of Tripping

Date and Time of Restoration

Remarks Receipt of DREL at WRLDC Satna Sasan

765 kV Sasan-Satna 2

25-07-14 1026

25-07-14 1155

Protection Mal-Operation DT at Sasan End on OV as line remain hanging from Sasan end

No Yes

765 kV 240 MVAr Bus Reactor at Satna

25-07-14 1026

25-07-14 1139

Protection Mal-Operation DT at Sasan End on OV as line remain hanging from Sasan

No Yes

765 kV Sasan-Satna 2

25-07-14 1229

25-07-14 1342

Line got charged from Satna and synchronized at Sasan No Yes

18

462nd OCC MINUTES

end but immediately DT was received at Sasan from Satna and Line tripped Prior to tripping voltage at Sasan end was 796 kV

765 kV Sasan-Satna 2

25-07-14 1628 -

Charging attempt was taken from Satna end but line tripped before synchronization at Sasan end due to DT from Satna Open end voltage at Sasan 826 kV for the line

No Yes

Representative from Sasan UMPP informed that with regards to the 765 kv Line and

Bus reactors all the material required for completion of works have been received at

site

Line reactor and bus reactor would be commissioned by Aug14 and Sep 14

respectively

The Sub Committee noted the same 4 SPS AT SIPAT

The SPS scheme implemented at NTPC Sipat has been received at WRLDC It is observed that a time delay of 15sec is provided to unload units 1 2 4 amp5 each by 150MW if any ICT s load exceeds 130 of rated load It was conveyed that if ex-bus generation at Sipat is more than 2200 MW immediate unloading of units may be done and the intentional delay which is required to prevent mal-operation may be 45 second instead of 15 second

NTPC Sipat representative agreed to implement the same accordingly The Sub Committee noted the same

5 COMMISSIONING OF SPS AT 400220 KV VAPI During the special WRPC meeting on 18032013 at Dadra an SPS for automatic load shedding subsequent to tripping of 400220 kV ICT at Vapi was approved as under It was decided that POWERGRID would extend trip signal from Vapi ICTs to the requisite feeders

Contingency Envisaged SPS action

Identified Feeders

Tripping of any one ICT at 400200 Vapi Sub-Station

Automatic Load Shedding of 100MW

DNH 1) 66 kV-Kharadpara-Rakholi-I 50 MW 2) 66 kV Khadoli-Khadoli-3 30 MW DD 1) 66 kV Magarwada-Kachigam 60 MW

19

462nd OCC MINUTES

It was felt that due to change in topology loading in ICT is not critical however SPS may be in place as defense mechanism in case of any emergency

DD amp DNH representative were absent in the meeting The Sub Committee noted the same

6 ADDRESSING HIGH VOLTAGE CONDITION IN SSP amp NEARBY AREA

High voltage condition is being observed at SSP and nearby area in off peak period particularly between 2300 hrs at night to 0500 hrs in the morning Also on many occasions the system operator is compelled to hand trip the 400 kV lines emanating from SSP to control over voltage Summary for the month of Julyrsquo14 is given under

Sl No 400 kV Line DatailsFrom To

Time Date Time Date 1 SSP-RAJGARH-I 0009 19-Jul-14 0730 29-Jul-14 2 SSP - RAJGARH-II 0406 16-Jul-14 1016 18-Jul-14 3 SSP-DHULE-I 1310 22-Jul-14 0953 23-Jul-14 4 SSP - DHULE - II 1533 15-Jul-14 0734 18-Jul-14 5 SSP - DHULE - I 1703 10-Jul-14 1100 11-Jul-14 6 SSP-DHULE-I 1712 28-Jul-14 0933 31-Jul-14 7 SSP - DHULE - II 1730 19-Jul-14 0917 20-Jul-14 8 SSP - DHULE - I 1757 18-Jul-14 0935 19-Jul-14 9 SSP-DHULE-II 1809 21-Jul-14 0914 22-Jul-14 10 SSP-DHULE-I 1815 30-Jun-14 0542 1-Jul-14 11 SSP-DHULE-I 1819 20-Jul-14 0858 21-Jul-14 12 SSP-DHULE-II 1825 8-Jul-14 0949 9-Jul-14 13 SSP - DHULE - II 1831 11-Jul-14 1007 13-Jul-14 14 SSP - DHULE - I 1838 1-Jul-14 0556 2-Jul-14 15 SSP - DHULE - I 1848 9-Jul-14 0912 10-Jul-14 16 SSP - DHULE - I 2136 13-Jul-14 0850 14-Jul-14 17 SSP-DHULE-II 2201 23-Jul-14 0945 28-Jul-14

Also it has been observed that Wanakbori TPS injects around 60 MVAr per unit even when voltage at Wanakbori is above 420 kV for nearly 100 of the time Further envisaged bus reactors at Rajgarh amp Dhule are yet to be commissioned Hence in view of system reliability it is advisable to explore all possibilities to contain high voltage condition in SSP and nearby area The following actions need to be taken to address the situation

bull Operating RBPH machines at SSP in synchronous condenser mode bull Absorption of MVAr by Wanakbori (WTPS) units bull The commissioning of Reactors at 400 kV Rajgarh may be expedited by

WRTS-2

20

462nd OCC MINUTES

bull The commissioning of Reactors at 400 kV Dhule may be expedited by MSETCL CE SLDC GETCO agreed for looking into absorption of MVAR at Wanakbori

7 IMPLEMENTATION OF THE REVISED AUFLS IN DD AND DNH Representatives from the DD and DNH intimated during the 459th OCC meeting that the tendering process was stalled because of general elections (election code of conduct was in force) amp action would be initiated post the elections Member Secretary WRPC vide letter dated 01082014 took up the matter with Secretary (P) DDDNH (copy enclosed) DD amp DNH representative were absent in the meeting to comment

The Sub Committee noted the same 8 ADMS(AUTOMATIC DEMAND MANAGEMENT SCHEME) IMPLEMENTATION

AS PER SEC 542 OF IEGC The format for reporting the progress of implementation of the ADMS in Western Region States was given as part of MoM of the 461st OCC meeting All utilities may like to furnish the updated status to WRPCWRLDC as per the above format It is understood that MP has submitted its detailed action plan in the form of an affidavit to CERC for implementation of ADMS However SLDC MPPTCL is requested to furnish data to OCC forum in the above format

The Sub Committee noted the same

9 STATUS OF TELEMETRY IN WESTERN REGION

In the 460th amp 461st OCC meetings the status of telemetry in Western Region was discussed in detail It was also highlighted that the Honrsquoble CERC vide its order in petition SM0072014 issued Notice under section 142 on several constituents of Western Region All the constituents had assured to address the telemetry issues within a month or two The telemetry status as on 4th August 2014 is tabulated below

21

462nd OCC MINUTES

a Maharashtra The non-availability of telemetry is 583 for sub-stations amp 18

for generating stations This is a matter of serious concern The issue has been

discussed in several OCC meetings since last 8 months As per the information available with WRLDC telemetry is not available from the following generating stations at 400 kV level

bull Kaparkheda bull Deepnagar

Also telemetry is not available from the following sub-stations at 400 kV level bull Warora bull Lonikhand(New) bull Chandrapur-stg-II

As per the information available with WRLDC telemetry is intermittent at 4 generating stations viz

bull Jaigad bull Paras-extension bull Trombay bull Deepnagar GCR

Also telemetry is intermittent at following sub-stations at 400 kV level bull Bableswar-II bull Deepnagar SS bull Dhule bull Khaparkheda bull Kolhapur-3

22

462nd OCC MINUTES

bull Sholapur-3 SLDC MSETCL Maharashtra informed that telemetry has been established for 46 locations

a Chhattisgarh100 available b Madhya Pradesh As per the latest status telemetered data is available from

100 of the locations c Gujarat As per the latest information submitted to CERC the non-availability of

telemetry data from Gujarat as on date is 33 for substations As per the information available with WRLDC Telemetry is not available form 2 number of 220 kV sub-stations viz bull Bhatiya bull Mokha Gujarat intimated in 460th OCCM that these sub-stations were ready but lines were in construction phase Also telemetry is intermittent from the following SS in Gujarat bull 220 kV Navasari (GETCO) ss bull 400 kV Kasor ss

SLDC GETCO may expedite amp resolve the issue for the above stations at the

earliest d Goa As per the latest information telemetry is not available form 2 number of

220 kV sub-stations viz Amona amp Cuncolim Telemetry is intermittent from 220 kV Tivim Ponda Xeldam amp 110 kV Kadamba amp Verna Thus Non availability of telemetry from Goa is 100 Goa to resolve the issue on war footing

e DD Telemetry is not available form 1 number of 220 kV sub-station viz Magarwada Thus availability of telemetry from DD is NIL DD representative intimated in 460th OCCM that RTU was being installed at 220 kV Magarwada SS under the new SCADAEMS up gradation project amp it would take 3 months to complete the work DD representative was absent in 461st OCCM so information on progress in this matter is yet to be received from DD DD to expedite the issue for the above station(s) on war footing

f DNH Telemetry is not available form 2 number of 220 kV sub-station viz Kharadpara amp Khadoli Thus availability of telemetry from DNH is NIL DNH representative was absent in 460th amp 461st OCC meetings to comment on the issue DNH to resolve the issue for the above station(s) on war footing

g ISGS As per the latest information submitted to CERC the non-availability of telemetry data from ISGS generating stations as on date is 125 Telemetry is intermittent from 220 kV Kawas(NTPC) station Power Grid NTPC to expedite

23

462nd OCC MINUTES

NTPC amp Power Grid agreed to expedite the matter during 460th amp 461st OCC meetings of WRPC However no progress has been reported

h POWERGRID As per the latest information submitted to CERC the non-availability of telemetry data from Power Grid substations as on date is 111 Telemetry is intermittent from the following ss

o 765 kV Kotra SS o 765 kV Dharamjaigad o 765 kV Tamnar SS o 400 kV Navasari SS

Additional points

a) In the report available on the WRLDC website it is clearly indicated that Communication link between all SLDC to WRLDC is in radial mode (without redundancy) and any failure in any equipment Fibre leads to total data black out Power Grid to ensure that links are on two channels

i IPP As per the latest information submitted to CERC the non-availability of

telemetry data from IPP generating stations as on date is 15 Telemetry is intermittent from Jindal amp Essar Mahan GMR Raipur JPL ESSAR Mahan GMR Raipur to expedite

Additional Points

bull Adani(APL) Tiroda There is only one channel emanating from Adani Tiroda Recently there was a case when entire station was not visible due to non-Availability of that channel

bull CGPL Mundra There is only one channel emanating from CGPL Mundra In case of non-availability of data leads to non-visibility of 4000 MW generation which creates difficulty in Grid Operation

bull Sasan There is only one channel emanating from Sasan In case of non-availability of data leads to non-visibility of 2400 + MW generation which creates difficulty in Grid Operation

bull APL Mundra There is only one channel emanating from CGPL Mundra In case of non-availability of data leads to non-visibility of 4000 + MW generation which creates difficulty in Grid Operation

The above issue was already discussed in 460th OCCM The utilities (APL SASAN CGPL) may kindly update the progress in this matter

24

462nd OCC MINUTES

j PMU data Regarding Satna to WRLDC link WRTS II informed that work is under progress for laying of OPGW from Satna 220 kV (MPPTCL) to Satna 765 kV (PG) and it may take 3-4 monthsrsquo time It was suggested that till such time the OPGW operation is in place WRTS-II may explore leased line connectivity at the earliest Power Grid to expedite

The Sub-Committee noted the same amp agreed to make availability of telemetry in their concerns and the report be updated position in next meeting

The Sub Committee noted the same

10 BLACK OUT AT NTPC KAWAS POWER STATION On 11th July 2014 Kawas Gas generating complex got blackout due to tripping of evacuation lines one by one within a short span of 30 minutes The complete loss of evacuation lines occurred at 0117 Hrs The blackout has resulted in tripping of GT1A GT1B and ST causing 320 MW generation loss in the area It was reported that weather condition was foggy with slight drizzling was in the area

Line Time of Tripping Kawas End Remote

end Restoration Time

220 kV Kawas-Navsari 1 1246 AM R phase to EF Fault location 2 km R Phase to EF 122 AM

220 kV Kawas ndashNavsari 2 112 AM R phase to EF Fault location 2208 km

R Phase to EF 347 AM

220 kV Kawas-Haldarwa 1 107 AM R phase to EF Fault location 16 km

R Phase to EF 246 AM

220 kV Kawas-Haldarwa 2 108 AM R phase to EF Fault location 2 km

R Phase to EF 304 AM

220 kV Kawas-Icchapur 1 108 AM B phase to EF B Phase to EF 301 AM

220 kV Kawas-Icchapur 2 108 AM B phase to EF Fault location 356 km

B Phase to EF 331 AM

220 kV Kawas-Vav 1 117 AM No tripping Hand Tripped later Line Tripped 225 AM

220 kV Kawas Vav 2 117 AM Y Phase to EF Y Phase to EF 317 AM

Even the line restoration has failed on several attempt as the lines were not holding due to persisting fault Such an event of total loss of evacuation lines from a generating station resulting in blackout scenario is a matter of serious concern Representative from WRTS-II stated that being highly industrial corridor the said lines are suffering with smog and informed that they are in process of replacement of existing insulator with polymer type insulators Order has been already placed amp it may be completed within next two to three month The Sub Committee noted the same

25

462nd OCC MINUTES

11 OPERATING PROCEDURE OF WR-2014 As discussed in 460th OCCM of WRPC the operating procedure of Western Region 2014 has been updated on 31072014 and the same has been uploaded on WRLDC web site at the following link httpwwwwrldccomdocsWR_OPERATING_PROCEDURE_2014pdf

The Sub Committee noted the same 12 MOCK BLACK START EXERCISE

MP representative informed that DG set at Bargi will be ready within a week time amp mock black start exercise can be performed in October 2014

NTPC Gandhar has successfully performed the mock black start exercise on 27072014

The Sub Committee noted the same

13 REVIEW OF LIST OF FEEDERS IDENTIFIED FROM ISGS LEVEL IN CASE OF

THREAT OF GRID SECURITY DUE TO LARGE DEVIATION

During the 461st OCC it was decided that list of feeders identified for load

control under emergency measure for safeguarding grid security would be

reviewed in a special meeting The list is yet to be reviewed GM WRLDC

requested SLDC to review the same amp submit Till such time the existing list will

continue

The Sub Committee noted the same 14 IMPLEMENTATION OF VOLTAGE AND TIME GRADING ON OV RELAYS TO

PREVENT TRIPPING OF MULTIPLE EHV LINES EMANATING FROM SINGLE NODE ON HIGH VOLTAGE

During the 461st OCC it was informed by Power Grid representative that they have already implemented voltage grading in various line emanating from the same node (matter has not come in the MoM) Power Grid amp other utilities may kindly intimate the present status of voltage grading at their respective sub-stations Member Secretary WRPC suggested to take the matter in PCM

The Sub Committee noted the same

26

462nd OCC MINUTES

15 INADEQUATE PARTICIPATION OF GENERATORS ENVISAGED SPS FOR SR-NEW GRID OPERATION

The details of SPS operation from 1st July 2014 till 6th August 2014 is as under

Sl No Date SPS No Condition 1 01 July 2014 SPS-1 613 SholapurRaichur DC gt1000 MW 2 01 July 2014 SPS-1 1752 SholapurRaichur DC gt1000 MW 3 04 July 2014 SPS-1 0406 SholapurRaichur DC gt1000 MW 4 09 July 2014 SPS-1 350 SholapurRaichur DC gt1000 MW 5 14 July 2014 SPS-1 506 SholapurRaichur DC gt1000 MW 6 17 July 2014 SPS-1 2204 SholapurRaichur DC gt1000 MW 7 23 July 2014 SPS-1 547 SholapurRaichur DC gt1000 MW 8 26 July 2014 SPS-1 1201 SholapurRaichur DC gt1000 MW 9 30 July 2014 SPS-1 902 SholapurRaichur DC gt1000 MW 10 30 July 2014 SPS-1 1954 SholapurRaichur DC gt1000 MW

During the last OCC the matter was discussed and it was suggested by Member Secretary WRPC to have Special Protection Sub-Committee meeting to discuss progress of implementation of the revised SPS at Solapur (for WR-SR interconnection) amp extension of signal from Solapur to additional generators in WR so as to address the issue of inadequate participation of WR Member Secretary WRPC requested to all generators who are having more than one units shall participate in implementation of SPS for SR-NEW grid operation

The Sub-committee noted the same ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING OCC reviewed the meeting roaster and finalized sheet is enclosed at Annexure-10

Due to non-readiness of BDTCL to host the next meeting NTPC KawasGandhar

would host the 463rd OCC meeting The exact date amp venue details will be intimated

separately

SlNo Organisation Name amp Designation E-mail Mobile

I WRPC1 Shri SD Taksande MS ms-wrpcnicin 98208783842 Shri Satyanarayan S opc-wrpcnicin 92233999383 Shri LKS Rathore DD lksr_2000yahoocom 98333718444 Shri Ratnesh Kumar Yadav AD ratneshkumar7437gmailcom 8903929150

II MSETCL MSEDCLMahaGenco5 Shri VD Pande EE vasantpandemahasldcin 98207419416 Shri Ajit V Pachori EE ajitpachorimahagencocoin 9619461420

III MPPTCL MPPGCL7 Shri KK Prabhakar SE sldcmpjbpyahoocom 94258052678 Shri SK Mehta EE mehtasanjay67yahooin 9425805017

IV CSPTCL CSPGCL9 Shri BR Soni Addl CE balramsonirediffmailcom 942518880710 Shri Arvind Mukherjee gccraipurgmailcom 9429227699

V GETCO GSLDC GSECL11 Shri BB Mehta CE cesldcgujgmailcom 987920073612 Shri BM Shah DyEE demissldcgetcogebmailcom 9925212836

VI WRLDC POWERGRID13 Shri P Mukhopadhyay GM prithwishmukhopadhyayposocoin 986943807314 Shri VK Shrivastava AGM vkspowergridindiacom 986945022115 Smt Sachala Mishra CM mishrasachalagmailcom 986945022316 Smt Pushpa S CM pushpa_seshadrihotmailcom 986940448217 Shri Aditya P Das Dy Mgr aditya19227gmailcom 9869404569

POWERGRID REGION-I18 Shri Anil Darode 70207powergridindiacom 942230180519 Shri Manu Sinha 02457powergridindiacom 9425293864

POWERGRID RETION -II20 Shri Abhinav Verma stawr2gmailcom 942850406221 Shri Anand Dubey ananddubey_pgrediffmailcom 9428504065

VII NTPC22 Shri PB Behre GM pbbeherentpccoin 900449708823 Shri Hari Nath AGM harinath01ntpccoin 900449713324 Shri SK Shrivastava AGM sksrivastava09ntpccoin 942517806925 Shri Amir Kr Singh SM aksingh01ntpccoin 942414081426 Shri Amitabh Kumar amitabhkumarntpccoin 9425178122

VIII TATA POWER27 Shri RM Sankhe GM rmsankhetatapowercom 909900654128 Shri PR Gadave AGM prgadavetatapowercom 9223553341

IX NHDC 29 Shri Anurag Seth CE annu226hotmailcom 9425326135

LIST OF PARTICIPANTS OF 462nd OCC MEETING OF WRPC HELD ON 11082014 AT TARAPURAnnexure-I

30 Shri Vinod Kumar Singh vinodnhdcrediffmailcom 9425925251

X APL 31 Shri CS Bobade GM chandrashekharbobadeadanicom 8980802255

XI RINFRA32 Shri SG Zirpe GM sachinzirperelianceadacom 932260763033 Shri Sanil C Namboodiripad sanilnamboodiripadrelianceadacom932104697434 Shri Subrata Das subratakudasrelianceadacom 932093072235 Shri Ishan Roy Asst Mgr ishanroyrelianceadacom 9860027348

XII KSK Mahanadi36 Shri Sudarshan B Reddy sudarshanreddybkskcoin 9000377721

XIII NPCIL37 Shri Mandeep mandeepnpcil 904991887038 Shri JS Choubey jschoubeynpcilcoin 942882191839 Shri Ritesh Chandra Singh rcsinghnpcilcoin 8007991744

XIV ESSAR 40 Shri OJ Saxena Sr Mgr osaxenaessarcom 987910126841 Shri Kamlesh Garg kamleshgargessarcom 987910284942 Shri Sarabjeet Singh sarabjeetsinghessarcom 750957010543 Shri Ashwin Ande ashwinandeessarcom 9909993594

XV JPL44 Shri RK Srivastava AGM rkshrivastavajindalpowercom 9329445016

XVI TORRENT POWER45 Shri Kamal K Vyas kamalvyastorrentpowercom 997407965746 Shri Pramod G Patel AGM pramodpateltorrentpowercom 9824370005

XVII NCA47 Shri Naveen Nath Das emc_ncarediffmailcom 9425053309

XVIII STERLITE GRID LTD48 Shri Sachin S Deshpande GM sachindeshpandesterlitecom 8966903047

XIX LANCO AMARKANTAK POWER LTD49 Shri BN Panda pandabnlancogroupcom 769770301550 Shri Anil Sharma anilshlancogroupcom 9560258009

XX KWPCL51 Mis Smruti R Nayak DGM smrutinayakavanthapowercom 9424176680

XXI MB POWER LTD 52 Shri Sandeep Kumar Gupta sandeepguptahpplin 9582896418

Anaulagnak 21

maah jaUlaa[- 2014

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5020 Hz BETWEEN 1700 Hrs amp 1800 Hrs Hrs ON 27072014

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4962 Hz BETWEEN 1900 Hrs amp 2000 Hrs Hrs ON 25072014

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4993 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5036 Hz AT 130344 Hrs ON 23072014

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4939 Hz AT 194315 hrs Hrs ON 25072014

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS JULY 2014 JUNE 2014 MAY 2014

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 008 023 000

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 314 476 093 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 3129 3216 2155 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 5016 4536 5319

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1533 1749 2433

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING JULY 2014

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

Voltage Profile during the month of July 2014

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 420 402 420 404 433 411 424 424 417 400 420 403 422 407 408 3902 417 398 420 400 431 407 424 424 417 401 427 418 421 409 410 3943 417 393 419 397 432 408 420 396 417 400 425 419 422 408 407 3934 416 398 419 401 434 412 422 402 417 400 426 421 418 406 411 3965 417 400 419 403 433 414 424 424 417 403 424 419 417 406 410 3996 420 406 422 408 438 411 421 402 419 407 427 421 422 412 409 3897 412 396 419 402 428 413 420 399 414 401 423 419 417 409 409 3968 418 400 421 410 433 400 424 400 416 400 425 419 422 400 410 3949 418 412 421 410 433 413 424 410 416 408 425 419 422 412 410 394

10 415 399 417 403 435 415 400 400 418 404 424 421 422 414 410 41111

स नक Annex-23

िभलाईBhilai

धल असोज कासोरKarad Dhule Asoj Kasor

इदौर इटारसी कराडIndore Itarsi

जतपरJetpur

11 416 402 423 407 436 416 422 407 416 405 425 421 423 413 410 39712 419 400 422 406 436 417 400 400 419 403 426 422 423 413 410 39713 415 400 422 410 437 417 400 400 417 406 425 421 422 414 411 39514 416 398 423 409 439 416 400 400 419 404 424 421 422 413 412 39815 420 403 423 408 437 413 428 401 418 404 426 422 423 413 410 39816 423 408 426 411 437 413 429 403 421 406 428 424 423 415 413 40017 421 404 424 407 436 416 400 400 419 408 423 414 423 414 411 39818 421 404 424 407 436 416 400 400 420 406 427 423 423 414 411 39819 423 407 425 410 434 415 425 411 424 405 428 425 424 416 422 39520 421 407 424 410 420 420 427 410 421 407 427 424 423 416 417 39621 421 406 424 411 420 420 400 400 420 402 428 425 426 418 413 39222 421 407 426 413 420 420 400 400 419 401 428 425 428 420 412 39623 422 409 427 410 419 415 415 402 420 403 425 419 428 420 412 39624 420 406 425 409 420 420 400 400 420 404 429 426 427 416 409 39625 422 401 421 404 420 420 400 400 424 402 428 424 423 415 415 39726 420 402 421 406 431 419 400 400 422 403 428 423 422 413 415 40027 417 404 422 407 434 416 423 407 421 405 428 424 422 413 416 40128 419 403 421 407 437 416 431 408 423 406 428 426 423 415 415 40229 419 403 420 408 437 415 400 400 421 406 429 426 423 416 415 39930 421 404 422 406 438 415 400 400 423 404 430 426 426 415 420 40331 420 395 420 402 431 406 428 403 422 403 429 425 423 414 419 398

423 393 427 397 439 400 431 396 424 400 430 403 428 400 422 389

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 418 404 411 395 423 406 430 406 789 752 788 757 787 756 791 7662 419 397 411 393 423 403 431 404 772 748 791 756 786 750 793 7553 416 402 411 397 421 397 425 399 772 748 780 751 781 757 791 7634 417 404 409 396 420 415 428 406 772 748 786 757 780 755 791 7655 418 404 418 400 421 404 427 407 772 748 796 755 796 765 802 7726 419 408 416 402 424 410 429 413 789 752 797 768 796 765 799 7757 414 406 407 397 420 403 426 407 789 752 776 758 777 757 784 7658 418 408 411 388 422 400 429 400 789 752 786 767 783 746 790 7719 412 401 403 386 422 405 429 408 789 752 781 761 772 745 783 76010 413 403 402 394 420 404 424 406 789 752 792 764 774 755 785 765

Bina Gwalior Nagda Khandwa Sipat

बना वािलयरिसविननागदावािलयर बनाBina

िसपतखडवाseoni Gwalior

10 413 403 402 394 420 404 424 406 789 752 792 764 774 755 785 76511 415 407 403 395 421 407 426 410 789 752 790 774 785 758 790 77212 418 406 407 392 422 404 427 404 789 752 796 769 784 756 796 76913 418 406 407 392 421 408 427 411 789 752 796 769 784 756 796 76914 419 410 409 397 423 406 428 409 789 752 784 768 786 763 792 77415 419 404 408 391 424 407 429 408 789 752 789 763 786 750 791 76416 424 414 408 400 427 411 431 413 789 752 792 766 785 767 797 77917 421 410 411 399 424 407 432 409 789 752 788 762 789 766 795 77618 423 412 414 396 424 407 432 409 789 752 783 770 796 765 801 77719 424 411 410 396 426 411 431 413 789 752 791 770 788 764 803 77720 425 411 411 396 424 410 428 414 789 752 786 763 789 760 800 77221 422 412 410 395 424 409 428 413 789 752 784 760 788 763 796 77522 423 416 414 402 424 410 429 414 789 752 791 774 794 773 801 78423 425 413 418 402 424 410 430 412 787 750 785 770 798 780 804 78324 422 411 411 397 425 409 431 415 789 752 790 772 791 773 801 78125 421 410 405 396 423 403 429 409 789 752 784 770 794 767 798 77726 421 410 409 395 423 404 427 409 789 752 792 773 789 767 799 77827 423 412 413 399 420 404 428 409 789 752 794 766 797 770 808 78028 422 411 411 399 421 405 428 410 789 752 789 763 794 770 793 77029 419 409 411 397 423 406 430 414 789 752 794 771 795 767 796 77430 422 409 413 398 420 404 430 413 788 753 796 766 799 766 799 77331 420 404 409 395 421 397 429 411 789 752 787 764 792 759 795 767

425 397 418 386 427 397 432 399 789 748 797 751 799 745 808 755

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Jul-14 0 0 0 0 0 0 0 02 02-Jul-14 0 0 0 0 0 0 0 03 03-Jul-14 0 0 0 0 0 0 0 04 04-Jul-14 0 0 0 0 0 0 0 05 05-Jul-14 0 0 0 0 0 0 0 06 06-Jul-14 1 67 0 0 0 0 0 07 07-Jul-14 0 0 0 0 0 0 0 08 08-Jul-14 1 278 0 0 0 0 0 09 09-Jul-14 0 0 0 0 0 0 0 0

10 10-Jul-14 1 565 0 0 0 0 0 011 11-Jul-14 0 0 0 0 0 0 0 012 12-Jul-14 0 0 0 0 0 0 0 013 13-Jul-14 3 758 0 0 0 0 0 014 14-Jul-14 0 0 0 0 0 0 0 015 15-Jul-14 0 0 0 0 0 0 016 16-Jul-14 2 2127 NIL NIL NIL 017 17-Jul-14 0 0 0 0 0 0 0 018 18-Jul-14 1 08 0 0 0 0 0 019 19-Jul-14 0 0 0 0 0 0 0 020 20-Jul-14 0 0 0 0 0 0 0 021 21-Jul-14 0 0 0 0 0 0 0 022 22-Jul-14 0 0 0 0 0 0 0 023 23-Jul-14 0 0 0 0 0 0 0 024 24-Jul-14 0 0 0 0 0 0 0 025 25-Jul-14 0 0 0 0 0 0 0 026 26-Jul-14 0 0 0 0 0 0 0 027 27-Jul-14 0 0 0 0 0 0 0 028 28-Jul-14 0 0 0 0 0 0 0 029 29-Jul-14 0 0 0 0 0 0 0 030 30-Jul-14 0 0 0 0 0 0 0 031 31-Jul-14 0 0

Max 3 758 0 0 0 00 0 0Total 9 24917 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month July 2014

Recommonded Load relief at 492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE 25

POWER CUTRESTRICTIONS IN WESTERN REGION FOR THE MONTH OF JULY-2014

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply(DLF)

01072014 31072014 2343 2105 2300

21 Three-Phase Supply(Irrigation)

01072014 31072014 0953 0857 0933

21 Three-Phase Supply(Mixed)

01072014 31072014 2339 2055 2240

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01072014 31072014 2353 2325 2344 32 District Head Qtrs 01072014 31072014 2357 2330 2348 33 Tehsil Head Qtrs 01072014 31072014 2350 2230 2319

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 010714 to 310714

SaUnya Nil

0-470 MW

SaUnya Nil

0000

SaUnya Nil 2400

SaUnya Nil

19 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs) 21 Three-Phase Supply 01072014 31072014 1000 0800 0900

22 Single-Phase Supply 01072014 31072014 1800 1800 1800 3 Anya jaanakarI Any other information There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

8860 (Av) of 31days 0000(Av) 0000 (Av)

1Rural 7109(Av) for 23447 Hrs 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0532 - -

0537 -

3 HT Industries 8261 (Av) for 17270 Hrs 0357 Total Energy Cutday 1426 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01072014 to 310714 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 3172014 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil ca gaaovaa Goa SaUnya Nil

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-26 Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai अिनवाय यिनट आऊटज का जलाई2014का वःता रत यौरा

Details of forced unit outages during the month ofJuly2014

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 एःसार Essar-2

गरा विनिल GSECL

172 1212 22-Feb-13 अनपल ध Still out

अनपल ध Still out

Shortage of gas

2 यट पीएस UTPS-2

गरा विनिल GSECL

120 1951 17-Jun-14 अनपल ध Still out

अनपल ध Still out

Turbine tripped(RSD)

3 एःसार व डनार Essar vadinar-1

गरा विनिल GSECL

600 2335 3-Jul-14 1324 22-Jul-14 Coal shortage

4 डब यट पीएस WTPS-6

गरा विनिल GSECL

210 953 10-Jul-14 0707 14-Jul-14 BTL

5 एसट पीएस STPS-1

गरा विनिल GSECL

120 1220 10-Jul-14 0710 14-Jul-14 BTL

6 जीआईपीसीएल GIPCL-STG I-2

गरा विनिल GSECL

165 1744 14-Jul-14 अनपल ध Still out

अनपल ध Still out

C ampI problem

7 एएलट पीएस ALTPS-1

गरा विनिल GSECL

120 107 15-Jul-14 2037 19-Jul-14 BTL

8 िस का ट पीएस SIKATPS-1

गरा विनिल GSECL

120 1330 17-Jul-14 अनपल ध Still out

अनपल ध Still out

RSD

9 डब यट पीएस WTPS-4

गरा विनिल GSECL

210 858 18-Jul-14 अनपल ध Still out

अनपल ध Still out

RSD

10 डब यट पीएस WTPS-3

गरा विनिल GSECL

210 1046 18-Jul-14 अनपल ध Still out

अनपल ध Still out

RSD

11 डब यट पीएस WTPS-5

गरा विनिल GSECL

210 1818 18-Jul-14 000 21-Jul-14 RSD

12 डब यट पीएस WTPS-6

गरा विनिल GSECL

210 447 19-Jul-14 अनपल ध Still out

अनपल ध Still out

RSD

13 यट पीएस UTPS-3

गरा विनिल GSECL

200 1055 26-Jul-14 2328 1-Aug-14 RSD

14 एपीएल APL-6

अदानी ADANI

660 2146 5-Jul-14 1105 2-Aug-14 Heavy hydrogen leakage

15 एपीएमएल APML-4

अदानी ADANI

660 1132 10-Jul-14 1407 23-Jul-14 Coal shortage

16 एपीएल APL-1

अदानी ADANI

330 117 20-Jul-14 612 23-Jul-14 RSD

प म ऽय भार षण कि म बई णाली चालन-ISO-I

17 एपीएल APL-8

अदानी ADANI

660 2018 18-Jul-14 2209 21-Jul-14 BTL

18 एपीएल APL-2

गरा विनिल GSECL

330 0913 26-Jul-14 1714 29-Jul-14 Air pre heater problem

19 एपीएल APL-5

गरा विनिल GSECL

660 1910 29-Jul-14 1533 2-Aug-14 Heavy steam leakage

20 डब यपीसीएल WPCL-1

मारा वउकिल MSPGCL

135 1245 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Furnace press high

21 डब यपीसीएल WPCL-4

मारा वउकिल MSPGCL

135 001 3-Apr-14 2347 11-Jul-14 Less schedule

22 कोराड Koradi-5

मारा वउकिल MSPGCL

200 1030 17-Jun-14 अनपल ध Still out

अनपल ध Still out

ID fan bearing temperature high

23 इ डयाबल Indiabulls - 1

मारा वउकिल MSPGCL

270 546 26-Jun-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

24 पल Parli -4

मारा वउकिल MSPGCL

210 1019 29-Jun-14 अनपल ध Still out

अनपल ध Still out

water shortage

25 भसावल Bhusawal-2

मारा वउकिल MSPGCL

210 1117 6-Jul-14 544 10-Jul-14 Coal problem

26 चिपर Chandrapur-1

मारा वउकिल MSPGCL

210 2211 8-Jul-14 2106 13-Jul-14 BTL

27 चिपर Chandrapur-3

मारा वउकिल MSPGCL

210 2216 14-Jul-14 1452 18-Jul-14 Safety valve problem

28 उरण Uran-6 मारा वउकिल MSPGCL

108 1634 15-Jul-14 1407 22-Jul-14 Gas shortage

29 उरण Uran -5 मारा वउकिल MSPGCL

108 2338 17-Jul-14 1125 24-Jul-14 For rotor balancing work

30 उरण Uran -A0 मारा वउकिल MSPGCL

120 2340 17-Jul-14 2315 23-Jul-14 For rotor balancing work

31 भसावल Bhusawal-2

मारा वउकिल MSPGCL

210 2346 18-Jul-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

32 खापरखड़ा Khaparkeda-3

मारा वउकिल MSPGCL

210 1036 20-Jul-14 041 29-Jul-14 Flame failure

33 जयगड Jaigad-2 मारा वउकिल MSPGCL

300 000 20-Jul-14 Ready Ready Less requisition

34 वीआईपीएल VIPL-2

मारा वउकिल MSPGCL

300 2302 20-Jul-14 1716 26-Jul-14 Coal feeding problem

35 एपीएमएल APML-3

मारा वउकिल MSPGCL

660 0444 22-Jul-14 044 26-Jul-14 Pressure release valve operated

36 भसावल Bhusawal-4

मारा वउकिल MSPGCL

500 003 23-Jul-14 151 29-Jun-14 BTL

37 वीआईपीएल VIPL-1

मारा वउकिल MSPGCL

300 015 23-Jul-14 1300 31-Jul-14 Coal feeding problem

38 उरण Uran -8 मारा वउकिल MSPGCL

108 730 26-Jul-14 1700 29-Jul-14 Gas shortage

39 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 347 29-Jul-14 638 4-Aug-14 BTL

प म ऽय भार षण कि म बई णाली चालन-ISO-I

40 पल PARLI-5 मारा वउकिल MSPGCL

210 002 30-Jul-14 अनपल ध Still out

अनपल ध Still out

Water shortage

41 टाटा TATA-8

टाटा TATA

250 2255 9-Jan-14 अनपल ध Still out

अनपल ध Still out

HT due to fire near turbine generator desk

42 टाटा TATA-6

टाटा TATA

500 2134 31-Jul-14 Ready Ready Less requisition

43 आरजीपीपीएल RGPPL-3A

आरजीपीपीएल RGPPL

320 1857 17-Apr-14 Ready Ready Less requisition

44 आरजीपीपीएल RGPPL-2B

आरजीपीपीएल RGPPL

320 1915 17-Jun-14 अनपल ध Still out

अनपल ध Still out

Raw water problem

45 आरजीपीपीएल RGPPL-2A

आरजीपीपीएल RGPPL

320 1615 25-Jun-14 1200 21-Jul-14 Less requisition

46 आरजीपीपीएल RGPPL-1A

आरजीपीपीएल RGPPL

320 1330 8-Jul-14 Ready Ready Less requisition

47 अमरकनटक Amarkantak-4

म वउकिल MPPGCL

120 1113 30-Apr-14 अनपल ध Still out

अनपल ध Still out

TURBINE BEARING VIBRATION HIGH

48 सातपरा Satpura-6

म वउकिल MPPGCL

200 305 18-Jun-14 अनपल ध Still out

अनपल ध Still out

BTL

49 एसजीट पीएस SGTPS-3

म वउकिल MPPGCL

210 617 26-Jun-14 020 26-Jul-14 Conveyer belt problem

50 अमरकनटक Amarkantak-3

म वउकिल MPPGCL

120 1640 2-Jul-14 1623 11-Jul-14 BTL

51 सातपरा Satpura-9

म वउकिल MPPGCL

210 2200 5-Jul-14 855 15-Jul-14 Condenser tube cleaning

52 सातपरा Satpura-9

म वउकिल MPPGCL

210 1310 15-Jul-14 845 24-Jul-14 BTL

53 एसजीट पीएस SGTPS-4

म वउकिल MPPGCL

210 2233 19-Jul-14 1252 4-Aug-14 Coal shortage

54 सातपरा Satpura-7

म वउकिल MPPGCL

210 225 21-Jul-14 545 24-Jul-14 BTL

55 सातपरा Satpura-10

म वउकिल MPPGCL

250 2316 22-Jul-14 07082014 High vibration in generator winding

56 एसजीट पीएस SGTPS-3

म वउकिल MPPGCL

210 1857 28-Jul-14 1020 2-Aug-14 Drum level low

57 DSPM(K(E) extn)-2

छरा वउकिल CSPGCL

250 2310 21-Jul-14 2029 22-Jul-14 Coal shortage

58 कोरबा पव Korba(E)-3

छरा वउकिल CSPGCL

210 1030 22-Jul-14 1025 27-Jul-14 CTL

59 कोरबा पव Korba(E)-5

छरा वउकिल CSPGCL

120 1345 22-Jul-14 1140 26-Jul-14 Wet coal problem

60 कोरबा पव Korba(E)-5

छरा वउकिल CSPGCL

120 2320 30-Jul-14 155 2-Aug-14 Coal shortage

61 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

62 एःसार महान Essar-Mahan-1

एःसारESSAR 600 014 22-Jun-14 1255 11-Jul-14 Less schedule

63 एःसारमहानEssar Mahan-1

एःसार ESSAR 600 620 16-Jul-14 1252 28-Jul-14 Withdrawn due to tripping of evacuation

प म ऽय भार षण कि म बई णाली चालन-ISO-I

Lines

64 सीजीपीएल CGPL-50

सीजीपीएल CGPL

830 948 13-Jun-14 409 23-Jul-14 Ash hopper refractory damage

65 सीजीपीएल CGPL-10

सीजीपीएल CGPL

830 1332 1-Jul-14 1952 9-Jul-14 BTL

66 सीजीपीएल CGPL-20

सीजीपीएल CGPL

800 1214 24-Jul-14 13-aug-14

Bottom ash Hopper works

67 सीजीपीएल CGPL - 40

सीजीपीएल CGPL

830 1918 26-Jul-14 1020 2-Aug-14 GT electrical fault

68 जपीएल JPL STG-2 UNIT-1

जपीएल JPL 600 051 26-Jun-14 अनपल ध Still out

अनपल ध Still out

Turbine vibration

69 जपीएलJPL STG-2 UNIT-2

जपीएलJPL 600 000 5-Jul-14 1457 11-Jul-14 Less requisition

70 जपीएल JPL STG-2 UNIT-2

जपीएलJPL 600 748 21-Jul-14 1800 24-Jul-14 BTL

71 एसीबीआईएल ACBIL-1

एसीबीआईएल ACBIL

135 151 6-Jul-14 1753 9-Jul-14 Furnace draft high

72 ससान Sasan -3 आरईएल REL 660 1648 15-Jul-14 2248 4-Aug-14 Ash evacuation problem

73 ससान Sasan-4 आरईएल REL 660 1645 24-Jul-14 810 3-Aug-14 High press main steam tripped

74 एमको EMCO-I एमको EMCO 200 109 16-Jul-14 अनपल ध Still out

अनपल ध Still out

Turbine vibration high

75 एसीबीआईएल ACBIL-2

एसीबीआईएल ACBIL

135 1955 21-Jul-14 601 24-Jul-14 Furnace draft high

76 मौदा Mouda -1

एनट पीसीNTPC 500 1630 18-Jun-14 2042 14-Jul-14 Flame failure

77 कावास Kawas-1C

एनट पीसीNTPC 116 2311 2-Jul-14 2100 6-Jul-14 Heavy steam leakage from stop valve

78 कावास Kawas-1B

एनट पीसीNTPC 106 2323 2-Jul-14 632 7-Jul-14 Less requisition

79 कावास Kawas-2B एनट पीसीNTPC 164 1704 10-Jul-14 Ready Ready Less requisition

80 कावास Kawas-1A एनट पीसीNTPC 164 1200 12-Jul-14 745 22-Jul-14 Less requisition

81 वीएसट पीएस VSTPS-11

एनट पीसीNTPC 500 1204 13-Jul-14 000 16-Jul-14 Coal shortage

82 गाधारGandhar-1 एनट पीसीNTPC 144 149 16-Jul-14 1807 21-Jul-14 Less requisition

83 कावास Kawas-1B एनट पीसीNTPC 164 1027 18-Jul-14 442 23-Jul-14 Less requisition

84 मौदा Mouda-1 एनट पीसीNTPC 500 000 18-Jul-14 1745 24-Jul-14 Less requisition

85 िसपतSipat-1 एनट पीसीNTPC 660 000 21-Jul-14 955 24-Jul-14 Generator H2 gas leakage

86 गाधार Gandhar-3

एनट पीसीNTPC 144 1607 21-Jul-14 अनपल ध Still out

अनपल ध Still out

BB protection operatedatJhanor

87 गाधार Gandhar-4(ST)

एनट पीसीNTPC 224 1607 21-Jul-14 1320 26-Jul-14 BB protection operatedatJhanor

88 ट स TAPS-1

एनट पीसीNTPC 160 2227 21-Jul-14 1407 26-Jul-14 Maintenance

89 गाधार एनट पीसीNTPC 144 507 22-Jul-14 Ready Ready Less requisition

प म ऽय भार षण कि म बई णाली चालन-ISO-I

Gandhar -1

90 मौदा mouda-2 एनट पीसीNTPC 500 915 23-Jul-14 315 31-Jul-14 Coal feeding problem

91 कावास Kawas-1A

एनट पीसीNTPC 106 608 24-Jul-14 1309 27-Jul-14 Less requisition

92 गाधार Gandhar-2

एनट पीसीNTPC 144 2036 26-Jul-14 100814 Less requisition

93 वीएसट पीएस VSTPS-2

एनट पीसीNTPC 210 500 27-Jul-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

94 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 748 27-Jul-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

95 मौदा Mouda-2 एनट पीसीNTPC 500 315 31-Jul-14 210 3-Aug-14 Less requisition Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का जलाई2014 का वःता रत यौरा

Details of planned unit outages during the month of July2014 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

सo From

समय दनाक

कारण Reason

Time Date Time Date

1 एसएलपीपी SLPP-2

गरा विनिल GSECL

125 045 23-Jun-14 NA 17-Jul -14 AOH

2 डब यट पीएस WTPS-5

गरा विनिल GSECL

210 000 21-Jul-14 29-0814 COH

3 यट पीएस UTPS-4

गरा विनिल GSECL

200 000 21-Jul-14 240814 AOH

4 एसएलपीपी SLPP-3

गरा विनिल GSECL

125 130 22-Jul-14 060814 AOH

5 यट पीएस UTPS-1

गरा विनिल GSECL

120 000 29-Jul-14 28814 AOH

6 पल ParlI-3

मारा वउकिल MSPGCL

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

Water supply problem

7 चिपर Chandrapur-7

मारा वउकिल MSPGCL

500 600 19-Jun-14 1124 2-Aug-14 AOH

8 नािसक NASIK -3

मारा वउकिल MSPGCL

210 1410 10-Jul-14 अनपल ध Still out

100814 AOH

9 कोरबा प म Korba(W)-2

छरा वउकिल CSPGCL

210 936 26-Jun-14 140814 AOH

10 वदनाVandana-I वदना VANDANA 135 1940 17-Jul-14 अनपल ध Still out

अनपल ध Still out

ETL

11 वीएसट पीएस VSTPS-8

एनट पीसीNTPC 500 012 1-Jun-14 253 13-Jul-14 AOH

12 कएसट पीएस KSTPS-4

एनट पीसीNTPC 500 2335 20-Jun-14 180814 COH

13 कावास Kawas-2A

एनट पीसीNTPC 106 000 27-Jun-14 260814 RampM works

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

11 Akrimota 1 125 4-Aug-14 14-Aug-14 AOH12 WTPS 2 210 5-Aug-14 3-Sep-14 AOH13 SLPP 1 125 16-Aug-14 4-Sep-14 AOH14 DGB 1 107 20-Aug-14 27-Aug-14 CI15 GIPCL-I GT-3 48 22-Aug-14 27-Aug-14 HGPI16 GIPCL-I GT-2 48 29-Aug-14 3-Sep-14 HGPI17 GIPCL-I GT-2 48 12-Aug-14 24-Aug-14 HGPI18 UTPS 3 200 19-Aug-14 12-Sep-14 AOH19 GTPS 2 120 25-Aug-14 14-Sep-14 AOH110 STPS 1 120 19-Aug-14 30-Aug-14 AOH111 GTPS 3 210 24-Aug-14 13-Sep-14 AOH112 APL 9 660 1-Sep-14 20-Sep-14 AOH

221 SGTPS 4 210 010914 250914 AOH3 Craiva]kMila CSPGCL

31 Korba East-6 6 120 21-Aug-14 13-Sep-14 AOH32 Korba East-1 1 50 15-Aug-14 1-Sep-14 AOH33 Korba East-3 3 50 21-Aug-14 30-Sep-14 AOH34 Korba West-1 1 210 12-Sep-14 27-Sep-14 COH35 Korba West-5 5 500 15-Aug-14 30-Aug-14 AOH

4

41 PARAS 3 250 20914 151014 AOH42 RELIANCE 2 250 140814 160814 TURBINE VIBRATION

5 koMd``Iya xao~ Central Sector

51 SIPAT 1 600 050914 191014 BLR OH + HPT + IPT+LPT + GEN

52VINDHYACHAL

5 500 120814 200914 CAP+TG PED CKG+GEN+BLR CHEM CLNG+ESP RampM

53VINDHYACHAL

9 500 120814 150914 BLR OH + HPT + IPT+ GEN

54VINDHYACHAL

11 500 160714 170814 AOH

55CGPL

30 800 150814 050914 Bottom ash hopper Refractory repair and General maintainance work

56 CGPL 40 800 060914 300914 UT 40B repair work57 NSPCL 1 250 200814 110914 AOH

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING AUGUST 2014 AND SEPTEMBER 2014

Capacity Outage as per Annual Maintenance Plan

Date Time Date Time

1 400 400KV BUS-I at Bilaspur Ss 14-Aug-14 900 14-Aug-14 1800 DAILY For bus bar stability of LANCO bays amp jumpering work WRTS-I LANCO C

2 400kV 50 MVAR Bus Reactor-2 at Itarsi SS 14-Aug-14 800 15-Oct-14 1800 Continuo

us Installation of 125MVAR reactor WRTS-II WRTS-II C

3 765 Satna-Gwalior2 14-Aug-14 800 17-Aug-14 1800 DailyCompletion of 765kV Gwalior2 Main Bay Erection amp Testing works at Satna

PGCIL WRTS-II C

4 400 400kV JBP- JBP Pooling 2 Line 14-Aug-14 1000 14-Aug-14 1500 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

5 400 400KV BUS-II at Bilaspur Ss 16-Aug-14 900 16-Aug-14 1800 DAILY For bus bar stability of LANCO bays amp jumpering work WRTS-I LANCO C

6 765 Bus2 at satna 16-Aug-14 800 18-Aug-14 1800 DailyExtension of bus 2 for Gwalior2 bay amp completion of Main Bay Erection

PGCIL WRTS-II C

7 400 Khandwa-Dhule1 16-Aug-14 800 31-Aug-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WR-II C

8 400 Gandahr - Navsari DC 16-Aug-14 800 31-Aug-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WR-II R

PID testing of insulator strings

KV Line From To

Annexure-32

Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

9 400 Navsari - Vapi - Kala 16-Aug-14 800 31-Aug-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WR-II R

10 400 Satna - Bina Ckt 1amp2 16-Aug-14 800 31-Aug-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WR-II R

11 400 80 MVAR Bus Reactor at Kotra 16-Aug-14 900 17-Aug-14 1800 ContinuousTo attend isolator defects WRTS-I PGCIL C

12 400 400kV JBP- JBP Pooling 1 Line 17-Aug-14 1000 17-Aug-14 1500 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

13 765 ICT II at Bina 17-Aug-14 0900 17-Aug-14 1800 Daily Post Commissioning check of Fire-Fighting system at Bina PGCIL WRTS-II C

14 765 Bus-2 at Gwalior 17-Aug-2014 1000 18-Aug-2014 1800 Daily Busbar Jumpering ampStability test related to Bus reactor

POWERGRID WRTS-II C

15 765 Seoni 2 LR(704 LR) at Bilaspur Ss 18-Aug-14 900 18-Aug-14 1500 DAILY For taking Spare LR in service

first time WRTS-I PGCIL C

16 400 Bhadrawati-Ramagundam I 18-Aug-14 800 18-Aug-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

17 400 400kV Vchal - JBP 1 Line 18-Aug-14 1000 18-Aug-14 1200 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

18 400 400kV Vchal - JBP 2 Line 18-Aug-14 1400 18-Aug-14 1600 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

19 400 400KV BUS-II at Bilaspur Ss 19-Aug-14 900 19-Aug-14 1800 DAILY For bus bar stability of LANCO bays amp jumpering work WRTS-I LANCO C

20 400 Bhadrawati-Ramagundam II 19-Aug-14 800 19-Aug-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

21 765 ICT 1 at G alior 19 A g 14 10 00 20 A g 14 18 00 Continou SPARE ICT COMMISSIONING PGCIL WRTS II C21 765 ICT - 1 at Gwalior 19-Aug-14 1000 20-Aug-14 1800 s SPARE ICT COMMISSIONING PGCIL WRTS-II C

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

22 400 400kV JBP- Itarsi 1 Line 19-Aug-14 1000 19-Aug-14 1200 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

23 400 400kV JBP- Itarsi 2 Line 19-Aug-14 1400 19-Aug-14 1600 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

24 400 400 kV Sipat -Ranchi-1 19-Aug-14 900 20-Aug-14 1900 Continous 1 no of CT replacement NTPC NTPC

25 400 BUS-I at Aurangabad(PG) 19-Aug-14 600 20-Aug-14 1800 ContiBus-1 extn for commissioning of 400 kV Boisar-1amp2 bays with 80 MVAR Reactors

WRTS-I WRTS-I C

26 400kV 400kV SUGEN PIRANA Line (Line 2) 19-Aug-14 900 19-Aug-14 1700 Daily Corrective Maintenance of

Transfer Isolator TPL-SUGE TPL-SUG R

27 400kV 400kV PGCIL - PIRANA Feeder No 2 19-Aug-14 900 19-Aug-14 1700 Daily 400kV CT connectors replacementTPL-AHME TPL-AHM R

28 400 Bhadrawati-Parli 1amp 2 19-Aug-14 000 20-Oct-14 1800 DailyFor OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

29 400 Mundra - Jetpur line No1 19-Aug-14 800 19-Aug-14 1200 Daily protection logic checking work PGCIL GETCO30 400 Mundra - Jetpur line No 2 19-Aug-14 1400 19-Aug-14 1800 Daily protection logic checking work PGCIL GETCO

31 400 400KV BUS-I at Bilaspur Ss 20-Aug-14 900 20-Aug-14 1800 DAILY For bus bar stability of LANCO bays amp jumpering work WRTS-I LANCO C

32 400 KSK ndash Raigarh circuit 4 20-Aug-14 900 21-Aug-14 1800 CONT complete PLCC rectification works WRTS-I KSK C

33 HVDC HVDC POLE I AT BHADRAWATI 20 A 14 8 00 21 A 14 18 00 D il AMP WORKS WRTS I WRTS I R33 HVDC HVDC POLE-I AT BHADRAWATI 20-Aug-14 800 21-Aug-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

34 765kV Dharamjaygarh - Durg ckt-2 20-Aug-14 800 22-Aug-14 1800 daily CSD relay commissioning (M+T) WRTS-I PGCIL C

35 765 JBP - BINA 1 at Jabalpur Pooling Station 20-Aug-14 1000 21-Aug-14 1800 Daily Commissioning of CSD Relay for

765KV JBP - BINA Ckt 1 PGCIL WRTS-II C

36 400 Khandwa-Dhule1 20-Aug-14 1000 20-Aug-14 1500 Daily AMP PGCIL WRTS-II R

37 400 Bus-1 at Shujalpur 20-Aug-14 1000 20-Aug-14 1800 Daily AMP PGCIL WRTS-II R

38 400 Bus2 at Satna 20-Aug-14 900 20-Aug-14 1800 Daily For Bus Bar Stability and charging activity of 406 Bay PGCIL WRTS-II C

39 400 Bus1 at Indore 20-Aug-14 900 20-Aug-14 1800 Daily Jumper connection amp stability checking of Pitampur1 PGCIL WRTS-II C

40 400 400kV JBP- Itarsi 3 Line 20-Aug-14 1000 20-Aug-14 1200 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

41 765 Raigarh (Kotra) - Raigarh (Tamnar) 20-Aug-14 900 31-Aug-14 1800 ContinuousFor installation of Bird guards WRTS-I PGCIL C

42 400 Kansari - Kankroli line 20-Aug-14 800 20-Aug-14 1800 Daily PMU installation work and maintenPGCIL GETCO43 400 BUS-2 AT SOLAPUR 21-Aug-14 900 22-Aug-14 1800 Daily Pune bays extension works WRTS-I WRTS-I C

44 765 ICT 1 at Jabalpur Pooling Station 21-Aug-14 1000 21-Aug-14 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus for Spare ICT Phase

PGCIL WRTS-II C

45 400 Bina-Shujalpur1 21-Aug-14 900 21-Aug-14 1000 Daily

For Replacement of 390kV Reactor LA with 336kV LA Line will be taken in service without PGCIL WRTS-II Cj p g g y will be taken in service without Line Reactor at Shujalpur

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

46 400 Khandwa-Dhule2 21-Aug-14 1000 21-Aug-14 1800 DailyFor Replacement of 390kV Reactor LA with 336kV LA At Khandwa amp AMP

PGCIL WRTS-II C

47 220 Damoh-Sagar 21-Aug-14 1000 21-Aug-14 1500 Daily AMP of terminal equipment at Damoh SS MPPTCL WR-II R

48 765 ICT2 at Indore 21-Aug-14 900 22-Aug-14 1800 Continious

For Auxiliary bus erection at Indore PGCIL WRTS-II C

49 400 125MVAr BR at Shujalpur 21-Aug-14 900 21-Aug-14 1800 Daily Differential stability of tie bay (Under commissioning) PGCIL WRTS-II C

50 400 Raipur-Bhadrawati-III 21-Aug-14 900 21-Aug-14 1800 ContinuousBus split at Raipur WRTS-I PGCIL C51 400 Kansari - Bhinmal line 21-Aug-14 800 21-Aug-14 1800 Daily PMU installation work and maintenPGCIL GETCO

52 HVDC HVDC POLE-2 AT BHADRAWATI 22-Aug-14 800 23-Aug-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

53 765 ICT I at Bina 22-Aug-14 0900 23-Aug-14 1800 DailyCommissioning of CSD Relay for 400kV side of ICT- rescheduling of outage

PGCIL WRTS-II C

54 765 JBP - BINA 2 at Jabalpur Pooling Station 22-Aug-14 1000 23-Aug-14 1800 Daily Commissioning of CSD Relay for

765KV JBP - BINA Ckt 2 PGCIL WRTS-II C

55 400 Khandwa-Rajgarh1 22-Aug-14 800 23-Aug-14 1800 PM Continous

Rectification of damaged tower peak at locno83 due to collapse of MPPTCL tower which is under construction

PGCIL MPPTCL C

F j i amp h i th56 400 Pirana-Vadodara-Asoj DC 22-Aug-14 800 23-Aug-14 1800 Daily

For jumpering amp charging the future cirucit of line in multi-circuit towers to prevent conductor theft

PGCIL WRTS-II C

57 220 Damoh-Damoh2 22-Aug-14 1000 22-Aug-14 1500 Daily AMP of terminal equipment at Damoh SS MPPTCL WR-II R

58 400kV 400kV SUGEN VAPI Line 22-Aug-14 900 22-Aug-14 1400 Daily Corrective Maintenance amp Inspection Dropper of 5 Core CT

TPL-SUGE TPL-SUG R

59 765 Bus Reactor Kotra 22-Aug-14 900 23-Aug-14 1800 Daily WRTS-I PGCIL C

60 400 Vindhyachal-Jabalpur3 23-Aug-14 900 23-Aug-14 1800 Daily

For Replacement of 390kV Reactor LA with 336kV LA At Jabalpur Line will remain out of service due to less clearance of Reactor LA from Line conductor

PGCIL WRTS-II C

61 765 ICT1 at Indore 23-Aug-14 900 26-Aug-14 1800 Continious

re routing of cables in CMB for commissioning of spare unit at Indore

PGCIL WRTS-II C

62 765 Bus- 2 at Bina 23-Aug-2014 0900 23-Aug-2014 1800 DailyFor Bus stability required for 765kV Jabalpur 3 Bay- Rescheduling of outage

POWERGRID WRTS-II C

63 765 Bus-1 at Gwalior 24-Aug-14 1000 25-Aug-14 1800 Daily Busbar Jumpering ampStability test related to Jaipur 1 main bay PGCIL WRTS-II C

64 400 Navasari- Kala MC line 25-Aug-14 800 26-Aug-14 1800 DailyConstruction work of Navasari- Boisar line on same Multi ckt WRTS-II WRTS-I Ctower

65 765 765400 AT-1 AT SOLAPUR 25-Aug-14 900 26-Aug-14 1800 Daily Spare ICT unit Aux bus commisioning works WRTS-I WRTS-I C

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

66 220 Korba-Budhipadar Ckt-3 at CSPDCL Korba Ss 25-Aug-14 900 26-Aug-14 1800 DAILY For diversion of line for SE

Railway MCL project WRTS-I PGCIL C

67 765 765KV Bus 1 at Jabalpur Pooling Station 25-Aug-14 1000 25-Aug-14 1800 Daily

765KV Bus 1 Extension for Switchyard Extension for BINA 3 Line Dia

PGCIL WRTS-II C

68 765 765KV ICT 1 at Jabalpur Pooling Station 25-Aug-14 1000 25-Aug-14 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus Isolators for Spare ICT Phase - Heavy Induction

PGCIL WRTS-II C

69 400 Vindhyachal-Jabalpur4 25-Aug-14 900 25-Aug-14 1800 Daily

For Replacement of 390kV Reactor LA with 336kV LA At Jabalpur Line will remain out of service due to less clearance of Reactor LA from Line conductor

PGCIL WRTS-II C

70 400 Bus-I at satna 25-Aug-14 900 25-Aug-14 1800 DailyFor Changing of Jumper from Twin Moose To Quad Moose in 401 bay (jaypee nigrie line-1)

PGCIL WR-II C

71 400 Deepnagar-Thaptitanda 25-Aug-14 900 25-Aug-14 1700 Daily To attend Isolator alignment problem MSETCL MSETCL

72 765 BUS-II and 765 ICT-1 at Aurangabad (PG) 25-Aug-14 600 25-Aug-14 1800 Daily Commissioning of spare ICT unit

at Aurangabad (PG) WRTS-I WRTS-I CAurangabad (PG) at Aurangabad (PG)

73 765 Kotra-durg Ckt-2 along with line reactor 25-Aug-14 900 28-Aug-14 1800 ContinuousReplacement of spacer damper WRTS-I PGCIL C

74 765 Wardha-Aurangabad (PG)-2 and Padge-1 LReactor 26-Aug-14 600 26-Aug-14 1800 Daily Construction of up-coming

Padghe bay at Aurangabad (PG) WRTS-I WRTS-I C

75 765 Gwalior -Bina 1 26-Aug-14 1000 27-Aug-14 1800 Daily Spare reactor commissioning at Gwalior PGCIL WR-II C

76 765 1500MVA ICT 2 at Jabalpur Pooling Station 26-Aug-14 1000 26-Aug-14 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus Isolators for Spare ICT Phase - Heavy Induction

PGCIL WRTS-II C

77 400 Jabalpur-Itarsi4 26-Aug-14 900 26-Aug-14 1800 Daily

For Replacement of 390kV Reactor LA with 336kV LA At Jabalpur Line will remain out of service due to less clearance of Reactor LA from Line conductor

PGCIL WRTS-II C

78 400 Akola ll-Thaptitanda 27-Aug-14 900 27-Aug-14 1900 Daily To attend chattering noise on B-ph wave trap MSETCL MSETCL

79 400 Vapi- Kala MC Line 27-Aug-14 800 28-Aug-14 1800 DailyConstruction work of Navasari- Boisar line on same Multi ckt tower

WRTS-II WRTS-I C

80 765 Bus 1 at Jabalpur Pooling Station 27-Aug-14 1000 27-Aug-14 1800 Daily

765KV Bus 1 Extension Busbar Stability test related to BINA 3 Line Dia

PGCIL WRTS-II C

81 400 KORBA SIPAT 27 Aug 14 600 29 Aug 14 2200 CONT NORMALISED THE LILO AT PGCIL LANCO C81 400 KORBA -SIPAT 27-Aug-14 600 29-Aug-14 2200 RAMPUR PGCIL LANCO C

82 400 TARAPUR-PADGHE II 27-Aug-14 800 28-Aug-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

83 765 Gwalior-Satna1 28-Aug-14 800 28-Aug-14 1800 Daily For spare reactor commissioning works at Gwalior PGCIL WRTS-II C

84 765 BUS-II and Padge-2 LReactor at Aurangabad (PG) 28-Aug-14 600 28-Aug-14 1800 Daily

Commissioning of Padghe-2 upcoming bay at Aurangabad (PG)

WRTS-I WRTS-I C

85 765 Bilaspur 1 Main bay (710) at Seoni 28-Aug-14 800 29-Aug-14 1800 Daily AMP works WRTS-I WRTS-I R

86 765 765400 AT-2 AT SOLAPUR 28-Aug-14 900 28-Aug-14 1800 Daily Spare ICT unit Aux bus commisioning works WRTS-I WRTS-I C

87 765 Bus Reactor(706 BR) at Bilaspur Ss 28-Aug-14 900 01-Sep-14 1800 DAILY For replacement of unarmoured

cable by TBEA WRTS-I PGCIL C

88 765 Bus 2 at Jabalpur Pooling Station 28-Aug-14 1000 29-Aug-14 1800 Daily

765KV Bus 2 Extension for Switchyard Extension for BINA 3 Line Dia

PGCIL WRTS-II C

89 400 MOUDA 400KV BUS REACTOR 28-Aug-14 0900hrs 29-Aug-14 1800 ContionuouAnnual Maintainance NTPC NTPC

90 765 Satna - Bina 1 29-Aug-14 0900 31-Aug-14 1800 Daily

for erection of new TC amp TE tower forNHPTL at Bina-Rescheduling of outage

PGCIL WRTS-II C

91 765 Bus Reactor at Satna 29-Aug-14 900 30-Aug-14 1800 Continious Commissioning of spre reactor PGCIL WRTS-II Cus

92 400 125MVAr BR1 at Indore 29-Aug-14 900 29-Aug-14 1800 Daily Post Commissioning check of Fire-Fighting system at Indore PGCIL WRTS-II C

93 400 Chorania Hadala line 29-Aug-14 800 29-Aug-14 1800 Daily PMM WORK GETCO GETCO

94 765 Kotra-durg Ckt-2 along with line reactor 29-Aug-14 900 31-Aug-14 1800 Daily WRTS-I PGCIL C

95 765 765400 ICT-2 at Aurangabad (PG) 30-Aug-14 600 30-Aug-14 1800 Daily Altube erection in 400 kV Boisar-

1amp2 Tie bays WRTS-I WRTS-I C

96 765kV Dharamjaygarh - Bilaspur 30-Aug-14 800 30-Aug-14 1800 daily commissioning of JBP-1 bay (side) WRTS-I PGCIL C

97 765kV 330 MVAR Bus Rector-2 at Dharamjaygarh 30-Aug-14 800 30-Aug-14 1800 daily commissioning of JBP-1 bay

(side) WRTS-I PGCIL C

98 400 Mundra Hadala SC 30-Aug-14 800 30-Aug-14 1800 DailyPower Line Crossing of 400 KV DC Bhachau SS (PG) - Varsana SS (GETCO) TrL

GETCO WRTS-II C

99 220 Gwalior - Mahalgaon 1amp2 30-Aug-14 900 31-Aug-14 1800 Continuous

For crossing of 765kV Gwalior - Jaipur line PGCIL WRTS-II C

100 220 Gwalior - Malanpur 1amp2 30-Aug-14 900 31-Aug-14 1800 Continuous

For crossing of 765kV Gwalior - Jaipur line PGCIL WRTS-II C

101 400 400 kV Akola- Nandagaon peth sc 31-Aug-14 800 31-Aug-14 1600 Daily crossing works of 765 kV Koradi-AWRTS-I WRTS-I R

102 400 Bina-Shujalpur2 31-Aug-2014 900 31-Aug-2014 1000 DailyFor Replacement of 390kV Reactor LA with 336kV LA Line

ill b t k i i ith t

POWERGRID WRTS-II C

103 400 Mundra - Sami DC 01-Sep-14 800 01-Sep-14 1800 DailyPower Line Crossing of 400 KV DC Bhachau SS (PG) - Varsana SS (GETCO) TrL

ADANI WRTS-II C

104 400 Akola-Wardha 1amp 2 01-Sep-14 800 30-Sep-14 1800 Daily For Online PID Line in service with AR in non-auto mode WRTS-I WRTS-I For IOwith AR in non auto mode

105 765 Bilaspur 2 Main bay (716) at Seoni 01-Sep-14 800 02-Sep-14 1800 Daily AMP works WRTS-I WRTS-I R

106 400 400220 ICT-1 AT SOLAPUR 01-Sep-14 900 01-Sep-14 1500 Daily AMP WORK WRTS-I WRTS-I R

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

107 765 1000 MVA ICT I amp ICT II at Bina 01-Sep-14 0900 01-Sep-14 1800 Daily Commissioning of Master follower

scheme PGCIL WRTS-II C

108 765 Bus 1 at Jabalpur Pooling Station 01-Sep-14 100000 AM 01-Sep-14 60000 PM Daily

765KV Bus 1 Extension Busbar Stability test related to Bhopal 1 Line Dia

PGCIL WRTS-II C

109 400 Shujalpur - Bina 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

110 400 Birsinghpur-Damoh 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

111 400 Gandhar - Navsari 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

112 400 Khandwa - Rajgarh 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

113 400 Indore - Nagda 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

114 400 Jabalpur - Jabalpur Pool 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II Cnon auto mode

115 400 Khandwa - Dhule 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

116 400 Itarsi - Khandwa 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

117 220 Satna - Satna 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

118 765 Dehgam - Ranchhodpura 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

119 765 Shujalpur - Nagda 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

120 400 Asoj - SSP 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

121 400 Bhachau - Mundra 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

122 400 Bina - Gwalior 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

123 400 Satna - Gwalior 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in PGCIL WRTS-II Cnon auto mode

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

124 400 LILO portion of Vapi - Navi Mumbai at Kala(Vapi-Kala Line) 01-Sep-14 600 30-Sep-14 1800 Daily

Online replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

125 400400 kV Khandwa - Rajgarh

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

126 400400 kV Gandhar-Navsari

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

127 400400 kV Rajgarh ndash SSP

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

128 400400 kV SSP-Asoj

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

129 400 400 kV Shujalpur - Nagda (MPPTCL)

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

130 400400 kV Dehgam - Ranchodpura

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

131 400 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in PGCIL WRTS-II C

400 kV Ranchodpura ndash Bhachaup p y OPGW AR shall be kept in

non auto mode

132 400400 kV Mundra-Bhachau

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

133 400400 kV Vindhyachal NTPC -SASAN UMPP Ckt-1 01-Sep-14 600 30-Sep-14 1800 Daily

Online replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

134 400400 kV Vindhyachal Pooling -Vindhyachal NTPC 01-Sep-14 600 30-Sep-14 1800 Daily

Online replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

135 400 400 kV LILO at Kala (DNH) SS of Vapi-Navi Mumbai Line

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

136 765765 kV Bina - Gwalior

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

137 765765 kV Satna - Gwalior Ckt-I

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

138 400 Gandahr - Navsari DC 01-Sep-14 800 30-Sep-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

139 400 Navsari - Vapi - Kala 01-Sep-14 800 30-Sep-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

PID testing of insulator strings 140 400 Satna - Bina Ckt 1amp2 01-Sep-14 800 30-Sep-14 1800 Daily AR shall be kept In non auto

modePGCIL WRTS-II R

141 400 Nagda - Dehgam DC 01-Sep-14 800 30-Sep-14 1800 Daily PID testing of insulator strings AR h ll b k t I t

PGCIL WRTS-II R

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

142 220 Kakrapar - Vapi DC 01-Sep-14 800 30-Sep-14 1800 Daily PID testing of insulator strings PGCIL WRTS-II R

143

220 220 KV Jhanor - Haldrwa Line 1

01-Sep-14

800

05-Sep-14

000

Continous Replacement of existing CTCVT with 02 class CT amp CVT and for testing of the same NTPC NTPC

144 400 Akola-Aurangabad(PG) 2 01-Sep-14 800 02-Sep-14 1800 Conti commissioning of 50MVAR Lreactor at Aurangabad(PG) WRTS-I WRTS-I C

145 765 Bina-Satna 2 02-Sep-14 0900 03-Sep-14 1800 Daily Post Commissioning check of Fire-Fighting system at Bina PGCIL WRTS-II C

146 400 Vadavi-Chorania 1 02-Sep-14 800 02-Sep-14 1800 Daily PMM WORK WRTGPL GETCO147 400 BUS REACTOR AT SOLAPUR 02-Sep-14 900 02-Sep-14 1500 Daily AMP WORK WRTS-I WRTS-I R

148 765 Korba Line Main Bay (716) at Bilaspur Ss 02-Sep-14 900 02-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

149 765 Bus 2 at Jabalpur Pooling Station 02-Sep-14 100000 AM 02-Sep-14 60000 PM Daily

765KV Bus 2 Extension for Switchyard Extension for Bhopal 1 Line Dia

PGCIL WRTS-II C

150 400 Bus2 at Indore 02-Sep-14 900 02-Sep-14 1800 Daily Jumper connection amp stability checking of Pitampur1 PGCIL WRTS-II C

151 400 CGPL-Limbdi-1 02-Sep-14 2-Sep-14 8AM 6PM Daily routine maintenance and isolator aPGCIL CGPL

152400 Korba-Bhalai line -1

02-Sep-14 900 03-Sep-14 19002 days

continuous CVTs replacement

NTPC NTPC00 o ba a a e us C s ep ace e t

153 400 Sipat 400KV Bus-1 02-Sep-14 900 03-Sep-14 1900 Continous Annual Preventive maintenance NTPC NTPC

154 765 Bilaspur 2 Tie bay (717) at Seoni 03-Sep-14 800 04-Sep-14 1800 Daily AMP works WRTS-I WRTS-I R

155 400 400220 ICT-1 AT SOLAPUR 03-Sep-14 900 03-Sep-14 1500 Daily AMP WORK WRTS-I WRTS-I R

156 765 Sipat2 Main Bay (712) at Bilaspur Ss 03-Sep-14 900 03-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

157 765 Bina-Gwalior 2 03-Sep-14 0900 04-Sep-14 1800 Daily For spare reactor commissioning works at Gwalior PGCIL WRTS-II C

158 765 Bus 2 at Jabalpur Pooling Station 03-Sep-14 100000 AM 03-Sep-14 60000 PM Daily

765KV Bus 2 Extension for Switchyard Extension for Jumpering (Bus Extension) for Bhopal 1

PGCIL WRTS-II C

159 400 Indore-Asoj3 03-Sep-14 900 04-Sep-14 1800 Continuous

For checking protection transfer system at Indore (MPPTCL) PGCIL WRTS-II C

160 400 400 kv Nagda- Rajgarh ckt Pgcil ckt I 03-Sep-14 900 03-Sep-14 03092014 1800 daily Maintenan

ce Work PGCIL EHT- Mamp I

161 400 Vadavi-Chorania 2 04-Sep-14 800 04-Sep-14 1800 Daily PMM WORK WRTGPL GETCO162 220 SOLAPUR(PG)-Solapur(M) 04-Sep-14 900 04-Sep-14 1800 Daily AMP WORK MSETCL WRTS-I R

163 765 Bus 2 at Jabalpur Pooling Station 04-Sep-14 100000 AM 04-Sep-14 60000 PM Daily

765KV Bus 2 Extension Busbar Stability test related to Bhopal 1 Line Dia

PGCIL WRTS-II C

164 400 CGPL-Limbdi-2 04-Sep-14 4-Sep-14 8AM 6PM Daily routine maintenance and isolator aPGCIL CGPL

165 400 400 kv Nagda- Rajgarh ckt Pgcil ckt II 04-Sep-14 900 04-Sep-14 04092014 1800 daily Maintenan

ce Work PGCIL EHT- Mamp I

166400 Korba-Bhalai line -2

04-Sep-14 900 05-Sep-14 19002 days

continuous CVTs replacement

NTPC NTPC

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

167 400 BUS-1 AT SOLAPUR 05-Sep-14 900 05-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I C

168 400 Seoni-Khandwa 1 05-Sep-14 800 05-Sep-14 1800 Daily Line AMP works at Seoni WRTS-II WRTS-I R

169 400 400220 ICT-2 AT BOISAR 05-Sep-14 900 05-Sep-14 1500 Daily For Bushing oil DGA Testing WRTS-I WRTS-I R

170 765 Sipat2 Tie Bay (711) at Bilaspur Ss 05-Sep-14 900 05-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

171 765 Bina-Jabalpur I 05-Sep-14 0900 06-Sep-14 1800 Daily Post Commissioning check of Fire-Fighting system at Bina PGCIL WRTS-II C

172 400 Bus Reactor 1 at Jabalpur Pooling Station 05-Sep-14 100000 AM 05-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

173 220 Navsari - Nasik - 1 05-Sep-14 800 05-Sep-14 1800 Daily PMM WORK PGCIL GETCO174 400 Sipat 400KV Bus-2 05-Sep-14 900 06-Sep-14 1900 Continous Annual Preventive maintenance NTPC NTPC175 400 Akola-Wardha ckt 2 05-Sep-14 800 05-Sep-14 1700 Daily QMwork MSETCL MSETCL176 400 Kalwa-Kharghar 05-Sep-14 900 05-Sep-14 1700 Daily R amp M work MSETCL MSETCL177 400 Seoni-Khandwa 2 06-Sep-14 800 06-Sep-14 1800 Daily Line AMP works at Seoni WRTS-II WRTS-I R178 400 400220 ICT-1 AT BOISAR 06-Sep-14 900 06-Sep-14 1500 Daily For Bushing oil DGA Testing WRTS-I WRTS-I R

179 400 Bus Reactor 2 at Jabalpur Pooling Station 06-Sep-14 100000 AM 06-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

180 765 Gwalior-Satna2 06-Sep-14 800 06-Sep-14 1800 Daily For spare reactor commissioning works at Gwalior PGCIL WRTS-II C

181 400 Indore-Indore1 06-Sep-14 900 07-Sep-14 1800 Continuo For checking protection transfer t t I d (MPPTCL) PGCIL WRTS-II C181 400 Indore Indore1 06 Sep 14 900 07 Sep 14 1800 us system at Indore (MPPTCL) PGCIL WRTS II C

182 220 Navsari - Nasik - 2 06-Sep-14 800 06-Sep-14 1800 Daily PMM WORK PGCIL GETCO

183 400 VAPI-BOISAR 07-Sep-14 800 08-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

184 765 Satna-Gwalior-2 Reactor 07-Sep-14 900 07-Sep-14 1800 Daily For Commissioning of CSD relay in Gwalior-2 reactor bay at Satna PGCIL WRTS-II C

185 220 DC Welspun - Shivlakha amp Anjar shivlakha Trl 07-Sep-14 80000 AM 07-Sep-14 60000 PM Daily

Power Line Crossing of 400 KV DC Bhachau SS (PG) - Varsana SS (GETCO) TrL

GETCO WR-II C

186 765 Bilaspur 1 Tie bay (711) at Seoni 08-Sep-14 800 09-Sep-14 1800 Daily AMP works WRTS-I WRTS-I R

187 400kV Bus-1 at Itarsi SS 08-Sep-14 800 08-Sep-14 1800 Daily AMP amp Protection testing WRTS-II WRTS-II R

188 765 Seoni2 Main Bay (707) at Bilaspur Ss 08-Sep-14 900 08-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

189 765 Bina-Jabalpur II 08-Sep-14 0900 09-Sep-14 1800 Daily Post Commissioning check of Fire-Fighting system at Bina PGCIL WRTS-II C

190 765 ICT 1 at Jabalpur Pooling Station 08-Sep-14 100000 AM 08-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

191 765 Gwalior-Bina3 08-Sep-14 800 09-Sep-14 1800 Daily For spare reactor commissioning works at Gwalior PGCIL WRTS-II C

192 400 V-satna-1 08-Sep-14 900 09-Sep-14 1900 Continuous

Major OH of Line Circuit Breaker (For dismantling of poles) NTPC NTPC

193

220 220 KV Jhanor- Haldrwa Line 2

08-Sep-14

800

12-Sep-14

000

Continous Replacement of existing CTCVT with 02 class CT amp CVT and for testing of the same NTPC NTPC

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

194 400 Vadavi- Kansari- 1 09-Sep-14 800 09-Sep-14 1800 Daily PMM WORK WRTGPL GETCO195 400 Bus-1 at Damoh 09-Sep-14 1000 10-Sep-14 1800 Daily AMP PGCIL WRTS-II R

196 765 Bus Reactor 1 at Jabalpur Pooling Station 09-Sep-14 100000 AM 09-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

197 400 Bina - Shujalpur 1 09-Sep-14 1000 09-Sep-14 1400 Daily AMP PGCIL WRTS-II C

198 400 400 kv Katni- Damoh ckt 09-Sep-14 800 09-Sep-14 09092014 1800 daily Maintenance Work PGCIL EHT-

Mamp I

199 220 220 KV OMKARESHWAR -KHANDWA 09-Sep-14 900 09-Sep-14 09092014 1600 daily Maintenan

ce Work PGCIL EHT- Mamp I

200 220 220KV MALANPUR -AURAIYA 09-Sep-14 900 09-Sep-14 09092014 1700 daily Maintenance Work

EHT- Mamp I

201400 Korba 400 KV Bus coupler -1

09-Sep-14 900 10-Sep-14 19002 days

continuous Annual maintenance and testing

NTPC NTPC

202 400kV Bus-2 at Itarsi SS 10-Sep-14 800 10-Sep-14 1800 Daily AMP amp Protection testing WRTS-II WRTS-II R203 400 400220KV ICT-2 at Seoni 10-Sep-14 800 11-Sep-14 1800 Conti OLTC overhauling works WRTS-I WRTS-I R

204 400 VAPI-BOISAR 10-Sep-14 800 11-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

205 400 Parli 2 Tie Bay (417) at Solapur 10-Sep-14 900 10-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

206 765 330 MVAR Bus Rector-1 at Dharamjaygarh 10-Sep-14 800 11-Sep-14 1700 DAILY CSD relay commissioning in main

bay WRTS-I PGCIL C

207 765 ICT3 Tie Bay (717) at Bilaspur 10 S 14 9 00 10 S 14 18 00 DAILY F AMP k WRTS I PGCIL R207 765 ICT3 Tie Bay (717) at Bilaspur Ss 10-Sep-14 900 10-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

208 765 765kV Dharamjaygarh - Ranchi-2 l 10-Sep-14 900 15-Sep-14 1800 continous

For strining Jumpering of parallel ckt and Crossing of 765kV Dharamjaygarh-Jabalpur line

WRTS-I PGCIL C

209 765 ICT 2 at Jabalpur Pooling Station 10-Sep-14 100000 AM 10-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

210 400 Shujalpur-Nagda 1 10-Sep-14 1000 10-Sep-14 1400 Daily AMP PGCIL WRTS-II C211 400 Vadavi- Kansari- 2 10-Sep-14 800 10-Sep-14 1800 Daily PMM WORK WRTGPL GETCO

212 400 400 kv ISP - Nagda ckt 10-Sep-14 900 10-Sep-14 10092014 1800 daily Maintenance Work

EHT- Mamp I

213 220 220KV MALANPUR -AURAIYA 10-Sep-14 900 10-Sep-14 10092014 1700 daily Maintenance Work

EHT- Mamp I

214 220 220 KV DAMOH PGCIL IC - I 10-Sep-14 800 10-Sep-14 10092014 1800 daily Maintenance Work PGCIL EHT-

Mamp I

215765KV400K

VSipat 765KV400KV ICT-1 10-Sep-14 900 11-Sep-14

1900 Continous Annual Preventive maintenance NTPC NTPC216 400 New Koyna-Dabhol ckt 1 10-Sep-14 830 10-Sep-14 1730 Daily QMwork MSETCL MSETCL217 400 Akola-Aurangabad ckt 1 10-Sep-14 830 10-Sep-14 1730 Daily QMwork MSETCL MSETCL

218 400 TARAPUR-PADGHE I 11-Sep-14 800 12-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

219 400 ICT 2 Main Bay (409) at Mapusa 11-Sep-14 900 11-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

220 765 Korba LR (716 LR) at Bilaspur Ss 11-Sep-14 900 11-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

221 220 Bus-1 at Damoh 11-Sep-14 1000 12-Sep-14 1800 Daily AMP PGCIL WRTS-II R

222 765 Bus Reactor 2 at Jabalpur Pooling Station 11-Sep-14 100000 AM 11-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

223 220MC Bhimasar - Lalpar Bhimasar -Morbi amp Bhimasar - Mansar (on same tower)

11-Sep-14 80000 AM 11-Sep-14 60000 PM DailyPower Line Crossing of 400 KV DC Bhachau SS (PG) - Varsana SS (GETCO) TrL

GETCO WR-II C

224 220 Navsari - Dastan- 1 11-Sep-14 800 12-Sep-14 1800 Daily PMM WORK PGCIL GETCO

225 400 400 kv Rajgarh Pgcil - SSP CKT I 11-Sep-14 900 11-Sep-14 11092014 1800 daily Maintenance Work PGCIL EHT-

Mamp I

226 220 220K KV MEHGAON - AURAIYA 11-Sep-14 900 11-Sep-14 11092014 1700 daily Maintenance Work

EHT- Mamp I

227400 Korba Lanco

11-Sep-14 900 12-Sep-14 19002 days

continuous Annual maintenance and testing

NTPC NTPC

228 400 Lonikand II-Lonikand I 11-Sep-14 900 11-Sep-14 1700 Daily QMwork MSETCL MSETCL

229 400 Parali-Lonikand II ckt 2 11-Sep-14 900 11-Sep-14 1700 Daily QMwork MSETCL MSETCL

230 400 Waluj-Bableshwer 11-Sep-14 900 11-Sep-14 1700 Daily QMwork MSETCL MSETCL

231 400 Tie Transformer-II NTPC-Korba 11-Sep-14 900 12-Sep-14 1700 Maintenance NTPC NTPC

232 400kV Sipat-Raipur-2 12-Sep-14 000 12-Sep-14 1700 Daily Attending hot spots and SD nature defects WRTS-I PGCIL R

233 400 400220 ICT 1 AT WARDHA 12 Sep 14 9 00 12 Sep 14 15 00 Dail For B shing oil DGA Testing WRTS I WRTS I R233 400 400220 ICT-1 AT WARDHA 12-Sep-14 900 12-Sep-14 1500 Daily For Bushing oil DGA Testing WRTS-I WRTS-I R

234 400 Khandwa-Dhule 2 line reactor at Dhule 12-Sep-14 800 12-Sep-14 1800 Daily For Bushing oil DGA Testing

Line in service wo reactor WRTS-I WRTS-I R

235 400 BUS I AT MAPUSA 12-Sep-14 900 12-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

236 765 JBP - Dharmjaygarh Reactor Line 1 Reactor at Jabalpur Pooling Station

12-Sep-14 100000 AM 12-Sep-14 60000 PM Daily Installation amp Commissioning of CSD Relay PGCIL WRTS-II C

237 400 400 kv Rajgarh Pgcil - SSP CKT II 12-Sep-14 900 12-Sep-14 12092014 1800 daily Maintenan

ce Work PGCIL EHT- Mamp I

238 400 400 kv Indore - Nagda ckt 12-Sep-14 900 12-Sep-14 12092014 1800 daily Maintenance Work

EHT- Mamp I

239 220 220K KV MEHGAON - AURAIYA 12-Sep-14 900 12-Sep-14 12092014 1700 daily Maintenance Work

EHT- Mamp I

240 400 Lonikand-Stage IV 12-Sep-14 900 12-Sep-14 1700 Daily QMwork MSETCL MSETCL

241 400 Aurangabad(PG)-Aurangabad (Waluj)-1 12-Sep-14 800 15-Sep-14 1800 Conti Augmentation works at MSETCL

Waluj 400kV SSWRTS-I WRTS-I C

242 400 TARAPUR-PADGHE I 13-Sep-14 800 14-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

243 400 Karad-Lonikand 13-Sep-14 900 13-Sep-14 1700 Daily QMwork MSETCL MSETCL

244 400kV Sipat-Raipur-1 13-Sep-14 000 13-Sep-14 1700 Daily Attending hot spots and SD nature defects WRTS-I PGCIL R

245 400 BOISAR-PADGHE 13-Sep-14 800 14-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

246 400 400220 ICT-2 AT WARDHA 13-Sep-14 900 13-Sep-14 1500 Daily For Bushing oil DGA Testing WRTS-I WRTS-I R

247 400 Khandwa-Dhule 1 line reactor at Dhule 13-Sep-14 800 13-Sep-14 1800 Daily For Bushing oil DGA Testing

Line in service wo reactor WRTS-I WRTS-I R

248 220 BUS I AT MAPUSA 13-Sep-14 900 13-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R248 220 BUS I AT MAPUSA 13-Sep-14 900 13-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

249 765 Korba Line Main Bay (716) at Bilaspur Ss 13-Sep-14 900 13-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

250 400 Dhule-Babhleswar ckt 2 13-Sep-14 900 13-Sep-14 1700 Daily QMwork MSETCL MSETCL

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

251 400 Kolhapur-Mapusa 1 13-Sep-14 800 17-Sep-14 1800 Daily Insulator replacement due to polluted streaches

WRTS-I WRTS-I R

252 400 Kolhapur-Mapusa 1 13-Sep-14 800 17-Sep-14 1800 Daily Insulator replacement due to polluted streaches

WRTS-I WRTS-I R

253 400 Bhachau - Ranchodpura DC(Subject to SLDC consent) 14-Sep-14 80000 AM 20-Sep-14 60000 PM Continuo

us

Shifting of towers to maintain clearance for SSNL canal crossing (Loc 26-33 amp 78-84)

PGCIL WRTS-II C

254 400kV Bhilai-koradi line 15-Sep-14 000 16-Sep-14 000 Daily Attending hot spots and SD nature defects WRTS-I PGCIL R

255 400 Navasari- Kala MC line 15-Sep-14 800 16-Sep-14 1800 DailyConstruction work of Navasari- Boisar line on same Multi ckt tower

WRTS-II WRTS-I C

256 400 SOLAPUR(PG)-KARAD 15-Sep-14 900 20-Sep-14 1800 Conti Tower Erection of Line Reactor gantry of Karad Line at Solapur MSETCL WRTS-I R

257 765 WARDHA-AURANGABAD(PG) 2 15-Sep-14 800 15-Sep-14 1800 Daily

For replacement of Rph reactor unit at Wardha Line in service wo reactor Taking out reactor out of service

WRTS-I WRTS-I R

258 400 Chandrapur 3 Main Bay (420) at Bhadrawati 15-Sep-14 900 15-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

259 765 Seoni1 Main Bay (704 ) at Bilaspur Ss 15-Sep-14 900 15-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL RBilaspur Ss

260 220 Kakrapar-Haldarwa1 15-Sep-14 900 15-Sep-14 1800 DailyReplacement of existing 220kV CTs with High Fault current CTs at Haldarwa SS

PGCIL WRTS-II C

261 400 SSP - Rajgarh - 1 15-Sep-14 800 17-Sep-14 1800 Daily PMM WORK PGCIL GETCO

262

220 Jhanor 220 KV Bus1

15-Sep-14

800

16-Sep-14

000

Continous Replacement of existing CTCVT with 02 class CT amp CVT and for testing of the same NTPC NTPC

263 400 BOISAR-PADGHE 16-Sep-14 800 17-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

264 400 Chandrapur 3Tie Bay (421) at Bhadrawati 16-Sep-14 900 16-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

265 400 Indore-Asoj2 16-Sep-14 80000 AM 16-Sep-14 60000 PM Daily Replacement of broken insulators PGCIL WRTS-II R

266 765 Sasan-Satna2 16-Sep-14 900 17-Sep-14 1800 Daily Power line crossing for stringing of of 765Kv Vin pool- satna ck2 PGCIL WRTS-II C

267 400 315MVA ICT1 at Shujalpur 16-Sep-14 1000 16-Sep-14 1400 Daily AMP PGCIL WRTS-II R

268 220 Kakrapar-Haldarwa2 16-Sep-14 900 16-Sep-14 1800 DailyReplacement of existing 220kV CTs with High Fault current CTs at Haldarwa SS

PGCIL WRTS-II C

269 220 220 KV PITHAMPUR - RAJGARH PG CKT - I 16-Sep-14 900 16-Sep-14 16092014 1600 daily Maintenan

ce Work PGCIL EHT- Mamp I

270 400 V-satna-1 16-Sep-14 900 16-Sep-14 1900 Daily basis For erection of Breaker after OH NTPC NTPC

Construction work of Navasari- 271 400 Vapi- Kala MC Line 17-Sep-14 800 18-Sep-14 1800 Daily Boisar line on same Multi ckt

towerWRTS-II WRTS-I C

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

272 400 HVDC IBay (403) at Bhadrawati 17-Sep-14 900 17-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

273

220 Jhanor 220 KV Bus2

17-Sep-14

800

18-Sep-14

000

Continous Replacement of existing CTCVT with 02 class CT amp CVT and for testing of the same NTPC NTPC

274 400 Parli 1 Main Bay (423) at Bhadrawati 18-Sep-14 900 18-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

275 220 Kawas-Haldarwa1 18-Sep-14 900 18-Sep-14 1800 DailyReplacement of existing 220kV CTs with High Fault current CTs at Haldarwa SS

PGCIL WRTS-II C

276 400 SSP - Rajgarh - 2 18-Sep-14 800 20-Sep-14 1800 Daily PMM WORK PGCIL GETCO

277 400 400 KV Sarni - Seoni ckt 18-Sep-14 800 18-Sep-14 18092014 1800 daily Maintenance Work PGCIL EHT-

Mamp I

278 220 220 KV PITHAMPUR - RAJGARH PG CKT - II 18-Sep-14 900 18-Sep-14 18092014 1600 daily Maintenan

ce Work PGCIL EHT- Mamp I

279 220 220 KV DAMOH PG - TIKAMGARH CKT I 18-Sep-14 800 18-Sep-14 18092014 1800 daily Maintenan

ce Work PGCIL EHT- Mamp I

280 400Sipat 400KV Bay-9 (Raipur-1 Main bay) 18-Sep-14 900 19-Sep-14 1900 Continous Annual Preventive maintenance NTPC NTPC

281 400 Kolhapur-Mapusa 2 18-Sep-14 800 22-Sep-14 1800 Daily Insulator replacement due to polluted streaches

WRTS-I WRTS-I R

282 400 Khandwa 2 Tie bay (423) at 19 S 14 8 00 20 S 14 18 00 D il AMP k WRTS I WRTS I R282 400 Khandwa 2 Tie bay (423) at Seoni 19-Sep-14 800 20-Sep-14 1800 Daily AMP works WRTS-I WRTS-I R

283 400 BOISAR-PADGHE 19-Sep-14 800 20-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

284 400 Parli 1 Tie Bay (424) at Bhadrawati 19-Sep-14 900 19-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

285 220 Kawas-Haldarwa2 19-Sep-14 900 19-Sep-14 1800 DailyReplacement of existing 220kV CTs with High Fault current CTs at Haldarwa SS

PGCIL WRTS-II C

286 400 V-satna-2 19-Sep-14 900 20-Sep-14 1900 Continuous

Major OH of Line Circuit Breaker (For dismantling of poles) NTPC NTPC

287 400 Aurangabad(PG)-Aurangabad (Waluj)-2 19-Sep-14 800 22-Sep-14 1800 Conti Augmentation works at MSETCL

Waluj 400kV SSWRTS-I WRTS-I C

288 400 Parli 2 Main Bay (416) at Solapur 20-Sep-14 900 20-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

289 400 400220 ICT-3 AT MAPUSA 20-Sep-14 900 20-Sep-14 1500 Daily AMP WORKS WRTS-I WRTS-I R

Anaulagnak 33

Agast 2014 AaOr isatmbar 2014 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR AUGUST 2014 AND SEPTEMBER 2014

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)Agast 2014 isatmbar 2014 Agast 2014 isatmbar 2014

AUGUST 2014 SEPTEMBER 2014 AUGUST 2014 SEPTEMBER 2014

1 gaujarat

saIimat 12500 13900 7750 8500

AsaIimat 12540 13940 7760 8510

2 maQya p`doSa

saIimat 6200 6500 3800 4100

AsaIimat 6250 6500 3800 4100

3 CltaIsagaZ

saIimat 3030 3199 16425195 172052635

AsaIimat 3160 3269 172031 169036025

4 maharaYT

saIimat 16050 17750 10700 10800

AsaIimat 16100 17800 10750 10850

5 gaaovaa

saIimat 410 415 290 285

AsaIimat 425 425 300 290

6 dmana dIva

saIimat 315 320 205 200

AsaIimat 320 325 210 210

7 DI ena eca

saIimat 645 640 425 420

AsaIimat 650 645 430 425

8 piScama xao~

saIimat 37614 41048 25600 26080

AsaIimat 37898 41254 26450 27900

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah jaUlaa[- 2014

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 2236 75

]k[- Ukai - 2 529 75]k[- Ukai - 3 000 0]k[- Ukai - 4 2023 75]k[- Ukai (Total) 4788 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 094 2]k[- ela baI saI eca Ukai LBCH - 2 028 2]k[- ela baI saI eca Ukai LBCH (Total) 123 1 0018

3 kDanaa Kadana - 1 699 61 0010kDanaa Kadana - 2 910 57 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 1115 62 0000kDanaa Kadana (Total) 2724 62 0010

4 pnama PANAM amp Madhuban Dam 1 amp 2 160 8 0017 6 kula jalaIya TOTAL(H) 7794 225 0390

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 3339 57 34582 TaoronT pavar ilaimaToD yauinaT DI 6957 122 64083 TaoronT pavar ilaimaToD yauinaT [- 8082 122 67664 TaoronT pavar ilaimaToD yauinaT ef 8380 124 73285 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 037511 Qauvarna tapIya Dhuvaran - GT 2 000 0 116012 Qauvarna tapIya Dhuvaran - STG 1783 10113 ]ka[- yauinaT 1 Ukai -1 000 0 019714 ]ka[- yauinaT 2 Ukai -2 000 0 019315 ]ka[- yauinaT 3 Ukai -3 10038 202 922016 ]ka[- yauinaT 4 Ukai -4 6930 202 697517 ]ka[- yauinaT 5 Ukai -5 11833 212 1138718 ]ka[- yauinaT 6 Ukai -6 30277 507 2287219 gaaMQaInagar 1 Gandhinagar - 1 000 0 008220 gaaMQaInagar 2 Gandhinagar - 2 000 0 009221 gaaMQaInagar 3 Gandhinagar - 3 6275 213 669022 gaaMQaInagar 4 Gandhinagar - 4 6060 212 706523 gaaMQaInagar 5 Gandhinagar - 5 13495 215 1331024 vaNakbaaorI 1 Wanakbori - 1 12142 209 000025 vaaNakbaaOrI 2 Wanakbori - 2 12364 21026 vaaNakbaaOrI 3 Wanakbori - 3 6669 20227 vaaNakbaaOrI 4 Wanakbori - 4 7244 21128 vaaNakbaaOrI 5 Wanakbori - 5 6198 21029 vaaNakbaaOrI 6 Wanakbori - 6 5924 21230 vaaNakbaaOrI 7 Wanakbori - 7 9489 21031 ]trna Utran GT 1 000 0 026832 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 1200 221 024735 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 819 143 1098

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

Anaulagnak 41

ACTUAL GENERATION amp AVALABILITY FOR JULY 2014Actual vaastivak

Actual vaastivak

37 isaka Sikka - 1 1326 107 179438 isaka Sikka - 2 3489 114 401539 kcC ilagnaa[-T Kutch Lignite - 1 5092 71 859040 kcC ilagnaa[-T Kutch Lignite - 2 4929 7141 kcC ilagnaa[-T Kutch Lignite - 3 000 042 kcC ilagnaa[-T Kutch Lignite - 4 2388 68 571043 saUrt ilagnaa[-T Surat Lignite - 1 8775 130 874544 saUrt ilagnaa[-T Surat Lignite - 2 3966 130 445845 saUrt ilagnaa[-T Surat Lignite - 3 5411 130 524346 saUrt ilagnaa[-T Surat Lignite - 4 8973 130 883347 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5446 103 859048 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 6057 10749 jaI Aa[- pI saI ela GIPCL GT - 1 1123 33 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1510 3251 jaI Aa[- pI saI ela GIPCL GT - 3 598 3052 jaI Aa[- pI saI ela GIPCL ST - 1 1846 4553 jaI Aa[- pI saI ela GIPCL GT - 4 357 98 000054 jaI Aa[- pI saI ela GIPCL ST - 2 186 5055 [- esa esa e Aar ESSAR GT - 1 000 0 029356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 083 146 002860 jaI pI [- saI GPEC GT - 2 148 153 023361 jaI pI [- saI GPEC GT - 3 1387 145 028462 jaI pI [- saI GPEC STG 521 7563 jaI esa [- jaI GSEG GT - 1 206 51 112164 jaI esa [- jaI GSEG GT - 2 1079 4765 jaI esa [- jaI GSEG STG 613 2466 Sugen (GT 1 + GT 2) 000 0 693867 saIpIpI sao Aayaat Imp from CPP+MUNDRA 249228 6777

kula tapIya Total (T) 511604 7860 431554kula jalaIya+tapIya Total (H+T) 519398 8078 431944ivaMD [najaI- Wind Energy 94980kula jalaIya+tapIya+hvaa Total (H+T+Wind) 614378 9539ivainamaya Exchanges 150828 saIimat jaa- maaMga Restricted Energy Req 765205

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 767 135

11 gaaMQaI saagar Gandhi Sagar 998 117 008012 raNaa p`tap sagar RPSagar 096 86 004013 javaahr sagar Jawahar Sagar 439 66 0020

2 ponca Pench 1381 160 01003 baargaI Bargi 712 33 00704 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 5724 309 02906 banasaagar Bansagar-2 (Deolondh) 104 407 banasaagar Bansagar-3 (Silpara) 565 31 00608 banasaagar Bansagar-4 (Zinaha) 425 20 00309 maoDIKoDa Medikheda 096 58

10 ibarisaMGapur Birsingpur 680 20 002011 Tavaa Tawa 000 012 rajaGaaT Rajghat 001 7 007013 Omkareshwar 4226 340 14 [Midra saagar Indira Sagar 6679 679 0598

kula jalaIya TOTAL(H) MPPGCL 19979 2031 1152

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 2223 84 179302 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 14496 216 0

Actual vaastivak

4 satpura I Satpura-I(60Share) 000 0 00005 satpura II Satpura-II Unit 6 000 0 83106 satpura II Satpura-II Unit 7 7549 1857 satpura II Satpura-II Unit 8 12446 195 173908 satpura II Satpura-II Unit 9 4038 1759 satpura III Satpura-III Unit 10 9508 219 23440

10 satpura III Satpura-III Unit 11 8675 167 2096011 esajaITIpIesa 1 SGTPS Unit - 1 8675 167 2096012 esajaITIpIesa 2 SGTPS Unit - 2 9354 16013 esajaITIpIesa 3 SGTPS Unit - 3 1129 165 1642014 esajaITIpIesa 4 SGTPS Unit - 4 6022 16015 esajaITIpIesa 5 SGTPS Unit - 5 27597 50816 SSTPS 7895 309 9910

kula tapIya Total (T) 117479 2427 115480kula jalaIya+tapIya Total (H+T) 137458 4759 116632Injection from WIND 14572 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 152030 4759ivainamaya Exchanges 271419 saIimat jaa- maaMga Rest En Req 423449

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 606 120 01102 Gangrel 039 10 00203 Mini Micro KWB 039 7

kula jalaIya TOTAL(H) CSEB 684 137 0520tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 40 125902 kaorbaa (pU) Korba (E) Unit-2 2764 383 kaorbaa (pU) Korba (E) Unit-3 2764 384 kaorbaa (pU) Korba (E) Unit-4 2784 405 kaorbaa (pU) Korba (E) Unit -5 3685 120 244406 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 154608 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 24740

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 13343 243 1124012 KORBA(EB) Extn - 2 14104 248 11250

kula tapIya Total (T) 119955 1644 10189013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 119955 1644kula jalaIya+tapIya Total (H+T) 120639 1781 102410ivainamaya Exchanges 59759 0saIimat jaa- maaMga Rest En Req 180398 1781

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 5228 585 06952 kaoyanaa III Koyna III 3695 3203 kaoyanaa IV Koyna IV 371 11204 kaoyanaa DIpIeca Koyna DPH 414 385 TaTa jalaIya TATA Hydro 10123 741 44976 vaOtrNaa Vaitarna 1151 617 eladarI Eldari 000 168 BaTgar AaOr vaIr Bhatgar amp Vir 036 49 pOzana Paithan 976 49

10 itlaarI Tillari 1036 6511 BaIra Tola rosa Bhira Tail Race 846 4112 GaTGar Ghatghar 3639 25013 Anya CaoTo jalaIya Small Hydro (others) 1041 0

kula jalaIya TOTAL(H) 28404 -1073 5192

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL

Actual vaastivak

3 naaisak 3 Nasik Unit -3 4157 1954 naaisak 4 Nasik Unit -4 12489 1985 naaisak 5 Nasik Unit -5 12480 2006 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 30718 5038 Tambao 6 Trombay Unit -6 6619 5009 Tambao 8 Trombay Unit -8 000 0

10 Tambao 7A gaOsa Trombay -7A (Gas) 7476 127 288611 Tambao 7ba Trombay -7B (WHR) 4373 6912 kaoraDI 5 Koradi Unit -5 000 013 kaoraDI 6 Koradi Unit -6 8448 16714 kaoraDI 7 Koradi Unit -7 10994 19415 Bausaavala 2 Bhusawal Unit -2 4715 16516 Bausaavala 3 Bhusawal Unit -3 6454 16517 Bausaavala 4 Bhusawal Unit -4 20419 50518 Bausaavala 4 Bhusawal Unit -5 23286 43519 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 000 021 parlaI 5 Parli Unit -5 9315 17522 parlaI 6 Parli Unit -6 14237 25323 parlaI 7 Parli Unit -7 14028 25024 KaprKoDa 1 Khaperkheda Unit -1 8108 20025 KaprKoDa 2 Khaperkheda Unit -2 10924 19026 KaprKoDa 3 Khaperkheda Unit -3 7917 20627 KaprKoDa 4 Khaperkheda Unit -4 10446 21028 KaprKoDa 5 Khaperkheda Unit -5 24555 50030 parsa Paras-3 11676 21831 parsa Paras-4 10326 24032 ]rna Uran (Gas) 18771 40133 ]rna Uran (WHR) 10760 138 586234 caMd`pur 1 Chandrapur Unit -1 7526 16535 caMd`pur 2 Chandrapur Unit -2 9375 19936 caMd`pur 3 Chandrapur Unit -3 8728 20037 caMd`pur 4 Chandrapur Unit - 4 12276 47038 caMd`pur 5 Chandrapur Unit -5 29203 41039 caMd`pur 6 Chandrapur Unit -6 26351 040 caMd`pur 7 Chandrapur Unit -7 000 041 DhaNaU 1 Dahanu Unit-1 16882 250 1563042 DhaNaU 2 Dahanu Unit-2 19263 250 1660143 CPP 258820 41160044 RGPPL Share 000 0

kula tapIya Total (T) 692115 14094 350211MAH Wind + Solar Generation 110432 0kula jalaIya +tapIya Total (H+T+Wind) 830951 16176 396382

TOTAivainamaya Exchanges 274116saIimat jaa- maaMga Rest En Req 1105066

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1173 17ivainamaya Exchanges 33083saIimat jaa- maaMga Rest En Req 34256 459

C (F) dmana AaOr dIva DAMAN amp DIU 17467 298ja (G) dadra nagar hvaolaI DNH 43779 673

kula DD ampDNH (T) 61246 970

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 9731 160 1564312 tara`pur 2 TAPS Unit -2 11531 16013 tara`pur 3 TAPS Unit -3 40214 545 7288014 tara`pur 4 TAPS Unit -4 39284 53715 kakrapr 1 KAPS Unit -1 16048 545 3195016 kakrapr 2 KAPS Unit -2 14903 537

kula ena pI saI NPC Total 131710 24842 ena TI pI saI NTPC

Actual vaastivak

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15236 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14181 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14568 214 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 000 025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 32338 51326 kaorbaa esaTIpIesa 6 KSTPS Unit-6 33493 51427 kaorbaa esaTIpIesa 7 KSTPS Unit-7 30558 516

kula kaorbaa KSTPS Total 140373 2548 9318427 ivanQa esaTIpIesa 1 VSTPS Unit-1 13430 21528 ivanQa esaTIpIesa 2 VSTPS Unit-2 11930 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 13695 212210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14017 214211 ivanQa esaTIpIesa 5 VSTPS Unit-5 11952 215212 ivanQa esaTIpIesa 6 VSTPS Unit-6 8991 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 32786 515214 ivanQa esaTIpIesa 8 VSTPS Unit-8 19668 514215 ivanQa esaTIpIesa 9 VSTPS Unit-9 31796 516216 ivanQa esaTIpIesa 10 VSTPS Unit-10 31597 515217 ivanQa esaTIpIesa 11 VSTPS Unit-11 13881 512

kula ivanQayaacala VSTPS Total 233445 REF 16238 31 saIpt -1 -SIPAT-1 38555 66600 32 saIpt -2 -SIPAT-2 16033 66500 33 saIpt -3 -SIPAT-3 43240 66800 34 saIpt -4 -SIPAT-4 25865 51200 35 saIpt -5 SIPAT-5 33302 51500

kula saIpt -SIPAT TOTAL 156995 280100 920541 kvaasa gaOsa 1e Kawas GT-1A 2605 10442 kvaasa gaOsa 1baI Kawas GT-1B 4355 10643 kvaasa esaTI 1saI Kawas ST-1C 3365 11744 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 044 9846 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 10369 309 245151 gaMQaar gaOsa 1 Gandhar GT-1 2177 14352 gaMQaar gaOsa 2 Gandhar GT-2 3014 14553 gaMQaar gaOsa 3 Gandhar GT-3 5333 14754 gaMQaar esaTI 4 Gandhar ST-4 5586 158

kula gaMQaar GGPS Total 16109 437 475161 maaOda 1 Mauda -1 5368 514 000062 maaOda 2 Mauda -2 16240 513 0000

kula maaOda MAUDA Total 21608 756 2258161 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 000 31 000071 esa esa pI SSP RBPH - 1 1265 18872 esa esa pI SSP RBPH - 2 1102 18673 esa esa pI SSP RBPH - 3 1197 18774 esa esa pI SSP RBPH - 4 1116 18675 esa esa pI SSP RBPH - 5 1432 18676 esa esa pI SSP RBPH - 6 1653 18677 esa esa pI SSP CHPH - 1 422 3578 esa esa pI SSP CHPH - 2 384 3079 esa esa pI SSP CHPH - 3 179 34710 esa esa pI SSP CHPH - 4 1012 36711 esa esa pI SSP CHPH - 5 340 30

kula esa esa pI SSP Total 10101 1283 101081 kula poMca Pench Total 1381 160 010082 Jindal Injection 50805 083 Amarkantak Lanco 16857 0

(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2508924

(J) ]plabQata Availability 2439102 naoT ivainamaya Net Exchanges -311541 ]plabQa jaa- Energy Availability 2127561

maah jaUlaa[- 2014 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR JULY 2014 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 13833 - - - 13833 070714 1500 4972

saIimat Restricted 12500

AsaIimat Unrestricted 12540 13833 0 136 0 13969 070714 1500 4972

nyaUnatma pMjaIkRt maaMga Min Registered Demand 7617 7617 250714 0400 4999

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 7090 - - - 7090 020714 2015 4985

saIimat Restricted 6040

AsaIimat Unrestricted 6040 7090 0 31 0 7121 020714 2015 4985

nyaUnatma pMjaIkRt maaMga Min Registered Demand 3895 3895 230714 1500

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3118 3118 050714 2100 4985

saIimat Restricted 3150

AsaIimat Unrestricted 3250 2972 41792 24 0 3414 030714 2000 4977

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1336 1336 220714 1300 4995

maharaYT MAHARASHTRApMjaIkRt Registered 19283 - - - 19283 010714 1600 4994

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19283 62 40 0 19385 010714 1600 4994

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11936 11936 300714 0500 5000

gaaovaa GOApMjaIkRt Registered 405 459 - - 459 260714 2000 4967

AsaIimat Unrestricted 405 459 0 5 - 464 260714 2000 4967

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 532 - - 532 290714 0900 4998

AsaIimat Unrestricted 532 0 0 - 532 290714 0900 4998

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 287 - - 287 060714 1000 4991

AsaIimat Unrestricted 287 0 1 - 288 060714 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 721 - - 721 050714 1700 4983

AsaIimat Unrestricted 721 0 - 721 050714 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 400 435 290714

piScama xao~ WESTERN REGIONpMjaIkRt Registered 43034 - - - 43034 010714 1600 4994

saIimat Restricted 40703

AsaIimat Unrestricted 40905 43034 295 90 0 43419 010714 1600 4994

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28431 28431 240714 0500 5000 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

माह जलाई 2014Jul-14

अनब समातरवतीय चालन PARALLELRADIAL OPERATION TOTAL OPERATING HOURS

1 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-NR)

2 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-SR) 7424400

टाई लाईन TIE LINE

1 765 कवी िसवनी स वधा-I 765kV Soni to Wardha 6780100

2 765 कवी िसवनी स वधा-II 765kV Seoni to Wardha 2043700

3 400 कवी िभलाई स कोराड 400kV Bhilai to Koradi 7440000

4 400 कवी िभलाई स भिावती 400kV Bhilai to Bhadravati 7440000

5 400 कवी रायपर स भिावती -I 400kV Raipur to Bhadravati-I 7440000

6 400 कवी रायपर स भिावती ndashII 400kV Raipur to Bhadravati-II 7440000

7 400 कवी रायपर स भिावती ndashIII 400kV Raipur to Bhadravati-III 7440000

8 400 कवी सातपरा स कोराड 400kV Satpura to Koradi 7060200

9 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7440000

10 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 7440000

11 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7225100

12 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 7082500

13 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 5361200

14 400 कवी को हापर स मापसा-I 400kV Kolhapur-Mapusa-I 4561600

15 400 कवी को हापर स मापसा-II 400kV Kolhapur-Mapusa-II 4793700

16 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7440000

17 400 कवी रायगढ़ स ःटरलाइट-I 400kV Raigarh to Sterlight-I 7371100

18 400 कवी रायगढ़ स ःटरलाइट-II 400kV Raigarh to Sterlight -II 7440000

19 400 कवी रायगढ़ स झरसगड़ा-I 400kV Raigarh to Jharsuguda-I 7302900

20 400 कवी रायगढ़ स झरसगड़ा-II 400kV Raigarh to Jharsuguda-II 7303700

21 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 5400900

22 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7292200

23 400 कवी रायपर स वधाndashI 400kV Raipur to Wardha-I 7440000

24 400 कवी रायपर स वधाndashII 400kV Raipur to Wardha-II 7440000

25 220 कवी कोरबा पव स ब पादर-III 220kV K(E) to Budhipadar-III 7361200

ANNEXURE 43

maah jaUlaa[- 2014 ko daOrana pa~ta iSaDyaUla GaTkaoM Wara koMd`Iya xao~ ko sToSanaaoMM sao D`avala AaOr ivainamayaaoM ka ivavarNa

1 koMd`Iya sToSanaaoMM samaip-t koMd`Iya sToSanaoMa saMyaut inajaI sToSanaaoM kI GaaoiYat xamata (basa pr) AaOr laaBaaiqa-yaaMo kI pa~ta1 Declared Capcity (ex-bus) of Central Gen StnsDedicated CG StnsJointly owned Stns amp entitlement of beneficieries (MUs)

GaaoiYat xamata gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI + ecaDblyaubaI kula

(A) koMd`Iya ibajalaIGar A Central Gen Stns Dec Cap GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC+HWB TOTAL

kaorbaa esaTIpIesa Korba STPS 1017635 174452 237891 103616 324281 102699 23918 26164 1017635kaorbaa esaTIpIesa -III Korba STPS-III 283431 54419 44422 85553 76649 3066 3405 13029 283431ivanQa esaTIpIesa I Vindhyachal STPS-I 674012 123034 240046 1253 246970 19644 7141 23669 12255 674012ivanQa esaTIpIesa II Vindhyachal STPS-II 491154 117386 158375 0909 175903 6532 4569 16539 491154ivanQa esaTIpIesa III Vindhyachal STPS-III 627679 166963 156579 67068 186511 7093 7097 22387 627679ivanQa esaTIpIesa IV Vindhyachal STPS-IV 411100 98631 118464 26475 133406 5356 5241 19338 411100kvaasa gaOsa Kawas GPP 306920 87464 65557 0000 95562 5791 14520 37998 306920gaMQaar gaOsa Gandhar GPP 406294 146476 72428 0000 123833 7814 19389 36310 406294saIpt Sipat 1665864 454494 301337 266370 509047 19436 19662 68224 1665864kakrapar Kakrapar APS 275783 78347 69731 0000 94368 9698 5200 8018 10420 275783tara`pur 3 AaOr 4 Tarapur APS 3amp4 721903 183150 155921 32084 295823 8510 8953 31049 721903

(ba) samaip-t koMd`Iya ibajalaIGar B Dedicated CG Stations Actual injection vaasaivak [njaoSana [Midra saagar Indira Sagar 245570 245570 245570

(sa) saMyaut inajaI sToSana C Jointly owned Stationstara`pur 1 AaOr 2 Tarapur APS 1amp2 196640 98320 0000 0000 98320 0000 0000 0000 196640esaesapI SSP 97965 15674 55840 0000 26450 0000 0000 0000 97965ponca Pench 13620 9080 0000 4540 0000 0000 0000 13620

kula ([M saagar kao CaoD kr) Total (excl Indira Sagar) 11988065 2808880 2297269 640720 3692105 208667 173093 400816 1766516 11988065 Actual injection

2 koMd`Iya sToSanaaoMM samaip-t koMd`Iya sToSanaoMa saMyaut inajaI sToSanaaoM kI ]padna SaoDyaUla AaOr laaBaaiqa-yaaoM kI D`avala SaoDyaUla2 Generation Schedule (ex-bus) of Central Gen StationsDedicated CG StationsJointly owned Stations amp schedule of benificieries (MUs)

SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI+ ecaDblyaubaI kula

(A) koMd`Iya ibajalaIGar A Central Gen Stns Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH

HVDC+HWB Outside region(NR

amp SR) TOTALkaorbaa esaTIpIesa Korba STPS 1015070 174452 238276 103310 321801 102699 23918 26164 1015070kaorbaa esaTIpIesa -III $ Korba STPS-III $ 282671 54342 44422 85185 76334 3066 3405 13029 282671ivanQa esaTIpIesa I Vindhyachal STPS-I 660248 120064 239050 1253 237415 19644 7141 23473 12209 660248ivanQa esaTIpIesa II Vindhyachal STPS-II 488287 117160 156978 0909 174700 6532 4569 16539 488287ivanQa esaTIpIesa III Vindhyachal STPS- III 600504 134916 160349 67878 186319 7093 7227 22827 600504ivanQa esaTIpIesa IV Vindhyachal STPS- IV 409072 98719 118259 24888 133048 5356 5241 19374 409072kvaasa gaOsa Kawas GPP 99574 27083 25459 0000 23510 2678 5916 14915 0000 99574gaMQaar gaOsa Gandhar GPP 154677 55634 30257 0000 41633 3783 8217 15131 0000 154677saIpt Sipat 1448506 290983 323024 258111 436177 19418 23860 69790 1448506kakrapar Kakrapar APS 275783 78347 69731 0000 94368 9698 5200 8018 10420 275783tara`pur 3 AaOr 4 Tarapur APS 3amp4 721903 183150 155921 32084 295823 8510 8953 31049 721903

(ba) samaip-t koMd`Iya ibajalaIGar B Dedicated CG Stations[Midra saagar Indira Sagar 245570 245570 245570

RPPC(NVVNL) 0000

0000

0000

(sa) saMyaut inajaI sToSana C Jointly owned Stations Actual injection vaasaivak [njaoSana tara`pur 1 AaOr 2 Tarapur APS 1amp2 196640 98320 0000 0000 98320 0000 0000 0000 196640esaesapI SSP 97965 15674 55840 0000 26450 0000 0000 0000 97965ponca Pench 13620 0000 9080 0000 4540 0000 0000 0000 13620kula [M saagar kao CaoD kr Total (excl Ind Sagar) 10173905 2352674 2217883 625946 2591731 193349 149578 336130 1706614 10173905

Actual injectionNote- $ These Scheduled Transactions are done by WRLDC under STOA

3 AMtrxao~Iya ivainamayaaoM iWpxaIya ivanamayaaoM kI SaoDyaUla (ima yauinaTsa)3 Schedule for interregional exchangesbilateral exchanges (MUs)

SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kulaxao~ rajya RegionState Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL

k pUvaI- xao~ ko rasto Import SDLs through ER -110482Aayaat SaoDyaUla Indian Energy Exchange (WR to ER) 0000 0000 0000 0000 0000 0000 0000 139465

Power Exchange of India (ER to WR) 0000 0000 0000 0000 0000 0000 0000 3671ER (NTPC) 47912 28298 11592 52018 0000 0786 1209 93903

DVC to MPPTCL (Long Term Open Access) 0000 201316 0000 0000 0000 0000 0000 201316Hirakud to CSEB 0000 0000 1354 0000 0000 0000 0000 1354

APL2 GUVNL to APPCC ( AEL) -0918 0000 0000 0000 0000 0000 0000 -0918APL3 GUVNL to APPCC ( AEL) -0924 0000 0000 0000 0000 0000 0000 -0924

CSEB to APPCC ( NVVNL) 0000 0000 -44813 0000 0000 0000 0000 -44813DBPOWER to APPCC ( GMRETL) 0000 0000 -1828 0000 0000 0000 0000 -1828

JPL to APPCC ( KISPL) 0000 0000 -15225 0000 0000 0000 0000 -15225JPL-II to APPCC ( KISPL) 0000 0000 -11376 0000 0000 0000 0000 -11376

Anaulagnak 45

DETAILS OF ENTITLEMENTSCHEDULEDRAWAL BY THE CONSTITUENTS FROM CENTRAL SECTOR STATIONS AND EXCHANGES FOR THE MONTH OF JULY 2014

(pxaoivasa` Wara jaarI xao~Iya jaa- laoKa ko AaQaar pr)

13896KAWAS(RLNG)

GANDHAR(RLNG)

JPL-II to APPCC ( NVVNL) 0000 0000 -11414 0000 0000 0000 0000 -11414JPL-II to APPCC ( PTC LTD) 0000 0000 -14853 0000 0000 0000 0000 -14853

CSEB to ASEB ( PTC LTD) 0000 0000 -0575 0000 0000 0000 0000 -0575MPPMCL MPSEB to ASEB ( IEXL) 0000 -0575 0000 0000 0000 0000 0000 -0575

APL1 GUVNL to BIHAR ( AEL) -106185 0000 0000 0000 0000 0000 0000 -106185APL2 GUVNL to BIHAR ( AEL) -72520 0000 0000 0000 0000 0000 0000 -72520APL3 GUVNL to BIHAR ( AEL) -51827 0000 0000 0000 0000 0000 0000 -51827

DBPOWER to BIHAR ( MANIKARAN) 0000 0000 -0350 0000 0000 0000 0000 -0350EMCO to BIHAR ( PXIL) 0000 0000 0000 -0413 0000 0000 0000 -0413

GUVNL to BIHAR ( PXIL) -0200 0000 0000 0000 0000 0000 0000 -0200MSEB to BIHAR ( PXIL) 0000 0000 0000 -0100 0000 0000 0000 -0100

MPPMCL MPSEB to BIHAR ( PXIL) 0000 -0150 0000 0000 0000 0000 0000 -0150GUVNL to BESCOM ( GUVNL) -14041 0000 0000 0000 0000 0000 0000 -14041

ESSAR_MAHAN to BESCOM ( ESSAR_MAHAN) 0000 -4353 0000 0000 0000 0000 0000 -4353ADHUNIK to BALCO ( BALCO) 0000 0000 0064 0000 0000 0000 0000 0064

ADHUNIK to BALCO ( MANIKARAN) 0000 0000 7200 0000 0000 0000 0000 7200JSEB(ER) to BALCO ( MPPL) 0000 0000 1481 0000 0000 0000 0000 1481

JSEB(ER) to BALCO ( MANIKARAN) 0000 0000 1200 0000 0000 0000 0000 1200JITPL to BALCO ( BALCO) 0000 0000 1200 0000 0000 0000 0000 1200

STERLITE to BALCO ( BALCO) 0000 0000 18603 0000 0000 0000 0000 18603JSEB(ER) to ESIL_WR ( MPPL) 0600 0000 0000 0000 0000 0000 0000 0600STERLITE to ESIL_WR ( PXIL) 1900 0000 0000 0000 0000 0000 0000 1900

NSPCL to SAIL ROURKELA ( SAIL ROURKELA) 0000 0000 -23994 0000 0000 0000 0000 -23994APL2 GUVNL to TGPCC ( AEL) -1074 0000 0000 0000 0000 0000 0000 -1074APL3 GUVNL to TGPCC ( AEL) -1081 0000 0000 0000 0000 0000 0000 -1081

CSEB to TGPCC ( NVVNL) 0000 0000 -52359 0000 0000 0000 0000 -52359JPL to TGPCC ( KISPL) 0000 0000 -17792 0000 0000 0000 0000 -17792

JPL-II to TGPCC ( KISPL) 0000 0000 -13295 0000 0000 0000 0000 -13295JPL-II to TGPCC ( NVVNL) 0000 0000 -13342 0000 0000 0000 0000 -13342

JPL-II to TGPCC ( PTC LTD) 0000 0000 -17335 0000 0000 0000 0000 -17335TISCO to VFL MPSEB ( TPTCL) 0000 0000 0268 0000 0000 0000 0000 0268

BLAPPL MPSEB to WBSEB ( IEXL) 0000 -0016 0000 0000 0000 0000 0000 -0016DBPOWER to WBSEB ( PTC LTD) 0000 0000 -0595 0000 0000 0000 0000 -0595

MPPMCL MPSEB to WBSEB ( PTC LTD) 0000 -89184 0000 0000 0000 0000 0000 -89184

SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kulaxao~ rajya RegionState Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL

K dixaNa xao~ ko rasto Import SDLs through SR 10967

Aayaat SaoDyaUla Indian Energy Exchange (SR to WR) 0000 0000 0000 0000 0000 0000 0000 0169Power Exchange of India (SR to WR) 0000 0000 0000 0000 0000 0000 0000 0000RSTPS-SR to GOA ( BILATERAL) 0000 0000 0000 0000 2186 0000 0000 2186RSTPS-SR to GOA ( WHEELING) 0000 0000 0000 0000 3118 0000 0000 3118

RSTPS-SR to GOA ( WHEELING GOA) 0000 0000 0000 0000 5494 0000 0000 5494

ga ]trI xao~ ko rasto Import SDLs through NR -321127Aayaat SaoDyaUla Indian Energy Exchange (NR to WR) 0000 0000 0000 0000 0000 0000 0000 -164961

Power Exchange of India (NR to WR) 0000 0000 0000 0000 0000 0000 0000 -3367Rihand (Hydro) to MPPTCL (Long Term Open Access) 0000 7970 0000 0000 0000 0000 0000 7970

Matathilla (Hydro) to MPPTCL (Long Term Open Access) 0000 0000 0000 0000 0000 0000 0000 0000EMCO to BIHAR ( PXIL) 0000 0000 0000 -0188 0000 0000 0000 -0188MSEB to BIHAR ( IEXL) 0000 0000 0000 -0400 0000 0000 0000 -0400

MPPMCL MPSEB to BSES_RAJ ( MPPL) 0000 -7000 0000 0000 0000 0000 0000 -7000ADHUNIK to BALCO ( MANIKARAN) 0000 0000 5198 0000 0000 0000 0000 5198

HIMACHAL to ESIL_WR ( IEXL) 0050 0000 0000 0000 0000 0000 0000 0050HARIYANA to ESIL_WR ( IEXL) 1525 0000 0000 0000 0000 0000 0000 1525HARIYANA to ESIL_WR ( PXIL) 5610 0000 0000 0000 0000 0000 0000 5610

KWHEPS to ESIL_WR ( PXIL) 0150 0000 0000 0000 0000 0000 0000 0150SCL to ESIL_WR ( IEXL) 0610 0000 0000 0000 0000 0000 0000 0610SCL to ESIL_WR ( PXIL) 0090 0000 0000 0000 0000 0000 0000 0090

MPPMCL MPSEB to HARIYANA ( HARIYANA) 0000 -126636 0000 0000 0000 0000 0000 -126636SCL to HRJIL MSEB ( SCL) 0000 0000 0000 1993 0000 0000 0000 1993

APL3 GUVNL to JVVNL-NR ( IEXL) -0120 0000 0000 0000 0000 0000 0000 -0120APL3 GUVNL to JVVNL-NR ( PXIL) -0122 0000 0000 0000 0000 0000 0000 -0122

BLAPPL MPSEB to JVVNL-NR ( IEXL) 0000 -0250 0000 0000 0000 0000 0000 -0250EMCO to JVVNL-NR ( IEXL) 0000 0000 0000 -0720 0000 0000 0000 -0720MSEB to JVVNL-NR ( PXIL) 0000 0000 0000 -0300 0000 0000 0000 -0300

MPSEB to NDPL(DTL)-NR ( PTC LTD) 0000 -1626 0000 0000 0000 0000 0000 -1626MPPMCL MPSEB to NDPL(DTL)-NR ( PTC LTD) 0000 -35052 0000 0000 0000 0000 0000 -35052

MPPMCL MPSEB to RPPC ( RPPC) 0000 -3562 0000 0000 0000 0000 0000 -3562EMCO to TRIPURA ( IEXL) 0000 0000 0000 -0070 0000 0000 0000 -0070

ADHPL to TORRAHM GUVNL ( IEXL) 0051 0000 0000 0000 0000 0000 0000 0051

Ga iWpxaIya SaoDyaUlsa Exchanges within WRMundra APL to Gujarat (LTOA) 0000 0000 0000 0000 0000 0000 0000 0000

JPL to ARVIND GUVNL ( MPPL) 4464 0000 0000 0000 0000 0000 0000 4464JPL to AIGL MSEB ( AIGL MSEB) 0000 0000 0000 0789 0000 0000 0000 0789

JPL to ARPIPL MSEB ( ARPIPL MSEB) 0000 0000 0000 0771 0000 0000 0000 0771JPL to ACCIL MSEB ( ACCIL MSEB) 0000 0000 0000 2380 0000 0000 0000 2380

APL1 GUVNL to AWLD GUVNL ( AEL) 3874 0000 0000 0000 0000 0000 0000 3874DBPOWER to BALCO ( BALCO) 0000 0000 0120 0000 0000 0000 0000 0120

DBPOWER to BALCO ( DBPOWER) 0000 0000 15887 0000 0000 0000 0000 15887EMCO to BALCO ( EMCO) 0000 0000 0080 0000 0000 0000 0000 0080

JPL to BOSCH MSEB ( BOSCH MSEB) 0000 0000 0000 1552 0000 0000 0000 1552JPL to BCSIL MSEB ( BCSIL MSEB) 0000 0000 0000 0720 0000 0000 0000 0720JPL-II to CSEB ( CSPTRDCL CSEB) 0000 0000 12569 0000 0000 0000 0000 12569

SPECT ACBIL to CSEB ( CSPTRDCL CSEB) 0000 0000 0720 0000 0000 0000 0000 0720ACBIL to CSPTRDCL CSEB ( CSPTRDCL CSEB) 0000 0000 5374 0000 0000 0000 0000 5374

JPL to CLASSIC MSEB ( CLASSIC MSEB) 0000 0000 0000 1309 0000 0000 0000 1309JPL to CIPLA MSEB ( CIPLA MSEB) 0000 0000 0000 0610 0000 0000 0000 0610

JPL to CEAT MSEB ( MPPL) 0000 0000 0000 2921 0000 0000 0000 2921APL1 GUVNL to CHLM GUVNL ( AEL) 2187 0000 0000 0000 0000 0000 0000 2187

NSPCL to DD ( DD) 0000 0000 0000 0000 0000 13156 0000 13156EMCO to DNH ( EMCO) 0000 0000 0000 0000 0000 0000 28097 28097

JPL to DNL MSEB ( DNL MSEB) 0000 0000 0000 0870 0000 0000 0000 0870JPL to ETLC MSEB ( ETL) 0000 0000 0000 0758 0000 0000 0000 0758JPL to ETLT MSEB ( ETL) 0000 0000 0000 0758 0000 0000 0000 0758

APL2 GUVNL to ESIL_WR ( PXIL) 0283 0000 0000 0000 0000 0000 0000 0283APL3 GUVNL to ESIL_WR ( PXIL) 8355 0000 0000 0000 0000 0000 0000 8355

DBPOWER to ESIL_WR ( MANIKARAN) 0000 0000 0000 0000 0000 0000 0000 0345EOL GUVNL to ESIL_WR ( ESIL_WR) -19578 0000 0000 0000 0000 0000 0000 0000

EPGL GUVNL to ESIL_WR ( ESIL_WR) -2866 0000 0000 0000 0000 0000 0000 0000JPL to ESIL_WR ( JPL) 0000 0000 0000 0000 0000 0000 0000 45641

JSWEL(RTNGIRI) MSEB to ESIL_WR ( PXIL) 0000 0000 0000 -2328 0000 0000 0000 0000MSEB to ESIL_WR ( PXIL) 0000 0000 0000 -1705 0000 0000 0000 0000

ESSAR_MAHAN to ESIL_WR ( ESIL_WR) 0000 0000 0000 0000 0000 0000 0000 52250VANDANA to ESIL_WR ( PXIL) 0000 0000 0000 0000 0000 0000 0000 0480

JPL to ESIL MSEB ( JPL) 0000 0000 0000 0108 0000 0000 0000 0108ESSAR_MAHAN to ESIL MSEB ( ESIL_WR) 0000 0000 0000 1244 0000 0000 0000 1244

JPL to ETLW MSEB ( ETL) 0000 0000 0000 0732 0000 0000 0000 0732JPL to ETLB MSEB ( ETL) 0000 0000 0000 0866 0000 0000 0000 0866

JPL to EILR MSEB ( MPPL) 0000 0000 0000 1049 0000 0000 0000 1049JPL to ETLK MSEB ( ETL) 0000 0000 0000 0643 0000 0000 0000 0643

JPL to EXIDE MSEB ( EXIDE MSEB) 0000 0000 0000 1239 0000 0000 0000 1239CSEB to GOA ( PTC LTD) 0000 0000 -0400 0000 0400 0000 0000 0000

DBPOWER to GOA ( PTC LTD) 0000 0000 0000 0000 17390 0000 0000 17390JPL to GSL MSEB ( GSL MSEB) 0000 0000 0000 0870 0000 0000 0000 0870

EMCO to GCEL ( EMCO) 0000 0000 3394 0000 0000 0000 0000 3394JPL to HINDMOUDA MSEB ( HINDMOUDA MSEB) 0000 0000 0000 2249 0000 0000 0000 2249

HINDAHEJ GUVNL to HINDTALOJ MSEB ( HINDTALOJ MSEB) -2962 0000 0000 2962 0000 0000 0000 0000EMCO to DNH ( EMCO) 0000 0000 0000 0000 0000 0000 119290 119290

JPL to HNGIL MSEB ( HNGIL MSEB) 0000 0000 0000 5156 0000 0000 0000 5156LANCO TO MP 0000 191431 0000 0000 0000 0000 0000 191431

IEE 103711 47279 -413725 163201 0000 26840 0000 31054PEI 3561 7107 0000 -0214 0000 0000 0000 17561

ca kula Aayaat Total Import 781888 184933 483401 86303 247768 28588 40782 148596 781888kula inayaa-t Total Export 1202530 274418 268404 653270 6437 0000 0000 0000 1202530naoT Aayaat inayaa-t Net Imp (+)Exp (-) -420642 -89485 214997 -566968 241330 28588 40782 148596 -420642

4 kula gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kula

Total GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL11567423 2719395 2512265 73752 3933435 237255 213875 549412 12255 11567424

5 kI kula iSaDUyala Total Sdl incl IR bi-lateral exch Sdl 9753264 2263189 2432879 58978 2833062 221937 190360 484727 12209 97532646 ibanaa xait ko kula D`avala Total Drl excl Tr Loss 9388390 2433257 2716560 597587 2741156 286430 174671 437785 0944 93883907 xait imalaakr kula D`avala Total Drl incl Tr Loss 9703552 2433257 2716560 597587 2741156 286430 174671 437785 0976 93884228 p p`NaalaI maoM kula pUla xait Pooled loss in WR System 3151629 p xao`~ sToSanaaoM sao kaorbaa ivanQa 1 AaOr 2 ivanQa 3 kvaasa gaMQaar kakrapar tara`pur esaesapI ponca kula

vaastivak [njaoSana Actual Inj - WR Stns KSTPS VSTPS-1amp 2 VSTPS-3 KGPS GGPS KAPS TAPS SSP PENCH TOTAL (ima yauinaTsa) (MUs) 1310550 1162242 1009828 99928 156340 275783 918544 97965 13620 12860991

] xao~ Aa ]xao kao ina ] xao naoT d xao Aa d xao inayaa-t d xao naoT pU xao Aa pU xao inayaa-t pU xao naoT kula naoT10 vaasaivak AMtrxao~Iya Actual IR Exchanges NR Imp NR Exp NR Net SR Imp SR Exp SR Net ER Imp ER Exp ER Net Total Net

ivainamaya (ima yauinaTsa) (MUs) 0347 2303947 -2303600 0000 737616 -737616 73271 189494 -116223 -3157439 AMtrxao~Iya ivainamaya IR Exchange Schedule NRI sdl NRE sdl Net NR sdl SRI sdl SREsdl Net SR sdl ERI sdl ERE sdl Net ER sdl Net WR sdl iSaDyaUla (ima yauinaTsa) (MUs) 2987 714531 -711544 404371 0000 404371 0000 113469 -113469 -420642

Total Entitlement incl IR and bi-lateral exchange schedule

11

AMtrxao~Iya AaOr iWpxaIya ivanamayaaoM kI iSaDyaUla imalaakr kula pa~ta

maah jaUlaa[- 2014 ko AMtr-ajyaIya AMtrxao~Iya ivainamayaaoM ka ivavarNa Anaulagnak 46DETAILS OF INTERSTATEINTER-REGIONAL EXCHANGES FOR THE MONTH OF JULY 2014 Annex-46

k`maaMkFrom To

gauivainaila map`iva]kMila Craivabaao maraiva]kMila gaaovaa dmana dIva da na h [ssaar ] xao~ d xao~ pU xao~ piScama xao~ kulaA InterstateInter-regional Schedules

included in ISGSGUVNL MPPGCL CSEB MSPGCL GOA DD DNH ESIL NR SR ER WR TOTAL

1 gauivainaila GUVNL 2962 31082 34044

2 map`iva]kMila MPPGCL 0000

3 Craivabaao CSEB04

0400

4 maraiva]kM ila MSPGCL 4033 4033

5 gaaovaa GOA 0000

6da na h DNH 0000

7kaorbaa KORBA-III 0000

8 iMjadla pavar JPL 4464 12569 26349 45641 89023

9 ADanaI pavar APL 6061 6061

10 ESSAR MAHAN 1244 52250 53494

11 laonakao Lanco -Pathadi 0000

12 esaIbaIAa[-ela -ACBIL 6093 6093

13 KSK MAHANADI14 DB POWER 16008 17390 0345

15 VANDANA 0480

16 EMCO 3473

17 ESIL18 ena esa pI saI ela NSPCL 13157 28097 41254

19 ]ltarI xao~ NRegion (WR end) 0347 0347

20 dixaNaI xao~ S Region (S Bus) 0000 0000

21 pUvaI- xao~ E Region (WR end) 73271 73271

22 p xao~ WRegion (WR end) 737616 189494 3231057

23 enaTIpIsaI NTPC Injection 5216788

24 enapIsaI NPC Injection 1194327

25 Total ISGS drawal from the Grid incl interregional bi-lateral

2433257 2716560 597587 2741156 286430 174671 437785

B InterstateIR Exchanges not included in ISGS

20 knaa-Tk Karnataka 444 44400

21 yaUpIpIsaIela UPPCL 0000 0000

22 AarvaIpIenaela RVPNL -237 -2370

23 UPPCL ( Excess Drawn From Rajghat 0000 0000

24 kaoTa ]jjaOna Kota - Ujjain 0000 0000

25 kula ba Total B (13 to 17) 0000 -2370 0000 0000 44400 0000 0000 42030

C inavala ivainamaya Net Exchange (12+18) 2433257 2714190 597587 2741156 330830 174671 437785 9429476

D kula Aayaat Total Imp by WR 115648

E kula inayaa-t Total Export by WR 3231057

F inavala ivainamaya Net Exchange (D-E) -3115409

G p xao~ Wara vaIlD jaa- Energy wheeled by WR

26 pU xao~ sao d xao~ kao inayaa-t ER export to SR0000

0000

27 d xao~ sao ] xao~ kao inayaa-t pUxao pxao sao haokr SR export to NR via ERWR0000

0000

28 d xao~ sao ] xao~ kao inayaa-t pxao sao haokr SR export to NR via WR0000

0000

29 pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr ER export to NR via WR0000

0000

30 ] xao~ sao d xao~ kao inayaa-t pxao sao haokr NR export to SR via WR393404

393404

31 pU xao~ sao d xao~ kao inayaa-t pxao sao haokr ER export to SR via WR0000

0000

32 pU xao~ sao d xao~ kao inayaa-t ]xao pxao sao haokr ER export to SR via NRWR0000 0000

0000

33 ]pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr NER export to NR via WR0000

0000

Anaulagnak 47Annex-47

maah jaUlaa[- 2014 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39697 65459

9964 39521

Levels in Mtrs str maITr maoM

]ka[- Ukai

64932

10110

25501

25801

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF JULY 2014

ivavarNa Particulars

Sr No Details of incident (Elements Generation Tripped) Owner Utility Date TimeEffect (Loss of generation Load) if

anyCategory as per

Standards1 Bus Fault at Lonikhand 400 kV Bus 1 MSETCL 04Jul14 315 Nil GI‐22 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 06Jul14 433 load Loss 277 MW GD‐13 Tripping of Multiple Elements from 400220 kV Parli (MSETCL) Ss MSETCL 08Jul14 2359 Nil GI‐24 Poles tripping of HVDC Bhadarwati PGCIL 09Jul14 0350 amp 0504 Nil GI‐25 Tripping in Jejuri and Loanand Area MSETCL 10Jul14 126 Load Loss 400 MW GD‐16 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 11Jul14 349 load Loss 335 MW GD‐17 Blackout at Kawas Ss NTPC 11Jul14 117 Gen Loss 320 MW GD‐18 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 13Jul14 642 load Loss 263 MW GD‐19 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 15Jul14 611 load Loss 264 MW GD‐110 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 16Jul14 334 load Loss 200 MW GD‐111 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 17Jul14 417 load Loss 150 MW GD‐112 Tripping at Gandhar Ss NTPC 21Jul14 1607 Gen Loss 180 MW GD‐113 Multiple time tripping of 765 kV Sasan ‐Satna 2 ckt on Protection Mal‐operation PGCILSASAN 7252014 1026 amp 1229 Hrs Nil GI‐2

List of Grid Disturbances and Grid incidents (GDGI) in July-2014 Western RegionANNEXURE-5

SR NO UTILITIES OCC NO MONTH STATUS REMARK 1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14 HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314 AT MUMBAI BY NTPC MUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514 AT MUMBAI BY WRPC AT RELIANCE

7 WRTS-I 460 Jun-14 HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714 AT RAIPUR BY KWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-1411 RELIANCE SASAN 464 Oct-1412 MADHYA PRADESH 465 Nov-1413 BDTCLJBTCL 466 Dec-1414 NTPC Vindhyachal 467 Jan-1515 ESSAR TRANSMISSIOM 468 Feb-1516 TATA POWER 469 Mar-1517 SUGEN (TPL) 470 Apr-1518 TORRENT POWER 471 May-1519 CGPL 472 Jun-1520 NTPC Korba 473 Jul-1521 NCA 474 Aug-1522 NHDC 475 Sep-1523 NTPC Mouda 476 Oct-1524 KSK 477 Nov-1525 RELIANCE 478 Dec-1526 NTPC SIPAT CG 479 Jan-1627 TAPS-3amp4 480 Feb-1628 ESSAR ESIL 481 Mar-1629 GOA 482 Apr-1630 KAPS 483 May-1631 JPL 484 Jun-1632 DNH 485 Jul-1633 NTPC Mumbai 486 Aug-1634 ADANI TRANSMISSION 487 Sep-1635 INDIAN RAILWAY 488 Oct-1636 WRTS-II 489 Nov-16

ANNEXURE 10

8212014

1

OCC MEETING (462nd )

Power system Operation Corporation Ltd

OPERATIONAL HIGHLIGHTS amp ISSUES

Date 11082014Venue ndash Tarapur

MonthsIEGC Band

FVIlt499 499‐5005 gt5005

March14 1291 4783 3927 012

April14 3064 5233 1703 016

May14 2248 5319 2433 013

Junersquo14 3715 4536 1749 02460

80

100

120Frequency Profile for July 2014Frequency Profile for July 2014

Maximum instantaneous frequency

5036 Hz

on 23rd July 2014 at 1304 hrs

Minimum instantaneous frequency

4941 Hz

on 10th July and 25th July 2014 at 1950 hrs and 1944 hrs respectively

Julyrsquo14 3451 5016 1533 020

0

20

40

60

1‐Jul

2‐Jul

3‐Jul

4‐Jul

5‐Jul

6‐Jul

7‐Jul

8‐Jul

9‐Jul

10‐Jul

11‐Jul

12‐Jul

13‐Jul

14‐Jul

15‐Jul

16‐Jul

17‐Jul

18‐Jul

19‐Jul

20‐Jul

21‐Jul

22‐Jul

23‐Jul

24‐Jul

25‐Jul

26‐Jul

27‐Jul

28‐Jul

29‐Jul

30‐Jul

31‐Jul

Avg Frequency of the month

4993 Hz

1High frequency day due to heavy rain in almost all places in the country low demand was observed(117 GW) Heavy underdrawal by all constituents of WR around 700‐1000 MW during 1300 hrs2 Low frequency day Demand was high and Od by constituents Od by NR

lt499 499‐5005 gt5005

8212014

2

501

502

503

504

Frequency for July 2014

496

497

498

499

50

494

495

1 60 119

178

237

296

355

414

473

532

591

650

709

768

827

886

945

1004

1063

1122

1181

1240

1299

1358

1417

1476

1535

1594

1653

1712

1771

1830

1889

1948

2007

2066

2125

2184

2243

2302

2361

2420

2479

2538

2597

2656

2715

2774

2833

2892

2951

3010

3069

3128

3187

3246

3305

3364

3423

3482

3541

3600

3659

3718

3777

3836

3895

3954

4013

4072

4131

4190

4249

4308

Frequency 499 5005

26000

28000

Unit Outage‐ JULY‐14 Max 26128 MW on 26072014JUNE14 Max 20818 MW on 210714

PLANNED OUTAGE FORCED OUTAGE TOTAL OUTAGE‐JULY14 TOTAL OUTAGE‐JUNE14

10000

12000

14000

16000

18000

20000

22000

24000

26000

MW

0

2000

4000

6000

8000

10000

1‐Jul‐14 6‐Jul‐14 11‐Jul‐14 16‐Jul‐14 21‐Jul‐14 26‐Jul‐14 31‐Jul‐14Date

8212014

3

Energy ConsumptionMax

986 Mus on 2nd July+2975 as compared

to last year900

1000

1100

IN M

Us ‐‐‐‐gt

DAILY CONSUMPTION OF WESTERN REGION(2010‐11 TO 2014‐15)

Min749 Mus on 24th July

500

600

700

800

CONSU

MPT

ION

Apr

May Jun

Jul

Aug Sep

Oct

Nov Dec Jan

Feb

Mar

MONTHS ‐‐‐‐gt2010‐11 2011‐12 2012‐13 2013‐14 2014‐15

Energy Consumption MUDay

Jul‐14 Jun‐14 Jul‐13 Change wrt last month

Change wrt last Year

Average 848 927 712 ‐845 1909Max 986 971 760 156 2975Date 2‐Jul‐14 30‐Jun‐14 2‐Jul‐13 ~ ~

PEAK DEMAND (this month vis-agrave-vis last month)

STATE

CATERED(MW) UNRESTRICTED(MW)

Julyrsquo14 Junrsquo14 Julyrsquo14 Junrsquo14

GUJARAT 13833 13755 13969 13906

MP 7090 7120 7121 7434

CHATTISGARH 3118 3472 3414 3473

Regional Demand met

Max 43034 MW(1st July 1600 hrs)

2540 more than the l

MAHARASHTRA 19283 19452 19385 19755

GOA 459 475 459 482

DD 287 298 287 298

DNH 721 677 721 685

ESIL 532 535 532 535

43034 42934 43419 43802

last year

Min 28431 MW(24th July0500 hrs)

WR TOTAL 43034 42934 43419 43802

Figures shown are Maximums in the month

Demand Met Jul‐14 Jun‐14 Jul‐13 Change wrt last month

Change wrt last Year

Average 35215 40463 32253 ‐1297 918Max 43034 42934 34317 023 2540

Date when Max 1‐Jul‐14 30‐Jun‐14 2‐Jul‐13 ~ ~

8212014

4

Constituents Total Time Block Noof time block Violation of Compilance Violation of Compilancein the month of July Type ‐1 Type‐2

Chhattisgarh 2976 983 6697 927 6885Guajrat 2976 681 77 12 222 92 54

DSM Violation for the Month of July 2014

Guajrat 2976 681 7712 222 9254Madhya Pradesh 2976 528 8226 594 8004Maharashtra 2976 1045 6489 442 8515

Goa 2976 712 7608 1868 3723Daman and Diu 2976 1720 4220 2506 1579

Dadar Nagar Haveli 2976 23 9923 1299 5635

Violation Type‐2 When The drawl does not change sign in 12 consecutive time block

Violation Type‐1 When The drawl is more or less than 12 schedule or 150 MW whichever lesser

Total No of Blocks ‐ 2976

New Elements July 2014a) COMMISSIONING OF NEW GENERATING UNITSSLNO CONSTITUENT UNIT NAME UNIT NO C`ty(MW) DATE TIME

1 IPP(Jay Prakash Nigrie) JNSTPP I 660 150714(sync) 845

b) COMMISSIONING OF NEW TRANSMISSION LINES

SLNO CONSTITUENT LINE NAME CKT NO KV DATE TIME Line length( in km)

1 POWERGRID Wardha‐Aurangabad II 765 372014 2300 347 581 POWERGRID Wardha Aurangabad II 765 372014 2300 34758

2 POWERGRID Wardha‐Aurangabad I 765 572014 1900 34758

3 GETCO Kosamba‐Chorania I 400 572014 2035 230

4 GETCO Kosamba‐Chorania II 400 572014 2105 230

5 BDTCL BDTCL‐Bhopal(MP) I 400 16714 1833 864

6 POWERGRIDLILO of Raipur‐Raigarh‐4

IV 400 1872014 2200 2826 POWERGRIDat KSK

IV 400 1872014 2200 282

7 MPPTCL Indore‐Pithampura II 400 210714 1625 150

8 POWERGRIDDharamjaygarh‐Jharsuguda

I 765 29714 000 14893

9 POWERGRIDDharamjaygarh‐Jharsuguda

II 765 28714 2125 14893

Total ckt Km 189366

8212014

5

c) COMMISSIONING OF NEW ICTS

SLNO CONSTITUENT STATION NAME KV RATIOCAPACITY (MVA) DATE

TIME

1 BDTCL BDTCL(Bhopal)ICT 1 765400 3x500 372014 1657

2 POWERGRID Dharamjaygarh(ICT 1) 765400 3x500 772014 22593 POWERGRID Navasari(ICT 3) 400220 500 872014 1959

d)CO SS O G O C O Sd)COMMISSIONING OF LINE REACTORS

SLNO CONSTITUENT STATION NAME Line Name KVCty(MVAR

) DATETIME

1 BDTCL BDTCL Indore‐BDTCL I 765 3x80 23714 1935

2 POWERGRID DharamjaygarhDharamjaygarh‐Jharsuguda II

765 3x110 280714 2125

3 POWERGRID DharamjaygarhDharamjaygarh‐Jharsuguda I

765 3x110 29714 000

4 POWERGRID Satna Satna‐Gwalior‐II 765 3x80 29714 10005 POWERGRID Aurangabad Padghe Aurangabad 1 765 3x80 310714 22 475 POWERGRID Aurangabad Padghe‐Aurangabad‐1 765 3x80 310714 2247

e)COMMISSIONING OF BUS REACTORS

SLNO CONSTITUENT STATION NAME KVCty(MVA

R) DATETIME

1 POWERGRID Bhatapara 400 125 24714 19562 POWERGRID Indore 765 3x80 31714 18273 POWERGRID Sujalpur 400 125 31714 1205

Congestion Charge was applied 3 times in July 2014 on WR‐NR path ie on12th 14th amp 15th July 2014

8212014

6

5515 5484

5200

5400

5600

Congestion Charge applied on WR‐NR path Dt12714 (Block 3 ‐16)

4200

4400

4600

4800

5000WR‐NR TTC(4900 MW)

WR‐NR ATC(4400 MW)

4000

4200

030

034

038

042

046

050

054

058

102

106

110

114

118

122

126

130

134

138

142

146

150

154

158

202

206

210

214

218

222

226

230

234

238

242

246

250

254

258

302

306

310

314

318

322

326

330

WR‐NR_Act(MW) WR‐NR_TTC(4900 MW) WR_NR_ATC(4400 MW)

2200 00

240000

260000

280000

300000

320000

MW

Maharashtra Sch Vs Drawal‐12714(Block 3‐16)

140000

160000

180000

200000

220000

240000

MW

Gujarat Sch Vs Drawal_12714

200000

220000

3 4 5 6 7 8 9 10 11 12 13 14 15 16

TIme Block

Maharashtra_Sch Maharashtra_Drawal

340000

350000

W

MP Sch Vs Drawal_12714(Block 3‐16)

120000

3 4 5 6 7 8 9 10 11 12 13 14 15 16Time Block

GETCO_Sch(MW) GETCO_Drawal(MW)

750008000085000

CSPTCL‐12714(3‐16)

310000

320000

330000

3 4 5 6 7 8 9 10 11 12 13 14 15 16

MW

TIme Block

MP_Sch MP_Drawal

450005000055000600006500070000

3 4 5 6 7 8 9 10 11 12 13 14 15 16

MW

Time Block

CG_Sch CG_Drawal

Under Drawal By WR constituents during the imposition of Congestion on WR‐NR on 12714

8212014

7

5292

5100

5300

Congestion Charge applied on WR‐NR path Dt14714 (Block 57 ‐71)

4638

4300

4500

4700

4900

5100

WR‐NR TTC(4900 MW)

WR‐NR ATC(4400 MW)

3900

4100

1330

1336

1342

1348

1354

1400

1406

1412

1418

1424

1430

1436

1442

1448

1454

1500

1506

1512

1518

1524

1530

1536

1542

1548

1554

1600

1606

1612

1618

1624

1630

1636

1642

1648

1654

1700

1706

1712

1718

1724

1730

1736

1742

1748

1754

1800

WR‐NR_Act(MW) WR‐NR_TTC(4900 MW) WR_NR_ATC(4400 MW)

3600380040004200440046004800

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

MW

Maharashtra Sch Vs Drawal‐14714(Block 57‐71)

1900

2000

2100

2200

2300

2400

2500

2600

MW

Gujarat Sch Vs Drawal_14714

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

TIme Block

Maharashtra_Sch Maharashtra_Drawal

1800

1900

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

Time Block

GETCO_Sch(MW) GETCO_Drawal(MW)

700

750

800

Chhattisgarh Sch Vs Drawal_141714(Block57‐71)

2600

2700

2800

2900

MW

MP Sch Vs Drawal‐14714(57‐71)

500

550

600

650

700

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

MW

Time Block

CG_Sch CG_Drawal

2400

2500

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

Time Block

MP_Sch MP_Drawal

8212014

8

4630

45004700

Congestion Charge applied on WR‐NR path Dt15714 (Block 50 ‐96)

4463

350037003900410043004500

WR‐NR TTC(4150 MW)

WR‐NR ATC(3650 MW)

31003300

1215

1234

1253

1312

1331

1350

1409

1428

1447

1506

1525

1544

1603

1622

1641

1700

1719

1738

1757

1816

1835

1854

1913

1932

1951

2010

2029

2048

2107

2126

2145

2204

2223

2242

2301

2320

2339

2358

WR‐NR_Act(MW) WR‐NR_TTC(4150 MW) WR_NR_ATC(3650 MW)

3800

4000

4200

4400

4600

4800

MW

Maharashtra Sch Ve Actual on 15714(50‐96)

130015001700190021002300250027002900

MW

Gujarat Sch Vs Actual on 15714(50‐96)

3600

50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96

Time Block

Maharashtra_Sch Maharashtra_Drawal

1300

50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96

Time BLock

GETCO_Sch(MW) GETCO_Drawal(MW)

3500

3700

MP Sch Vs Actual for 15714(50‐96)

850

950

1050

Chhattisgarh Sch Vs Actual‐15714(50‐96)

2700

2900

3100

3300

50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96

MW

Time Block

MP_Sch MP_Drawal

350

450

550

650

750

850

50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96

MW

Time BLock

CG_Sch CG_Drawal

8212014

9

Summary of Grid Events (GD amp GI) in July 2014

Sr No

Details of incident (Elements Generation Tripped) Owner Utility Date TimeEffect (Loss of

generation Load) if any

Category as per

Standards

1 Bus Fault at Lonikhand 400 kV Bus 1 MSETCL 04Jul14 315 Nil GI‐2

2 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 06Jul14 433 load Loss 277 MW GD‐1

3Tripping of Multiple Elements from 400220 kV Parli

MSETCL 08Jul14 Nil GI 23(MSETCL) Ss

MSETCL 08Jul142359

Nil GI‐2

4 Poles tripping of HVDC Bhadarwati PGCIL 09Jul140350 amp 0504

Nil GI‐2

5 Tripping in Jejuri and Loanand Area MSETCL 10Jul14 126 Load Loss 400 MW GD‐1

6 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 11Jul14 349 load Loss 335 MW GD‐1

7 Blackout at Kawas Ss NTPC 11Jul14 117 Gen Loss 320 MW GD‐1

8 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 13Jul14 642 load Loss 263 MW GD‐1

9 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 15Jul14 611 load Loss 264 MW GD‐1

10 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 16Jul14 334 load Loss 200 MW GD‐1

11 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 17Jul14 417 load Loss 150 MW GD‐1

12 Tripping at Gandhar Ss NTPC 21Jul14 1607 Gen Loss 180 MW GD‐1

13Multiple time tripping of 765 kV Sasan ‐Satna 2 ckt on

Protection Mal‐operation PGCILSASAN 7252014

1026 amp 1229 Hrs

Nil GI‐2

S No Name of power

stations

Unit Reason for

outage

1 VSTPS 2 (210 MW) Coal Shortage

91 Operation of grid at high frequency ( gt 505 Hz) even under fuel shortage condition

Issues1 Major ISGSIPP are facing fuel

shortage1 VSTPS 2 (210 MW) Coal Shortage

2 VSTPS 5 (210 MW) Coal Shortage

3 Singhaji 1 (600 MW) Coal Shortage

4 SGTPS 4 (210 MW) Coal Shortage

5 JP Bina 2 (250 MW) Coal Shortage

6 Bhusawal 2 (210 MW) Coal Shortage

shortage2 Expected High Demand during dry

spell in September amp October3 Optimal use of precious fuel is

necessary to tackle the high demand in dry spell

7 Parli 4 (210 MW) Coal Shortage

8 India Bulls 1 (270 MW) Coal Shortage

8212014

10

Agenda 92 Insecure operation Oscillations Power Swingbull N‐1 contingency of 765 kV Tirora‐Akola2 on 10th and 11th June 2014

bull Tirora gen gt 1500 MW AR not operatedbull Intra plant mode of oscillations (097 Hz) with poor damping

bull N‐1 contingency of 400 kV Tirora‐Warora‐1 on 20th May 2014N 1 contingency of 400 kV Tirora Warora 1 on 20 May 2014bull Tirora gen gt 1500 MW 765 kV Tirora‐Akola2 out of servicebull SPS bull Power Swing and loss of complete power station GD‐1

bull The need for transmission augmentation as well as PSS tuning at APML Tirodawas discussed in the 461st OCC meeting

bull Member Secretary WRPC suggested that APML would send details of PSSMember Secretary WRPC suggested that APML would send details of PSS tuning studies to WRPC and they may consult IIT‐Mumbai for assistance and expedite

bull Representative from SLDC Kalwa APL may like to update the progress

Events at APML TiroraCase 3 Date 11‐07‐14 1529 hrsbull Line tripped on Y Phase to earth fault AR was unsuccessful due to persisting faultbull Sudden power transfer through 400 kV System resulted in swing Oscillation of 097 Hz observed across WR and

East West generation in Western region oscillatedO ill i i d f 10 dbull Oscillation persisted for 10 seconds

bull Damping ratio was 257

8212014

11

Events at APML TiroraCase 4 Date 23‐07‐14 0227 hrsbull 765400 kV APML Tirora ICT trippedbull Sudden power transfer through 400 kV System resulted in swing Oscillation of 097 Hz observed across WR

and East West generation in Western region oscillatedO ill i i d f 17 dbull Oscillation persisted for 17 seconds

bull Damping ratio was 7

bull Need for transmission augmentation as well as PSS tunning at APML Tiroda required

bull It has been decided in 461th OCC thatAPML would send details of PSS

Expected date of

tuning studies to WRPC and they may consult IIT‐Mumbai for assistance and expedite Representative from SLDC Kalwa APL may like to update the progress

Expected date of bull 2nd ckt of 765 kV Tirora‐Akola2bull 220 kV network from 400220 kV Warorabull 220 kV network from 765400 kV Akola2 and 765400 kV Taptithandabull 220 kV network from 765400 kV Aurangabad‐PG 400220 kV Pune

Redistribution of Load within Maharashtra system

8212014

12

Elements Date and

Time of

Tripping

Date and

Time of

Restoratio

n

Remarks Receipt of

DREL at WRLDC

Satna Sasan

765 kV Sasan‐Satna 225‐07‐14

1026

25‐07‐14

1155

Protection Mal‐Operation DT at Sasan End

on OV as line remain hanging from Sasan No Yes

Agenda 93 Frequent Tripping of 765 kV Satna‐Sasan line

Issues

1Expedite commissioning of Line Reactor at 765 kV Sasanend

2 Submission of DREL for1026 1155end

765 kV 240 MVAr

Bus Reactor at Satna

25‐07‐14

1026

25‐07‐14

1139

Protection Mal‐Operation DT at Sasan End

on OV as line remain hanging from SasanNo Yes

765 kV Sasan‐Satna 225‐07‐14

1342

25‐07‐14

1342

Line got charged from Satna and

synchronized at Sasan end but immediately

DT was received at Sasan from Satna and

Line tripped Prior to tripping voltage at

No Yes

2 Submission of DREL for event analysis in line with CEA standards IEGC

3 Threat to grid security and constraints in evacuation from large generation complexarising from frequent undesirable tripping particularily

Sasan end was 796 kV

765 kV Sasan‐Satna 225‐07‐14

1628‐

Charging attempt was taken from Satna end

but line tripped before synchronization at

Sasan end due to DT from Satna Open end

voltage at Sasan 826 kV for the line

No Yes

The above was a narrow miss because the tripping occurred when one of the bus was under shutdown Fortunately during theabove period only two units of Sasan were in service and the second 765 kV bus remained in service else the situation would havebeen a serious threat to the system security

during protection testing construction activities

The progress of reactor commissioning at Sasan over the last 8 months is given under

Schedule in formed in meetings

SN 451st OCC 455th

OCC

456th OCC 457th 458th 459th 460th 461st

1 Line reactor By Dec By April By May By June End of June End of By By

of 765 kV

Sasan‐Satna

ckt‐2

y

2013

y p

2014

y y

2014

y

2014(Testing under

progress)

2014 (As per

joint report

post site visit

on 26314)

June 2014

y

Aug‐

2014

y

Aug‐2014

2 765kV Bus‐1

Reactor

Jan 2014 By Mar

2014

By June

2014

By June

2014(Testing under

)

End of July

2014(As per

j i t t

End of July

2014

By

Sep‐

2014

By

Sep‐2014

Sasan may intimate the progress in reactor commissioning to the sub-committee

progress) joint report

post site visit

on 26314)

2014

8212014

13

Item no94 SPS at Sipat

bull The SPS scheme implemented at NTPC Sipat received at WRLDC

bull It is observed that a time delay of 15sec is provided to unload units 1 2 4 amp5 each by 150MW if ICT l d d 130 f t d l dany ICT s load exceeds 130 of rated load

bull As per decision of WRPC meeting on 18314 if ex‐bus generation at Sipat is more than 2200 MW immediate unloading of units were decided and the intentional delay provided needs to be re‐ examined (Maximum 2‐3 sec delay may be appropriate) as unloading by 150MW would also take another 4‐5sec

8212014

14

Contingency Envisaged SPS action Identified FeedersTripping of any oneICT at 400200 VapiSub‐Station

Automatic LoadShedding of 100MW

DNH 1) 66 kV‐Kharadpara‐Rakholi‐I 50 MW2) 66 kV Khadoli‐Khadoli‐3 30 MW

Item No95 SPS at 400220 kV Vapi(PGCIL) Item No912

DD1) 66 kV Magarwada‐Kachigam 60 MW

It was apprised by representatives from DD amp DNH in the 459th OCC meeting that the above scheme shall be implemented within a month

UT DDDNHmay apprise the status of commissioning of the envisaged SPSUT‐DDDNH may apprise the status of commissioning of the envisaged SPS

Item no96 Addressing High Voltage condition in SSP amp nearby area Sl No Line No of Times tripped in Julrsquo141 400 kV SSP‐Dhule‐I 32 400 kV SSP ‐ Rajgarh‐ I 2

Issues1 Multiple tripping of

feeders emanating from SSP

2 S l tiSl No Line No of occasions kept open on HV 2 Several emanating feeders being kept open on high voltage in SSP amp nearby area

Sl No Line No of occasions kept open on HV

1 400 kV SSP‐Dhule‐I 9

2 400 kV SSP‐Dhule‐II 6

3 400 kV SSP ‐ Rajgarh‐ I 1

4 400 kV SSP ‐ Rajgarh‐ II 1

bull Operating RBPH machines in synchronous condenser mode during offOperating RBPH machines in synchronous condenser mode during off peak hours

bull Reactor commissioning at Rajgarh amp Dhule to be expedited by WRTS‐II(PGCIL) amp MSETCL

bull Absorption of MVAr by Wanakbori WTS

8212014

15

1 Voltage at Wanakbori was gt420 kV for 100 the time during Julrsquo14

2 WTPS units 567 are injecting MVAR (~ 60 MVAR) at Voltage gt 420 kV

3 Absorption of MVAR by WTPS units is expected during the high voltage condition at WTPS amp nearby area

97Status of implementation of UFRWestern Region

States Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Stage - I 492 Hz Stage - II 490 Hz Stage - III 488 Hz Stage - IV 486 Hz

relief GUJARAT 580 773 580 726 580 1117 590 1025MADHYA PRADESH 460 468 460 450 460 460 465 490CHATTISGARH 150 110 150 114 155 117 155 91MAHARASHTRA 805 1108 810 1200 815 765 820 851GOA 25 25 25 25 25 25 25 25UT DD 10 15 15 15 UT DNH 30 30 35 35 Total load relief 2060 2484 2070 2515 2085 2485 2105 2482

Not received

DD and DNH have not implemented any stage of AUFLS

DD and DNH may appraise the status

Real‐time monitoring of the likely relief available from AUFLS at any given instant mandated by CERC

Telemetry to be provided at SLDC amp RLDC

Not received

8212014

16

Agenda 98 ADMS (Automatic Demand Management Scheme) Implementation as per Sec 542 of IEGC

As per CERC order dt06062014 the target of fully implementation of scheme is by January2015Constituents have to submit bi‐monthly progress report to WRPC Secretariat with a copy to the Commission and WRLDCMP has submitted its detailed action plan in the form of an affidavit to CERC for implementation of ADMS However SLDC MPPTCL is requested to furnish data to OCC forum in the above format

Item No 99 Status of Telemetry in WR

Telemetry Issuesdoc

8212014

17

Item No 910 Black Out at NTPC Kawas Power Station

bull On 11th July 2014 Kawas Gas generating complex got blackout due to tripping of evacuation lines one by one

within a short span of 30 minutes

bull The complete loss of evacuation lines occurred at 0117 Hrs The blackout has resulted in tripping of GT1A

GT1B and ST causing 320 MW generation loss in the area It was reported that weather condition was foggy with

slight drizzling was in the area

LineTime of Tripping

Kawas End Remote endRestoration Time

220 kV Kawas‐Navsari1

1246 AM

R phase to EF

Fault location 2 km

R Phase to EF

122 AM

220 kV Kawas ndashNavsari2

112 AMR phase to EF

Fault location 2208 km

R Phase to EF 347 AM

220 kV Kawas‐Haldarwa 1

107 AMR phase to EF

Fault location 16 km

R Phase to EF 246 AM

220 kV Kawas‐ R phase to EF R Phase to

bull Line restoration has failed on several attempt as the lines

were not holding due to persisting fault

bull Such an event of total loss of evacuation lines from a

generating station resulting in blackout scenario is a

matter of serious concern

bull WRTS-2 may kindly send the reasons for such faults

which has caused the incidence and the remedial action

taken in this regard220 kV Kawas‐Haldarwa 2

108 AMp

Fault location 2 kmEF 304 AM

220 kV Kawas‐Icchapur1

108 AM B phase to EFB Phase to EF

301 AM

220 kV Kawas‐Icchapur2

108 AMB phase to EF Faultlocation 356 km

B Phase to EF

331 AM

220 kV Kawas‐Vav 1 117 AMNo tripping

Hand Tripped laterLine Tripped 225 AM

220 kV Kawas Vav 2 117 AM Y Phase to EFY Phase to EF

317 AM

taken in this regard

bull Disturbance Recorder (DR) and Event Logger(EL) out

puts are yet to be received from WRTS-2

bull As per IEGC the information like DREL output relay

indications amp sequence of events etc must be sent to

RLDCRPC by 24 hrs of the event WRTS-2 may kindly

expedite amp furnish the information to WRLDC amp WRPC

Item No 911 Operating Procedure of WR-2014

The operating procedure of Western Region 2014 has been updated on 31072014 and the p g p g psame has been uploaded on WRLDC web site at the following link

httpwwwwrldccomdocsWR_OPERATING_PROCEDURE_2014pdf

8212014

18

Item No 12 Mock Black start Exercise

Station Name Date Proposed Remarks

Mock Black Start Plan for the following stations has been received by WRLDC

CLPIPL Gas Power Plant 29‐Jun‐2014 ‐

Gandhar Gas Power Plant 27‐July‐2014 ‐

Other Utilities may update the sub‐committee regarding their plan for black start exercise

SL No Name of the Station Remarks

1 Bargi DG set under outage

2 TONS Governor Problem

3 Birsinghpur Governor Problem

Healthiness of DG sets

3 Birsinghpur Governor Problem

4 Medikheda Governor Problem

5 Rajghat Governor Problem

1 Outage of DG set for longer period is matter of serious concern 2 SLDC Jabalpur may apprise the present status2 SLDC‐Jabalpur may apprise the present status3 Possibility of procurement of stand‐by DG sets to be examined to take care of such prolonged outage of DG sets which virtually renders the black start facility sterile4 There is need for blackstart generator planning in W3 area Thermal IPP generators are disconnected from state grid and there is no hydro station So with only UHV lines and large thermal units system restoration post disturbance would be extremely challenging for Chattisgarh

8212014

19

Maharashtra

Madhya Pradesh

Item No13 Review of list of feeders for load regulation in emergency

Gujarat

DD amp DNHChattisgarh

Goa

bull Decided during the 461st OCC that list ofDecided during the 461st OCC that list of

feeders identified for load control under

emergency measure for safeguarding grid

security would be reviewed in a special

meeting The list is yet to be reviewed

8212014

20

Item No 14 Implementation of voltage and time grading on OV relays to prevent tripping of multiple EHV lines emanating from single node on high voltage

bull During the 461st OCC it was informed by Power Grid representative that they have already implemented voltage grading in various line emanating from the same node (matter has not come in the MoM)

bull Power Grid amp other utilities may kindly intimate the present status of voltage grading at their respective sub‐stations

Power Station Number of instances

when the SPS signal

was received at the

station

Number of instances

when the action by

the generators was

adequate

Number of instances

when the automatic

generation reduction was

done partially

JPL 53 0 50

Item No 15 SPS for SR‐WR Inter Connection Inadequate Participation by Generators

Issues

1 10 times operation of SPS‐1 causing backing down at JPL amp KSK during 1714 to 7 8 14JPL 53 0 50

KSK 53 0 36

APML 35 0 30

Mouda 35 0 0

Koyna 0 0 0

Koradi 0 0 0

Khaparkheda 0 0 0

Chandrapur 0 0 0

to 78142 Participation by other envisaged

generators to be expedited3 PGCIL may update status of Extention of

SPS signal from Solapur(PG) to the additional generators identified for participation

4 Decided in 461st OCC to have special Chandrapur 0 0 0

DB Power 0 0 0

NSPCL 0 0 0

Balco 0 0 0

Lanco 0 0 0

KWPCL 0 0 0

pProtection Sub‐Committee meeting to discuss progress of implementation of the revised SPS at Solapur (for WR‐SR interconnection) amp extension of signal from Sholapur to additional generators in WR

8212014

21

Thank you

DiscussionhelliphelliphellipDiscussionhelliphelliphellip

  • 462 occ_minutepdf
  • participants list_462 OCC meeting 110814pdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 26-7pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 45pdf
  • 46pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84pdf
  • 84apdf
    • 26wrpc_minute 107pdf
    • 26wrpc_minute 108pdf
    • 26wrpc_minute 109pdf
    • 26wrpc_minute 110pdf
    • 26wrpc_minute 111pdf
    • 26wrpc_minute 112pdf
    • 26wrpc_minute 113pdf
      • 85pdf
      • 87pdf
      • 98pdf
      • 913pdf
      • 10pdf
Page 3: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR

3

462nd OCC MINUTES

22 Operational Discipline

There was a net inter-regional export of 356400 MUs by WR against net export

schedule of 335400 MUs

The Sub-Committee noted

23 Voltage Profile Voltage profile at some of 765400 kV sub-stations during the month of July

2014 furnished by WRLDC is enclosed at Annex-23

The Sub-Committee noted as above

24 UF Relay Operations

As per WRLDC records during July 2014 the system frequency didnrsquot touch 492 Hz

and no UF relay operation reported by any constituents The Sub-Committee noted as above

25 Power Cuts Load Restrictions

Details of Power Cuts and Regulatory measures during July 2014 as furnished by the

state utilities are given in Annex 25 The Sub-Committee noted as above

26 Details of Generating Units under Forced outages Details of generating units under forced outages during July 2014 are given in

Annex-26

The Sub-Committee noted as above 27 Details of Generating Units under Planned outages

The details of generating units under Planned Outages during July 2014 are given in Annex-27

The Sub-Committee noted as above

ITEM NO3 OPERATIONAL PLANNING 31 Proposed Planned maintenance programme of generating units

The maintenance programme of generating units for August 2014 amp September

2014 was discussed

4

462nd OCC MINUTES

Sub - committee discussed the matter amp suggested that outages of major coal fired

units(200MW amp above) amp hydro generating station shall be deferred till next OCC

meeting due to following reasons

1 Intermittent rain profile in the region amp Load generation balance requirements of

grid for secure operation

2 Coal shortage being faced by some important generating station of NTPC viz

Sipat amp Vindhyachal etc

3 Gas shortages being faced by Gas stations

4 Water shortage by Parli units of Maharashtra state power generating company

ltd(MSPGCL)

The finalized outage schedule of generating units for the above period and the

modified outages plan is placed at Annexure-31

The Sub-Committee agreed as above

32 Outage Programme of Transmission Lineselements The committee had received 275 nos of proposals for outage planning during Aug-Sep

2014 Further some proposals were received at the last moment of the meeting

The committee observed that -

1 There were repetitions in the proposals wherein the same line had been

requested for outage a no of times

2 The lines pertaining to STU were asked for outage As per 446th OCCM such

lines should be first approached to concerned STU and only in case of

problems faced in outages OCC-WR may like to review

3 Line detailsreasons in many cases were not already mentioned Committee

requested that while submitting outage planning data necessary care may

please be taken

4 All utilities were requested to avail outages as planned

The Sub-Committee agreed for the same

33 ANTICIPATED POWER SUPPLY POSITION FOR THE MONTHS ndash AUGUST 2014 amp SEPTEMBER 2014

Details of anticipated restricted amp un-restricted demands for the months of August 2014 amp

September 2014are given in Annex 33

The Sub-Committee noted the same

5

462nd OCC MINUTES

ITEM NO 4 OPERATIONAL STATISTICS FOR THE MONTH OF July 2014 The details of actual generation demand drawl of power from grid exchanges etc are given in the following Annexure Annex 41 - Actual Generation and Requirement for July 2014 Annex 42 - Peak Demand Schedule Vs Actual for July 2014 Annex 43 - Integrated Operation of the System and Operation of Inter State Tie lines

For July 2014 Annex 47 ndash Details of level of Major Reservoirs in Western Region for Month July

2014

The Sub-Committee noted ITEM NO 5 SYSTEM DISTURBANCES IN WESTERN REGION There was no major grid disturbance in the Western Region during the month The

tripping details during the month received from WRLDC is enclosed at Annexure-5

The Sub-Committee noted as above ITEM NO 6Healthiness status of SERsDRs of equipment in the system

Constituents have furnished the status of healthiness of SERDRs in their systems on the dates below

Sl No Name of

constituents Date of Receipt

1 PGCILWRTS-I 06082014 2 PGCILWRTS-II 07082014 3 MPPTCL 11082014 4 NTPC 04082014 5 CSPTCL 03082014 6 GETCO 07082014 7 MSETCL 11082014

Constituents of WR are requested to ensure healthiness and send the information to

this office regularly as per the recommendation of enquiry committee of Grid

disturbances on 25022007 and 28022007

ITEM NO 7 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS TRANSMISSION LINES AND GENERATING UNITS IN WR

71 Status of completion of ongoing Schemes for Commissioning of reactors The present status regarding schedule and commissioning of reactors is as below

6

462nd OCC MINUTES

S No

400 kV Substn

Size (MVAR)

Implementing agency

Expected commissioning date

1 Ranchodpura 125 MVAR GETCO Commd On 8th July 2013

2 Varsana 125 MVAR GETCO Commd On 25th July 2013

3 Rajkot 125 MVAR GETCO Commd On 5th August 2013

4 Amreli 125 MVAR GETCO Commd On 12072013

5 Jetpur 63 MVAR GETCO Commd on 11072013

6 Zerda 125 MVAR GETCO Commd in July 2013

7 Kosmba 80 MVAR GETCO Commissioned on 29112013

8 Limbdi (Chornia)

125 MVAR GETCO 25th July 2013

9 Jabalpur 125 MVAR PGCIL Commissioned on 26032014

10 Khandwa 125 MVAR PGCIL Commissioned on 28032014

11 India bulls 80 MVAR BR

MSETCL Commissioned 26112013

12 Nagda 50 MVAR MPPTCL Commissioned in Feb-2014

13 Sasan Line reactor-1

240 MVAR RELIANCE Commissioned on 16022014

14 Shujalpur 125 MVAR PGCIL July 2014 end

15 Bhatapara 125 MVAR PGCIL July 2014 end

16 Raigarh 125 MVAR PGCIL July 2014 end

17 Aurangabad 125 MVAR PGCIL 28042014

18 Nanded 125 MVAR MSETCL 2015

19 Sholapur 125 MVAR MSETCL Sept-2014

20 Kolhapur 125 MVAR MSETCL Sept-2014

7

462nd OCC MINUTES

21 Akola 125 MVAR MSETCL Sept-2014

22 Nagda 125 MVAR MPPTCL Oct 2014

23 Bhopal 80 MVAR MPPTCL Sept 2014

24 Damoh 125 MVAR PGCIL August 2014

25 Bachau 125 MVAR PGCIL August 2014

26 Pirana 125 MVAR PGCIL August 2014

27 Itarsi 2X125 MVAR

PGCIL August 2014

28 Seoni 125 MVAR PGCIL August 2014

29 Parli 125 MVAR PGCIL August 2014

30 Raipur 125 MVAR PGCIL August 2014

31 Gwalior 125 MVAR PGCIL Commissioned on 30062014

32 ISP 125 MVAR NHDC 2015

33 Satpura 50 MVAR MPPGCL March-2015

34 Sasan Line reactor-2

240 MVAR RELIANCE August -2014

35 Sasan Bus reactor

240 MVAR RELIANCE Sept-2014

72Status of completion of 765400 kV and above ongoing Transmission Schemes

being executedimplemented by Transmission Agencies The updated status on various ongoing transmission schemes for the current year as per the current information available is as follows - S No

Name of the Line Target Completion Date

Remarks

POWERGRID 1 400 kV Navsari ndash Kudus DC Line Sept- 2014 ROW problem 2 765kV SC Satna-Gwalior line

(359Km + 60Km DC Portion) Ckt-II August- 2014

3 765 kV Raigarh (Kotra) pooling Commissioned on

8

462nd OCC MINUTES

station -Champa Pooling station -Dharamjaygarh PS - 2nd ckt

21052014

4 765 kV Gwalior - Jaipur line (1st Ckt) SC

Dec 2014

5 765 kV Dharamjaygarh - Jabalpur Pooling Station DC line

Dec-2014

6 765 kV Wardha ndashNizamabad-Hyderabad DC

March-15

7 765 kV Narendra-Kolhapur DC March-15 8 HVDC Raigarh(Kotra)-Pugalur Bi-

pole March-15

9 400 kV Aurangabad - Boisar line DC line

Dec -2014

10 765 kV Aurangabad (PG) - Padghe (PG) DC

August-2014

11 800kV DC Champa ndash Kurukshetra Bipole

Jan 2015

12 765 kV DC Jharsuguda ndash Korba Dec 2014 13 2 X 765 kV SC Ranchi ndash Sipat Jan 2015 14 765 kV Wardha- Aurangabad DC

Line

Ckt I Commissioned on 010714 Ckt II Commissioned on 030714

15 765 kV Aurangabad- Solapur DC line

Dec 2014

16 765 kV Solapur-Pune line

Sept 2014

17 765KV Durg-Wardha DC Sept 2014 CHHATTISHGARH 1 LILO of 400 kV Korba west-

Khedamara at Marwa August 2014

2 400 kV DCDS Raipur(Raita)- Jagdalpur(DCDS)

March 2015

21 220 kV Korba-Bishrampur line (DCSS)

Sept 2014

22 220 kV DCDS lines Chhuri to Mopka (Bilaspur) (DCDS)

Nov 2014

26 LILO of 220 kV Raigarh-Budipadar at 400 kV PGCIL Ss Raigarh

Sept2014

28 LILO of 220 Korba (E)- Bishrampur line at 220 kV Churri Ss

Sept 2014

29 LILO of 220 kV Raigarh ndash Jindal (Tamnar) at Girwani 220 kV Ss

Sept 2014

GUJARAT 1 400 kV DC Kosamba-Chorania line

(Package I)(From Chorania SS to AP-54)

Aug -2014 Commissioned on 100314

9

462nd OCC MINUTES

2 400 kV DC Kosamba-Chorania line

(Package II)(From Kosamba SS to AP-54)

Aug -2014

3 400 kV DC Mundra-Zerda line No 1 Aug -2014 4 400 kV DC Mundra-Zerda line No 2 March-2015 5 400 kV DC Vadinar-Amreli line December -

2014

6 400kV Mundra-Hadala LILO to Halvad

August -2014

7 400 kV DC Amreli-Kasor line(Part-1) December-2014

8 400 kV Charanka- Veloda Oct 2014 MADHYA PRADESH 1 Chhegaon-Julwania 400 KV DCDS

Line OCT - 2014

2

Pithampur- Indore 400KV DCDS Line

August - 2014

Work of the line have been completed by MPPTCL feeder bay from Indore PGCIL is awaited

3 Satpura TPH-Ashta 400KV DCDS Line

December ndash 2014

MAHARASHTRA(STU)

1 400KV DC line from Koradi-II to Wardha SS(PG) DC

Oct- 2014

2 400 kV Akola-Taptiganga Sept 2014 3 400 kV Tiroda-Akola Dec - 2014 GUJARAT (IPTC route) by WR Transmission (Guj) Pvt Ltd

1 400 kV Rajgarh(PG)-Karamsad (GETCO) DC

Sept -2014

STERLITE (JTCL) 1 765 KvDhramjaygarh - Jabalpur (JTCL)

DC line May -2015 Severe ROW Problem

2 765 kV Jabalpur - Bina (JTCL) Sc May -2015 Severe ROW Problem STERLITE (BDTCL) 1 765 kV Bhopal - Indore (BDTCL) SC August-2014 2 765 kV Bhopal-Bhopal Commissioned on

160714 3 765 kV Dhule - Vadodara SC Oct - 2014 4 765 kV Vadodara - Dhule (BDTCL) SC Oct - 2014 5 765 kV Dhule - Aurangabad (BDTCL)

SC August-2014

RAICHUR SHOLAPUR TRANSMISSION CO LTD(RSTCL)

1 765 kV Raichur - Sholapur line 2nd SC

Commissioned on 29062014

10

462nd OCC MINUTES

It was suggested by WRLDC and constituents that important list of line will be sent by

each constituent to WRLDC and WRLDC will compile and furnish the list as per

priority of commissioning

The Sub-Committee noted and agreed as above

73 Commissioning of new Generating units in Western Region and the capacity expected to be commissioned during the current year 2014-15

The status regarding Generating units expected to be commissioned during the

current year 2014-15 is as below

Name of the Power Projects Unit No Capacity (MW)

Date of Commissioning Schedule Date

GUJARAT Bhavnagar Lignite TPP-JV I 250 August 2014 II 250 August 2014 UNO SUGEN 2 3825 July 2014 CHHATTISGARH Marwa 1 500 Sept 2014 2 500 Dec 2014 MAHARASHTRA Dhariwal 2 300 Synd On 23042014 CHANDRAPUR 8 500 Oct 2014 CHANDRAPUR 9 500 March 2015 KORADI 8 660 Oct 2014 KORADI 9 660 Jan 2015 PARLI 8 250 March 2015 MADHYA PRADESH Singhaji TPS 2 600 Oct-2014 Ms Jhabua Power Seoni 1 600 Dec ndash 2014 MB Power Anuppur 1 600 Sept ndash 2014 Jaiprakash Power Nigri 1 660 July 2014 Jaiprakash Power Nigri 2 660 Dec 2014 Moser Bear (Hindustan power) 1 600 Nov- 2014 Moser Bear (Hindustan power) 2 600 March 2015 Essar Concessional ampEssar Power 1 600 Oct 2014 Essar Concessional ampEssar Power 2 600 Dec 2014 BLA 2X4 90 March 15 Jhabua Power 1 600 Dec 2014 CENTRAL SECTORIPP KSK 2 600 August 2014 KSK 5 600 January 2015

11

462nd OCC MINUTES

ACBIL 1 300 March 2015 SASAN 5 660 July 2014 SASAN 6 660 August 2014 Sasan 4 660 Synchronized in May 2014

Sub-committee noted as above ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS (A) FOLLOW-UP ITEM NO 81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

All the constituents are requested to submit the CMP report for the First quarter

(April 2014 to June 2014) for the year 2014-15

The Sub-Committee members noted as above ITEM NO 82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR

Status of physical amp cyber security in Power Sector for the First quarter (April 2014 to

June 2014) for the year 2014-15 have not been received from some of the

constituents

The Sub-Committee members noted as above ITEM NO 83 PROCEDURE FOR CALCULATION OF TRANSMISSION SYSTEM

AVAILABILITY FACTOR FOR A MONTH AS PER CERC REGULATION 2014-19

Member Secretary WRPC informed that a procedure for calculation of

transmission system availability factor as envisaged in CERC Regulation 2014-15

was discussed in 461st OCC held at Raipur Various aspects were discussed and

finalized However there were concerns expressed by transmission licensee

regarding addition of 12 hrs to outage hrs after each tripping beyond admissible 2

tripping in a year as it will reduce availability below 95 Also concern was

expressed for multiplying outage hrs by 2 for line affecting generation Also

whether addition of 12 hrs is applicable to such lines affecting generation was

also expressed Whether these clauses are applicable to HVDC system was not

known Therefore all such concerns of transmission licenses have been taken up

with CERC for revision clarification

Meetings were held on 1st and 4th August 2014 with transmission licenses

regarding verification of data data formatting and sorting out various anomalies

and doubts for data from April to July 2014 for further processing at WRPC end

12

462nd OCC MINUTES

Member Secretary WRPC informed that certification for some transmission licensees

has already been done The certificate for PGCIL is to be issued as effect on

generation evacuation certificate from WRLDC is awaited

CM WRLDC requested all the transmission licensees to submit the data to WRLDC in

same format as submitted to WRPC

Representative from Transmission licensees agreed the same

The Sub-committee noted as above ITEM NO 84 IMPLEMENTATION OF RSD METHODOLOGY Shri Satyanarayan SE WRPC informed that GM (OSampC) NTPC HQ-I Mumbai vide letter dated 28072014 (copy enclosed at annexure 84) requested to call a meeting for resolvingclarification of methodology developed by WRPC The procedure for RSD framed by WRPC is enclosed at Annexure 84A SLDC MPPTCL Jabalpur informed that RSD was implemented for NTPC Mauda unit

on 18072014 but it was not more extended beyond 20072014 as no other major

beneficiaries agreed for extension

CE GETCO informed that intermittent rain profile in the different geographical area of

Gujarat amp increasing demand pattern didnrsquot permit them to take RSD of any NTPC

units as minimum of 3 days is required

Representative from SLDC Maharashtra also endorsed the Gujarat view points on

RSD

GM NTPC requested to the committee that if RSD wasnrsquot possible then at least

technical minimum schedule should be given

Member Secretary WRPC summarized the matter as follows

1 RSD was implemented for NTPC Mauda unit from 18072014 to 20072014

but it could not be extended due to increasing demand pattern amp uncertainty of

rain profile in the region

2 The method framed by WRPC shall be continued amp will be applied as and

when required

3 He requested constituents to schedule the NTPC generating units at its

technical minimum in case RSD is not feasible

The Sub-committee noted as above

13

462nd OCC MINUTES

ITEM NO 85 LOAD FORECASTING IN WESTERN REGION Background- As per the amended Indian Electricity Grid Code that is effective from 17th February 2014 the SLDCs SEB distribution licensees shall always restrict the net drawal of the State from the grid within the drawal schedule keeping the deviations from the schedule within the limits specified in the Deviation settlement mechanism regulations Therefore it is imperative that adequate attention may be paid towards load forecasting The matter was discussed in the past several OCC as well as in the 26th TCCWRPC board meeting wherein it was decided to create a task force for exploring development of a software for load forecasting A meeting was held on 03042014 under leadership of CE(SLDC) GETCO Gujarat at

Mumbai The outcome of the Meeting was as following

1 Short term action a) all the discoms were advised to provide maximum historical data b) Discoms have to bifurcate the geographical area in to zone and derive effect of temp rain festival on load

2 Long term action a) Provide computer base meters up to all the distribution feeders for close monitoring b) Provide weather sensors at various strategically important locations c) Formulation of forecasting desk (load amp RE) at SLDC level

The 2nd meeting regarding Load Forecasting Mechanism was held with members of WRPC WRLDC Western Region SLDCs amp State Discoms Forecasting Service Providers (FSPs) on 110614 at SLDC Vadodara Gujarat During the 460th OCC meeting CE SLDC GETCO informed that roadmap for implementation of pilot project amp main project has been prepared Budget proposal have already called from FSP amp they assured to submit till the end of the month For implementation of pilot project the Utility and their respective Pilot FSP are decided as tabulated below

Sr No STATE ndashSLDCDISCOM Pilot FSP

1 GUJARAT MS TESLA

2 MAHARASHTRA IIT MUMBAI

3 MADHYA PRADESH MS METEOLOGICA

4 CHHATISGARH MS SAS

5 GOA MS MARCADOS

6 DDDNH IITGANDHINAGAR

MP informed vide letter dated 27062014(copy enclosed at 85) that they have

already placed on order to Ms L amp T InfoTech on 12072013 for load forecasting

software project Therefore MP had requested to exclude them from pilot project

activities decided in earlier meetings

14

462nd OCC MINUTES

462nd OCC Discussions- State wise status is as under -

bull CE SLDC informed that Gujarat has prepared the NDA and forwarded to TESLA for signing and the same was signed by TESLA New Zealand office and their Mumbai office shall forward the same to SLDC Gujarat Thereafter Input data shall be provided and ID shall be provided to TESLA so as to start forecasting by them

bull SLDC Gujarat vide letter no SLDCCEMIST-6458 dtd 270614 has conveyed to all WR Nodal SLDC coordinators regarding progress of load forecasting pilot project Thereafter also e mailed on date 2082014 to all Nodal SLDC for submission of status Report on Pilot Load Forecasting Project However no proper response is received so far

bull MP SLDC conveyed that they have already awarded contract for load forecasting and the same is expected to be available by year end Therefore MP shall not participate in the present scheme

bull SLDC Chhattisgarh representative informed that matter has been taken with discom Chhattisgarh Discom were facing difficulties to contact with coordinator of Ms SAS

CE SLDC Gujarat being a group leader stated that Chhattisgarh shall intimate to them for further needful and would help them in this matter

bull Maharashtra SLDC informed that there was a meeting held on 09082014 with IIT Bombay where availability of data has been discussed amp one more meeting will be held on 22082014 outcome of the same will be intimated in next OCC meeting BEST amp TATA are already having such forecasting system

bull No one from GOA has attended last meeting even though GOA was forwarded copy of MOM Due to non availability of any coordinator details of GOA it was not possible to contact them However Ms Marcadose has also conveyed that he has not been contacted by Goa

bull No one from DDDNH has attended last meeting even though DD DNH was forwarded copy of MOM However IIT Gandhinagar conveyed that they were not been contacted by DD DNH

Member Secretary WRPC informed that a letter to DD DNH amp GOA has been written

from WRPC secretariat regarding implementation of ADMS Load Forecasting amp

telemetry status He further requested the constituents to implement the decision

taken in earlier meeting of load forecasting

OCC suggested that the next load forecasting meeting may be held at DDDNH

The Sub-committee noted as above

15

462nd OCC MINUTES

ITEM NO 86 NEED OF COOPERATION FROM WRLDC IN REAL TIME

bull CE SLDC informed that at present APL is under their control area and embedded scheduling model is used It may be noted that for units 78amp 9 at APL Gujarat has no share (all are for NR beneficiaries)There have been occasions when units 78amp 9 have tripped (given at annexure) Since APL is shown as embedded in Gujarat WRLDC requested Gujarat to reduce overdrawl when APL units 78amp 9 trips Hence Gujarat has to pick up state generationcostlier generation for no fault of Gujarat

bull Further lines are opened to curtail overdrawl when Gujarat is not faulty Gujarat is seen as overdrawing (due to embedded scheduling of APL) when APL trips

bull To complicate matters the scenario coupled with wind variations state generation has to be constantly varied to avoid overdrawl

Gujarat requested followings-

1 When large sized units (APL units 78amp 9) trips then scheduling of Gujarat should be changed with immediate effect OR Gujarat should not be pursued for deviation correction to the extent of schedule of units tripped at APL units 78amp 9 OR Schedule of Gujarat from other central sector stations should be changed as per their request with immediate effect

2 APL units 78amp 9 should be made a separate control area 3 Under above circumstances transmission lines should not be opened

due to default by APL as these affects Gujarat without any fault of their own Further this was done without informingtaking SLDC into confidence It was clear from the discussions that Gujarat Discoms are put to unnecessary financial implications WRLDC clarified that 220 KV Dehgam- Khanpur Line no1 was opened due to frequency touching 493 Hz and control of overdrawl was taken as security measure WRLDC agreed to inform CE SLDC whenever such discussions are taken and agreed to take care in future

The Sub-committee noted as above

ITEM NO 87 GUIDE LINES FOR SPLIT BUS OPERATION AT SSP RBPH SWITCHYARD CE SLDC Gujarat vide letter dated 07082014 informed that a meeting was held on

220514 at Kevadia Colony SSP regarding split bus arrangement at SSP RBPH

16

462nd OCC MINUTES

switchyard and subsequent discussions during 55th meeting of PSC of NCA held in

Vadodara on 140714 the guidelines for the same had been prepared in consultation

with GETCO protection wing and sent vide mail dated 23072014 However the same

has been attached herewith as Annexure-87 It was clarified during discussion that

split bus operation would be used only as per requirement and will not be a permanent

arrangement

The Sub-committee noted as above

ITEMS FROM WRLDC

1 OPERATION OF GRID AT HIGH FREQUENCY ( gt 505 HZ) The onsetrevival of monsoon in the last fortnight of July 2014 has reduced the demand in Western Region However the demand would pick up sharply during the dry spell in September and October months Presently the major State Central Sector IPP generators in Western Region that are facing coal shortage are tabulated as under S No Name of power

stations Unit Reason for

outage 1 VSTPS 2 (210 MW) Coal Shortage 2 VSTPS 5 (210 MW) Coal Shortage 3 Singhaji 1 (600 MW) Coal Shortage 4 SGTPS 4 (210 MW) Coal Shortage 5 JP Bina 2 (250 MW) Coal Shortage 6 Bhusawal 2 (210 MW) Coal Shortage 7 Parli 4 (210 MW) Coal Shortage 8 India Bulls 1 (270 MW) Coal Shortage Likewise several Gas Power Stations in Western Region are facing fuel shortage Under the above circumstances it is desirable that precious fuel optimally utilized to maintain adequate stock for the dry spell In the month of July 2014 the grid frequency remained above 5005 Hz for more than 15 of the time while it remained below 499 Hz for more than 34 of the time Operation of high frequency is unnecessary loss of fuel that could have been conserved and utilized during low frequency regime

The Sub Committee noted the same

17

462nd OCC MINUTES

2 OBSERVATION OF INTRA-PLANT MODE OF OSCILLATIONS (097 HZ) WITH POOR DAMPING ON 10TH AND 11TH JUNE 2014 AND LOSS OF 1800 MW IN MAHARASHTRA SYSTEM DUE TO POWER SWING UNDER N-1 CONTINGENCY ON 20TH MAY 2014 The issue of Intra plant mode of oscillations with poor damping as observed during the grid event on 10th and 11th June 2014 was discussed during the 461st OCC meeting Similar oscillations were again recorded on 11th July 2014 GM WRLDC informed that they have written to generators seeking details of MW fluctuations PSS status etc and requested constituents to share the dataHe requested that constituents may share PMU data also CESLDC Gujarat informed that they are proposing PSS tuning with consultants from IITs in their system EE SLDC Maharashtra informed that APL-Tiroda has recently tuned PSS at Tiroda units by OEM

It was once again requested constituent to furnish information as designed by WRLDC The Sub Committee noted the same

3 FREQUENT TRIPPING OF 765 KV SATNA-SASAN LINE

WRLDC informed that 765 kV Sasan-Satna Line has tripped on three occasions

while 240 MVAr Bus Reactor at 765 kV Satna tripped on one occasion The

tripping occurred due to protection mal-operation at Satna end during stability test

for the 765 kV Bus-1 The details of the tripping is given below

The above OV at Sasan end could have been avoided if the Line Reactor of this line at Sasan end had been commissioned The restoration of the tripped circuit also was considerably delayed in the absence of Line Reactor at Sasan end

Elements Date and Time of Tripping

Date and Time of Restoration

Remarks Receipt of DREL at WRLDC Satna Sasan

765 kV Sasan-Satna 2

25-07-14 1026

25-07-14 1155

Protection Mal-Operation DT at Sasan End on OV as line remain hanging from Sasan end

No Yes

765 kV 240 MVAr Bus Reactor at Satna

25-07-14 1026

25-07-14 1139

Protection Mal-Operation DT at Sasan End on OV as line remain hanging from Sasan

No Yes

765 kV Sasan-Satna 2

25-07-14 1229

25-07-14 1342

Line got charged from Satna and synchronized at Sasan No Yes

18

462nd OCC MINUTES

end but immediately DT was received at Sasan from Satna and Line tripped Prior to tripping voltage at Sasan end was 796 kV

765 kV Sasan-Satna 2

25-07-14 1628 -

Charging attempt was taken from Satna end but line tripped before synchronization at Sasan end due to DT from Satna Open end voltage at Sasan 826 kV for the line

No Yes

Representative from Sasan UMPP informed that with regards to the 765 kv Line and

Bus reactors all the material required for completion of works have been received at

site

Line reactor and bus reactor would be commissioned by Aug14 and Sep 14

respectively

The Sub Committee noted the same 4 SPS AT SIPAT

The SPS scheme implemented at NTPC Sipat has been received at WRLDC It is observed that a time delay of 15sec is provided to unload units 1 2 4 amp5 each by 150MW if any ICT s load exceeds 130 of rated load It was conveyed that if ex-bus generation at Sipat is more than 2200 MW immediate unloading of units may be done and the intentional delay which is required to prevent mal-operation may be 45 second instead of 15 second

NTPC Sipat representative agreed to implement the same accordingly The Sub Committee noted the same

5 COMMISSIONING OF SPS AT 400220 KV VAPI During the special WRPC meeting on 18032013 at Dadra an SPS for automatic load shedding subsequent to tripping of 400220 kV ICT at Vapi was approved as under It was decided that POWERGRID would extend trip signal from Vapi ICTs to the requisite feeders

Contingency Envisaged SPS action

Identified Feeders

Tripping of any one ICT at 400200 Vapi Sub-Station

Automatic Load Shedding of 100MW

DNH 1) 66 kV-Kharadpara-Rakholi-I 50 MW 2) 66 kV Khadoli-Khadoli-3 30 MW DD 1) 66 kV Magarwada-Kachigam 60 MW

19

462nd OCC MINUTES

It was felt that due to change in topology loading in ICT is not critical however SPS may be in place as defense mechanism in case of any emergency

DD amp DNH representative were absent in the meeting The Sub Committee noted the same

6 ADDRESSING HIGH VOLTAGE CONDITION IN SSP amp NEARBY AREA

High voltage condition is being observed at SSP and nearby area in off peak period particularly between 2300 hrs at night to 0500 hrs in the morning Also on many occasions the system operator is compelled to hand trip the 400 kV lines emanating from SSP to control over voltage Summary for the month of Julyrsquo14 is given under

Sl No 400 kV Line DatailsFrom To

Time Date Time Date 1 SSP-RAJGARH-I 0009 19-Jul-14 0730 29-Jul-14 2 SSP - RAJGARH-II 0406 16-Jul-14 1016 18-Jul-14 3 SSP-DHULE-I 1310 22-Jul-14 0953 23-Jul-14 4 SSP - DHULE - II 1533 15-Jul-14 0734 18-Jul-14 5 SSP - DHULE - I 1703 10-Jul-14 1100 11-Jul-14 6 SSP-DHULE-I 1712 28-Jul-14 0933 31-Jul-14 7 SSP - DHULE - II 1730 19-Jul-14 0917 20-Jul-14 8 SSP - DHULE - I 1757 18-Jul-14 0935 19-Jul-14 9 SSP-DHULE-II 1809 21-Jul-14 0914 22-Jul-14 10 SSP-DHULE-I 1815 30-Jun-14 0542 1-Jul-14 11 SSP-DHULE-I 1819 20-Jul-14 0858 21-Jul-14 12 SSP-DHULE-II 1825 8-Jul-14 0949 9-Jul-14 13 SSP - DHULE - II 1831 11-Jul-14 1007 13-Jul-14 14 SSP - DHULE - I 1838 1-Jul-14 0556 2-Jul-14 15 SSP - DHULE - I 1848 9-Jul-14 0912 10-Jul-14 16 SSP - DHULE - I 2136 13-Jul-14 0850 14-Jul-14 17 SSP-DHULE-II 2201 23-Jul-14 0945 28-Jul-14

Also it has been observed that Wanakbori TPS injects around 60 MVAr per unit even when voltage at Wanakbori is above 420 kV for nearly 100 of the time Further envisaged bus reactors at Rajgarh amp Dhule are yet to be commissioned Hence in view of system reliability it is advisable to explore all possibilities to contain high voltage condition in SSP and nearby area The following actions need to be taken to address the situation

bull Operating RBPH machines at SSP in synchronous condenser mode bull Absorption of MVAr by Wanakbori (WTPS) units bull The commissioning of Reactors at 400 kV Rajgarh may be expedited by

WRTS-2

20

462nd OCC MINUTES

bull The commissioning of Reactors at 400 kV Dhule may be expedited by MSETCL CE SLDC GETCO agreed for looking into absorption of MVAR at Wanakbori

7 IMPLEMENTATION OF THE REVISED AUFLS IN DD AND DNH Representatives from the DD and DNH intimated during the 459th OCC meeting that the tendering process was stalled because of general elections (election code of conduct was in force) amp action would be initiated post the elections Member Secretary WRPC vide letter dated 01082014 took up the matter with Secretary (P) DDDNH (copy enclosed) DD amp DNH representative were absent in the meeting to comment

The Sub Committee noted the same 8 ADMS(AUTOMATIC DEMAND MANAGEMENT SCHEME) IMPLEMENTATION

AS PER SEC 542 OF IEGC The format for reporting the progress of implementation of the ADMS in Western Region States was given as part of MoM of the 461st OCC meeting All utilities may like to furnish the updated status to WRPCWRLDC as per the above format It is understood that MP has submitted its detailed action plan in the form of an affidavit to CERC for implementation of ADMS However SLDC MPPTCL is requested to furnish data to OCC forum in the above format

The Sub Committee noted the same

9 STATUS OF TELEMETRY IN WESTERN REGION

In the 460th amp 461st OCC meetings the status of telemetry in Western Region was discussed in detail It was also highlighted that the Honrsquoble CERC vide its order in petition SM0072014 issued Notice under section 142 on several constituents of Western Region All the constituents had assured to address the telemetry issues within a month or two The telemetry status as on 4th August 2014 is tabulated below

21

462nd OCC MINUTES

a Maharashtra The non-availability of telemetry is 583 for sub-stations amp 18

for generating stations This is a matter of serious concern The issue has been

discussed in several OCC meetings since last 8 months As per the information available with WRLDC telemetry is not available from the following generating stations at 400 kV level

bull Kaparkheda bull Deepnagar

Also telemetry is not available from the following sub-stations at 400 kV level bull Warora bull Lonikhand(New) bull Chandrapur-stg-II

As per the information available with WRLDC telemetry is intermittent at 4 generating stations viz

bull Jaigad bull Paras-extension bull Trombay bull Deepnagar GCR

Also telemetry is intermittent at following sub-stations at 400 kV level bull Bableswar-II bull Deepnagar SS bull Dhule bull Khaparkheda bull Kolhapur-3

22

462nd OCC MINUTES

bull Sholapur-3 SLDC MSETCL Maharashtra informed that telemetry has been established for 46 locations

a Chhattisgarh100 available b Madhya Pradesh As per the latest status telemetered data is available from

100 of the locations c Gujarat As per the latest information submitted to CERC the non-availability of

telemetry data from Gujarat as on date is 33 for substations As per the information available with WRLDC Telemetry is not available form 2 number of 220 kV sub-stations viz bull Bhatiya bull Mokha Gujarat intimated in 460th OCCM that these sub-stations were ready but lines were in construction phase Also telemetry is intermittent from the following SS in Gujarat bull 220 kV Navasari (GETCO) ss bull 400 kV Kasor ss

SLDC GETCO may expedite amp resolve the issue for the above stations at the

earliest d Goa As per the latest information telemetry is not available form 2 number of

220 kV sub-stations viz Amona amp Cuncolim Telemetry is intermittent from 220 kV Tivim Ponda Xeldam amp 110 kV Kadamba amp Verna Thus Non availability of telemetry from Goa is 100 Goa to resolve the issue on war footing

e DD Telemetry is not available form 1 number of 220 kV sub-station viz Magarwada Thus availability of telemetry from DD is NIL DD representative intimated in 460th OCCM that RTU was being installed at 220 kV Magarwada SS under the new SCADAEMS up gradation project amp it would take 3 months to complete the work DD representative was absent in 461st OCCM so information on progress in this matter is yet to be received from DD DD to expedite the issue for the above station(s) on war footing

f DNH Telemetry is not available form 2 number of 220 kV sub-station viz Kharadpara amp Khadoli Thus availability of telemetry from DNH is NIL DNH representative was absent in 460th amp 461st OCC meetings to comment on the issue DNH to resolve the issue for the above station(s) on war footing

g ISGS As per the latest information submitted to CERC the non-availability of telemetry data from ISGS generating stations as on date is 125 Telemetry is intermittent from 220 kV Kawas(NTPC) station Power Grid NTPC to expedite

23

462nd OCC MINUTES

NTPC amp Power Grid agreed to expedite the matter during 460th amp 461st OCC meetings of WRPC However no progress has been reported

h POWERGRID As per the latest information submitted to CERC the non-availability of telemetry data from Power Grid substations as on date is 111 Telemetry is intermittent from the following ss

o 765 kV Kotra SS o 765 kV Dharamjaigad o 765 kV Tamnar SS o 400 kV Navasari SS

Additional points

a) In the report available on the WRLDC website it is clearly indicated that Communication link between all SLDC to WRLDC is in radial mode (without redundancy) and any failure in any equipment Fibre leads to total data black out Power Grid to ensure that links are on two channels

i IPP As per the latest information submitted to CERC the non-availability of

telemetry data from IPP generating stations as on date is 15 Telemetry is intermittent from Jindal amp Essar Mahan GMR Raipur JPL ESSAR Mahan GMR Raipur to expedite

Additional Points

bull Adani(APL) Tiroda There is only one channel emanating from Adani Tiroda Recently there was a case when entire station was not visible due to non-Availability of that channel

bull CGPL Mundra There is only one channel emanating from CGPL Mundra In case of non-availability of data leads to non-visibility of 4000 MW generation which creates difficulty in Grid Operation

bull Sasan There is only one channel emanating from Sasan In case of non-availability of data leads to non-visibility of 2400 + MW generation which creates difficulty in Grid Operation

bull APL Mundra There is only one channel emanating from CGPL Mundra In case of non-availability of data leads to non-visibility of 4000 + MW generation which creates difficulty in Grid Operation

The above issue was already discussed in 460th OCCM The utilities (APL SASAN CGPL) may kindly update the progress in this matter

24

462nd OCC MINUTES

j PMU data Regarding Satna to WRLDC link WRTS II informed that work is under progress for laying of OPGW from Satna 220 kV (MPPTCL) to Satna 765 kV (PG) and it may take 3-4 monthsrsquo time It was suggested that till such time the OPGW operation is in place WRTS-II may explore leased line connectivity at the earliest Power Grid to expedite

The Sub-Committee noted the same amp agreed to make availability of telemetry in their concerns and the report be updated position in next meeting

The Sub Committee noted the same

10 BLACK OUT AT NTPC KAWAS POWER STATION On 11th July 2014 Kawas Gas generating complex got blackout due to tripping of evacuation lines one by one within a short span of 30 minutes The complete loss of evacuation lines occurred at 0117 Hrs The blackout has resulted in tripping of GT1A GT1B and ST causing 320 MW generation loss in the area It was reported that weather condition was foggy with slight drizzling was in the area

Line Time of Tripping Kawas End Remote

end Restoration Time

220 kV Kawas-Navsari 1 1246 AM R phase to EF Fault location 2 km R Phase to EF 122 AM

220 kV Kawas ndashNavsari 2 112 AM R phase to EF Fault location 2208 km

R Phase to EF 347 AM

220 kV Kawas-Haldarwa 1 107 AM R phase to EF Fault location 16 km

R Phase to EF 246 AM

220 kV Kawas-Haldarwa 2 108 AM R phase to EF Fault location 2 km

R Phase to EF 304 AM

220 kV Kawas-Icchapur 1 108 AM B phase to EF B Phase to EF 301 AM

220 kV Kawas-Icchapur 2 108 AM B phase to EF Fault location 356 km

B Phase to EF 331 AM

220 kV Kawas-Vav 1 117 AM No tripping Hand Tripped later Line Tripped 225 AM

220 kV Kawas Vav 2 117 AM Y Phase to EF Y Phase to EF 317 AM

Even the line restoration has failed on several attempt as the lines were not holding due to persisting fault Such an event of total loss of evacuation lines from a generating station resulting in blackout scenario is a matter of serious concern Representative from WRTS-II stated that being highly industrial corridor the said lines are suffering with smog and informed that they are in process of replacement of existing insulator with polymer type insulators Order has been already placed amp it may be completed within next two to three month The Sub Committee noted the same

25

462nd OCC MINUTES

11 OPERATING PROCEDURE OF WR-2014 As discussed in 460th OCCM of WRPC the operating procedure of Western Region 2014 has been updated on 31072014 and the same has been uploaded on WRLDC web site at the following link httpwwwwrldccomdocsWR_OPERATING_PROCEDURE_2014pdf

The Sub Committee noted the same 12 MOCK BLACK START EXERCISE

MP representative informed that DG set at Bargi will be ready within a week time amp mock black start exercise can be performed in October 2014

NTPC Gandhar has successfully performed the mock black start exercise on 27072014

The Sub Committee noted the same

13 REVIEW OF LIST OF FEEDERS IDENTIFIED FROM ISGS LEVEL IN CASE OF

THREAT OF GRID SECURITY DUE TO LARGE DEVIATION

During the 461st OCC it was decided that list of feeders identified for load

control under emergency measure for safeguarding grid security would be

reviewed in a special meeting The list is yet to be reviewed GM WRLDC

requested SLDC to review the same amp submit Till such time the existing list will

continue

The Sub Committee noted the same 14 IMPLEMENTATION OF VOLTAGE AND TIME GRADING ON OV RELAYS TO

PREVENT TRIPPING OF MULTIPLE EHV LINES EMANATING FROM SINGLE NODE ON HIGH VOLTAGE

During the 461st OCC it was informed by Power Grid representative that they have already implemented voltage grading in various line emanating from the same node (matter has not come in the MoM) Power Grid amp other utilities may kindly intimate the present status of voltage grading at their respective sub-stations Member Secretary WRPC suggested to take the matter in PCM

The Sub Committee noted the same

26

462nd OCC MINUTES

15 INADEQUATE PARTICIPATION OF GENERATORS ENVISAGED SPS FOR SR-NEW GRID OPERATION

The details of SPS operation from 1st July 2014 till 6th August 2014 is as under

Sl No Date SPS No Condition 1 01 July 2014 SPS-1 613 SholapurRaichur DC gt1000 MW 2 01 July 2014 SPS-1 1752 SholapurRaichur DC gt1000 MW 3 04 July 2014 SPS-1 0406 SholapurRaichur DC gt1000 MW 4 09 July 2014 SPS-1 350 SholapurRaichur DC gt1000 MW 5 14 July 2014 SPS-1 506 SholapurRaichur DC gt1000 MW 6 17 July 2014 SPS-1 2204 SholapurRaichur DC gt1000 MW 7 23 July 2014 SPS-1 547 SholapurRaichur DC gt1000 MW 8 26 July 2014 SPS-1 1201 SholapurRaichur DC gt1000 MW 9 30 July 2014 SPS-1 902 SholapurRaichur DC gt1000 MW 10 30 July 2014 SPS-1 1954 SholapurRaichur DC gt1000 MW

During the last OCC the matter was discussed and it was suggested by Member Secretary WRPC to have Special Protection Sub-Committee meeting to discuss progress of implementation of the revised SPS at Solapur (for WR-SR interconnection) amp extension of signal from Solapur to additional generators in WR so as to address the issue of inadequate participation of WR Member Secretary WRPC requested to all generators who are having more than one units shall participate in implementation of SPS for SR-NEW grid operation

The Sub-committee noted the same ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING OCC reviewed the meeting roaster and finalized sheet is enclosed at Annexure-10

Due to non-readiness of BDTCL to host the next meeting NTPC KawasGandhar

would host the 463rd OCC meeting The exact date amp venue details will be intimated

separately

SlNo Organisation Name amp Designation E-mail Mobile

I WRPC1 Shri SD Taksande MS ms-wrpcnicin 98208783842 Shri Satyanarayan S opc-wrpcnicin 92233999383 Shri LKS Rathore DD lksr_2000yahoocom 98333718444 Shri Ratnesh Kumar Yadav AD ratneshkumar7437gmailcom 8903929150

II MSETCL MSEDCLMahaGenco5 Shri VD Pande EE vasantpandemahasldcin 98207419416 Shri Ajit V Pachori EE ajitpachorimahagencocoin 9619461420

III MPPTCL MPPGCL7 Shri KK Prabhakar SE sldcmpjbpyahoocom 94258052678 Shri SK Mehta EE mehtasanjay67yahooin 9425805017

IV CSPTCL CSPGCL9 Shri BR Soni Addl CE balramsonirediffmailcom 942518880710 Shri Arvind Mukherjee gccraipurgmailcom 9429227699

V GETCO GSLDC GSECL11 Shri BB Mehta CE cesldcgujgmailcom 987920073612 Shri BM Shah DyEE demissldcgetcogebmailcom 9925212836

VI WRLDC POWERGRID13 Shri P Mukhopadhyay GM prithwishmukhopadhyayposocoin 986943807314 Shri VK Shrivastava AGM vkspowergridindiacom 986945022115 Smt Sachala Mishra CM mishrasachalagmailcom 986945022316 Smt Pushpa S CM pushpa_seshadrihotmailcom 986940448217 Shri Aditya P Das Dy Mgr aditya19227gmailcom 9869404569

POWERGRID REGION-I18 Shri Anil Darode 70207powergridindiacom 942230180519 Shri Manu Sinha 02457powergridindiacom 9425293864

POWERGRID RETION -II20 Shri Abhinav Verma stawr2gmailcom 942850406221 Shri Anand Dubey ananddubey_pgrediffmailcom 9428504065

VII NTPC22 Shri PB Behre GM pbbeherentpccoin 900449708823 Shri Hari Nath AGM harinath01ntpccoin 900449713324 Shri SK Shrivastava AGM sksrivastava09ntpccoin 942517806925 Shri Amir Kr Singh SM aksingh01ntpccoin 942414081426 Shri Amitabh Kumar amitabhkumarntpccoin 9425178122

VIII TATA POWER27 Shri RM Sankhe GM rmsankhetatapowercom 909900654128 Shri PR Gadave AGM prgadavetatapowercom 9223553341

IX NHDC 29 Shri Anurag Seth CE annu226hotmailcom 9425326135

LIST OF PARTICIPANTS OF 462nd OCC MEETING OF WRPC HELD ON 11082014 AT TARAPURAnnexure-I

30 Shri Vinod Kumar Singh vinodnhdcrediffmailcom 9425925251

X APL 31 Shri CS Bobade GM chandrashekharbobadeadanicom 8980802255

XI RINFRA32 Shri SG Zirpe GM sachinzirperelianceadacom 932260763033 Shri Sanil C Namboodiripad sanilnamboodiripadrelianceadacom932104697434 Shri Subrata Das subratakudasrelianceadacom 932093072235 Shri Ishan Roy Asst Mgr ishanroyrelianceadacom 9860027348

XII KSK Mahanadi36 Shri Sudarshan B Reddy sudarshanreddybkskcoin 9000377721

XIII NPCIL37 Shri Mandeep mandeepnpcil 904991887038 Shri JS Choubey jschoubeynpcilcoin 942882191839 Shri Ritesh Chandra Singh rcsinghnpcilcoin 8007991744

XIV ESSAR 40 Shri OJ Saxena Sr Mgr osaxenaessarcom 987910126841 Shri Kamlesh Garg kamleshgargessarcom 987910284942 Shri Sarabjeet Singh sarabjeetsinghessarcom 750957010543 Shri Ashwin Ande ashwinandeessarcom 9909993594

XV JPL44 Shri RK Srivastava AGM rkshrivastavajindalpowercom 9329445016

XVI TORRENT POWER45 Shri Kamal K Vyas kamalvyastorrentpowercom 997407965746 Shri Pramod G Patel AGM pramodpateltorrentpowercom 9824370005

XVII NCA47 Shri Naveen Nath Das emc_ncarediffmailcom 9425053309

XVIII STERLITE GRID LTD48 Shri Sachin S Deshpande GM sachindeshpandesterlitecom 8966903047

XIX LANCO AMARKANTAK POWER LTD49 Shri BN Panda pandabnlancogroupcom 769770301550 Shri Anil Sharma anilshlancogroupcom 9560258009

XX KWPCL51 Mis Smruti R Nayak DGM smrutinayakavanthapowercom 9424176680

XXI MB POWER LTD 52 Shri Sandeep Kumar Gupta sandeepguptahpplin 9582896418

Anaulagnak 21

maah jaUlaa[- 2014

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5020 Hz BETWEEN 1700 Hrs amp 1800 Hrs Hrs ON 27072014

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4962 Hz BETWEEN 1900 Hrs amp 2000 Hrs Hrs ON 25072014

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4993 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5036 Hz AT 130344 Hrs ON 23072014

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4939 Hz AT 194315 hrs Hrs ON 25072014

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS JULY 2014 JUNE 2014 MAY 2014

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 008 023 000

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 314 476 093 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 3129 3216 2155 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 5016 4536 5319

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1533 1749 2433

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING JULY 2014

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

Voltage Profile during the month of July 2014

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 420 402 420 404 433 411 424 424 417 400 420 403 422 407 408 3902 417 398 420 400 431 407 424 424 417 401 427 418 421 409 410 3943 417 393 419 397 432 408 420 396 417 400 425 419 422 408 407 3934 416 398 419 401 434 412 422 402 417 400 426 421 418 406 411 3965 417 400 419 403 433 414 424 424 417 403 424 419 417 406 410 3996 420 406 422 408 438 411 421 402 419 407 427 421 422 412 409 3897 412 396 419 402 428 413 420 399 414 401 423 419 417 409 409 3968 418 400 421 410 433 400 424 400 416 400 425 419 422 400 410 3949 418 412 421 410 433 413 424 410 416 408 425 419 422 412 410 394

10 415 399 417 403 435 415 400 400 418 404 424 421 422 414 410 41111

स नक Annex-23

िभलाईBhilai

धल असोज कासोरKarad Dhule Asoj Kasor

इदौर इटारसी कराडIndore Itarsi

जतपरJetpur

11 416 402 423 407 436 416 422 407 416 405 425 421 423 413 410 39712 419 400 422 406 436 417 400 400 419 403 426 422 423 413 410 39713 415 400 422 410 437 417 400 400 417 406 425 421 422 414 411 39514 416 398 423 409 439 416 400 400 419 404 424 421 422 413 412 39815 420 403 423 408 437 413 428 401 418 404 426 422 423 413 410 39816 423 408 426 411 437 413 429 403 421 406 428 424 423 415 413 40017 421 404 424 407 436 416 400 400 419 408 423 414 423 414 411 39818 421 404 424 407 436 416 400 400 420 406 427 423 423 414 411 39819 423 407 425 410 434 415 425 411 424 405 428 425 424 416 422 39520 421 407 424 410 420 420 427 410 421 407 427 424 423 416 417 39621 421 406 424 411 420 420 400 400 420 402 428 425 426 418 413 39222 421 407 426 413 420 420 400 400 419 401 428 425 428 420 412 39623 422 409 427 410 419 415 415 402 420 403 425 419 428 420 412 39624 420 406 425 409 420 420 400 400 420 404 429 426 427 416 409 39625 422 401 421 404 420 420 400 400 424 402 428 424 423 415 415 39726 420 402 421 406 431 419 400 400 422 403 428 423 422 413 415 40027 417 404 422 407 434 416 423 407 421 405 428 424 422 413 416 40128 419 403 421 407 437 416 431 408 423 406 428 426 423 415 415 40229 419 403 420 408 437 415 400 400 421 406 429 426 423 416 415 39930 421 404 422 406 438 415 400 400 423 404 430 426 426 415 420 40331 420 395 420 402 431 406 428 403 422 403 429 425 423 414 419 398

423 393 427 397 439 400 431 396 424 400 430 403 428 400 422 389

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 418 404 411 395 423 406 430 406 789 752 788 757 787 756 791 7662 419 397 411 393 423 403 431 404 772 748 791 756 786 750 793 7553 416 402 411 397 421 397 425 399 772 748 780 751 781 757 791 7634 417 404 409 396 420 415 428 406 772 748 786 757 780 755 791 7655 418 404 418 400 421 404 427 407 772 748 796 755 796 765 802 7726 419 408 416 402 424 410 429 413 789 752 797 768 796 765 799 7757 414 406 407 397 420 403 426 407 789 752 776 758 777 757 784 7658 418 408 411 388 422 400 429 400 789 752 786 767 783 746 790 7719 412 401 403 386 422 405 429 408 789 752 781 761 772 745 783 76010 413 403 402 394 420 404 424 406 789 752 792 764 774 755 785 765

Bina Gwalior Nagda Khandwa Sipat

बना वािलयरिसविननागदावािलयर बनाBina

िसपतखडवाseoni Gwalior

10 413 403 402 394 420 404 424 406 789 752 792 764 774 755 785 76511 415 407 403 395 421 407 426 410 789 752 790 774 785 758 790 77212 418 406 407 392 422 404 427 404 789 752 796 769 784 756 796 76913 418 406 407 392 421 408 427 411 789 752 796 769 784 756 796 76914 419 410 409 397 423 406 428 409 789 752 784 768 786 763 792 77415 419 404 408 391 424 407 429 408 789 752 789 763 786 750 791 76416 424 414 408 400 427 411 431 413 789 752 792 766 785 767 797 77917 421 410 411 399 424 407 432 409 789 752 788 762 789 766 795 77618 423 412 414 396 424 407 432 409 789 752 783 770 796 765 801 77719 424 411 410 396 426 411 431 413 789 752 791 770 788 764 803 77720 425 411 411 396 424 410 428 414 789 752 786 763 789 760 800 77221 422 412 410 395 424 409 428 413 789 752 784 760 788 763 796 77522 423 416 414 402 424 410 429 414 789 752 791 774 794 773 801 78423 425 413 418 402 424 410 430 412 787 750 785 770 798 780 804 78324 422 411 411 397 425 409 431 415 789 752 790 772 791 773 801 78125 421 410 405 396 423 403 429 409 789 752 784 770 794 767 798 77726 421 410 409 395 423 404 427 409 789 752 792 773 789 767 799 77827 423 412 413 399 420 404 428 409 789 752 794 766 797 770 808 78028 422 411 411 399 421 405 428 410 789 752 789 763 794 770 793 77029 419 409 411 397 423 406 430 414 789 752 794 771 795 767 796 77430 422 409 413 398 420 404 430 413 788 753 796 766 799 766 799 77331 420 404 409 395 421 397 429 411 789 752 787 764 792 759 795 767

425 397 418 386 427 397 432 399 789 748 797 751 799 745 808 755

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Jul-14 0 0 0 0 0 0 0 02 02-Jul-14 0 0 0 0 0 0 0 03 03-Jul-14 0 0 0 0 0 0 0 04 04-Jul-14 0 0 0 0 0 0 0 05 05-Jul-14 0 0 0 0 0 0 0 06 06-Jul-14 1 67 0 0 0 0 0 07 07-Jul-14 0 0 0 0 0 0 0 08 08-Jul-14 1 278 0 0 0 0 0 09 09-Jul-14 0 0 0 0 0 0 0 0

10 10-Jul-14 1 565 0 0 0 0 0 011 11-Jul-14 0 0 0 0 0 0 0 012 12-Jul-14 0 0 0 0 0 0 0 013 13-Jul-14 3 758 0 0 0 0 0 014 14-Jul-14 0 0 0 0 0 0 0 015 15-Jul-14 0 0 0 0 0 0 016 16-Jul-14 2 2127 NIL NIL NIL 017 17-Jul-14 0 0 0 0 0 0 0 018 18-Jul-14 1 08 0 0 0 0 0 019 19-Jul-14 0 0 0 0 0 0 0 020 20-Jul-14 0 0 0 0 0 0 0 021 21-Jul-14 0 0 0 0 0 0 0 022 22-Jul-14 0 0 0 0 0 0 0 023 23-Jul-14 0 0 0 0 0 0 0 024 24-Jul-14 0 0 0 0 0 0 0 025 25-Jul-14 0 0 0 0 0 0 0 026 26-Jul-14 0 0 0 0 0 0 0 027 27-Jul-14 0 0 0 0 0 0 0 028 28-Jul-14 0 0 0 0 0 0 0 029 29-Jul-14 0 0 0 0 0 0 0 030 30-Jul-14 0 0 0 0 0 0 0 031 31-Jul-14 0 0

Max 3 758 0 0 0 00 0 0Total 9 24917 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month July 2014

Recommonded Load relief at 492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE 25

POWER CUTRESTRICTIONS IN WESTERN REGION FOR THE MONTH OF JULY-2014

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply(DLF)

01072014 31072014 2343 2105 2300

21 Three-Phase Supply(Irrigation)

01072014 31072014 0953 0857 0933

21 Three-Phase Supply(Mixed)

01072014 31072014 2339 2055 2240

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01072014 31072014 2353 2325 2344 32 District Head Qtrs 01072014 31072014 2357 2330 2348 33 Tehsil Head Qtrs 01072014 31072014 2350 2230 2319

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 010714 to 310714

SaUnya Nil

0-470 MW

SaUnya Nil

0000

SaUnya Nil 2400

SaUnya Nil

19 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs) 21 Three-Phase Supply 01072014 31072014 1000 0800 0900

22 Single-Phase Supply 01072014 31072014 1800 1800 1800 3 Anya jaanakarI Any other information There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

8860 (Av) of 31days 0000(Av) 0000 (Av)

1Rural 7109(Av) for 23447 Hrs 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0532 - -

0537 -

3 HT Industries 8261 (Av) for 17270 Hrs 0357 Total Energy Cutday 1426 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01072014 to 310714 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 3172014 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil ca gaaovaa Goa SaUnya Nil

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-26 Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai अिनवाय यिनट आऊटज का जलाई2014का वःता रत यौरा

Details of forced unit outages during the month ofJuly2014

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 एःसार Essar-2

गरा विनिल GSECL

172 1212 22-Feb-13 अनपल ध Still out

अनपल ध Still out

Shortage of gas

2 यट पीएस UTPS-2

गरा विनिल GSECL

120 1951 17-Jun-14 अनपल ध Still out

अनपल ध Still out

Turbine tripped(RSD)

3 एःसार व डनार Essar vadinar-1

गरा विनिल GSECL

600 2335 3-Jul-14 1324 22-Jul-14 Coal shortage

4 डब यट पीएस WTPS-6

गरा विनिल GSECL

210 953 10-Jul-14 0707 14-Jul-14 BTL

5 एसट पीएस STPS-1

गरा विनिल GSECL

120 1220 10-Jul-14 0710 14-Jul-14 BTL

6 जीआईपीसीएल GIPCL-STG I-2

गरा विनिल GSECL

165 1744 14-Jul-14 अनपल ध Still out

अनपल ध Still out

C ampI problem

7 एएलट पीएस ALTPS-1

गरा विनिल GSECL

120 107 15-Jul-14 2037 19-Jul-14 BTL

8 िस का ट पीएस SIKATPS-1

गरा विनिल GSECL

120 1330 17-Jul-14 अनपल ध Still out

अनपल ध Still out

RSD

9 डब यट पीएस WTPS-4

गरा विनिल GSECL

210 858 18-Jul-14 अनपल ध Still out

अनपल ध Still out

RSD

10 डब यट पीएस WTPS-3

गरा विनिल GSECL

210 1046 18-Jul-14 अनपल ध Still out

अनपल ध Still out

RSD

11 डब यट पीएस WTPS-5

गरा विनिल GSECL

210 1818 18-Jul-14 000 21-Jul-14 RSD

12 डब यट पीएस WTPS-6

गरा विनिल GSECL

210 447 19-Jul-14 अनपल ध Still out

अनपल ध Still out

RSD

13 यट पीएस UTPS-3

गरा विनिल GSECL

200 1055 26-Jul-14 2328 1-Aug-14 RSD

14 एपीएल APL-6

अदानी ADANI

660 2146 5-Jul-14 1105 2-Aug-14 Heavy hydrogen leakage

15 एपीएमएल APML-4

अदानी ADANI

660 1132 10-Jul-14 1407 23-Jul-14 Coal shortage

16 एपीएल APL-1

अदानी ADANI

330 117 20-Jul-14 612 23-Jul-14 RSD

प म ऽय भार षण कि म बई णाली चालन-ISO-I

17 एपीएल APL-8

अदानी ADANI

660 2018 18-Jul-14 2209 21-Jul-14 BTL

18 एपीएल APL-2

गरा विनिल GSECL

330 0913 26-Jul-14 1714 29-Jul-14 Air pre heater problem

19 एपीएल APL-5

गरा विनिल GSECL

660 1910 29-Jul-14 1533 2-Aug-14 Heavy steam leakage

20 डब यपीसीएल WPCL-1

मारा वउकिल MSPGCL

135 1245 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Furnace press high

21 डब यपीसीएल WPCL-4

मारा वउकिल MSPGCL

135 001 3-Apr-14 2347 11-Jul-14 Less schedule

22 कोराड Koradi-5

मारा वउकिल MSPGCL

200 1030 17-Jun-14 अनपल ध Still out

अनपल ध Still out

ID fan bearing temperature high

23 इ डयाबल Indiabulls - 1

मारा वउकिल MSPGCL

270 546 26-Jun-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

24 पल Parli -4

मारा वउकिल MSPGCL

210 1019 29-Jun-14 अनपल ध Still out

अनपल ध Still out

water shortage

25 भसावल Bhusawal-2

मारा वउकिल MSPGCL

210 1117 6-Jul-14 544 10-Jul-14 Coal problem

26 चिपर Chandrapur-1

मारा वउकिल MSPGCL

210 2211 8-Jul-14 2106 13-Jul-14 BTL

27 चिपर Chandrapur-3

मारा वउकिल MSPGCL

210 2216 14-Jul-14 1452 18-Jul-14 Safety valve problem

28 उरण Uran-6 मारा वउकिल MSPGCL

108 1634 15-Jul-14 1407 22-Jul-14 Gas shortage

29 उरण Uran -5 मारा वउकिल MSPGCL

108 2338 17-Jul-14 1125 24-Jul-14 For rotor balancing work

30 उरण Uran -A0 मारा वउकिल MSPGCL

120 2340 17-Jul-14 2315 23-Jul-14 For rotor balancing work

31 भसावल Bhusawal-2

मारा वउकिल MSPGCL

210 2346 18-Jul-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

32 खापरखड़ा Khaparkeda-3

मारा वउकिल MSPGCL

210 1036 20-Jul-14 041 29-Jul-14 Flame failure

33 जयगड Jaigad-2 मारा वउकिल MSPGCL

300 000 20-Jul-14 Ready Ready Less requisition

34 वीआईपीएल VIPL-2

मारा वउकिल MSPGCL

300 2302 20-Jul-14 1716 26-Jul-14 Coal feeding problem

35 एपीएमएल APML-3

मारा वउकिल MSPGCL

660 0444 22-Jul-14 044 26-Jul-14 Pressure release valve operated

36 भसावल Bhusawal-4

मारा वउकिल MSPGCL

500 003 23-Jul-14 151 29-Jun-14 BTL

37 वीआईपीएल VIPL-1

मारा वउकिल MSPGCL

300 015 23-Jul-14 1300 31-Jul-14 Coal feeding problem

38 उरण Uran -8 मारा वउकिल MSPGCL

108 730 26-Jul-14 1700 29-Jul-14 Gas shortage

39 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 347 29-Jul-14 638 4-Aug-14 BTL

प म ऽय भार षण कि म बई णाली चालन-ISO-I

40 पल PARLI-5 मारा वउकिल MSPGCL

210 002 30-Jul-14 अनपल ध Still out

अनपल ध Still out

Water shortage

41 टाटा TATA-8

टाटा TATA

250 2255 9-Jan-14 अनपल ध Still out

अनपल ध Still out

HT due to fire near turbine generator desk

42 टाटा TATA-6

टाटा TATA

500 2134 31-Jul-14 Ready Ready Less requisition

43 आरजीपीपीएल RGPPL-3A

आरजीपीपीएल RGPPL

320 1857 17-Apr-14 Ready Ready Less requisition

44 आरजीपीपीएल RGPPL-2B

आरजीपीपीएल RGPPL

320 1915 17-Jun-14 अनपल ध Still out

अनपल ध Still out

Raw water problem

45 आरजीपीपीएल RGPPL-2A

आरजीपीपीएल RGPPL

320 1615 25-Jun-14 1200 21-Jul-14 Less requisition

46 आरजीपीपीएल RGPPL-1A

आरजीपीपीएल RGPPL

320 1330 8-Jul-14 Ready Ready Less requisition

47 अमरकनटक Amarkantak-4

म वउकिल MPPGCL

120 1113 30-Apr-14 अनपल ध Still out

अनपल ध Still out

TURBINE BEARING VIBRATION HIGH

48 सातपरा Satpura-6

म वउकिल MPPGCL

200 305 18-Jun-14 अनपल ध Still out

अनपल ध Still out

BTL

49 एसजीट पीएस SGTPS-3

म वउकिल MPPGCL

210 617 26-Jun-14 020 26-Jul-14 Conveyer belt problem

50 अमरकनटक Amarkantak-3

म वउकिल MPPGCL

120 1640 2-Jul-14 1623 11-Jul-14 BTL

51 सातपरा Satpura-9

म वउकिल MPPGCL

210 2200 5-Jul-14 855 15-Jul-14 Condenser tube cleaning

52 सातपरा Satpura-9

म वउकिल MPPGCL

210 1310 15-Jul-14 845 24-Jul-14 BTL

53 एसजीट पीएस SGTPS-4

म वउकिल MPPGCL

210 2233 19-Jul-14 1252 4-Aug-14 Coal shortage

54 सातपरा Satpura-7

म वउकिल MPPGCL

210 225 21-Jul-14 545 24-Jul-14 BTL

55 सातपरा Satpura-10

म वउकिल MPPGCL

250 2316 22-Jul-14 07082014 High vibration in generator winding

56 एसजीट पीएस SGTPS-3

म वउकिल MPPGCL

210 1857 28-Jul-14 1020 2-Aug-14 Drum level low

57 DSPM(K(E) extn)-2

छरा वउकिल CSPGCL

250 2310 21-Jul-14 2029 22-Jul-14 Coal shortage

58 कोरबा पव Korba(E)-3

छरा वउकिल CSPGCL

210 1030 22-Jul-14 1025 27-Jul-14 CTL

59 कोरबा पव Korba(E)-5

छरा वउकिल CSPGCL

120 1345 22-Jul-14 1140 26-Jul-14 Wet coal problem

60 कोरबा पव Korba(E)-5

छरा वउकिल CSPGCL

120 2320 30-Jul-14 155 2-Aug-14 Coal shortage

61 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

62 एःसार महान Essar-Mahan-1

एःसारESSAR 600 014 22-Jun-14 1255 11-Jul-14 Less schedule

63 एःसारमहानEssar Mahan-1

एःसार ESSAR 600 620 16-Jul-14 1252 28-Jul-14 Withdrawn due to tripping of evacuation

प म ऽय भार षण कि म बई णाली चालन-ISO-I

Lines

64 सीजीपीएल CGPL-50

सीजीपीएल CGPL

830 948 13-Jun-14 409 23-Jul-14 Ash hopper refractory damage

65 सीजीपीएल CGPL-10

सीजीपीएल CGPL

830 1332 1-Jul-14 1952 9-Jul-14 BTL

66 सीजीपीएल CGPL-20

सीजीपीएल CGPL

800 1214 24-Jul-14 13-aug-14

Bottom ash Hopper works

67 सीजीपीएल CGPL - 40

सीजीपीएल CGPL

830 1918 26-Jul-14 1020 2-Aug-14 GT electrical fault

68 जपीएल JPL STG-2 UNIT-1

जपीएल JPL 600 051 26-Jun-14 अनपल ध Still out

अनपल ध Still out

Turbine vibration

69 जपीएलJPL STG-2 UNIT-2

जपीएलJPL 600 000 5-Jul-14 1457 11-Jul-14 Less requisition

70 जपीएल JPL STG-2 UNIT-2

जपीएलJPL 600 748 21-Jul-14 1800 24-Jul-14 BTL

71 एसीबीआईएल ACBIL-1

एसीबीआईएल ACBIL

135 151 6-Jul-14 1753 9-Jul-14 Furnace draft high

72 ससान Sasan -3 आरईएल REL 660 1648 15-Jul-14 2248 4-Aug-14 Ash evacuation problem

73 ससान Sasan-4 आरईएल REL 660 1645 24-Jul-14 810 3-Aug-14 High press main steam tripped

74 एमको EMCO-I एमको EMCO 200 109 16-Jul-14 अनपल ध Still out

अनपल ध Still out

Turbine vibration high

75 एसीबीआईएल ACBIL-2

एसीबीआईएल ACBIL

135 1955 21-Jul-14 601 24-Jul-14 Furnace draft high

76 मौदा Mouda -1

एनट पीसीNTPC 500 1630 18-Jun-14 2042 14-Jul-14 Flame failure

77 कावास Kawas-1C

एनट पीसीNTPC 116 2311 2-Jul-14 2100 6-Jul-14 Heavy steam leakage from stop valve

78 कावास Kawas-1B

एनट पीसीNTPC 106 2323 2-Jul-14 632 7-Jul-14 Less requisition

79 कावास Kawas-2B एनट पीसीNTPC 164 1704 10-Jul-14 Ready Ready Less requisition

80 कावास Kawas-1A एनट पीसीNTPC 164 1200 12-Jul-14 745 22-Jul-14 Less requisition

81 वीएसट पीएस VSTPS-11

एनट पीसीNTPC 500 1204 13-Jul-14 000 16-Jul-14 Coal shortage

82 गाधारGandhar-1 एनट पीसीNTPC 144 149 16-Jul-14 1807 21-Jul-14 Less requisition

83 कावास Kawas-1B एनट पीसीNTPC 164 1027 18-Jul-14 442 23-Jul-14 Less requisition

84 मौदा Mouda-1 एनट पीसीNTPC 500 000 18-Jul-14 1745 24-Jul-14 Less requisition

85 िसपतSipat-1 एनट पीसीNTPC 660 000 21-Jul-14 955 24-Jul-14 Generator H2 gas leakage

86 गाधार Gandhar-3

एनट पीसीNTPC 144 1607 21-Jul-14 अनपल ध Still out

अनपल ध Still out

BB protection operatedatJhanor

87 गाधार Gandhar-4(ST)

एनट पीसीNTPC 224 1607 21-Jul-14 1320 26-Jul-14 BB protection operatedatJhanor

88 ट स TAPS-1

एनट पीसीNTPC 160 2227 21-Jul-14 1407 26-Jul-14 Maintenance

89 गाधार एनट पीसीNTPC 144 507 22-Jul-14 Ready Ready Less requisition

प म ऽय भार षण कि म बई णाली चालन-ISO-I

Gandhar -1

90 मौदा mouda-2 एनट पीसीNTPC 500 915 23-Jul-14 315 31-Jul-14 Coal feeding problem

91 कावास Kawas-1A

एनट पीसीNTPC 106 608 24-Jul-14 1309 27-Jul-14 Less requisition

92 गाधार Gandhar-2

एनट पीसीNTPC 144 2036 26-Jul-14 100814 Less requisition

93 वीएसट पीएस VSTPS-2

एनट पीसीNTPC 210 500 27-Jul-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

94 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 748 27-Jul-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

95 मौदा Mouda-2 एनट पीसीNTPC 500 315 31-Jul-14 210 3-Aug-14 Less requisition Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का जलाई2014 का वःता रत यौरा

Details of planned unit outages during the month of July2014 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

सo From

समय दनाक

कारण Reason

Time Date Time Date

1 एसएलपीपी SLPP-2

गरा विनिल GSECL

125 045 23-Jun-14 NA 17-Jul -14 AOH

2 डब यट पीएस WTPS-5

गरा विनिल GSECL

210 000 21-Jul-14 29-0814 COH

3 यट पीएस UTPS-4

गरा विनिल GSECL

200 000 21-Jul-14 240814 AOH

4 एसएलपीपी SLPP-3

गरा विनिल GSECL

125 130 22-Jul-14 060814 AOH

5 यट पीएस UTPS-1

गरा विनिल GSECL

120 000 29-Jul-14 28814 AOH

6 पल ParlI-3

मारा वउकिल MSPGCL

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

Water supply problem

7 चिपर Chandrapur-7

मारा वउकिल MSPGCL

500 600 19-Jun-14 1124 2-Aug-14 AOH

8 नािसक NASIK -3

मारा वउकिल MSPGCL

210 1410 10-Jul-14 अनपल ध Still out

100814 AOH

9 कोरबा प म Korba(W)-2

छरा वउकिल CSPGCL

210 936 26-Jun-14 140814 AOH

10 वदनाVandana-I वदना VANDANA 135 1940 17-Jul-14 अनपल ध Still out

अनपल ध Still out

ETL

11 वीएसट पीएस VSTPS-8

एनट पीसीNTPC 500 012 1-Jun-14 253 13-Jul-14 AOH

12 कएसट पीएस KSTPS-4

एनट पीसीNTPC 500 2335 20-Jun-14 180814 COH

13 कावास Kawas-2A

एनट पीसीNTPC 106 000 27-Jun-14 260814 RampM works

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

11 Akrimota 1 125 4-Aug-14 14-Aug-14 AOH12 WTPS 2 210 5-Aug-14 3-Sep-14 AOH13 SLPP 1 125 16-Aug-14 4-Sep-14 AOH14 DGB 1 107 20-Aug-14 27-Aug-14 CI15 GIPCL-I GT-3 48 22-Aug-14 27-Aug-14 HGPI16 GIPCL-I GT-2 48 29-Aug-14 3-Sep-14 HGPI17 GIPCL-I GT-2 48 12-Aug-14 24-Aug-14 HGPI18 UTPS 3 200 19-Aug-14 12-Sep-14 AOH19 GTPS 2 120 25-Aug-14 14-Sep-14 AOH110 STPS 1 120 19-Aug-14 30-Aug-14 AOH111 GTPS 3 210 24-Aug-14 13-Sep-14 AOH112 APL 9 660 1-Sep-14 20-Sep-14 AOH

221 SGTPS 4 210 010914 250914 AOH3 Craiva]kMila CSPGCL

31 Korba East-6 6 120 21-Aug-14 13-Sep-14 AOH32 Korba East-1 1 50 15-Aug-14 1-Sep-14 AOH33 Korba East-3 3 50 21-Aug-14 30-Sep-14 AOH34 Korba West-1 1 210 12-Sep-14 27-Sep-14 COH35 Korba West-5 5 500 15-Aug-14 30-Aug-14 AOH

4

41 PARAS 3 250 20914 151014 AOH42 RELIANCE 2 250 140814 160814 TURBINE VIBRATION

5 koMd``Iya xao~ Central Sector

51 SIPAT 1 600 050914 191014 BLR OH + HPT + IPT+LPT + GEN

52VINDHYACHAL

5 500 120814 200914 CAP+TG PED CKG+GEN+BLR CHEM CLNG+ESP RampM

53VINDHYACHAL

9 500 120814 150914 BLR OH + HPT + IPT+ GEN

54VINDHYACHAL

11 500 160714 170814 AOH

55CGPL

30 800 150814 050914 Bottom ash hopper Refractory repair and General maintainance work

56 CGPL 40 800 060914 300914 UT 40B repair work57 NSPCL 1 250 200814 110914 AOH

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING AUGUST 2014 AND SEPTEMBER 2014

Capacity Outage as per Annual Maintenance Plan

Date Time Date Time

1 400 400KV BUS-I at Bilaspur Ss 14-Aug-14 900 14-Aug-14 1800 DAILY For bus bar stability of LANCO bays amp jumpering work WRTS-I LANCO C

2 400kV 50 MVAR Bus Reactor-2 at Itarsi SS 14-Aug-14 800 15-Oct-14 1800 Continuo

us Installation of 125MVAR reactor WRTS-II WRTS-II C

3 765 Satna-Gwalior2 14-Aug-14 800 17-Aug-14 1800 DailyCompletion of 765kV Gwalior2 Main Bay Erection amp Testing works at Satna

PGCIL WRTS-II C

4 400 400kV JBP- JBP Pooling 2 Line 14-Aug-14 1000 14-Aug-14 1500 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

5 400 400KV BUS-II at Bilaspur Ss 16-Aug-14 900 16-Aug-14 1800 DAILY For bus bar stability of LANCO bays amp jumpering work WRTS-I LANCO C

6 765 Bus2 at satna 16-Aug-14 800 18-Aug-14 1800 DailyExtension of bus 2 for Gwalior2 bay amp completion of Main Bay Erection

PGCIL WRTS-II C

7 400 Khandwa-Dhule1 16-Aug-14 800 31-Aug-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WR-II C

8 400 Gandahr - Navsari DC 16-Aug-14 800 31-Aug-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WR-II R

PID testing of insulator strings

KV Line From To

Annexure-32

Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

9 400 Navsari - Vapi - Kala 16-Aug-14 800 31-Aug-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WR-II R

10 400 Satna - Bina Ckt 1amp2 16-Aug-14 800 31-Aug-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WR-II R

11 400 80 MVAR Bus Reactor at Kotra 16-Aug-14 900 17-Aug-14 1800 ContinuousTo attend isolator defects WRTS-I PGCIL C

12 400 400kV JBP- JBP Pooling 1 Line 17-Aug-14 1000 17-Aug-14 1500 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

13 765 ICT II at Bina 17-Aug-14 0900 17-Aug-14 1800 Daily Post Commissioning check of Fire-Fighting system at Bina PGCIL WRTS-II C

14 765 Bus-2 at Gwalior 17-Aug-2014 1000 18-Aug-2014 1800 Daily Busbar Jumpering ampStability test related to Bus reactor

POWERGRID WRTS-II C

15 765 Seoni 2 LR(704 LR) at Bilaspur Ss 18-Aug-14 900 18-Aug-14 1500 DAILY For taking Spare LR in service

first time WRTS-I PGCIL C

16 400 Bhadrawati-Ramagundam I 18-Aug-14 800 18-Aug-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

17 400 400kV Vchal - JBP 1 Line 18-Aug-14 1000 18-Aug-14 1200 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

18 400 400kV Vchal - JBP 2 Line 18-Aug-14 1400 18-Aug-14 1600 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

19 400 400KV BUS-II at Bilaspur Ss 19-Aug-14 900 19-Aug-14 1800 DAILY For bus bar stability of LANCO bays amp jumpering work WRTS-I LANCO C

20 400 Bhadrawati-Ramagundam II 19-Aug-14 800 19-Aug-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

21 765 ICT 1 at G alior 19 A g 14 10 00 20 A g 14 18 00 Continou SPARE ICT COMMISSIONING PGCIL WRTS II C21 765 ICT - 1 at Gwalior 19-Aug-14 1000 20-Aug-14 1800 s SPARE ICT COMMISSIONING PGCIL WRTS-II C

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

22 400 400kV JBP- Itarsi 1 Line 19-Aug-14 1000 19-Aug-14 1200 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

23 400 400kV JBP- Itarsi 2 Line 19-Aug-14 1400 19-Aug-14 1600 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

24 400 400 kV Sipat -Ranchi-1 19-Aug-14 900 20-Aug-14 1900 Continous 1 no of CT replacement NTPC NTPC

25 400 BUS-I at Aurangabad(PG) 19-Aug-14 600 20-Aug-14 1800 ContiBus-1 extn for commissioning of 400 kV Boisar-1amp2 bays with 80 MVAR Reactors

WRTS-I WRTS-I C

26 400kV 400kV SUGEN PIRANA Line (Line 2) 19-Aug-14 900 19-Aug-14 1700 Daily Corrective Maintenance of

Transfer Isolator TPL-SUGE TPL-SUG R

27 400kV 400kV PGCIL - PIRANA Feeder No 2 19-Aug-14 900 19-Aug-14 1700 Daily 400kV CT connectors replacementTPL-AHME TPL-AHM R

28 400 Bhadrawati-Parli 1amp 2 19-Aug-14 000 20-Oct-14 1800 DailyFor OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

29 400 Mundra - Jetpur line No1 19-Aug-14 800 19-Aug-14 1200 Daily protection logic checking work PGCIL GETCO30 400 Mundra - Jetpur line No 2 19-Aug-14 1400 19-Aug-14 1800 Daily protection logic checking work PGCIL GETCO

31 400 400KV BUS-I at Bilaspur Ss 20-Aug-14 900 20-Aug-14 1800 DAILY For bus bar stability of LANCO bays amp jumpering work WRTS-I LANCO C

32 400 KSK ndash Raigarh circuit 4 20-Aug-14 900 21-Aug-14 1800 CONT complete PLCC rectification works WRTS-I KSK C

33 HVDC HVDC POLE I AT BHADRAWATI 20 A 14 8 00 21 A 14 18 00 D il AMP WORKS WRTS I WRTS I R33 HVDC HVDC POLE-I AT BHADRAWATI 20-Aug-14 800 21-Aug-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

34 765kV Dharamjaygarh - Durg ckt-2 20-Aug-14 800 22-Aug-14 1800 daily CSD relay commissioning (M+T) WRTS-I PGCIL C

35 765 JBP - BINA 1 at Jabalpur Pooling Station 20-Aug-14 1000 21-Aug-14 1800 Daily Commissioning of CSD Relay for

765KV JBP - BINA Ckt 1 PGCIL WRTS-II C

36 400 Khandwa-Dhule1 20-Aug-14 1000 20-Aug-14 1500 Daily AMP PGCIL WRTS-II R

37 400 Bus-1 at Shujalpur 20-Aug-14 1000 20-Aug-14 1800 Daily AMP PGCIL WRTS-II R

38 400 Bus2 at Satna 20-Aug-14 900 20-Aug-14 1800 Daily For Bus Bar Stability and charging activity of 406 Bay PGCIL WRTS-II C

39 400 Bus1 at Indore 20-Aug-14 900 20-Aug-14 1800 Daily Jumper connection amp stability checking of Pitampur1 PGCIL WRTS-II C

40 400 400kV JBP- Itarsi 3 Line 20-Aug-14 1000 20-Aug-14 1200 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

41 765 Raigarh (Kotra) - Raigarh (Tamnar) 20-Aug-14 900 31-Aug-14 1800 ContinuousFor installation of Bird guards WRTS-I PGCIL C

42 400 Kansari - Kankroli line 20-Aug-14 800 20-Aug-14 1800 Daily PMU installation work and maintenPGCIL GETCO43 400 BUS-2 AT SOLAPUR 21-Aug-14 900 22-Aug-14 1800 Daily Pune bays extension works WRTS-I WRTS-I C

44 765 ICT 1 at Jabalpur Pooling Station 21-Aug-14 1000 21-Aug-14 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus for Spare ICT Phase

PGCIL WRTS-II C

45 400 Bina-Shujalpur1 21-Aug-14 900 21-Aug-14 1000 Daily

For Replacement of 390kV Reactor LA with 336kV LA Line will be taken in service without PGCIL WRTS-II Cj p g g y will be taken in service without Line Reactor at Shujalpur

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

46 400 Khandwa-Dhule2 21-Aug-14 1000 21-Aug-14 1800 DailyFor Replacement of 390kV Reactor LA with 336kV LA At Khandwa amp AMP

PGCIL WRTS-II C

47 220 Damoh-Sagar 21-Aug-14 1000 21-Aug-14 1500 Daily AMP of terminal equipment at Damoh SS MPPTCL WR-II R

48 765 ICT2 at Indore 21-Aug-14 900 22-Aug-14 1800 Continious

For Auxiliary bus erection at Indore PGCIL WRTS-II C

49 400 125MVAr BR at Shujalpur 21-Aug-14 900 21-Aug-14 1800 Daily Differential stability of tie bay (Under commissioning) PGCIL WRTS-II C

50 400 Raipur-Bhadrawati-III 21-Aug-14 900 21-Aug-14 1800 ContinuousBus split at Raipur WRTS-I PGCIL C51 400 Kansari - Bhinmal line 21-Aug-14 800 21-Aug-14 1800 Daily PMU installation work and maintenPGCIL GETCO

52 HVDC HVDC POLE-2 AT BHADRAWATI 22-Aug-14 800 23-Aug-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

53 765 ICT I at Bina 22-Aug-14 0900 23-Aug-14 1800 DailyCommissioning of CSD Relay for 400kV side of ICT- rescheduling of outage

PGCIL WRTS-II C

54 765 JBP - BINA 2 at Jabalpur Pooling Station 22-Aug-14 1000 23-Aug-14 1800 Daily Commissioning of CSD Relay for

765KV JBP - BINA Ckt 2 PGCIL WRTS-II C

55 400 Khandwa-Rajgarh1 22-Aug-14 800 23-Aug-14 1800 PM Continous

Rectification of damaged tower peak at locno83 due to collapse of MPPTCL tower which is under construction

PGCIL MPPTCL C

F j i amp h i th56 400 Pirana-Vadodara-Asoj DC 22-Aug-14 800 23-Aug-14 1800 Daily

For jumpering amp charging the future cirucit of line in multi-circuit towers to prevent conductor theft

PGCIL WRTS-II C

57 220 Damoh-Damoh2 22-Aug-14 1000 22-Aug-14 1500 Daily AMP of terminal equipment at Damoh SS MPPTCL WR-II R

58 400kV 400kV SUGEN VAPI Line 22-Aug-14 900 22-Aug-14 1400 Daily Corrective Maintenance amp Inspection Dropper of 5 Core CT

TPL-SUGE TPL-SUG R

59 765 Bus Reactor Kotra 22-Aug-14 900 23-Aug-14 1800 Daily WRTS-I PGCIL C

60 400 Vindhyachal-Jabalpur3 23-Aug-14 900 23-Aug-14 1800 Daily

For Replacement of 390kV Reactor LA with 336kV LA At Jabalpur Line will remain out of service due to less clearance of Reactor LA from Line conductor

PGCIL WRTS-II C

61 765 ICT1 at Indore 23-Aug-14 900 26-Aug-14 1800 Continious

re routing of cables in CMB for commissioning of spare unit at Indore

PGCIL WRTS-II C

62 765 Bus- 2 at Bina 23-Aug-2014 0900 23-Aug-2014 1800 DailyFor Bus stability required for 765kV Jabalpur 3 Bay- Rescheduling of outage

POWERGRID WRTS-II C

63 765 Bus-1 at Gwalior 24-Aug-14 1000 25-Aug-14 1800 Daily Busbar Jumpering ampStability test related to Jaipur 1 main bay PGCIL WRTS-II C

64 400 Navasari- Kala MC line 25-Aug-14 800 26-Aug-14 1800 DailyConstruction work of Navasari- Boisar line on same Multi ckt WRTS-II WRTS-I Ctower

65 765 765400 AT-1 AT SOLAPUR 25-Aug-14 900 26-Aug-14 1800 Daily Spare ICT unit Aux bus commisioning works WRTS-I WRTS-I C

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

66 220 Korba-Budhipadar Ckt-3 at CSPDCL Korba Ss 25-Aug-14 900 26-Aug-14 1800 DAILY For diversion of line for SE

Railway MCL project WRTS-I PGCIL C

67 765 765KV Bus 1 at Jabalpur Pooling Station 25-Aug-14 1000 25-Aug-14 1800 Daily

765KV Bus 1 Extension for Switchyard Extension for BINA 3 Line Dia

PGCIL WRTS-II C

68 765 765KV ICT 1 at Jabalpur Pooling Station 25-Aug-14 1000 25-Aug-14 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus Isolators for Spare ICT Phase - Heavy Induction

PGCIL WRTS-II C

69 400 Vindhyachal-Jabalpur4 25-Aug-14 900 25-Aug-14 1800 Daily

For Replacement of 390kV Reactor LA with 336kV LA At Jabalpur Line will remain out of service due to less clearance of Reactor LA from Line conductor

PGCIL WRTS-II C

70 400 Bus-I at satna 25-Aug-14 900 25-Aug-14 1800 DailyFor Changing of Jumper from Twin Moose To Quad Moose in 401 bay (jaypee nigrie line-1)

PGCIL WR-II C

71 400 Deepnagar-Thaptitanda 25-Aug-14 900 25-Aug-14 1700 Daily To attend Isolator alignment problem MSETCL MSETCL

72 765 BUS-II and 765 ICT-1 at Aurangabad (PG) 25-Aug-14 600 25-Aug-14 1800 Daily Commissioning of spare ICT unit

at Aurangabad (PG) WRTS-I WRTS-I CAurangabad (PG) at Aurangabad (PG)

73 765 Kotra-durg Ckt-2 along with line reactor 25-Aug-14 900 28-Aug-14 1800 ContinuousReplacement of spacer damper WRTS-I PGCIL C

74 765 Wardha-Aurangabad (PG)-2 and Padge-1 LReactor 26-Aug-14 600 26-Aug-14 1800 Daily Construction of up-coming

Padghe bay at Aurangabad (PG) WRTS-I WRTS-I C

75 765 Gwalior -Bina 1 26-Aug-14 1000 27-Aug-14 1800 Daily Spare reactor commissioning at Gwalior PGCIL WR-II C

76 765 1500MVA ICT 2 at Jabalpur Pooling Station 26-Aug-14 1000 26-Aug-14 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus Isolators for Spare ICT Phase - Heavy Induction

PGCIL WRTS-II C

77 400 Jabalpur-Itarsi4 26-Aug-14 900 26-Aug-14 1800 Daily

For Replacement of 390kV Reactor LA with 336kV LA At Jabalpur Line will remain out of service due to less clearance of Reactor LA from Line conductor

PGCIL WRTS-II C

78 400 Akola ll-Thaptitanda 27-Aug-14 900 27-Aug-14 1900 Daily To attend chattering noise on B-ph wave trap MSETCL MSETCL

79 400 Vapi- Kala MC Line 27-Aug-14 800 28-Aug-14 1800 DailyConstruction work of Navasari- Boisar line on same Multi ckt tower

WRTS-II WRTS-I C

80 765 Bus 1 at Jabalpur Pooling Station 27-Aug-14 1000 27-Aug-14 1800 Daily

765KV Bus 1 Extension Busbar Stability test related to BINA 3 Line Dia

PGCIL WRTS-II C

81 400 KORBA SIPAT 27 Aug 14 600 29 Aug 14 2200 CONT NORMALISED THE LILO AT PGCIL LANCO C81 400 KORBA -SIPAT 27-Aug-14 600 29-Aug-14 2200 RAMPUR PGCIL LANCO C

82 400 TARAPUR-PADGHE II 27-Aug-14 800 28-Aug-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

83 765 Gwalior-Satna1 28-Aug-14 800 28-Aug-14 1800 Daily For spare reactor commissioning works at Gwalior PGCIL WRTS-II C

84 765 BUS-II and Padge-2 LReactor at Aurangabad (PG) 28-Aug-14 600 28-Aug-14 1800 Daily

Commissioning of Padghe-2 upcoming bay at Aurangabad (PG)

WRTS-I WRTS-I C

85 765 Bilaspur 1 Main bay (710) at Seoni 28-Aug-14 800 29-Aug-14 1800 Daily AMP works WRTS-I WRTS-I R

86 765 765400 AT-2 AT SOLAPUR 28-Aug-14 900 28-Aug-14 1800 Daily Spare ICT unit Aux bus commisioning works WRTS-I WRTS-I C

87 765 Bus Reactor(706 BR) at Bilaspur Ss 28-Aug-14 900 01-Sep-14 1800 DAILY For replacement of unarmoured

cable by TBEA WRTS-I PGCIL C

88 765 Bus 2 at Jabalpur Pooling Station 28-Aug-14 1000 29-Aug-14 1800 Daily

765KV Bus 2 Extension for Switchyard Extension for BINA 3 Line Dia

PGCIL WRTS-II C

89 400 MOUDA 400KV BUS REACTOR 28-Aug-14 0900hrs 29-Aug-14 1800 ContionuouAnnual Maintainance NTPC NTPC

90 765 Satna - Bina 1 29-Aug-14 0900 31-Aug-14 1800 Daily

for erection of new TC amp TE tower forNHPTL at Bina-Rescheduling of outage

PGCIL WRTS-II C

91 765 Bus Reactor at Satna 29-Aug-14 900 30-Aug-14 1800 Continious Commissioning of spre reactor PGCIL WRTS-II Cus

92 400 125MVAr BR1 at Indore 29-Aug-14 900 29-Aug-14 1800 Daily Post Commissioning check of Fire-Fighting system at Indore PGCIL WRTS-II C

93 400 Chorania Hadala line 29-Aug-14 800 29-Aug-14 1800 Daily PMM WORK GETCO GETCO

94 765 Kotra-durg Ckt-2 along with line reactor 29-Aug-14 900 31-Aug-14 1800 Daily WRTS-I PGCIL C

95 765 765400 ICT-2 at Aurangabad (PG) 30-Aug-14 600 30-Aug-14 1800 Daily Altube erection in 400 kV Boisar-

1amp2 Tie bays WRTS-I WRTS-I C

96 765kV Dharamjaygarh - Bilaspur 30-Aug-14 800 30-Aug-14 1800 daily commissioning of JBP-1 bay (side) WRTS-I PGCIL C

97 765kV 330 MVAR Bus Rector-2 at Dharamjaygarh 30-Aug-14 800 30-Aug-14 1800 daily commissioning of JBP-1 bay

(side) WRTS-I PGCIL C

98 400 Mundra Hadala SC 30-Aug-14 800 30-Aug-14 1800 DailyPower Line Crossing of 400 KV DC Bhachau SS (PG) - Varsana SS (GETCO) TrL

GETCO WRTS-II C

99 220 Gwalior - Mahalgaon 1amp2 30-Aug-14 900 31-Aug-14 1800 Continuous

For crossing of 765kV Gwalior - Jaipur line PGCIL WRTS-II C

100 220 Gwalior - Malanpur 1amp2 30-Aug-14 900 31-Aug-14 1800 Continuous

For crossing of 765kV Gwalior - Jaipur line PGCIL WRTS-II C

101 400 400 kV Akola- Nandagaon peth sc 31-Aug-14 800 31-Aug-14 1600 Daily crossing works of 765 kV Koradi-AWRTS-I WRTS-I R

102 400 Bina-Shujalpur2 31-Aug-2014 900 31-Aug-2014 1000 DailyFor Replacement of 390kV Reactor LA with 336kV LA Line

ill b t k i i ith t

POWERGRID WRTS-II C

103 400 Mundra - Sami DC 01-Sep-14 800 01-Sep-14 1800 DailyPower Line Crossing of 400 KV DC Bhachau SS (PG) - Varsana SS (GETCO) TrL

ADANI WRTS-II C

104 400 Akola-Wardha 1amp 2 01-Sep-14 800 30-Sep-14 1800 Daily For Online PID Line in service with AR in non-auto mode WRTS-I WRTS-I For IOwith AR in non auto mode

105 765 Bilaspur 2 Main bay (716) at Seoni 01-Sep-14 800 02-Sep-14 1800 Daily AMP works WRTS-I WRTS-I R

106 400 400220 ICT-1 AT SOLAPUR 01-Sep-14 900 01-Sep-14 1500 Daily AMP WORK WRTS-I WRTS-I R

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

107 765 1000 MVA ICT I amp ICT II at Bina 01-Sep-14 0900 01-Sep-14 1800 Daily Commissioning of Master follower

scheme PGCIL WRTS-II C

108 765 Bus 1 at Jabalpur Pooling Station 01-Sep-14 100000 AM 01-Sep-14 60000 PM Daily

765KV Bus 1 Extension Busbar Stability test related to Bhopal 1 Line Dia

PGCIL WRTS-II C

109 400 Shujalpur - Bina 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

110 400 Birsinghpur-Damoh 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

111 400 Gandhar - Navsari 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

112 400 Khandwa - Rajgarh 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

113 400 Indore - Nagda 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

114 400 Jabalpur - Jabalpur Pool 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II Cnon auto mode

115 400 Khandwa - Dhule 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

116 400 Itarsi - Khandwa 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

117 220 Satna - Satna 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

118 765 Dehgam - Ranchhodpura 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

119 765 Shujalpur - Nagda 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

120 400 Asoj - SSP 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

121 400 Bhachau - Mundra 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

122 400 Bina - Gwalior 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

123 400 Satna - Gwalior 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in PGCIL WRTS-II Cnon auto mode

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

124 400 LILO portion of Vapi - Navi Mumbai at Kala(Vapi-Kala Line) 01-Sep-14 600 30-Sep-14 1800 Daily

Online replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

125 400400 kV Khandwa - Rajgarh

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

126 400400 kV Gandhar-Navsari

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

127 400400 kV Rajgarh ndash SSP

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

128 400400 kV SSP-Asoj

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

129 400 400 kV Shujalpur - Nagda (MPPTCL)

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

130 400400 kV Dehgam - Ranchodpura

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

131 400 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in PGCIL WRTS-II C

400 kV Ranchodpura ndash Bhachaup p y OPGW AR shall be kept in

non auto mode

132 400400 kV Mundra-Bhachau

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

133 400400 kV Vindhyachal NTPC -SASAN UMPP Ckt-1 01-Sep-14 600 30-Sep-14 1800 Daily

Online replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

134 400400 kV Vindhyachal Pooling -Vindhyachal NTPC 01-Sep-14 600 30-Sep-14 1800 Daily

Online replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

135 400 400 kV LILO at Kala (DNH) SS of Vapi-Navi Mumbai Line

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

136 765765 kV Bina - Gwalior

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

137 765765 kV Satna - Gwalior Ckt-I

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

138 400 Gandahr - Navsari DC 01-Sep-14 800 30-Sep-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

139 400 Navsari - Vapi - Kala 01-Sep-14 800 30-Sep-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

PID testing of insulator strings 140 400 Satna - Bina Ckt 1amp2 01-Sep-14 800 30-Sep-14 1800 Daily AR shall be kept In non auto

modePGCIL WRTS-II R

141 400 Nagda - Dehgam DC 01-Sep-14 800 30-Sep-14 1800 Daily PID testing of insulator strings AR h ll b k t I t

PGCIL WRTS-II R

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

142 220 Kakrapar - Vapi DC 01-Sep-14 800 30-Sep-14 1800 Daily PID testing of insulator strings PGCIL WRTS-II R

143

220 220 KV Jhanor - Haldrwa Line 1

01-Sep-14

800

05-Sep-14

000

Continous Replacement of existing CTCVT with 02 class CT amp CVT and for testing of the same NTPC NTPC

144 400 Akola-Aurangabad(PG) 2 01-Sep-14 800 02-Sep-14 1800 Conti commissioning of 50MVAR Lreactor at Aurangabad(PG) WRTS-I WRTS-I C

145 765 Bina-Satna 2 02-Sep-14 0900 03-Sep-14 1800 Daily Post Commissioning check of Fire-Fighting system at Bina PGCIL WRTS-II C

146 400 Vadavi-Chorania 1 02-Sep-14 800 02-Sep-14 1800 Daily PMM WORK WRTGPL GETCO147 400 BUS REACTOR AT SOLAPUR 02-Sep-14 900 02-Sep-14 1500 Daily AMP WORK WRTS-I WRTS-I R

148 765 Korba Line Main Bay (716) at Bilaspur Ss 02-Sep-14 900 02-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

149 765 Bus 2 at Jabalpur Pooling Station 02-Sep-14 100000 AM 02-Sep-14 60000 PM Daily

765KV Bus 2 Extension for Switchyard Extension for Bhopal 1 Line Dia

PGCIL WRTS-II C

150 400 Bus2 at Indore 02-Sep-14 900 02-Sep-14 1800 Daily Jumper connection amp stability checking of Pitampur1 PGCIL WRTS-II C

151 400 CGPL-Limbdi-1 02-Sep-14 2-Sep-14 8AM 6PM Daily routine maintenance and isolator aPGCIL CGPL

152400 Korba-Bhalai line -1

02-Sep-14 900 03-Sep-14 19002 days

continuous CVTs replacement

NTPC NTPC00 o ba a a e us C s ep ace e t

153 400 Sipat 400KV Bus-1 02-Sep-14 900 03-Sep-14 1900 Continous Annual Preventive maintenance NTPC NTPC

154 765 Bilaspur 2 Tie bay (717) at Seoni 03-Sep-14 800 04-Sep-14 1800 Daily AMP works WRTS-I WRTS-I R

155 400 400220 ICT-1 AT SOLAPUR 03-Sep-14 900 03-Sep-14 1500 Daily AMP WORK WRTS-I WRTS-I R

156 765 Sipat2 Main Bay (712) at Bilaspur Ss 03-Sep-14 900 03-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

157 765 Bina-Gwalior 2 03-Sep-14 0900 04-Sep-14 1800 Daily For spare reactor commissioning works at Gwalior PGCIL WRTS-II C

158 765 Bus 2 at Jabalpur Pooling Station 03-Sep-14 100000 AM 03-Sep-14 60000 PM Daily

765KV Bus 2 Extension for Switchyard Extension for Jumpering (Bus Extension) for Bhopal 1

PGCIL WRTS-II C

159 400 Indore-Asoj3 03-Sep-14 900 04-Sep-14 1800 Continuous

For checking protection transfer system at Indore (MPPTCL) PGCIL WRTS-II C

160 400 400 kv Nagda- Rajgarh ckt Pgcil ckt I 03-Sep-14 900 03-Sep-14 03092014 1800 daily Maintenan

ce Work PGCIL EHT- Mamp I

161 400 Vadavi-Chorania 2 04-Sep-14 800 04-Sep-14 1800 Daily PMM WORK WRTGPL GETCO162 220 SOLAPUR(PG)-Solapur(M) 04-Sep-14 900 04-Sep-14 1800 Daily AMP WORK MSETCL WRTS-I R

163 765 Bus 2 at Jabalpur Pooling Station 04-Sep-14 100000 AM 04-Sep-14 60000 PM Daily

765KV Bus 2 Extension Busbar Stability test related to Bhopal 1 Line Dia

PGCIL WRTS-II C

164 400 CGPL-Limbdi-2 04-Sep-14 4-Sep-14 8AM 6PM Daily routine maintenance and isolator aPGCIL CGPL

165 400 400 kv Nagda- Rajgarh ckt Pgcil ckt II 04-Sep-14 900 04-Sep-14 04092014 1800 daily Maintenan

ce Work PGCIL EHT- Mamp I

166400 Korba-Bhalai line -2

04-Sep-14 900 05-Sep-14 19002 days

continuous CVTs replacement

NTPC NTPC

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

167 400 BUS-1 AT SOLAPUR 05-Sep-14 900 05-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I C

168 400 Seoni-Khandwa 1 05-Sep-14 800 05-Sep-14 1800 Daily Line AMP works at Seoni WRTS-II WRTS-I R

169 400 400220 ICT-2 AT BOISAR 05-Sep-14 900 05-Sep-14 1500 Daily For Bushing oil DGA Testing WRTS-I WRTS-I R

170 765 Sipat2 Tie Bay (711) at Bilaspur Ss 05-Sep-14 900 05-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

171 765 Bina-Jabalpur I 05-Sep-14 0900 06-Sep-14 1800 Daily Post Commissioning check of Fire-Fighting system at Bina PGCIL WRTS-II C

172 400 Bus Reactor 1 at Jabalpur Pooling Station 05-Sep-14 100000 AM 05-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

173 220 Navsari - Nasik - 1 05-Sep-14 800 05-Sep-14 1800 Daily PMM WORK PGCIL GETCO174 400 Sipat 400KV Bus-2 05-Sep-14 900 06-Sep-14 1900 Continous Annual Preventive maintenance NTPC NTPC175 400 Akola-Wardha ckt 2 05-Sep-14 800 05-Sep-14 1700 Daily QMwork MSETCL MSETCL176 400 Kalwa-Kharghar 05-Sep-14 900 05-Sep-14 1700 Daily R amp M work MSETCL MSETCL177 400 Seoni-Khandwa 2 06-Sep-14 800 06-Sep-14 1800 Daily Line AMP works at Seoni WRTS-II WRTS-I R178 400 400220 ICT-1 AT BOISAR 06-Sep-14 900 06-Sep-14 1500 Daily For Bushing oil DGA Testing WRTS-I WRTS-I R

179 400 Bus Reactor 2 at Jabalpur Pooling Station 06-Sep-14 100000 AM 06-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

180 765 Gwalior-Satna2 06-Sep-14 800 06-Sep-14 1800 Daily For spare reactor commissioning works at Gwalior PGCIL WRTS-II C

181 400 Indore-Indore1 06-Sep-14 900 07-Sep-14 1800 Continuo For checking protection transfer t t I d (MPPTCL) PGCIL WRTS-II C181 400 Indore Indore1 06 Sep 14 900 07 Sep 14 1800 us system at Indore (MPPTCL) PGCIL WRTS II C

182 220 Navsari - Nasik - 2 06-Sep-14 800 06-Sep-14 1800 Daily PMM WORK PGCIL GETCO

183 400 VAPI-BOISAR 07-Sep-14 800 08-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

184 765 Satna-Gwalior-2 Reactor 07-Sep-14 900 07-Sep-14 1800 Daily For Commissioning of CSD relay in Gwalior-2 reactor bay at Satna PGCIL WRTS-II C

185 220 DC Welspun - Shivlakha amp Anjar shivlakha Trl 07-Sep-14 80000 AM 07-Sep-14 60000 PM Daily

Power Line Crossing of 400 KV DC Bhachau SS (PG) - Varsana SS (GETCO) TrL

GETCO WR-II C

186 765 Bilaspur 1 Tie bay (711) at Seoni 08-Sep-14 800 09-Sep-14 1800 Daily AMP works WRTS-I WRTS-I R

187 400kV Bus-1 at Itarsi SS 08-Sep-14 800 08-Sep-14 1800 Daily AMP amp Protection testing WRTS-II WRTS-II R

188 765 Seoni2 Main Bay (707) at Bilaspur Ss 08-Sep-14 900 08-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

189 765 Bina-Jabalpur II 08-Sep-14 0900 09-Sep-14 1800 Daily Post Commissioning check of Fire-Fighting system at Bina PGCIL WRTS-II C

190 765 ICT 1 at Jabalpur Pooling Station 08-Sep-14 100000 AM 08-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

191 765 Gwalior-Bina3 08-Sep-14 800 09-Sep-14 1800 Daily For spare reactor commissioning works at Gwalior PGCIL WRTS-II C

192 400 V-satna-1 08-Sep-14 900 09-Sep-14 1900 Continuous

Major OH of Line Circuit Breaker (For dismantling of poles) NTPC NTPC

193

220 220 KV Jhanor- Haldrwa Line 2

08-Sep-14

800

12-Sep-14

000

Continous Replacement of existing CTCVT with 02 class CT amp CVT and for testing of the same NTPC NTPC

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

194 400 Vadavi- Kansari- 1 09-Sep-14 800 09-Sep-14 1800 Daily PMM WORK WRTGPL GETCO195 400 Bus-1 at Damoh 09-Sep-14 1000 10-Sep-14 1800 Daily AMP PGCIL WRTS-II R

196 765 Bus Reactor 1 at Jabalpur Pooling Station 09-Sep-14 100000 AM 09-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

197 400 Bina - Shujalpur 1 09-Sep-14 1000 09-Sep-14 1400 Daily AMP PGCIL WRTS-II C

198 400 400 kv Katni- Damoh ckt 09-Sep-14 800 09-Sep-14 09092014 1800 daily Maintenance Work PGCIL EHT-

Mamp I

199 220 220 KV OMKARESHWAR -KHANDWA 09-Sep-14 900 09-Sep-14 09092014 1600 daily Maintenan

ce Work PGCIL EHT- Mamp I

200 220 220KV MALANPUR -AURAIYA 09-Sep-14 900 09-Sep-14 09092014 1700 daily Maintenance Work

EHT- Mamp I

201400 Korba 400 KV Bus coupler -1

09-Sep-14 900 10-Sep-14 19002 days

continuous Annual maintenance and testing

NTPC NTPC

202 400kV Bus-2 at Itarsi SS 10-Sep-14 800 10-Sep-14 1800 Daily AMP amp Protection testing WRTS-II WRTS-II R203 400 400220KV ICT-2 at Seoni 10-Sep-14 800 11-Sep-14 1800 Conti OLTC overhauling works WRTS-I WRTS-I R

204 400 VAPI-BOISAR 10-Sep-14 800 11-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

205 400 Parli 2 Tie Bay (417) at Solapur 10-Sep-14 900 10-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

206 765 330 MVAR Bus Rector-1 at Dharamjaygarh 10-Sep-14 800 11-Sep-14 1700 DAILY CSD relay commissioning in main

bay WRTS-I PGCIL C

207 765 ICT3 Tie Bay (717) at Bilaspur 10 S 14 9 00 10 S 14 18 00 DAILY F AMP k WRTS I PGCIL R207 765 ICT3 Tie Bay (717) at Bilaspur Ss 10-Sep-14 900 10-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

208 765 765kV Dharamjaygarh - Ranchi-2 l 10-Sep-14 900 15-Sep-14 1800 continous

For strining Jumpering of parallel ckt and Crossing of 765kV Dharamjaygarh-Jabalpur line

WRTS-I PGCIL C

209 765 ICT 2 at Jabalpur Pooling Station 10-Sep-14 100000 AM 10-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

210 400 Shujalpur-Nagda 1 10-Sep-14 1000 10-Sep-14 1400 Daily AMP PGCIL WRTS-II C211 400 Vadavi- Kansari- 2 10-Sep-14 800 10-Sep-14 1800 Daily PMM WORK WRTGPL GETCO

212 400 400 kv ISP - Nagda ckt 10-Sep-14 900 10-Sep-14 10092014 1800 daily Maintenance Work

EHT- Mamp I

213 220 220KV MALANPUR -AURAIYA 10-Sep-14 900 10-Sep-14 10092014 1700 daily Maintenance Work

EHT- Mamp I

214 220 220 KV DAMOH PGCIL IC - I 10-Sep-14 800 10-Sep-14 10092014 1800 daily Maintenance Work PGCIL EHT-

Mamp I

215765KV400K

VSipat 765KV400KV ICT-1 10-Sep-14 900 11-Sep-14

1900 Continous Annual Preventive maintenance NTPC NTPC216 400 New Koyna-Dabhol ckt 1 10-Sep-14 830 10-Sep-14 1730 Daily QMwork MSETCL MSETCL217 400 Akola-Aurangabad ckt 1 10-Sep-14 830 10-Sep-14 1730 Daily QMwork MSETCL MSETCL

218 400 TARAPUR-PADGHE I 11-Sep-14 800 12-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

219 400 ICT 2 Main Bay (409) at Mapusa 11-Sep-14 900 11-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

220 765 Korba LR (716 LR) at Bilaspur Ss 11-Sep-14 900 11-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

221 220 Bus-1 at Damoh 11-Sep-14 1000 12-Sep-14 1800 Daily AMP PGCIL WRTS-II R

222 765 Bus Reactor 2 at Jabalpur Pooling Station 11-Sep-14 100000 AM 11-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

223 220MC Bhimasar - Lalpar Bhimasar -Morbi amp Bhimasar - Mansar (on same tower)

11-Sep-14 80000 AM 11-Sep-14 60000 PM DailyPower Line Crossing of 400 KV DC Bhachau SS (PG) - Varsana SS (GETCO) TrL

GETCO WR-II C

224 220 Navsari - Dastan- 1 11-Sep-14 800 12-Sep-14 1800 Daily PMM WORK PGCIL GETCO

225 400 400 kv Rajgarh Pgcil - SSP CKT I 11-Sep-14 900 11-Sep-14 11092014 1800 daily Maintenance Work PGCIL EHT-

Mamp I

226 220 220K KV MEHGAON - AURAIYA 11-Sep-14 900 11-Sep-14 11092014 1700 daily Maintenance Work

EHT- Mamp I

227400 Korba Lanco

11-Sep-14 900 12-Sep-14 19002 days

continuous Annual maintenance and testing

NTPC NTPC

228 400 Lonikand II-Lonikand I 11-Sep-14 900 11-Sep-14 1700 Daily QMwork MSETCL MSETCL

229 400 Parali-Lonikand II ckt 2 11-Sep-14 900 11-Sep-14 1700 Daily QMwork MSETCL MSETCL

230 400 Waluj-Bableshwer 11-Sep-14 900 11-Sep-14 1700 Daily QMwork MSETCL MSETCL

231 400 Tie Transformer-II NTPC-Korba 11-Sep-14 900 12-Sep-14 1700 Maintenance NTPC NTPC

232 400kV Sipat-Raipur-2 12-Sep-14 000 12-Sep-14 1700 Daily Attending hot spots and SD nature defects WRTS-I PGCIL R

233 400 400220 ICT 1 AT WARDHA 12 Sep 14 9 00 12 Sep 14 15 00 Dail For B shing oil DGA Testing WRTS I WRTS I R233 400 400220 ICT-1 AT WARDHA 12-Sep-14 900 12-Sep-14 1500 Daily For Bushing oil DGA Testing WRTS-I WRTS-I R

234 400 Khandwa-Dhule 2 line reactor at Dhule 12-Sep-14 800 12-Sep-14 1800 Daily For Bushing oil DGA Testing

Line in service wo reactor WRTS-I WRTS-I R

235 400 BUS I AT MAPUSA 12-Sep-14 900 12-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

236 765 JBP - Dharmjaygarh Reactor Line 1 Reactor at Jabalpur Pooling Station

12-Sep-14 100000 AM 12-Sep-14 60000 PM Daily Installation amp Commissioning of CSD Relay PGCIL WRTS-II C

237 400 400 kv Rajgarh Pgcil - SSP CKT II 12-Sep-14 900 12-Sep-14 12092014 1800 daily Maintenan

ce Work PGCIL EHT- Mamp I

238 400 400 kv Indore - Nagda ckt 12-Sep-14 900 12-Sep-14 12092014 1800 daily Maintenance Work

EHT- Mamp I

239 220 220K KV MEHGAON - AURAIYA 12-Sep-14 900 12-Sep-14 12092014 1700 daily Maintenance Work

EHT- Mamp I

240 400 Lonikand-Stage IV 12-Sep-14 900 12-Sep-14 1700 Daily QMwork MSETCL MSETCL

241 400 Aurangabad(PG)-Aurangabad (Waluj)-1 12-Sep-14 800 15-Sep-14 1800 Conti Augmentation works at MSETCL

Waluj 400kV SSWRTS-I WRTS-I C

242 400 TARAPUR-PADGHE I 13-Sep-14 800 14-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

243 400 Karad-Lonikand 13-Sep-14 900 13-Sep-14 1700 Daily QMwork MSETCL MSETCL

244 400kV Sipat-Raipur-1 13-Sep-14 000 13-Sep-14 1700 Daily Attending hot spots and SD nature defects WRTS-I PGCIL R

245 400 BOISAR-PADGHE 13-Sep-14 800 14-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

246 400 400220 ICT-2 AT WARDHA 13-Sep-14 900 13-Sep-14 1500 Daily For Bushing oil DGA Testing WRTS-I WRTS-I R

247 400 Khandwa-Dhule 1 line reactor at Dhule 13-Sep-14 800 13-Sep-14 1800 Daily For Bushing oil DGA Testing

Line in service wo reactor WRTS-I WRTS-I R

248 220 BUS I AT MAPUSA 13-Sep-14 900 13-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R248 220 BUS I AT MAPUSA 13-Sep-14 900 13-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

249 765 Korba Line Main Bay (716) at Bilaspur Ss 13-Sep-14 900 13-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

250 400 Dhule-Babhleswar ckt 2 13-Sep-14 900 13-Sep-14 1700 Daily QMwork MSETCL MSETCL

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

251 400 Kolhapur-Mapusa 1 13-Sep-14 800 17-Sep-14 1800 Daily Insulator replacement due to polluted streaches

WRTS-I WRTS-I R

252 400 Kolhapur-Mapusa 1 13-Sep-14 800 17-Sep-14 1800 Daily Insulator replacement due to polluted streaches

WRTS-I WRTS-I R

253 400 Bhachau - Ranchodpura DC(Subject to SLDC consent) 14-Sep-14 80000 AM 20-Sep-14 60000 PM Continuo

us

Shifting of towers to maintain clearance for SSNL canal crossing (Loc 26-33 amp 78-84)

PGCIL WRTS-II C

254 400kV Bhilai-koradi line 15-Sep-14 000 16-Sep-14 000 Daily Attending hot spots and SD nature defects WRTS-I PGCIL R

255 400 Navasari- Kala MC line 15-Sep-14 800 16-Sep-14 1800 DailyConstruction work of Navasari- Boisar line on same Multi ckt tower

WRTS-II WRTS-I C

256 400 SOLAPUR(PG)-KARAD 15-Sep-14 900 20-Sep-14 1800 Conti Tower Erection of Line Reactor gantry of Karad Line at Solapur MSETCL WRTS-I R

257 765 WARDHA-AURANGABAD(PG) 2 15-Sep-14 800 15-Sep-14 1800 Daily

For replacement of Rph reactor unit at Wardha Line in service wo reactor Taking out reactor out of service

WRTS-I WRTS-I R

258 400 Chandrapur 3 Main Bay (420) at Bhadrawati 15-Sep-14 900 15-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

259 765 Seoni1 Main Bay (704 ) at Bilaspur Ss 15-Sep-14 900 15-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL RBilaspur Ss

260 220 Kakrapar-Haldarwa1 15-Sep-14 900 15-Sep-14 1800 DailyReplacement of existing 220kV CTs with High Fault current CTs at Haldarwa SS

PGCIL WRTS-II C

261 400 SSP - Rajgarh - 1 15-Sep-14 800 17-Sep-14 1800 Daily PMM WORK PGCIL GETCO

262

220 Jhanor 220 KV Bus1

15-Sep-14

800

16-Sep-14

000

Continous Replacement of existing CTCVT with 02 class CT amp CVT and for testing of the same NTPC NTPC

263 400 BOISAR-PADGHE 16-Sep-14 800 17-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

264 400 Chandrapur 3Tie Bay (421) at Bhadrawati 16-Sep-14 900 16-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

265 400 Indore-Asoj2 16-Sep-14 80000 AM 16-Sep-14 60000 PM Daily Replacement of broken insulators PGCIL WRTS-II R

266 765 Sasan-Satna2 16-Sep-14 900 17-Sep-14 1800 Daily Power line crossing for stringing of of 765Kv Vin pool- satna ck2 PGCIL WRTS-II C

267 400 315MVA ICT1 at Shujalpur 16-Sep-14 1000 16-Sep-14 1400 Daily AMP PGCIL WRTS-II R

268 220 Kakrapar-Haldarwa2 16-Sep-14 900 16-Sep-14 1800 DailyReplacement of existing 220kV CTs with High Fault current CTs at Haldarwa SS

PGCIL WRTS-II C

269 220 220 KV PITHAMPUR - RAJGARH PG CKT - I 16-Sep-14 900 16-Sep-14 16092014 1600 daily Maintenan

ce Work PGCIL EHT- Mamp I

270 400 V-satna-1 16-Sep-14 900 16-Sep-14 1900 Daily basis For erection of Breaker after OH NTPC NTPC

Construction work of Navasari- 271 400 Vapi- Kala MC Line 17-Sep-14 800 18-Sep-14 1800 Daily Boisar line on same Multi ckt

towerWRTS-II WRTS-I C

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

272 400 HVDC IBay (403) at Bhadrawati 17-Sep-14 900 17-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

273

220 Jhanor 220 KV Bus2

17-Sep-14

800

18-Sep-14

000

Continous Replacement of existing CTCVT with 02 class CT amp CVT and for testing of the same NTPC NTPC

274 400 Parli 1 Main Bay (423) at Bhadrawati 18-Sep-14 900 18-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

275 220 Kawas-Haldarwa1 18-Sep-14 900 18-Sep-14 1800 DailyReplacement of existing 220kV CTs with High Fault current CTs at Haldarwa SS

PGCIL WRTS-II C

276 400 SSP - Rajgarh - 2 18-Sep-14 800 20-Sep-14 1800 Daily PMM WORK PGCIL GETCO

277 400 400 KV Sarni - Seoni ckt 18-Sep-14 800 18-Sep-14 18092014 1800 daily Maintenance Work PGCIL EHT-

Mamp I

278 220 220 KV PITHAMPUR - RAJGARH PG CKT - II 18-Sep-14 900 18-Sep-14 18092014 1600 daily Maintenan

ce Work PGCIL EHT- Mamp I

279 220 220 KV DAMOH PG - TIKAMGARH CKT I 18-Sep-14 800 18-Sep-14 18092014 1800 daily Maintenan

ce Work PGCIL EHT- Mamp I

280 400Sipat 400KV Bay-9 (Raipur-1 Main bay) 18-Sep-14 900 19-Sep-14 1900 Continous Annual Preventive maintenance NTPC NTPC

281 400 Kolhapur-Mapusa 2 18-Sep-14 800 22-Sep-14 1800 Daily Insulator replacement due to polluted streaches

WRTS-I WRTS-I R

282 400 Khandwa 2 Tie bay (423) at 19 S 14 8 00 20 S 14 18 00 D il AMP k WRTS I WRTS I R282 400 Khandwa 2 Tie bay (423) at Seoni 19-Sep-14 800 20-Sep-14 1800 Daily AMP works WRTS-I WRTS-I R

283 400 BOISAR-PADGHE 19-Sep-14 800 20-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

284 400 Parli 1 Tie Bay (424) at Bhadrawati 19-Sep-14 900 19-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

285 220 Kawas-Haldarwa2 19-Sep-14 900 19-Sep-14 1800 DailyReplacement of existing 220kV CTs with High Fault current CTs at Haldarwa SS

PGCIL WRTS-II C

286 400 V-satna-2 19-Sep-14 900 20-Sep-14 1900 Continuous

Major OH of Line Circuit Breaker (For dismantling of poles) NTPC NTPC

287 400 Aurangabad(PG)-Aurangabad (Waluj)-2 19-Sep-14 800 22-Sep-14 1800 Conti Augmentation works at MSETCL

Waluj 400kV SSWRTS-I WRTS-I C

288 400 Parli 2 Main Bay (416) at Solapur 20-Sep-14 900 20-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

289 400 400220 ICT-3 AT MAPUSA 20-Sep-14 900 20-Sep-14 1500 Daily AMP WORKS WRTS-I WRTS-I R

Anaulagnak 33

Agast 2014 AaOr isatmbar 2014 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR AUGUST 2014 AND SEPTEMBER 2014

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)Agast 2014 isatmbar 2014 Agast 2014 isatmbar 2014

AUGUST 2014 SEPTEMBER 2014 AUGUST 2014 SEPTEMBER 2014

1 gaujarat

saIimat 12500 13900 7750 8500

AsaIimat 12540 13940 7760 8510

2 maQya p`doSa

saIimat 6200 6500 3800 4100

AsaIimat 6250 6500 3800 4100

3 CltaIsagaZ

saIimat 3030 3199 16425195 172052635

AsaIimat 3160 3269 172031 169036025

4 maharaYT

saIimat 16050 17750 10700 10800

AsaIimat 16100 17800 10750 10850

5 gaaovaa

saIimat 410 415 290 285

AsaIimat 425 425 300 290

6 dmana dIva

saIimat 315 320 205 200

AsaIimat 320 325 210 210

7 DI ena eca

saIimat 645 640 425 420

AsaIimat 650 645 430 425

8 piScama xao~

saIimat 37614 41048 25600 26080

AsaIimat 37898 41254 26450 27900

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah jaUlaa[- 2014

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 2236 75

]k[- Ukai - 2 529 75]k[- Ukai - 3 000 0]k[- Ukai - 4 2023 75]k[- Ukai (Total) 4788 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 094 2]k[- ela baI saI eca Ukai LBCH - 2 028 2]k[- ela baI saI eca Ukai LBCH (Total) 123 1 0018

3 kDanaa Kadana - 1 699 61 0010kDanaa Kadana - 2 910 57 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 1115 62 0000kDanaa Kadana (Total) 2724 62 0010

4 pnama PANAM amp Madhuban Dam 1 amp 2 160 8 0017 6 kula jalaIya TOTAL(H) 7794 225 0390

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 3339 57 34582 TaoronT pavar ilaimaToD yauinaT DI 6957 122 64083 TaoronT pavar ilaimaToD yauinaT [- 8082 122 67664 TaoronT pavar ilaimaToD yauinaT ef 8380 124 73285 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 037511 Qauvarna tapIya Dhuvaran - GT 2 000 0 116012 Qauvarna tapIya Dhuvaran - STG 1783 10113 ]ka[- yauinaT 1 Ukai -1 000 0 019714 ]ka[- yauinaT 2 Ukai -2 000 0 019315 ]ka[- yauinaT 3 Ukai -3 10038 202 922016 ]ka[- yauinaT 4 Ukai -4 6930 202 697517 ]ka[- yauinaT 5 Ukai -5 11833 212 1138718 ]ka[- yauinaT 6 Ukai -6 30277 507 2287219 gaaMQaInagar 1 Gandhinagar - 1 000 0 008220 gaaMQaInagar 2 Gandhinagar - 2 000 0 009221 gaaMQaInagar 3 Gandhinagar - 3 6275 213 669022 gaaMQaInagar 4 Gandhinagar - 4 6060 212 706523 gaaMQaInagar 5 Gandhinagar - 5 13495 215 1331024 vaNakbaaorI 1 Wanakbori - 1 12142 209 000025 vaaNakbaaOrI 2 Wanakbori - 2 12364 21026 vaaNakbaaOrI 3 Wanakbori - 3 6669 20227 vaaNakbaaOrI 4 Wanakbori - 4 7244 21128 vaaNakbaaOrI 5 Wanakbori - 5 6198 21029 vaaNakbaaOrI 6 Wanakbori - 6 5924 21230 vaaNakbaaOrI 7 Wanakbori - 7 9489 21031 ]trna Utran GT 1 000 0 026832 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 1200 221 024735 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 819 143 1098

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

Anaulagnak 41

ACTUAL GENERATION amp AVALABILITY FOR JULY 2014Actual vaastivak

Actual vaastivak

37 isaka Sikka - 1 1326 107 179438 isaka Sikka - 2 3489 114 401539 kcC ilagnaa[-T Kutch Lignite - 1 5092 71 859040 kcC ilagnaa[-T Kutch Lignite - 2 4929 7141 kcC ilagnaa[-T Kutch Lignite - 3 000 042 kcC ilagnaa[-T Kutch Lignite - 4 2388 68 571043 saUrt ilagnaa[-T Surat Lignite - 1 8775 130 874544 saUrt ilagnaa[-T Surat Lignite - 2 3966 130 445845 saUrt ilagnaa[-T Surat Lignite - 3 5411 130 524346 saUrt ilagnaa[-T Surat Lignite - 4 8973 130 883347 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5446 103 859048 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 6057 10749 jaI Aa[- pI saI ela GIPCL GT - 1 1123 33 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1510 3251 jaI Aa[- pI saI ela GIPCL GT - 3 598 3052 jaI Aa[- pI saI ela GIPCL ST - 1 1846 4553 jaI Aa[- pI saI ela GIPCL GT - 4 357 98 000054 jaI Aa[- pI saI ela GIPCL ST - 2 186 5055 [- esa esa e Aar ESSAR GT - 1 000 0 029356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 083 146 002860 jaI pI [- saI GPEC GT - 2 148 153 023361 jaI pI [- saI GPEC GT - 3 1387 145 028462 jaI pI [- saI GPEC STG 521 7563 jaI esa [- jaI GSEG GT - 1 206 51 112164 jaI esa [- jaI GSEG GT - 2 1079 4765 jaI esa [- jaI GSEG STG 613 2466 Sugen (GT 1 + GT 2) 000 0 693867 saIpIpI sao Aayaat Imp from CPP+MUNDRA 249228 6777

kula tapIya Total (T) 511604 7860 431554kula jalaIya+tapIya Total (H+T) 519398 8078 431944ivaMD [najaI- Wind Energy 94980kula jalaIya+tapIya+hvaa Total (H+T+Wind) 614378 9539ivainamaya Exchanges 150828 saIimat jaa- maaMga Restricted Energy Req 765205

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 767 135

11 gaaMQaI saagar Gandhi Sagar 998 117 008012 raNaa p`tap sagar RPSagar 096 86 004013 javaahr sagar Jawahar Sagar 439 66 0020

2 ponca Pench 1381 160 01003 baargaI Bargi 712 33 00704 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 5724 309 02906 banasaagar Bansagar-2 (Deolondh) 104 407 banasaagar Bansagar-3 (Silpara) 565 31 00608 banasaagar Bansagar-4 (Zinaha) 425 20 00309 maoDIKoDa Medikheda 096 58

10 ibarisaMGapur Birsingpur 680 20 002011 Tavaa Tawa 000 012 rajaGaaT Rajghat 001 7 007013 Omkareshwar 4226 340 14 [Midra saagar Indira Sagar 6679 679 0598

kula jalaIya TOTAL(H) MPPGCL 19979 2031 1152

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 2223 84 179302 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 14496 216 0

Actual vaastivak

4 satpura I Satpura-I(60Share) 000 0 00005 satpura II Satpura-II Unit 6 000 0 83106 satpura II Satpura-II Unit 7 7549 1857 satpura II Satpura-II Unit 8 12446 195 173908 satpura II Satpura-II Unit 9 4038 1759 satpura III Satpura-III Unit 10 9508 219 23440

10 satpura III Satpura-III Unit 11 8675 167 2096011 esajaITIpIesa 1 SGTPS Unit - 1 8675 167 2096012 esajaITIpIesa 2 SGTPS Unit - 2 9354 16013 esajaITIpIesa 3 SGTPS Unit - 3 1129 165 1642014 esajaITIpIesa 4 SGTPS Unit - 4 6022 16015 esajaITIpIesa 5 SGTPS Unit - 5 27597 50816 SSTPS 7895 309 9910

kula tapIya Total (T) 117479 2427 115480kula jalaIya+tapIya Total (H+T) 137458 4759 116632Injection from WIND 14572 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 152030 4759ivainamaya Exchanges 271419 saIimat jaa- maaMga Rest En Req 423449

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 606 120 01102 Gangrel 039 10 00203 Mini Micro KWB 039 7

kula jalaIya TOTAL(H) CSEB 684 137 0520tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 40 125902 kaorbaa (pU) Korba (E) Unit-2 2764 383 kaorbaa (pU) Korba (E) Unit-3 2764 384 kaorbaa (pU) Korba (E) Unit-4 2784 405 kaorbaa (pU) Korba (E) Unit -5 3685 120 244406 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 154608 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 24740

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 13343 243 1124012 KORBA(EB) Extn - 2 14104 248 11250

kula tapIya Total (T) 119955 1644 10189013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 119955 1644kula jalaIya+tapIya Total (H+T) 120639 1781 102410ivainamaya Exchanges 59759 0saIimat jaa- maaMga Rest En Req 180398 1781

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 5228 585 06952 kaoyanaa III Koyna III 3695 3203 kaoyanaa IV Koyna IV 371 11204 kaoyanaa DIpIeca Koyna DPH 414 385 TaTa jalaIya TATA Hydro 10123 741 44976 vaOtrNaa Vaitarna 1151 617 eladarI Eldari 000 168 BaTgar AaOr vaIr Bhatgar amp Vir 036 49 pOzana Paithan 976 49

10 itlaarI Tillari 1036 6511 BaIra Tola rosa Bhira Tail Race 846 4112 GaTGar Ghatghar 3639 25013 Anya CaoTo jalaIya Small Hydro (others) 1041 0

kula jalaIya TOTAL(H) 28404 -1073 5192

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL

Actual vaastivak

3 naaisak 3 Nasik Unit -3 4157 1954 naaisak 4 Nasik Unit -4 12489 1985 naaisak 5 Nasik Unit -5 12480 2006 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 30718 5038 Tambao 6 Trombay Unit -6 6619 5009 Tambao 8 Trombay Unit -8 000 0

10 Tambao 7A gaOsa Trombay -7A (Gas) 7476 127 288611 Tambao 7ba Trombay -7B (WHR) 4373 6912 kaoraDI 5 Koradi Unit -5 000 013 kaoraDI 6 Koradi Unit -6 8448 16714 kaoraDI 7 Koradi Unit -7 10994 19415 Bausaavala 2 Bhusawal Unit -2 4715 16516 Bausaavala 3 Bhusawal Unit -3 6454 16517 Bausaavala 4 Bhusawal Unit -4 20419 50518 Bausaavala 4 Bhusawal Unit -5 23286 43519 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 000 021 parlaI 5 Parli Unit -5 9315 17522 parlaI 6 Parli Unit -6 14237 25323 parlaI 7 Parli Unit -7 14028 25024 KaprKoDa 1 Khaperkheda Unit -1 8108 20025 KaprKoDa 2 Khaperkheda Unit -2 10924 19026 KaprKoDa 3 Khaperkheda Unit -3 7917 20627 KaprKoDa 4 Khaperkheda Unit -4 10446 21028 KaprKoDa 5 Khaperkheda Unit -5 24555 50030 parsa Paras-3 11676 21831 parsa Paras-4 10326 24032 ]rna Uran (Gas) 18771 40133 ]rna Uran (WHR) 10760 138 586234 caMd`pur 1 Chandrapur Unit -1 7526 16535 caMd`pur 2 Chandrapur Unit -2 9375 19936 caMd`pur 3 Chandrapur Unit -3 8728 20037 caMd`pur 4 Chandrapur Unit - 4 12276 47038 caMd`pur 5 Chandrapur Unit -5 29203 41039 caMd`pur 6 Chandrapur Unit -6 26351 040 caMd`pur 7 Chandrapur Unit -7 000 041 DhaNaU 1 Dahanu Unit-1 16882 250 1563042 DhaNaU 2 Dahanu Unit-2 19263 250 1660143 CPP 258820 41160044 RGPPL Share 000 0

kula tapIya Total (T) 692115 14094 350211MAH Wind + Solar Generation 110432 0kula jalaIya +tapIya Total (H+T+Wind) 830951 16176 396382

TOTAivainamaya Exchanges 274116saIimat jaa- maaMga Rest En Req 1105066

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1173 17ivainamaya Exchanges 33083saIimat jaa- maaMga Rest En Req 34256 459

C (F) dmana AaOr dIva DAMAN amp DIU 17467 298ja (G) dadra nagar hvaolaI DNH 43779 673

kula DD ampDNH (T) 61246 970

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 9731 160 1564312 tara`pur 2 TAPS Unit -2 11531 16013 tara`pur 3 TAPS Unit -3 40214 545 7288014 tara`pur 4 TAPS Unit -4 39284 53715 kakrapr 1 KAPS Unit -1 16048 545 3195016 kakrapr 2 KAPS Unit -2 14903 537

kula ena pI saI NPC Total 131710 24842 ena TI pI saI NTPC

Actual vaastivak

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15236 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14181 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14568 214 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 000 025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 32338 51326 kaorbaa esaTIpIesa 6 KSTPS Unit-6 33493 51427 kaorbaa esaTIpIesa 7 KSTPS Unit-7 30558 516

kula kaorbaa KSTPS Total 140373 2548 9318427 ivanQa esaTIpIesa 1 VSTPS Unit-1 13430 21528 ivanQa esaTIpIesa 2 VSTPS Unit-2 11930 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 13695 212210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14017 214211 ivanQa esaTIpIesa 5 VSTPS Unit-5 11952 215212 ivanQa esaTIpIesa 6 VSTPS Unit-6 8991 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 32786 515214 ivanQa esaTIpIesa 8 VSTPS Unit-8 19668 514215 ivanQa esaTIpIesa 9 VSTPS Unit-9 31796 516216 ivanQa esaTIpIesa 10 VSTPS Unit-10 31597 515217 ivanQa esaTIpIesa 11 VSTPS Unit-11 13881 512

kula ivanQayaacala VSTPS Total 233445 REF 16238 31 saIpt -1 -SIPAT-1 38555 66600 32 saIpt -2 -SIPAT-2 16033 66500 33 saIpt -3 -SIPAT-3 43240 66800 34 saIpt -4 -SIPAT-4 25865 51200 35 saIpt -5 SIPAT-5 33302 51500

kula saIpt -SIPAT TOTAL 156995 280100 920541 kvaasa gaOsa 1e Kawas GT-1A 2605 10442 kvaasa gaOsa 1baI Kawas GT-1B 4355 10643 kvaasa esaTI 1saI Kawas ST-1C 3365 11744 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 044 9846 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 10369 309 245151 gaMQaar gaOsa 1 Gandhar GT-1 2177 14352 gaMQaar gaOsa 2 Gandhar GT-2 3014 14553 gaMQaar gaOsa 3 Gandhar GT-3 5333 14754 gaMQaar esaTI 4 Gandhar ST-4 5586 158

kula gaMQaar GGPS Total 16109 437 475161 maaOda 1 Mauda -1 5368 514 000062 maaOda 2 Mauda -2 16240 513 0000

kula maaOda MAUDA Total 21608 756 2258161 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 000 31 000071 esa esa pI SSP RBPH - 1 1265 18872 esa esa pI SSP RBPH - 2 1102 18673 esa esa pI SSP RBPH - 3 1197 18774 esa esa pI SSP RBPH - 4 1116 18675 esa esa pI SSP RBPH - 5 1432 18676 esa esa pI SSP RBPH - 6 1653 18677 esa esa pI SSP CHPH - 1 422 3578 esa esa pI SSP CHPH - 2 384 3079 esa esa pI SSP CHPH - 3 179 34710 esa esa pI SSP CHPH - 4 1012 36711 esa esa pI SSP CHPH - 5 340 30

kula esa esa pI SSP Total 10101 1283 101081 kula poMca Pench Total 1381 160 010082 Jindal Injection 50805 083 Amarkantak Lanco 16857 0

(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2508924

(J) ]plabQata Availability 2439102 naoT ivainamaya Net Exchanges -311541 ]plabQa jaa- Energy Availability 2127561

maah jaUlaa[- 2014 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR JULY 2014 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 13833 - - - 13833 070714 1500 4972

saIimat Restricted 12500

AsaIimat Unrestricted 12540 13833 0 136 0 13969 070714 1500 4972

nyaUnatma pMjaIkRt maaMga Min Registered Demand 7617 7617 250714 0400 4999

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 7090 - - - 7090 020714 2015 4985

saIimat Restricted 6040

AsaIimat Unrestricted 6040 7090 0 31 0 7121 020714 2015 4985

nyaUnatma pMjaIkRt maaMga Min Registered Demand 3895 3895 230714 1500

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3118 3118 050714 2100 4985

saIimat Restricted 3150

AsaIimat Unrestricted 3250 2972 41792 24 0 3414 030714 2000 4977

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1336 1336 220714 1300 4995

maharaYT MAHARASHTRApMjaIkRt Registered 19283 - - - 19283 010714 1600 4994

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19283 62 40 0 19385 010714 1600 4994

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11936 11936 300714 0500 5000

gaaovaa GOApMjaIkRt Registered 405 459 - - 459 260714 2000 4967

AsaIimat Unrestricted 405 459 0 5 - 464 260714 2000 4967

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 532 - - 532 290714 0900 4998

AsaIimat Unrestricted 532 0 0 - 532 290714 0900 4998

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 287 - - 287 060714 1000 4991

AsaIimat Unrestricted 287 0 1 - 288 060714 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 721 - - 721 050714 1700 4983

AsaIimat Unrestricted 721 0 - 721 050714 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 400 435 290714

piScama xao~ WESTERN REGIONpMjaIkRt Registered 43034 - - - 43034 010714 1600 4994

saIimat Restricted 40703

AsaIimat Unrestricted 40905 43034 295 90 0 43419 010714 1600 4994

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28431 28431 240714 0500 5000 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

माह जलाई 2014Jul-14

अनब समातरवतीय चालन PARALLELRADIAL OPERATION TOTAL OPERATING HOURS

1 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-NR)

2 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-SR) 7424400

टाई लाईन TIE LINE

1 765 कवी िसवनी स वधा-I 765kV Soni to Wardha 6780100

2 765 कवी िसवनी स वधा-II 765kV Seoni to Wardha 2043700

3 400 कवी िभलाई स कोराड 400kV Bhilai to Koradi 7440000

4 400 कवी िभलाई स भिावती 400kV Bhilai to Bhadravati 7440000

5 400 कवी रायपर स भिावती -I 400kV Raipur to Bhadravati-I 7440000

6 400 कवी रायपर स भिावती ndashII 400kV Raipur to Bhadravati-II 7440000

7 400 कवी रायपर स भिावती ndashIII 400kV Raipur to Bhadravati-III 7440000

8 400 कवी सातपरा स कोराड 400kV Satpura to Koradi 7060200

9 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7440000

10 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 7440000

11 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7225100

12 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 7082500

13 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 5361200

14 400 कवी को हापर स मापसा-I 400kV Kolhapur-Mapusa-I 4561600

15 400 कवी को हापर स मापसा-II 400kV Kolhapur-Mapusa-II 4793700

16 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7440000

17 400 कवी रायगढ़ स ःटरलाइट-I 400kV Raigarh to Sterlight-I 7371100

18 400 कवी रायगढ़ स ःटरलाइट-II 400kV Raigarh to Sterlight -II 7440000

19 400 कवी रायगढ़ स झरसगड़ा-I 400kV Raigarh to Jharsuguda-I 7302900

20 400 कवी रायगढ़ स झरसगड़ा-II 400kV Raigarh to Jharsuguda-II 7303700

21 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 5400900

22 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7292200

23 400 कवी रायपर स वधाndashI 400kV Raipur to Wardha-I 7440000

24 400 कवी रायपर स वधाndashII 400kV Raipur to Wardha-II 7440000

25 220 कवी कोरबा पव स ब पादर-III 220kV K(E) to Budhipadar-III 7361200

ANNEXURE 43

maah jaUlaa[- 2014 ko daOrana pa~ta iSaDyaUla GaTkaoM Wara koMd`Iya xao~ ko sToSanaaoMM sao D`avala AaOr ivainamayaaoM ka ivavarNa

1 koMd`Iya sToSanaaoMM samaip-t koMd`Iya sToSanaoMa saMyaut inajaI sToSanaaoM kI GaaoiYat xamata (basa pr) AaOr laaBaaiqa-yaaMo kI pa~ta1 Declared Capcity (ex-bus) of Central Gen StnsDedicated CG StnsJointly owned Stns amp entitlement of beneficieries (MUs)

GaaoiYat xamata gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI + ecaDblyaubaI kula

(A) koMd`Iya ibajalaIGar A Central Gen Stns Dec Cap GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC+HWB TOTAL

kaorbaa esaTIpIesa Korba STPS 1017635 174452 237891 103616 324281 102699 23918 26164 1017635kaorbaa esaTIpIesa -III Korba STPS-III 283431 54419 44422 85553 76649 3066 3405 13029 283431ivanQa esaTIpIesa I Vindhyachal STPS-I 674012 123034 240046 1253 246970 19644 7141 23669 12255 674012ivanQa esaTIpIesa II Vindhyachal STPS-II 491154 117386 158375 0909 175903 6532 4569 16539 491154ivanQa esaTIpIesa III Vindhyachal STPS-III 627679 166963 156579 67068 186511 7093 7097 22387 627679ivanQa esaTIpIesa IV Vindhyachal STPS-IV 411100 98631 118464 26475 133406 5356 5241 19338 411100kvaasa gaOsa Kawas GPP 306920 87464 65557 0000 95562 5791 14520 37998 306920gaMQaar gaOsa Gandhar GPP 406294 146476 72428 0000 123833 7814 19389 36310 406294saIpt Sipat 1665864 454494 301337 266370 509047 19436 19662 68224 1665864kakrapar Kakrapar APS 275783 78347 69731 0000 94368 9698 5200 8018 10420 275783tara`pur 3 AaOr 4 Tarapur APS 3amp4 721903 183150 155921 32084 295823 8510 8953 31049 721903

(ba) samaip-t koMd`Iya ibajalaIGar B Dedicated CG Stations Actual injection vaasaivak [njaoSana [Midra saagar Indira Sagar 245570 245570 245570

(sa) saMyaut inajaI sToSana C Jointly owned Stationstara`pur 1 AaOr 2 Tarapur APS 1amp2 196640 98320 0000 0000 98320 0000 0000 0000 196640esaesapI SSP 97965 15674 55840 0000 26450 0000 0000 0000 97965ponca Pench 13620 9080 0000 4540 0000 0000 0000 13620

kula ([M saagar kao CaoD kr) Total (excl Indira Sagar) 11988065 2808880 2297269 640720 3692105 208667 173093 400816 1766516 11988065 Actual injection

2 koMd`Iya sToSanaaoMM samaip-t koMd`Iya sToSanaoMa saMyaut inajaI sToSanaaoM kI ]padna SaoDyaUla AaOr laaBaaiqa-yaaoM kI D`avala SaoDyaUla2 Generation Schedule (ex-bus) of Central Gen StationsDedicated CG StationsJointly owned Stations amp schedule of benificieries (MUs)

SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI+ ecaDblyaubaI kula

(A) koMd`Iya ibajalaIGar A Central Gen Stns Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH

HVDC+HWB Outside region(NR

amp SR) TOTALkaorbaa esaTIpIesa Korba STPS 1015070 174452 238276 103310 321801 102699 23918 26164 1015070kaorbaa esaTIpIesa -III $ Korba STPS-III $ 282671 54342 44422 85185 76334 3066 3405 13029 282671ivanQa esaTIpIesa I Vindhyachal STPS-I 660248 120064 239050 1253 237415 19644 7141 23473 12209 660248ivanQa esaTIpIesa II Vindhyachal STPS-II 488287 117160 156978 0909 174700 6532 4569 16539 488287ivanQa esaTIpIesa III Vindhyachal STPS- III 600504 134916 160349 67878 186319 7093 7227 22827 600504ivanQa esaTIpIesa IV Vindhyachal STPS- IV 409072 98719 118259 24888 133048 5356 5241 19374 409072kvaasa gaOsa Kawas GPP 99574 27083 25459 0000 23510 2678 5916 14915 0000 99574gaMQaar gaOsa Gandhar GPP 154677 55634 30257 0000 41633 3783 8217 15131 0000 154677saIpt Sipat 1448506 290983 323024 258111 436177 19418 23860 69790 1448506kakrapar Kakrapar APS 275783 78347 69731 0000 94368 9698 5200 8018 10420 275783tara`pur 3 AaOr 4 Tarapur APS 3amp4 721903 183150 155921 32084 295823 8510 8953 31049 721903

(ba) samaip-t koMd`Iya ibajalaIGar B Dedicated CG Stations[Midra saagar Indira Sagar 245570 245570 245570

RPPC(NVVNL) 0000

0000

0000

(sa) saMyaut inajaI sToSana C Jointly owned Stations Actual injection vaasaivak [njaoSana tara`pur 1 AaOr 2 Tarapur APS 1amp2 196640 98320 0000 0000 98320 0000 0000 0000 196640esaesapI SSP 97965 15674 55840 0000 26450 0000 0000 0000 97965ponca Pench 13620 0000 9080 0000 4540 0000 0000 0000 13620kula [M saagar kao CaoD kr Total (excl Ind Sagar) 10173905 2352674 2217883 625946 2591731 193349 149578 336130 1706614 10173905

Actual injectionNote- $ These Scheduled Transactions are done by WRLDC under STOA

3 AMtrxao~Iya ivainamayaaoM iWpxaIya ivanamayaaoM kI SaoDyaUla (ima yauinaTsa)3 Schedule for interregional exchangesbilateral exchanges (MUs)

SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kulaxao~ rajya RegionState Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL

k pUvaI- xao~ ko rasto Import SDLs through ER -110482Aayaat SaoDyaUla Indian Energy Exchange (WR to ER) 0000 0000 0000 0000 0000 0000 0000 139465

Power Exchange of India (ER to WR) 0000 0000 0000 0000 0000 0000 0000 3671ER (NTPC) 47912 28298 11592 52018 0000 0786 1209 93903

DVC to MPPTCL (Long Term Open Access) 0000 201316 0000 0000 0000 0000 0000 201316Hirakud to CSEB 0000 0000 1354 0000 0000 0000 0000 1354

APL2 GUVNL to APPCC ( AEL) -0918 0000 0000 0000 0000 0000 0000 -0918APL3 GUVNL to APPCC ( AEL) -0924 0000 0000 0000 0000 0000 0000 -0924

CSEB to APPCC ( NVVNL) 0000 0000 -44813 0000 0000 0000 0000 -44813DBPOWER to APPCC ( GMRETL) 0000 0000 -1828 0000 0000 0000 0000 -1828

JPL to APPCC ( KISPL) 0000 0000 -15225 0000 0000 0000 0000 -15225JPL-II to APPCC ( KISPL) 0000 0000 -11376 0000 0000 0000 0000 -11376

Anaulagnak 45

DETAILS OF ENTITLEMENTSCHEDULEDRAWAL BY THE CONSTITUENTS FROM CENTRAL SECTOR STATIONS AND EXCHANGES FOR THE MONTH OF JULY 2014

(pxaoivasa` Wara jaarI xao~Iya jaa- laoKa ko AaQaar pr)

13896KAWAS(RLNG)

GANDHAR(RLNG)

JPL-II to APPCC ( NVVNL) 0000 0000 -11414 0000 0000 0000 0000 -11414JPL-II to APPCC ( PTC LTD) 0000 0000 -14853 0000 0000 0000 0000 -14853

CSEB to ASEB ( PTC LTD) 0000 0000 -0575 0000 0000 0000 0000 -0575MPPMCL MPSEB to ASEB ( IEXL) 0000 -0575 0000 0000 0000 0000 0000 -0575

APL1 GUVNL to BIHAR ( AEL) -106185 0000 0000 0000 0000 0000 0000 -106185APL2 GUVNL to BIHAR ( AEL) -72520 0000 0000 0000 0000 0000 0000 -72520APL3 GUVNL to BIHAR ( AEL) -51827 0000 0000 0000 0000 0000 0000 -51827

DBPOWER to BIHAR ( MANIKARAN) 0000 0000 -0350 0000 0000 0000 0000 -0350EMCO to BIHAR ( PXIL) 0000 0000 0000 -0413 0000 0000 0000 -0413

GUVNL to BIHAR ( PXIL) -0200 0000 0000 0000 0000 0000 0000 -0200MSEB to BIHAR ( PXIL) 0000 0000 0000 -0100 0000 0000 0000 -0100

MPPMCL MPSEB to BIHAR ( PXIL) 0000 -0150 0000 0000 0000 0000 0000 -0150GUVNL to BESCOM ( GUVNL) -14041 0000 0000 0000 0000 0000 0000 -14041

ESSAR_MAHAN to BESCOM ( ESSAR_MAHAN) 0000 -4353 0000 0000 0000 0000 0000 -4353ADHUNIK to BALCO ( BALCO) 0000 0000 0064 0000 0000 0000 0000 0064

ADHUNIK to BALCO ( MANIKARAN) 0000 0000 7200 0000 0000 0000 0000 7200JSEB(ER) to BALCO ( MPPL) 0000 0000 1481 0000 0000 0000 0000 1481

JSEB(ER) to BALCO ( MANIKARAN) 0000 0000 1200 0000 0000 0000 0000 1200JITPL to BALCO ( BALCO) 0000 0000 1200 0000 0000 0000 0000 1200

STERLITE to BALCO ( BALCO) 0000 0000 18603 0000 0000 0000 0000 18603JSEB(ER) to ESIL_WR ( MPPL) 0600 0000 0000 0000 0000 0000 0000 0600STERLITE to ESIL_WR ( PXIL) 1900 0000 0000 0000 0000 0000 0000 1900

NSPCL to SAIL ROURKELA ( SAIL ROURKELA) 0000 0000 -23994 0000 0000 0000 0000 -23994APL2 GUVNL to TGPCC ( AEL) -1074 0000 0000 0000 0000 0000 0000 -1074APL3 GUVNL to TGPCC ( AEL) -1081 0000 0000 0000 0000 0000 0000 -1081

CSEB to TGPCC ( NVVNL) 0000 0000 -52359 0000 0000 0000 0000 -52359JPL to TGPCC ( KISPL) 0000 0000 -17792 0000 0000 0000 0000 -17792

JPL-II to TGPCC ( KISPL) 0000 0000 -13295 0000 0000 0000 0000 -13295JPL-II to TGPCC ( NVVNL) 0000 0000 -13342 0000 0000 0000 0000 -13342

JPL-II to TGPCC ( PTC LTD) 0000 0000 -17335 0000 0000 0000 0000 -17335TISCO to VFL MPSEB ( TPTCL) 0000 0000 0268 0000 0000 0000 0000 0268

BLAPPL MPSEB to WBSEB ( IEXL) 0000 -0016 0000 0000 0000 0000 0000 -0016DBPOWER to WBSEB ( PTC LTD) 0000 0000 -0595 0000 0000 0000 0000 -0595

MPPMCL MPSEB to WBSEB ( PTC LTD) 0000 -89184 0000 0000 0000 0000 0000 -89184

SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kulaxao~ rajya RegionState Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL

K dixaNa xao~ ko rasto Import SDLs through SR 10967

Aayaat SaoDyaUla Indian Energy Exchange (SR to WR) 0000 0000 0000 0000 0000 0000 0000 0169Power Exchange of India (SR to WR) 0000 0000 0000 0000 0000 0000 0000 0000RSTPS-SR to GOA ( BILATERAL) 0000 0000 0000 0000 2186 0000 0000 2186RSTPS-SR to GOA ( WHEELING) 0000 0000 0000 0000 3118 0000 0000 3118

RSTPS-SR to GOA ( WHEELING GOA) 0000 0000 0000 0000 5494 0000 0000 5494

ga ]trI xao~ ko rasto Import SDLs through NR -321127Aayaat SaoDyaUla Indian Energy Exchange (NR to WR) 0000 0000 0000 0000 0000 0000 0000 -164961

Power Exchange of India (NR to WR) 0000 0000 0000 0000 0000 0000 0000 -3367Rihand (Hydro) to MPPTCL (Long Term Open Access) 0000 7970 0000 0000 0000 0000 0000 7970

Matathilla (Hydro) to MPPTCL (Long Term Open Access) 0000 0000 0000 0000 0000 0000 0000 0000EMCO to BIHAR ( PXIL) 0000 0000 0000 -0188 0000 0000 0000 -0188MSEB to BIHAR ( IEXL) 0000 0000 0000 -0400 0000 0000 0000 -0400

MPPMCL MPSEB to BSES_RAJ ( MPPL) 0000 -7000 0000 0000 0000 0000 0000 -7000ADHUNIK to BALCO ( MANIKARAN) 0000 0000 5198 0000 0000 0000 0000 5198

HIMACHAL to ESIL_WR ( IEXL) 0050 0000 0000 0000 0000 0000 0000 0050HARIYANA to ESIL_WR ( IEXL) 1525 0000 0000 0000 0000 0000 0000 1525HARIYANA to ESIL_WR ( PXIL) 5610 0000 0000 0000 0000 0000 0000 5610

KWHEPS to ESIL_WR ( PXIL) 0150 0000 0000 0000 0000 0000 0000 0150SCL to ESIL_WR ( IEXL) 0610 0000 0000 0000 0000 0000 0000 0610SCL to ESIL_WR ( PXIL) 0090 0000 0000 0000 0000 0000 0000 0090

MPPMCL MPSEB to HARIYANA ( HARIYANA) 0000 -126636 0000 0000 0000 0000 0000 -126636SCL to HRJIL MSEB ( SCL) 0000 0000 0000 1993 0000 0000 0000 1993

APL3 GUVNL to JVVNL-NR ( IEXL) -0120 0000 0000 0000 0000 0000 0000 -0120APL3 GUVNL to JVVNL-NR ( PXIL) -0122 0000 0000 0000 0000 0000 0000 -0122

BLAPPL MPSEB to JVVNL-NR ( IEXL) 0000 -0250 0000 0000 0000 0000 0000 -0250EMCO to JVVNL-NR ( IEXL) 0000 0000 0000 -0720 0000 0000 0000 -0720MSEB to JVVNL-NR ( PXIL) 0000 0000 0000 -0300 0000 0000 0000 -0300

MPSEB to NDPL(DTL)-NR ( PTC LTD) 0000 -1626 0000 0000 0000 0000 0000 -1626MPPMCL MPSEB to NDPL(DTL)-NR ( PTC LTD) 0000 -35052 0000 0000 0000 0000 0000 -35052

MPPMCL MPSEB to RPPC ( RPPC) 0000 -3562 0000 0000 0000 0000 0000 -3562EMCO to TRIPURA ( IEXL) 0000 0000 0000 -0070 0000 0000 0000 -0070

ADHPL to TORRAHM GUVNL ( IEXL) 0051 0000 0000 0000 0000 0000 0000 0051

Ga iWpxaIya SaoDyaUlsa Exchanges within WRMundra APL to Gujarat (LTOA) 0000 0000 0000 0000 0000 0000 0000 0000

JPL to ARVIND GUVNL ( MPPL) 4464 0000 0000 0000 0000 0000 0000 4464JPL to AIGL MSEB ( AIGL MSEB) 0000 0000 0000 0789 0000 0000 0000 0789

JPL to ARPIPL MSEB ( ARPIPL MSEB) 0000 0000 0000 0771 0000 0000 0000 0771JPL to ACCIL MSEB ( ACCIL MSEB) 0000 0000 0000 2380 0000 0000 0000 2380

APL1 GUVNL to AWLD GUVNL ( AEL) 3874 0000 0000 0000 0000 0000 0000 3874DBPOWER to BALCO ( BALCO) 0000 0000 0120 0000 0000 0000 0000 0120

DBPOWER to BALCO ( DBPOWER) 0000 0000 15887 0000 0000 0000 0000 15887EMCO to BALCO ( EMCO) 0000 0000 0080 0000 0000 0000 0000 0080

JPL to BOSCH MSEB ( BOSCH MSEB) 0000 0000 0000 1552 0000 0000 0000 1552JPL to BCSIL MSEB ( BCSIL MSEB) 0000 0000 0000 0720 0000 0000 0000 0720JPL-II to CSEB ( CSPTRDCL CSEB) 0000 0000 12569 0000 0000 0000 0000 12569

SPECT ACBIL to CSEB ( CSPTRDCL CSEB) 0000 0000 0720 0000 0000 0000 0000 0720ACBIL to CSPTRDCL CSEB ( CSPTRDCL CSEB) 0000 0000 5374 0000 0000 0000 0000 5374

JPL to CLASSIC MSEB ( CLASSIC MSEB) 0000 0000 0000 1309 0000 0000 0000 1309JPL to CIPLA MSEB ( CIPLA MSEB) 0000 0000 0000 0610 0000 0000 0000 0610

JPL to CEAT MSEB ( MPPL) 0000 0000 0000 2921 0000 0000 0000 2921APL1 GUVNL to CHLM GUVNL ( AEL) 2187 0000 0000 0000 0000 0000 0000 2187

NSPCL to DD ( DD) 0000 0000 0000 0000 0000 13156 0000 13156EMCO to DNH ( EMCO) 0000 0000 0000 0000 0000 0000 28097 28097

JPL to DNL MSEB ( DNL MSEB) 0000 0000 0000 0870 0000 0000 0000 0870JPL to ETLC MSEB ( ETL) 0000 0000 0000 0758 0000 0000 0000 0758JPL to ETLT MSEB ( ETL) 0000 0000 0000 0758 0000 0000 0000 0758

APL2 GUVNL to ESIL_WR ( PXIL) 0283 0000 0000 0000 0000 0000 0000 0283APL3 GUVNL to ESIL_WR ( PXIL) 8355 0000 0000 0000 0000 0000 0000 8355

DBPOWER to ESIL_WR ( MANIKARAN) 0000 0000 0000 0000 0000 0000 0000 0345EOL GUVNL to ESIL_WR ( ESIL_WR) -19578 0000 0000 0000 0000 0000 0000 0000

EPGL GUVNL to ESIL_WR ( ESIL_WR) -2866 0000 0000 0000 0000 0000 0000 0000JPL to ESIL_WR ( JPL) 0000 0000 0000 0000 0000 0000 0000 45641

JSWEL(RTNGIRI) MSEB to ESIL_WR ( PXIL) 0000 0000 0000 -2328 0000 0000 0000 0000MSEB to ESIL_WR ( PXIL) 0000 0000 0000 -1705 0000 0000 0000 0000

ESSAR_MAHAN to ESIL_WR ( ESIL_WR) 0000 0000 0000 0000 0000 0000 0000 52250VANDANA to ESIL_WR ( PXIL) 0000 0000 0000 0000 0000 0000 0000 0480

JPL to ESIL MSEB ( JPL) 0000 0000 0000 0108 0000 0000 0000 0108ESSAR_MAHAN to ESIL MSEB ( ESIL_WR) 0000 0000 0000 1244 0000 0000 0000 1244

JPL to ETLW MSEB ( ETL) 0000 0000 0000 0732 0000 0000 0000 0732JPL to ETLB MSEB ( ETL) 0000 0000 0000 0866 0000 0000 0000 0866

JPL to EILR MSEB ( MPPL) 0000 0000 0000 1049 0000 0000 0000 1049JPL to ETLK MSEB ( ETL) 0000 0000 0000 0643 0000 0000 0000 0643

JPL to EXIDE MSEB ( EXIDE MSEB) 0000 0000 0000 1239 0000 0000 0000 1239CSEB to GOA ( PTC LTD) 0000 0000 -0400 0000 0400 0000 0000 0000

DBPOWER to GOA ( PTC LTD) 0000 0000 0000 0000 17390 0000 0000 17390JPL to GSL MSEB ( GSL MSEB) 0000 0000 0000 0870 0000 0000 0000 0870

EMCO to GCEL ( EMCO) 0000 0000 3394 0000 0000 0000 0000 3394JPL to HINDMOUDA MSEB ( HINDMOUDA MSEB) 0000 0000 0000 2249 0000 0000 0000 2249

HINDAHEJ GUVNL to HINDTALOJ MSEB ( HINDTALOJ MSEB) -2962 0000 0000 2962 0000 0000 0000 0000EMCO to DNH ( EMCO) 0000 0000 0000 0000 0000 0000 119290 119290

JPL to HNGIL MSEB ( HNGIL MSEB) 0000 0000 0000 5156 0000 0000 0000 5156LANCO TO MP 0000 191431 0000 0000 0000 0000 0000 191431

IEE 103711 47279 -413725 163201 0000 26840 0000 31054PEI 3561 7107 0000 -0214 0000 0000 0000 17561

ca kula Aayaat Total Import 781888 184933 483401 86303 247768 28588 40782 148596 781888kula inayaa-t Total Export 1202530 274418 268404 653270 6437 0000 0000 0000 1202530naoT Aayaat inayaa-t Net Imp (+)Exp (-) -420642 -89485 214997 -566968 241330 28588 40782 148596 -420642

4 kula gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kula

Total GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL11567423 2719395 2512265 73752 3933435 237255 213875 549412 12255 11567424

5 kI kula iSaDUyala Total Sdl incl IR bi-lateral exch Sdl 9753264 2263189 2432879 58978 2833062 221937 190360 484727 12209 97532646 ibanaa xait ko kula D`avala Total Drl excl Tr Loss 9388390 2433257 2716560 597587 2741156 286430 174671 437785 0944 93883907 xait imalaakr kula D`avala Total Drl incl Tr Loss 9703552 2433257 2716560 597587 2741156 286430 174671 437785 0976 93884228 p p`NaalaI maoM kula pUla xait Pooled loss in WR System 3151629 p xao`~ sToSanaaoM sao kaorbaa ivanQa 1 AaOr 2 ivanQa 3 kvaasa gaMQaar kakrapar tara`pur esaesapI ponca kula

vaastivak [njaoSana Actual Inj - WR Stns KSTPS VSTPS-1amp 2 VSTPS-3 KGPS GGPS KAPS TAPS SSP PENCH TOTAL (ima yauinaTsa) (MUs) 1310550 1162242 1009828 99928 156340 275783 918544 97965 13620 12860991

] xao~ Aa ]xao kao ina ] xao naoT d xao Aa d xao inayaa-t d xao naoT pU xao Aa pU xao inayaa-t pU xao naoT kula naoT10 vaasaivak AMtrxao~Iya Actual IR Exchanges NR Imp NR Exp NR Net SR Imp SR Exp SR Net ER Imp ER Exp ER Net Total Net

ivainamaya (ima yauinaTsa) (MUs) 0347 2303947 -2303600 0000 737616 -737616 73271 189494 -116223 -3157439 AMtrxao~Iya ivainamaya IR Exchange Schedule NRI sdl NRE sdl Net NR sdl SRI sdl SREsdl Net SR sdl ERI sdl ERE sdl Net ER sdl Net WR sdl iSaDyaUla (ima yauinaTsa) (MUs) 2987 714531 -711544 404371 0000 404371 0000 113469 -113469 -420642

Total Entitlement incl IR and bi-lateral exchange schedule

11

AMtrxao~Iya AaOr iWpxaIya ivanamayaaoM kI iSaDyaUla imalaakr kula pa~ta

maah jaUlaa[- 2014 ko AMtr-ajyaIya AMtrxao~Iya ivainamayaaoM ka ivavarNa Anaulagnak 46DETAILS OF INTERSTATEINTER-REGIONAL EXCHANGES FOR THE MONTH OF JULY 2014 Annex-46

k`maaMkFrom To

gauivainaila map`iva]kMila Craivabaao maraiva]kMila gaaovaa dmana dIva da na h [ssaar ] xao~ d xao~ pU xao~ piScama xao~ kulaA InterstateInter-regional Schedules

included in ISGSGUVNL MPPGCL CSEB MSPGCL GOA DD DNH ESIL NR SR ER WR TOTAL

1 gauivainaila GUVNL 2962 31082 34044

2 map`iva]kMila MPPGCL 0000

3 Craivabaao CSEB04

0400

4 maraiva]kM ila MSPGCL 4033 4033

5 gaaovaa GOA 0000

6da na h DNH 0000

7kaorbaa KORBA-III 0000

8 iMjadla pavar JPL 4464 12569 26349 45641 89023

9 ADanaI pavar APL 6061 6061

10 ESSAR MAHAN 1244 52250 53494

11 laonakao Lanco -Pathadi 0000

12 esaIbaIAa[-ela -ACBIL 6093 6093

13 KSK MAHANADI14 DB POWER 16008 17390 0345

15 VANDANA 0480

16 EMCO 3473

17 ESIL18 ena esa pI saI ela NSPCL 13157 28097 41254

19 ]ltarI xao~ NRegion (WR end) 0347 0347

20 dixaNaI xao~ S Region (S Bus) 0000 0000

21 pUvaI- xao~ E Region (WR end) 73271 73271

22 p xao~ WRegion (WR end) 737616 189494 3231057

23 enaTIpIsaI NTPC Injection 5216788

24 enapIsaI NPC Injection 1194327

25 Total ISGS drawal from the Grid incl interregional bi-lateral

2433257 2716560 597587 2741156 286430 174671 437785

B InterstateIR Exchanges not included in ISGS

20 knaa-Tk Karnataka 444 44400

21 yaUpIpIsaIela UPPCL 0000 0000

22 AarvaIpIenaela RVPNL -237 -2370

23 UPPCL ( Excess Drawn From Rajghat 0000 0000

24 kaoTa ]jjaOna Kota - Ujjain 0000 0000

25 kula ba Total B (13 to 17) 0000 -2370 0000 0000 44400 0000 0000 42030

C inavala ivainamaya Net Exchange (12+18) 2433257 2714190 597587 2741156 330830 174671 437785 9429476

D kula Aayaat Total Imp by WR 115648

E kula inayaa-t Total Export by WR 3231057

F inavala ivainamaya Net Exchange (D-E) -3115409

G p xao~ Wara vaIlD jaa- Energy wheeled by WR

26 pU xao~ sao d xao~ kao inayaa-t ER export to SR0000

0000

27 d xao~ sao ] xao~ kao inayaa-t pUxao pxao sao haokr SR export to NR via ERWR0000

0000

28 d xao~ sao ] xao~ kao inayaa-t pxao sao haokr SR export to NR via WR0000

0000

29 pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr ER export to NR via WR0000

0000

30 ] xao~ sao d xao~ kao inayaa-t pxao sao haokr NR export to SR via WR393404

393404

31 pU xao~ sao d xao~ kao inayaa-t pxao sao haokr ER export to SR via WR0000

0000

32 pU xao~ sao d xao~ kao inayaa-t ]xao pxao sao haokr ER export to SR via NRWR0000 0000

0000

33 ]pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr NER export to NR via WR0000

0000

Anaulagnak 47Annex-47

maah jaUlaa[- 2014 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39697 65459

9964 39521

Levels in Mtrs str maITr maoM

]ka[- Ukai

64932

10110

25501

25801

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF JULY 2014

ivavarNa Particulars

Sr No Details of incident (Elements Generation Tripped) Owner Utility Date TimeEffect (Loss of generation Load) if

anyCategory as per

Standards1 Bus Fault at Lonikhand 400 kV Bus 1 MSETCL 04Jul14 315 Nil GI‐22 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 06Jul14 433 load Loss 277 MW GD‐13 Tripping of Multiple Elements from 400220 kV Parli (MSETCL) Ss MSETCL 08Jul14 2359 Nil GI‐24 Poles tripping of HVDC Bhadarwati PGCIL 09Jul14 0350 amp 0504 Nil GI‐25 Tripping in Jejuri and Loanand Area MSETCL 10Jul14 126 Load Loss 400 MW GD‐16 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 11Jul14 349 load Loss 335 MW GD‐17 Blackout at Kawas Ss NTPC 11Jul14 117 Gen Loss 320 MW GD‐18 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 13Jul14 642 load Loss 263 MW GD‐19 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 15Jul14 611 load Loss 264 MW GD‐110 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 16Jul14 334 load Loss 200 MW GD‐111 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 17Jul14 417 load Loss 150 MW GD‐112 Tripping at Gandhar Ss NTPC 21Jul14 1607 Gen Loss 180 MW GD‐113 Multiple time tripping of 765 kV Sasan ‐Satna 2 ckt on Protection Mal‐operation PGCILSASAN 7252014 1026 amp 1229 Hrs Nil GI‐2

List of Grid Disturbances and Grid incidents (GDGI) in July-2014 Western RegionANNEXURE-5

SR NO UTILITIES OCC NO MONTH STATUS REMARK 1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14 HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314 AT MUMBAI BY NTPC MUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514 AT MUMBAI BY WRPC AT RELIANCE

7 WRTS-I 460 Jun-14 HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714 AT RAIPUR BY KWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-1411 RELIANCE SASAN 464 Oct-1412 MADHYA PRADESH 465 Nov-1413 BDTCLJBTCL 466 Dec-1414 NTPC Vindhyachal 467 Jan-1515 ESSAR TRANSMISSIOM 468 Feb-1516 TATA POWER 469 Mar-1517 SUGEN (TPL) 470 Apr-1518 TORRENT POWER 471 May-1519 CGPL 472 Jun-1520 NTPC Korba 473 Jul-1521 NCA 474 Aug-1522 NHDC 475 Sep-1523 NTPC Mouda 476 Oct-1524 KSK 477 Nov-1525 RELIANCE 478 Dec-1526 NTPC SIPAT CG 479 Jan-1627 TAPS-3amp4 480 Feb-1628 ESSAR ESIL 481 Mar-1629 GOA 482 Apr-1630 KAPS 483 May-1631 JPL 484 Jun-1632 DNH 485 Jul-1633 NTPC Mumbai 486 Aug-1634 ADANI TRANSMISSION 487 Sep-1635 INDIAN RAILWAY 488 Oct-1636 WRTS-II 489 Nov-16

ANNEXURE 10

8212014

1

OCC MEETING (462nd )

Power system Operation Corporation Ltd

OPERATIONAL HIGHLIGHTS amp ISSUES

Date 11082014Venue ndash Tarapur

MonthsIEGC Band

FVIlt499 499‐5005 gt5005

March14 1291 4783 3927 012

April14 3064 5233 1703 016

May14 2248 5319 2433 013

Junersquo14 3715 4536 1749 02460

80

100

120Frequency Profile for July 2014Frequency Profile for July 2014

Maximum instantaneous frequency

5036 Hz

on 23rd July 2014 at 1304 hrs

Minimum instantaneous frequency

4941 Hz

on 10th July and 25th July 2014 at 1950 hrs and 1944 hrs respectively

Julyrsquo14 3451 5016 1533 020

0

20

40

60

1‐Jul

2‐Jul

3‐Jul

4‐Jul

5‐Jul

6‐Jul

7‐Jul

8‐Jul

9‐Jul

10‐Jul

11‐Jul

12‐Jul

13‐Jul

14‐Jul

15‐Jul

16‐Jul

17‐Jul

18‐Jul

19‐Jul

20‐Jul

21‐Jul

22‐Jul

23‐Jul

24‐Jul

25‐Jul

26‐Jul

27‐Jul

28‐Jul

29‐Jul

30‐Jul

31‐Jul

Avg Frequency of the month

4993 Hz

1High frequency day due to heavy rain in almost all places in the country low demand was observed(117 GW) Heavy underdrawal by all constituents of WR around 700‐1000 MW during 1300 hrs2 Low frequency day Demand was high and Od by constituents Od by NR

lt499 499‐5005 gt5005

8212014

2

501

502

503

504

Frequency for July 2014

496

497

498

499

50

494

495

1 60 119

178

237

296

355

414

473

532

591

650

709

768

827

886

945

1004

1063

1122

1181

1240

1299

1358

1417

1476

1535

1594

1653

1712

1771

1830

1889

1948

2007

2066

2125

2184

2243

2302

2361

2420

2479

2538

2597

2656

2715

2774

2833

2892

2951

3010

3069

3128

3187

3246

3305

3364

3423

3482

3541

3600

3659

3718

3777

3836

3895

3954

4013

4072

4131

4190

4249

4308

Frequency 499 5005

26000

28000

Unit Outage‐ JULY‐14 Max 26128 MW on 26072014JUNE14 Max 20818 MW on 210714

PLANNED OUTAGE FORCED OUTAGE TOTAL OUTAGE‐JULY14 TOTAL OUTAGE‐JUNE14

10000

12000

14000

16000

18000

20000

22000

24000

26000

MW

0

2000

4000

6000

8000

10000

1‐Jul‐14 6‐Jul‐14 11‐Jul‐14 16‐Jul‐14 21‐Jul‐14 26‐Jul‐14 31‐Jul‐14Date

8212014

3

Energy ConsumptionMax

986 Mus on 2nd July+2975 as compared

to last year900

1000

1100

IN M

Us ‐‐‐‐gt

DAILY CONSUMPTION OF WESTERN REGION(2010‐11 TO 2014‐15)

Min749 Mus on 24th July

500

600

700

800

CONSU

MPT

ION

Apr

May Jun

Jul

Aug Sep

Oct

Nov Dec Jan

Feb

Mar

MONTHS ‐‐‐‐gt2010‐11 2011‐12 2012‐13 2013‐14 2014‐15

Energy Consumption MUDay

Jul‐14 Jun‐14 Jul‐13 Change wrt last month

Change wrt last Year

Average 848 927 712 ‐845 1909Max 986 971 760 156 2975Date 2‐Jul‐14 30‐Jun‐14 2‐Jul‐13 ~ ~

PEAK DEMAND (this month vis-agrave-vis last month)

STATE

CATERED(MW) UNRESTRICTED(MW)

Julyrsquo14 Junrsquo14 Julyrsquo14 Junrsquo14

GUJARAT 13833 13755 13969 13906

MP 7090 7120 7121 7434

CHATTISGARH 3118 3472 3414 3473

Regional Demand met

Max 43034 MW(1st July 1600 hrs)

2540 more than the l

MAHARASHTRA 19283 19452 19385 19755

GOA 459 475 459 482

DD 287 298 287 298

DNH 721 677 721 685

ESIL 532 535 532 535

43034 42934 43419 43802

last year

Min 28431 MW(24th July0500 hrs)

WR TOTAL 43034 42934 43419 43802

Figures shown are Maximums in the month

Demand Met Jul‐14 Jun‐14 Jul‐13 Change wrt last month

Change wrt last Year

Average 35215 40463 32253 ‐1297 918Max 43034 42934 34317 023 2540

Date when Max 1‐Jul‐14 30‐Jun‐14 2‐Jul‐13 ~ ~

8212014

4

Constituents Total Time Block Noof time block Violation of Compilance Violation of Compilancein the month of July Type ‐1 Type‐2

Chhattisgarh 2976 983 6697 927 6885Guajrat 2976 681 77 12 222 92 54

DSM Violation for the Month of July 2014

Guajrat 2976 681 7712 222 9254Madhya Pradesh 2976 528 8226 594 8004Maharashtra 2976 1045 6489 442 8515

Goa 2976 712 7608 1868 3723Daman and Diu 2976 1720 4220 2506 1579

Dadar Nagar Haveli 2976 23 9923 1299 5635

Violation Type‐2 When The drawl does not change sign in 12 consecutive time block

Violation Type‐1 When The drawl is more or less than 12 schedule or 150 MW whichever lesser

Total No of Blocks ‐ 2976

New Elements July 2014a) COMMISSIONING OF NEW GENERATING UNITSSLNO CONSTITUENT UNIT NAME UNIT NO C`ty(MW) DATE TIME

1 IPP(Jay Prakash Nigrie) JNSTPP I 660 150714(sync) 845

b) COMMISSIONING OF NEW TRANSMISSION LINES

SLNO CONSTITUENT LINE NAME CKT NO KV DATE TIME Line length( in km)

1 POWERGRID Wardha‐Aurangabad II 765 372014 2300 347 581 POWERGRID Wardha Aurangabad II 765 372014 2300 34758

2 POWERGRID Wardha‐Aurangabad I 765 572014 1900 34758

3 GETCO Kosamba‐Chorania I 400 572014 2035 230

4 GETCO Kosamba‐Chorania II 400 572014 2105 230

5 BDTCL BDTCL‐Bhopal(MP) I 400 16714 1833 864

6 POWERGRIDLILO of Raipur‐Raigarh‐4

IV 400 1872014 2200 2826 POWERGRIDat KSK

IV 400 1872014 2200 282

7 MPPTCL Indore‐Pithampura II 400 210714 1625 150

8 POWERGRIDDharamjaygarh‐Jharsuguda

I 765 29714 000 14893

9 POWERGRIDDharamjaygarh‐Jharsuguda

II 765 28714 2125 14893

Total ckt Km 189366

8212014

5

c) COMMISSIONING OF NEW ICTS

SLNO CONSTITUENT STATION NAME KV RATIOCAPACITY (MVA) DATE

TIME

1 BDTCL BDTCL(Bhopal)ICT 1 765400 3x500 372014 1657

2 POWERGRID Dharamjaygarh(ICT 1) 765400 3x500 772014 22593 POWERGRID Navasari(ICT 3) 400220 500 872014 1959

d)CO SS O G O C O Sd)COMMISSIONING OF LINE REACTORS

SLNO CONSTITUENT STATION NAME Line Name KVCty(MVAR

) DATETIME

1 BDTCL BDTCL Indore‐BDTCL I 765 3x80 23714 1935

2 POWERGRID DharamjaygarhDharamjaygarh‐Jharsuguda II

765 3x110 280714 2125

3 POWERGRID DharamjaygarhDharamjaygarh‐Jharsuguda I

765 3x110 29714 000

4 POWERGRID Satna Satna‐Gwalior‐II 765 3x80 29714 10005 POWERGRID Aurangabad Padghe Aurangabad 1 765 3x80 310714 22 475 POWERGRID Aurangabad Padghe‐Aurangabad‐1 765 3x80 310714 2247

e)COMMISSIONING OF BUS REACTORS

SLNO CONSTITUENT STATION NAME KVCty(MVA

R) DATETIME

1 POWERGRID Bhatapara 400 125 24714 19562 POWERGRID Indore 765 3x80 31714 18273 POWERGRID Sujalpur 400 125 31714 1205

Congestion Charge was applied 3 times in July 2014 on WR‐NR path ie on12th 14th amp 15th July 2014

8212014

6

5515 5484

5200

5400

5600

Congestion Charge applied on WR‐NR path Dt12714 (Block 3 ‐16)

4200

4400

4600

4800

5000WR‐NR TTC(4900 MW)

WR‐NR ATC(4400 MW)

4000

4200

030

034

038

042

046

050

054

058

102

106

110

114

118

122

126

130

134

138

142

146

150

154

158

202

206

210

214

218

222

226

230

234

238

242

246

250

254

258

302

306

310

314

318

322

326

330

WR‐NR_Act(MW) WR‐NR_TTC(4900 MW) WR_NR_ATC(4400 MW)

2200 00

240000

260000

280000

300000

320000

MW

Maharashtra Sch Vs Drawal‐12714(Block 3‐16)

140000

160000

180000

200000

220000

240000

MW

Gujarat Sch Vs Drawal_12714

200000

220000

3 4 5 6 7 8 9 10 11 12 13 14 15 16

TIme Block

Maharashtra_Sch Maharashtra_Drawal

340000

350000

W

MP Sch Vs Drawal_12714(Block 3‐16)

120000

3 4 5 6 7 8 9 10 11 12 13 14 15 16Time Block

GETCO_Sch(MW) GETCO_Drawal(MW)

750008000085000

CSPTCL‐12714(3‐16)

310000

320000

330000

3 4 5 6 7 8 9 10 11 12 13 14 15 16

MW

TIme Block

MP_Sch MP_Drawal

450005000055000600006500070000

3 4 5 6 7 8 9 10 11 12 13 14 15 16

MW

Time Block

CG_Sch CG_Drawal

Under Drawal By WR constituents during the imposition of Congestion on WR‐NR on 12714

8212014

7

5292

5100

5300

Congestion Charge applied on WR‐NR path Dt14714 (Block 57 ‐71)

4638

4300

4500

4700

4900

5100

WR‐NR TTC(4900 MW)

WR‐NR ATC(4400 MW)

3900

4100

1330

1336

1342

1348

1354

1400

1406

1412

1418

1424

1430

1436

1442

1448

1454

1500

1506

1512

1518

1524

1530

1536

1542

1548

1554

1600

1606

1612

1618

1624

1630

1636

1642

1648

1654

1700

1706

1712

1718

1724

1730

1736

1742

1748

1754

1800

WR‐NR_Act(MW) WR‐NR_TTC(4900 MW) WR_NR_ATC(4400 MW)

3600380040004200440046004800

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

MW

Maharashtra Sch Vs Drawal‐14714(Block 57‐71)

1900

2000

2100

2200

2300

2400

2500

2600

MW

Gujarat Sch Vs Drawal_14714

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

TIme Block

Maharashtra_Sch Maharashtra_Drawal

1800

1900

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

Time Block

GETCO_Sch(MW) GETCO_Drawal(MW)

700

750

800

Chhattisgarh Sch Vs Drawal_141714(Block57‐71)

2600

2700

2800

2900

MW

MP Sch Vs Drawal‐14714(57‐71)

500

550

600

650

700

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

MW

Time Block

CG_Sch CG_Drawal

2400

2500

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

Time Block

MP_Sch MP_Drawal

8212014

8

4630

45004700

Congestion Charge applied on WR‐NR path Dt15714 (Block 50 ‐96)

4463

350037003900410043004500

WR‐NR TTC(4150 MW)

WR‐NR ATC(3650 MW)

31003300

1215

1234

1253

1312

1331

1350

1409

1428

1447

1506

1525

1544

1603

1622

1641

1700

1719

1738

1757

1816

1835

1854

1913

1932

1951

2010

2029

2048

2107

2126

2145

2204

2223

2242

2301

2320

2339

2358

WR‐NR_Act(MW) WR‐NR_TTC(4150 MW) WR_NR_ATC(3650 MW)

3800

4000

4200

4400

4600

4800

MW

Maharashtra Sch Ve Actual on 15714(50‐96)

130015001700190021002300250027002900

MW

Gujarat Sch Vs Actual on 15714(50‐96)

3600

50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96

Time Block

Maharashtra_Sch Maharashtra_Drawal

1300

50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96

Time BLock

GETCO_Sch(MW) GETCO_Drawal(MW)

3500

3700

MP Sch Vs Actual for 15714(50‐96)

850

950

1050

Chhattisgarh Sch Vs Actual‐15714(50‐96)

2700

2900

3100

3300

50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96

MW

Time Block

MP_Sch MP_Drawal

350

450

550

650

750

850

50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96

MW

Time BLock

CG_Sch CG_Drawal

8212014

9

Summary of Grid Events (GD amp GI) in July 2014

Sr No

Details of incident (Elements Generation Tripped) Owner Utility Date TimeEffect (Loss of

generation Load) if any

Category as per

Standards

1 Bus Fault at Lonikhand 400 kV Bus 1 MSETCL 04Jul14 315 Nil GI‐2

2 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 06Jul14 433 load Loss 277 MW GD‐1

3Tripping of Multiple Elements from 400220 kV Parli

MSETCL 08Jul14 Nil GI 23(MSETCL) Ss

MSETCL 08Jul142359

Nil GI‐2

4 Poles tripping of HVDC Bhadarwati PGCIL 09Jul140350 amp 0504

Nil GI‐2

5 Tripping in Jejuri and Loanand Area MSETCL 10Jul14 126 Load Loss 400 MW GD‐1

6 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 11Jul14 349 load Loss 335 MW GD‐1

7 Blackout at Kawas Ss NTPC 11Jul14 117 Gen Loss 320 MW GD‐1

8 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 13Jul14 642 load Loss 263 MW GD‐1

9 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 15Jul14 611 load Loss 264 MW GD‐1

10 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 16Jul14 334 load Loss 200 MW GD‐1

11 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 17Jul14 417 load Loss 150 MW GD‐1

12 Tripping at Gandhar Ss NTPC 21Jul14 1607 Gen Loss 180 MW GD‐1

13Multiple time tripping of 765 kV Sasan ‐Satna 2 ckt on

Protection Mal‐operation PGCILSASAN 7252014

1026 amp 1229 Hrs

Nil GI‐2

S No Name of power

stations

Unit Reason for

outage

1 VSTPS 2 (210 MW) Coal Shortage

91 Operation of grid at high frequency ( gt 505 Hz) even under fuel shortage condition

Issues1 Major ISGSIPP are facing fuel

shortage1 VSTPS 2 (210 MW) Coal Shortage

2 VSTPS 5 (210 MW) Coal Shortage

3 Singhaji 1 (600 MW) Coal Shortage

4 SGTPS 4 (210 MW) Coal Shortage

5 JP Bina 2 (250 MW) Coal Shortage

6 Bhusawal 2 (210 MW) Coal Shortage

shortage2 Expected High Demand during dry

spell in September amp October3 Optimal use of precious fuel is

necessary to tackle the high demand in dry spell

7 Parli 4 (210 MW) Coal Shortage

8 India Bulls 1 (270 MW) Coal Shortage

8212014

10

Agenda 92 Insecure operation Oscillations Power Swingbull N‐1 contingency of 765 kV Tirora‐Akola2 on 10th and 11th June 2014

bull Tirora gen gt 1500 MW AR not operatedbull Intra plant mode of oscillations (097 Hz) with poor damping

bull N‐1 contingency of 400 kV Tirora‐Warora‐1 on 20th May 2014N 1 contingency of 400 kV Tirora Warora 1 on 20 May 2014bull Tirora gen gt 1500 MW 765 kV Tirora‐Akola2 out of servicebull SPS bull Power Swing and loss of complete power station GD‐1

bull The need for transmission augmentation as well as PSS tuning at APML Tirodawas discussed in the 461st OCC meeting

bull Member Secretary WRPC suggested that APML would send details of PSSMember Secretary WRPC suggested that APML would send details of PSS tuning studies to WRPC and they may consult IIT‐Mumbai for assistance and expedite

bull Representative from SLDC Kalwa APL may like to update the progress

Events at APML TiroraCase 3 Date 11‐07‐14 1529 hrsbull Line tripped on Y Phase to earth fault AR was unsuccessful due to persisting faultbull Sudden power transfer through 400 kV System resulted in swing Oscillation of 097 Hz observed across WR and

East West generation in Western region oscillatedO ill i i d f 10 dbull Oscillation persisted for 10 seconds

bull Damping ratio was 257

8212014

11

Events at APML TiroraCase 4 Date 23‐07‐14 0227 hrsbull 765400 kV APML Tirora ICT trippedbull Sudden power transfer through 400 kV System resulted in swing Oscillation of 097 Hz observed across WR

and East West generation in Western region oscillatedO ill i i d f 17 dbull Oscillation persisted for 17 seconds

bull Damping ratio was 7

bull Need for transmission augmentation as well as PSS tunning at APML Tiroda required

bull It has been decided in 461th OCC thatAPML would send details of PSS

Expected date of

tuning studies to WRPC and they may consult IIT‐Mumbai for assistance and expedite Representative from SLDC Kalwa APL may like to update the progress

Expected date of bull 2nd ckt of 765 kV Tirora‐Akola2bull 220 kV network from 400220 kV Warorabull 220 kV network from 765400 kV Akola2 and 765400 kV Taptithandabull 220 kV network from 765400 kV Aurangabad‐PG 400220 kV Pune

Redistribution of Load within Maharashtra system

8212014

12

Elements Date and

Time of

Tripping

Date and

Time of

Restoratio

n

Remarks Receipt of

DREL at WRLDC

Satna Sasan

765 kV Sasan‐Satna 225‐07‐14

1026

25‐07‐14

1155

Protection Mal‐Operation DT at Sasan End

on OV as line remain hanging from Sasan No Yes

Agenda 93 Frequent Tripping of 765 kV Satna‐Sasan line

Issues

1Expedite commissioning of Line Reactor at 765 kV Sasanend

2 Submission of DREL for1026 1155end

765 kV 240 MVAr

Bus Reactor at Satna

25‐07‐14

1026

25‐07‐14

1139

Protection Mal‐Operation DT at Sasan End

on OV as line remain hanging from SasanNo Yes

765 kV Sasan‐Satna 225‐07‐14

1342

25‐07‐14

1342

Line got charged from Satna and

synchronized at Sasan end but immediately

DT was received at Sasan from Satna and

Line tripped Prior to tripping voltage at

No Yes

2 Submission of DREL for event analysis in line with CEA standards IEGC

3 Threat to grid security and constraints in evacuation from large generation complexarising from frequent undesirable tripping particularily

Sasan end was 796 kV

765 kV Sasan‐Satna 225‐07‐14

1628‐

Charging attempt was taken from Satna end

but line tripped before synchronization at

Sasan end due to DT from Satna Open end

voltage at Sasan 826 kV for the line

No Yes

The above was a narrow miss because the tripping occurred when one of the bus was under shutdown Fortunately during theabove period only two units of Sasan were in service and the second 765 kV bus remained in service else the situation would havebeen a serious threat to the system security

during protection testing construction activities

The progress of reactor commissioning at Sasan over the last 8 months is given under

Schedule in formed in meetings

SN 451st OCC 455th

OCC

456th OCC 457th 458th 459th 460th 461st

1 Line reactor By Dec By April By May By June End of June End of By By

of 765 kV

Sasan‐Satna

ckt‐2

y

2013

y p

2014

y y

2014

y

2014(Testing under

progress)

2014 (As per

joint report

post site visit

on 26314)

June 2014

y

Aug‐

2014

y

Aug‐2014

2 765kV Bus‐1

Reactor

Jan 2014 By Mar

2014

By June

2014

By June

2014(Testing under

)

End of July

2014(As per

j i t t

End of July

2014

By

Sep‐

2014

By

Sep‐2014

Sasan may intimate the progress in reactor commissioning to the sub-committee

progress) joint report

post site visit

on 26314)

2014

8212014

13

Item no94 SPS at Sipat

bull The SPS scheme implemented at NTPC Sipat received at WRLDC

bull It is observed that a time delay of 15sec is provided to unload units 1 2 4 amp5 each by 150MW if ICT l d d 130 f t d l dany ICT s load exceeds 130 of rated load

bull As per decision of WRPC meeting on 18314 if ex‐bus generation at Sipat is more than 2200 MW immediate unloading of units were decided and the intentional delay provided needs to be re‐ examined (Maximum 2‐3 sec delay may be appropriate) as unloading by 150MW would also take another 4‐5sec

8212014

14

Contingency Envisaged SPS action Identified FeedersTripping of any oneICT at 400200 VapiSub‐Station

Automatic LoadShedding of 100MW

DNH 1) 66 kV‐Kharadpara‐Rakholi‐I 50 MW2) 66 kV Khadoli‐Khadoli‐3 30 MW

Item No95 SPS at 400220 kV Vapi(PGCIL) Item No912

DD1) 66 kV Magarwada‐Kachigam 60 MW

It was apprised by representatives from DD amp DNH in the 459th OCC meeting that the above scheme shall be implemented within a month

UT DDDNHmay apprise the status of commissioning of the envisaged SPSUT‐DDDNH may apprise the status of commissioning of the envisaged SPS

Item no96 Addressing High Voltage condition in SSP amp nearby area Sl No Line No of Times tripped in Julrsquo141 400 kV SSP‐Dhule‐I 32 400 kV SSP ‐ Rajgarh‐ I 2

Issues1 Multiple tripping of

feeders emanating from SSP

2 S l tiSl No Line No of occasions kept open on HV 2 Several emanating feeders being kept open on high voltage in SSP amp nearby area

Sl No Line No of occasions kept open on HV

1 400 kV SSP‐Dhule‐I 9

2 400 kV SSP‐Dhule‐II 6

3 400 kV SSP ‐ Rajgarh‐ I 1

4 400 kV SSP ‐ Rajgarh‐ II 1

bull Operating RBPH machines in synchronous condenser mode during offOperating RBPH machines in synchronous condenser mode during off peak hours

bull Reactor commissioning at Rajgarh amp Dhule to be expedited by WRTS‐II(PGCIL) amp MSETCL

bull Absorption of MVAr by Wanakbori WTS

8212014

15

1 Voltage at Wanakbori was gt420 kV for 100 the time during Julrsquo14

2 WTPS units 567 are injecting MVAR (~ 60 MVAR) at Voltage gt 420 kV

3 Absorption of MVAR by WTPS units is expected during the high voltage condition at WTPS amp nearby area

97Status of implementation of UFRWestern Region

States Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Stage - I 492 Hz Stage - II 490 Hz Stage - III 488 Hz Stage - IV 486 Hz

relief GUJARAT 580 773 580 726 580 1117 590 1025MADHYA PRADESH 460 468 460 450 460 460 465 490CHATTISGARH 150 110 150 114 155 117 155 91MAHARASHTRA 805 1108 810 1200 815 765 820 851GOA 25 25 25 25 25 25 25 25UT DD 10 15 15 15 UT DNH 30 30 35 35 Total load relief 2060 2484 2070 2515 2085 2485 2105 2482

Not received

DD and DNH have not implemented any stage of AUFLS

DD and DNH may appraise the status

Real‐time monitoring of the likely relief available from AUFLS at any given instant mandated by CERC

Telemetry to be provided at SLDC amp RLDC

Not received

8212014

16

Agenda 98 ADMS (Automatic Demand Management Scheme) Implementation as per Sec 542 of IEGC

As per CERC order dt06062014 the target of fully implementation of scheme is by January2015Constituents have to submit bi‐monthly progress report to WRPC Secretariat with a copy to the Commission and WRLDCMP has submitted its detailed action plan in the form of an affidavit to CERC for implementation of ADMS However SLDC MPPTCL is requested to furnish data to OCC forum in the above format

Item No 99 Status of Telemetry in WR

Telemetry Issuesdoc

8212014

17

Item No 910 Black Out at NTPC Kawas Power Station

bull On 11th July 2014 Kawas Gas generating complex got blackout due to tripping of evacuation lines one by one

within a short span of 30 minutes

bull The complete loss of evacuation lines occurred at 0117 Hrs The blackout has resulted in tripping of GT1A

GT1B and ST causing 320 MW generation loss in the area It was reported that weather condition was foggy with

slight drizzling was in the area

LineTime of Tripping

Kawas End Remote endRestoration Time

220 kV Kawas‐Navsari1

1246 AM

R phase to EF

Fault location 2 km

R Phase to EF

122 AM

220 kV Kawas ndashNavsari2

112 AMR phase to EF

Fault location 2208 km

R Phase to EF 347 AM

220 kV Kawas‐Haldarwa 1

107 AMR phase to EF

Fault location 16 km

R Phase to EF 246 AM

220 kV Kawas‐ R phase to EF R Phase to

bull Line restoration has failed on several attempt as the lines

were not holding due to persisting fault

bull Such an event of total loss of evacuation lines from a

generating station resulting in blackout scenario is a

matter of serious concern

bull WRTS-2 may kindly send the reasons for such faults

which has caused the incidence and the remedial action

taken in this regard220 kV Kawas‐Haldarwa 2

108 AMp

Fault location 2 kmEF 304 AM

220 kV Kawas‐Icchapur1

108 AM B phase to EFB Phase to EF

301 AM

220 kV Kawas‐Icchapur2

108 AMB phase to EF Faultlocation 356 km

B Phase to EF

331 AM

220 kV Kawas‐Vav 1 117 AMNo tripping

Hand Tripped laterLine Tripped 225 AM

220 kV Kawas Vav 2 117 AM Y Phase to EFY Phase to EF

317 AM

taken in this regard

bull Disturbance Recorder (DR) and Event Logger(EL) out

puts are yet to be received from WRTS-2

bull As per IEGC the information like DREL output relay

indications amp sequence of events etc must be sent to

RLDCRPC by 24 hrs of the event WRTS-2 may kindly

expedite amp furnish the information to WRLDC amp WRPC

Item No 911 Operating Procedure of WR-2014

The operating procedure of Western Region 2014 has been updated on 31072014 and the p g p g psame has been uploaded on WRLDC web site at the following link

httpwwwwrldccomdocsWR_OPERATING_PROCEDURE_2014pdf

8212014

18

Item No 12 Mock Black start Exercise

Station Name Date Proposed Remarks

Mock Black Start Plan for the following stations has been received by WRLDC

CLPIPL Gas Power Plant 29‐Jun‐2014 ‐

Gandhar Gas Power Plant 27‐July‐2014 ‐

Other Utilities may update the sub‐committee regarding their plan for black start exercise

SL No Name of the Station Remarks

1 Bargi DG set under outage

2 TONS Governor Problem

3 Birsinghpur Governor Problem

Healthiness of DG sets

3 Birsinghpur Governor Problem

4 Medikheda Governor Problem

5 Rajghat Governor Problem

1 Outage of DG set for longer period is matter of serious concern 2 SLDC Jabalpur may apprise the present status2 SLDC‐Jabalpur may apprise the present status3 Possibility of procurement of stand‐by DG sets to be examined to take care of such prolonged outage of DG sets which virtually renders the black start facility sterile4 There is need for blackstart generator planning in W3 area Thermal IPP generators are disconnected from state grid and there is no hydro station So with only UHV lines and large thermal units system restoration post disturbance would be extremely challenging for Chattisgarh

8212014

19

Maharashtra

Madhya Pradesh

Item No13 Review of list of feeders for load regulation in emergency

Gujarat

DD amp DNHChattisgarh

Goa

bull Decided during the 461st OCC that list ofDecided during the 461st OCC that list of

feeders identified for load control under

emergency measure for safeguarding grid

security would be reviewed in a special

meeting The list is yet to be reviewed

8212014

20

Item No 14 Implementation of voltage and time grading on OV relays to prevent tripping of multiple EHV lines emanating from single node on high voltage

bull During the 461st OCC it was informed by Power Grid representative that they have already implemented voltage grading in various line emanating from the same node (matter has not come in the MoM)

bull Power Grid amp other utilities may kindly intimate the present status of voltage grading at their respective sub‐stations

Power Station Number of instances

when the SPS signal

was received at the

station

Number of instances

when the action by

the generators was

adequate

Number of instances

when the automatic

generation reduction was

done partially

JPL 53 0 50

Item No 15 SPS for SR‐WR Inter Connection Inadequate Participation by Generators

Issues

1 10 times operation of SPS‐1 causing backing down at JPL amp KSK during 1714 to 7 8 14JPL 53 0 50

KSK 53 0 36

APML 35 0 30

Mouda 35 0 0

Koyna 0 0 0

Koradi 0 0 0

Khaparkheda 0 0 0

Chandrapur 0 0 0

to 78142 Participation by other envisaged

generators to be expedited3 PGCIL may update status of Extention of

SPS signal from Solapur(PG) to the additional generators identified for participation

4 Decided in 461st OCC to have special Chandrapur 0 0 0

DB Power 0 0 0

NSPCL 0 0 0

Balco 0 0 0

Lanco 0 0 0

KWPCL 0 0 0

pProtection Sub‐Committee meeting to discuss progress of implementation of the revised SPS at Solapur (for WR‐SR interconnection) amp extension of signal from Sholapur to additional generators in WR

8212014

21

Thank you

DiscussionhelliphelliphellipDiscussionhelliphelliphellip

  • 462 occ_minutepdf
  • participants list_462 OCC meeting 110814pdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 26-7pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 45pdf
  • 46pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84pdf
  • 84apdf
    • 26wrpc_minute 107pdf
    • 26wrpc_minute 108pdf
    • 26wrpc_minute 109pdf
    • 26wrpc_minute 110pdf
    • 26wrpc_minute 111pdf
    • 26wrpc_minute 112pdf
    • 26wrpc_minute 113pdf
      • 85pdf
      • 87pdf
      • 98pdf
      • 913pdf
      • 10pdf
Page 4: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR

4

462nd OCC MINUTES

Sub - committee discussed the matter amp suggested that outages of major coal fired

units(200MW amp above) amp hydro generating station shall be deferred till next OCC

meeting due to following reasons

1 Intermittent rain profile in the region amp Load generation balance requirements of

grid for secure operation

2 Coal shortage being faced by some important generating station of NTPC viz

Sipat amp Vindhyachal etc

3 Gas shortages being faced by Gas stations

4 Water shortage by Parli units of Maharashtra state power generating company

ltd(MSPGCL)

The finalized outage schedule of generating units for the above period and the

modified outages plan is placed at Annexure-31

The Sub-Committee agreed as above

32 Outage Programme of Transmission Lineselements The committee had received 275 nos of proposals for outage planning during Aug-Sep

2014 Further some proposals were received at the last moment of the meeting

The committee observed that -

1 There were repetitions in the proposals wherein the same line had been

requested for outage a no of times

2 The lines pertaining to STU were asked for outage As per 446th OCCM such

lines should be first approached to concerned STU and only in case of

problems faced in outages OCC-WR may like to review

3 Line detailsreasons in many cases were not already mentioned Committee

requested that while submitting outage planning data necessary care may

please be taken

4 All utilities were requested to avail outages as planned

The Sub-Committee agreed for the same

33 ANTICIPATED POWER SUPPLY POSITION FOR THE MONTHS ndash AUGUST 2014 amp SEPTEMBER 2014

Details of anticipated restricted amp un-restricted demands for the months of August 2014 amp

September 2014are given in Annex 33

The Sub-Committee noted the same

5

462nd OCC MINUTES

ITEM NO 4 OPERATIONAL STATISTICS FOR THE MONTH OF July 2014 The details of actual generation demand drawl of power from grid exchanges etc are given in the following Annexure Annex 41 - Actual Generation and Requirement for July 2014 Annex 42 - Peak Demand Schedule Vs Actual for July 2014 Annex 43 - Integrated Operation of the System and Operation of Inter State Tie lines

For July 2014 Annex 47 ndash Details of level of Major Reservoirs in Western Region for Month July

2014

The Sub-Committee noted ITEM NO 5 SYSTEM DISTURBANCES IN WESTERN REGION There was no major grid disturbance in the Western Region during the month The

tripping details during the month received from WRLDC is enclosed at Annexure-5

The Sub-Committee noted as above ITEM NO 6Healthiness status of SERsDRs of equipment in the system

Constituents have furnished the status of healthiness of SERDRs in their systems on the dates below

Sl No Name of

constituents Date of Receipt

1 PGCILWRTS-I 06082014 2 PGCILWRTS-II 07082014 3 MPPTCL 11082014 4 NTPC 04082014 5 CSPTCL 03082014 6 GETCO 07082014 7 MSETCL 11082014

Constituents of WR are requested to ensure healthiness and send the information to

this office regularly as per the recommendation of enquiry committee of Grid

disturbances on 25022007 and 28022007

ITEM NO 7 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS TRANSMISSION LINES AND GENERATING UNITS IN WR

71 Status of completion of ongoing Schemes for Commissioning of reactors The present status regarding schedule and commissioning of reactors is as below

6

462nd OCC MINUTES

S No

400 kV Substn

Size (MVAR)

Implementing agency

Expected commissioning date

1 Ranchodpura 125 MVAR GETCO Commd On 8th July 2013

2 Varsana 125 MVAR GETCO Commd On 25th July 2013

3 Rajkot 125 MVAR GETCO Commd On 5th August 2013

4 Amreli 125 MVAR GETCO Commd On 12072013

5 Jetpur 63 MVAR GETCO Commd on 11072013

6 Zerda 125 MVAR GETCO Commd in July 2013

7 Kosmba 80 MVAR GETCO Commissioned on 29112013

8 Limbdi (Chornia)

125 MVAR GETCO 25th July 2013

9 Jabalpur 125 MVAR PGCIL Commissioned on 26032014

10 Khandwa 125 MVAR PGCIL Commissioned on 28032014

11 India bulls 80 MVAR BR

MSETCL Commissioned 26112013

12 Nagda 50 MVAR MPPTCL Commissioned in Feb-2014

13 Sasan Line reactor-1

240 MVAR RELIANCE Commissioned on 16022014

14 Shujalpur 125 MVAR PGCIL July 2014 end

15 Bhatapara 125 MVAR PGCIL July 2014 end

16 Raigarh 125 MVAR PGCIL July 2014 end

17 Aurangabad 125 MVAR PGCIL 28042014

18 Nanded 125 MVAR MSETCL 2015

19 Sholapur 125 MVAR MSETCL Sept-2014

20 Kolhapur 125 MVAR MSETCL Sept-2014

7

462nd OCC MINUTES

21 Akola 125 MVAR MSETCL Sept-2014

22 Nagda 125 MVAR MPPTCL Oct 2014

23 Bhopal 80 MVAR MPPTCL Sept 2014

24 Damoh 125 MVAR PGCIL August 2014

25 Bachau 125 MVAR PGCIL August 2014

26 Pirana 125 MVAR PGCIL August 2014

27 Itarsi 2X125 MVAR

PGCIL August 2014

28 Seoni 125 MVAR PGCIL August 2014

29 Parli 125 MVAR PGCIL August 2014

30 Raipur 125 MVAR PGCIL August 2014

31 Gwalior 125 MVAR PGCIL Commissioned on 30062014

32 ISP 125 MVAR NHDC 2015

33 Satpura 50 MVAR MPPGCL March-2015

34 Sasan Line reactor-2

240 MVAR RELIANCE August -2014

35 Sasan Bus reactor

240 MVAR RELIANCE Sept-2014

72Status of completion of 765400 kV and above ongoing Transmission Schemes

being executedimplemented by Transmission Agencies The updated status on various ongoing transmission schemes for the current year as per the current information available is as follows - S No

Name of the Line Target Completion Date

Remarks

POWERGRID 1 400 kV Navsari ndash Kudus DC Line Sept- 2014 ROW problem 2 765kV SC Satna-Gwalior line

(359Km + 60Km DC Portion) Ckt-II August- 2014

3 765 kV Raigarh (Kotra) pooling Commissioned on

8

462nd OCC MINUTES

station -Champa Pooling station -Dharamjaygarh PS - 2nd ckt

21052014

4 765 kV Gwalior - Jaipur line (1st Ckt) SC

Dec 2014

5 765 kV Dharamjaygarh - Jabalpur Pooling Station DC line

Dec-2014

6 765 kV Wardha ndashNizamabad-Hyderabad DC

March-15

7 765 kV Narendra-Kolhapur DC March-15 8 HVDC Raigarh(Kotra)-Pugalur Bi-

pole March-15

9 400 kV Aurangabad - Boisar line DC line

Dec -2014

10 765 kV Aurangabad (PG) - Padghe (PG) DC

August-2014

11 800kV DC Champa ndash Kurukshetra Bipole

Jan 2015

12 765 kV DC Jharsuguda ndash Korba Dec 2014 13 2 X 765 kV SC Ranchi ndash Sipat Jan 2015 14 765 kV Wardha- Aurangabad DC

Line

Ckt I Commissioned on 010714 Ckt II Commissioned on 030714

15 765 kV Aurangabad- Solapur DC line

Dec 2014

16 765 kV Solapur-Pune line

Sept 2014

17 765KV Durg-Wardha DC Sept 2014 CHHATTISHGARH 1 LILO of 400 kV Korba west-

Khedamara at Marwa August 2014

2 400 kV DCDS Raipur(Raita)- Jagdalpur(DCDS)

March 2015

21 220 kV Korba-Bishrampur line (DCSS)

Sept 2014

22 220 kV DCDS lines Chhuri to Mopka (Bilaspur) (DCDS)

Nov 2014

26 LILO of 220 kV Raigarh-Budipadar at 400 kV PGCIL Ss Raigarh

Sept2014

28 LILO of 220 Korba (E)- Bishrampur line at 220 kV Churri Ss

Sept 2014

29 LILO of 220 kV Raigarh ndash Jindal (Tamnar) at Girwani 220 kV Ss

Sept 2014

GUJARAT 1 400 kV DC Kosamba-Chorania line

(Package I)(From Chorania SS to AP-54)

Aug -2014 Commissioned on 100314

9

462nd OCC MINUTES

2 400 kV DC Kosamba-Chorania line

(Package II)(From Kosamba SS to AP-54)

Aug -2014

3 400 kV DC Mundra-Zerda line No 1 Aug -2014 4 400 kV DC Mundra-Zerda line No 2 March-2015 5 400 kV DC Vadinar-Amreli line December -

2014

6 400kV Mundra-Hadala LILO to Halvad

August -2014

7 400 kV DC Amreli-Kasor line(Part-1) December-2014

8 400 kV Charanka- Veloda Oct 2014 MADHYA PRADESH 1 Chhegaon-Julwania 400 KV DCDS

Line OCT - 2014

2

Pithampur- Indore 400KV DCDS Line

August - 2014

Work of the line have been completed by MPPTCL feeder bay from Indore PGCIL is awaited

3 Satpura TPH-Ashta 400KV DCDS Line

December ndash 2014

MAHARASHTRA(STU)

1 400KV DC line from Koradi-II to Wardha SS(PG) DC

Oct- 2014

2 400 kV Akola-Taptiganga Sept 2014 3 400 kV Tiroda-Akola Dec - 2014 GUJARAT (IPTC route) by WR Transmission (Guj) Pvt Ltd

1 400 kV Rajgarh(PG)-Karamsad (GETCO) DC

Sept -2014

STERLITE (JTCL) 1 765 KvDhramjaygarh - Jabalpur (JTCL)

DC line May -2015 Severe ROW Problem

2 765 kV Jabalpur - Bina (JTCL) Sc May -2015 Severe ROW Problem STERLITE (BDTCL) 1 765 kV Bhopal - Indore (BDTCL) SC August-2014 2 765 kV Bhopal-Bhopal Commissioned on

160714 3 765 kV Dhule - Vadodara SC Oct - 2014 4 765 kV Vadodara - Dhule (BDTCL) SC Oct - 2014 5 765 kV Dhule - Aurangabad (BDTCL)

SC August-2014

RAICHUR SHOLAPUR TRANSMISSION CO LTD(RSTCL)

1 765 kV Raichur - Sholapur line 2nd SC

Commissioned on 29062014

10

462nd OCC MINUTES

It was suggested by WRLDC and constituents that important list of line will be sent by

each constituent to WRLDC and WRLDC will compile and furnish the list as per

priority of commissioning

The Sub-Committee noted and agreed as above

73 Commissioning of new Generating units in Western Region and the capacity expected to be commissioned during the current year 2014-15

The status regarding Generating units expected to be commissioned during the

current year 2014-15 is as below

Name of the Power Projects Unit No Capacity (MW)

Date of Commissioning Schedule Date

GUJARAT Bhavnagar Lignite TPP-JV I 250 August 2014 II 250 August 2014 UNO SUGEN 2 3825 July 2014 CHHATTISGARH Marwa 1 500 Sept 2014 2 500 Dec 2014 MAHARASHTRA Dhariwal 2 300 Synd On 23042014 CHANDRAPUR 8 500 Oct 2014 CHANDRAPUR 9 500 March 2015 KORADI 8 660 Oct 2014 KORADI 9 660 Jan 2015 PARLI 8 250 March 2015 MADHYA PRADESH Singhaji TPS 2 600 Oct-2014 Ms Jhabua Power Seoni 1 600 Dec ndash 2014 MB Power Anuppur 1 600 Sept ndash 2014 Jaiprakash Power Nigri 1 660 July 2014 Jaiprakash Power Nigri 2 660 Dec 2014 Moser Bear (Hindustan power) 1 600 Nov- 2014 Moser Bear (Hindustan power) 2 600 March 2015 Essar Concessional ampEssar Power 1 600 Oct 2014 Essar Concessional ampEssar Power 2 600 Dec 2014 BLA 2X4 90 March 15 Jhabua Power 1 600 Dec 2014 CENTRAL SECTORIPP KSK 2 600 August 2014 KSK 5 600 January 2015

11

462nd OCC MINUTES

ACBIL 1 300 March 2015 SASAN 5 660 July 2014 SASAN 6 660 August 2014 Sasan 4 660 Synchronized in May 2014

Sub-committee noted as above ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS (A) FOLLOW-UP ITEM NO 81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

All the constituents are requested to submit the CMP report for the First quarter

(April 2014 to June 2014) for the year 2014-15

The Sub-Committee members noted as above ITEM NO 82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR

Status of physical amp cyber security in Power Sector for the First quarter (April 2014 to

June 2014) for the year 2014-15 have not been received from some of the

constituents

The Sub-Committee members noted as above ITEM NO 83 PROCEDURE FOR CALCULATION OF TRANSMISSION SYSTEM

AVAILABILITY FACTOR FOR A MONTH AS PER CERC REGULATION 2014-19

Member Secretary WRPC informed that a procedure for calculation of

transmission system availability factor as envisaged in CERC Regulation 2014-15

was discussed in 461st OCC held at Raipur Various aspects were discussed and

finalized However there were concerns expressed by transmission licensee

regarding addition of 12 hrs to outage hrs after each tripping beyond admissible 2

tripping in a year as it will reduce availability below 95 Also concern was

expressed for multiplying outage hrs by 2 for line affecting generation Also

whether addition of 12 hrs is applicable to such lines affecting generation was

also expressed Whether these clauses are applicable to HVDC system was not

known Therefore all such concerns of transmission licenses have been taken up

with CERC for revision clarification

Meetings were held on 1st and 4th August 2014 with transmission licenses

regarding verification of data data formatting and sorting out various anomalies

and doubts for data from April to July 2014 for further processing at WRPC end

12

462nd OCC MINUTES

Member Secretary WRPC informed that certification for some transmission licensees

has already been done The certificate for PGCIL is to be issued as effect on

generation evacuation certificate from WRLDC is awaited

CM WRLDC requested all the transmission licensees to submit the data to WRLDC in

same format as submitted to WRPC

Representative from Transmission licensees agreed the same

The Sub-committee noted as above ITEM NO 84 IMPLEMENTATION OF RSD METHODOLOGY Shri Satyanarayan SE WRPC informed that GM (OSampC) NTPC HQ-I Mumbai vide letter dated 28072014 (copy enclosed at annexure 84) requested to call a meeting for resolvingclarification of methodology developed by WRPC The procedure for RSD framed by WRPC is enclosed at Annexure 84A SLDC MPPTCL Jabalpur informed that RSD was implemented for NTPC Mauda unit

on 18072014 but it was not more extended beyond 20072014 as no other major

beneficiaries agreed for extension

CE GETCO informed that intermittent rain profile in the different geographical area of

Gujarat amp increasing demand pattern didnrsquot permit them to take RSD of any NTPC

units as minimum of 3 days is required

Representative from SLDC Maharashtra also endorsed the Gujarat view points on

RSD

GM NTPC requested to the committee that if RSD wasnrsquot possible then at least

technical minimum schedule should be given

Member Secretary WRPC summarized the matter as follows

1 RSD was implemented for NTPC Mauda unit from 18072014 to 20072014

but it could not be extended due to increasing demand pattern amp uncertainty of

rain profile in the region

2 The method framed by WRPC shall be continued amp will be applied as and

when required

3 He requested constituents to schedule the NTPC generating units at its

technical minimum in case RSD is not feasible

The Sub-committee noted as above

13

462nd OCC MINUTES

ITEM NO 85 LOAD FORECASTING IN WESTERN REGION Background- As per the amended Indian Electricity Grid Code that is effective from 17th February 2014 the SLDCs SEB distribution licensees shall always restrict the net drawal of the State from the grid within the drawal schedule keeping the deviations from the schedule within the limits specified in the Deviation settlement mechanism regulations Therefore it is imperative that adequate attention may be paid towards load forecasting The matter was discussed in the past several OCC as well as in the 26th TCCWRPC board meeting wherein it was decided to create a task force for exploring development of a software for load forecasting A meeting was held on 03042014 under leadership of CE(SLDC) GETCO Gujarat at

Mumbai The outcome of the Meeting was as following

1 Short term action a) all the discoms were advised to provide maximum historical data b) Discoms have to bifurcate the geographical area in to zone and derive effect of temp rain festival on load

2 Long term action a) Provide computer base meters up to all the distribution feeders for close monitoring b) Provide weather sensors at various strategically important locations c) Formulation of forecasting desk (load amp RE) at SLDC level

The 2nd meeting regarding Load Forecasting Mechanism was held with members of WRPC WRLDC Western Region SLDCs amp State Discoms Forecasting Service Providers (FSPs) on 110614 at SLDC Vadodara Gujarat During the 460th OCC meeting CE SLDC GETCO informed that roadmap for implementation of pilot project amp main project has been prepared Budget proposal have already called from FSP amp they assured to submit till the end of the month For implementation of pilot project the Utility and their respective Pilot FSP are decided as tabulated below

Sr No STATE ndashSLDCDISCOM Pilot FSP

1 GUJARAT MS TESLA

2 MAHARASHTRA IIT MUMBAI

3 MADHYA PRADESH MS METEOLOGICA

4 CHHATISGARH MS SAS

5 GOA MS MARCADOS

6 DDDNH IITGANDHINAGAR

MP informed vide letter dated 27062014(copy enclosed at 85) that they have

already placed on order to Ms L amp T InfoTech on 12072013 for load forecasting

software project Therefore MP had requested to exclude them from pilot project

activities decided in earlier meetings

14

462nd OCC MINUTES

462nd OCC Discussions- State wise status is as under -

bull CE SLDC informed that Gujarat has prepared the NDA and forwarded to TESLA for signing and the same was signed by TESLA New Zealand office and their Mumbai office shall forward the same to SLDC Gujarat Thereafter Input data shall be provided and ID shall be provided to TESLA so as to start forecasting by them

bull SLDC Gujarat vide letter no SLDCCEMIST-6458 dtd 270614 has conveyed to all WR Nodal SLDC coordinators regarding progress of load forecasting pilot project Thereafter also e mailed on date 2082014 to all Nodal SLDC for submission of status Report on Pilot Load Forecasting Project However no proper response is received so far

bull MP SLDC conveyed that they have already awarded contract for load forecasting and the same is expected to be available by year end Therefore MP shall not participate in the present scheme

bull SLDC Chhattisgarh representative informed that matter has been taken with discom Chhattisgarh Discom were facing difficulties to contact with coordinator of Ms SAS

CE SLDC Gujarat being a group leader stated that Chhattisgarh shall intimate to them for further needful and would help them in this matter

bull Maharashtra SLDC informed that there was a meeting held on 09082014 with IIT Bombay where availability of data has been discussed amp one more meeting will be held on 22082014 outcome of the same will be intimated in next OCC meeting BEST amp TATA are already having such forecasting system

bull No one from GOA has attended last meeting even though GOA was forwarded copy of MOM Due to non availability of any coordinator details of GOA it was not possible to contact them However Ms Marcadose has also conveyed that he has not been contacted by Goa

bull No one from DDDNH has attended last meeting even though DD DNH was forwarded copy of MOM However IIT Gandhinagar conveyed that they were not been contacted by DD DNH

Member Secretary WRPC informed that a letter to DD DNH amp GOA has been written

from WRPC secretariat regarding implementation of ADMS Load Forecasting amp

telemetry status He further requested the constituents to implement the decision

taken in earlier meeting of load forecasting

OCC suggested that the next load forecasting meeting may be held at DDDNH

The Sub-committee noted as above

15

462nd OCC MINUTES

ITEM NO 86 NEED OF COOPERATION FROM WRLDC IN REAL TIME

bull CE SLDC informed that at present APL is under their control area and embedded scheduling model is used It may be noted that for units 78amp 9 at APL Gujarat has no share (all are for NR beneficiaries)There have been occasions when units 78amp 9 have tripped (given at annexure) Since APL is shown as embedded in Gujarat WRLDC requested Gujarat to reduce overdrawl when APL units 78amp 9 trips Hence Gujarat has to pick up state generationcostlier generation for no fault of Gujarat

bull Further lines are opened to curtail overdrawl when Gujarat is not faulty Gujarat is seen as overdrawing (due to embedded scheduling of APL) when APL trips

bull To complicate matters the scenario coupled with wind variations state generation has to be constantly varied to avoid overdrawl

Gujarat requested followings-

1 When large sized units (APL units 78amp 9) trips then scheduling of Gujarat should be changed with immediate effect OR Gujarat should not be pursued for deviation correction to the extent of schedule of units tripped at APL units 78amp 9 OR Schedule of Gujarat from other central sector stations should be changed as per their request with immediate effect

2 APL units 78amp 9 should be made a separate control area 3 Under above circumstances transmission lines should not be opened

due to default by APL as these affects Gujarat without any fault of their own Further this was done without informingtaking SLDC into confidence It was clear from the discussions that Gujarat Discoms are put to unnecessary financial implications WRLDC clarified that 220 KV Dehgam- Khanpur Line no1 was opened due to frequency touching 493 Hz and control of overdrawl was taken as security measure WRLDC agreed to inform CE SLDC whenever such discussions are taken and agreed to take care in future

The Sub-committee noted as above

ITEM NO 87 GUIDE LINES FOR SPLIT BUS OPERATION AT SSP RBPH SWITCHYARD CE SLDC Gujarat vide letter dated 07082014 informed that a meeting was held on

220514 at Kevadia Colony SSP regarding split bus arrangement at SSP RBPH

16

462nd OCC MINUTES

switchyard and subsequent discussions during 55th meeting of PSC of NCA held in

Vadodara on 140714 the guidelines for the same had been prepared in consultation

with GETCO protection wing and sent vide mail dated 23072014 However the same

has been attached herewith as Annexure-87 It was clarified during discussion that

split bus operation would be used only as per requirement and will not be a permanent

arrangement

The Sub-committee noted as above

ITEMS FROM WRLDC

1 OPERATION OF GRID AT HIGH FREQUENCY ( gt 505 HZ) The onsetrevival of monsoon in the last fortnight of July 2014 has reduced the demand in Western Region However the demand would pick up sharply during the dry spell in September and October months Presently the major State Central Sector IPP generators in Western Region that are facing coal shortage are tabulated as under S No Name of power

stations Unit Reason for

outage 1 VSTPS 2 (210 MW) Coal Shortage 2 VSTPS 5 (210 MW) Coal Shortage 3 Singhaji 1 (600 MW) Coal Shortage 4 SGTPS 4 (210 MW) Coal Shortage 5 JP Bina 2 (250 MW) Coal Shortage 6 Bhusawal 2 (210 MW) Coal Shortage 7 Parli 4 (210 MW) Coal Shortage 8 India Bulls 1 (270 MW) Coal Shortage Likewise several Gas Power Stations in Western Region are facing fuel shortage Under the above circumstances it is desirable that precious fuel optimally utilized to maintain adequate stock for the dry spell In the month of July 2014 the grid frequency remained above 5005 Hz for more than 15 of the time while it remained below 499 Hz for more than 34 of the time Operation of high frequency is unnecessary loss of fuel that could have been conserved and utilized during low frequency regime

The Sub Committee noted the same

17

462nd OCC MINUTES

2 OBSERVATION OF INTRA-PLANT MODE OF OSCILLATIONS (097 HZ) WITH POOR DAMPING ON 10TH AND 11TH JUNE 2014 AND LOSS OF 1800 MW IN MAHARASHTRA SYSTEM DUE TO POWER SWING UNDER N-1 CONTINGENCY ON 20TH MAY 2014 The issue of Intra plant mode of oscillations with poor damping as observed during the grid event on 10th and 11th June 2014 was discussed during the 461st OCC meeting Similar oscillations were again recorded on 11th July 2014 GM WRLDC informed that they have written to generators seeking details of MW fluctuations PSS status etc and requested constituents to share the dataHe requested that constituents may share PMU data also CESLDC Gujarat informed that they are proposing PSS tuning with consultants from IITs in their system EE SLDC Maharashtra informed that APL-Tiroda has recently tuned PSS at Tiroda units by OEM

It was once again requested constituent to furnish information as designed by WRLDC The Sub Committee noted the same

3 FREQUENT TRIPPING OF 765 KV SATNA-SASAN LINE

WRLDC informed that 765 kV Sasan-Satna Line has tripped on three occasions

while 240 MVAr Bus Reactor at 765 kV Satna tripped on one occasion The

tripping occurred due to protection mal-operation at Satna end during stability test

for the 765 kV Bus-1 The details of the tripping is given below

The above OV at Sasan end could have been avoided if the Line Reactor of this line at Sasan end had been commissioned The restoration of the tripped circuit also was considerably delayed in the absence of Line Reactor at Sasan end

Elements Date and Time of Tripping

Date and Time of Restoration

Remarks Receipt of DREL at WRLDC Satna Sasan

765 kV Sasan-Satna 2

25-07-14 1026

25-07-14 1155

Protection Mal-Operation DT at Sasan End on OV as line remain hanging from Sasan end

No Yes

765 kV 240 MVAr Bus Reactor at Satna

25-07-14 1026

25-07-14 1139

Protection Mal-Operation DT at Sasan End on OV as line remain hanging from Sasan

No Yes

765 kV Sasan-Satna 2

25-07-14 1229

25-07-14 1342

Line got charged from Satna and synchronized at Sasan No Yes

18

462nd OCC MINUTES

end but immediately DT was received at Sasan from Satna and Line tripped Prior to tripping voltage at Sasan end was 796 kV

765 kV Sasan-Satna 2

25-07-14 1628 -

Charging attempt was taken from Satna end but line tripped before synchronization at Sasan end due to DT from Satna Open end voltage at Sasan 826 kV for the line

No Yes

Representative from Sasan UMPP informed that with regards to the 765 kv Line and

Bus reactors all the material required for completion of works have been received at

site

Line reactor and bus reactor would be commissioned by Aug14 and Sep 14

respectively

The Sub Committee noted the same 4 SPS AT SIPAT

The SPS scheme implemented at NTPC Sipat has been received at WRLDC It is observed that a time delay of 15sec is provided to unload units 1 2 4 amp5 each by 150MW if any ICT s load exceeds 130 of rated load It was conveyed that if ex-bus generation at Sipat is more than 2200 MW immediate unloading of units may be done and the intentional delay which is required to prevent mal-operation may be 45 second instead of 15 second

NTPC Sipat representative agreed to implement the same accordingly The Sub Committee noted the same

5 COMMISSIONING OF SPS AT 400220 KV VAPI During the special WRPC meeting on 18032013 at Dadra an SPS for automatic load shedding subsequent to tripping of 400220 kV ICT at Vapi was approved as under It was decided that POWERGRID would extend trip signal from Vapi ICTs to the requisite feeders

Contingency Envisaged SPS action

Identified Feeders

Tripping of any one ICT at 400200 Vapi Sub-Station

Automatic Load Shedding of 100MW

DNH 1) 66 kV-Kharadpara-Rakholi-I 50 MW 2) 66 kV Khadoli-Khadoli-3 30 MW DD 1) 66 kV Magarwada-Kachigam 60 MW

19

462nd OCC MINUTES

It was felt that due to change in topology loading in ICT is not critical however SPS may be in place as defense mechanism in case of any emergency

DD amp DNH representative were absent in the meeting The Sub Committee noted the same

6 ADDRESSING HIGH VOLTAGE CONDITION IN SSP amp NEARBY AREA

High voltage condition is being observed at SSP and nearby area in off peak period particularly between 2300 hrs at night to 0500 hrs in the morning Also on many occasions the system operator is compelled to hand trip the 400 kV lines emanating from SSP to control over voltage Summary for the month of Julyrsquo14 is given under

Sl No 400 kV Line DatailsFrom To

Time Date Time Date 1 SSP-RAJGARH-I 0009 19-Jul-14 0730 29-Jul-14 2 SSP - RAJGARH-II 0406 16-Jul-14 1016 18-Jul-14 3 SSP-DHULE-I 1310 22-Jul-14 0953 23-Jul-14 4 SSP - DHULE - II 1533 15-Jul-14 0734 18-Jul-14 5 SSP - DHULE - I 1703 10-Jul-14 1100 11-Jul-14 6 SSP-DHULE-I 1712 28-Jul-14 0933 31-Jul-14 7 SSP - DHULE - II 1730 19-Jul-14 0917 20-Jul-14 8 SSP - DHULE - I 1757 18-Jul-14 0935 19-Jul-14 9 SSP-DHULE-II 1809 21-Jul-14 0914 22-Jul-14 10 SSP-DHULE-I 1815 30-Jun-14 0542 1-Jul-14 11 SSP-DHULE-I 1819 20-Jul-14 0858 21-Jul-14 12 SSP-DHULE-II 1825 8-Jul-14 0949 9-Jul-14 13 SSP - DHULE - II 1831 11-Jul-14 1007 13-Jul-14 14 SSP - DHULE - I 1838 1-Jul-14 0556 2-Jul-14 15 SSP - DHULE - I 1848 9-Jul-14 0912 10-Jul-14 16 SSP - DHULE - I 2136 13-Jul-14 0850 14-Jul-14 17 SSP-DHULE-II 2201 23-Jul-14 0945 28-Jul-14

Also it has been observed that Wanakbori TPS injects around 60 MVAr per unit even when voltage at Wanakbori is above 420 kV for nearly 100 of the time Further envisaged bus reactors at Rajgarh amp Dhule are yet to be commissioned Hence in view of system reliability it is advisable to explore all possibilities to contain high voltage condition in SSP and nearby area The following actions need to be taken to address the situation

bull Operating RBPH machines at SSP in synchronous condenser mode bull Absorption of MVAr by Wanakbori (WTPS) units bull The commissioning of Reactors at 400 kV Rajgarh may be expedited by

WRTS-2

20

462nd OCC MINUTES

bull The commissioning of Reactors at 400 kV Dhule may be expedited by MSETCL CE SLDC GETCO agreed for looking into absorption of MVAR at Wanakbori

7 IMPLEMENTATION OF THE REVISED AUFLS IN DD AND DNH Representatives from the DD and DNH intimated during the 459th OCC meeting that the tendering process was stalled because of general elections (election code of conduct was in force) amp action would be initiated post the elections Member Secretary WRPC vide letter dated 01082014 took up the matter with Secretary (P) DDDNH (copy enclosed) DD amp DNH representative were absent in the meeting to comment

The Sub Committee noted the same 8 ADMS(AUTOMATIC DEMAND MANAGEMENT SCHEME) IMPLEMENTATION

AS PER SEC 542 OF IEGC The format for reporting the progress of implementation of the ADMS in Western Region States was given as part of MoM of the 461st OCC meeting All utilities may like to furnish the updated status to WRPCWRLDC as per the above format It is understood that MP has submitted its detailed action plan in the form of an affidavit to CERC for implementation of ADMS However SLDC MPPTCL is requested to furnish data to OCC forum in the above format

The Sub Committee noted the same

9 STATUS OF TELEMETRY IN WESTERN REGION

In the 460th amp 461st OCC meetings the status of telemetry in Western Region was discussed in detail It was also highlighted that the Honrsquoble CERC vide its order in petition SM0072014 issued Notice under section 142 on several constituents of Western Region All the constituents had assured to address the telemetry issues within a month or two The telemetry status as on 4th August 2014 is tabulated below

21

462nd OCC MINUTES

a Maharashtra The non-availability of telemetry is 583 for sub-stations amp 18

for generating stations This is a matter of serious concern The issue has been

discussed in several OCC meetings since last 8 months As per the information available with WRLDC telemetry is not available from the following generating stations at 400 kV level

bull Kaparkheda bull Deepnagar

Also telemetry is not available from the following sub-stations at 400 kV level bull Warora bull Lonikhand(New) bull Chandrapur-stg-II

As per the information available with WRLDC telemetry is intermittent at 4 generating stations viz

bull Jaigad bull Paras-extension bull Trombay bull Deepnagar GCR

Also telemetry is intermittent at following sub-stations at 400 kV level bull Bableswar-II bull Deepnagar SS bull Dhule bull Khaparkheda bull Kolhapur-3

22

462nd OCC MINUTES

bull Sholapur-3 SLDC MSETCL Maharashtra informed that telemetry has been established for 46 locations

a Chhattisgarh100 available b Madhya Pradesh As per the latest status telemetered data is available from

100 of the locations c Gujarat As per the latest information submitted to CERC the non-availability of

telemetry data from Gujarat as on date is 33 for substations As per the information available with WRLDC Telemetry is not available form 2 number of 220 kV sub-stations viz bull Bhatiya bull Mokha Gujarat intimated in 460th OCCM that these sub-stations were ready but lines were in construction phase Also telemetry is intermittent from the following SS in Gujarat bull 220 kV Navasari (GETCO) ss bull 400 kV Kasor ss

SLDC GETCO may expedite amp resolve the issue for the above stations at the

earliest d Goa As per the latest information telemetry is not available form 2 number of

220 kV sub-stations viz Amona amp Cuncolim Telemetry is intermittent from 220 kV Tivim Ponda Xeldam amp 110 kV Kadamba amp Verna Thus Non availability of telemetry from Goa is 100 Goa to resolve the issue on war footing

e DD Telemetry is not available form 1 number of 220 kV sub-station viz Magarwada Thus availability of telemetry from DD is NIL DD representative intimated in 460th OCCM that RTU was being installed at 220 kV Magarwada SS under the new SCADAEMS up gradation project amp it would take 3 months to complete the work DD representative was absent in 461st OCCM so information on progress in this matter is yet to be received from DD DD to expedite the issue for the above station(s) on war footing

f DNH Telemetry is not available form 2 number of 220 kV sub-station viz Kharadpara amp Khadoli Thus availability of telemetry from DNH is NIL DNH representative was absent in 460th amp 461st OCC meetings to comment on the issue DNH to resolve the issue for the above station(s) on war footing

g ISGS As per the latest information submitted to CERC the non-availability of telemetry data from ISGS generating stations as on date is 125 Telemetry is intermittent from 220 kV Kawas(NTPC) station Power Grid NTPC to expedite

23

462nd OCC MINUTES

NTPC amp Power Grid agreed to expedite the matter during 460th amp 461st OCC meetings of WRPC However no progress has been reported

h POWERGRID As per the latest information submitted to CERC the non-availability of telemetry data from Power Grid substations as on date is 111 Telemetry is intermittent from the following ss

o 765 kV Kotra SS o 765 kV Dharamjaigad o 765 kV Tamnar SS o 400 kV Navasari SS

Additional points

a) In the report available on the WRLDC website it is clearly indicated that Communication link between all SLDC to WRLDC is in radial mode (without redundancy) and any failure in any equipment Fibre leads to total data black out Power Grid to ensure that links are on two channels

i IPP As per the latest information submitted to CERC the non-availability of

telemetry data from IPP generating stations as on date is 15 Telemetry is intermittent from Jindal amp Essar Mahan GMR Raipur JPL ESSAR Mahan GMR Raipur to expedite

Additional Points

bull Adani(APL) Tiroda There is only one channel emanating from Adani Tiroda Recently there was a case when entire station was not visible due to non-Availability of that channel

bull CGPL Mundra There is only one channel emanating from CGPL Mundra In case of non-availability of data leads to non-visibility of 4000 MW generation which creates difficulty in Grid Operation

bull Sasan There is only one channel emanating from Sasan In case of non-availability of data leads to non-visibility of 2400 + MW generation which creates difficulty in Grid Operation

bull APL Mundra There is only one channel emanating from CGPL Mundra In case of non-availability of data leads to non-visibility of 4000 + MW generation which creates difficulty in Grid Operation

The above issue was already discussed in 460th OCCM The utilities (APL SASAN CGPL) may kindly update the progress in this matter

24

462nd OCC MINUTES

j PMU data Regarding Satna to WRLDC link WRTS II informed that work is under progress for laying of OPGW from Satna 220 kV (MPPTCL) to Satna 765 kV (PG) and it may take 3-4 monthsrsquo time It was suggested that till such time the OPGW operation is in place WRTS-II may explore leased line connectivity at the earliest Power Grid to expedite

The Sub-Committee noted the same amp agreed to make availability of telemetry in their concerns and the report be updated position in next meeting

The Sub Committee noted the same

10 BLACK OUT AT NTPC KAWAS POWER STATION On 11th July 2014 Kawas Gas generating complex got blackout due to tripping of evacuation lines one by one within a short span of 30 minutes The complete loss of evacuation lines occurred at 0117 Hrs The blackout has resulted in tripping of GT1A GT1B and ST causing 320 MW generation loss in the area It was reported that weather condition was foggy with slight drizzling was in the area

Line Time of Tripping Kawas End Remote

end Restoration Time

220 kV Kawas-Navsari 1 1246 AM R phase to EF Fault location 2 km R Phase to EF 122 AM

220 kV Kawas ndashNavsari 2 112 AM R phase to EF Fault location 2208 km

R Phase to EF 347 AM

220 kV Kawas-Haldarwa 1 107 AM R phase to EF Fault location 16 km

R Phase to EF 246 AM

220 kV Kawas-Haldarwa 2 108 AM R phase to EF Fault location 2 km

R Phase to EF 304 AM

220 kV Kawas-Icchapur 1 108 AM B phase to EF B Phase to EF 301 AM

220 kV Kawas-Icchapur 2 108 AM B phase to EF Fault location 356 km

B Phase to EF 331 AM

220 kV Kawas-Vav 1 117 AM No tripping Hand Tripped later Line Tripped 225 AM

220 kV Kawas Vav 2 117 AM Y Phase to EF Y Phase to EF 317 AM

Even the line restoration has failed on several attempt as the lines were not holding due to persisting fault Such an event of total loss of evacuation lines from a generating station resulting in blackout scenario is a matter of serious concern Representative from WRTS-II stated that being highly industrial corridor the said lines are suffering with smog and informed that they are in process of replacement of existing insulator with polymer type insulators Order has been already placed amp it may be completed within next two to three month The Sub Committee noted the same

25

462nd OCC MINUTES

11 OPERATING PROCEDURE OF WR-2014 As discussed in 460th OCCM of WRPC the operating procedure of Western Region 2014 has been updated on 31072014 and the same has been uploaded on WRLDC web site at the following link httpwwwwrldccomdocsWR_OPERATING_PROCEDURE_2014pdf

The Sub Committee noted the same 12 MOCK BLACK START EXERCISE

MP representative informed that DG set at Bargi will be ready within a week time amp mock black start exercise can be performed in October 2014

NTPC Gandhar has successfully performed the mock black start exercise on 27072014

The Sub Committee noted the same

13 REVIEW OF LIST OF FEEDERS IDENTIFIED FROM ISGS LEVEL IN CASE OF

THREAT OF GRID SECURITY DUE TO LARGE DEVIATION

During the 461st OCC it was decided that list of feeders identified for load

control under emergency measure for safeguarding grid security would be

reviewed in a special meeting The list is yet to be reviewed GM WRLDC

requested SLDC to review the same amp submit Till such time the existing list will

continue

The Sub Committee noted the same 14 IMPLEMENTATION OF VOLTAGE AND TIME GRADING ON OV RELAYS TO

PREVENT TRIPPING OF MULTIPLE EHV LINES EMANATING FROM SINGLE NODE ON HIGH VOLTAGE

During the 461st OCC it was informed by Power Grid representative that they have already implemented voltage grading in various line emanating from the same node (matter has not come in the MoM) Power Grid amp other utilities may kindly intimate the present status of voltage grading at their respective sub-stations Member Secretary WRPC suggested to take the matter in PCM

The Sub Committee noted the same

26

462nd OCC MINUTES

15 INADEQUATE PARTICIPATION OF GENERATORS ENVISAGED SPS FOR SR-NEW GRID OPERATION

The details of SPS operation from 1st July 2014 till 6th August 2014 is as under

Sl No Date SPS No Condition 1 01 July 2014 SPS-1 613 SholapurRaichur DC gt1000 MW 2 01 July 2014 SPS-1 1752 SholapurRaichur DC gt1000 MW 3 04 July 2014 SPS-1 0406 SholapurRaichur DC gt1000 MW 4 09 July 2014 SPS-1 350 SholapurRaichur DC gt1000 MW 5 14 July 2014 SPS-1 506 SholapurRaichur DC gt1000 MW 6 17 July 2014 SPS-1 2204 SholapurRaichur DC gt1000 MW 7 23 July 2014 SPS-1 547 SholapurRaichur DC gt1000 MW 8 26 July 2014 SPS-1 1201 SholapurRaichur DC gt1000 MW 9 30 July 2014 SPS-1 902 SholapurRaichur DC gt1000 MW 10 30 July 2014 SPS-1 1954 SholapurRaichur DC gt1000 MW

During the last OCC the matter was discussed and it was suggested by Member Secretary WRPC to have Special Protection Sub-Committee meeting to discuss progress of implementation of the revised SPS at Solapur (for WR-SR interconnection) amp extension of signal from Solapur to additional generators in WR so as to address the issue of inadequate participation of WR Member Secretary WRPC requested to all generators who are having more than one units shall participate in implementation of SPS for SR-NEW grid operation

The Sub-committee noted the same ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING OCC reviewed the meeting roaster and finalized sheet is enclosed at Annexure-10

Due to non-readiness of BDTCL to host the next meeting NTPC KawasGandhar

would host the 463rd OCC meeting The exact date amp venue details will be intimated

separately

SlNo Organisation Name amp Designation E-mail Mobile

I WRPC1 Shri SD Taksande MS ms-wrpcnicin 98208783842 Shri Satyanarayan S opc-wrpcnicin 92233999383 Shri LKS Rathore DD lksr_2000yahoocom 98333718444 Shri Ratnesh Kumar Yadav AD ratneshkumar7437gmailcom 8903929150

II MSETCL MSEDCLMahaGenco5 Shri VD Pande EE vasantpandemahasldcin 98207419416 Shri Ajit V Pachori EE ajitpachorimahagencocoin 9619461420

III MPPTCL MPPGCL7 Shri KK Prabhakar SE sldcmpjbpyahoocom 94258052678 Shri SK Mehta EE mehtasanjay67yahooin 9425805017

IV CSPTCL CSPGCL9 Shri BR Soni Addl CE balramsonirediffmailcom 942518880710 Shri Arvind Mukherjee gccraipurgmailcom 9429227699

V GETCO GSLDC GSECL11 Shri BB Mehta CE cesldcgujgmailcom 987920073612 Shri BM Shah DyEE demissldcgetcogebmailcom 9925212836

VI WRLDC POWERGRID13 Shri P Mukhopadhyay GM prithwishmukhopadhyayposocoin 986943807314 Shri VK Shrivastava AGM vkspowergridindiacom 986945022115 Smt Sachala Mishra CM mishrasachalagmailcom 986945022316 Smt Pushpa S CM pushpa_seshadrihotmailcom 986940448217 Shri Aditya P Das Dy Mgr aditya19227gmailcom 9869404569

POWERGRID REGION-I18 Shri Anil Darode 70207powergridindiacom 942230180519 Shri Manu Sinha 02457powergridindiacom 9425293864

POWERGRID RETION -II20 Shri Abhinav Verma stawr2gmailcom 942850406221 Shri Anand Dubey ananddubey_pgrediffmailcom 9428504065

VII NTPC22 Shri PB Behre GM pbbeherentpccoin 900449708823 Shri Hari Nath AGM harinath01ntpccoin 900449713324 Shri SK Shrivastava AGM sksrivastava09ntpccoin 942517806925 Shri Amir Kr Singh SM aksingh01ntpccoin 942414081426 Shri Amitabh Kumar amitabhkumarntpccoin 9425178122

VIII TATA POWER27 Shri RM Sankhe GM rmsankhetatapowercom 909900654128 Shri PR Gadave AGM prgadavetatapowercom 9223553341

IX NHDC 29 Shri Anurag Seth CE annu226hotmailcom 9425326135

LIST OF PARTICIPANTS OF 462nd OCC MEETING OF WRPC HELD ON 11082014 AT TARAPURAnnexure-I

30 Shri Vinod Kumar Singh vinodnhdcrediffmailcom 9425925251

X APL 31 Shri CS Bobade GM chandrashekharbobadeadanicom 8980802255

XI RINFRA32 Shri SG Zirpe GM sachinzirperelianceadacom 932260763033 Shri Sanil C Namboodiripad sanilnamboodiripadrelianceadacom932104697434 Shri Subrata Das subratakudasrelianceadacom 932093072235 Shri Ishan Roy Asst Mgr ishanroyrelianceadacom 9860027348

XII KSK Mahanadi36 Shri Sudarshan B Reddy sudarshanreddybkskcoin 9000377721

XIII NPCIL37 Shri Mandeep mandeepnpcil 904991887038 Shri JS Choubey jschoubeynpcilcoin 942882191839 Shri Ritesh Chandra Singh rcsinghnpcilcoin 8007991744

XIV ESSAR 40 Shri OJ Saxena Sr Mgr osaxenaessarcom 987910126841 Shri Kamlesh Garg kamleshgargessarcom 987910284942 Shri Sarabjeet Singh sarabjeetsinghessarcom 750957010543 Shri Ashwin Ande ashwinandeessarcom 9909993594

XV JPL44 Shri RK Srivastava AGM rkshrivastavajindalpowercom 9329445016

XVI TORRENT POWER45 Shri Kamal K Vyas kamalvyastorrentpowercom 997407965746 Shri Pramod G Patel AGM pramodpateltorrentpowercom 9824370005

XVII NCA47 Shri Naveen Nath Das emc_ncarediffmailcom 9425053309

XVIII STERLITE GRID LTD48 Shri Sachin S Deshpande GM sachindeshpandesterlitecom 8966903047

XIX LANCO AMARKANTAK POWER LTD49 Shri BN Panda pandabnlancogroupcom 769770301550 Shri Anil Sharma anilshlancogroupcom 9560258009

XX KWPCL51 Mis Smruti R Nayak DGM smrutinayakavanthapowercom 9424176680

XXI MB POWER LTD 52 Shri Sandeep Kumar Gupta sandeepguptahpplin 9582896418

Anaulagnak 21

maah jaUlaa[- 2014

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5020 Hz BETWEEN 1700 Hrs amp 1800 Hrs Hrs ON 27072014

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4962 Hz BETWEEN 1900 Hrs amp 2000 Hrs Hrs ON 25072014

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4993 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5036 Hz AT 130344 Hrs ON 23072014

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4939 Hz AT 194315 hrs Hrs ON 25072014

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS JULY 2014 JUNE 2014 MAY 2014

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 008 023 000

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 314 476 093 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 3129 3216 2155 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 5016 4536 5319

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1533 1749 2433

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING JULY 2014

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

Voltage Profile during the month of July 2014

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 420 402 420 404 433 411 424 424 417 400 420 403 422 407 408 3902 417 398 420 400 431 407 424 424 417 401 427 418 421 409 410 3943 417 393 419 397 432 408 420 396 417 400 425 419 422 408 407 3934 416 398 419 401 434 412 422 402 417 400 426 421 418 406 411 3965 417 400 419 403 433 414 424 424 417 403 424 419 417 406 410 3996 420 406 422 408 438 411 421 402 419 407 427 421 422 412 409 3897 412 396 419 402 428 413 420 399 414 401 423 419 417 409 409 3968 418 400 421 410 433 400 424 400 416 400 425 419 422 400 410 3949 418 412 421 410 433 413 424 410 416 408 425 419 422 412 410 394

10 415 399 417 403 435 415 400 400 418 404 424 421 422 414 410 41111

स नक Annex-23

िभलाईBhilai

धल असोज कासोरKarad Dhule Asoj Kasor

इदौर इटारसी कराडIndore Itarsi

जतपरJetpur

11 416 402 423 407 436 416 422 407 416 405 425 421 423 413 410 39712 419 400 422 406 436 417 400 400 419 403 426 422 423 413 410 39713 415 400 422 410 437 417 400 400 417 406 425 421 422 414 411 39514 416 398 423 409 439 416 400 400 419 404 424 421 422 413 412 39815 420 403 423 408 437 413 428 401 418 404 426 422 423 413 410 39816 423 408 426 411 437 413 429 403 421 406 428 424 423 415 413 40017 421 404 424 407 436 416 400 400 419 408 423 414 423 414 411 39818 421 404 424 407 436 416 400 400 420 406 427 423 423 414 411 39819 423 407 425 410 434 415 425 411 424 405 428 425 424 416 422 39520 421 407 424 410 420 420 427 410 421 407 427 424 423 416 417 39621 421 406 424 411 420 420 400 400 420 402 428 425 426 418 413 39222 421 407 426 413 420 420 400 400 419 401 428 425 428 420 412 39623 422 409 427 410 419 415 415 402 420 403 425 419 428 420 412 39624 420 406 425 409 420 420 400 400 420 404 429 426 427 416 409 39625 422 401 421 404 420 420 400 400 424 402 428 424 423 415 415 39726 420 402 421 406 431 419 400 400 422 403 428 423 422 413 415 40027 417 404 422 407 434 416 423 407 421 405 428 424 422 413 416 40128 419 403 421 407 437 416 431 408 423 406 428 426 423 415 415 40229 419 403 420 408 437 415 400 400 421 406 429 426 423 416 415 39930 421 404 422 406 438 415 400 400 423 404 430 426 426 415 420 40331 420 395 420 402 431 406 428 403 422 403 429 425 423 414 419 398

423 393 427 397 439 400 431 396 424 400 430 403 428 400 422 389

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 418 404 411 395 423 406 430 406 789 752 788 757 787 756 791 7662 419 397 411 393 423 403 431 404 772 748 791 756 786 750 793 7553 416 402 411 397 421 397 425 399 772 748 780 751 781 757 791 7634 417 404 409 396 420 415 428 406 772 748 786 757 780 755 791 7655 418 404 418 400 421 404 427 407 772 748 796 755 796 765 802 7726 419 408 416 402 424 410 429 413 789 752 797 768 796 765 799 7757 414 406 407 397 420 403 426 407 789 752 776 758 777 757 784 7658 418 408 411 388 422 400 429 400 789 752 786 767 783 746 790 7719 412 401 403 386 422 405 429 408 789 752 781 761 772 745 783 76010 413 403 402 394 420 404 424 406 789 752 792 764 774 755 785 765

Bina Gwalior Nagda Khandwa Sipat

बना वािलयरिसविननागदावािलयर बनाBina

िसपतखडवाseoni Gwalior

10 413 403 402 394 420 404 424 406 789 752 792 764 774 755 785 76511 415 407 403 395 421 407 426 410 789 752 790 774 785 758 790 77212 418 406 407 392 422 404 427 404 789 752 796 769 784 756 796 76913 418 406 407 392 421 408 427 411 789 752 796 769 784 756 796 76914 419 410 409 397 423 406 428 409 789 752 784 768 786 763 792 77415 419 404 408 391 424 407 429 408 789 752 789 763 786 750 791 76416 424 414 408 400 427 411 431 413 789 752 792 766 785 767 797 77917 421 410 411 399 424 407 432 409 789 752 788 762 789 766 795 77618 423 412 414 396 424 407 432 409 789 752 783 770 796 765 801 77719 424 411 410 396 426 411 431 413 789 752 791 770 788 764 803 77720 425 411 411 396 424 410 428 414 789 752 786 763 789 760 800 77221 422 412 410 395 424 409 428 413 789 752 784 760 788 763 796 77522 423 416 414 402 424 410 429 414 789 752 791 774 794 773 801 78423 425 413 418 402 424 410 430 412 787 750 785 770 798 780 804 78324 422 411 411 397 425 409 431 415 789 752 790 772 791 773 801 78125 421 410 405 396 423 403 429 409 789 752 784 770 794 767 798 77726 421 410 409 395 423 404 427 409 789 752 792 773 789 767 799 77827 423 412 413 399 420 404 428 409 789 752 794 766 797 770 808 78028 422 411 411 399 421 405 428 410 789 752 789 763 794 770 793 77029 419 409 411 397 423 406 430 414 789 752 794 771 795 767 796 77430 422 409 413 398 420 404 430 413 788 753 796 766 799 766 799 77331 420 404 409 395 421 397 429 411 789 752 787 764 792 759 795 767

425 397 418 386 427 397 432 399 789 748 797 751 799 745 808 755

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Jul-14 0 0 0 0 0 0 0 02 02-Jul-14 0 0 0 0 0 0 0 03 03-Jul-14 0 0 0 0 0 0 0 04 04-Jul-14 0 0 0 0 0 0 0 05 05-Jul-14 0 0 0 0 0 0 0 06 06-Jul-14 1 67 0 0 0 0 0 07 07-Jul-14 0 0 0 0 0 0 0 08 08-Jul-14 1 278 0 0 0 0 0 09 09-Jul-14 0 0 0 0 0 0 0 0

10 10-Jul-14 1 565 0 0 0 0 0 011 11-Jul-14 0 0 0 0 0 0 0 012 12-Jul-14 0 0 0 0 0 0 0 013 13-Jul-14 3 758 0 0 0 0 0 014 14-Jul-14 0 0 0 0 0 0 0 015 15-Jul-14 0 0 0 0 0 0 016 16-Jul-14 2 2127 NIL NIL NIL 017 17-Jul-14 0 0 0 0 0 0 0 018 18-Jul-14 1 08 0 0 0 0 0 019 19-Jul-14 0 0 0 0 0 0 0 020 20-Jul-14 0 0 0 0 0 0 0 021 21-Jul-14 0 0 0 0 0 0 0 022 22-Jul-14 0 0 0 0 0 0 0 023 23-Jul-14 0 0 0 0 0 0 0 024 24-Jul-14 0 0 0 0 0 0 0 025 25-Jul-14 0 0 0 0 0 0 0 026 26-Jul-14 0 0 0 0 0 0 0 027 27-Jul-14 0 0 0 0 0 0 0 028 28-Jul-14 0 0 0 0 0 0 0 029 29-Jul-14 0 0 0 0 0 0 0 030 30-Jul-14 0 0 0 0 0 0 0 031 31-Jul-14 0 0

Max 3 758 0 0 0 00 0 0Total 9 24917 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month July 2014

Recommonded Load relief at 492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE 25

POWER CUTRESTRICTIONS IN WESTERN REGION FOR THE MONTH OF JULY-2014

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply(DLF)

01072014 31072014 2343 2105 2300

21 Three-Phase Supply(Irrigation)

01072014 31072014 0953 0857 0933

21 Three-Phase Supply(Mixed)

01072014 31072014 2339 2055 2240

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01072014 31072014 2353 2325 2344 32 District Head Qtrs 01072014 31072014 2357 2330 2348 33 Tehsil Head Qtrs 01072014 31072014 2350 2230 2319

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 010714 to 310714

SaUnya Nil

0-470 MW

SaUnya Nil

0000

SaUnya Nil 2400

SaUnya Nil

19 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs) 21 Three-Phase Supply 01072014 31072014 1000 0800 0900

22 Single-Phase Supply 01072014 31072014 1800 1800 1800 3 Anya jaanakarI Any other information There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

8860 (Av) of 31days 0000(Av) 0000 (Av)

1Rural 7109(Av) for 23447 Hrs 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0532 - -

0537 -

3 HT Industries 8261 (Av) for 17270 Hrs 0357 Total Energy Cutday 1426 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01072014 to 310714 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 3172014 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil ca gaaovaa Goa SaUnya Nil

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-26 Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai अिनवाय यिनट आऊटज का जलाई2014का वःता रत यौरा

Details of forced unit outages during the month ofJuly2014

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 एःसार Essar-2

गरा विनिल GSECL

172 1212 22-Feb-13 अनपल ध Still out

अनपल ध Still out

Shortage of gas

2 यट पीएस UTPS-2

गरा विनिल GSECL

120 1951 17-Jun-14 अनपल ध Still out

अनपल ध Still out

Turbine tripped(RSD)

3 एःसार व डनार Essar vadinar-1

गरा विनिल GSECL

600 2335 3-Jul-14 1324 22-Jul-14 Coal shortage

4 डब यट पीएस WTPS-6

गरा विनिल GSECL

210 953 10-Jul-14 0707 14-Jul-14 BTL

5 एसट पीएस STPS-1

गरा विनिल GSECL

120 1220 10-Jul-14 0710 14-Jul-14 BTL

6 जीआईपीसीएल GIPCL-STG I-2

गरा विनिल GSECL

165 1744 14-Jul-14 अनपल ध Still out

अनपल ध Still out

C ampI problem

7 एएलट पीएस ALTPS-1

गरा विनिल GSECL

120 107 15-Jul-14 2037 19-Jul-14 BTL

8 िस का ट पीएस SIKATPS-1

गरा विनिल GSECL

120 1330 17-Jul-14 अनपल ध Still out

अनपल ध Still out

RSD

9 डब यट पीएस WTPS-4

गरा विनिल GSECL

210 858 18-Jul-14 अनपल ध Still out

अनपल ध Still out

RSD

10 डब यट पीएस WTPS-3

गरा विनिल GSECL

210 1046 18-Jul-14 अनपल ध Still out

अनपल ध Still out

RSD

11 डब यट पीएस WTPS-5

गरा विनिल GSECL

210 1818 18-Jul-14 000 21-Jul-14 RSD

12 डब यट पीएस WTPS-6

गरा विनिल GSECL

210 447 19-Jul-14 अनपल ध Still out

अनपल ध Still out

RSD

13 यट पीएस UTPS-3

गरा विनिल GSECL

200 1055 26-Jul-14 2328 1-Aug-14 RSD

14 एपीएल APL-6

अदानी ADANI

660 2146 5-Jul-14 1105 2-Aug-14 Heavy hydrogen leakage

15 एपीएमएल APML-4

अदानी ADANI

660 1132 10-Jul-14 1407 23-Jul-14 Coal shortage

16 एपीएल APL-1

अदानी ADANI

330 117 20-Jul-14 612 23-Jul-14 RSD

प म ऽय भार षण कि म बई णाली चालन-ISO-I

17 एपीएल APL-8

अदानी ADANI

660 2018 18-Jul-14 2209 21-Jul-14 BTL

18 एपीएल APL-2

गरा विनिल GSECL

330 0913 26-Jul-14 1714 29-Jul-14 Air pre heater problem

19 एपीएल APL-5

गरा विनिल GSECL

660 1910 29-Jul-14 1533 2-Aug-14 Heavy steam leakage

20 डब यपीसीएल WPCL-1

मारा वउकिल MSPGCL

135 1245 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Furnace press high

21 डब यपीसीएल WPCL-4

मारा वउकिल MSPGCL

135 001 3-Apr-14 2347 11-Jul-14 Less schedule

22 कोराड Koradi-5

मारा वउकिल MSPGCL

200 1030 17-Jun-14 अनपल ध Still out

अनपल ध Still out

ID fan bearing temperature high

23 इ डयाबल Indiabulls - 1

मारा वउकिल MSPGCL

270 546 26-Jun-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

24 पल Parli -4

मारा वउकिल MSPGCL

210 1019 29-Jun-14 अनपल ध Still out

अनपल ध Still out

water shortage

25 भसावल Bhusawal-2

मारा वउकिल MSPGCL

210 1117 6-Jul-14 544 10-Jul-14 Coal problem

26 चिपर Chandrapur-1

मारा वउकिल MSPGCL

210 2211 8-Jul-14 2106 13-Jul-14 BTL

27 चिपर Chandrapur-3

मारा वउकिल MSPGCL

210 2216 14-Jul-14 1452 18-Jul-14 Safety valve problem

28 उरण Uran-6 मारा वउकिल MSPGCL

108 1634 15-Jul-14 1407 22-Jul-14 Gas shortage

29 उरण Uran -5 मारा वउकिल MSPGCL

108 2338 17-Jul-14 1125 24-Jul-14 For rotor balancing work

30 उरण Uran -A0 मारा वउकिल MSPGCL

120 2340 17-Jul-14 2315 23-Jul-14 For rotor balancing work

31 भसावल Bhusawal-2

मारा वउकिल MSPGCL

210 2346 18-Jul-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

32 खापरखड़ा Khaparkeda-3

मारा वउकिल MSPGCL

210 1036 20-Jul-14 041 29-Jul-14 Flame failure

33 जयगड Jaigad-2 मारा वउकिल MSPGCL

300 000 20-Jul-14 Ready Ready Less requisition

34 वीआईपीएल VIPL-2

मारा वउकिल MSPGCL

300 2302 20-Jul-14 1716 26-Jul-14 Coal feeding problem

35 एपीएमएल APML-3

मारा वउकिल MSPGCL

660 0444 22-Jul-14 044 26-Jul-14 Pressure release valve operated

36 भसावल Bhusawal-4

मारा वउकिल MSPGCL

500 003 23-Jul-14 151 29-Jun-14 BTL

37 वीआईपीएल VIPL-1

मारा वउकिल MSPGCL

300 015 23-Jul-14 1300 31-Jul-14 Coal feeding problem

38 उरण Uran -8 मारा वउकिल MSPGCL

108 730 26-Jul-14 1700 29-Jul-14 Gas shortage

39 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 347 29-Jul-14 638 4-Aug-14 BTL

प म ऽय भार षण कि म बई णाली चालन-ISO-I

40 पल PARLI-5 मारा वउकिल MSPGCL

210 002 30-Jul-14 अनपल ध Still out

अनपल ध Still out

Water shortage

41 टाटा TATA-8

टाटा TATA

250 2255 9-Jan-14 अनपल ध Still out

अनपल ध Still out

HT due to fire near turbine generator desk

42 टाटा TATA-6

टाटा TATA

500 2134 31-Jul-14 Ready Ready Less requisition

43 आरजीपीपीएल RGPPL-3A

आरजीपीपीएल RGPPL

320 1857 17-Apr-14 Ready Ready Less requisition

44 आरजीपीपीएल RGPPL-2B

आरजीपीपीएल RGPPL

320 1915 17-Jun-14 अनपल ध Still out

अनपल ध Still out

Raw water problem

45 आरजीपीपीएल RGPPL-2A

आरजीपीपीएल RGPPL

320 1615 25-Jun-14 1200 21-Jul-14 Less requisition

46 आरजीपीपीएल RGPPL-1A

आरजीपीपीएल RGPPL

320 1330 8-Jul-14 Ready Ready Less requisition

47 अमरकनटक Amarkantak-4

म वउकिल MPPGCL

120 1113 30-Apr-14 अनपल ध Still out

अनपल ध Still out

TURBINE BEARING VIBRATION HIGH

48 सातपरा Satpura-6

म वउकिल MPPGCL

200 305 18-Jun-14 अनपल ध Still out

अनपल ध Still out

BTL

49 एसजीट पीएस SGTPS-3

म वउकिल MPPGCL

210 617 26-Jun-14 020 26-Jul-14 Conveyer belt problem

50 अमरकनटक Amarkantak-3

म वउकिल MPPGCL

120 1640 2-Jul-14 1623 11-Jul-14 BTL

51 सातपरा Satpura-9

म वउकिल MPPGCL

210 2200 5-Jul-14 855 15-Jul-14 Condenser tube cleaning

52 सातपरा Satpura-9

म वउकिल MPPGCL

210 1310 15-Jul-14 845 24-Jul-14 BTL

53 एसजीट पीएस SGTPS-4

म वउकिल MPPGCL

210 2233 19-Jul-14 1252 4-Aug-14 Coal shortage

54 सातपरा Satpura-7

म वउकिल MPPGCL

210 225 21-Jul-14 545 24-Jul-14 BTL

55 सातपरा Satpura-10

म वउकिल MPPGCL

250 2316 22-Jul-14 07082014 High vibration in generator winding

56 एसजीट पीएस SGTPS-3

म वउकिल MPPGCL

210 1857 28-Jul-14 1020 2-Aug-14 Drum level low

57 DSPM(K(E) extn)-2

छरा वउकिल CSPGCL

250 2310 21-Jul-14 2029 22-Jul-14 Coal shortage

58 कोरबा पव Korba(E)-3

छरा वउकिल CSPGCL

210 1030 22-Jul-14 1025 27-Jul-14 CTL

59 कोरबा पव Korba(E)-5

छरा वउकिल CSPGCL

120 1345 22-Jul-14 1140 26-Jul-14 Wet coal problem

60 कोरबा पव Korba(E)-5

छरा वउकिल CSPGCL

120 2320 30-Jul-14 155 2-Aug-14 Coal shortage

61 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

62 एःसार महान Essar-Mahan-1

एःसारESSAR 600 014 22-Jun-14 1255 11-Jul-14 Less schedule

63 एःसारमहानEssar Mahan-1

एःसार ESSAR 600 620 16-Jul-14 1252 28-Jul-14 Withdrawn due to tripping of evacuation

प म ऽय भार षण कि म बई णाली चालन-ISO-I

Lines

64 सीजीपीएल CGPL-50

सीजीपीएल CGPL

830 948 13-Jun-14 409 23-Jul-14 Ash hopper refractory damage

65 सीजीपीएल CGPL-10

सीजीपीएल CGPL

830 1332 1-Jul-14 1952 9-Jul-14 BTL

66 सीजीपीएल CGPL-20

सीजीपीएल CGPL

800 1214 24-Jul-14 13-aug-14

Bottom ash Hopper works

67 सीजीपीएल CGPL - 40

सीजीपीएल CGPL

830 1918 26-Jul-14 1020 2-Aug-14 GT electrical fault

68 जपीएल JPL STG-2 UNIT-1

जपीएल JPL 600 051 26-Jun-14 अनपल ध Still out

अनपल ध Still out

Turbine vibration

69 जपीएलJPL STG-2 UNIT-2

जपीएलJPL 600 000 5-Jul-14 1457 11-Jul-14 Less requisition

70 जपीएल JPL STG-2 UNIT-2

जपीएलJPL 600 748 21-Jul-14 1800 24-Jul-14 BTL

71 एसीबीआईएल ACBIL-1

एसीबीआईएल ACBIL

135 151 6-Jul-14 1753 9-Jul-14 Furnace draft high

72 ससान Sasan -3 आरईएल REL 660 1648 15-Jul-14 2248 4-Aug-14 Ash evacuation problem

73 ससान Sasan-4 आरईएल REL 660 1645 24-Jul-14 810 3-Aug-14 High press main steam tripped

74 एमको EMCO-I एमको EMCO 200 109 16-Jul-14 अनपल ध Still out

अनपल ध Still out

Turbine vibration high

75 एसीबीआईएल ACBIL-2

एसीबीआईएल ACBIL

135 1955 21-Jul-14 601 24-Jul-14 Furnace draft high

76 मौदा Mouda -1

एनट पीसीNTPC 500 1630 18-Jun-14 2042 14-Jul-14 Flame failure

77 कावास Kawas-1C

एनट पीसीNTPC 116 2311 2-Jul-14 2100 6-Jul-14 Heavy steam leakage from stop valve

78 कावास Kawas-1B

एनट पीसीNTPC 106 2323 2-Jul-14 632 7-Jul-14 Less requisition

79 कावास Kawas-2B एनट पीसीNTPC 164 1704 10-Jul-14 Ready Ready Less requisition

80 कावास Kawas-1A एनट पीसीNTPC 164 1200 12-Jul-14 745 22-Jul-14 Less requisition

81 वीएसट पीएस VSTPS-11

एनट पीसीNTPC 500 1204 13-Jul-14 000 16-Jul-14 Coal shortage

82 गाधारGandhar-1 एनट पीसीNTPC 144 149 16-Jul-14 1807 21-Jul-14 Less requisition

83 कावास Kawas-1B एनट पीसीNTPC 164 1027 18-Jul-14 442 23-Jul-14 Less requisition

84 मौदा Mouda-1 एनट पीसीNTPC 500 000 18-Jul-14 1745 24-Jul-14 Less requisition

85 िसपतSipat-1 एनट पीसीNTPC 660 000 21-Jul-14 955 24-Jul-14 Generator H2 gas leakage

86 गाधार Gandhar-3

एनट पीसीNTPC 144 1607 21-Jul-14 अनपल ध Still out

अनपल ध Still out

BB protection operatedatJhanor

87 गाधार Gandhar-4(ST)

एनट पीसीNTPC 224 1607 21-Jul-14 1320 26-Jul-14 BB protection operatedatJhanor

88 ट स TAPS-1

एनट पीसीNTPC 160 2227 21-Jul-14 1407 26-Jul-14 Maintenance

89 गाधार एनट पीसीNTPC 144 507 22-Jul-14 Ready Ready Less requisition

प म ऽय भार षण कि म बई णाली चालन-ISO-I

Gandhar -1

90 मौदा mouda-2 एनट पीसीNTPC 500 915 23-Jul-14 315 31-Jul-14 Coal feeding problem

91 कावास Kawas-1A

एनट पीसीNTPC 106 608 24-Jul-14 1309 27-Jul-14 Less requisition

92 गाधार Gandhar-2

एनट पीसीNTPC 144 2036 26-Jul-14 100814 Less requisition

93 वीएसट पीएस VSTPS-2

एनट पीसीNTPC 210 500 27-Jul-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

94 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 748 27-Jul-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

95 मौदा Mouda-2 एनट पीसीNTPC 500 315 31-Jul-14 210 3-Aug-14 Less requisition Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का जलाई2014 का वःता रत यौरा

Details of planned unit outages during the month of July2014 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

सo From

समय दनाक

कारण Reason

Time Date Time Date

1 एसएलपीपी SLPP-2

गरा विनिल GSECL

125 045 23-Jun-14 NA 17-Jul -14 AOH

2 डब यट पीएस WTPS-5

गरा विनिल GSECL

210 000 21-Jul-14 29-0814 COH

3 यट पीएस UTPS-4

गरा विनिल GSECL

200 000 21-Jul-14 240814 AOH

4 एसएलपीपी SLPP-3

गरा विनिल GSECL

125 130 22-Jul-14 060814 AOH

5 यट पीएस UTPS-1

गरा विनिल GSECL

120 000 29-Jul-14 28814 AOH

6 पल ParlI-3

मारा वउकिल MSPGCL

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

Water supply problem

7 चिपर Chandrapur-7

मारा वउकिल MSPGCL

500 600 19-Jun-14 1124 2-Aug-14 AOH

8 नािसक NASIK -3

मारा वउकिल MSPGCL

210 1410 10-Jul-14 अनपल ध Still out

100814 AOH

9 कोरबा प म Korba(W)-2

छरा वउकिल CSPGCL

210 936 26-Jun-14 140814 AOH

10 वदनाVandana-I वदना VANDANA 135 1940 17-Jul-14 अनपल ध Still out

अनपल ध Still out

ETL

11 वीएसट पीएस VSTPS-8

एनट पीसीNTPC 500 012 1-Jun-14 253 13-Jul-14 AOH

12 कएसट पीएस KSTPS-4

एनट पीसीNTPC 500 2335 20-Jun-14 180814 COH

13 कावास Kawas-2A

एनट पीसीNTPC 106 000 27-Jun-14 260814 RampM works

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

11 Akrimota 1 125 4-Aug-14 14-Aug-14 AOH12 WTPS 2 210 5-Aug-14 3-Sep-14 AOH13 SLPP 1 125 16-Aug-14 4-Sep-14 AOH14 DGB 1 107 20-Aug-14 27-Aug-14 CI15 GIPCL-I GT-3 48 22-Aug-14 27-Aug-14 HGPI16 GIPCL-I GT-2 48 29-Aug-14 3-Sep-14 HGPI17 GIPCL-I GT-2 48 12-Aug-14 24-Aug-14 HGPI18 UTPS 3 200 19-Aug-14 12-Sep-14 AOH19 GTPS 2 120 25-Aug-14 14-Sep-14 AOH110 STPS 1 120 19-Aug-14 30-Aug-14 AOH111 GTPS 3 210 24-Aug-14 13-Sep-14 AOH112 APL 9 660 1-Sep-14 20-Sep-14 AOH

221 SGTPS 4 210 010914 250914 AOH3 Craiva]kMila CSPGCL

31 Korba East-6 6 120 21-Aug-14 13-Sep-14 AOH32 Korba East-1 1 50 15-Aug-14 1-Sep-14 AOH33 Korba East-3 3 50 21-Aug-14 30-Sep-14 AOH34 Korba West-1 1 210 12-Sep-14 27-Sep-14 COH35 Korba West-5 5 500 15-Aug-14 30-Aug-14 AOH

4

41 PARAS 3 250 20914 151014 AOH42 RELIANCE 2 250 140814 160814 TURBINE VIBRATION

5 koMd``Iya xao~ Central Sector

51 SIPAT 1 600 050914 191014 BLR OH + HPT + IPT+LPT + GEN

52VINDHYACHAL

5 500 120814 200914 CAP+TG PED CKG+GEN+BLR CHEM CLNG+ESP RampM

53VINDHYACHAL

9 500 120814 150914 BLR OH + HPT + IPT+ GEN

54VINDHYACHAL

11 500 160714 170814 AOH

55CGPL

30 800 150814 050914 Bottom ash hopper Refractory repair and General maintainance work

56 CGPL 40 800 060914 300914 UT 40B repair work57 NSPCL 1 250 200814 110914 AOH

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING AUGUST 2014 AND SEPTEMBER 2014

Capacity Outage as per Annual Maintenance Plan

Date Time Date Time

1 400 400KV BUS-I at Bilaspur Ss 14-Aug-14 900 14-Aug-14 1800 DAILY For bus bar stability of LANCO bays amp jumpering work WRTS-I LANCO C

2 400kV 50 MVAR Bus Reactor-2 at Itarsi SS 14-Aug-14 800 15-Oct-14 1800 Continuo

us Installation of 125MVAR reactor WRTS-II WRTS-II C

3 765 Satna-Gwalior2 14-Aug-14 800 17-Aug-14 1800 DailyCompletion of 765kV Gwalior2 Main Bay Erection amp Testing works at Satna

PGCIL WRTS-II C

4 400 400kV JBP- JBP Pooling 2 Line 14-Aug-14 1000 14-Aug-14 1500 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

5 400 400KV BUS-II at Bilaspur Ss 16-Aug-14 900 16-Aug-14 1800 DAILY For bus bar stability of LANCO bays amp jumpering work WRTS-I LANCO C

6 765 Bus2 at satna 16-Aug-14 800 18-Aug-14 1800 DailyExtension of bus 2 for Gwalior2 bay amp completion of Main Bay Erection

PGCIL WRTS-II C

7 400 Khandwa-Dhule1 16-Aug-14 800 31-Aug-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WR-II C

8 400 Gandahr - Navsari DC 16-Aug-14 800 31-Aug-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WR-II R

PID testing of insulator strings

KV Line From To

Annexure-32

Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

9 400 Navsari - Vapi - Kala 16-Aug-14 800 31-Aug-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WR-II R

10 400 Satna - Bina Ckt 1amp2 16-Aug-14 800 31-Aug-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WR-II R

11 400 80 MVAR Bus Reactor at Kotra 16-Aug-14 900 17-Aug-14 1800 ContinuousTo attend isolator defects WRTS-I PGCIL C

12 400 400kV JBP- JBP Pooling 1 Line 17-Aug-14 1000 17-Aug-14 1500 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

13 765 ICT II at Bina 17-Aug-14 0900 17-Aug-14 1800 Daily Post Commissioning check of Fire-Fighting system at Bina PGCIL WRTS-II C

14 765 Bus-2 at Gwalior 17-Aug-2014 1000 18-Aug-2014 1800 Daily Busbar Jumpering ampStability test related to Bus reactor

POWERGRID WRTS-II C

15 765 Seoni 2 LR(704 LR) at Bilaspur Ss 18-Aug-14 900 18-Aug-14 1500 DAILY For taking Spare LR in service

first time WRTS-I PGCIL C

16 400 Bhadrawati-Ramagundam I 18-Aug-14 800 18-Aug-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

17 400 400kV Vchal - JBP 1 Line 18-Aug-14 1000 18-Aug-14 1200 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

18 400 400kV Vchal - JBP 2 Line 18-Aug-14 1400 18-Aug-14 1600 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

19 400 400KV BUS-II at Bilaspur Ss 19-Aug-14 900 19-Aug-14 1800 DAILY For bus bar stability of LANCO bays amp jumpering work WRTS-I LANCO C

20 400 Bhadrawati-Ramagundam II 19-Aug-14 800 19-Aug-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

21 765 ICT 1 at G alior 19 A g 14 10 00 20 A g 14 18 00 Continou SPARE ICT COMMISSIONING PGCIL WRTS II C21 765 ICT - 1 at Gwalior 19-Aug-14 1000 20-Aug-14 1800 s SPARE ICT COMMISSIONING PGCIL WRTS-II C

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

22 400 400kV JBP- Itarsi 1 Line 19-Aug-14 1000 19-Aug-14 1200 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

23 400 400kV JBP- Itarsi 2 Line 19-Aug-14 1400 19-Aug-14 1600 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

24 400 400 kV Sipat -Ranchi-1 19-Aug-14 900 20-Aug-14 1900 Continous 1 no of CT replacement NTPC NTPC

25 400 BUS-I at Aurangabad(PG) 19-Aug-14 600 20-Aug-14 1800 ContiBus-1 extn for commissioning of 400 kV Boisar-1amp2 bays with 80 MVAR Reactors

WRTS-I WRTS-I C

26 400kV 400kV SUGEN PIRANA Line (Line 2) 19-Aug-14 900 19-Aug-14 1700 Daily Corrective Maintenance of

Transfer Isolator TPL-SUGE TPL-SUG R

27 400kV 400kV PGCIL - PIRANA Feeder No 2 19-Aug-14 900 19-Aug-14 1700 Daily 400kV CT connectors replacementTPL-AHME TPL-AHM R

28 400 Bhadrawati-Parli 1amp 2 19-Aug-14 000 20-Oct-14 1800 DailyFor OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

29 400 Mundra - Jetpur line No1 19-Aug-14 800 19-Aug-14 1200 Daily protection logic checking work PGCIL GETCO30 400 Mundra - Jetpur line No 2 19-Aug-14 1400 19-Aug-14 1800 Daily protection logic checking work PGCIL GETCO

31 400 400KV BUS-I at Bilaspur Ss 20-Aug-14 900 20-Aug-14 1800 DAILY For bus bar stability of LANCO bays amp jumpering work WRTS-I LANCO C

32 400 KSK ndash Raigarh circuit 4 20-Aug-14 900 21-Aug-14 1800 CONT complete PLCC rectification works WRTS-I KSK C

33 HVDC HVDC POLE I AT BHADRAWATI 20 A 14 8 00 21 A 14 18 00 D il AMP WORKS WRTS I WRTS I R33 HVDC HVDC POLE-I AT BHADRAWATI 20-Aug-14 800 21-Aug-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

34 765kV Dharamjaygarh - Durg ckt-2 20-Aug-14 800 22-Aug-14 1800 daily CSD relay commissioning (M+T) WRTS-I PGCIL C

35 765 JBP - BINA 1 at Jabalpur Pooling Station 20-Aug-14 1000 21-Aug-14 1800 Daily Commissioning of CSD Relay for

765KV JBP - BINA Ckt 1 PGCIL WRTS-II C

36 400 Khandwa-Dhule1 20-Aug-14 1000 20-Aug-14 1500 Daily AMP PGCIL WRTS-II R

37 400 Bus-1 at Shujalpur 20-Aug-14 1000 20-Aug-14 1800 Daily AMP PGCIL WRTS-II R

38 400 Bus2 at Satna 20-Aug-14 900 20-Aug-14 1800 Daily For Bus Bar Stability and charging activity of 406 Bay PGCIL WRTS-II C

39 400 Bus1 at Indore 20-Aug-14 900 20-Aug-14 1800 Daily Jumper connection amp stability checking of Pitampur1 PGCIL WRTS-II C

40 400 400kV JBP- Itarsi 3 Line 20-Aug-14 1000 20-Aug-14 1200 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

41 765 Raigarh (Kotra) - Raigarh (Tamnar) 20-Aug-14 900 31-Aug-14 1800 ContinuousFor installation of Bird guards WRTS-I PGCIL C

42 400 Kansari - Kankroli line 20-Aug-14 800 20-Aug-14 1800 Daily PMU installation work and maintenPGCIL GETCO43 400 BUS-2 AT SOLAPUR 21-Aug-14 900 22-Aug-14 1800 Daily Pune bays extension works WRTS-I WRTS-I C

44 765 ICT 1 at Jabalpur Pooling Station 21-Aug-14 1000 21-Aug-14 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus for Spare ICT Phase

PGCIL WRTS-II C

45 400 Bina-Shujalpur1 21-Aug-14 900 21-Aug-14 1000 Daily

For Replacement of 390kV Reactor LA with 336kV LA Line will be taken in service without PGCIL WRTS-II Cj p g g y will be taken in service without Line Reactor at Shujalpur

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

46 400 Khandwa-Dhule2 21-Aug-14 1000 21-Aug-14 1800 DailyFor Replacement of 390kV Reactor LA with 336kV LA At Khandwa amp AMP

PGCIL WRTS-II C

47 220 Damoh-Sagar 21-Aug-14 1000 21-Aug-14 1500 Daily AMP of terminal equipment at Damoh SS MPPTCL WR-II R

48 765 ICT2 at Indore 21-Aug-14 900 22-Aug-14 1800 Continious

For Auxiliary bus erection at Indore PGCIL WRTS-II C

49 400 125MVAr BR at Shujalpur 21-Aug-14 900 21-Aug-14 1800 Daily Differential stability of tie bay (Under commissioning) PGCIL WRTS-II C

50 400 Raipur-Bhadrawati-III 21-Aug-14 900 21-Aug-14 1800 ContinuousBus split at Raipur WRTS-I PGCIL C51 400 Kansari - Bhinmal line 21-Aug-14 800 21-Aug-14 1800 Daily PMU installation work and maintenPGCIL GETCO

52 HVDC HVDC POLE-2 AT BHADRAWATI 22-Aug-14 800 23-Aug-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

53 765 ICT I at Bina 22-Aug-14 0900 23-Aug-14 1800 DailyCommissioning of CSD Relay for 400kV side of ICT- rescheduling of outage

PGCIL WRTS-II C

54 765 JBP - BINA 2 at Jabalpur Pooling Station 22-Aug-14 1000 23-Aug-14 1800 Daily Commissioning of CSD Relay for

765KV JBP - BINA Ckt 2 PGCIL WRTS-II C

55 400 Khandwa-Rajgarh1 22-Aug-14 800 23-Aug-14 1800 PM Continous

Rectification of damaged tower peak at locno83 due to collapse of MPPTCL tower which is under construction

PGCIL MPPTCL C

F j i amp h i th56 400 Pirana-Vadodara-Asoj DC 22-Aug-14 800 23-Aug-14 1800 Daily

For jumpering amp charging the future cirucit of line in multi-circuit towers to prevent conductor theft

PGCIL WRTS-II C

57 220 Damoh-Damoh2 22-Aug-14 1000 22-Aug-14 1500 Daily AMP of terminal equipment at Damoh SS MPPTCL WR-II R

58 400kV 400kV SUGEN VAPI Line 22-Aug-14 900 22-Aug-14 1400 Daily Corrective Maintenance amp Inspection Dropper of 5 Core CT

TPL-SUGE TPL-SUG R

59 765 Bus Reactor Kotra 22-Aug-14 900 23-Aug-14 1800 Daily WRTS-I PGCIL C

60 400 Vindhyachal-Jabalpur3 23-Aug-14 900 23-Aug-14 1800 Daily

For Replacement of 390kV Reactor LA with 336kV LA At Jabalpur Line will remain out of service due to less clearance of Reactor LA from Line conductor

PGCIL WRTS-II C

61 765 ICT1 at Indore 23-Aug-14 900 26-Aug-14 1800 Continious

re routing of cables in CMB for commissioning of spare unit at Indore

PGCIL WRTS-II C

62 765 Bus- 2 at Bina 23-Aug-2014 0900 23-Aug-2014 1800 DailyFor Bus stability required for 765kV Jabalpur 3 Bay- Rescheduling of outage

POWERGRID WRTS-II C

63 765 Bus-1 at Gwalior 24-Aug-14 1000 25-Aug-14 1800 Daily Busbar Jumpering ampStability test related to Jaipur 1 main bay PGCIL WRTS-II C

64 400 Navasari- Kala MC line 25-Aug-14 800 26-Aug-14 1800 DailyConstruction work of Navasari- Boisar line on same Multi ckt WRTS-II WRTS-I Ctower

65 765 765400 AT-1 AT SOLAPUR 25-Aug-14 900 26-Aug-14 1800 Daily Spare ICT unit Aux bus commisioning works WRTS-I WRTS-I C

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

66 220 Korba-Budhipadar Ckt-3 at CSPDCL Korba Ss 25-Aug-14 900 26-Aug-14 1800 DAILY For diversion of line for SE

Railway MCL project WRTS-I PGCIL C

67 765 765KV Bus 1 at Jabalpur Pooling Station 25-Aug-14 1000 25-Aug-14 1800 Daily

765KV Bus 1 Extension for Switchyard Extension for BINA 3 Line Dia

PGCIL WRTS-II C

68 765 765KV ICT 1 at Jabalpur Pooling Station 25-Aug-14 1000 25-Aug-14 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus Isolators for Spare ICT Phase - Heavy Induction

PGCIL WRTS-II C

69 400 Vindhyachal-Jabalpur4 25-Aug-14 900 25-Aug-14 1800 Daily

For Replacement of 390kV Reactor LA with 336kV LA At Jabalpur Line will remain out of service due to less clearance of Reactor LA from Line conductor

PGCIL WRTS-II C

70 400 Bus-I at satna 25-Aug-14 900 25-Aug-14 1800 DailyFor Changing of Jumper from Twin Moose To Quad Moose in 401 bay (jaypee nigrie line-1)

PGCIL WR-II C

71 400 Deepnagar-Thaptitanda 25-Aug-14 900 25-Aug-14 1700 Daily To attend Isolator alignment problem MSETCL MSETCL

72 765 BUS-II and 765 ICT-1 at Aurangabad (PG) 25-Aug-14 600 25-Aug-14 1800 Daily Commissioning of spare ICT unit

at Aurangabad (PG) WRTS-I WRTS-I CAurangabad (PG) at Aurangabad (PG)

73 765 Kotra-durg Ckt-2 along with line reactor 25-Aug-14 900 28-Aug-14 1800 ContinuousReplacement of spacer damper WRTS-I PGCIL C

74 765 Wardha-Aurangabad (PG)-2 and Padge-1 LReactor 26-Aug-14 600 26-Aug-14 1800 Daily Construction of up-coming

Padghe bay at Aurangabad (PG) WRTS-I WRTS-I C

75 765 Gwalior -Bina 1 26-Aug-14 1000 27-Aug-14 1800 Daily Spare reactor commissioning at Gwalior PGCIL WR-II C

76 765 1500MVA ICT 2 at Jabalpur Pooling Station 26-Aug-14 1000 26-Aug-14 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus Isolators for Spare ICT Phase - Heavy Induction

PGCIL WRTS-II C

77 400 Jabalpur-Itarsi4 26-Aug-14 900 26-Aug-14 1800 Daily

For Replacement of 390kV Reactor LA with 336kV LA At Jabalpur Line will remain out of service due to less clearance of Reactor LA from Line conductor

PGCIL WRTS-II C

78 400 Akola ll-Thaptitanda 27-Aug-14 900 27-Aug-14 1900 Daily To attend chattering noise on B-ph wave trap MSETCL MSETCL

79 400 Vapi- Kala MC Line 27-Aug-14 800 28-Aug-14 1800 DailyConstruction work of Navasari- Boisar line on same Multi ckt tower

WRTS-II WRTS-I C

80 765 Bus 1 at Jabalpur Pooling Station 27-Aug-14 1000 27-Aug-14 1800 Daily

765KV Bus 1 Extension Busbar Stability test related to BINA 3 Line Dia

PGCIL WRTS-II C

81 400 KORBA SIPAT 27 Aug 14 600 29 Aug 14 2200 CONT NORMALISED THE LILO AT PGCIL LANCO C81 400 KORBA -SIPAT 27-Aug-14 600 29-Aug-14 2200 RAMPUR PGCIL LANCO C

82 400 TARAPUR-PADGHE II 27-Aug-14 800 28-Aug-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

83 765 Gwalior-Satna1 28-Aug-14 800 28-Aug-14 1800 Daily For spare reactor commissioning works at Gwalior PGCIL WRTS-II C

84 765 BUS-II and Padge-2 LReactor at Aurangabad (PG) 28-Aug-14 600 28-Aug-14 1800 Daily

Commissioning of Padghe-2 upcoming bay at Aurangabad (PG)

WRTS-I WRTS-I C

85 765 Bilaspur 1 Main bay (710) at Seoni 28-Aug-14 800 29-Aug-14 1800 Daily AMP works WRTS-I WRTS-I R

86 765 765400 AT-2 AT SOLAPUR 28-Aug-14 900 28-Aug-14 1800 Daily Spare ICT unit Aux bus commisioning works WRTS-I WRTS-I C

87 765 Bus Reactor(706 BR) at Bilaspur Ss 28-Aug-14 900 01-Sep-14 1800 DAILY For replacement of unarmoured

cable by TBEA WRTS-I PGCIL C

88 765 Bus 2 at Jabalpur Pooling Station 28-Aug-14 1000 29-Aug-14 1800 Daily

765KV Bus 2 Extension for Switchyard Extension for BINA 3 Line Dia

PGCIL WRTS-II C

89 400 MOUDA 400KV BUS REACTOR 28-Aug-14 0900hrs 29-Aug-14 1800 ContionuouAnnual Maintainance NTPC NTPC

90 765 Satna - Bina 1 29-Aug-14 0900 31-Aug-14 1800 Daily

for erection of new TC amp TE tower forNHPTL at Bina-Rescheduling of outage

PGCIL WRTS-II C

91 765 Bus Reactor at Satna 29-Aug-14 900 30-Aug-14 1800 Continious Commissioning of spre reactor PGCIL WRTS-II Cus

92 400 125MVAr BR1 at Indore 29-Aug-14 900 29-Aug-14 1800 Daily Post Commissioning check of Fire-Fighting system at Indore PGCIL WRTS-II C

93 400 Chorania Hadala line 29-Aug-14 800 29-Aug-14 1800 Daily PMM WORK GETCO GETCO

94 765 Kotra-durg Ckt-2 along with line reactor 29-Aug-14 900 31-Aug-14 1800 Daily WRTS-I PGCIL C

95 765 765400 ICT-2 at Aurangabad (PG) 30-Aug-14 600 30-Aug-14 1800 Daily Altube erection in 400 kV Boisar-

1amp2 Tie bays WRTS-I WRTS-I C

96 765kV Dharamjaygarh - Bilaspur 30-Aug-14 800 30-Aug-14 1800 daily commissioning of JBP-1 bay (side) WRTS-I PGCIL C

97 765kV 330 MVAR Bus Rector-2 at Dharamjaygarh 30-Aug-14 800 30-Aug-14 1800 daily commissioning of JBP-1 bay

(side) WRTS-I PGCIL C

98 400 Mundra Hadala SC 30-Aug-14 800 30-Aug-14 1800 DailyPower Line Crossing of 400 KV DC Bhachau SS (PG) - Varsana SS (GETCO) TrL

GETCO WRTS-II C

99 220 Gwalior - Mahalgaon 1amp2 30-Aug-14 900 31-Aug-14 1800 Continuous

For crossing of 765kV Gwalior - Jaipur line PGCIL WRTS-II C

100 220 Gwalior - Malanpur 1amp2 30-Aug-14 900 31-Aug-14 1800 Continuous

For crossing of 765kV Gwalior - Jaipur line PGCIL WRTS-II C

101 400 400 kV Akola- Nandagaon peth sc 31-Aug-14 800 31-Aug-14 1600 Daily crossing works of 765 kV Koradi-AWRTS-I WRTS-I R

102 400 Bina-Shujalpur2 31-Aug-2014 900 31-Aug-2014 1000 DailyFor Replacement of 390kV Reactor LA with 336kV LA Line

ill b t k i i ith t

POWERGRID WRTS-II C

103 400 Mundra - Sami DC 01-Sep-14 800 01-Sep-14 1800 DailyPower Line Crossing of 400 KV DC Bhachau SS (PG) - Varsana SS (GETCO) TrL

ADANI WRTS-II C

104 400 Akola-Wardha 1amp 2 01-Sep-14 800 30-Sep-14 1800 Daily For Online PID Line in service with AR in non-auto mode WRTS-I WRTS-I For IOwith AR in non auto mode

105 765 Bilaspur 2 Main bay (716) at Seoni 01-Sep-14 800 02-Sep-14 1800 Daily AMP works WRTS-I WRTS-I R

106 400 400220 ICT-1 AT SOLAPUR 01-Sep-14 900 01-Sep-14 1500 Daily AMP WORK WRTS-I WRTS-I R

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

107 765 1000 MVA ICT I amp ICT II at Bina 01-Sep-14 0900 01-Sep-14 1800 Daily Commissioning of Master follower

scheme PGCIL WRTS-II C

108 765 Bus 1 at Jabalpur Pooling Station 01-Sep-14 100000 AM 01-Sep-14 60000 PM Daily

765KV Bus 1 Extension Busbar Stability test related to Bhopal 1 Line Dia

PGCIL WRTS-II C

109 400 Shujalpur - Bina 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

110 400 Birsinghpur-Damoh 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

111 400 Gandhar - Navsari 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

112 400 Khandwa - Rajgarh 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

113 400 Indore - Nagda 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

114 400 Jabalpur - Jabalpur Pool 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II Cnon auto mode

115 400 Khandwa - Dhule 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

116 400 Itarsi - Khandwa 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

117 220 Satna - Satna 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

118 765 Dehgam - Ranchhodpura 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

119 765 Shujalpur - Nagda 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

120 400 Asoj - SSP 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

121 400 Bhachau - Mundra 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

122 400 Bina - Gwalior 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

123 400 Satna - Gwalior 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in PGCIL WRTS-II Cnon auto mode

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

124 400 LILO portion of Vapi - Navi Mumbai at Kala(Vapi-Kala Line) 01-Sep-14 600 30-Sep-14 1800 Daily

Online replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

125 400400 kV Khandwa - Rajgarh

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

126 400400 kV Gandhar-Navsari

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

127 400400 kV Rajgarh ndash SSP

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

128 400400 kV SSP-Asoj

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

129 400 400 kV Shujalpur - Nagda (MPPTCL)

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

130 400400 kV Dehgam - Ranchodpura

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

131 400 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in PGCIL WRTS-II C

400 kV Ranchodpura ndash Bhachaup p y OPGW AR shall be kept in

non auto mode

132 400400 kV Mundra-Bhachau

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

133 400400 kV Vindhyachal NTPC -SASAN UMPP Ckt-1 01-Sep-14 600 30-Sep-14 1800 Daily

Online replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

134 400400 kV Vindhyachal Pooling -Vindhyachal NTPC 01-Sep-14 600 30-Sep-14 1800 Daily

Online replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

135 400 400 kV LILO at Kala (DNH) SS of Vapi-Navi Mumbai Line

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

136 765765 kV Bina - Gwalior

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

137 765765 kV Satna - Gwalior Ckt-I

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

138 400 Gandahr - Navsari DC 01-Sep-14 800 30-Sep-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

139 400 Navsari - Vapi - Kala 01-Sep-14 800 30-Sep-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

PID testing of insulator strings 140 400 Satna - Bina Ckt 1amp2 01-Sep-14 800 30-Sep-14 1800 Daily AR shall be kept In non auto

modePGCIL WRTS-II R

141 400 Nagda - Dehgam DC 01-Sep-14 800 30-Sep-14 1800 Daily PID testing of insulator strings AR h ll b k t I t

PGCIL WRTS-II R

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

142 220 Kakrapar - Vapi DC 01-Sep-14 800 30-Sep-14 1800 Daily PID testing of insulator strings PGCIL WRTS-II R

143

220 220 KV Jhanor - Haldrwa Line 1

01-Sep-14

800

05-Sep-14

000

Continous Replacement of existing CTCVT with 02 class CT amp CVT and for testing of the same NTPC NTPC

144 400 Akola-Aurangabad(PG) 2 01-Sep-14 800 02-Sep-14 1800 Conti commissioning of 50MVAR Lreactor at Aurangabad(PG) WRTS-I WRTS-I C

145 765 Bina-Satna 2 02-Sep-14 0900 03-Sep-14 1800 Daily Post Commissioning check of Fire-Fighting system at Bina PGCIL WRTS-II C

146 400 Vadavi-Chorania 1 02-Sep-14 800 02-Sep-14 1800 Daily PMM WORK WRTGPL GETCO147 400 BUS REACTOR AT SOLAPUR 02-Sep-14 900 02-Sep-14 1500 Daily AMP WORK WRTS-I WRTS-I R

148 765 Korba Line Main Bay (716) at Bilaspur Ss 02-Sep-14 900 02-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

149 765 Bus 2 at Jabalpur Pooling Station 02-Sep-14 100000 AM 02-Sep-14 60000 PM Daily

765KV Bus 2 Extension for Switchyard Extension for Bhopal 1 Line Dia

PGCIL WRTS-II C

150 400 Bus2 at Indore 02-Sep-14 900 02-Sep-14 1800 Daily Jumper connection amp stability checking of Pitampur1 PGCIL WRTS-II C

151 400 CGPL-Limbdi-1 02-Sep-14 2-Sep-14 8AM 6PM Daily routine maintenance and isolator aPGCIL CGPL

152400 Korba-Bhalai line -1

02-Sep-14 900 03-Sep-14 19002 days

continuous CVTs replacement

NTPC NTPC00 o ba a a e us C s ep ace e t

153 400 Sipat 400KV Bus-1 02-Sep-14 900 03-Sep-14 1900 Continous Annual Preventive maintenance NTPC NTPC

154 765 Bilaspur 2 Tie bay (717) at Seoni 03-Sep-14 800 04-Sep-14 1800 Daily AMP works WRTS-I WRTS-I R

155 400 400220 ICT-1 AT SOLAPUR 03-Sep-14 900 03-Sep-14 1500 Daily AMP WORK WRTS-I WRTS-I R

156 765 Sipat2 Main Bay (712) at Bilaspur Ss 03-Sep-14 900 03-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

157 765 Bina-Gwalior 2 03-Sep-14 0900 04-Sep-14 1800 Daily For spare reactor commissioning works at Gwalior PGCIL WRTS-II C

158 765 Bus 2 at Jabalpur Pooling Station 03-Sep-14 100000 AM 03-Sep-14 60000 PM Daily

765KV Bus 2 Extension for Switchyard Extension for Jumpering (Bus Extension) for Bhopal 1

PGCIL WRTS-II C

159 400 Indore-Asoj3 03-Sep-14 900 04-Sep-14 1800 Continuous

For checking protection transfer system at Indore (MPPTCL) PGCIL WRTS-II C

160 400 400 kv Nagda- Rajgarh ckt Pgcil ckt I 03-Sep-14 900 03-Sep-14 03092014 1800 daily Maintenan

ce Work PGCIL EHT- Mamp I

161 400 Vadavi-Chorania 2 04-Sep-14 800 04-Sep-14 1800 Daily PMM WORK WRTGPL GETCO162 220 SOLAPUR(PG)-Solapur(M) 04-Sep-14 900 04-Sep-14 1800 Daily AMP WORK MSETCL WRTS-I R

163 765 Bus 2 at Jabalpur Pooling Station 04-Sep-14 100000 AM 04-Sep-14 60000 PM Daily

765KV Bus 2 Extension Busbar Stability test related to Bhopal 1 Line Dia

PGCIL WRTS-II C

164 400 CGPL-Limbdi-2 04-Sep-14 4-Sep-14 8AM 6PM Daily routine maintenance and isolator aPGCIL CGPL

165 400 400 kv Nagda- Rajgarh ckt Pgcil ckt II 04-Sep-14 900 04-Sep-14 04092014 1800 daily Maintenan

ce Work PGCIL EHT- Mamp I

166400 Korba-Bhalai line -2

04-Sep-14 900 05-Sep-14 19002 days

continuous CVTs replacement

NTPC NTPC

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

167 400 BUS-1 AT SOLAPUR 05-Sep-14 900 05-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I C

168 400 Seoni-Khandwa 1 05-Sep-14 800 05-Sep-14 1800 Daily Line AMP works at Seoni WRTS-II WRTS-I R

169 400 400220 ICT-2 AT BOISAR 05-Sep-14 900 05-Sep-14 1500 Daily For Bushing oil DGA Testing WRTS-I WRTS-I R

170 765 Sipat2 Tie Bay (711) at Bilaspur Ss 05-Sep-14 900 05-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

171 765 Bina-Jabalpur I 05-Sep-14 0900 06-Sep-14 1800 Daily Post Commissioning check of Fire-Fighting system at Bina PGCIL WRTS-II C

172 400 Bus Reactor 1 at Jabalpur Pooling Station 05-Sep-14 100000 AM 05-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

173 220 Navsari - Nasik - 1 05-Sep-14 800 05-Sep-14 1800 Daily PMM WORK PGCIL GETCO174 400 Sipat 400KV Bus-2 05-Sep-14 900 06-Sep-14 1900 Continous Annual Preventive maintenance NTPC NTPC175 400 Akola-Wardha ckt 2 05-Sep-14 800 05-Sep-14 1700 Daily QMwork MSETCL MSETCL176 400 Kalwa-Kharghar 05-Sep-14 900 05-Sep-14 1700 Daily R amp M work MSETCL MSETCL177 400 Seoni-Khandwa 2 06-Sep-14 800 06-Sep-14 1800 Daily Line AMP works at Seoni WRTS-II WRTS-I R178 400 400220 ICT-1 AT BOISAR 06-Sep-14 900 06-Sep-14 1500 Daily For Bushing oil DGA Testing WRTS-I WRTS-I R

179 400 Bus Reactor 2 at Jabalpur Pooling Station 06-Sep-14 100000 AM 06-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

180 765 Gwalior-Satna2 06-Sep-14 800 06-Sep-14 1800 Daily For spare reactor commissioning works at Gwalior PGCIL WRTS-II C

181 400 Indore-Indore1 06-Sep-14 900 07-Sep-14 1800 Continuo For checking protection transfer t t I d (MPPTCL) PGCIL WRTS-II C181 400 Indore Indore1 06 Sep 14 900 07 Sep 14 1800 us system at Indore (MPPTCL) PGCIL WRTS II C

182 220 Navsari - Nasik - 2 06-Sep-14 800 06-Sep-14 1800 Daily PMM WORK PGCIL GETCO

183 400 VAPI-BOISAR 07-Sep-14 800 08-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

184 765 Satna-Gwalior-2 Reactor 07-Sep-14 900 07-Sep-14 1800 Daily For Commissioning of CSD relay in Gwalior-2 reactor bay at Satna PGCIL WRTS-II C

185 220 DC Welspun - Shivlakha amp Anjar shivlakha Trl 07-Sep-14 80000 AM 07-Sep-14 60000 PM Daily

Power Line Crossing of 400 KV DC Bhachau SS (PG) - Varsana SS (GETCO) TrL

GETCO WR-II C

186 765 Bilaspur 1 Tie bay (711) at Seoni 08-Sep-14 800 09-Sep-14 1800 Daily AMP works WRTS-I WRTS-I R

187 400kV Bus-1 at Itarsi SS 08-Sep-14 800 08-Sep-14 1800 Daily AMP amp Protection testing WRTS-II WRTS-II R

188 765 Seoni2 Main Bay (707) at Bilaspur Ss 08-Sep-14 900 08-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

189 765 Bina-Jabalpur II 08-Sep-14 0900 09-Sep-14 1800 Daily Post Commissioning check of Fire-Fighting system at Bina PGCIL WRTS-II C

190 765 ICT 1 at Jabalpur Pooling Station 08-Sep-14 100000 AM 08-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

191 765 Gwalior-Bina3 08-Sep-14 800 09-Sep-14 1800 Daily For spare reactor commissioning works at Gwalior PGCIL WRTS-II C

192 400 V-satna-1 08-Sep-14 900 09-Sep-14 1900 Continuous

Major OH of Line Circuit Breaker (For dismantling of poles) NTPC NTPC

193

220 220 KV Jhanor- Haldrwa Line 2

08-Sep-14

800

12-Sep-14

000

Continous Replacement of existing CTCVT with 02 class CT amp CVT and for testing of the same NTPC NTPC

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

194 400 Vadavi- Kansari- 1 09-Sep-14 800 09-Sep-14 1800 Daily PMM WORK WRTGPL GETCO195 400 Bus-1 at Damoh 09-Sep-14 1000 10-Sep-14 1800 Daily AMP PGCIL WRTS-II R

196 765 Bus Reactor 1 at Jabalpur Pooling Station 09-Sep-14 100000 AM 09-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

197 400 Bina - Shujalpur 1 09-Sep-14 1000 09-Sep-14 1400 Daily AMP PGCIL WRTS-II C

198 400 400 kv Katni- Damoh ckt 09-Sep-14 800 09-Sep-14 09092014 1800 daily Maintenance Work PGCIL EHT-

Mamp I

199 220 220 KV OMKARESHWAR -KHANDWA 09-Sep-14 900 09-Sep-14 09092014 1600 daily Maintenan

ce Work PGCIL EHT- Mamp I

200 220 220KV MALANPUR -AURAIYA 09-Sep-14 900 09-Sep-14 09092014 1700 daily Maintenance Work

EHT- Mamp I

201400 Korba 400 KV Bus coupler -1

09-Sep-14 900 10-Sep-14 19002 days

continuous Annual maintenance and testing

NTPC NTPC

202 400kV Bus-2 at Itarsi SS 10-Sep-14 800 10-Sep-14 1800 Daily AMP amp Protection testing WRTS-II WRTS-II R203 400 400220KV ICT-2 at Seoni 10-Sep-14 800 11-Sep-14 1800 Conti OLTC overhauling works WRTS-I WRTS-I R

204 400 VAPI-BOISAR 10-Sep-14 800 11-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

205 400 Parli 2 Tie Bay (417) at Solapur 10-Sep-14 900 10-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

206 765 330 MVAR Bus Rector-1 at Dharamjaygarh 10-Sep-14 800 11-Sep-14 1700 DAILY CSD relay commissioning in main

bay WRTS-I PGCIL C

207 765 ICT3 Tie Bay (717) at Bilaspur 10 S 14 9 00 10 S 14 18 00 DAILY F AMP k WRTS I PGCIL R207 765 ICT3 Tie Bay (717) at Bilaspur Ss 10-Sep-14 900 10-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

208 765 765kV Dharamjaygarh - Ranchi-2 l 10-Sep-14 900 15-Sep-14 1800 continous

For strining Jumpering of parallel ckt and Crossing of 765kV Dharamjaygarh-Jabalpur line

WRTS-I PGCIL C

209 765 ICT 2 at Jabalpur Pooling Station 10-Sep-14 100000 AM 10-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

210 400 Shujalpur-Nagda 1 10-Sep-14 1000 10-Sep-14 1400 Daily AMP PGCIL WRTS-II C211 400 Vadavi- Kansari- 2 10-Sep-14 800 10-Sep-14 1800 Daily PMM WORK WRTGPL GETCO

212 400 400 kv ISP - Nagda ckt 10-Sep-14 900 10-Sep-14 10092014 1800 daily Maintenance Work

EHT- Mamp I

213 220 220KV MALANPUR -AURAIYA 10-Sep-14 900 10-Sep-14 10092014 1700 daily Maintenance Work

EHT- Mamp I

214 220 220 KV DAMOH PGCIL IC - I 10-Sep-14 800 10-Sep-14 10092014 1800 daily Maintenance Work PGCIL EHT-

Mamp I

215765KV400K

VSipat 765KV400KV ICT-1 10-Sep-14 900 11-Sep-14

1900 Continous Annual Preventive maintenance NTPC NTPC216 400 New Koyna-Dabhol ckt 1 10-Sep-14 830 10-Sep-14 1730 Daily QMwork MSETCL MSETCL217 400 Akola-Aurangabad ckt 1 10-Sep-14 830 10-Sep-14 1730 Daily QMwork MSETCL MSETCL

218 400 TARAPUR-PADGHE I 11-Sep-14 800 12-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

219 400 ICT 2 Main Bay (409) at Mapusa 11-Sep-14 900 11-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

220 765 Korba LR (716 LR) at Bilaspur Ss 11-Sep-14 900 11-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

221 220 Bus-1 at Damoh 11-Sep-14 1000 12-Sep-14 1800 Daily AMP PGCIL WRTS-II R

222 765 Bus Reactor 2 at Jabalpur Pooling Station 11-Sep-14 100000 AM 11-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

223 220MC Bhimasar - Lalpar Bhimasar -Morbi amp Bhimasar - Mansar (on same tower)

11-Sep-14 80000 AM 11-Sep-14 60000 PM DailyPower Line Crossing of 400 KV DC Bhachau SS (PG) - Varsana SS (GETCO) TrL

GETCO WR-II C

224 220 Navsari - Dastan- 1 11-Sep-14 800 12-Sep-14 1800 Daily PMM WORK PGCIL GETCO

225 400 400 kv Rajgarh Pgcil - SSP CKT I 11-Sep-14 900 11-Sep-14 11092014 1800 daily Maintenance Work PGCIL EHT-

Mamp I

226 220 220K KV MEHGAON - AURAIYA 11-Sep-14 900 11-Sep-14 11092014 1700 daily Maintenance Work

EHT- Mamp I

227400 Korba Lanco

11-Sep-14 900 12-Sep-14 19002 days

continuous Annual maintenance and testing

NTPC NTPC

228 400 Lonikand II-Lonikand I 11-Sep-14 900 11-Sep-14 1700 Daily QMwork MSETCL MSETCL

229 400 Parali-Lonikand II ckt 2 11-Sep-14 900 11-Sep-14 1700 Daily QMwork MSETCL MSETCL

230 400 Waluj-Bableshwer 11-Sep-14 900 11-Sep-14 1700 Daily QMwork MSETCL MSETCL

231 400 Tie Transformer-II NTPC-Korba 11-Sep-14 900 12-Sep-14 1700 Maintenance NTPC NTPC

232 400kV Sipat-Raipur-2 12-Sep-14 000 12-Sep-14 1700 Daily Attending hot spots and SD nature defects WRTS-I PGCIL R

233 400 400220 ICT 1 AT WARDHA 12 Sep 14 9 00 12 Sep 14 15 00 Dail For B shing oil DGA Testing WRTS I WRTS I R233 400 400220 ICT-1 AT WARDHA 12-Sep-14 900 12-Sep-14 1500 Daily For Bushing oil DGA Testing WRTS-I WRTS-I R

234 400 Khandwa-Dhule 2 line reactor at Dhule 12-Sep-14 800 12-Sep-14 1800 Daily For Bushing oil DGA Testing

Line in service wo reactor WRTS-I WRTS-I R

235 400 BUS I AT MAPUSA 12-Sep-14 900 12-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

236 765 JBP - Dharmjaygarh Reactor Line 1 Reactor at Jabalpur Pooling Station

12-Sep-14 100000 AM 12-Sep-14 60000 PM Daily Installation amp Commissioning of CSD Relay PGCIL WRTS-II C

237 400 400 kv Rajgarh Pgcil - SSP CKT II 12-Sep-14 900 12-Sep-14 12092014 1800 daily Maintenan

ce Work PGCIL EHT- Mamp I

238 400 400 kv Indore - Nagda ckt 12-Sep-14 900 12-Sep-14 12092014 1800 daily Maintenance Work

EHT- Mamp I

239 220 220K KV MEHGAON - AURAIYA 12-Sep-14 900 12-Sep-14 12092014 1700 daily Maintenance Work

EHT- Mamp I

240 400 Lonikand-Stage IV 12-Sep-14 900 12-Sep-14 1700 Daily QMwork MSETCL MSETCL

241 400 Aurangabad(PG)-Aurangabad (Waluj)-1 12-Sep-14 800 15-Sep-14 1800 Conti Augmentation works at MSETCL

Waluj 400kV SSWRTS-I WRTS-I C

242 400 TARAPUR-PADGHE I 13-Sep-14 800 14-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

243 400 Karad-Lonikand 13-Sep-14 900 13-Sep-14 1700 Daily QMwork MSETCL MSETCL

244 400kV Sipat-Raipur-1 13-Sep-14 000 13-Sep-14 1700 Daily Attending hot spots and SD nature defects WRTS-I PGCIL R

245 400 BOISAR-PADGHE 13-Sep-14 800 14-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

246 400 400220 ICT-2 AT WARDHA 13-Sep-14 900 13-Sep-14 1500 Daily For Bushing oil DGA Testing WRTS-I WRTS-I R

247 400 Khandwa-Dhule 1 line reactor at Dhule 13-Sep-14 800 13-Sep-14 1800 Daily For Bushing oil DGA Testing

Line in service wo reactor WRTS-I WRTS-I R

248 220 BUS I AT MAPUSA 13-Sep-14 900 13-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R248 220 BUS I AT MAPUSA 13-Sep-14 900 13-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

249 765 Korba Line Main Bay (716) at Bilaspur Ss 13-Sep-14 900 13-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

250 400 Dhule-Babhleswar ckt 2 13-Sep-14 900 13-Sep-14 1700 Daily QMwork MSETCL MSETCL

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

251 400 Kolhapur-Mapusa 1 13-Sep-14 800 17-Sep-14 1800 Daily Insulator replacement due to polluted streaches

WRTS-I WRTS-I R

252 400 Kolhapur-Mapusa 1 13-Sep-14 800 17-Sep-14 1800 Daily Insulator replacement due to polluted streaches

WRTS-I WRTS-I R

253 400 Bhachau - Ranchodpura DC(Subject to SLDC consent) 14-Sep-14 80000 AM 20-Sep-14 60000 PM Continuo

us

Shifting of towers to maintain clearance for SSNL canal crossing (Loc 26-33 amp 78-84)

PGCIL WRTS-II C

254 400kV Bhilai-koradi line 15-Sep-14 000 16-Sep-14 000 Daily Attending hot spots and SD nature defects WRTS-I PGCIL R

255 400 Navasari- Kala MC line 15-Sep-14 800 16-Sep-14 1800 DailyConstruction work of Navasari- Boisar line on same Multi ckt tower

WRTS-II WRTS-I C

256 400 SOLAPUR(PG)-KARAD 15-Sep-14 900 20-Sep-14 1800 Conti Tower Erection of Line Reactor gantry of Karad Line at Solapur MSETCL WRTS-I R

257 765 WARDHA-AURANGABAD(PG) 2 15-Sep-14 800 15-Sep-14 1800 Daily

For replacement of Rph reactor unit at Wardha Line in service wo reactor Taking out reactor out of service

WRTS-I WRTS-I R

258 400 Chandrapur 3 Main Bay (420) at Bhadrawati 15-Sep-14 900 15-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

259 765 Seoni1 Main Bay (704 ) at Bilaspur Ss 15-Sep-14 900 15-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL RBilaspur Ss

260 220 Kakrapar-Haldarwa1 15-Sep-14 900 15-Sep-14 1800 DailyReplacement of existing 220kV CTs with High Fault current CTs at Haldarwa SS

PGCIL WRTS-II C

261 400 SSP - Rajgarh - 1 15-Sep-14 800 17-Sep-14 1800 Daily PMM WORK PGCIL GETCO

262

220 Jhanor 220 KV Bus1

15-Sep-14

800

16-Sep-14

000

Continous Replacement of existing CTCVT with 02 class CT amp CVT and for testing of the same NTPC NTPC

263 400 BOISAR-PADGHE 16-Sep-14 800 17-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

264 400 Chandrapur 3Tie Bay (421) at Bhadrawati 16-Sep-14 900 16-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

265 400 Indore-Asoj2 16-Sep-14 80000 AM 16-Sep-14 60000 PM Daily Replacement of broken insulators PGCIL WRTS-II R

266 765 Sasan-Satna2 16-Sep-14 900 17-Sep-14 1800 Daily Power line crossing for stringing of of 765Kv Vin pool- satna ck2 PGCIL WRTS-II C

267 400 315MVA ICT1 at Shujalpur 16-Sep-14 1000 16-Sep-14 1400 Daily AMP PGCIL WRTS-II R

268 220 Kakrapar-Haldarwa2 16-Sep-14 900 16-Sep-14 1800 DailyReplacement of existing 220kV CTs with High Fault current CTs at Haldarwa SS

PGCIL WRTS-II C

269 220 220 KV PITHAMPUR - RAJGARH PG CKT - I 16-Sep-14 900 16-Sep-14 16092014 1600 daily Maintenan

ce Work PGCIL EHT- Mamp I

270 400 V-satna-1 16-Sep-14 900 16-Sep-14 1900 Daily basis For erection of Breaker after OH NTPC NTPC

Construction work of Navasari- 271 400 Vapi- Kala MC Line 17-Sep-14 800 18-Sep-14 1800 Daily Boisar line on same Multi ckt

towerWRTS-II WRTS-I C

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

272 400 HVDC IBay (403) at Bhadrawati 17-Sep-14 900 17-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

273

220 Jhanor 220 KV Bus2

17-Sep-14

800

18-Sep-14

000

Continous Replacement of existing CTCVT with 02 class CT amp CVT and for testing of the same NTPC NTPC

274 400 Parli 1 Main Bay (423) at Bhadrawati 18-Sep-14 900 18-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

275 220 Kawas-Haldarwa1 18-Sep-14 900 18-Sep-14 1800 DailyReplacement of existing 220kV CTs with High Fault current CTs at Haldarwa SS

PGCIL WRTS-II C

276 400 SSP - Rajgarh - 2 18-Sep-14 800 20-Sep-14 1800 Daily PMM WORK PGCIL GETCO

277 400 400 KV Sarni - Seoni ckt 18-Sep-14 800 18-Sep-14 18092014 1800 daily Maintenance Work PGCIL EHT-

Mamp I

278 220 220 KV PITHAMPUR - RAJGARH PG CKT - II 18-Sep-14 900 18-Sep-14 18092014 1600 daily Maintenan

ce Work PGCIL EHT- Mamp I

279 220 220 KV DAMOH PG - TIKAMGARH CKT I 18-Sep-14 800 18-Sep-14 18092014 1800 daily Maintenan

ce Work PGCIL EHT- Mamp I

280 400Sipat 400KV Bay-9 (Raipur-1 Main bay) 18-Sep-14 900 19-Sep-14 1900 Continous Annual Preventive maintenance NTPC NTPC

281 400 Kolhapur-Mapusa 2 18-Sep-14 800 22-Sep-14 1800 Daily Insulator replacement due to polluted streaches

WRTS-I WRTS-I R

282 400 Khandwa 2 Tie bay (423) at 19 S 14 8 00 20 S 14 18 00 D il AMP k WRTS I WRTS I R282 400 Khandwa 2 Tie bay (423) at Seoni 19-Sep-14 800 20-Sep-14 1800 Daily AMP works WRTS-I WRTS-I R

283 400 BOISAR-PADGHE 19-Sep-14 800 20-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

284 400 Parli 1 Tie Bay (424) at Bhadrawati 19-Sep-14 900 19-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

285 220 Kawas-Haldarwa2 19-Sep-14 900 19-Sep-14 1800 DailyReplacement of existing 220kV CTs with High Fault current CTs at Haldarwa SS

PGCIL WRTS-II C

286 400 V-satna-2 19-Sep-14 900 20-Sep-14 1900 Continuous

Major OH of Line Circuit Breaker (For dismantling of poles) NTPC NTPC

287 400 Aurangabad(PG)-Aurangabad (Waluj)-2 19-Sep-14 800 22-Sep-14 1800 Conti Augmentation works at MSETCL

Waluj 400kV SSWRTS-I WRTS-I C

288 400 Parli 2 Main Bay (416) at Solapur 20-Sep-14 900 20-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

289 400 400220 ICT-3 AT MAPUSA 20-Sep-14 900 20-Sep-14 1500 Daily AMP WORKS WRTS-I WRTS-I R

Anaulagnak 33

Agast 2014 AaOr isatmbar 2014 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR AUGUST 2014 AND SEPTEMBER 2014

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)Agast 2014 isatmbar 2014 Agast 2014 isatmbar 2014

AUGUST 2014 SEPTEMBER 2014 AUGUST 2014 SEPTEMBER 2014

1 gaujarat

saIimat 12500 13900 7750 8500

AsaIimat 12540 13940 7760 8510

2 maQya p`doSa

saIimat 6200 6500 3800 4100

AsaIimat 6250 6500 3800 4100

3 CltaIsagaZ

saIimat 3030 3199 16425195 172052635

AsaIimat 3160 3269 172031 169036025

4 maharaYT

saIimat 16050 17750 10700 10800

AsaIimat 16100 17800 10750 10850

5 gaaovaa

saIimat 410 415 290 285

AsaIimat 425 425 300 290

6 dmana dIva

saIimat 315 320 205 200

AsaIimat 320 325 210 210

7 DI ena eca

saIimat 645 640 425 420

AsaIimat 650 645 430 425

8 piScama xao~

saIimat 37614 41048 25600 26080

AsaIimat 37898 41254 26450 27900

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah jaUlaa[- 2014

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 2236 75

]k[- Ukai - 2 529 75]k[- Ukai - 3 000 0]k[- Ukai - 4 2023 75]k[- Ukai (Total) 4788 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 094 2]k[- ela baI saI eca Ukai LBCH - 2 028 2]k[- ela baI saI eca Ukai LBCH (Total) 123 1 0018

3 kDanaa Kadana - 1 699 61 0010kDanaa Kadana - 2 910 57 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 1115 62 0000kDanaa Kadana (Total) 2724 62 0010

4 pnama PANAM amp Madhuban Dam 1 amp 2 160 8 0017 6 kula jalaIya TOTAL(H) 7794 225 0390

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 3339 57 34582 TaoronT pavar ilaimaToD yauinaT DI 6957 122 64083 TaoronT pavar ilaimaToD yauinaT [- 8082 122 67664 TaoronT pavar ilaimaToD yauinaT ef 8380 124 73285 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 037511 Qauvarna tapIya Dhuvaran - GT 2 000 0 116012 Qauvarna tapIya Dhuvaran - STG 1783 10113 ]ka[- yauinaT 1 Ukai -1 000 0 019714 ]ka[- yauinaT 2 Ukai -2 000 0 019315 ]ka[- yauinaT 3 Ukai -3 10038 202 922016 ]ka[- yauinaT 4 Ukai -4 6930 202 697517 ]ka[- yauinaT 5 Ukai -5 11833 212 1138718 ]ka[- yauinaT 6 Ukai -6 30277 507 2287219 gaaMQaInagar 1 Gandhinagar - 1 000 0 008220 gaaMQaInagar 2 Gandhinagar - 2 000 0 009221 gaaMQaInagar 3 Gandhinagar - 3 6275 213 669022 gaaMQaInagar 4 Gandhinagar - 4 6060 212 706523 gaaMQaInagar 5 Gandhinagar - 5 13495 215 1331024 vaNakbaaorI 1 Wanakbori - 1 12142 209 000025 vaaNakbaaOrI 2 Wanakbori - 2 12364 21026 vaaNakbaaOrI 3 Wanakbori - 3 6669 20227 vaaNakbaaOrI 4 Wanakbori - 4 7244 21128 vaaNakbaaOrI 5 Wanakbori - 5 6198 21029 vaaNakbaaOrI 6 Wanakbori - 6 5924 21230 vaaNakbaaOrI 7 Wanakbori - 7 9489 21031 ]trna Utran GT 1 000 0 026832 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 1200 221 024735 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 819 143 1098

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

Anaulagnak 41

ACTUAL GENERATION amp AVALABILITY FOR JULY 2014Actual vaastivak

Actual vaastivak

37 isaka Sikka - 1 1326 107 179438 isaka Sikka - 2 3489 114 401539 kcC ilagnaa[-T Kutch Lignite - 1 5092 71 859040 kcC ilagnaa[-T Kutch Lignite - 2 4929 7141 kcC ilagnaa[-T Kutch Lignite - 3 000 042 kcC ilagnaa[-T Kutch Lignite - 4 2388 68 571043 saUrt ilagnaa[-T Surat Lignite - 1 8775 130 874544 saUrt ilagnaa[-T Surat Lignite - 2 3966 130 445845 saUrt ilagnaa[-T Surat Lignite - 3 5411 130 524346 saUrt ilagnaa[-T Surat Lignite - 4 8973 130 883347 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5446 103 859048 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 6057 10749 jaI Aa[- pI saI ela GIPCL GT - 1 1123 33 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1510 3251 jaI Aa[- pI saI ela GIPCL GT - 3 598 3052 jaI Aa[- pI saI ela GIPCL ST - 1 1846 4553 jaI Aa[- pI saI ela GIPCL GT - 4 357 98 000054 jaI Aa[- pI saI ela GIPCL ST - 2 186 5055 [- esa esa e Aar ESSAR GT - 1 000 0 029356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 083 146 002860 jaI pI [- saI GPEC GT - 2 148 153 023361 jaI pI [- saI GPEC GT - 3 1387 145 028462 jaI pI [- saI GPEC STG 521 7563 jaI esa [- jaI GSEG GT - 1 206 51 112164 jaI esa [- jaI GSEG GT - 2 1079 4765 jaI esa [- jaI GSEG STG 613 2466 Sugen (GT 1 + GT 2) 000 0 693867 saIpIpI sao Aayaat Imp from CPP+MUNDRA 249228 6777

kula tapIya Total (T) 511604 7860 431554kula jalaIya+tapIya Total (H+T) 519398 8078 431944ivaMD [najaI- Wind Energy 94980kula jalaIya+tapIya+hvaa Total (H+T+Wind) 614378 9539ivainamaya Exchanges 150828 saIimat jaa- maaMga Restricted Energy Req 765205

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 767 135

11 gaaMQaI saagar Gandhi Sagar 998 117 008012 raNaa p`tap sagar RPSagar 096 86 004013 javaahr sagar Jawahar Sagar 439 66 0020

2 ponca Pench 1381 160 01003 baargaI Bargi 712 33 00704 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 5724 309 02906 banasaagar Bansagar-2 (Deolondh) 104 407 banasaagar Bansagar-3 (Silpara) 565 31 00608 banasaagar Bansagar-4 (Zinaha) 425 20 00309 maoDIKoDa Medikheda 096 58

10 ibarisaMGapur Birsingpur 680 20 002011 Tavaa Tawa 000 012 rajaGaaT Rajghat 001 7 007013 Omkareshwar 4226 340 14 [Midra saagar Indira Sagar 6679 679 0598

kula jalaIya TOTAL(H) MPPGCL 19979 2031 1152

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 2223 84 179302 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 14496 216 0

Actual vaastivak

4 satpura I Satpura-I(60Share) 000 0 00005 satpura II Satpura-II Unit 6 000 0 83106 satpura II Satpura-II Unit 7 7549 1857 satpura II Satpura-II Unit 8 12446 195 173908 satpura II Satpura-II Unit 9 4038 1759 satpura III Satpura-III Unit 10 9508 219 23440

10 satpura III Satpura-III Unit 11 8675 167 2096011 esajaITIpIesa 1 SGTPS Unit - 1 8675 167 2096012 esajaITIpIesa 2 SGTPS Unit - 2 9354 16013 esajaITIpIesa 3 SGTPS Unit - 3 1129 165 1642014 esajaITIpIesa 4 SGTPS Unit - 4 6022 16015 esajaITIpIesa 5 SGTPS Unit - 5 27597 50816 SSTPS 7895 309 9910

kula tapIya Total (T) 117479 2427 115480kula jalaIya+tapIya Total (H+T) 137458 4759 116632Injection from WIND 14572 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 152030 4759ivainamaya Exchanges 271419 saIimat jaa- maaMga Rest En Req 423449

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 606 120 01102 Gangrel 039 10 00203 Mini Micro KWB 039 7

kula jalaIya TOTAL(H) CSEB 684 137 0520tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 40 125902 kaorbaa (pU) Korba (E) Unit-2 2764 383 kaorbaa (pU) Korba (E) Unit-3 2764 384 kaorbaa (pU) Korba (E) Unit-4 2784 405 kaorbaa (pU) Korba (E) Unit -5 3685 120 244406 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 154608 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 24740

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 13343 243 1124012 KORBA(EB) Extn - 2 14104 248 11250

kula tapIya Total (T) 119955 1644 10189013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 119955 1644kula jalaIya+tapIya Total (H+T) 120639 1781 102410ivainamaya Exchanges 59759 0saIimat jaa- maaMga Rest En Req 180398 1781

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 5228 585 06952 kaoyanaa III Koyna III 3695 3203 kaoyanaa IV Koyna IV 371 11204 kaoyanaa DIpIeca Koyna DPH 414 385 TaTa jalaIya TATA Hydro 10123 741 44976 vaOtrNaa Vaitarna 1151 617 eladarI Eldari 000 168 BaTgar AaOr vaIr Bhatgar amp Vir 036 49 pOzana Paithan 976 49

10 itlaarI Tillari 1036 6511 BaIra Tola rosa Bhira Tail Race 846 4112 GaTGar Ghatghar 3639 25013 Anya CaoTo jalaIya Small Hydro (others) 1041 0

kula jalaIya TOTAL(H) 28404 -1073 5192

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL

Actual vaastivak

3 naaisak 3 Nasik Unit -3 4157 1954 naaisak 4 Nasik Unit -4 12489 1985 naaisak 5 Nasik Unit -5 12480 2006 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 30718 5038 Tambao 6 Trombay Unit -6 6619 5009 Tambao 8 Trombay Unit -8 000 0

10 Tambao 7A gaOsa Trombay -7A (Gas) 7476 127 288611 Tambao 7ba Trombay -7B (WHR) 4373 6912 kaoraDI 5 Koradi Unit -5 000 013 kaoraDI 6 Koradi Unit -6 8448 16714 kaoraDI 7 Koradi Unit -7 10994 19415 Bausaavala 2 Bhusawal Unit -2 4715 16516 Bausaavala 3 Bhusawal Unit -3 6454 16517 Bausaavala 4 Bhusawal Unit -4 20419 50518 Bausaavala 4 Bhusawal Unit -5 23286 43519 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 000 021 parlaI 5 Parli Unit -5 9315 17522 parlaI 6 Parli Unit -6 14237 25323 parlaI 7 Parli Unit -7 14028 25024 KaprKoDa 1 Khaperkheda Unit -1 8108 20025 KaprKoDa 2 Khaperkheda Unit -2 10924 19026 KaprKoDa 3 Khaperkheda Unit -3 7917 20627 KaprKoDa 4 Khaperkheda Unit -4 10446 21028 KaprKoDa 5 Khaperkheda Unit -5 24555 50030 parsa Paras-3 11676 21831 parsa Paras-4 10326 24032 ]rna Uran (Gas) 18771 40133 ]rna Uran (WHR) 10760 138 586234 caMd`pur 1 Chandrapur Unit -1 7526 16535 caMd`pur 2 Chandrapur Unit -2 9375 19936 caMd`pur 3 Chandrapur Unit -3 8728 20037 caMd`pur 4 Chandrapur Unit - 4 12276 47038 caMd`pur 5 Chandrapur Unit -5 29203 41039 caMd`pur 6 Chandrapur Unit -6 26351 040 caMd`pur 7 Chandrapur Unit -7 000 041 DhaNaU 1 Dahanu Unit-1 16882 250 1563042 DhaNaU 2 Dahanu Unit-2 19263 250 1660143 CPP 258820 41160044 RGPPL Share 000 0

kula tapIya Total (T) 692115 14094 350211MAH Wind + Solar Generation 110432 0kula jalaIya +tapIya Total (H+T+Wind) 830951 16176 396382

TOTAivainamaya Exchanges 274116saIimat jaa- maaMga Rest En Req 1105066

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1173 17ivainamaya Exchanges 33083saIimat jaa- maaMga Rest En Req 34256 459

C (F) dmana AaOr dIva DAMAN amp DIU 17467 298ja (G) dadra nagar hvaolaI DNH 43779 673

kula DD ampDNH (T) 61246 970

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 9731 160 1564312 tara`pur 2 TAPS Unit -2 11531 16013 tara`pur 3 TAPS Unit -3 40214 545 7288014 tara`pur 4 TAPS Unit -4 39284 53715 kakrapr 1 KAPS Unit -1 16048 545 3195016 kakrapr 2 KAPS Unit -2 14903 537

kula ena pI saI NPC Total 131710 24842 ena TI pI saI NTPC

Actual vaastivak

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15236 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14181 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14568 214 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 000 025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 32338 51326 kaorbaa esaTIpIesa 6 KSTPS Unit-6 33493 51427 kaorbaa esaTIpIesa 7 KSTPS Unit-7 30558 516

kula kaorbaa KSTPS Total 140373 2548 9318427 ivanQa esaTIpIesa 1 VSTPS Unit-1 13430 21528 ivanQa esaTIpIesa 2 VSTPS Unit-2 11930 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 13695 212210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14017 214211 ivanQa esaTIpIesa 5 VSTPS Unit-5 11952 215212 ivanQa esaTIpIesa 6 VSTPS Unit-6 8991 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 32786 515214 ivanQa esaTIpIesa 8 VSTPS Unit-8 19668 514215 ivanQa esaTIpIesa 9 VSTPS Unit-9 31796 516216 ivanQa esaTIpIesa 10 VSTPS Unit-10 31597 515217 ivanQa esaTIpIesa 11 VSTPS Unit-11 13881 512

kula ivanQayaacala VSTPS Total 233445 REF 16238 31 saIpt -1 -SIPAT-1 38555 66600 32 saIpt -2 -SIPAT-2 16033 66500 33 saIpt -3 -SIPAT-3 43240 66800 34 saIpt -4 -SIPAT-4 25865 51200 35 saIpt -5 SIPAT-5 33302 51500

kula saIpt -SIPAT TOTAL 156995 280100 920541 kvaasa gaOsa 1e Kawas GT-1A 2605 10442 kvaasa gaOsa 1baI Kawas GT-1B 4355 10643 kvaasa esaTI 1saI Kawas ST-1C 3365 11744 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 044 9846 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 10369 309 245151 gaMQaar gaOsa 1 Gandhar GT-1 2177 14352 gaMQaar gaOsa 2 Gandhar GT-2 3014 14553 gaMQaar gaOsa 3 Gandhar GT-3 5333 14754 gaMQaar esaTI 4 Gandhar ST-4 5586 158

kula gaMQaar GGPS Total 16109 437 475161 maaOda 1 Mauda -1 5368 514 000062 maaOda 2 Mauda -2 16240 513 0000

kula maaOda MAUDA Total 21608 756 2258161 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 000 31 000071 esa esa pI SSP RBPH - 1 1265 18872 esa esa pI SSP RBPH - 2 1102 18673 esa esa pI SSP RBPH - 3 1197 18774 esa esa pI SSP RBPH - 4 1116 18675 esa esa pI SSP RBPH - 5 1432 18676 esa esa pI SSP RBPH - 6 1653 18677 esa esa pI SSP CHPH - 1 422 3578 esa esa pI SSP CHPH - 2 384 3079 esa esa pI SSP CHPH - 3 179 34710 esa esa pI SSP CHPH - 4 1012 36711 esa esa pI SSP CHPH - 5 340 30

kula esa esa pI SSP Total 10101 1283 101081 kula poMca Pench Total 1381 160 010082 Jindal Injection 50805 083 Amarkantak Lanco 16857 0

(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2508924

(J) ]plabQata Availability 2439102 naoT ivainamaya Net Exchanges -311541 ]plabQa jaa- Energy Availability 2127561

maah jaUlaa[- 2014 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR JULY 2014 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 13833 - - - 13833 070714 1500 4972

saIimat Restricted 12500

AsaIimat Unrestricted 12540 13833 0 136 0 13969 070714 1500 4972

nyaUnatma pMjaIkRt maaMga Min Registered Demand 7617 7617 250714 0400 4999

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 7090 - - - 7090 020714 2015 4985

saIimat Restricted 6040

AsaIimat Unrestricted 6040 7090 0 31 0 7121 020714 2015 4985

nyaUnatma pMjaIkRt maaMga Min Registered Demand 3895 3895 230714 1500

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3118 3118 050714 2100 4985

saIimat Restricted 3150

AsaIimat Unrestricted 3250 2972 41792 24 0 3414 030714 2000 4977

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1336 1336 220714 1300 4995

maharaYT MAHARASHTRApMjaIkRt Registered 19283 - - - 19283 010714 1600 4994

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19283 62 40 0 19385 010714 1600 4994

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11936 11936 300714 0500 5000

gaaovaa GOApMjaIkRt Registered 405 459 - - 459 260714 2000 4967

AsaIimat Unrestricted 405 459 0 5 - 464 260714 2000 4967

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 532 - - 532 290714 0900 4998

AsaIimat Unrestricted 532 0 0 - 532 290714 0900 4998

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 287 - - 287 060714 1000 4991

AsaIimat Unrestricted 287 0 1 - 288 060714 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 721 - - 721 050714 1700 4983

AsaIimat Unrestricted 721 0 - 721 050714 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 400 435 290714

piScama xao~ WESTERN REGIONpMjaIkRt Registered 43034 - - - 43034 010714 1600 4994

saIimat Restricted 40703

AsaIimat Unrestricted 40905 43034 295 90 0 43419 010714 1600 4994

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28431 28431 240714 0500 5000 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

माह जलाई 2014Jul-14

अनब समातरवतीय चालन PARALLELRADIAL OPERATION TOTAL OPERATING HOURS

1 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-NR)

2 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-SR) 7424400

टाई लाईन TIE LINE

1 765 कवी िसवनी स वधा-I 765kV Soni to Wardha 6780100

2 765 कवी िसवनी स वधा-II 765kV Seoni to Wardha 2043700

3 400 कवी िभलाई स कोराड 400kV Bhilai to Koradi 7440000

4 400 कवी िभलाई स भिावती 400kV Bhilai to Bhadravati 7440000

5 400 कवी रायपर स भिावती -I 400kV Raipur to Bhadravati-I 7440000

6 400 कवी रायपर स भिावती ndashII 400kV Raipur to Bhadravati-II 7440000

7 400 कवी रायपर स भिावती ndashIII 400kV Raipur to Bhadravati-III 7440000

8 400 कवी सातपरा स कोराड 400kV Satpura to Koradi 7060200

9 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7440000

10 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 7440000

11 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7225100

12 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 7082500

13 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 5361200

14 400 कवी को हापर स मापसा-I 400kV Kolhapur-Mapusa-I 4561600

15 400 कवी को हापर स मापसा-II 400kV Kolhapur-Mapusa-II 4793700

16 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7440000

17 400 कवी रायगढ़ स ःटरलाइट-I 400kV Raigarh to Sterlight-I 7371100

18 400 कवी रायगढ़ स ःटरलाइट-II 400kV Raigarh to Sterlight -II 7440000

19 400 कवी रायगढ़ स झरसगड़ा-I 400kV Raigarh to Jharsuguda-I 7302900

20 400 कवी रायगढ़ स झरसगड़ा-II 400kV Raigarh to Jharsuguda-II 7303700

21 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 5400900

22 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7292200

23 400 कवी रायपर स वधाndashI 400kV Raipur to Wardha-I 7440000

24 400 कवी रायपर स वधाndashII 400kV Raipur to Wardha-II 7440000

25 220 कवी कोरबा पव स ब पादर-III 220kV K(E) to Budhipadar-III 7361200

ANNEXURE 43

maah jaUlaa[- 2014 ko daOrana pa~ta iSaDyaUla GaTkaoM Wara koMd`Iya xao~ ko sToSanaaoMM sao D`avala AaOr ivainamayaaoM ka ivavarNa

1 koMd`Iya sToSanaaoMM samaip-t koMd`Iya sToSanaoMa saMyaut inajaI sToSanaaoM kI GaaoiYat xamata (basa pr) AaOr laaBaaiqa-yaaMo kI pa~ta1 Declared Capcity (ex-bus) of Central Gen StnsDedicated CG StnsJointly owned Stns amp entitlement of beneficieries (MUs)

GaaoiYat xamata gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI + ecaDblyaubaI kula

(A) koMd`Iya ibajalaIGar A Central Gen Stns Dec Cap GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC+HWB TOTAL

kaorbaa esaTIpIesa Korba STPS 1017635 174452 237891 103616 324281 102699 23918 26164 1017635kaorbaa esaTIpIesa -III Korba STPS-III 283431 54419 44422 85553 76649 3066 3405 13029 283431ivanQa esaTIpIesa I Vindhyachal STPS-I 674012 123034 240046 1253 246970 19644 7141 23669 12255 674012ivanQa esaTIpIesa II Vindhyachal STPS-II 491154 117386 158375 0909 175903 6532 4569 16539 491154ivanQa esaTIpIesa III Vindhyachal STPS-III 627679 166963 156579 67068 186511 7093 7097 22387 627679ivanQa esaTIpIesa IV Vindhyachal STPS-IV 411100 98631 118464 26475 133406 5356 5241 19338 411100kvaasa gaOsa Kawas GPP 306920 87464 65557 0000 95562 5791 14520 37998 306920gaMQaar gaOsa Gandhar GPP 406294 146476 72428 0000 123833 7814 19389 36310 406294saIpt Sipat 1665864 454494 301337 266370 509047 19436 19662 68224 1665864kakrapar Kakrapar APS 275783 78347 69731 0000 94368 9698 5200 8018 10420 275783tara`pur 3 AaOr 4 Tarapur APS 3amp4 721903 183150 155921 32084 295823 8510 8953 31049 721903

(ba) samaip-t koMd`Iya ibajalaIGar B Dedicated CG Stations Actual injection vaasaivak [njaoSana [Midra saagar Indira Sagar 245570 245570 245570

(sa) saMyaut inajaI sToSana C Jointly owned Stationstara`pur 1 AaOr 2 Tarapur APS 1amp2 196640 98320 0000 0000 98320 0000 0000 0000 196640esaesapI SSP 97965 15674 55840 0000 26450 0000 0000 0000 97965ponca Pench 13620 9080 0000 4540 0000 0000 0000 13620

kula ([M saagar kao CaoD kr) Total (excl Indira Sagar) 11988065 2808880 2297269 640720 3692105 208667 173093 400816 1766516 11988065 Actual injection

2 koMd`Iya sToSanaaoMM samaip-t koMd`Iya sToSanaoMa saMyaut inajaI sToSanaaoM kI ]padna SaoDyaUla AaOr laaBaaiqa-yaaoM kI D`avala SaoDyaUla2 Generation Schedule (ex-bus) of Central Gen StationsDedicated CG StationsJointly owned Stations amp schedule of benificieries (MUs)

SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI+ ecaDblyaubaI kula

(A) koMd`Iya ibajalaIGar A Central Gen Stns Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH

HVDC+HWB Outside region(NR

amp SR) TOTALkaorbaa esaTIpIesa Korba STPS 1015070 174452 238276 103310 321801 102699 23918 26164 1015070kaorbaa esaTIpIesa -III $ Korba STPS-III $ 282671 54342 44422 85185 76334 3066 3405 13029 282671ivanQa esaTIpIesa I Vindhyachal STPS-I 660248 120064 239050 1253 237415 19644 7141 23473 12209 660248ivanQa esaTIpIesa II Vindhyachal STPS-II 488287 117160 156978 0909 174700 6532 4569 16539 488287ivanQa esaTIpIesa III Vindhyachal STPS- III 600504 134916 160349 67878 186319 7093 7227 22827 600504ivanQa esaTIpIesa IV Vindhyachal STPS- IV 409072 98719 118259 24888 133048 5356 5241 19374 409072kvaasa gaOsa Kawas GPP 99574 27083 25459 0000 23510 2678 5916 14915 0000 99574gaMQaar gaOsa Gandhar GPP 154677 55634 30257 0000 41633 3783 8217 15131 0000 154677saIpt Sipat 1448506 290983 323024 258111 436177 19418 23860 69790 1448506kakrapar Kakrapar APS 275783 78347 69731 0000 94368 9698 5200 8018 10420 275783tara`pur 3 AaOr 4 Tarapur APS 3amp4 721903 183150 155921 32084 295823 8510 8953 31049 721903

(ba) samaip-t koMd`Iya ibajalaIGar B Dedicated CG Stations[Midra saagar Indira Sagar 245570 245570 245570

RPPC(NVVNL) 0000

0000

0000

(sa) saMyaut inajaI sToSana C Jointly owned Stations Actual injection vaasaivak [njaoSana tara`pur 1 AaOr 2 Tarapur APS 1amp2 196640 98320 0000 0000 98320 0000 0000 0000 196640esaesapI SSP 97965 15674 55840 0000 26450 0000 0000 0000 97965ponca Pench 13620 0000 9080 0000 4540 0000 0000 0000 13620kula [M saagar kao CaoD kr Total (excl Ind Sagar) 10173905 2352674 2217883 625946 2591731 193349 149578 336130 1706614 10173905

Actual injectionNote- $ These Scheduled Transactions are done by WRLDC under STOA

3 AMtrxao~Iya ivainamayaaoM iWpxaIya ivanamayaaoM kI SaoDyaUla (ima yauinaTsa)3 Schedule for interregional exchangesbilateral exchanges (MUs)

SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kulaxao~ rajya RegionState Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL

k pUvaI- xao~ ko rasto Import SDLs through ER -110482Aayaat SaoDyaUla Indian Energy Exchange (WR to ER) 0000 0000 0000 0000 0000 0000 0000 139465

Power Exchange of India (ER to WR) 0000 0000 0000 0000 0000 0000 0000 3671ER (NTPC) 47912 28298 11592 52018 0000 0786 1209 93903

DVC to MPPTCL (Long Term Open Access) 0000 201316 0000 0000 0000 0000 0000 201316Hirakud to CSEB 0000 0000 1354 0000 0000 0000 0000 1354

APL2 GUVNL to APPCC ( AEL) -0918 0000 0000 0000 0000 0000 0000 -0918APL3 GUVNL to APPCC ( AEL) -0924 0000 0000 0000 0000 0000 0000 -0924

CSEB to APPCC ( NVVNL) 0000 0000 -44813 0000 0000 0000 0000 -44813DBPOWER to APPCC ( GMRETL) 0000 0000 -1828 0000 0000 0000 0000 -1828

JPL to APPCC ( KISPL) 0000 0000 -15225 0000 0000 0000 0000 -15225JPL-II to APPCC ( KISPL) 0000 0000 -11376 0000 0000 0000 0000 -11376

Anaulagnak 45

DETAILS OF ENTITLEMENTSCHEDULEDRAWAL BY THE CONSTITUENTS FROM CENTRAL SECTOR STATIONS AND EXCHANGES FOR THE MONTH OF JULY 2014

(pxaoivasa` Wara jaarI xao~Iya jaa- laoKa ko AaQaar pr)

13896KAWAS(RLNG)

GANDHAR(RLNG)

JPL-II to APPCC ( NVVNL) 0000 0000 -11414 0000 0000 0000 0000 -11414JPL-II to APPCC ( PTC LTD) 0000 0000 -14853 0000 0000 0000 0000 -14853

CSEB to ASEB ( PTC LTD) 0000 0000 -0575 0000 0000 0000 0000 -0575MPPMCL MPSEB to ASEB ( IEXL) 0000 -0575 0000 0000 0000 0000 0000 -0575

APL1 GUVNL to BIHAR ( AEL) -106185 0000 0000 0000 0000 0000 0000 -106185APL2 GUVNL to BIHAR ( AEL) -72520 0000 0000 0000 0000 0000 0000 -72520APL3 GUVNL to BIHAR ( AEL) -51827 0000 0000 0000 0000 0000 0000 -51827

DBPOWER to BIHAR ( MANIKARAN) 0000 0000 -0350 0000 0000 0000 0000 -0350EMCO to BIHAR ( PXIL) 0000 0000 0000 -0413 0000 0000 0000 -0413

GUVNL to BIHAR ( PXIL) -0200 0000 0000 0000 0000 0000 0000 -0200MSEB to BIHAR ( PXIL) 0000 0000 0000 -0100 0000 0000 0000 -0100

MPPMCL MPSEB to BIHAR ( PXIL) 0000 -0150 0000 0000 0000 0000 0000 -0150GUVNL to BESCOM ( GUVNL) -14041 0000 0000 0000 0000 0000 0000 -14041

ESSAR_MAHAN to BESCOM ( ESSAR_MAHAN) 0000 -4353 0000 0000 0000 0000 0000 -4353ADHUNIK to BALCO ( BALCO) 0000 0000 0064 0000 0000 0000 0000 0064

ADHUNIK to BALCO ( MANIKARAN) 0000 0000 7200 0000 0000 0000 0000 7200JSEB(ER) to BALCO ( MPPL) 0000 0000 1481 0000 0000 0000 0000 1481

JSEB(ER) to BALCO ( MANIKARAN) 0000 0000 1200 0000 0000 0000 0000 1200JITPL to BALCO ( BALCO) 0000 0000 1200 0000 0000 0000 0000 1200

STERLITE to BALCO ( BALCO) 0000 0000 18603 0000 0000 0000 0000 18603JSEB(ER) to ESIL_WR ( MPPL) 0600 0000 0000 0000 0000 0000 0000 0600STERLITE to ESIL_WR ( PXIL) 1900 0000 0000 0000 0000 0000 0000 1900

NSPCL to SAIL ROURKELA ( SAIL ROURKELA) 0000 0000 -23994 0000 0000 0000 0000 -23994APL2 GUVNL to TGPCC ( AEL) -1074 0000 0000 0000 0000 0000 0000 -1074APL3 GUVNL to TGPCC ( AEL) -1081 0000 0000 0000 0000 0000 0000 -1081

CSEB to TGPCC ( NVVNL) 0000 0000 -52359 0000 0000 0000 0000 -52359JPL to TGPCC ( KISPL) 0000 0000 -17792 0000 0000 0000 0000 -17792

JPL-II to TGPCC ( KISPL) 0000 0000 -13295 0000 0000 0000 0000 -13295JPL-II to TGPCC ( NVVNL) 0000 0000 -13342 0000 0000 0000 0000 -13342

JPL-II to TGPCC ( PTC LTD) 0000 0000 -17335 0000 0000 0000 0000 -17335TISCO to VFL MPSEB ( TPTCL) 0000 0000 0268 0000 0000 0000 0000 0268

BLAPPL MPSEB to WBSEB ( IEXL) 0000 -0016 0000 0000 0000 0000 0000 -0016DBPOWER to WBSEB ( PTC LTD) 0000 0000 -0595 0000 0000 0000 0000 -0595

MPPMCL MPSEB to WBSEB ( PTC LTD) 0000 -89184 0000 0000 0000 0000 0000 -89184

SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kulaxao~ rajya RegionState Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL

K dixaNa xao~ ko rasto Import SDLs through SR 10967

Aayaat SaoDyaUla Indian Energy Exchange (SR to WR) 0000 0000 0000 0000 0000 0000 0000 0169Power Exchange of India (SR to WR) 0000 0000 0000 0000 0000 0000 0000 0000RSTPS-SR to GOA ( BILATERAL) 0000 0000 0000 0000 2186 0000 0000 2186RSTPS-SR to GOA ( WHEELING) 0000 0000 0000 0000 3118 0000 0000 3118

RSTPS-SR to GOA ( WHEELING GOA) 0000 0000 0000 0000 5494 0000 0000 5494

ga ]trI xao~ ko rasto Import SDLs through NR -321127Aayaat SaoDyaUla Indian Energy Exchange (NR to WR) 0000 0000 0000 0000 0000 0000 0000 -164961

Power Exchange of India (NR to WR) 0000 0000 0000 0000 0000 0000 0000 -3367Rihand (Hydro) to MPPTCL (Long Term Open Access) 0000 7970 0000 0000 0000 0000 0000 7970

Matathilla (Hydro) to MPPTCL (Long Term Open Access) 0000 0000 0000 0000 0000 0000 0000 0000EMCO to BIHAR ( PXIL) 0000 0000 0000 -0188 0000 0000 0000 -0188MSEB to BIHAR ( IEXL) 0000 0000 0000 -0400 0000 0000 0000 -0400

MPPMCL MPSEB to BSES_RAJ ( MPPL) 0000 -7000 0000 0000 0000 0000 0000 -7000ADHUNIK to BALCO ( MANIKARAN) 0000 0000 5198 0000 0000 0000 0000 5198

HIMACHAL to ESIL_WR ( IEXL) 0050 0000 0000 0000 0000 0000 0000 0050HARIYANA to ESIL_WR ( IEXL) 1525 0000 0000 0000 0000 0000 0000 1525HARIYANA to ESIL_WR ( PXIL) 5610 0000 0000 0000 0000 0000 0000 5610

KWHEPS to ESIL_WR ( PXIL) 0150 0000 0000 0000 0000 0000 0000 0150SCL to ESIL_WR ( IEXL) 0610 0000 0000 0000 0000 0000 0000 0610SCL to ESIL_WR ( PXIL) 0090 0000 0000 0000 0000 0000 0000 0090

MPPMCL MPSEB to HARIYANA ( HARIYANA) 0000 -126636 0000 0000 0000 0000 0000 -126636SCL to HRJIL MSEB ( SCL) 0000 0000 0000 1993 0000 0000 0000 1993

APL3 GUVNL to JVVNL-NR ( IEXL) -0120 0000 0000 0000 0000 0000 0000 -0120APL3 GUVNL to JVVNL-NR ( PXIL) -0122 0000 0000 0000 0000 0000 0000 -0122

BLAPPL MPSEB to JVVNL-NR ( IEXL) 0000 -0250 0000 0000 0000 0000 0000 -0250EMCO to JVVNL-NR ( IEXL) 0000 0000 0000 -0720 0000 0000 0000 -0720MSEB to JVVNL-NR ( PXIL) 0000 0000 0000 -0300 0000 0000 0000 -0300

MPSEB to NDPL(DTL)-NR ( PTC LTD) 0000 -1626 0000 0000 0000 0000 0000 -1626MPPMCL MPSEB to NDPL(DTL)-NR ( PTC LTD) 0000 -35052 0000 0000 0000 0000 0000 -35052

MPPMCL MPSEB to RPPC ( RPPC) 0000 -3562 0000 0000 0000 0000 0000 -3562EMCO to TRIPURA ( IEXL) 0000 0000 0000 -0070 0000 0000 0000 -0070

ADHPL to TORRAHM GUVNL ( IEXL) 0051 0000 0000 0000 0000 0000 0000 0051

Ga iWpxaIya SaoDyaUlsa Exchanges within WRMundra APL to Gujarat (LTOA) 0000 0000 0000 0000 0000 0000 0000 0000

JPL to ARVIND GUVNL ( MPPL) 4464 0000 0000 0000 0000 0000 0000 4464JPL to AIGL MSEB ( AIGL MSEB) 0000 0000 0000 0789 0000 0000 0000 0789

JPL to ARPIPL MSEB ( ARPIPL MSEB) 0000 0000 0000 0771 0000 0000 0000 0771JPL to ACCIL MSEB ( ACCIL MSEB) 0000 0000 0000 2380 0000 0000 0000 2380

APL1 GUVNL to AWLD GUVNL ( AEL) 3874 0000 0000 0000 0000 0000 0000 3874DBPOWER to BALCO ( BALCO) 0000 0000 0120 0000 0000 0000 0000 0120

DBPOWER to BALCO ( DBPOWER) 0000 0000 15887 0000 0000 0000 0000 15887EMCO to BALCO ( EMCO) 0000 0000 0080 0000 0000 0000 0000 0080

JPL to BOSCH MSEB ( BOSCH MSEB) 0000 0000 0000 1552 0000 0000 0000 1552JPL to BCSIL MSEB ( BCSIL MSEB) 0000 0000 0000 0720 0000 0000 0000 0720JPL-II to CSEB ( CSPTRDCL CSEB) 0000 0000 12569 0000 0000 0000 0000 12569

SPECT ACBIL to CSEB ( CSPTRDCL CSEB) 0000 0000 0720 0000 0000 0000 0000 0720ACBIL to CSPTRDCL CSEB ( CSPTRDCL CSEB) 0000 0000 5374 0000 0000 0000 0000 5374

JPL to CLASSIC MSEB ( CLASSIC MSEB) 0000 0000 0000 1309 0000 0000 0000 1309JPL to CIPLA MSEB ( CIPLA MSEB) 0000 0000 0000 0610 0000 0000 0000 0610

JPL to CEAT MSEB ( MPPL) 0000 0000 0000 2921 0000 0000 0000 2921APL1 GUVNL to CHLM GUVNL ( AEL) 2187 0000 0000 0000 0000 0000 0000 2187

NSPCL to DD ( DD) 0000 0000 0000 0000 0000 13156 0000 13156EMCO to DNH ( EMCO) 0000 0000 0000 0000 0000 0000 28097 28097

JPL to DNL MSEB ( DNL MSEB) 0000 0000 0000 0870 0000 0000 0000 0870JPL to ETLC MSEB ( ETL) 0000 0000 0000 0758 0000 0000 0000 0758JPL to ETLT MSEB ( ETL) 0000 0000 0000 0758 0000 0000 0000 0758

APL2 GUVNL to ESIL_WR ( PXIL) 0283 0000 0000 0000 0000 0000 0000 0283APL3 GUVNL to ESIL_WR ( PXIL) 8355 0000 0000 0000 0000 0000 0000 8355

DBPOWER to ESIL_WR ( MANIKARAN) 0000 0000 0000 0000 0000 0000 0000 0345EOL GUVNL to ESIL_WR ( ESIL_WR) -19578 0000 0000 0000 0000 0000 0000 0000

EPGL GUVNL to ESIL_WR ( ESIL_WR) -2866 0000 0000 0000 0000 0000 0000 0000JPL to ESIL_WR ( JPL) 0000 0000 0000 0000 0000 0000 0000 45641

JSWEL(RTNGIRI) MSEB to ESIL_WR ( PXIL) 0000 0000 0000 -2328 0000 0000 0000 0000MSEB to ESIL_WR ( PXIL) 0000 0000 0000 -1705 0000 0000 0000 0000

ESSAR_MAHAN to ESIL_WR ( ESIL_WR) 0000 0000 0000 0000 0000 0000 0000 52250VANDANA to ESIL_WR ( PXIL) 0000 0000 0000 0000 0000 0000 0000 0480

JPL to ESIL MSEB ( JPL) 0000 0000 0000 0108 0000 0000 0000 0108ESSAR_MAHAN to ESIL MSEB ( ESIL_WR) 0000 0000 0000 1244 0000 0000 0000 1244

JPL to ETLW MSEB ( ETL) 0000 0000 0000 0732 0000 0000 0000 0732JPL to ETLB MSEB ( ETL) 0000 0000 0000 0866 0000 0000 0000 0866

JPL to EILR MSEB ( MPPL) 0000 0000 0000 1049 0000 0000 0000 1049JPL to ETLK MSEB ( ETL) 0000 0000 0000 0643 0000 0000 0000 0643

JPL to EXIDE MSEB ( EXIDE MSEB) 0000 0000 0000 1239 0000 0000 0000 1239CSEB to GOA ( PTC LTD) 0000 0000 -0400 0000 0400 0000 0000 0000

DBPOWER to GOA ( PTC LTD) 0000 0000 0000 0000 17390 0000 0000 17390JPL to GSL MSEB ( GSL MSEB) 0000 0000 0000 0870 0000 0000 0000 0870

EMCO to GCEL ( EMCO) 0000 0000 3394 0000 0000 0000 0000 3394JPL to HINDMOUDA MSEB ( HINDMOUDA MSEB) 0000 0000 0000 2249 0000 0000 0000 2249

HINDAHEJ GUVNL to HINDTALOJ MSEB ( HINDTALOJ MSEB) -2962 0000 0000 2962 0000 0000 0000 0000EMCO to DNH ( EMCO) 0000 0000 0000 0000 0000 0000 119290 119290

JPL to HNGIL MSEB ( HNGIL MSEB) 0000 0000 0000 5156 0000 0000 0000 5156LANCO TO MP 0000 191431 0000 0000 0000 0000 0000 191431

IEE 103711 47279 -413725 163201 0000 26840 0000 31054PEI 3561 7107 0000 -0214 0000 0000 0000 17561

ca kula Aayaat Total Import 781888 184933 483401 86303 247768 28588 40782 148596 781888kula inayaa-t Total Export 1202530 274418 268404 653270 6437 0000 0000 0000 1202530naoT Aayaat inayaa-t Net Imp (+)Exp (-) -420642 -89485 214997 -566968 241330 28588 40782 148596 -420642

4 kula gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kula

Total GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL11567423 2719395 2512265 73752 3933435 237255 213875 549412 12255 11567424

5 kI kula iSaDUyala Total Sdl incl IR bi-lateral exch Sdl 9753264 2263189 2432879 58978 2833062 221937 190360 484727 12209 97532646 ibanaa xait ko kula D`avala Total Drl excl Tr Loss 9388390 2433257 2716560 597587 2741156 286430 174671 437785 0944 93883907 xait imalaakr kula D`avala Total Drl incl Tr Loss 9703552 2433257 2716560 597587 2741156 286430 174671 437785 0976 93884228 p p`NaalaI maoM kula pUla xait Pooled loss in WR System 3151629 p xao`~ sToSanaaoM sao kaorbaa ivanQa 1 AaOr 2 ivanQa 3 kvaasa gaMQaar kakrapar tara`pur esaesapI ponca kula

vaastivak [njaoSana Actual Inj - WR Stns KSTPS VSTPS-1amp 2 VSTPS-3 KGPS GGPS KAPS TAPS SSP PENCH TOTAL (ima yauinaTsa) (MUs) 1310550 1162242 1009828 99928 156340 275783 918544 97965 13620 12860991

] xao~ Aa ]xao kao ina ] xao naoT d xao Aa d xao inayaa-t d xao naoT pU xao Aa pU xao inayaa-t pU xao naoT kula naoT10 vaasaivak AMtrxao~Iya Actual IR Exchanges NR Imp NR Exp NR Net SR Imp SR Exp SR Net ER Imp ER Exp ER Net Total Net

ivainamaya (ima yauinaTsa) (MUs) 0347 2303947 -2303600 0000 737616 -737616 73271 189494 -116223 -3157439 AMtrxao~Iya ivainamaya IR Exchange Schedule NRI sdl NRE sdl Net NR sdl SRI sdl SREsdl Net SR sdl ERI sdl ERE sdl Net ER sdl Net WR sdl iSaDyaUla (ima yauinaTsa) (MUs) 2987 714531 -711544 404371 0000 404371 0000 113469 -113469 -420642

Total Entitlement incl IR and bi-lateral exchange schedule

11

AMtrxao~Iya AaOr iWpxaIya ivanamayaaoM kI iSaDyaUla imalaakr kula pa~ta

maah jaUlaa[- 2014 ko AMtr-ajyaIya AMtrxao~Iya ivainamayaaoM ka ivavarNa Anaulagnak 46DETAILS OF INTERSTATEINTER-REGIONAL EXCHANGES FOR THE MONTH OF JULY 2014 Annex-46

k`maaMkFrom To

gauivainaila map`iva]kMila Craivabaao maraiva]kMila gaaovaa dmana dIva da na h [ssaar ] xao~ d xao~ pU xao~ piScama xao~ kulaA InterstateInter-regional Schedules

included in ISGSGUVNL MPPGCL CSEB MSPGCL GOA DD DNH ESIL NR SR ER WR TOTAL

1 gauivainaila GUVNL 2962 31082 34044

2 map`iva]kMila MPPGCL 0000

3 Craivabaao CSEB04

0400

4 maraiva]kM ila MSPGCL 4033 4033

5 gaaovaa GOA 0000

6da na h DNH 0000

7kaorbaa KORBA-III 0000

8 iMjadla pavar JPL 4464 12569 26349 45641 89023

9 ADanaI pavar APL 6061 6061

10 ESSAR MAHAN 1244 52250 53494

11 laonakao Lanco -Pathadi 0000

12 esaIbaIAa[-ela -ACBIL 6093 6093

13 KSK MAHANADI14 DB POWER 16008 17390 0345

15 VANDANA 0480

16 EMCO 3473

17 ESIL18 ena esa pI saI ela NSPCL 13157 28097 41254

19 ]ltarI xao~ NRegion (WR end) 0347 0347

20 dixaNaI xao~ S Region (S Bus) 0000 0000

21 pUvaI- xao~ E Region (WR end) 73271 73271

22 p xao~ WRegion (WR end) 737616 189494 3231057

23 enaTIpIsaI NTPC Injection 5216788

24 enapIsaI NPC Injection 1194327

25 Total ISGS drawal from the Grid incl interregional bi-lateral

2433257 2716560 597587 2741156 286430 174671 437785

B InterstateIR Exchanges not included in ISGS

20 knaa-Tk Karnataka 444 44400

21 yaUpIpIsaIela UPPCL 0000 0000

22 AarvaIpIenaela RVPNL -237 -2370

23 UPPCL ( Excess Drawn From Rajghat 0000 0000

24 kaoTa ]jjaOna Kota - Ujjain 0000 0000

25 kula ba Total B (13 to 17) 0000 -2370 0000 0000 44400 0000 0000 42030

C inavala ivainamaya Net Exchange (12+18) 2433257 2714190 597587 2741156 330830 174671 437785 9429476

D kula Aayaat Total Imp by WR 115648

E kula inayaa-t Total Export by WR 3231057

F inavala ivainamaya Net Exchange (D-E) -3115409

G p xao~ Wara vaIlD jaa- Energy wheeled by WR

26 pU xao~ sao d xao~ kao inayaa-t ER export to SR0000

0000

27 d xao~ sao ] xao~ kao inayaa-t pUxao pxao sao haokr SR export to NR via ERWR0000

0000

28 d xao~ sao ] xao~ kao inayaa-t pxao sao haokr SR export to NR via WR0000

0000

29 pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr ER export to NR via WR0000

0000

30 ] xao~ sao d xao~ kao inayaa-t pxao sao haokr NR export to SR via WR393404

393404

31 pU xao~ sao d xao~ kao inayaa-t pxao sao haokr ER export to SR via WR0000

0000

32 pU xao~ sao d xao~ kao inayaa-t ]xao pxao sao haokr ER export to SR via NRWR0000 0000

0000

33 ]pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr NER export to NR via WR0000

0000

Anaulagnak 47Annex-47

maah jaUlaa[- 2014 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39697 65459

9964 39521

Levels in Mtrs str maITr maoM

]ka[- Ukai

64932

10110

25501

25801

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF JULY 2014

ivavarNa Particulars

Sr No Details of incident (Elements Generation Tripped) Owner Utility Date TimeEffect (Loss of generation Load) if

anyCategory as per

Standards1 Bus Fault at Lonikhand 400 kV Bus 1 MSETCL 04Jul14 315 Nil GI‐22 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 06Jul14 433 load Loss 277 MW GD‐13 Tripping of Multiple Elements from 400220 kV Parli (MSETCL) Ss MSETCL 08Jul14 2359 Nil GI‐24 Poles tripping of HVDC Bhadarwati PGCIL 09Jul14 0350 amp 0504 Nil GI‐25 Tripping in Jejuri and Loanand Area MSETCL 10Jul14 126 Load Loss 400 MW GD‐16 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 11Jul14 349 load Loss 335 MW GD‐17 Blackout at Kawas Ss NTPC 11Jul14 117 Gen Loss 320 MW GD‐18 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 13Jul14 642 load Loss 263 MW GD‐19 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 15Jul14 611 load Loss 264 MW GD‐110 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 16Jul14 334 load Loss 200 MW GD‐111 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 17Jul14 417 load Loss 150 MW GD‐112 Tripping at Gandhar Ss NTPC 21Jul14 1607 Gen Loss 180 MW GD‐113 Multiple time tripping of 765 kV Sasan ‐Satna 2 ckt on Protection Mal‐operation PGCILSASAN 7252014 1026 amp 1229 Hrs Nil GI‐2

List of Grid Disturbances and Grid incidents (GDGI) in July-2014 Western RegionANNEXURE-5

SR NO UTILITIES OCC NO MONTH STATUS REMARK 1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14 HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314 AT MUMBAI BY NTPC MUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514 AT MUMBAI BY WRPC AT RELIANCE

7 WRTS-I 460 Jun-14 HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714 AT RAIPUR BY KWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-1411 RELIANCE SASAN 464 Oct-1412 MADHYA PRADESH 465 Nov-1413 BDTCLJBTCL 466 Dec-1414 NTPC Vindhyachal 467 Jan-1515 ESSAR TRANSMISSIOM 468 Feb-1516 TATA POWER 469 Mar-1517 SUGEN (TPL) 470 Apr-1518 TORRENT POWER 471 May-1519 CGPL 472 Jun-1520 NTPC Korba 473 Jul-1521 NCA 474 Aug-1522 NHDC 475 Sep-1523 NTPC Mouda 476 Oct-1524 KSK 477 Nov-1525 RELIANCE 478 Dec-1526 NTPC SIPAT CG 479 Jan-1627 TAPS-3amp4 480 Feb-1628 ESSAR ESIL 481 Mar-1629 GOA 482 Apr-1630 KAPS 483 May-1631 JPL 484 Jun-1632 DNH 485 Jul-1633 NTPC Mumbai 486 Aug-1634 ADANI TRANSMISSION 487 Sep-1635 INDIAN RAILWAY 488 Oct-1636 WRTS-II 489 Nov-16

ANNEXURE 10

8212014

1

OCC MEETING (462nd )

Power system Operation Corporation Ltd

OPERATIONAL HIGHLIGHTS amp ISSUES

Date 11082014Venue ndash Tarapur

MonthsIEGC Band

FVIlt499 499‐5005 gt5005

March14 1291 4783 3927 012

April14 3064 5233 1703 016

May14 2248 5319 2433 013

Junersquo14 3715 4536 1749 02460

80

100

120Frequency Profile for July 2014Frequency Profile for July 2014

Maximum instantaneous frequency

5036 Hz

on 23rd July 2014 at 1304 hrs

Minimum instantaneous frequency

4941 Hz

on 10th July and 25th July 2014 at 1950 hrs and 1944 hrs respectively

Julyrsquo14 3451 5016 1533 020

0

20

40

60

1‐Jul

2‐Jul

3‐Jul

4‐Jul

5‐Jul

6‐Jul

7‐Jul

8‐Jul

9‐Jul

10‐Jul

11‐Jul

12‐Jul

13‐Jul

14‐Jul

15‐Jul

16‐Jul

17‐Jul

18‐Jul

19‐Jul

20‐Jul

21‐Jul

22‐Jul

23‐Jul

24‐Jul

25‐Jul

26‐Jul

27‐Jul

28‐Jul

29‐Jul

30‐Jul

31‐Jul

Avg Frequency of the month

4993 Hz

1High frequency day due to heavy rain in almost all places in the country low demand was observed(117 GW) Heavy underdrawal by all constituents of WR around 700‐1000 MW during 1300 hrs2 Low frequency day Demand was high and Od by constituents Od by NR

lt499 499‐5005 gt5005

8212014

2

501

502

503

504

Frequency for July 2014

496

497

498

499

50

494

495

1 60 119

178

237

296

355

414

473

532

591

650

709

768

827

886

945

1004

1063

1122

1181

1240

1299

1358

1417

1476

1535

1594

1653

1712

1771

1830

1889

1948

2007

2066

2125

2184

2243

2302

2361

2420

2479

2538

2597

2656

2715

2774

2833

2892

2951

3010

3069

3128

3187

3246

3305

3364

3423

3482

3541

3600

3659

3718

3777

3836

3895

3954

4013

4072

4131

4190

4249

4308

Frequency 499 5005

26000

28000

Unit Outage‐ JULY‐14 Max 26128 MW on 26072014JUNE14 Max 20818 MW on 210714

PLANNED OUTAGE FORCED OUTAGE TOTAL OUTAGE‐JULY14 TOTAL OUTAGE‐JUNE14

10000

12000

14000

16000

18000

20000

22000

24000

26000

MW

0

2000

4000

6000

8000

10000

1‐Jul‐14 6‐Jul‐14 11‐Jul‐14 16‐Jul‐14 21‐Jul‐14 26‐Jul‐14 31‐Jul‐14Date

8212014

3

Energy ConsumptionMax

986 Mus on 2nd July+2975 as compared

to last year900

1000

1100

IN M

Us ‐‐‐‐gt

DAILY CONSUMPTION OF WESTERN REGION(2010‐11 TO 2014‐15)

Min749 Mus on 24th July

500

600

700

800

CONSU

MPT

ION

Apr

May Jun

Jul

Aug Sep

Oct

Nov Dec Jan

Feb

Mar

MONTHS ‐‐‐‐gt2010‐11 2011‐12 2012‐13 2013‐14 2014‐15

Energy Consumption MUDay

Jul‐14 Jun‐14 Jul‐13 Change wrt last month

Change wrt last Year

Average 848 927 712 ‐845 1909Max 986 971 760 156 2975Date 2‐Jul‐14 30‐Jun‐14 2‐Jul‐13 ~ ~

PEAK DEMAND (this month vis-agrave-vis last month)

STATE

CATERED(MW) UNRESTRICTED(MW)

Julyrsquo14 Junrsquo14 Julyrsquo14 Junrsquo14

GUJARAT 13833 13755 13969 13906

MP 7090 7120 7121 7434

CHATTISGARH 3118 3472 3414 3473

Regional Demand met

Max 43034 MW(1st July 1600 hrs)

2540 more than the l

MAHARASHTRA 19283 19452 19385 19755

GOA 459 475 459 482

DD 287 298 287 298

DNH 721 677 721 685

ESIL 532 535 532 535

43034 42934 43419 43802

last year

Min 28431 MW(24th July0500 hrs)

WR TOTAL 43034 42934 43419 43802

Figures shown are Maximums in the month

Demand Met Jul‐14 Jun‐14 Jul‐13 Change wrt last month

Change wrt last Year

Average 35215 40463 32253 ‐1297 918Max 43034 42934 34317 023 2540

Date when Max 1‐Jul‐14 30‐Jun‐14 2‐Jul‐13 ~ ~

8212014

4

Constituents Total Time Block Noof time block Violation of Compilance Violation of Compilancein the month of July Type ‐1 Type‐2

Chhattisgarh 2976 983 6697 927 6885Guajrat 2976 681 77 12 222 92 54

DSM Violation for the Month of July 2014

Guajrat 2976 681 7712 222 9254Madhya Pradesh 2976 528 8226 594 8004Maharashtra 2976 1045 6489 442 8515

Goa 2976 712 7608 1868 3723Daman and Diu 2976 1720 4220 2506 1579

Dadar Nagar Haveli 2976 23 9923 1299 5635

Violation Type‐2 When The drawl does not change sign in 12 consecutive time block

Violation Type‐1 When The drawl is more or less than 12 schedule or 150 MW whichever lesser

Total No of Blocks ‐ 2976

New Elements July 2014a) COMMISSIONING OF NEW GENERATING UNITSSLNO CONSTITUENT UNIT NAME UNIT NO C`ty(MW) DATE TIME

1 IPP(Jay Prakash Nigrie) JNSTPP I 660 150714(sync) 845

b) COMMISSIONING OF NEW TRANSMISSION LINES

SLNO CONSTITUENT LINE NAME CKT NO KV DATE TIME Line length( in km)

1 POWERGRID Wardha‐Aurangabad II 765 372014 2300 347 581 POWERGRID Wardha Aurangabad II 765 372014 2300 34758

2 POWERGRID Wardha‐Aurangabad I 765 572014 1900 34758

3 GETCO Kosamba‐Chorania I 400 572014 2035 230

4 GETCO Kosamba‐Chorania II 400 572014 2105 230

5 BDTCL BDTCL‐Bhopal(MP) I 400 16714 1833 864

6 POWERGRIDLILO of Raipur‐Raigarh‐4

IV 400 1872014 2200 2826 POWERGRIDat KSK

IV 400 1872014 2200 282

7 MPPTCL Indore‐Pithampura II 400 210714 1625 150

8 POWERGRIDDharamjaygarh‐Jharsuguda

I 765 29714 000 14893

9 POWERGRIDDharamjaygarh‐Jharsuguda

II 765 28714 2125 14893

Total ckt Km 189366

8212014

5

c) COMMISSIONING OF NEW ICTS

SLNO CONSTITUENT STATION NAME KV RATIOCAPACITY (MVA) DATE

TIME

1 BDTCL BDTCL(Bhopal)ICT 1 765400 3x500 372014 1657

2 POWERGRID Dharamjaygarh(ICT 1) 765400 3x500 772014 22593 POWERGRID Navasari(ICT 3) 400220 500 872014 1959

d)CO SS O G O C O Sd)COMMISSIONING OF LINE REACTORS

SLNO CONSTITUENT STATION NAME Line Name KVCty(MVAR

) DATETIME

1 BDTCL BDTCL Indore‐BDTCL I 765 3x80 23714 1935

2 POWERGRID DharamjaygarhDharamjaygarh‐Jharsuguda II

765 3x110 280714 2125

3 POWERGRID DharamjaygarhDharamjaygarh‐Jharsuguda I

765 3x110 29714 000

4 POWERGRID Satna Satna‐Gwalior‐II 765 3x80 29714 10005 POWERGRID Aurangabad Padghe Aurangabad 1 765 3x80 310714 22 475 POWERGRID Aurangabad Padghe‐Aurangabad‐1 765 3x80 310714 2247

e)COMMISSIONING OF BUS REACTORS

SLNO CONSTITUENT STATION NAME KVCty(MVA

R) DATETIME

1 POWERGRID Bhatapara 400 125 24714 19562 POWERGRID Indore 765 3x80 31714 18273 POWERGRID Sujalpur 400 125 31714 1205

Congestion Charge was applied 3 times in July 2014 on WR‐NR path ie on12th 14th amp 15th July 2014

8212014

6

5515 5484

5200

5400

5600

Congestion Charge applied on WR‐NR path Dt12714 (Block 3 ‐16)

4200

4400

4600

4800

5000WR‐NR TTC(4900 MW)

WR‐NR ATC(4400 MW)

4000

4200

030

034

038

042

046

050

054

058

102

106

110

114

118

122

126

130

134

138

142

146

150

154

158

202

206

210

214

218

222

226

230

234

238

242

246

250

254

258

302

306

310

314

318

322

326

330

WR‐NR_Act(MW) WR‐NR_TTC(4900 MW) WR_NR_ATC(4400 MW)

2200 00

240000

260000

280000

300000

320000

MW

Maharashtra Sch Vs Drawal‐12714(Block 3‐16)

140000

160000

180000

200000

220000

240000

MW

Gujarat Sch Vs Drawal_12714

200000

220000

3 4 5 6 7 8 9 10 11 12 13 14 15 16

TIme Block

Maharashtra_Sch Maharashtra_Drawal

340000

350000

W

MP Sch Vs Drawal_12714(Block 3‐16)

120000

3 4 5 6 7 8 9 10 11 12 13 14 15 16Time Block

GETCO_Sch(MW) GETCO_Drawal(MW)

750008000085000

CSPTCL‐12714(3‐16)

310000

320000

330000

3 4 5 6 7 8 9 10 11 12 13 14 15 16

MW

TIme Block

MP_Sch MP_Drawal

450005000055000600006500070000

3 4 5 6 7 8 9 10 11 12 13 14 15 16

MW

Time Block

CG_Sch CG_Drawal

Under Drawal By WR constituents during the imposition of Congestion on WR‐NR on 12714

8212014

7

5292

5100

5300

Congestion Charge applied on WR‐NR path Dt14714 (Block 57 ‐71)

4638

4300

4500

4700

4900

5100

WR‐NR TTC(4900 MW)

WR‐NR ATC(4400 MW)

3900

4100

1330

1336

1342

1348

1354

1400

1406

1412

1418

1424

1430

1436

1442

1448

1454

1500

1506

1512

1518

1524

1530

1536

1542

1548

1554

1600

1606

1612

1618

1624

1630

1636

1642

1648

1654

1700

1706

1712

1718

1724

1730

1736

1742

1748

1754

1800

WR‐NR_Act(MW) WR‐NR_TTC(4900 MW) WR_NR_ATC(4400 MW)

3600380040004200440046004800

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

MW

Maharashtra Sch Vs Drawal‐14714(Block 57‐71)

1900

2000

2100

2200

2300

2400

2500

2600

MW

Gujarat Sch Vs Drawal_14714

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

TIme Block

Maharashtra_Sch Maharashtra_Drawal

1800

1900

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

Time Block

GETCO_Sch(MW) GETCO_Drawal(MW)

700

750

800

Chhattisgarh Sch Vs Drawal_141714(Block57‐71)

2600

2700

2800

2900

MW

MP Sch Vs Drawal‐14714(57‐71)

500

550

600

650

700

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

MW

Time Block

CG_Sch CG_Drawal

2400

2500

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

Time Block

MP_Sch MP_Drawal

8212014

8

4630

45004700

Congestion Charge applied on WR‐NR path Dt15714 (Block 50 ‐96)

4463

350037003900410043004500

WR‐NR TTC(4150 MW)

WR‐NR ATC(3650 MW)

31003300

1215

1234

1253

1312

1331

1350

1409

1428

1447

1506

1525

1544

1603

1622

1641

1700

1719

1738

1757

1816

1835

1854

1913

1932

1951

2010

2029

2048

2107

2126

2145

2204

2223

2242

2301

2320

2339

2358

WR‐NR_Act(MW) WR‐NR_TTC(4150 MW) WR_NR_ATC(3650 MW)

3800

4000

4200

4400

4600

4800

MW

Maharashtra Sch Ve Actual on 15714(50‐96)

130015001700190021002300250027002900

MW

Gujarat Sch Vs Actual on 15714(50‐96)

3600

50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96

Time Block

Maharashtra_Sch Maharashtra_Drawal

1300

50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96

Time BLock

GETCO_Sch(MW) GETCO_Drawal(MW)

3500

3700

MP Sch Vs Actual for 15714(50‐96)

850

950

1050

Chhattisgarh Sch Vs Actual‐15714(50‐96)

2700

2900

3100

3300

50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96

MW

Time Block

MP_Sch MP_Drawal

350

450

550

650

750

850

50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96

MW

Time BLock

CG_Sch CG_Drawal

8212014

9

Summary of Grid Events (GD amp GI) in July 2014

Sr No

Details of incident (Elements Generation Tripped) Owner Utility Date TimeEffect (Loss of

generation Load) if any

Category as per

Standards

1 Bus Fault at Lonikhand 400 kV Bus 1 MSETCL 04Jul14 315 Nil GI‐2

2 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 06Jul14 433 load Loss 277 MW GD‐1

3Tripping of Multiple Elements from 400220 kV Parli

MSETCL 08Jul14 Nil GI 23(MSETCL) Ss

MSETCL 08Jul142359

Nil GI‐2

4 Poles tripping of HVDC Bhadarwati PGCIL 09Jul140350 amp 0504

Nil GI‐2

5 Tripping in Jejuri and Loanand Area MSETCL 10Jul14 126 Load Loss 400 MW GD‐1

6 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 11Jul14 349 load Loss 335 MW GD‐1

7 Blackout at Kawas Ss NTPC 11Jul14 117 Gen Loss 320 MW GD‐1

8 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 13Jul14 642 load Loss 263 MW GD‐1

9 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 15Jul14 611 load Loss 264 MW GD‐1

10 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 16Jul14 334 load Loss 200 MW GD‐1

11 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 17Jul14 417 load Loss 150 MW GD‐1

12 Tripping at Gandhar Ss NTPC 21Jul14 1607 Gen Loss 180 MW GD‐1

13Multiple time tripping of 765 kV Sasan ‐Satna 2 ckt on

Protection Mal‐operation PGCILSASAN 7252014

1026 amp 1229 Hrs

Nil GI‐2

S No Name of power

stations

Unit Reason for

outage

1 VSTPS 2 (210 MW) Coal Shortage

91 Operation of grid at high frequency ( gt 505 Hz) even under fuel shortage condition

Issues1 Major ISGSIPP are facing fuel

shortage1 VSTPS 2 (210 MW) Coal Shortage

2 VSTPS 5 (210 MW) Coal Shortage

3 Singhaji 1 (600 MW) Coal Shortage

4 SGTPS 4 (210 MW) Coal Shortage

5 JP Bina 2 (250 MW) Coal Shortage

6 Bhusawal 2 (210 MW) Coal Shortage

shortage2 Expected High Demand during dry

spell in September amp October3 Optimal use of precious fuel is

necessary to tackle the high demand in dry spell

7 Parli 4 (210 MW) Coal Shortage

8 India Bulls 1 (270 MW) Coal Shortage

8212014

10

Agenda 92 Insecure operation Oscillations Power Swingbull N‐1 contingency of 765 kV Tirora‐Akola2 on 10th and 11th June 2014

bull Tirora gen gt 1500 MW AR not operatedbull Intra plant mode of oscillations (097 Hz) with poor damping

bull N‐1 contingency of 400 kV Tirora‐Warora‐1 on 20th May 2014N 1 contingency of 400 kV Tirora Warora 1 on 20 May 2014bull Tirora gen gt 1500 MW 765 kV Tirora‐Akola2 out of servicebull SPS bull Power Swing and loss of complete power station GD‐1

bull The need for transmission augmentation as well as PSS tuning at APML Tirodawas discussed in the 461st OCC meeting

bull Member Secretary WRPC suggested that APML would send details of PSSMember Secretary WRPC suggested that APML would send details of PSS tuning studies to WRPC and they may consult IIT‐Mumbai for assistance and expedite

bull Representative from SLDC Kalwa APL may like to update the progress

Events at APML TiroraCase 3 Date 11‐07‐14 1529 hrsbull Line tripped on Y Phase to earth fault AR was unsuccessful due to persisting faultbull Sudden power transfer through 400 kV System resulted in swing Oscillation of 097 Hz observed across WR and

East West generation in Western region oscillatedO ill i i d f 10 dbull Oscillation persisted for 10 seconds

bull Damping ratio was 257

8212014

11

Events at APML TiroraCase 4 Date 23‐07‐14 0227 hrsbull 765400 kV APML Tirora ICT trippedbull Sudden power transfer through 400 kV System resulted in swing Oscillation of 097 Hz observed across WR

and East West generation in Western region oscillatedO ill i i d f 17 dbull Oscillation persisted for 17 seconds

bull Damping ratio was 7

bull Need for transmission augmentation as well as PSS tunning at APML Tiroda required

bull It has been decided in 461th OCC thatAPML would send details of PSS

Expected date of

tuning studies to WRPC and they may consult IIT‐Mumbai for assistance and expedite Representative from SLDC Kalwa APL may like to update the progress

Expected date of bull 2nd ckt of 765 kV Tirora‐Akola2bull 220 kV network from 400220 kV Warorabull 220 kV network from 765400 kV Akola2 and 765400 kV Taptithandabull 220 kV network from 765400 kV Aurangabad‐PG 400220 kV Pune

Redistribution of Load within Maharashtra system

8212014

12

Elements Date and

Time of

Tripping

Date and

Time of

Restoratio

n

Remarks Receipt of

DREL at WRLDC

Satna Sasan

765 kV Sasan‐Satna 225‐07‐14

1026

25‐07‐14

1155

Protection Mal‐Operation DT at Sasan End

on OV as line remain hanging from Sasan No Yes

Agenda 93 Frequent Tripping of 765 kV Satna‐Sasan line

Issues

1Expedite commissioning of Line Reactor at 765 kV Sasanend

2 Submission of DREL for1026 1155end

765 kV 240 MVAr

Bus Reactor at Satna

25‐07‐14

1026

25‐07‐14

1139

Protection Mal‐Operation DT at Sasan End

on OV as line remain hanging from SasanNo Yes

765 kV Sasan‐Satna 225‐07‐14

1342

25‐07‐14

1342

Line got charged from Satna and

synchronized at Sasan end but immediately

DT was received at Sasan from Satna and

Line tripped Prior to tripping voltage at

No Yes

2 Submission of DREL for event analysis in line with CEA standards IEGC

3 Threat to grid security and constraints in evacuation from large generation complexarising from frequent undesirable tripping particularily

Sasan end was 796 kV

765 kV Sasan‐Satna 225‐07‐14

1628‐

Charging attempt was taken from Satna end

but line tripped before synchronization at

Sasan end due to DT from Satna Open end

voltage at Sasan 826 kV for the line

No Yes

The above was a narrow miss because the tripping occurred when one of the bus was under shutdown Fortunately during theabove period only two units of Sasan were in service and the second 765 kV bus remained in service else the situation would havebeen a serious threat to the system security

during protection testing construction activities

The progress of reactor commissioning at Sasan over the last 8 months is given under

Schedule in formed in meetings

SN 451st OCC 455th

OCC

456th OCC 457th 458th 459th 460th 461st

1 Line reactor By Dec By April By May By June End of June End of By By

of 765 kV

Sasan‐Satna

ckt‐2

y

2013

y p

2014

y y

2014

y

2014(Testing under

progress)

2014 (As per

joint report

post site visit

on 26314)

June 2014

y

Aug‐

2014

y

Aug‐2014

2 765kV Bus‐1

Reactor

Jan 2014 By Mar

2014

By June

2014

By June

2014(Testing under

)

End of July

2014(As per

j i t t

End of July

2014

By

Sep‐

2014

By

Sep‐2014

Sasan may intimate the progress in reactor commissioning to the sub-committee

progress) joint report

post site visit

on 26314)

2014

8212014

13

Item no94 SPS at Sipat

bull The SPS scheme implemented at NTPC Sipat received at WRLDC

bull It is observed that a time delay of 15sec is provided to unload units 1 2 4 amp5 each by 150MW if ICT l d d 130 f t d l dany ICT s load exceeds 130 of rated load

bull As per decision of WRPC meeting on 18314 if ex‐bus generation at Sipat is more than 2200 MW immediate unloading of units were decided and the intentional delay provided needs to be re‐ examined (Maximum 2‐3 sec delay may be appropriate) as unloading by 150MW would also take another 4‐5sec

8212014

14

Contingency Envisaged SPS action Identified FeedersTripping of any oneICT at 400200 VapiSub‐Station

Automatic LoadShedding of 100MW

DNH 1) 66 kV‐Kharadpara‐Rakholi‐I 50 MW2) 66 kV Khadoli‐Khadoli‐3 30 MW

Item No95 SPS at 400220 kV Vapi(PGCIL) Item No912

DD1) 66 kV Magarwada‐Kachigam 60 MW

It was apprised by representatives from DD amp DNH in the 459th OCC meeting that the above scheme shall be implemented within a month

UT DDDNHmay apprise the status of commissioning of the envisaged SPSUT‐DDDNH may apprise the status of commissioning of the envisaged SPS

Item no96 Addressing High Voltage condition in SSP amp nearby area Sl No Line No of Times tripped in Julrsquo141 400 kV SSP‐Dhule‐I 32 400 kV SSP ‐ Rajgarh‐ I 2

Issues1 Multiple tripping of

feeders emanating from SSP

2 S l tiSl No Line No of occasions kept open on HV 2 Several emanating feeders being kept open on high voltage in SSP amp nearby area

Sl No Line No of occasions kept open on HV

1 400 kV SSP‐Dhule‐I 9

2 400 kV SSP‐Dhule‐II 6

3 400 kV SSP ‐ Rajgarh‐ I 1

4 400 kV SSP ‐ Rajgarh‐ II 1

bull Operating RBPH machines in synchronous condenser mode during offOperating RBPH machines in synchronous condenser mode during off peak hours

bull Reactor commissioning at Rajgarh amp Dhule to be expedited by WRTS‐II(PGCIL) amp MSETCL

bull Absorption of MVAr by Wanakbori WTS

8212014

15

1 Voltage at Wanakbori was gt420 kV for 100 the time during Julrsquo14

2 WTPS units 567 are injecting MVAR (~ 60 MVAR) at Voltage gt 420 kV

3 Absorption of MVAR by WTPS units is expected during the high voltage condition at WTPS amp nearby area

97Status of implementation of UFRWestern Region

States Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Stage - I 492 Hz Stage - II 490 Hz Stage - III 488 Hz Stage - IV 486 Hz

relief GUJARAT 580 773 580 726 580 1117 590 1025MADHYA PRADESH 460 468 460 450 460 460 465 490CHATTISGARH 150 110 150 114 155 117 155 91MAHARASHTRA 805 1108 810 1200 815 765 820 851GOA 25 25 25 25 25 25 25 25UT DD 10 15 15 15 UT DNH 30 30 35 35 Total load relief 2060 2484 2070 2515 2085 2485 2105 2482

Not received

DD and DNH have not implemented any stage of AUFLS

DD and DNH may appraise the status

Real‐time monitoring of the likely relief available from AUFLS at any given instant mandated by CERC

Telemetry to be provided at SLDC amp RLDC

Not received

8212014

16

Agenda 98 ADMS (Automatic Demand Management Scheme) Implementation as per Sec 542 of IEGC

As per CERC order dt06062014 the target of fully implementation of scheme is by January2015Constituents have to submit bi‐monthly progress report to WRPC Secretariat with a copy to the Commission and WRLDCMP has submitted its detailed action plan in the form of an affidavit to CERC for implementation of ADMS However SLDC MPPTCL is requested to furnish data to OCC forum in the above format

Item No 99 Status of Telemetry in WR

Telemetry Issuesdoc

8212014

17

Item No 910 Black Out at NTPC Kawas Power Station

bull On 11th July 2014 Kawas Gas generating complex got blackout due to tripping of evacuation lines one by one

within a short span of 30 minutes

bull The complete loss of evacuation lines occurred at 0117 Hrs The blackout has resulted in tripping of GT1A

GT1B and ST causing 320 MW generation loss in the area It was reported that weather condition was foggy with

slight drizzling was in the area

LineTime of Tripping

Kawas End Remote endRestoration Time

220 kV Kawas‐Navsari1

1246 AM

R phase to EF

Fault location 2 km

R Phase to EF

122 AM

220 kV Kawas ndashNavsari2

112 AMR phase to EF

Fault location 2208 km

R Phase to EF 347 AM

220 kV Kawas‐Haldarwa 1

107 AMR phase to EF

Fault location 16 km

R Phase to EF 246 AM

220 kV Kawas‐ R phase to EF R Phase to

bull Line restoration has failed on several attempt as the lines

were not holding due to persisting fault

bull Such an event of total loss of evacuation lines from a

generating station resulting in blackout scenario is a

matter of serious concern

bull WRTS-2 may kindly send the reasons for such faults

which has caused the incidence and the remedial action

taken in this regard220 kV Kawas‐Haldarwa 2

108 AMp

Fault location 2 kmEF 304 AM

220 kV Kawas‐Icchapur1

108 AM B phase to EFB Phase to EF

301 AM

220 kV Kawas‐Icchapur2

108 AMB phase to EF Faultlocation 356 km

B Phase to EF

331 AM

220 kV Kawas‐Vav 1 117 AMNo tripping

Hand Tripped laterLine Tripped 225 AM

220 kV Kawas Vav 2 117 AM Y Phase to EFY Phase to EF

317 AM

taken in this regard

bull Disturbance Recorder (DR) and Event Logger(EL) out

puts are yet to be received from WRTS-2

bull As per IEGC the information like DREL output relay

indications amp sequence of events etc must be sent to

RLDCRPC by 24 hrs of the event WRTS-2 may kindly

expedite amp furnish the information to WRLDC amp WRPC

Item No 911 Operating Procedure of WR-2014

The operating procedure of Western Region 2014 has been updated on 31072014 and the p g p g psame has been uploaded on WRLDC web site at the following link

httpwwwwrldccomdocsWR_OPERATING_PROCEDURE_2014pdf

8212014

18

Item No 12 Mock Black start Exercise

Station Name Date Proposed Remarks

Mock Black Start Plan for the following stations has been received by WRLDC

CLPIPL Gas Power Plant 29‐Jun‐2014 ‐

Gandhar Gas Power Plant 27‐July‐2014 ‐

Other Utilities may update the sub‐committee regarding their plan for black start exercise

SL No Name of the Station Remarks

1 Bargi DG set under outage

2 TONS Governor Problem

3 Birsinghpur Governor Problem

Healthiness of DG sets

3 Birsinghpur Governor Problem

4 Medikheda Governor Problem

5 Rajghat Governor Problem

1 Outage of DG set for longer period is matter of serious concern 2 SLDC Jabalpur may apprise the present status2 SLDC‐Jabalpur may apprise the present status3 Possibility of procurement of stand‐by DG sets to be examined to take care of such prolonged outage of DG sets which virtually renders the black start facility sterile4 There is need for blackstart generator planning in W3 area Thermal IPP generators are disconnected from state grid and there is no hydro station So with only UHV lines and large thermal units system restoration post disturbance would be extremely challenging for Chattisgarh

8212014

19

Maharashtra

Madhya Pradesh

Item No13 Review of list of feeders for load regulation in emergency

Gujarat

DD amp DNHChattisgarh

Goa

bull Decided during the 461st OCC that list ofDecided during the 461st OCC that list of

feeders identified for load control under

emergency measure for safeguarding grid

security would be reviewed in a special

meeting The list is yet to be reviewed

8212014

20

Item No 14 Implementation of voltage and time grading on OV relays to prevent tripping of multiple EHV lines emanating from single node on high voltage

bull During the 461st OCC it was informed by Power Grid representative that they have already implemented voltage grading in various line emanating from the same node (matter has not come in the MoM)

bull Power Grid amp other utilities may kindly intimate the present status of voltage grading at their respective sub‐stations

Power Station Number of instances

when the SPS signal

was received at the

station

Number of instances

when the action by

the generators was

adequate

Number of instances

when the automatic

generation reduction was

done partially

JPL 53 0 50

Item No 15 SPS for SR‐WR Inter Connection Inadequate Participation by Generators

Issues

1 10 times operation of SPS‐1 causing backing down at JPL amp KSK during 1714 to 7 8 14JPL 53 0 50

KSK 53 0 36

APML 35 0 30

Mouda 35 0 0

Koyna 0 0 0

Koradi 0 0 0

Khaparkheda 0 0 0

Chandrapur 0 0 0

to 78142 Participation by other envisaged

generators to be expedited3 PGCIL may update status of Extention of

SPS signal from Solapur(PG) to the additional generators identified for participation

4 Decided in 461st OCC to have special Chandrapur 0 0 0

DB Power 0 0 0

NSPCL 0 0 0

Balco 0 0 0

Lanco 0 0 0

KWPCL 0 0 0

pProtection Sub‐Committee meeting to discuss progress of implementation of the revised SPS at Solapur (for WR‐SR interconnection) amp extension of signal from Sholapur to additional generators in WR

8212014

21

Thank you

DiscussionhelliphelliphellipDiscussionhelliphelliphellip

  • 462 occ_minutepdf
  • participants list_462 OCC meeting 110814pdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 26-7pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 45pdf
  • 46pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84pdf
  • 84apdf
    • 26wrpc_minute 107pdf
    • 26wrpc_minute 108pdf
    • 26wrpc_minute 109pdf
    • 26wrpc_minute 110pdf
    • 26wrpc_minute 111pdf
    • 26wrpc_minute 112pdf
    • 26wrpc_minute 113pdf
      • 85pdf
      • 87pdf
      • 98pdf
      • 913pdf
      • 10pdf
Page 5: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR

5

462nd OCC MINUTES

ITEM NO 4 OPERATIONAL STATISTICS FOR THE MONTH OF July 2014 The details of actual generation demand drawl of power from grid exchanges etc are given in the following Annexure Annex 41 - Actual Generation and Requirement for July 2014 Annex 42 - Peak Demand Schedule Vs Actual for July 2014 Annex 43 - Integrated Operation of the System and Operation of Inter State Tie lines

For July 2014 Annex 47 ndash Details of level of Major Reservoirs in Western Region for Month July

2014

The Sub-Committee noted ITEM NO 5 SYSTEM DISTURBANCES IN WESTERN REGION There was no major grid disturbance in the Western Region during the month The

tripping details during the month received from WRLDC is enclosed at Annexure-5

The Sub-Committee noted as above ITEM NO 6Healthiness status of SERsDRs of equipment in the system

Constituents have furnished the status of healthiness of SERDRs in their systems on the dates below

Sl No Name of

constituents Date of Receipt

1 PGCILWRTS-I 06082014 2 PGCILWRTS-II 07082014 3 MPPTCL 11082014 4 NTPC 04082014 5 CSPTCL 03082014 6 GETCO 07082014 7 MSETCL 11082014

Constituents of WR are requested to ensure healthiness and send the information to

this office regularly as per the recommendation of enquiry committee of Grid

disturbances on 25022007 and 28022007

ITEM NO 7 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS TRANSMISSION LINES AND GENERATING UNITS IN WR

71 Status of completion of ongoing Schemes for Commissioning of reactors The present status regarding schedule and commissioning of reactors is as below

6

462nd OCC MINUTES

S No

400 kV Substn

Size (MVAR)

Implementing agency

Expected commissioning date

1 Ranchodpura 125 MVAR GETCO Commd On 8th July 2013

2 Varsana 125 MVAR GETCO Commd On 25th July 2013

3 Rajkot 125 MVAR GETCO Commd On 5th August 2013

4 Amreli 125 MVAR GETCO Commd On 12072013

5 Jetpur 63 MVAR GETCO Commd on 11072013

6 Zerda 125 MVAR GETCO Commd in July 2013

7 Kosmba 80 MVAR GETCO Commissioned on 29112013

8 Limbdi (Chornia)

125 MVAR GETCO 25th July 2013

9 Jabalpur 125 MVAR PGCIL Commissioned on 26032014

10 Khandwa 125 MVAR PGCIL Commissioned on 28032014

11 India bulls 80 MVAR BR

MSETCL Commissioned 26112013

12 Nagda 50 MVAR MPPTCL Commissioned in Feb-2014

13 Sasan Line reactor-1

240 MVAR RELIANCE Commissioned on 16022014

14 Shujalpur 125 MVAR PGCIL July 2014 end

15 Bhatapara 125 MVAR PGCIL July 2014 end

16 Raigarh 125 MVAR PGCIL July 2014 end

17 Aurangabad 125 MVAR PGCIL 28042014

18 Nanded 125 MVAR MSETCL 2015

19 Sholapur 125 MVAR MSETCL Sept-2014

20 Kolhapur 125 MVAR MSETCL Sept-2014

7

462nd OCC MINUTES

21 Akola 125 MVAR MSETCL Sept-2014

22 Nagda 125 MVAR MPPTCL Oct 2014

23 Bhopal 80 MVAR MPPTCL Sept 2014

24 Damoh 125 MVAR PGCIL August 2014

25 Bachau 125 MVAR PGCIL August 2014

26 Pirana 125 MVAR PGCIL August 2014

27 Itarsi 2X125 MVAR

PGCIL August 2014

28 Seoni 125 MVAR PGCIL August 2014

29 Parli 125 MVAR PGCIL August 2014

30 Raipur 125 MVAR PGCIL August 2014

31 Gwalior 125 MVAR PGCIL Commissioned on 30062014

32 ISP 125 MVAR NHDC 2015

33 Satpura 50 MVAR MPPGCL March-2015

34 Sasan Line reactor-2

240 MVAR RELIANCE August -2014

35 Sasan Bus reactor

240 MVAR RELIANCE Sept-2014

72Status of completion of 765400 kV and above ongoing Transmission Schemes

being executedimplemented by Transmission Agencies The updated status on various ongoing transmission schemes for the current year as per the current information available is as follows - S No

Name of the Line Target Completion Date

Remarks

POWERGRID 1 400 kV Navsari ndash Kudus DC Line Sept- 2014 ROW problem 2 765kV SC Satna-Gwalior line

(359Km + 60Km DC Portion) Ckt-II August- 2014

3 765 kV Raigarh (Kotra) pooling Commissioned on

8

462nd OCC MINUTES

station -Champa Pooling station -Dharamjaygarh PS - 2nd ckt

21052014

4 765 kV Gwalior - Jaipur line (1st Ckt) SC

Dec 2014

5 765 kV Dharamjaygarh - Jabalpur Pooling Station DC line

Dec-2014

6 765 kV Wardha ndashNizamabad-Hyderabad DC

March-15

7 765 kV Narendra-Kolhapur DC March-15 8 HVDC Raigarh(Kotra)-Pugalur Bi-

pole March-15

9 400 kV Aurangabad - Boisar line DC line

Dec -2014

10 765 kV Aurangabad (PG) - Padghe (PG) DC

August-2014

11 800kV DC Champa ndash Kurukshetra Bipole

Jan 2015

12 765 kV DC Jharsuguda ndash Korba Dec 2014 13 2 X 765 kV SC Ranchi ndash Sipat Jan 2015 14 765 kV Wardha- Aurangabad DC

Line

Ckt I Commissioned on 010714 Ckt II Commissioned on 030714

15 765 kV Aurangabad- Solapur DC line

Dec 2014

16 765 kV Solapur-Pune line

Sept 2014

17 765KV Durg-Wardha DC Sept 2014 CHHATTISHGARH 1 LILO of 400 kV Korba west-

Khedamara at Marwa August 2014

2 400 kV DCDS Raipur(Raita)- Jagdalpur(DCDS)

March 2015

21 220 kV Korba-Bishrampur line (DCSS)

Sept 2014

22 220 kV DCDS lines Chhuri to Mopka (Bilaspur) (DCDS)

Nov 2014

26 LILO of 220 kV Raigarh-Budipadar at 400 kV PGCIL Ss Raigarh

Sept2014

28 LILO of 220 Korba (E)- Bishrampur line at 220 kV Churri Ss

Sept 2014

29 LILO of 220 kV Raigarh ndash Jindal (Tamnar) at Girwani 220 kV Ss

Sept 2014

GUJARAT 1 400 kV DC Kosamba-Chorania line

(Package I)(From Chorania SS to AP-54)

Aug -2014 Commissioned on 100314

9

462nd OCC MINUTES

2 400 kV DC Kosamba-Chorania line

(Package II)(From Kosamba SS to AP-54)

Aug -2014

3 400 kV DC Mundra-Zerda line No 1 Aug -2014 4 400 kV DC Mundra-Zerda line No 2 March-2015 5 400 kV DC Vadinar-Amreli line December -

2014

6 400kV Mundra-Hadala LILO to Halvad

August -2014

7 400 kV DC Amreli-Kasor line(Part-1) December-2014

8 400 kV Charanka- Veloda Oct 2014 MADHYA PRADESH 1 Chhegaon-Julwania 400 KV DCDS

Line OCT - 2014

2

Pithampur- Indore 400KV DCDS Line

August - 2014

Work of the line have been completed by MPPTCL feeder bay from Indore PGCIL is awaited

3 Satpura TPH-Ashta 400KV DCDS Line

December ndash 2014

MAHARASHTRA(STU)

1 400KV DC line from Koradi-II to Wardha SS(PG) DC

Oct- 2014

2 400 kV Akola-Taptiganga Sept 2014 3 400 kV Tiroda-Akola Dec - 2014 GUJARAT (IPTC route) by WR Transmission (Guj) Pvt Ltd

1 400 kV Rajgarh(PG)-Karamsad (GETCO) DC

Sept -2014

STERLITE (JTCL) 1 765 KvDhramjaygarh - Jabalpur (JTCL)

DC line May -2015 Severe ROW Problem

2 765 kV Jabalpur - Bina (JTCL) Sc May -2015 Severe ROW Problem STERLITE (BDTCL) 1 765 kV Bhopal - Indore (BDTCL) SC August-2014 2 765 kV Bhopal-Bhopal Commissioned on

160714 3 765 kV Dhule - Vadodara SC Oct - 2014 4 765 kV Vadodara - Dhule (BDTCL) SC Oct - 2014 5 765 kV Dhule - Aurangabad (BDTCL)

SC August-2014

RAICHUR SHOLAPUR TRANSMISSION CO LTD(RSTCL)

1 765 kV Raichur - Sholapur line 2nd SC

Commissioned on 29062014

10

462nd OCC MINUTES

It was suggested by WRLDC and constituents that important list of line will be sent by

each constituent to WRLDC and WRLDC will compile and furnish the list as per

priority of commissioning

The Sub-Committee noted and agreed as above

73 Commissioning of new Generating units in Western Region and the capacity expected to be commissioned during the current year 2014-15

The status regarding Generating units expected to be commissioned during the

current year 2014-15 is as below

Name of the Power Projects Unit No Capacity (MW)

Date of Commissioning Schedule Date

GUJARAT Bhavnagar Lignite TPP-JV I 250 August 2014 II 250 August 2014 UNO SUGEN 2 3825 July 2014 CHHATTISGARH Marwa 1 500 Sept 2014 2 500 Dec 2014 MAHARASHTRA Dhariwal 2 300 Synd On 23042014 CHANDRAPUR 8 500 Oct 2014 CHANDRAPUR 9 500 March 2015 KORADI 8 660 Oct 2014 KORADI 9 660 Jan 2015 PARLI 8 250 March 2015 MADHYA PRADESH Singhaji TPS 2 600 Oct-2014 Ms Jhabua Power Seoni 1 600 Dec ndash 2014 MB Power Anuppur 1 600 Sept ndash 2014 Jaiprakash Power Nigri 1 660 July 2014 Jaiprakash Power Nigri 2 660 Dec 2014 Moser Bear (Hindustan power) 1 600 Nov- 2014 Moser Bear (Hindustan power) 2 600 March 2015 Essar Concessional ampEssar Power 1 600 Oct 2014 Essar Concessional ampEssar Power 2 600 Dec 2014 BLA 2X4 90 March 15 Jhabua Power 1 600 Dec 2014 CENTRAL SECTORIPP KSK 2 600 August 2014 KSK 5 600 January 2015

11

462nd OCC MINUTES

ACBIL 1 300 March 2015 SASAN 5 660 July 2014 SASAN 6 660 August 2014 Sasan 4 660 Synchronized in May 2014

Sub-committee noted as above ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS (A) FOLLOW-UP ITEM NO 81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

All the constituents are requested to submit the CMP report for the First quarter

(April 2014 to June 2014) for the year 2014-15

The Sub-Committee members noted as above ITEM NO 82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR

Status of physical amp cyber security in Power Sector for the First quarter (April 2014 to

June 2014) for the year 2014-15 have not been received from some of the

constituents

The Sub-Committee members noted as above ITEM NO 83 PROCEDURE FOR CALCULATION OF TRANSMISSION SYSTEM

AVAILABILITY FACTOR FOR A MONTH AS PER CERC REGULATION 2014-19

Member Secretary WRPC informed that a procedure for calculation of

transmission system availability factor as envisaged in CERC Regulation 2014-15

was discussed in 461st OCC held at Raipur Various aspects were discussed and

finalized However there were concerns expressed by transmission licensee

regarding addition of 12 hrs to outage hrs after each tripping beyond admissible 2

tripping in a year as it will reduce availability below 95 Also concern was

expressed for multiplying outage hrs by 2 for line affecting generation Also

whether addition of 12 hrs is applicable to such lines affecting generation was

also expressed Whether these clauses are applicable to HVDC system was not

known Therefore all such concerns of transmission licenses have been taken up

with CERC for revision clarification

Meetings were held on 1st and 4th August 2014 with transmission licenses

regarding verification of data data formatting and sorting out various anomalies

and doubts for data from April to July 2014 for further processing at WRPC end

12

462nd OCC MINUTES

Member Secretary WRPC informed that certification for some transmission licensees

has already been done The certificate for PGCIL is to be issued as effect on

generation evacuation certificate from WRLDC is awaited

CM WRLDC requested all the transmission licensees to submit the data to WRLDC in

same format as submitted to WRPC

Representative from Transmission licensees agreed the same

The Sub-committee noted as above ITEM NO 84 IMPLEMENTATION OF RSD METHODOLOGY Shri Satyanarayan SE WRPC informed that GM (OSampC) NTPC HQ-I Mumbai vide letter dated 28072014 (copy enclosed at annexure 84) requested to call a meeting for resolvingclarification of methodology developed by WRPC The procedure for RSD framed by WRPC is enclosed at Annexure 84A SLDC MPPTCL Jabalpur informed that RSD was implemented for NTPC Mauda unit

on 18072014 but it was not more extended beyond 20072014 as no other major

beneficiaries agreed for extension

CE GETCO informed that intermittent rain profile in the different geographical area of

Gujarat amp increasing demand pattern didnrsquot permit them to take RSD of any NTPC

units as minimum of 3 days is required

Representative from SLDC Maharashtra also endorsed the Gujarat view points on

RSD

GM NTPC requested to the committee that if RSD wasnrsquot possible then at least

technical minimum schedule should be given

Member Secretary WRPC summarized the matter as follows

1 RSD was implemented for NTPC Mauda unit from 18072014 to 20072014

but it could not be extended due to increasing demand pattern amp uncertainty of

rain profile in the region

2 The method framed by WRPC shall be continued amp will be applied as and

when required

3 He requested constituents to schedule the NTPC generating units at its

technical minimum in case RSD is not feasible

The Sub-committee noted as above

13

462nd OCC MINUTES

ITEM NO 85 LOAD FORECASTING IN WESTERN REGION Background- As per the amended Indian Electricity Grid Code that is effective from 17th February 2014 the SLDCs SEB distribution licensees shall always restrict the net drawal of the State from the grid within the drawal schedule keeping the deviations from the schedule within the limits specified in the Deviation settlement mechanism regulations Therefore it is imperative that adequate attention may be paid towards load forecasting The matter was discussed in the past several OCC as well as in the 26th TCCWRPC board meeting wherein it was decided to create a task force for exploring development of a software for load forecasting A meeting was held on 03042014 under leadership of CE(SLDC) GETCO Gujarat at

Mumbai The outcome of the Meeting was as following

1 Short term action a) all the discoms were advised to provide maximum historical data b) Discoms have to bifurcate the geographical area in to zone and derive effect of temp rain festival on load

2 Long term action a) Provide computer base meters up to all the distribution feeders for close monitoring b) Provide weather sensors at various strategically important locations c) Formulation of forecasting desk (load amp RE) at SLDC level

The 2nd meeting regarding Load Forecasting Mechanism was held with members of WRPC WRLDC Western Region SLDCs amp State Discoms Forecasting Service Providers (FSPs) on 110614 at SLDC Vadodara Gujarat During the 460th OCC meeting CE SLDC GETCO informed that roadmap for implementation of pilot project amp main project has been prepared Budget proposal have already called from FSP amp they assured to submit till the end of the month For implementation of pilot project the Utility and their respective Pilot FSP are decided as tabulated below

Sr No STATE ndashSLDCDISCOM Pilot FSP

1 GUJARAT MS TESLA

2 MAHARASHTRA IIT MUMBAI

3 MADHYA PRADESH MS METEOLOGICA

4 CHHATISGARH MS SAS

5 GOA MS MARCADOS

6 DDDNH IITGANDHINAGAR

MP informed vide letter dated 27062014(copy enclosed at 85) that they have

already placed on order to Ms L amp T InfoTech on 12072013 for load forecasting

software project Therefore MP had requested to exclude them from pilot project

activities decided in earlier meetings

14

462nd OCC MINUTES

462nd OCC Discussions- State wise status is as under -

bull CE SLDC informed that Gujarat has prepared the NDA and forwarded to TESLA for signing and the same was signed by TESLA New Zealand office and their Mumbai office shall forward the same to SLDC Gujarat Thereafter Input data shall be provided and ID shall be provided to TESLA so as to start forecasting by them

bull SLDC Gujarat vide letter no SLDCCEMIST-6458 dtd 270614 has conveyed to all WR Nodal SLDC coordinators regarding progress of load forecasting pilot project Thereafter also e mailed on date 2082014 to all Nodal SLDC for submission of status Report on Pilot Load Forecasting Project However no proper response is received so far

bull MP SLDC conveyed that they have already awarded contract for load forecasting and the same is expected to be available by year end Therefore MP shall not participate in the present scheme

bull SLDC Chhattisgarh representative informed that matter has been taken with discom Chhattisgarh Discom were facing difficulties to contact with coordinator of Ms SAS

CE SLDC Gujarat being a group leader stated that Chhattisgarh shall intimate to them for further needful and would help them in this matter

bull Maharashtra SLDC informed that there was a meeting held on 09082014 with IIT Bombay where availability of data has been discussed amp one more meeting will be held on 22082014 outcome of the same will be intimated in next OCC meeting BEST amp TATA are already having such forecasting system

bull No one from GOA has attended last meeting even though GOA was forwarded copy of MOM Due to non availability of any coordinator details of GOA it was not possible to contact them However Ms Marcadose has also conveyed that he has not been contacted by Goa

bull No one from DDDNH has attended last meeting even though DD DNH was forwarded copy of MOM However IIT Gandhinagar conveyed that they were not been contacted by DD DNH

Member Secretary WRPC informed that a letter to DD DNH amp GOA has been written

from WRPC secretariat regarding implementation of ADMS Load Forecasting amp

telemetry status He further requested the constituents to implement the decision

taken in earlier meeting of load forecasting

OCC suggested that the next load forecasting meeting may be held at DDDNH

The Sub-committee noted as above

15

462nd OCC MINUTES

ITEM NO 86 NEED OF COOPERATION FROM WRLDC IN REAL TIME

bull CE SLDC informed that at present APL is under their control area and embedded scheduling model is used It may be noted that for units 78amp 9 at APL Gujarat has no share (all are for NR beneficiaries)There have been occasions when units 78amp 9 have tripped (given at annexure) Since APL is shown as embedded in Gujarat WRLDC requested Gujarat to reduce overdrawl when APL units 78amp 9 trips Hence Gujarat has to pick up state generationcostlier generation for no fault of Gujarat

bull Further lines are opened to curtail overdrawl when Gujarat is not faulty Gujarat is seen as overdrawing (due to embedded scheduling of APL) when APL trips

bull To complicate matters the scenario coupled with wind variations state generation has to be constantly varied to avoid overdrawl

Gujarat requested followings-

1 When large sized units (APL units 78amp 9) trips then scheduling of Gujarat should be changed with immediate effect OR Gujarat should not be pursued for deviation correction to the extent of schedule of units tripped at APL units 78amp 9 OR Schedule of Gujarat from other central sector stations should be changed as per their request with immediate effect

2 APL units 78amp 9 should be made a separate control area 3 Under above circumstances transmission lines should not be opened

due to default by APL as these affects Gujarat without any fault of their own Further this was done without informingtaking SLDC into confidence It was clear from the discussions that Gujarat Discoms are put to unnecessary financial implications WRLDC clarified that 220 KV Dehgam- Khanpur Line no1 was opened due to frequency touching 493 Hz and control of overdrawl was taken as security measure WRLDC agreed to inform CE SLDC whenever such discussions are taken and agreed to take care in future

The Sub-committee noted as above

ITEM NO 87 GUIDE LINES FOR SPLIT BUS OPERATION AT SSP RBPH SWITCHYARD CE SLDC Gujarat vide letter dated 07082014 informed that a meeting was held on

220514 at Kevadia Colony SSP regarding split bus arrangement at SSP RBPH

16

462nd OCC MINUTES

switchyard and subsequent discussions during 55th meeting of PSC of NCA held in

Vadodara on 140714 the guidelines for the same had been prepared in consultation

with GETCO protection wing and sent vide mail dated 23072014 However the same

has been attached herewith as Annexure-87 It was clarified during discussion that

split bus operation would be used only as per requirement and will not be a permanent

arrangement

The Sub-committee noted as above

ITEMS FROM WRLDC

1 OPERATION OF GRID AT HIGH FREQUENCY ( gt 505 HZ) The onsetrevival of monsoon in the last fortnight of July 2014 has reduced the demand in Western Region However the demand would pick up sharply during the dry spell in September and October months Presently the major State Central Sector IPP generators in Western Region that are facing coal shortage are tabulated as under S No Name of power

stations Unit Reason for

outage 1 VSTPS 2 (210 MW) Coal Shortage 2 VSTPS 5 (210 MW) Coal Shortage 3 Singhaji 1 (600 MW) Coal Shortage 4 SGTPS 4 (210 MW) Coal Shortage 5 JP Bina 2 (250 MW) Coal Shortage 6 Bhusawal 2 (210 MW) Coal Shortage 7 Parli 4 (210 MW) Coal Shortage 8 India Bulls 1 (270 MW) Coal Shortage Likewise several Gas Power Stations in Western Region are facing fuel shortage Under the above circumstances it is desirable that precious fuel optimally utilized to maintain adequate stock for the dry spell In the month of July 2014 the grid frequency remained above 5005 Hz for more than 15 of the time while it remained below 499 Hz for more than 34 of the time Operation of high frequency is unnecessary loss of fuel that could have been conserved and utilized during low frequency regime

The Sub Committee noted the same

17

462nd OCC MINUTES

2 OBSERVATION OF INTRA-PLANT MODE OF OSCILLATIONS (097 HZ) WITH POOR DAMPING ON 10TH AND 11TH JUNE 2014 AND LOSS OF 1800 MW IN MAHARASHTRA SYSTEM DUE TO POWER SWING UNDER N-1 CONTINGENCY ON 20TH MAY 2014 The issue of Intra plant mode of oscillations with poor damping as observed during the grid event on 10th and 11th June 2014 was discussed during the 461st OCC meeting Similar oscillations were again recorded on 11th July 2014 GM WRLDC informed that they have written to generators seeking details of MW fluctuations PSS status etc and requested constituents to share the dataHe requested that constituents may share PMU data also CESLDC Gujarat informed that they are proposing PSS tuning with consultants from IITs in their system EE SLDC Maharashtra informed that APL-Tiroda has recently tuned PSS at Tiroda units by OEM

It was once again requested constituent to furnish information as designed by WRLDC The Sub Committee noted the same

3 FREQUENT TRIPPING OF 765 KV SATNA-SASAN LINE

WRLDC informed that 765 kV Sasan-Satna Line has tripped on three occasions

while 240 MVAr Bus Reactor at 765 kV Satna tripped on one occasion The

tripping occurred due to protection mal-operation at Satna end during stability test

for the 765 kV Bus-1 The details of the tripping is given below

The above OV at Sasan end could have been avoided if the Line Reactor of this line at Sasan end had been commissioned The restoration of the tripped circuit also was considerably delayed in the absence of Line Reactor at Sasan end

Elements Date and Time of Tripping

Date and Time of Restoration

Remarks Receipt of DREL at WRLDC Satna Sasan

765 kV Sasan-Satna 2

25-07-14 1026

25-07-14 1155

Protection Mal-Operation DT at Sasan End on OV as line remain hanging from Sasan end

No Yes

765 kV 240 MVAr Bus Reactor at Satna

25-07-14 1026

25-07-14 1139

Protection Mal-Operation DT at Sasan End on OV as line remain hanging from Sasan

No Yes

765 kV Sasan-Satna 2

25-07-14 1229

25-07-14 1342

Line got charged from Satna and synchronized at Sasan No Yes

18

462nd OCC MINUTES

end but immediately DT was received at Sasan from Satna and Line tripped Prior to tripping voltage at Sasan end was 796 kV

765 kV Sasan-Satna 2

25-07-14 1628 -

Charging attempt was taken from Satna end but line tripped before synchronization at Sasan end due to DT from Satna Open end voltage at Sasan 826 kV for the line

No Yes

Representative from Sasan UMPP informed that with regards to the 765 kv Line and

Bus reactors all the material required for completion of works have been received at

site

Line reactor and bus reactor would be commissioned by Aug14 and Sep 14

respectively

The Sub Committee noted the same 4 SPS AT SIPAT

The SPS scheme implemented at NTPC Sipat has been received at WRLDC It is observed that a time delay of 15sec is provided to unload units 1 2 4 amp5 each by 150MW if any ICT s load exceeds 130 of rated load It was conveyed that if ex-bus generation at Sipat is more than 2200 MW immediate unloading of units may be done and the intentional delay which is required to prevent mal-operation may be 45 second instead of 15 second

NTPC Sipat representative agreed to implement the same accordingly The Sub Committee noted the same

5 COMMISSIONING OF SPS AT 400220 KV VAPI During the special WRPC meeting on 18032013 at Dadra an SPS for automatic load shedding subsequent to tripping of 400220 kV ICT at Vapi was approved as under It was decided that POWERGRID would extend trip signal from Vapi ICTs to the requisite feeders

Contingency Envisaged SPS action

Identified Feeders

Tripping of any one ICT at 400200 Vapi Sub-Station

Automatic Load Shedding of 100MW

DNH 1) 66 kV-Kharadpara-Rakholi-I 50 MW 2) 66 kV Khadoli-Khadoli-3 30 MW DD 1) 66 kV Magarwada-Kachigam 60 MW

19

462nd OCC MINUTES

It was felt that due to change in topology loading in ICT is not critical however SPS may be in place as defense mechanism in case of any emergency

DD amp DNH representative were absent in the meeting The Sub Committee noted the same

6 ADDRESSING HIGH VOLTAGE CONDITION IN SSP amp NEARBY AREA

High voltage condition is being observed at SSP and nearby area in off peak period particularly between 2300 hrs at night to 0500 hrs in the morning Also on many occasions the system operator is compelled to hand trip the 400 kV lines emanating from SSP to control over voltage Summary for the month of Julyrsquo14 is given under

Sl No 400 kV Line DatailsFrom To

Time Date Time Date 1 SSP-RAJGARH-I 0009 19-Jul-14 0730 29-Jul-14 2 SSP - RAJGARH-II 0406 16-Jul-14 1016 18-Jul-14 3 SSP-DHULE-I 1310 22-Jul-14 0953 23-Jul-14 4 SSP - DHULE - II 1533 15-Jul-14 0734 18-Jul-14 5 SSP - DHULE - I 1703 10-Jul-14 1100 11-Jul-14 6 SSP-DHULE-I 1712 28-Jul-14 0933 31-Jul-14 7 SSP - DHULE - II 1730 19-Jul-14 0917 20-Jul-14 8 SSP - DHULE - I 1757 18-Jul-14 0935 19-Jul-14 9 SSP-DHULE-II 1809 21-Jul-14 0914 22-Jul-14 10 SSP-DHULE-I 1815 30-Jun-14 0542 1-Jul-14 11 SSP-DHULE-I 1819 20-Jul-14 0858 21-Jul-14 12 SSP-DHULE-II 1825 8-Jul-14 0949 9-Jul-14 13 SSP - DHULE - II 1831 11-Jul-14 1007 13-Jul-14 14 SSP - DHULE - I 1838 1-Jul-14 0556 2-Jul-14 15 SSP - DHULE - I 1848 9-Jul-14 0912 10-Jul-14 16 SSP - DHULE - I 2136 13-Jul-14 0850 14-Jul-14 17 SSP-DHULE-II 2201 23-Jul-14 0945 28-Jul-14

Also it has been observed that Wanakbori TPS injects around 60 MVAr per unit even when voltage at Wanakbori is above 420 kV for nearly 100 of the time Further envisaged bus reactors at Rajgarh amp Dhule are yet to be commissioned Hence in view of system reliability it is advisable to explore all possibilities to contain high voltage condition in SSP and nearby area The following actions need to be taken to address the situation

bull Operating RBPH machines at SSP in synchronous condenser mode bull Absorption of MVAr by Wanakbori (WTPS) units bull The commissioning of Reactors at 400 kV Rajgarh may be expedited by

WRTS-2

20

462nd OCC MINUTES

bull The commissioning of Reactors at 400 kV Dhule may be expedited by MSETCL CE SLDC GETCO agreed for looking into absorption of MVAR at Wanakbori

7 IMPLEMENTATION OF THE REVISED AUFLS IN DD AND DNH Representatives from the DD and DNH intimated during the 459th OCC meeting that the tendering process was stalled because of general elections (election code of conduct was in force) amp action would be initiated post the elections Member Secretary WRPC vide letter dated 01082014 took up the matter with Secretary (P) DDDNH (copy enclosed) DD amp DNH representative were absent in the meeting to comment

The Sub Committee noted the same 8 ADMS(AUTOMATIC DEMAND MANAGEMENT SCHEME) IMPLEMENTATION

AS PER SEC 542 OF IEGC The format for reporting the progress of implementation of the ADMS in Western Region States was given as part of MoM of the 461st OCC meeting All utilities may like to furnish the updated status to WRPCWRLDC as per the above format It is understood that MP has submitted its detailed action plan in the form of an affidavit to CERC for implementation of ADMS However SLDC MPPTCL is requested to furnish data to OCC forum in the above format

The Sub Committee noted the same

9 STATUS OF TELEMETRY IN WESTERN REGION

In the 460th amp 461st OCC meetings the status of telemetry in Western Region was discussed in detail It was also highlighted that the Honrsquoble CERC vide its order in petition SM0072014 issued Notice under section 142 on several constituents of Western Region All the constituents had assured to address the telemetry issues within a month or two The telemetry status as on 4th August 2014 is tabulated below

21

462nd OCC MINUTES

a Maharashtra The non-availability of telemetry is 583 for sub-stations amp 18

for generating stations This is a matter of serious concern The issue has been

discussed in several OCC meetings since last 8 months As per the information available with WRLDC telemetry is not available from the following generating stations at 400 kV level

bull Kaparkheda bull Deepnagar

Also telemetry is not available from the following sub-stations at 400 kV level bull Warora bull Lonikhand(New) bull Chandrapur-stg-II

As per the information available with WRLDC telemetry is intermittent at 4 generating stations viz

bull Jaigad bull Paras-extension bull Trombay bull Deepnagar GCR

Also telemetry is intermittent at following sub-stations at 400 kV level bull Bableswar-II bull Deepnagar SS bull Dhule bull Khaparkheda bull Kolhapur-3

22

462nd OCC MINUTES

bull Sholapur-3 SLDC MSETCL Maharashtra informed that telemetry has been established for 46 locations

a Chhattisgarh100 available b Madhya Pradesh As per the latest status telemetered data is available from

100 of the locations c Gujarat As per the latest information submitted to CERC the non-availability of

telemetry data from Gujarat as on date is 33 for substations As per the information available with WRLDC Telemetry is not available form 2 number of 220 kV sub-stations viz bull Bhatiya bull Mokha Gujarat intimated in 460th OCCM that these sub-stations were ready but lines were in construction phase Also telemetry is intermittent from the following SS in Gujarat bull 220 kV Navasari (GETCO) ss bull 400 kV Kasor ss

SLDC GETCO may expedite amp resolve the issue for the above stations at the

earliest d Goa As per the latest information telemetry is not available form 2 number of

220 kV sub-stations viz Amona amp Cuncolim Telemetry is intermittent from 220 kV Tivim Ponda Xeldam amp 110 kV Kadamba amp Verna Thus Non availability of telemetry from Goa is 100 Goa to resolve the issue on war footing

e DD Telemetry is not available form 1 number of 220 kV sub-station viz Magarwada Thus availability of telemetry from DD is NIL DD representative intimated in 460th OCCM that RTU was being installed at 220 kV Magarwada SS under the new SCADAEMS up gradation project amp it would take 3 months to complete the work DD representative was absent in 461st OCCM so information on progress in this matter is yet to be received from DD DD to expedite the issue for the above station(s) on war footing

f DNH Telemetry is not available form 2 number of 220 kV sub-station viz Kharadpara amp Khadoli Thus availability of telemetry from DNH is NIL DNH representative was absent in 460th amp 461st OCC meetings to comment on the issue DNH to resolve the issue for the above station(s) on war footing

g ISGS As per the latest information submitted to CERC the non-availability of telemetry data from ISGS generating stations as on date is 125 Telemetry is intermittent from 220 kV Kawas(NTPC) station Power Grid NTPC to expedite

23

462nd OCC MINUTES

NTPC amp Power Grid agreed to expedite the matter during 460th amp 461st OCC meetings of WRPC However no progress has been reported

h POWERGRID As per the latest information submitted to CERC the non-availability of telemetry data from Power Grid substations as on date is 111 Telemetry is intermittent from the following ss

o 765 kV Kotra SS o 765 kV Dharamjaigad o 765 kV Tamnar SS o 400 kV Navasari SS

Additional points

a) In the report available on the WRLDC website it is clearly indicated that Communication link between all SLDC to WRLDC is in radial mode (without redundancy) and any failure in any equipment Fibre leads to total data black out Power Grid to ensure that links are on two channels

i IPP As per the latest information submitted to CERC the non-availability of

telemetry data from IPP generating stations as on date is 15 Telemetry is intermittent from Jindal amp Essar Mahan GMR Raipur JPL ESSAR Mahan GMR Raipur to expedite

Additional Points

bull Adani(APL) Tiroda There is only one channel emanating from Adani Tiroda Recently there was a case when entire station was not visible due to non-Availability of that channel

bull CGPL Mundra There is only one channel emanating from CGPL Mundra In case of non-availability of data leads to non-visibility of 4000 MW generation which creates difficulty in Grid Operation

bull Sasan There is only one channel emanating from Sasan In case of non-availability of data leads to non-visibility of 2400 + MW generation which creates difficulty in Grid Operation

bull APL Mundra There is only one channel emanating from CGPL Mundra In case of non-availability of data leads to non-visibility of 4000 + MW generation which creates difficulty in Grid Operation

The above issue was already discussed in 460th OCCM The utilities (APL SASAN CGPL) may kindly update the progress in this matter

24

462nd OCC MINUTES

j PMU data Regarding Satna to WRLDC link WRTS II informed that work is under progress for laying of OPGW from Satna 220 kV (MPPTCL) to Satna 765 kV (PG) and it may take 3-4 monthsrsquo time It was suggested that till such time the OPGW operation is in place WRTS-II may explore leased line connectivity at the earliest Power Grid to expedite

The Sub-Committee noted the same amp agreed to make availability of telemetry in their concerns and the report be updated position in next meeting

The Sub Committee noted the same

10 BLACK OUT AT NTPC KAWAS POWER STATION On 11th July 2014 Kawas Gas generating complex got blackout due to tripping of evacuation lines one by one within a short span of 30 minutes The complete loss of evacuation lines occurred at 0117 Hrs The blackout has resulted in tripping of GT1A GT1B and ST causing 320 MW generation loss in the area It was reported that weather condition was foggy with slight drizzling was in the area

Line Time of Tripping Kawas End Remote

end Restoration Time

220 kV Kawas-Navsari 1 1246 AM R phase to EF Fault location 2 km R Phase to EF 122 AM

220 kV Kawas ndashNavsari 2 112 AM R phase to EF Fault location 2208 km

R Phase to EF 347 AM

220 kV Kawas-Haldarwa 1 107 AM R phase to EF Fault location 16 km

R Phase to EF 246 AM

220 kV Kawas-Haldarwa 2 108 AM R phase to EF Fault location 2 km

R Phase to EF 304 AM

220 kV Kawas-Icchapur 1 108 AM B phase to EF B Phase to EF 301 AM

220 kV Kawas-Icchapur 2 108 AM B phase to EF Fault location 356 km

B Phase to EF 331 AM

220 kV Kawas-Vav 1 117 AM No tripping Hand Tripped later Line Tripped 225 AM

220 kV Kawas Vav 2 117 AM Y Phase to EF Y Phase to EF 317 AM

Even the line restoration has failed on several attempt as the lines were not holding due to persisting fault Such an event of total loss of evacuation lines from a generating station resulting in blackout scenario is a matter of serious concern Representative from WRTS-II stated that being highly industrial corridor the said lines are suffering with smog and informed that they are in process of replacement of existing insulator with polymer type insulators Order has been already placed amp it may be completed within next two to three month The Sub Committee noted the same

25

462nd OCC MINUTES

11 OPERATING PROCEDURE OF WR-2014 As discussed in 460th OCCM of WRPC the operating procedure of Western Region 2014 has been updated on 31072014 and the same has been uploaded on WRLDC web site at the following link httpwwwwrldccomdocsWR_OPERATING_PROCEDURE_2014pdf

The Sub Committee noted the same 12 MOCK BLACK START EXERCISE

MP representative informed that DG set at Bargi will be ready within a week time amp mock black start exercise can be performed in October 2014

NTPC Gandhar has successfully performed the mock black start exercise on 27072014

The Sub Committee noted the same

13 REVIEW OF LIST OF FEEDERS IDENTIFIED FROM ISGS LEVEL IN CASE OF

THREAT OF GRID SECURITY DUE TO LARGE DEVIATION

During the 461st OCC it was decided that list of feeders identified for load

control under emergency measure for safeguarding grid security would be

reviewed in a special meeting The list is yet to be reviewed GM WRLDC

requested SLDC to review the same amp submit Till such time the existing list will

continue

The Sub Committee noted the same 14 IMPLEMENTATION OF VOLTAGE AND TIME GRADING ON OV RELAYS TO

PREVENT TRIPPING OF MULTIPLE EHV LINES EMANATING FROM SINGLE NODE ON HIGH VOLTAGE

During the 461st OCC it was informed by Power Grid representative that they have already implemented voltage grading in various line emanating from the same node (matter has not come in the MoM) Power Grid amp other utilities may kindly intimate the present status of voltage grading at their respective sub-stations Member Secretary WRPC suggested to take the matter in PCM

The Sub Committee noted the same

26

462nd OCC MINUTES

15 INADEQUATE PARTICIPATION OF GENERATORS ENVISAGED SPS FOR SR-NEW GRID OPERATION

The details of SPS operation from 1st July 2014 till 6th August 2014 is as under

Sl No Date SPS No Condition 1 01 July 2014 SPS-1 613 SholapurRaichur DC gt1000 MW 2 01 July 2014 SPS-1 1752 SholapurRaichur DC gt1000 MW 3 04 July 2014 SPS-1 0406 SholapurRaichur DC gt1000 MW 4 09 July 2014 SPS-1 350 SholapurRaichur DC gt1000 MW 5 14 July 2014 SPS-1 506 SholapurRaichur DC gt1000 MW 6 17 July 2014 SPS-1 2204 SholapurRaichur DC gt1000 MW 7 23 July 2014 SPS-1 547 SholapurRaichur DC gt1000 MW 8 26 July 2014 SPS-1 1201 SholapurRaichur DC gt1000 MW 9 30 July 2014 SPS-1 902 SholapurRaichur DC gt1000 MW 10 30 July 2014 SPS-1 1954 SholapurRaichur DC gt1000 MW

During the last OCC the matter was discussed and it was suggested by Member Secretary WRPC to have Special Protection Sub-Committee meeting to discuss progress of implementation of the revised SPS at Solapur (for WR-SR interconnection) amp extension of signal from Solapur to additional generators in WR so as to address the issue of inadequate participation of WR Member Secretary WRPC requested to all generators who are having more than one units shall participate in implementation of SPS for SR-NEW grid operation

The Sub-committee noted the same ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING OCC reviewed the meeting roaster and finalized sheet is enclosed at Annexure-10

Due to non-readiness of BDTCL to host the next meeting NTPC KawasGandhar

would host the 463rd OCC meeting The exact date amp venue details will be intimated

separately

SlNo Organisation Name amp Designation E-mail Mobile

I WRPC1 Shri SD Taksande MS ms-wrpcnicin 98208783842 Shri Satyanarayan S opc-wrpcnicin 92233999383 Shri LKS Rathore DD lksr_2000yahoocom 98333718444 Shri Ratnesh Kumar Yadav AD ratneshkumar7437gmailcom 8903929150

II MSETCL MSEDCLMahaGenco5 Shri VD Pande EE vasantpandemahasldcin 98207419416 Shri Ajit V Pachori EE ajitpachorimahagencocoin 9619461420

III MPPTCL MPPGCL7 Shri KK Prabhakar SE sldcmpjbpyahoocom 94258052678 Shri SK Mehta EE mehtasanjay67yahooin 9425805017

IV CSPTCL CSPGCL9 Shri BR Soni Addl CE balramsonirediffmailcom 942518880710 Shri Arvind Mukherjee gccraipurgmailcom 9429227699

V GETCO GSLDC GSECL11 Shri BB Mehta CE cesldcgujgmailcom 987920073612 Shri BM Shah DyEE demissldcgetcogebmailcom 9925212836

VI WRLDC POWERGRID13 Shri P Mukhopadhyay GM prithwishmukhopadhyayposocoin 986943807314 Shri VK Shrivastava AGM vkspowergridindiacom 986945022115 Smt Sachala Mishra CM mishrasachalagmailcom 986945022316 Smt Pushpa S CM pushpa_seshadrihotmailcom 986940448217 Shri Aditya P Das Dy Mgr aditya19227gmailcom 9869404569

POWERGRID REGION-I18 Shri Anil Darode 70207powergridindiacom 942230180519 Shri Manu Sinha 02457powergridindiacom 9425293864

POWERGRID RETION -II20 Shri Abhinav Verma stawr2gmailcom 942850406221 Shri Anand Dubey ananddubey_pgrediffmailcom 9428504065

VII NTPC22 Shri PB Behre GM pbbeherentpccoin 900449708823 Shri Hari Nath AGM harinath01ntpccoin 900449713324 Shri SK Shrivastava AGM sksrivastava09ntpccoin 942517806925 Shri Amir Kr Singh SM aksingh01ntpccoin 942414081426 Shri Amitabh Kumar amitabhkumarntpccoin 9425178122

VIII TATA POWER27 Shri RM Sankhe GM rmsankhetatapowercom 909900654128 Shri PR Gadave AGM prgadavetatapowercom 9223553341

IX NHDC 29 Shri Anurag Seth CE annu226hotmailcom 9425326135

LIST OF PARTICIPANTS OF 462nd OCC MEETING OF WRPC HELD ON 11082014 AT TARAPURAnnexure-I

30 Shri Vinod Kumar Singh vinodnhdcrediffmailcom 9425925251

X APL 31 Shri CS Bobade GM chandrashekharbobadeadanicom 8980802255

XI RINFRA32 Shri SG Zirpe GM sachinzirperelianceadacom 932260763033 Shri Sanil C Namboodiripad sanilnamboodiripadrelianceadacom932104697434 Shri Subrata Das subratakudasrelianceadacom 932093072235 Shri Ishan Roy Asst Mgr ishanroyrelianceadacom 9860027348

XII KSK Mahanadi36 Shri Sudarshan B Reddy sudarshanreddybkskcoin 9000377721

XIII NPCIL37 Shri Mandeep mandeepnpcil 904991887038 Shri JS Choubey jschoubeynpcilcoin 942882191839 Shri Ritesh Chandra Singh rcsinghnpcilcoin 8007991744

XIV ESSAR 40 Shri OJ Saxena Sr Mgr osaxenaessarcom 987910126841 Shri Kamlesh Garg kamleshgargessarcom 987910284942 Shri Sarabjeet Singh sarabjeetsinghessarcom 750957010543 Shri Ashwin Ande ashwinandeessarcom 9909993594

XV JPL44 Shri RK Srivastava AGM rkshrivastavajindalpowercom 9329445016

XVI TORRENT POWER45 Shri Kamal K Vyas kamalvyastorrentpowercom 997407965746 Shri Pramod G Patel AGM pramodpateltorrentpowercom 9824370005

XVII NCA47 Shri Naveen Nath Das emc_ncarediffmailcom 9425053309

XVIII STERLITE GRID LTD48 Shri Sachin S Deshpande GM sachindeshpandesterlitecom 8966903047

XIX LANCO AMARKANTAK POWER LTD49 Shri BN Panda pandabnlancogroupcom 769770301550 Shri Anil Sharma anilshlancogroupcom 9560258009

XX KWPCL51 Mis Smruti R Nayak DGM smrutinayakavanthapowercom 9424176680

XXI MB POWER LTD 52 Shri Sandeep Kumar Gupta sandeepguptahpplin 9582896418

Anaulagnak 21

maah jaUlaa[- 2014

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5020 Hz BETWEEN 1700 Hrs amp 1800 Hrs Hrs ON 27072014

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4962 Hz BETWEEN 1900 Hrs amp 2000 Hrs Hrs ON 25072014

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4993 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5036 Hz AT 130344 Hrs ON 23072014

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4939 Hz AT 194315 hrs Hrs ON 25072014

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS JULY 2014 JUNE 2014 MAY 2014

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 008 023 000

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 314 476 093 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 3129 3216 2155 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 5016 4536 5319

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1533 1749 2433

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING JULY 2014

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

Voltage Profile during the month of July 2014

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 420 402 420 404 433 411 424 424 417 400 420 403 422 407 408 3902 417 398 420 400 431 407 424 424 417 401 427 418 421 409 410 3943 417 393 419 397 432 408 420 396 417 400 425 419 422 408 407 3934 416 398 419 401 434 412 422 402 417 400 426 421 418 406 411 3965 417 400 419 403 433 414 424 424 417 403 424 419 417 406 410 3996 420 406 422 408 438 411 421 402 419 407 427 421 422 412 409 3897 412 396 419 402 428 413 420 399 414 401 423 419 417 409 409 3968 418 400 421 410 433 400 424 400 416 400 425 419 422 400 410 3949 418 412 421 410 433 413 424 410 416 408 425 419 422 412 410 394

10 415 399 417 403 435 415 400 400 418 404 424 421 422 414 410 41111

स नक Annex-23

िभलाईBhilai

धल असोज कासोरKarad Dhule Asoj Kasor

इदौर इटारसी कराडIndore Itarsi

जतपरJetpur

11 416 402 423 407 436 416 422 407 416 405 425 421 423 413 410 39712 419 400 422 406 436 417 400 400 419 403 426 422 423 413 410 39713 415 400 422 410 437 417 400 400 417 406 425 421 422 414 411 39514 416 398 423 409 439 416 400 400 419 404 424 421 422 413 412 39815 420 403 423 408 437 413 428 401 418 404 426 422 423 413 410 39816 423 408 426 411 437 413 429 403 421 406 428 424 423 415 413 40017 421 404 424 407 436 416 400 400 419 408 423 414 423 414 411 39818 421 404 424 407 436 416 400 400 420 406 427 423 423 414 411 39819 423 407 425 410 434 415 425 411 424 405 428 425 424 416 422 39520 421 407 424 410 420 420 427 410 421 407 427 424 423 416 417 39621 421 406 424 411 420 420 400 400 420 402 428 425 426 418 413 39222 421 407 426 413 420 420 400 400 419 401 428 425 428 420 412 39623 422 409 427 410 419 415 415 402 420 403 425 419 428 420 412 39624 420 406 425 409 420 420 400 400 420 404 429 426 427 416 409 39625 422 401 421 404 420 420 400 400 424 402 428 424 423 415 415 39726 420 402 421 406 431 419 400 400 422 403 428 423 422 413 415 40027 417 404 422 407 434 416 423 407 421 405 428 424 422 413 416 40128 419 403 421 407 437 416 431 408 423 406 428 426 423 415 415 40229 419 403 420 408 437 415 400 400 421 406 429 426 423 416 415 39930 421 404 422 406 438 415 400 400 423 404 430 426 426 415 420 40331 420 395 420 402 431 406 428 403 422 403 429 425 423 414 419 398

423 393 427 397 439 400 431 396 424 400 430 403 428 400 422 389

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 418 404 411 395 423 406 430 406 789 752 788 757 787 756 791 7662 419 397 411 393 423 403 431 404 772 748 791 756 786 750 793 7553 416 402 411 397 421 397 425 399 772 748 780 751 781 757 791 7634 417 404 409 396 420 415 428 406 772 748 786 757 780 755 791 7655 418 404 418 400 421 404 427 407 772 748 796 755 796 765 802 7726 419 408 416 402 424 410 429 413 789 752 797 768 796 765 799 7757 414 406 407 397 420 403 426 407 789 752 776 758 777 757 784 7658 418 408 411 388 422 400 429 400 789 752 786 767 783 746 790 7719 412 401 403 386 422 405 429 408 789 752 781 761 772 745 783 76010 413 403 402 394 420 404 424 406 789 752 792 764 774 755 785 765

Bina Gwalior Nagda Khandwa Sipat

बना वािलयरिसविननागदावािलयर बनाBina

िसपतखडवाseoni Gwalior

10 413 403 402 394 420 404 424 406 789 752 792 764 774 755 785 76511 415 407 403 395 421 407 426 410 789 752 790 774 785 758 790 77212 418 406 407 392 422 404 427 404 789 752 796 769 784 756 796 76913 418 406 407 392 421 408 427 411 789 752 796 769 784 756 796 76914 419 410 409 397 423 406 428 409 789 752 784 768 786 763 792 77415 419 404 408 391 424 407 429 408 789 752 789 763 786 750 791 76416 424 414 408 400 427 411 431 413 789 752 792 766 785 767 797 77917 421 410 411 399 424 407 432 409 789 752 788 762 789 766 795 77618 423 412 414 396 424 407 432 409 789 752 783 770 796 765 801 77719 424 411 410 396 426 411 431 413 789 752 791 770 788 764 803 77720 425 411 411 396 424 410 428 414 789 752 786 763 789 760 800 77221 422 412 410 395 424 409 428 413 789 752 784 760 788 763 796 77522 423 416 414 402 424 410 429 414 789 752 791 774 794 773 801 78423 425 413 418 402 424 410 430 412 787 750 785 770 798 780 804 78324 422 411 411 397 425 409 431 415 789 752 790 772 791 773 801 78125 421 410 405 396 423 403 429 409 789 752 784 770 794 767 798 77726 421 410 409 395 423 404 427 409 789 752 792 773 789 767 799 77827 423 412 413 399 420 404 428 409 789 752 794 766 797 770 808 78028 422 411 411 399 421 405 428 410 789 752 789 763 794 770 793 77029 419 409 411 397 423 406 430 414 789 752 794 771 795 767 796 77430 422 409 413 398 420 404 430 413 788 753 796 766 799 766 799 77331 420 404 409 395 421 397 429 411 789 752 787 764 792 759 795 767

425 397 418 386 427 397 432 399 789 748 797 751 799 745 808 755

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Jul-14 0 0 0 0 0 0 0 02 02-Jul-14 0 0 0 0 0 0 0 03 03-Jul-14 0 0 0 0 0 0 0 04 04-Jul-14 0 0 0 0 0 0 0 05 05-Jul-14 0 0 0 0 0 0 0 06 06-Jul-14 1 67 0 0 0 0 0 07 07-Jul-14 0 0 0 0 0 0 0 08 08-Jul-14 1 278 0 0 0 0 0 09 09-Jul-14 0 0 0 0 0 0 0 0

10 10-Jul-14 1 565 0 0 0 0 0 011 11-Jul-14 0 0 0 0 0 0 0 012 12-Jul-14 0 0 0 0 0 0 0 013 13-Jul-14 3 758 0 0 0 0 0 014 14-Jul-14 0 0 0 0 0 0 0 015 15-Jul-14 0 0 0 0 0 0 016 16-Jul-14 2 2127 NIL NIL NIL 017 17-Jul-14 0 0 0 0 0 0 0 018 18-Jul-14 1 08 0 0 0 0 0 019 19-Jul-14 0 0 0 0 0 0 0 020 20-Jul-14 0 0 0 0 0 0 0 021 21-Jul-14 0 0 0 0 0 0 0 022 22-Jul-14 0 0 0 0 0 0 0 023 23-Jul-14 0 0 0 0 0 0 0 024 24-Jul-14 0 0 0 0 0 0 0 025 25-Jul-14 0 0 0 0 0 0 0 026 26-Jul-14 0 0 0 0 0 0 0 027 27-Jul-14 0 0 0 0 0 0 0 028 28-Jul-14 0 0 0 0 0 0 0 029 29-Jul-14 0 0 0 0 0 0 0 030 30-Jul-14 0 0 0 0 0 0 0 031 31-Jul-14 0 0

Max 3 758 0 0 0 00 0 0Total 9 24917 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month July 2014

Recommonded Load relief at 492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE 25

POWER CUTRESTRICTIONS IN WESTERN REGION FOR THE MONTH OF JULY-2014

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply(DLF)

01072014 31072014 2343 2105 2300

21 Three-Phase Supply(Irrigation)

01072014 31072014 0953 0857 0933

21 Three-Phase Supply(Mixed)

01072014 31072014 2339 2055 2240

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01072014 31072014 2353 2325 2344 32 District Head Qtrs 01072014 31072014 2357 2330 2348 33 Tehsil Head Qtrs 01072014 31072014 2350 2230 2319

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 010714 to 310714

SaUnya Nil

0-470 MW

SaUnya Nil

0000

SaUnya Nil 2400

SaUnya Nil

19 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs) 21 Three-Phase Supply 01072014 31072014 1000 0800 0900

22 Single-Phase Supply 01072014 31072014 1800 1800 1800 3 Anya jaanakarI Any other information There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

8860 (Av) of 31days 0000(Av) 0000 (Av)

1Rural 7109(Av) for 23447 Hrs 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0532 - -

0537 -

3 HT Industries 8261 (Av) for 17270 Hrs 0357 Total Energy Cutday 1426 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01072014 to 310714 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 3172014 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil ca gaaovaa Goa SaUnya Nil

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-26 Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai अिनवाय यिनट आऊटज का जलाई2014का वःता रत यौरा

Details of forced unit outages during the month ofJuly2014

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 एःसार Essar-2

गरा विनिल GSECL

172 1212 22-Feb-13 अनपल ध Still out

अनपल ध Still out

Shortage of gas

2 यट पीएस UTPS-2

गरा विनिल GSECL

120 1951 17-Jun-14 अनपल ध Still out

अनपल ध Still out

Turbine tripped(RSD)

3 एःसार व डनार Essar vadinar-1

गरा विनिल GSECL

600 2335 3-Jul-14 1324 22-Jul-14 Coal shortage

4 डब यट पीएस WTPS-6

गरा विनिल GSECL

210 953 10-Jul-14 0707 14-Jul-14 BTL

5 एसट पीएस STPS-1

गरा विनिल GSECL

120 1220 10-Jul-14 0710 14-Jul-14 BTL

6 जीआईपीसीएल GIPCL-STG I-2

गरा विनिल GSECL

165 1744 14-Jul-14 अनपल ध Still out

अनपल ध Still out

C ampI problem

7 एएलट पीएस ALTPS-1

गरा विनिल GSECL

120 107 15-Jul-14 2037 19-Jul-14 BTL

8 िस का ट पीएस SIKATPS-1

गरा विनिल GSECL

120 1330 17-Jul-14 अनपल ध Still out

अनपल ध Still out

RSD

9 डब यट पीएस WTPS-4

गरा विनिल GSECL

210 858 18-Jul-14 अनपल ध Still out

अनपल ध Still out

RSD

10 डब यट पीएस WTPS-3

गरा विनिल GSECL

210 1046 18-Jul-14 अनपल ध Still out

अनपल ध Still out

RSD

11 डब यट पीएस WTPS-5

गरा विनिल GSECL

210 1818 18-Jul-14 000 21-Jul-14 RSD

12 डब यट पीएस WTPS-6

गरा विनिल GSECL

210 447 19-Jul-14 अनपल ध Still out

अनपल ध Still out

RSD

13 यट पीएस UTPS-3

गरा विनिल GSECL

200 1055 26-Jul-14 2328 1-Aug-14 RSD

14 एपीएल APL-6

अदानी ADANI

660 2146 5-Jul-14 1105 2-Aug-14 Heavy hydrogen leakage

15 एपीएमएल APML-4

अदानी ADANI

660 1132 10-Jul-14 1407 23-Jul-14 Coal shortage

16 एपीएल APL-1

अदानी ADANI

330 117 20-Jul-14 612 23-Jul-14 RSD

प म ऽय भार षण कि म बई णाली चालन-ISO-I

17 एपीएल APL-8

अदानी ADANI

660 2018 18-Jul-14 2209 21-Jul-14 BTL

18 एपीएल APL-2

गरा विनिल GSECL

330 0913 26-Jul-14 1714 29-Jul-14 Air pre heater problem

19 एपीएल APL-5

गरा विनिल GSECL

660 1910 29-Jul-14 1533 2-Aug-14 Heavy steam leakage

20 डब यपीसीएल WPCL-1

मारा वउकिल MSPGCL

135 1245 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Furnace press high

21 डब यपीसीएल WPCL-4

मारा वउकिल MSPGCL

135 001 3-Apr-14 2347 11-Jul-14 Less schedule

22 कोराड Koradi-5

मारा वउकिल MSPGCL

200 1030 17-Jun-14 अनपल ध Still out

अनपल ध Still out

ID fan bearing temperature high

23 इ डयाबल Indiabulls - 1

मारा वउकिल MSPGCL

270 546 26-Jun-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

24 पल Parli -4

मारा वउकिल MSPGCL

210 1019 29-Jun-14 अनपल ध Still out

अनपल ध Still out

water shortage

25 भसावल Bhusawal-2

मारा वउकिल MSPGCL

210 1117 6-Jul-14 544 10-Jul-14 Coal problem

26 चिपर Chandrapur-1

मारा वउकिल MSPGCL

210 2211 8-Jul-14 2106 13-Jul-14 BTL

27 चिपर Chandrapur-3

मारा वउकिल MSPGCL

210 2216 14-Jul-14 1452 18-Jul-14 Safety valve problem

28 उरण Uran-6 मारा वउकिल MSPGCL

108 1634 15-Jul-14 1407 22-Jul-14 Gas shortage

29 उरण Uran -5 मारा वउकिल MSPGCL

108 2338 17-Jul-14 1125 24-Jul-14 For rotor balancing work

30 उरण Uran -A0 मारा वउकिल MSPGCL

120 2340 17-Jul-14 2315 23-Jul-14 For rotor balancing work

31 भसावल Bhusawal-2

मारा वउकिल MSPGCL

210 2346 18-Jul-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

32 खापरखड़ा Khaparkeda-3

मारा वउकिल MSPGCL

210 1036 20-Jul-14 041 29-Jul-14 Flame failure

33 जयगड Jaigad-2 मारा वउकिल MSPGCL

300 000 20-Jul-14 Ready Ready Less requisition

34 वीआईपीएल VIPL-2

मारा वउकिल MSPGCL

300 2302 20-Jul-14 1716 26-Jul-14 Coal feeding problem

35 एपीएमएल APML-3

मारा वउकिल MSPGCL

660 0444 22-Jul-14 044 26-Jul-14 Pressure release valve operated

36 भसावल Bhusawal-4

मारा वउकिल MSPGCL

500 003 23-Jul-14 151 29-Jun-14 BTL

37 वीआईपीएल VIPL-1

मारा वउकिल MSPGCL

300 015 23-Jul-14 1300 31-Jul-14 Coal feeding problem

38 उरण Uran -8 मारा वउकिल MSPGCL

108 730 26-Jul-14 1700 29-Jul-14 Gas shortage

39 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 347 29-Jul-14 638 4-Aug-14 BTL

प म ऽय भार षण कि म बई णाली चालन-ISO-I

40 पल PARLI-5 मारा वउकिल MSPGCL

210 002 30-Jul-14 अनपल ध Still out

अनपल ध Still out

Water shortage

41 टाटा TATA-8

टाटा TATA

250 2255 9-Jan-14 अनपल ध Still out

अनपल ध Still out

HT due to fire near turbine generator desk

42 टाटा TATA-6

टाटा TATA

500 2134 31-Jul-14 Ready Ready Less requisition

43 आरजीपीपीएल RGPPL-3A

आरजीपीपीएल RGPPL

320 1857 17-Apr-14 Ready Ready Less requisition

44 आरजीपीपीएल RGPPL-2B

आरजीपीपीएल RGPPL

320 1915 17-Jun-14 अनपल ध Still out

अनपल ध Still out

Raw water problem

45 आरजीपीपीएल RGPPL-2A

आरजीपीपीएल RGPPL

320 1615 25-Jun-14 1200 21-Jul-14 Less requisition

46 आरजीपीपीएल RGPPL-1A

आरजीपीपीएल RGPPL

320 1330 8-Jul-14 Ready Ready Less requisition

47 अमरकनटक Amarkantak-4

म वउकिल MPPGCL

120 1113 30-Apr-14 अनपल ध Still out

अनपल ध Still out

TURBINE BEARING VIBRATION HIGH

48 सातपरा Satpura-6

म वउकिल MPPGCL

200 305 18-Jun-14 अनपल ध Still out

अनपल ध Still out

BTL

49 एसजीट पीएस SGTPS-3

म वउकिल MPPGCL

210 617 26-Jun-14 020 26-Jul-14 Conveyer belt problem

50 अमरकनटक Amarkantak-3

म वउकिल MPPGCL

120 1640 2-Jul-14 1623 11-Jul-14 BTL

51 सातपरा Satpura-9

म वउकिल MPPGCL

210 2200 5-Jul-14 855 15-Jul-14 Condenser tube cleaning

52 सातपरा Satpura-9

म वउकिल MPPGCL

210 1310 15-Jul-14 845 24-Jul-14 BTL

53 एसजीट पीएस SGTPS-4

म वउकिल MPPGCL

210 2233 19-Jul-14 1252 4-Aug-14 Coal shortage

54 सातपरा Satpura-7

म वउकिल MPPGCL

210 225 21-Jul-14 545 24-Jul-14 BTL

55 सातपरा Satpura-10

म वउकिल MPPGCL

250 2316 22-Jul-14 07082014 High vibration in generator winding

56 एसजीट पीएस SGTPS-3

म वउकिल MPPGCL

210 1857 28-Jul-14 1020 2-Aug-14 Drum level low

57 DSPM(K(E) extn)-2

छरा वउकिल CSPGCL

250 2310 21-Jul-14 2029 22-Jul-14 Coal shortage

58 कोरबा पव Korba(E)-3

छरा वउकिल CSPGCL

210 1030 22-Jul-14 1025 27-Jul-14 CTL

59 कोरबा पव Korba(E)-5

छरा वउकिल CSPGCL

120 1345 22-Jul-14 1140 26-Jul-14 Wet coal problem

60 कोरबा पव Korba(E)-5

छरा वउकिल CSPGCL

120 2320 30-Jul-14 155 2-Aug-14 Coal shortage

61 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

62 एःसार महान Essar-Mahan-1

एःसारESSAR 600 014 22-Jun-14 1255 11-Jul-14 Less schedule

63 एःसारमहानEssar Mahan-1

एःसार ESSAR 600 620 16-Jul-14 1252 28-Jul-14 Withdrawn due to tripping of evacuation

प म ऽय भार षण कि म बई णाली चालन-ISO-I

Lines

64 सीजीपीएल CGPL-50

सीजीपीएल CGPL

830 948 13-Jun-14 409 23-Jul-14 Ash hopper refractory damage

65 सीजीपीएल CGPL-10

सीजीपीएल CGPL

830 1332 1-Jul-14 1952 9-Jul-14 BTL

66 सीजीपीएल CGPL-20

सीजीपीएल CGPL

800 1214 24-Jul-14 13-aug-14

Bottom ash Hopper works

67 सीजीपीएल CGPL - 40

सीजीपीएल CGPL

830 1918 26-Jul-14 1020 2-Aug-14 GT electrical fault

68 जपीएल JPL STG-2 UNIT-1

जपीएल JPL 600 051 26-Jun-14 अनपल ध Still out

अनपल ध Still out

Turbine vibration

69 जपीएलJPL STG-2 UNIT-2

जपीएलJPL 600 000 5-Jul-14 1457 11-Jul-14 Less requisition

70 जपीएल JPL STG-2 UNIT-2

जपीएलJPL 600 748 21-Jul-14 1800 24-Jul-14 BTL

71 एसीबीआईएल ACBIL-1

एसीबीआईएल ACBIL

135 151 6-Jul-14 1753 9-Jul-14 Furnace draft high

72 ससान Sasan -3 आरईएल REL 660 1648 15-Jul-14 2248 4-Aug-14 Ash evacuation problem

73 ससान Sasan-4 आरईएल REL 660 1645 24-Jul-14 810 3-Aug-14 High press main steam tripped

74 एमको EMCO-I एमको EMCO 200 109 16-Jul-14 अनपल ध Still out

अनपल ध Still out

Turbine vibration high

75 एसीबीआईएल ACBIL-2

एसीबीआईएल ACBIL

135 1955 21-Jul-14 601 24-Jul-14 Furnace draft high

76 मौदा Mouda -1

एनट पीसीNTPC 500 1630 18-Jun-14 2042 14-Jul-14 Flame failure

77 कावास Kawas-1C

एनट पीसीNTPC 116 2311 2-Jul-14 2100 6-Jul-14 Heavy steam leakage from stop valve

78 कावास Kawas-1B

एनट पीसीNTPC 106 2323 2-Jul-14 632 7-Jul-14 Less requisition

79 कावास Kawas-2B एनट पीसीNTPC 164 1704 10-Jul-14 Ready Ready Less requisition

80 कावास Kawas-1A एनट पीसीNTPC 164 1200 12-Jul-14 745 22-Jul-14 Less requisition

81 वीएसट पीएस VSTPS-11

एनट पीसीNTPC 500 1204 13-Jul-14 000 16-Jul-14 Coal shortage

82 गाधारGandhar-1 एनट पीसीNTPC 144 149 16-Jul-14 1807 21-Jul-14 Less requisition

83 कावास Kawas-1B एनट पीसीNTPC 164 1027 18-Jul-14 442 23-Jul-14 Less requisition

84 मौदा Mouda-1 एनट पीसीNTPC 500 000 18-Jul-14 1745 24-Jul-14 Less requisition

85 िसपतSipat-1 एनट पीसीNTPC 660 000 21-Jul-14 955 24-Jul-14 Generator H2 gas leakage

86 गाधार Gandhar-3

एनट पीसीNTPC 144 1607 21-Jul-14 अनपल ध Still out

अनपल ध Still out

BB protection operatedatJhanor

87 गाधार Gandhar-4(ST)

एनट पीसीNTPC 224 1607 21-Jul-14 1320 26-Jul-14 BB protection operatedatJhanor

88 ट स TAPS-1

एनट पीसीNTPC 160 2227 21-Jul-14 1407 26-Jul-14 Maintenance

89 गाधार एनट पीसीNTPC 144 507 22-Jul-14 Ready Ready Less requisition

प म ऽय भार षण कि म बई णाली चालन-ISO-I

Gandhar -1

90 मौदा mouda-2 एनट पीसीNTPC 500 915 23-Jul-14 315 31-Jul-14 Coal feeding problem

91 कावास Kawas-1A

एनट पीसीNTPC 106 608 24-Jul-14 1309 27-Jul-14 Less requisition

92 गाधार Gandhar-2

एनट पीसीNTPC 144 2036 26-Jul-14 100814 Less requisition

93 वीएसट पीएस VSTPS-2

एनट पीसीNTPC 210 500 27-Jul-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

94 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 748 27-Jul-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

95 मौदा Mouda-2 एनट पीसीNTPC 500 315 31-Jul-14 210 3-Aug-14 Less requisition Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का जलाई2014 का वःता रत यौरा

Details of planned unit outages during the month of July2014 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

सo From

समय दनाक

कारण Reason

Time Date Time Date

1 एसएलपीपी SLPP-2

गरा विनिल GSECL

125 045 23-Jun-14 NA 17-Jul -14 AOH

2 डब यट पीएस WTPS-5

गरा विनिल GSECL

210 000 21-Jul-14 29-0814 COH

3 यट पीएस UTPS-4

गरा विनिल GSECL

200 000 21-Jul-14 240814 AOH

4 एसएलपीपी SLPP-3

गरा विनिल GSECL

125 130 22-Jul-14 060814 AOH

5 यट पीएस UTPS-1

गरा विनिल GSECL

120 000 29-Jul-14 28814 AOH

6 पल ParlI-3

मारा वउकिल MSPGCL

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

Water supply problem

7 चिपर Chandrapur-7

मारा वउकिल MSPGCL

500 600 19-Jun-14 1124 2-Aug-14 AOH

8 नािसक NASIK -3

मारा वउकिल MSPGCL

210 1410 10-Jul-14 अनपल ध Still out

100814 AOH

9 कोरबा प म Korba(W)-2

छरा वउकिल CSPGCL

210 936 26-Jun-14 140814 AOH

10 वदनाVandana-I वदना VANDANA 135 1940 17-Jul-14 अनपल ध Still out

अनपल ध Still out

ETL

11 वीएसट पीएस VSTPS-8

एनट पीसीNTPC 500 012 1-Jun-14 253 13-Jul-14 AOH

12 कएसट पीएस KSTPS-4

एनट पीसीNTPC 500 2335 20-Jun-14 180814 COH

13 कावास Kawas-2A

एनट पीसीNTPC 106 000 27-Jun-14 260814 RampM works

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

11 Akrimota 1 125 4-Aug-14 14-Aug-14 AOH12 WTPS 2 210 5-Aug-14 3-Sep-14 AOH13 SLPP 1 125 16-Aug-14 4-Sep-14 AOH14 DGB 1 107 20-Aug-14 27-Aug-14 CI15 GIPCL-I GT-3 48 22-Aug-14 27-Aug-14 HGPI16 GIPCL-I GT-2 48 29-Aug-14 3-Sep-14 HGPI17 GIPCL-I GT-2 48 12-Aug-14 24-Aug-14 HGPI18 UTPS 3 200 19-Aug-14 12-Sep-14 AOH19 GTPS 2 120 25-Aug-14 14-Sep-14 AOH110 STPS 1 120 19-Aug-14 30-Aug-14 AOH111 GTPS 3 210 24-Aug-14 13-Sep-14 AOH112 APL 9 660 1-Sep-14 20-Sep-14 AOH

221 SGTPS 4 210 010914 250914 AOH3 Craiva]kMila CSPGCL

31 Korba East-6 6 120 21-Aug-14 13-Sep-14 AOH32 Korba East-1 1 50 15-Aug-14 1-Sep-14 AOH33 Korba East-3 3 50 21-Aug-14 30-Sep-14 AOH34 Korba West-1 1 210 12-Sep-14 27-Sep-14 COH35 Korba West-5 5 500 15-Aug-14 30-Aug-14 AOH

4

41 PARAS 3 250 20914 151014 AOH42 RELIANCE 2 250 140814 160814 TURBINE VIBRATION

5 koMd``Iya xao~ Central Sector

51 SIPAT 1 600 050914 191014 BLR OH + HPT + IPT+LPT + GEN

52VINDHYACHAL

5 500 120814 200914 CAP+TG PED CKG+GEN+BLR CHEM CLNG+ESP RampM

53VINDHYACHAL

9 500 120814 150914 BLR OH + HPT + IPT+ GEN

54VINDHYACHAL

11 500 160714 170814 AOH

55CGPL

30 800 150814 050914 Bottom ash hopper Refractory repair and General maintainance work

56 CGPL 40 800 060914 300914 UT 40B repair work57 NSPCL 1 250 200814 110914 AOH

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING AUGUST 2014 AND SEPTEMBER 2014

Capacity Outage as per Annual Maintenance Plan

Date Time Date Time

1 400 400KV BUS-I at Bilaspur Ss 14-Aug-14 900 14-Aug-14 1800 DAILY For bus bar stability of LANCO bays amp jumpering work WRTS-I LANCO C

2 400kV 50 MVAR Bus Reactor-2 at Itarsi SS 14-Aug-14 800 15-Oct-14 1800 Continuo

us Installation of 125MVAR reactor WRTS-II WRTS-II C

3 765 Satna-Gwalior2 14-Aug-14 800 17-Aug-14 1800 DailyCompletion of 765kV Gwalior2 Main Bay Erection amp Testing works at Satna

PGCIL WRTS-II C

4 400 400kV JBP- JBP Pooling 2 Line 14-Aug-14 1000 14-Aug-14 1500 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

5 400 400KV BUS-II at Bilaspur Ss 16-Aug-14 900 16-Aug-14 1800 DAILY For bus bar stability of LANCO bays amp jumpering work WRTS-I LANCO C

6 765 Bus2 at satna 16-Aug-14 800 18-Aug-14 1800 DailyExtension of bus 2 for Gwalior2 bay amp completion of Main Bay Erection

PGCIL WRTS-II C

7 400 Khandwa-Dhule1 16-Aug-14 800 31-Aug-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WR-II C

8 400 Gandahr - Navsari DC 16-Aug-14 800 31-Aug-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WR-II R

PID testing of insulator strings

KV Line From To

Annexure-32

Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

9 400 Navsari - Vapi - Kala 16-Aug-14 800 31-Aug-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WR-II R

10 400 Satna - Bina Ckt 1amp2 16-Aug-14 800 31-Aug-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WR-II R

11 400 80 MVAR Bus Reactor at Kotra 16-Aug-14 900 17-Aug-14 1800 ContinuousTo attend isolator defects WRTS-I PGCIL C

12 400 400kV JBP- JBP Pooling 1 Line 17-Aug-14 1000 17-Aug-14 1500 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

13 765 ICT II at Bina 17-Aug-14 0900 17-Aug-14 1800 Daily Post Commissioning check of Fire-Fighting system at Bina PGCIL WRTS-II C

14 765 Bus-2 at Gwalior 17-Aug-2014 1000 18-Aug-2014 1800 Daily Busbar Jumpering ampStability test related to Bus reactor

POWERGRID WRTS-II C

15 765 Seoni 2 LR(704 LR) at Bilaspur Ss 18-Aug-14 900 18-Aug-14 1500 DAILY For taking Spare LR in service

first time WRTS-I PGCIL C

16 400 Bhadrawati-Ramagundam I 18-Aug-14 800 18-Aug-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

17 400 400kV Vchal - JBP 1 Line 18-Aug-14 1000 18-Aug-14 1200 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

18 400 400kV Vchal - JBP 2 Line 18-Aug-14 1400 18-Aug-14 1600 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

19 400 400KV BUS-II at Bilaspur Ss 19-Aug-14 900 19-Aug-14 1800 DAILY For bus bar stability of LANCO bays amp jumpering work WRTS-I LANCO C

20 400 Bhadrawati-Ramagundam II 19-Aug-14 800 19-Aug-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

21 765 ICT 1 at G alior 19 A g 14 10 00 20 A g 14 18 00 Continou SPARE ICT COMMISSIONING PGCIL WRTS II C21 765 ICT - 1 at Gwalior 19-Aug-14 1000 20-Aug-14 1800 s SPARE ICT COMMISSIONING PGCIL WRTS-II C

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

22 400 400kV JBP- Itarsi 1 Line 19-Aug-14 1000 19-Aug-14 1200 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

23 400 400kV JBP- Itarsi 2 Line 19-Aug-14 1400 19-Aug-14 1600 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

24 400 400 kV Sipat -Ranchi-1 19-Aug-14 900 20-Aug-14 1900 Continous 1 no of CT replacement NTPC NTPC

25 400 BUS-I at Aurangabad(PG) 19-Aug-14 600 20-Aug-14 1800 ContiBus-1 extn for commissioning of 400 kV Boisar-1amp2 bays with 80 MVAR Reactors

WRTS-I WRTS-I C

26 400kV 400kV SUGEN PIRANA Line (Line 2) 19-Aug-14 900 19-Aug-14 1700 Daily Corrective Maintenance of

Transfer Isolator TPL-SUGE TPL-SUG R

27 400kV 400kV PGCIL - PIRANA Feeder No 2 19-Aug-14 900 19-Aug-14 1700 Daily 400kV CT connectors replacementTPL-AHME TPL-AHM R

28 400 Bhadrawati-Parli 1amp 2 19-Aug-14 000 20-Oct-14 1800 DailyFor OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

29 400 Mundra - Jetpur line No1 19-Aug-14 800 19-Aug-14 1200 Daily protection logic checking work PGCIL GETCO30 400 Mundra - Jetpur line No 2 19-Aug-14 1400 19-Aug-14 1800 Daily protection logic checking work PGCIL GETCO

31 400 400KV BUS-I at Bilaspur Ss 20-Aug-14 900 20-Aug-14 1800 DAILY For bus bar stability of LANCO bays amp jumpering work WRTS-I LANCO C

32 400 KSK ndash Raigarh circuit 4 20-Aug-14 900 21-Aug-14 1800 CONT complete PLCC rectification works WRTS-I KSK C

33 HVDC HVDC POLE I AT BHADRAWATI 20 A 14 8 00 21 A 14 18 00 D il AMP WORKS WRTS I WRTS I R33 HVDC HVDC POLE-I AT BHADRAWATI 20-Aug-14 800 21-Aug-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

34 765kV Dharamjaygarh - Durg ckt-2 20-Aug-14 800 22-Aug-14 1800 daily CSD relay commissioning (M+T) WRTS-I PGCIL C

35 765 JBP - BINA 1 at Jabalpur Pooling Station 20-Aug-14 1000 21-Aug-14 1800 Daily Commissioning of CSD Relay for

765KV JBP - BINA Ckt 1 PGCIL WRTS-II C

36 400 Khandwa-Dhule1 20-Aug-14 1000 20-Aug-14 1500 Daily AMP PGCIL WRTS-II R

37 400 Bus-1 at Shujalpur 20-Aug-14 1000 20-Aug-14 1800 Daily AMP PGCIL WRTS-II R

38 400 Bus2 at Satna 20-Aug-14 900 20-Aug-14 1800 Daily For Bus Bar Stability and charging activity of 406 Bay PGCIL WRTS-II C

39 400 Bus1 at Indore 20-Aug-14 900 20-Aug-14 1800 Daily Jumper connection amp stability checking of Pitampur1 PGCIL WRTS-II C

40 400 400kV JBP- Itarsi 3 Line 20-Aug-14 1000 20-Aug-14 1200 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

41 765 Raigarh (Kotra) - Raigarh (Tamnar) 20-Aug-14 900 31-Aug-14 1800 ContinuousFor installation of Bird guards WRTS-I PGCIL C

42 400 Kansari - Kankroli line 20-Aug-14 800 20-Aug-14 1800 Daily PMU installation work and maintenPGCIL GETCO43 400 BUS-2 AT SOLAPUR 21-Aug-14 900 22-Aug-14 1800 Daily Pune bays extension works WRTS-I WRTS-I C

44 765 ICT 1 at Jabalpur Pooling Station 21-Aug-14 1000 21-Aug-14 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus for Spare ICT Phase

PGCIL WRTS-II C

45 400 Bina-Shujalpur1 21-Aug-14 900 21-Aug-14 1000 Daily

For Replacement of 390kV Reactor LA with 336kV LA Line will be taken in service without PGCIL WRTS-II Cj p g g y will be taken in service without Line Reactor at Shujalpur

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

46 400 Khandwa-Dhule2 21-Aug-14 1000 21-Aug-14 1800 DailyFor Replacement of 390kV Reactor LA with 336kV LA At Khandwa amp AMP

PGCIL WRTS-II C

47 220 Damoh-Sagar 21-Aug-14 1000 21-Aug-14 1500 Daily AMP of terminal equipment at Damoh SS MPPTCL WR-II R

48 765 ICT2 at Indore 21-Aug-14 900 22-Aug-14 1800 Continious

For Auxiliary bus erection at Indore PGCIL WRTS-II C

49 400 125MVAr BR at Shujalpur 21-Aug-14 900 21-Aug-14 1800 Daily Differential stability of tie bay (Under commissioning) PGCIL WRTS-II C

50 400 Raipur-Bhadrawati-III 21-Aug-14 900 21-Aug-14 1800 ContinuousBus split at Raipur WRTS-I PGCIL C51 400 Kansari - Bhinmal line 21-Aug-14 800 21-Aug-14 1800 Daily PMU installation work and maintenPGCIL GETCO

52 HVDC HVDC POLE-2 AT BHADRAWATI 22-Aug-14 800 23-Aug-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

53 765 ICT I at Bina 22-Aug-14 0900 23-Aug-14 1800 DailyCommissioning of CSD Relay for 400kV side of ICT- rescheduling of outage

PGCIL WRTS-II C

54 765 JBP - BINA 2 at Jabalpur Pooling Station 22-Aug-14 1000 23-Aug-14 1800 Daily Commissioning of CSD Relay for

765KV JBP - BINA Ckt 2 PGCIL WRTS-II C

55 400 Khandwa-Rajgarh1 22-Aug-14 800 23-Aug-14 1800 PM Continous

Rectification of damaged tower peak at locno83 due to collapse of MPPTCL tower which is under construction

PGCIL MPPTCL C

F j i amp h i th56 400 Pirana-Vadodara-Asoj DC 22-Aug-14 800 23-Aug-14 1800 Daily

For jumpering amp charging the future cirucit of line in multi-circuit towers to prevent conductor theft

PGCIL WRTS-II C

57 220 Damoh-Damoh2 22-Aug-14 1000 22-Aug-14 1500 Daily AMP of terminal equipment at Damoh SS MPPTCL WR-II R

58 400kV 400kV SUGEN VAPI Line 22-Aug-14 900 22-Aug-14 1400 Daily Corrective Maintenance amp Inspection Dropper of 5 Core CT

TPL-SUGE TPL-SUG R

59 765 Bus Reactor Kotra 22-Aug-14 900 23-Aug-14 1800 Daily WRTS-I PGCIL C

60 400 Vindhyachal-Jabalpur3 23-Aug-14 900 23-Aug-14 1800 Daily

For Replacement of 390kV Reactor LA with 336kV LA At Jabalpur Line will remain out of service due to less clearance of Reactor LA from Line conductor

PGCIL WRTS-II C

61 765 ICT1 at Indore 23-Aug-14 900 26-Aug-14 1800 Continious

re routing of cables in CMB for commissioning of spare unit at Indore

PGCIL WRTS-II C

62 765 Bus- 2 at Bina 23-Aug-2014 0900 23-Aug-2014 1800 DailyFor Bus stability required for 765kV Jabalpur 3 Bay- Rescheduling of outage

POWERGRID WRTS-II C

63 765 Bus-1 at Gwalior 24-Aug-14 1000 25-Aug-14 1800 Daily Busbar Jumpering ampStability test related to Jaipur 1 main bay PGCIL WRTS-II C

64 400 Navasari- Kala MC line 25-Aug-14 800 26-Aug-14 1800 DailyConstruction work of Navasari- Boisar line on same Multi ckt WRTS-II WRTS-I Ctower

65 765 765400 AT-1 AT SOLAPUR 25-Aug-14 900 26-Aug-14 1800 Daily Spare ICT unit Aux bus commisioning works WRTS-I WRTS-I C

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

66 220 Korba-Budhipadar Ckt-3 at CSPDCL Korba Ss 25-Aug-14 900 26-Aug-14 1800 DAILY For diversion of line for SE

Railway MCL project WRTS-I PGCIL C

67 765 765KV Bus 1 at Jabalpur Pooling Station 25-Aug-14 1000 25-Aug-14 1800 Daily

765KV Bus 1 Extension for Switchyard Extension for BINA 3 Line Dia

PGCIL WRTS-II C

68 765 765KV ICT 1 at Jabalpur Pooling Station 25-Aug-14 1000 25-Aug-14 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus Isolators for Spare ICT Phase - Heavy Induction

PGCIL WRTS-II C

69 400 Vindhyachal-Jabalpur4 25-Aug-14 900 25-Aug-14 1800 Daily

For Replacement of 390kV Reactor LA with 336kV LA At Jabalpur Line will remain out of service due to less clearance of Reactor LA from Line conductor

PGCIL WRTS-II C

70 400 Bus-I at satna 25-Aug-14 900 25-Aug-14 1800 DailyFor Changing of Jumper from Twin Moose To Quad Moose in 401 bay (jaypee nigrie line-1)

PGCIL WR-II C

71 400 Deepnagar-Thaptitanda 25-Aug-14 900 25-Aug-14 1700 Daily To attend Isolator alignment problem MSETCL MSETCL

72 765 BUS-II and 765 ICT-1 at Aurangabad (PG) 25-Aug-14 600 25-Aug-14 1800 Daily Commissioning of spare ICT unit

at Aurangabad (PG) WRTS-I WRTS-I CAurangabad (PG) at Aurangabad (PG)

73 765 Kotra-durg Ckt-2 along with line reactor 25-Aug-14 900 28-Aug-14 1800 ContinuousReplacement of spacer damper WRTS-I PGCIL C

74 765 Wardha-Aurangabad (PG)-2 and Padge-1 LReactor 26-Aug-14 600 26-Aug-14 1800 Daily Construction of up-coming

Padghe bay at Aurangabad (PG) WRTS-I WRTS-I C

75 765 Gwalior -Bina 1 26-Aug-14 1000 27-Aug-14 1800 Daily Spare reactor commissioning at Gwalior PGCIL WR-II C

76 765 1500MVA ICT 2 at Jabalpur Pooling Station 26-Aug-14 1000 26-Aug-14 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus Isolators for Spare ICT Phase - Heavy Induction

PGCIL WRTS-II C

77 400 Jabalpur-Itarsi4 26-Aug-14 900 26-Aug-14 1800 Daily

For Replacement of 390kV Reactor LA with 336kV LA At Jabalpur Line will remain out of service due to less clearance of Reactor LA from Line conductor

PGCIL WRTS-II C

78 400 Akola ll-Thaptitanda 27-Aug-14 900 27-Aug-14 1900 Daily To attend chattering noise on B-ph wave trap MSETCL MSETCL

79 400 Vapi- Kala MC Line 27-Aug-14 800 28-Aug-14 1800 DailyConstruction work of Navasari- Boisar line on same Multi ckt tower

WRTS-II WRTS-I C

80 765 Bus 1 at Jabalpur Pooling Station 27-Aug-14 1000 27-Aug-14 1800 Daily

765KV Bus 1 Extension Busbar Stability test related to BINA 3 Line Dia

PGCIL WRTS-II C

81 400 KORBA SIPAT 27 Aug 14 600 29 Aug 14 2200 CONT NORMALISED THE LILO AT PGCIL LANCO C81 400 KORBA -SIPAT 27-Aug-14 600 29-Aug-14 2200 RAMPUR PGCIL LANCO C

82 400 TARAPUR-PADGHE II 27-Aug-14 800 28-Aug-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

83 765 Gwalior-Satna1 28-Aug-14 800 28-Aug-14 1800 Daily For spare reactor commissioning works at Gwalior PGCIL WRTS-II C

84 765 BUS-II and Padge-2 LReactor at Aurangabad (PG) 28-Aug-14 600 28-Aug-14 1800 Daily

Commissioning of Padghe-2 upcoming bay at Aurangabad (PG)

WRTS-I WRTS-I C

85 765 Bilaspur 1 Main bay (710) at Seoni 28-Aug-14 800 29-Aug-14 1800 Daily AMP works WRTS-I WRTS-I R

86 765 765400 AT-2 AT SOLAPUR 28-Aug-14 900 28-Aug-14 1800 Daily Spare ICT unit Aux bus commisioning works WRTS-I WRTS-I C

87 765 Bus Reactor(706 BR) at Bilaspur Ss 28-Aug-14 900 01-Sep-14 1800 DAILY For replacement of unarmoured

cable by TBEA WRTS-I PGCIL C

88 765 Bus 2 at Jabalpur Pooling Station 28-Aug-14 1000 29-Aug-14 1800 Daily

765KV Bus 2 Extension for Switchyard Extension for BINA 3 Line Dia

PGCIL WRTS-II C

89 400 MOUDA 400KV BUS REACTOR 28-Aug-14 0900hrs 29-Aug-14 1800 ContionuouAnnual Maintainance NTPC NTPC

90 765 Satna - Bina 1 29-Aug-14 0900 31-Aug-14 1800 Daily

for erection of new TC amp TE tower forNHPTL at Bina-Rescheduling of outage

PGCIL WRTS-II C

91 765 Bus Reactor at Satna 29-Aug-14 900 30-Aug-14 1800 Continious Commissioning of spre reactor PGCIL WRTS-II Cus

92 400 125MVAr BR1 at Indore 29-Aug-14 900 29-Aug-14 1800 Daily Post Commissioning check of Fire-Fighting system at Indore PGCIL WRTS-II C

93 400 Chorania Hadala line 29-Aug-14 800 29-Aug-14 1800 Daily PMM WORK GETCO GETCO

94 765 Kotra-durg Ckt-2 along with line reactor 29-Aug-14 900 31-Aug-14 1800 Daily WRTS-I PGCIL C

95 765 765400 ICT-2 at Aurangabad (PG) 30-Aug-14 600 30-Aug-14 1800 Daily Altube erection in 400 kV Boisar-

1amp2 Tie bays WRTS-I WRTS-I C

96 765kV Dharamjaygarh - Bilaspur 30-Aug-14 800 30-Aug-14 1800 daily commissioning of JBP-1 bay (side) WRTS-I PGCIL C

97 765kV 330 MVAR Bus Rector-2 at Dharamjaygarh 30-Aug-14 800 30-Aug-14 1800 daily commissioning of JBP-1 bay

(side) WRTS-I PGCIL C

98 400 Mundra Hadala SC 30-Aug-14 800 30-Aug-14 1800 DailyPower Line Crossing of 400 KV DC Bhachau SS (PG) - Varsana SS (GETCO) TrL

GETCO WRTS-II C

99 220 Gwalior - Mahalgaon 1amp2 30-Aug-14 900 31-Aug-14 1800 Continuous

For crossing of 765kV Gwalior - Jaipur line PGCIL WRTS-II C

100 220 Gwalior - Malanpur 1amp2 30-Aug-14 900 31-Aug-14 1800 Continuous

For crossing of 765kV Gwalior - Jaipur line PGCIL WRTS-II C

101 400 400 kV Akola- Nandagaon peth sc 31-Aug-14 800 31-Aug-14 1600 Daily crossing works of 765 kV Koradi-AWRTS-I WRTS-I R

102 400 Bina-Shujalpur2 31-Aug-2014 900 31-Aug-2014 1000 DailyFor Replacement of 390kV Reactor LA with 336kV LA Line

ill b t k i i ith t

POWERGRID WRTS-II C

103 400 Mundra - Sami DC 01-Sep-14 800 01-Sep-14 1800 DailyPower Line Crossing of 400 KV DC Bhachau SS (PG) - Varsana SS (GETCO) TrL

ADANI WRTS-II C

104 400 Akola-Wardha 1amp 2 01-Sep-14 800 30-Sep-14 1800 Daily For Online PID Line in service with AR in non-auto mode WRTS-I WRTS-I For IOwith AR in non auto mode

105 765 Bilaspur 2 Main bay (716) at Seoni 01-Sep-14 800 02-Sep-14 1800 Daily AMP works WRTS-I WRTS-I R

106 400 400220 ICT-1 AT SOLAPUR 01-Sep-14 900 01-Sep-14 1500 Daily AMP WORK WRTS-I WRTS-I R

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

107 765 1000 MVA ICT I amp ICT II at Bina 01-Sep-14 0900 01-Sep-14 1800 Daily Commissioning of Master follower

scheme PGCIL WRTS-II C

108 765 Bus 1 at Jabalpur Pooling Station 01-Sep-14 100000 AM 01-Sep-14 60000 PM Daily

765KV Bus 1 Extension Busbar Stability test related to Bhopal 1 Line Dia

PGCIL WRTS-II C

109 400 Shujalpur - Bina 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

110 400 Birsinghpur-Damoh 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

111 400 Gandhar - Navsari 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

112 400 Khandwa - Rajgarh 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

113 400 Indore - Nagda 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

114 400 Jabalpur - Jabalpur Pool 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II Cnon auto mode

115 400 Khandwa - Dhule 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

116 400 Itarsi - Khandwa 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

117 220 Satna - Satna 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

118 765 Dehgam - Ranchhodpura 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

119 765 Shujalpur - Nagda 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

120 400 Asoj - SSP 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

121 400 Bhachau - Mundra 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

122 400 Bina - Gwalior 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

123 400 Satna - Gwalior 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in PGCIL WRTS-II Cnon auto mode

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

124 400 LILO portion of Vapi - Navi Mumbai at Kala(Vapi-Kala Line) 01-Sep-14 600 30-Sep-14 1800 Daily

Online replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

125 400400 kV Khandwa - Rajgarh

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

126 400400 kV Gandhar-Navsari

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

127 400400 kV Rajgarh ndash SSP

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

128 400400 kV SSP-Asoj

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

129 400 400 kV Shujalpur - Nagda (MPPTCL)

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

130 400400 kV Dehgam - Ranchodpura

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

131 400 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in PGCIL WRTS-II C

400 kV Ranchodpura ndash Bhachaup p y OPGW AR shall be kept in

non auto mode

132 400400 kV Mundra-Bhachau

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

133 400400 kV Vindhyachal NTPC -SASAN UMPP Ckt-1 01-Sep-14 600 30-Sep-14 1800 Daily

Online replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

134 400400 kV Vindhyachal Pooling -Vindhyachal NTPC 01-Sep-14 600 30-Sep-14 1800 Daily

Online replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

135 400 400 kV LILO at Kala (DNH) SS of Vapi-Navi Mumbai Line

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

136 765765 kV Bina - Gwalior

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

137 765765 kV Satna - Gwalior Ckt-I

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

138 400 Gandahr - Navsari DC 01-Sep-14 800 30-Sep-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

139 400 Navsari - Vapi - Kala 01-Sep-14 800 30-Sep-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

PID testing of insulator strings 140 400 Satna - Bina Ckt 1amp2 01-Sep-14 800 30-Sep-14 1800 Daily AR shall be kept In non auto

modePGCIL WRTS-II R

141 400 Nagda - Dehgam DC 01-Sep-14 800 30-Sep-14 1800 Daily PID testing of insulator strings AR h ll b k t I t

PGCIL WRTS-II R

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

142 220 Kakrapar - Vapi DC 01-Sep-14 800 30-Sep-14 1800 Daily PID testing of insulator strings PGCIL WRTS-II R

143

220 220 KV Jhanor - Haldrwa Line 1

01-Sep-14

800

05-Sep-14

000

Continous Replacement of existing CTCVT with 02 class CT amp CVT and for testing of the same NTPC NTPC

144 400 Akola-Aurangabad(PG) 2 01-Sep-14 800 02-Sep-14 1800 Conti commissioning of 50MVAR Lreactor at Aurangabad(PG) WRTS-I WRTS-I C

145 765 Bina-Satna 2 02-Sep-14 0900 03-Sep-14 1800 Daily Post Commissioning check of Fire-Fighting system at Bina PGCIL WRTS-II C

146 400 Vadavi-Chorania 1 02-Sep-14 800 02-Sep-14 1800 Daily PMM WORK WRTGPL GETCO147 400 BUS REACTOR AT SOLAPUR 02-Sep-14 900 02-Sep-14 1500 Daily AMP WORK WRTS-I WRTS-I R

148 765 Korba Line Main Bay (716) at Bilaspur Ss 02-Sep-14 900 02-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

149 765 Bus 2 at Jabalpur Pooling Station 02-Sep-14 100000 AM 02-Sep-14 60000 PM Daily

765KV Bus 2 Extension for Switchyard Extension for Bhopal 1 Line Dia

PGCIL WRTS-II C

150 400 Bus2 at Indore 02-Sep-14 900 02-Sep-14 1800 Daily Jumper connection amp stability checking of Pitampur1 PGCIL WRTS-II C

151 400 CGPL-Limbdi-1 02-Sep-14 2-Sep-14 8AM 6PM Daily routine maintenance and isolator aPGCIL CGPL

152400 Korba-Bhalai line -1

02-Sep-14 900 03-Sep-14 19002 days

continuous CVTs replacement

NTPC NTPC00 o ba a a e us C s ep ace e t

153 400 Sipat 400KV Bus-1 02-Sep-14 900 03-Sep-14 1900 Continous Annual Preventive maintenance NTPC NTPC

154 765 Bilaspur 2 Tie bay (717) at Seoni 03-Sep-14 800 04-Sep-14 1800 Daily AMP works WRTS-I WRTS-I R

155 400 400220 ICT-1 AT SOLAPUR 03-Sep-14 900 03-Sep-14 1500 Daily AMP WORK WRTS-I WRTS-I R

156 765 Sipat2 Main Bay (712) at Bilaspur Ss 03-Sep-14 900 03-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

157 765 Bina-Gwalior 2 03-Sep-14 0900 04-Sep-14 1800 Daily For spare reactor commissioning works at Gwalior PGCIL WRTS-II C

158 765 Bus 2 at Jabalpur Pooling Station 03-Sep-14 100000 AM 03-Sep-14 60000 PM Daily

765KV Bus 2 Extension for Switchyard Extension for Jumpering (Bus Extension) for Bhopal 1

PGCIL WRTS-II C

159 400 Indore-Asoj3 03-Sep-14 900 04-Sep-14 1800 Continuous

For checking protection transfer system at Indore (MPPTCL) PGCIL WRTS-II C

160 400 400 kv Nagda- Rajgarh ckt Pgcil ckt I 03-Sep-14 900 03-Sep-14 03092014 1800 daily Maintenan

ce Work PGCIL EHT- Mamp I

161 400 Vadavi-Chorania 2 04-Sep-14 800 04-Sep-14 1800 Daily PMM WORK WRTGPL GETCO162 220 SOLAPUR(PG)-Solapur(M) 04-Sep-14 900 04-Sep-14 1800 Daily AMP WORK MSETCL WRTS-I R

163 765 Bus 2 at Jabalpur Pooling Station 04-Sep-14 100000 AM 04-Sep-14 60000 PM Daily

765KV Bus 2 Extension Busbar Stability test related to Bhopal 1 Line Dia

PGCIL WRTS-II C

164 400 CGPL-Limbdi-2 04-Sep-14 4-Sep-14 8AM 6PM Daily routine maintenance and isolator aPGCIL CGPL

165 400 400 kv Nagda- Rajgarh ckt Pgcil ckt II 04-Sep-14 900 04-Sep-14 04092014 1800 daily Maintenan

ce Work PGCIL EHT- Mamp I

166400 Korba-Bhalai line -2

04-Sep-14 900 05-Sep-14 19002 days

continuous CVTs replacement

NTPC NTPC

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

167 400 BUS-1 AT SOLAPUR 05-Sep-14 900 05-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I C

168 400 Seoni-Khandwa 1 05-Sep-14 800 05-Sep-14 1800 Daily Line AMP works at Seoni WRTS-II WRTS-I R

169 400 400220 ICT-2 AT BOISAR 05-Sep-14 900 05-Sep-14 1500 Daily For Bushing oil DGA Testing WRTS-I WRTS-I R

170 765 Sipat2 Tie Bay (711) at Bilaspur Ss 05-Sep-14 900 05-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

171 765 Bina-Jabalpur I 05-Sep-14 0900 06-Sep-14 1800 Daily Post Commissioning check of Fire-Fighting system at Bina PGCIL WRTS-II C

172 400 Bus Reactor 1 at Jabalpur Pooling Station 05-Sep-14 100000 AM 05-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

173 220 Navsari - Nasik - 1 05-Sep-14 800 05-Sep-14 1800 Daily PMM WORK PGCIL GETCO174 400 Sipat 400KV Bus-2 05-Sep-14 900 06-Sep-14 1900 Continous Annual Preventive maintenance NTPC NTPC175 400 Akola-Wardha ckt 2 05-Sep-14 800 05-Sep-14 1700 Daily QMwork MSETCL MSETCL176 400 Kalwa-Kharghar 05-Sep-14 900 05-Sep-14 1700 Daily R amp M work MSETCL MSETCL177 400 Seoni-Khandwa 2 06-Sep-14 800 06-Sep-14 1800 Daily Line AMP works at Seoni WRTS-II WRTS-I R178 400 400220 ICT-1 AT BOISAR 06-Sep-14 900 06-Sep-14 1500 Daily For Bushing oil DGA Testing WRTS-I WRTS-I R

179 400 Bus Reactor 2 at Jabalpur Pooling Station 06-Sep-14 100000 AM 06-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

180 765 Gwalior-Satna2 06-Sep-14 800 06-Sep-14 1800 Daily For spare reactor commissioning works at Gwalior PGCIL WRTS-II C

181 400 Indore-Indore1 06-Sep-14 900 07-Sep-14 1800 Continuo For checking protection transfer t t I d (MPPTCL) PGCIL WRTS-II C181 400 Indore Indore1 06 Sep 14 900 07 Sep 14 1800 us system at Indore (MPPTCL) PGCIL WRTS II C

182 220 Navsari - Nasik - 2 06-Sep-14 800 06-Sep-14 1800 Daily PMM WORK PGCIL GETCO

183 400 VAPI-BOISAR 07-Sep-14 800 08-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

184 765 Satna-Gwalior-2 Reactor 07-Sep-14 900 07-Sep-14 1800 Daily For Commissioning of CSD relay in Gwalior-2 reactor bay at Satna PGCIL WRTS-II C

185 220 DC Welspun - Shivlakha amp Anjar shivlakha Trl 07-Sep-14 80000 AM 07-Sep-14 60000 PM Daily

Power Line Crossing of 400 KV DC Bhachau SS (PG) - Varsana SS (GETCO) TrL

GETCO WR-II C

186 765 Bilaspur 1 Tie bay (711) at Seoni 08-Sep-14 800 09-Sep-14 1800 Daily AMP works WRTS-I WRTS-I R

187 400kV Bus-1 at Itarsi SS 08-Sep-14 800 08-Sep-14 1800 Daily AMP amp Protection testing WRTS-II WRTS-II R

188 765 Seoni2 Main Bay (707) at Bilaspur Ss 08-Sep-14 900 08-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

189 765 Bina-Jabalpur II 08-Sep-14 0900 09-Sep-14 1800 Daily Post Commissioning check of Fire-Fighting system at Bina PGCIL WRTS-II C

190 765 ICT 1 at Jabalpur Pooling Station 08-Sep-14 100000 AM 08-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

191 765 Gwalior-Bina3 08-Sep-14 800 09-Sep-14 1800 Daily For spare reactor commissioning works at Gwalior PGCIL WRTS-II C

192 400 V-satna-1 08-Sep-14 900 09-Sep-14 1900 Continuous

Major OH of Line Circuit Breaker (For dismantling of poles) NTPC NTPC

193

220 220 KV Jhanor- Haldrwa Line 2

08-Sep-14

800

12-Sep-14

000

Continous Replacement of existing CTCVT with 02 class CT amp CVT and for testing of the same NTPC NTPC

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

194 400 Vadavi- Kansari- 1 09-Sep-14 800 09-Sep-14 1800 Daily PMM WORK WRTGPL GETCO195 400 Bus-1 at Damoh 09-Sep-14 1000 10-Sep-14 1800 Daily AMP PGCIL WRTS-II R

196 765 Bus Reactor 1 at Jabalpur Pooling Station 09-Sep-14 100000 AM 09-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

197 400 Bina - Shujalpur 1 09-Sep-14 1000 09-Sep-14 1400 Daily AMP PGCIL WRTS-II C

198 400 400 kv Katni- Damoh ckt 09-Sep-14 800 09-Sep-14 09092014 1800 daily Maintenance Work PGCIL EHT-

Mamp I

199 220 220 KV OMKARESHWAR -KHANDWA 09-Sep-14 900 09-Sep-14 09092014 1600 daily Maintenan

ce Work PGCIL EHT- Mamp I

200 220 220KV MALANPUR -AURAIYA 09-Sep-14 900 09-Sep-14 09092014 1700 daily Maintenance Work

EHT- Mamp I

201400 Korba 400 KV Bus coupler -1

09-Sep-14 900 10-Sep-14 19002 days

continuous Annual maintenance and testing

NTPC NTPC

202 400kV Bus-2 at Itarsi SS 10-Sep-14 800 10-Sep-14 1800 Daily AMP amp Protection testing WRTS-II WRTS-II R203 400 400220KV ICT-2 at Seoni 10-Sep-14 800 11-Sep-14 1800 Conti OLTC overhauling works WRTS-I WRTS-I R

204 400 VAPI-BOISAR 10-Sep-14 800 11-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

205 400 Parli 2 Tie Bay (417) at Solapur 10-Sep-14 900 10-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

206 765 330 MVAR Bus Rector-1 at Dharamjaygarh 10-Sep-14 800 11-Sep-14 1700 DAILY CSD relay commissioning in main

bay WRTS-I PGCIL C

207 765 ICT3 Tie Bay (717) at Bilaspur 10 S 14 9 00 10 S 14 18 00 DAILY F AMP k WRTS I PGCIL R207 765 ICT3 Tie Bay (717) at Bilaspur Ss 10-Sep-14 900 10-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

208 765 765kV Dharamjaygarh - Ranchi-2 l 10-Sep-14 900 15-Sep-14 1800 continous

For strining Jumpering of parallel ckt and Crossing of 765kV Dharamjaygarh-Jabalpur line

WRTS-I PGCIL C

209 765 ICT 2 at Jabalpur Pooling Station 10-Sep-14 100000 AM 10-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

210 400 Shujalpur-Nagda 1 10-Sep-14 1000 10-Sep-14 1400 Daily AMP PGCIL WRTS-II C211 400 Vadavi- Kansari- 2 10-Sep-14 800 10-Sep-14 1800 Daily PMM WORK WRTGPL GETCO

212 400 400 kv ISP - Nagda ckt 10-Sep-14 900 10-Sep-14 10092014 1800 daily Maintenance Work

EHT- Mamp I

213 220 220KV MALANPUR -AURAIYA 10-Sep-14 900 10-Sep-14 10092014 1700 daily Maintenance Work

EHT- Mamp I

214 220 220 KV DAMOH PGCIL IC - I 10-Sep-14 800 10-Sep-14 10092014 1800 daily Maintenance Work PGCIL EHT-

Mamp I

215765KV400K

VSipat 765KV400KV ICT-1 10-Sep-14 900 11-Sep-14

1900 Continous Annual Preventive maintenance NTPC NTPC216 400 New Koyna-Dabhol ckt 1 10-Sep-14 830 10-Sep-14 1730 Daily QMwork MSETCL MSETCL217 400 Akola-Aurangabad ckt 1 10-Sep-14 830 10-Sep-14 1730 Daily QMwork MSETCL MSETCL

218 400 TARAPUR-PADGHE I 11-Sep-14 800 12-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

219 400 ICT 2 Main Bay (409) at Mapusa 11-Sep-14 900 11-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

220 765 Korba LR (716 LR) at Bilaspur Ss 11-Sep-14 900 11-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

221 220 Bus-1 at Damoh 11-Sep-14 1000 12-Sep-14 1800 Daily AMP PGCIL WRTS-II R

222 765 Bus Reactor 2 at Jabalpur Pooling Station 11-Sep-14 100000 AM 11-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

223 220MC Bhimasar - Lalpar Bhimasar -Morbi amp Bhimasar - Mansar (on same tower)

11-Sep-14 80000 AM 11-Sep-14 60000 PM DailyPower Line Crossing of 400 KV DC Bhachau SS (PG) - Varsana SS (GETCO) TrL

GETCO WR-II C

224 220 Navsari - Dastan- 1 11-Sep-14 800 12-Sep-14 1800 Daily PMM WORK PGCIL GETCO

225 400 400 kv Rajgarh Pgcil - SSP CKT I 11-Sep-14 900 11-Sep-14 11092014 1800 daily Maintenance Work PGCIL EHT-

Mamp I

226 220 220K KV MEHGAON - AURAIYA 11-Sep-14 900 11-Sep-14 11092014 1700 daily Maintenance Work

EHT- Mamp I

227400 Korba Lanco

11-Sep-14 900 12-Sep-14 19002 days

continuous Annual maintenance and testing

NTPC NTPC

228 400 Lonikand II-Lonikand I 11-Sep-14 900 11-Sep-14 1700 Daily QMwork MSETCL MSETCL

229 400 Parali-Lonikand II ckt 2 11-Sep-14 900 11-Sep-14 1700 Daily QMwork MSETCL MSETCL

230 400 Waluj-Bableshwer 11-Sep-14 900 11-Sep-14 1700 Daily QMwork MSETCL MSETCL

231 400 Tie Transformer-II NTPC-Korba 11-Sep-14 900 12-Sep-14 1700 Maintenance NTPC NTPC

232 400kV Sipat-Raipur-2 12-Sep-14 000 12-Sep-14 1700 Daily Attending hot spots and SD nature defects WRTS-I PGCIL R

233 400 400220 ICT 1 AT WARDHA 12 Sep 14 9 00 12 Sep 14 15 00 Dail For B shing oil DGA Testing WRTS I WRTS I R233 400 400220 ICT-1 AT WARDHA 12-Sep-14 900 12-Sep-14 1500 Daily For Bushing oil DGA Testing WRTS-I WRTS-I R

234 400 Khandwa-Dhule 2 line reactor at Dhule 12-Sep-14 800 12-Sep-14 1800 Daily For Bushing oil DGA Testing

Line in service wo reactor WRTS-I WRTS-I R

235 400 BUS I AT MAPUSA 12-Sep-14 900 12-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

236 765 JBP - Dharmjaygarh Reactor Line 1 Reactor at Jabalpur Pooling Station

12-Sep-14 100000 AM 12-Sep-14 60000 PM Daily Installation amp Commissioning of CSD Relay PGCIL WRTS-II C

237 400 400 kv Rajgarh Pgcil - SSP CKT II 12-Sep-14 900 12-Sep-14 12092014 1800 daily Maintenan

ce Work PGCIL EHT- Mamp I

238 400 400 kv Indore - Nagda ckt 12-Sep-14 900 12-Sep-14 12092014 1800 daily Maintenance Work

EHT- Mamp I

239 220 220K KV MEHGAON - AURAIYA 12-Sep-14 900 12-Sep-14 12092014 1700 daily Maintenance Work

EHT- Mamp I

240 400 Lonikand-Stage IV 12-Sep-14 900 12-Sep-14 1700 Daily QMwork MSETCL MSETCL

241 400 Aurangabad(PG)-Aurangabad (Waluj)-1 12-Sep-14 800 15-Sep-14 1800 Conti Augmentation works at MSETCL

Waluj 400kV SSWRTS-I WRTS-I C

242 400 TARAPUR-PADGHE I 13-Sep-14 800 14-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

243 400 Karad-Lonikand 13-Sep-14 900 13-Sep-14 1700 Daily QMwork MSETCL MSETCL

244 400kV Sipat-Raipur-1 13-Sep-14 000 13-Sep-14 1700 Daily Attending hot spots and SD nature defects WRTS-I PGCIL R

245 400 BOISAR-PADGHE 13-Sep-14 800 14-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

246 400 400220 ICT-2 AT WARDHA 13-Sep-14 900 13-Sep-14 1500 Daily For Bushing oil DGA Testing WRTS-I WRTS-I R

247 400 Khandwa-Dhule 1 line reactor at Dhule 13-Sep-14 800 13-Sep-14 1800 Daily For Bushing oil DGA Testing

Line in service wo reactor WRTS-I WRTS-I R

248 220 BUS I AT MAPUSA 13-Sep-14 900 13-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R248 220 BUS I AT MAPUSA 13-Sep-14 900 13-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

249 765 Korba Line Main Bay (716) at Bilaspur Ss 13-Sep-14 900 13-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

250 400 Dhule-Babhleswar ckt 2 13-Sep-14 900 13-Sep-14 1700 Daily QMwork MSETCL MSETCL

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

251 400 Kolhapur-Mapusa 1 13-Sep-14 800 17-Sep-14 1800 Daily Insulator replacement due to polluted streaches

WRTS-I WRTS-I R

252 400 Kolhapur-Mapusa 1 13-Sep-14 800 17-Sep-14 1800 Daily Insulator replacement due to polluted streaches

WRTS-I WRTS-I R

253 400 Bhachau - Ranchodpura DC(Subject to SLDC consent) 14-Sep-14 80000 AM 20-Sep-14 60000 PM Continuo

us

Shifting of towers to maintain clearance for SSNL canal crossing (Loc 26-33 amp 78-84)

PGCIL WRTS-II C

254 400kV Bhilai-koradi line 15-Sep-14 000 16-Sep-14 000 Daily Attending hot spots and SD nature defects WRTS-I PGCIL R

255 400 Navasari- Kala MC line 15-Sep-14 800 16-Sep-14 1800 DailyConstruction work of Navasari- Boisar line on same Multi ckt tower

WRTS-II WRTS-I C

256 400 SOLAPUR(PG)-KARAD 15-Sep-14 900 20-Sep-14 1800 Conti Tower Erection of Line Reactor gantry of Karad Line at Solapur MSETCL WRTS-I R

257 765 WARDHA-AURANGABAD(PG) 2 15-Sep-14 800 15-Sep-14 1800 Daily

For replacement of Rph reactor unit at Wardha Line in service wo reactor Taking out reactor out of service

WRTS-I WRTS-I R

258 400 Chandrapur 3 Main Bay (420) at Bhadrawati 15-Sep-14 900 15-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

259 765 Seoni1 Main Bay (704 ) at Bilaspur Ss 15-Sep-14 900 15-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL RBilaspur Ss

260 220 Kakrapar-Haldarwa1 15-Sep-14 900 15-Sep-14 1800 DailyReplacement of existing 220kV CTs with High Fault current CTs at Haldarwa SS

PGCIL WRTS-II C

261 400 SSP - Rajgarh - 1 15-Sep-14 800 17-Sep-14 1800 Daily PMM WORK PGCIL GETCO

262

220 Jhanor 220 KV Bus1

15-Sep-14

800

16-Sep-14

000

Continous Replacement of existing CTCVT with 02 class CT amp CVT and for testing of the same NTPC NTPC

263 400 BOISAR-PADGHE 16-Sep-14 800 17-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

264 400 Chandrapur 3Tie Bay (421) at Bhadrawati 16-Sep-14 900 16-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

265 400 Indore-Asoj2 16-Sep-14 80000 AM 16-Sep-14 60000 PM Daily Replacement of broken insulators PGCIL WRTS-II R

266 765 Sasan-Satna2 16-Sep-14 900 17-Sep-14 1800 Daily Power line crossing for stringing of of 765Kv Vin pool- satna ck2 PGCIL WRTS-II C

267 400 315MVA ICT1 at Shujalpur 16-Sep-14 1000 16-Sep-14 1400 Daily AMP PGCIL WRTS-II R

268 220 Kakrapar-Haldarwa2 16-Sep-14 900 16-Sep-14 1800 DailyReplacement of existing 220kV CTs with High Fault current CTs at Haldarwa SS

PGCIL WRTS-II C

269 220 220 KV PITHAMPUR - RAJGARH PG CKT - I 16-Sep-14 900 16-Sep-14 16092014 1600 daily Maintenan

ce Work PGCIL EHT- Mamp I

270 400 V-satna-1 16-Sep-14 900 16-Sep-14 1900 Daily basis For erection of Breaker after OH NTPC NTPC

Construction work of Navasari- 271 400 Vapi- Kala MC Line 17-Sep-14 800 18-Sep-14 1800 Daily Boisar line on same Multi ckt

towerWRTS-II WRTS-I C

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

272 400 HVDC IBay (403) at Bhadrawati 17-Sep-14 900 17-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

273

220 Jhanor 220 KV Bus2

17-Sep-14

800

18-Sep-14

000

Continous Replacement of existing CTCVT with 02 class CT amp CVT and for testing of the same NTPC NTPC

274 400 Parli 1 Main Bay (423) at Bhadrawati 18-Sep-14 900 18-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

275 220 Kawas-Haldarwa1 18-Sep-14 900 18-Sep-14 1800 DailyReplacement of existing 220kV CTs with High Fault current CTs at Haldarwa SS

PGCIL WRTS-II C

276 400 SSP - Rajgarh - 2 18-Sep-14 800 20-Sep-14 1800 Daily PMM WORK PGCIL GETCO

277 400 400 KV Sarni - Seoni ckt 18-Sep-14 800 18-Sep-14 18092014 1800 daily Maintenance Work PGCIL EHT-

Mamp I

278 220 220 KV PITHAMPUR - RAJGARH PG CKT - II 18-Sep-14 900 18-Sep-14 18092014 1600 daily Maintenan

ce Work PGCIL EHT- Mamp I

279 220 220 KV DAMOH PG - TIKAMGARH CKT I 18-Sep-14 800 18-Sep-14 18092014 1800 daily Maintenan

ce Work PGCIL EHT- Mamp I

280 400Sipat 400KV Bay-9 (Raipur-1 Main bay) 18-Sep-14 900 19-Sep-14 1900 Continous Annual Preventive maintenance NTPC NTPC

281 400 Kolhapur-Mapusa 2 18-Sep-14 800 22-Sep-14 1800 Daily Insulator replacement due to polluted streaches

WRTS-I WRTS-I R

282 400 Khandwa 2 Tie bay (423) at 19 S 14 8 00 20 S 14 18 00 D il AMP k WRTS I WRTS I R282 400 Khandwa 2 Tie bay (423) at Seoni 19-Sep-14 800 20-Sep-14 1800 Daily AMP works WRTS-I WRTS-I R

283 400 BOISAR-PADGHE 19-Sep-14 800 20-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

284 400 Parli 1 Tie Bay (424) at Bhadrawati 19-Sep-14 900 19-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

285 220 Kawas-Haldarwa2 19-Sep-14 900 19-Sep-14 1800 DailyReplacement of existing 220kV CTs with High Fault current CTs at Haldarwa SS

PGCIL WRTS-II C

286 400 V-satna-2 19-Sep-14 900 20-Sep-14 1900 Continuous

Major OH of Line Circuit Breaker (For dismantling of poles) NTPC NTPC

287 400 Aurangabad(PG)-Aurangabad (Waluj)-2 19-Sep-14 800 22-Sep-14 1800 Conti Augmentation works at MSETCL

Waluj 400kV SSWRTS-I WRTS-I C

288 400 Parli 2 Main Bay (416) at Solapur 20-Sep-14 900 20-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

289 400 400220 ICT-3 AT MAPUSA 20-Sep-14 900 20-Sep-14 1500 Daily AMP WORKS WRTS-I WRTS-I R

Anaulagnak 33

Agast 2014 AaOr isatmbar 2014 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR AUGUST 2014 AND SEPTEMBER 2014

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)Agast 2014 isatmbar 2014 Agast 2014 isatmbar 2014

AUGUST 2014 SEPTEMBER 2014 AUGUST 2014 SEPTEMBER 2014

1 gaujarat

saIimat 12500 13900 7750 8500

AsaIimat 12540 13940 7760 8510

2 maQya p`doSa

saIimat 6200 6500 3800 4100

AsaIimat 6250 6500 3800 4100

3 CltaIsagaZ

saIimat 3030 3199 16425195 172052635

AsaIimat 3160 3269 172031 169036025

4 maharaYT

saIimat 16050 17750 10700 10800

AsaIimat 16100 17800 10750 10850

5 gaaovaa

saIimat 410 415 290 285

AsaIimat 425 425 300 290

6 dmana dIva

saIimat 315 320 205 200

AsaIimat 320 325 210 210

7 DI ena eca

saIimat 645 640 425 420

AsaIimat 650 645 430 425

8 piScama xao~

saIimat 37614 41048 25600 26080

AsaIimat 37898 41254 26450 27900

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah jaUlaa[- 2014

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 2236 75

]k[- Ukai - 2 529 75]k[- Ukai - 3 000 0]k[- Ukai - 4 2023 75]k[- Ukai (Total) 4788 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 094 2]k[- ela baI saI eca Ukai LBCH - 2 028 2]k[- ela baI saI eca Ukai LBCH (Total) 123 1 0018

3 kDanaa Kadana - 1 699 61 0010kDanaa Kadana - 2 910 57 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 1115 62 0000kDanaa Kadana (Total) 2724 62 0010

4 pnama PANAM amp Madhuban Dam 1 amp 2 160 8 0017 6 kula jalaIya TOTAL(H) 7794 225 0390

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 3339 57 34582 TaoronT pavar ilaimaToD yauinaT DI 6957 122 64083 TaoronT pavar ilaimaToD yauinaT [- 8082 122 67664 TaoronT pavar ilaimaToD yauinaT ef 8380 124 73285 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 037511 Qauvarna tapIya Dhuvaran - GT 2 000 0 116012 Qauvarna tapIya Dhuvaran - STG 1783 10113 ]ka[- yauinaT 1 Ukai -1 000 0 019714 ]ka[- yauinaT 2 Ukai -2 000 0 019315 ]ka[- yauinaT 3 Ukai -3 10038 202 922016 ]ka[- yauinaT 4 Ukai -4 6930 202 697517 ]ka[- yauinaT 5 Ukai -5 11833 212 1138718 ]ka[- yauinaT 6 Ukai -6 30277 507 2287219 gaaMQaInagar 1 Gandhinagar - 1 000 0 008220 gaaMQaInagar 2 Gandhinagar - 2 000 0 009221 gaaMQaInagar 3 Gandhinagar - 3 6275 213 669022 gaaMQaInagar 4 Gandhinagar - 4 6060 212 706523 gaaMQaInagar 5 Gandhinagar - 5 13495 215 1331024 vaNakbaaorI 1 Wanakbori - 1 12142 209 000025 vaaNakbaaOrI 2 Wanakbori - 2 12364 21026 vaaNakbaaOrI 3 Wanakbori - 3 6669 20227 vaaNakbaaOrI 4 Wanakbori - 4 7244 21128 vaaNakbaaOrI 5 Wanakbori - 5 6198 21029 vaaNakbaaOrI 6 Wanakbori - 6 5924 21230 vaaNakbaaOrI 7 Wanakbori - 7 9489 21031 ]trna Utran GT 1 000 0 026832 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 1200 221 024735 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 819 143 1098

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

Anaulagnak 41

ACTUAL GENERATION amp AVALABILITY FOR JULY 2014Actual vaastivak

Actual vaastivak

37 isaka Sikka - 1 1326 107 179438 isaka Sikka - 2 3489 114 401539 kcC ilagnaa[-T Kutch Lignite - 1 5092 71 859040 kcC ilagnaa[-T Kutch Lignite - 2 4929 7141 kcC ilagnaa[-T Kutch Lignite - 3 000 042 kcC ilagnaa[-T Kutch Lignite - 4 2388 68 571043 saUrt ilagnaa[-T Surat Lignite - 1 8775 130 874544 saUrt ilagnaa[-T Surat Lignite - 2 3966 130 445845 saUrt ilagnaa[-T Surat Lignite - 3 5411 130 524346 saUrt ilagnaa[-T Surat Lignite - 4 8973 130 883347 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5446 103 859048 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 6057 10749 jaI Aa[- pI saI ela GIPCL GT - 1 1123 33 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1510 3251 jaI Aa[- pI saI ela GIPCL GT - 3 598 3052 jaI Aa[- pI saI ela GIPCL ST - 1 1846 4553 jaI Aa[- pI saI ela GIPCL GT - 4 357 98 000054 jaI Aa[- pI saI ela GIPCL ST - 2 186 5055 [- esa esa e Aar ESSAR GT - 1 000 0 029356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 083 146 002860 jaI pI [- saI GPEC GT - 2 148 153 023361 jaI pI [- saI GPEC GT - 3 1387 145 028462 jaI pI [- saI GPEC STG 521 7563 jaI esa [- jaI GSEG GT - 1 206 51 112164 jaI esa [- jaI GSEG GT - 2 1079 4765 jaI esa [- jaI GSEG STG 613 2466 Sugen (GT 1 + GT 2) 000 0 693867 saIpIpI sao Aayaat Imp from CPP+MUNDRA 249228 6777

kula tapIya Total (T) 511604 7860 431554kula jalaIya+tapIya Total (H+T) 519398 8078 431944ivaMD [najaI- Wind Energy 94980kula jalaIya+tapIya+hvaa Total (H+T+Wind) 614378 9539ivainamaya Exchanges 150828 saIimat jaa- maaMga Restricted Energy Req 765205

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 767 135

11 gaaMQaI saagar Gandhi Sagar 998 117 008012 raNaa p`tap sagar RPSagar 096 86 004013 javaahr sagar Jawahar Sagar 439 66 0020

2 ponca Pench 1381 160 01003 baargaI Bargi 712 33 00704 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 5724 309 02906 banasaagar Bansagar-2 (Deolondh) 104 407 banasaagar Bansagar-3 (Silpara) 565 31 00608 banasaagar Bansagar-4 (Zinaha) 425 20 00309 maoDIKoDa Medikheda 096 58

10 ibarisaMGapur Birsingpur 680 20 002011 Tavaa Tawa 000 012 rajaGaaT Rajghat 001 7 007013 Omkareshwar 4226 340 14 [Midra saagar Indira Sagar 6679 679 0598

kula jalaIya TOTAL(H) MPPGCL 19979 2031 1152

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 2223 84 179302 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 14496 216 0

Actual vaastivak

4 satpura I Satpura-I(60Share) 000 0 00005 satpura II Satpura-II Unit 6 000 0 83106 satpura II Satpura-II Unit 7 7549 1857 satpura II Satpura-II Unit 8 12446 195 173908 satpura II Satpura-II Unit 9 4038 1759 satpura III Satpura-III Unit 10 9508 219 23440

10 satpura III Satpura-III Unit 11 8675 167 2096011 esajaITIpIesa 1 SGTPS Unit - 1 8675 167 2096012 esajaITIpIesa 2 SGTPS Unit - 2 9354 16013 esajaITIpIesa 3 SGTPS Unit - 3 1129 165 1642014 esajaITIpIesa 4 SGTPS Unit - 4 6022 16015 esajaITIpIesa 5 SGTPS Unit - 5 27597 50816 SSTPS 7895 309 9910

kula tapIya Total (T) 117479 2427 115480kula jalaIya+tapIya Total (H+T) 137458 4759 116632Injection from WIND 14572 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 152030 4759ivainamaya Exchanges 271419 saIimat jaa- maaMga Rest En Req 423449

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 606 120 01102 Gangrel 039 10 00203 Mini Micro KWB 039 7

kula jalaIya TOTAL(H) CSEB 684 137 0520tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 40 125902 kaorbaa (pU) Korba (E) Unit-2 2764 383 kaorbaa (pU) Korba (E) Unit-3 2764 384 kaorbaa (pU) Korba (E) Unit-4 2784 405 kaorbaa (pU) Korba (E) Unit -5 3685 120 244406 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 154608 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 24740

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 13343 243 1124012 KORBA(EB) Extn - 2 14104 248 11250

kula tapIya Total (T) 119955 1644 10189013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 119955 1644kula jalaIya+tapIya Total (H+T) 120639 1781 102410ivainamaya Exchanges 59759 0saIimat jaa- maaMga Rest En Req 180398 1781

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 5228 585 06952 kaoyanaa III Koyna III 3695 3203 kaoyanaa IV Koyna IV 371 11204 kaoyanaa DIpIeca Koyna DPH 414 385 TaTa jalaIya TATA Hydro 10123 741 44976 vaOtrNaa Vaitarna 1151 617 eladarI Eldari 000 168 BaTgar AaOr vaIr Bhatgar amp Vir 036 49 pOzana Paithan 976 49

10 itlaarI Tillari 1036 6511 BaIra Tola rosa Bhira Tail Race 846 4112 GaTGar Ghatghar 3639 25013 Anya CaoTo jalaIya Small Hydro (others) 1041 0

kula jalaIya TOTAL(H) 28404 -1073 5192

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL

Actual vaastivak

3 naaisak 3 Nasik Unit -3 4157 1954 naaisak 4 Nasik Unit -4 12489 1985 naaisak 5 Nasik Unit -5 12480 2006 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 30718 5038 Tambao 6 Trombay Unit -6 6619 5009 Tambao 8 Trombay Unit -8 000 0

10 Tambao 7A gaOsa Trombay -7A (Gas) 7476 127 288611 Tambao 7ba Trombay -7B (WHR) 4373 6912 kaoraDI 5 Koradi Unit -5 000 013 kaoraDI 6 Koradi Unit -6 8448 16714 kaoraDI 7 Koradi Unit -7 10994 19415 Bausaavala 2 Bhusawal Unit -2 4715 16516 Bausaavala 3 Bhusawal Unit -3 6454 16517 Bausaavala 4 Bhusawal Unit -4 20419 50518 Bausaavala 4 Bhusawal Unit -5 23286 43519 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 000 021 parlaI 5 Parli Unit -5 9315 17522 parlaI 6 Parli Unit -6 14237 25323 parlaI 7 Parli Unit -7 14028 25024 KaprKoDa 1 Khaperkheda Unit -1 8108 20025 KaprKoDa 2 Khaperkheda Unit -2 10924 19026 KaprKoDa 3 Khaperkheda Unit -3 7917 20627 KaprKoDa 4 Khaperkheda Unit -4 10446 21028 KaprKoDa 5 Khaperkheda Unit -5 24555 50030 parsa Paras-3 11676 21831 parsa Paras-4 10326 24032 ]rna Uran (Gas) 18771 40133 ]rna Uran (WHR) 10760 138 586234 caMd`pur 1 Chandrapur Unit -1 7526 16535 caMd`pur 2 Chandrapur Unit -2 9375 19936 caMd`pur 3 Chandrapur Unit -3 8728 20037 caMd`pur 4 Chandrapur Unit - 4 12276 47038 caMd`pur 5 Chandrapur Unit -5 29203 41039 caMd`pur 6 Chandrapur Unit -6 26351 040 caMd`pur 7 Chandrapur Unit -7 000 041 DhaNaU 1 Dahanu Unit-1 16882 250 1563042 DhaNaU 2 Dahanu Unit-2 19263 250 1660143 CPP 258820 41160044 RGPPL Share 000 0

kula tapIya Total (T) 692115 14094 350211MAH Wind + Solar Generation 110432 0kula jalaIya +tapIya Total (H+T+Wind) 830951 16176 396382

TOTAivainamaya Exchanges 274116saIimat jaa- maaMga Rest En Req 1105066

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1173 17ivainamaya Exchanges 33083saIimat jaa- maaMga Rest En Req 34256 459

C (F) dmana AaOr dIva DAMAN amp DIU 17467 298ja (G) dadra nagar hvaolaI DNH 43779 673

kula DD ampDNH (T) 61246 970

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 9731 160 1564312 tara`pur 2 TAPS Unit -2 11531 16013 tara`pur 3 TAPS Unit -3 40214 545 7288014 tara`pur 4 TAPS Unit -4 39284 53715 kakrapr 1 KAPS Unit -1 16048 545 3195016 kakrapr 2 KAPS Unit -2 14903 537

kula ena pI saI NPC Total 131710 24842 ena TI pI saI NTPC

Actual vaastivak

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15236 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14181 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14568 214 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 000 025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 32338 51326 kaorbaa esaTIpIesa 6 KSTPS Unit-6 33493 51427 kaorbaa esaTIpIesa 7 KSTPS Unit-7 30558 516

kula kaorbaa KSTPS Total 140373 2548 9318427 ivanQa esaTIpIesa 1 VSTPS Unit-1 13430 21528 ivanQa esaTIpIesa 2 VSTPS Unit-2 11930 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 13695 212210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14017 214211 ivanQa esaTIpIesa 5 VSTPS Unit-5 11952 215212 ivanQa esaTIpIesa 6 VSTPS Unit-6 8991 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 32786 515214 ivanQa esaTIpIesa 8 VSTPS Unit-8 19668 514215 ivanQa esaTIpIesa 9 VSTPS Unit-9 31796 516216 ivanQa esaTIpIesa 10 VSTPS Unit-10 31597 515217 ivanQa esaTIpIesa 11 VSTPS Unit-11 13881 512

kula ivanQayaacala VSTPS Total 233445 REF 16238 31 saIpt -1 -SIPAT-1 38555 66600 32 saIpt -2 -SIPAT-2 16033 66500 33 saIpt -3 -SIPAT-3 43240 66800 34 saIpt -4 -SIPAT-4 25865 51200 35 saIpt -5 SIPAT-5 33302 51500

kula saIpt -SIPAT TOTAL 156995 280100 920541 kvaasa gaOsa 1e Kawas GT-1A 2605 10442 kvaasa gaOsa 1baI Kawas GT-1B 4355 10643 kvaasa esaTI 1saI Kawas ST-1C 3365 11744 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 044 9846 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 10369 309 245151 gaMQaar gaOsa 1 Gandhar GT-1 2177 14352 gaMQaar gaOsa 2 Gandhar GT-2 3014 14553 gaMQaar gaOsa 3 Gandhar GT-3 5333 14754 gaMQaar esaTI 4 Gandhar ST-4 5586 158

kula gaMQaar GGPS Total 16109 437 475161 maaOda 1 Mauda -1 5368 514 000062 maaOda 2 Mauda -2 16240 513 0000

kula maaOda MAUDA Total 21608 756 2258161 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 000 31 000071 esa esa pI SSP RBPH - 1 1265 18872 esa esa pI SSP RBPH - 2 1102 18673 esa esa pI SSP RBPH - 3 1197 18774 esa esa pI SSP RBPH - 4 1116 18675 esa esa pI SSP RBPH - 5 1432 18676 esa esa pI SSP RBPH - 6 1653 18677 esa esa pI SSP CHPH - 1 422 3578 esa esa pI SSP CHPH - 2 384 3079 esa esa pI SSP CHPH - 3 179 34710 esa esa pI SSP CHPH - 4 1012 36711 esa esa pI SSP CHPH - 5 340 30

kula esa esa pI SSP Total 10101 1283 101081 kula poMca Pench Total 1381 160 010082 Jindal Injection 50805 083 Amarkantak Lanco 16857 0

(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2508924

(J) ]plabQata Availability 2439102 naoT ivainamaya Net Exchanges -311541 ]plabQa jaa- Energy Availability 2127561

maah jaUlaa[- 2014 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR JULY 2014 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 13833 - - - 13833 070714 1500 4972

saIimat Restricted 12500

AsaIimat Unrestricted 12540 13833 0 136 0 13969 070714 1500 4972

nyaUnatma pMjaIkRt maaMga Min Registered Demand 7617 7617 250714 0400 4999

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 7090 - - - 7090 020714 2015 4985

saIimat Restricted 6040

AsaIimat Unrestricted 6040 7090 0 31 0 7121 020714 2015 4985

nyaUnatma pMjaIkRt maaMga Min Registered Demand 3895 3895 230714 1500

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3118 3118 050714 2100 4985

saIimat Restricted 3150

AsaIimat Unrestricted 3250 2972 41792 24 0 3414 030714 2000 4977

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1336 1336 220714 1300 4995

maharaYT MAHARASHTRApMjaIkRt Registered 19283 - - - 19283 010714 1600 4994

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19283 62 40 0 19385 010714 1600 4994

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11936 11936 300714 0500 5000

gaaovaa GOApMjaIkRt Registered 405 459 - - 459 260714 2000 4967

AsaIimat Unrestricted 405 459 0 5 - 464 260714 2000 4967

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 532 - - 532 290714 0900 4998

AsaIimat Unrestricted 532 0 0 - 532 290714 0900 4998

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 287 - - 287 060714 1000 4991

AsaIimat Unrestricted 287 0 1 - 288 060714 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 721 - - 721 050714 1700 4983

AsaIimat Unrestricted 721 0 - 721 050714 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 400 435 290714

piScama xao~ WESTERN REGIONpMjaIkRt Registered 43034 - - - 43034 010714 1600 4994

saIimat Restricted 40703

AsaIimat Unrestricted 40905 43034 295 90 0 43419 010714 1600 4994

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28431 28431 240714 0500 5000 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

माह जलाई 2014Jul-14

अनब समातरवतीय चालन PARALLELRADIAL OPERATION TOTAL OPERATING HOURS

1 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-NR)

2 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-SR) 7424400

टाई लाईन TIE LINE

1 765 कवी िसवनी स वधा-I 765kV Soni to Wardha 6780100

2 765 कवी िसवनी स वधा-II 765kV Seoni to Wardha 2043700

3 400 कवी िभलाई स कोराड 400kV Bhilai to Koradi 7440000

4 400 कवी िभलाई स भिावती 400kV Bhilai to Bhadravati 7440000

5 400 कवी रायपर स भिावती -I 400kV Raipur to Bhadravati-I 7440000

6 400 कवी रायपर स भिावती ndashII 400kV Raipur to Bhadravati-II 7440000

7 400 कवी रायपर स भिावती ndashIII 400kV Raipur to Bhadravati-III 7440000

8 400 कवी सातपरा स कोराड 400kV Satpura to Koradi 7060200

9 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7440000

10 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 7440000

11 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7225100

12 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 7082500

13 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 5361200

14 400 कवी को हापर स मापसा-I 400kV Kolhapur-Mapusa-I 4561600

15 400 कवी को हापर स मापसा-II 400kV Kolhapur-Mapusa-II 4793700

16 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7440000

17 400 कवी रायगढ़ स ःटरलाइट-I 400kV Raigarh to Sterlight-I 7371100

18 400 कवी रायगढ़ स ःटरलाइट-II 400kV Raigarh to Sterlight -II 7440000

19 400 कवी रायगढ़ स झरसगड़ा-I 400kV Raigarh to Jharsuguda-I 7302900

20 400 कवी रायगढ़ स झरसगड़ा-II 400kV Raigarh to Jharsuguda-II 7303700

21 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 5400900

22 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7292200

23 400 कवी रायपर स वधाndashI 400kV Raipur to Wardha-I 7440000

24 400 कवी रायपर स वधाndashII 400kV Raipur to Wardha-II 7440000

25 220 कवी कोरबा पव स ब पादर-III 220kV K(E) to Budhipadar-III 7361200

ANNEXURE 43

maah jaUlaa[- 2014 ko daOrana pa~ta iSaDyaUla GaTkaoM Wara koMd`Iya xao~ ko sToSanaaoMM sao D`avala AaOr ivainamayaaoM ka ivavarNa

1 koMd`Iya sToSanaaoMM samaip-t koMd`Iya sToSanaoMa saMyaut inajaI sToSanaaoM kI GaaoiYat xamata (basa pr) AaOr laaBaaiqa-yaaMo kI pa~ta1 Declared Capcity (ex-bus) of Central Gen StnsDedicated CG StnsJointly owned Stns amp entitlement of beneficieries (MUs)

GaaoiYat xamata gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI + ecaDblyaubaI kula

(A) koMd`Iya ibajalaIGar A Central Gen Stns Dec Cap GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC+HWB TOTAL

kaorbaa esaTIpIesa Korba STPS 1017635 174452 237891 103616 324281 102699 23918 26164 1017635kaorbaa esaTIpIesa -III Korba STPS-III 283431 54419 44422 85553 76649 3066 3405 13029 283431ivanQa esaTIpIesa I Vindhyachal STPS-I 674012 123034 240046 1253 246970 19644 7141 23669 12255 674012ivanQa esaTIpIesa II Vindhyachal STPS-II 491154 117386 158375 0909 175903 6532 4569 16539 491154ivanQa esaTIpIesa III Vindhyachal STPS-III 627679 166963 156579 67068 186511 7093 7097 22387 627679ivanQa esaTIpIesa IV Vindhyachal STPS-IV 411100 98631 118464 26475 133406 5356 5241 19338 411100kvaasa gaOsa Kawas GPP 306920 87464 65557 0000 95562 5791 14520 37998 306920gaMQaar gaOsa Gandhar GPP 406294 146476 72428 0000 123833 7814 19389 36310 406294saIpt Sipat 1665864 454494 301337 266370 509047 19436 19662 68224 1665864kakrapar Kakrapar APS 275783 78347 69731 0000 94368 9698 5200 8018 10420 275783tara`pur 3 AaOr 4 Tarapur APS 3amp4 721903 183150 155921 32084 295823 8510 8953 31049 721903

(ba) samaip-t koMd`Iya ibajalaIGar B Dedicated CG Stations Actual injection vaasaivak [njaoSana [Midra saagar Indira Sagar 245570 245570 245570

(sa) saMyaut inajaI sToSana C Jointly owned Stationstara`pur 1 AaOr 2 Tarapur APS 1amp2 196640 98320 0000 0000 98320 0000 0000 0000 196640esaesapI SSP 97965 15674 55840 0000 26450 0000 0000 0000 97965ponca Pench 13620 9080 0000 4540 0000 0000 0000 13620

kula ([M saagar kao CaoD kr) Total (excl Indira Sagar) 11988065 2808880 2297269 640720 3692105 208667 173093 400816 1766516 11988065 Actual injection

2 koMd`Iya sToSanaaoMM samaip-t koMd`Iya sToSanaoMa saMyaut inajaI sToSanaaoM kI ]padna SaoDyaUla AaOr laaBaaiqa-yaaoM kI D`avala SaoDyaUla2 Generation Schedule (ex-bus) of Central Gen StationsDedicated CG StationsJointly owned Stations amp schedule of benificieries (MUs)

SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI+ ecaDblyaubaI kula

(A) koMd`Iya ibajalaIGar A Central Gen Stns Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH

HVDC+HWB Outside region(NR

amp SR) TOTALkaorbaa esaTIpIesa Korba STPS 1015070 174452 238276 103310 321801 102699 23918 26164 1015070kaorbaa esaTIpIesa -III $ Korba STPS-III $ 282671 54342 44422 85185 76334 3066 3405 13029 282671ivanQa esaTIpIesa I Vindhyachal STPS-I 660248 120064 239050 1253 237415 19644 7141 23473 12209 660248ivanQa esaTIpIesa II Vindhyachal STPS-II 488287 117160 156978 0909 174700 6532 4569 16539 488287ivanQa esaTIpIesa III Vindhyachal STPS- III 600504 134916 160349 67878 186319 7093 7227 22827 600504ivanQa esaTIpIesa IV Vindhyachal STPS- IV 409072 98719 118259 24888 133048 5356 5241 19374 409072kvaasa gaOsa Kawas GPP 99574 27083 25459 0000 23510 2678 5916 14915 0000 99574gaMQaar gaOsa Gandhar GPP 154677 55634 30257 0000 41633 3783 8217 15131 0000 154677saIpt Sipat 1448506 290983 323024 258111 436177 19418 23860 69790 1448506kakrapar Kakrapar APS 275783 78347 69731 0000 94368 9698 5200 8018 10420 275783tara`pur 3 AaOr 4 Tarapur APS 3amp4 721903 183150 155921 32084 295823 8510 8953 31049 721903

(ba) samaip-t koMd`Iya ibajalaIGar B Dedicated CG Stations[Midra saagar Indira Sagar 245570 245570 245570

RPPC(NVVNL) 0000

0000

0000

(sa) saMyaut inajaI sToSana C Jointly owned Stations Actual injection vaasaivak [njaoSana tara`pur 1 AaOr 2 Tarapur APS 1amp2 196640 98320 0000 0000 98320 0000 0000 0000 196640esaesapI SSP 97965 15674 55840 0000 26450 0000 0000 0000 97965ponca Pench 13620 0000 9080 0000 4540 0000 0000 0000 13620kula [M saagar kao CaoD kr Total (excl Ind Sagar) 10173905 2352674 2217883 625946 2591731 193349 149578 336130 1706614 10173905

Actual injectionNote- $ These Scheduled Transactions are done by WRLDC under STOA

3 AMtrxao~Iya ivainamayaaoM iWpxaIya ivanamayaaoM kI SaoDyaUla (ima yauinaTsa)3 Schedule for interregional exchangesbilateral exchanges (MUs)

SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kulaxao~ rajya RegionState Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL

k pUvaI- xao~ ko rasto Import SDLs through ER -110482Aayaat SaoDyaUla Indian Energy Exchange (WR to ER) 0000 0000 0000 0000 0000 0000 0000 139465

Power Exchange of India (ER to WR) 0000 0000 0000 0000 0000 0000 0000 3671ER (NTPC) 47912 28298 11592 52018 0000 0786 1209 93903

DVC to MPPTCL (Long Term Open Access) 0000 201316 0000 0000 0000 0000 0000 201316Hirakud to CSEB 0000 0000 1354 0000 0000 0000 0000 1354

APL2 GUVNL to APPCC ( AEL) -0918 0000 0000 0000 0000 0000 0000 -0918APL3 GUVNL to APPCC ( AEL) -0924 0000 0000 0000 0000 0000 0000 -0924

CSEB to APPCC ( NVVNL) 0000 0000 -44813 0000 0000 0000 0000 -44813DBPOWER to APPCC ( GMRETL) 0000 0000 -1828 0000 0000 0000 0000 -1828

JPL to APPCC ( KISPL) 0000 0000 -15225 0000 0000 0000 0000 -15225JPL-II to APPCC ( KISPL) 0000 0000 -11376 0000 0000 0000 0000 -11376

Anaulagnak 45

DETAILS OF ENTITLEMENTSCHEDULEDRAWAL BY THE CONSTITUENTS FROM CENTRAL SECTOR STATIONS AND EXCHANGES FOR THE MONTH OF JULY 2014

(pxaoivasa` Wara jaarI xao~Iya jaa- laoKa ko AaQaar pr)

13896KAWAS(RLNG)

GANDHAR(RLNG)

JPL-II to APPCC ( NVVNL) 0000 0000 -11414 0000 0000 0000 0000 -11414JPL-II to APPCC ( PTC LTD) 0000 0000 -14853 0000 0000 0000 0000 -14853

CSEB to ASEB ( PTC LTD) 0000 0000 -0575 0000 0000 0000 0000 -0575MPPMCL MPSEB to ASEB ( IEXL) 0000 -0575 0000 0000 0000 0000 0000 -0575

APL1 GUVNL to BIHAR ( AEL) -106185 0000 0000 0000 0000 0000 0000 -106185APL2 GUVNL to BIHAR ( AEL) -72520 0000 0000 0000 0000 0000 0000 -72520APL3 GUVNL to BIHAR ( AEL) -51827 0000 0000 0000 0000 0000 0000 -51827

DBPOWER to BIHAR ( MANIKARAN) 0000 0000 -0350 0000 0000 0000 0000 -0350EMCO to BIHAR ( PXIL) 0000 0000 0000 -0413 0000 0000 0000 -0413

GUVNL to BIHAR ( PXIL) -0200 0000 0000 0000 0000 0000 0000 -0200MSEB to BIHAR ( PXIL) 0000 0000 0000 -0100 0000 0000 0000 -0100

MPPMCL MPSEB to BIHAR ( PXIL) 0000 -0150 0000 0000 0000 0000 0000 -0150GUVNL to BESCOM ( GUVNL) -14041 0000 0000 0000 0000 0000 0000 -14041

ESSAR_MAHAN to BESCOM ( ESSAR_MAHAN) 0000 -4353 0000 0000 0000 0000 0000 -4353ADHUNIK to BALCO ( BALCO) 0000 0000 0064 0000 0000 0000 0000 0064

ADHUNIK to BALCO ( MANIKARAN) 0000 0000 7200 0000 0000 0000 0000 7200JSEB(ER) to BALCO ( MPPL) 0000 0000 1481 0000 0000 0000 0000 1481

JSEB(ER) to BALCO ( MANIKARAN) 0000 0000 1200 0000 0000 0000 0000 1200JITPL to BALCO ( BALCO) 0000 0000 1200 0000 0000 0000 0000 1200

STERLITE to BALCO ( BALCO) 0000 0000 18603 0000 0000 0000 0000 18603JSEB(ER) to ESIL_WR ( MPPL) 0600 0000 0000 0000 0000 0000 0000 0600STERLITE to ESIL_WR ( PXIL) 1900 0000 0000 0000 0000 0000 0000 1900

NSPCL to SAIL ROURKELA ( SAIL ROURKELA) 0000 0000 -23994 0000 0000 0000 0000 -23994APL2 GUVNL to TGPCC ( AEL) -1074 0000 0000 0000 0000 0000 0000 -1074APL3 GUVNL to TGPCC ( AEL) -1081 0000 0000 0000 0000 0000 0000 -1081

CSEB to TGPCC ( NVVNL) 0000 0000 -52359 0000 0000 0000 0000 -52359JPL to TGPCC ( KISPL) 0000 0000 -17792 0000 0000 0000 0000 -17792

JPL-II to TGPCC ( KISPL) 0000 0000 -13295 0000 0000 0000 0000 -13295JPL-II to TGPCC ( NVVNL) 0000 0000 -13342 0000 0000 0000 0000 -13342

JPL-II to TGPCC ( PTC LTD) 0000 0000 -17335 0000 0000 0000 0000 -17335TISCO to VFL MPSEB ( TPTCL) 0000 0000 0268 0000 0000 0000 0000 0268

BLAPPL MPSEB to WBSEB ( IEXL) 0000 -0016 0000 0000 0000 0000 0000 -0016DBPOWER to WBSEB ( PTC LTD) 0000 0000 -0595 0000 0000 0000 0000 -0595

MPPMCL MPSEB to WBSEB ( PTC LTD) 0000 -89184 0000 0000 0000 0000 0000 -89184

SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kulaxao~ rajya RegionState Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL

K dixaNa xao~ ko rasto Import SDLs through SR 10967

Aayaat SaoDyaUla Indian Energy Exchange (SR to WR) 0000 0000 0000 0000 0000 0000 0000 0169Power Exchange of India (SR to WR) 0000 0000 0000 0000 0000 0000 0000 0000RSTPS-SR to GOA ( BILATERAL) 0000 0000 0000 0000 2186 0000 0000 2186RSTPS-SR to GOA ( WHEELING) 0000 0000 0000 0000 3118 0000 0000 3118

RSTPS-SR to GOA ( WHEELING GOA) 0000 0000 0000 0000 5494 0000 0000 5494

ga ]trI xao~ ko rasto Import SDLs through NR -321127Aayaat SaoDyaUla Indian Energy Exchange (NR to WR) 0000 0000 0000 0000 0000 0000 0000 -164961

Power Exchange of India (NR to WR) 0000 0000 0000 0000 0000 0000 0000 -3367Rihand (Hydro) to MPPTCL (Long Term Open Access) 0000 7970 0000 0000 0000 0000 0000 7970

Matathilla (Hydro) to MPPTCL (Long Term Open Access) 0000 0000 0000 0000 0000 0000 0000 0000EMCO to BIHAR ( PXIL) 0000 0000 0000 -0188 0000 0000 0000 -0188MSEB to BIHAR ( IEXL) 0000 0000 0000 -0400 0000 0000 0000 -0400

MPPMCL MPSEB to BSES_RAJ ( MPPL) 0000 -7000 0000 0000 0000 0000 0000 -7000ADHUNIK to BALCO ( MANIKARAN) 0000 0000 5198 0000 0000 0000 0000 5198

HIMACHAL to ESIL_WR ( IEXL) 0050 0000 0000 0000 0000 0000 0000 0050HARIYANA to ESIL_WR ( IEXL) 1525 0000 0000 0000 0000 0000 0000 1525HARIYANA to ESIL_WR ( PXIL) 5610 0000 0000 0000 0000 0000 0000 5610

KWHEPS to ESIL_WR ( PXIL) 0150 0000 0000 0000 0000 0000 0000 0150SCL to ESIL_WR ( IEXL) 0610 0000 0000 0000 0000 0000 0000 0610SCL to ESIL_WR ( PXIL) 0090 0000 0000 0000 0000 0000 0000 0090

MPPMCL MPSEB to HARIYANA ( HARIYANA) 0000 -126636 0000 0000 0000 0000 0000 -126636SCL to HRJIL MSEB ( SCL) 0000 0000 0000 1993 0000 0000 0000 1993

APL3 GUVNL to JVVNL-NR ( IEXL) -0120 0000 0000 0000 0000 0000 0000 -0120APL3 GUVNL to JVVNL-NR ( PXIL) -0122 0000 0000 0000 0000 0000 0000 -0122

BLAPPL MPSEB to JVVNL-NR ( IEXL) 0000 -0250 0000 0000 0000 0000 0000 -0250EMCO to JVVNL-NR ( IEXL) 0000 0000 0000 -0720 0000 0000 0000 -0720MSEB to JVVNL-NR ( PXIL) 0000 0000 0000 -0300 0000 0000 0000 -0300

MPSEB to NDPL(DTL)-NR ( PTC LTD) 0000 -1626 0000 0000 0000 0000 0000 -1626MPPMCL MPSEB to NDPL(DTL)-NR ( PTC LTD) 0000 -35052 0000 0000 0000 0000 0000 -35052

MPPMCL MPSEB to RPPC ( RPPC) 0000 -3562 0000 0000 0000 0000 0000 -3562EMCO to TRIPURA ( IEXL) 0000 0000 0000 -0070 0000 0000 0000 -0070

ADHPL to TORRAHM GUVNL ( IEXL) 0051 0000 0000 0000 0000 0000 0000 0051

Ga iWpxaIya SaoDyaUlsa Exchanges within WRMundra APL to Gujarat (LTOA) 0000 0000 0000 0000 0000 0000 0000 0000

JPL to ARVIND GUVNL ( MPPL) 4464 0000 0000 0000 0000 0000 0000 4464JPL to AIGL MSEB ( AIGL MSEB) 0000 0000 0000 0789 0000 0000 0000 0789

JPL to ARPIPL MSEB ( ARPIPL MSEB) 0000 0000 0000 0771 0000 0000 0000 0771JPL to ACCIL MSEB ( ACCIL MSEB) 0000 0000 0000 2380 0000 0000 0000 2380

APL1 GUVNL to AWLD GUVNL ( AEL) 3874 0000 0000 0000 0000 0000 0000 3874DBPOWER to BALCO ( BALCO) 0000 0000 0120 0000 0000 0000 0000 0120

DBPOWER to BALCO ( DBPOWER) 0000 0000 15887 0000 0000 0000 0000 15887EMCO to BALCO ( EMCO) 0000 0000 0080 0000 0000 0000 0000 0080

JPL to BOSCH MSEB ( BOSCH MSEB) 0000 0000 0000 1552 0000 0000 0000 1552JPL to BCSIL MSEB ( BCSIL MSEB) 0000 0000 0000 0720 0000 0000 0000 0720JPL-II to CSEB ( CSPTRDCL CSEB) 0000 0000 12569 0000 0000 0000 0000 12569

SPECT ACBIL to CSEB ( CSPTRDCL CSEB) 0000 0000 0720 0000 0000 0000 0000 0720ACBIL to CSPTRDCL CSEB ( CSPTRDCL CSEB) 0000 0000 5374 0000 0000 0000 0000 5374

JPL to CLASSIC MSEB ( CLASSIC MSEB) 0000 0000 0000 1309 0000 0000 0000 1309JPL to CIPLA MSEB ( CIPLA MSEB) 0000 0000 0000 0610 0000 0000 0000 0610

JPL to CEAT MSEB ( MPPL) 0000 0000 0000 2921 0000 0000 0000 2921APL1 GUVNL to CHLM GUVNL ( AEL) 2187 0000 0000 0000 0000 0000 0000 2187

NSPCL to DD ( DD) 0000 0000 0000 0000 0000 13156 0000 13156EMCO to DNH ( EMCO) 0000 0000 0000 0000 0000 0000 28097 28097

JPL to DNL MSEB ( DNL MSEB) 0000 0000 0000 0870 0000 0000 0000 0870JPL to ETLC MSEB ( ETL) 0000 0000 0000 0758 0000 0000 0000 0758JPL to ETLT MSEB ( ETL) 0000 0000 0000 0758 0000 0000 0000 0758

APL2 GUVNL to ESIL_WR ( PXIL) 0283 0000 0000 0000 0000 0000 0000 0283APL3 GUVNL to ESIL_WR ( PXIL) 8355 0000 0000 0000 0000 0000 0000 8355

DBPOWER to ESIL_WR ( MANIKARAN) 0000 0000 0000 0000 0000 0000 0000 0345EOL GUVNL to ESIL_WR ( ESIL_WR) -19578 0000 0000 0000 0000 0000 0000 0000

EPGL GUVNL to ESIL_WR ( ESIL_WR) -2866 0000 0000 0000 0000 0000 0000 0000JPL to ESIL_WR ( JPL) 0000 0000 0000 0000 0000 0000 0000 45641

JSWEL(RTNGIRI) MSEB to ESIL_WR ( PXIL) 0000 0000 0000 -2328 0000 0000 0000 0000MSEB to ESIL_WR ( PXIL) 0000 0000 0000 -1705 0000 0000 0000 0000

ESSAR_MAHAN to ESIL_WR ( ESIL_WR) 0000 0000 0000 0000 0000 0000 0000 52250VANDANA to ESIL_WR ( PXIL) 0000 0000 0000 0000 0000 0000 0000 0480

JPL to ESIL MSEB ( JPL) 0000 0000 0000 0108 0000 0000 0000 0108ESSAR_MAHAN to ESIL MSEB ( ESIL_WR) 0000 0000 0000 1244 0000 0000 0000 1244

JPL to ETLW MSEB ( ETL) 0000 0000 0000 0732 0000 0000 0000 0732JPL to ETLB MSEB ( ETL) 0000 0000 0000 0866 0000 0000 0000 0866

JPL to EILR MSEB ( MPPL) 0000 0000 0000 1049 0000 0000 0000 1049JPL to ETLK MSEB ( ETL) 0000 0000 0000 0643 0000 0000 0000 0643

JPL to EXIDE MSEB ( EXIDE MSEB) 0000 0000 0000 1239 0000 0000 0000 1239CSEB to GOA ( PTC LTD) 0000 0000 -0400 0000 0400 0000 0000 0000

DBPOWER to GOA ( PTC LTD) 0000 0000 0000 0000 17390 0000 0000 17390JPL to GSL MSEB ( GSL MSEB) 0000 0000 0000 0870 0000 0000 0000 0870

EMCO to GCEL ( EMCO) 0000 0000 3394 0000 0000 0000 0000 3394JPL to HINDMOUDA MSEB ( HINDMOUDA MSEB) 0000 0000 0000 2249 0000 0000 0000 2249

HINDAHEJ GUVNL to HINDTALOJ MSEB ( HINDTALOJ MSEB) -2962 0000 0000 2962 0000 0000 0000 0000EMCO to DNH ( EMCO) 0000 0000 0000 0000 0000 0000 119290 119290

JPL to HNGIL MSEB ( HNGIL MSEB) 0000 0000 0000 5156 0000 0000 0000 5156LANCO TO MP 0000 191431 0000 0000 0000 0000 0000 191431

IEE 103711 47279 -413725 163201 0000 26840 0000 31054PEI 3561 7107 0000 -0214 0000 0000 0000 17561

ca kula Aayaat Total Import 781888 184933 483401 86303 247768 28588 40782 148596 781888kula inayaa-t Total Export 1202530 274418 268404 653270 6437 0000 0000 0000 1202530naoT Aayaat inayaa-t Net Imp (+)Exp (-) -420642 -89485 214997 -566968 241330 28588 40782 148596 -420642

4 kula gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kula

Total GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL11567423 2719395 2512265 73752 3933435 237255 213875 549412 12255 11567424

5 kI kula iSaDUyala Total Sdl incl IR bi-lateral exch Sdl 9753264 2263189 2432879 58978 2833062 221937 190360 484727 12209 97532646 ibanaa xait ko kula D`avala Total Drl excl Tr Loss 9388390 2433257 2716560 597587 2741156 286430 174671 437785 0944 93883907 xait imalaakr kula D`avala Total Drl incl Tr Loss 9703552 2433257 2716560 597587 2741156 286430 174671 437785 0976 93884228 p p`NaalaI maoM kula pUla xait Pooled loss in WR System 3151629 p xao`~ sToSanaaoM sao kaorbaa ivanQa 1 AaOr 2 ivanQa 3 kvaasa gaMQaar kakrapar tara`pur esaesapI ponca kula

vaastivak [njaoSana Actual Inj - WR Stns KSTPS VSTPS-1amp 2 VSTPS-3 KGPS GGPS KAPS TAPS SSP PENCH TOTAL (ima yauinaTsa) (MUs) 1310550 1162242 1009828 99928 156340 275783 918544 97965 13620 12860991

] xao~ Aa ]xao kao ina ] xao naoT d xao Aa d xao inayaa-t d xao naoT pU xao Aa pU xao inayaa-t pU xao naoT kula naoT10 vaasaivak AMtrxao~Iya Actual IR Exchanges NR Imp NR Exp NR Net SR Imp SR Exp SR Net ER Imp ER Exp ER Net Total Net

ivainamaya (ima yauinaTsa) (MUs) 0347 2303947 -2303600 0000 737616 -737616 73271 189494 -116223 -3157439 AMtrxao~Iya ivainamaya IR Exchange Schedule NRI sdl NRE sdl Net NR sdl SRI sdl SREsdl Net SR sdl ERI sdl ERE sdl Net ER sdl Net WR sdl iSaDyaUla (ima yauinaTsa) (MUs) 2987 714531 -711544 404371 0000 404371 0000 113469 -113469 -420642

Total Entitlement incl IR and bi-lateral exchange schedule

11

AMtrxao~Iya AaOr iWpxaIya ivanamayaaoM kI iSaDyaUla imalaakr kula pa~ta

maah jaUlaa[- 2014 ko AMtr-ajyaIya AMtrxao~Iya ivainamayaaoM ka ivavarNa Anaulagnak 46DETAILS OF INTERSTATEINTER-REGIONAL EXCHANGES FOR THE MONTH OF JULY 2014 Annex-46

k`maaMkFrom To

gauivainaila map`iva]kMila Craivabaao maraiva]kMila gaaovaa dmana dIva da na h [ssaar ] xao~ d xao~ pU xao~ piScama xao~ kulaA InterstateInter-regional Schedules

included in ISGSGUVNL MPPGCL CSEB MSPGCL GOA DD DNH ESIL NR SR ER WR TOTAL

1 gauivainaila GUVNL 2962 31082 34044

2 map`iva]kMila MPPGCL 0000

3 Craivabaao CSEB04

0400

4 maraiva]kM ila MSPGCL 4033 4033

5 gaaovaa GOA 0000

6da na h DNH 0000

7kaorbaa KORBA-III 0000

8 iMjadla pavar JPL 4464 12569 26349 45641 89023

9 ADanaI pavar APL 6061 6061

10 ESSAR MAHAN 1244 52250 53494

11 laonakao Lanco -Pathadi 0000

12 esaIbaIAa[-ela -ACBIL 6093 6093

13 KSK MAHANADI14 DB POWER 16008 17390 0345

15 VANDANA 0480

16 EMCO 3473

17 ESIL18 ena esa pI saI ela NSPCL 13157 28097 41254

19 ]ltarI xao~ NRegion (WR end) 0347 0347

20 dixaNaI xao~ S Region (S Bus) 0000 0000

21 pUvaI- xao~ E Region (WR end) 73271 73271

22 p xao~ WRegion (WR end) 737616 189494 3231057

23 enaTIpIsaI NTPC Injection 5216788

24 enapIsaI NPC Injection 1194327

25 Total ISGS drawal from the Grid incl interregional bi-lateral

2433257 2716560 597587 2741156 286430 174671 437785

B InterstateIR Exchanges not included in ISGS

20 knaa-Tk Karnataka 444 44400

21 yaUpIpIsaIela UPPCL 0000 0000

22 AarvaIpIenaela RVPNL -237 -2370

23 UPPCL ( Excess Drawn From Rajghat 0000 0000

24 kaoTa ]jjaOna Kota - Ujjain 0000 0000

25 kula ba Total B (13 to 17) 0000 -2370 0000 0000 44400 0000 0000 42030

C inavala ivainamaya Net Exchange (12+18) 2433257 2714190 597587 2741156 330830 174671 437785 9429476

D kula Aayaat Total Imp by WR 115648

E kula inayaa-t Total Export by WR 3231057

F inavala ivainamaya Net Exchange (D-E) -3115409

G p xao~ Wara vaIlD jaa- Energy wheeled by WR

26 pU xao~ sao d xao~ kao inayaa-t ER export to SR0000

0000

27 d xao~ sao ] xao~ kao inayaa-t pUxao pxao sao haokr SR export to NR via ERWR0000

0000

28 d xao~ sao ] xao~ kao inayaa-t pxao sao haokr SR export to NR via WR0000

0000

29 pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr ER export to NR via WR0000

0000

30 ] xao~ sao d xao~ kao inayaa-t pxao sao haokr NR export to SR via WR393404

393404

31 pU xao~ sao d xao~ kao inayaa-t pxao sao haokr ER export to SR via WR0000

0000

32 pU xao~ sao d xao~ kao inayaa-t ]xao pxao sao haokr ER export to SR via NRWR0000 0000

0000

33 ]pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr NER export to NR via WR0000

0000

Anaulagnak 47Annex-47

maah jaUlaa[- 2014 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39697 65459

9964 39521

Levels in Mtrs str maITr maoM

]ka[- Ukai

64932

10110

25501

25801

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF JULY 2014

ivavarNa Particulars

Sr No Details of incident (Elements Generation Tripped) Owner Utility Date TimeEffect (Loss of generation Load) if

anyCategory as per

Standards1 Bus Fault at Lonikhand 400 kV Bus 1 MSETCL 04Jul14 315 Nil GI‐22 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 06Jul14 433 load Loss 277 MW GD‐13 Tripping of Multiple Elements from 400220 kV Parli (MSETCL) Ss MSETCL 08Jul14 2359 Nil GI‐24 Poles tripping of HVDC Bhadarwati PGCIL 09Jul14 0350 amp 0504 Nil GI‐25 Tripping in Jejuri and Loanand Area MSETCL 10Jul14 126 Load Loss 400 MW GD‐16 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 11Jul14 349 load Loss 335 MW GD‐17 Blackout at Kawas Ss NTPC 11Jul14 117 Gen Loss 320 MW GD‐18 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 13Jul14 642 load Loss 263 MW GD‐19 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 15Jul14 611 load Loss 264 MW GD‐110 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 16Jul14 334 load Loss 200 MW GD‐111 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 17Jul14 417 load Loss 150 MW GD‐112 Tripping at Gandhar Ss NTPC 21Jul14 1607 Gen Loss 180 MW GD‐113 Multiple time tripping of 765 kV Sasan ‐Satna 2 ckt on Protection Mal‐operation PGCILSASAN 7252014 1026 amp 1229 Hrs Nil GI‐2

List of Grid Disturbances and Grid incidents (GDGI) in July-2014 Western RegionANNEXURE-5

SR NO UTILITIES OCC NO MONTH STATUS REMARK 1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14 HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314 AT MUMBAI BY NTPC MUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514 AT MUMBAI BY WRPC AT RELIANCE

7 WRTS-I 460 Jun-14 HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714 AT RAIPUR BY KWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-1411 RELIANCE SASAN 464 Oct-1412 MADHYA PRADESH 465 Nov-1413 BDTCLJBTCL 466 Dec-1414 NTPC Vindhyachal 467 Jan-1515 ESSAR TRANSMISSIOM 468 Feb-1516 TATA POWER 469 Mar-1517 SUGEN (TPL) 470 Apr-1518 TORRENT POWER 471 May-1519 CGPL 472 Jun-1520 NTPC Korba 473 Jul-1521 NCA 474 Aug-1522 NHDC 475 Sep-1523 NTPC Mouda 476 Oct-1524 KSK 477 Nov-1525 RELIANCE 478 Dec-1526 NTPC SIPAT CG 479 Jan-1627 TAPS-3amp4 480 Feb-1628 ESSAR ESIL 481 Mar-1629 GOA 482 Apr-1630 KAPS 483 May-1631 JPL 484 Jun-1632 DNH 485 Jul-1633 NTPC Mumbai 486 Aug-1634 ADANI TRANSMISSION 487 Sep-1635 INDIAN RAILWAY 488 Oct-1636 WRTS-II 489 Nov-16

ANNEXURE 10

8212014

1

OCC MEETING (462nd )

Power system Operation Corporation Ltd

OPERATIONAL HIGHLIGHTS amp ISSUES

Date 11082014Venue ndash Tarapur

MonthsIEGC Band

FVIlt499 499‐5005 gt5005

March14 1291 4783 3927 012

April14 3064 5233 1703 016

May14 2248 5319 2433 013

Junersquo14 3715 4536 1749 02460

80

100

120Frequency Profile for July 2014Frequency Profile for July 2014

Maximum instantaneous frequency

5036 Hz

on 23rd July 2014 at 1304 hrs

Minimum instantaneous frequency

4941 Hz

on 10th July and 25th July 2014 at 1950 hrs and 1944 hrs respectively

Julyrsquo14 3451 5016 1533 020

0

20

40

60

1‐Jul

2‐Jul

3‐Jul

4‐Jul

5‐Jul

6‐Jul

7‐Jul

8‐Jul

9‐Jul

10‐Jul

11‐Jul

12‐Jul

13‐Jul

14‐Jul

15‐Jul

16‐Jul

17‐Jul

18‐Jul

19‐Jul

20‐Jul

21‐Jul

22‐Jul

23‐Jul

24‐Jul

25‐Jul

26‐Jul

27‐Jul

28‐Jul

29‐Jul

30‐Jul

31‐Jul

Avg Frequency of the month

4993 Hz

1High frequency day due to heavy rain in almost all places in the country low demand was observed(117 GW) Heavy underdrawal by all constituents of WR around 700‐1000 MW during 1300 hrs2 Low frequency day Demand was high and Od by constituents Od by NR

lt499 499‐5005 gt5005

8212014

2

501

502

503

504

Frequency for July 2014

496

497

498

499

50

494

495

1 60 119

178

237

296

355

414

473

532

591

650

709

768

827

886

945

1004

1063

1122

1181

1240

1299

1358

1417

1476

1535

1594

1653

1712

1771

1830

1889

1948

2007

2066

2125

2184

2243

2302

2361

2420

2479

2538

2597

2656

2715

2774

2833

2892

2951

3010

3069

3128

3187

3246

3305

3364

3423

3482

3541

3600

3659

3718

3777

3836

3895

3954

4013

4072

4131

4190

4249

4308

Frequency 499 5005

26000

28000

Unit Outage‐ JULY‐14 Max 26128 MW on 26072014JUNE14 Max 20818 MW on 210714

PLANNED OUTAGE FORCED OUTAGE TOTAL OUTAGE‐JULY14 TOTAL OUTAGE‐JUNE14

10000

12000

14000

16000

18000

20000

22000

24000

26000

MW

0

2000

4000

6000

8000

10000

1‐Jul‐14 6‐Jul‐14 11‐Jul‐14 16‐Jul‐14 21‐Jul‐14 26‐Jul‐14 31‐Jul‐14Date

8212014

3

Energy ConsumptionMax

986 Mus on 2nd July+2975 as compared

to last year900

1000

1100

IN M

Us ‐‐‐‐gt

DAILY CONSUMPTION OF WESTERN REGION(2010‐11 TO 2014‐15)

Min749 Mus on 24th July

500

600

700

800

CONSU

MPT

ION

Apr

May Jun

Jul

Aug Sep

Oct

Nov Dec Jan

Feb

Mar

MONTHS ‐‐‐‐gt2010‐11 2011‐12 2012‐13 2013‐14 2014‐15

Energy Consumption MUDay

Jul‐14 Jun‐14 Jul‐13 Change wrt last month

Change wrt last Year

Average 848 927 712 ‐845 1909Max 986 971 760 156 2975Date 2‐Jul‐14 30‐Jun‐14 2‐Jul‐13 ~ ~

PEAK DEMAND (this month vis-agrave-vis last month)

STATE

CATERED(MW) UNRESTRICTED(MW)

Julyrsquo14 Junrsquo14 Julyrsquo14 Junrsquo14

GUJARAT 13833 13755 13969 13906

MP 7090 7120 7121 7434

CHATTISGARH 3118 3472 3414 3473

Regional Demand met

Max 43034 MW(1st July 1600 hrs)

2540 more than the l

MAHARASHTRA 19283 19452 19385 19755

GOA 459 475 459 482

DD 287 298 287 298

DNH 721 677 721 685

ESIL 532 535 532 535

43034 42934 43419 43802

last year

Min 28431 MW(24th July0500 hrs)

WR TOTAL 43034 42934 43419 43802

Figures shown are Maximums in the month

Demand Met Jul‐14 Jun‐14 Jul‐13 Change wrt last month

Change wrt last Year

Average 35215 40463 32253 ‐1297 918Max 43034 42934 34317 023 2540

Date when Max 1‐Jul‐14 30‐Jun‐14 2‐Jul‐13 ~ ~

8212014

4

Constituents Total Time Block Noof time block Violation of Compilance Violation of Compilancein the month of July Type ‐1 Type‐2

Chhattisgarh 2976 983 6697 927 6885Guajrat 2976 681 77 12 222 92 54

DSM Violation for the Month of July 2014

Guajrat 2976 681 7712 222 9254Madhya Pradesh 2976 528 8226 594 8004Maharashtra 2976 1045 6489 442 8515

Goa 2976 712 7608 1868 3723Daman and Diu 2976 1720 4220 2506 1579

Dadar Nagar Haveli 2976 23 9923 1299 5635

Violation Type‐2 When The drawl does not change sign in 12 consecutive time block

Violation Type‐1 When The drawl is more or less than 12 schedule or 150 MW whichever lesser

Total No of Blocks ‐ 2976

New Elements July 2014a) COMMISSIONING OF NEW GENERATING UNITSSLNO CONSTITUENT UNIT NAME UNIT NO C`ty(MW) DATE TIME

1 IPP(Jay Prakash Nigrie) JNSTPP I 660 150714(sync) 845

b) COMMISSIONING OF NEW TRANSMISSION LINES

SLNO CONSTITUENT LINE NAME CKT NO KV DATE TIME Line length( in km)

1 POWERGRID Wardha‐Aurangabad II 765 372014 2300 347 581 POWERGRID Wardha Aurangabad II 765 372014 2300 34758

2 POWERGRID Wardha‐Aurangabad I 765 572014 1900 34758

3 GETCO Kosamba‐Chorania I 400 572014 2035 230

4 GETCO Kosamba‐Chorania II 400 572014 2105 230

5 BDTCL BDTCL‐Bhopal(MP) I 400 16714 1833 864

6 POWERGRIDLILO of Raipur‐Raigarh‐4

IV 400 1872014 2200 2826 POWERGRIDat KSK

IV 400 1872014 2200 282

7 MPPTCL Indore‐Pithampura II 400 210714 1625 150

8 POWERGRIDDharamjaygarh‐Jharsuguda

I 765 29714 000 14893

9 POWERGRIDDharamjaygarh‐Jharsuguda

II 765 28714 2125 14893

Total ckt Km 189366

8212014

5

c) COMMISSIONING OF NEW ICTS

SLNO CONSTITUENT STATION NAME KV RATIOCAPACITY (MVA) DATE

TIME

1 BDTCL BDTCL(Bhopal)ICT 1 765400 3x500 372014 1657

2 POWERGRID Dharamjaygarh(ICT 1) 765400 3x500 772014 22593 POWERGRID Navasari(ICT 3) 400220 500 872014 1959

d)CO SS O G O C O Sd)COMMISSIONING OF LINE REACTORS

SLNO CONSTITUENT STATION NAME Line Name KVCty(MVAR

) DATETIME

1 BDTCL BDTCL Indore‐BDTCL I 765 3x80 23714 1935

2 POWERGRID DharamjaygarhDharamjaygarh‐Jharsuguda II

765 3x110 280714 2125

3 POWERGRID DharamjaygarhDharamjaygarh‐Jharsuguda I

765 3x110 29714 000

4 POWERGRID Satna Satna‐Gwalior‐II 765 3x80 29714 10005 POWERGRID Aurangabad Padghe Aurangabad 1 765 3x80 310714 22 475 POWERGRID Aurangabad Padghe‐Aurangabad‐1 765 3x80 310714 2247

e)COMMISSIONING OF BUS REACTORS

SLNO CONSTITUENT STATION NAME KVCty(MVA

R) DATETIME

1 POWERGRID Bhatapara 400 125 24714 19562 POWERGRID Indore 765 3x80 31714 18273 POWERGRID Sujalpur 400 125 31714 1205

Congestion Charge was applied 3 times in July 2014 on WR‐NR path ie on12th 14th amp 15th July 2014

8212014

6

5515 5484

5200

5400

5600

Congestion Charge applied on WR‐NR path Dt12714 (Block 3 ‐16)

4200

4400

4600

4800

5000WR‐NR TTC(4900 MW)

WR‐NR ATC(4400 MW)

4000

4200

030

034

038

042

046

050

054

058

102

106

110

114

118

122

126

130

134

138

142

146

150

154

158

202

206

210

214

218

222

226

230

234

238

242

246

250

254

258

302

306

310

314

318

322

326

330

WR‐NR_Act(MW) WR‐NR_TTC(4900 MW) WR_NR_ATC(4400 MW)

2200 00

240000

260000

280000

300000

320000

MW

Maharashtra Sch Vs Drawal‐12714(Block 3‐16)

140000

160000

180000

200000

220000

240000

MW

Gujarat Sch Vs Drawal_12714

200000

220000

3 4 5 6 7 8 9 10 11 12 13 14 15 16

TIme Block

Maharashtra_Sch Maharashtra_Drawal

340000

350000

W

MP Sch Vs Drawal_12714(Block 3‐16)

120000

3 4 5 6 7 8 9 10 11 12 13 14 15 16Time Block

GETCO_Sch(MW) GETCO_Drawal(MW)

750008000085000

CSPTCL‐12714(3‐16)

310000

320000

330000

3 4 5 6 7 8 9 10 11 12 13 14 15 16

MW

TIme Block

MP_Sch MP_Drawal

450005000055000600006500070000

3 4 5 6 7 8 9 10 11 12 13 14 15 16

MW

Time Block

CG_Sch CG_Drawal

Under Drawal By WR constituents during the imposition of Congestion on WR‐NR on 12714

8212014

7

5292

5100

5300

Congestion Charge applied on WR‐NR path Dt14714 (Block 57 ‐71)

4638

4300

4500

4700

4900

5100

WR‐NR TTC(4900 MW)

WR‐NR ATC(4400 MW)

3900

4100

1330

1336

1342

1348

1354

1400

1406

1412

1418

1424

1430

1436

1442

1448

1454

1500

1506

1512

1518

1524

1530

1536

1542

1548

1554

1600

1606

1612

1618

1624

1630

1636

1642

1648

1654

1700

1706

1712

1718

1724

1730

1736

1742

1748

1754

1800

WR‐NR_Act(MW) WR‐NR_TTC(4900 MW) WR_NR_ATC(4400 MW)

3600380040004200440046004800

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

MW

Maharashtra Sch Vs Drawal‐14714(Block 57‐71)

1900

2000

2100

2200

2300

2400

2500

2600

MW

Gujarat Sch Vs Drawal_14714

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

TIme Block

Maharashtra_Sch Maharashtra_Drawal

1800

1900

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

Time Block

GETCO_Sch(MW) GETCO_Drawal(MW)

700

750

800

Chhattisgarh Sch Vs Drawal_141714(Block57‐71)

2600

2700

2800

2900

MW

MP Sch Vs Drawal‐14714(57‐71)

500

550

600

650

700

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

MW

Time Block

CG_Sch CG_Drawal

2400

2500

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

Time Block

MP_Sch MP_Drawal

8212014

8

4630

45004700

Congestion Charge applied on WR‐NR path Dt15714 (Block 50 ‐96)

4463

350037003900410043004500

WR‐NR TTC(4150 MW)

WR‐NR ATC(3650 MW)

31003300

1215

1234

1253

1312

1331

1350

1409

1428

1447

1506

1525

1544

1603

1622

1641

1700

1719

1738

1757

1816

1835

1854

1913

1932

1951

2010

2029

2048

2107

2126

2145

2204

2223

2242

2301

2320

2339

2358

WR‐NR_Act(MW) WR‐NR_TTC(4150 MW) WR_NR_ATC(3650 MW)

3800

4000

4200

4400

4600

4800

MW

Maharashtra Sch Ve Actual on 15714(50‐96)

130015001700190021002300250027002900

MW

Gujarat Sch Vs Actual on 15714(50‐96)

3600

50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96

Time Block

Maharashtra_Sch Maharashtra_Drawal

1300

50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96

Time BLock

GETCO_Sch(MW) GETCO_Drawal(MW)

3500

3700

MP Sch Vs Actual for 15714(50‐96)

850

950

1050

Chhattisgarh Sch Vs Actual‐15714(50‐96)

2700

2900

3100

3300

50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96

MW

Time Block

MP_Sch MP_Drawal

350

450

550

650

750

850

50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96

MW

Time BLock

CG_Sch CG_Drawal

8212014

9

Summary of Grid Events (GD amp GI) in July 2014

Sr No

Details of incident (Elements Generation Tripped) Owner Utility Date TimeEffect (Loss of

generation Load) if any

Category as per

Standards

1 Bus Fault at Lonikhand 400 kV Bus 1 MSETCL 04Jul14 315 Nil GI‐2

2 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 06Jul14 433 load Loss 277 MW GD‐1

3Tripping of Multiple Elements from 400220 kV Parli

MSETCL 08Jul14 Nil GI 23(MSETCL) Ss

MSETCL 08Jul142359

Nil GI‐2

4 Poles tripping of HVDC Bhadarwati PGCIL 09Jul140350 amp 0504

Nil GI‐2

5 Tripping in Jejuri and Loanand Area MSETCL 10Jul14 126 Load Loss 400 MW GD‐1

6 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 11Jul14 349 load Loss 335 MW GD‐1

7 Blackout at Kawas Ss NTPC 11Jul14 117 Gen Loss 320 MW GD‐1

8 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 13Jul14 642 load Loss 263 MW GD‐1

9 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 15Jul14 611 load Loss 264 MW GD‐1

10 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 16Jul14 334 load Loss 200 MW GD‐1

11 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 17Jul14 417 load Loss 150 MW GD‐1

12 Tripping at Gandhar Ss NTPC 21Jul14 1607 Gen Loss 180 MW GD‐1

13Multiple time tripping of 765 kV Sasan ‐Satna 2 ckt on

Protection Mal‐operation PGCILSASAN 7252014

1026 amp 1229 Hrs

Nil GI‐2

S No Name of power

stations

Unit Reason for

outage

1 VSTPS 2 (210 MW) Coal Shortage

91 Operation of grid at high frequency ( gt 505 Hz) even under fuel shortage condition

Issues1 Major ISGSIPP are facing fuel

shortage1 VSTPS 2 (210 MW) Coal Shortage

2 VSTPS 5 (210 MW) Coal Shortage

3 Singhaji 1 (600 MW) Coal Shortage

4 SGTPS 4 (210 MW) Coal Shortage

5 JP Bina 2 (250 MW) Coal Shortage

6 Bhusawal 2 (210 MW) Coal Shortage

shortage2 Expected High Demand during dry

spell in September amp October3 Optimal use of precious fuel is

necessary to tackle the high demand in dry spell

7 Parli 4 (210 MW) Coal Shortage

8 India Bulls 1 (270 MW) Coal Shortage

8212014

10

Agenda 92 Insecure operation Oscillations Power Swingbull N‐1 contingency of 765 kV Tirora‐Akola2 on 10th and 11th June 2014

bull Tirora gen gt 1500 MW AR not operatedbull Intra plant mode of oscillations (097 Hz) with poor damping

bull N‐1 contingency of 400 kV Tirora‐Warora‐1 on 20th May 2014N 1 contingency of 400 kV Tirora Warora 1 on 20 May 2014bull Tirora gen gt 1500 MW 765 kV Tirora‐Akola2 out of servicebull SPS bull Power Swing and loss of complete power station GD‐1

bull The need for transmission augmentation as well as PSS tuning at APML Tirodawas discussed in the 461st OCC meeting

bull Member Secretary WRPC suggested that APML would send details of PSSMember Secretary WRPC suggested that APML would send details of PSS tuning studies to WRPC and they may consult IIT‐Mumbai for assistance and expedite

bull Representative from SLDC Kalwa APL may like to update the progress

Events at APML TiroraCase 3 Date 11‐07‐14 1529 hrsbull Line tripped on Y Phase to earth fault AR was unsuccessful due to persisting faultbull Sudden power transfer through 400 kV System resulted in swing Oscillation of 097 Hz observed across WR and

East West generation in Western region oscillatedO ill i i d f 10 dbull Oscillation persisted for 10 seconds

bull Damping ratio was 257

8212014

11

Events at APML TiroraCase 4 Date 23‐07‐14 0227 hrsbull 765400 kV APML Tirora ICT trippedbull Sudden power transfer through 400 kV System resulted in swing Oscillation of 097 Hz observed across WR

and East West generation in Western region oscillatedO ill i i d f 17 dbull Oscillation persisted for 17 seconds

bull Damping ratio was 7

bull Need for transmission augmentation as well as PSS tunning at APML Tiroda required

bull It has been decided in 461th OCC thatAPML would send details of PSS

Expected date of

tuning studies to WRPC and they may consult IIT‐Mumbai for assistance and expedite Representative from SLDC Kalwa APL may like to update the progress

Expected date of bull 2nd ckt of 765 kV Tirora‐Akola2bull 220 kV network from 400220 kV Warorabull 220 kV network from 765400 kV Akola2 and 765400 kV Taptithandabull 220 kV network from 765400 kV Aurangabad‐PG 400220 kV Pune

Redistribution of Load within Maharashtra system

8212014

12

Elements Date and

Time of

Tripping

Date and

Time of

Restoratio

n

Remarks Receipt of

DREL at WRLDC

Satna Sasan

765 kV Sasan‐Satna 225‐07‐14

1026

25‐07‐14

1155

Protection Mal‐Operation DT at Sasan End

on OV as line remain hanging from Sasan No Yes

Agenda 93 Frequent Tripping of 765 kV Satna‐Sasan line

Issues

1Expedite commissioning of Line Reactor at 765 kV Sasanend

2 Submission of DREL for1026 1155end

765 kV 240 MVAr

Bus Reactor at Satna

25‐07‐14

1026

25‐07‐14

1139

Protection Mal‐Operation DT at Sasan End

on OV as line remain hanging from SasanNo Yes

765 kV Sasan‐Satna 225‐07‐14

1342

25‐07‐14

1342

Line got charged from Satna and

synchronized at Sasan end but immediately

DT was received at Sasan from Satna and

Line tripped Prior to tripping voltage at

No Yes

2 Submission of DREL for event analysis in line with CEA standards IEGC

3 Threat to grid security and constraints in evacuation from large generation complexarising from frequent undesirable tripping particularily

Sasan end was 796 kV

765 kV Sasan‐Satna 225‐07‐14

1628‐

Charging attempt was taken from Satna end

but line tripped before synchronization at

Sasan end due to DT from Satna Open end

voltage at Sasan 826 kV for the line

No Yes

The above was a narrow miss because the tripping occurred when one of the bus was under shutdown Fortunately during theabove period only two units of Sasan were in service and the second 765 kV bus remained in service else the situation would havebeen a serious threat to the system security

during protection testing construction activities

The progress of reactor commissioning at Sasan over the last 8 months is given under

Schedule in formed in meetings

SN 451st OCC 455th

OCC

456th OCC 457th 458th 459th 460th 461st

1 Line reactor By Dec By April By May By June End of June End of By By

of 765 kV

Sasan‐Satna

ckt‐2

y

2013

y p

2014

y y

2014

y

2014(Testing under

progress)

2014 (As per

joint report

post site visit

on 26314)

June 2014

y

Aug‐

2014

y

Aug‐2014

2 765kV Bus‐1

Reactor

Jan 2014 By Mar

2014

By June

2014

By June

2014(Testing under

)

End of July

2014(As per

j i t t

End of July

2014

By

Sep‐

2014

By

Sep‐2014

Sasan may intimate the progress in reactor commissioning to the sub-committee

progress) joint report

post site visit

on 26314)

2014

8212014

13

Item no94 SPS at Sipat

bull The SPS scheme implemented at NTPC Sipat received at WRLDC

bull It is observed that a time delay of 15sec is provided to unload units 1 2 4 amp5 each by 150MW if ICT l d d 130 f t d l dany ICT s load exceeds 130 of rated load

bull As per decision of WRPC meeting on 18314 if ex‐bus generation at Sipat is more than 2200 MW immediate unloading of units were decided and the intentional delay provided needs to be re‐ examined (Maximum 2‐3 sec delay may be appropriate) as unloading by 150MW would also take another 4‐5sec

8212014

14

Contingency Envisaged SPS action Identified FeedersTripping of any oneICT at 400200 VapiSub‐Station

Automatic LoadShedding of 100MW

DNH 1) 66 kV‐Kharadpara‐Rakholi‐I 50 MW2) 66 kV Khadoli‐Khadoli‐3 30 MW

Item No95 SPS at 400220 kV Vapi(PGCIL) Item No912

DD1) 66 kV Magarwada‐Kachigam 60 MW

It was apprised by representatives from DD amp DNH in the 459th OCC meeting that the above scheme shall be implemented within a month

UT DDDNHmay apprise the status of commissioning of the envisaged SPSUT‐DDDNH may apprise the status of commissioning of the envisaged SPS

Item no96 Addressing High Voltage condition in SSP amp nearby area Sl No Line No of Times tripped in Julrsquo141 400 kV SSP‐Dhule‐I 32 400 kV SSP ‐ Rajgarh‐ I 2

Issues1 Multiple tripping of

feeders emanating from SSP

2 S l tiSl No Line No of occasions kept open on HV 2 Several emanating feeders being kept open on high voltage in SSP amp nearby area

Sl No Line No of occasions kept open on HV

1 400 kV SSP‐Dhule‐I 9

2 400 kV SSP‐Dhule‐II 6

3 400 kV SSP ‐ Rajgarh‐ I 1

4 400 kV SSP ‐ Rajgarh‐ II 1

bull Operating RBPH machines in synchronous condenser mode during offOperating RBPH machines in synchronous condenser mode during off peak hours

bull Reactor commissioning at Rajgarh amp Dhule to be expedited by WRTS‐II(PGCIL) amp MSETCL

bull Absorption of MVAr by Wanakbori WTS

8212014

15

1 Voltage at Wanakbori was gt420 kV for 100 the time during Julrsquo14

2 WTPS units 567 are injecting MVAR (~ 60 MVAR) at Voltage gt 420 kV

3 Absorption of MVAR by WTPS units is expected during the high voltage condition at WTPS amp nearby area

97Status of implementation of UFRWestern Region

States Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Stage - I 492 Hz Stage - II 490 Hz Stage - III 488 Hz Stage - IV 486 Hz

relief GUJARAT 580 773 580 726 580 1117 590 1025MADHYA PRADESH 460 468 460 450 460 460 465 490CHATTISGARH 150 110 150 114 155 117 155 91MAHARASHTRA 805 1108 810 1200 815 765 820 851GOA 25 25 25 25 25 25 25 25UT DD 10 15 15 15 UT DNH 30 30 35 35 Total load relief 2060 2484 2070 2515 2085 2485 2105 2482

Not received

DD and DNH have not implemented any stage of AUFLS

DD and DNH may appraise the status

Real‐time monitoring of the likely relief available from AUFLS at any given instant mandated by CERC

Telemetry to be provided at SLDC amp RLDC

Not received

8212014

16

Agenda 98 ADMS (Automatic Demand Management Scheme) Implementation as per Sec 542 of IEGC

As per CERC order dt06062014 the target of fully implementation of scheme is by January2015Constituents have to submit bi‐monthly progress report to WRPC Secretariat with a copy to the Commission and WRLDCMP has submitted its detailed action plan in the form of an affidavit to CERC for implementation of ADMS However SLDC MPPTCL is requested to furnish data to OCC forum in the above format

Item No 99 Status of Telemetry in WR

Telemetry Issuesdoc

8212014

17

Item No 910 Black Out at NTPC Kawas Power Station

bull On 11th July 2014 Kawas Gas generating complex got blackout due to tripping of evacuation lines one by one

within a short span of 30 minutes

bull The complete loss of evacuation lines occurred at 0117 Hrs The blackout has resulted in tripping of GT1A

GT1B and ST causing 320 MW generation loss in the area It was reported that weather condition was foggy with

slight drizzling was in the area

LineTime of Tripping

Kawas End Remote endRestoration Time

220 kV Kawas‐Navsari1

1246 AM

R phase to EF

Fault location 2 km

R Phase to EF

122 AM

220 kV Kawas ndashNavsari2

112 AMR phase to EF

Fault location 2208 km

R Phase to EF 347 AM

220 kV Kawas‐Haldarwa 1

107 AMR phase to EF

Fault location 16 km

R Phase to EF 246 AM

220 kV Kawas‐ R phase to EF R Phase to

bull Line restoration has failed on several attempt as the lines

were not holding due to persisting fault

bull Such an event of total loss of evacuation lines from a

generating station resulting in blackout scenario is a

matter of serious concern

bull WRTS-2 may kindly send the reasons for such faults

which has caused the incidence and the remedial action

taken in this regard220 kV Kawas‐Haldarwa 2

108 AMp

Fault location 2 kmEF 304 AM

220 kV Kawas‐Icchapur1

108 AM B phase to EFB Phase to EF

301 AM

220 kV Kawas‐Icchapur2

108 AMB phase to EF Faultlocation 356 km

B Phase to EF

331 AM

220 kV Kawas‐Vav 1 117 AMNo tripping

Hand Tripped laterLine Tripped 225 AM

220 kV Kawas Vav 2 117 AM Y Phase to EFY Phase to EF

317 AM

taken in this regard

bull Disturbance Recorder (DR) and Event Logger(EL) out

puts are yet to be received from WRTS-2

bull As per IEGC the information like DREL output relay

indications amp sequence of events etc must be sent to

RLDCRPC by 24 hrs of the event WRTS-2 may kindly

expedite amp furnish the information to WRLDC amp WRPC

Item No 911 Operating Procedure of WR-2014

The operating procedure of Western Region 2014 has been updated on 31072014 and the p g p g psame has been uploaded on WRLDC web site at the following link

httpwwwwrldccomdocsWR_OPERATING_PROCEDURE_2014pdf

8212014

18

Item No 12 Mock Black start Exercise

Station Name Date Proposed Remarks

Mock Black Start Plan for the following stations has been received by WRLDC

CLPIPL Gas Power Plant 29‐Jun‐2014 ‐

Gandhar Gas Power Plant 27‐July‐2014 ‐

Other Utilities may update the sub‐committee regarding their plan for black start exercise

SL No Name of the Station Remarks

1 Bargi DG set under outage

2 TONS Governor Problem

3 Birsinghpur Governor Problem

Healthiness of DG sets

3 Birsinghpur Governor Problem

4 Medikheda Governor Problem

5 Rajghat Governor Problem

1 Outage of DG set for longer period is matter of serious concern 2 SLDC Jabalpur may apprise the present status2 SLDC‐Jabalpur may apprise the present status3 Possibility of procurement of stand‐by DG sets to be examined to take care of such prolonged outage of DG sets which virtually renders the black start facility sterile4 There is need for blackstart generator planning in W3 area Thermal IPP generators are disconnected from state grid and there is no hydro station So with only UHV lines and large thermal units system restoration post disturbance would be extremely challenging for Chattisgarh

8212014

19

Maharashtra

Madhya Pradesh

Item No13 Review of list of feeders for load regulation in emergency

Gujarat

DD amp DNHChattisgarh

Goa

bull Decided during the 461st OCC that list ofDecided during the 461st OCC that list of

feeders identified for load control under

emergency measure for safeguarding grid

security would be reviewed in a special

meeting The list is yet to be reviewed

8212014

20

Item No 14 Implementation of voltage and time grading on OV relays to prevent tripping of multiple EHV lines emanating from single node on high voltage

bull During the 461st OCC it was informed by Power Grid representative that they have already implemented voltage grading in various line emanating from the same node (matter has not come in the MoM)

bull Power Grid amp other utilities may kindly intimate the present status of voltage grading at their respective sub‐stations

Power Station Number of instances

when the SPS signal

was received at the

station

Number of instances

when the action by

the generators was

adequate

Number of instances

when the automatic

generation reduction was

done partially

JPL 53 0 50

Item No 15 SPS for SR‐WR Inter Connection Inadequate Participation by Generators

Issues

1 10 times operation of SPS‐1 causing backing down at JPL amp KSK during 1714 to 7 8 14JPL 53 0 50

KSK 53 0 36

APML 35 0 30

Mouda 35 0 0

Koyna 0 0 0

Koradi 0 0 0

Khaparkheda 0 0 0

Chandrapur 0 0 0

to 78142 Participation by other envisaged

generators to be expedited3 PGCIL may update status of Extention of

SPS signal from Solapur(PG) to the additional generators identified for participation

4 Decided in 461st OCC to have special Chandrapur 0 0 0

DB Power 0 0 0

NSPCL 0 0 0

Balco 0 0 0

Lanco 0 0 0

KWPCL 0 0 0

pProtection Sub‐Committee meeting to discuss progress of implementation of the revised SPS at Solapur (for WR‐SR interconnection) amp extension of signal from Sholapur to additional generators in WR

8212014

21

Thank you

DiscussionhelliphelliphellipDiscussionhelliphelliphellip

  • 462 occ_minutepdf
  • participants list_462 OCC meeting 110814pdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 26-7pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 45pdf
  • 46pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84pdf
  • 84apdf
    • 26wrpc_minute 107pdf
    • 26wrpc_minute 108pdf
    • 26wrpc_minute 109pdf
    • 26wrpc_minute 110pdf
    • 26wrpc_minute 111pdf
    • 26wrpc_minute 112pdf
    • 26wrpc_minute 113pdf
      • 85pdf
      • 87pdf
      • 98pdf
      • 913pdf
      • 10pdf
Page 6: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR

6

462nd OCC MINUTES

S No

400 kV Substn

Size (MVAR)

Implementing agency

Expected commissioning date

1 Ranchodpura 125 MVAR GETCO Commd On 8th July 2013

2 Varsana 125 MVAR GETCO Commd On 25th July 2013

3 Rajkot 125 MVAR GETCO Commd On 5th August 2013

4 Amreli 125 MVAR GETCO Commd On 12072013

5 Jetpur 63 MVAR GETCO Commd on 11072013

6 Zerda 125 MVAR GETCO Commd in July 2013

7 Kosmba 80 MVAR GETCO Commissioned on 29112013

8 Limbdi (Chornia)

125 MVAR GETCO 25th July 2013

9 Jabalpur 125 MVAR PGCIL Commissioned on 26032014

10 Khandwa 125 MVAR PGCIL Commissioned on 28032014

11 India bulls 80 MVAR BR

MSETCL Commissioned 26112013

12 Nagda 50 MVAR MPPTCL Commissioned in Feb-2014

13 Sasan Line reactor-1

240 MVAR RELIANCE Commissioned on 16022014

14 Shujalpur 125 MVAR PGCIL July 2014 end

15 Bhatapara 125 MVAR PGCIL July 2014 end

16 Raigarh 125 MVAR PGCIL July 2014 end

17 Aurangabad 125 MVAR PGCIL 28042014

18 Nanded 125 MVAR MSETCL 2015

19 Sholapur 125 MVAR MSETCL Sept-2014

20 Kolhapur 125 MVAR MSETCL Sept-2014

7

462nd OCC MINUTES

21 Akola 125 MVAR MSETCL Sept-2014

22 Nagda 125 MVAR MPPTCL Oct 2014

23 Bhopal 80 MVAR MPPTCL Sept 2014

24 Damoh 125 MVAR PGCIL August 2014

25 Bachau 125 MVAR PGCIL August 2014

26 Pirana 125 MVAR PGCIL August 2014

27 Itarsi 2X125 MVAR

PGCIL August 2014

28 Seoni 125 MVAR PGCIL August 2014

29 Parli 125 MVAR PGCIL August 2014

30 Raipur 125 MVAR PGCIL August 2014

31 Gwalior 125 MVAR PGCIL Commissioned on 30062014

32 ISP 125 MVAR NHDC 2015

33 Satpura 50 MVAR MPPGCL March-2015

34 Sasan Line reactor-2

240 MVAR RELIANCE August -2014

35 Sasan Bus reactor

240 MVAR RELIANCE Sept-2014

72Status of completion of 765400 kV and above ongoing Transmission Schemes

being executedimplemented by Transmission Agencies The updated status on various ongoing transmission schemes for the current year as per the current information available is as follows - S No

Name of the Line Target Completion Date

Remarks

POWERGRID 1 400 kV Navsari ndash Kudus DC Line Sept- 2014 ROW problem 2 765kV SC Satna-Gwalior line

(359Km + 60Km DC Portion) Ckt-II August- 2014

3 765 kV Raigarh (Kotra) pooling Commissioned on

8

462nd OCC MINUTES

station -Champa Pooling station -Dharamjaygarh PS - 2nd ckt

21052014

4 765 kV Gwalior - Jaipur line (1st Ckt) SC

Dec 2014

5 765 kV Dharamjaygarh - Jabalpur Pooling Station DC line

Dec-2014

6 765 kV Wardha ndashNizamabad-Hyderabad DC

March-15

7 765 kV Narendra-Kolhapur DC March-15 8 HVDC Raigarh(Kotra)-Pugalur Bi-

pole March-15

9 400 kV Aurangabad - Boisar line DC line

Dec -2014

10 765 kV Aurangabad (PG) - Padghe (PG) DC

August-2014

11 800kV DC Champa ndash Kurukshetra Bipole

Jan 2015

12 765 kV DC Jharsuguda ndash Korba Dec 2014 13 2 X 765 kV SC Ranchi ndash Sipat Jan 2015 14 765 kV Wardha- Aurangabad DC

Line

Ckt I Commissioned on 010714 Ckt II Commissioned on 030714

15 765 kV Aurangabad- Solapur DC line

Dec 2014

16 765 kV Solapur-Pune line

Sept 2014

17 765KV Durg-Wardha DC Sept 2014 CHHATTISHGARH 1 LILO of 400 kV Korba west-

Khedamara at Marwa August 2014

2 400 kV DCDS Raipur(Raita)- Jagdalpur(DCDS)

March 2015

21 220 kV Korba-Bishrampur line (DCSS)

Sept 2014

22 220 kV DCDS lines Chhuri to Mopka (Bilaspur) (DCDS)

Nov 2014

26 LILO of 220 kV Raigarh-Budipadar at 400 kV PGCIL Ss Raigarh

Sept2014

28 LILO of 220 Korba (E)- Bishrampur line at 220 kV Churri Ss

Sept 2014

29 LILO of 220 kV Raigarh ndash Jindal (Tamnar) at Girwani 220 kV Ss

Sept 2014

GUJARAT 1 400 kV DC Kosamba-Chorania line

(Package I)(From Chorania SS to AP-54)

Aug -2014 Commissioned on 100314

9

462nd OCC MINUTES

2 400 kV DC Kosamba-Chorania line

(Package II)(From Kosamba SS to AP-54)

Aug -2014

3 400 kV DC Mundra-Zerda line No 1 Aug -2014 4 400 kV DC Mundra-Zerda line No 2 March-2015 5 400 kV DC Vadinar-Amreli line December -

2014

6 400kV Mundra-Hadala LILO to Halvad

August -2014

7 400 kV DC Amreli-Kasor line(Part-1) December-2014

8 400 kV Charanka- Veloda Oct 2014 MADHYA PRADESH 1 Chhegaon-Julwania 400 KV DCDS

Line OCT - 2014

2

Pithampur- Indore 400KV DCDS Line

August - 2014

Work of the line have been completed by MPPTCL feeder bay from Indore PGCIL is awaited

3 Satpura TPH-Ashta 400KV DCDS Line

December ndash 2014

MAHARASHTRA(STU)

1 400KV DC line from Koradi-II to Wardha SS(PG) DC

Oct- 2014

2 400 kV Akola-Taptiganga Sept 2014 3 400 kV Tiroda-Akola Dec - 2014 GUJARAT (IPTC route) by WR Transmission (Guj) Pvt Ltd

1 400 kV Rajgarh(PG)-Karamsad (GETCO) DC

Sept -2014

STERLITE (JTCL) 1 765 KvDhramjaygarh - Jabalpur (JTCL)

DC line May -2015 Severe ROW Problem

2 765 kV Jabalpur - Bina (JTCL) Sc May -2015 Severe ROW Problem STERLITE (BDTCL) 1 765 kV Bhopal - Indore (BDTCL) SC August-2014 2 765 kV Bhopal-Bhopal Commissioned on

160714 3 765 kV Dhule - Vadodara SC Oct - 2014 4 765 kV Vadodara - Dhule (BDTCL) SC Oct - 2014 5 765 kV Dhule - Aurangabad (BDTCL)

SC August-2014

RAICHUR SHOLAPUR TRANSMISSION CO LTD(RSTCL)

1 765 kV Raichur - Sholapur line 2nd SC

Commissioned on 29062014

10

462nd OCC MINUTES

It was suggested by WRLDC and constituents that important list of line will be sent by

each constituent to WRLDC and WRLDC will compile and furnish the list as per

priority of commissioning

The Sub-Committee noted and agreed as above

73 Commissioning of new Generating units in Western Region and the capacity expected to be commissioned during the current year 2014-15

The status regarding Generating units expected to be commissioned during the

current year 2014-15 is as below

Name of the Power Projects Unit No Capacity (MW)

Date of Commissioning Schedule Date

GUJARAT Bhavnagar Lignite TPP-JV I 250 August 2014 II 250 August 2014 UNO SUGEN 2 3825 July 2014 CHHATTISGARH Marwa 1 500 Sept 2014 2 500 Dec 2014 MAHARASHTRA Dhariwal 2 300 Synd On 23042014 CHANDRAPUR 8 500 Oct 2014 CHANDRAPUR 9 500 March 2015 KORADI 8 660 Oct 2014 KORADI 9 660 Jan 2015 PARLI 8 250 March 2015 MADHYA PRADESH Singhaji TPS 2 600 Oct-2014 Ms Jhabua Power Seoni 1 600 Dec ndash 2014 MB Power Anuppur 1 600 Sept ndash 2014 Jaiprakash Power Nigri 1 660 July 2014 Jaiprakash Power Nigri 2 660 Dec 2014 Moser Bear (Hindustan power) 1 600 Nov- 2014 Moser Bear (Hindustan power) 2 600 March 2015 Essar Concessional ampEssar Power 1 600 Oct 2014 Essar Concessional ampEssar Power 2 600 Dec 2014 BLA 2X4 90 March 15 Jhabua Power 1 600 Dec 2014 CENTRAL SECTORIPP KSK 2 600 August 2014 KSK 5 600 January 2015

11

462nd OCC MINUTES

ACBIL 1 300 March 2015 SASAN 5 660 July 2014 SASAN 6 660 August 2014 Sasan 4 660 Synchronized in May 2014

Sub-committee noted as above ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS (A) FOLLOW-UP ITEM NO 81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

All the constituents are requested to submit the CMP report for the First quarter

(April 2014 to June 2014) for the year 2014-15

The Sub-Committee members noted as above ITEM NO 82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR

Status of physical amp cyber security in Power Sector for the First quarter (April 2014 to

June 2014) for the year 2014-15 have not been received from some of the

constituents

The Sub-Committee members noted as above ITEM NO 83 PROCEDURE FOR CALCULATION OF TRANSMISSION SYSTEM

AVAILABILITY FACTOR FOR A MONTH AS PER CERC REGULATION 2014-19

Member Secretary WRPC informed that a procedure for calculation of

transmission system availability factor as envisaged in CERC Regulation 2014-15

was discussed in 461st OCC held at Raipur Various aspects were discussed and

finalized However there were concerns expressed by transmission licensee

regarding addition of 12 hrs to outage hrs after each tripping beyond admissible 2

tripping in a year as it will reduce availability below 95 Also concern was

expressed for multiplying outage hrs by 2 for line affecting generation Also

whether addition of 12 hrs is applicable to such lines affecting generation was

also expressed Whether these clauses are applicable to HVDC system was not

known Therefore all such concerns of transmission licenses have been taken up

with CERC for revision clarification

Meetings were held on 1st and 4th August 2014 with transmission licenses

regarding verification of data data formatting and sorting out various anomalies

and doubts for data from April to July 2014 for further processing at WRPC end

12

462nd OCC MINUTES

Member Secretary WRPC informed that certification for some transmission licensees

has already been done The certificate for PGCIL is to be issued as effect on

generation evacuation certificate from WRLDC is awaited

CM WRLDC requested all the transmission licensees to submit the data to WRLDC in

same format as submitted to WRPC

Representative from Transmission licensees agreed the same

The Sub-committee noted as above ITEM NO 84 IMPLEMENTATION OF RSD METHODOLOGY Shri Satyanarayan SE WRPC informed that GM (OSampC) NTPC HQ-I Mumbai vide letter dated 28072014 (copy enclosed at annexure 84) requested to call a meeting for resolvingclarification of methodology developed by WRPC The procedure for RSD framed by WRPC is enclosed at Annexure 84A SLDC MPPTCL Jabalpur informed that RSD was implemented for NTPC Mauda unit

on 18072014 but it was not more extended beyond 20072014 as no other major

beneficiaries agreed for extension

CE GETCO informed that intermittent rain profile in the different geographical area of

Gujarat amp increasing demand pattern didnrsquot permit them to take RSD of any NTPC

units as minimum of 3 days is required

Representative from SLDC Maharashtra also endorsed the Gujarat view points on

RSD

GM NTPC requested to the committee that if RSD wasnrsquot possible then at least

technical minimum schedule should be given

Member Secretary WRPC summarized the matter as follows

1 RSD was implemented for NTPC Mauda unit from 18072014 to 20072014

but it could not be extended due to increasing demand pattern amp uncertainty of

rain profile in the region

2 The method framed by WRPC shall be continued amp will be applied as and

when required

3 He requested constituents to schedule the NTPC generating units at its

technical minimum in case RSD is not feasible

The Sub-committee noted as above

13

462nd OCC MINUTES

ITEM NO 85 LOAD FORECASTING IN WESTERN REGION Background- As per the amended Indian Electricity Grid Code that is effective from 17th February 2014 the SLDCs SEB distribution licensees shall always restrict the net drawal of the State from the grid within the drawal schedule keeping the deviations from the schedule within the limits specified in the Deviation settlement mechanism regulations Therefore it is imperative that adequate attention may be paid towards load forecasting The matter was discussed in the past several OCC as well as in the 26th TCCWRPC board meeting wherein it was decided to create a task force for exploring development of a software for load forecasting A meeting was held on 03042014 under leadership of CE(SLDC) GETCO Gujarat at

Mumbai The outcome of the Meeting was as following

1 Short term action a) all the discoms were advised to provide maximum historical data b) Discoms have to bifurcate the geographical area in to zone and derive effect of temp rain festival on load

2 Long term action a) Provide computer base meters up to all the distribution feeders for close monitoring b) Provide weather sensors at various strategically important locations c) Formulation of forecasting desk (load amp RE) at SLDC level

The 2nd meeting regarding Load Forecasting Mechanism was held with members of WRPC WRLDC Western Region SLDCs amp State Discoms Forecasting Service Providers (FSPs) on 110614 at SLDC Vadodara Gujarat During the 460th OCC meeting CE SLDC GETCO informed that roadmap for implementation of pilot project amp main project has been prepared Budget proposal have already called from FSP amp they assured to submit till the end of the month For implementation of pilot project the Utility and their respective Pilot FSP are decided as tabulated below

Sr No STATE ndashSLDCDISCOM Pilot FSP

1 GUJARAT MS TESLA

2 MAHARASHTRA IIT MUMBAI

3 MADHYA PRADESH MS METEOLOGICA

4 CHHATISGARH MS SAS

5 GOA MS MARCADOS

6 DDDNH IITGANDHINAGAR

MP informed vide letter dated 27062014(copy enclosed at 85) that they have

already placed on order to Ms L amp T InfoTech on 12072013 for load forecasting

software project Therefore MP had requested to exclude them from pilot project

activities decided in earlier meetings

14

462nd OCC MINUTES

462nd OCC Discussions- State wise status is as under -

bull CE SLDC informed that Gujarat has prepared the NDA and forwarded to TESLA for signing and the same was signed by TESLA New Zealand office and their Mumbai office shall forward the same to SLDC Gujarat Thereafter Input data shall be provided and ID shall be provided to TESLA so as to start forecasting by them

bull SLDC Gujarat vide letter no SLDCCEMIST-6458 dtd 270614 has conveyed to all WR Nodal SLDC coordinators regarding progress of load forecasting pilot project Thereafter also e mailed on date 2082014 to all Nodal SLDC for submission of status Report on Pilot Load Forecasting Project However no proper response is received so far

bull MP SLDC conveyed that they have already awarded contract for load forecasting and the same is expected to be available by year end Therefore MP shall not participate in the present scheme

bull SLDC Chhattisgarh representative informed that matter has been taken with discom Chhattisgarh Discom were facing difficulties to contact with coordinator of Ms SAS

CE SLDC Gujarat being a group leader stated that Chhattisgarh shall intimate to them for further needful and would help them in this matter

bull Maharashtra SLDC informed that there was a meeting held on 09082014 with IIT Bombay where availability of data has been discussed amp one more meeting will be held on 22082014 outcome of the same will be intimated in next OCC meeting BEST amp TATA are already having such forecasting system

bull No one from GOA has attended last meeting even though GOA was forwarded copy of MOM Due to non availability of any coordinator details of GOA it was not possible to contact them However Ms Marcadose has also conveyed that he has not been contacted by Goa

bull No one from DDDNH has attended last meeting even though DD DNH was forwarded copy of MOM However IIT Gandhinagar conveyed that they were not been contacted by DD DNH

Member Secretary WRPC informed that a letter to DD DNH amp GOA has been written

from WRPC secretariat regarding implementation of ADMS Load Forecasting amp

telemetry status He further requested the constituents to implement the decision

taken in earlier meeting of load forecasting

OCC suggested that the next load forecasting meeting may be held at DDDNH

The Sub-committee noted as above

15

462nd OCC MINUTES

ITEM NO 86 NEED OF COOPERATION FROM WRLDC IN REAL TIME

bull CE SLDC informed that at present APL is under their control area and embedded scheduling model is used It may be noted that for units 78amp 9 at APL Gujarat has no share (all are for NR beneficiaries)There have been occasions when units 78amp 9 have tripped (given at annexure) Since APL is shown as embedded in Gujarat WRLDC requested Gujarat to reduce overdrawl when APL units 78amp 9 trips Hence Gujarat has to pick up state generationcostlier generation for no fault of Gujarat

bull Further lines are opened to curtail overdrawl when Gujarat is not faulty Gujarat is seen as overdrawing (due to embedded scheduling of APL) when APL trips

bull To complicate matters the scenario coupled with wind variations state generation has to be constantly varied to avoid overdrawl

Gujarat requested followings-

1 When large sized units (APL units 78amp 9) trips then scheduling of Gujarat should be changed with immediate effect OR Gujarat should not be pursued for deviation correction to the extent of schedule of units tripped at APL units 78amp 9 OR Schedule of Gujarat from other central sector stations should be changed as per their request with immediate effect

2 APL units 78amp 9 should be made a separate control area 3 Under above circumstances transmission lines should not be opened

due to default by APL as these affects Gujarat without any fault of their own Further this was done without informingtaking SLDC into confidence It was clear from the discussions that Gujarat Discoms are put to unnecessary financial implications WRLDC clarified that 220 KV Dehgam- Khanpur Line no1 was opened due to frequency touching 493 Hz and control of overdrawl was taken as security measure WRLDC agreed to inform CE SLDC whenever such discussions are taken and agreed to take care in future

The Sub-committee noted as above

ITEM NO 87 GUIDE LINES FOR SPLIT BUS OPERATION AT SSP RBPH SWITCHYARD CE SLDC Gujarat vide letter dated 07082014 informed that a meeting was held on

220514 at Kevadia Colony SSP regarding split bus arrangement at SSP RBPH

16

462nd OCC MINUTES

switchyard and subsequent discussions during 55th meeting of PSC of NCA held in

Vadodara on 140714 the guidelines for the same had been prepared in consultation

with GETCO protection wing and sent vide mail dated 23072014 However the same

has been attached herewith as Annexure-87 It was clarified during discussion that

split bus operation would be used only as per requirement and will not be a permanent

arrangement

The Sub-committee noted as above

ITEMS FROM WRLDC

1 OPERATION OF GRID AT HIGH FREQUENCY ( gt 505 HZ) The onsetrevival of monsoon in the last fortnight of July 2014 has reduced the demand in Western Region However the demand would pick up sharply during the dry spell in September and October months Presently the major State Central Sector IPP generators in Western Region that are facing coal shortage are tabulated as under S No Name of power

stations Unit Reason for

outage 1 VSTPS 2 (210 MW) Coal Shortage 2 VSTPS 5 (210 MW) Coal Shortage 3 Singhaji 1 (600 MW) Coal Shortage 4 SGTPS 4 (210 MW) Coal Shortage 5 JP Bina 2 (250 MW) Coal Shortage 6 Bhusawal 2 (210 MW) Coal Shortage 7 Parli 4 (210 MW) Coal Shortage 8 India Bulls 1 (270 MW) Coal Shortage Likewise several Gas Power Stations in Western Region are facing fuel shortage Under the above circumstances it is desirable that precious fuel optimally utilized to maintain adequate stock for the dry spell In the month of July 2014 the grid frequency remained above 5005 Hz for more than 15 of the time while it remained below 499 Hz for more than 34 of the time Operation of high frequency is unnecessary loss of fuel that could have been conserved and utilized during low frequency regime

The Sub Committee noted the same

17

462nd OCC MINUTES

2 OBSERVATION OF INTRA-PLANT MODE OF OSCILLATIONS (097 HZ) WITH POOR DAMPING ON 10TH AND 11TH JUNE 2014 AND LOSS OF 1800 MW IN MAHARASHTRA SYSTEM DUE TO POWER SWING UNDER N-1 CONTINGENCY ON 20TH MAY 2014 The issue of Intra plant mode of oscillations with poor damping as observed during the grid event on 10th and 11th June 2014 was discussed during the 461st OCC meeting Similar oscillations were again recorded on 11th July 2014 GM WRLDC informed that they have written to generators seeking details of MW fluctuations PSS status etc and requested constituents to share the dataHe requested that constituents may share PMU data also CESLDC Gujarat informed that they are proposing PSS tuning with consultants from IITs in their system EE SLDC Maharashtra informed that APL-Tiroda has recently tuned PSS at Tiroda units by OEM

It was once again requested constituent to furnish information as designed by WRLDC The Sub Committee noted the same

3 FREQUENT TRIPPING OF 765 KV SATNA-SASAN LINE

WRLDC informed that 765 kV Sasan-Satna Line has tripped on three occasions

while 240 MVAr Bus Reactor at 765 kV Satna tripped on one occasion The

tripping occurred due to protection mal-operation at Satna end during stability test

for the 765 kV Bus-1 The details of the tripping is given below

The above OV at Sasan end could have been avoided if the Line Reactor of this line at Sasan end had been commissioned The restoration of the tripped circuit also was considerably delayed in the absence of Line Reactor at Sasan end

Elements Date and Time of Tripping

Date and Time of Restoration

Remarks Receipt of DREL at WRLDC Satna Sasan

765 kV Sasan-Satna 2

25-07-14 1026

25-07-14 1155

Protection Mal-Operation DT at Sasan End on OV as line remain hanging from Sasan end

No Yes

765 kV 240 MVAr Bus Reactor at Satna

25-07-14 1026

25-07-14 1139

Protection Mal-Operation DT at Sasan End on OV as line remain hanging from Sasan

No Yes

765 kV Sasan-Satna 2

25-07-14 1229

25-07-14 1342

Line got charged from Satna and synchronized at Sasan No Yes

18

462nd OCC MINUTES

end but immediately DT was received at Sasan from Satna and Line tripped Prior to tripping voltage at Sasan end was 796 kV

765 kV Sasan-Satna 2

25-07-14 1628 -

Charging attempt was taken from Satna end but line tripped before synchronization at Sasan end due to DT from Satna Open end voltage at Sasan 826 kV for the line

No Yes

Representative from Sasan UMPP informed that with regards to the 765 kv Line and

Bus reactors all the material required for completion of works have been received at

site

Line reactor and bus reactor would be commissioned by Aug14 and Sep 14

respectively

The Sub Committee noted the same 4 SPS AT SIPAT

The SPS scheme implemented at NTPC Sipat has been received at WRLDC It is observed that a time delay of 15sec is provided to unload units 1 2 4 amp5 each by 150MW if any ICT s load exceeds 130 of rated load It was conveyed that if ex-bus generation at Sipat is more than 2200 MW immediate unloading of units may be done and the intentional delay which is required to prevent mal-operation may be 45 second instead of 15 second

NTPC Sipat representative agreed to implement the same accordingly The Sub Committee noted the same

5 COMMISSIONING OF SPS AT 400220 KV VAPI During the special WRPC meeting on 18032013 at Dadra an SPS for automatic load shedding subsequent to tripping of 400220 kV ICT at Vapi was approved as under It was decided that POWERGRID would extend trip signal from Vapi ICTs to the requisite feeders

Contingency Envisaged SPS action

Identified Feeders

Tripping of any one ICT at 400200 Vapi Sub-Station

Automatic Load Shedding of 100MW

DNH 1) 66 kV-Kharadpara-Rakholi-I 50 MW 2) 66 kV Khadoli-Khadoli-3 30 MW DD 1) 66 kV Magarwada-Kachigam 60 MW

19

462nd OCC MINUTES

It was felt that due to change in topology loading in ICT is not critical however SPS may be in place as defense mechanism in case of any emergency

DD amp DNH representative were absent in the meeting The Sub Committee noted the same

6 ADDRESSING HIGH VOLTAGE CONDITION IN SSP amp NEARBY AREA

High voltage condition is being observed at SSP and nearby area in off peak period particularly between 2300 hrs at night to 0500 hrs in the morning Also on many occasions the system operator is compelled to hand trip the 400 kV lines emanating from SSP to control over voltage Summary for the month of Julyrsquo14 is given under

Sl No 400 kV Line DatailsFrom To

Time Date Time Date 1 SSP-RAJGARH-I 0009 19-Jul-14 0730 29-Jul-14 2 SSP - RAJGARH-II 0406 16-Jul-14 1016 18-Jul-14 3 SSP-DHULE-I 1310 22-Jul-14 0953 23-Jul-14 4 SSP - DHULE - II 1533 15-Jul-14 0734 18-Jul-14 5 SSP - DHULE - I 1703 10-Jul-14 1100 11-Jul-14 6 SSP-DHULE-I 1712 28-Jul-14 0933 31-Jul-14 7 SSP - DHULE - II 1730 19-Jul-14 0917 20-Jul-14 8 SSP - DHULE - I 1757 18-Jul-14 0935 19-Jul-14 9 SSP-DHULE-II 1809 21-Jul-14 0914 22-Jul-14 10 SSP-DHULE-I 1815 30-Jun-14 0542 1-Jul-14 11 SSP-DHULE-I 1819 20-Jul-14 0858 21-Jul-14 12 SSP-DHULE-II 1825 8-Jul-14 0949 9-Jul-14 13 SSP - DHULE - II 1831 11-Jul-14 1007 13-Jul-14 14 SSP - DHULE - I 1838 1-Jul-14 0556 2-Jul-14 15 SSP - DHULE - I 1848 9-Jul-14 0912 10-Jul-14 16 SSP - DHULE - I 2136 13-Jul-14 0850 14-Jul-14 17 SSP-DHULE-II 2201 23-Jul-14 0945 28-Jul-14

Also it has been observed that Wanakbori TPS injects around 60 MVAr per unit even when voltage at Wanakbori is above 420 kV for nearly 100 of the time Further envisaged bus reactors at Rajgarh amp Dhule are yet to be commissioned Hence in view of system reliability it is advisable to explore all possibilities to contain high voltage condition in SSP and nearby area The following actions need to be taken to address the situation

bull Operating RBPH machines at SSP in synchronous condenser mode bull Absorption of MVAr by Wanakbori (WTPS) units bull The commissioning of Reactors at 400 kV Rajgarh may be expedited by

WRTS-2

20

462nd OCC MINUTES

bull The commissioning of Reactors at 400 kV Dhule may be expedited by MSETCL CE SLDC GETCO agreed for looking into absorption of MVAR at Wanakbori

7 IMPLEMENTATION OF THE REVISED AUFLS IN DD AND DNH Representatives from the DD and DNH intimated during the 459th OCC meeting that the tendering process was stalled because of general elections (election code of conduct was in force) amp action would be initiated post the elections Member Secretary WRPC vide letter dated 01082014 took up the matter with Secretary (P) DDDNH (copy enclosed) DD amp DNH representative were absent in the meeting to comment

The Sub Committee noted the same 8 ADMS(AUTOMATIC DEMAND MANAGEMENT SCHEME) IMPLEMENTATION

AS PER SEC 542 OF IEGC The format for reporting the progress of implementation of the ADMS in Western Region States was given as part of MoM of the 461st OCC meeting All utilities may like to furnish the updated status to WRPCWRLDC as per the above format It is understood that MP has submitted its detailed action plan in the form of an affidavit to CERC for implementation of ADMS However SLDC MPPTCL is requested to furnish data to OCC forum in the above format

The Sub Committee noted the same

9 STATUS OF TELEMETRY IN WESTERN REGION

In the 460th amp 461st OCC meetings the status of telemetry in Western Region was discussed in detail It was also highlighted that the Honrsquoble CERC vide its order in petition SM0072014 issued Notice under section 142 on several constituents of Western Region All the constituents had assured to address the telemetry issues within a month or two The telemetry status as on 4th August 2014 is tabulated below

21

462nd OCC MINUTES

a Maharashtra The non-availability of telemetry is 583 for sub-stations amp 18

for generating stations This is a matter of serious concern The issue has been

discussed in several OCC meetings since last 8 months As per the information available with WRLDC telemetry is not available from the following generating stations at 400 kV level

bull Kaparkheda bull Deepnagar

Also telemetry is not available from the following sub-stations at 400 kV level bull Warora bull Lonikhand(New) bull Chandrapur-stg-II

As per the information available with WRLDC telemetry is intermittent at 4 generating stations viz

bull Jaigad bull Paras-extension bull Trombay bull Deepnagar GCR

Also telemetry is intermittent at following sub-stations at 400 kV level bull Bableswar-II bull Deepnagar SS bull Dhule bull Khaparkheda bull Kolhapur-3

22

462nd OCC MINUTES

bull Sholapur-3 SLDC MSETCL Maharashtra informed that telemetry has been established for 46 locations

a Chhattisgarh100 available b Madhya Pradesh As per the latest status telemetered data is available from

100 of the locations c Gujarat As per the latest information submitted to CERC the non-availability of

telemetry data from Gujarat as on date is 33 for substations As per the information available with WRLDC Telemetry is not available form 2 number of 220 kV sub-stations viz bull Bhatiya bull Mokha Gujarat intimated in 460th OCCM that these sub-stations were ready but lines were in construction phase Also telemetry is intermittent from the following SS in Gujarat bull 220 kV Navasari (GETCO) ss bull 400 kV Kasor ss

SLDC GETCO may expedite amp resolve the issue for the above stations at the

earliest d Goa As per the latest information telemetry is not available form 2 number of

220 kV sub-stations viz Amona amp Cuncolim Telemetry is intermittent from 220 kV Tivim Ponda Xeldam amp 110 kV Kadamba amp Verna Thus Non availability of telemetry from Goa is 100 Goa to resolve the issue on war footing

e DD Telemetry is not available form 1 number of 220 kV sub-station viz Magarwada Thus availability of telemetry from DD is NIL DD representative intimated in 460th OCCM that RTU was being installed at 220 kV Magarwada SS under the new SCADAEMS up gradation project amp it would take 3 months to complete the work DD representative was absent in 461st OCCM so information on progress in this matter is yet to be received from DD DD to expedite the issue for the above station(s) on war footing

f DNH Telemetry is not available form 2 number of 220 kV sub-station viz Kharadpara amp Khadoli Thus availability of telemetry from DNH is NIL DNH representative was absent in 460th amp 461st OCC meetings to comment on the issue DNH to resolve the issue for the above station(s) on war footing

g ISGS As per the latest information submitted to CERC the non-availability of telemetry data from ISGS generating stations as on date is 125 Telemetry is intermittent from 220 kV Kawas(NTPC) station Power Grid NTPC to expedite

23

462nd OCC MINUTES

NTPC amp Power Grid agreed to expedite the matter during 460th amp 461st OCC meetings of WRPC However no progress has been reported

h POWERGRID As per the latest information submitted to CERC the non-availability of telemetry data from Power Grid substations as on date is 111 Telemetry is intermittent from the following ss

o 765 kV Kotra SS o 765 kV Dharamjaigad o 765 kV Tamnar SS o 400 kV Navasari SS

Additional points

a) In the report available on the WRLDC website it is clearly indicated that Communication link between all SLDC to WRLDC is in radial mode (without redundancy) and any failure in any equipment Fibre leads to total data black out Power Grid to ensure that links are on two channels

i IPP As per the latest information submitted to CERC the non-availability of

telemetry data from IPP generating stations as on date is 15 Telemetry is intermittent from Jindal amp Essar Mahan GMR Raipur JPL ESSAR Mahan GMR Raipur to expedite

Additional Points

bull Adani(APL) Tiroda There is only one channel emanating from Adani Tiroda Recently there was a case when entire station was not visible due to non-Availability of that channel

bull CGPL Mundra There is only one channel emanating from CGPL Mundra In case of non-availability of data leads to non-visibility of 4000 MW generation which creates difficulty in Grid Operation

bull Sasan There is only one channel emanating from Sasan In case of non-availability of data leads to non-visibility of 2400 + MW generation which creates difficulty in Grid Operation

bull APL Mundra There is only one channel emanating from CGPL Mundra In case of non-availability of data leads to non-visibility of 4000 + MW generation which creates difficulty in Grid Operation

The above issue was already discussed in 460th OCCM The utilities (APL SASAN CGPL) may kindly update the progress in this matter

24

462nd OCC MINUTES

j PMU data Regarding Satna to WRLDC link WRTS II informed that work is under progress for laying of OPGW from Satna 220 kV (MPPTCL) to Satna 765 kV (PG) and it may take 3-4 monthsrsquo time It was suggested that till such time the OPGW operation is in place WRTS-II may explore leased line connectivity at the earliest Power Grid to expedite

The Sub-Committee noted the same amp agreed to make availability of telemetry in their concerns and the report be updated position in next meeting

The Sub Committee noted the same

10 BLACK OUT AT NTPC KAWAS POWER STATION On 11th July 2014 Kawas Gas generating complex got blackout due to tripping of evacuation lines one by one within a short span of 30 minutes The complete loss of evacuation lines occurred at 0117 Hrs The blackout has resulted in tripping of GT1A GT1B and ST causing 320 MW generation loss in the area It was reported that weather condition was foggy with slight drizzling was in the area

Line Time of Tripping Kawas End Remote

end Restoration Time

220 kV Kawas-Navsari 1 1246 AM R phase to EF Fault location 2 km R Phase to EF 122 AM

220 kV Kawas ndashNavsari 2 112 AM R phase to EF Fault location 2208 km

R Phase to EF 347 AM

220 kV Kawas-Haldarwa 1 107 AM R phase to EF Fault location 16 km

R Phase to EF 246 AM

220 kV Kawas-Haldarwa 2 108 AM R phase to EF Fault location 2 km

R Phase to EF 304 AM

220 kV Kawas-Icchapur 1 108 AM B phase to EF B Phase to EF 301 AM

220 kV Kawas-Icchapur 2 108 AM B phase to EF Fault location 356 km

B Phase to EF 331 AM

220 kV Kawas-Vav 1 117 AM No tripping Hand Tripped later Line Tripped 225 AM

220 kV Kawas Vav 2 117 AM Y Phase to EF Y Phase to EF 317 AM

Even the line restoration has failed on several attempt as the lines were not holding due to persisting fault Such an event of total loss of evacuation lines from a generating station resulting in blackout scenario is a matter of serious concern Representative from WRTS-II stated that being highly industrial corridor the said lines are suffering with smog and informed that they are in process of replacement of existing insulator with polymer type insulators Order has been already placed amp it may be completed within next two to three month The Sub Committee noted the same

25

462nd OCC MINUTES

11 OPERATING PROCEDURE OF WR-2014 As discussed in 460th OCCM of WRPC the operating procedure of Western Region 2014 has been updated on 31072014 and the same has been uploaded on WRLDC web site at the following link httpwwwwrldccomdocsWR_OPERATING_PROCEDURE_2014pdf

The Sub Committee noted the same 12 MOCK BLACK START EXERCISE

MP representative informed that DG set at Bargi will be ready within a week time amp mock black start exercise can be performed in October 2014

NTPC Gandhar has successfully performed the mock black start exercise on 27072014

The Sub Committee noted the same

13 REVIEW OF LIST OF FEEDERS IDENTIFIED FROM ISGS LEVEL IN CASE OF

THREAT OF GRID SECURITY DUE TO LARGE DEVIATION

During the 461st OCC it was decided that list of feeders identified for load

control under emergency measure for safeguarding grid security would be

reviewed in a special meeting The list is yet to be reviewed GM WRLDC

requested SLDC to review the same amp submit Till such time the existing list will

continue

The Sub Committee noted the same 14 IMPLEMENTATION OF VOLTAGE AND TIME GRADING ON OV RELAYS TO

PREVENT TRIPPING OF MULTIPLE EHV LINES EMANATING FROM SINGLE NODE ON HIGH VOLTAGE

During the 461st OCC it was informed by Power Grid representative that they have already implemented voltage grading in various line emanating from the same node (matter has not come in the MoM) Power Grid amp other utilities may kindly intimate the present status of voltage grading at their respective sub-stations Member Secretary WRPC suggested to take the matter in PCM

The Sub Committee noted the same

26

462nd OCC MINUTES

15 INADEQUATE PARTICIPATION OF GENERATORS ENVISAGED SPS FOR SR-NEW GRID OPERATION

The details of SPS operation from 1st July 2014 till 6th August 2014 is as under

Sl No Date SPS No Condition 1 01 July 2014 SPS-1 613 SholapurRaichur DC gt1000 MW 2 01 July 2014 SPS-1 1752 SholapurRaichur DC gt1000 MW 3 04 July 2014 SPS-1 0406 SholapurRaichur DC gt1000 MW 4 09 July 2014 SPS-1 350 SholapurRaichur DC gt1000 MW 5 14 July 2014 SPS-1 506 SholapurRaichur DC gt1000 MW 6 17 July 2014 SPS-1 2204 SholapurRaichur DC gt1000 MW 7 23 July 2014 SPS-1 547 SholapurRaichur DC gt1000 MW 8 26 July 2014 SPS-1 1201 SholapurRaichur DC gt1000 MW 9 30 July 2014 SPS-1 902 SholapurRaichur DC gt1000 MW 10 30 July 2014 SPS-1 1954 SholapurRaichur DC gt1000 MW

During the last OCC the matter was discussed and it was suggested by Member Secretary WRPC to have Special Protection Sub-Committee meeting to discuss progress of implementation of the revised SPS at Solapur (for WR-SR interconnection) amp extension of signal from Solapur to additional generators in WR so as to address the issue of inadequate participation of WR Member Secretary WRPC requested to all generators who are having more than one units shall participate in implementation of SPS for SR-NEW grid operation

The Sub-committee noted the same ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING OCC reviewed the meeting roaster and finalized sheet is enclosed at Annexure-10

Due to non-readiness of BDTCL to host the next meeting NTPC KawasGandhar

would host the 463rd OCC meeting The exact date amp venue details will be intimated

separately

SlNo Organisation Name amp Designation E-mail Mobile

I WRPC1 Shri SD Taksande MS ms-wrpcnicin 98208783842 Shri Satyanarayan S opc-wrpcnicin 92233999383 Shri LKS Rathore DD lksr_2000yahoocom 98333718444 Shri Ratnesh Kumar Yadav AD ratneshkumar7437gmailcom 8903929150

II MSETCL MSEDCLMahaGenco5 Shri VD Pande EE vasantpandemahasldcin 98207419416 Shri Ajit V Pachori EE ajitpachorimahagencocoin 9619461420

III MPPTCL MPPGCL7 Shri KK Prabhakar SE sldcmpjbpyahoocom 94258052678 Shri SK Mehta EE mehtasanjay67yahooin 9425805017

IV CSPTCL CSPGCL9 Shri BR Soni Addl CE balramsonirediffmailcom 942518880710 Shri Arvind Mukherjee gccraipurgmailcom 9429227699

V GETCO GSLDC GSECL11 Shri BB Mehta CE cesldcgujgmailcom 987920073612 Shri BM Shah DyEE demissldcgetcogebmailcom 9925212836

VI WRLDC POWERGRID13 Shri P Mukhopadhyay GM prithwishmukhopadhyayposocoin 986943807314 Shri VK Shrivastava AGM vkspowergridindiacom 986945022115 Smt Sachala Mishra CM mishrasachalagmailcom 986945022316 Smt Pushpa S CM pushpa_seshadrihotmailcom 986940448217 Shri Aditya P Das Dy Mgr aditya19227gmailcom 9869404569

POWERGRID REGION-I18 Shri Anil Darode 70207powergridindiacom 942230180519 Shri Manu Sinha 02457powergridindiacom 9425293864

POWERGRID RETION -II20 Shri Abhinav Verma stawr2gmailcom 942850406221 Shri Anand Dubey ananddubey_pgrediffmailcom 9428504065

VII NTPC22 Shri PB Behre GM pbbeherentpccoin 900449708823 Shri Hari Nath AGM harinath01ntpccoin 900449713324 Shri SK Shrivastava AGM sksrivastava09ntpccoin 942517806925 Shri Amir Kr Singh SM aksingh01ntpccoin 942414081426 Shri Amitabh Kumar amitabhkumarntpccoin 9425178122

VIII TATA POWER27 Shri RM Sankhe GM rmsankhetatapowercom 909900654128 Shri PR Gadave AGM prgadavetatapowercom 9223553341

IX NHDC 29 Shri Anurag Seth CE annu226hotmailcom 9425326135

LIST OF PARTICIPANTS OF 462nd OCC MEETING OF WRPC HELD ON 11082014 AT TARAPURAnnexure-I

30 Shri Vinod Kumar Singh vinodnhdcrediffmailcom 9425925251

X APL 31 Shri CS Bobade GM chandrashekharbobadeadanicom 8980802255

XI RINFRA32 Shri SG Zirpe GM sachinzirperelianceadacom 932260763033 Shri Sanil C Namboodiripad sanilnamboodiripadrelianceadacom932104697434 Shri Subrata Das subratakudasrelianceadacom 932093072235 Shri Ishan Roy Asst Mgr ishanroyrelianceadacom 9860027348

XII KSK Mahanadi36 Shri Sudarshan B Reddy sudarshanreddybkskcoin 9000377721

XIII NPCIL37 Shri Mandeep mandeepnpcil 904991887038 Shri JS Choubey jschoubeynpcilcoin 942882191839 Shri Ritesh Chandra Singh rcsinghnpcilcoin 8007991744

XIV ESSAR 40 Shri OJ Saxena Sr Mgr osaxenaessarcom 987910126841 Shri Kamlesh Garg kamleshgargessarcom 987910284942 Shri Sarabjeet Singh sarabjeetsinghessarcom 750957010543 Shri Ashwin Ande ashwinandeessarcom 9909993594

XV JPL44 Shri RK Srivastava AGM rkshrivastavajindalpowercom 9329445016

XVI TORRENT POWER45 Shri Kamal K Vyas kamalvyastorrentpowercom 997407965746 Shri Pramod G Patel AGM pramodpateltorrentpowercom 9824370005

XVII NCA47 Shri Naveen Nath Das emc_ncarediffmailcom 9425053309

XVIII STERLITE GRID LTD48 Shri Sachin S Deshpande GM sachindeshpandesterlitecom 8966903047

XIX LANCO AMARKANTAK POWER LTD49 Shri BN Panda pandabnlancogroupcom 769770301550 Shri Anil Sharma anilshlancogroupcom 9560258009

XX KWPCL51 Mis Smruti R Nayak DGM smrutinayakavanthapowercom 9424176680

XXI MB POWER LTD 52 Shri Sandeep Kumar Gupta sandeepguptahpplin 9582896418

Anaulagnak 21

maah jaUlaa[- 2014

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5020 Hz BETWEEN 1700 Hrs amp 1800 Hrs Hrs ON 27072014

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4962 Hz BETWEEN 1900 Hrs amp 2000 Hrs Hrs ON 25072014

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4993 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5036 Hz AT 130344 Hrs ON 23072014

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4939 Hz AT 194315 hrs Hrs ON 25072014

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS JULY 2014 JUNE 2014 MAY 2014

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 008 023 000

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 314 476 093 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 3129 3216 2155 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 5016 4536 5319

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1533 1749 2433

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING JULY 2014

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

Voltage Profile during the month of July 2014

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 420 402 420 404 433 411 424 424 417 400 420 403 422 407 408 3902 417 398 420 400 431 407 424 424 417 401 427 418 421 409 410 3943 417 393 419 397 432 408 420 396 417 400 425 419 422 408 407 3934 416 398 419 401 434 412 422 402 417 400 426 421 418 406 411 3965 417 400 419 403 433 414 424 424 417 403 424 419 417 406 410 3996 420 406 422 408 438 411 421 402 419 407 427 421 422 412 409 3897 412 396 419 402 428 413 420 399 414 401 423 419 417 409 409 3968 418 400 421 410 433 400 424 400 416 400 425 419 422 400 410 3949 418 412 421 410 433 413 424 410 416 408 425 419 422 412 410 394

10 415 399 417 403 435 415 400 400 418 404 424 421 422 414 410 41111

स नक Annex-23

िभलाईBhilai

धल असोज कासोरKarad Dhule Asoj Kasor

इदौर इटारसी कराडIndore Itarsi

जतपरJetpur

11 416 402 423 407 436 416 422 407 416 405 425 421 423 413 410 39712 419 400 422 406 436 417 400 400 419 403 426 422 423 413 410 39713 415 400 422 410 437 417 400 400 417 406 425 421 422 414 411 39514 416 398 423 409 439 416 400 400 419 404 424 421 422 413 412 39815 420 403 423 408 437 413 428 401 418 404 426 422 423 413 410 39816 423 408 426 411 437 413 429 403 421 406 428 424 423 415 413 40017 421 404 424 407 436 416 400 400 419 408 423 414 423 414 411 39818 421 404 424 407 436 416 400 400 420 406 427 423 423 414 411 39819 423 407 425 410 434 415 425 411 424 405 428 425 424 416 422 39520 421 407 424 410 420 420 427 410 421 407 427 424 423 416 417 39621 421 406 424 411 420 420 400 400 420 402 428 425 426 418 413 39222 421 407 426 413 420 420 400 400 419 401 428 425 428 420 412 39623 422 409 427 410 419 415 415 402 420 403 425 419 428 420 412 39624 420 406 425 409 420 420 400 400 420 404 429 426 427 416 409 39625 422 401 421 404 420 420 400 400 424 402 428 424 423 415 415 39726 420 402 421 406 431 419 400 400 422 403 428 423 422 413 415 40027 417 404 422 407 434 416 423 407 421 405 428 424 422 413 416 40128 419 403 421 407 437 416 431 408 423 406 428 426 423 415 415 40229 419 403 420 408 437 415 400 400 421 406 429 426 423 416 415 39930 421 404 422 406 438 415 400 400 423 404 430 426 426 415 420 40331 420 395 420 402 431 406 428 403 422 403 429 425 423 414 419 398

423 393 427 397 439 400 431 396 424 400 430 403 428 400 422 389

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 418 404 411 395 423 406 430 406 789 752 788 757 787 756 791 7662 419 397 411 393 423 403 431 404 772 748 791 756 786 750 793 7553 416 402 411 397 421 397 425 399 772 748 780 751 781 757 791 7634 417 404 409 396 420 415 428 406 772 748 786 757 780 755 791 7655 418 404 418 400 421 404 427 407 772 748 796 755 796 765 802 7726 419 408 416 402 424 410 429 413 789 752 797 768 796 765 799 7757 414 406 407 397 420 403 426 407 789 752 776 758 777 757 784 7658 418 408 411 388 422 400 429 400 789 752 786 767 783 746 790 7719 412 401 403 386 422 405 429 408 789 752 781 761 772 745 783 76010 413 403 402 394 420 404 424 406 789 752 792 764 774 755 785 765

Bina Gwalior Nagda Khandwa Sipat

बना वािलयरिसविननागदावािलयर बनाBina

िसपतखडवाseoni Gwalior

10 413 403 402 394 420 404 424 406 789 752 792 764 774 755 785 76511 415 407 403 395 421 407 426 410 789 752 790 774 785 758 790 77212 418 406 407 392 422 404 427 404 789 752 796 769 784 756 796 76913 418 406 407 392 421 408 427 411 789 752 796 769 784 756 796 76914 419 410 409 397 423 406 428 409 789 752 784 768 786 763 792 77415 419 404 408 391 424 407 429 408 789 752 789 763 786 750 791 76416 424 414 408 400 427 411 431 413 789 752 792 766 785 767 797 77917 421 410 411 399 424 407 432 409 789 752 788 762 789 766 795 77618 423 412 414 396 424 407 432 409 789 752 783 770 796 765 801 77719 424 411 410 396 426 411 431 413 789 752 791 770 788 764 803 77720 425 411 411 396 424 410 428 414 789 752 786 763 789 760 800 77221 422 412 410 395 424 409 428 413 789 752 784 760 788 763 796 77522 423 416 414 402 424 410 429 414 789 752 791 774 794 773 801 78423 425 413 418 402 424 410 430 412 787 750 785 770 798 780 804 78324 422 411 411 397 425 409 431 415 789 752 790 772 791 773 801 78125 421 410 405 396 423 403 429 409 789 752 784 770 794 767 798 77726 421 410 409 395 423 404 427 409 789 752 792 773 789 767 799 77827 423 412 413 399 420 404 428 409 789 752 794 766 797 770 808 78028 422 411 411 399 421 405 428 410 789 752 789 763 794 770 793 77029 419 409 411 397 423 406 430 414 789 752 794 771 795 767 796 77430 422 409 413 398 420 404 430 413 788 753 796 766 799 766 799 77331 420 404 409 395 421 397 429 411 789 752 787 764 792 759 795 767

425 397 418 386 427 397 432 399 789 748 797 751 799 745 808 755

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Jul-14 0 0 0 0 0 0 0 02 02-Jul-14 0 0 0 0 0 0 0 03 03-Jul-14 0 0 0 0 0 0 0 04 04-Jul-14 0 0 0 0 0 0 0 05 05-Jul-14 0 0 0 0 0 0 0 06 06-Jul-14 1 67 0 0 0 0 0 07 07-Jul-14 0 0 0 0 0 0 0 08 08-Jul-14 1 278 0 0 0 0 0 09 09-Jul-14 0 0 0 0 0 0 0 0

10 10-Jul-14 1 565 0 0 0 0 0 011 11-Jul-14 0 0 0 0 0 0 0 012 12-Jul-14 0 0 0 0 0 0 0 013 13-Jul-14 3 758 0 0 0 0 0 014 14-Jul-14 0 0 0 0 0 0 0 015 15-Jul-14 0 0 0 0 0 0 016 16-Jul-14 2 2127 NIL NIL NIL 017 17-Jul-14 0 0 0 0 0 0 0 018 18-Jul-14 1 08 0 0 0 0 0 019 19-Jul-14 0 0 0 0 0 0 0 020 20-Jul-14 0 0 0 0 0 0 0 021 21-Jul-14 0 0 0 0 0 0 0 022 22-Jul-14 0 0 0 0 0 0 0 023 23-Jul-14 0 0 0 0 0 0 0 024 24-Jul-14 0 0 0 0 0 0 0 025 25-Jul-14 0 0 0 0 0 0 0 026 26-Jul-14 0 0 0 0 0 0 0 027 27-Jul-14 0 0 0 0 0 0 0 028 28-Jul-14 0 0 0 0 0 0 0 029 29-Jul-14 0 0 0 0 0 0 0 030 30-Jul-14 0 0 0 0 0 0 0 031 31-Jul-14 0 0

Max 3 758 0 0 0 00 0 0Total 9 24917 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month July 2014

Recommonded Load relief at 492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE 25

POWER CUTRESTRICTIONS IN WESTERN REGION FOR THE MONTH OF JULY-2014

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply(DLF)

01072014 31072014 2343 2105 2300

21 Three-Phase Supply(Irrigation)

01072014 31072014 0953 0857 0933

21 Three-Phase Supply(Mixed)

01072014 31072014 2339 2055 2240

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01072014 31072014 2353 2325 2344 32 District Head Qtrs 01072014 31072014 2357 2330 2348 33 Tehsil Head Qtrs 01072014 31072014 2350 2230 2319

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 010714 to 310714

SaUnya Nil

0-470 MW

SaUnya Nil

0000

SaUnya Nil 2400

SaUnya Nil

19 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs) 21 Three-Phase Supply 01072014 31072014 1000 0800 0900

22 Single-Phase Supply 01072014 31072014 1800 1800 1800 3 Anya jaanakarI Any other information There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

8860 (Av) of 31days 0000(Av) 0000 (Av)

1Rural 7109(Av) for 23447 Hrs 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0532 - -

0537 -

3 HT Industries 8261 (Av) for 17270 Hrs 0357 Total Energy Cutday 1426 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01072014 to 310714 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 3172014 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil ca gaaovaa Goa SaUnya Nil

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-26 Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai अिनवाय यिनट आऊटज का जलाई2014का वःता रत यौरा

Details of forced unit outages during the month ofJuly2014

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 एःसार Essar-2

गरा विनिल GSECL

172 1212 22-Feb-13 अनपल ध Still out

अनपल ध Still out

Shortage of gas

2 यट पीएस UTPS-2

गरा विनिल GSECL

120 1951 17-Jun-14 अनपल ध Still out

अनपल ध Still out

Turbine tripped(RSD)

3 एःसार व डनार Essar vadinar-1

गरा विनिल GSECL

600 2335 3-Jul-14 1324 22-Jul-14 Coal shortage

4 डब यट पीएस WTPS-6

गरा विनिल GSECL

210 953 10-Jul-14 0707 14-Jul-14 BTL

5 एसट पीएस STPS-1

गरा विनिल GSECL

120 1220 10-Jul-14 0710 14-Jul-14 BTL

6 जीआईपीसीएल GIPCL-STG I-2

गरा विनिल GSECL

165 1744 14-Jul-14 अनपल ध Still out

अनपल ध Still out

C ampI problem

7 एएलट पीएस ALTPS-1

गरा विनिल GSECL

120 107 15-Jul-14 2037 19-Jul-14 BTL

8 िस का ट पीएस SIKATPS-1

गरा विनिल GSECL

120 1330 17-Jul-14 अनपल ध Still out

अनपल ध Still out

RSD

9 डब यट पीएस WTPS-4

गरा विनिल GSECL

210 858 18-Jul-14 अनपल ध Still out

अनपल ध Still out

RSD

10 डब यट पीएस WTPS-3

गरा विनिल GSECL

210 1046 18-Jul-14 अनपल ध Still out

अनपल ध Still out

RSD

11 डब यट पीएस WTPS-5

गरा विनिल GSECL

210 1818 18-Jul-14 000 21-Jul-14 RSD

12 डब यट पीएस WTPS-6

गरा विनिल GSECL

210 447 19-Jul-14 अनपल ध Still out

अनपल ध Still out

RSD

13 यट पीएस UTPS-3

गरा विनिल GSECL

200 1055 26-Jul-14 2328 1-Aug-14 RSD

14 एपीएल APL-6

अदानी ADANI

660 2146 5-Jul-14 1105 2-Aug-14 Heavy hydrogen leakage

15 एपीएमएल APML-4

अदानी ADANI

660 1132 10-Jul-14 1407 23-Jul-14 Coal shortage

16 एपीएल APL-1

अदानी ADANI

330 117 20-Jul-14 612 23-Jul-14 RSD

प म ऽय भार षण कि म बई णाली चालन-ISO-I

17 एपीएल APL-8

अदानी ADANI

660 2018 18-Jul-14 2209 21-Jul-14 BTL

18 एपीएल APL-2

गरा विनिल GSECL

330 0913 26-Jul-14 1714 29-Jul-14 Air pre heater problem

19 एपीएल APL-5

गरा विनिल GSECL

660 1910 29-Jul-14 1533 2-Aug-14 Heavy steam leakage

20 डब यपीसीएल WPCL-1

मारा वउकिल MSPGCL

135 1245 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Furnace press high

21 डब यपीसीएल WPCL-4

मारा वउकिल MSPGCL

135 001 3-Apr-14 2347 11-Jul-14 Less schedule

22 कोराड Koradi-5

मारा वउकिल MSPGCL

200 1030 17-Jun-14 अनपल ध Still out

अनपल ध Still out

ID fan bearing temperature high

23 इ डयाबल Indiabulls - 1

मारा वउकिल MSPGCL

270 546 26-Jun-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

24 पल Parli -4

मारा वउकिल MSPGCL

210 1019 29-Jun-14 अनपल ध Still out

अनपल ध Still out

water shortage

25 भसावल Bhusawal-2

मारा वउकिल MSPGCL

210 1117 6-Jul-14 544 10-Jul-14 Coal problem

26 चिपर Chandrapur-1

मारा वउकिल MSPGCL

210 2211 8-Jul-14 2106 13-Jul-14 BTL

27 चिपर Chandrapur-3

मारा वउकिल MSPGCL

210 2216 14-Jul-14 1452 18-Jul-14 Safety valve problem

28 उरण Uran-6 मारा वउकिल MSPGCL

108 1634 15-Jul-14 1407 22-Jul-14 Gas shortage

29 उरण Uran -5 मारा वउकिल MSPGCL

108 2338 17-Jul-14 1125 24-Jul-14 For rotor balancing work

30 उरण Uran -A0 मारा वउकिल MSPGCL

120 2340 17-Jul-14 2315 23-Jul-14 For rotor balancing work

31 भसावल Bhusawal-2

मारा वउकिल MSPGCL

210 2346 18-Jul-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

32 खापरखड़ा Khaparkeda-3

मारा वउकिल MSPGCL

210 1036 20-Jul-14 041 29-Jul-14 Flame failure

33 जयगड Jaigad-2 मारा वउकिल MSPGCL

300 000 20-Jul-14 Ready Ready Less requisition

34 वीआईपीएल VIPL-2

मारा वउकिल MSPGCL

300 2302 20-Jul-14 1716 26-Jul-14 Coal feeding problem

35 एपीएमएल APML-3

मारा वउकिल MSPGCL

660 0444 22-Jul-14 044 26-Jul-14 Pressure release valve operated

36 भसावल Bhusawal-4

मारा वउकिल MSPGCL

500 003 23-Jul-14 151 29-Jun-14 BTL

37 वीआईपीएल VIPL-1

मारा वउकिल MSPGCL

300 015 23-Jul-14 1300 31-Jul-14 Coal feeding problem

38 उरण Uran -8 मारा वउकिल MSPGCL

108 730 26-Jul-14 1700 29-Jul-14 Gas shortage

39 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 347 29-Jul-14 638 4-Aug-14 BTL

प म ऽय भार षण कि म बई णाली चालन-ISO-I

40 पल PARLI-5 मारा वउकिल MSPGCL

210 002 30-Jul-14 अनपल ध Still out

अनपल ध Still out

Water shortage

41 टाटा TATA-8

टाटा TATA

250 2255 9-Jan-14 अनपल ध Still out

अनपल ध Still out

HT due to fire near turbine generator desk

42 टाटा TATA-6

टाटा TATA

500 2134 31-Jul-14 Ready Ready Less requisition

43 आरजीपीपीएल RGPPL-3A

आरजीपीपीएल RGPPL

320 1857 17-Apr-14 Ready Ready Less requisition

44 आरजीपीपीएल RGPPL-2B

आरजीपीपीएल RGPPL

320 1915 17-Jun-14 अनपल ध Still out

अनपल ध Still out

Raw water problem

45 आरजीपीपीएल RGPPL-2A

आरजीपीपीएल RGPPL

320 1615 25-Jun-14 1200 21-Jul-14 Less requisition

46 आरजीपीपीएल RGPPL-1A

आरजीपीपीएल RGPPL

320 1330 8-Jul-14 Ready Ready Less requisition

47 अमरकनटक Amarkantak-4

म वउकिल MPPGCL

120 1113 30-Apr-14 अनपल ध Still out

अनपल ध Still out

TURBINE BEARING VIBRATION HIGH

48 सातपरा Satpura-6

म वउकिल MPPGCL

200 305 18-Jun-14 अनपल ध Still out

अनपल ध Still out

BTL

49 एसजीट पीएस SGTPS-3

म वउकिल MPPGCL

210 617 26-Jun-14 020 26-Jul-14 Conveyer belt problem

50 अमरकनटक Amarkantak-3

म वउकिल MPPGCL

120 1640 2-Jul-14 1623 11-Jul-14 BTL

51 सातपरा Satpura-9

म वउकिल MPPGCL

210 2200 5-Jul-14 855 15-Jul-14 Condenser tube cleaning

52 सातपरा Satpura-9

म वउकिल MPPGCL

210 1310 15-Jul-14 845 24-Jul-14 BTL

53 एसजीट पीएस SGTPS-4

म वउकिल MPPGCL

210 2233 19-Jul-14 1252 4-Aug-14 Coal shortage

54 सातपरा Satpura-7

म वउकिल MPPGCL

210 225 21-Jul-14 545 24-Jul-14 BTL

55 सातपरा Satpura-10

म वउकिल MPPGCL

250 2316 22-Jul-14 07082014 High vibration in generator winding

56 एसजीट पीएस SGTPS-3

म वउकिल MPPGCL

210 1857 28-Jul-14 1020 2-Aug-14 Drum level low

57 DSPM(K(E) extn)-2

छरा वउकिल CSPGCL

250 2310 21-Jul-14 2029 22-Jul-14 Coal shortage

58 कोरबा पव Korba(E)-3

छरा वउकिल CSPGCL

210 1030 22-Jul-14 1025 27-Jul-14 CTL

59 कोरबा पव Korba(E)-5

छरा वउकिल CSPGCL

120 1345 22-Jul-14 1140 26-Jul-14 Wet coal problem

60 कोरबा पव Korba(E)-5

छरा वउकिल CSPGCL

120 2320 30-Jul-14 155 2-Aug-14 Coal shortage

61 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

62 एःसार महान Essar-Mahan-1

एःसारESSAR 600 014 22-Jun-14 1255 11-Jul-14 Less schedule

63 एःसारमहानEssar Mahan-1

एःसार ESSAR 600 620 16-Jul-14 1252 28-Jul-14 Withdrawn due to tripping of evacuation

प म ऽय भार षण कि म बई णाली चालन-ISO-I

Lines

64 सीजीपीएल CGPL-50

सीजीपीएल CGPL

830 948 13-Jun-14 409 23-Jul-14 Ash hopper refractory damage

65 सीजीपीएल CGPL-10

सीजीपीएल CGPL

830 1332 1-Jul-14 1952 9-Jul-14 BTL

66 सीजीपीएल CGPL-20

सीजीपीएल CGPL

800 1214 24-Jul-14 13-aug-14

Bottom ash Hopper works

67 सीजीपीएल CGPL - 40

सीजीपीएल CGPL

830 1918 26-Jul-14 1020 2-Aug-14 GT electrical fault

68 जपीएल JPL STG-2 UNIT-1

जपीएल JPL 600 051 26-Jun-14 अनपल ध Still out

अनपल ध Still out

Turbine vibration

69 जपीएलJPL STG-2 UNIT-2

जपीएलJPL 600 000 5-Jul-14 1457 11-Jul-14 Less requisition

70 जपीएल JPL STG-2 UNIT-2

जपीएलJPL 600 748 21-Jul-14 1800 24-Jul-14 BTL

71 एसीबीआईएल ACBIL-1

एसीबीआईएल ACBIL

135 151 6-Jul-14 1753 9-Jul-14 Furnace draft high

72 ससान Sasan -3 आरईएल REL 660 1648 15-Jul-14 2248 4-Aug-14 Ash evacuation problem

73 ससान Sasan-4 आरईएल REL 660 1645 24-Jul-14 810 3-Aug-14 High press main steam tripped

74 एमको EMCO-I एमको EMCO 200 109 16-Jul-14 अनपल ध Still out

अनपल ध Still out

Turbine vibration high

75 एसीबीआईएल ACBIL-2

एसीबीआईएल ACBIL

135 1955 21-Jul-14 601 24-Jul-14 Furnace draft high

76 मौदा Mouda -1

एनट पीसीNTPC 500 1630 18-Jun-14 2042 14-Jul-14 Flame failure

77 कावास Kawas-1C

एनट पीसीNTPC 116 2311 2-Jul-14 2100 6-Jul-14 Heavy steam leakage from stop valve

78 कावास Kawas-1B

एनट पीसीNTPC 106 2323 2-Jul-14 632 7-Jul-14 Less requisition

79 कावास Kawas-2B एनट पीसीNTPC 164 1704 10-Jul-14 Ready Ready Less requisition

80 कावास Kawas-1A एनट पीसीNTPC 164 1200 12-Jul-14 745 22-Jul-14 Less requisition

81 वीएसट पीएस VSTPS-11

एनट पीसीNTPC 500 1204 13-Jul-14 000 16-Jul-14 Coal shortage

82 गाधारGandhar-1 एनट पीसीNTPC 144 149 16-Jul-14 1807 21-Jul-14 Less requisition

83 कावास Kawas-1B एनट पीसीNTPC 164 1027 18-Jul-14 442 23-Jul-14 Less requisition

84 मौदा Mouda-1 एनट पीसीNTPC 500 000 18-Jul-14 1745 24-Jul-14 Less requisition

85 िसपतSipat-1 एनट पीसीNTPC 660 000 21-Jul-14 955 24-Jul-14 Generator H2 gas leakage

86 गाधार Gandhar-3

एनट पीसीNTPC 144 1607 21-Jul-14 अनपल ध Still out

अनपल ध Still out

BB protection operatedatJhanor

87 गाधार Gandhar-4(ST)

एनट पीसीNTPC 224 1607 21-Jul-14 1320 26-Jul-14 BB protection operatedatJhanor

88 ट स TAPS-1

एनट पीसीNTPC 160 2227 21-Jul-14 1407 26-Jul-14 Maintenance

89 गाधार एनट पीसीNTPC 144 507 22-Jul-14 Ready Ready Less requisition

प म ऽय भार षण कि म बई णाली चालन-ISO-I

Gandhar -1

90 मौदा mouda-2 एनट पीसीNTPC 500 915 23-Jul-14 315 31-Jul-14 Coal feeding problem

91 कावास Kawas-1A

एनट पीसीNTPC 106 608 24-Jul-14 1309 27-Jul-14 Less requisition

92 गाधार Gandhar-2

एनट पीसीNTPC 144 2036 26-Jul-14 100814 Less requisition

93 वीएसट पीएस VSTPS-2

एनट पीसीNTPC 210 500 27-Jul-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

94 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 748 27-Jul-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

95 मौदा Mouda-2 एनट पीसीNTPC 500 315 31-Jul-14 210 3-Aug-14 Less requisition Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का जलाई2014 का वःता रत यौरा

Details of planned unit outages during the month of July2014 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

सo From

समय दनाक

कारण Reason

Time Date Time Date

1 एसएलपीपी SLPP-2

गरा विनिल GSECL

125 045 23-Jun-14 NA 17-Jul -14 AOH

2 डब यट पीएस WTPS-5

गरा विनिल GSECL

210 000 21-Jul-14 29-0814 COH

3 यट पीएस UTPS-4

गरा विनिल GSECL

200 000 21-Jul-14 240814 AOH

4 एसएलपीपी SLPP-3

गरा विनिल GSECL

125 130 22-Jul-14 060814 AOH

5 यट पीएस UTPS-1

गरा विनिल GSECL

120 000 29-Jul-14 28814 AOH

6 पल ParlI-3

मारा वउकिल MSPGCL

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

Water supply problem

7 चिपर Chandrapur-7

मारा वउकिल MSPGCL

500 600 19-Jun-14 1124 2-Aug-14 AOH

8 नािसक NASIK -3

मारा वउकिल MSPGCL

210 1410 10-Jul-14 अनपल ध Still out

100814 AOH

9 कोरबा प म Korba(W)-2

छरा वउकिल CSPGCL

210 936 26-Jun-14 140814 AOH

10 वदनाVandana-I वदना VANDANA 135 1940 17-Jul-14 अनपल ध Still out

अनपल ध Still out

ETL

11 वीएसट पीएस VSTPS-8

एनट पीसीNTPC 500 012 1-Jun-14 253 13-Jul-14 AOH

12 कएसट पीएस KSTPS-4

एनट पीसीNTPC 500 2335 20-Jun-14 180814 COH

13 कावास Kawas-2A

एनट पीसीNTPC 106 000 27-Jun-14 260814 RampM works

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

11 Akrimota 1 125 4-Aug-14 14-Aug-14 AOH12 WTPS 2 210 5-Aug-14 3-Sep-14 AOH13 SLPP 1 125 16-Aug-14 4-Sep-14 AOH14 DGB 1 107 20-Aug-14 27-Aug-14 CI15 GIPCL-I GT-3 48 22-Aug-14 27-Aug-14 HGPI16 GIPCL-I GT-2 48 29-Aug-14 3-Sep-14 HGPI17 GIPCL-I GT-2 48 12-Aug-14 24-Aug-14 HGPI18 UTPS 3 200 19-Aug-14 12-Sep-14 AOH19 GTPS 2 120 25-Aug-14 14-Sep-14 AOH110 STPS 1 120 19-Aug-14 30-Aug-14 AOH111 GTPS 3 210 24-Aug-14 13-Sep-14 AOH112 APL 9 660 1-Sep-14 20-Sep-14 AOH

221 SGTPS 4 210 010914 250914 AOH3 Craiva]kMila CSPGCL

31 Korba East-6 6 120 21-Aug-14 13-Sep-14 AOH32 Korba East-1 1 50 15-Aug-14 1-Sep-14 AOH33 Korba East-3 3 50 21-Aug-14 30-Sep-14 AOH34 Korba West-1 1 210 12-Sep-14 27-Sep-14 COH35 Korba West-5 5 500 15-Aug-14 30-Aug-14 AOH

4

41 PARAS 3 250 20914 151014 AOH42 RELIANCE 2 250 140814 160814 TURBINE VIBRATION

5 koMd``Iya xao~ Central Sector

51 SIPAT 1 600 050914 191014 BLR OH + HPT + IPT+LPT + GEN

52VINDHYACHAL

5 500 120814 200914 CAP+TG PED CKG+GEN+BLR CHEM CLNG+ESP RampM

53VINDHYACHAL

9 500 120814 150914 BLR OH + HPT + IPT+ GEN

54VINDHYACHAL

11 500 160714 170814 AOH

55CGPL

30 800 150814 050914 Bottom ash hopper Refractory repair and General maintainance work

56 CGPL 40 800 060914 300914 UT 40B repair work57 NSPCL 1 250 200814 110914 AOH

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING AUGUST 2014 AND SEPTEMBER 2014

Capacity Outage as per Annual Maintenance Plan

Date Time Date Time

1 400 400KV BUS-I at Bilaspur Ss 14-Aug-14 900 14-Aug-14 1800 DAILY For bus bar stability of LANCO bays amp jumpering work WRTS-I LANCO C

2 400kV 50 MVAR Bus Reactor-2 at Itarsi SS 14-Aug-14 800 15-Oct-14 1800 Continuo

us Installation of 125MVAR reactor WRTS-II WRTS-II C

3 765 Satna-Gwalior2 14-Aug-14 800 17-Aug-14 1800 DailyCompletion of 765kV Gwalior2 Main Bay Erection amp Testing works at Satna

PGCIL WRTS-II C

4 400 400kV JBP- JBP Pooling 2 Line 14-Aug-14 1000 14-Aug-14 1500 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

5 400 400KV BUS-II at Bilaspur Ss 16-Aug-14 900 16-Aug-14 1800 DAILY For bus bar stability of LANCO bays amp jumpering work WRTS-I LANCO C

6 765 Bus2 at satna 16-Aug-14 800 18-Aug-14 1800 DailyExtension of bus 2 for Gwalior2 bay amp completion of Main Bay Erection

PGCIL WRTS-II C

7 400 Khandwa-Dhule1 16-Aug-14 800 31-Aug-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WR-II C

8 400 Gandahr - Navsari DC 16-Aug-14 800 31-Aug-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WR-II R

PID testing of insulator strings

KV Line From To

Annexure-32

Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

9 400 Navsari - Vapi - Kala 16-Aug-14 800 31-Aug-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WR-II R

10 400 Satna - Bina Ckt 1amp2 16-Aug-14 800 31-Aug-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WR-II R

11 400 80 MVAR Bus Reactor at Kotra 16-Aug-14 900 17-Aug-14 1800 ContinuousTo attend isolator defects WRTS-I PGCIL C

12 400 400kV JBP- JBP Pooling 1 Line 17-Aug-14 1000 17-Aug-14 1500 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

13 765 ICT II at Bina 17-Aug-14 0900 17-Aug-14 1800 Daily Post Commissioning check of Fire-Fighting system at Bina PGCIL WRTS-II C

14 765 Bus-2 at Gwalior 17-Aug-2014 1000 18-Aug-2014 1800 Daily Busbar Jumpering ampStability test related to Bus reactor

POWERGRID WRTS-II C

15 765 Seoni 2 LR(704 LR) at Bilaspur Ss 18-Aug-14 900 18-Aug-14 1500 DAILY For taking Spare LR in service

first time WRTS-I PGCIL C

16 400 Bhadrawati-Ramagundam I 18-Aug-14 800 18-Aug-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

17 400 400kV Vchal - JBP 1 Line 18-Aug-14 1000 18-Aug-14 1200 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

18 400 400kV Vchal - JBP 2 Line 18-Aug-14 1400 18-Aug-14 1600 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

19 400 400KV BUS-II at Bilaspur Ss 19-Aug-14 900 19-Aug-14 1800 DAILY For bus bar stability of LANCO bays amp jumpering work WRTS-I LANCO C

20 400 Bhadrawati-Ramagundam II 19-Aug-14 800 19-Aug-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

21 765 ICT 1 at G alior 19 A g 14 10 00 20 A g 14 18 00 Continou SPARE ICT COMMISSIONING PGCIL WRTS II C21 765 ICT - 1 at Gwalior 19-Aug-14 1000 20-Aug-14 1800 s SPARE ICT COMMISSIONING PGCIL WRTS-II C

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

22 400 400kV JBP- Itarsi 1 Line 19-Aug-14 1000 19-Aug-14 1200 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

23 400 400kV JBP- Itarsi 2 Line 19-Aug-14 1400 19-Aug-14 1600 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

24 400 400 kV Sipat -Ranchi-1 19-Aug-14 900 20-Aug-14 1900 Continous 1 no of CT replacement NTPC NTPC

25 400 BUS-I at Aurangabad(PG) 19-Aug-14 600 20-Aug-14 1800 ContiBus-1 extn for commissioning of 400 kV Boisar-1amp2 bays with 80 MVAR Reactors

WRTS-I WRTS-I C

26 400kV 400kV SUGEN PIRANA Line (Line 2) 19-Aug-14 900 19-Aug-14 1700 Daily Corrective Maintenance of

Transfer Isolator TPL-SUGE TPL-SUG R

27 400kV 400kV PGCIL - PIRANA Feeder No 2 19-Aug-14 900 19-Aug-14 1700 Daily 400kV CT connectors replacementTPL-AHME TPL-AHM R

28 400 Bhadrawati-Parli 1amp 2 19-Aug-14 000 20-Oct-14 1800 DailyFor OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

29 400 Mundra - Jetpur line No1 19-Aug-14 800 19-Aug-14 1200 Daily protection logic checking work PGCIL GETCO30 400 Mundra - Jetpur line No 2 19-Aug-14 1400 19-Aug-14 1800 Daily protection logic checking work PGCIL GETCO

31 400 400KV BUS-I at Bilaspur Ss 20-Aug-14 900 20-Aug-14 1800 DAILY For bus bar stability of LANCO bays amp jumpering work WRTS-I LANCO C

32 400 KSK ndash Raigarh circuit 4 20-Aug-14 900 21-Aug-14 1800 CONT complete PLCC rectification works WRTS-I KSK C

33 HVDC HVDC POLE I AT BHADRAWATI 20 A 14 8 00 21 A 14 18 00 D il AMP WORKS WRTS I WRTS I R33 HVDC HVDC POLE-I AT BHADRAWATI 20-Aug-14 800 21-Aug-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

34 765kV Dharamjaygarh - Durg ckt-2 20-Aug-14 800 22-Aug-14 1800 daily CSD relay commissioning (M+T) WRTS-I PGCIL C

35 765 JBP - BINA 1 at Jabalpur Pooling Station 20-Aug-14 1000 21-Aug-14 1800 Daily Commissioning of CSD Relay for

765KV JBP - BINA Ckt 1 PGCIL WRTS-II C

36 400 Khandwa-Dhule1 20-Aug-14 1000 20-Aug-14 1500 Daily AMP PGCIL WRTS-II R

37 400 Bus-1 at Shujalpur 20-Aug-14 1000 20-Aug-14 1800 Daily AMP PGCIL WRTS-II R

38 400 Bus2 at Satna 20-Aug-14 900 20-Aug-14 1800 Daily For Bus Bar Stability and charging activity of 406 Bay PGCIL WRTS-II C

39 400 Bus1 at Indore 20-Aug-14 900 20-Aug-14 1800 Daily Jumper connection amp stability checking of Pitampur1 PGCIL WRTS-II C

40 400 400kV JBP- Itarsi 3 Line 20-Aug-14 1000 20-Aug-14 1200 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

41 765 Raigarh (Kotra) - Raigarh (Tamnar) 20-Aug-14 900 31-Aug-14 1800 ContinuousFor installation of Bird guards WRTS-I PGCIL C

42 400 Kansari - Kankroli line 20-Aug-14 800 20-Aug-14 1800 Daily PMU installation work and maintenPGCIL GETCO43 400 BUS-2 AT SOLAPUR 21-Aug-14 900 22-Aug-14 1800 Daily Pune bays extension works WRTS-I WRTS-I C

44 765 ICT 1 at Jabalpur Pooling Station 21-Aug-14 1000 21-Aug-14 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus for Spare ICT Phase

PGCIL WRTS-II C

45 400 Bina-Shujalpur1 21-Aug-14 900 21-Aug-14 1000 Daily

For Replacement of 390kV Reactor LA with 336kV LA Line will be taken in service without PGCIL WRTS-II Cj p g g y will be taken in service without Line Reactor at Shujalpur

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

46 400 Khandwa-Dhule2 21-Aug-14 1000 21-Aug-14 1800 DailyFor Replacement of 390kV Reactor LA with 336kV LA At Khandwa amp AMP

PGCIL WRTS-II C

47 220 Damoh-Sagar 21-Aug-14 1000 21-Aug-14 1500 Daily AMP of terminal equipment at Damoh SS MPPTCL WR-II R

48 765 ICT2 at Indore 21-Aug-14 900 22-Aug-14 1800 Continious

For Auxiliary bus erection at Indore PGCIL WRTS-II C

49 400 125MVAr BR at Shujalpur 21-Aug-14 900 21-Aug-14 1800 Daily Differential stability of tie bay (Under commissioning) PGCIL WRTS-II C

50 400 Raipur-Bhadrawati-III 21-Aug-14 900 21-Aug-14 1800 ContinuousBus split at Raipur WRTS-I PGCIL C51 400 Kansari - Bhinmal line 21-Aug-14 800 21-Aug-14 1800 Daily PMU installation work and maintenPGCIL GETCO

52 HVDC HVDC POLE-2 AT BHADRAWATI 22-Aug-14 800 23-Aug-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

53 765 ICT I at Bina 22-Aug-14 0900 23-Aug-14 1800 DailyCommissioning of CSD Relay for 400kV side of ICT- rescheduling of outage

PGCIL WRTS-II C

54 765 JBP - BINA 2 at Jabalpur Pooling Station 22-Aug-14 1000 23-Aug-14 1800 Daily Commissioning of CSD Relay for

765KV JBP - BINA Ckt 2 PGCIL WRTS-II C

55 400 Khandwa-Rajgarh1 22-Aug-14 800 23-Aug-14 1800 PM Continous

Rectification of damaged tower peak at locno83 due to collapse of MPPTCL tower which is under construction

PGCIL MPPTCL C

F j i amp h i th56 400 Pirana-Vadodara-Asoj DC 22-Aug-14 800 23-Aug-14 1800 Daily

For jumpering amp charging the future cirucit of line in multi-circuit towers to prevent conductor theft

PGCIL WRTS-II C

57 220 Damoh-Damoh2 22-Aug-14 1000 22-Aug-14 1500 Daily AMP of terminal equipment at Damoh SS MPPTCL WR-II R

58 400kV 400kV SUGEN VAPI Line 22-Aug-14 900 22-Aug-14 1400 Daily Corrective Maintenance amp Inspection Dropper of 5 Core CT

TPL-SUGE TPL-SUG R

59 765 Bus Reactor Kotra 22-Aug-14 900 23-Aug-14 1800 Daily WRTS-I PGCIL C

60 400 Vindhyachal-Jabalpur3 23-Aug-14 900 23-Aug-14 1800 Daily

For Replacement of 390kV Reactor LA with 336kV LA At Jabalpur Line will remain out of service due to less clearance of Reactor LA from Line conductor

PGCIL WRTS-II C

61 765 ICT1 at Indore 23-Aug-14 900 26-Aug-14 1800 Continious

re routing of cables in CMB for commissioning of spare unit at Indore

PGCIL WRTS-II C

62 765 Bus- 2 at Bina 23-Aug-2014 0900 23-Aug-2014 1800 DailyFor Bus stability required for 765kV Jabalpur 3 Bay- Rescheduling of outage

POWERGRID WRTS-II C

63 765 Bus-1 at Gwalior 24-Aug-14 1000 25-Aug-14 1800 Daily Busbar Jumpering ampStability test related to Jaipur 1 main bay PGCIL WRTS-II C

64 400 Navasari- Kala MC line 25-Aug-14 800 26-Aug-14 1800 DailyConstruction work of Navasari- Boisar line on same Multi ckt WRTS-II WRTS-I Ctower

65 765 765400 AT-1 AT SOLAPUR 25-Aug-14 900 26-Aug-14 1800 Daily Spare ICT unit Aux bus commisioning works WRTS-I WRTS-I C

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

66 220 Korba-Budhipadar Ckt-3 at CSPDCL Korba Ss 25-Aug-14 900 26-Aug-14 1800 DAILY For diversion of line for SE

Railway MCL project WRTS-I PGCIL C

67 765 765KV Bus 1 at Jabalpur Pooling Station 25-Aug-14 1000 25-Aug-14 1800 Daily

765KV Bus 1 Extension for Switchyard Extension for BINA 3 Line Dia

PGCIL WRTS-II C

68 765 765KV ICT 1 at Jabalpur Pooling Station 25-Aug-14 1000 25-Aug-14 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus Isolators for Spare ICT Phase - Heavy Induction

PGCIL WRTS-II C

69 400 Vindhyachal-Jabalpur4 25-Aug-14 900 25-Aug-14 1800 Daily

For Replacement of 390kV Reactor LA with 336kV LA At Jabalpur Line will remain out of service due to less clearance of Reactor LA from Line conductor

PGCIL WRTS-II C

70 400 Bus-I at satna 25-Aug-14 900 25-Aug-14 1800 DailyFor Changing of Jumper from Twin Moose To Quad Moose in 401 bay (jaypee nigrie line-1)

PGCIL WR-II C

71 400 Deepnagar-Thaptitanda 25-Aug-14 900 25-Aug-14 1700 Daily To attend Isolator alignment problem MSETCL MSETCL

72 765 BUS-II and 765 ICT-1 at Aurangabad (PG) 25-Aug-14 600 25-Aug-14 1800 Daily Commissioning of spare ICT unit

at Aurangabad (PG) WRTS-I WRTS-I CAurangabad (PG) at Aurangabad (PG)

73 765 Kotra-durg Ckt-2 along with line reactor 25-Aug-14 900 28-Aug-14 1800 ContinuousReplacement of spacer damper WRTS-I PGCIL C

74 765 Wardha-Aurangabad (PG)-2 and Padge-1 LReactor 26-Aug-14 600 26-Aug-14 1800 Daily Construction of up-coming

Padghe bay at Aurangabad (PG) WRTS-I WRTS-I C

75 765 Gwalior -Bina 1 26-Aug-14 1000 27-Aug-14 1800 Daily Spare reactor commissioning at Gwalior PGCIL WR-II C

76 765 1500MVA ICT 2 at Jabalpur Pooling Station 26-Aug-14 1000 26-Aug-14 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus Isolators for Spare ICT Phase - Heavy Induction

PGCIL WRTS-II C

77 400 Jabalpur-Itarsi4 26-Aug-14 900 26-Aug-14 1800 Daily

For Replacement of 390kV Reactor LA with 336kV LA At Jabalpur Line will remain out of service due to less clearance of Reactor LA from Line conductor

PGCIL WRTS-II C

78 400 Akola ll-Thaptitanda 27-Aug-14 900 27-Aug-14 1900 Daily To attend chattering noise on B-ph wave trap MSETCL MSETCL

79 400 Vapi- Kala MC Line 27-Aug-14 800 28-Aug-14 1800 DailyConstruction work of Navasari- Boisar line on same Multi ckt tower

WRTS-II WRTS-I C

80 765 Bus 1 at Jabalpur Pooling Station 27-Aug-14 1000 27-Aug-14 1800 Daily

765KV Bus 1 Extension Busbar Stability test related to BINA 3 Line Dia

PGCIL WRTS-II C

81 400 KORBA SIPAT 27 Aug 14 600 29 Aug 14 2200 CONT NORMALISED THE LILO AT PGCIL LANCO C81 400 KORBA -SIPAT 27-Aug-14 600 29-Aug-14 2200 RAMPUR PGCIL LANCO C

82 400 TARAPUR-PADGHE II 27-Aug-14 800 28-Aug-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

83 765 Gwalior-Satna1 28-Aug-14 800 28-Aug-14 1800 Daily For spare reactor commissioning works at Gwalior PGCIL WRTS-II C

84 765 BUS-II and Padge-2 LReactor at Aurangabad (PG) 28-Aug-14 600 28-Aug-14 1800 Daily

Commissioning of Padghe-2 upcoming bay at Aurangabad (PG)

WRTS-I WRTS-I C

85 765 Bilaspur 1 Main bay (710) at Seoni 28-Aug-14 800 29-Aug-14 1800 Daily AMP works WRTS-I WRTS-I R

86 765 765400 AT-2 AT SOLAPUR 28-Aug-14 900 28-Aug-14 1800 Daily Spare ICT unit Aux bus commisioning works WRTS-I WRTS-I C

87 765 Bus Reactor(706 BR) at Bilaspur Ss 28-Aug-14 900 01-Sep-14 1800 DAILY For replacement of unarmoured

cable by TBEA WRTS-I PGCIL C

88 765 Bus 2 at Jabalpur Pooling Station 28-Aug-14 1000 29-Aug-14 1800 Daily

765KV Bus 2 Extension for Switchyard Extension for BINA 3 Line Dia

PGCIL WRTS-II C

89 400 MOUDA 400KV BUS REACTOR 28-Aug-14 0900hrs 29-Aug-14 1800 ContionuouAnnual Maintainance NTPC NTPC

90 765 Satna - Bina 1 29-Aug-14 0900 31-Aug-14 1800 Daily

for erection of new TC amp TE tower forNHPTL at Bina-Rescheduling of outage

PGCIL WRTS-II C

91 765 Bus Reactor at Satna 29-Aug-14 900 30-Aug-14 1800 Continious Commissioning of spre reactor PGCIL WRTS-II Cus

92 400 125MVAr BR1 at Indore 29-Aug-14 900 29-Aug-14 1800 Daily Post Commissioning check of Fire-Fighting system at Indore PGCIL WRTS-II C

93 400 Chorania Hadala line 29-Aug-14 800 29-Aug-14 1800 Daily PMM WORK GETCO GETCO

94 765 Kotra-durg Ckt-2 along with line reactor 29-Aug-14 900 31-Aug-14 1800 Daily WRTS-I PGCIL C

95 765 765400 ICT-2 at Aurangabad (PG) 30-Aug-14 600 30-Aug-14 1800 Daily Altube erection in 400 kV Boisar-

1amp2 Tie bays WRTS-I WRTS-I C

96 765kV Dharamjaygarh - Bilaspur 30-Aug-14 800 30-Aug-14 1800 daily commissioning of JBP-1 bay (side) WRTS-I PGCIL C

97 765kV 330 MVAR Bus Rector-2 at Dharamjaygarh 30-Aug-14 800 30-Aug-14 1800 daily commissioning of JBP-1 bay

(side) WRTS-I PGCIL C

98 400 Mundra Hadala SC 30-Aug-14 800 30-Aug-14 1800 DailyPower Line Crossing of 400 KV DC Bhachau SS (PG) - Varsana SS (GETCO) TrL

GETCO WRTS-II C

99 220 Gwalior - Mahalgaon 1amp2 30-Aug-14 900 31-Aug-14 1800 Continuous

For crossing of 765kV Gwalior - Jaipur line PGCIL WRTS-II C

100 220 Gwalior - Malanpur 1amp2 30-Aug-14 900 31-Aug-14 1800 Continuous

For crossing of 765kV Gwalior - Jaipur line PGCIL WRTS-II C

101 400 400 kV Akola- Nandagaon peth sc 31-Aug-14 800 31-Aug-14 1600 Daily crossing works of 765 kV Koradi-AWRTS-I WRTS-I R

102 400 Bina-Shujalpur2 31-Aug-2014 900 31-Aug-2014 1000 DailyFor Replacement of 390kV Reactor LA with 336kV LA Line

ill b t k i i ith t

POWERGRID WRTS-II C

103 400 Mundra - Sami DC 01-Sep-14 800 01-Sep-14 1800 DailyPower Line Crossing of 400 KV DC Bhachau SS (PG) - Varsana SS (GETCO) TrL

ADANI WRTS-II C

104 400 Akola-Wardha 1amp 2 01-Sep-14 800 30-Sep-14 1800 Daily For Online PID Line in service with AR in non-auto mode WRTS-I WRTS-I For IOwith AR in non auto mode

105 765 Bilaspur 2 Main bay (716) at Seoni 01-Sep-14 800 02-Sep-14 1800 Daily AMP works WRTS-I WRTS-I R

106 400 400220 ICT-1 AT SOLAPUR 01-Sep-14 900 01-Sep-14 1500 Daily AMP WORK WRTS-I WRTS-I R

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

107 765 1000 MVA ICT I amp ICT II at Bina 01-Sep-14 0900 01-Sep-14 1800 Daily Commissioning of Master follower

scheme PGCIL WRTS-II C

108 765 Bus 1 at Jabalpur Pooling Station 01-Sep-14 100000 AM 01-Sep-14 60000 PM Daily

765KV Bus 1 Extension Busbar Stability test related to Bhopal 1 Line Dia

PGCIL WRTS-II C

109 400 Shujalpur - Bina 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

110 400 Birsinghpur-Damoh 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

111 400 Gandhar - Navsari 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

112 400 Khandwa - Rajgarh 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

113 400 Indore - Nagda 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

114 400 Jabalpur - Jabalpur Pool 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II Cnon auto mode

115 400 Khandwa - Dhule 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

116 400 Itarsi - Khandwa 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

117 220 Satna - Satna 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

118 765 Dehgam - Ranchhodpura 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

119 765 Shujalpur - Nagda 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

120 400 Asoj - SSP 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

121 400 Bhachau - Mundra 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

122 400 Bina - Gwalior 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

123 400 Satna - Gwalior 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in PGCIL WRTS-II Cnon auto mode

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

124 400 LILO portion of Vapi - Navi Mumbai at Kala(Vapi-Kala Line) 01-Sep-14 600 30-Sep-14 1800 Daily

Online replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

125 400400 kV Khandwa - Rajgarh

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

126 400400 kV Gandhar-Navsari

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

127 400400 kV Rajgarh ndash SSP

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

128 400400 kV SSP-Asoj

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

129 400 400 kV Shujalpur - Nagda (MPPTCL)

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

130 400400 kV Dehgam - Ranchodpura

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

131 400 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in PGCIL WRTS-II C

400 kV Ranchodpura ndash Bhachaup p y OPGW AR shall be kept in

non auto mode

132 400400 kV Mundra-Bhachau

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

133 400400 kV Vindhyachal NTPC -SASAN UMPP Ckt-1 01-Sep-14 600 30-Sep-14 1800 Daily

Online replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

134 400400 kV Vindhyachal Pooling -Vindhyachal NTPC 01-Sep-14 600 30-Sep-14 1800 Daily

Online replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

135 400 400 kV LILO at Kala (DNH) SS of Vapi-Navi Mumbai Line

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

136 765765 kV Bina - Gwalior

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

137 765765 kV Satna - Gwalior Ckt-I

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

138 400 Gandahr - Navsari DC 01-Sep-14 800 30-Sep-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

139 400 Navsari - Vapi - Kala 01-Sep-14 800 30-Sep-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

PID testing of insulator strings 140 400 Satna - Bina Ckt 1amp2 01-Sep-14 800 30-Sep-14 1800 Daily AR shall be kept In non auto

modePGCIL WRTS-II R

141 400 Nagda - Dehgam DC 01-Sep-14 800 30-Sep-14 1800 Daily PID testing of insulator strings AR h ll b k t I t

PGCIL WRTS-II R

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

142 220 Kakrapar - Vapi DC 01-Sep-14 800 30-Sep-14 1800 Daily PID testing of insulator strings PGCIL WRTS-II R

143

220 220 KV Jhanor - Haldrwa Line 1

01-Sep-14

800

05-Sep-14

000

Continous Replacement of existing CTCVT with 02 class CT amp CVT and for testing of the same NTPC NTPC

144 400 Akola-Aurangabad(PG) 2 01-Sep-14 800 02-Sep-14 1800 Conti commissioning of 50MVAR Lreactor at Aurangabad(PG) WRTS-I WRTS-I C

145 765 Bina-Satna 2 02-Sep-14 0900 03-Sep-14 1800 Daily Post Commissioning check of Fire-Fighting system at Bina PGCIL WRTS-II C

146 400 Vadavi-Chorania 1 02-Sep-14 800 02-Sep-14 1800 Daily PMM WORK WRTGPL GETCO147 400 BUS REACTOR AT SOLAPUR 02-Sep-14 900 02-Sep-14 1500 Daily AMP WORK WRTS-I WRTS-I R

148 765 Korba Line Main Bay (716) at Bilaspur Ss 02-Sep-14 900 02-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

149 765 Bus 2 at Jabalpur Pooling Station 02-Sep-14 100000 AM 02-Sep-14 60000 PM Daily

765KV Bus 2 Extension for Switchyard Extension for Bhopal 1 Line Dia

PGCIL WRTS-II C

150 400 Bus2 at Indore 02-Sep-14 900 02-Sep-14 1800 Daily Jumper connection amp stability checking of Pitampur1 PGCIL WRTS-II C

151 400 CGPL-Limbdi-1 02-Sep-14 2-Sep-14 8AM 6PM Daily routine maintenance and isolator aPGCIL CGPL

152400 Korba-Bhalai line -1

02-Sep-14 900 03-Sep-14 19002 days

continuous CVTs replacement

NTPC NTPC00 o ba a a e us C s ep ace e t

153 400 Sipat 400KV Bus-1 02-Sep-14 900 03-Sep-14 1900 Continous Annual Preventive maintenance NTPC NTPC

154 765 Bilaspur 2 Tie bay (717) at Seoni 03-Sep-14 800 04-Sep-14 1800 Daily AMP works WRTS-I WRTS-I R

155 400 400220 ICT-1 AT SOLAPUR 03-Sep-14 900 03-Sep-14 1500 Daily AMP WORK WRTS-I WRTS-I R

156 765 Sipat2 Main Bay (712) at Bilaspur Ss 03-Sep-14 900 03-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

157 765 Bina-Gwalior 2 03-Sep-14 0900 04-Sep-14 1800 Daily For spare reactor commissioning works at Gwalior PGCIL WRTS-II C

158 765 Bus 2 at Jabalpur Pooling Station 03-Sep-14 100000 AM 03-Sep-14 60000 PM Daily

765KV Bus 2 Extension for Switchyard Extension for Jumpering (Bus Extension) for Bhopal 1

PGCIL WRTS-II C

159 400 Indore-Asoj3 03-Sep-14 900 04-Sep-14 1800 Continuous

For checking protection transfer system at Indore (MPPTCL) PGCIL WRTS-II C

160 400 400 kv Nagda- Rajgarh ckt Pgcil ckt I 03-Sep-14 900 03-Sep-14 03092014 1800 daily Maintenan

ce Work PGCIL EHT- Mamp I

161 400 Vadavi-Chorania 2 04-Sep-14 800 04-Sep-14 1800 Daily PMM WORK WRTGPL GETCO162 220 SOLAPUR(PG)-Solapur(M) 04-Sep-14 900 04-Sep-14 1800 Daily AMP WORK MSETCL WRTS-I R

163 765 Bus 2 at Jabalpur Pooling Station 04-Sep-14 100000 AM 04-Sep-14 60000 PM Daily

765KV Bus 2 Extension Busbar Stability test related to Bhopal 1 Line Dia

PGCIL WRTS-II C

164 400 CGPL-Limbdi-2 04-Sep-14 4-Sep-14 8AM 6PM Daily routine maintenance and isolator aPGCIL CGPL

165 400 400 kv Nagda- Rajgarh ckt Pgcil ckt II 04-Sep-14 900 04-Sep-14 04092014 1800 daily Maintenan

ce Work PGCIL EHT- Mamp I

166400 Korba-Bhalai line -2

04-Sep-14 900 05-Sep-14 19002 days

continuous CVTs replacement

NTPC NTPC

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

167 400 BUS-1 AT SOLAPUR 05-Sep-14 900 05-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I C

168 400 Seoni-Khandwa 1 05-Sep-14 800 05-Sep-14 1800 Daily Line AMP works at Seoni WRTS-II WRTS-I R

169 400 400220 ICT-2 AT BOISAR 05-Sep-14 900 05-Sep-14 1500 Daily For Bushing oil DGA Testing WRTS-I WRTS-I R

170 765 Sipat2 Tie Bay (711) at Bilaspur Ss 05-Sep-14 900 05-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

171 765 Bina-Jabalpur I 05-Sep-14 0900 06-Sep-14 1800 Daily Post Commissioning check of Fire-Fighting system at Bina PGCIL WRTS-II C

172 400 Bus Reactor 1 at Jabalpur Pooling Station 05-Sep-14 100000 AM 05-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

173 220 Navsari - Nasik - 1 05-Sep-14 800 05-Sep-14 1800 Daily PMM WORK PGCIL GETCO174 400 Sipat 400KV Bus-2 05-Sep-14 900 06-Sep-14 1900 Continous Annual Preventive maintenance NTPC NTPC175 400 Akola-Wardha ckt 2 05-Sep-14 800 05-Sep-14 1700 Daily QMwork MSETCL MSETCL176 400 Kalwa-Kharghar 05-Sep-14 900 05-Sep-14 1700 Daily R amp M work MSETCL MSETCL177 400 Seoni-Khandwa 2 06-Sep-14 800 06-Sep-14 1800 Daily Line AMP works at Seoni WRTS-II WRTS-I R178 400 400220 ICT-1 AT BOISAR 06-Sep-14 900 06-Sep-14 1500 Daily For Bushing oil DGA Testing WRTS-I WRTS-I R

179 400 Bus Reactor 2 at Jabalpur Pooling Station 06-Sep-14 100000 AM 06-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

180 765 Gwalior-Satna2 06-Sep-14 800 06-Sep-14 1800 Daily For spare reactor commissioning works at Gwalior PGCIL WRTS-II C

181 400 Indore-Indore1 06-Sep-14 900 07-Sep-14 1800 Continuo For checking protection transfer t t I d (MPPTCL) PGCIL WRTS-II C181 400 Indore Indore1 06 Sep 14 900 07 Sep 14 1800 us system at Indore (MPPTCL) PGCIL WRTS II C

182 220 Navsari - Nasik - 2 06-Sep-14 800 06-Sep-14 1800 Daily PMM WORK PGCIL GETCO

183 400 VAPI-BOISAR 07-Sep-14 800 08-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

184 765 Satna-Gwalior-2 Reactor 07-Sep-14 900 07-Sep-14 1800 Daily For Commissioning of CSD relay in Gwalior-2 reactor bay at Satna PGCIL WRTS-II C

185 220 DC Welspun - Shivlakha amp Anjar shivlakha Trl 07-Sep-14 80000 AM 07-Sep-14 60000 PM Daily

Power Line Crossing of 400 KV DC Bhachau SS (PG) - Varsana SS (GETCO) TrL

GETCO WR-II C

186 765 Bilaspur 1 Tie bay (711) at Seoni 08-Sep-14 800 09-Sep-14 1800 Daily AMP works WRTS-I WRTS-I R

187 400kV Bus-1 at Itarsi SS 08-Sep-14 800 08-Sep-14 1800 Daily AMP amp Protection testing WRTS-II WRTS-II R

188 765 Seoni2 Main Bay (707) at Bilaspur Ss 08-Sep-14 900 08-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

189 765 Bina-Jabalpur II 08-Sep-14 0900 09-Sep-14 1800 Daily Post Commissioning check of Fire-Fighting system at Bina PGCIL WRTS-II C

190 765 ICT 1 at Jabalpur Pooling Station 08-Sep-14 100000 AM 08-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

191 765 Gwalior-Bina3 08-Sep-14 800 09-Sep-14 1800 Daily For spare reactor commissioning works at Gwalior PGCIL WRTS-II C

192 400 V-satna-1 08-Sep-14 900 09-Sep-14 1900 Continuous

Major OH of Line Circuit Breaker (For dismantling of poles) NTPC NTPC

193

220 220 KV Jhanor- Haldrwa Line 2

08-Sep-14

800

12-Sep-14

000

Continous Replacement of existing CTCVT with 02 class CT amp CVT and for testing of the same NTPC NTPC

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

194 400 Vadavi- Kansari- 1 09-Sep-14 800 09-Sep-14 1800 Daily PMM WORK WRTGPL GETCO195 400 Bus-1 at Damoh 09-Sep-14 1000 10-Sep-14 1800 Daily AMP PGCIL WRTS-II R

196 765 Bus Reactor 1 at Jabalpur Pooling Station 09-Sep-14 100000 AM 09-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

197 400 Bina - Shujalpur 1 09-Sep-14 1000 09-Sep-14 1400 Daily AMP PGCIL WRTS-II C

198 400 400 kv Katni- Damoh ckt 09-Sep-14 800 09-Sep-14 09092014 1800 daily Maintenance Work PGCIL EHT-

Mamp I

199 220 220 KV OMKARESHWAR -KHANDWA 09-Sep-14 900 09-Sep-14 09092014 1600 daily Maintenan

ce Work PGCIL EHT- Mamp I

200 220 220KV MALANPUR -AURAIYA 09-Sep-14 900 09-Sep-14 09092014 1700 daily Maintenance Work

EHT- Mamp I

201400 Korba 400 KV Bus coupler -1

09-Sep-14 900 10-Sep-14 19002 days

continuous Annual maintenance and testing

NTPC NTPC

202 400kV Bus-2 at Itarsi SS 10-Sep-14 800 10-Sep-14 1800 Daily AMP amp Protection testing WRTS-II WRTS-II R203 400 400220KV ICT-2 at Seoni 10-Sep-14 800 11-Sep-14 1800 Conti OLTC overhauling works WRTS-I WRTS-I R

204 400 VAPI-BOISAR 10-Sep-14 800 11-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

205 400 Parli 2 Tie Bay (417) at Solapur 10-Sep-14 900 10-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

206 765 330 MVAR Bus Rector-1 at Dharamjaygarh 10-Sep-14 800 11-Sep-14 1700 DAILY CSD relay commissioning in main

bay WRTS-I PGCIL C

207 765 ICT3 Tie Bay (717) at Bilaspur 10 S 14 9 00 10 S 14 18 00 DAILY F AMP k WRTS I PGCIL R207 765 ICT3 Tie Bay (717) at Bilaspur Ss 10-Sep-14 900 10-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

208 765 765kV Dharamjaygarh - Ranchi-2 l 10-Sep-14 900 15-Sep-14 1800 continous

For strining Jumpering of parallel ckt and Crossing of 765kV Dharamjaygarh-Jabalpur line

WRTS-I PGCIL C

209 765 ICT 2 at Jabalpur Pooling Station 10-Sep-14 100000 AM 10-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

210 400 Shujalpur-Nagda 1 10-Sep-14 1000 10-Sep-14 1400 Daily AMP PGCIL WRTS-II C211 400 Vadavi- Kansari- 2 10-Sep-14 800 10-Sep-14 1800 Daily PMM WORK WRTGPL GETCO

212 400 400 kv ISP - Nagda ckt 10-Sep-14 900 10-Sep-14 10092014 1800 daily Maintenance Work

EHT- Mamp I

213 220 220KV MALANPUR -AURAIYA 10-Sep-14 900 10-Sep-14 10092014 1700 daily Maintenance Work

EHT- Mamp I

214 220 220 KV DAMOH PGCIL IC - I 10-Sep-14 800 10-Sep-14 10092014 1800 daily Maintenance Work PGCIL EHT-

Mamp I

215765KV400K

VSipat 765KV400KV ICT-1 10-Sep-14 900 11-Sep-14

1900 Continous Annual Preventive maintenance NTPC NTPC216 400 New Koyna-Dabhol ckt 1 10-Sep-14 830 10-Sep-14 1730 Daily QMwork MSETCL MSETCL217 400 Akola-Aurangabad ckt 1 10-Sep-14 830 10-Sep-14 1730 Daily QMwork MSETCL MSETCL

218 400 TARAPUR-PADGHE I 11-Sep-14 800 12-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

219 400 ICT 2 Main Bay (409) at Mapusa 11-Sep-14 900 11-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

220 765 Korba LR (716 LR) at Bilaspur Ss 11-Sep-14 900 11-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

221 220 Bus-1 at Damoh 11-Sep-14 1000 12-Sep-14 1800 Daily AMP PGCIL WRTS-II R

222 765 Bus Reactor 2 at Jabalpur Pooling Station 11-Sep-14 100000 AM 11-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

223 220MC Bhimasar - Lalpar Bhimasar -Morbi amp Bhimasar - Mansar (on same tower)

11-Sep-14 80000 AM 11-Sep-14 60000 PM DailyPower Line Crossing of 400 KV DC Bhachau SS (PG) - Varsana SS (GETCO) TrL

GETCO WR-II C

224 220 Navsari - Dastan- 1 11-Sep-14 800 12-Sep-14 1800 Daily PMM WORK PGCIL GETCO

225 400 400 kv Rajgarh Pgcil - SSP CKT I 11-Sep-14 900 11-Sep-14 11092014 1800 daily Maintenance Work PGCIL EHT-

Mamp I

226 220 220K KV MEHGAON - AURAIYA 11-Sep-14 900 11-Sep-14 11092014 1700 daily Maintenance Work

EHT- Mamp I

227400 Korba Lanco

11-Sep-14 900 12-Sep-14 19002 days

continuous Annual maintenance and testing

NTPC NTPC

228 400 Lonikand II-Lonikand I 11-Sep-14 900 11-Sep-14 1700 Daily QMwork MSETCL MSETCL

229 400 Parali-Lonikand II ckt 2 11-Sep-14 900 11-Sep-14 1700 Daily QMwork MSETCL MSETCL

230 400 Waluj-Bableshwer 11-Sep-14 900 11-Sep-14 1700 Daily QMwork MSETCL MSETCL

231 400 Tie Transformer-II NTPC-Korba 11-Sep-14 900 12-Sep-14 1700 Maintenance NTPC NTPC

232 400kV Sipat-Raipur-2 12-Sep-14 000 12-Sep-14 1700 Daily Attending hot spots and SD nature defects WRTS-I PGCIL R

233 400 400220 ICT 1 AT WARDHA 12 Sep 14 9 00 12 Sep 14 15 00 Dail For B shing oil DGA Testing WRTS I WRTS I R233 400 400220 ICT-1 AT WARDHA 12-Sep-14 900 12-Sep-14 1500 Daily For Bushing oil DGA Testing WRTS-I WRTS-I R

234 400 Khandwa-Dhule 2 line reactor at Dhule 12-Sep-14 800 12-Sep-14 1800 Daily For Bushing oil DGA Testing

Line in service wo reactor WRTS-I WRTS-I R

235 400 BUS I AT MAPUSA 12-Sep-14 900 12-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

236 765 JBP - Dharmjaygarh Reactor Line 1 Reactor at Jabalpur Pooling Station

12-Sep-14 100000 AM 12-Sep-14 60000 PM Daily Installation amp Commissioning of CSD Relay PGCIL WRTS-II C

237 400 400 kv Rajgarh Pgcil - SSP CKT II 12-Sep-14 900 12-Sep-14 12092014 1800 daily Maintenan

ce Work PGCIL EHT- Mamp I

238 400 400 kv Indore - Nagda ckt 12-Sep-14 900 12-Sep-14 12092014 1800 daily Maintenance Work

EHT- Mamp I

239 220 220K KV MEHGAON - AURAIYA 12-Sep-14 900 12-Sep-14 12092014 1700 daily Maintenance Work

EHT- Mamp I

240 400 Lonikand-Stage IV 12-Sep-14 900 12-Sep-14 1700 Daily QMwork MSETCL MSETCL

241 400 Aurangabad(PG)-Aurangabad (Waluj)-1 12-Sep-14 800 15-Sep-14 1800 Conti Augmentation works at MSETCL

Waluj 400kV SSWRTS-I WRTS-I C

242 400 TARAPUR-PADGHE I 13-Sep-14 800 14-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

243 400 Karad-Lonikand 13-Sep-14 900 13-Sep-14 1700 Daily QMwork MSETCL MSETCL

244 400kV Sipat-Raipur-1 13-Sep-14 000 13-Sep-14 1700 Daily Attending hot spots and SD nature defects WRTS-I PGCIL R

245 400 BOISAR-PADGHE 13-Sep-14 800 14-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

246 400 400220 ICT-2 AT WARDHA 13-Sep-14 900 13-Sep-14 1500 Daily For Bushing oil DGA Testing WRTS-I WRTS-I R

247 400 Khandwa-Dhule 1 line reactor at Dhule 13-Sep-14 800 13-Sep-14 1800 Daily For Bushing oil DGA Testing

Line in service wo reactor WRTS-I WRTS-I R

248 220 BUS I AT MAPUSA 13-Sep-14 900 13-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R248 220 BUS I AT MAPUSA 13-Sep-14 900 13-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

249 765 Korba Line Main Bay (716) at Bilaspur Ss 13-Sep-14 900 13-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

250 400 Dhule-Babhleswar ckt 2 13-Sep-14 900 13-Sep-14 1700 Daily QMwork MSETCL MSETCL

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

251 400 Kolhapur-Mapusa 1 13-Sep-14 800 17-Sep-14 1800 Daily Insulator replacement due to polluted streaches

WRTS-I WRTS-I R

252 400 Kolhapur-Mapusa 1 13-Sep-14 800 17-Sep-14 1800 Daily Insulator replacement due to polluted streaches

WRTS-I WRTS-I R

253 400 Bhachau - Ranchodpura DC(Subject to SLDC consent) 14-Sep-14 80000 AM 20-Sep-14 60000 PM Continuo

us

Shifting of towers to maintain clearance for SSNL canal crossing (Loc 26-33 amp 78-84)

PGCIL WRTS-II C

254 400kV Bhilai-koradi line 15-Sep-14 000 16-Sep-14 000 Daily Attending hot spots and SD nature defects WRTS-I PGCIL R

255 400 Navasari- Kala MC line 15-Sep-14 800 16-Sep-14 1800 DailyConstruction work of Navasari- Boisar line on same Multi ckt tower

WRTS-II WRTS-I C

256 400 SOLAPUR(PG)-KARAD 15-Sep-14 900 20-Sep-14 1800 Conti Tower Erection of Line Reactor gantry of Karad Line at Solapur MSETCL WRTS-I R

257 765 WARDHA-AURANGABAD(PG) 2 15-Sep-14 800 15-Sep-14 1800 Daily

For replacement of Rph reactor unit at Wardha Line in service wo reactor Taking out reactor out of service

WRTS-I WRTS-I R

258 400 Chandrapur 3 Main Bay (420) at Bhadrawati 15-Sep-14 900 15-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

259 765 Seoni1 Main Bay (704 ) at Bilaspur Ss 15-Sep-14 900 15-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL RBilaspur Ss

260 220 Kakrapar-Haldarwa1 15-Sep-14 900 15-Sep-14 1800 DailyReplacement of existing 220kV CTs with High Fault current CTs at Haldarwa SS

PGCIL WRTS-II C

261 400 SSP - Rajgarh - 1 15-Sep-14 800 17-Sep-14 1800 Daily PMM WORK PGCIL GETCO

262

220 Jhanor 220 KV Bus1

15-Sep-14

800

16-Sep-14

000

Continous Replacement of existing CTCVT with 02 class CT amp CVT and for testing of the same NTPC NTPC

263 400 BOISAR-PADGHE 16-Sep-14 800 17-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

264 400 Chandrapur 3Tie Bay (421) at Bhadrawati 16-Sep-14 900 16-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

265 400 Indore-Asoj2 16-Sep-14 80000 AM 16-Sep-14 60000 PM Daily Replacement of broken insulators PGCIL WRTS-II R

266 765 Sasan-Satna2 16-Sep-14 900 17-Sep-14 1800 Daily Power line crossing for stringing of of 765Kv Vin pool- satna ck2 PGCIL WRTS-II C

267 400 315MVA ICT1 at Shujalpur 16-Sep-14 1000 16-Sep-14 1400 Daily AMP PGCIL WRTS-II R

268 220 Kakrapar-Haldarwa2 16-Sep-14 900 16-Sep-14 1800 DailyReplacement of existing 220kV CTs with High Fault current CTs at Haldarwa SS

PGCIL WRTS-II C

269 220 220 KV PITHAMPUR - RAJGARH PG CKT - I 16-Sep-14 900 16-Sep-14 16092014 1600 daily Maintenan

ce Work PGCIL EHT- Mamp I

270 400 V-satna-1 16-Sep-14 900 16-Sep-14 1900 Daily basis For erection of Breaker after OH NTPC NTPC

Construction work of Navasari- 271 400 Vapi- Kala MC Line 17-Sep-14 800 18-Sep-14 1800 Daily Boisar line on same Multi ckt

towerWRTS-II WRTS-I C

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

272 400 HVDC IBay (403) at Bhadrawati 17-Sep-14 900 17-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

273

220 Jhanor 220 KV Bus2

17-Sep-14

800

18-Sep-14

000

Continous Replacement of existing CTCVT with 02 class CT amp CVT and for testing of the same NTPC NTPC

274 400 Parli 1 Main Bay (423) at Bhadrawati 18-Sep-14 900 18-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

275 220 Kawas-Haldarwa1 18-Sep-14 900 18-Sep-14 1800 DailyReplacement of existing 220kV CTs with High Fault current CTs at Haldarwa SS

PGCIL WRTS-II C

276 400 SSP - Rajgarh - 2 18-Sep-14 800 20-Sep-14 1800 Daily PMM WORK PGCIL GETCO

277 400 400 KV Sarni - Seoni ckt 18-Sep-14 800 18-Sep-14 18092014 1800 daily Maintenance Work PGCIL EHT-

Mamp I

278 220 220 KV PITHAMPUR - RAJGARH PG CKT - II 18-Sep-14 900 18-Sep-14 18092014 1600 daily Maintenan

ce Work PGCIL EHT- Mamp I

279 220 220 KV DAMOH PG - TIKAMGARH CKT I 18-Sep-14 800 18-Sep-14 18092014 1800 daily Maintenan

ce Work PGCIL EHT- Mamp I

280 400Sipat 400KV Bay-9 (Raipur-1 Main bay) 18-Sep-14 900 19-Sep-14 1900 Continous Annual Preventive maintenance NTPC NTPC

281 400 Kolhapur-Mapusa 2 18-Sep-14 800 22-Sep-14 1800 Daily Insulator replacement due to polluted streaches

WRTS-I WRTS-I R

282 400 Khandwa 2 Tie bay (423) at 19 S 14 8 00 20 S 14 18 00 D il AMP k WRTS I WRTS I R282 400 Khandwa 2 Tie bay (423) at Seoni 19-Sep-14 800 20-Sep-14 1800 Daily AMP works WRTS-I WRTS-I R

283 400 BOISAR-PADGHE 19-Sep-14 800 20-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

284 400 Parli 1 Tie Bay (424) at Bhadrawati 19-Sep-14 900 19-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

285 220 Kawas-Haldarwa2 19-Sep-14 900 19-Sep-14 1800 DailyReplacement of existing 220kV CTs with High Fault current CTs at Haldarwa SS

PGCIL WRTS-II C

286 400 V-satna-2 19-Sep-14 900 20-Sep-14 1900 Continuous

Major OH of Line Circuit Breaker (For dismantling of poles) NTPC NTPC

287 400 Aurangabad(PG)-Aurangabad (Waluj)-2 19-Sep-14 800 22-Sep-14 1800 Conti Augmentation works at MSETCL

Waluj 400kV SSWRTS-I WRTS-I C

288 400 Parli 2 Main Bay (416) at Solapur 20-Sep-14 900 20-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

289 400 400220 ICT-3 AT MAPUSA 20-Sep-14 900 20-Sep-14 1500 Daily AMP WORKS WRTS-I WRTS-I R

Anaulagnak 33

Agast 2014 AaOr isatmbar 2014 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR AUGUST 2014 AND SEPTEMBER 2014

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)Agast 2014 isatmbar 2014 Agast 2014 isatmbar 2014

AUGUST 2014 SEPTEMBER 2014 AUGUST 2014 SEPTEMBER 2014

1 gaujarat

saIimat 12500 13900 7750 8500

AsaIimat 12540 13940 7760 8510

2 maQya p`doSa

saIimat 6200 6500 3800 4100

AsaIimat 6250 6500 3800 4100

3 CltaIsagaZ

saIimat 3030 3199 16425195 172052635

AsaIimat 3160 3269 172031 169036025

4 maharaYT

saIimat 16050 17750 10700 10800

AsaIimat 16100 17800 10750 10850

5 gaaovaa

saIimat 410 415 290 285

AsaIimat 425 425 300 290

6 dmana dIva

saIimat 315 320 205 200

AsaIimat 320 325 210 210

7 DI ena eca

saIimat 645 640 425 420

AsaIimat 650 645 430 425

8 piScama xao~

saIimat 37614 41048 25600 26080

AsaIimat 37898 41254 26450 27900

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah jaUlaa[- 2014

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 2236 75

]k[- Ukai - 2 529 75]k[- Ukai - 3 000 0]k[- Ukai - 4 2023 75]k[- Ukai (Total) 4788 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 094 2]k[- ela baI saI eca Ukai LBCH - 2 028 2]k[- ela baI saI eca Ukai LBCH (Total) 123 1 0018

3 kDanaa Kadana - 1 699 61 0010kDanaa Kadana - 2 910 57 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 1115 62 0000kDanaa Kadana (Total) 2724 62 0010

4 pnama PANAM amp Madhuban Dam 1 amp 2 160 8 0017 6 kula jalaIya TOTAL(H) 7794 225 0390

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 3339 57 34582 TaoronT pavar ilaimaToD yauinaT DI 6957 122 64083 TaoronT pavar ilaimaToD yauinaT [- 8082 122 67664 TaoronT pavar ilaimaToD yauinaT ef 8380 124 73285 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 037511 Qauvarna tapIya Dhuvaran - GT 2 000 0 116012 Qauvarna tapIya Dhuvaran - STG 1783 10113 ]ka[- yauinaT 1 Ukai -1 000 0 019714 ]ka[- yauinaT 2 Ukai -2 000 0 019315 ]ka[- yauinaT 3 Ukai -3 10038 202 922016 ]ka[- yauinaT 4 Ukai -4 6930 202 697517 ]ka[- yauinaT 5 Ukai -5 11833 212 1138718 ]ka[- yauinaT 6 Ukai -6 30277 507 2287219 gaaMQaInagar 1 Gandhinagar - 1 000 0 008220 gaaMQaInagar 2 Gandhinagar - 2 000 0 009221 gaaMQaInagar 3 Gandhinagar - 3 6275 213 669022 gaaMQaInagar 4 Gandhinagar - 4 6060 212 706523 gaaMQaInagar 5 Gandhinagar - 5 13495 215 1331024 vaNakbaaorI 1 Wanakbori - 1 12142 209 000025 vaaNakbaaOrI 2 Wanakbori - 2 12364 21026 vaaNakbaaOrI 3 Wanakbori - 3 6669 20227 vaaNakbaaOrI 4 Wanakbori - 4 7244 21128 vaaNakbaaOrI 5 Wanakbori - 5 6198 21029 vaaNakbaaOrI 6 Wanakbori - 6 5924 21230 vaaNakbaaOrI 7 Wanakbori - 7 9489 21031 ]trna Utran GT 1 000 0 026832 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 1200 221 024735 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 819 143 1098

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

Anaulagnak 41

ACTUAL GENERATION amp AVALABILITY FOR JULY 2014Actual vaastivak

Actual vaastivak

37 isaka Sikka - 1 1326 107 179438 isaka Sikka - 2 3489 114 401539 kcC ilagnaa[-T Kutch Lignite - 1 5092 71 859040 kcC ilagnaa[-T Kutch Lignite - 2 4929 7141 kcC ilagnaa[-T Kutch Lignite - 3 000 042 kcC ilagnaa[-T Kutch Lignite - 4 2388 68 571043 saUrt ilagnaa[-T Surat Lignite - 1 8775 130 874544 saUrt ilagnaa[-T Surat Lignite - 2 3966 130 445845 saUrt ilagnaa[-T Surat Lignite - 3 5411 130 524346 saUrt ilagnaa[-T Surat Lignite - 4 8973 130 883347 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5446 103 859048 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 6057 10749 jaI Aa[- pI saI ela GIPCL GT - 1 1123 33 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1510 3251 jaI Aa[- pI saI ela GIPCL GT - 3 598 3052 jaI Aa[- pI saI ela GIPCL ST - 1 1846 4553 jaI Aa[- pI saI ela GIPCL GT - 4 357 98 000054 jaI Aa[- pI saI ela GIPCL ST - 2 186 5055 [- esa esa e Aar ESSAR GT - 1 000 0 029356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 083 146 002860 jaI pI [- saI GPEC GT - 2 148 153 023361 jaI pI [- saI GPEC GT - 3 1387 145 028462 jaI pI [- saI GPEC STG 521 7563 jaI esa [- jaI GSEG GT - 1 206 51 112164 jaI esa [- jaI GSEG GT - 2 1079 4765 jaI esa [- jaI GSEG STG 613 2466 Sugen (GT 1 + GT 2) 000 0 693867 saIpIpI sao Aayaat Imp from CPP+MUNDRA 249228 6777

kula tapIya Total (T) 511604 7860 431554kula jalaIya+tapIya Total (H+T) 519398 8078 431944ivaMD [najaI- Wind Energy 94980kula jalaIya+tapIya+hvaa Total (H+T+Wind) 614378 9539ivainamaya Exchanges 150828 saIimat jaa- maaMga Restricted Energy Req 765205

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 767 135

11 gaaMQaI saagar Gandhi Sagar 998 117 008012 raNaa p`tap sagar RPSagar 096 86 004013 javaahr sagar Jawahar Sagar 439 66 0020

2 ponca Pench 1381 160 01003 baargaI Bargi 712 33 00704 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 5724 309 02906 banasaagar Bansagar-2 (Deolondh) 104 407 banasaagar Bansagar-3 (Silpara) 565 31 00608 banasaagar Bansagar-4 (Zinaha) 425 20 00309 maoDIKoDa Medikheda 096 58

10 ibarisaMGapur Birsingpur 680 20 002011 Tavaa Tawa 000 012 rajaGaaT Rajghat 001 7 007013 Omkareshwar 4226 340 14 [Midra saagar Indira Sagar 6679 679 0598

kula jalaIya TOTAL(H) MPPGCL 19979 2031 1152

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 2223 84 179302 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 14496 216 0

Actual vaastivak

4 satpura I Satpura-I(60Share) 000 0 00005 satpura II Satpura-II Unit 6 000 0 83106 satpura II Satpura-II Unit 7 7549 1857 satpura II Satpura-II Unit 8 12446 195 173908 satpura II Satpura-II Unit 9 4038 1759 satpura III Satpura-III Unit 10 9508 219 23440

10 satpura III Satpura-III Unit 11 8675 167 2096011 esajaITIpIesa 1 SGTPS Unit - 1 8675 167 2096012 esajaITIpIesa 2 SGTPS Unit - 2 9354 16013 esajaITIpIesa 3 SGTPS Unit - 3 1129 165 1642014 esajaITIpIesa 4 SGTPS Unit - 4 6022 16015 esajaITIpIesa 5 SGTPS Unit - 5 27597 50816 SSTPS 7895 309 9910

kula tapIya Total (T) 117479 2427 115480kula jalaIya+tapIya Total (H+T) 137458 4759 116632Injection from WIND 14572 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 152030 4759ivainamaya Exchanges 271419 saIimat jaa- maaMga Rest En Req 423449

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 606 120 01102 Gangrel 039 10 00203 Mini Micro KWB 039 7

kula jalaIya TOTAL(H) CSEB 684 137 0520tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 40 125902 kaorbaa (pU) Korba (E) Unit-2 2764 383 kaorbaa (pU) Korba (E) Unit-3 2764 384 kaorbaa (pU) Korba (E) Unit-4 2784 405 kaorbaa (pU) Korba (E) Unit -5 3685 120 244406 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 154608 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 24740

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 13343 243 1124012 KORBA(EB) Extn - 2 14104 248 11250

kula tapIya Total (T) 119955 1644 10189013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 119955 1644kula jalaIya+tapIya Total (H+T) 120639 1781 102410ivainamaya Exchanges 59759 0saIimat jaa- maaMga Rest En Req 180398 1781

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 5228 585 06952 kaoyanaa III Koyna III 3695 3203 kaoyanaa IV Koyna IV 371 11204 kaoyanaa DIpIeca Koyna DPH 414 385 TaTa jalaIya TATA Hydro 10123 741 44976 vaOtrNaa Vaitarna 1151 617 eladarI Eldari 000 168 BaTgar AaOr vaIr Bhatgar amp Vir 036 49 pOzana Paithan 976 49

10 itlaarI Tillari 1036 6511 BaIra Tola rosa Bhira Tail Race 846 4112 GaTGar Ghatghar 3639 25013 Anya CaoTo jalaIya Small Hydro (others) 1041 0

kula jalaIya TOTAL(H) 28404 -1073 5192

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL

Actual vaastivak

3 naaisak 3 Nasik Unit -3 4157 1954 naaisak 4 Nasik Unit -4 12489 1985 naaisak 5 Nasik Unit -5 12480 2006 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 30718 5038 Tambao 6 Trombay Unit -6 6619 5009 Tambao 8 Trombay Unit -8 000 0

10 Tambao 7A gaOsa Trombay -7A (Gas) 7476 127 288611 Tambao 7ba Trombay -7B (WHR) 4373 6912 kaoraDI 5 Koradi Unit -5 000 013 kaoraDI 6 Koradi Unit -6 8448 16714 kaoraDI 7 Koradi Unit -7 10994 19415 Bausaavala 2 Bhusawal Unit -2 4715 16516 Bausaavala 3 Bhusawal Unit -3 6454 16517 Bausaavala 4 Bhusawal Unit -4 20419 50518 Bausaavala 4 Bhusawal Unit -5 23286 43519 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 000 021 parlaI 5 Parli Unit -5 9315 17522 parlaI 6 Parli Unit -6 14237 25323 parlaI 7 Parli Unit -7 14028 25024 KaprKoDa 1 Khaperkheda Unit -1 8108 20025 KaprKoDa 2 Khaperkheda Unit -2 10924 19026 KaprKoDa 3 Khaperkheda Unit -3 7917 20627 KaprKoDa 4 Khaperkheda Unit -4 10446 21028 KaprKoDa 5 Khaperkheda Unit -5 24555 50030 parsa Paras-3 11676 21831 parsa Paras-4 10326 24032 ]rna Uran (Gas) 18771 40133 ]rna Uran (WHR) 10760 138 586234 caMd`pur 1 Chandrapur Unit -1 7526 16535 caMd`pur 2 Chandrapur Unit -2 9375 19936 caMd`pur 3 Chandrapur Unit -3 8728 20037 caMd`pur 4 Chandrapur Unit - 4 12276 47038 caMd`pur 5 Chandrapur Unit -5 29203 41039 caMd`pur 6 Chandrapur Unit -6 26351 040 caMd`pur 7 Chandrapur Unit -7 000 041 DhaNaU 1 Dahanu Unit-1 16882 250 1563042 DhaNaU 2 Dahanu Unit-2 19263 250 1660143 CPP 258820 41160044 RGPPL Share 000 0

kula tapIya Total (T) 692115 14094 350211MAH Wind + Solar Generation 110432 0kula jalaIya +tapIya Total (H+T+Wind) 830951 16176 396382

TOTAivainamaya Exchanges 274116saIimat jaa- maaMga Rest En Req 1105066

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1173 17ivainamaya Exchanges 33083saIimat jaa- maaMga Rest En Req 34256 459

C (F) dmana AaOr dIva DAMAN amp DIU 17467 298ja (G) dadra nagar hvaolaI DNH 43779 673

kula DD ampDNH (T) 61246 970

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 9731 160 1564312 tara`pur 2 TAPS Unit -2 11531 16013 tara`pur 3 TAPS Unit -3 40214 545 7288014 tara`pur 4 TAPS Unit -4 39284 53715 kakrapr 1 KAPS Unit -1 16048 545 3195016 kakrapr 2 KAPS Unit -2 14903 537

kula ena pI saI NPC Total 131710 24842 ena TI pI saI NTPC

Actual vaastivak

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15236 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14181 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14568 214 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 000 025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 32338 51326 kaorbaa esaTIpIesa 6 KSTPS Unit-6 33493 51427 kaorbaa esaTIpIesa 7 KSTPS Unit-7 30558 516

kula kaorbaa KSTPS Total 140373 2548 9318427 ivanQa esaTIpIesa 1 VSTPS Unit-1 13430 21528 ivanQa esaTIpIesa 2 VSTPS Unit-2 11930 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 13695 212210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14017 214211 ivanQa esaTIpIesa 5 VSTPS Unit-5 11952 215212 ivanQa esaTIpIesa 6 VSTPS Unit-6 8991 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 32786 515214 ivanQa esaTIpIesa 8 VSTPS Unit-8 19668 514215 ivanQa esaTIpIesa 9 VSTPS Unit-9 31796 516216 ivanQa esaTIpIesa 10 VSTPS Unit-10 31597 515217 ivanQa esaTIpIesa 11 VSTPS Unit-11 13881 512

kula ivanQayaacala VSTPS Total 233445 REF 16238 31 saIpt -1 -SIPAT-1 38555 66600 32 saIpt -2 -SIPAT-2 16033 66500 33 saIpt -3 -SIPAT-3 43240 66800 34 saIpt -4 -SIPAT-4 25865 51200 35 saIpt -5 SIPAT-5 33302 51500

kula saIpt -SIPAT TOTAL 156995 280100 920541 kvaasa gaOsa 1e Kawas GT-1A 2605 10442 kvaasa gaOsa 1baI Kawas GT-1B 4355 10643 kvaasa esaTI 1saI Kawas ST-1C 3365 11744 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 044 9846 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 10369 309 245151 gaMQaar gaOsa 1 Gandhar GT-1 2177 14352 gaMQaar gaOsa 2 Gandhar GT-2 3014 14553 gaMQaar gaOsa 3 Gandhar GT-3 5333 14754 gaMQaar esaTI 4 Gandhar ST-4 5586 158

kula gaMQaar GGPS Total 16109 437 475161 maaOda 1 Mauda -1 5368 514 000062 maaOda 2 Mauda -2 16240 513 0000

kula maaOda MAUDA Total 21608 756 2258161 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 000 31 000071 esa esa pI SSP RBPH - 1 1265 18872 esa esa pI SSP RBPH - 2 1102 18673 esa esa pI SSP RBPH - 3 1197 18774 esa esa pI SSP RBPH - 4 1116 18675 esa esa pI SSP RBPH - 5 1432 18676 esa esa pI SSP RBPH - 6 1653 18677 esa esa pI SSP CHPH - 1 422 3578 esa esa pI SSP CHPH - 2 384 3079 esa esa pI SSP CHPH - 3 179 34710 esa esa pI SSP CHPH - 4 1012 36711 esa esa pI SSP CHPH - 5 340 30

kula esa esa pI SSP Total 10101 1283 101081 kula poMca Pench Total 1381 160 010082 Jindal Injection 50805 083 Amarkantak Lanco 16857 0

(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2508924

(J) ]plabQata Availability 2439102 naoT ivainamaya Net Exchanges -311541 ]plabQa jaa- Energy Availability 2127561

maah jaUlaa[- 2014 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR JULY 2014 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 13833 - - - 13833 070714 1500 4972

saIimat Restricted 12500

AsaIimat Unrestricted 12540 13833 0 136 0 13969 070714 1500 4972

nyaUnatma pMjaIkRt maaMga Min Registered Demand 7617 7617 250714 0400 4999

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 7090 - - - 7090 020714 2015 4985

saIimat Restricted 6040

AsaIimat Unrestricted 6040 7090 0 31 0 7121 020714 2015 4985

nyaUnatma pMjaIkRt maaMga Min Registered Demand 3895 3895 230714 1500

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3118 3118 050714 2100 4985

saIimat Restricted 3150

AsaIimat Unrestricted 3250 2972 41792 24 0 3414 030714 2000 4977

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1336 1336 220714 1300 4995

maharaYT MAHARASHTRApMjaIkRt Registered 19283 - - - 19283 010714 1600 4994

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19283 62 40 0 19385 010714 1600 4994

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11936 11936 300714 0500 5000

gaaovaa GOApMjaIkRt Registered 405 459 - - 459 260714 2000 4967

AsaIimat Unrestricted 405 459 0 5 - 464 260714 2000 4967

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 532 - - 532 290714 0900 4998

AsaIimat Unrestricted 532 0 0 - 532 290714 0900 4998

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 287 - - 287 060714 1000 4991

AsaIimat Unrestricted 287 0 1 - 288 060714 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 721 - - 721 050714 1700 4983

AsaIimat Unrestricted 721 0 - 721 050714 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 400 435 290714

piScama xao~ WESTERN REGIONpMjaIkRt Registered 43034 - - - 43034 010714 1600 4994

saIimat Restricted 40703

AsaIimat Unrestricted 40905 43034 295 90 0 43419 010714 1600 4994

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28431 28431 240714 0500 5000 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

माह जलाई 2014Jul-14

अनब समातरवतीय चालन PARALLELRADIAL OPERATION TOTAL OPERATING HOURS

1 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-NR)

2 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-SR) 7424400

टाई लाईन TIE LINE

1 765 कवी िसवनी स वधा-I 765kV Soni to Wardha 6780100

2 765 कवी िसवनी स वधा-II 765kV Seoni to Wardha 2043700

3 400 कवी िभलाई स कोराड 400kV Bhilai to Koradi 7440000

4 400 कवी िभलाई स भिावती 400kV Bhilai to Bhadravati 7440000

5 400 कवी रायपर स भिावती -I 400kV Raipur to Bhadravati-I 7440000

6 400 कवी रायपर स भिावती ndashII 400kV Raipur to Bhadravati-II 7440000

7 400 कवी रायपर स भिावती ndashIII 400kV Raipur to Bhadravati-III 7440000

8 400 कवी सातपरा स कोराड 400kV Satpura to Koradi 7060200

9 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7440000

10 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 7440000

11 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7225100

12 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 7082500

13 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 5361200

14 400 कवी को हापर स मापसा-I 400kV Kolhapur-Mapusa-I 4561600

15 400 कवी को हापर स मापसा-II 400kV Kolhapur-Mapusa-II 4793700

16 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7440000

17 400 कवी रायगढ़ स ःटरलाइट-I 400kV Raigarh to Sterlight-I 7371100

18 400 कवी रायगढ़ स ःटरलाइट-II 400kV Raigarh to Sterlight -II 7440000

19 400 कवी रायगढ़ स झरसगड़ा-I 400kV Raigarh to Jharsuguda-I 7302900

20 400 कवी रायगढ़ स झरसगड़ा-II 400kV Raigarh to Jharsuguda-II 7303700

21 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 5400900

22 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7292200

23 400 कवी रायपर स वधाndashI 400kV Raipur to Wardha-I 7440000

24 400 कवी रायपर स वधाndashII 400kV Raipur to Wardha-II 7440000

25 220 कवी कोरबा पव स ब पादर-III 220kV K(E) to Budhipadar-III 7361200

ANNEXURE 43

maah jaUlaa[- 2014 ko daOrana pa~ta iSaDyaUla GaTkaoM Wara koMd`Iya xao~ ko sToSanaaoMM sao D`avala AaOr ivainamayaaoM ka ivavarNa

1 koMd`Iya sToSanaaoMM samaip-t koMd`Iya sToSanaoMa saMyaut inajaI sToSanaaoM kI GaaoiYat xamata (basa pr) AaOr laaBaaiqa-yaaMo kI pa~ta1 Declared Capcity (ex-bus) of Central Gen StnsDedicated CG StnsJointly owned Stns amp entitlement of beneficieries (MUs)

GaaoiYat xamata gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI + ecaDblyaubaI kula

(A) koMd`Iya ibajalaIGar A Central Gen Stns Dec Cap GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC+HWB TOTAL

kaorbaa esaTIpIesa Korba STPS 1017635 174452 237891 103616 324281 102699 23918 26164 1017635kaorbaa esaTIpIesa -III Korba STPS-III 283431 54419 44422 85553 76649 3066 3405 13029 283431ivanQa esaTIpIesa I Vindhyachal STPS-I 674012 123034 240046 1253 246970 19644 7141 23669 12255 674012ivanQa esaTIpIesa II Vindhyachal STPS-II 491154 117386 158375 0909 175903 6532 4569 16539 491154ivanQa esaTIpIesa III Vindhyachal STPS-III 627679 166963 156579 67068 186511 7093 7097 22387 627679ivanQa esaTIpIesa IV Vindhyachal STPS-IV 411100 98631 118464 26475 133406 5356 5241 19338 411100kvaasa gaOsa Kawas GPP 306920 87464 65557 0000 95562 5791 14520 37998 306920gaMQaar gaOsa Gandhar GPP 406294 146476 72428 0000 123833 7814 19389 36310 406294saIpt Sipat 1665864 454494 301337 266370 509047 19436 19662 68224 1665864kakrapar Kakrapar APS 275783 78347 69731 0000 94368 9698 5200 8018 10420 275783tara`pur 3 AaOr 4 Tarapur APS 3amp4 721903 183150 155921 32084 295823 8510 8953 31049 721903

(ba) samaip-t koMd`Iya ibajalaIGar B Dedicated CG Stations Actual injection vaasaivak [njaoSana [Midra saagar Indira Sagar 245570 245570 245570

(sa) saMyaut inajaI sToSana C Jointly owned Stationstara`pur 1 AaOr 2 Tarapur APS 1amp2 196640 98320 0000 0000 98320 0000 0000 0000 196640esaesapI SSP 97965 15674 55840 0000 26450 0000 0000 0000 97965ponca Pench 13620 9080 0000 4540 0000 0000 0000 13620

kula ([M saagar kao CaoD kr) Total (excl Indira Sagar) 11988065 2808880 2297269 640720 3692105 208667 173093 400816 1766516 11988065 Actual injection

2 koMd`Iya sToSanaaoMM samaip-t koMd`Iya sToSanaoMa saMyaut inajaI sToSanaaoM kI ]padna SaoDyaUla AaOr laaBaaiqa-yaaoM kI D`avala SaoDyaUla2 Generation Schedule (ex-bus) of Central Gen StationsDedicated CG StationsJointly owned Stations amp schedule of benificieries (MUs)

SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI+ ecaDblyaubaI kula

(A) koMd`Iya ibajalaIGar A Central Gen Stns Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH

HVDC+HWB Outside region(NR

amp SR) TOTALkaorbaa esaTIpIesa Korba STPS 1015070 174452 238276 103310 321801 102699 23918 26164 1015070kaorbaa esaTIpIesa -III $ Korba STPS-III $ 282671 54342 44422 85185 76334 3066 3405 13029 282671ivanQa esaTIpIesa I Vindhyachal STPS-I 660248 120064 239050 1253 237415 19644 7141 23473 12209 660248ivanQa esaTIpIesa II Vindhyachal STPS-II 488287 117160 156978 0909 174700 6532 4569 16539 488287ivanQa esaTIpIesa III Vindhyachal STPS- III 600504 134916 160349 67878 186319 7093 7227 22827 600504ivanQa esaTIpIesa IV Vindhyachal STPS- IV 409072 98719 118259 24888 133048 5356 5241 19374 409072kvaasa gaOsa Kawas GPP 99574 27083 25459 0000 23510 2678 5916 14915 0000 99574gaMQaar gaOsa Gandhar GPP 154677 55634 30257 0000 41633 3783 8217 15131 0000 154677saIpt Sipat 1448506 290983 323024 258111 436177 19418 23860 69790 1448506kakrapar Kakrapar APS 275783 78347 69731 0000 94368 9698 5200 8018 10420 275783tara`pur 3 AaOr 4 Tarapur APS 3amp4 721903 183150 155921 32084 295823 8510 8953 31049 721903

(ba) samaip-t koMd`Iya ibajalaIGar B Dedicated CG Stations[Midra saagar Indira Sagar 245570 245570 245570

RPPC(NVVNL) 0000

0000

0000

(sa) saMyaut inajaI sToSana C Jointly owned Stations Actual injection vaasaivak [njaoSana tara`pur 1 AaOr 2 Tarapur APS 1amp2 196640 98320 0000 0000 98320 0000 0000 0000 196640esaesapI SSP 97965 15674 55840 0000 26450 0000 0000 0000 97965ponca Pench 13620 0000 9080 0000 4540 0000 0000 0000 13620kula [M saagar kao CaoD kr Total (excl Ind Sagar) 10173905 2352674 2217883 625946 2591731 193349 149578 336130 1706614 10173905

Actual injectionNote- $ These Scheduled Transactions are done by WRLDC under STOA

3 AMtrxao~Iya ivainamayaaoM iWpxaIya ivanamayaaoM kI SaoDyaUla (ima yauinaTsa)3 Schedule for interregional exchangesbilateral exchanges (MUs)

SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kulaxao~ rajya RegionState Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL

k pUvaI- xao~ ko rasto Import SDLs through ER -110482Aayaat SaoDyaUla Indian Energy Exchange (WR to ER) 0000 0000 0000 0000 0000 0000 0000 139465

Power Exchange of India (ER to WR) 0000 0000 0000 0000 0000 0000 0000 3671ER (NTPC) 47912 28298 11592 52018 0000 0786 1209 93903

DVC to MPPTCL (Long Term Open Access) 0000 201316 0000 0000 0000 0000 0000 201316Hirakud to CSEB 0000 0000 1354 0000 0000 0000 0000 1354

APL2 GUVNL to APPCC ( AEL) -0918 0000 0000 0000 0000 0000 0000 -0918APL3 GUVNL to APPCC ( AEL) -0924 0000 0000 0000 0000 0000 0000 -0924

CSEB to APPCC ( NVVNL) 0000 0000 -44813 0000 0000 0000 0000 -44813DBPOWER to APPCC ( GMRETL) 0000 0000 -1828 0000 0000 0000 0000 -1828

JPL to APPCC ( KISPL) 0000 0000 -15225 0000 0000 0000 0000 -15225JPL-II to APPCC ( KISPL) 0000 0000 -11376 0000 0000 0000 0000 -11376

Anaulagnak 45

DETAILS OF ENTITLEMENTSCHEDULEDRAWAL BY THE CONSTITUENTS FROM CENTRAL SECTOR STATIONS AND EXCHANGES FOR THE MONTH OF JULY 2014

(pxaoivasa` Wara jaarI xao~Iya jaa- laoKa ko AaQaar pr)

13896KAWAS(RLNG)

GANDHAR(RLNG)

JPL-II to APPCC ( NVVNL) 0000 0000 -11414 0000 0000 0000 0000 -11414JPL-II to APPCC ( PTC LTD) 0000 0000 -14853 0000 0000 0000 0000 -14853

CSEB to ASEB ( PTC LTD) 0000 0000 -0575 0000 0000 0000 0000 -0575MPPMCL MPSEB to ASEB ( IEXL) 0000 -0575 0000 0000 0000 0000 0000 -0575

APL1 GUVNL to BIHAR ( AEL) -106185 0000 0000 0000 0000 0000 0000 -106185APL2 GUVNL to BIHAR ( AEL) -72520 0000 0000 0000 0000 0000 0000 -72520APL3 GUVNL to BIHAR ( AEL) -51827 0000 0000 0000 0000 0000 0000 -51827

DBPOWER to BIHAR ( MANIKARAN) 0000 0000 -0350 0000 0000 0000 0000 -0350EMCO to BIHAR ( PXIL) 0000 0000 0000 -0413 0000 0000 0000 -0413

GUVNL to BIHAR ( PXIL) -0200 0000 0000 0000 0000 0000 0000 -0200MSEB to BIHAR ( PXIL) 0000 0000 0000 -0100 0000 0000 0000 -0100

MPPMCL MPSEB to BIHAR ( PXIL) 0000 -0150 0000 0000 0000 0000 0000 -0150GUVNL to BESCOM ( GUVNL) -14041 0000 0000 0000 0000 0000 0000 -14041

ESSAR_MAHAN to BESCOM ( ESSAR_MAHAN) 0000 -4353 0000 0000 0000 0000 0000 -4353ADHUNIK to BALCO ( BALCO) 0000 0000 0064 0000 0000 0000 0000 0064

ADHUNIK to BALCO ( MANIKARAN) 0000 0000 7200 0000 0000 0000 0000 7200JSEB(ER) to BALCO ( MPPL) 0000 0000 1481 0000 0000 0000 0000 1481

JSEB(ER) to BALCO ( MANIKARAN) 0000 0000 1200 0000 0000 0000 0000 1200JITPL to BALCO ( BALCO) 0000 0000 1200 0000 0000 0000 0000 1200

STERLITE to BALCO ( BALCO) 0000 0000 18603 0000 0000 0000 0000 18603JSEB(ER) to ESIL_WR ( MPPL) 0600 0000 0000 0000 0000 0000 0000 0600STERLITE to ESIL_WR ( PXIL) 1900 0000 0000 0000 0000 0000 0000 1900

NSPCL to SAIL ROURKELA ( SAIL ROURKELA) 0000 0000 -23994 0000 0000 0000 0000 -23994APL2 GUVNL to TGPCC ( AEL) -1074 0000 0000 0000 0000 0000 0000 -1074APL3 GUVNL to TGPCC ( AEL) -1081 0000 0000 0000 0000 0000 0000 -1081

CSEB to TGPCC ( NVVNL) 0000 0000 -52359 0000 0000 0000 0000 -52359JPL to TGPCC ( KISPL) 0000 0000 -17792 0000 0000 0000 0000 -17792

JPL-II to TGPCC ( KISPL) 0000 0000 -13295 0000 0000 0000 0000 -13295JPL-II to TGPCC ( NVVNL) 0000 0000 -13342 0000 0000 0000 0000 -13342

JPL-II to TGPCC ( PTC LTD) 0000 0000 -17335 0000 0000 0000 0000 -17335TISCO to VFL MPSEB ( TPTCL) 0000 0000 0268 0000 0000 0000 0000 0268

BLAPPL MPSEB to WBSEB ( IEXL) 0000 -0016 0000 0000 0000 0000 0000 -0016DBPOWER to WBSEB ( PTC LTD) 0000 0000 -0595 0000 0000 0000 0000 -0595

MPPMCL MPSEB to WBSEB ( PTC LTD) 0000 -89184 0000 0000 0000 0000 0000 -89184

SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kulaxao~ rajya RegionState Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL

K dixaNa xao~ ko rasto Import SDLs through SR 10967

Aayaat SaoDyaUla Indian Energy Exchange (SR to WR) 0000 0000 0000 0000 0000 0000 0000 0169Power Exchange of India (SR to WR) 0000 0000 0000 0000 0000 0000 0000 0000RSTPS-SR to GOA ( BILATERAL) 0000 0000 0000 0000 2186 0000 0000 2186RSTPS-SR to GOA ( WHEELING) 0000 0000 0000 0000 3118 0000 0000 3118

RSTPS-SR to GOA ( WHEELING GOA) 0000 0000 0000 0000 5494 0000 0000 5494

ga ]trI xao~ ko rasto Import SDLs through NR -321127Aayaat SaoDyaUla Indian Energy Exchange (NR to WR) 0000 0000 0000 0000 0000 0000 0000 -164961

Power Exchange of India (NR to WR) 0000 0000 0000 0000 0000 0000 0000 -3367Rihand (Hydro) to MPPTCL (Long Term Open Access) 0000 7970 0000 0000 0000 0000 0000 7970

Matathilla (Hydro) to MPPTCL (Long Term Open Access) 0000 0000 0000 0000 0000 0000 0000 0000EMCO to BIHAR ( PXIL) 0000 0000 0000 -0188 0000 0000 0000 -0188MSEB to BIHAR ( IEXL) 0000 0000 0000 -0400 0000 0000 0000 -0400

MPPMCL MPSEB to BSES_RAJ ( MPPL) 0000 -7000 0000 0000 0000 0000 0000 -7000ADHUNIK to BALCO ( MANIKARAN) 0000 0000 5198 0000 0000 0000 0000 5198

HIMACHAL to ESIL_WR ( IEXL) 0050 0000 0000 0000 0000 0000 0000 0050HARIYANA to ESIL_WR ( IEXL) 1525 0000 0000 0000 0000 0000 0000 1525HARIYANA to ESIL_WR ( PXIL) 5610 0000 0000 0000 0000 0000 0000 5610

KWHEPS to ESIL_WR ( PXIL) 0150 0000 0000 0000 0000 0000 0000 0150SCL to ESIL_WR ( IEXL) 0610 0000 0000 0000 0000 0000 0000 0610SCL to ESIL_WR ( PXIL) 0090 0000 0000 0000 0000 0000 0000 0090

MPPMCL MPSEB to HARIYANA ( HARIYANA) 0000 -126636 0000 0000 0000 0000 0000 -126636SCL to HRJIL MSEB ( SCL) 0000 0000 0000 1993 0000 0000 0000 1993

APL3 GUVNL to JVVNL-NR ( IEXL) -0120 0000 0000 0000 0000 0000 0000 -0120APL3 GUVNL to JVVNL-NR ( PXIL) -0122 0000 0000 0000 0000 0000 0000 -0122

BLAPPL MPSEB to JVVNL-NR ( IEXL) 0000 -0250 0000 0000 0000 0000 0000 -0250EMCO to JVVNL-NR ( IEXL) 0000 0000 0000 -0720 0000 0000 0000 -0720MSEB to JVVNL-NR ( PXIL) 0000 0000 0000 -0300 0000 0000 0000 -0300

MPSEB to NDPL(DTL)-NR ( PTC LTD) 0000 -1626 0000 0000 0000 0000 0000 -1626MPPMCL MPSEB to NDPL(DTL)-NR ( PTC LTD) 0000 -35052 0000 0000 0000 0000 0000 -35052

MPPMCL MPSEB to RPPC ( RPPC) 0000 -3562 0000 0000 0000 0000 0000 -3562EMCO to TRIPURA ( IEXL) 0000 0000 0000 -0070 0000 0000 0000 -0070

ADHPL to TORRAHM GUVNL ( IEXL) 0051 0000 0000 0000 0000 0000 0000 0051

Ga iWpxaIya SaoDyaUlsa Exchanges within WRMundra APL to Gujarat (LTOA) 0000 0000 0000 0000 0000 0000 0000 0000

JPL to ARVIND GUVNL ( MPPL) 4464 0000 0000 0000 0000 0000 0000 4464JPL to AIGL MSEB ( AIGL MSEB) 0000 0000 0000 0789 0000 0000 0000 0789

JPL to ARPIPL MSEB ( ARPIPL MSEB) 0000 0000 0000 0771 0000 0000 0000 0771JPL to ACCIL MSEB ( ACCIL MSEB) 0000 0000 0000 2380 0000 0000 0000 2380

APL1 GUVNL to AWLD GUVNL ( AEL) 3874 0000 0000 0000 0000 0000 0000 3874DBPOWER to BALCO ( BALCO) 0000 0000 0120 0000 0000 0000 0000 0120

DBPOWER to BALCO ( DBPOWER) 0000 0000 15887 0000 0000 0000 0000 15887EMCO to BALCO ( EMCO) 0000 0000 0080 0000 0000 0000 0000 0080

JPL to BOSCH MSEB ( BOSCH MSEB) 0000 0000 0000 1552 0000 0000 0000 1552JPL to BCSIL MSEB ( BCSIL MSEB) 0000 0000 0000 0720 0000 0000 0000 0720JPL-II to CSEB ( CSPTRDCL CSEB) 0000 0000 12569 0000 0000 0000 0000 12569

SPECT ACBIL to CSEB ( CSPTRDCL CSEB) 0000 0000 0720 0000 0000 0000 0000 0720ACBIL to CSPTRDCL CSEB ( CSPTRDCL CSEB) 0000 0000 5374 0000 0000 0000 0000 5374

JPL to CLASSIC MSEB ( CLASSIC MSEB) 0000 0000 0000 1309 0000 0000 0000 1309JPL to CIPLA MSEB ( CIPLA MSEB) 0000 0000 0000 0610 0000 0000 0000 0610

JPL to CEAT MSEB ( MPPL) 0000 0000 0000 2921 0000 0000 0000 2921APL1 GUVNL to CHLM GUVNL ( AEL) 2187 0000 0000 0000 0000 0000 0000 2187

NSPCL to DD ( DD) 0000 0000 0000 0000 0000 13156 0000 13156EMCO to DNH ( EMCO) 0000 0000 0000 0000 0000 0000 28097 28097

JPL to DNL MSEB ( DNL MSEB) 0000 0000 0000 0870 0000 0000 0000 0870JPL to ETLC MSEB ( ETL) 0000 0000 0000 0758 0000 0000 0000 0758JPL to ETLT MSEB ( ETL) 0000 0000 0000 0758 0000 0000 0000 0758

APL2 GUVNL to ESIL_WR ( PXIL) 0283 0000 0000 0000 0000 0000 0000 0283APL3 GUVNL to ESIL_WR ( PXIL) 8355 0000 0000 0000 0000 0000 0000 8355

DBPOWER to ESIL_WR ( MANIKARAN) 0000 0000 0000 0000 0000 0000 0000 0345EOL GUVNL to ESIL_WR ( ESIL_WR) -19578 0000 0000 0000 0000 0000 0000 0000

EPGL GUVNL to ESIL_WR ( ESIL_WR) -2866 0000 0000 0000 0000 0000 0000 0000JPL to ESIL_WR ( JPL) 0000 0000 0000 0000 0000 0000 0000 45641

JSWEL(RTNGIRI) MSEB to ESIL_WR ( PXIL) 0000 0000 0000 -2328 0000 0000 0000 0000MSEB to ESIL_WR ( PXIL) 0000 0000 0000 -1705 0000 0000 0000 0000

ESSAR_MAHAN to ESIL_WR ( ESIL_WR) 0000 0000 0000 0000 0000 0000 0000 52250VANDANA to ESIL_WR ( PXIL) 0000 0000 0000 0000 0000 0000 0000 0480

JPL to ESIL MSEB ( JPL) 0000 0000 0000 0108 0000 0000 0000 0108ESSAR_MAHAN to ESIL MSEB ( ESIL_WR) 0000 0000 0000 1244 0000 0000 0000 1244

JPL to ETLW MSEB ( ETL) 0000 0000 0000 0732 0000 0000 0000 0732JPL to ETLB MSEB ( ETL) 0000 0000 0000 0866 0000 0000 0000 0866

JPL to EILR MSEB ( MPPL) 0000 0000 0000 1049 0000 0000 0000 1049JPL to ETLK MSEB ( ETL) 0000 0000 0000 0643 0000 0000 0000 0643

JPL to EXIDE MSEB ( EXIDE MSEB) 0000 0000 0000 1239 0000 0000 0000 1239CSEB to GOA ( PTC LTD) 0000 0000 -0400 0000 0400 0000 0000 0000

DBPOWER to GOA ( PTC LTD) 0000 0000 0000 0000 17390 0000 0000 17390JPL to GSL MSEB ( GSL MSEB) 0000 0000 0000 0870 0000 0000 0000 0870

EMCO to GCEL ( EMCO) 0000 0000 3394 0000 0000 0000 0000 3394JPL to HINDMOUDA MSEB ( HINDMOUDA MSEB) 0000 0000 0000 2249 0000 0000 0000 2249

HINDAHEJ GUVNL to HINDTALOJ MSEB ( HINDTALOJ MSEB) -2962 0000 0000 2962 0000 0000 0000 0000EMCO to DNH ( EMCO) 0000 0000 0000 0000 0000 0000 119290 119290

JPL to HNGIL MSEB ( HNGIL MSEB) 0000 0000 0000 5156 0000 0000 0000 5156LANCO TO MP 0000 191431 0000 0000 0000 0000 0000 191431

IEE 103711 47279 -413725 163201 0000 26840 0000 31054PEI 3561 7107 0000 -0214 0000 0000 0000 17561

ca kula Aayaat Total Import 781888 184933 483401 86303 247768 28588 40782 148596 781888kula inayaa-t Total Export 1202530 274418 268404 653270 6437 0000 0000 0000 1202530naoT Aayaat inayaa-t Net Imp (+)Exp (-) -420642 -89485 214997 -566968 241330 28588 40782 148596 -420642

4 kula gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kula

Total GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL11567423 2719395 2512265 73752 3933435 237255 213875 549412 12255 11567424

5 kI kula iSaDUyala Total Sdl incl IR bi-lateral exch Sdl 9753264 2263189 2432879 58978 2833062 221937 190360 484727 12209 97532646 ibanaa xait ko kula D`avala Total Drl excl Tr Loss 9388390 2433257 2716560 597587 2741156 286430 174671 437785 0944 93883907 xait imalaakr kula D`avala Total Drl incl Tr Loss 9703552 2433257 2716560 597587 2741156 286430 174671 437785 0976 93884228 p p`NaalaI maoM kula pUla xait Pooled loss in WR System 3151629 p xao`~ sToSanaaoM sao kaorbaa ivanQa 1 AaOr 2 ivanQa 3 kvaasa gaMQaar kakrapar tara`pur esaesapI ponca kula

vaastivak [njaoSana Actual Inj - WR Stns KSTPS VSTPS-1amp 2 VSTPS-3 KGPS GGPS KAPS TAPS SSP PENCH TOTAL (ima yauinaTsa) (MUs) 1310550 1162242 1009828 99928 156340 275783 918544 97965 13620 12860991

] xao~ Aa ]xao kao ina ] xao naoT d xao Aa d xao inayaa-t d xao naoT pU xao Aa pU xao inayaa-t pU xao naoT kula naoT10 vaasaivak AMtrxao~Iya Actual IR Exchanges NR Imp NR Exp NR Net SR Imp SR Exp SR Net ER Imp ER Exp ER Net Total Net

ivainamaya (ima yauinaTsa) (MUs) 0347 2303947 -2303600 0000 737616 -737616 73271 189494 -116223 -3157439 AMtrxao~Iya ivainamaya IR Exchange Schedule NRI sdl NRE sdl Net NR sdl SRI sdl SREsdl Net SR sdl ERI sdl ERE sdl Net ER sdl Net WR sdl iSaDyaUla (ima yauinaTsa) (MUs) 2987 714531 -711544 404371 0000 404371 0000 113469 -113469 -420642

Total Entitlement incl IR and bi-lateral exchange schedule

11

AMtrxao~Iya AaOr iWpxaIya ivanamayaaoM kI iSaDyaUla imalaakr kula pa~ta

maah jaUlaa[- 2014 ko AMtr-ajyaIya AMtrxao~Iya ivainamayaaoM ka ivavarNa Anaulagnak 46DETAILS OF INTERSTATEINTER-REGIONAL EXCHANGES FOR THE MONTH OF JULY 2014 Annex-46

k`maaMkFrom To

gauivainaila map`iva]kMila Craivabaao maraiva]kMila gaaovaa dmana dIva da na h [ssaar ] xao~ d xao~ pU xao~ piScama xao~ kulaA InterstateInter-regional Schedules

included in ISGSGUVNL MPPGCL CSEB MSPGCL GOA DD DNH ESIL NR SR ER WR TOTAL

1 gauivainaila GUVNL 2962 31082 34044

2 map`iva]kMila MPPGCL 0000

3 Craivabaao CSEB04

0400

4 maraiva]kM ila MSPGCL 4033 4033

5 gaaovaa GOA 0000

6da na h DNH 0000

7kaorbaa KORBA-III 0000

8 iMjadla pavar JPL 4464 12569 26349 45641 89023

9 ADanaI pavar APL 6061 6061

10 ESSAR MAHAN 1244 52250 53494

11 laonakao Lanco -Pathadi 0000

12 esaIbaIAa[-ela -ACBIL 6093 6093

13 KSK MAHANADI14 DB POWER 16008 17390 0345

15 VANDANA 0480

16 EMCO 3473

17 ESIL18 ena esa pI saI ela NSPCL 13157 28097 41254

19 ]ltarI xao~ NRegion (WR end) 0347 0347

20 dixaNaI xao~ S Region (S Bus) 0000 0000

21 pUvaI- xao~ E Region (WR end) 73271 73271

22 p xao~ WRegion (WR end) 737616 189494 3231057

23 enaTIpIsaI NTPC Injection 5216788

24 enapIsaI NPC Injection 1194327

25 Total ISGS drawal from the Grid incl interregional bi-lateral

2433257 2716560 597587 2741156 286430 174671 437785

B InterstateIR Exchanges not included in ISGS

20 knaa-Tk Karnataka 444 44400

21 yaUpIpIsaIela UPPCL 0000 0000

22 AarvaIpIenaela RVPNL -237 -2370

23 UPPCL ( Excess Drawn From Rajghat 0000 0000

24 kaoTa ]jjaOna Kota - Ujjain 0000 0000

25 kula ba Total B (13 to 17) 0000 -2370 0000 0000 44400 0000 0000 42030

C inavala ivainamaya Net Exchange (12+18) 2433257 2714190 597587 2741156 330830 174671 437785 9429476

D kula Aayaat Total Imp by WR 115648

E kula inayaa-t Total Export by WR 3231057

F inavala ivainamaya Net Exchange (D-E) -3115409

G p xao~ Wara vaIlD jaa- Energy wheeled by WR

26 pU xao~ sao d xao~ kao inayaa-t ER export to SR0000

0000

27 d xao~ sao ] xao~ kao inayaa-t pUxao pxao sao haokr SR export to NR via ERWR0000

0000

28 d xao~ sao ] xao~ kao inayaa-t pxao sao haokr SR export to NR via WR0000

0000

29 pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr ER export to NR via WR0000

0000

30 ] xao~ sao d xao~ kao inayaa-t pxao sao haokr NR export to SR via WR393404

393404

31 pU xao~ sao d xao~ kao inayaa-t pxao sao haokr ER export to SR via WR0000

0000

32 pU xao~ sao d xao~ kao inayaa-t ]xao pxao sao haokr ER export to SR via NRWR0000 0000

0000

33 ]pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr NER export to NR via WR0000

0000

Anaulagnak 47Annex-47

maah jaUlaa[- 2014 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39697 65459

9964 39521

Levels in Mtrs str maITr maoM

]ka[- Ukai

64932

10110

25501

25801

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF JULY 2014

ivavarNa Particulars

Sr No Details of incident (Elements Generation Tripped) Owner Utility Date TimeEffect (Loss of generation Load) if

anyCategory as per

Standards1 Bus Fault at Lonikhand 400 kV Bus 1 MSETCL 04Jul14 315 Nil GI‐22 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 06Jul14 433 load Loss 277 MW GD‐13 Tripping of Multiple Elements from 400220 kV Parli (MSETCL) Ss MSETCL 08Jul14 2359 Nil GI‐24 Poles tripping of HVDC Bhadarwati PGCIL 09Jul14 0350 amp 0504 Nil GI‐25 Tripping in Jejuri and Loanand Area MSETCL 10Jul14 126 Load Loss 400 MW GD‐16 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 11Jul14 349 load Loss 335 MW GD‐17 Blackout at Kawas Ss NTPC 11Jul14 117 Gen Loss 320 MW GD‐18 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 13Jul14 642 load Loss 263 MW GD‐19 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 15Jul14 611 load Loss 264 MW GD‐110 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 16Jul14 334 load Loss 200 MW GD‐111 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 17Jul14 417 load Loss 150 MW GD‐112 Tripping at Gandhar Ss NTPC 21Jul14 1607 Gen Loss 180 MW GD‐113 Multiple time tripping of 765 kV Sasan ‐Satna 2 ckt on Protection Mal‐operation PGCILSASAN 7252014 1026 amp 1229 Hrs Nil GI‐2

List of Grid Disturbances and Grid incidents (GDGI) in July-2014 Western RegionANNEXURE-5

SR NO UTILITIES OCC NO MONTH STATUS REMARK 1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14 HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314 AT MUMBAI BY NTPC MUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514 AT MUMBAI BY WRPC AT RELIANCE

7 WRTS-I 460 Jun-14 HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714 AT RAIPUR BY KWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-1411 RELIANCE SASAN 464 Oct-1412 MADHYA PRADESH 465 Nov-1413 BDTCLJBTCL 466 Dec-1414 NTPC Vindhyachal 467 Jan-1515 ESSAR TRANSMISSIOM 468 Feb-1516 TATA POWER 469 Mar-1517 SUGEN (TPL) 470 Apr-1518 TORRENT POWER 471 May-1519 CGPL 472 Jun-1520 NTPC Korba 473 Jul-1521 NCA 474 Aug-1522 NHDC 475 Sep-1523 NTPC Mouda 476 Oct-1524 KSK 477 Nov-1525 RELIANCE 478 Dec-1526 NTPC SIPAT CG 479 Jan-1627 TAPS-3amp4 480 Feb-1628 ESSAR ESIL 481 Mar-1629 GOA 482 Apr-1630 KAPS 483 May-1631 JPL 484 Jun-1632 DNH 485 Jul-1633 NTPC Mumbai 486 Aug-1634 ADANI TRANSMISSION 487 Sep-1635 INDIAN RAILWAY 488 Oct-1636 WRTS-II 489 Nov-16

ANNEXURE 10

8212014

1

OCC MEETING (462nd )

Power system Operation Corporation Ltd

OPERATIONAL HIGHLIGHTS amp ISSUES

Date 11082014Venue ndash Tarapur

MonthsIEGC Band

FVIlt499 499‐5005 gt5005

March14 1291 4783 3927 012

April14 3064 5233 1703 016

May14 2248 5319 2433 013

Junersquo14 3715 4536 1749 02460

80

100

120Frequency Profile for July 2014Frequency Profile for July 2014

Maximum instantaneous frequency

5036 Hz

on 23rd July 2014 at 1304 hrs

Minimum instantaneous frequency

4941 Hz

on 10th July and 25th July 2014 at 1950 hrs and 1944 hrs respectively

Julyrsquo14 3451 5016 1533 020

0

20

40

60

1‐Jul

2‐Jul

3‐Jul

4‐Jul

5‐Jul

6‐Jul

7‐Jul

8‐Jul

9‐Jul

10‐Jul

11‐Jul

12‐Jul

13‐Jul

14‐Jul

15‐Jul

16‐Jul

17‐Jul

18‐Jul

19‐Jul

20‐Jul

21‐Jul

22‐Jul

23‐Jul

24‐Jul

25‐Jul

26‐Jul

27‐Jul

28‐Jul

29‐Jul

30‐Jul

31‐Jul

Avg Frequency of the month

4993 Hz

1High frequency day due to heavy rain in almost all places in the country low demand was observed(117 GW) Heavy underdrawal by all constituents of WR around 700‐1000 MW during 1300 hrs2 Low frequency day Demand was high and Od by constituents Od by NR

lt499 499‐5005 gt5005

8212014

2

501

502

503

504

Frequency for July 2014

496

497

498

499

50

494

495

1 60 119

178

237

296

355

414

473

532

591

650

709

768

827

886

945

1004

1063

1122

1181

1240

1299

1358

1417

1476

1535

1594

1653

1712

1771

1830

1889

1948

2007

2066

2125

2184

2243

2302

2361

2420

2479

2538

2597

2656

2715

2774

2833

2892

2951

3010

3069

3128

3187

3246

3305

3364

3423

3482

3541

3600

3659

3718

3777

3836

3895

3954

4013

4072

4131

4190

4249

4308

Frequency 499 5005

26000

28000

Unit Outage‐ JULY‐14 Max 26128 MW on 26072014JUNE14 Max 20818 MW on 210714

PLANNED OUTAGE FORCED OUTAGE TOTAL OUTAGE‐JULY14 TOTAL OUTAGE‐JUNE14

10000

12000

14000

16000

18000

20000

22000

24000

26000

MW

0

2000

4000

6000

8000

10000

1‐Jul‐14 6‐Jul‐14 11‐Jul‐14 16‐Jul‐14 21‐Jul‐14 26‐Jul‐14 31‐Jul‐14Date

8212014

3

Energy ConsumptionMax

986 Mus on 2nd July+2975 as compared

to last year900

1000

1100

IN M

Us ‐‐‐‐gt

DAILY CONSUMPTION OF WESTERN REGION(2010‐11 TO 2014‐15)

Min749 Mus on 24th July

500

600

700

800

CONSU

MPT

ION

Apr

May Jun

Jul

Aug Sep

Oct

Nov Dec Jan

Feb

Mar

MONTHS ‐‐‐‐gt2010‐11 2011‐12 2012‐13 2013‐14 2014‐15

Energy Consumption MUDay

Jul‐14 Jun‐14 Jul‐13 Change wrt last month

Change wrt last Year

Average 848 927 712 ‐845 1909Max 986 971 760 156 2975Date 2‐Jul‐14 30‐Jun‐14 2‐Jul‐13 ~ ~

PEAK DEMAND (this month vis-agrave-vis last month)

STATE

CATERED(MW) UNRESTRICTED(MW)

Julyrsquo14 Junrsquo14 Julyrsquo14 Junrsquo14

GUJARAT 13833 13755 13969 13906

MP 7090 7120 7121 7434

CHATTISGARH 3118 3472 3414 3473

Regional Demand met

Max 43034 MW(1st July 1600 hrs)

2540 more than the l

MAHARASHTRA 19283 19452 19385 19755

GOA 459 475 459 482

DD 287 298 287 298

DNH 721 677 721 685

ESIL 532 535 532 535

43034 42934 43419 43802

last year

Min 28431 MW(24th July0500 hrs)

WR TOTAL 43034 42934 43419 43802

Figures shown are Maximums in the month

Demand Met Jul‐14 Jun‐14 Jul‐13 Change wrt last month

Change wrt last Year

Average 35215 40463 32253 ‐1297 918Max 43034 42934 34317 023 2540

Date when Max 1‐Jul‐14 30‐Jun‐14 2‐Jul‐13 ~ ~

8212014

4

Constituents Total Time Block Noof time block Violation of Compilance Violation of Compilancein the month of July Type ‐1 Type‐2

Chhattisgarh 2976 983 6697 927 6885Guajrat 2976 681 77 12 222 92 54

DSM Violation for the Month of July 2014

Guajrat 2976 681 7712 222 9254Madhya Pradesh 2976 528 8226 594 8004Maharashtra 2976 1045 6489 442 8515

Goa 2976 712 7608 1868 3723Daman and Diu 2976 1720 4220 2506 1579

Dadar Nagar Haveli 2976 23 9923 1299 5635

Violation Type‐2 When The drawl does not change sign in 12 consecutive time block

Violation Type‐1 When The drawl is more or less than 12 schedule or 150 MW whichever lesser

Total No of Blocks ‐ 2976

New Elements July 2014a) COMMISSIONING OF NEW GENERATING UNITSSLNO CONSTITUENT UNIT NAME UNIT NO C`ty(MW) DATE TIME

1 IPP(Jay Prakash Nigrie) JNSTPP I 660 150714(sync) 845

b) COMMISSIONING OF NEW TRANSMISSION LINES

SLNO CONSTITUENT LINE NAME CKT NO KV DATE TIME Line length( in km)

1 POWERGRID Wardha‐Aurangabad II 765 372014 2300 347 581 POWERGRID Wardha Aurangabad II 765 372014 2300 34758

2 POWERGRID Wardha‐Aurangabad I 765 572014 1900 34758

3 GETCO Kosamba‐Chorania I 400 572014 2035 230

4 GETCO Kosamba‐Chorania II 400 572014 2105 230

5 BDTCL BDTCL‐Bhopal(MP) I 400 16714 1833 864

6 POWERGRIDLILO of Raipur‐Raigarh‐4

IV 400 1872014 2200 2826 POWERGRIDat KSK

IV 400 1872014 2200 282

7 MPPTCL Indore‐Pithampura II 400 210714 1625 150

8 POWERGRIDDharamjaygarh‐Jharsuguda

I 765 29714 000 14893

9 POWERGRIDDharamjaygarh‐Jharsuguda

II 765 28714 2125 14893

Total ckt Km 189366

8212014

5

c) COMMISSIONING OF NEW ICTS

SLNO CONSTITUENT STATION NAME KV RATIOCAPACITY (MVA) DATE

TIME

1 BDTCL BDTCL(Bhopal)ICT 1 765400 3x500 372014 1657

2 POWERGRID Dharamjaygarh(ICT 1) 765400 3x500 772014 22593 POWERGRID Navasari(ICT 3) 400220 500 872014 1959

d)CO SS O G O C O Sd)COMMISSIONING OF LINE REACTORS

SLNO CONSTITUENT STATION NAME Line Name KVCty(MVAR

) DATETIME

1 BDTCL BDTCL Indore‐BDTCL I 765 3x80 23714 1935

2 POWERGRID DharamjaygarhDharamjaygarh‐Jharsuguda II

765 3x110 280714 2125

3 POWERGRID DharamjaygarhDharamjaygarh‐Jharsuguda I

765 3x110 29714 000

4 POWERGRID Satna Satna‐Gwalior‐II 765 3x80 29714 10005 POWERGRID Aurangabad Padghe Aurangabad 1 765 3x80 310714 22 475 POWERGRID Aurangabad Padghe‐Aurangabad‐1 765 3x80 310714 2247

e)COMMISSIONING OF BUS REACTORS

SLNO CONSTITUENT STATION NAME KVCty(MVA

R) DATETIME

1 POWERGRID Bhatapara 400 125 24714 19562 POWERGRID Indore 765 3x80 31714 18273 POWERGRID Sujalpur 400 125 31714 1205

Congestion Charge was applied 3 times in July 2014 on WR‐NR path ie on12th 14th amp 15th July 2014

8212014

6

5515 5484

5200

5400

5600

Congestion Charge applied on WR‐NR path Dt12714 (Block 3 ‐16)

4200

4400

4600

4800

5000WR‐NR TTC(4900 MW)

WR‐NR ATC(4400 MW)

4000

4200

030

034

038

042

046

050

054

058

102

106

110

114

118

122

126

130

134

138

142

146

150

154

158

202

206

210

214

218

222

226

230

234

238

242

246

250

254

258

302

306

310

314

318

322

326

330

WR‐NR_Act(MW) WR‐NR_TTC(4900 MW) WR_NR_ATC(4400 MW)

2200 00

240000

260000

280000

300000

320000

MW

Maharashtra Sch Vs Drawal‐12714(Block 3‐16)

140000

160000

180000

200000

220000

240000

MW

Gujarat Sch Vs Drawal_12714

200000

220000

3 4 5 6 7 8 9 10 11 12 13 14 15 16

TIme Block

Maharashtra_Sch Maharashtra_Drawal

340000

350000

W

MP Sch Vs Drawal_12714(Block 3‐16)

120000

3 4 5 6 7 8 9 10 11 12 13 14 15 16Time Block

GETCO_Sch(MW) GETCO_Drawal(MW)

750008000085000

CSPTCL‐12714(3‐16)

310000

320000

330000

3 4 5 6 7 8 9 10 11 12 13 14 15 16

MW

TIme Block

MP_Sch MP_Drawal

450005000055000600006500070000

3 4 5 6 7 8 9 10 11 12 13 14 15 16

MW

Time Block

CG_Sch CG_Drawal

Under Drawal By WR constituents during the imposition of Congestion on WR‐NR on 12714

8212014

7

5292

5100

5300

Congestion Charge applied on WR‐NR path Dt14714 (Block 57 ‐71)

4638

4300

4500

4700

4900

5100

WR‐NR TTC(4900 MW)

WR‐NR ATC(4400 MW)

3900

4100

1330

1336

1342

1348

1354

1400

1406

1412

1418

1424

1430

1436

1442

1448

1454

1500

1506

1512

1518

1524

1530

1536

1542

1548

1554

1600

1606

1612

1618

1624

1630

1636

1642

1648

1654

1700

1706

1712

1718

1724

1730

1736

1742

1748

1754

1800

WR‐NR_Act(MW) WR‐NR_TTC(4900 MW) WR_NR_ATC(4400 MW)

3600380040004200440046004800

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

MW

Maharashtra Sch Vs Drawal‐14714(Block 57‐71)

1900

2000

2100

2200

2300

2400

2500

2600

MW

Gujarat Sch Vs Drawal_14714

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

TIme Block

Maharashtra_Sch Maharashtra_Drawal

1800

1900

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

Time Block

GETCO_Sch(MW) GETCO_Drawal(MW)

700

750

800

Chhattisgarh Sch Vs Drawal_141714(Block57‐71)

2600

2700

2800

2900

MW

MP Sch Vs Drawal‐14714(57‐71)

500

550

600

650

700

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

MW

Time Block

CG_Sch CG_Drawal

2400

2500

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

Time Block

MP_Sch MP_Drawal

8212014

8

4630

45004700

Congestion Charge applied on WR‐NR path Dt15714 (Block 50 ‐96)

4463

350037003900410043004500

WR‐NR TTC(4150 MW)

WR‐NR ATC(3650 MW)

31003300

1215

1234

1253

1312

1331

1350

1409

1428

1447

1506

1525

1544

1603

1622

1641

1700

1719

1738

1757

1816

1835

1854

1913

1932

1951

2010

2029

2048

2107

2126

2145

2204

2223

2242

2301

2320

2339

2358

WR‐NR_Act(MW) WR‐NR_TTC(4150 MW) WR_NR_ATC(3650 MW)

3800

4000

4200

4400

4600

4800

MW

Maharashtra Sch Ve Actual on 15714(50‐96)

130015001700190021002300250027002900

MW

Gujarat Sch Vs Actual on 15714(50‐96)

3600

50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96

Time Block

Maharashtra_Sch Maharashtra_Drawal

1300

50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96

Time BLock

GETCO_Sch(MW) GETCO_Drawal(MW)

3500

3700

MP Sch Vs Actual for 15714(50‐96)

850

950

1050

Chhattisgarh Sch Vs Actual‐15714(50‐96)

2700

2900

3100

3300

50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96

MW

Time Block

MP_Sch MP_Drawal

350

450

550

650

750

850

50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96

MW

Time BLock

CG_Sch CG_Drawal

8212014

9

Summary of Grid Events (GD amp GI) in July 2014

Sr No

Details of incident (Elements Generation Tripped) Owner Utility Date TimeEffect (Loss of

generation Load) if any

Category as per

Standards

1 Bus Fault at Lonikhand 400 kV Bus 1 MSETCL 04Jul14 315 Nil GI‐2

2 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 06Jul14 433 load Loss 277 MW GD‐1

3Tripping of Multiple Elements from 400220 kV Parli

MSETCL 08Jul14 Nil GI 23(MSETCL) Ss

MSETCL 08Jul142359

Nil GI‐2

4 Poles tripping of HVDC Bhadarwati PGCIL 09Jul140350 amp 0504

Nil GI‐2

5 Tripping in Jejuri and Loanand Area MSETCL 10Jul14 126 Load Loss 400 MW GD‐1

6 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 11Jul14 349 load Loss 335 MW GD‐1

7 Blackout at Kawas Ss NTPC 11Jul14 117 Gen Loss 320 MW GD‐1

8 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 13Jul14 642 load Loss 263 MW GD‐1

9 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 15Jul14 611 load Loss 264 MW GD‐1

10 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 16Jul14 334 load Loss 200 MW GD‐1

11 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 17Jul14 417 load Loss 150 MW GD‐1

12 Tripping at Gandhar Ss NTPC 21Jul14 1607 Gen Loss 180 MW GD‐1

13Multiple time tripping of 765 kV Sasan ‐Satna 2 ckt on

Protection Mal‐operation PGCILSASAN 7252014

1026 amp 1229 Hrs

Nil GI‐2

S No Name of power

stations

Unit Reason for

outage

1 VSTPS 2 (210 MW) Coal Shortage

91 Operation of grid at high frequency ( gt 505 Hz) even under fuel shortage condition

Issues1 Major ISGSIPP are facing fuel

shortage1 VSTPS 2 (210 MW) Coal Shortage

2 VSTPS 5 (210 MW) Coal Shortage

3 Singhaji 1 (600 MW) Coal Shortage

4 SGTPS 4 (210 MW) Coal Shortage

5 JP Bina 2 (250 MW) Coal Shortage

6 Bhusawal 2 (210 MW) Coal Shortage

shortage2 Expected High Demand during dry

spell in September amp October3 Optimal use of precious fuel is

necessary to tackle the high demand in dry spell

7 Parli 4 (210 MW) Coal Shortage

8 India Bulls 1 (270 MW) Coal Shortage

8212014

10

Agenda 92 Insecure operation Oscillations Power Swingbull N‐1 contingency of 765 kV Tirora‐Akola2 on 10th and 11th June 2014

bull Tirora gen gt 1500 MW AR not operatedbull Intra plant mode of oscillations (097 Hz) with poor damping

bull N‐1 contingency of 400 kV Tirora‐Warora‐1 on 20th May 2014N 1 contingency of 400 kV Tirora Warora 1 on 20 May 2014bull Tirora gen gt 1500 MW 765 kV Tirora‐Akola2 out of servicebull SPS bull Power Swing and loss of complete power station GD‐1

bull The need for transmission augmentation as well as PSS tuning at APML Tirodawas discussed in the 461st OCC meeting

bull Member Secretary WRPC suggested that APML would send details of PSSMember Secretary WRPC suggested that APML would send details of PSS tuning studies to WRPC and they may consult IIT‐Mumbai for assistance and expedite

bull Representative from SLDC Kalwa APL may like to update the progress

Events at APML TiroraCase 3 Date 11‐07‐14 1529 hrsbull Line tripped on Y Phase to earth fault AR was unsuccessful due to persisting faultbull Sudden power transfer through 400 kV System resulted in swing Oscillation of 097 Hz observed across WR and

East West generation in Western region oscillatedO ill i i d f 10 dbull Oscillation persisted for 10 seconds

bull Damping ratio was 257

8212014

11

Events at APML TiroraCase 4 Date 23‐07‐14 0227 hrsbull 765400 kV APML Tirora ICT trippedbull Sudden power transfer through 400 kV System resulted in swing Oscillation of 097 Hz observed across WR

and East West generation in Western region oscillatedO ill i i d f 17 dbull Oscillation persisted for 17 seconds

bull Damping ratio was 7

bull Need for transmission augmentation as well as PSS tunning at APML Tiroda required

bull It has been decided in 461th OCC thatAPML would send details of PSS

Expected date of

tuning studies to WRPC and they may consult IIT‐Mumbai for assistance and expedite Representative from SLDC Kalwa APL may like to update the progress

Expected date of bull 2nd ckt of 765 kV Tirora‐Akola2bull 220 kV network from 400220 kV Warorabull 220 kV network from 765400 kV Akola2 and 765400 kV Taptithandabull 220 kV network from 765400 kV Aurangabad‐PG 400220 kV Pune

Redistribution of Load within Maharashtra system

8212014

12

Elements Date and

Time of

Tripping

Date and

Time of

Restoratio

n

Remarks Receipt of

DREL at WRLDC

Satna Sasan

765 kV Sasan‐Satna 225‐07‐14

1026

25‐07‐14

1155

Protection Mal‐Operation DT at Sasan End

on OV as line remain hanging from Sasan No Yes

Agenda 93 Frequent Tripping of 765 kV Satna‐Sasan line

Issues

1Expedite commissioning of Line Reactor at 765 kV Sasanend

2 Submission of DREL for1026 1155end

765 kV 240 MVAr

Bus Reactor at Satna

25‐07‐14

1026

25‐07‐14

1139

Protection Mal‐Operation DT at Sasan End

on OV as line remain hanging from SasanNo Yes

765 kV Sasan‐Satna 225‐07‐14

1342

25‐07‐14

1342

Line got charged from Satna and

synchronized at Sasan end but immediately

DT was received at Sasan from Satna and

Line tripped Prior to tripping voltage at

No Yes

2 Submission of DREL for event analysis in line with CEA standards IEGC

3 Threat to grid security and constraints in evacuation from large generation complexarising from frequent undesirable tripping particularily

Sasan end was 796 kV

765 kV Sasan‐Satna 225‐07‐14

1628‐

Charging attempt was taken from Satna end

but line tripped before synchronization at

Sasan end due to DT from Satna Open end

voltage at Sasan 826 kV for the line

No Yes

The above was a narrow miss because the tripping occurred when one of the bus was under shutdown Fortunately during theabove period only two units of Sasan were in service and the second 765 kV bus remained in service else the situation would havebeen a serious threat to the system security

during protection testing construction activities

The progress of reactor commissioning at Sasan over the last 8 months is given under

Schedule in formed in meetings

SN 451st OCC 455th

OCC

456th OCC 457th 458th 459th 460th 461st

1 Line reactor By Dec By April By May By June End of June End of By By

of 765 kV

Sasan‐Satna

ckt‐2

y

2013

y p

2014

y y

2014

y

2014(Testing under

progress)

2014 (As per

joint report

post site visit

on 26314)

June 2014

y

Aug‐

2014

y

Aug‐2014

2 765kV Bus‐1

Reactor

Jan 2014 By Mar

2014

By June

2014

By June

2014(Testing under

)

End of July

2014(As per

j i t t

End of July

2014

By

Sep‐

2014

By

Sep‐2014

Sasan may intimate the progress in reactor commissioning to the sub-committee

progress) joint report

post site visit

on 26314)

2014

8212014

13

Item no94 SPS at Sipat

bull The SPS scheme implemented at NTPC Sipat received at WRLDC

bull It is observed that a time delay of 15sec is provided to unload units 1 2 4 amp5 each by 150MW if ICT l d d 130 f t d l dany ICT s load exceeds 130 of rated load

bull As per decision of WRPC meeting on 18314 if ex‐bus generation at Sipat is more than 2200 MW immediate unloading of units were decided and the intentional delay provided needs to be re‐ examined (Maximum 2‐3 sec delay may be appropriate) as unloading by 150MW would also take another 4‐5sec

8212014

14

Contingency Envisaged SPS action Identified FeedersTripping of any oneICT at 400200 VapiSub‐Station

Automatic LoadShedding of 100MW

DNH 1) 66 kV‐Kharadpara‐Rakholi‐I 50 MW2) 66 kV Khadoli‐Khadoli‐3 30 MW

Item No95 SPS at 400220 kV Vapi(PGCIL) Item No912

DD1) 66 kV Magarwada‐Kachigam 60 MW

It was apprised by representatives from DD amp DNH in the 459th OCC meeting that the above scheme shall be implemented within a month

UT DDDNHmay apprise the status of commissioning of the envisaged SPSUT‐DDDNH may apprise the status of commissioning of the envisaged SPS

Item no96 Addressing High Voltage condition in SSP amp nearby area Sl No Line No of Times tripped in Julrsquo141 400 kV SSP‐Dhule‐I 32 400 kV SSP ‐ Rajgarh‐ I 2

Issues1 Multiple tripping of

feeders emanating from SSP

2 S l tiSl No Line No of occasions kept open on HV 2 Several emanating feeders being kept open on high voltage in SSP amp nearby area

Sl No Line No of occasions kept open on HV

1 400 kV SSP‐Dhule‐I 9

2 400 kV SSP‐Dhule‐II 6

3 400 kV SSP ‐ Rajgarh‐ I 1

4 400 kV SSP ‐ Rajgarh‐ II 1

bull Operating RBPH machines in synchronous condenser mode during offOperating RBPH machines in synchronous condenser mode during off peak hours

bull Reactor commissioning at Rajgarh amp Dhule to be expedited by WRTS‐II(PGCIL) amp MSETCL

bull Absorption of MVAr by Wanakbori WTS

8212014

15

1 Voltage at Wanakbori was gt420 kV for 100 the time during Julrsquo14

2 WTPS units 567 are injecting MVAR (~ 60 MVAR) at Voltage gt 420 kV

3 Absorption of MVAR by WTPS units is expected during the high voltage condition at WTPS amp nearby area

97Status of implementation of UFRWestern Region

States Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Stage - I 492 Hz Stage - II 490 Hz Stage - III 488 Hz Stage - IV 486 Hz

relief GUJARAT 580 773 580 726 580 1117 590 1025MADHYA PRADESH 460 468 460 450 460 460 465 490CHATTISGARH 150 110 150 114 155 117 155 91MAHARASHTRA 805 1108 810 1200 815 765 820 851GOA 25 25 25 25 25 25 25 25UT DD 10 15 15 15 UT DNH 30 30 35 35 Total load relief 2060 2484 2070 2515 2085 2485 2105 2482

Not received

DD and DNH have not implemented any stage of AUFLS

DD and DNH may appraise the status

Real‐time monitoring of the likely relief available from AUFLS at any given instant mandated by CERC

Telemetry to be provided at SLDC amp RLDC

Not received

8212014

16

Agenda 98 ADMS (Automatic Demand Management Scheme) Implementation as per Sec 542 of IEGC

As per CERC order dt06062014 the target of fully implementation of scheme is by January2015Constituents have to submit bi‐monthly progress report to WRPC Secretariat with a copy to the Commission and WRLDCMP has submitted its detailed action plan in the form of an affidavit to CERC for implementation of ADMS However SLDC MPPTCL is requested to furnish data to OCC forum in the above format

Item No 99 Status of Telemetry in WR

Telemetry Issuesdoc

8212014

17

Item No 910 Black Out at NTPC Kawas Power Station

bull On 11th July 2014 Kawas Gas generating complex got blackout due to tripping of evacuation lines one by one

within a short span of 30 minutes

bull The complete loss of evacuation lines occurred at 0117 Hrs The blackout has resulted in tripping of GT1A

GT1B and ST causing 320 MW generation loss in the area It was reported that weather condition was foggy with

slight drizzling was in the area

LineTime of Tripping

Kawas End Remote endRestoration Time

220 kV Kawas‐Navsari1

1246 AM

R phase to EF

Fault location 2 km

R Phase to EF

122 AM

220 kV Kawas ndashNavsari2

112 AMR phase to EF

Fault location 2208 km

R Phase to EF 347 AM

220 kV Kawas‐Haldarwa 1

107 AMR phase to EF

Fault location 16 km

R Phase to EF 246 AM

220 kV Kawas‐ R phase to EF R Phase to

bull Line restoration has failed on several attempt as the lines

were not holding due to persisting fault

bull Such an event of total loss of evacuation lines from a

generating station resulting in blackout scenario is a

matter of serious concern

bull WRTS-2 may kindly send the reasons for such faults

which has caused the incidence and the remedial action

taken in this regard220 kV Kawas‐Haldarwa 2

108 AMp

Fault location 2 kmEF 304 AM

220 kV Kawas‐Icchapur1

108 AM B phase to EFB Phase to EF

301 AM

220 kV Kawas‐Icchapur2

108 AMB phase to EF Faultlocation 356 km

B Phase to EF

331 AM

220 kV Kawas‐Vav 1 117 AMNo tripping

Hand Tripped laterLine Tripped 225 AM

220 kV Kawas Vav 2 117 AM Y Phase to EFY Phase to EF

317 AM

taken in this regard

bull Disturbance Recorder (DR) and Event Logger(EL) out

puts are yet to be received from WRTS-2

bull As per IEGC the information like DREL output relay

indications amp sequence of events etc must be sent to

RLDCRPC by 24 hrs of the event WRTS-2 may kindly

expedite amp furnish the information to WRLDC amp WRPC

Item No 911 Operating Procedure of WR-2014

The operating procedure of Western Region 2014 has been updated on 31072014 and the p g p g psame has been uploaded on WRLDC web site at the following link

httpwwwwrldccomdocsWR_OPERATING_PROCEDURE_2014pdf

8212014

18

Item No 12 Mock Black start Exercise

Station Name Date Proposed Remarks

Mock Black Start Plan for the following stations has been received by WRLDC

CLPIPL Gas Power Plant 29‐Jun‐2014 ‐

Gandhar Gas Power Plant 27‐July‐2014 ‐

Other Utilities may update the sub‐committee regarding their plan for black start exercise

SL No Name of the Station Remarks

1 Bargi DG set under outage

2 TONS Governor Problem

3 Birsinghpur Governor Problem

Healthiness of DG sets

3 Birsinghpur Governor Problem

4 Medikheda Governor Problem

5 Rajghat Governor Problem

1 Outage of DG set for longer period is matter of serious concern 2 SLDC Jabalpur may apprise the present status2 SLDC‐Jabalpur may apprise the present status3 Possibility of procurement of stand‐by DG sets to be examined to take care of such prolonged outage of DG sets which virtually renders the black start facility sterile4 There is need for blackstart generator planning in W3 area Thermal IPP generators are disconnected from state grid and there is no hydro station So with only UHV lines and large thermal units system restoration post disturbance would be extremely challenging for Chattisgarh

8212014

19

Maharashtra

Madhya Pradesh

Item No13 Review of list of feeders for load regulation in emergency

Gujarat

DD amp DNHChattisgarh

Goa

bull Decided during the 461st OCC that list ofDecided during the 461st OCC that list of

feeders identified for load control under

emergency measure for safeguarding grid

security would be reviewed in a special

meeting The list is yet to be reviewed

8212014

20

Item No 14 Implementation of voltage and time grading on OV relays to prevent tripping of multiple EHV lines emanating from single node on high voltage

bull During the 461st OCC it was informed by Power Grid representative that they have already implemented voltage grading in various line emanating from the same node (matter has not come in the MoM)

bull Power Grid amp other utilities may kindly intimate the present status of voltage grading at their respective sub‐stations

Power Station Number of instances

when the SPS signal

was received at the

station

Number of instances

when the action by

the generators was

adequate

Number of instances

when the automatic

generation reduction was

done partially

JPL 53 0 50

Item No 15 SPS for SR‐WR Inter Connection Inadequate Participation by Generators

Issues

1 10 times operation of SPS‐1 causing backing down at JPL amp KSK during 1714 to 7 8 14JPL 53 0 50

KSK 53 0 36

APML 35 0 30

Mouda 35 0 0

Koyna 0 0 0

Koradi 0 0 0

Khaparkheda 0 0 0

Chandrapur 0 0 0

to 78142 Participation by other envisaged

generators to be expedited3 PGCIL may update status of Extention of

SPS signal from Solapur(PG) to the additional generators identified for participation

4 Decided in 461st OCC to have special Chandrapur 0 0 0

DB Power 0 0 0

NSPCL 0 0 0

Balco 0 0 0

Lanco 0 0 0

KWPCL 0 0 0

pProtection Sub‐Committee meeting to discuss progress of implementation of the revised SPS at Solapur (for WR‐SR interconnection) amp extension of signal from Sholapur to additional generators in WR

8212014

21

Thank you

DiscussionhelliphelliphellipDiscussionhelliphelliphellip

  • 462 occ_minutepdf
  • participants list_462 OCC meeting 110814pdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 26-7pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 45pdf
  • 46pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84pdf
  • 84apdf
    • 26wrpc_minute 107pdf
    • 26wrpc_minute 108pdf
    • 26wrpc_minute 109pdf
    • 26wrpc_minute 110pdf
    • 26wrpc_minute 111pdf
    • 26wrpc_minute 112pdf
    • 26wrpc_minute 113pdf
      • 85pdf
      • 87pdf
      • 98pdf
      • 913pdf
      • 10pdf
Page 7: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR

7

462nd OCC MINUTES

21 Akola 125 MVAR MSETCL Sept-2014

22 Nagda 125 MVAR MPPTCL Oct 2014

23 Bhopal 80 MVAR MPPTCL Sept 2014

24 Damoh 125 MVAR PGCIL August 2014

25 Bachau 125 MVAR PGCIL August 2014

26 Pirana 125 MVAR PGCIL August 2014

27 Itarsi 2X125 MVAR

PGCIL August 2014

28 Seoni 125 MVAR PGCIL August 2014

29 Parli 125 MVAR PGCIL August 2014

30 Raipur 125 MVAR PGCIL August 2014

31 Gwalior 125 MVAR PGCIL Commissioned on 30062014

32 ISP 125 MVAR NHDC 2015

33 Satpura 50 MVAR MPPGCL March-2015

34 Sasan Line reactor-2

240 MVAR RELIANCE August -2014

35 Sasan Bus reactor

240 MVAR RELIANCE Sept-2014

72Status of completion of 765400 kV and above ongoing Transmission Schemes

being executedimplemented by Transmission Agencies The updated status on various ongoing transmission schemes for the current year as per the current information available is as follows - S No

Name of the Line Target Completion Date

Remarks

POWERGRID 1 400 kV Navsari ndash Kudus DC Line Sept- 2014 ROW problem 2 765kV SC Satna-Gwalior line

(359Km + 60Km DC Portion) Ckt-II August- 2014

3 765 kV Raigarh (Kotra) pooling Commissioned on

8

462nd OCC MINUTES

station -Champa Pooling station -Dharamjaygarh PS - 2nd ckt

21052014

4 765 kV Gwalior - Jaipur line (1st Ckt) SC

Dec 2014

5 765 kV Dharamjaygarh - Jabalpur Pooling Station DC line

Dec-2014

6 765 kV Wardha ndashNizamabad-Hyderabad DC

March-15

7 765 kV Narendra-Kolhapur DC March-15 8 HVDC Raigarh(Kotra)-Pugalur Bi-

pole March-15

9 400 kV Aurangabad - Boisar line DC line

Dec -2014

10 765 kV Aurangabad (PG) - Padghe (PG) DC

August-2014

11 800kV DC Champa ndash Kurukshetra Bipole

Jan 2015

12 765 kV DC Jharsuguda ndash Korba Dec 2014 13 2 X 765 kV SC Ranchi ndash Sipat Jan 2015 14 765 kV Wardha- Aurangabad DC

Line

Ckt I Commissioned on 010714 Ckt II Commissioned on 030714

15 765 kV Aurangabad- Solapur DC line

Dec 2014

16 765 kV Solapur-Pune line

Sept 2014

17 765KV Durg-Wardha DC Sept 2014 CHHATTISHGARH 1 LILO of 400 kV Korba west-

Khedamara at Marwa August 2014

2 400 kV DCDS Raipur(Raita)- Jagdalpur(DCDS)

March 2015

21 220 kV Korba-Bishrampur line (DCSS)

Sept 2014

22 220 kV DCDS lines Chhuri to Mopka (Bilaspur) (DCDS)

Nov 2014

26 LILO of 220 kV Raigarh-Budipadar at 400 kV PGCIL Ss Raigarh

Sept2014

28 LILO of 220 Korba (E)- Bishrampur line at 220 kV Churri Ss

Sept 2014

29 LILO of 220 kV Raigarh ndash Jindal (Tamnar) at Girwani 220 kV Ss

Sept 2014

GUJARAT 1 400 kV DC Kosamba-Chorania line

(Package I)(From Chorania SS to AP-54)

Aug -2014 Commissioned on 100314

9

462nd OCC MINUTES

2 400 kV DC Kosamba-Chorania line

(Package II)(From Kosamba SS to AP-54)

Aug -2014

3 400 kV DC Mundra-Zerda line No 1 Aug -2014 4 400 kV DC Mundra-Zerda line No 2 March-2015 5 400 kV DC Vadinar-Amreli line December -

2014

6 400kV Mundra-Hadala LILO to Halvad

August -2014

7 400 kV DC Amreli-Kasor line(Part-1) December-2014

8 400 kV Charanka- Veloda Oct 2014 MADHYA PRADESH 1 Chhegaon-Julwania 400 KV DCDS

Line OCT - 2014

2

Pithampur- Indore 400KV DCDS Line

August - 2014

Work of the line have been completed by MPPTCL feeder bay from Indore PGCIL is awaited

3 Satpura TPH-Ashta 400KV DCDS Line

December ndash 2014

MAHARASHTRA(STU)

1 400KV DC line from Koradi-II to Wardha SS(PG) DC

Oct- 2014

2 400 kV Akola-Taptiganga Sept 2014 3 400 kV Tiroda-Akola Dec - 2014 GUJARAT (IPTC route) by WR Transmission (Guj) Pvt Ltd

1 400 kV Rajgarh(PG)-Karamsad (GETCO) DC

Sept -2014

STERLITE (JTCL) 1 765 KvDhramjaygarh - Jabalpur (JTCL)

DC line May -2015 Severe ROW Problem

2 765 kV Jabalpur - Bina (JTCL) Sc May -2015 Severe ROW Problem STERLITE (BDTCL) 1 765 kV Bhopal - Indore (BDTCL) SC August-2014 2 765 kV Bhopal-Bhopal Commissioned on

160714 3 765 kV Dhule - Vadodara SC Oct - 2014 4 765 kV Vadodara - Dhule (BDTCL) SC Oct - 2014 5 765 kV Dhule - Aurangabad (BDTCL)

SC August-2014

RAICHUR SHOLAPUR TRANSMISSION CO LTD(RSTCL)

1 765 kV Raichur - Sholapur line 2nd SC

Commissioned on 29062014

10

462nd OCC MINUTES

It was suggested by WRLDC and constituents that important list of line will be sent by

each constituent to WRLDC and WRLDC will compile and furnish the list as per

priority of commissioning

The Sub-Committee noted and agreed as above

73 Commissioning of new Generating units in Western Region and the capacity expected to be commissioned during the current year 2014-15

The status regarding Generating units expected to be commissioned during the

current year 2014-15 is as below

Name of the Power Projects Unit No Capacity (MW)

Date of Commissioning Schedule Date

GUJARAT Bhavnagar Lignite TPP-JV I 250 August 2014 II 250 August 2014 UNO SUGEN 2 3825 July 2014 CHHATTISGARH Marwa 1 500 Sept 2014 2 500 Dec 2014 MAHARASHTRA Dhariwal 2 300 Synd On 23042014 CHANDRAPUR 8 500 Oct 2014 CHANDRAPUR 9 500 March 2015 KORADI 8 660 Oct 2014 KORADI 9 660 Jan 2015 PARLI 8 250 March 2015 MADHYA PRADESH Singhaji TPS 2 600 Oct-2014 Ms Jhabua Power Seoni 1 600 Dec ndash 2014 MB Power Anuppur 1 600 Sept ndash 2014 Jaiprakash Power Nigri 1 660 July 2014 Jaiprakash Power Nigri 2 660 Dec 2014 Moser Bear (Hindustan power) 1 600 Nov- 2014 Moser Bear (Hindustan power) 2 600 March 2015 Essar Concessional ampEssar Power 1 600 Oct 2014 Essar Concessional ampEssar Power 2 600 Dec 2014 BLA 2X4 90 March 15 Jhabua Power 1 600 Dec 2014 CENTRAL SECTORIPP KSK 2 600 August 2014 KSK 5 600 January 2015

11

462nd OCC MINUTES

ACBIL 1 300 March 2015 SASAN 5 660 July 2014 SASAN 6 660 August 2014 Sasan 4 660 Synchronized in May 2014

Sub-committee noted as above ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS (A) FOLLOW-UP ITEM NO 81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

All the constituents are requested to submit the CMP report for the First quarter

(April 2014 to June 2014) for the year 2014-15

The Sub-Committee members noted as above ITEM NO 82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR

Status of physical amp cyber security in Power Sector for the First quarter (April 2014 to

June 2014) for the year 2014-15 have not been received from some of the

constituents

The Sub-Committee members noted as above ITEM NO 83 PROCEDURE FOR CALCULATION OF TRANSMISSION SYSTEM

AVAILABILITY FACTOR FOR A MONTH AS PER CERC REGULATION 2014-19

Member Secretary WRPC informed that a procedure for calculation of

transmission system availability factor as envisaged in CERC Regulation 2014-15

was discussed in 461st OCC held at Raipur Various aspects were discussed and

finalized However there were concerns expressed by transmission licensee

regarding addition of 12 hrs to outage hrs after each tripping beyond admissible 2

tripping in a year as it will reduce availability below 95 Also concern was

expressed for multiplying outage hrs by 2 for line affecting generation Also

whether addition of 12 hrs is applicable to such lines affecting generation was

also expressed Whether these clauses are applicable to HVDC system was not

known Therefore all such concerns of transmission licenses have been taken up

with CERC for revision clarification

Meetings were held on 1st and 4th August 2014 with transmission licenses

regarding verification of data data formatting and sorting out various anomalies

and doubts for data from April to July 2014 for further processing at WRPC end

12

462nd OCC MINUTES

Member Secretary WRPC informed that certification for some transmission licensees

has already been done The certificate for PGCIL is to be issued as effect on

generation evacuation certificate from WRLDC is awaited

CM WRLDC requested all the transmission licensees to submit the data to WRLDC in

same format as submitted to WRPC

Representative from Transmission licensees agreed the same

The Sub-committee noted as above ITEM NO 84 IMPLEMENTATION OF RSD METHODOLOGY Shri Satyanarayan SE WRPC informed that GM (OSampC) NTPC HQ-I Mumbai vide letter dated 28072014 (copy enclosed at annexure 84) requested to call a meeting for resolvingclarification of methodology developed by WRPC The procedure for RSD framed by WRPC is enclosed at Annexure 84A SLDC MPPTCL Jabalpur informed that RSD was implemented for NTPC Mauda unit

on 18072014 but it was not more extended beyond 20072014 as no other major

beneficiaries agreed for extension

CE GETCO informed that intermittent rain profile in the different geographical area of

Gujarat amp increasing demand pattern didnrsquot permit them to take RSD of any NTPC

units as minimum of 3 days is required

Representative from SLDC Maharashtra also endorsed the Gujarat view points on

RSD

GM NTPC requested to the committee that if RSD wasnrsquot possible then at least

technical minimum schedule should be given

Member Secretary WRPC summarized the matter as follows

1 RSD was implemented for NTPC Mauda unit from 18072014 to 20072014

but it could not be extended due to increasing demand pattern amp uncertainty of

rain profile in the region

2 The method framed by WRPC shall be continued amp will be applied as and

when required

3 He requested constituents to schedule the NTPC generating units at its

technical minimum in case RSD is not feasible

The Sub-committee noted as above

13

462nd OCC MINUTES

ITEM NO 85 LOAD FORECASTING IN WESTERN REGION Background- As per the amended Indian Electricity Grid Code that is effective from 17th February 2014 the SLDCs SEB distribution licensees shall always restrict the net drawal of the State from the grid within the drawal schedule keeping the deviations from the schedule within the limits specified in the Deviation settlement mechanism regulations Therefore it is imperative that adequate attention may be paid towards load forecasting The matter was discussed in the past several OCC as well as in the 26th TCCWRPC board meeting wherein it was decided to create a task force for exploring development of a software for load forecasting A meeting was held on 03042014 under leadership of CE(SLDC) GETCO Gujarat at

Mumbai The outcome of the Meeting was as following

1 Short term action a) all the discoms were advised to provide maximum historical data b) Discoms have to bifurcate the geographical area in to zone and derive effect of temp rain festival on load

2 Long term action a) Provide computer base meters up to all the distribution feeders for close monitoring b) Provide weather sensors at various strategically important locations c) Formulation of forecasting desk (load amp RE) at SLDC level

The 2nd meeting regarding Load Forecasting Mechanism was held with members of WRPC WRLDC Western Region SLDCs amp State Discoms Forecasting Service Providers (FSPs) on 110614 at SLDC Vadodara Gujarat During the 460th OCC meeting CE SLDC GETCO informed that roadmap for implementation of pilot project amp main project has been prepared Budget proposal have already called from FSP amp they assured to submit till the end of the month For implementation of pilot project the Utility and their respective Pilot FSP are decided as tabulated below

Sr No STATE ndashSLDCDISCOM Pilot FSP

1 GUJARAT MS TESLA

2 MAHARASHTRA IIT MUMBAI

3 MADHYA PRADESH MS METEOLOGICA

4 CHHATISGARH MS SAS

5 GOA MS MARCADOS

6 DDDNH IITGANDHINAGAR

MP informed vide letter dated 27062014(copy enclosed at 85) that they have

already placed on order to Ms L amp T InfoTech on 12072013 for load forecasting

software project Therefore MP had requested to exclude them from pilot project

activities decided in earlier meetings

14

462nd OCC MINUTES

462nd OCC Discussions- State wise status is as under -

bull CE SLDC informed that Gujarat has prepared the NDA and forwarded to TESLA for signing and the same was signed by TESLA New Zealand office and their Mumbai office shall forward the same to SLDC Gujarat Thereafter Input data shall be provided and ID shall be provided to TESLA so as to start forecasting by them

bull SLDC Gujarat vide letter no SLDCCEMIST-6458 dtd 270614 has conveyed to all WR Nodal SLDC coordinators regarding progress of load forecasting pilot project Thereafter also e mailed on date 2082014 to all Nodal SLDC for submission of status Report on Pilot Load Forecasting Project However no proper response is received so far

bull MP SLDC conveyed that they have already awarded contract for load forecasting and the same is expected to be available by year end Therefore MP shall not participate in the present scheme

bull SLDC Chhattisgarh representative informed that matter has been taken with discom Chhattisgarh Discom were facing difficulties to contact with coordinator of Ms SAS

CE SLDC Gujarat being a group leader stated that Chhattisgarh shall intimate to them for further needful and would help them in this matter

bull Maharashtra SLDC informed that there was a meeting held on 09082014 with IIT Bombay where availability of data has been discussed amp one more meeting will be held on 22082014 outcome of the same will be intimated in next OCC meeting BEST amp TATA are already having such forecasting system

bull No one from GOA has attended last meeting even though GOA was forwarded copy of MOM Due to non availability of any coordinator details of GOA it was not possible to contact them However Ms Marcadose has also conveyed that he has not been contacted by Goa

bull No one from DDDNH has attended last meeting even though DD DNH was forwarded copy of MOM However IIT Gandhinagar conveyed that they were not been contacted by DD DNH

Member Secretary WRPC informed that a letter to DD DNH amp GOA has been written

from WRPC secretariat regarding implementation of ADMS Load Forecasting amp

telemetry status He further requested the constituents to implement the decision

taken in earlier meeting of load forecasting

OCC suggested that the next load forecasting meeting may be held at DDDNH

The Sub-committee noted as above

15

462nd OCC MINUTES

ITEM NO 86 NEED OF COOPERATION FROM WRLDC IN REAL TIME

bull CE SLDC informed that at present APL is under their control area and embedded scheduling model is used It may be noted that for units 78amp 9 at APL Gujarat has no share (all are for NR beneficiaries)There have been occasions when units 78amp 9 have tripped (given at annexure) Since APL is shown as embedded in Gujarat WRLDC requested Gujarat to reduce overdrawl when APL units 78amp 9 trips Hence Gujarat has to pick up state generationcostlier generation for no fault of Gujarat

bull Further lines are opened to curtail overdrawl when Gujarat is not faulty Gujarat is seen as overdrawing (due to embedded scheduling of APL) when APL trips

bull To complicate matters the scenario coupled with wind variations state generation has to be constantly varied to avoid overdrawl

Gujarat requested followings-

1 When large sized units (APL units 78amp 9) trips then scheduling of Gujarat should be changed with immediate effect OR Gujarat should not be pursued for deviation correction to the extent of schedule of units tripped at APL units 78amp 9 OR Schedule of Gujarat from other central sector stations should be changed as per their request with immediate effect

2 APL units 78amp 9 should be made a separate control area 3 Under above circumstances transmission lines should not be opened

due to default by APL as these affects Gujarat without any fault of their own Further this was done without informingtaking SLDC into confidence It was clear from the discussions that Gujarat Discoms are put to unnecessary financial implications WRLDC clarified that 220 KV Dehgam- Khanpur Line no1 was opened due to frequency touching 493 Hz and control of overdrawl was taken as security measure WRLDC agreed to inform CE SLDC whenever such discussions are taken and agreed to take care in future

The Sub-committee noted as above

ITEM NO 87 GUIDE LINES FOR SPLIT BUS OPERATION AT SSP RBPH SWITCHYARD CE SLDC Gujarat vide letter dated 07082014 informed that a meeting was held on

220514 at Kevadia Colony SSP regarding split bus arrangement at SSP RBPH

16

462nd OCC MINUTES

switchyard and subsequent discussions during 55th meeting of PSC of NCA held in

Vadodara on 140714 the guidelines for the same had been prepared in consultation

with GETCO protection wing and sent vide mail dated 23072014 However the same

has been attached herewith as Annexure-87 It was clarified during discussion that

split bus operation would be used only as per requirement and will not be a permanent

arrangement

The Sub-committee noted as above

ITEMS FROM WRLDC

1 OPERATION OF GRID AT HIGH FREQUENCY ( gt 505 HZ) The onsetrevival of monsoon in the last fortnight of July 2014 has reduced the demand in Western Region However the demand would pick up sharply during the dry spell in September and October months Presently the major State Central Sector IPP generators in Western Region that are facing coal shortage are tabulated as under S No Name of power

stations Unit Reason for

outage 1 VSTPS 2 (210 MW) Coal Shortage 2 VSTPS 5 (210 MW) Coal Shortage 3 Singhaji 1 (600 MW) Coal Shortage 4 SGTPS 4 (210 MW) Coal Shortage 5 JP Bina 2 (250 MW) Coal Shortage 6 Bhusawal 2 (210 MW) Coal Shortage 7 Parli 4 (210 MW) Coal Shortage 8 India Bulls 1 (270 MW) Coal Shortage Likewise several Gas Power Stations in Western Region are facing fuel shortage Under the above circumstances it is desirable that precious fuel optimally utilized to maintain adequate stock for the dry spell In the month of July 2014 the grid frequency remained above 5005 Hz for more than 15 of the time while it remained below 499 Hz for more than 34 of the time Operation of high frequency is unnecessary loss of fuel that could have been conserved and utilized during low frequency regime

The Sub Committee noted the same

17

462nd OCC MINUTES

2 OBSERVATION OF INTRA-PLANT MODE OF OSCILLATIONS (097 HZ) WITH POOR DAMPING ON 10TH AND 11TH JUNE 2014 AND LOSS OF 1800 MW IN MAHARASHTRA SYSTEM DUE TO POWER SWING UNDER N-1 CONTINGENCY ON 20TH MAY 2014 The issue of Intra plant mode of oscillations with poor damping as observed during the grid event on 10th and 11th June 2014 was discussed during the 461st OCC meeting Similar oscillations were again recorded on 11th July 2014 GM WRLDC informed that they have written to generators seeking details of MW fluctuations PSS status etc and requested constituents to share the dataHe requested that constituents may share PMU data also CESLDC Gujarat informed that they are proposing PSS tuning with consultants from IITs in their system EE SLDC Maharashtra informed that APL-Tiroda has recently tuned PSS at Tiroda units by OEM

It was once again requested constituent to furnish information as designed by WRLDC The Sub Committee noted the same

3 FREQUENT TRIPPING OF 765 KV SATNA-SASAN LINE

WRLDC informed that 765 kV Sasan-Satna Line has tripped on three occasions

while 240 MVAr Bus Reactor at 765 kV Satna tripped on one occasion The

tripping occurred due to protection mal-operation at Satna end during stability test

for the 765 kV Bus-1 The details of the tripping is given below

The above OV at Sasan end could have been avoided if the Line Reactor of this line at Sasan end had been commissioned The restoration of the tripped circuit also was considerably delayed in the absence of Line Reactor at Sasan end

Elements Date and Time of Tripping

Date and Time of Restoration

Remarks Receipt of DREL at WRLDC Satna Sasan

765 kV Sasan-Satna 2

25-07-14 1026

25-07-14 1155

Protection Mal-Operation DT at Sasan End on OV as line remain hanging from Sasan end

No Yes

765 kV 240 MVAr Bus Reactor at Satna

25-07-14 1026

25-07-14 1139

Protection Mal-Operation DT at Sasan End on OV as line remain hanging from Sasan

No Yes

765 kV Sasan-Satna 2

25-07-14 1229

25-07-14 1342

Line got charged from Satna and synchronized at Sasan No Yes

18

462nd OCC MINUTES

end but immediately DT was received at Sasan from Satna and Line tripped Prior to tripping voltage at Sasan end was 796 kV

765 kV Sasan-Satna 2

25-07-14 1628 -

Charging attempt was taken from Satna end but line tripped before synchronization at Sasan end due to DT from Satna Open end voltage at Sasan 826 kV for the line

No Yes

Representative from Sasan UMPP informed that with regards to the 765 kv Line and

Bus reactors all the material required for completion of works have been received at

site

Line reactor and bus reactor would be commissioned by Aug14 and Sep 14

respectively

The Sub Committee noted the same 4 SPS AT SIPAT

The SPS scheme implemented at NTPC Sipat has been received at WRLDC It is observed that a time delay of 15sec is provided to unload units 1 2 4 amp5 each by 150MW if any ICT s load exceeds 130 of rated load It was conveyed that if ex-bus generation at Sipat is more than 2200 MW immediate unloading of units may be done and the intentional delay which is required to prevent mal-operation may be 45 second instead of 15 second

NTPC Sipat representative agreed to implement the same accordingly The Sub Committee noted the same

5 COMMISSIONING OF SPS AT 400220 KV VAPI During the special WRPC meeting on 18032013 at Dadra an SPS for automatic load shedding subsequent to tripping of 400220 kV ICT at Vapi was approved as under It was decided that POWERGRID would extend trip signal from Vapi ICTs to the requisite feeders

Contingency Envisaged SPS action

Identified Feeders

Tripping of any one ICT at 400200 Vapi Sub-Station

Automatic Load Shedding of 100MW

DNH 1) 66 kV-Kharadpara-Rakholi-I 50 MW 2) 66 kV Khadoli-Khadoli-3 30 MW DD 1) 66 kV Magarwada-Kachigam 60 MW

19

462nd OCC MINUTES

It was felt that due to change in topology loading in ICT is not critical however SPS may be in place as defense mechanism in case of any emergency

DD amp DNH representative were absent in the meeting The Sub Committee noted the same

6 ADDRESSING HIGH VOLTAGE CONDITION IN SSP amp NEARBY AREA

High voltage condition is being observed at SSP and nearby area in off peak period particularly between 2300 hrs at night to 0500 hrs in the morning Also on many occasions the system operator is compelled to hand trip the 400 kV lines emanating from SSP to control over voltage Summary for the month of Julyrsquo14 is given under

Sl No 400 kV Line DatailsFrom To

Time Date Time Date 1 SSP-RAJGARH-I 0009 19-Jul-14 0730 29-Jul-14 2 SSP - RAJGARH-II 0406 16-Jul-14 1016 18-Jul-14 3 SSP-DHULE-I 1310 22-Jul-14 0953 23-Jul-14 4 SSP - DHULE - II 1533 15-Jul-14 0734 18-Jul-14 5 SSP - DHULE - I 1703 10-Jul-14 1100 11-Jul-14 6 SSP-DHULE-I 1712 28-Jul-14 0933 31-Jul-14 7 SSP - DHULE - II 1730 19-Jul-14 0917 20-Jul-14 8 SSP - DHULE - I 1757 18-Jul-14 0935 19-Jul-14 9 SSP-DHULE-II 1809 21-Jul-14 0914 22-Jul-14 10 SSP-DHULE-I 1815 30-Jun-14 0542 1-Jul-14 11 SSP-DHULE-I 1819 20-Jul-14 0858 21-Jul-14 12 SSP-DHULE-II 1825 8-Jul-14 0949 9-Jul-14 13 SSP - DHULE - II 1831 11-Jul-14 1007 13-Jul-14 14 SSP - DHULE - I 1838 1-Jul-14 0556 2-Jul-14 15 SSP - DHULE - I 1848 9-Jul-14 0912 10-Jul-14 16 SSP - DHULE - I 2136 13-Jul-14 0850 14-Jul-14 17 SSP-DHULE-II 2201 23-Jul-14 0945 28-Jul-14

Also it has been observed that Wanakbori TPS injects around 60 MVAr per unit even when voltage at Wanakbori is above 420 kV for nearly 100 of the time Further envisaged bus reactors at Rajgarh amp Dhule are yet to be commissioned Hence in view of system reliability it is advisable to explore all possibilities to contain high voltage condition in SSP and nearby area The following actions need to be taken to address the situation

bull Operating RBPH machines at SSP in synchronous condenser mode bull Absorption of MVAr by Wanakbori (WTPS) units bull The commissioning of Reactors at 400 kV Rajgarh may be expedited by

WRTS-2

20

462nd OCC MINUTES

bull The commissioning of Reactors at 400 kV Dhule may be expedited by MSETCL CE SLDC GETCO agreed for looking into absorption of MVAR at Wanakbori

7 IMPLEMENTATION OF THE REVISED AUFLS IN DD AND DNH Representatives from the DD and DNH intimated during the 459th OCC meeting that the tendering process was stalled because of general elections (election code of conduct was in force) amp action would be initiated post the elections Member Secretary WRPC vide letter dated 01082014 took up the matter with Secretary (P) DDDNH (copy enclosed) DD amp DNH representative were absent in the meeting to comment

The Sub Committee noted the same 8 ADMS(AUTOMATIC DEMAND MANAGEMENT SCHEME) IMPLEMENTATION

AS PER SEC 542 OF IEGC The format for reporting the progress of implementation of the ADMS in Western Region States was given as part of MoM of the 461st OCC meeting All utilities may like to furnish the updated status to WRPCWRLDC as per the above format It is understood that MP has submitted its detailed action plan in the form of an affidavit to CERC for implementation of ADMS However SLDC MPPTCL is requested to furnish data to OCC forum in the above format

The Sub Committee noted the same

9 STATUS OF TELEMETRY IN WESTERN REGION

In the 460th amp 461st OCC meetings the status of telemetry in Western Region was discussed in detail It was also highlighted that the Honrsquoble CERC vide its order in petition SM0072014 issued Notice under section 142 on several constituents of Western Region All the constituents had assured to address the telemetry issues within a month or two The telemetry status as on 4th August 2014 is tabulated below

21

462nd OCC MINUTES

a Maharashtra The non-availability of telemetry is 583 for sub-stations amp 18

for generating stations This is a matter of serious concern The issue has been

discussed in several OCC meetings since last 8 months As per the information available with WRLDC telemetry is not available from the following generating stations at 400 kV level

bull Kaparkheda bull Deepnagar

Also telemetry is not available from the following sub-stations at 400 kV level bull Warora bull Lonikhand(New) bull Chandrapur-stg-II

As per the information available with WRLDC telemetry is intermittent at 4 generating stations viz

bull Jaigad bull Paras-extension bull Trombay bull Deepnagar GCR

Also telemetry is intermittent at following sub-stations at 400 kV level bull Bableswar-II bull Deepnagar SS bull Dhule bull Khaparkheda bull Kolhapur-3

22

462nd OCC MINUTES

bull Sholapur-3 SLDC MSETCL Maharashtra informed that telemetry has been established for 46 locations

a Chhattisgarh100 available b Madhya Pradesh As per the latest status telemetered data is available from

100 of the locations c Gujarat As per the latest information submitted to CERC the non-availability of

telemetry data from Gujarat as on date is 33 for substations As per the information available with WRLDC Telemetry is not available form 2 number of 220 kV sub-stations viz bull Bhatiya bull Mokha Gujarat intimated in 460th OCCM that these sub-stations were ready but lines were in construction phase Also telemetry is intermittent from the following SS in Gujarat bull 220 kV Navasari (GETCO) ss bull 400 kV Kasor ss

SLDC GETCO may expedite amp resolve the issue for the above stations at the

earliest d Goa As per the latest information telemetry is not available form 2 number of

220 kV sub-stations viz Amona amp Cuncolim Telemetry is intermittent from 220 kV Tivim Ponda Xeldam amp 110 kV Kadamba amp Verna Thus Non availability of telemetry from Goa is 100 Goa to resolve the issue on war footing

e DD Telemetry is not available form 1 number of 220 kV sub-station viz Magarwada Thus availability of telemetry from DD is NIL DD representative intimated in 460th OCCM that RTU was being installed at 220 kV Magarwada SS under the new SCADAEMS up gradation project amp it would take 3 months to complete the work DD representative was absent in 461st OCCM so information on progress in this matter is yet to be received from DD DD to expedite the issue for the above station(s) on war footing

f DNH Telemetry is not available form 2 number of 220 kV sub-station viz Kharadpara amp Khadoli Thus availability of telemetry from DNH is NIL DNH representative was absent in 460th amp 461st OCC meetings to comment on the issue DNH to resolve the issue for the above station(s) on war footing

g ISGS As per the latest information submitted to CERC the non-availability of telemetry data from ISGS generating stations as on date is 125 Telemetry is intermittent from 220 kV Kawas(NTPC) station Power Grid NTPC to expedite

23

462nd OCC MINUTES

NTPC amp Power Grid agreed to expedite the matter during 460th amp 461st OCC meetings of WRPC However no progress has been reported

h POWERGRID As per the latest information submitted to CERC the non-availability of telemetry data from Power Grid substations as on date is 111 Telemetry is intermittent from the following ss

o 765 kV Kotra SS o 765 kV Dharamjaigad o 765 kV Tamnar SS o 400 kV Navasari SS

Additional points

a) In the report available on the WRLDC website it is clearly indicated that Communication link between all SLDC to WRLDC is in radial mode (without redundancy) and any failure in any equipment Fibre leads to total data black out Power Grid to ensure that links are on two channels

i IPP As per the latest information submitted to CERC the non-availability of

telemetry data from IPP generating stations as on date is 15 Telemetry is intermittent from Jindal amp Essar Mahan GMR Raipur JPL ESSAR Mahan GMR Raipur to expedite

Additional Points

bull Adani(APL) Tiroda There is only one channel emanating from Adani Tiroda Recently there was a case when entire station was not visible due to non-Availability of that channel

bull CGPL Mundra There is only one channel emanating from CGPL Mundra In case of non-availability of data leads to non-visibility of 4000 MW generation which creates difficulty in Grid Operation

bull Sasan There is only one channel emanating from Sasan In case of non-availability of data leads to non-visibility of 2400 + MW generation which creates difficulty in Grid Operation

bull APL Mundra There is only one channel emanating from CGPL Mundra In case of non-availability of data leads to non-visibility of 4000 + MW generation which creates difficulty in Grid Operation

The above issue was already discussed in 460th OCCM The utilities (APL SASAN CGPL) may kindly update the progress in this matter

24

462nd OCC MINUTES

j PMU data Regarding Satna to WRLDC link WRTS II informed that work is under progress for laying of OPGW from Satna 220 kV (MPPTCL) to Satna 765 kV (PG) and it may take 3-4 monthsrsquo time It was suggested that till such time the OPGW operation is in place WRTS-II may explore leased line connectivity at the earliest Power Grid to expedite

The Sub-Committee noted the same amp agreed to make availability of telemetry in their concerns and the report be updated position in next meeting

The Sub Committee noted the same

10 BLACK OUT AT NTPC KAWAS POWER STATION On 11th July 2014 Kawas Gas generating complex got blackout due to tripping of evacuation lines one by one within a short span of 30 minutes The complete loss of evacuation lines occurred at 0117 Hrs The blackout has resulted in tripping of GT1A GT1B and ST causing 320 MW generation loss in the area It was reported that weather condition was foggy with slight drizzling was in the area

Line Time of Tripping Kawas End Remote

end Restoration Time

220 kV Kawas-Navsari 1 1246 AM R phase to EF Fault location 2 km R Phase to EF 122 AM

220 kV Kawas ndashNavsari 2 112 AM R phase to EF Fault location 2208 km

R Phase to EF 347 AM

220 kV Kawas-Haldarwa 1 107 AM R phase to EF Fault location 16 km

R Phase to EF 246 AM

220 kV Kawas-Haldarwa 2 108 AM R phase to EF Fault location 2 km

R Phase to EF 304 AM

220 kV Kawas-Icchapur 1 108 AM B phase to EF B Phase to EF 301 AM

220 kV Kawas-Icchapur 2 108 AM B phase to EF Fault location 356 km

B Phase to EF 331 AM

220 kV Kawas-Vav 1 117 AM No tripping Hand Tripped later Line Tripped 225 AM

220 kV Kawas Vav 2 117 AM Y Phase to EF Y Phase to EF 317 AM

Even the line restoration has failed on several attempt as the lines were not holding due to persisting fault Such an event of total loss of evacuation lines from a generating station resulting in blackout scenario is a matter of serious concern Representative from WRTS-II stated that being highly industrial corridor the said lines are suffering with smog and informed that they are in process of replacement of existing insulator with polymer type insulators Order has been already placed amp it may be completed within next two to three month The Sub Committee noted the same

25

462nd OCC MINUTES

11 OPERATING PROCEDURE OF WR-2014 As discussed in 460th OCCM of WRPC the operating procedure of Western Region 2014 has been updated on 31072014 and the same has been uploaded on WRLDC web site at the following link httpwwwwrldccomdocsWR_OPERATING_PROCEDURE_2014pdf

The Sub Committee noted the same 12 MOCK BLACK START EXERCISE

MP representative informed that DG set at Bargi will be ready within a week time amp mock black start exercise can be performed in October 2014

NTPC Gandhar has successfully performed the mock black start exercise on 27072014

The Sub Committee noted the same

13 REVIEW OF LIST OF FEEDERS IDENTIFIED FROM ISGS LEVEL IN CASE OF

THREAT OF GRID SECURITY DUE TO LARGE DEVIATION

During the 461st OCC it was decided that list of feeders identified for load

control under emergency measure for safeguarding grid security would be

reviewed in a special meeting The list is yet to be reviewed GM WRLDC

requested SLDC to review the same amp submit Till such time the existing list will

continue

The Sub Committee noted the same 14 IMPLEMENTATION OF VOLTAGE AND TIME GRADING ON OV RELAYS TO

PREVENT TRIPPING OF MULTIPLE EHV LINES EMANATING FROM SINGLE NODE ON HIGH VOLTAGE

During the 461st OCC it was informed by Power Grid representative that they have already implemented voltage grading in various line emanating from the same node (matter has not come in the MoM) Power Grid amp other utilities may kindly intimate the present status of voltage grading at their respective sub-stations Member Secretary WRPC suggested to take the matter in PCM

The Sub Committee noted the same

26

462nd OCC MINUTES

15 INADEQUATE PARTICIPATION OF GENERATORS ENVISAGED SPS FOR SR-NEW GRID OPERATION

The details of SPS operation from 1st July 2014 till 6th August 2014 is as under

Sl No Date SPS No Condition 1 01 July 2014 SPS-1 613 SholapurRaichur DC gt1000 MW 2 01 July 2014 SPS-1 1752 SholapurRaichur DC gt1000 MW 3 04 July 2014 SPS-1 0406 SholapurRaichur DC gt1000 MW 4 09 July 2014 SPS-1 350 SholapurRaichur DC gt1000 MW 5 14 July 2014 SPS-1 506 SholapurRaichur DC gt1000 MW 6 17 July 2014 SPS-1 2204 SholapurRaichur DC gt1000 MW 7 23 July 2014 SPS-1 547 SholapurRaichur DC gt1000 MW 8 26 July 2014 SPS-1 1201 SholapurRaichur DC gt1000 MW 9 30 July 2014 SPS-1 902 SholapurRaichur DC gt1000 MW 10 30 July 2014 SPS-1 1954 SholapurRaichur DC gt1000 MW

During the last OCC the matter was discussed and it was suggested by Member Secretary WRPC to have Special Protection Sub-Committee meeting to discuss progress of implementation of the revised SPS at Solapur (for WR-SR interconnection) amp extension of signal from Solapur to additional generators in WR so as to address the issue of inadequate participation of WR Member Secretary WRPC requested to all generators who are having more than one units shall participate in implementation of SPS for SR-NEW grid operation

The Sub-committee noted the same ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING OCC reviewed the meeting roaster and finalized sheet is enclosed at Annexure-10

Due to non-readiness of BDTCL to host the next meeting NTPC KawasGandhar

would host the 463rd OCC meeting The exact date amp venue details will be intimated

separately

SlNo Organisation Name amp Designation E-mail Mobile

I WRPC1 Shri SD Taksande MS ms-wrpcnicin 98208783842 Shri Satyanarayan S opc-wrpcnicin 92233999383 Shri LKS Rathore DD lksr_2000yahoocom 98333718444 Shri Ratnesh Kumar Yadav AD ratneshkumar7437gmailcom 8903929150

II MSETCL MSEDCLMahaGenco5 Shri VD Pande EE vasantpandemahasldcin 98207419416 Shri Ajit V Pachori EE ajitpachorimahagencocoin 9619461420

III MPPTCL MPPGCL7 Shri KK Prabhakar SE sldcmpjbpyahoocom 94258052678 Shri SK Mehta EE mehtasanjay67yahooin 9425805017

IV CSPTCL CSPGCL9 Shri BR Soni Addl CE balramsonirediffmailcom 942518880710 Shri Arvind Mukherjee gccraipurgmailcom 9429227699

V GETCO GSLDC GSECL11 Shri BB Mehta CE cesldcgujgmailcom 987920073612 Shri BM Shah DyEE demissldcgetcogebmailcom 9925212836

VI WRLDC POWERGRID13 Shri P Mukhopadhyay GM prithwishmukhopadhyayposocoin 986943807314 Shri VK Shrivastava AGM vkspowergridindiacom 986945022115 Smt Sachala Mishra CM mishrasachalagmailcom 986945022316 Smt Pushpa S CM pushpa_seshadrihotmailcom 986940448217 Shri Aditya P Das Dy Mgr aditya19227gmailcom 9869404569

POWERGRID REGION-I18 Shri Anil Darode 70207powergridindiacom 942230180519 Shri Manu Sinha 02457powergridindiacom 9425293864

POWERGRID RETION -II20 Shri Abhinav Verma stawr2gmailcom 942850406221 Shri Anand Dubey ananddubey_pgrediffmailcom 9428504065

VII NTPC22 Shri PB Behre GM pbbeherentpccoin 900449708823 Shri Hari Nath AGM harinath01ntpccoin 900449713324 Shri SK Shrivastava AGM sksrivastava09ntpccoin 942517806925 Shri Amir Kr Singh SM aksingh01ntpccoin 942414081426 Shri Amitabh Kumar amitabhkumarntpccoin 9425178122

VIII TATA POWER27 Shri RM Sankhe GM rmsankhetatapowercom 909900654128 Shri PR Gadave AGM prgadavetatapowercom 9223553341

IX NHDC 29 Shri Anurag Seth CE annu226hotmailcom 9425326135

LIST OF PARTICIPANTS OF 462nd OCC MEETING OF WRPC HELD ON 11082014 AT TARAPURAnnexure-I

30 Shri Vinod Kumar Singh vinodnhdcrediffmailcom 9425925251

X APL 31 Shri CS Bobade GM chandrashekharbobadeadanicom 8980802255

XI RINFRA32 Shri SG Zirpe GM sachinzirperelianceadacom 932260763033 Shri Sanil C Namboodiripad sanilnamboodiripadrelianceadacom932104697434 Shri Subrata Das subratakudasrelianceadacom 932093072235 Shri Ishan Roy Asst Mgr ishanroyrelianceadacom 9860027348

XII KSK Mahanadi36 Shri Sudarshan B Reddy sudarshanreddybkskcoin 9000377721

XIII NPCIL37 Shri Mandeep mandeepnpcil 904991887038 Shri JS Choubey jschoubeynpcilcoin 942882191839 Shri Ritesh Chandra Singh rcsinghnpcilcoin 8007991744

XIV ESSAR 40 Shri OJ Saxena Sr Mgr osaxenaessarcom 987910126841 Shri Kamlesh Garg kamleshgargessarcom 987910284942 Shri Sarabjeet Singh sarabjeetsinghessarcom 750957010543 Shri Ashwin Ande ashwinandeessarcom 9909993594

XV JPL44 Shri RK Srivastava AGM rkshrivastavajindalpowercom 9329445016

XVI TORRENT POWER45 Shri Kamal K Vyas kamalvyastorrentpowercom 997407965746 Shri Pramod G Patel AGM pramodpateltorrentpowercom 9824370005

XVII NCA47 Shri Naveen Nath Das emc_ncarediffmailcom 9425053309

XVIII STERLITE GRID LTD48 Shri Sachin S Deshpande GM sachindeshpandesterlitecom 8966903047

XIX LANCO AMARKANTAK POWER LTD49 Shri BN Panda pandabnlancogroupcom 769770301550 Shri Anil Sharma anilshlancogroupcom 9560258009

XX KWPCL51 Mis Smruti R Nayak DGM smrutinayakavanthapowercom 9424176680

XXI MB POWER LTD 52 Shri Sandeep Kumar Gupta sandeepguptahpplin 9582896418

Anaulagnak 21

maah jaUlaa[- 2014

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5020 Hz BETWEEN 1700 Hrs amp 1800 Hrs Hrs ON 27072014

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4962 Hz BETWEEN 1900 Hrs amp 2000 Hrs Hrs ON 25072014

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4993 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5036 Hz AT 130344 Hrs ON 23072014

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4939 Hz AT 194315 hrs Hrs ON 25072014

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS JULY 2014 JUNE 2014 MAY 2014

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 008 023 000

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 314 476 093 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 3129 3216 2155 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 5016 4536 5319

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1533 1749 2433

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING JULY 2014

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

Voltage Profile during the month of July 2014

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 420 402 420 404 433 411 424 424 417 400 420 403 422 407 408 3902 417 398 420 400 431 407 424 424 417 401 427 418 421 409 410 3943 417 393 419 397 432 408 420 396 417 400 425 419 422 408 407 3934 416 398 419 401 434 412 422 402 417 400 426 421 418 406 411 3965 417 400 419 403 433 414 424 424 417 403 424 419 417 406 410 3996 420 406 422 408 438 411 421 402 419 407 427 421 422 412 409 3897 412 396 419 402 428 413 420 399 414 401 423 419 417 409 409 3968 418 400 421 410 433 400 424 400 416 400 425 419 422 400 410 3949 418 412 421 410 433 413 424 410 416 408 425 419 422 412 410 394

10 415 399 417 403 435 415 400 400 418 404 424 421 422 414 410 41111

स नक Annex-23

िभलाईBhilai

धल असोज कासोरKarad Dhule Asoj Kasor

इदौर इटारसी कराडIndore Itarsi

जतपरJetpur

11 416 402 423 407 436 416 422 407 416 405 425 421 423 413 410 39712 419 400 422 406 436 417 400 400 419 403 426 422 423 413 410 39713 415 400 422 410 437 417 400 400 417 406 425 421 422 414 411 39514 416 398 423 409 439 416 400 400 419 404 424 421 422 413 412 39815 420 403 423 408 437 413 428 401 418 404 426 422 423 413 410 39816 423 408 426 411 437 413 429 403 421 406 428 424 423 415 413 40017 421 404 424 407 436 416 400 400 419 408 423 414 423 414 411 39818 421 404 424 407 436 416 400 400 420 406 427 423 423 414 411 39819 423 407 425 410 434 415 425 411 424 405 428 425 424 416 422 39520 421 407 424 410 420 420 427 410 421 407 427 424 423 416 417 39621 421 406 424 411 420 420 400 400 420 402 428 425 426 418 413 39222 421 407 426 413 420 420 400 400 419 401 428 425 428 420 412 39623 422 409 427 410 419 415 415 402 420 403 425 419 428 420 412 39624 420 406 425 409 420 420 400 400 420 404 429 426 427 416 409 39625 422 401 421 404 420 420 400 400 424 402 428 424 423 415 415 39726 420 402 421 406 431 419 400 400 422 403 428 423 422 413 415 40027 417 404 422 407 434 416 423 407 421 405 428 424 422 413 416 40128 419 403 421 407 437 416 431 408 423 406 428 426 423 415 415 40229 419 403 420 408 437 415 400 400 421 406 429 426 423 416 415 39930 421 404 422 406 438 415 400 400 423 404 430 426 426 415 420 40331 420 395 420 402 431 406 428 403 422 403 429 425 423 414 419 398

423 393 427 397 439 400 431 396 424 400 430 403 428 400 422 389

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 418 404 411 395 423 406 430 406 789 752 788 757 787 756 791 7662 419 397 411 393 423 403 431 404 772 748 791 756 786 750 793 7553 416 402 411 397 421 397 425 399 772 748 780 751 781 757 791 7634 417 404 409 396 420 415 428 406 772 748 786 757 780 755 791 7655 418 404 418 400 421 404 427 407 772 748 796 755 796 765 802 7726 419 408 416 402 424 410 429 413 789 752 797 768 796 765 799 7757 414 406 407 397 420 403 426 407 789 752 776 758 777 757 784 7658 418 408 411 388 422 400 429 400 789 752 786 767 783 746 790 7719 412 401 403 386 422 405 429 408 789 752 781 761 772 745 783 76010 413 403 402 394 420 404 424 406 789 752 792 764 774 755 785 765

Bina Gwalior Nagda Khandwa Sipat

बना वािलयरिसविननागदावािलयर बनाBina

िसपतखडवाseoni Gwalior

10 413 403 402 394 420 404 424 406 789 752 792 764 774 755 785 76511 415 407 403 395 421 407 426 410 789 752 790 774 785 758 790 77212 418 406 407 392 422 404 427 404 789 752 796 769 784 756 796 76913 418 406 407 392 421 408 427 411 789 752 796 769 784 756 796 76914 419 410 409 397 423 406 428 409 789 752 784 768 786 763 792 77415 419 404 408 391 424 407 429 408 789 752 789 763 786 750 791 76416 424 414 408 400 427 411 431 413 789 752 792 766 785 767 797 77917 421 410 411 399 424 407 432 409 789 752 788 762 789 766 795 77618 423 412 414 396 424 407 432 409 789 752 783 770 796 765 801 77719 424 411 410 396 426 411 431 413 789 752 791 770 788 764 803 77720 425 411 411 396 424 410 428 414 789 752 786 763 789 760 800 77221 422 412 410 395 424 409 428 413 789 752 784 760 788 763 796 77522 423 416 414 402 424 410 429 414 789 752 791 774 794 773 801 78423 425 413 418 402 424 410 430 412 787 750 785 770 798 780 804 78324 422 411 411 397 425 409 431 415 789 752 790 772 791 773 801 78125 421 410 405 396 423 403 429 409 789 752 784 770 794 767 798 77726 421 410 409 395 423 404 427 409 789 752 792 773 789 767 799 77827 423 412 413 399 420 404 428 409 789 752 794 766 797 770 808 78028 422 411 411 399 421 405 428 410 789 752 789 763 794 770 793 77029 419 409 411 397 423 406 430 414 789 752 794 771 795 767 796 77430 422 409 413 398 420 404 430 413 788 753 796 766 799 766 799 77331 420 404 409 395 421 397 429 411 789 752 787 764 792 759 795 767

425 397 418 386 427 397 432 399 789 748 797 751 799 745 808 755

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Jul-14 0 0 0 0 0 0 0 02 02-Jul-14 0 0 0 0 0 0 0 03 03-Jul-14 0 0 0 0 0 0 0 04 04-Jul-14 0 0 0 0 0 0 0 05 05-Jul-14 0 0 0 0 0 0 0 06 06-Jul-14 1 67 0 0 0 0 0 07 07-Jul-14 0 0 0 0 0 0 0 08 08-Jul-14 1 278 0 0 0 0 0 09 09-Jul-14 0 0 0 0 0 0 0 0

10 10-Jul-14 1 565 0 0 0 0 0 011 11-Jul-14 0 0 0 0 0 0 0 012 12-Jul-14 0 0 0 0 0 0 0 013 13-Jul-14 3 758 0 0 0 0 0 014 14-Jul-14 0 0 0 0 0 0 0 015 15-Jul-14 0 0 0 0 0 0 016 16-Jul-14 2 2127 NIL NIL NIL 017 17-Jul-14 0 0 0 0 0 0 0 018 18-Jul-14 1 08 0 0 0 0 0 019 19-Jul-14 0 0 0 0 0 0 0 020 20-Jul-14 0 0 0 0 0 0 0 021 21-Jul-14 0 0 0 0 0 0 0 022 22-Jul-14 0 0 0 0 0 0 0 023 23-Jul-14 0 0 0 0 0 0 0 024 24-Jul-14 0 0 0 0 0 0 0 025 25-Jul-14 0 0 0 0 0 0 0 026 26-Jul-14 0 0 0 0 0 0 0 027 27-Jul-14 0 0 0 0 0 0 0 028 28-Jul-14 0 0 0 0 0 0 0 029 29-Jul-14 0 0 0 0 0 0 0 030 30-Jul-14 0 0 0 0 0 0 0 031 31-Jul-14 0 0

Max 3 758 0 0 0 00 0 0Total 9 24917 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month July 2014

Recommonded Load relief at 492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE 25

POWER CUTRESTRICTIONS IN WESTERN REGION FOR THE MONTH OF JULY-2014

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply(DLF)

01072014 31072014 2343 2105 2300

21 Three-Phase Supply(Irrigation)

01072014 31072014 0953 0857 0933

21 Three-Phase Supply(Mixed)

01072014 31072014 2339 2055 2240

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01072014 31072014 2353 2325 2344 32 District Head Qtrs 01072014 31072014 2357 2330 2348 33 Tehsil Head Qtrs 01072014 31072014 2350 2230 2319

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 010714 to 310714

SaUnya Nil

0-470 MW

SaUnya Nil

0000

SaUnya Nil 2400

SaUnya Nil

19 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs) 21 Three-Phase Supply 01072014 31072014 1000 0800 0900

22 Single-Phase Supply 01072014 31072014 1800 1800 1800 3 Anya jaanakarI Any other information There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

8860 (Av) of 31days 0000(Av) 0000 (Av)

1Rural 7109(Av) for 23447 Hrs 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0532 - -

0537 -

3 HT Industries 8261 (Av) for 17270 Hrs 0357 Total Energy Cutday 1426 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01072014 to 310714 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 3172014 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil ca gaaovaa Goa SaUnya Nil

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-26 Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai अिनवाय यिनट आऊटज का जलाई2014का वःता रत यौरा

Details of forced unit outages during the month ofJuly2014

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 एःसार Essar-2

गरा विनिल GSECL

172 1212 22-Feb-13 अनपल ध Still out

अनपल ध Still out

Shortage of gas

2 यट पीएस UTPS-2

गरा विनिल GSECL

120 1951 17-Jun-14 अनपल ध Still out

अनपल ध Still out

Turbine tripped(RSD)

3 एःसार व डनार Essar vadinar-1

गरा विनिल GSECL

600 2335 3-Jul-14 1324 22-Jul-14 Coal shortage

4 डब यट पीएस WTPS-6

गरा विनिल GSECL

210 953 10-Jul-14 0707 14-Jul-14 BTL

5 एसट पीएस STPS-1

गरा विनिल GSECL

120 1220 10-Jul-14 0710 14-Jul-14 BTL

6 जीआईपीसीएल GIPCL-STG I-2

गरा विनिल GSECL

165 1744 14-Jul-14 अनपल ध Still out

अनपल ध Still out

C ampI problem

7 एएलट पीएस ALTPS-1

गरा विनिल GSECL

120 107 15-Jul-14 2037 19-Jul-14 BTL

8 िस का ट पीएस SIKATPS-1

गरा विनिल GSECL

120 1330 17-Jul-14 अनपल ध Still out

अनपल ध Still out

RSD

9 डब यट पीएस WTPS-4

गरा विनिल GSECL

210 858 18-Jul-14 अनपल ध Still out

अनपल ध Still out

RSD

10 डब यट पीएस WTPS-3

गरा विनिल GSECL

210 1046 18-Jul-14 अनपल ध Still out

अनपल ध Still out

RSD

11 डब यट पीएस WTPS-5

गरा विनिल GSECL

210 1818 18-Jul-14 000 21-Jul-14 RSD

12 डब यट पीएस WTPS-6

गरा विनिल GSECL

210 447 19-Jul-14 अनपल ध Still out

अनपल ध Still out

RSD

13 यट पीएस UTPS-3

गरा विनिल GSECL

200 1055 26-Jul-14 2328 1-Aug-14 RSD

14 एपीएल APL-6

अदानी ADANI

660 2146 5-Jul-14 1105 2-Aug-14 Heavy hydrogen leakage

15 एपीएमएल APML-4

अदानी ADANI

660 1132 10-Jul-14 1407 23-Jul-14 Coal shortage

16 एपीएल APL-1

अदानी ADANI

330 117 20-Jul-14 612 23-Jul-14 RSD

प म ऽय भार षण कि म बई णाली चालन-ISO-I

17 एपीएल APL-8

अदानी ADANI

660 2018 18-Jul-14 2209 21-Jul-14 BTL

18 एपीएल APL-2

गरा विनिल GSECL

330 0913 26-Jul-14 1714 29-Jul-14 Air pre heater problem

19 एपीएल APL-5

गरा विनिल GSECL

660 1910 29-Jul-14 1533 2-Aug-14 Heavy steam leakage

20 डब यपीसीएल WPCL-1

मारा वउकिल MSPGCL

135 1245 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Furnace press high

21 डब यपीसीएल WPCL-4

मारा वउकिल MSPGCL

135 001 3-Apr-14 2347 11-Jul-14 Less schedule

22 कोराड Koradi-5

मारा वउकिल MSPGCL

200 1030 17-Jun-14 अनपल ध Still out

अनपल ध Still out

ID fan bearing temperature high

23 इ डयाबल Indiabulls - 1

मारा वउकिल MSPGCL

270 546 26-Jun-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

24 पल Parli -4

मारा वउकिल MSPGCL

210 1019 29-Jun-14 अनपल ध Still out

अनपल ध Still out

water shortage

25 भसावल Bhusawal-2

मारा वउकिल MSPGCL

210 1117 6-Jul-14 544 10-Jul-14 Coal problem

26 चिपर Chandrapur-1

मारा वउकिल MSPGCL

210 2211 8-Jul-14 2106 13-Jul-14 BTL

27 चिपर Chandrapur-3

मारा वउकिल MSPGCL

210 2216 14-Jul-14 1452 18-Jul-14 Safety valve problem

28 उरण Uran-6 मारा वउकिल MSPGCL

108 1634 15-Jul-14 1407 22-Jul-14 Gas shortage

29 उरण Uran -5 मारा वउकिल MSPGCL

108 2338 17-Jul-14 1125 24-Jul-14 For rotor balancing work

30 उरण Uran -A0 मारा वउकिल MSPGCL

120 2340 17-Jul-14 2315 23-Jul-14 For rotor balancing work

31 भसावल Bhusawal-2

मारा वउकिल MSPGCL

210 2346 18-Jul-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

32 खापरखड़ा Khaparkeda-3

मारा वउकिल MSPGCL

210 1036 20-Jul-14 041 29-Jul-14 Flame failure

33 जयगड Jaigad-2 मारा वउकिल MSPGCL

300 000 20-Jul-14 Ready Ready Less requisition

34 वीआईपीएल VIPL-2

मारा वउकिल MSPGCL

300 2302 20-Jul-14 1716 26-Jul-14 Coal feeding problem

35 एपीएमएल APML-3

मारा वउकिल MSPGCL

660 0444 22-Jul-14 044 26-Jul-14 Pressure release valve operated

36 भसावल Bhusawal-4

मारा वउकिल MSPGCL

500 003 23-Jul-14 151 29-Jun-14 BTL

37 वीआईपीएल VIPL-1

मारा वउकिल MSPGCL

300 015 23-Jul-14 1300 31-Jul-14 Coal feeding problem

38 उरण Uran -8 मारा वउकिल MSPGCL

108 730 26-Jul-14 1700 29-Jul-14 Gas shortage

39 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 347 29-Jul-14 638 4-Aug-14 BTL

प म ऽय भार षण कि म बई णाली चालन-ISO-I

40 पल PARLI-5 मारा वउकिल MSPGCL

210 002 30-Jul-14 अनपल ध Still out

अनपल ध Still out

Water shortage

41 टाटा TATA-8

टाटा TATA

250 2255 9-Jan-14 अनपल ध Still out

अनपल ध Still out

HT due to fire near turbine generator desk

42 टाटा TATA-6

टाटा TATA

500 2134 31-Jul-14 Ready Ready Less requisition

43 आरजीपीपीएल RGPPL-3A

आरजीपीपीएल RGPPL

320 1857 17-Apr-14 Ready Ready Less requisition

44 आरजीपीपीएल RGPPL-2B

आरजीपीपीएल RGPPL

320 1915 17-Jun-14 अनपल ध Still out

अनपल ध Still out

Raw water problem

45 आरजीपीपीएल RGPPL-2A

आरजीपीपीएल RGPPL

320 1615 25-Jun-14 1200 21-Jul-14 Less requisition

46 आरजीपीपीएल RGPPL-1A

आरजीपीपीएल RGPPL

320 1330 8-Jul-14 Ready Ready Less requisition

47 अमरकनटक Amarkantak-4

म वउकिल MPPGCL

120 1113 30-Apr-14 अनपल ध Still out

अनपल ध Still out

TURBINE BEARING VIBRATION HIGH

48 सातपरा Satpura-6

म वउकिल MPPGCL

200 305 18-Jun-14 अनपल ध Still out

अनपल ध Still out

BTL

49 एसजीट पीएस SGTPS-3

म वउकिल MPPGCL

210 617 26-Jun-14 020 26-Jul-14 Conveyer belt problem

50 अमरकनटक Amarkantak-3

म वउकिल MPPGCL

120 1640 2-Jul-14 1623 11-Jul-14 BTL

51 सातपरा Satpura-9

म वउकिल MPPGCL

210 2200 5-Jul-14 855 15-Jul-14 Condenser tube cleaning

52 सातपरा Satpura-9

म वउकिल MPPGCL

210 1310 15-Jul-14 845 24-Jul-14 BTL

53 एसजीट पीएस SGTPS-4

म वउकिल MPPGCL

210 2233 19-Jul-14 1252 4-Aug-14 Coal shortage

54 सातपरा Satpura-7

म वउकिल MPPGCL

210 225 21-Jul-14 545 24-Jul-14 BTL

55 सातपरा Satpura-10

म वउकिल MPPGCL

250 2316 22-Jul-14 07082014 High vibration in generator winding

56 एसजीट पीएस SGTPS-3

म वउकिल MPPGCL

210 1857 28-Jul-14 1020 2-Aug-14 Drum level low

57 DSPM(K(E) extn)-2

छरा वउकिल CSPGCL

250 2310 21-Jul-14 2029 22-Jul-14 Coal shortage

58 कोरबा पव Korba(E)-3

छरा वउकिल CSPGCL

210 1030 22-Jul-14 1025 27-Jul-14 CTL

59 कोरबा पव Korba(E)-5

छरा वउकिल CSPGCL

120 1345 22-Jul-14 1140 26-Jul-14 Wet coal problem

60 कोरबा पव Korba(E)-5

छरा वउकिल CSPGCL

120 2320 30-Jul-14 155 2-Aug-14 Coal shortage

61 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

62 एःसार महान Essar-Mahan-1

एःसारESSAR 600 014 22-Jun-14 1255 11-Jul-14 Less schedule

63 एःसारमहानEssar Mahan-1

एःसार ESSAR 600 620 16-Jul-14 1252 28-Jul-14 Withdrawn due to tripping of evacuation

प म ऽय भार षण कि म बई णाली चालन-ISO-I

Lines

64 सीजीपीएल CGPL-50

सीजीपीएल CGPL

830 948 13-Jun-14 409 23-Jul-14 Ash hopper refractory damage

65 सीजीपीएल CGPL-10

सीजीपीएल CGPL

830 1332 1-Jul-14 1952 9-Jul-14 BTL

66 सीजीपीएल CGPL-20

सीजीपीएल CGPL

800 1214 24-Jul-14 13-aug-14

Bottom ash Hopper works

67 सीजीपीएल CGPL - 40

सीजीपीएल CGPL

830 1918 26-Jul-14 1020 2-Aug-14 GT electrical fault

68 जपीएल JPL STG-2 UNIT-1

जपीएल JPL 600 051 26-Jun-14 अनपल ध Still out

अनपल ध Still out

Turbine vibration

69 जपीएलJPL STG-2 UNIT-2

जपीएलJPL 600 000 5-Jul-14 1457 11-Jul-14 Less requisition

70 जपीएल JPL STG-2 UNIT-2

जपीएलJPL 600 748 21-Jul-14 1800 24-Jul-14 BTL

71 एसीबीआईएल ACBIL-1

एसीबीआईएल ACBIL

135 151 6-Jul-14 1753 9-Jul-14 Furnace draft high

72 ससान Sasan -3 आरईएल REL 660 1648 15-Jul-14 2248 4-Aug-14 Ash evacuation problem

73 ससान Sasan-4 आरईएल REL 660 1645 24-Jul-14 810 3-Aug-14 High press main steam tripped

74 एमको EMCO-I एमको EMCO 200 109 16-Jul-14 अनपल ध Still out

अनपल ध Still out

Turbine vibration high

75 एसीबीआईएल ACBIL-2

एसीबीआईएल ACBIL

135 1955 21-Jul-14 601 24-Jul-14 Furnace draft high

76 मौदा Mouda -1

एनट पीसीNTPC 500 1630 18-Jun-14 2042 14-Jul-14 Flame failure

77 कावास Kawas-1C

एनट पीसीNTPC 116 2311 2-Jul-14 2100 6-Jul-14 Heavy steam leakage from stop valve

78 कावास Kawas-1B

एनट पीसीNTPC 106 2323 2-Jul-14 632 7-Jul-14 Less requisition

79 कावास Kawas-2B एनट पीसीNTPC 164 1704 10-Jul-14 Ready Ready Less requisition

80 कावास Kawas-1A एनट पीसीNTPC 164 1200 12-Jul-14 745 22-Jul-14 Less requisition

81 वीएसट पीएस VSTPS-11

एनट पीसीNTPC 500 1204 13-Jul-14 000 16-Jul-14 Coal shortage

82 गाधारGandhar-1 एनट पीसीNTPC 144 149 16-Jul-14 1807 21-Jul-14 Less requisition

83 कावास Kawas-1B एनट पीसीNTPC 164 1027 18-Jul-14 442 23-Jul-14 Less requisition

84 मौदा Mouda-1 एनट पीसीNTPC 500 000 18-Jul-14 1745 24-Jul-14 Less requisition

85 िसपतSipat-1 एनट पीसीNTPC 660 000 21-Jul-14 955 24-Jul-14 Generator H2 gas leakage

86 गाधार Gandhar-3

एनट पीसीNTPC 144 1607 21-Jul-14 अनपल ध Still out

अनपल ध Still out

BB protection operatedatJhanor

87 गाधार Gandhar-4(ST)

एनट पीसीNTPC 224 1607 21-Jul-14 1320 26-Jul-14 BB protection operatedatJhanor

88 ट स TAPS-1

एनट पीसीNTPC 160 2227 21-Jul-14 1407 26-Jul-14 Maintenance

89 गाधार एनट पीसीNTPC 144 507 22-Jul-14 Ready Ready Less requisition

प म ऽय भार षण कि म बई णाली चालन-ISO-I

Gandhar -1

90 मौदा mouda-2 एनट पीसीNTPC 500 915 23-Jul-14 315 31-Jul-14 Coal feeding problem

91 कावास Kawas-1A

एनट पीसीNTPC 106 608 24-Jul-14 1309 27-Jul-14 Less requisition

92 गाधार Gandhar-2

एनट पीसीNTPC 144 2036 26-Jul-14 100814 Less requisition

93 वीएसट पीएस VSTPS-2

एनट पीसीNTPC 210 500 27-Jul-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

94 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 748 27-Jul-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

95 मौदा Mouda-2 एनट पीसीNTPC 500 315 31-Jul-14 210 3-Aug-14 Less requisition Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का जलाई2014 का वःता रत यौरा

Details of planned unit outages during the month of July2014 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

सo From

समय दनाक

कारण Reason

Time Date Time Date

1 एसएलपीपी SLPP-2

गरा विनिल GSECL

125 045 23-Jun-14 NA 17-Jul -14 AOH

2 डब यट पीएस WTPS-5

गरा विनिल GSECL

210 000 21-Jul-14 29-0814 COH

3 यट पीएस UTPS-4

गरा विनिल GSECL

200 000 21-Jul-14 240814 AOH

4 एसएलपीपी SLPP-3

गरा विनिल GSECL

125 130 22-Jul-14 060814 AOH

5 यट पीएस UTPS-1

गरा विनिल GSECL

120 000 29-Jul-14 28814 AOH

6 पल ParlI-3

मारा वउकिल MSPGCL

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

Water supply problem

7 चिपर Chandrapur-7

मारा वउकिल MSPGCL

500 600 19-Jun-14 1124 2-Aug-14 AOH

8 नािसक NASIK -3

मारा वउकिल MSPGCL

210 1410 10-Jul-14 अनपल ध Still out

100814 AOH

9 कोरबा प म Korba(W)-2

छरा वउकिल CSPGCL

210 936 26-Jun-14 140814 AOH

10 वदनाVandana-I वदना VANDANA 135 1940 17-Jul-14 अनपल ध Still out

अनपल ध Still out

ETL

11 वीएसट पीएस VSTPS-8

एनट पीसीNTPC 500 012 1-Jun-14 253 13-Jul-14 AOH

12 कएसट पीएस KSTPS-4

एनट पीसीNTPC 500 2335 20-Jun-14 180814 COH

13 कावास Kawas-2A

एनट पीसीNTPC 106 000 27-Jun-14 260814 RampM works

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

11 Akrimota 1 125 4-Aug-14 14-Aug-14 AOH12 WTPS 2 210 5-Aug-14 3-Sep-14 AOH13 SLPP 1 125 16-Aug-14 4-Sep-14 AOH14 DGB 1 107 20-Aug-14 27-Aug-14 CI15 GIPCL-I GT-3 48 22-Aug-14 27-Aug-14 HGPI16 GIPCL-I GT-2 48 29-Aug-14 3-Sep-14 HGPI17 GIPCL-I GT-2 48 12-Aug-14 24-Aug-14 HGPI18 UTPS 3 200 19-Aug-14 12-Sep-14 AOH19 GTPS 2 120 25-Aug-14 14-Sep-14 AOH110 STPS 1 120 19-Aug-14 30-Aug-14 AOH111 GTPS 3 210 24-Aug-14 13-Sep-14 AOH112 APL 9 660 1-Sep-14 20-Sep-14 AOH

221 SGTPS 4 210 010914 250914 AOH3 Craiva]kMila CSPGCL

31 Korba East-6 6 120 21-Aug-14 13-Sep-14 AOH32 Korba East-1 1 50 15-Aug-14 1-Sep-14 AOH33 Korba East-3 3 50 21-Aug-14 30-Sep-14 AOH34 Korba West-1 1 210 12-Sep-14 27-Sep-14 COH35 Korba West-5 5 500 15-Aug-14 30-Aug-14 AOH

4

41 PARAS 3 250 20914 151014 AOH42 RELIANCE 2 250 140814 160814 TURBINE VIBRATION

5 koMd``Iya xao~ Central Sector

51 SIPAT 1 600 050914 191014 BLR OH + HPT + IPT+LPT + GEN

52VINDHYACHAL

5 500 120814 200914 CAP+TG PED CKG+GEN+BLR CHEM CLNG+ESP RampM

53VINDHYACHAL

9 500 120814 150914 BLR OH + HPT + IPT+ GEN

54VINDHYACHAL

11 500 160714 170814 AOH

55CGPL

30 800 150814 050914 Bottom ash hopper Refractory repair and General maintainance work

56 CGPL 40 800 060914 300914 UT 40B repair work57 NSPCL 1 250 200814 110914 AOH

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING AUGUST 2014 AND SEPTEMBER 2014

Capacity Outage as per Annual Maintenance Plan

Date Time Date Time

1 400 400KV BUS-I at Bilaspur Ss 14-Aug-14 900 14-Aug-14 1800 DAILY For bus bar stability of LANCO bays amp jumpering work WRTS-I LANCO C

2 400kV 50 MVAR Bus Reactor-2 at Itarsi SS 14-Aug-14 800 15-Oct-14 1800 Continuo

us Installation of 125MVAR reactor WRTS-II WRTS-II C

3 765 Satna-Gwalior2 14-Aug-14 800 17-Aug-14 1800 DailyCompletion of 765kV Gwalior2 Main Bay Erection amp Testing works at Satna

PGCIL WRTS-II C

4 400 400kV JBP- JBP Pooling 2 Line 14-Aug-14 1000 14-Aug-14 1500 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

5 400 400KV BUS-II at Bilaspur Ss 16-Aug-14 900 16-Aug-14 1800 DAILY For bus bar stability of LANCO bays amp jumpering work WRTS-I LANCO C

6 765 Bus2 at satna 16-Aug-14 800 18-Aug-14 1800 DailyExtension of bus 2 for Gwalior2 bay amp completion of Main Bay Erection

PGCIL WRTS-II C

7 400 Khandwa-Dhule1 16-Aug-14 800 31-Aug-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WR-II C

8 400 Gandahr - Navsari DC 16-Aug-14 800 31-Aug-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WR-II R

PID testing of insulator strings

KV Line From To

Annexure-32

Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

9 400 Navsari - Vapi - Kala 16-Aug-14 800 31-Aug-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WR-II R

10 400 Satna - Bina Ckt 1amp2 16-Aug-14 800 31-Aug-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WR-II R

11 400 80 MVAR Bus Reactor at Kotra 16-Aug-14 900 17-Aug-14 1800 ContinuousTo attend isolator defects WRTS-I PGCIL C

12 400 400kV JBP- JBP Pooling 1 Line 17-Aug-14 1000 17-Aug-14 1500 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

13 765 ICT II at Bina 17-Aug-14 0900 17-Aug-14 1800 Daily Post Commissioning check of Fire-Fighting system at Bina PGCIL WRTS-II C

14 765 Bus-2 at Gwalior 17-Aug-2014 1000 18-Aug-2014 1800 Daily Busbar Jumpering ampStability test related to Bus reactor

POWERGRID WRTS-II C

15 765 Seoni 2 LR(704 LR) at Bilaspur Ss 18-Aug-14 900 18-Aug-14 1500 DAILY For taking Spare LR in service

first time WRTS-I PGCIL C

16 400 Bhadrawati-Ramagundam I 18-Aug-14 800 18-Aug-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

17 400 400kV Vchal - JBP 1 Line 18-Aug-14 1000 18-Aug-14 1200 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

18 400 400kV Vchal - JBP 2 Line 18-Aug-14 1400 18-Aug-14 1600 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

19 400 400KV BUS-II at Bilaspur Ss 19-Aug-14 900 19-Aug-14 1800 DAILY For bus bar stability of LANCO bays amp jumpering work WRTS-I LANCO C

20 400 Bhadrawati-Ramagundam II 19-Aug-14 800 19-Aug-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

21 765 ICT 1 at G alior 19 A g 14 10 00 20 A g 14 18 00 Continou SPARE ICT COMMISSIONING PGCIL WRTS II C21 765 ICT - 1 at Gwalior 19-Aug-14 1000 20-Aug-14 1800 s SPARE ICT COMMISSIONING PGCIL WRTS-II C

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

22 400 400kV JBP- Itarsi 1 Line 19-Aug-14 1000 19-Aug-14 1200 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

23 400 400kV JBP- Itarsi 2 Line 19-Aug-14 1400 19-Aug-14 1600 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

24 400 400 kV Sipat -Ranchi-1 19-Aug-14 900 20-Aug-14 1900 Continous 1 no of CT replacement NTPC NTPC

25 400 BUS-I at Aurangabad(PG) 19-Aug-14 600 20-Aug-14 1800 ContiBus-1 extn for commissioning of 400 kV Boisar-1amp2 bays with 80 MVAR Reactors

WRTS-I WRTS-I C

26 400kV 400kV SUGEN PIRANA Line (Line 2) 19-Aug-14 900 19-Aug-14 1700 Daily Corrective Maintenance of

Transfer Isolator TPL-SUGE TPL-SUG R

27 400kV 400kV PGCIL - PIRANA Feeder No 2 19-Aug-14 900 19-Aug-14 1700 Daily 400kV CT connectors replacementTPL-AHME TPL-AHM R

28 400 Bhadrawati-Parli 1amp 2 19-Aug-14 000 20-Oct-14 1800 DailyFor OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

29 400 Mundra - Jetpur line No1 19-Aug-14 800 19-Aug-14 1200 Daily protection logic checking work PGCIL GETCO30 400 Mundra - Jetpur line No 2 19-Aug-14 1400 19-Aug-14 1800 Daily protection logic checking work PGCIL GETCO

31 400 400KV BUS-I at Bilaspur Ss 20-Aug-14 900 20-Aug-14 1800 DAILY For bus bar stability of LANCO bays amp jumpering work WRTS-I LANCO C

32 400 KSK ndash Raigarh circuit 4 20-Aug-14 900 21-Aug-14 1800 CONT complete PLCC rectification works WRTS-I KSK C

33 HVDC HVDC POLE I AT BHADRAWATI 20 A 14 8 00 21 A 14 18 00 D il AMP WORKS WRTS I WRTS I R33 HVDC HVDC POLE-I AT BHADRAWATI 20-Aug-14 800 21-Aug-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

34 765kV Dharamjaygarh - Durg ckt-2 20-Aug-14 800 22-Aug-14 1800 daily CSD relay commissioning (M+T) WRTS-I PGCIL C

35 765 JBP - BINA 1 at Jabalpur Pooling Station 20-Aug-14 1000 21-Aug-14 1800 Daily Commissioning of CSD Relay for

765KV JBP - BINA Ckt 1 PGCIL WRTS-II C

36 400 Khandwa-Dhule1 20-Aug-14 1000 20-Aug-14 1500 Daily AMP PGCIL WRTS-II R

37 400 Bus-1 at Shujalpur 20-Aug-14 1000 20-Aug-14 1800 Daily AMP PGCIL WRTS-II R

38 400 Bus2 at Satna 20-Aug-14 900 20-Aug-14 1800 Daily For Bus Bar Stability and charging activity of 406 Bay PGCIL WRTS-II C

39 400 Bus1 at Indore 20-Aug-14 900 20-Aug-14 1800 Daily Jumper connection amp stability checking of Pitampur1 PGCIL WRTS-II C

40 400 400kV JBP- Itarsi 3 Line 20-Aug-14 1000 20-Aug-14 1200 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

41 765 Raigarh (Kotra) - Raigarh (Tamnar) 20-Aug-14 900 31-Aug-14 1800 ContinuousFor installation of Bird guards WRTS-I PGCIL C

42 400 Kansari - Kankroli line 20-Aug-14 800 20-Aug-14 1800 Daily PMU installation work and maintenPGCIL GETCO43 400 BUS-2 AT SOLAPUR 21-Aug-14 900 22-Aug-14 1800 Daily Pune bays extension works WRTS-I WRTS-I C

44 765 ICT 1 at Jabalpur Pooling Station 21-Aug-14 1000 21-Aug-14 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus for Spare ICT Phase

PGCIL WRTS-II C

45 400 Bina-Shujalpur1 21-Aug-14 900 21-Aug-14 1000 Daily

For Replacement of 390kV Reactor LA with 336kV LA Line will be taken in service without PGCIL WRTS-II Cj p g g y will be taken in service without Line Reactor at Shujalpur

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

46 400 Khandwa-Dhule2 21-Aug-14 1000 21-Aug-14 1800 DailyFor Replacement of 390kV Reactor LA with 336kV LA At Khandwa amp AMP

PGCIL WRTS-II C

47 220 Damoh-Sagar 21-Aug-14 1000 21-Aug-14 1500 Daily AMP of terminal equipment at Damoh SS MPPTCL WR-II R

48 765 ICT2 at Indore 21-Aug-14 900 22-Aug-14 1800 Continious

For Auxiliary bus erection at Indore PGCIL WRTS-II C

49 400 125MVAr BR at Shujalpur 21-Aug-14 900 21-Aug-14 1800 Daily Differential stability of tie bay (Under commissioning) PGCIL WRTS-II C

50 400 Raipur-Bhadrawati-III 21-Aug-14 900 21-Aug-14 1800 ContinuousBus split at Raipur WRTS-I PGCIL C51 400 Kansari - Bhinmal line 21-Aug-14 800 21-Aug-14 1800 Daily PMU installation work and maintenPGCIL GETCO

52 HVDC HVDC POLE-2 AT BHADRAWATI 22-Aug-14 800 23-Aug-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

53 765 ICT I at Bina 22-Aug-14 0900 23-Aug-14 1800 DailyCommissioning of CSD Relay for 400kV side of ICT- rescheduling of outage

PGCIL WRTS-II C

54 765 JBP - BINA 2 at Jabalpur Pooling Station 22-Aug-14 1000 23-Aug-14 1800 Daily Commissioning of CSD Relay for

765KV JBP - BINA Ckt 2 PGCIL WRTS-II C

55 400 Khandwa-Rajgarh1 22-Aug-14 800 23-Aug-14 1800 PM Continous

Rectification of damaged tower peak at locno83 due to collapse of MPPTCL tower which is under construction

PGCIL MPPTCL C

F j i amp h i th56 400 Pirana-Vadodara-Asoj DC 22-Aug-14 800 23-Aug-14 1800 Daily

For jumpering amp charging the future cirucit of line in multi-circuit towers to prevent conductor theft

PGCIL WRTS-II C

57 220 Damoh-Damoh2 22-Aug-14 1000 22-Aug-14 1500 Daily AMP of terminal equipment at Damoh SS MPPTCL WR-II R

58 400kV 400kV SUGEN VAPI Line 22-Aug-14 900 22-Aug-14 1400 Daily Corrective Maintenance amp Inspection Dropper of 5 Core CT

TPL-SUGE TPL-SUG R

59 765 Bus Reactor Kotra 22-Aug-14 900 23-Aug-14 1800 Daily WRTS-I PGCIL C

60 400 Vindhyachal-Jabalpur3 23-Aug-14 900 23-Aug-14 1800 Daily

For Replacement of 390kV Reactor LA with 336kV LA At Jabalpur Line will remain out of service due to less clearance of Reactor LA from Line conductor

PGCIL WRTS-II C

61 765 ICT1 at Indore 23-Aug-14 900 26-Aug-14 1800 Continious

re routing of cables in CMB for commissioning of spare unit at Indore

PGCIL WRTS-II C

62 765 Bus- 2 at Bina 23-Aug-2014 0900 23-Aug-2014 1800 DailyFor Bus stability required for 765kV Jabalpur 3 Bay- Rescheduling of outage

POWERGRID WRTS-II C

63 765 Bus-1 at Gwalior 24-Aug-14 1000 25-Aug-14 1800 Daily Busbar Jumpering ampStability test related to Jaipur 1 main bay PGCIL WRTS-II C

64 400 Navasari- Kala MC line 25-Aug-14 800 26-Aug-14 1800 DailyConstruction work of Navasari- Boisar line on same Multi ckt WRTS-II WRTS-I Ctower

65 765 765400 AT-1 AT SOLAPUR 25-Aug-14 900 26-Aug-14 1800 Daily Spare ICT unit Aux bus commisioning works WRTS-I WRTS-I C

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

66 220 Korba-Budhipadar Ckt-3 at CSPDCL Korba Ss 25-Aug-14 900 26-Aug-14 1800 DAILY For diversion of line for SE

Railway MCL project WRTS-I PGCIL C

67 765 765KV Bus 1 at Jabalpur Pooling Station 25-Aug-14 1000 25-Aug-14 1800 Daily

765KV Bus 1 Extension for Switchyard Extension for BINA 3 Line Dia

PGCIL WRTS-II C

68 765 765KV ICT 1 at Jabalpur Pooling Station 25-Aug-14 1000 25-Aug-14 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus Isolators for Spare ICT Phase - Heavy Induction

PGCIL WRTS-II C

69 400 Vindhyachal-Jabalpur4 25-Aug-14 900 25-Aug-14 1800 Daily

For Replacement of 390kV Reactor LA with 336kV LA At Jabalpur Line will remain out of service due to less clearance of Reactor LA from Line conductor

PGCIL WRTS-II C

70 400 Bus-I at satna 25-Aug-14 900 25-Aug-14 1800 DailyFor Changing of Jumper from Twin Moose To Quad Moose in 401 bay (jaypee nigrie line-1)

PGCIL WR-II C

71 400 Deepnagar-Thaptitanda 25-Aug-14 900 25-Aug-14 1700 Daily To attend Isolator alignment problem MSETCL MSETCL

72 765 BUS-II and 765 ICT-1 at Aurangabad (PG) 25-Aug-14 600 25-Aug-14 1800 Daily Commissioning of spare ICT unit

at Aurangabad (PG) WRTS-I WRTS-I CAurangabad (PG) at Aurangabad (PG)

73 765 Kotra-durg Ckt-2 along with line reactor 25-Aug-14 900 28-Aug-14 1800 ContinuousReplacement of spacer damper WRTS-I PGCIL C

74 765 Wardha-Aurangabad (PG)-2 and Padge-1 LReactor 26-Aug-14 600 26-Aug-14 1800 Daily Construction of up-coming

Padghe bay at Aurangabad (PG) WRTS-I WRTS-I C

75 765 Gwalior -Bina 1 26-Aug-14 1000 27-Aug-14 1800 Daily Spare reactor commissioning at Gwalior PGCIL WR-II C

76 765 1500MVA ICT 2 at Jabalpur Pooling Station 26-Aug-14 1000 26-Aug-14 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus Isolators for Spare ICT Phase - Heavy Induction

PGCIL WRTS-II C

77 400 Jabalpur-Itarsi4 26-Aug-14 900 26-Aug-14 1800 Daily

For Replacement of 390kV Reactor LA with 336kV LA At Jabalpur Line will remain out of service due to less clearance of Reactor LA from Line conductor

PGCIL WRTS-II C

78 400 Akola ll-Thaptitanda 27-Aug-14 900 27-Aug-14 1900 Daily To attend chattering noise on B-ph wave trap MSETCL MSETCL

79 400 Vapi- Kala MC Line 27-Aug-14 800 28-Aug-14 1800 DailyConstruction work of Navasari- Boisar line on same Multi ckt tower

WRTS-II WRTS-I C

80 765 Bus 1 at Jabalpur Pooling Station 27-Aug-14 1000 27-Aug-14 1800 Daily

765KV Bus 1 Extension Busbar Stability test related to BINA 3 Line Dia

PGCIL WRTS-II C

81 400 KORBA SIPAT 27 Aug 14 600 29 Aug 14 2200 CONT NORMALISED THE LILO AT PGCIL LANCO C81 400 KORBA -SIPAT 27-Aug-14 600 29-Aug-14 2200 RAMPUR PGCIL LANCO C

82 400 TARAPUR-PADGHE II 27-Aug-14 800 28-Aug-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

83 765 Gwalior-Satna1 28-Aug-14 800 28-Aug-14 1800 Daily For spare reactor commissioning works at Gwalior PGCIL WRTS-II C

84 765 BUS-II and Padge-2 LReactor at Aurangabad (PG) 28-Aug-14 600 28-Aug-14 1800 Daily

Commissioning of Padghe-2 upcoming bay at Aurangabad (PG)

WRTS-I WRTS-I C

85 765 Bilaspur 1 Main bay (710) at Seoni 28-Aug-14 800 29-Aug-14 1800 Daily AMP works WRTS-I WRTS-I R

86 765 765400 AT-2 AT SOLAPUR 28-Aug-14 900 28-Aug-14 1800 Daily Spare ICT unit Aux bus commisioning works WRTS-I WRTS-I C

87 765 Bus Reactor(706 BR) at Bilaspur Ss 28-Aug-14 900 01-Sep-14 1800 DAILY For replacement of unarmoured

cable by TBEA WRTS-I PGCIL C

88 765 Bus 2 at Jabalpur Pooling Station 28-Aug-14 1000 29-Aug-14 1800 Daily

765KV Bus 2 Extension for Switchyard Extension for BINA 3 Line Dia

PGCIL WRTS-II C

89 400 MOUDA 400KV BUS REACTOR 28-Aug-14 0900hrs 29-Aug-14 1800 ContionuouAnnual Maintainance NTPC NTPC

90 765 Satna - Bina 1 29-Aug-14 0900 31-Aug-14 1800 Daily

for erection of new TC amp TE tower forNHPTL at Bina-Rescheduling of outage

PGCIL WRTS-II C

91 765 Bus Reactor at Satna 29-Aug-14 900 30-Aug-14 1800 Continious Commissioning of spre reactor PGCIL WRTS-II Cus

92 400 125MVAr BR1 at Indore 29-Aug-14 900 29-Aug-14 1800 Daily Post Commissioning check of Fire-Fighting system at Indore PGCIL WRTS-II C

93 400 Chorania Hadala line 29-Aug-14 800 29-Aug-14 1800 Daily PMM WORK GETCO GETCO

94 765 Kotra-durg Ckt-2 along with line reactor 29-Aug-14 900 31-Aug-14 1800 Daily WRTS-I PGCIL C

95 765 765400 ICT-2 at Aurangabad (PG) 30-Aug-14 600 30-Aug-14 1800 Daily Altube erection in 400 kV Boisar-

1amp2 Tie bays WRTS-I WRTS-I C

96 765kV Dharamjaygarh - Bilaspur 30-Aug-14 800 30-Aug-14 1800 daily commissioning of JBP-1 bay (side) WRTS-I PGCIL C

97 765kV 330 MVAR Bus Rector-2 at Dharamjaygarh 30-Aug-14 800 30-Aug-14 1800 daily commissioning of JBP-1 bay

(side) WRTS-I PGCIL C

98 400 Mundra Hadala SC 30-Aug-14 800 30-Aug-14 1800 DailyPower Line Crossing of 400 KV DC Bhachau SS (PG) - Varsana SS (GETCO) TrL

GETCO WRTS-II C

99 220 Gwalior - Mahalgaon 1amp2 30-Aug-14 900 31-Aug-14 1800 Continuous

For crossing of 765kV Gwalior - Jaipur line PGCIL WRTS-II C

100 220 Gwalior - Malanpur 1amp2 30-Aug-14 900 31-Aug-14 1800 Continuous

For crossing of 765kV Gwalior - Jaipur line PGCIL WRTS-II C

101 400 400 kV Akola- Nandagaon peth sc 31-Aug-14 800 31-Aug-14 1600 Daily crossing works of 765 kV Koradi-AWRTS-I WRTS-I R

102 400 Bina-Shujalpur2 31-Aug-2014 900 31-Aug-2014 1000 DailyFor Replacement of 390kV Reactor LA with 336kV LA Line

ill b t k i i ith t

POWERGRID WRTS-II C

103 400 Mundra - Sami DC 01-Sep-14 800 01-Sep-14 1800 DailyPower Line Crossing of 400 KV DC Bhachau SS (PG) - Varsana SS (GETCO) TrL

ADANI WRTS-II C

104 400 Akola-Wardha 1amp 2 01-Sep-14 800 30-Sep-14 1800 Daily For Online PID Line in service with AR in non-auto mode WRTS-I WRTS-I For IOwith AR in non auto mode

105 765 Bilaspur 2 Main bay (716) at Seoni 01-Sep-14 800 02-Sep-14 1800 Daily AMP works WRTS-I WRTS-I R

106 400 400220 ICT-1 AT SOLAPUR 01-Sep-14 900 01-Sep-14 1500 Daily AMP WORK WRTS-I WRTS-I R

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

107 765 1000 MVA ICT I amp ICT II at Bina 01-Sep-14 0900 01-Sep-14 1800 Daily Commissioning of Master follower

scheme PGCIL WRTS-II C

108 765 Bus 1 at Jabalpur Pooling Station 01-Sep-14 100000 AM 01-Sep-14 60000 PM Daily

765KV Bus 1 Extension Busbar Stability test related to Bhopal 1 Line Dia

PGCIL WRTS-II C

109 400 Shujalpur - Bina 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

110 400 Birsinghpur-Damoh 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

111 400 Gandhar - Navsari 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

112 400 Khandwa - Rajgarh 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

113 400 Indore - Nagda 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

114 400 Jabalpur - Jabalpur Pool 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II Cnon auto mode

115 400 Khandwa - Dhule 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

116 400 Itarsi - Khandwa 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

117 220 Satna - Satna 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

118 765 Dehgam - Ranchhodpura 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

119 765 Shujalpur - Nagda 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

120 400 Asoj - SSP 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

121 400 Bhachau - Mundra 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

122 400 Bina - Gwalior 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

123 400 Satna - Gwalior 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in PGCIL WRTS-II Cnon auto mode

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

124 400 LILO portion of Vapi - Navi Mumbai at Kala(Vapi-Kala Line) 01-Sep-14 600 30-Sep-14 1800 Daily

Online replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

125 400400 kV Khandwa - Rajgarh

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

126 400400 kV Gandhar-Navsari

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

127 400400 kV Rajgarh ndash SSP

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

128 400400 kV SSP-Asoj

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

129 400 400 kV Shujalpur - Nagda (MPPTCL)

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

130 400400 kV Dehgam - Ranchodpura

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

131 400 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in PGCIL WRTS-II C

400 kV Ranchodpura ndash Bhachaup p y OPGW AR shall be kept in

non auto mode

132 400400 kV Mundra-Bhachau

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

133 400400 kV Vindhyachal NTPC -SASAN UMPP Ckt-1 01-Sep-14 600 30-Sep-14 1800 Daily

Online replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

134 400400 kV Vindhyachal Pooling -Vindhyachal NTPC 01-Sep-14 600 30-Sep-14 1800 Daily

Online replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

135 400 400 kV LILO at Kala (DNH) SS of Vapi-Navi Mumbai Line

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

136 765765 kV Bina - Gwalior

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

137 765765 kV Satna - Gwalior Ckt-I

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

138 400 Gandahr - Navsari DC 01-Sep-14 800 30-Sep-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

139 400 Navsari - Vapi - Kala 01-Sep-14 800 30-Sep-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

PID testing of insulator strings 140 400 Satna - Bina Ckt 1amp2 01-Sep-14 800 30-Sep-14 1800 Daily AR shall be kept In non auto

modePGCIL WRTS-II R

141 400 Nagda - Dehgam DC 01-Sep-14 800 30-Sep-14 1800 Daily PID testing of insulator strings AR h ll b k t I t

PGCIL WRTS-II R

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

142 220 Kakrapar - Vapi DC 01-Sep-14 800 30-Sep-14 1800 Daily PID testing of insulator strings PGCIL WRTS-II R

143

220 220 KV Jhanor - Haldrwa Line 1

01-Sep-14

800

05-Sep-14

000

Continous Replacement of existing CTCVT with 02 class CT amp CVT and for testing of the same NTPC NTPC

144 400 Akola-Aurangabad(PG) 2 01-Sep-14 800 02-Sep-14 1800 Conti commissioning of 50MVAR Lreactor at Aurangabad(PG) WRTS-I WRTS-I C

145 765 Bina-Satna 2 02-Sep-14 0900 03-Sep-14 1800 Daily Post Commissioning check of Fire-Fighting system at Bina PGCIL WRTS-II C

146 400 Vadavi-Chorania 1 02-Sep-14 800 02-Sep-14 1800 Daily PMM WORK WRTGPL GETCO147 400 BUS REACTOR AT SOLAPUR 02-Sep-14 900 02-Sep-14 1500 Daily AMP WORK WRTS-I WRTS-I R

148 765 Korba Line Main Bay (716) at Bilaspur Ss 02-Sep-14 900 02-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

149 765 Bus 2 at Jabalpur Pooling Station 02-Sep-14 100000 AM 02-Sep-14 60000 PM Daily

765KV Bus 2 Extension for Switchyard Extension for Bhopal 1 Line Dia

PGCIL WRTS-II C

150 400 Bus2 at Indore 02-Sep-14 900 02-Sep-14 1800 Daily Jumper connection amp stability checking of Pitampur1 PGCIL WRTS-II C

151 400 CGPL-Limbdi-1 02-Sep-14 2-Sep-14 8AM 6PM Daily routine maintenance and isolator aPGCIL CGPL

152400 Korba-Bhalai line -1

02-Sep-14 900 03-Sep-14 19002 days

continuous CVTs replacement

NTPC NTPC00 o ba a a e us C s ep ace e t

153 400 Sipat 400KV Bus-1 02-Sep-14 900 03-Sep-14 1900 Continous Annual Preventive maintenance NTPC NTPC

154 765 Bilaspur 2 Tie bay (717) at Seoni 03-Sep-14 800 04-Sep-14 1800 Daily AMP works WRTS-I WRTS-I R

155 400 400220 ICT-1 AT SOLAPUR 03-Sep-14 900 03-Sep-14 1500 Daily AMP WORK WRTS-I WRTS-I R

156 765 Sipat2 Main Bay (712) at Bilaspur Ss 03-Sep-14 900 03-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

157 765 Bina-Gwalior 2 03-Sep-14 0900 04-Sep-14 1800 Daily For spare reactor commissioning works at Gwalior PGCIL WRTS-II C

158 765 Bus 2 at Jabalpur Pooling Station 03-Sep-14 100000 AM 03-Sep-14 60000 PM Daily

765KV Bus 2 Extension for Switchyard Extension for Jumpering (Bus Extension) for Bhopal 1

PGCIL WRTS-II C

159 400 Indore-Asoj3 03-Sep-14 900 04-Sep-14 1800 Continuous

For checking protection transfer system at Indore (MPPTCL) PGCIL WRTS-II C

160 400 400 kv Nagda- Rajgarh ckt Pgcil ckt I 03-Sep-14 900 03-Sep-14 03092014 1800 daily Maintenan

ce Work PGCIL EHT- Mamp I

161 400 Vadavi-Chorania 2 04-Sep-14 800 04-Sep-14 1800 Daily PMM WORK WRTGPL GETCO162 220 SOLAPUR(PG)-Solapur(M) 04-Sep-14 900 04-Sep-14 1800 Daily AMP WORK MSETCL WRTS-I R

163 765 Bus 2 at Jabalpur Pooling Station 04-Sep-14 100000 AM 04-Sep-14 60000 PM Daily

765KV Bus 2 Extension Busbar Stability test related to Bhopal 1 Line Dia

PGCIL WRTS-II C

164 400 CGPL-Limbdi-2 04-Sep-14 4-Sep-14 8AM 6PM Daily routine maintenance and isolator aPGCIL CGPL

165 400 400 kv Nagda- Rajgarh ckt Pgcil ckt II 04-Sep-14 900 04-Sep-14 04092014 1800 daily Maintenan

ce Work PGCIL EHT- Mamp I

166400 Korba-Bhalai line -2

04-Sep-14 900 05-Sep-14 19002 days

continuous CVTs replacement

NTPC NTPC

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

167 400 BUS-1 AT SOLAPUR 05-Sep-14 900 05-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I C

168 400 Seoni-Khandwa 1 05-Sep-14 800 05-Sep-14 1800 Daily Line AMP works at Seoni WRTS-II WRTS-I R

169 400 400220 ICT-2 AT BOISAR 05-Sep-14 900 05-Sep-14 1500 Daily For Bushing oil DGA Testing WRTS-I WRTS-I R

170 765 Sipat2 Tie Bay (711) at Bilaspur Ss 05-Sep-14 900 05-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

171 765 Bina-Jabalpur I 05-Sep-14 0900 06-Sep-14 1800 Daily Post Commissioning check of Fire-Fighting system at Bina PGCIL WRTS-II C

172 400 Bus Reactor 1 at Jabalpur Pooling Station 05-Sep-14 100000 AM 05-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

173 220 Navsari - Nasik - 1 05-Sep-14 800 05-Sep-14 1800 Daily PMM WORK PGCIL GETCO174 400 Sipat 400KV Bus-2 05-Sep-14 900 06-Sep-14 1900 Continous Annual Preventive maintenance NTPC NTPC175 400 Akola-Wardha ckt 2 05-Sep-14 800 05-Sep-14 1700 Daily QMwork MSETCL MSETCL176 400 Kalwa-Kharghar 05-Sep-14 900 05-Sep-14 1700 Daily R amp M work MSETCL MSETCL177 400 Seoni-Khandwa 2 06-Sep-14 800 06-Sep-14 1800 Daily Line AMP works at Seoni WRTS-II WRTS-I R178 400 400220 ICT-1 AT BOISAR 06-Sep-14 900 06-Sep-14 1500 Daily For Bushing oil DGA Testing WRTS-I WRTS-I R

179 400 Bus Reactor 2 at Jabalpur Pooling Station 06-Sep-14 100000 AM 06-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

180 765 Gwalior-Satna2 06-Sep-14 800 06-Sep-14 1800 Daily For spare reactor commissioning works at Gwalior PGCIL WRTS-II C

181 400 Indore-Indore1 06-Sep-14 900 07-Sep-14 1800 Continuo For checking protection transfer t t I d (MPPTCL) PGCIL WRTS-II C181 400 Indore Indore1 06 Sep 14 900 07 Sep 14 1800 us system at Indore (MPPTCL) PGCIL WRTS II C

182 220 Navsari - Nasik - 2 06-Sep-14 800 06-Sep-14 1800 Daily PMM WORK PGCIL GETCO

183 400 VAPI-BOISAR 07-Sep-14 800 08-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

184 765 Satna-Gwalior-2 Reactor 07-Sep-14 900 07-Sep-14 1800 Daily For Commissioning of CSD relay in Gwalior-2 reactor bay at Satna PGCIL WRTS-II C

185 220 DC Welspun - Shivlakha amp Anjar shivlakha Trl 07-Sep-14 80000 AM 07-Sep-14 60000 PM Daily

Power Line Crossing of 400 KV DC Bhachau SS (PG) - Varsana SS (GETCO) TrL

GETCO WR-II C

186 765 Bilaspur 1 Tie bay (711) at Seoni 08-Sep-14 800 09-Sep-14 1800 Daily AMP works WRTS-I WRTS-I R

187 400kV Bus-1 at Itarsi SS 08-Sep-14 800 08-Sep-14 1800 Daily AMP amp Protection testing WRTS-II WRTS-II R

188 765 Seoni2 Main Bay (707) at Bilaspur Ss 08-Sep-14 900 08-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

189 765 Bina-Jabalpur II 08-Sep-14 0900 09-Sep-14 1800 Daily Post Commissioning check of Fire-Fighting system at Bina PGCIL WRTS-II C

190 765 ICT 1 at Jabalpur Pooling Station 08-Sep-14 100000 AM 08-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

191 765 Gwalior-Bina3 08-Sep-14 800 09-Sep-14 1800 Daily For spare reactor commissioning works at Gwalior PGCIL WRTS-II C

192 400 V-satna-1 08-Sep-14 900 09-Sep-14 1900 Continuous

Major OH of Line Circuit Breaker (For dismantling of poles) NTPC NTPC

193

220 220 KV Jhanor- Haldrwa Line 2

08-Sep-14

800

12-Sep-14

000

Continous Replacement of existing CTCVT with 02 class CT amp CVT and for testing of the same NTPC NTPC

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

194 400 Vadavi- Kansari- 1 09-Sep-14 800 09-Sep-14 1800 Daily PMM WORK WRTGPL GETCO195 400 Bus-1 at Damoh 09-Sep-14 1000 10-Sep-14 1800 Daily AMP PGCIL WRTS-II R

196 765 Bus Reactor 1 at Jabalpur Pooling Station 09-Sep-14 100000 AM 09-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

197 400 Bina - Shujalpur 1 09-Sep-14 1000 09-Sep-14 1400 Daily AMP PGCIL WRTS-II C

198 400 400 kv Katni- Damoh ckt 09-Sep-14 800 09-Sep-14 09092014 1800 daily Maintenance Work PGCIL EHT-

Mamp I

199 220 220 KV OMKARESHWAR -KHANDWA 09-Sep-14 900 09-Sep-14 09092014 1600 daily Maintenan

ce Work PGCIL EHT- Mamp I

200 220 220KV MALANPUR -AURAIYA 09-Sep-14 900 09-Sep-14 09092014 1700 daily Maintenance Work

EHT- Mamp I

201400 Korba 400 KV Bus coupler -1

09-Sep-14 900 10-Sep-14 19002 days

continuous Annual maintenance and testing

NTPC NTPC

202 400kV Bus-2 at Itarsi SS 10-Sep-14 800 10-Sep-14 1800 Daily AMP amp Protection testing WRTS-II WRTS-II R203 400 400220KV ICT-2 at Seoni 10-Sep-14 800 11-Sep-14 1800 Conti OLTC overhauling works WRTS-I WRTS-I R

204 400 VAPI-BOISAR 10-Sep-14 800 11-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

205 400 Parli 2 Tie Bay (417) at Solapur 10-Sep-14 900 10-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

206 765 330 MVAR Bus Rector-1 at Dharamjaygarh 10-Sep-14 800 11-Sep-14 1700 DAILY CSD relay commissioning in main

bay WRTS-I PGCIL C

207 765 ICT3 Tie Bay (717) at Bilaspur 10 S 14 9 00 10 S 14 18 00 DAILY F AMP k WRTS I PGCIL R207 765 ICT3 Tie Bay (717) at Bilaspur Ss 10-Sep-14 900 10-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

208 765 765kV Dharamjaygarh - Ranchi-2 l 10-Sep-14 900 15-Sep-14 1800 continous

For strining Jumpering of parallel ckt and Crossing of 765kV Dharamjaygarh-Jabalpur line

WRTS-I PGCIL C

209 765 ICT 2 at Jabalpur Pooling Station 10-Sep-14 100000 AM 10-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

210 400 Shujalpur-Nagda 1 10-Sep-14 1000 10-Sep-14 1400 Daily AMP PGCIL WRTS-II C211 400 Vadavi- Kansari- 2 10-Sep-14 800 10-Sep-14 1800 Daily PMM WORK WRTGPL GETCO

212 400 400 kv ISP - Nagda ckt 10-Sep-14 900 10-Sep-14 10092014 1800 daily Maintenance Work

EHT- Mamp I

213 220 220KV MALANPUR -AURAIYA 10-Sep-14 900 10-Sep-14 10092014 1700 daily Maintenance Work

EHT- Mamp I

214 220 220 KV DAMOH PGCIL IC - I 10-Sep-14 800 10-Sep-14 10092014 1800 daily Maintenance Work PGCIL EHT-

Mamp I

215765KV400K

VSipat 765KV400KV ICT-1 10-Sep-14 900 11-Sep-14

1900 Continous Annual Preventive maintenance NTPC NTPC216 400 New Koyna-Dabhol ckt 1 10-Sep-14 830 10-Sep-14 1730 Daily QMwork MSETCL MSETCL217 400 Akola-Aurangabad ckt 1 10-Sep-14 830 10-Sep-14 1730 Daily QMwork MSETCL MSETCL

218 400 TARAPUR-PADGHE I 11-Sep-14 800 12-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

219 400 ICT 2 Main Bay (409) at Mapusa 11-Sep-14 900 11-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

220 765 Korba LR (716 LR) at Bilaspur Ss 11-Sep-14 900 11-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

221 220 Bus-1 at Damoh 11-Sep-14 1000 12-Sep-14 1800 Daily AMP PGCIL WRTS-II R

222 765 Bus Reactor 2 at Jabalpur Pooling Station 11-Sep-14 100000 AM 11-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

223 220MC Bhimasar - Lalpar Bhimasar -Morbi amp Bhimasar - Mansar (on same tower)

11-Sep-14 80000 AM 11-Sep-14 60000 PM DailyPower Line Crossing of 400 KV DC Bhachau SS (PG) - Varsana SS (GETCO) TrL

GETCO WR-II C

224 220 Navsari - Dastan- 1 11-Sep-14 800 12-Sep-14 1800 Daily PMM WORK PGCIL GETCO

225 400 400 kv Rajgarh Pgcil - SSP CKT I 11-Sep-14 900 11-Sep-14 11092014 1800 daily Maintenance Work PGCIL EHT-

Mamp I

226 220 220K KV MEHGAON - AURAIYA 11-Sep-14 900 11-Sep-14 11092014 1700 daily Maintenance Work

EHT- Mamp I

227400 Korba Lanco

11-Sep-14 900 12-Sep-14 19002 days

continuous Annual maintenance and testing

NTPC NTPC

228 400 Lonikand II-Lonikand I 11-Sep-14 900 11-Sep-14 1700 Daily QMwork MSETCL MSETCL

229 400 Parali-Lonikand II ckt 2 11-Sep-14 900 11-Sep-14 1700 Daily QMwork MSETCL MSETCL

230 400 Waluj-Bableshwer 11-Sep-14 900 11-Sep-14 1700 Daily QMwork MSETCL MSETCL

231 400 Tie Transformer-II NTPC-Korba 11-Sep-14 900 12-Sep-14 1700 Maintenance NTPC NTPC

232 400kV Sipat-Raipur-2 12-Sep-14 000 12-Sep-14 1700 Daily Attending hot spots and SD nature defects WRTS-I PGCIL R

233 400 400220 ICT 1 AT WARDHA 12 Sep 14 9 00 12 Sep 14 15 00 Dail For B shing oil DGA Testing WRTS I WRTS I R233 400 400220 ICT-1 AT WARDHA 12-Sep-14 900 12-Sep-14 1500 Daily For Bushing oil DGA Testing WRTS-I WRTS-I R

234 400 Khandwa-Dhule 2 line reactor at Dhule 12-Sep-14 800 12-Sep-14 1800 Daily For Bushing oil DGA Testing

Line in service wo reactor WRTS-I WRTS-I R

235 400 BUS I AT MAPUSA 12-Sep-14 900 12-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

236 765 JBP - Dharmjaygarh Reactor Line 1 Reactor at Jabalpur Pooling Station

12-Sep-14 100000 AM 12-Sep-14 60000 PM Daily Installation amp Commissioning of CSD Relay PGCIL WRTS-II C

237 400 400 kv Rajgarh Pgcil - SSP CKT II 12-Sep-14 900 12-Sep-14 12092014 1800 daily Maintenan

ce Work PGCIL EHT- Mamp I

238 400 400 kv Indore - Nagda ckt 12-Sep-14 900 12-Sep-14 12092014 1800 daily Maintenance Work

EHT- Mamp I

239 220 220K KV MEHGAON - AURAIYA 12-Sep-14 900 12-Sep-14 12092014 1700 daily Maintenance Work

EHT- Mamp I

240 400 Lonikand-Stage IV 12-Sep-14 900 12-Sep-14 1700 Daily QMwork MSETCL MSETCL

241 400 Aurangabad(PG)-Aurangabad (Waluj)-1 12-Sep-14 800 15-Sep-14 1800 Conti Augmentation works at MSETCL

Waluj 400kV SSWRTS-I WRTS-I C

242 400 TARAPUR-PADGHE I 13-Sep-14 800 14-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

243 400 Karad-Lonikand 13-Sep-14 900 13-Sep-14 1700 Daily QMwork MSETCL MSETCL

244 400kV Sipat-Raipur-1 13-Sep-14 000 13-Sep-14 1700 Daily Attending hot spots and SD nature defects WRTS-I PGCIL R

245 400 BOISAR-PADGHE 13-Sep-14 800 14-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

246 400 400220 ICT-2 AT WARDHA 13-Sep-14 900 13-Sep-14 1500 Daily For Bushing oil DGA Testing WRTS-I WRTS-I R

247 400 Khandwa-Dhule 1 line reactor at Dhule 13-Sep-14 800 13-Sep-14 1800 Daily For Bushing oil DGA Testing

Line in service wo reactor WRTS-I WRTS-I R

248 220 BUS I AT MAPUSA 13-Sep-14 900 13-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R248 220 BUS I AT MAPUSA 13-Sep-14 900 13-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

249 765 Korba Line Main Bay (716) at Bilaspur Ss 13-Sep-14 900 13-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

250 400 Dhule-Babhleswar ckt 2 13-Sep-14 900 13-Sep-14 1700 Daily QMwork MSETCL MSETCL

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

251 400 Kolhapur-Mapusa 1 13-Sep-14 800 17-Sep-14 1800 Daily Insulator replacement due to polluted streaches

WRTS-I WRTS-I R

252 400 Kolhapur-Mapusa 1 13-Sep-14 800 17-Sep-14 1800 Daily Insulator replacement due to polluted streaches

WRTS-I WRTS-I R

253 400 Bhachau - Ranchodpura DC(Subject to SLDC consent) 14-Sep-14 80000 AM 20-Sep-14 60000 PM Continuo

us

Shifting of towers to maintain clearance for SSNL canal crossing (Loc 26-33 amp 78-84)

PGCIL WRTS-II C

254 400kV Bhilai-koradi line 15-Sep-14 000 16-Sep-14 000 Daily Attending hot spots and SD nature defects WRTS-I PGCIL R

255 400 Navasari- Kala MC line 15-Sep-14 800 16-Sep-14 1800 DailyConstruction work of Navasari- Boisar line on same Multi ckt tower

WRTS-II WRTS-I C

256 400 SOLAPUR(PG)-KARAD 15-Sep-14 900 20-Sep-14 1800 Conti Tower Erection of Line Reactor gantry of Karad Line at Solapur MSETCL WRTS-I R

257 765 WARDHA-AURANGABAD(PG) 2 15-Sep-14 800 15-Sep-14 1800 Daily

For replacement of Rph reactor unit at Wardha Line in service wo reactor Taking out reactor out of service

WRTS-I WRTS-I R

258 400 Chandrapur 3 Main Bay (420) at Bhadrawati 15-Sep-14 900 15-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

259 765 Seoni1 Main Bay (704 ) at Bilaspur Ss 15-Sep-14 900 15-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL RBilaspur Ss

260 220 Kakrapar-Haldarwa1 15-Sep-14 900 15-Sep-14 1800 DailyReplacement of existing 220kV CTs with High Fault current CTs at Haldarwa SS

PGCIL WRTS-II C

261 400 SSP - Rajgarh - 1 15-Sep-14 800 17-Sep-14 1800 Daily PMM WORK PGCIL GETCO

262

220 Jhanor 220 KV Bus1

15-Sep-14

800

16-Sep-14

000

Continous Replacement of existing CTCVT with 02 class CT amp CVT and for testing of the same NTPC NTPC

263 400 BOISAR-PADGHE 16-Sep-14 800 17-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

264 400 Chandrapur 3Tie Bay (421) at Bhadrawati 16-Sep-14 900 16-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

265 400 Indore-Asoj2 16-Sep-14 80000 AM 16-Sep-14 60000 PM Daily Replacement of broken insulators PGCIL WRTS-II R

266 765 Sasan-Satna2 16-Sep-14 900 17-Sep-14 1800 Daily Power line crossing for stringing of of 765Kv Vin pool- satna ck2 PGCIL WRTS-II C

267 400 315MVA ICT1 at Shujalpur 16-Sep-14 1000 16-Sep-14 1400 Daily AMP PGCIL WRTS-II R

268 220 Kakrapar-Haldarwa2 16-Sep-14 900 16-Sep-14 1800 DailyReplacement of existing 220kV CTs with High Fault current CTs at Haldarwa SS

PGCIL WRTS-II C

269 220 220 KV PITHAMPUR - RAJGARH PG CKT - I 16-Sep-14 900 16-Sep-14 16092014 1600 daily Maintenan

ce Work PGCIL EHT- Mamp I

270 400 V-satna-1 16-Sep-14 900 16-Sep-14 1900 Daily basis For erection of Breaker after OH NTPC NTPC

Construction work of Navasari- 271 400 Vapi- Kala MC Line 17-Sep-14 800 18-Sep-14 1800 Daily Boisar line on same Multi ckt

towerWRTS-II WRTS-I C

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

272 400 HVDC IBay (403) at Bhadrawati 17-Sep-14 900 17-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

273

220 Jhanor 220 KV Bus2

17-Sep-14

800

18-Sep-14

000

Continous Replacement of existing CTCVT with 02 class CT amp CVT and for testing of the same NTPC NTPC

274 400 Parli 1 Main Bay (423) at Bhadrawati 18-Sep-14 900 18-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

275 220 Kawas-Haldarwa1 18-Sep-14 900 18-Sep-14 1800 DailyReplacement of existing 220kV CTs with High Fault current CTs at Haldarwa SS

PGCIL WRTS-II C

276 400 SSP - Rajgarh - 2 18-Sep-14 800 20-Sep-14 1800 Daily PMM WORK PGCIL GETCO

277 400 400 KV Sarni - Seoni ckt 18-Sep-14 800 18-Sep-14 18092014 1800 daily Maintenance Work PGCIL EHT-

Mamp I

278 220 220 KV PITHAMPUR - RAJGARH PG CKT - II 18-Sep-14 900 18-Sep-14 18092014 1600 daily Maintenan

ce Work PGCIL EHT- Mamp I

279 220 220 KV DAMOH PG - TIKAMGARH CKT I 18-Sep-14 800 18-Sep-14 18092014 1800 daily Maintenan

ce Work PGCIL EHT- Mamp I

280 400Sipat 400KV Bay-9 (Raipur-1 Main bay) 18-Sep-14 900 19-Sep-14 1900 Continous Annual Preventive maintenance NTPC NTPC

281 400 Kolhapur-Mapusa 2 18-Sep-14 800 22-Sep-14 1800 Daily Insulator replacement due to polluted streaches

WRTS-I WRTS-I R

282 400 Khandwa 2 Tie bay (423) at 19 S 14 8 00 20 S 14 18 00 D il AMP k WRTS I WRTS I R282 400 Khandwa 2 Tie bay (423) at Seoni 19-Sep-14 800 20-Sep-14 1800 Daily AMP works WRTS-I WRTS-I R

283 400 BOISAR-PADGHE 19-Sep-14 800 20-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

284 400 Parli 1 Tie Bay (424) at Bhadrawati 19-Sep-14 900 19-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

285 220 Kawas-Haldarwa2 19-Sep-14 900 19-Sep-14 1800 DailyReplacement of existing 220kV CTs with High Fault current CTs at Haldarwa SS

PGCIL WRTS-II C

286 400 V-satna-2 19-Sep-14 900 20-Sep-14 1900 Continuous

Major OH of Line Circuit Breaker (For dismantling of poles) NTPC NTPC

287 400 Aurangabad(PG)-Aurangabad (Waluj)-2 19-Sep-14 800 22-Sep-14 1800 Conti Augmentation works at MSETCL

Waluj 400kV SSWRTS-I WRTS-I C

288 400 Parli 2 Main Bay (416) at Solapur 20-Sep-14 900 20-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

289 400 400220 ICT-3 AT MAPUSA 20-Sep-14 900 20-Sep-14 1500 Daily AMP WORKS WRTS-I WRTS-I R

Anaulagnak 33

Agast 2014 AaOr isatmbar 2014 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR AUGUST 2014 AND SEPTEMBER 2014

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)Agast 2014 isatmbar 2014 Agast 2014 isatmbar 2014

AUGUST 2014 SEPTEMBER 2014 AUGUST 2014 SEPTEMBER 2014

1 gaujarat

saIimat 12500 13900 7750 8500

AsaIimat 12540 13940 7760 8510

2 maQya p`doSa

saIimat 6200 6500 3800 4100

AsaIimat 6250 6500 3800 4100

3 CltaIsagaZ

saIimat 3030 3199 16425195 172052635

AsaIimat 3160 3269 172031 169036025

4 maharaYT

saIimat 16050 17750 10700 10800

AsaIimat 16100 17800 10750 10850

5 gaaovaa

saIimat 410 415 290 285

AsaIimat 425 425 300 290

6 dmana dIva

saIimat 315 320 205 200

AsaIimat 320 325 210 210

7 DI ena eca

saIimat 645 640 425 420

AsaIimat 650 645 430 425

8 piScama xao~

saIimat 37614 41048 25600 26080

AsaIimat 37898 41254 26450 27900

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah jaUlaa[- 2014

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 2236 75

]k[- Ukai - 2 529 75]k[- Ukai - 3 000 0]k[- Ukai - 4 2023 75]k[- Ukai (Total) 4788 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 094 2]k[- ela baI saI eca Ukai LBCH - 2 028 2]k[- ela baI saI eca Ukai LBCH (Total) 123 1 0018

3 kDanaa Kadana - 1 699 61 0010kDanaa Kadana - 2 910 57 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 1115 62 0000kDanaa Kadana (Total) 2724 62 0010

4 pnama PANAM amp Madhuban Dam 1 amp 2 160 8 0017 6 kula jalaIya TOTAL(H) 7794 225 0390

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 3339 57 34582 TaoronT pavar ilaimaToD yauinaT DI 6957 122 64083 TaoronT pavar ilaimaToD yauinaT [- 8082 122 67664 TaoronT pavar ilaimaToD yauinaT ef 8380 124 73285 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 037511 Qauvarna tapIya Dhuvaran - GT 2 000 0 116012 Qauvarna tapIya Dhuvaran - STG 1783 10113 ]ka[- yauinaT 1 Ukai -1 000 0 019714 ]ka[- yauinaT 2 Ukai -2 000 0 019315 ]ka[- yauinaT 3 Ukai -3 10038 202 922016 ]ka[- yauinaT 4 Ukai -4 6930 202 697517 ]ka[- yauinaT 5 Ukai -5 11833 212 1138718 ]ka[- yauinaT 6 Ukai -6 30277 507 2287219 gaaMQaInagar 1 Gandhinagar - 1 000 0 008220 gaaMQaInagar 2 Gandhinagar - 2 000 0 009221 gaaMQaInagar 3 Gandhinagar - 3 6275 213 669022 gaaMQaInagar 4 Gandhinagar - 4 6060 212 706523 gaaMQaInagar 5 Gandhinagar - 5 13495 215 1331024 vaNakbaaorI 1 Wanakbori - 1 12142 209 000025 vaaNakbaaOrI 2 Wanakbori - 2 12364 21026 vaaNakbaaOrI 3 Wanakbori - 3 6669 20227 vaaNakbaaOrI 4 Wanakbori - 4 7244 21128 vaaNakbaaOrI 5 Wanakbori - 5 6198 21029 vaaNakbaaOrI 6 Wanakbori - 6 5924 21230 vaaNakbaaOrI 7 Wanakbori - 7 9489 21031 ]trna Utran GT 1 000 0 026832 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 1200 221 024735 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 819 143 1098

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

Anaulagnak 41

ACTUAL GENERATION amp AVALABILITY FOR JULY 2014Actual vaastivak

Actual vaastivak

37 isaka Sikka - 1 1326 107 179438 isaka Sikka - 2 3489 114 401539 kcC ilagnaa[-T Kutch Lignite - 1 5092 71 859040 kcC ilagnaa[-T Kutch Lignite - 2 4929 7141 kcC ilagnaa[-T Kutch Lignite - 3 000 042 kcC ilagnaa[-T Kutch Lignite - 4 2388 68 571043 saUrt ilagnaa[-T Surat Lignite - 1 8775 130 874544 saUrt ilagnaa[-T Surat Lignite - 2 3966 130 445845 saUrt ilagnaa[-T Surat Lignite - 3 5411 130 524346 saUrt ilagnaa[-T Surat Lignite - 4 8973 130 883347 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5446 103 859048 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 6057 10749 jaI Aa[- pI saI ela GIPCL GT - 1 1123 33 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1510 3251 jaI Aa[- pI saI ela GIPCL GT - 3 598 3052 jaI Aa[- pI saI ela GIPCL ST - 1 1846 4553 jaI Aa[- pI saI ela GIPCL GT - 4 357 98 000054 jaI Aa[- pI saI ela GIPCL ST - 2 186 5055 [- esa esa e Aar ESSAR GT - 1 000 0 029356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 083 146 002860 jaI pI [- saI GPEC GT - 2 148 153 023361 jaI pI [- saI GPEC GT - 3 1387 145 028462 jaI pI [- saI GPEC STG 521 7563 jaI esa [- jaI GSEG GT - 1 206 51 112164 jaI esa [- jaI GSEG GT - 2 1079 4765 jaI esa [- jaI GSEG STG 613 2466 Sugen (GT 1 + GT 2) 000 0 693867 saIpIpI sao Aayaat Imp from CPP+MUNDRA 249228 6777

kula tapIya Total (T) 511604 7860 431554kula jalaIya+tapIya Total (H+T) 519398 8078 431944ivaMD [najaI- Wind Energy 94980kula jalaIya+tapIya+hvaa Total (H+T+Wind) 614378 9539ivainamaya Exchanges 150828 saIimat jaa- maaMga Restricted Energy Req 765205

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 767 135

11 gaaMQaI saagar Gandhi Sagar 998 117 008012 raNaa p`tap sagar RPSagar 096 86 004013 javaahr sagar Jawahar Sagar 439 66 0020

2 ponca Pench 1381 160 01003 baargaI Bargi 712 33 00704 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 5724 309 02906 banasaagar Bansagar-2 (Deolondh) 104 407 banasaagar Bansagar-3 (Silpara) 565 31 00608 banasaagar Bansagar-4 (Zinaha) 425 20 00309 maoDIKoDa Medikheda 096 58

10 ibarisaMGapur Birsingpur 680 20 002011 Tavaa Tawa 000 012 rajaGaaT Rajghat 001 7 007013 Omkareshwar 4226 340 14 [Midra saagar Indira Sagar 6679 679 0598

kula jalaIya TOTAL(H) MPPGCL 19979 2031 1152

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 2223 84 179302 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 14496 216 0

Actual vaastivak

4 satpura I Satpura-I(60Share) 000 0 00005 satpura II Satpura-II Unit 6 000 0 83106 satpura II Satpura-II Unit 7 7549 1857 satpura II Satpura-II Unit 8 12446 195 173908 satpura II Satpura-II Unit 9 4038 1759 satpura III Satpura-III Unit 10 9508 219 23440

10 satpura III Satpura-III Unit 11 8675 167 2096011 esajaITIpIesa 1 SGTPS Unit - 1 8675 167 2096012 esajaITIpIesa 2 SGTPS Unit - 2 9354 16013 esajaITIpIesa 3 SGTPS Unit - 3 1129 165 1642014 esajaITIpIesa 4 SGTPS Unit - 4 6022 16015 esajaITIpIesa 5 SGTPS Unit - 5 27597 50816 SSTPS 7895 309 9910

kula tapIya Total (T) 117479 2427 115480kula jalaIya+tapIya Total (H+T) 137458 4759 116632Injection from WIND 14572 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 152030 4759ivainamaya Exchanges 271419 saIimat jaa- maaMga Rest En Req 423449

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 606 120 01102 Gangrel 039 10 00203 Mini Micro KWB 039 7

kula jalaIya TOTAL(H) CSEB 684 137 0520tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 40 125902 kaorbaa (pU) Korba (E) Unit-2 2764 383 kaorbaa (pU) Korba (E) Unit-3 2764 384 kaorbaa (pU) Korba (E) Unit-4 2784 405 kaorbaa (pU) Korba (E) Unit -5 3685 120 244406 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 154608 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 24740

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 13343 243 1124012 KORBA(EB) Extn - 2 14104 248 11250

kula tapIya Total (T) 119955 1644 10189013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 119955 1644kula jalaIya+tapIya Total (H+T) 120639 1781 102410ivainamaya Exchanges 59759 0saIimat jaa- maaMga Rest En Req 180398 1781

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 5228 585 06952 kaoyanaa III Koyna III 3695 3203 kaoyanaa IV Koyna IV 371 11204 kaoyanaa DIpIeca Koyna DPH 414 385 TaTa jalaIya TATA Hydro 10123 741 44976 vaOtrNaa Vaitarna 1151 617 eladarI Eldari 000 168 BaTgar AaOr vaIr Bhatgar amp Vir 036 49 pOzana Paithan 976 49

10 itlaarI Tillari 1036 6511 BaIra Tola rosa Bhira Tail Race 846 4112 GaTGar Ghatghar 3639 25013 Anya CaoTo jalaIya Small Hydro (others) 1041 0

kula jalaIya TOTAL(H) 28404 -1073 5192

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL

Actual vaastivak

3 naaisak 3 Nasik Unit -3 4157 1954 naaisak 4 Nasik Unit -4 12489 1985 naaisak 5 Nasik Unit -5 12480 2006 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 30718 5038 Tambao 6 Trombay Unit -6 6619 5009 Tambao 8 Trombay Unit -8 000 0

10 Tambao 7A gaOsa Trombay -7A (Gas) 7476 127 288611 Tambao 7ba Trombay -7B (WHR) 4373 6912 kaoraDI 5 Koradi Unit -5 000 013 kaoraDI 6 Koradi Unit -6 8448 16714 kaoraDI 7 Koradi Unit -7 10994 19415 Bausaavala 2 Bhusawal Unit -2 4715 16516 Bausaavala 3 Bhusawal Unit -3 6454 16517 Bausaavala 4 Bhusawal Unit -4 20419 50518 Bausaavala 4 Bhusawal Unit -5 23286 43519 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 000 021 parlaI 5 Parli Unit -5 9315 17522 parlaI 6 Parli Unit -6 14237 25323 parlaI 7 Parli Unit -7 14028 25024 KaprKoDa 1 Khaperkheda Unit -1 8108 20025 KaprKoDa 2 Khaperkheda Unit -2 10924 19026 KaprKoDa 3 Khaperkheda Unit -3 7917 20627 KaprKoDa 4 Khaperkheda Unit -4 10446 21028 KaprKoDa 5 Khaperkheda Unit -5 24555 50030 parsa Paras-3 11676 21831 parsa Paras-4 10326 24032 ]rna Uran (Gas) 18771 40133 ]rna Uran (WHR) 10760 138 586234 caMd`pur 1 Chandrapur Unit -1 7526 16535 caMd`pur 2 Chandrapur Unit -2 9375 19936 caMd`pur 3 Chandrapur Unit -3 8728 20037 caMd`pur 4 Chandrapur Unit - 4 12276 47038 caMd`pur 5 Chandrapur Unit -5 29203 41039 caMd`pur 6 Chandrapur Unit -6 26351 040 caMd`pur 7 Chandrapur Unit -7 000 041 DhaNaU 1 Dahanu Unit-1 16882 250 1563042 DhaNaU 2 Dahanu Unit-2 19263 250 1660143 CPP 258820 41160044 RGPPL Share 000 0

kula tapIya Total (T) 692115 14094 350211MAH Wind + Solar Generation 110432 0kula jalaIya +tapIya Total (H+T+Wind) 830951 16176 396382

TOTAivainamaya Exchanges 274116saIimat jaa- maaMga Rest En Req 1105066

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1173 17ivainamaya Exchanges 33083saIimat jaa- maaMga Rest En Req 34256 459

C (F) dmana AaOr dIva DAMAN amp DIU 17467 298ja (G) dadra nagar hvaolaI DNH 43779 673

kula DD ampDNH (T) 61246 970

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 9731 160 1564312 tara`pur 2 TAPS Unit -2 11531 16013 tara`pur 3 TAPS Unit -3 40214 545 7288014 tara`pur 4 TAPS Unit -4 39284 53715 kakrapr 1 KAPS Unit -1 16048 545 3195016 kakrapr 2 KAPS Unit -2 14903 537

kula ena pI saI NPC Total 131710 24842 ena TI pI saI NTPC

Actual vaastivak

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15236 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14181 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14568 214 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 000 025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 32338 51326 kaorbaa esaTIpIesa 6 KSTPS Unit-6 33493 51427 kaorbaa esaTIpIesa 7 KSTPS Unit-7 30558 516

kula kaorbaa KSTPS Total 140373 2548 9318427 ivanQa esaTIpIesa 1 VSTPS Unit-1 13430 21528 ivanQa esaTIpIesa 2 VSTPS Unit-2 11930 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 13695 212210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14017 214211 ivanQa esaTIpIesa 5 VSTPS Unit-5 11952 215212 ivanQa esaTIpIesa 6 VSTPS Unit-6 8991 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 32786 515214 ivanQa esaTIpIesa 8 VSTPS Unit-8 19668 514215 ivanQa esaTIpIesa 9 VSTPS Unit-9 31796 516216 ivanQa esaTIpIesa 10 VSTPS Unit-10 31597 515217 ivanQa esaTIpIesa 11 VSTPS Unit-11 13881 512

kula ivanQayaacala VSTPS Total 233445 REF 16238 31 saIpt -1 -SIPAT-1 38555 66600 32 saIpt -2 -SIPAT-2 16033 66500 33 saIpt -3 -SIPAT-3 43240 66800 34 saIpt -4 -SIPAT-4 25865 51200 35 saIpt -5 SIPAT-5 33302 51500

kula saIpt -SIPAT TOTAL 156995 280100 920541 kvaasa gaOsa 1e Kawas GT-1A 2605 10442 kvaasa gaOsa 1baI Kawas GT-1B 4355 10643 kvaasa esaTI 1saI Kawas ST-1C 3365 11744 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 044 9846 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 10369 309 245151 gaMQaar gaOsa 1 Gandhar GT-1 2177 14352 gaMQaar gaOsa 2 Gandhar GT-2 3014 14553 gaMQaar gaOsa 3 Gandhar GT-3 5333 14754 gaMQaar esaTI 4 Gandhar ST-4 5586 158

kula gaMQaar GGPS Total 16109 437 475161 maaOda 1 Mauda -1 5368 514 000062 maaOda 2 Mauda -2 16240 513 0000

kula maaOda MAUDA Total 21608 756 2258161 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 000 31 000071 esa esa pI SSP RBPH - 1 1265 18872 esa esa pI SSP RBPH - 2 1102 18673 esa esa pI SSP RBPH - 3 1197 18774 esa esa pI SSP RBPH - 4 1116 18675 esa esa pI SSP RBPH - 5 1432 18676 esa esa pI SSP RBPH - 6 1653 18677 esa esa pI SSP CHPH - 1 422 3578 esa esa pI SSP CHPH - 2 384 3079 esa esa pI SSP CHPH - 3 179 34710 esa esa pI SSP CHPH - 4 1012 36711 esa esa pI SSP CHPH - 5 340 30

kula esa esa pI SSP Total 10101 1283 101081 kula poMca Pench Total 1381 160 010082 Jindal Injection 50805 083 Amarkantak Lanco 16857 0

(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2508924

(J) ]plabQata Availability 2439102 naoT ivainamaya Net Exchanges -311541 ]plabQa jaa- Energy Availability 2127561

maah jaUlaa[- 2014 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR JULY 2014 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 13833 - - - 13833 070714 1500 4972

saIimat Restricted 12500

AsaIimat Unrestricted 12540 13833 0 136 0 13969 070714 1500 4972

nyaUnatma pMjaIkRt maaMga Min Registered Demand 7617 7617 250714 0400 4999

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 7090 - - - 7090 020714 2015 4985

saIimat Restricted 6040

AsaIimat Unrestricted 6040 7090 0 31 0 7121 020714 2015 4985

nyaUnatma pMjaIkRt maaMga Min Registered Demand 3895 3895 230714 1500

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3118 3118 050714 2100 4985

saIimat Restricted 3150

AsaIimat Unrestricted 3250 2972 41792 24 0 3414 030714 2000 4977

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1336 1336 220714 1300 4995

maharaYT MAHARASHTRApMjaIkRt Registered 19283 - - - 19283 010714 1600 4994

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19283 62 40 0 19385 010714 1600 4994

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11936 11936 300714 0500 5000

gaaovaa GOApMjaIkRt Registered 405 459 - - 459 260714 2000 4967

AsaIimat Unrestricted 405 459 0 5 - 464 260714 2000 4967

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 532 - - 532 290714 0900 4998

AsaIimat Unrestricted 532 0 0 - 532 290714 0900 4998

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 287 - - 287 060714 1000 4991

AsaIimat Unrestricted 287 0 1 - 288 060714 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 721 - - 721 050714 1700 4983

AsaIimat Unrestricted 721 0 - 721 050714 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 400 435 290714

piScama xao~ WESTERN REGIONpMjaIkRt Registered 43034 - - - 43034 010714 1600 4994

saIimat Restricted 40703

AsaIimat Unrestricted 40905 43034 295 90 0 43419 010714 1600 4994

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28431 28431 240714 0500 5000 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

माह जलाई 2014Jul-14

अनब समातरवतीय चालन PARALLELRADIAL OPERATION TOTAL OPERATING HOURS

1 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-NR)

2 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-SR) 7424400

टाई लाईन TIE LINE

1 765 कवी िसवनी स वधा-I 765kV Soni to Wardha 6780100

2 765 कवी िसवनी स वधा-II 765kV Seoni to Wardha 2043700

3 400 कवी िभलाई स कोराड 400kV Bhilai to Koradi 7440000

4 400 कवी िभलाई स भिावती 400kV Bhilai to Bhadravati 7440000

5 400 कवी रायपर स भिावती -I 400kV Raipur to Bhadravati-I 7440000

6 400 कवी रायपर स भिावती ndashII 400kV Raipur to Bhadravati-II 7440000

7 400 कवी रायपर स भिावती ndashIII 400kV Raipur to Bhadravati-III 7440000

8 400 कवी सातपरा स कोराड 400kV Satpura to Koradi 7060200

9 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7440000

10 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 7440000

11 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7225100

12 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 7082500

13 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 5361200

14 400 कवी को हापर स मापसा-I 400kV Kolhapur-Mapusa-I 4561600

15 400 कवी को हापर स मापसा-II 400kV Kolhapur-Mapusa-II 4793700

16 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7440000

17 400 कवी रायगढ़ स ःटरलाइट-I 400kV Raigarh to Sterlight-I 7371100

18 400 कवी रायगढ़ स ःटरलाइट-II 400kV Raigarh to Sterlight -II 7440000

19 400 कवी रायगढ़ स झरसगड़ा-I 400kV Raigarh to Jharsuguda-I 7302900

20 400 कवी रायगढ़ स झरसगड़ा-II 400kV Raigarh to Jharsuguda-II 7303700

21 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 5400900

22 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7292200

23 400 कवी रायपर स वधाndashI 400kV Raipur to Wardha-I 7440000

24 400 कवी रायपर स वधाndashII 400kV Raipur to Wardha-II 7440000

25 220 कवी कोरबा पव स ब पादर-III 220kV K(E) to Budhipadar-III 7361200

ANNEXURE 43

maah jaUlaa[- 2014 ko daOrana pa~ta iSaDyaUla GaTkaoM Wara koMd`Iya xao~ ko sToSanaaoMM sao D`avala AaOr ivainamayaaoM ka ivavarNa

1 koMd`Iya sToSanaaoMM samaip-t koMd`Iya sToSanaoMa saMyaut inajaI sToSanaaoM kI GaaoiYat xamata (basa pr) AaOr laaBaaiqa-yaaMo kI pa~ta1 Declared Capcity (ex-bus) of Central Gen StnsDedicated CG StnsJointly owned Stns amp entitlement of beneficieries (MUs)

GaaoiYat xamata gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI + ecaDblyaubaI kula

(A) koMd`Iya ibajalaIGar A Central Gen Stns Dec Cap GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC+HWB TOTAL

kaorbaa esaTIpIesa Korba STPS 1017635 174452 237891 103616 324281 102699 23918 26164 1017635kaorbaa esaTIpIesa -III Korba STPS-III 283431 54419 44422 85553 76649 3066 3405 13029 283431ivanQa esaTIpIesa I Vindhyachal STPS-I 674012 123034 240046 1253 246970 19644 7141 23669 12255 674012ivanQa esaTIpIesa II Vindhyachal STPS-II 491154 117386 158375 0909 175903 6532 4569 16539 491154ivanQa esaTIpIesa III Vindhyachal STPS-III 627679 166963 156579 67068 186511 7093 7097 22387 627679ivanQa esaTIpIesa IV Vindhyachal STPS-IV 411100 98631 118464 26475 133406 5356 5241 19338 411100kvaasa gaOsa Kawas GPP 306920 87464 65557 0000 95562 5791 14520 37998 306920gaMQaar gaOsa Gandhar GPP 406294 146476 72428 0000 123833 7814 19389 36310 406294saIpt Sipat 1665864 454494 301337 266370 509047 19436 19662 68224 1665864kakrapar Kakrapar APS 275783 78347 69731 0000 94368 9698 5200 8018 10420 275783tara`pur 3 AaOr 4 Tarapur APS 3amp4 721903 183150 155921 32084 295823 8510 8953 31049 721903

(ba) samaip-t koMd`Iya ibajalaIGar B Dedicated CG Stations Actual injection vaasaivak [njaoSana [Midra saagar Indira Sagar 245570 245570 245570

(sa) saMyaut inajaI sToSana C Jointly owned Stationstara`pur 1 AaOr 2 Tarapur APS 1amp2 196640 98320 0000 0000 98320 0000 0000 0000 196640esaesapI SSP 97965 15674 55840 0000 26450 0000 0000 0000 97965ponca Pench 13620 9080 0000 4540 0000 0000 0000 13620

kula ([M saagar kao CaoD kr) Total (excl Indira Sagar) 11988065 2808880 2297269 640720 3692105 208667 173093 400816 1766516 11988065 Actual injection

2 koMd`Iya sToSanaaoMM samaip-t koMd`Iya sToSanaoMa saMyaut inajaI sToSanaaoM kI ]padna SaoDyaUla AaOr laaBaaiqa-yaaoM kI D`avala SaoDyaUla2 Generation Schedule (ex-bus) of Central Gen StationsDedicated CG StationsJointly owned Stations amp schedule of benificieries (MUs)

SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI+ ecaDblyaubaI kula

(A) koMd`Iya ibajalaIGar A Central Gen Stns Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH

HVDC+HWB Outside region(NR

amp SR) TOTALkaorbaa esaTIpIesa Korba STPS 1015070 174452 238276 103310 321801 102699 23918 26164 1015070kaorbaa esaTIpIesa -III $ Korba STPS-III $ 282671 54342 44422 85185 76334 3066 3405 13029 282671ivanQa esaTIpIesa I Vindhyachal STPS-I 660248 120064 239050 1253 237415 19644 7141 23473 12209 660248ivanQa esaTIpIesa II Vindhyachal STPS-II 488287 117160 156978 0909 174700 6532 4569 16539 488287ivanQa esaTIpIesa III Vindhyachal STPS- III 600504 134916 160349 67878 186319 7093 7227 22827 600504ivanQa esaTIpIesa IV Vindhyachal STPS- IV 409072 98719 118259 24888 133048 5356 5241 19374 409072kvaasa gaOsa Kawas GPP 99574 27083 25459 0000 23510 2678 5916 14915 0000 99574gaMQaar gaOsa Gandhar GPP 154677 55634 30257 0000 41633 3783 8217 15131 0000 154677saIpt Sipat 1448506 290983 323024 258111 436177 19418 23860 69790 1448506kakrapar Kakrapar APS 275783 78347 69731 0000 94368 9698 5200 8018 10420 275783tara`pur 3 AaOr 4 Tarapur APS 3amp4 721903 183150 155921 32084 295823 8510 8953 31049 721903

(ba) samaip-t koMd`Iya ibajalaIGar B Dedicated CG Stations[Midra saagar Indira Sagar 245570 245570 245570

RPPC(NVVNL) 0000

0000

0000

(sa) saMyaut inajaI sToSana C Jointly owned Stations Actual injection vaasaivak [njaoSana tara`pur 1 AaOr 2 Tarapur APS 1amp2 196640 98320 0000 0000 98320 0000 0000 0000 196640esaesapI SSP 97965 15674 55840 0000 26450 0000 0000 0000 97965ponca Pench 13620 0000 9080 0000 4540 0000 0000 0000 13620kula [M saagar kao CaoD kr Total (excl Ind Sagar) 10173905 2352674 2217883 625946 2591731 193349 149578 336130 1706614 10173905

Actual injectionNote- $ These Scheduled Transactions are done by WRLDC under STOA

3 AMtrxao~Iya ivainamayaaoM iWpxaIya ivanamayaaoM kI SaoDyaUla (ima yauinaTsa)3 Schedule for interregional exchangesbilateral exchanges (MUs)

SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kulaxao~ rajya RegionState Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL

k pUvaI- xao~ ko rasto Import SDLs through ER -110482Aayaat SaoDyaUla Indian Energy Exchange (WR to ER) 0000 0000 0000 0000 0000 0000 0000 139465

Power Exchange of India (ER to WR) 0000 0000 0000 0000 0000 0000 0000 3671ER (NTPC) 47912 28298 11592 52018 0000 0786 1209 93903

DVC to MPPTCL (Long Term Open Access) 0000 201316 0000 0000 0000 0000 0000 201316Hirakud to CSEB 0000 0000 1354 0000 0000 0000 0000 1354

APL2 GUVNL to APPCC ( AEL) -0918 0000 0000 0000 0000 0000 0000 -0918APL3 GUVNL to APPCC ( AEL) -0924 0000 0000 0000 0000 0000 0000 -0924

CSEB to APPCC ( NVVNL) 0000 0000 -44813 0000 0000 0000 0000 -44813DBPOWER to APPCC ( GMRETL) 0000 0000 -1828 0000 0000 0000 0000 -1828

JPL to APPCC ( KISPL) 0000 0000 -15225 0000 0000 0000 0000 -15225JPL-II to APPCC ( KISPL) 0000 0000 -11376 0000 0000 0000 0000 -11376

Anaulagnak 45

DETAILS OF ENTITLEMENTSCHEDULEDRAWAL BY THE CONSTITUENTS FROM CENTRAL SECTOR STATIONS AND EXCHANGES FOR THE MONTH OF JULY 2014

(pxaoivasa` Wara jaarI xao~Iya jaa- laoKa ko AaQaar pr)

13896KAWAS(RLNG)

GANDHAR(RLNG)

JPL-II to APPCC ( NVVNL) 0000 0000 -11414 0000 0000 0000 0000 -11414JPL-II to APPCC ( PTC LTD) 0000 0000 -14853 0000 0000 0000 0000 -14853

CSEB to ASEB ( PTC LTD) 0000 0000 -0575 0000 0000 0000 0000 -0575MPPMCL MPSEB to ASEB ( IEXL) 0000 -0575 0000 0000 0000 0000 0000 -0575

APL1 GUVNL to BIHAR ( AEL) -106185 0000 0000 0000 0000 0000 0000 -106185APL2 GUVNL to BIHAR ( AEL) -72520 0000 0000 0000 0000 0000 0000 -72520APL3 GUVNL to BIHAR ( AEL) -51827 0000 0000 0000 0000 0000 0000 -51827

DBPOWER to BIHAR ( MANIKARAN) 0000 0000 -0350 0000 0000 0000 0000 -0350EMCO to BIHAR ( PXIL) 0000 0000 0000 -0413 0000 0000 0000 -0413

GUVNL to BIHAR ( PXIL) -0200 0000 0000 0000 0000 0000 0000 -0200MSEB to BIHAR ( PXIL) 0000 0000 0000 -0100 0000 0000 0000 -0100

MPPMCL MPSEB to BIHAR ( PXIL) 0000 -0150 0000 0000 0000 0000 0000 -0150GUVNL to BESCOM ( GUVNL) -14041 0000 0000 0000 0000 0000 0000 -14041

ESSAR_MAHAN to BESCOM ( ESSAR_MAHAN) 0000 -4353 0000 0000 0000 0000 0000 -4353ADHUNIK to BALCO ( BALCO) 0000 0000 0064 0000 0000 0000 0000 0064

ADHUNIK to BALCO ( MANIKARAN) 0000 0000 7200 0000 0000 0000 0000 7200JSEB(ER) to BALCO ( MPPL) 0000 0000 1481 0000 0000 0000 0000 1481

JSEB(ER) to BALCO ( MANIKARAN) 0000 0000 1200 0000 0000 0000 0000 1200JITPL to BALCO ( BALCO) 0000 0000 1200 0000 0000 0000 0000 1200

STERLITE to BALCO ( BALCO) 0000 0000 18603 0000 0000 0000 0000 18603JSEB(ER) to ESIL_WR ( MPPL) 0600 0000 0000 0000 0000 0000 0000 0600STERLITE to ESIL_WR ( PXIL) 1900 0000 0000 0000 0000 0000 0000 1900

NSPCL to SAIL ROURKELA ( SAIL ROURKELA) 0000 0000 -23994 0000 0000 0000 0000 -23994APL2 GUVNL to TGPCC ( AEL) -1074 0000 0000 0000 0000 0000 0000 -1074APL3 GUVNL to TGPCC ( AEL) -1081 0000 0000 0000 0000 0000 0000 -1081

CSEB to TGPCC ( NVVNL) 0000 0000 -52359 0000 0000 0000 0000 -52359JPL to TGPCC ( KISPL) 0000 0000 -17792 0000 0000 0000 0000 -17792

JPL-II to TGPCC ( KISPL) 0000 0000 -13295 0000 0000 0000 0000 -13295JPL-II to TGPCC ( NVVNL) 0000 0000 -13342 0000 0000 0000 0000 -13342

JPL-II to TGPCC ( PTC LTD) 0000 0000 -17335 0000 0000 0000 0000 -17335TISCO to VFL MPSEB ( TPTCL) 0000 0000 0268 0000 0000 0000 0000 0268

BLAPPL MPSEB to WBSEB ( IEXL) 0000 -0016 0000 0000 0000 0000 0000 -0016DBPOWER to WBSEB ( PTC LTD) 0000 0000 -0595 0000 0000 0000 0000 -0595

MPPMCL MPSEB to WBSEB ( PTC LTD) 0000 -89184 0000 0000 0000 0000 0000 -89184

SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kulaxao~ rajya RegionState Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL

K dixaNa xao~ ko rasto Import SDLs through SR 10967

Aayaat SaoDyaUla Indian Energy Exchange (SR to WR) 0000 0000 0000 0000 0000 0000 0000 0169Power Exchange of India (SR to WR) 0000 0000 0000 0000 0000 0000 0000 0000RSTPS-SR to GOA ( BILATERAL) 0000 0000 0000 0000 2186 0000 0000 2186RSTPS-SR to GOA ( WHEELING) 0000 0000 0000 0000 3118 0000 0000 3118

RSTPS-SR to GOA ( WHEELING GOA) 0000 0000 0000 0000 5494 0000 0000 5494

ga ]trI xao~ ko rasto Import SDLs through NR -321127Aayaat SaoDyaUla Indian Energy Exchange (NR to WR) 0000 0000 0000 0000 0000 0000 0000 -164961

Power Exchange of India (NR to WR) 0000 0000 0000 0000 0000 0000 0000 -3367Rihand (Hydro) to MPPTCL (Long Term Open Access) 0000 7970 0000 0000 0000 0000 0000 7970

Matathilla (Hydro) to MPPTCL (Long Term Open Access) 0000 0000 0000 0000 0000 0000 0000 0000EMCO to BIHAR ( PXIL) 0000 0000 0000 -0188 0000 0000 0000 -0188MSEB to BIHAR ( IEXL) 0000 0000 0000 -0400 0000 0000 0000 -0400

MPPMCL MPSEB to BSES_RAJ ( MPPL) 0000 -7000 0000 0000 0000 0000 0000 -7000ADHUNIK to BALCO ( MANIKARAN) 0000 0000 5198 0000 0000 0000 0000 5198

HIMACHAL to ESIL_WR ( IEXL) 0050 0000 0000 0000 0000 0000 0000 0050HARIYANA to ESIL_WR ( IEXL) 1525 0000 0000 0000 0000 0000 0000 1525HARIYANA to ESIL_WR ( PXIL) 5610 0000 0000 0000 0000 0000 0000 5610

KWHEPS to ESIL_WR ( PXIL) 0150 0000 0000 0000 0000 0000 0000 0150SCL to ESIL_WR ( IEXL) 0610 0000 0000 0000 0000 0000 0000 0610SCL to ESIL_WR ( PXIL) 0090 0000 0000 0000 0000 0000 0000 0090

MPPMCL MPSEB to HARIYANA ( HARIYANA) 0000 -126636 0000 0000 0000 0000 0000 -126636SCL to HRJIL MSEB ( SCL) 0000 0000 0000 1993 0000 0000 0000 1993

APL3 GUVNL to JVVNL-NR ( IEXL) -0120 0000 0000 0000 0000 0000 0000 -0120APL3 GUVNL to JVVNL-NR ( PXIL) -0122 0000 0000 0000 0000 0000 0000 -0122

BLAPPL MPSEB to JVVNL-NR ( IEXL) 0000 -0250 0000 0000 0000 0000 0000 -0250EMCO to JVVNL-NR ( IEXL) 0000 0000 0000 -0720 0000 0000 0000 -0720MSEB to JVVNL-NR ( PXIL) 0000 0000 0000 -0300 0000 0000 0000 -0300

MPSEB to NDPL(DTL)-NR ( PTC LTD) 0000 -1626 0000 0000 0000 0000 0000 -1626MPPMCL MPSEB to NDPL(DTL)-NR ( PTC LTD) 0000 -35052 0000 0000 0000 0000 0000 -35052

MPPMCL MPSEB to RPPC ( RPPC) 0000 -3562 0000 0000 0000 0000 0000 -3562EMCO to TRIPURA ( IEXL) 0000 0000 0000 -0070 0000 0000 0000 -0070

ADHPL to TORRAHM GUVNL ( IEXL) 0051 0000 0000 0000 0000 0000 0000 0051

Ga iWpxaIya SaoDyaUlsa Exchanges within WRMundra APL to Gujarat (LTOA) 0000 0000 0000 0000 0000 0000 0000 0000

JPL to ARVIND GUVNL ( MPPL) 4464 0000 0000 0000 0000 0000 0000 4464JPL to AIGL MSEB ( AIGL MSEB) 0000 0000 0000 0789 0000 0000 0000 0789

JPL to ARPIPL MSEB ( ARPIPL MSEB) 0000 0000 0000 0771 0000 0000 0000 0771JPL to ACCIL MSEB ( ACCIL MSEB) 0000 0000 0000 2380 0000 0000 0000 2380

APL1 GUVNL to AWLD GUVNL ( AEL) 3874 0000 0000 0000 0000 0000 0000 3874DBPOWER to BALCO ( BALCO) 0000 0000 0120 0000 0000 0000 0000 0120

DBPOWER to BALCO ( DBPOWER) 0000 0000 15887 0000 0000 0000 0000 15887EMCO to BALCO ( EMCO) 0000 0000 0080 0000 0000 0000 0000 0080

JPL to BOSCH MSEB ( BOSCH MSEB) 0000 0000 0000 1552 0000 0000 0000 1552JPL to BCSIL MSEB ( BCSIL MSEB) 0000 0000 0000 0720 0000 0000 0000 0720JPL-II to CSEB ( CSPTRDCL CSEB) 0000 0000 12569 0000 0000 0000 0000 12569

SPECT ACBIL to CSEB ( CSPTRDCL CSEB) 0000 0000 0720 0000 0000 0000 0000 0720ACBIL to CSPTRDCL CSEB ( CSPTRDCL CSEB) 0000 0000 5374 0000 0000 0000 0000 5374

JPL to CLASSIC MSEB ( CLASSIC MSEB) 0000 0000 0000 1309 0000 0000 0000 1309JPL to CIPLA MSEB ( CIPLA MSEB) 0000 0000 0000 0610 0000 0000 0000 0610

JPL to CEAT MSEB ( MPPL) 0000 0000 0000 2921 0000 0000 0000 2921APL1 GUVNL to CHLM GUVNL ( AEL) 2187 0000 0000 0000 0000 0000 0000 2187

NSPCL to DD ( DD) 0000 0000 0000 0000 0000 13156 0000 13156EMCO to DNH ( EMCO) 0000 0000 0000 0000 0000 0000 28097 28097

JPL to DNL MSEB ( DNL MSEB) 0000 0000 0000 0870 0000 0000 0000 0870JPL to ETLC MSEB ( ETL) 0000 0000 0000 0758 0000 0000 0000 0758JPL to ETLT MSEB ( ETL) 0000 0000 0000 0758 0000 0000 0000 0758

APL2 GUVNL to ESIL_WR ( PXIL) 0283 0000 0000 0000 0000 0000 0000 0283APL3 GUVNL to ESIL_WR ( PXIL) 8355 0000 0000 0000 0000 0000 0000 8355

DBPOWER to ESIL_WR ( MANIKARAN) 0000 0000 0000 0000 0000 0000 0000 0345EOL GUVNL to ESIL_WR ( ESIL_WR) -19578 0000 0000 0000 0000 0000 0000 0000

EPGL GUVNL to ESIL_WR ( ESIL_WR) -2866 0000 0000 0000 0000 0000 0000 0000JPL to ESIL_WR ( JPL) 0000 0000 0000 0000 0000 0000 0000 45641

JSWEL(RTNGIRI) MSEB to ESIL_WR ( PXIL) 0000 0000 0000 -2328 0000 0000 0000 0000MSEB to ESIL_WR ( PXIL) 0000 0000 0000 -1705 0000 0000 0000 0000

ESSAR_MAHAN to ESIL_WR ( ESIL_WR) 0000 0000 0000 0000 0000 0000 0000 52250VANDANA to ESIL_WR ( PXIL) 0000 0000 0000 0000 0000 0000 0000 0480

JPL to ESIL MSEB ( JPL) 0000 0000 0000 0108 0000 0000 0000 0108ESSAR_MAHAN to ESIL MSEB ( ESIL_WR) 0000 0000 0000 1244 0000 0000 0000 1244

JPL to ETLW MSEB ( ETL) 0000 0000 0000 0732 0000 0000 0000 0732JPL to ETLB MSEB ( ETL) 0000 0000 0000 0866 0000 0000 0000 0866

JPL to EILR MSEB ( MPPL) 0000 0000 0000 1049 0000 0000 0000 1049JPL to ETLK MSEB ( ETL) 0000 0000 0000 0643 0000 0000 0000 0643

JPL to EXIDE MSEB ( EXIDE MSEB) 0000 0000 0000 1239 0000 0000 0000 1239CSEB to GOA ( PTC LTD) 0000 0000 -0400 0000 0400 0000 0000 0000

DBPOWER to GOA ( PTC LTD) 0000 0000 0000 0000 17390 0000 0000 17390JPL to GSL MSEB ( GSL MSEB) 0000 0000 0000 0870 0000 0000 0000 0870

EMCO to GCEL ( EMCO) 0000 0000 3394 0000 0000 0000 0000 3394JPL to HINDMOUDA MSEB ( HINDMOUDA MSEB) 0000 0000 0000 2249 0000 0000 0000 2249

HINDAHEJ GUVNL to HINDTALOJ MSEB ( HINDTALOJ MSEB) -2962 0000 0000 2962 0000 0000 0000 0000EMCO to DNH ( EMCO) 0000 0000 0000 0000 0000 0000 119290 119290

JPL to HNGIL MSEB ( HNGIL MSEB) 0000 0000 0000 5156 0000 0000 0000 5156LANCO TO MP 0000 191431 0000 0000 0000 0000 0000 191431

IEE 103711 47279 -413725 163201 0000 26840 0000 31054PEI 3561 7107 0000 -0214 0000 0000 0000 17561

ca kula Aayaat Total Import 781888 184933 483401 86303 247768 28588 40782 148596 781888kula inayaa-t Total Export 1202530 274418 268404 653270 6437 0000 0000 0000 1202530naoT Aayaat inayaa-t Net Imp (+)Exp (-) -420642 -89485 214997 -566968 241330 28588 40782 148596 -420642

4 kula gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kula

Total GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL11567423 2719395 2512265 73752 3933435 237255 213875 549412 12255 11567424

5 kI kula iSaDUyala Total Sdl incl IR bi-lateral exch Sdl 9753264 2263189 2432879 58978 2833062 221937 190360 484727 12209 97532646 ibanaa xait ko kula D`avala Total Drl excl Tr Loss 9388390 2433257 2716560 597587 2741156 286430 174671 437785 0944 93883907 xait imalaakr kula D`avala Total Drl incl Tr Loss 9703552 2433257 2716560 597587 2741156 286430 174671 437785 0976 93884228 p p`NaalaI maoM kula pUla xait Pooled loss in WR System 3151629 p xao`~ sToSanaaoM sao kaorbaa ivanQa 1 AaOr 2 ivanQa 3 kvaasa gaMQaar kakrapar tara`pur esaesapI ponca kula

vaastivak [njaoSana Actual Inj - WR Stns KSTPS VSTPS-1amp 2 VSTPS-3 KGPS GGPS KAPS TAPS SSP PENCH TOTAL (ima yauinaTsa) (MUs) 1310550 1162242 1009828 99928 156340 275783 918544 97965 13620 12860991

] xao~ Aa ]xao kao ina ] xao naoT d xao Aa d xao inayaa-t d xao naoT pU xao Aa pU xao inayaa-t pU xao naoT kula naoT10 vaasaivak AMtrxao~Iya Actual IR Exchanges NR Imp NR Exp NR Net SR Imp SR Exp SR Net ER Imp ER Exp ER Net Total Net

ivainamaya (ima yauinaTsa) (MUs) 0347 2303947 -2303600 0000 737616 -737616 73271 189494 -116223 -3157439 AMtrxao~Iya ivainamaya IR Exchange Schedule NRI sdl NRE sdl Net NR sdl SRI sdl SREsdl Net SR sdl ERI sdl ERE sdl Net ER sdl Net WR sdl iSaDyaUla (ima yauinaTsa) (MUs) 2987 714531 -711544 404371 0000 404371 0000 113469 -113469 -420642

Total Entitlement incl IR and bi-lateral exchange schedule

11

AMtrxao~Iya AaOr iWpxaIya ivanamayaaoM kI iSaDyaUla imalaakr kula pa~ta

maah jaUlaa[- 2014 ko AMtr-ajyaIya AMtrxao~Iya ivainamayaaoM ka ivavarNa Anaulagnak 46DETAILS OF INTERSTATEINTER-REGIONAL EXCHANGES FOR THE MONTH OF JULY 2014 Annex-46

k`maaMkFrom To

gauivainaila map`iva]kMila Craivabaao maraiva]kMila gaaovaa dmana dIva da na h [ssaar ] xao~ d xao~ pU xao~ piScama xao~ kulaA InterstateInter-regional Schedules

included in ISGSGUVNL MPPGCL CSEB MSPGCL GOA DD DNH ESIL NR SR ER WR TOTAL

1 gauivainaila GUVNL 2962 31082 34044

2 map`iva]kMila MPPGCL 0000

3 Craivabaao CSEB04

0400

4 maraiva]kM ila MSPGCL 4033 4033

5 gaaovaa GOA 0000

6da na h DNH 0000

7kaorbaa KORBA-III 0000

8 iMjadla pavar JPL 4464 12569 26349 45641 89023

9 ADanaI pavar APL 6061 6061

10 ESSAR MAHAN 1244 52250 53494

11 laonakao Lanco -Pathadi 0000

12 esaIbaIAa[-ela -ACBIL 6093 6093

13 KSK MAHANADI14 DB POWER 16008 17390 0345

15 VANDANA 0480

16 EMCO 3473

17 ESIL18 ena esa pI saI ela NSPCL 13157 28097 41254

19 ]ltarI xao~ NRegion (WR end) 0347 0347

20 dixaNaI xao~ S Region (S Bus) 0000 0000

21 pUvaI- xao~ E Region (WR end) 73271 73271

22 p xao~ WRegion (WR end) 737616 189494 3231057

23 enaTIpIsaI NTPC Injection 5216788

24 enapIsaI NPC Injection 1194327

25 Total ISGS drawal from the Grid incl interregional bi-lateral

2433257 2716560 597587 2741156 286430 174671 437785

B InterstateIR Exchanges not included in ISGS

20 knaa-Tk Karnataka 444 44400

21 yaUpIpIsaIela UPPCL 0000 0000

22 AarvaIpIenaela RVPNL -237 -2370

23 UPPCL ( Excess Drawn From Rajghat 0000 0000

24 kaoTa ]jjaOna Kota - Ujjain 0000 0000

25 kula ba Total B (13 to 17) 0000 -2370 0000 0000 44400 0000 0000 42030

C inavala ivainamaya Net Exchange (12+18) 2433257 2714190 597587 2741156 330830 174671 437785 9429476

D kula Aayaat Total Imp by WR 115648

E kula inayaa-t Total Export by WR 3231057

F inavala ivainamaya Net Exchange (D-E) -3115409

G p xao~ Wara vaIlD jaa- Energy wheeled by WR

26 pU xao~ sao d xao~ kao inayaa-t ER export to SR0000

0000

27 d xao~ sao ] xao~ kao inayaa-t pUxao pxao sao haokr SR export to NR via ERWR0000

0000

28 d xao~ sao ] xao~ kao inayaa-t pxao sao haokr SR export to NR via WR0000

0000

29 pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr ER export to NR via WR0000

0000

30 ] xao~ sao d xao~ kao inayaa-t pxao sao haokr NR export to SR via WR393404

393404

31 pU xao~ sao d xao~ kao inayaa-t pxao sao haokr ER export to SR via WR0000

0000

32 pU xao~ sao d xao~ kao inayaa-t ]xao pxao sao haokr ER export to SR via NRWR0000 0000

0000

33 ]pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr NER export to NR via WR0000

0000

Anaulagnak 47Annex-47

maah jaUlaa[- 2014 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39697 65459

9964 39521

Levels in Mtrs str maITr maoM

]ka[- Ukai

64932

10110

25501

25801

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF JULY 2014

ivavarNa Particulars

Sr No Details of incident (Elements Generation Tripped) Owner Utility Date TimeEffect (Loss of generation Load) if

anyCategory as per

Standards1 Bus Fault at Lonikhand 400 kV Bus 1 MSETCL 04Jul14 315 Nil GI‐22 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 06Jul14 433 load Loss 277 MW GD‐13 Tripping of Multiple Elements from 400220 kV Parli (MSETCL) Ss MSETCL 08Jul14 2359 Nil GI‐24 Poles tripping of HVDC Bhadarwati PGCIL 09Jul14 0350 amp 0504 Nil GI‐25 Tripping in Jejuri and Loanand Area MSETCL 10Jul14 126 Load Loss 400 MW GD‐16 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 11Jul14 349 load Loss 335 MW GD‐17 Blackout at Kawas Ss NTPC 11Jul14 117 Gen Loss 320 MW GD‐18 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 13Jul14 642 load Loss 263 MW GD‐19 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 15Jul14 611 load Loss 264 MW GD‐110 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 16Jul14 334 load Loss 200 MW GD‐111 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 17Jul14 417 load Loss 150 MW GD‐112 Tripping at Gandhar Ss NTPC 21Jul14 1607 Gen Loss 180 MW GD‐113 Multiple time tripping of 765 kV Sasan ‐Satna 2 ckt on Protection Mal‐operation PGCILSASAN 7252014 1026 amp 1229 Hrs Nil GI‐2

List of Grid Disturbances and Grid incidents (GDGI) in July-2014 Western RegionANNEXURE-5

SR NO UTILITIES OCC NO MONTH STATUS REMARK 1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14 HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314 AT MUMBAI BY NTPC MUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514 AT MUMBAI BY WRPC AT RELIANCE

7 WRTS-I 460 Jun-14 HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714 AT RAIPUR BY KWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-1411 RELIANCE SASAN 464 Oct-1412 MADHYA PRADESH 465 Nov-1413 BDTCLJBTCL 466 Dec-1414 NTPC Vindhyachal 467 Jan-1515 ESSAR TRANSMISSIOM 468 Feb-1516 TATA POWER 469 Mar-1517 SUGEN (TPL) 470 Apr-1518 TORRENT POWER 471 May-1519 CGPL 472 Jun-1520 NTPC Korba 473 Jul-1521 NCA 474 Aug-1522 NHDC 475 Sep-1523 NTPC Mouda 476 Oct-1524 KSK 477 Nov-1525 RELIANCE 478 Dec-1526 NTPC SIPAT CG 479 Jan-1627 TAPS-3amp4 480 Feb-1628 ESSAR ESIL 481 Mar-1629 GOA 482 Apr-1630 KAPS 483 May-1631 JPL 484 Jun-1632 DNH 485 Jul-1633 NTPC Mumbai 486 Aug-1634 ADANI TRANSMISSION 487 Sep-1635 INDIAN RAILWAY 488 Oct-1636 WRTS-II 489 Nov-16

ANNEXURE 10

8212014

1

OCC MEETING (462nd )

Power system Operation Corporation Ltd

OPERATIONAL HIGHLIGHTS amp ISSUES

Date 11082014Venue ndash Tarapur

MonthsIEGC Band

FVIlt499 499‐5005 gt5005

March14 1291 4783 3927 012

April14 3064 5233 1703 016

May14 2248 5319 2433 013

Junersquo14 3715 4536 1749 02460

80

100

120Frequency Profile for July 2014Frequency Profile for July 2014

Maximum instantaneous frequency

5036 Hz

on 23rd July 2014 at 1304 hrs

Minimum instantaneous frequency

4941 Hz

on 10th July and 25th July 2014 at 1950 hrs and 1944 hrs respectively

Julyrsquo14 3451 5016 1533 020

0

20

40

60

1‐Jul

2‐Jul

3‐Jul

4‐Jul

5‐Jul

6‐Jul

7‐Jul

8‐Jul

9‐Jul

10‐Jul

11‐Jul

12‐Jul

13‐Jul

14‐Jul

15‐Jul

16‐Jul

17‐Jul

18‐Jul

19‐Jul

20‐Jul

21‐Jul

22‐Jul

23‐Jul

24‐Jul

25‐Jul

26‐Jul

27‐Jul

28‐Jul

29‐Jul

30‐Jul

31‐Jul

Avg Frequency of the month

4993 Hz

1High frequency day due to heavy rain in almost all places in the country low demand was observed(117 GW) Heavy underdrawal by all constituents of WR around 700‐1000 MW during 1300 hrs2 Low frequency day Demand was high and Od by constituents Od by NR

lt499 499‐5005 gt5005

8212014

2

501

502

503

504

Frequency for July 2014

496

497

498

499

50

494

495

1 60 119

178

237

296

355

414

473

532

591

650

709

768

827

886

945

1004

1063

1122

1181

1240

1299

1358

1417

1476

1535

1594

1653

1712

1771

1830

1889

1948

2007

2066

2125

2184

2243

2302

2361

2420

2479

2538

2597

2656

2715

2774

2833

2892

2951

3010

3069

3128

3187

3246

3305

3364

3423

3482

3541

3600

3659

3718

3777

3836

3895

3954

4013

4072

4131

4190

4249

4308

Frequency 499 5005

26000

28000

Unit Outage‐ JULY‐14 Max 26128 MW on 26072014JUNE14 Max 20818 MW on 210714

PLANNED OUTAGE FORCED OUTAGE TOTAL OUTAGE‐JULY14 TOTAL OUTAGE‐JUNE14

10000

12000

14000

16000

18000

20000

22000

24000

26000

MW

0

2000

4000

6000

8000

10000

1‐Jul‐14 6‐Jul‐14 11‐Jul‐14 16‐Jul‐14 21‐Jul‐14 26‐Jul‐14 31‐Jul‐14Date

8212014

3

Energy ConsumptionMax

986 Mus on 2nd July+2975 as compared

to last year900

1000

1100

IN M

Us ‐‐‐‐gt

DAILY CONSUMPTION OF WESTERN REGION(2010‐11 TO 2014‐15)

Min749 Mus on 24th July

500

600

700

800

CONSU

MPT

ION

Apr

May Jun

Jul

Aug Sep

Oct

Nov Dec Jan

Feb

Mar

MONTHS ‐‐‐‐gt2010‐11 2011‐12 2012‐13 2013‐14 2014‐15

Energy Consumption MUDay

Jul‐14 Jun‐14 Jul‐13 Change wrt last month

Change wrt last Year

Average 848 927 712 ‐845 1909Max 986 971 760 156 2975Date 2‐Jul‐14 30‐Jun‐14 2‐Jul‐13 ~ ~

PEAK DEMAND (this month vis-agrave-vis last month)

STATE

CATERED(MW) UNRESTRICTED(MW)

Julyrsquo14 Junrsquo14 Julyrsquo14 Junrsquo14

GUJARAT 13833 13755 13969 13906

MP 7090 7120 7121 7434

CHATTISGARH 3118 3472 3414 3473

Regional Demand met

Max 43034 MW(1st July 1600 hrs)

2540 more than the l

MAHARASHTRA 19283 19452 19385 19755

GOA 459 475 459 482

DD 287 298 287 298

DNH 721 677 721 685

ESIL 532 535 532 535

43034 42934 43419 43802

last year

Min 28431 MW(24th July0500 hrs)

WR TOTAL 43034 42934 43419 43802

Figures shown are Maximums in the month

Demand Met Jul‐14 Jun‐14 Jul‐13 Change wrt last month

Change wrt last Year

Average 35215 40463 32253 ‐1297 918Max 43034 42934 34317 023 2540

Date when Max 1‐Jul‐14 30‐Jun‐14 2‐Jul‐13 ~ ~

8212014

4

Constituents Total Time Block Noof time block Violation of Compilance Violation of Compilancein the month of July Type ‐1 Type‐2

Chhattisgarh 2976 983 6697 927 6885Guajrat 2976 681 77 12 222 92 54

DSM Violation for the Month of July 2014

Guajrat 2976 681 7712 222 9254Madhya Pradesh 2976 528 8226 594 8004Maharashtra 2976 1045 6489 442 8515

Goa 2976 712 7608 1868 3723Daman and Diu 2976 1720 4220 2506 1579

Dadar Nagar Haveli 2976 23 9923 1299 5635

Violation Type‐2 When The drawl does not change sign in 12 consecutive time block

Violation Type‐1 When The drawl is more or less than 12 schedule or 150 MW whichever lesser

Total No of Blocks ‐ 2976

New Elements July 2014a) COMMISSIONING OF NEW GENERATING UNITSSLNO CONSTITUENT UNIT NAME UNIT NO C`ty(MW) DATE TIME

1 IPP(Jay Prakash Nigrie) JNSTPP I 660 150714(sync) 845

b) COMMISSIONING OF NEW TRANSMISSION LINES

SLNO CONSTITUENT LINE NAME CKT NO KV DATE TIME Line length( in km)

1 POWERGRID Wardha‐Aurangabad II 765 372014 2300 347 581 POWERGRID Wardha Aurangabad II 765 372014 2300 34758

2 POWERGRID Wardha‐Aurangabad I 765 572014 1900 34758

3 GETCO Kosamba‐Chorania I 400 572014 2035 230

4 GETCO Kosamba‐Chorania II 400 572014 2105 230

5 BDTCL BDTCL‐Bhopal(MP) I 400 16714 1833 864

6 POWERGRIDLILO of Raipur‐Raigarh‐4

IV 400 1872014 2200 2826 POWERGRIDat KSK

IV 400 1872014 2200 282

7 MPPTCL Indore‐Pithampura II 400 210714 1625 150

8 POWERGRIDDharamjaygarh‐Jharsuguda

I 765 29714 000 14893

9 POWERGRIDDharamjaygarh‐Jharsuguda

II 765 28714 2125 14893

Total ckt Km 189366

8212014

5

c) COMMISSIONING OF NEW ICTS

SLNO CONSTITUENT STATION NAME KV RATIOCAPACITY (MVA) DATE

TIME

1 BDTCL BDTCL(Bhopal)ICT 1 765400 3x500 372014 1657

2 POWERGRID Dharamjaygarh(ICT 1) 765400 3x500 772014 22593 POWERGRID Navasari(ICT 3) 400220 500 872014 1959

d)CO SS O G O C O Sd)COMMISSIONING OF LINE REACTORS

SLNO CONSTITUENT STATION NAME Line Name KVCty(MVAR

) DATETIME

1 BDTCL BDTCL Indore‐BDTCL I 765 3x80 23714 1935

2 POWERGRID DharamjaygarhDharamjaygarh‐Jharsuguda II

765 3x110 280714 2125

3 POWERGRID DharamjaygarhDharamjaygarh‐Jharsuguda I

765 3x110 29714 000

4 POWERGRID Satna Satna‐Gwalior‐II 765 3x80 29714 10005 POWERGRID Aurangabad Padghe Aurangabad 1 765 3x80 310714 22 475 POWERGRID Aurangabad Padghe‐Aurangabad‐1 765 3x80 310714 2247

e)COMMISSIONING OF BUS REACTORS

SLNO CONSTITUENT STATION NAME KVCty(MVA

R) DATETIME

1 POWERGRID Bhatapara 400 125 24714 19562 POWERGRID Indore 765 3x80 31714 18273 POWERGRID Sujalpur 400 125 31714 1205

Congestion Charge was applied 3 times in July 2014 on WR‐NR path ie on12th 14th amp 15th July 2014

8212014

6

5515 5484

5200

5400

5600

Congestion Charge applied on WR‐NR path Dt12714 (Block 3 ‐16)

4200

4400

4600

4800

5000WR‐NR TTC(4900 MW)

WR‐NR ATC(4400 MW)

4000

4200

030

034

038

042

046

050

054

058

102

106

110

114

118

122

126

130

134

138

142

146

150

154

158

202

206

210

214

218

222

226

230

234

238

242

246

250

254

258

302

306

310

314

318

322

326

330

WR‐NR_Act(MW) WR‐NR_TTC(4900 MW) WR_NR_ATC(4400 MW)

2200 00

240000

260000

280000

300000

320000

MW

Maharashtra Sch Vs Drawal‐12714(Block 3‐16)

140000

160000

180000

200000

220000

240000

MW

Gujarat Sch Vs Drawal_12714

200000

220000

3 4 5 6 7 8 9 10 11 12 13 14 15 16

TIme Block

Maharashtra_Sch Maharashtra_Drawal

340000

350000

W

MP Sch Vs Drawal_12714(Block 3‐16)

120000

3 4 5 6 7 8 9 10 11 12 13 14 15 16Time Block

GETCO_Sch(MW) GETCO_Drawal(MW)

750008000085000

CSPTCL‐12714(3‐16)

310000

320000

330000

3 4 5 6 7 8 9 10 11 12 13 14 15 16

MW

TIme Block

MP_Sch MP_Drawal

450005000055000600006500070000

3 4 5 6 7 8 9 10 11 12 13 14 15 16

MW

Time Block

CG_Sch CG_Drawal

Under Drawal By WR constituents during the imposition of Congestion on WR‐NR on 12714

8212014

7

5292

5100

5300

Congestion Charge applied on WR‐NR path Dt14714 (Block 57 ‐71)

4638

4300

4500

4700

4900

5100

WR‐NR TTC(4900 MW)

WR‐NR ATC(4400 MW)

3900

4100

1330

1336

1342

1348

1354

1400

1406

1412

1418

1424

1430

1436

1442

1448

1454

1500

1506

1512

1518

1524

1530

1536

1542

1548

1554

1600

1606

1612

1618

1624

1630

1636

1642

1648

1654

1700

1706

1712

1718

1724

1730

1736

1742

1748

1754

1800

WR‐NR_Act(MW) WR‐NR_TTC(4900 MW) WR_NR_ATC(4400 MW)

3600380040004200440046004800

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

MW

Maharashtra Sch Vs Drawal‐14714(Block 57‐71)

1900

2000

2100

2200

2300

2400

2500

2600

MW

Gujarat Sch Vs Drawal_14714

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

TIme Block

Maharashtra_Sch Maharashtra_Drawal

1800

1900

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

Time Block

GETCO_Sch(MW) GETCO_Drawal(MW)

700

750

800

Chhattisgarh Sch Vs Drawal_141714(Block57‐71)

2600

2700

2800

2900

MW

MP Sch Vs Drawal‐14714(57‐71)

500

550

600

650

700

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

MW

Time Block

CG_Sch CG_Drawal

2400

2500

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

Time Block

MP_Sch MP_Drawal

8212014

8

4630

45004700

Congestion Charge applied on WR‐NR path Dt15714 (Block 50 ‐96)

4463

350037003900410043004500

WR‐NR TTC(4150 MW)

WR‐NR ATC(3650 MW)

31003300

1215

1234

1253

1312

1331

1350

1409

1428

1447

1506

1525

1544

1603

1622

1641

1700

1719

1738

1757

1816

1835

1854

1913

1932

1951

2010

2029

2048

2107

2126

2145

2204

2223

2242

2301

2320

2339

2358

WR‐NR_Act(MW) WR‐NR_TTC(4150 MW) WR_NR_ATC(3650 MW)

3800

4000

4200

4400

4600

4800

MW

Maharashtra Sch Ve Actual on 15714(50‐96)

130015001700190021002300250027002900

MW

Gujarat Sch Vs Actual on 15714(50‐96)

3600

50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96

Time Block

Maharashtra_Sch Maharashtra_Drawal

1300

50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96

Time BLock

GETCO_Sch(MW) GETCO_Drawal(MW)

3500

3700

MP Sch Vs Actual for 15714(50‐96)

850

950

1050

Chhattisgarh Sch Vs Actual‐15714(50‐96)

2700

2900

3100

3300

50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96

MW

Time Block

MP_Sch MP_Drawal

350

450

550

650

750

850

50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96

MW

Time BLock

CG_Sch CG_Drawal

8212014

9

Summary of Grid Events (GD amp GI) in July 2014

Sr No

Details of incident (Elements Generation Tripped) Owner Utility Date TimeEffect (Loss of

generation Load) if any

Category as per

Standards

1 Bus Fault at Lonikhand 400 kV Bus 1 MSETCL 04Jul14 315 Nil GI‐2

2 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 06Jul14 433 load Loss 277 MW GD‐1

3Tripping of Multiple Elements from 400220 kV Parli

MSETCL 08Jul14 Nil GI 23(MSETCL) Ss

MSETCL 08Jul142359

Nil GI‐2

4 Poles tripping of HVDC Bhadarwati PGCIL 09Jul140350 amp 0504

Nil GI‐2

5 Tripping in Jejuri and Loanand Area MSETCL 10Jul14 126 Load Loss 400 MW GD‐1

6 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 11Jul14 349 load Loss 335 MW GD‐1

7 Blackout at Kawas Ss NTPC 11Jul14 117 Gen Loss 320 MW GD‐1

8 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 13Jul14 642 load Loss 263 MW GD‐1

9 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 15Jul14 611 load Loss 264 MW GD‐1

10 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 16Jul14 334 load Loss 200 MW GD‐1

11 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 17Jul14 417 load Loss 150 MW GD‐1

12 Tripping at Gandhar Ss NTPC 21Jul14 1607 Gen Loss 180 MW GD‐1

13Multiple time tripping of 765 kV Sasan ‐Satna 2 ckt on

Protection Mal‐operation PGCILSASAN 7252014

1026 amp 1229 Hrs

Nil GI‐2

S No Name of power

stations

Unit Reason for

outage

1 VSTPS 2 (210 MW) Coal Shortage

91 Operation of grid at high frequency ( gt 505 Hz) even under fuel shortage condition

Issues1 Major ISGSIPP are facing fuel

shortage1 VSTPS 2 (210 MW) Coal Shortage

2 VSTPS 5 (210 MW) Coal Shortage

3 Singhaji 1 (600 MW) Coal Shortage

4 SGTPS 4 (210 MW) Coal Shortage

5 JP Bina 2 (250 MW) Coal Shortage

6 Bhusawal 2 (210 MW) Coal Shortage

shortage2 Expected High Demand during dry

spell in September amp October3 Optimal use of precious fuel is

necessary to tackle the high demand in dry spell

7 Parli 4 (210 MW) Coal Shortage

8 India Bulls 1 (270 MW) Coal Shortage

8212014

10

Agenda 92 Insecure operation Oscillations Power Swingbull N‐1 contingency of 765 kV Tirora‐Akola2 on 10th and 11th June 2014

bull Tirora gen gt 1500 MW AR not operatedbull Intra plant mode of oscillations (097 Hz) with poor damping

bull N‐1 contingency of 400 kV Tirora‐Warora‐1 on 20th May 2014N 1 contingency of 400 kV Tirora Warora 1 on 20 May 2014bull Tirora gen gt 1500 MW 765 kV Tirora‐Akola2 out of servicebull SPS bull Power Swing and loss of complete power station GD‐1

bull The need for transmission augmentation as well as PSS tuning at APML Tirodawas discussed in the 461st OCC meeting

bull Member Secretary WRPC suggested that APML would send details of PSSMember Secretary WRPC suggested that APML would send details of PSS tuning studies to WRPC and they may consult IIT‐Mumbai for assistance and expedite

bull Representative from SLDC Kalwa APL may like to update the progress

Events at APML TiroraCase 3 Date 11‐07‐14 1529 hrsbull Line tripped on Y Phase to earth fault AR was unsuccessful due to persisting faultbull Sudden power transfer through 400 kV System resulted in swing Oscillation of 097 Hz observed across WR and

East West generation in Western region oscillatedO ill i i d f 10 dbull Oscillation persisted for 10 seconds

bull Damping ratio was 257

8212014

11

Events at APML TiroraCase 4 Date 23‐07‐14 0227 hrsbull 765400 kV APML Tirora ICT trippedbull Sudden power transfer through 400 kV System resulted in swing Oscillation of 097 Hz observed across WR

and East West generation in Western region oscillatedO ill i i d f 17 dbull Oscillation persisted for 17 seconds

bull Damping ratio was 7

bull Need for transmission augmentation as well as PSS tunning at APML Tiroda required

bull It has been decided in 461th OCC thatAPML would send details of PSS

Expected date of

tuning studies to WRPC and they may consult IIT‐Mumbai for assistance and expedite Representative from SLDC Kalwa APL may like to update the progress

Expected date of bull 2nd ckt of 765 kV Tirora‐Akola2bull 220 kV network from 400220 kV Warorabull 220 kV network from 765400 kV Akola2 and 765400 kV Taptithandabull 220 kV network from 765400 kV Aurangabad‐PG 400220 kV Pune

Redistribution of Load within Maharashtra system

8212014

12

Elements Date and

Time of

Tripping

Date and

Time of

Restoratio

n

Remarks Receipt of

DREL at WRLDC

Satna Sasan

765 kV Sasan‐Satna 225‐07‐14

1026

25‐07‐14

1155

Protection Mal‐Operation DT at Sasan End

on OV as line remain hanging from Sasan No Yes

Agenda 93 Frequent Tripping of 765 kV Satna‐Sasan line

Issues

1Expedite commissioning of Line Reactor at 765 kV Sasanend

2 Submission of DREL for1026 1155end

765 kV 240 MVAr

Bus Reactor at Satna

25‐07‐14

1026

25‐07‐14

1139

Protection Mal‐Operation DT at Sasan End

on OV as line remain hanging from SasanNo Yes

765 kV Sasan‐Satna 225‐07‐14

1342

25‐07‐14

1342

Line got charged from Satna and

synchronized at Sasan end but immediately

DT was received at Sasan from Satna and

Line tripped Prior to tripping voltage at

No Yes

2 Submission of DREL for event analysis in line with CEA standards IEGC

3 Threat to grid security and constraints in evacuation from large generation complexarising from frequent undesirable tripping particularily

Sasan end was 796 kV

765 kV Sasan‐Satna 225‐07‐14

1628‐

Charging attempt was taken from Satna end

but line tripped before synchronization at

Sasan end due to DT from Satna Open end

voltage at Sasan 826 kV for the line

No Yes

The above was a narrow miss because the tripping occurred when one of the bus was under shutdown Fortunately during theabove period only two units of Sasan were in service and the second 765 kV bus remained in service else the situation would havebeen a serious threat to the system security

during protection testing construction activities

The progress of reactor commissioning at Sasan over the last 8 months is given under

Schedule in formed in meetings

SN 451st OCC 455th

OCC

456th OCC 457th 458th 459th 460th 461st

1 Line reactor By Dec By April By May By June End of June End of By By

of 765 kV

Sasan‐Satna

ckt‐2

y

2013

y p

2014

y y

2014

y

2014(Testing under

progress)

2014 (As per

joint report

post site visit

on 26314)

June 2014

y

Aug‐

2014

y

Aug‐2014

2 765kV Bus‐1

Reactor

Jan 2014 By Mar

2014

By June

2014

By June

2014(Testing under

)

End of July

2014(As per

j i t t

End of July

2014

By

Sep‐

2014

By

Sep‐2014

Sasan may intimate the progress in reactor commissioning to the sub-committee

progress) joint report

post site visit

on 26314)

2014

8212014

13

Item no94 SPS at Sipat

bull The SPS scheme implemented at NTPC Sipat received at WRLDC

bull It is observed that a time delay of 15sec is provided to unload units 1 2 4 amp5 each by 150MW if ICT l d d 130 f t d l dany ICT s load exceeds 130 of rated load

bull As per decision of WRPC meeting on 18314 if ex‐bus generation at Sipat is more than 2200 MW immediate unloading of units were decided and the intentional delay provided needs to be re‐ examined (Maximum 2‐3 sec delay may be appropriate) as unloading by 150MW would also take another 4‐5sec

8212014

14

Contingency Envisaged SPS action Identified FeedersTripping of any oneICT at 400200 VapiSub‐Station

Automatic LoadShedding of 100MW

DNH 1) 66 kV‐Kharadpara‐Rakholi‐I 50 MW2) 66 kV Khadoli‐Khadoli‐3 30 MW

Item No95 SPS at 400220 kV Vapi(PGCIL) Item No912

DD1) 66 kV Magarwada‐Kachigam 60 MW

It was apprised by representatives from DD amp DNH in the 459th OCC meeting that the above scheme shall be implemented within a month

UT DDDNHmay apprise the status of commissioning of the envisaged SPSUT‐DDDNH may apprise the status of commissioning of the envisaged SPS

Item no96 Addressing High Voltage condition in SSP amp nearby area Sl No Line No of Times tripped in Julrsquo141 400 kV SSP‐Dhule‐I 32 400 kV SSP ‐ Rajgarh‐ I 2

Issues1 Multiple tripping of

feeders emanating from SSP

2 S l tiSl No Line No of occasions kept open on HV 2 Several emanating feeders being kept open on high voltage in SSP amp nearby area

Sl No Line No of occasions kept open on HV

1 400 kV SSP‐Dhule‐I 9

2 400 kV SSP‐Dhule‐II 6

3 400 kV SSP ‐ Rajgarh‐ I 1

4 400 kV SSP ‐ Rajgarh‐ II 1

bull Operating RBPH machines in synchronous condenser mode during offOperating RBPH machines in synchronous condenser mode during off peak hours

bull Reactor commissioning at Rajgarh amp Dhule to be expedited by WRTS‐II(PGCIL) amp MSETCL

bull Absorption of MVAr by Wanakbori WTS

8212014

15

1 Voltage at Wanakbori was gt420 kV for 100 the time during Julrsquo14

2 WTPS units 567 are injecting MVAR (~ 60 MVAR) at Voltage gt 420 kV

3 Absorption of MVAR by WTPS units is expected during the high voltage condition at WTPS amp nearby area

97Status of implementation of UFRWestern Region

States Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Stage - I 492 Hz Stage - II 490 Hz Stage - III 488 Hz Stage - IV 486 Hz

relief GUJARAT 580 773 580 726 580 1117 590 1025MADHYA PRADESH 460 468 460 450 460 460 465 490CHATTISGARH 150 110 150 114 155 117 155 91MAHARASHTRA 805 1108 810 1200 815 765 820 851GOA 25 25 25 25 25 25 25 25UT DD 10 15 15 15 UT DNH 30 30 35 35 Total load relief 2060 2484 2070 2515 2085 2485 2105 2482

Not received

DD and DNH have not implemented any stage of AUFLS

DD and DNH may appraise the status

Real‐time monitoring of the likely relief available from AUFLS at any given instant mandated by CERC

Telemetry to be provided at SLDC amp RLDC

Not received

8212014

16

Agenda 98 ADMS (Automatic Demand Management Scheme) Implementation as per Sec 542 of IEGC

As per CERC order dt06062014 the target of fully implementation of scheme is by January2015Constituents have to submit bi‐monthly progress report to WRPC Secretariat with a copy to the Commission and WRLDCMP has submitted its detailed action plan in the form of an affidavit to CERC for implementation of ADMS However SLDC MPPTCL is requested to furnish data to OCC forum in the above format

Item No 99 Status of Telemetry in WR

Telemetry Issuesdoc

8212014

17

Item No 910 Black Out at NTPC Kawas Power Station

bull On 11th July 2014 Kawas Gas generating complex got blackout due to tripping of evacuation lines one by one

within a short span of 30 minutes

bull The complete loss of evacuation lines occurred at 0117 Hrs The blackout has resulted in tripping of GT1A

GT1B and ST causing 320 MW generation loss in the area It was reported that weather condition was foggy with

slight drizzling was in the area

LineTime of Tripping

Kawas End Remote endRestoration Time

220 kV Kawas‐Navsari1

1246 AM

R phase to EF

Fault location 2 km

R Phase to EF

122 AM

220 kV Kawas ndashNavsari2

112 AMR phase to EF

Fault location 2208 km

R Phase to EF 347 AM

220 kV Kawas‐Haldarwa 1

107 AMR phase to EF

Fault location 16 km

R Phase to EF 246 AM

220 kV Kawas‐ R phase to EF R Phase to

bull Line restoration has failed on several attempt as the lines

were not holding due to persisting fault

bull Such an event of total loss of evacuation lines from a

generating station resulting in blackout scenario is a

matter of serious concern

bull WRTS-2 may kindly send the reasons for such faults

which has caused the incidence and the remedial action

taken in this regard220 kV Kawas‐Haldarwa 2

108 AMp

Fault location 2 kmEF 304 AM

220 kV Kawas‐Icchapur1

108 AM B phase to EFB Phase to EF

301 AM

220 kV Kawas‐Icchapur2

108 AMB phase to EF Faultlocation 356 km

B Phase to EF

331 AM

220 kV Kawas‐Vav 1 117 AMNo tripping

Hand Tripped laterLine Tripped 225 AM

220 kV Kawas Vav 2 117 AM Y Phase to EFY Phase to EF

317 AM

taken in this regard

bull Disturbance Recorder (DR) and Event Logger(EL) out

puts are yet to be received from WRTS-2

bull As per IEGC the information like DREL output relay

indications amp sequence of events etc must be sent to

RLDCRPC by 24 hrs of the event WRTS-2 may kindly

expedite amp furnish the information to WRLDC amp WRPC

Item No 911 Operating Procedure of WR-2014

The operating procedure of Western Region 2014 has been updated on 31072014 and the p g p g psame has been uploaded on WRLDC web site at the following link

httpwwwwrldccomdocsWR_OPERATING_PROCEDURE_2014pdf

8212014

18

Item No 12 Mock Black start Exercise

Station Name Date Proposed Remarks

Mock Black Start Plan for the following stations has been received by WRLDC

CLPIPL Gas Power Plant 29‐Jun‐2014 ‐

Gandhar Gas Power Plant 27‐July‐2014 ‐

Other Utilities may update the sub‐committee regarding their plan for black start exercise

SL No Name of the Station Remarks

1 Bargi DG set under outage

2 TONS Governor Problem

3 Birsinghpur Governor Problem

Healthiness of DG sets

3 Birsinghpur Governor Problem

4 Medikheda Governor Problem

5 Rajghat Governor Problem

1 Outage of DG set for longer period is matter of serious concern 2 SLDC Jabalpur may apprise the present status2 SLDC‐Jabalpur may apprise the present status3 Possibility of procurement of stand‐by DG sets to be examined to take care of such prolonged outage of DG sets which virtually renders the black start facility sterile4 There is need for blackstart generator planning in W3 area Thermal IPP generators are disconnected from state grid and there is no hydro station So with only UHV lines and large thermal units system restoration post disturbance would be extremely challenging for Chattisgarh

8212014

19

Maharashtra

Madhya Pradesh

Item No13 Review of list of feeders for load regulation in emergency

Gujarat

DD amp DNHChattisgarh

Goa

bull Decided during the 461st OCC that list ofDecided during the 461st OCC that list of

feeders identified for load control under

emergency measure for safeguarding grid

security would be reviewed in a special

meeting The list is yet to be reviewed

8212014

20

Item No 14 Implementation of voltage and time grading on OV relays to prevent tripping of multiple EHV lines emanating from single node on high voltage

bull During the 461st OCC it was informed by Power Grid representative that they have already implemented voltage grading in various line emanating from the same node (matter has not come in the MoM)

bull Power Grid amp other utilities may kindly intimate the present status of voltage grading at their respective sub‐stations

Power Station Number of instances

when the SPS signal

was received at the

station

Number of instances

when the action by

the generators was

adequate

Number of instances

when the automatic

generation reduction was

done partially

JPL 53 0 50

Item No 15 SPS for SR‐WR Inter Connection Inadequate Participation by Generators

Issues

1 10 times operation of SPS‐1 causing backing down at JPL amp KSK during 1714 to 7 8 14JPL 53 0 50

KSK 53 0 36

APML 35 0 30

Mouda 35 0 0

Koyna 0 0 0

Koradi 0 0 0

Khaparkheda 0 0 0

Chandrapur 0 0 0

to 78142 Participation by other envisaged

generators to be expedited3 PGCIL may update status of Extention of

SPS signal from Solapur(PG) to the additional generators identified for participation

4 Decided in 461st OCC to have special Chandrapur 0 0 0

DB Power 0 0 0

NSPCL 0 0 0

Balco 0 0 0

Lanco 0 0 0

KWPCL 0 0 0

pProtection Sub‐Committee meeting to discuss progress of implementation of the revised SPS at Solapur (for WR‐SR interconnection) amp extension of signal from Sholapur to additional generators in WR

8212014

21

Thank you

DiscussionhelliphelliphellipDiscussionhelliphelliphellip

  • 462 occ_minutepdf
  • participants list_462 OCC meeting 110814pdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 26-7pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 45pdf
  • 46pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84pdf
  • 84apdf
    • 26wrpc_minute 107pdf
    • 26wrpc_minute 108pdf
    • 26wrpc_minute 109pdf
    • 26wrpc_minute 110pdf
    • 26wrpc_minute 111pdf
    • 26wrpc_minute 112pdf
    • 26wrpc_minute 113pdf
      • 85pdf
      • 87pdf
      • 98pdf
      • 913pdf
      • 10pdf
Page 8: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR

8

462nd OCC MINUTES

station -Champa Pooling station -Dharamjaygarh PS - 2nd ckt

21052014

4 765 kV Gwalior - Jaipur line (1st Ckt) SC

Dec 2014

5 765 kV Dharamjaygarh - Jabalpur Pooling Station DC line

Dec-2014

6 765 kV Wardha ndashNizamabad-Hyderabad DC

March-15

7 765 kV Narendra-Kolhapur DC March-15 8 HVDC Raigarh(Kotra)-Pugalur Bi-

pole March-15

9 400 kV Aurangabad - Boisar line DC line

Dec -2014

10 765 kV Aurangabad (PG) - Padghe (PG) DC

August-2014

11 800kV DC Champa ndash Kurukshetra Bipole

Jan 2015

12 765 kV DC Jharsuguda ndash Korba Dec 2014 13 2 X 765 kV SC Ranchi ndash Sipat Jan 2015 14 765 kV Wardha- Aurangabad DC

Line

Ckt I Commissioned on 010714 Ckt II Commissioned on 030714

15 765 kV Aurangabad- Solapur DC line

Dec 2014

16 765 kV Solapur-Pune line

Sept 2014

17 765KV Durg-Wardha DC Sept 2014 CHHATTISHGARH 1 LILO of 400 kV Korba west-

Khedamara at Marwa August 2014

2 400 kV DCDS Raipur(Raita)- Jagdalpur(DCDS)

March 2015

21 220 kV Korba-Bishrampur line (DCSS)

Sept 2014

22 220 kV DCDS lines Chhuri to Mopka (Bilaspur) (DCDS)

Nov 2014

26 LILO of 220 kV Raigarh-Budipadar at 400 kV PGCIL Ss Raigarh

Sept2014

28 LILO of 220 Korba (E)- Bishrampur line at 220 kV Churri Ss

Sept 2014

29 LILO of 220 kV Raigarh ndash Jindal (Tamnar) at Girwani 220 kV Ss

Sept 2014

GUJARAT 1 400 kV DC Kosamba-Chorania line

(Package I)(From Chorania SS to AP-54)

Aug -2014 Commissioned on 100314

9

462nd OCC MINUTES

2 400 kV DC Kosamba-Chorania line

(Package II)(From Kosamba SS to AP-54)

Aug -2014

3 400 kV DC Mundra-Zerda line No 1 Aug -2014 4 400 kV DC Mundra-Zerda line No 2 March-2015 5 400 kV DC Vadinar-Amreli line December -

2014

6 400kV Mundra-Hadala LILO to Halvad

August -2014

7 400 kV DC Amreli-Kasor line(Part-1) December-2014

8 400 kV Charanka- Veloda Oct 2014 MADHYA PRADESH 1 Chhegaon-Julwania 400 KV DCDS

Line OCT - 2014

2

Pithampur- Indore 400KV DCDS Line

August - 2014

Work of the line have been completed by MPPTCL feeder bay from Indore PGCIL is awaited

3 Satpura TPH-Ashta 400KV DCDS Line

December ndash 2014

MAHARASHTRA(STU)

1 400KV DC line from Koradi-II to Wardha SS(PG) DC

Oct- 2014

2 400 kV Akola-Taptiganga Sept 2014 3 400 kV Tiroda-Akola Dec - 2014 GUJARAT (IPTC route) by WR Transmission (Guj) Pvt Ltd

1 400 kV Rajgarh(PG)-Karamsad (GETCO) DC

Sept -2014

STERLITE (JTCL) 1 765 KvDhramjaygarh - Jabalpur (JTCL)

DC line May -2015 Severe ROW Problem

2 765 kV Jabalpur - Bina (JTCL) Sc May -2015 Severe ROW Problem STERLITE (BDTCL) 1 765 kV Bhopal - Indore (BDTCL) SC August-2014 2 765 kV Bhopal-Bhopal Commissioned on

160714 3 765 kV Dhule - Vadodara SC Oct - 2014 4 765 kV Vadodara - Dhule (BDTCL) SC Oct - 2014 5 765 kV Dhule - Aurangabad (BDTCL)

SC August-2014

RAICHUR SHOLAPUR TRANSMISSION CO LTD(RSTCL)

1 765 kV Raichur - Sholapur line 2nd SC

Commissioned on 29062014

10

462nd OCC MINUTES

It was suggested by WRLDC and constituents that important list of line will be sent by

each constituent to WRLDC and WRLDC will compile and furnish the list as per

priority of commissioning

The Sub-Committee noted and agreed as above

73 Commissioning of new Generating units in Western Region and the capacity expected to be commissioned during the current year 2014-15

The status regarding Generating units expected to be commissioned during the

current year 2014-15 is as below

Name of the Power Projects Unit No Capacity (MW)

Date of Commissioning Schedule Date

GUJARAT Bhavnagar Lignite TPP-JV I 250 August 2014 II 250 August 2014 UNO SUGEN 2 3825 July 2014 CHHATTISGARH Marwa 1 500 Sept 2014 2 500 Dec 2014 MAHARASHTRA Dhariwal 2 300 Synd On 23042014 CHANDRAPUR 8 500 Oct 2014 CHANDRAPUR 9 500 March 2015 KORADI 8 660 Oct 2014 KORADI 9 660 Jan 2015 PARLI 8 250 March 2015 MADHYA PRADESH Singhaji TPS 2 600 Oct-2014 Ms Jhabua Power Seoni 1 600 Dec ndash 2014 MB Power Anuppur 1 600 Sept ndash 2014 Jaiprakash Power Nigri 1 660 July 2014 Jaiprakash Power Nigri 2 660 Dec 2014 Moser Bear (Hindustan power) 1 600 Nov- 2014 Moser Bear (Hindustan power) 2 600 March 2015 Essar Concessional ampEssar Power 1 600 Oct 2014 Essar Concessional ampEssar Power 2 600 Dec 2014 BLA 2X4 90 March 15 Jhabua Power 1 600 Dec 2014 CENTRAL SECTORIPP KSK 2 600 August 2014 KSK 5 600 January 2015

11

462nd OCC MINUTES

ACBIL 1 300 March 2015 SASAN 5 660 July 2014 SASAN 6 660 August 2014 Sasan 4 660 Synchronized in May 2014

Sub-committee noted as above ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS (A) FOLLOW-UP ITEM NO 81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

All the constituents are requested to submit the CMP report for the First quarter

(April 2014 to June 2014) for the year 2014-15

The Sub-Committee members noted as above ITEM NO 82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR

Status of physical amp cyber security in Power Sector for the First quarter (April 2014 to

June 2014) for the year 2014-15 have not been received from some of the

constituents

The Sub-Committee members noted as above ITEM NO 83 PROCEDURE FOR CALCULATION OF TRANSMISSION SYSTEM

AVAILABILITY FACTOR FOR A MONTH AS PER CERC REGULATION 2014-19

Member Secretary WRPC informed that a procedure for calculation of

transmission system availability factor as envisaged in CERC Regulation 2014-15

was discussed in 461st OCC held at Raipur Various aspects were discussed and

finalized However there were concerns expressed by transmission licensee

regarding addition of 12 hrs to outage hrs after each tripping beyond admissible 2

tripping in a year as it will reduce availability below 95 Also concern was

expressed for multiplying outage hrs by 2 for line affecting generation Also

whether addition of 12 hrs is applicable to such lines affecting generation was

also expressed Whether these clauses are applicable to HVDC system was not

known Therefore all such concerns of transmission licenses have been taken up

with CERC for revision clarification

Meetings were held on 1st and 4th August 2014 with transmission licenses

regarding verification of data data formatting and sorting out various anomalies

and doubts for data from April to July 2014 for further processing at WRPC end

12

462nd OCC MINUTES

Member Secretary WRPC informed that certification for some transmission licensees

has already been done The certificate for PGCIL is to be issued as effect on

generation evacuation certificate from WRLDC is awaited

CM WRLDC requested all the transmission licensees to submit the data to WRLDC in

same format as submitted to WRPC

Representative from Transmission licensees agreed the same

The Sub-committee noted as above ITEM NO 84 IMPLEMENTATION OF RSD METHODOLOGY Shri Satyanarayan SE WRPC informed that GM (OSampC) NTPC HQ-I Mumbai vide letter dated 28072014 (copy enclosed at annexure 84) requested to call a meeting for resolvingclarification of methodology developed by WRPC The procedure for RSD framed by WRPC is enclosed at Annexure 84A SLDC MPPTCL Jabalpur informed that RSD was implemented for NTPC Mauda unit

on 18072014 but it was not more extended beyond 20072014 as no other major

beneficiaries agreed for extension

CE GETCO informed that intermittent rain profile in the different geographical area of

Gujarat amp increasing demand pattern didnrsquot permit them to take RSD of any NTPC

units as minimum of 3 days is required

Representative from SLDC Maharashtra also endorsed the Gujarat view points on

RSD

GM NTPC requested to the committee that if RSD wasnrsquot possible then at least

technical minimum schedule should be given

Member Secretary WRPC summarized the matter as follows

1 RSD was implemented for NTPC Mauda unit from 18072014 to 20072014

but it could not be extended due to increasing demand pattern amp uncertainty of

rain profile in the region

2 The method framed by WRPC shall be continued amp will be applied as and

when required

3 He requested constituents to schedule the NTPC generating units at its

technical minimum in case RSD is not feasible

The Sub-committee noted as above

13

462nd OCC MINUTES

ITEM NO 85 LOAD FORECASTING IN WESTERN REGION Background- As per the amended Indian Electricity Grid Code that is effective from 17th February 2014 the SLDCs SEB distribution licensees shall always restrict the net drawal of the State from the grid within the drawal schedule keeping the deviations from the schedule within the limits specified in the Deviation settlement mechanism regulations Therefore it is imperative that adequate attention may be paid towards load forecasting The matter was discussed in the past several OCC as well as in the 26th TCCWRPC board meeting wherein it was decided to create a task force for exploring development of a software for load forecasting A meeting was held on 03042014 under leadership of CE(SLDC) GETCO Gujarat at

Mumbai The outcome of the Meeting was as following

1 Short term action a) all the discoms were advised to provide maximum historical data b) Discoms have to bifurcate the geographical area in to zone and derive effect of temp rain festival on load

2 Long term action a) Provide computer base meters up to all the distribution feeders for close monitoring b) Provide weather sensors at various strategically important locations c) Formulation of forecasting desk (load amp RE) at SLDC level

The 2nd meeting regarding Load Forecasting Mechanism was held with members of WRPC WRLDC Western Region SLDCs amp State Discoms Forecasting Service Providers (FSPs) on 110614 at SLDC Vadodara Gujarat During the 460th OCC meeting CE SLDC GETCO informed that roadmap for implementation of pilot project amp main project has been prepared Budget proposal have already called from FSP amp they assured to submit till the end of the month For implementation of pilot project the Utility and their respective Pilot FSP are decided as tabulated below

Sr No STATE ndashSLDCDISCOM Pilot FSP

1 GUJARAT MS TESLA

2 MAHARASHTRA IIT MUMBAI

3 MADHYA PRADESH MS METEOLOGICA

4 CHHATISGARH MS SAS

5 GOA MS MARCADOS

6 DDDNH IITGANDHINAGAR

MP informed vide letter dated 27062014(copy enclosed at 85) that they have

already placed on order to Ms L amp T InfoTech on 12072013 for load forecasting

software project Therefore MP had requested to exclude them from pilot project

activities decided in earlier meetings

14

462nd OCC MINUTES

462nd OCC Discussions- State wise status is as under -

bull CE SLDC informed that Gujarat has prepared the NDA and forwarded to TESLA for signing and the same was signed by TESLA New Zealand office and their Mumbai office shall forward the same to SLDC Gujarat Thereafter Input data shall be provided and ID shall be provided to TESLA so as to start forecasting by them

bull SLDC Gujarat vide letter no SLDCCEMIST-6458 dtd 270614 has conveyed to all WR Nodal SLDC coordinators regarding progress of load forecasting pilot project Thereafter also e mailed on date 2082014 to all Nodal SLDC for submission of status Report on Pilot Load Forecasting Project However no proper response is received so far

bull MP SLDC conveyed that they have already awarded contract for load forecasting and the same is expected to be available by year end Therefore MP shall not participate in the present scheme

bull SLDC Chhattisgarh representative informed that matter has been taken with discom Chhattisgarh Discom were facing difficulties to contact with coordinator of Ms SAS

CE SLDC Gujarat being a group leader stated that Chhattisgarh shall intimate to them for further needful and would help them in this matter

bull Maharashtra SLDC informed that there was a meeting held on 09082014 with IIT Bombay where availability of data has been discussed amp one more meeting will be held on 22082014 outcome of the same will be intimated in next OCC meeting BEST amp TATA are already having such forecasting system

bull No one from GOA has attended last meeting even though GOA was forwarded copy of MOM Due to non availability of any coordinator details of GOA it was not possible to contact them However Ms Marcadose has also conveyed that he has not been contacted by Goa

bull No one from DDDNH has attended last meeting even though DD DNH was forwarded copy of MOM However IIT Gandhinagar conveyed that they were not been contacted by DD DNH

Member Secretary WRPC informed that a letter to DD DNH amp GOA has been written

from WRPC secretariat regarding implementation of ADMS Load Forecasting amp

telemetry status He further requested the constituents to implement the decision

taken in earlier meeting of load forecasting

OCC suggested that the next load forecasting meeting may be held at DDDNH

The Sub-committee noted as above

15

462nd OCC MINUTES

ITEM NO 86 NEED OF COOPERATION FROM WRLDC IN REAL TIME

bull CE SLDC informed that at present APL is under their control area and embedded scheduling model is used It may be noted that for units 78amp 9 at APL Gujarat has no share (all are for NR beneficiaries)There have been occasions when units 78amp 9 have tripped (given at annexure) Since APL is shown as embedded in Gujarat WRLDC requested Gujarat to reduce overdrawl when APL units 78amp 9 trips Hence Gujarat has to pick up state generationcostlier generation for no fault of Gujarat

bull Further lines are opened to curtail overdrawl when Gujarat is not faulty Gujarat is seen as overdrawing (due to embedded scheduling of APL) when APL trips

bull To complicate matters the scenario coupled with wind variations state generation has to be constantly varied to avoid overdrawl

Gujarat requested followings-

1 When large sized units (APL units 78amp 9) trips then scheduling of Gujarat should be changed with immediate effect OR Gujarat should not be pursued for deviation correction to the extent of schedule of units tripped at APL units 78amp 9 OR Schedule of Gujarat from other central sector stations should be changed as per their request with immediate effect

2 APL units 78amp 9 should be made a separate control area 3 Under above circumstances transmission lines should not be opened

due to default by APL as these affects Gujarat without any fault of their own Further this was done without informingtaking SLDC into confidence It was clear from the discussions that Gujarat Discoms are put to unnecessary financial implications WRLDC clarified that 220 KV Dehgam- Khanpur Line no1 was opened due to frequency touching 493 Hz and control of overdrawl was taken as security measure WRLDC agreed to inform CE SLDC whenever such discussions are taken and agreed to take care in future

The Sub-committee noted as above

ITEM NO 87 GUIDE LINES FOR SPLIT BUS OPERATION AT SSP RBPH SWITCHYARD CE SLDC Gujarat vide letter dated 07082014 informed that a meeting was held on

220514 at Kevadia Colony SSP regarding split bus arrangement at SSP RBPH

16

462nd OCC MINUTES

switchyard and subsequent discussions during 55th meeting of PSC of NCA held in

Vadodara on 140714 the guidelines for the same had been prepared in consultation

with GETCO protection wing and sent vide mail dated 23072014 However the same

has been attached herewith as Annexure-87 It was clarified during discussion that

split bus operation would be used only as per requirement and will not be a permanent

arrangement

The Sub-committee noted as above

ITEMS FROM WRLDC

1 OPERATION OF GRID AT HIGH FREQUENCY ( gt 505 HZ) The onsetrevival of monsoon in the last fortnight of July 2014 has reduced the demand in Western Region However the demand would pick up sharply during the dry spell in September and October months Presently the major State Central Sector IPP generators in Western Region that are facing coal shortage are tabulated as under S No Name of power

stations Unit Reason for

outage 1 VSTPS 2 (210 MW) Coal Shortage 2 VSTPS 5 (210 MW) Coal Shortage 3 Singhaji 1 (600 MW) Coal Shortage 4 SGTPS 4 (210 MW) Coal Shortage 5 JP Bina 2 (250 MW) Coal Shortage 6 Bhusawal 2 (210 MW) Coal Shortage 7 Parli 4 (210 MW) Coal Shortage 8 India Bulls 1 (270 MW) Coal Shortage Likewise several Gas Power Stations in Western Region are facing fuel shortage Under the above circumstances it is desirable that precious fuel optimally utilized to maintain adequate stock for the dry spell In the month of July 2014 the grid frequency remained above 5005 Hz for more than 15 of the time while it remained below 499 Hz for more than 34 of the time Operation of high frequency is unnecessary loss of fuel that could have been conserved and utilized during low frequency regime

The Sub Committee noted the same

17

462nd OCC MINUTES

2 OBSERVATION OF INTRA-PLANT MODE OF OSCILLATIONS (097 HZ) WITH POOR DAMPING ON 10TH AND 11TH JUNE 2014 AND LOSS OF 1800 MW IN MAHARASHTRA SYSTEM DUE TO POWER SWING UNDER N-1 CONTINGENCY ON 20TH MAY 2014 The issue of Intra plant mode of oscillations with poor damping as observed during the grid event on 10th and 11th June 2014 was discussed during the 461st OCC meeting Similar oscillations were again recorded on 11th July 2014 GM WRLDC informed that they have written to generators seeking details of MW fluctuations PSS status etc and requested constituents to share the dataHe requested that constituents may share PMU data also CESLDC Gujarat informed that they are proposing PSS tuning with consultants from IITs in their system EE SLDC Maharashtra informed that APL-Tiroda has recently tuned PSS at Tiroda units by OEM

It was once again requested constituent to furnish information as designed by WRLDC The Sub Committee noted the same

3 FREQUENT TRIPPING OF 765 KV SATNA-SASAN LINE

WRLDC informed that 765 kV Sasan-Satna Line has tripped on three occasions

while 240 MVAr Bus Reactor at 765 kV Satna tripped on one occasion The

tripping occurred due to protection mal-operation at Satna end during stability test

for the 765 kV Bus-1 The details of the tripping is given below

The above OV at Sasan end could have been avoided if the Line Reactor of this line at Sasan end had been commissioned The restoration of the tripped circuit also was considerably delayed in the absence of Line Reactor at Sasan end

Elements Date and Time of Tripping

Date and Time of Restoration

Remarks Receipt of DREL at WRLDC Satna Sasan

765 kV Sasan-Satna 2

25-07-14 1026

25-07-14 1155

Protection Mal-Operation DT at Sasan End on OV as line remain hanging from Sasan end

No Yes

765 kV 240 MVAr Bus Reactor at Satna

25-07-14 1026

25-07-14 1139

Protection Mal-Operation DT at Sasan End on OV as line remain hanging from Sasan

No Yes

765 kV Sasan-Satna 2

25-07-14 1229

25-07-14 1342

Line got charged from Satna and synchronized at Sasan No Yes

18

462nd OCC MINUTES

end but immediately DT was received at Sasan from Satna and Line tripped Prior to tripping voltage at Sasan end was 796 kV

765 kV Sasan-Satna 2

25-07-14 1628 -

Charging attempt was taken from Satna end but line tripped before synchronization at Sasan end due to DT from Satna Open end voltage at Sasan 826 kV for the line

No Yes

Representative from Sasan UMPP informed that with regards to the 765 kv Line and

Bus reactors all the material required for completion of works have been received at

site

Line reactor and bus reactor would be commissioned by Aug14 and Sep 14

respectively

The Sub Committee noted the same 4 SPS AT SIPAT

The SPS scheme implemented at NTPC Sipat has been received at WRLDC It is observed that a time delay of 15sec is provided to unload units 1 2 4 amp5 each by 150MW if any ICT s load exceeds 130 of rated load It was conveyed that if ex-bus generation at Sipat is more than 2200 MW immediate unloading of units may be done and the intentional delay which is required to prevent mal-operation may be 45 second instead of 15 second

NTPC Sipat representative agreed to implement the same accordingly The Sub Committee noted the same

5 COMMISSIONING OF SPS AT 400220 KV VAPI During the special WRPC meeting on 18032013 at Dadra an SPS for automatic load shedding subsequent to tripping of 400220 kV ICT at Vapi was approved as under It was decided that POWERGRID would extend trip signal from Vapi ICTs to the requisite feeders

Contingency Envisaged SPS action

Identified Feeders

Tripping of any one ICT at 400200 Vapi Sub-Station

Automatic Load Shedding of 100MW

DNH 1) 66 kV-Kharadpara-Rakholi-I 50 MW 2) 66 kV Khadoli-Khadoli-3 30 MW DD 1) 66 kV Magarwada-Kachigam 60 MW

19

462nd OCC MINUTES

It was felt that due to change in topology loading in ICT is not critical however SPS may be in place as defense mechanism in case of any emergency

DD amp DNH representative were absent in the meeting The Sub Committee noted the same

6 ADDRESSING HIGH VOLTAGE CONDITION IN SSP amp NEARBY AREA

High voltage condition is being observed at SSP and nearby area in off peak period particularly between 2300 hrs at night to 0500 hrs in the morning Also on many occasions the system operator is compelled to hand trip the 400 kV lines emanating from SSP to control over voltage Summary for the month of Julyrsquo14 is given under

Sl No 400 kV Line DatailsFrom To

Time Date Time Date 1 SSP-RAJGARH-I 0009 19-Jul-14 0730 29-Jul-14 2 SSP - RAJGARH-II 0406 16-Jul-14 1016 18-Jul-14 3 SSP-DHULE-I 1310 22-Jul-14 0953 23-Jul-14 4 SSP - DHULE - II 1533 15-Jul-14 0734 18-Jul-14 5 SSP - DHULE - I 1703 10-Jul-14 1100 11-Jul-14 6 SSP-DHULE-I 1712 28-Jul-14 0933 31-Jul-14 7 SSP - DHULE - II 1730 19-Jul-14 0917 20-Jul-14 8 SSP - DHULE - I 1757 18-Jul-14 0935 19-Jul-14 9 SSP-DHULE-II 1809 21-Jul-14 0914 22-Jul-14 10 SSP-DHULE-I 1815 30-Jun-14 0542 1-Jul-14 11 SSP-DHULE-I 1819 20-Jul-14 0858 21-Jul-14 12 SSP-DHULE-II 1825 8-Jul-14 0949 9-Jul-14 13 SSP - DHULE - II 1831 11-Jul-14 1007 13-Jul-14 14 SSP - DHULE - I 1838 1-Jul-14 0556 2-Jul-14 15 SSP - DHULE - I 1848 9-Jul-14 0912 10-Jul-14 16 SSP - DHULE - I 2136 13-Jul-14 0850 14-Jul-14 17 SSP-DHULE-II 2201 23-Jul-14 0945 28-Jul-14

Also it has been observed that Wanakbori TPS injects around 60 MVAr per unit even when voltage at Wanakbori is above 420 kV for nearly 100 of the time Further envisaged bus reactors at Rajgarh amp Dhule are yet to be commissioned Hence in view of system reliability it is advisable to explore all possibilities to contain high voltage condition in SSP and nearby area The following actions need to be taken to address the situation

bull Operating RBPH machines at SSP in synchronous condenser mode bull Absorption of MVAr by Wanakbori (WTPS) units bull The commissioning of Reactors at 400 kV Rajgarh may be expedited by

WRTS-2

20

462nd OCC MINUTES

bull The commissioning of Reactors at 400 kV Dhule may be expedited by MSETCL CE SLDC GETCO agreed for looking into absorption of MVAR at Wanakbori

7 IMPLEMENTATION OF THE REVISED AUFLS IN DD AND DNH Representatives from the DD and DNH intimated during the 459th OCC meeting that the tendering process was stalled because of general elections (election code of conduct was in force) amp action would be initiated post the elections Member Secretary WRPC vide letter dated 01082014 took up the matter with Secretary (P) DDDNH (copy enclosed) DD amp DNH representative were absent in the meeting to comment

The Sub Committee noted the same 8 ADMS(AUTOMATIC DEMAND MANAGEMENT SCHEME) IMPLEMENTATION

AS PER SEC 542 OF IEGC The format for reporting the progress of implementation of the ADMS in Western Region States was given as part of MoM of the 461st OCC meeting All utilities may like to furnish the updated status to WRPCWRLDC as per the above format It is understood that MP has submitted its detailed action plan in the form of an affidavit to CERC for implementation of ADMS However SLDC MPPTCL is requested to furnish data to OCC forum in the above format

The Sub Committee noted the same

9 STATUS OF TELEMETRY IN WESTERN REGION

In the 460th amp 461st OCC meetings the status of telemetry in Western Region was discussed in detail It was also highlighted that the Honrsquoble CERC vide its order in petition SM0072014 issued Notice under section 142 on several constituents of Western Region All the constituents had assured to address the telemetry issues within a month or two The telemetry status as on 4th August 2014 is tabulated below

21

462nd OCC MINUTES

a Maharashtra The non-availability of telemetry is 583 for sub-stations amp 18

for generating stations This is a matter of serious concern The issue has been

discussed in several OCC meetings since last 8 months As per the information available with WRLDC telemetry is not available from the following generating stations at 400 kV level

bull Kaparkheda bull Deepnagar

Also telemetry is not available from the following sub-stations at 400 kV level bull Warora bull Lonikhand(New) bull Chandrapur-stg-II

As per the information available with WRLDC telemetry is intermittent at 4 generating stations viz

bull Jaigad bull Paras-extension bull Trombay bull Deepnagar GCR

Also telemetry is intermittent at following sub-stations at 400 kV level bull Bableswar-II bull Deepnagar SS bull Dhule bull Khaparkheda bull Kolhapur-3

22

462nd OCC MINUTES

bull Sholapur-3 SLDC MSETCL Maharashtra informed that telemetry has been established for 46 locations

a Chhattisgarh100 available b Madhya Pradesh As per the latest status telemetered data is available from

100 of the locations c Gujarat As per the latest information submitted to CERC the non-availability of

telemetry data from Gujarat as on date is 33 for substations As per the information available with WRLDC Telemetry is not available form 2 number of 220 kV sub-stations viz bull Bhatiya bull Mokha Gujarat intimated in 460th OCCM that these sub-stations were ready but lines were in construction phase Also telemetry is intermittent from the following SS in Gujarat bull 220 kV Navasari (GETCO) ss bull 400 kV Kasor ss

SLDC GETCO may expedite amp resolve the issue for the above stations at the

earliest d Goa As per the latest information telemetry is not available form 2 number of

220 kV sub-stations viz Amona amp Cuncolim Telemetry is intermittent from 220 kV Tivim Ponda Xeldam amp 110 kV Kadamba amp Verna Thus Non availability of telemetry from Goa is 100 Goa to resolve the issue on war footing

e DD Telemetry is not available form 1 number of 220 kV sub-station viz Magarwada Thus availability of telemetry from DD is NIL DD representative intimated in 460th OCCM that RTU was being installed at 220 kV Magarwada SS under the new SCADAEMS up gradation project amp it would take 3 months to complete the work DD representative was absent in 461st OCCM so information on progress in this matter is yet to be received from DD DD to expedite the issue for the above station(s) on war footing

f DNH Telemetry is not available form 2 number of 220 kV sub-station viz Kharadpara amp Khadoli Thus availability of telemetry from DNH is NIL DNH representative was absent in 460th amp 461st OCC meetings to comment on the issue DNH to resolve the issue for the above station(s) on war footing

g ISGS As per the latest information submitted to CERC the non-availability of telemetry data from ISGS generating stations as on date is 125 Telemetry is intermittent from 220 kV Kawas(NTPC) station Power Grid NTPC to expedite

23

462nd OCC MINUTES

NTPC amp Power Grid agreed to expedite the matter during 460th amp 461st OCC meetings of WRPC However no progress has been reported

h POWERGRID As per the latest information submitted to CERC the non-availability of telemetry data from Power Grid substations as on date is 111 Telemetry is intermittent from the following ss

o 765 kV Kotra SS o 765 kV Dharamjaigad o 765 kV Tamnar SS o 400 kV Navasari SS

Additional points

a) In the report available on the WRLDC website it is clearly indicated that Communication link between all SLDC to WRLDC is in radial mode (without redundancy) and any failure in any equipment Fibre leads to total data black out Power Grid to ensure that links are on two channels

i IPP As per the latest information submitted to CERC the non-availability of

telemetry data from IPP generating stations as on date is 15 Telemetry is intermittent from Jindal amp Essar Mahan GMR Raipur JPL ESSAR Mahan GMR Raipur to expedite

Additional Points

bull Adani(APL) Tiroda There is only one channel emanating from Adani Tiroda Recently there was a case when entire station was not visible due to non-Availability of that channel

bull CGPL Mundra There is only one channel emanating from CGPL Mundra In case of non-availability of data leads to non-visibility of 4000 MW generation which creates difficulty in Grid Operation

bull Sasan There is only one channel emanating from Sasan In case of non-availability of data leads to non-visibility of 2400 + MW generation which creates difficulty in Grid Operation

bull APL Mundra There is only one channel emanating from CGPL Mundra In case of non-availability of data leads to non-visibility of 4000 + MW generation which creates difficulty in Grid Operation

The above issue was already discussed in 460th OCCM The utilities (APL SASAN CGPL) may kindly update the progress in this matter

24

462nd OCC MINUTES

j PMU data Regarding Satna to WRLDC link WRTS II informed that work is under progress for laying of OPGW from Satna 220 kV (MPPTCL) to Satna 765 kV (PG) and it may take 3-4 monthsrsquo time It was suggested that till such time the OPGW operation is in place WRTS-II may explore leased line connectivity at the earliest Power Grid to expedite

The Sub-Committee noted the same amp agreed to make availability of telemetry in their concerns and the report be updated position in next meeting

The Sub Committee noted the same

10 BLACK OUT AT NTPC KAWAS POWER STATION On 11th July 2014 Kawas Gas generating complex got blackout due to tripping of evacuation lines one by one within a short span of 30 minutes The complete loss of evacuation lines occurred at 0117 Hrs The blackout has resulted in tripping of GT1A GT1B and ST causing 320 MW generation loss in the area It was reported that weather condition was foggy with slight drizzling was in the area

Line Time of Tripping Kawas End Remote

end Restoration Time

220 kV Kawas-Navsari 1 1246 AM R phase to EF Fault location 2 km R Phase to EF 122 AM

220 kV Kawas ndashNavsari 2 112 AM R phase to EF Fault location 2208 km

R Phase to EF 347 AM

220 kV Kawas-Haldarwa 1 107 AM R phase to EF Fault location 16 km

R Phase to EF 246 AM

220 kV Kawas-Haldarwa 2 108 AM R phase to EF Fault location 2 km

R Phase to EF 304 AM

220 kV Kawas-Icchapur 1 108 AM B phase to EF B Phase to EF 301 AM

220 kV Kawas-Icchapur 2 108 AM B phase to EF Fault location 356 km

B Phase to EF 331 AM

220 kV Kawas-Vav 1 117 AM No tripping Hand Tripped later Line Tripped 225 AM

220 kV Kawas Vav 2 117 AM Y Phase to EF Y Phase to EF 317 AM

Even the line restoration has failed on several attempt as the lines were not holding due to persisting fault Such an event of total loss of evacuation lines from a generating station resulting in blackout scenario is a matter of serious concern Representative from WRTS-II stated that being highly industrial corridor the said lines are suffering with smog and informed that they are in process of replacement of existing insulator with polymer type insulators Order has been already placed amp it may be completed within next two to three month The Sub Committee noted the same

25

462nd OCC MINUTES

11 OPERATING PROCEDURE OF WR-2014 As discussed in 460th OCCM of WRPC the operating procedure of Western Region 2014 has been updated on 31072014 and the same has been uploaded on WRLDC web site at the following link httpwwwwrldccomdocsWR_OPERATING_PROCEDURE_2014pdf

The Sub Committee noted the same 12 MOCK BLACK START EXERCISE

MP representative informed that DG set at Bargi will be ready within a week time amp mock black start exercise can be performed in October 2014

NTPC Gandhar has successfully performed the mock black start exercise on 27072014

The Sub Committee noted the same

13 REVIEW OF LIST OF FEEDERS IDENTIFIED FROM ISGS LEVEL IN CASE OF

THREAT OF GRID SECURITY DUE TO LARGE DEVIATION

During the 461st OCC it was decided that list of feeders identified for load

control under emergency measure for safeguarding grid security would be

reviewed in a special meeting The list is yet to be reviewed GM WRLDC

requested SLDC to review the same amp submit Till such time the existing list will

continue

The Sub Committee noted the same 14 IMPLEMENTATION OF VOLTAGE AND TIME GRADING ON OV RELAYS TO

PREVENT TRIPPING OF MULTIPLE EHV LINES EMANATING FROM SINGLE NODE ON HIGH VOLTAGE

During the 461st OCC it was informed by Power Grid representative that they have already implemented voltage grading in various line emanating from the same node (matter has not come in the MoM) Power Grid amp other utilities may kindly intimate the present status of voltage grading at their respective sub-stations Member Secretary WRPC suggested to take the matter in PCM

The Sub Committee noted the same

26

462nd OCC MINUTES

15 INADEQUATE PARTICIPATION OF GENERATORS ENVISAGED SPS FOR SR-NEW GRID OPERATION

The details of SPS operation from 1st July 2014 till 6th August 2014 is as under

Sl No Date SPS No Condition 1 01 July 2014 SPS-1 613 SholapurRaichur DC gt1000 MW 2 01 July 2014 SPS-1 1752 SholapurRaichur DC gt1000 MW 3 04 July 2014 SPS-1 0406 SholapurRaichur DC gt1000 MW 4 09 July 2014 SPS-1 350 SholapurRaichur DC gt1000 MW 5 14 July 2014 SPS-1 506 SholapurRaichur DC gt1000 MW 6 17 July 2014 SPS-1 2204 SholapurRaichur DC gt1000 MW 7 23 July 2014 SPS-1 547 SholapurRaichur DC gt1000 MW 8 26 July 2014 SPS-1 1201 SholapurRaichur DC gt1000 MW 9 30 July 2014 SPS-1 902 SholapurRaichur DC gt1000 MW 10 30 July 2014 SPS-1 1954 SholapurRaichur DC gt1000 MW

During the last OCC the matter was discussed and it was suggested by Member Secretary WRPC to have Special Protection Sub-Committee meeting to discuss progress of implementation of the revised SPS at Solapur (for WR-SR interconnection) amp extension of signal from Solapur to additional generators in WR so as to address the issue of inadequate participation of WR Member Secretary WRPC requested to all generators who are having more than one units shall participate in implementation of SPS for SR-NEW grid operation

The Sub-committee noted the same ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING OCC reviewed the meeting roaster and finalized sheet is enclosed at Annexure-10

Due to non-readiness of BDTCL to host the next meeting NTPC KawasGandhar

would host the 463rd OCC meeting The exact date amp venue details will be intimated

separately

SlNo Organisation Name amp Designation E-mail Mobile

I WRPC1 Shri SD Taksande MS ms-wrpcnicin 98208783842 Shri Satyanarayan S opc-wrpcnicin 92233999383 Shri LKS Rathore DD lksr_2000yahoocom 98333718444 Shri Ratnesh Kumar Yadav AD ratneshkumar7437gmailcom 8903929150

II MSETCL MSEDCLMahaGenco5 Shri VD Pande EE vasantpandemahasldcin 98207419416 Shri Ajit V Pachori EE ajitpachorimahagencocoin 9619461420

III MPPTCL MPPGCL7 Shri KK Prabhakar SE sldcmpjbpyahoocom 94258052678 Shri SK Mehta EE mehtasanjay67yahooin 9425805017

IV CSPTCL CSPGCL9 Shri BR Soni Addl CE balramsonirediffmailcom 942518880710 Shri Arvind Mukherjee gccraipurgmailcom 9429227699

V GETCO GSLDC GSECL11 Shri BB Mehta CE cesldcgujgmailcom 987920073612 Shri BM Shah DyEE demissldcgetcogebmailcom 9925212836

VI WRLDC POWERGRID13 Shri P Mukhopadhyay GM prithwishmukhopadhyayposocoin 986943807314 Shri VK Shrivastava AGM vkspowergridindiacom 986945022115 Smt Sachala Mishra CM mishrasachalagmailcom 986945022316 Smt Pushpa S CM pushpa_seshadrihotmailcom 986940448217 Shri Aditya P Das Dy Mgr aditya19227gmailcom 9869404569

POWERGRID REGION-I18 Shri Anil Darode 70207powergridindiacom 942230180519 Shri Manu Sinha 02457powergridindiacom 9425293864

POWERGRID RETION -II20 Shri Abhinav Verma stawr2gmailcom 942850406221 Shri Anand Dubey ananddubey_pgrediffmailcom 9428504065

VII NTPC22 Shri PB Behre GM pbbeherentpccoin 900449708823 Shri Hari Nath AGM harinath01ntpccoin 900449713324 Shri SK Shrivastava AGM sksrivastava09ntpccoin 942517806925 Shri Amir Kr Singh SM aksingh01ntpccoin 942414081426 Shri Amitabh Kumar amitabhkumarntpccoin 9425178122

VIII TATA POWER27 Shri RM Sankhe GM rmsankhetatapowercom 909900654128 Shri PR Gadave AGM prgadavetatapowercom 9223553341

IX NHDC 29 Shri Anurag Seth CE annu226hotmailcom 9425326135

LIST OF PARTICIPANTS OF 462nd OCC MEETING OF WRPC HELD ON 11082014 AT TARAPURAnnexure-I

30 Shri Vinod Kumar Singh vinodnhdcrediffmailcom 9425925251

X APL 31 Shri CS Bobade GM chandrashekharbobadeadanicom 8980802255

XI RINFRA32 Shri SG Zirpe GM sachinzirperelianceadacom 932260763033 Shri Sanil C Namboodiripad sanilnamboodiripadrelianceadacom932104697434 Shri Subrata Das subratakudasrelianceadacom 932093072235 Shri Ishan Roy Asst Mgr ishanroyrelianceadacom 9860027348

XII KSK Mahanadi36 Shri Sudarshan B Reddy sudarshanreddybkskcoin 9000377721

XIII NPCIL37 Shri Mandeep mandeepnpcil 904991887038 Shri JS Choubey jschoubeynpcilcoin 942882191839 Shri Ritesh Chandra Singh rcsinghnpcilcoin 8007991744

XIV ESSAR 40 Shri OJ Saxena Sr Mgr osaxenaessarcom 987910126841 Shri Kamlesh Garg kamleshgargessarcom 987910284942 Shri Sarabjeet Singh sarabjeetsinghessarcom 750957010543 Shri Ashwin Ande ashwinandeessarcom 9909993594

XV JPL44 Shri RK Srivastava AGM rkshrivastavajindalpowercom 9329445016

XVI TORRENT POWER45 Shri Kamal K Vyas kamalvyastorrentpowercom 997407965746 Shri Pramod G Patel AGM pramodpateltorrentpowercom 9824370005

XVII NCA47 Shri Naveen Nath Das emc_ncarediffmailcom 9425053309

XVIII STERLITE GRID LTD48 Shri Sachin S Deshpande GM sachindeshpandesterlitecom 8966903047

XIX LANCO AMARKANTAK POWER LTD49 Shri BN Panda pandabnlancogroupcom 769770301550 Shri Anil Sharma anilshlancogroupcom 9560258009

XX KWPCL51 Mis Smruti R Nayak DGM smrutinayakavanthapowercom 9424176680

XXI MB POWER LTD 52 Shri Sandeep Kumar Gupta sandeepguptahpplin 9582896418

Anaulagnak 21

maah jaUlaa[- 2014

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5020 Hz BETWEEN 1700 Hrs amp 1800 Hrs Hrs ON 27072014

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4962 Hz BETWEEN 1900 Hrs amp 2000 Hrs Hrs ON 25072014

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4993 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5036 Hz AT 130344 Hrs ON 23072014

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4939 Hz AT 194315 hrs Hrs ON 25072014

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS JULY 2014 JUNE 2014 MAY 2014

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 008 023 000

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 314 476 093 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 3129 3216 2155 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 5016 4536 5319

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1533 1749 2433

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING JULY 2014

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

Voltage Profile during the month of July 2014

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 420 402 420 404 433 411 424 424 417 400 420 403 422 407 408 3902 417 398 420 400 431 407 424 424 417 401 427 418 421 409 410 3943 417 393 419 397 432 408 420 396 417 400 425 419 422 408 407 3934 416 398 419 401 434 412 422 402 417 400 426 421 418 406 411 3965 417 400 419 403 433 414 424 424 417 403 424 419 417 406 410 3996 420 406 422 408 438 411 421 402 419 407 427 421 422 412 409 3897 412 396 419 402 428 413 420 399 414 401 423 419 417 409 409 3968 418 400 421 410 433 400 424 400 416 400 425 419 422 400 410 3949 418 412 421 410 433 413 424 410 416 408 425 419 422 412 410 394

10 415 399 417 403 435 415 400 400 418 404 424 421 422 414 410 41111

स नक Annex-23

िभलाईBhilai

धल असोज कासोरKarad Dhule Asoj Kasor

इदौर इटारसी कराडIndore Itarsi

जतपरJetpur

11 416 402 423 407 436 416 422 407 416 405 425 421 423 413 410 39712 419 400 422 406 436 417 400 400 419 403 426 422 423 413 410 39713 415 400 422 410 437 417 400 400 417 406 425 421 422 414 411 39514 416 398 423 409 439 416 400 400 419 404 424 421 422 413 412 39815 420 403 423 408 437 413 428 401 418 404 426 422 423 413 410 39816 423 408 426 411 437 413 429 403 421 406 428 424 423 415 413 40017 421 404 424 407 436 416 400 400 419 408 423 414 423 414 411 39818 421 404 424 407 436 416 400 400 420 406 427 423 423 414 411 39819 423 407 425 410 434 415 425 411 424 405 428 425 424 416 422 39520 421 407 424 410 420 420 427 410 421 407 427 424 423 416 417 39621 421 406 424 411 420 420 400 400 420 402 428 425 426 418 413 39222 421 407 426 413 420 420 400 400 419 401 428 425 428 420 412 39623 422 409 427 410 419 415 415 402 420 403 425 419 428 420 412 39624 420 406 425 409 420 420 400 400 420 404 429 426 427 416 409 39625 422 401 421 404 420 420 400 400 424 402 428 424 423 415 415 39726 420 402 421 406 431 419 400 400 422 403 428 423 422 413 415 40027 417 404 422 407 434 416 423 407 421 405 428 424 422 413 416 40128 419 403 421 407 437 416 431 408 423 406 428 426 423 415 415 40229 419 403 420 408 437 415 400 400 421 406 429 426 423 416 415 39930 421 404 422 406 438 415 400 400 423 404 430 426 426 415 420 40331 420 395 420 402 431 406 428 403 422 403 429 425 423 414 419 398

423 393 427 397 439 400 431 396 424 400 430 403 428 400 422 389

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 418 404 411 395 423 406 430 406 789 752 788 757 787 756 791 7662 419 397 411 393 423 403 431 404 772 748 791 756 786 750 793 7553 416 402 411 397 421 397 425 399 772 748 780 751 781 757 791 7634 417 404 409 396 420 415 428 406 772 748 786 757 780 755 791 7655 418 404 418 400 421 404 427 407 772 748 796 755 796 765 802 7726 419 408 416 402 424 410 429 413 789 752 797 768 796 765 799 7757 414 406 407 397 420 403 426 407 789 752 776 758 777 757 784 7658 418 408 411 388 422 400 429 400 789 752 786 767 783 746 790 7719 412 401 403 386 422 405 429 408 789 752 781 761 772 745 783 76010 413 403 402 394 420 404 424 406 789 752 792 764 774 755 785 765

Bina Gwalior Nagda Khandwa Sipat

बना वािलयरिसविननागदावािलयर बनाBina

िसपतखडवाseoni Gwalior

10 413 403 402 394 420 404 424 406 789 752 792 764 774 755 785 76511 415 407 403 395 421 407 426 410 789 752 790 774 785 758 790 77212 418 406 407 392 422 404 427 404 789 752 796 769 784 756 796 76913 418 406 407 392 421 408 427 411 789 752 796 769 784 756 796 76914 419 410 409 397 423 406 428 409 789 752 784 768 786 763 792 77415 419 404 408 391 424 407 429 408 789 752 789 763 786 750 791 76416 424 414 408 400 427 411 431 413 789 752 792 766 785 767 797 77917 421 410 411 399 424 407 432 409 789 752 788 762 789 766 795 77618 423 412 414 396 424 407 432 409 789 752 783 770 796 765 801 77719 424 411 410 396 426 411 431 413 789 752 791 770 788 764 803 77720 425 411 411 396 424 410 428 414 789 752 786 763 789 760 800 77221 422 412 410 395 424 409 428 413 789 752 784 760 788 763 796 77522 423 416 414 402 424 410 429 414 789 752 791 774 794 773 801 78423 425 413 418 402 424 410 430 412 787 750 785 770 798 780 804 78324 422 411 411 397 425 409 431 415 789 752 790 772 791 773 801 78125 421 410 405 396 423 403 429 409 789 752 784 770 794 767 798 77726 421 410 409 395 423 404 427 409 789 752 792 773 789 767 799 77827 423 412 413 399 420 404 428 409 789 752 794 766 797 770 808 78028 422 411 411 399 421 405 428 410 789 752 789 763 794 770 793 77029 419 409 411 397 423 406 430 414 789 752 794 771 795 767 796 77430 422 409 413 398 420 404 430 413 788 753 796 766 799 766 799 77331 420 404 409 395 421 397 429 411 789 752 787 764 792 759 795 767

425 397 418 386 427 397 432 399 789 748 797 751 799 745 808 755

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Jul-14 0 0 0 0 0 0 0 02 02-Jul-14 0 0 0 0 0 0 0 03 03-Jul-14 0 0 0 0 0 0 0 04 04-Jul-14 0 0 0 0 0 0 0 05 05-Jul-14 0 0 0 0 0 0 0 06 06-Jul-14 1 67 0 0 0 0 0 07 07-Jul-14 0 0 0 0 0 0 0 08 08-Jul-14 1 278 0 0 0 0 0 09 09-Jul-14 0 0 0 0 0 0 0 0

10 10-Jul-14 1 565 0 0 0 0 0 011 11-Jul-14 0 0 0 0 0 0 0 012 12-Jul-14 0 0 0 0 0 0 0 013 13-Jul-14 3 758 0 0 0 0 0 014 14-Jul-14 0 0 0 0 0 0 0 015 15-Jul-14 0 0 0 0 0 0 016 16-Jul-14 2 2127 NIL NIL NIL 017 17-Jul-14 0 0 0 0 0 0 0 018 18-Jul-14 1 08 0 0 0 0 0 019 19-Jul-14 0 0 0 0 0 0 0 020 20-Jul-14 0 0 0 0 0 0 0 021 21-Jul-14 0 0 0 0 0 0 0 022 22-Jul-14 0 0 0 0 0 0 0 023 23-Jul-14 0 0 0 0 0 0 0 024 24-Jul-14 0 0 0 0 0 0 0 025 25-Jul-14 0 0 0 0 0 0 0 026 26-Jul-14 0 0 0 0 0 0 0 027 27-Jul-14 0 0 0 0 0 0 0 028 28-Jul-14 0 0 0 0 0 0 0 029 29-Jul-14 0 0 0 0 0 0 0 030 30-Jul-14 0 0 0 0 0 0 0 031 31-Jul-14 0 0

Max 3 758 0 0 0 00 0 0Total 9 24917 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month July 2014

Recommonded Load relief at 492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE 25

POWER CUTRESTRICTIONS IN WESTERN REGION FOR THE MONTH OF JULY-2014

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply(DLF)

01072014 31072014 2343 2105 2300

21 Three-Phase Supply(Irrigation)

01072014 31072014 0953 0857 0933

21 Three-Phase Supply(Mixed)

01072014 31072014 2339 2055 2240

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01072014 31072014 2353 2325 2344 32 District Head Qtrs 01072014 31072014 2357 2330 2348 33 Tehsil Head Qtrs 01072014 31072014 2350 2230 2319

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 010714 to 310714

SaUnya Nil

0-470 MW

SaUnya Nil

0000

SaUnya Nil 2400

SaUnya Nil

19 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs) 21 Three-Phase Supply 01072014 31072014 1000 0800 0900

22 Single-Phase Supply 01072014 31072014 1800 1800 1800 3 Anya jaanakarI Any other information There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

8860 (Av) of 31days 0000(Av) 0000 (Av)

1Rural 7109(Av) for 23447 Hrs 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0532 - -

0537 -

3 HT Industries 8261 (Av) for 17270 Hrs 0357 Total Energy Cutday 1426 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01072014 to 310714 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 3172014 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil ca gaaovaa Goa SaUnya Nil

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-26 Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai अिनवाय यिनट आऊटज का जलाई2014का वःता रत यौरा

Details of forced unit outages during the month ofJuly2014

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 एःसार Essar-2

गरा विनिल GSECL

172 1212 22-Feb-13 अनपल ध Still out

अनपल ध Still out

Shortage of gas

2 यट पीएस UTPS-2

गरा विनिल GSECL

120 1951 17-Jun-14 अनपल ध Still out

अनपल ध Still out

Turbine tripped(RSD)

3 एःसार व डनार Essar vadinar-1

गरा विनिल GSECL

600 2335 3-Jul-14 1324 22-Jul-14 Coal shortage

4 डब यट पीएस WTPS-6

गरा विनिल GSECL

210 953 10-Jul-14 0707 14-Jul-14 BTL

5 एसट पीएस STPS-1

गरा विनिल GSECL

120 1220 10-Jul-14 0710 14-Jul-14 BTL

6 जीआईपीसीएल GIPCL-STG I-2

गरा विनिल GSECL

165 1744 14-Jul-14 अनपल ध Still out

अनपल ध Still out

C ampI problem

7 एएलट पीएस ALTPS-1

गरा विनिल GSECL

120 107 15-Jul-14 2037 19-Jul-14 BTL

8 िस का ट पीएस SIKATPS-1

गरा विनिल GSECL

120 1330 17-Jul-14 अनपल ध Still out

अनपल ध Still out

RSD

9 डब यट पीएस WTPS-4

गरा विनिल GSECL

210 858 18-Jul-14 अनपल ध Still out

अनपल ध Still out

RSD

10 डब यट पीएस WTPS-3

गरा विनिल GSECL

210 1046 18-Jul-14 अनपल ध Still out

अनपल ध Still out

RSD

11 डब यट पीएस WTPS-5

गरा विनिल GSECL

210 1818 18-Jul-14 000 21-Jul-14 RSD

12 डब यट पीएस WTPS-6

गरा विनिल GSECL

210 447 19-Jul-14 अनपल ध Still out

अनपल ध Still out

RSD

13 यट पीएस UTPS-3

गरा विनिल GSECL

200 1055 26-Jul-14 2328 1-Aug-14 RSD

14 एपीएल APL-6

अदानी ADANI

660 2146 5-Jul-14 1105 2-Aug-14 Heavy hydrogen leakage

15 एपीएमएल APML-4

अदानी ADANI

660 1132 10-Jul-14 1407 23-Jul-14 Coal shortage

16 एपीएल APL-1

अदानी ADANI

330 117 20-Jul-14 612 23-Jul-14 RSD

प म ऽय भार षण कि म बई णाली चालन-ISO-I

17 एपीएल APL-8

अदानी ADANI

660 2018 18-Jul-14 2209 21-Jul-14 BTL

18 एपीएल APL-2

गरा विनिल GSECL

330 0913 26-Jul-14 1714 29-Jul-14 Air pre heater problem

19 एपीएल APL-5

गरा विनिल GSECL

660 1910 29-Jul-14 1533 2-Aug-14 Heavy steam leakage

20 डब यपीसीएल WPCL-1

मारा वउकिल MSPGCL

135 1245 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Furnace press high

21 डब यपीसीएल WPCL-4

मारा वउकिल MSPGCL

135 001 3-Apr-14 2347 11-Jul-14 Less schedule

22 कोराड Koradi-5

मारा वउकिल MSPGCL

200 1030 17-Jun-14 अनपल ध Still out

अनपल ध Still out

ID fan bearing temperature high

23 इ डयाबल Indiabulls - 1

मारा वउकिल MSPGCL

270 546 26-Jun-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

24 पल Parli -4

मारा वउकिल MSPGCL

210 1019 29-Jun-14 अनपल ध Still out

अनपल ध Still out

water shortage

25 भसावल Bhusawal-2

मारा वउकिल MSPGCL

210 1117 6-Jul-14 544 10-Jul-14 Coal problem

26 चिपर Chandrapur-1

मारा वउकिल MSPGCL

210 2211 8-Jul-14 2106 13-Jul-14 BTL

27 चिपर Chandrapur-3

मारा वउकिल MSPGCL

210 2216 14-Jul-14 1452 18-Jul-14 Safety valve problem

28 उरण Uran-6 मारा वउकिल MSPGCL

108 1634 15-Jul-14 1407 22-Jul-14 Gas shortage

29 उरण Uran -5 मारा वउकिल MSPGCL

108 2338 17-Jul-14 1125 24-Jul-14 For rotor balancing work

30 उरण Uran -A0 मारा वउकिल MSPGCL

120 2340 17-Jul-14 2315 23-Jul-14 For rotor balancing work

31 भसावल Bhusawal-2

मारा वउकिल MSPGCL

210 2346 18-Jul-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

32 खापरखड़ा Khaparkeda-3

मारा वउकिल MSPGCL

210 1036 20-Jul-14 041 29-Jul-14 Flame failure

33 जयगड Jaigad-2 मारा वउकिल MSPGCL

300 000 20-Jul-14 Ready Ready Less requisition

34 वीआईपीएल VIPL-2

मारा वउकिल MSPGCL

300 2302 20-Jul-14 1716 26-Jul-14 Coal feeding problem

35 एपीएमएल APML-3

मारा वउकिल MSPGCL

660 0444 22-Jul-14 044 26-Jul-14 Pressure release valve operated

36 भसावल Bhusawal-4

मारा वउकिल MSPGCL

500 003 23-Jul-14 151 29-Jun-14 BTL

37 वीआईपीएल VIPL-1

मारा वउकिल MSPGCL

300 015 23-Jul-14 1300 31-Jul-14 Coal feeding problem

38 उरण Uran -8 मारा वउकिल MSPGCL

108 730 26-Jul-14 1700 29-Jul-14 Gas shortage

39 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 347 29-Jul-14 638 4-Aug-14 BTL

प म ऽय भार षण कि म बई णाली चालन-ISO-I

40 पल PARLI-5 मारा वउकिल MSPGCL

210 002 30-Jul-14 अनपल ध Still out

अनपल ध Still out

Water shortage

41 टाटा TATA-8

टाटा TATA

250 2255 9-Jan-14 अनपल ध Still out

अनपल ध Still out

HT due to fire near turbine generator desk

42 टाटा TATA-6

टाटा TATA

500 2134 31-Jul-14 Ready Ready Less requisition

43 आरजीपीपीएल RGPPL-3A

आरजीपीपीएल RGPPL

320 1857 17-Apr-14 Ready Ready Less requisition

44 आरजीपीपीएल RGPPL-2B

आरजीपीपीएल RGPPL

320 1915 17-Jun-14 अनपल ध Still out

अनपल ध Still out

Raw water problem

45 आरजीपीपीएल RGPPL-2A

आरजीपीपीएल RGPPL

320 1615 25-Jun-14 1200 21-Jul-14 Less requisition

46 आरजीपीपीएल RGPPL-1A

आरजीपीपीएल RGPPL

320 1330 8-Jul-14 Ready Ready Less requisition

47 अमरकनटक Amarkantak-4

म वउकिल MPPGCL

120 1113 30-Apr-14 अनपल ध Still out

अनपल ध Still out

TURBINE BEARING VIBRATION HIGH

48 सातपरा Satpura-6

म वउकिल MPPGCL

200 305 18-Jun-14 अनपल ध Still out

अनपल ध Still out

BTL

49 एसजीट पीएस SGTPS-3

म वउकिल MPPGCL

210 617 26-Jun-14 020 26-Jul-14 Conveyer belt problem

50 अमरकनटक Amarkantak-3

म वउकिल MPPGCL

120 1640 2-Jul-14 1623 11-Jul-14 BTL

51 सातपरा Satpura-9

म वउकिल MPPGCL

210 2200 5-Jul-14 855 15-Jul-14 Condenser tube cleaning

52 सातपरा Satpura-9

म वउकिल MPPGCL

210 1310 15-Jul-14 845 24-Jul-14 BTL

53 एसजीट पीएस SGTPS-4

म वउकिल MPPGCL

210 2233 19-Jul-14 1252 4-Aug-14 Coal shortage

54 सातपरा Satpura-7

म वउकिल MPPGCL

210 225 21-Jul-14 545 24-Jul-14 BTL

55 सातपरा Satpura-10

म वउकिल MPPGCL

250 2316 22-Jul-14 07082014 High vibration in generator winding

56 एसजीट पीएस SGTPS-3

म वउकिल MPPGCL

210 1857 28-Jul-14 1020 2-Aug-14 Drum level low

57 DSPM(K(E) extn)-2

छरा वउकिल CSPGCL

250 2310 21-Jul-14 2029 22-Jul-14 Coal shortage

58 कोरबा पव Korba(E)-3

छरा वउकिल CSPGCL

210 1030 22-Jul-14 1025 27-Jul-14 CTL

59 कोरबा पव Korba(E)-5

छरा वउकिल CSPGCL

120 1345 22-Jul-14 1140 26-Jul-14 Wet coal problem

60 कोरबा पव Korba(E)-5

छरा वउकिल CSPGCL

120 2320 30-Jul-14 155 2-Aug-14 Coal shortage

61 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

62 एःसार महान Essar-Mahan-1

एःसारESSAR 600 014 22-Jun-14 1255 11-Jul-14 Less schedule

63 एःसारमहानEssar Mahan-1

एःसार ESSAR 600 620 16-Jul-14 1252 28-Jul-14 Withdrawn due to tripping of evacuation

प म ऽय भार षण कि म बई णाली चालन-ISO-I

Lines

64 सीजीपीएल CGPL-50

सीजीपीएल CGPL

830 948 13-Jun-14 409 23-Jul-14 Ash hopper refractory damage

65 सीजीपीएल CGPL-10

सीजीपीएल CGPL

830 1332 1-Jul-14 1952 9-Jul-14 BTL

66 सीजीपीएल CGPL-20

सीजीपीएल CGPL

800 1214 24-Jul-14 13-aug-14

Bottom ash Hopper works

67 सीजीपीएल CGPL - 40

सीजीपीएल CGPL

830 1918 26-Jul-14 1020 2-Aug-14 GT electrical fault

68 जपीएल JPL STG-2 UNIT-1

जपीएल JPL 600 051 26-Jun-14 अनपल ध Still out

अनपल ध Still out

Turbine vibration

69 जपीएलJPL STG-2 UNIT-2

जपीएलJPL 600 000 5-Jul-14 1457 11-Jul-14 Less requisition

70 जपीएल JPL STG-2 UNIT-2

जपीएलJPL 600 748 21-Jul-14 1800 24-Jul-14 BTL

71 एसीबीआईएल ACBIL-1

एसीबीआईएल ACBIL

135 151 6-Jul-14 1753 9-Jul-14 Furnace draft high

72 ससान Sasan -3 आरईएल REL 660 1648 15-Jul-14 2248 4-Aug-14 Ash evacuation problem

73 ससान Sasan-4 आरईएल REL 660 1645 24-Jul-14 810 3-Aug-14 High press main steam tripped

74 एमको EMCO-I एमको EMCO 200 109 16-Jul-14 अनपल ध Still out

अनपल ध Still out

Turbine vibration high

75 एसीबीआईएल ACBIL-2

एसीबीआईएल ACBIL

135 1955 21-Jul-14 601 24-Jul-14 Furnace draft high

76 मौदा Mouda -1

एनट पीसीNTPC 500 1630 18-Jun-14 2042 14-Jul-14 Flame failure

77 कावास Kawas-1C

एनट पीसीNTPC 116 2311 2-Jul-14 2100 6-Jul-14 Heavy steam leakage from stop valve

78 कावास Kawas-1B

एनट पीसीNTPC 106 2323 2-Jul-14 632 7-Jul-14 Less requisition

79 कावास Kawas-2B एनट पीसीNTPC 164 1704 10-Jul-14 Ready Ready Less requisition

80 कावास Kawas-1A एनट पीसीNTPC 164 1200 12-Jul-14 745 22-Jul-14 Less requisition

81 वीएसट पीएस VSTPS-11

एनट पीसीNTPC 500 1204 13-Jul-14 000 16-Jul-14 Coal shortage

82 गाधारGandhar-1 एनट पीसीNTPC 144 149 16-Jul-14 1807 21-Jul-14 Less requisition

83 कावास Kawas-1B एनट पीसीNTPC 164 1027 18-Jul-14 442 23-Jul-14 Less requisition

84 मौदा Mouda-1 एनट पीसीNTPC 500 000 18-Jul-14 1745 24-Jul-14 Less requisition

85 िसपतSipat-1 एनट पीसीNTPC 660 000 21-Jul-14 955 24-Jul-14 Generator H2 gas leakage

86 गाधार Gandhar-3

एनट पीसीNTPC 144 1607 21-Jul-14 अनपल ध Still out

अनपल ध Still out

BB protection operatedatJhanor

87 गाधार Gandhar-4(ST)

एनट पीसीNTPC 224 1607 21-Jul-14 1320 26-Jul-14 BB protection operatedatJhanor

88 ट स TAPS-1

एनट पीसीNTPC 160 2227 21-Jul-14 1407 26-Jul-14 Maintenance

89 गाधार एनट पीसीNTPC 144 507 22-Jul-14 Ready Ready Less requisition

प म ऽय भार षण कि म बई णाली चालन-ISO-I

Gandhar -1

90 मौदा mouda-2 एनट पीसीNTPC 500 915 23-Jul-14 315 31-Jul-14 Coal feeding problem

91 कावास Kawas-1A

एनट पीसीNTPC 106 608 24-Jul-14 1309 27-Jul-14 Less requisition

92 गाधार Gandhar-2

एनट पीसीNTPC 144 2036 26-Jul-14 100814 Less requisition

93 वीएसट पीएस VSTPS-2

एनट पीसीNTPC 210 500 27-Jul-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

94 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 748 27-Jul-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

95 मौदा Mouda-2 एनट पीसीNTPC 500 315 31-Jul-14 210 3-Aug-14 Less requisition Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का जलाई2014 का वःता रत यौरा

Details of planned unit outages during the month of July2014 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

सo From

समय दनाक

कारण Reason

Time Date Time Date

1 एसएलपीपी SLPP-2

गरा विनिल GSECL

125 045 23-Jun-14 NA 17-Jul -14 AOH

2 डब यट पीएस WTPS-5

गरा विनिल GSECL

210 000 21-Jul-14 29-0814 COH

3 यट पीएस UTPS-4

गरा विनिल GSECL

200 000 21-Jul-14 240814 AOH

4 एसएलपीपी SLPP-3

गरा विनिल GSECL

125 130 22-Jul-14 060814 AOH

5 यट पीएस UTPS-1

गरा विनिल GSECL

120 000 29-Jul-14 28814 AOH

6 पल ParlI-3

मारा वउकिल MSPGCL

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

Water supply problem

7 चिपर Chandrapur-7

मारा वउकिल MSPGCL

500 600 19-Jun-14 1124 2-Aug-14 AOH

8 नािसक NASIK -3

मारा वउकिल MSPGCL

210 1410 10-Jul-14 अनपल ध Still out

100814 AOH

9 कोरबा प म Korba(W)-2

छरा वउकिल CSPGCL

210 936 26-Jun-14 140814 AOH

10 वदनाVandana-I वदना VANDANA 135 1940 17-Jul-14 अनपल ध Still out

अनपल ध Still out

ETL

11 वीएसट पीएस VSTPS-8

एनट पीसीNTPC 500 012 1-Jun-14 253 13-Jul-14 AOH

12 कएसट पीएस KSTPS-4

एनट पीसीNTPC 500 2335 20-Jun-14 180814 COH

13 कावास Kawas-2A

एनट पीसीNTPC 106 000 27-Jun-14 260814 RampM works

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

11 Akrimota 1 125 4-Aug-14 14-Aug-14 AOH12 WTPS 2 210 5-Aug-14 3-Sep-14 AOH13 SLPP 1 125 16-Aug-14 4-Sep-14 AOH14 DGB 1 107 20-Aug-14 27-Aug-14 CI15 GIPCL-I GT-3 48 22-Aug-14 27-Aug-14 HGPI16 GIPCL-I GT-2 48 29-Aug-14 3-Sep-14 HGPI17 GIPCL-I GT-2 48 12-Aug-14 24-Aug-14 HGPI18 UTPS 3 200 19-Aug-14 12-Sep-14 AOH19 GTPS 2 120 25-Aug-14 14-Sep-14 AOH110 STPS 1 120 19-Aug-14 30-Aug-14 AOH111 GTPS 3 210 24-Aug-14 13-Sep-14 AOH112 APL 9 660 1-Sep-14 20-Sep-14 AOH

221 SGTPS 4 210 010914 250914 AOH3 Craiva]kMila CSPGCL

31 Korba East-6 6 120 21-Aug-14 13-Sep-14 AOH32 Korba East-1 1 50 15-Aug-14 1-Sep-14 AOH33 Korba East-3 3 50 21-Aug-14 30-Sep-14 AOH34 Korba West-1 1 210 12-Sep-14 27-Sep-14 COH35 Korba West-5 5 500 15-Aug-14 30-Aug-14 AOH

4

41 PARAS 3 250 20914 151014 AOH42 RELIANCE 2 250 140814 160814 TURBINE VIBRATION

5 koMd``Iya xao~ Central Sector

51 SIPAT 1 600 050914 191014 BLR OH + HPT + IPT+LPT + GEN

52VINDHYACHAL

5 500 120814 200914 CAP+TG PED CKG+GEN+BLR CHEM CLNG+ESP RampM

53VINDHYACHAL

9 500 120814 150914 BLR OH + HPT + IPT+ GEN

54VINDHYACHAL

11 500 160714 170814 AOH

55CGPL

30 800 150814 050914 Bottom ash hopper Refractory repair and General maintainance work

56 CGPL 40 800 060914 300914 UT 40B repair work57 NSPCL 1 250 200814 110914 AOH

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING AUGUST 2014 AND SEPTEMBER 2014

Capacity Outage as per Annual Maintenance Plan

Date Time Date Time

1 400 400KV BUS-I at Bilaspur Ss 14-Aug-14 900 14-Aug-14 1800 DAILY For bus bar stability of LANCO bays amp jumpering work WRTS-I LANCO C

2 400kV 50 MVAR Bus Reactor-2 at Itarsi SS 14-Aug-14 800 15-Oct-14 1800 Continuo

us Installation of 125MVAR reactor WRTS-II WRTS-II C

3 765 Satna-Gwalior2 14-Aug-14 800 17-Aug-14 1800 DailyCompletion of 765kV Gwalior2 Main Bay Erection amp Testing works at Satna

PGCIL WRTS-II C

4 400 400kV JBP- JBP Pooling 2 Line 14-Aug-14 1000 14-Aug-14 1500 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

5 400 400KV BUS-II at Bilaspur Ss 16-Aug-14 900 16-Aug-14 1800 DAILY For bus bar stability of LANCO bays amp jumpering work WRTS-I LANCO C

6 765 Bus2 at satna 16-Aug-14 800 18-Aug-14 1800 DailyExtension of bus 2 for Gwalior2 bay amp completion of Main Bay Erection

PGCIL WRTS-II C

7 400 Khandwa-Dhule1 16-Aug-14 800 31-Aug-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WR-II C

8 400 Gandahr - Navsari DC 16-Aug-14 800 31-Aug-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WR-II R

PID testing of insulator strings

KV Line From To

Annexure-32

Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

9 400 Navsari - Vapi - Kala 16-Aug-14 800 31-Aug-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WR-II R

10 400 Satna - Bina Ckt 1amp2 16-Aug-14 800 31-Aug-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WR-II R

11 400 80 MVAR Bus Reactor at Kotra 16-Aug-14 900 17-Aug-14 1800 ContinuousTo attend isolator defects WRTS-I PGCIL C

12 400 400kV JBP- JBP Pooling 1 Line 17-Aug-14 1000 17-Aug-14 1500 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

13 765 ICT II at Bina 17-Aug-14 0900 17-Aug-14 1800 Daily Post Commissioning check of Fire-Fighting system at Bina PGCIL WRTS-II C

14 765 Bus-2 at Gwalior 17-Aug-2014 1000 18-Aug-2014 1800 Daily Busbar Jumpering ampStability test related to Bus reactor

POWERGRID WRTS-II C

15 765 Seoni 2 LR(704 LR) at Bilaspur Ss 18-Aug-14 900 18-Aug-14 1500 DAILY For taking Spare LR in service

first time WRTS-I PGCIL C

16 400 Bhadrawati-Ramagundam I 18-Aug-14 800 18-Aug-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

17 400 400kV Vchal - JBP 1 Line 18-Aug-14 1000 18-Aug-14 1200 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

18 400 400kV Vchal - JBP 2 Line 18-Aug-14 1400 18-Aug-14 1600 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

19 400 400KV BUS-II at Bilaspur Ss 19-Aug-14 900 19-Aug-14 1800 DAILY For bus bar stability of LANCO bays amp jumpering work WRTS-I LANCO C

20 400 Bhadrawati-Ramagundam II 19-Aug-14 800 19-Aug-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

21 765 ICT 1 at G alior 19 A g 14 10 00 20 A g 14 18 00 Continou SPARE ICT COMMISSIONING PGCIL WRTS II C21 765 ICT - 1 at Gwalior 19-Aug-14 1000 20-Aug-14 1800 s SPARE ICT COMMISSIONING PGCIL WRTS-II C

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

22 400 400kV JBP- Itarsi 1 Line 19-Aug-14 1000 19-Aug-14 1200 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

23 400 400kV JBP- Itarsi 2 Line 19-Aug-14 1400 19-Aug-14 1600 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

24 400 400 kV Sipat -Ranchi-1 19-Aug-14 900 20-Aug-14 1900 Continous 1 no of CT replacement NTPC NTPC

25 400 BUS-I at Aurangabad(PG) 19-Aug-14 600 20-Aug-14 1800 ContiBus-1 extn for commissioning of 400 kV Boisar-1amp2 bays with 80 MVAR Reactors

WRTS-I WRTS-I C

26 400kV 400kV SUGEN PIRANA Line (Line 2) 19-Aug-14 900 19-Aug-14 1700 Daily Corrective Maintenance of

Transfer Isolator TPL-SUGE TPL-SUG R

27 400kV 400kV PGCIL - PIRANA Feeder No 2 19-Aug-14 900 19-Aug-14 1700 Daily 400kV CT connectors replacementTPL-AHME TPL-AHM R

28 400 Bhadrawati-Parli 1amp 2 19-Aug-14 000 20-Oct-14 1800 DailyFor OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

29 400 Mundra - Jetpur line No1 19-Aug-14 800 19-Aug-14 1200 Daily protection logic checking work PGCIL GETCO30 400 Mundra - Jetpur line No 2 19-Aug-14 1400 19-Aug-14 1800 Daily protection logic checking work PGCIL GETCO

31 400 400KV BUS-I at Bilaspur Ss 20-Aug-14 900 20-Aug-14 1800 DAILY For bus bar stability of LANCO bays amp jumpering work WRTS-I LANCO C

32 400 KSK ndash Raigarh circuit 4 20-Aug-14 900 21-Aug-14 1800 CONT complete PLCC rectification works WRTS-I KSK C

33 HVDC HVDC POLE I AT BHADRAWATI 20 A 14 8 00 21 A 14 18 00 D il AMP WORKS WRTS I WRTS I R33 HVDC HVDC POLE-I AT BHADRAWATI 20-Aug-14 800 21-Aug-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

34 765kV Dharamjaygarh - Durg ckt-2 20-Aug-14 800 22-Aug-14 1800 daily CSD relay commissioning (M+T) WRTS-I PGCIL C

35 765 JBP - BINA 1 at Jabalpur Pooling Station 20-Aug-14 1000 21-Aug-14 1800 Daily Commissioning of CSD Relay for

765KV JBP - BINA Ckt 1 PGCIL WRTS-II C

36 400 Khandwa-Dhule1 20-Aug-14 1000 20-Aug-14 1500 Daily AMP PGCIL WRTS-II R

37 400 Bus-1 at Shujalpur 20-Aug-14 1000 20-Aug-14 1800 Daily AMP PGCIL WRTS-II R

38 400 Bus2 at Satna 20-Aug-14 900 20-Aug-14 1800 Daily For Bus Bar Stability and charging activity of 406 Bay PGCIL WRTS-II C

39 400 Bus1 at Indore 20-Aug-14 900 20-Aug-14 1800 Daily Jumper connection amp stability checking of Pitampur1 PGCIL WRTS-II C

40 400 400kV JBP- Itarsi 3 Line 20-Aug-14 1000 20-Aug-14 1200 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

41 765 Raigarh (Kotra) - Raigarh (Tamnar) 20-Aug-14 900 31-Aug-14 1800 ContinuousFor installation of Bird guards WRTS-I PGCIL C

42 400 Kansari - Kankroli line 20-Aug-14 800 20-Aug-14 1800 Daily PMU installation work and maintenPGCIL GETCO43 400 BUS-2 AT SOLAPUR 21-Aug-14 900 22-Aug-14 1800 Daily Pune bays extension works WRTS-I WRTS-I C

44 765 ICT 1 at Jabalpur Pooling Station 21-Aug-14 1000 21-Aug-14 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus for Spare ICT Phase

PGCIL WRTS-II C

45 400 Bina-Shujalpur1 21-Aug-14 900 21-Aug-14 1000 Daily

For Replacement of 390kV Reactor LA with 336kV LA Line will be taken in service without PGCIL WRTS-II Cj p g g y will be taken in service without Line Reactor at Shujalpur

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

46 400 Khandwa-Dhule2 21-Aug-14 1000 21-Aug-14 1800 DailyFor Replacement of 390kV Reactor LA with 336kV LA At Khandwa amp AMP

PGCIL WRTS-II C

47 220 Damoh-Sagar 21-Aug-14 1000 21-Aug-14 1500 Daily AMP of terminal equipment at Damoh SS MPPTCL WR-II R

48 765 ICT2 at Indore 21-Aug-14 900 22-Aug-14 1800 Continious

For Auxiliary bus erection at Indore PGCIL WRTS-II C

49 400 125MVAr BR at Shujalpur 21-Aug-14 900 21-Aug-14 1800 Daily Differential stability of tie bay (Under commissioning) PGCIL WRTS-II C

50 400 Raipur-Bhadrawati-III 21-Aug-14 900 21-Aug-14 1800 ContinuousBus split at Raipur WRTS-I PGCIL C51 400 Kansari - Bhinmal line 21-Aug-14 800 21-Aug-14 1800 Daily PMU installation work and maintenPGCIL GETCO

52 HVDC HVDC POLE-2 AT BHADRAWATI 22-Aug-14 800 23-Aug-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

53 765 ICT I at Bina 22-Aug-14 0900 23-Aug-14 1800 DailyCommissioning of CSD Relay for 400kV side of ICT- rescheduling of outage

PGCIL WRTS-II C

54 765 JBP - BINA 2 at Jabalpur Pooling Station 22-Aug-14 1000 23-Aug-14 1800 Daily Commissioning of CSD Relay for

765KV JBP - BINA Ckt 2 PGCIL WRTS-II C

55 400 Khandwa-Rajgarh1 22-Aug-14 800 23-Aug-14 1800 PM Continous

Rectification of damaged tower peak at locno83 due to collapse of MPPTCL tower which is under construction

PGCIL MPPTCL C

F j i amp h i th56 400 Pirana-Vadodara-Asoj DC 22-Aug-14 800 23-Aug-14 1800 Daily

For jumpering amp charging the future cirucit of line in multi-circuit towers to prevent conductor theft

PGCIL WRTS-II C

57 220 Damoh-Damoh2 22-Aug-14 1000 22-Aug-14 1500 Daily AMP of terminal equipment at Damoh SS MPPTCL WR-II R

58 400kV 400kV SUGEN VAPI Line 22-Aug-14 900 22-Aug-14 1400 Daily Corrective Maintenance amp Inspection Dropper of 5 Core CT

TPL-SUGE TPL-SUG R

59 765 Bus Reactor Kotra 22-Aug-14 900 23-Aug-14 1800 Daily WRTS-I PGCIL C

60 400 Vindhyachal-Jabalpur3 23-Aug-14 900 23-Aug-14 1800 Daily

For Replacement of 390kV Reactor LA with 336kV LA At Jabalpur Line will remain out of service due to less clearance of Reactor LA from Line conductor

PGCIL WRTS-II C

61 765 ICT1 at Indore 23-Aug-14 900 26-Aug-14 1800 Continious

re routing of cables in CMB for commissioning of spare unit at Indore

PGCIL WRTS-II C

62 765 Bus- 2 at Bina 23-Aug-2014 0900 23-Aug-2014 1800 DailyFor Bus stability required for 765kV Jabalpur 3 Bay- Rescheduling of outage

POWERGRID WRTS-II C

63 765 Bus-1 at Gwalior 24-Aug-14 1000 25-Aug-14 1800 Daily Busbar Jumpering ampStability test related to Jaipur 1 main bay PGCIL WRTS-II C

64 400 Navasari- Kala MC line 25-Aug-14 800 26-Aug-14 1800 DailyConstruction work of Navasari- Boisar line on same Multi ckt WRTS-II WRTS-I Ctower

65 765 765400 AT-1 AT SOLAPUR 25-Aug-14 900 26-Aug-14 1800 Daily Spare ICT unit Aux bus commisioning works WRTS-I WRTS-I C

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

66 220 Korba-Budhipadar Ckt-3 at CSPDCL Korba Ss 25-Aug-14 900 26-Aug-14 1800 DAILY For diversion of line for SE

Railway MCL project WRTS-I PGCIL C

67 765 765KV Bus 1 at Jabalpur Pooling Station 25-Aug-14 1000 25-Aug-14 1800 Daily

765KV Bus 1 Extension for Switchyard Extension for BINA 3 Line Dia

PGCIL WRTS-II C

68 765 765KV ICT 1 at Jabalpur Pooling Station 25-Aug-14 1000 25-Aug-14 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus Isolators for Spare ICT Phase - Heavy Induction

PGCIL WRTS-II C

69 400 Vindhyachal-Jabalpur4 25-Aug-14 900 25-Aug-14 1800 Daily

For Replacement of 390kV Reactor LA with 336kV LA At Jabalpur Line will remain out of service due to less clearance of Reactor LA from Line conductor

PGCIL WRTS-II C

70 400 Bus-I at satna 25-Aug-14 900 25-Aug-14 1800 DailyFor Changing of Jumper from Twin Moose To Quad Moose in 401 bay (jaypee nigrie line-1)

PGCIL WR-II C

71 400 Deepnagar-Thaptitanda 25-Aug-14 900 25-Aug-14 1700 Daily To attend Isolator alignment problem MSETCL MSETCL

72 765 BUS-II and 765 ICT-1 at Aurangabad (PG) 25-Aug-14 600 25-Aug-14 1800 Daily Commissioning of spare ICT unit

at Aurangabad (PG) WRTS-I WRTS-I CAurangabad (PG) at Aurangabad (PG)

73 765 Kotra-durg Ckt-2 along with line reactor 25-Aug-14 900 28-Aug-14 1800 ContinuousReplacement of spacer damper WRTS-I PGCIL C

74 765 Wardha-Aurangabad (PG)-2 and Padge-1 LReactor 26-Aug-14 600 26-Aug-14 1800 Daily Construction of up-coming

Padghe bay at Aurangabad (PG) WRTS-I WRTS-I C

75 765 Gwalior -Bina 1 26-Aug-14 1000 27-Aug-14 1800 Daily Spare reactor commissioning at Gwalior PGCIL WR-II C

76 765 1500MVA ICT 2 at Jabalpur Pooling Station 26-Aug-14 1000 26-Aug-14 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus Isolators for Spare ICT Phase - Heavy Induction

PGCIL WRTS-II C

77 400 Jabalpur-Itarsi4 26-Aug-14 900 26-Aug-14 1800 Daily

For Replacement of 390kV Reactor LA with 336kV LA At Jabalpur Line will remain out of service due to less clearance of Reactor LA from Line conductor

PGCIL WRTS-II C

78 400 Akola ll-Thaptitanda 27-Aug-14 900 27-Aug-14 1900 Daily To attend chattering noise on B-ph wave trap MSETCL MSETCL

79 400 Vapi- Kala MC Line 27-Aug-14 800 28-Aug-14 1800 DailyConstruction work of Navasari- Boisar line on same Multi ckt tower

WRTS-II WRTS-I C

80 765 Bus 1 at Jabalpur Pooling Station 27-Aug-14 1000 27-Aug-14 1800 Daily

765KV Bus 1 Extension Busbar Stability test related to BINA 3 Line Dia

PGCIL WRTS-II C

81 400 KORBA SIPAT 27 Aug 14 600 29 Aug 14 2200 CONT NORMALISED THE LILO AT PGCIL LANCO C81 400 KORBA -SIPAT 27-Aug-14 600 29-Aug-14 2200 RAMPUR PGCIL LANCO C

82 400 TARAPUR-PADGHE II 27-Aug-14 800 28-Aug-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

83 765 Gwalior-Satna1 28-Aug-14 800 28-Aug-14 1800 Daily For spare reactor commissioning works at Gwalior PGCIL WRTS-II C

84 765 BUS-II and Padge-2 LReactor at Aurangabad (PG) 28-Aug-14 600 28-Aug-14 1800 Daily

Commissioning of Padghe-2 upcoming bay at Aurangabad (PG)

WRTS-I WRTS-I C

85 765 Bilaspur 1 Main bay (710) at Seoni 28-Aug-14 800 29-Aug-14 1800 Daily AMP works WRTS-I WRTS-I R

86 765 765400 AT-2 AT SOLAPUR 28-Aug-14 900 28-Aug-14 1800 Daily Spare ICT unit Aux bus commisioning works WRTS-I WRTS-I C

87 765 Bus Reactor(706 BR) at Bilaspur Ss 28-Aug-14 900 01-Sep-14 1800 DAILY For replacement of unarmoured

cable by TBEA WRTS-I PGCIL C

88 765 Bus 2 at Jabalpur Pooling Station 28-Aug-14 1000 29-Aug-14 1800 Daily

765KV Bus 2 Extension for Switchyard Extension for BINA 3 Line Dia

PGCIL WRTS-II C

89 400 MOUDA 400KV BUS REACTOR 28-Aug-14 0900hrs 29-Aug-14 1800 ContionuouAnnual Maintainance NTPC NTPC

90 765 Satna - Bina 1 29-Aug-14 0900 31-Aug-14 1800 Daily

for erection of new TC amp TE tower forNHPTL at Bina-Rescheduling of outage

PGCIL WRTS-II C

91 765 Bus Reactor at Satna 29-Aug-14 900 30-Aug-14 1800 Continious Commissioning of spre reactor PGCIL WRTS-II Cus

92 400 125MVAr BR1 at Indore 29-Aug-14 900 29-Aug-14 1800 Daily Post Commissioning check of Fire-Fighting system at Indore PGCIL WRTS-II C

93 400 Chorania Hadala line 29-Aug-14 800 29-Aug-14 1800 Daily PMM WORK GETCO GETCO

94 765 Kotra-durg Ckt-2 along with line reactor 29-Aug-14 900 31-Aug-14 1800 Daily WRTS-I PGCIL C

95 765 765400 ICT-2 at Aurangabad (PG) 30-Aug-14 600 30-Aug-14 1800 Daily Altube erection in 400 kV Boisar-

1amp2 Tie bays WRTS-I WRTS-I C

96 765kV Dharamjaygarh - Bilaspur 30-Aug-14 800 30-Aug-14 1800 daily commissioning of JBP-1 bay (side) WRTS-I PGCIL C

97 765kV 330 MVAR Bus Rector-2 at Dharamjaygarh 30-Aug-14 800 30-Aug-14 1800 daily commissioning of JBP-1 bay

(side) WRTS-I PGCIL C

98 400 Mundra Hadala SC 30-Aug-14 800 30-Aug-14 1800 DailyPower Line Crossing of 400 KV DC Bhachau SS (PG) - Varsana SS (GETCO) TrL

GETCO WRTS-II C

99 220 Gwalior - Mahalgaon 1amp2 30-Aug-14 900 31-Aug-14 1800 Continuous

For crossing of 765kV Gwalior - Jaipur line PGCIL WRTS-II C

100 220 Gwalior - Malanpur 1amp2 30-Aug-14 900 31-Aug-14 1800 Continuous

For crossing of 765kV Gwalior - Jaipur line PGCIL WRTS-II C

101 400 400 kV Akola- Nandagaon peth sc 31-Aug-14 800 31-Aug-14 1600 Daily crossing works of 765 kV Koradi-AWRTS-I WRTS-I R

102 400 Bina-Shujalpur2 31-Aug-2014 900 31-Aug-2014 1000 DailyFor Replacement of 390kV Reactor LA with 336kV LA Line

ill b t k i i ith t

POWERGRID WRTS-II C

103 400 Mundra - Sami DC 01-Sep-14 800 01-Sep-14 1800 DailyPower Line Crossing of 400 KV DC Bhachau SS (PG) - Varsana SS (GETCO) TrL

ADANI WRTS-II C

104 400 Akola-Wardha 1amp 2 01-Sep-14 800 30-Sep-14 1800 Daily For Online PID Line in service with AR in non-auto mode WRTS-I WRTS-I For IOwith AR in non auto mode

105 765 Bilaspur 2 Main bay (716) at Seoni 01-Sep-14 800 02-Sep-14 1800 Daily AMP works WRTS-I WRTS-I R

106 400 400220 ICT-1 AT SOLAPUR 01-Sep-14 900 01-Sep-14 1500 Daily AMP WORK WRTS-I WRTS-I R

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

107 765 1000 MVA ICT I amp ICT II at Bina 01-Sep-14 0900 01-Sep-14 1800 Daily Commissioning of Master follower

scheme PGCIL WRTS-II C

108 765 Bus 1 at Jabalpur Pooling Station 01-Sep-14 100000 AM 01-Sep-14 60000 PM Daily

765KV Bus 1 Extension Busbar Stability test related to Bhopal 1 Line Dia

PGCIL WRTS-II C

109 400 Shujalpur - Bina 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

110 400 Birsinghpur-Damoh 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

111 400 Gandhar - Navsari 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

112 400 Khandwa - Rajgarh 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

113 400 Indore - Nagda 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

114 400 Jabalpur - Jabalpur Pool 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II Cnon auto mode

115 400 Khandwa - Dhule 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

116 400 Itarsi - Khandwa 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

117 220 Satna - Satna 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

118 765 Dehgam - Ranchhodpura 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

119 765 Shujalpur - Nagda 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

120 400 Asoj - SSP 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

121 400 Bhachau - Mundra 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

122 400 Bina - Gwalior 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

123 400 Satna - Gwalior 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in PGCIL WRTS-II Cnon auto mode

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

124 400 LILO portion of Vapi - Navi Mumbai at Kala(Vapi-Kala Line) 01-Sep-14 600 30-Sep-14 1800 Daily

Online replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

125 400400 kV Khandwa - Rajgarh

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

126 400400 kV Gandhar-Navsari

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

127 400400 kV Rajgarh ndash SSP

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

128 400400 kV SSP-Asoj

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

129 400 400 kV Shujalpur - Nagda (MPPTCL)

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

130 400400 kV Dehgam - Ranchodpura

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

131 400 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in PGCIL WRTS-II C

400 kV Ranchodpura ndash Bhachaup p y OPGW AR shall be kept in

non auto mode

132 400400 kV Mundra-Bhachau

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

133 400400 kV Vindhyachal NTPC -SASAN UMPP Ckt-1 01-Sep-14 600 30-Sep-14 1800 Daily

Online replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

134 400400 kV Vindhyachal Pooling -Vindhyachal NTPC 01-Sep-14 600 30-Sep-14 1800 Daily

Online replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

135 400 400 kV LILO at Kala (DNH) SS of Vapi-Navi Mumbai Line

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

136 765765 kV Bina - Gwalior

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

137 765765 kV Satna - Gwalior Ckt-I

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

138 400 Gandahr - Navsari DC 01-Sep-14 800 30-Sep-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

139 400 Navsari - Vapi - Kala 01-Sep-14 800 30-Sep-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

PID testing of insulator strings 140 400 Satna - Bina Ckt 1amp2 01-Sep-14 800 30-Sep-14 1800 Daily AR shall be kept In non auto

modePGCIL WRTS-II R

141 400 Nagda - Dehgam DC 01-Sep-14 800 30-Sep-14 1800 Daily PID testing of insulator strings AR h ll b k t I t

PGCIL WRTS-II R

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

142 220 Kakrapar - Vapi DC 01-Sep-14 800 30-Sep-14 1800 Daily PID testing of insulator strings PGCIL WRTS-II R

143

220 220 KV Jhanor - Haldrwa Line 1

01-Sep-14

800

05-Sep-14

000

Continous Replacement of existing CTCVT with 02 class CT amp CVT and for testing of the same NTPC NTPC

144 400 Akola-Aurangabad(PG) 2 01-Sep-14 800 02-Sep-14 1800 Conti commissioning of 50MVAR Lreactor at Aurangabad(PG) WRTS-I WRTS-I C

145 765 Bina-Satna 2 02-Sep-14 0900 03-Sep-14 1800 Daily Post Commissioning check of Fire-Fighting system at Bina PGCIL WRTS-II C

146 400 Vadavi-Chorania 1 02-Sep-14 800 02-Sep-14 1800 Daily PMM WORK WRTGPL GETCO147 400 BUS REACTOR AT SOLAPUR 02-Sep-14 900 02-Sep-14 1500 Daily AMP WORK WRTS-I WRTS-I R

148 765 Korba Line Main Bay (716) at Bilaspur Ss 02-Sep-14 900 02-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

149 765 Bus 2 at Jabalpur Pooling Station 02-Sep-14 100000 AM 02-Sep-14 60000 PM Daily

765KV Bus 2 Extension for Switchyard Extension for Bhopal 1 Line Dia

PGCIL WRTS-II C

150 400 Bus2 at Indore 02-Sep-14 900 02-Sep-14 1800 Daily Jumper connection amp stability checking of Pitampur1 PGCIL WRTS-II C

151 400 CGPL-Limbdi-1 02-Sep-14 2-Sep-14 8AM 6PM Daily routine maintenance and isolator aPGCIL CGPL

152400 Korba-Bhalai line -1

02-Sep-14 900 03-Sep-14 19002 days

continuous CVTs replacement

NTPC NTPC00 o ba a a e us C s ep ace e t

153 400 Sipat 400KV Bus-1 02-Sep-14 900 03-Sep-14 1900 Continous Annual Preventive maintenance NTPC NTPC

154 765 Bilaspur 2 Tie bay (717) at Seoni 03-Sep-14 800 04-Sep-14 1800 Daily AMP works WRTS-I WRTS-I R

155 400 400220 ICT-1 AT SOLAPUR 03-Sep-14 900 03-Sep-14 1500 Daily AMP WORK WRTS-I WRTS-I R

156 765 Sipat2 Main Bay (712) at Bilaspur Ss 03-Sep-14 900 03-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

157 765 Bina-Gwalior 2 03-Sep-14 0900 04-Sep-14 1800 Daily For spare reactor commissioning works at Gwalior PGCIL WRTS-II C

158 765 Bus 2 at Jabalpur Pooling Station 03-Sep-14 100000 AM 03-Sep-14 60000 PM Daily

765KV Bus 2 Extension for Switchyard Extension for Jumpering (Bus Extension) for Bhopal 1

PGCIL WRTS-II C

159 400 Indore-Asoj3 03-Sep-14 900 04-Sep-14 1800 Continuous

For checking protection transfer system at Indore (MPPTCL) PGCIL WRTS-II C

160 400 400 kv Nagda- Rajgarh ckt Pgcil ckt I 03-Sep-14 900 03-Sep-14 03092014 1800 daily Maintenan

ce Work PGCIL EHT- Mamp I

161 400 Vadavi-Chorania 2 04-Sep-14 800 04-Sep-14 1800 Daily PMM WORK WRTGPL GETCO162 220 SOLAPUR(PG)-Solapur(M) 04-Sep-14 900 04-Sep-14 1800 Daily AMP WORK MSETCL WRTS-I R

163 765 Bus 2 at Jabalpur Pooling Station 04-Sep-14 100000 AM 04-Sep-14 60000 PM Daily

765KV Bus 2 Extension Busbar Stability test related to Bhopal 1 Line Dia

PGCIL WRTS-II C

164 400 CGPL-Limbdi-2 04-Sep-14 4-Sep-14 8AM 6PM Daily routine maintenance and isolator aPGCIL CGPL

165 400 400 kv Nagda- Rajgarh ckt Pgcil ckt II 04-Sep-14 900 04-Sep-14 04092014 1800 daily Maintenan

ce Work PGCIL EHT- Mamp I

166400 Korba-Bhalai line -2

04-Sep-14 900 05-Sep-14 19002 days

continuous CVTs replacement

NTPC NTPC

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

167 400 BUS-1 AT SOLAPUR 05-Sep-14 900 05-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I C

168 400 Seoni-Khandwa 1 05-Sep-14 800 05-Sep-14 1800 Daily Line AMP works at Seoni WRTS-II WRTS-I R

169 400 400220 ICT-2 AT BOISAR 05-Sep-14 900 05-Sep-14 1500 Daily For Bushing oil DGA Testing WRTS-I WRTS-I R

170 765 Sipat2 Tie Bay (711) at Bilaspur Ss 05-Sep-14 900 05-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

171 765 Bina-Jabalpur I 05-Sep-14 0900 06-Sep-14 1800 Daily Post Commissioning check of Fire-Fighting system at Bina PGCIL WRTS-II C

172 400 Bus Reactor 1 at Jabalpur Pooling Station 05-Sep-14 100000 AM 05-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

173 220 Navsari - Nasik - 1 05-Sep-14 800 05-Sep-14 1800 Daily PMM WORK PGCIL GETCO174 400 Sipat 400KV Bus-2 05-Sep-14 900 06-Sep-14 1900 Continous Annual Preventive maintenance NTPC NTPC175 400 Akola-Wardha ckt 2 05-Sep-14 800 05-Sep-14 1700 Daily QMwork MSETCL MSETCL176 400 Kalwa-Kharghar 05-Sep-14 900 05-Sep-14 1700 Daily R amp M work MSETCL MSETCL177 400 Seoni-Khandwa 2 06-Sep-14 800 06-Sep-14 1800 Daily Line AMP works at Seoni WRTS-II WRTS-I R178 400 400220 ICT-1 AT BOISAR 06-Sep-14 900 06-Sep-14 1500 Daily For Bushing oil DGA Testing WRTS-I WRTS-I R

179 400 Bus Reactor 2 at Jabalpur Pooling Station 06-Sep-14 100000 AM 06-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

180 765 Gwalior-Satna2 06-Sep-14 800 06-Sep-14 1800 Daily For spare reactor commissioning works at Gwalior PGCIL WRTS-II C

181 400 Indore-Indore1 06-Sep-14 900 07-Sep-14 1800 Continuo For checking protection transfer t t I d (MPPTCL) PGCIL WRTS-II C181 400 Indore Indore1 06 Sep 14 900 07 Sep 14 1800 us system at Indore (MPPTCL) PGCIL WRTS II C

182 220 Navsari - Nasik - 2 06-Sep-14 800 06-Sep-14 1800 Daily PMM WORK PGCIL GETCO

183 400 VAPI-BOISAR 07-Sep-14 800 08-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

184 765 Satna-Gwalior-2 Reactor 07-Sep-14 900 07-Sep-14 1800 Daily For Commissioning of CSD relay in Gwalior-2 reactor bay at Satna PGCIL WRTS-II C

185 220 DC Welspun - Shivlakha amp Anjar shivlakha Trl 07-Sep-14 80000 AM 07-Sep-14 60000 PM Daily

Power Line Crossing of 400 KV DC Bhachau SS (PG) - Varsana SS (GETCO) TrL

GETCO WR-II C

186 765 Bilaspur 1 Tie bay (711) at Seoni 08-Sep-14 800 09-Sep-14 1800 Daily AMP works WRTS-I WRTS-I R

187 400kV Bus-1 at Itarsi SS 08-Sep-14 800 08-Sep-14 1800 Daily AMP amp Protection testing WRTS-II WRTS-II R

188 765 Seoni2 Main Bay (707) at Bilaspur Ss 08-Sep-14 900 08-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

189 765 Bina-Jabalpur II 08-Sep-14 0900 09-Sep-14 1800 Daily Post Commissioning check of Fire-Fighting system at Bina PGCIL WRTS-II C

190 765 ICT 1 at Jabalpur Pooling Station 08-Sep-14 100000 AM 08-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

191 765 Gwalior-Bina3 08-Sep-14 800 09-Sep-14 1800 Daily For spare reactor commissioning works at Gwalior PGCIL WRTS-II C

192 400 V-satna-1 08-Sep-14 900 09-Sep-14 1900 Continuous

Major OH of Line Circuit Breaker (For dismantling of poles) NTPC NTPC

193

220 220 KV Jhanor- Haldrwa Line 2

08-Sep-14

800

12-Sep-14

000

Continous Replacement of existing CTCVT with 02 class CT amp CVT and for testing of the same NTPC NTPC

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

194 400 Vadavi- Kansari- 1 09-Sep-14 800 09-Sep-14 1800 Daily PMM WORK WRTGPL GETCO195 400 Bus-1 at Damoh 09-Sep-14 1000 10-Sep-14 1800 Daily AMP PGCIL WRTS-II R

196 765 Bus Reactor 1 at Jabalpur Pooling Station 09-Sep-14 100000 AM 09-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

197 400 Bina - Shujalpur 1 09-Sep-14 1000 09-Sep-14 1400 Daily AMP PGCIL WRTS-II C

198 400 400 kv Katni- Damoh ckt 09-Sep-14 800 09-Sep-14 09092014 1800 daily Maintenance Work PGCIL EHT-

Mamp I

199 220 220 KV OMKARESHWAR -KHANDWA 09-Sep-14 900 09-Sep-14 09092014 1600 daily Maintenan

ce Work PGCIL EHT- Mamp I

200 220 220KV MALANPUR -AURAIYA 09-Sep-14 900 09-Sep-14 09092014 1700 daily Maintenance Work

EHT- Mamp I

201400 Korba 400 KV Bus coupler -1

09-Sep-14 900 10-Sep-14 19002 days

continuous Annual maintenance and testing

NTPC NTPC

202 400kV Bus-2 at Itarsi SS 10-Sep-14 800 10-Sep-14 1800 Daily AMP amp Protection testing WRTS-II WRTS-II R203 400 400220KV ICT-2 at Seoni 10-Sep-14 800 11-Sep-14 1800 Conti OLTC overhauling works WRTS-I WRTS-I R

204 400 VAPI-BOISAR 10-Sep-14 800 11-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

205 400 Parli 2 Tie Bay (417) at Solapur 10-Sep-14 900 10-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

206 765 330 MVAR Bus Rector-1 at Dharamjaygarh 10-Sep-14 800 11-Sep-14 1700 DAILY CSD relay commissioning in main

bay WRTS-I PGCIL C

207 765 ICT3 Tie Bay (717) at Bilaspur 10 S 14 9 00 10 S 14 18 00 DAILY F AMP k WRTS I PGCIL R207 765 ICT3 Tie Bay (717) at Bilaspur Ss 10-Sep-14 900 10-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

208 765 765kV Dharamjaygarh - Ranchi-2 l 10-Sep-14 900 15-Sep-14 1800 continous

For strining Jumpering of parallel ckt and Crossing of 765kV Dharamjaygarh-Jabalpur line

WRTS-I PGCIL C

209 765 ICT 2 at Jabalpur Pooling Station 10-Sep-14 100000 AM 10-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

210 400 Shujalpur-Nagda 1 10-Sep-14 1000 10-Sep-14 1400 Daily AMP PGCIL WRTS-II C211 400 Vadavi- Kansari- 2 10-Sep-14 800 10-Sep-14 1800 Daily PMM WORK WRTGPL GETCO

212 400 400 kv ISP - Nagda ckt 10-Sep-14 900 10-Sep-14 10092014 1800 daily Maintenance Work

EHT- Mamp I

213 220 220KV MALANPUR -AURAIYA 10-Sep-14 900 10-Sep-14 10092014 1700 daily Maintenance Work

EHT- Mamp I

214 220 220 KV DAMOH PGCIL IC - I 10-Sep-14 800 10-Sep-14 10092014 1800 daily Maintenance Work PGCIL EHT-

Mamp I

215765KV400K

VSipat 765KV400KV ICT-1 10-Sep-14 900 11-Sep-14

1900 Continous Annual Preventive maintenance NTPC NTPC216 400 New Koyna-Dabhol ckt 1 10-Sep-14 830 10-Sep-14 1730 Daily QMwork MSETCL MSETCL217 400 Akola-Aurangabad ckt 1 10-Sep-14 830 10-Sep-14 1730 Daily QMwork MSETCL MSETCL

218 400 TARAPUR-PADGHE I 11-Sep-14 800 12-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

219 400 ICT 2 Main Bay (409) at Mapusa 11-Sep-14 900 11-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

220 765 Korba LR (716 LR) at Bilaspur Ss 11-Sep-14 900 11-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

221 220 Bus-1 at Damoh 11-Sep-14 1000 12-Sep-14 1800 Daily AMP PGCIL WRTS-II R

222 765 Bus Reactor 2 at Jabalpur Pooling Station 11-Sep-14 100000 AM 11-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

223 220MC Bhimasar - Lalpar Bhimasar -Morbi amp Bhimasar - Mansar (on same tower)

11-Sep-14 80000 AM 11-Sep-14 60000 PM DailyPower Line Crossing of 400 KV DC Bhachau SS (PG) - Varsana SS (GETCO) TrL

GETCO WR-II C

224 220 Navsari - Dastan- 1 11-Sep-14 800 12-Sep-14 1800 Daily PMM WORK PGCIL GETCO

225 400 400 kv Rajgarh Pgcil - SSP CKT I 11-Sep-14 900 11-Sep-14 11092014 1800 daily Maintenance Work PGCIL EHT-

Mamp I

226 220 220K KV MEHGAON - AURAIYA 11-Sep-14 900 11-Sep-14 11092014 1700 daily Maintenance Work

EHT- Mamp I

227400 Korba Lanco

11-Sep-14 900 12-Sep-14 19002 days

continuous Annual maintenance and testing

NTPC NTPC

228 400 Lonikand II-Lonikand I 11-Sep-14 900 11-Sep-14 1700 Daily QMwork MSETCL MSETCL

229 400 Parali-Lonikand II ckt 2 11-Sep-14 900 11-Sep-14 1700 Daily QMwork MSETCL MSETCL

230 400 Waluj-Bableshwer 11-Sep-14 900 11-Sep-14 1700 Daily QMwork MSETCL MSETCL

231 400 Tie Transformer-II NTPC-Korba 11-Sep-14 900 12-Sep-14 1700 Maintenance NTPC NTPC

232 400kV Sipat-Raipur-2 12-Sep-14 000 12-Sep-14 1700 Daily Attending hot spots and SD nature defects WRTS-I PGCIL R

233 400 400220 ICT 1 AT WARDHA 12 Sep 14 9 00 12 Sep 14 15 00 Dail For B shing oil DGA Testing WRTS I WRTS I R233 400 400220 ICT-1 AT WARDHA 12-Sep-14 900 12-Sep-14 1500 Daily For Bushing oil DGA Testing WRTS-I WRTS-I R

234 400 Khandwa-Dhule 2 line reactor at Dhule 12-Sep-14 800 12-Sep-14 1800 Daily For Bushing oil DGA Testing

Line in service wo reactor WRTS-I WRTS-I R

235 400 BUS I AT MAPUSA 12-Sep-14 900 12-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

236 765 JBP - Dharmjaygarh Reactor Line 1 Reactor at Jabalpur Pooling Station

12-Sep-14 100000 AM 12-Sep-14 60000 PM Daily Installation amp Commissioning of CSD Relay PGCIL WRTS-II C

237 400 400 kv Rajgarh Pgcil - SSP CKT II 12-Sep-14 900 12-Sep-14 12092014 1800 daily Maintenan

ce Work PGCIL EHT- Mamp I

238 400 400 kv Indore - Nagda ckt 12-Sep-14 900 12-Sep-14 12092014 1800 daily Maintenance Work

EHT- Mamp I

239 220 220K KV MEHGAON - AURAIYA 12-Sep-14 900 12-Sep-14 12092014 1700 daily Maintenance Work

EHT- Mamp I

240 400 Lonikand-Stage IV 12-Sep-14 900 12-Sep-14 1700 Daily QMwork MSETCL MSETCL

241 400 Aurangabad(PG)-Aurangabad (Waluj)-1 12-Sep-14 800 15-Sep-14 1800 Conti Augmentation works at MSETCL

Waluj 400kV SSWRTS-I WRTS-I C

242 400 TARAPUR-PADGHE I 13-Sep-14 800 14-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

243 400 Karad-Lonikand 13-Sep-14 900 13-Sep-14 1700 Daily QMwork MSETCL MSETCL

244 400kV Sipat-Raipur-1 13-Sep-14 000 13-Sep-14 1700 Daily Attending hot spots and SD nature defects WRTS-I PGCIL R

245 400 BOISAR-PADGHE 13-Sep-14 800 14-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

246 400 400220 ICT-2 AT WARDHA 13-Sep-14 900 13-Sep-14 1500 Daily For Bushing oil DGA Testing WRTS-I WRTS-I R

247 400 Khandwa-Dhule 1 line reactor at Dhule 13-Sep-14 800 13-Sep-14 1800 Daily For Bushing oil DGA Testing

Line in service wo reactor WRTS-I WRTS-I R

248 220 BUS I AT MAPUSA 13-Sep-14 900 13-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R248 220 BUS I AT MAPUSA 13-Sep-14 900 13-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

249 765 Korba Line Main Bay (716) at Bilaspur Ss 13-Sep-14 900 13-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

250 400 Dhule-Babhleswar ckt 2 13-Sep-14 900 13-Sep-14 1700 Daily QMwork MSETCL MSETCL

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

251 400 Kolhapur-Mapusa 1 13-Sep-14 800 17-Sep-14 1800 Daily Insulator replacement due to polluted streaches

WRTS-I WRTS-I R

252 400 Kolhapur-Mapusa 1 13-Sep-14 800 17-Sep-14 1800 Daily Insulator replacement due to polluted streaches

WRTS-I WRTS-I R

253 400 Bhachau - Ranchodpura DC(Subject to SLDC consent) 14-Sep-14 80000 AM 20-Sep-14 60000 PM Continuo

us

Shifting of towers to maintain clearance for SSNL canal crossing (Loc 26-33 amp 78-84)

PGCIL WRTS-II C

254 400kV Bhilai-koradi line 15-Sep-14 000 16-Sep-14 000 Daily Attending hot spots and SD nature defects WRTS-I PGCIL R

255 400 Navasari- Kala MC line 15-Sep-14 800 16-Sep-14 1800 DailyConstruction work of Navasari- Boisar line on same Multi ckt tower

WRTS-II WRTS-I C

256 400 SOLAPUR(PG)-KARAD 15-Sep-14 900 20-Sep-14 1800 Conti Tower Erection of Line Reactor gantry of Karad Line at Solapur MSETCL WRTS-I R

257 765 WARDHA-AURANGABAD(PG) 2 15-Sep-14 800 15-Sep-14 1800 Daily

For replacement of Rph reactor unit at Wardha Line in service wo reactor Taking out reactor out of service

WRTS-I WRTS-I R

258 400 Chandrapur 3 Main Bay (420) at Bhadrawati 15-Sep-14 900 15-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

259 765 Seoni1 Main Bay (704 ) at Bilaspur Ss 15-Sep-14 900 15-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL RBilaspur Ss

260 220 Kakrapar-Haldarwa1 15-Sep-14 900 15-Sep-14 1800 DailyReplacement of existing 220kV CTs with High Fault current CTs at Haldarwa SS

PGCIL WRTS-II C

261 400 SSP - Rajgarh - 1 15-Sep-14 800 17-Sep-14 1800 Daily PMM WORK PGCIL GETCO

262

220 Jhanor 220 KV Bus1

15-Sep-14

800

16-Sep-14

000

Continous Replacement of existing CTCVT with 02 class CT amp CVT and for testing of the same NTPC NTPC

263 400 BOISAR-PADGHE 16-Sep-14 800 17-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

264 400 Chandrapur 3Tie Bay (421) at Bhadrawati 16-Sep-14 900 16-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

265 400 Indore-Asoj2 16-Sep-14 80000 AM 16-Sep-14 60000 PM Daily Replacement of broken insulators PGCIL WRTS-II R

266 765 Sasan-Satna2 16-Sep-14 900 17-Sep-14 1800 Daily Power line crossing for stringing of of 765Kv Vin pool- satna ck2 PGCIL WRTS-II C

267 400 315MVA ICT1 at Shujalpur 16-Sep-14 1000 16-Sep-14 1400 Daily AMP PGCIL WRTS-II R

268 220 Kakrapar-Haldarwa2 16-Sep-14 900 16-Sep-14 1800 DailyReplacement of existing 220kV CTs with High Fault current CTs at Haldarwa SS

PGCIL WRTS-II C

269 220 220 KV PITHAMPUR - RAJGARH PG CKT - I 16-Sep-14 900 16-Sep-14 16092014 1600 daily Maintenan

ce Work PGCIL EHT- Mamp I

270 400 V-satna-1 16-Sep-14 900 16-Sep-14 1900 Daily basis For erection of Breaker after OH NTPC NTPC

Construction work of Navasari- 271 400 Vapi- Kala MC Line 17-Sep-14 800 18-Sep-14 1800 Daily Boisar line on same Multi ckt

towerWRTS-II WRTS-I C

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

272 400 HVDC IBay (403) at Bhadrawati 17-Sep-14 900 17-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

273

220 Jhanor 220 KV Bus2

17-Sep-14

800

18-Sep-14

000

Continous Replacement of existing CTCVT with 02 class CT amp CVT and for testing of the same NTPC NTPC

274 400 Parli 1 Main Bay (423) at Bhadrawati 18-Sep-14 900 18-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

275 220 Kawas-Haldarwa1 18-Sep-14 900 18-Sep-14 1800 DailyReplacement of existing 220kV CTs with High Fault current CTs at Haldarwa SS

PGCIL WRTS-II C

276 400 SSP - Rajgarh - 2 18-Sep-14 800 20-Sep-14 1800 Daily PMM WORK PGCIL GETCO

277 400 400 KV Sarni - Seoni ckt 18-Sep-14 800 18-Sep-14 18092014 1800 daily Maintenance Work PGCIL EHT-

Mamp I

278 220 220 KV PITHAMPUR - RAJGARH PG CKT - II 18-Sep-14 900 18-Sep-14 18092014 1600 daily Maintenan

ce Work PGCIL EHT- Mamp I

279 220 220 KV DAMOH PG - TIKAMGARH CKT I 18-Sep-14 800 18-Sep-14 18092014 1800 daily Maintenan

ce Work PGCIL EHT- Mamp I

280 400Sipat 400KV Bay-9 (Raipur-1 Main bay) 18-Sep-14 900 19-Sep-14 1900 Continous Annual Preventive maintenance NTPC NTPC

281 400 Kolhapur-Mapusa 2 18-Sep-14 800 22-Sep-14 1800 Daily Insulator replacement due to polluted streaches

WRTS-I WRTS-I R

282 400 Khandwa 2 Tie bay (423) at 19 S 14 8 00 20 S 14 18 00 D il AMP k WRTS I WRTS I R282 400 Khandwa 2 Tie bay (423) at Seoni 19-Sep-14 800 20-Sep-14 1800 Daily AMP works WRTS-I WRTS-I R

283 400 BOISAR-PADGHE 19-Sep-14 800 20-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

284 400 Parli 1 Tie Bay (424) at Bhadrawati 19-Sep-14 900 19-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

285 220 Kawas-Haldarwa2 19-Sep-14 900 19-Sep-14 1800 DailyReplacement of existing 220kV CTs with High Fault current CTs at Haldarwa SS

PGCIL WRTS-II C

286 400 V-satna-2 19-Sep-14 900 20-Sep-14 1900 Continuous

Major OH of Line Circuit Breaker (For dismantling of poles) NTPC NTPC

287 400 Aurangabad(PG)-Aurangabad (Waluj)-2 19-Sep-14 800 22-Sep-14 1800 Conti Augmentation works at MSETCL

Waluj 400kV SSWRTS-I WRTS-I C

288 400 Parli 2 Main Bay (416) at Solapur 20-Sep-14 900 20-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

289 400 400220 ICT-3 AT MAPUSA 20-Sep-14 900 20-Sep-14 1500 Daily AMP WORKS WRTS-I WRTS-I R

Anaulagnak 33

Agast 2014 AaOr isatmbar 2014 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR AUGUST 2014 AND SEPTEMBER 2014

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)Agast 2014 isatmbar 2014 Agast 2014 isatmbar 2014

AUGUST 2014 SEPTEMBER 2014 AUGUST 2014 SEPTEMBER 2014

1 gaujarat

saIimat 12500 13900 7750 8500

AsaIimat 12540 13940 7760 8510

2 maQya p`doSa

saIimat 6200 6500 3800 4100

AsaIimat 6250 6500 3800 4100

3 CltaIsagaZ

saIimat 3030 3199 16425195 172052635

AsaIimat 3160 3269 172031 169036025

4 maharaYT

saIimat 16050 17750 10700 10800

AsaIimat 16100 17800 10750 10850

5 gaaovaa

saIimat 410 415 290 285

AsaIimat 425 425 300 290

6 dmana dIva

saIimat 315 320 205 200

AsaIimat 320 325 210 210

7 DI ena eca

saIimat 645 640 425 420

AsaIimat 650 645 430 425

8 piScama xao~

saIimat 37614 41048 25600 26080

AsaIimat 37898 41254 26450 27900

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah jaUlaa[- 2014

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 2236 75

]k[- Ukai - 2 529 75]k[- Ukai - 3 000 0]k[- Ukai - 4 2023 75]k[- Ukai (Total) 4788 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 094 2]k[- ela baI saI eca Ukai LBCH - 2 028 2]k[- ela baI saI eca Ukai LBCH (Total) 123 1 0018

3 kDanaa Kadana - 1 699 61 0010kDanaa Kadana - 2 910 57 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 1115 62 0000kDanaa Kadana (Total) 2724 62 0010

4 pnama PANAM amp Madhuban Dam 1 amp 2 160 8 0017 6 kula jalaIya TOTAL(H) 7794 225 0390

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 3339 57 34582 TaoronT pavar ilaimaToD yauinaT DI 6957 122 64083 TaoronT pavar ilaimaToD yauinaT [- 8082 122 67664 TaoronT pavar ilaimaToD yauinaT ef 8380 124 73285 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 037511 Qauvarna tapIya Dhuvaran - GT 2 000 0 116012 Qauvarna tapIya Dhuvaran - STG 1783 10113 ]ka[- yauinaT 1 Ukai -1 000 0 019714 ]ka[- yauinaT 2 Ukai -2 000 0 019315 ]ka[- yauinaT 3 Ukai -3 10038 202 922016 ]ka[- yauinaT 4 Ukai -4 6930 202 697517 ]ka[- yauinaT 5 Ukai -5 11833 212 1138718 ]ka[- yauinaT 6 Ukai -6 30277 507 2287219 gaaMQaInagar 1 Gandhinagar - 1 000 0 008220 gaaMQaInagar 2 Gandhinagar - 2 000 0 009221 gaaMQaInagar 3 Gandhinagar - 3 6275 213 669022 gaaMQaInagar 4 Gandhinagar - 4 6060 212 706523 gaaMQaInagar 5 Gandhinagar - 5 13495 215 1331024 vaNakbaaorI 1 Wanakbori - 1 12142 209 000025 vaaNakbaaOrI 2 Wanakbori - 2 12364 21026 vaaNakbaaOrI 3 Wanakbori - 3 6669 20227 vaaNakbaaOrI 4 Wanakbori - 4 7244 21128 vaaNakbaaOrI 5 Wanakbori - 5 6198 21029 vaaNakbaaOrI 6 Wanakbori - 6 5924 21230 vaaNakbaaOrI 7 Wanakbori - 7 9489 21031 ]trna Utran GT 1 000 0 026832 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 1200 221 024735 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 819 143 1098

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

Anaulagnak 41

ACTUAL GENERATION amp AVALABILITY FOR JULY 2014Actual vaastivak

Actual vaastivak

37 isaka Sikka - 1 1326 107 179438 isaka Sikka - 2 3489 114 401539 kcC ilagnaa[-T Kutch Lignite - 1 5092 71 859040 kcC ilagnaa[-T Kutch Lignite - 2 4929 7141 kcC ilagnaa[-T Kutch Lignite - 3 000 042 kcC ilagnaa[-T Kutch Lignite - 4 2388 68 571043 saUrt ilagnaa[-T Surat Lignite - 1 8775 130 874544 saUrt ilagnaa[-T Surat Lignite - 2 3966 130 445845 saUrt ilagnaa[-T Surat Lignite - 3 5411 130 524346 saUrt ilagnaa[-T Surat Lignite - 4 8973 130 883347 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5446 103 859048 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 6057 10749 jaI Aa[- pI saI ela GIPCL GT - 1 1123 33 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1510 3251 jaI Aa[- pI saI ela GIPCL GT - 3 598 3052 jaI Aa[- pI saI ela GIPCL ST - 1 1846 4553 jaI Aa[- pI saI ela GIPCL GT - 4 357 98 000054 jaI Aa[- pI saI ela GIPCL ST - 2 186 5055 [- esa esa e Aar ESSAR GT - 1 000 0 029356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 083 146 002860 jaI pI [- saI GPEC GT - 2 148 153 023361 jaI pI [- saI GPEC GT - 3 1387 145 028462 jaI pI [- saI GPEC STG 521 7563 jaI esa [- jaI GSEG GT - 1 206 51 112164 jaI esa [- jaI GSEG GT - 2 1079 4765 jaI esa [- jaI GSEG STG 613 2466 Sugen (GT 1 + GT 2) 000 0 693867 saIpIpI sao Aayaat Imp from CPP+MUNDRA 249228 6777

kula tapIya Total (T) 511604 7860 431554kula jalaIya+tapIya Total (H+T) 519398 8078 431944ivaMD [najaI- Wind Energy 94980kula jalaIya+tapIya+hvaa Total (H+T+Wind) 614378 9539ivainamaya Exchanges 150828 saIimat jaa- maaMga Restricted Energy Req 765205

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 767 135

11 gaaMQaI saagar Gandhi Sagar 998 117 008012 raNaa p`tap sagar RPSagar 096 86 004013 javaahr sagar Jawahar Sagar 439 66 0020

2 ponca Pench 1381 160 01003 baargaI Bargi 712 33 00704 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 5724 309 02906 banasaagar Bansagar-2 (Deolondh) 104 407 banasaagar Bansagar-3 (Silpara) 565 31 00608 banasaagar Bansagar-4 (Zinaha) 425 20 00309 maoDIKoDa Medikheda 096 58

10 ibarisaMGapur Birsingpur 680 20 002011 Tavaa Tawa 000 012 rajaGaaT Rajghat 001 7 007013 Omkareshwar 4226 340 14 [Midra saagar Indira Sagar 6679 679 0598

kula jalaIya TOTAL(H) MPPGCL 19979 2031 1152

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 2223 84 179302 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 14496 216 0

Actual vaastivak

4 satpura I Satpura-I(60Share) 000 0 00005 satpura II Satpura-II Unit 6 000 0 83106 satpura II Satpura-II Unit 7 7549 1857 satpura II Satpura-II Unit 8 12446 195 173908 satpura II Satpura-II Unit 9 4038 1759 satpura III Satpura-III Unit 10 9508 219 23440

10 satpura III Satpura-III Unit 11 8675 167 2096011 esajaITIpIesa 1 SGTPS Unit - 1 8675 167 2096012 esajaITIpIesa 2 SGTPS Unit - 2 9354 16013 esajaITIpIesa 3 SGTPS Unit - 3 1129 165 1642014 esajaITIpIesa 4 SGTPS Unit - 4 6022 16015 esajaITIpIesa 5 SGTPS Unit - 5 27597 50816 SSTPS 7895 309 9910

kula tapIya Total (T) 117479 2427 115480kula jalaIya+tapIya Total (H+T) 137458 4759 116632Injection from WIND 14572 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 152030 4759ivainamaya Exchanges 271419 saIimat jaa- maaMga Rest En Req 423449

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 606 120 01102 Gangrel 039 10 00203 Mini Micro KWB 039 7

kula jalaIya TOTAL(H) CSEB 684 137 0520tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 40 125902 kaorbaa (pU) Korba (E) Unit-2 2764 383 kaorbaa (pU) Korba (E) Unit-3 2764 384 kaorbaa (pU) Korba (E) Unit-4 2784 405 kaorbaa (pU) Korba (E) Unit -5 3685 120 244406 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 154608 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 24740

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 13343 243 1124012 KORBA(EB) Extn - 2 14104 248 11250

kula tapIya Total (T) 119955 1644 10189013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 119955 1644kula jalaIya+tapIya Total (H+T) 120639 1781 102410ivainamaya Exchanges 59759 0saIimat jaa- maaMga Rest En Req 180398 1781

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 5228 585 06952 kaoyanaa III Koyna III 3695 3203 kaoyanaa IV Koyna IV 371 11204 kaoyanaa DIpIeca Koyna DPH 414 385 TaTa jalaIya TATA Hydro 10123 741 44976 vaOtrNaa Vaitarna 1151 617 eladarI Eldari 000 168 BaTgar AaOr vaIr Bhatgar amp Vir 036 49 pOzana Paithan 976 49

10 itlaarI Tillari 1036 6511 BaIra Tola rosa Bhira Tail Race 846 4112 GaTGar Ghatghar 3639 25013 Anya CaoTo jalaIya Small Hydro (others) 1041 0

kula jalaIya TOTAL(H) 28404 -1073 5192

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL

Actual vaastivak

3 naaisak 3 Nasik Unit -3 4157 1954 naaisak 4 Nasik Unit -4 12489 1985 naaisak 5 Nasik Unit -5 12480 2006 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 30718 5038 Tambao 6 Trombay Unit -6 6619 5009 Tambao 8 Trombay Unit -8 000 0

10 Tambao 7A gaOsa Trombay -7A (Gas) 7476 127 288611 Tambao 7ba Trombay -7B (WHR) 4373 6912 kaoraDI 5 Koradi Unit -5 000 013 kaoraDI 6 Koradi Unit -6 8448 16714 kaoraDI 7 Koradi Unit -7 10994 19415 Bausaavala 2 Bhusawal Unit -2 4715 16516 Bausaavala 3 Bhusawal Unit -3 6454 16517 Bausaavala 4 Bhusawal Unit -4 20419 50518 Bausaavala 4 Bhusawal Unit -5 23286 43519 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 000 021 parlaI 5 Parli Unit -5 9315 17522 parlaI 6 Parli Unit -6 14237 25323 parlaI 7 Parli Unit -7 14028 25024 KaprKoDa 1 Khaperkheda Unit -1 8108 20025 KaprKoDa 2 Khaperkheda Unit -2 10924 19026 KaprKoDa 3 Khaperkheda Unit -3 7917 20627 KaprKoDa 4 Khaperkheda Unit -4 10446 21028 KaprKoDa 5 Khaperkheda Unit -5 24555 50030 parsa Paras-3 11676 21831 parsa Paras-4 10326 24032 ]rna Uran (Gas) 18771 40133 ]rna Uran (WHR) 10760 138 586234 caMd`pur 1 Chandrapur Unit -1 7526 16535 caMd`pur 2 Chandrapur Unit -2 9375 19936 caMd`pur 3 Chandrapur Unit -3 8728 20037 caMd`pur 4 Chandrapur Unit - 4 12276 47038 caMd`pur 5 Chandrapur Unit -5 29203 41039 caMd`pur 6 Chandrapur Unit -6 26351 040 caMd`pur 7 Chandrapur Unit -7 000 041 DhaNaU 1 Dahanu Unit-1 16882 250 1563042 DhaNaU 2 Dahanu Unit-2 19263 250 1660143 CPP 258820 41160044 RGPPL Share 000 0

kula tapIya Total (T) 692115 14094 350211MAH Wind + Solar Generation 110432 0kula jalaIya +tapIya Total (H+T+Wind) 830951 16176 396382

TOTAivainamaya Exchanges 274116saIimat jaa- maaMga Rest En Req 1105066

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1173 17ivainamaya Exchanges 33083saIimat jaa- maaMga Rest En Req 34256 459

C (F) dmana AaOr dIva DAMAN amp DIU 17467 298ja (G) dadra nagar hvaolaI DNH 43779 673

kula DD ampDNH (T) 61246 970

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 9731 160 1564312 tara`pur 2 TAPS Unit -2 11531 16013 tara`pur 3 TAPS Unit -3 40214 545 7288014 tara`pur 4 TAPS Unit -4 39284 53715 kakrapr 1 KAPS Unit -1 16048 545 3195016 kakrapr 2 KAPS Unit -2 14903 537

kula ena pI saI NPC Total 131710 24842 ena TI pI saI NTPC

Actual vaastivak

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15236 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14181 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14568 214 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 000 025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 32338 51326 kaorbaa esaTIpIesa 6 KSTPS Unit-6 33493 51427 kaorbaa esaTIpIesa 7 KSTPS Unit-7 30558 516

kula kaorbaa KSTPS Total 140373 2548 9318427 ivanQa esaTIpIesa 1 VSTPS Unit-1 13430 21528 ivanQa esaTIpIesa 2 VSTPS Unit-2 11930 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 13695 212210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14017 214211 ivanQa esaTIpIesa 5 VSTPS Unit-5 11952 215212 ivanQa esaTIpIesa 6 VSTPS Unit-6 8991 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 32786 515214 ivanQa esaTIpIesa 8 VSTPS Unit-8 19668 514215 ivanQa esaTIpIesa 9 VSTPS Unit-9 31796 516216 ivanQa esaTIpIesa 10 VSTPS Unit-10 31597 515217 ivanQa esaTIpIesa 11 VSTPS Unit-11 13881 512

kula ivanQayaacala VSTPS Total 233445 REF 16238 31 saIpt -1 -SIPAT-1 38555 66600 32 saIpt -2 -SIPAT-2 16033 66500 33 saIpt -3 -SIPAT-3 43240 66800 34 saIpt -4 -SIPAT-4 25865 51200 35 saIpt -5 SIPAT-5 33302 51500

kula saIpt -SIPAT TOTAL 156995 280100 920541 kvaasa gaOsa 1e Kawas GT-1A 2605 10442 kvaasa gaOsa 1baI Kawas GT-1B 4355 10643 kvaasa esaTI 1saI Kawas ST-1C 3365 11744 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 044 9846 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 10369 309 245151 gaMQaar gaOsa 1 Gandhar GT-1 2177 14352 gaMQaar gaOsa 2 Gandhar GT-2 3014 14553 gaMQaar gaOsa 3 Gandhar GT-3 5333 14754 gaMQaar esaTI 4 Gandhar ST-4 5586 158

kula gaMQaar GGPS Total 16109 437 475161 maaOda 1 Mauda -1 5368 514 000062 maaOda 2 Mauda -2 16240 513 0000

kula maaOda MAUDA Total 21608 756 2258161 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 000 31 000071 esa esa pI SSP RBPH - 1 1265 18872 esa esa pI SSP RBPH - 2 1102 18673 esa esa pI SSP RBPH - 3 1197 18774 esa esa pI SSP RBPH - 4 1116 18675 esa esa pI SSP RBPH - 5 1432 18676 esa esa pI SSP RBPH - 6 1653 18677 esa esa pI SSP CHPH - 1 422 3578 esa esa pI SSP CHPH - 2 384 3079 esa esa pI SSP CHPH - 3 179 34710 esa esa pI SSP CHPH - 4 1012 36711 esa esa pI SSP CHPH - 5 340 30

kula esa esa pI SSP Total 10101 1283 101081 kula poMca Pench Total 1381 160 010082 Jindal Injection 50805 083 Amarkantak Lanco 16857 0

(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2508924

(J) ]plabQata Availability 2439102 naoT ivainamaya Net Exchanges -311541 ]plabQa jaa- Energy Availability 2127561

maah jaUlaa[- 2014 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR JULY 2014 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 13833 - - - 13833 070714 1500 4972

saIimat Restricted 12500

AsaIimat Unrestricted 12540 13833 0 136 0 13969 070714 1500 4972

nyaUnatma pMjaIkRt maaMga Min Registered Demand 7617 7617 250714 0400 4999

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 7090 - - - 7090 020714 2015 4985

saIimat Restricted 6040

AsaIimat Unrestricted 6040 7090 0 31 0 7121 020714 2015 4985

nyaUnatma pMjaIkRt maaMga Min Registered Demand 3895 3895 230714 1500

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3118 3118 050714 2100 4985

saIimat Restricted 3150

AsaIimat Unrestricted 3250 2972 41792 24 0 3414 030714 2000 4977

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1336 1336 220714 1300 4995

maharaYT MAHARASHTRApMjaIkRt Registered 19283 - - - 19283 010714 1600 4994

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19283 62 40 0 19385 010714 1600 4994

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11936 11936 300714 0500 5000

gaaovaa GOApMjaIkRt Registered 405 459 - - 459 260714 2000 4967

AsaIimat Unrestricted 405 459 0 5 - 464 260714 2000 4967

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 532 - - 532 290714 0900 4998

AsaIimat Unrestricted 532 0 0 - 532 290714 0900 4998

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 287 - - 287 060714 1000 4991

AsaIimat Unrestricted 287 0 1 - 288 060714 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 721 - - 721 050714 1700 4983

AsaIimat Unrestricted 721 0 - 721 050714 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 400 435 290714

piScama xao~ WESTERN REGIONpMjaIkRt Registered 43034 - - - 43034 010714 1600 4994

saIimat Restricted 40703

AsaIimat Unrestricted 40905 43034 295 90 0 43419 010714 1600 4994

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28431 28431 240714 0500 5000 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

माह जलाई 2014Jul-14

अनब समातरवतीय चालन PARALLELRADIAL OPERATION TOTAL OPERATING HOURS

1 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-NR)

2 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-SR) 7424400

टाई लाईन TIE LINE

1 765 कवी िसवनी स वधा-I 765kV Soni to Wardha 6780100

2 765 कवी िसवनी स वधा-II 765kV Seoni to Wardha 2043700

3 400 कवी िभलाई स कोराड 400kV Bhilai to Koradi 7440000

4 400 कवी िभलाई स भिावती 400kV Bhilai to Bhadravati 7440000

5 400 कवी रायपर स भिावती -I 400kV Raipur to Bhadravati-I 7440000

6 400 कवी रायपर स भिावती ndashII 400kV Raipur to Bhadravati-II 7440000

7 400 कवी रायपर स भिावती ndashIII 400kV Raipur to Bhadravati-III 7440000

8 400 कवी सातपरा स कोराड 400kV Satpura to Koradi 7060200

9 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7440000

10 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 7440000

11 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7225100

12 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 7082500

13 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 5361200

14 400 कवी को हापर स मापसा-I 400kV Kolhapur-Mapusa-I 4561600

15 400 कवी को हापर स मापसा-II 400kV Kolhapur-Mapusa-II 4793700

16 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7440000

17 400 कवी रायगढ़ स ःटरलाइट-I 400kV Raigarh to Sterlight-I 7371100

18 400 कवी रायगढ़ स ःटरलाइट-II 400kV Raigarh to Sterlight -II 7440000

19 400 कवी रायगढ़ स झरसगड़ा-I 400kV Raigarh to Jharsuguda-I 7302900

20 400 कवी रायगढ़ स झरसगड़ा-II 400kV Raigarh to Jharsuguda-II 7303700

21 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 5400900

22 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7292200

23 400 कवी रायपर स वधाndashI 400kV Raipur to Wardha-I 7440000

24 400 कवी रायपर स वधाndashII 400kV Raipur to Wardha-II 7440000

25 220 कवी कोरबा पव स ब पादर-III 220kV K(E) to Budhipadar-III 7361200

ANNEXURE 43

maah jaUlaa[- 2014 ko daOrana pa~ta iSaDyaUla GaTkaoM Wara koMd`Iya xao~ ko sToSanaaoMM sao D`avala AaOr ivainamayaaoM ka ivavarNa

1 koMd`Iya sToSanaaoMM samaip-t koMd`Iya sToSanaoMa saMyaut inajaI sToSanaaoM kI GaaoiYat xamata (basa pr) AaOr laaBaaiqa-yaaMo kI pa~ta1 Declared Capcity (ex-bus) of Central Gen StnsDedicated CG StnsJointly owned Stns amp entitlement of beneficieries (MUs)

GaaoiYat xamata gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI + ecaDblyaubaI kula

(A) koMd`Iya ibajalaIGar A Central Gen Stns Dec Cap GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC+HWB TOTAL

kaorbaa esaTIpIesa Korba STPS 1017635 174452 237891 103616 324281 102699 23918 26164 1017635kaorbaa esaTIpIesa -III Korba STPS-III 283431 54419 44422 85553 76649 3066 3405 13029 283431ivanQa esaTIpIesa I Vindhyachal STPS-I 674012 123034 240046 1253 246970 19644 7141 23669 12255 674012ivanQa esaTIpIesa II Vindhyachal STPS-II 491154 117386 158375 0909 175903 6532 4569 16539 491154ivanQa esaTIpIesa III Vindhyachal STPS-III 627679 166963 156579 67068 186511 7093 7097 22387 627679ivanQa esaTIpIesa IV Vindhyachal STPS-IV 411100 98631 118464 26475 133406 5356 5241 19338 411100kvaasa gaOsa Kawas GPP 306920 87464 65557 0000 95562 5791 14520 37998 306920gaMQaar gaOsa Gandhar GPP 406294 146476 72428 0000 123833 7814 19389 36310 406294saIpt Sipat 1665864 454494 301337 266370 509047 19436 19662 68224 1665864kakrapar Kakrapar APS 275783 78347 69731 0000 94368 9698 5200 8018 10420 275783tara`pur 3 AaOr 4 Tarapur APS 3amp4 721903 183150 155921 32084 295823 8510 8953 31049 721903

(ba) samaip-t koMd`Iya ibajalaIGar B Dedicated CG Stations Actual injection vaasaivak [njaoSana [Midra saagar Indira Sagar 245570 245570 245570

(sa) saMyaut inajaI sToSana C Jointly owned Stationstara`pur 1 AaOr 2 Tarapur APS 1amp2 196640 98320 0000 0000 98320 0000 0000 0000 196640esaesapI SSP 97965 15674 55840 0000 26450 0000 0000 0000 97965ponca Pench 13620 9080 0000 4540 0000 0000 0000 13620

kula ([M saagar kao CaoD kr) Total (excl Indira Sagar) 11988065 2808880 2297269 640720 3692105 208667 173093 400816 1766516 11988065 Actual injection

2 koMd`Iya sToSanaaoMM samaip-t koMd`Iya sToSanaoMa saMyaut inajaI sToSanaaoM kI ]padna SaoDyaUla AaOr laaBaaiqa-yaaoM kI D`avala SaoDyaUla2 Generation Schedule (ex-bus) of Central Gen StationsDedicated CG StationsJointly owned Stations amp schedule of benificieries (MUs)

SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI+ ecaDblyaubaI kula

(A) koMd`Iya ibajalaIGar A Central Gen Stns Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH

HVDC+HWB Outside region(NR

amp SR) TOTALkaorbaa esaTIpIesa Korba STPS 1015070 174452 238276 103310 321801 102699 23918 26164 1015070kaorbaa esaTIpIesa -III $ Korba STPS-III $ 282671 54342 44422 85185 76334 3066 3405 13029 282671ivanQa esaTIpIesa I Vindhyachal STPS-I 660248 120064 239050 1253 237415 19644 7141 23473 12209 660248ivanQa esaTIpIesa II Vindhyachal STPS-II 488287 117160 156978 0909 174700 6532 4569 16539 488287ivanQa esaTIpIesa III Vindhyachal STPS- III 600504 134916 160349 67878 186319 7093 7227 22827 600504ivanQa esaTIpIesa IV Vindhyachal STPS- IV 409072 98719 118259 24888 133048 5356 5241 19374 409072kvaasa gaOsa Kawas GPP 99574 27083 25459 0000 23510 2678 5916 14915 0000 99574gaMQaar gaOsa Gandhar GPP 154677 55634 30257 0000 41633 3783 8217 15131 0000 154677saIpt Sipat 1448506 290983 323024 258111 436177 19418 23860 69790 1448506kakrapar Kakrapar APS 275783 78347 69731 0000 94368 9698 5200 8018 10420 275783tara`pur 3 AaOr 4 Tarapur APS 3amp4 721903 183150 155921 32084 295823 8510 8953 31049 721903

(ba) samaip-t koMd`Iya ibajalaIGar B Dedicated CG Stations[Midra saagar Indira Sagar 245570 245570 245570

RPPC(NVVNL) 0000

0000

0000

(sa) saMyaut inajaI sToSana C Jointly owned Stations Actual injection vaasaivak [njaoSana tara`pur 1 AaOr 2 Tarapur APS 1amp2 196640 98320 0000 0000 98320 0000 0000 0000 196640esaesapI SSP 97965 15674 55840 0000 26450 0000 0000 0000 97965ponca Pench 13620 0000 9080 0000 4540 0000 0000 0000 13620kula [M saagar kao CaoD kr Total (excl Ind Sagar) 10173905 2352674 2217883 625946 2591731 193349 149578 336130 1706614 10173905

Actual injectionNote- $ These Scheduled Transactions are done by WRLDC under STOA

3 AMtrxao~Iya ivainamayaaoM iWpxaIya ivanamayaaoM kI SaoDyaUla (ima yauinaTsa)3 Schedule for interregional exchangesbilateral exchanges (MUs)

SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kulaxao~ rajya RegionState Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL

k pUvaI- xao~ ko rasto Import SDLs through ER -110482Aayaat SaoDyaUla Indian Energy Exchange (WR to ER) 0000 0000 0000 0000 0000 0000 0000 139465

Power Exchange of India (ER to WR) 0000 0000 0000 0000 0000 0000 0000 3671ER (NTPC) 47912 28298 11592 52018 0000 0786 1209 93903

DVC to MPPTCL (Long Term Open Access) 0000 201316 0000 0000 0000 0000 0000 201316Hirakud to CSEB 0000 0000 1354 0000 0000 0000 0000 1354

APL2 GUVNL to APPCC ( AEL) -0918 0000 0000 0000 0000 0000 0000 -0918APL3 GUVNL to APPCC ( AEL) -0924 0000 0000 0000 0000 0000 0000 -0924

CSEB to APPCC ( NVVNL) 0000 0000 -44813 0000 0000 0000 0000 -44813DBPOWER to APPCC ( GMRETL) 0000 0000 -1828 0000 0000 0000 0000 -1828

JPL to APPCC ( KISPL) 0000 0000 -15225 0000 0000 0000 0000 -15225JPL-II to APPCC ( KISPL) 0000 0000 -11376 0000 0000 0000 0000 -11376

Anaulagnak 45

DETAILS OF ENTITLEMENTSCHEDULEDRAWAL BY THE CONSTITUENTS FROM CENTRAL SECTOR STATIONS AND EXCHANGES FOR THE MONTH OF JULY 2014

(pxaoivasa` Wara jaarI xao~Iya jaa- laoKa ko AaQaar pr)

13896KAWAS(RLNG)

GANDHAR(RLNG)

JPL-II to APPCC ( NVVNL) 0000 0000 -11414 0000 0000 0000 0000 -11414JPL-II to APPCC ( PTC LTD) 0000 0000 -14853 0000 0000 0000 0000 -14853

CSEB to ASEB ( PTC LTD) 0000 0000 -0575 0000 0000 0000 0000 -0575MPPMCL MPSEB to ASEB ( IEXL) 0000 -0575 0000 0000 0000 0000 0000 -0575

APL1 GUVNL to BIHAR ( AEL) -106185 0000 0000 0000 0000 0000 0000 -106185APL2 GUVNL to BIHAR ( AEL) -72520 0000 0000 0000 0000 0000 0000 -72520APL3 GUVNL to BIHAR ( AEL) -51827 0000 0000 0000 0000 0000 0000 -51827

DBPOWER to BIHAR ( MANIKARAN) 0000 0000 -0350 0000 0000 0000 0000 -0350EMCO to BIHAR ( PXIL) 0000 0000 0000 -0413 0000 0000 0000 -0413

GUVNL to BIHAR ( PXIL) -0200 0000 0000 0000 0000 0000 0000 -0200MSEB to BIHAR ( PXIL) 0000 0000 0000 -0100 0000 0000 0000 -0100

MPPMCL MPSEB to BIHAR ( PXIL) 0000 -0150 0000 0000 0000 0000 0000 -0150GUVNL to BESCOM ( GUVNL) -14041 0000 0000 0000 0000 0000 0000 -14041

ESSAR_MAHAN to BESCOM ( ESSAR_MAHAN) 0000 -4353 0000 0000 0000 0000 0000 -4353ADHUNIK to BALCO ( BALCO) 0000 0000 0064 0000 0000 0000 0000 0064

ADHUNIK to BALCO ( MANIKARAN) 0000 0000 7200 0000 0000 0000 0000 7200JSEB(ER) to BALCO ( MPPL) 0000 0000 1481 0000 0000 0000 0000 1481

JSEB(ER) to BALCO ( MANIKARAN) 0000 0000 1200 0000 0000 0000 0000 1200JITPL to BALCO ( BALCO) 0000 0000 1200 0000 0000 0000 0000 1200

STERLITE to BALCO ( BALCO) 0000 0000 18603 0000 0000 0000 0000 18603JSEB(ER) to ESIL_WR ( MPPL) 0600 0000 0000 0000 0000 0000 0000 0600STERLITE to ESIL_WR ( PXIL) 1900 0000 0000 0000 0000 0000 0000 1900

NSPCL to SAIL ROURKELA ( SAIL ROURKELA) 0000 0000 -23994 0000 0000 0000 0000 -23994APL2 GUVNL to TGPCC ( AEL) -1074 0000 0000 0000 0000 0000 0000 -1074APL3 GUVNL to TGPCC ( AEL) -1081 0000 0000 0000 0000 0000 0000 -1081

CSEB to TGPCC ( NVVNL) 0000 0000 -52359 0000 0000 0000 0000 -52359JPL to TGPCC ( KISPL) 0000 0000 -17792 0000 0000 0000 0000 -17792

JPL-II to TGPCC ( KISPL) 0000 0000 -13295 0000 0000 0000 0000 -13295JPL-II to TGPCC ( NVVNL) 0000 0000 -13342 0000 0000 0000 0000 -13342

JPL-II to TGPCC ( PTC LTD) 0000 0000 -17335 0000 0000 0000 0000 -17335TISCO to VFL MPSEB ( TPTCL) 0000 0000 0268 0000 0000 0000 0000 0268

BLAPPL MPSEB to WBSEB ( IEXL) 0000 -0016 0000 0000 0000 0000 0000 -0016DBPOWER to WBSEB ( PTC LTD) 0000 0000 -0595 0000 0000 0000 0000 -0595

MPPMCL MPSEB to WBSEB ( PTC LTD) 0000 -89184 0000 0000 0000 0000 0000 -89184

SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kulaxao~ rajya RegionState Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL

K dixaNa xao~ ko rasto Import SDLs through SR 10967

Aayaat SaoDyaUla Indian Energy Exchange (SR to WR) 0000 0000 0000 0000 0000 0000 0000 0169Power Exchange of India (SR to WR) 0000 0000 0000 0000 0000 0000 0000 0000RSTPS-SR to GOA ( BILATERAL) 0000 0000 0000 0000 2186 0000 0000 2186RSTPS-SR to GOA ( WHEELING) 0000 0000 0000 0000 3118 0000 0000 3118

RSTPS-SR to GOA ( WHEELING GOA) 0000 0000 0000 0000 5494 0000 0000 5494

ga ]trI xao~ ko rasto Import SDLs through NR -321127Aayaat SaoDyaUla Indian Energy Exchange (NR to WR) 0000 0000 0000 0000 0000 0000 0000 -164961

Power Exchange of India (NR to WR) 0000 0000 0000 0000 0000 0000 0000 -3367Rihand (Hydro) to MPPTCL (Long Term Open Access) 0000 7970 0000 0000 0000 0000 0000 7970

Matathilla (Hydro) to MPPTCL (Long Term Open Access) 0000 0000 0000 0000 0000 0000 0000 0000EMCO to BIHAR ( PXIL) 0000 0000 0000 -0188 0000 0000 0000 -0188MSEB to BIHAR ( IEXL) 0000 0000 0000 -0400 0000 0000 0000 -0400

MPPMCL MPSEB to BSES_RAJ ( MPPL) 0000 -7000 0000 0000 0000 0000 0000 -7000ADHUNIK to BALCO ( MANIKARAN) 0000 0000 5198 0000 0000 0000 0000 5198

HIMACHAL to ESIL_WR ( IEXL) 0050 0000 0000 0000 0000 0000 0000 0050HARIYANA to ESIL_WR ( IEXL) 1525 0000 0000 0000 0000 0000 0000 1525HARIYANA to ESIL_WR ( PXIL) 5610 0000 0000 0000 0000 0000 0000 5610

KWHEPS to ESIL_WR ( PXIL) 0150 0000 0000 0000 0000 0000 0000 0150SCL to ESIL_WR ( IEXL) 0610 0000 0000 0000 0000 0000 0000 0610SCL to ESIL_WR ( PXIL) 0090 0000 0000 0000 0000 0000 0000 0090

MPPMCL MPSEB to HARIYANA ( HARIYANA) 0000 -126636 0000 0000 0000 0000 0000 -126636SCL to HRJIL MSEB ( SCL) 0000 0000 0000 1993 0000 0000 0000 1993

APL3 GUVNL to JVVNL-NR ( IEXL) -0120 0000 0000 0000 0000 0000 0000 -0120APL3 GUVNL to JVVNL-NR ( PXIL) -0122 0000 0000 0000 0000 0000 0000 -0122

BLAPPL MPSEB to JVVNL-NR ( IEXL) 0000 -0250 0000 0000 0000 0000 0000 -0250EMCO to JVVNL-NR ( IEXL) 0000 0000 0000 -0720 0000 0000 0000 -0720MSEB to JVVNL-NR ( PXIL) 0000 0000 0000 -0300 0000 0000 0000 -0300

MPSEB to NDPL(DTL)-NR ( PTC LTD) 0000 -1626 0000 0000 0000 0000 0000 -1626MPPMCL MPSEB to NDPL(DTL)-NR ( PTC LTD) 0000 -35052 0000 0000 0000 0000 0000 -35052

MPPMCL MPSEB to RPPC ( RPPC) 0000 -3562 0000 0000 0000 0000 0000 -3562EMCO to TRIPURA ( IEXL) 0000 0000 0000 -0070 0000 0000 0000 -0070

ADHPL to TORRAHM GUVNL ( IEXL) 0051 0000 0000 0000 0000 0000 0000 0051

Ga iWpxaIya SaoDyaUlsa Exchanges within WRMundra APL to Gujarat (LTOA) 0000 0000 0000 0000 0000 0000 0000 0000

JPL to ARVIND GUVNL ( MPPL) 4464 0000 0000 0000 0000 0000 0000 4464JPL to AIGL MSEB ( AIGL MSEB) 0000 0000 0000 0789 0000 0000 0000 0789

JPL to ARPIPL MSEB ( ARPIPL MSEB) 0000 0000 0000 0771 0000 0000 0000 0771JPL to ACCIL MSEB ( ACCIL MSEB) 0000 0000 0000 2380 0000 0000 0000 2380

APL1 GUVNL to AWLD GUVNL ( AEL) 3874 0000 0000 0000 0000 0000 0000 3874DBPOWER to BALCO ( BALCO) 0000 0000 0120 0000 0000 0000 0000 0120

DBPOWER to BALCO ( DBPOWER) 0000 0000 15887 0000 0000 0000 0000 15887EMCO to BALCO ( EMCO) 0000 0000 0080 0000 0000 0000 0000 0080

JPL to BOSCH MSEB ( BOSCH MSEB) 0000 0000 0000 1552 0000 0000 0000 1552JPL to BCSIL MSEB ( BCSIL MSEB) 0000 0000 0000 0720 0000 0000 0000 0720JPL-II to CSEB ( CSPTRDCL CSEB) 0000 0000 12569 0000 0000 0000 0000 12569

SPECT ACBIL to CSEB ( CSPTRDCL CSEB) 0000 0000 0720 0000 0000 0000 0000 0720ACBIL to CSPTRDCL CSEB ( CSPTRDCL CSEB) 0000 0000 5374 0000 0000 0000 0000 5374

JPL to CLASSIC MSEB ( CLASSIC MSEB) 0000 0000 0000 1309 0000 0000 0000 1309JPL to CIPLA MSEB ( CIPLA MSEB) 0000 0000 0000 0610 0000 0000 0000 0610

JPL to CEAT MSEB ( MPPL) 0000 0000 0000 2921 0000 0000 0000 2921APL1 GUVNL to CHLM GUVNL ( AEL) 2187 0000 0000 0000 0000 0000 0000 2187

NSPCL to DD ( DD) 0000 0000 0000 0000 0000 13156 0000 13156EMCO to DNH ( EMCO) 0000 0000 0000 0000 0000 0000 28097 28097

JPL to DNL MSEB ( DNL MSEB) 0000 0000 0000 0870 0000 0000 0000 0870JPL to ETLC MSEB ( ETL) 0000 0000 0000 0758 0000 0000 0000 0758JPL to ETLT MSEB ( ETL) 0000 0000 0000 0758 0000 0000 0000 0758

APL2 GUVNL to ESIL_WR ( PXIL) 0283 0000 0000 0000 0000 0000 0000 0283APL3 GUVNL to ESIL_WR ( PXIL) 8355 0000 0000 0000 0000 0000 0000 8355

DBPOWER to ESIL_WR ( MANIKARAN) 0000 0000 0000 0000 0000 0000 0000 0345EOL GUVNL to ESIL_WR ( ESIL_WR) -19578 0000 0000 0000 0000 0000 0000 0000

EPGL GUVNL to ESIL_WR ( ESIL_WR) -2866 0000 0000 0000 0000 0000 0000 0000JPL to ESIL_WR ( JPL) 0000 0000 0000 0000 0000 0000 0000 45641

JSWEL(RTNGIRI) MSEB to ESIL_WR ( PXIL) 0000 0000 0000 -2328 0000 0000 0000 0000MSEB to ESIL_WR ( PXIL) 0000 0000 0000 -1705 0000 0000 0000 0000

ESSAR_MAHAN to ESIL_WR ( ESIL_WR) 0000 0000 0000 0000 0000 0000 0000 52250VANDANA to ESIL_WR ( PXIL) 0000 0000 0000 0000 0000 0000 0000 0480

JPL to ESIL MSEB ( JPL) 0000 0000 0000 0108 0000 0000 0000 0108ESSAR_MAHAN to ESIL MSEB ( ESIL_WR) 0000 0000 0000 1244 0000 0000 0000 1244

JPL to ETLW MSEB ( ETL) 0000 0000 0000 0732 0000 0000 0000 0732JPL to ETLB MSEB ( ETL) 0000 0000 0000 0866 0000 0000 0000 0866

JPL to EILR MSEB ( MPPL) 0000 0000 0000 1049 0000 0000 0000 1049JPL to ETLK MSEB ( ETL) 0000 0000 0000 0643 0000 0000 0000 0643

JPL to EXIDE MSEB ( EXIDE MSEB) 0000 0000 0000 1239 0000 0000 0000 1239CSEB to GOA ( PTC LTD) 0000 0000 -0400 0000 0400 0000 0000 0000

DBPOWER to GOA ( PTC LTD) 0000 0000 0000 0000 17390 0000 0000 17390JPL to GSL MSEB ( GSL MSEB) 0000 0000 0000 0870 0000 0000 0000 0870

EMCO to GCEL ( EMCO) 0000 0000 3394 0000 0000 0000 0000 3394JPL to HINDMOUDA MSEB ( HINDMOUDA MSEB) 0000 0000 0000 2249 0000 0000 0000 2249

HINDAHEJ GUVNL to HINDTALOJ MSEB ( HINDTALOJ MSEB) -2962 0000 0000 2962 0000 0000 0000 0000EMCO to DNH ( EMCO) 0000 0000 0000 0000 0000 0000 119290 119290

JPL to HNGIL MSEB ( HNGIL MSEB) 0000 0000 0000 5156 0000 0000 0000 5156LANCO TO MP 0000 191431 0000 0000 0000 0000 0000 191431

IEE 103711 47279 -413725 163201 0000 26840 0000 31054PEI 3561 7107 0000 -0214 0000 0000 0000 17561

ca kula Aayaat Total Import 781888 184933 483401 86303 247768 28588 40782 148596 781888kula inayaa-t Total Export 1202530 274418 268404 653270 6437 0000 0000 0000 1202530naoT Aayaat inayaa-t Net Imp (+)Exp (-) -420642 -89485 214997 -566968 241330 28588 40782 148596 -420642

4 kula gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kula

Total GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL11567423 2719395 2512265 73752 3933435 237255 213875 549412 12255 11567424

5 kI kula iSaDUyala Total Sdl incl IR bi-lateral exch Sdl 9753264 2263189 2432879 58978 2833062 221937 190360 484727 12209 97532646 ibanaa xait ko kula D`avala Total Drl excl Tr Loss 9388390 2433257 2716560 597587 2741156 286430 174671 437785 0944 93883907 xait imalaakr kula D`avala Total Drl incl Tr Loss 9703552 2433257 2716560 597587 2741156 286430 174671 437785 0976 93884228 p p`NaalaI maoM kula pUla xait Pooled loss in WR System 3151629 p xao`~ sToSanaaoM sao kaorbaa ivanQa 1 AaOr 2 ivanQa 3 kvaasa gaMQaar kakrapar tara`pur esaesapI ponca kula

vaastivak [njaoSana Actual Inj - WR Stns KSTPS VSTPS-1amp 2 VSTPS-3 KGPS GGPS KAPS TAPS SSP PENCH TOTAL (ima yauinaTsa) (MUs) 1310550 1162242 1009828 99928 156340 275783 918544 97965 13620 12860991

] xao~ Aa ]xao kao ina ] xao naoT d xao Aa d xao inayaa-t d xao naoT pU xao Aa pU xao inayaa-t pU xao naoT kula naoT10 vaasaivak AMtrxao~Iya Actual IR Exchanges NR Imp NR Exp NR Net SR Imp SR Exp SR Net ER Imp ER Exp ER Net Total Net

ivainamaya (ima yauinaTsa) (MUs) 0347 2303947 -2303600 0000 737616 -737616 73271 189494 -116223 -3157439 AMtrxao~Iya ivainamaya IR Exchange Schedule NRI sdl NRE sdl Net NR sdl SRI sdl SREsdl Net SR sdl ERI sdl ERE sdl Net ER sdl Net WR sdl iSaDyaUla (ima yauinaTsa) (MUs) 2987 714531 -711544 404371 0000 404371 0000 113469 -113469 -420642

Total Entitlement incl IR and bi-lateral exchange schedule

11

AMtrxao~Iya AaOr iWpxaIya ivanamayaaoM kI iSaDyaUla imalaakr kula pa~ta

maah jaUlaa[- 2014 ko AMtr-ajyaIya AMtrxao~Iya ivainamayaaoM ka ivavarNa Anaulagnak 46DETAILS OF INTERSTATEINTER-REGIONAL EXCHANGES FOR THE MONTH OF JULY 2014 Annex-46

k`maaMkFrom To

gauivainaila map`iva]kMila Craivabaao maraiva]kMila gaaovaa dmana dIva da na h [ssaar ] xao~ d xao~ pU xao~ piScama xao~ kulaA InterstateInter-regional Schedules

included in ISGSGUVNL MPPGCL CSEB MSPGCL GOA DD DNH ESIL NR SR ER WR TOTAL

1 gauivainaila GUVNL 2962 31082 34044

2 map`iva]kMila MPPGCL 0000

3 Craivabaao CSEB04

0400

4 maraiva]kM ila MSPGCL 4033 4033

5 gaaovaa GOA 0000

6da na h DNH 0000

7kaorbaa KORBA-III 0000

8 iMjadla pavar JPL 4464 12569 26349 45641 89023

9 ADanaI pavar APL 6061 6061

10 ESSAR MAHAN 1244 52250 53494

11 laonakao Lanco -Pathadi 0000

12 esaIbaIAa[-ela -ACBIL 6093 6093

13 KSK MAHANADI14 DB POWER 16008 17390 0345

15 VANDANA 0480

16 EMCO 3473

17 ESIL18 ena esa pI saI ela NSPCL 13157 28097 41254

19 ]ltarI xao~ NRegion (WR end) 0347 0347

20 dixaNaI xao~ S Region (S Bus) 0000 0000

21 pUvaI- xao~ E Region (WR end) 73271 73271

22 p xao~ WRegion (WR end) 737616 189494 3231057

23 enaTIpIsaI NTPC Injection 5216788

24 enapIsaI NPC Injection 1194327

25 Total ISGS drawal from the Grid incl interregional bi-lateral

2433257 2716560 597587 2741156 286430 174671 437785

B InterstateIR Exchanges not included in ISGS

20 knaa-Tk Karnataka 444 44400

21 yaUpIpIsaIela UPPCL 0000 0000

22 AarvaIpIenaela RVPNL -237 -2370

23 UPPCL ( Excess Drawn From Rajghat 0000 0000

24 kaoTa ]jjaOna Kota - Ujjain 0000 0000

25 kula ba Total B (13 to 17) 0000 -2370 0000 0000 44400 0000 0000 42030

C inavala ivainamaya Net Exchange (12+18) 2433257 2714190 597587 2741156 330830 174671 437785 9429476

D kula Aayaat Total Imp by WR 115648

E kula inayaa-t Total Export by WR 3231057

F inavala ivainamaya Net Exchange (D-E) -3115409

G p xao~ Wara vaIlD jaa- Energy wheeled by WR

26 pU xao~ sao d xao~ kao inayaa-t ER export to SR0000

0000

27 d xao~ sao ] xao~ kao inayaa-t pUxao pxao sao haokr SR export to NR via ERWR0000

0000

28 d xao~ sao ] xao~ kao inayaa-t pxao sao haokr SR export to NR via WR0000

0000

29 pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr ER export to NR via WR0000

0000

30 ] xao~ sao d xao~ kao inayaa-t pxao sao haokr NR export to SR via WR393404

393404

31 pU xao~ sao d xao~ kao inayaa-t pxao sao haokr ER export to SR via WR0000

0000

32 pU xao~ sao d xao~ kao inayaa-t ]xao pxao sao haokr ER export to SR via NRWR0000 0000

0000

33 ]pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr NER export to NR via WR0000

0000

Anaulagnak 47Annex-47

maah jaUlaa[- 2014 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39697 65459

9964 39521

Levels in Mtrs str maITr maoM

]ka[- Ukai

64932

10110

25501

25801

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF JULY 2014

ivavarNa Particulars

Sr No Details of incident (Elements Generation Tripped) Owner Utility Date TimeEffect (Loss of generation Load) if

anyCategory as per

Standards1 Bus Fault at Lonikhand 400 kV Bus 1 MSETCL 04Jul14 315 Nil GI‐22 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 06Jul14 433 load Loss 277 MW GD‐13 Tripping of Multiple Elements from 400220 kV Parli (MSETCL) Ss MSETCL 08Jul14 2359 Nil GI‐24 Poles tripping of HVDC Bhadarwati PGCIL 09Jul14 0350 amp 0504 Nil GI‐25 Tripping in Jejuri and Loanand Area MSETCL 10Jul14 126 Load Loss 400 MW GD‐16 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 11Jul14 349 load Loss 335 MW GD‐17 Blackout at Kawas Ss NTPC 11Jul14 117 Gen Loss 320 MW GD‐18 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 13Jul14 642 load Loss 263 MW GD‐19 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 15Jul14 611 load Loss 264 MW GD‐110 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 16Jul14 334 load Loss 200 MW GD‐111 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 17Jul14 417 load Loss 150 MW GD‐112 Tripping at Gandhar Ss NTPC 21Jul14 1607 Gen Loss 180 MW GD‐113 Multiple time tripping of 765 kV Sasan ‐Satna 2 ckt on Protection Mal‐operation PGCILSASAN 7252014 1026 amp 1229 Hrs Nil GI‐2

List of Grid Disturbances and Grid incidents (GDGI) in July-2014 Western RegionANNEXURE-5

SR NO UTILITIES OCC NO MONTH STATUS REMARK 1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14 HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314 AT MUMBAI BY NTPC MUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514 AT MUMBAI BY WRPC AT RELIANCE

7 WRTS-I 460 Jun-14 HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714 AT RAIPUR BY KWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-1411 RELIANCE SASAN 464 Oct-1412 MADHYA PRADESH 465 Nov-1413 BDTCLJBTCL 466 Dec-1414 NTPC Vindhyachal 467 Jan-1515 ESSAR TRANSMISSIOM 468 Feb-1516 TATA POWER 469 Mar-1517 SUGEN (TPL) 470 Apr-1518 TORRENT POWER 471 May-1519 CGPL 472 Jun-1520 NTPC Korba 473 Jul-1521 NCA 474 Aug-1522 NHDC 475 Sep-1523 NTPC Mouda 476 Oct-1524 KSK 477 Nov-1525 RELIANCE 478 Dec-1526 NTPC SIPAT CG 479 Jan-1627 TAPS-3amp4 480 Feb-1628 ESSAR ESIL 481 Mar-1629 GOA 482 Apr-1630 KAPS 483 May-1631 JPL 484 Jun-1632 DNH 485 Jul-1633 NTPC Mumbai 486 Aug-1634 ADANI TRANSMISSION 487 Sep-1635 INDIAN RAILWAY 488 Oct-1636 WRTS-II 489 Nov-16

ANNEXURE 10

8212014

1

OCC MEETING (462nd )

Power system Operation Corporation Ltd

OPERATIONAL HIGHLIGHTS amp ISSUES

Date 11082014Venue ndash Tarapur

MonthsIEGC Band

FVIlt499 499‐5005 gt5005

March14 1291 4783 3927 012

April14 3064 5233 1703 016

May14 2248 5319 2433 013

Junersquo14 3715 4536 1749 02460

80

100

120Frequency Profile for July 2014Frequency Profile for July 2014

Maximum instantaneous frequency

5036 Hz

on 23rd July 2014 at 1304 hrs

Minimum instantaneous frequency

4941 Hz

on 10th July and 25th July 2014 at 1950 hrs and 1944 hrs respectively

Julyrsquo14 3451 5016 1533 020

0

20

40

60

1‐Jul

2‐Jul

3‐Jul

4‐Jul

5‐Jul

6‐Jul

7‐Jul

8‐Jul

9‐Jul

10‐Jul

11‐Jul

12‐Jul

13‐Jul

14‐Jul

15‐Jul

16‐Jul

17‐Jul

18‐Jul

19‐Jul

20‐Jul

21‐Jul

22‐Jul

23‐Jul

24‐Jul

25‐Jul

26‐Jul

27‐Jul

28‐Jul

29‐Jul

30‐Jul

31‐Jul

Avg Frequency of the month

4993 Hz

1High frequency day due to heavy rain in almost all places in the country low demand was observed(117 GW) Heavy underdrawal by all constituents of WR around 700‐1000 MW during 1300 hrs2 Low frequency day Demand was high and Od by constituents Od by NR

lt499 499‐5005 gt5005

8212014

2

501

502

503

504

Frequency for July 2014

496

497

498

499

50

494

495

1 60 119

178

237

296

355

414

473

532

591

650

709

768

827

886

945

1004

1063

1122

1181

1240

1299

1358

1417

1476

1535

1594

1653

1712

1771

1830

1889

1948

2007

2066

2125

2184

2243

2302

2361

2420

2479

2538

2597

2656

2715

2774

2833

2892

2951

3010

3069

3128

3187

3246

3305

3364

3423

3482

3541

3600

3659

3718

3777

3836

3895

3954

4013

4072

4131

4190

4249

4308

Frequency 499 5005

26000

28000

Unit Outage‐ JULY‐14 Max 26128 MW on 26072014JUNE14 Max 20818 MW on 210714

PLANNED OUTAGE FORCED OUTAGE TOTAL OUTAGE‐JULY14 TOTAL OUTAGE‐JUNE14

10000

12000

14000

16000

18000

20000

22000

24000

26000

MW

0

2000

4000

6000

8000

10000

1‐Jul‐14 6‐Jul‐14 11‐Jul‐14 16‐Jul‐14 21‐Jul‐14 26‐Jul‐14 31‐Jul‐14Date

8212014

3

Energy ConsumptionMax

986 Mus on 2nd July+2975 as compared

to last year900

1000

1100

IN M

Us ‐‐‐‐gt

DAILY CONSUMPTION OF WESTERN REGION(2010‐11 TO 2014‐15)

Min749 Mus on 24th July

500

600

700

800

CONSU

MPT

ION

Apr

May Jun

Jul

Aug Sep

Oct

Nov Dec Jan

Feb

Mar

MONTHS ‐‐‐‐gt2010‐11 2011‐12 2012‐13 2013‐14 2014‐15

Energy Consumption MUDay

Jul‐14 Jun‐14 Jul‐13 Change wrt last month

Change wrt last Year

Average 848 927 712 ‐845 1909Max 986 971 760 156 2975Date 2‐Jul‐14 30‐Jun‐14 2‐Jul‐13 ~ ~

PEAK DEMAND (this month vis-agrave-vis last month)

STATE

CATERED(MW) UNRESTRICTED(MW)

Julyrsquo14 Junrsquo14 Julyrsquo14 Junrsquo14

GUJARAT 13833 13755 13969 13906

MP 7090 7120 7121 7434

CHATTISGARH 3118 3472 3414 3473

Regional Demand met

Max 43034 MW(1st July 1600 hrs)

2540 more than the l

MAHARASHTRA 19283 19452 19385 19755

GOA 459 475 459 482

DD 287 298 287 298

DNH 721 677 721 685

ESIL 532 535 532 535

43034 42934 43419 43802

last year

Min 28431 MW(24th July0500 hrs)

WR TOTAL 43034 42934 43419 43802

Figures shown are Maximums in the month

Demand Met Jul‐14 Jun‐14 Jul‐13 Change wrt last month

Change wrt last Year

Average 35215 40463 32253 ‐1297 918Max 43034 42934 34317 023 2540

Date when Max 1‐Jul‐14 30‐Jun‐14 2‐Jul‐13 ~ ~

8212014

4

Constituents Total Time Block Noof time block Violation of Compilance Violation of Compilancein the month of July Type ‐1 Type‐2

Chhattisgarh 2976 983 6697 927 6885Guajrat 2976 681 77 12 222 92 54

DSM Violation for the Month of July 2014

Guajrat 2976 681 7712 222 9254Madhya Pradesh 2976 528 8226 594 8004Maharashtra 2976 1045 6489 442 8515

Goa 2976 712 7608 1868 3723Daman and Diu 2976 1720 4220 2506 1579

Dadar Nagar Haveli 2976 23 9923 1299 5635

Violation Type‐2 When The drawl does not change sign in 12 consecutive time block

Violation Type‐1 When The drawl is more or less than 12 schedule or 150 MW whichever lesser

Total No of Blocks ‐ 2976

New Elements July 2014a) COMMISSIONING OF NEW GENERATING UNITSSLNO CONSTITUENT UNIT NAME UNIT NO C`ty(MW) DATE TIME

1 IPP(Jay Prakash Nigrie) JNSTPP I 660 150714(sync) 845

b) COMMISSIONING OF NEW TRANSMISSION LINES

SLNO CONSTITUENT LINE NAME CKT NO KV DATE TIME Line length( in km)

1 POWERGRID Wardha‐Aurangabad II 765 372014 2300 347 581 POWERGRID Wardha Aurangabad II 765 372014 2300 34758

2 POWERGRID Wardha‐Aurangabad I 765 572014 1900 34758

3 GETCO Kosamba‐Chorania I 400 572014 2035 230

4 GETCO Kosamba‐Chorania II 400 572014 2105 230

5 BDTCL BDTCL‐Bhopal(MP) I 400 16714 1833 864

6 POWERGRIDLILO of Raipur‐Raigarh‐4

IV 400 1872014 2200 2826 POWERGRIDat KSK

IV 400 1872014 2200 282

7 MPPTCL Indore‐Pithampura II 400 210714 1625 150

8 POWERGRIDDharamjaygarh‐Jharsuguda

I 765 29714 000 14893

9 POWERGRIDDharamjaygarh‐Jharsuguda

II 765 28714 2125 14893

Total ckt Km 189366

8212014

5

c) COMMISSIONING OF NEW ICTS

SLNO CONSTITUENT STATION NAME KV RATIOCAPACITY (MVA) DATE

TIME

1 BDTCL BDTCL(Bhopal)ICT 1 765400 3x500 372014 1657

2 POWERGRID Dharamjaygarh(ICT 1) 765400 3x500 772014 22593 POWERGRID Navasari(ICT 3) 400220 500 872014 1959

d)CO SS O G O C O Sd)COMMISSIONING OF LINE REACTORS

SLNO CONSTITUENT STATION NAME Line Name KVCty(MVAR

) DATETIME

1 BDTCL BDTCL Indore‐BDTCL I 765 3x80 23714 1935

2 POWERGRID DharamjaygarhDharamjaygarh‐Jharsuguda II

765 3x110 280714 2125

3 POWERGRID DharamjaygarhDharamjaygarh‐Jharsuguda I

765 3x110 29714 000

4 POWERGRID Satna Satna‐Gwalior‐II 765 3x80 29714 10005 POWERGRID Aurangabad Padghe Aurangabad 1 765 3x80 310714 22 475 POWERGRID Aurangabad Padghe‐Aurangabad‐1 765 3x80 310714 2247

e)COMMISSIONING OF BUS REACTORS

SLNO CONSTITUENT STATION NAME KVCty(MVA

R) DATETIME

1 POWERGRID Bhatapara 400 125 24714 19562 POWERGRID Indore 765 3x80 31714 18273 POWERGRID Sujalpur 400 125 31714 1205

Congestion Charge was applied 3 times in July 2014 on WR‐NR path ie on12th 14th amp 15th July 2014

8212014

6

5515 5484

5200

5400

5600

Congestion Charge applied on WR‐NR path Dt12714 (Block 3 ‐16)

4200

4400

4600

4800

5000WR‐NR TTC(4900 MW)

WR‐NR ATC(4400 MW)

4000

4200

030

034

038

042

046

050

054

058

102

106

110

114

118

122

126

130

134

138

142

146

150

154

158

202

206

210

214

218

222

226

230

234

238

242

246

250

254

258

302

306

310

314

318

322

326

330

WR‐NR_Act(MW) WR‐NR_TTC(4900 MW) WR_NR_ATC(4400 MW)

2200 00

240000

260000

280000

300000

320000

MW

Maharashtra Sch Vs Drawal‐12714(Block 3‐16)

140000

160000

180000

200000

220000

240000

MW

Gujarat Sch Vs Drawal_12714

200000

220000

3 4 5 6 7 8 9 10 11 12 13 14 15 16

TIme Block

Maharashtra_Sch Maharashtra_Drawal

340000

350000

W

MP Sch Vs Drawal_12714(Block 3‐16)

120000

3 4 5 6 7 8 9 10 11 12 13 14 15 16Time Block

GETCO_Sch(MW) GETCO_Drawal(MW)

750008000085000

CSPTCL‐12714(3‐16)

310000

320000

330000

3 4 5 6 7 8 9 10 11 12 13 14 15 16

MW

TIme Block

MP_Sch MP_Drawal

450005000055000600006500070000

3 4 5 6 7 8 9 10 11 12 13 14 15 16

MW

Time Block

CG_Sch CG_Drawal

Under Drawal By WR constituents during the imposition of Congestion on WR‐NR on 12714

8212014

7

5292

5100

5300

Congestion Charge applied on WR‐NR path Dt14714 (Block 57 ‐71)

4638

4300

4500

4700

4900

5100

WR‐NR TTC(4900 MW)

WR‐NR ATC(4400 MW)

3900

4100

1330

1336

1342

1348

1354

1400

1406

1412

1418

1424

1430

1436

1442

1448

1454

1500

1506

1512

1518

1524

1530

1536

1542

1548

1554

1600

1606

1612

1618

1624

1630

1636

1642

1648

1654

1700

1706

1712

1718

1724

1730

1736

1742

1748

1754

1800

WR‐NR_Act(MW) WR‐NR_TTC(4900 MW) WR_NR_ATC(4400 MW)

3600380040004200440046004800

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

MW

Maharashtra Sch Vs Drawal‐14714(Block 57‐71)

1900

2000

2100

2200

2300

2400

2500

2600

MW

Gujarat Sch Vs Drawal_14714

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

TIme Block

Maharashtra_Sch Maharashtra_Drawal

1800

1900

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

Time Block

GETCO_Sch(MW) GETCO_Drawal(MW)

700

750

800

Chhattisgarh Sch Vs Drawal_141714(Block57‐71)

2600

2700

2800

2900

MW

MP Sch Vs Drawal‐14714(57‐71)

500

550

600

650

700

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

MW

Time Block

CG_Sch CG_Drawal

2400

2500

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

Time Block

MP_Sch MP_Drawal

8212014

8

4630

45004700

Congestion Charge applied on WR‐NR path Dt15714 (Block 50 ‐96)

4463

350037003900410043004500

WR‐NR TTC(4150 MW)

WR‐NR ATC(3650 MW)

31003300

1215

1234

1253

1312

1331

1350

1409

1428

1447

1506

1525

1544

1603

1622

1641

1700

1719

1738

1757

1816

1835

1854

1913

1932

1951

2010

2029

2048

2107

2126

2145

2204

2223

2242

2301

2320

2339

2358

WR‐NR_Act(MW) WR‐NR_TTC(4150 MW) WR_NR_ATC(3650 MW)

3800

4000

4200

4400

4600

4800

MW

Maharashtra Sch Ve Actual on 15714(50‐96)

130015001700190021002300250027002900

MW

Gujarat Sch Vs Actual on 15714(50‐96)

3600

50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96

Time Block

Maharashtra_Sch Maharashtra_Drawal

1300

50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96

Time BLock

GETCO_Sch(MW) GETCO_Drawal(MW)

3500

3700

MP Sch Vs Actual for 15714(50‐96)

850

950

1050

Chhattisgarh Sch Vs Actual‐15714(50‐96)

2700

2900

3100

3300

50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96

MW

Time Block

MP_Sch MP_Drawal

350

450

550

650

750

850

50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96

MW

Time BLock

CG_Sch CG_Drawal

8212014

9

Summary of Grid Events (GD amp GI) in July 2014

Sr No

Details of incident (Elements Generation Tripped) Owner Utility Date TimeEffect (Loss of

generation Load) if any

Category as per

Standards

1 Bus Fault at Lonikhand 400 kV Bus 1 MSETCL 04Jul14 315 Nil GI‐2

2 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 06Jul14 433 load Loss 277 MW GD‐1

3Tripping of Multiple Elements from 400220 kV Parli

MSETCL 08Jul14 Nil GI 23(MSETCL) Ss

MSETCL 08Jul142359

Nil GI‐2

4 Poles tripping of HVDC Bhadarwati PGCIL 09Jul140350 amp 0504

Nil GI‐2

5 Tripping in Jejuri and Loanand Area MSETCL 10Jul14 126 Load Loss 400 MW GD‐1

6 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 11Jul14 349 load Loss 335 MW GD‐1

7 Blackout at Kawas Ss NTPC 11Jul14 117 Gen Loss 320 MW GD‐1

8 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 13Jul14 642 load Loss 263 MW GD‐1

9 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 15Jul14 611 load Loss 264 MW GD‐1

10 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 16Jul14 334 load Loss 200 MW GD‐1

11 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 17Jul14 417 load Loss 150 MW GD‐1

12 Tripping at Gandhar Ss NTPC 21Jul14 1607 Gen Loss 180 MW GD‐1

13Multiple time tripping of 765 kV Sasan ‐Satna 2 ckt on

Protection Mal‐operation PGCILSASAN 7252014

1026 amp 1229 Hrs

Nil GI‐2

S No Name of power

stations

Unit Reason for

outage

1 VSTPS 2 (210 MW) Coal Shortage

91 Operation of grid at high frequency ( gt 505 Hz) even under fuel shortage condition

Issues1 Major ISGSIPP are facing fuel

shortage1 VSTPS 2 (210 MW) Coal Shortage

2 VSTPS 5 (210 MW) Coal Shortage

3 Singhaji 1 (600 MW) Coal Shortage

4 SGTPS 4 (210 MW) Coal Shortage

5 JP Bina 2 (250 MW) Coal Shortage

6 Bhusawal 2 (210 MW) Coal Shortage

shortage2 Expected High Demand during dry

spell in September amp October3 Optimal use of precious fuel is

necessary to tackle the high demand in dry spell

7 Parli 4 (210 MW) Coal Shortage

8 India Bulls 1 (270 MW) Coal Shortage

8212014

10

Agenda 92 Insecure operation Oscillations Power Swingbull N‐1 contingency of 765 kV Tirora‐Akola2 on 10th and 11th June 2014

bull Tirora gen gt 1500 MW AR not operatedbull Intra plant mode of oscillations (097 Hz) with poor damping

bull N‐1 contingency of 400 kV Tirora‐Warora‐1 on 20th May 2014N 1 contingency of 400 kV Tirora Warora 1 on 20 May 2014bull Tirora gen gt 1500 MW 765 kV Tirora‐Akola2 out of servicebull SPS bull Power Swing and loss of complete power station GD‐1

bull The need for transmission augmentation as well as PSS tuning at APML Tirodawas discussed in the 461st OCC meeting

bull Member Secretary WRPC suggested that APML would send details of PSSMember Secretary WRPC suggested that APML would send details of PSS tuning studies to WRPC and they may consult IIT‐Mumbai for assistance and expedite

bull Representative from SLDC Kalwa APL may like to update the progress

Events at APML TiroraCase 3 Date 11‐07‐14 1529 hrsbull Line tripped on Y Phase to earth fault AR was unsuccessful due to persisting faultbull Sudden power transfer through 400 kV System resulted in swing Oscillation of 097 Hz observed across WR and

East West generation in Western region oscillatedO ill i i d f 10 dbull Oscillation persisted for 10 seconds

bull Damping ratio was 257

8212014

11

Events at APML TiroraCase 4 Date 23‐07‐14 0227 hrsbull 765400 kV APML Tirora ICT trippedbull Sudden power transfer through 400 kV System resulted in swing Oscillation of 097 Hz observed across WR

and East West generation in Western region oscillatedO ill i i d f 17 dbull Oscillation persisted for 17 seconds

bull Damping ratio was 7

bull Need for transmission augmentation as well as PSS tunning at APML Tiroda required

bull It has been decided in 461th OCC thatAPML would send details of PSS

Expected date of

tuning studies to WRPC and they may consult IIT‐Mumbai for assistance and expedite Representative from SLDC Kalwa APL may like to update the progress

Expected date of bull 2nd ckt of 765 kV Tirora‐Akola2bull 220 kV network from 400220 kV Warorabull 220 kV network from 765400 kV Akola2 and 765400 kV Taptithandabull 220 kV network from 765400 kV Aurangabad‐PG 400220 kV Pune

Redistribution of Load within Maharashtra system

8212014

12

Elements Date and

Time of

Tripping

Date and

Time of

Restoratio

n

Remarks Receipt of

DREL at WRLDC

Satna Sasan

765 kV Sasan‐Satna 225‐07‐14

1026

25‐07‐14

1155

Protection Mal‐Operation DT at Sasan End

on OV as line remain hanging from Sasan No Yes

Agenda 93 Frequent Tripping of 765 kV Satna‐Sasan line

Issues

1Expedite commissioning of Line Reactor at 765 kV Sasanend

2 Submission of DREL for1026 1155end

765 kV 240 MVAr

Bus Reactor at Satna

25‐07‐14

1026

25‐07‐14

1139

Protection Mal‐Operation DT at Sasan End

on OV as line remain hanging from SasanNo Yes

765 kV Sasan‐Satna 225‐07‐14

1342

25‐07‐14

1342

Line got charged from Satna and

synchronized at Sasan end but immediately

DT was received at Sasan from Satna and

Line tripped Prior to tripping voltage at

No Yes

2 Submission of DREL for event analysis in line with CEA standards IEGC

3 Threat to grid security and constraints in evacuation from large generation complexarising from frequent undesirable tripping particularily

Sasan end was 796 kV

765 kV Sasan‐Satna 225‐07‐14

1628‐

Charging attempt was taken from Satna end

but line tripped before synchronization at

Sasan end due to DT from Satna Open end

voltage at Sasan 826 kV for the line

No Yes

The above was a narrow miss because the tripping occurred when one of the bus was under shutdown Fortunately during theabove period only two units of Sasan were in service and the second 765 kV bus remained in service else the situation would havebeen a serious threat to the system security

during protection testing construction activities

The progress of reactor commissioning at Sasan over the last 8 months is given under

Schedule in formed in meetings

SN 451st OCC 455th

OCC

456th OCC 457th 458th 459th 460th 461st

1 Line reactor By Dec By April By May By June End of June End of By By

of 765 kV

Sasan‐Satna

ckt‐2

y

2013

y p

2014

y y

2014

y

2014(Testing under

progress)

2014 (As per

joint report

post site visit

on 26314)

June 2014

y

Aug‐

2014

y

Aug‐2014

2 765kV Bus‐1

Reactor

Jan 2014 By Mar

2014

By June

2014

By June

2014(Testing under

)

End of July

2014(As per

j i t t

End of July

2014

By

Sep‐

2014

By

Sep‐2014

Sasan may intimate the progress in reactor commissioning to the sub-committee

progress) joint report

post site visit

on 26314)

2014

8212014

13

Item no94 SPS at Sipat

bull The SPS scheme implemented at NTPC Sipat received at WRLDC

bull It is observed that a time delay of 15sec is provided to unload units 1 2 4 amp5 each by 150MW if ICT l d d 130 f t d l dany ICT s load exceeds 130 of rated load

bull As per decision of WRPC meeting on 18314 if ex‐bus generation at Sipat is more than 2200 MW immediate unloading of units were decided and the intentional delay provided needs to be re‐ examined (Maximum 2‐3 sec delay may be appropriate) as unloading by 150MW would also take another 4‐5sec

8212014

14

Contingency Envisaged SPS action Identified FeedersTripping of any oneICT at 400200 VapiSub‐Station

Automatic LoadShedding of 100MW

DNH 1) 66 kV‐Kharadpara‐Rakholi‐I 50 MW2) 66 kV Khadoli‐Khadoli‐3 30 MW

Item No95 SPS at 400220 kV Vapi(PGCIL) Item No912

DD1) 66 kV Magarwada‐Kachigam 60 MW

It was apprised by representatives from DD amp DNH in the 459th OCC meeting that the above scheme shall be implemented within a month

UT DDDNHmay apprise the status of commissioning of the envisaged SPSUT‐DDDNH may apprise the status of commissioning of the envisaged SPS

Item no96 Addressing High Voltage condition in SSP amp nearby area Sl No Line No of Times tripped in Julrsquo141 400 kV SSP‐Dhule‐I 32 400 kV SSP ‐ Rajgarh‐ I 2

Issues1 Multiple tripping of

feeders emanating from SSP

2 S l tiSl No Line No of occasions kept open on HV 2 Several emanating feeders being kept open on high voltage in SSP amp nearby area

Sl No Line No of occasions kept open on HV

1 400 kV SSP‐Dhule‐I 9

2 400 kV SSP‐Dhule‐II 6

3 400 kV SSP ‐ Rajgarh‐ I 1

4 400 kV SSP ‐ Rajgarh‐ II 1

bull Operating RBPH machines in synchronous condenser mode during offOperating RBPH machines in synchronous condenser mode during off peak hours

bull Reactor commissioning at Rajgarh amp Dhule to be expedited by WRTS‐II(PGCIL) amp MSETCL

bull Absorption of MVAr by Wanakbori WTS

8212014

15

1 Voltage at Wanakbori was gt420 kV for 100 the time during Julrsquo14

2 WTPS units 567 are injecting MVAR (~ 60 MVAR) at Voltage gt 420 kV

3 Absorption of MVAR by WTPS units is expected during the high voltage condition at WTPS amp nearby area

97Status of implementation of UFRWestern Region

States Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Stage - I 492 Hz Stage - II 490 Hz Stage - III 488 Hz Stage - IV 486 Hz

relief GUJARAT 580 773 580 726 580 1117 590 1025MADHYA PRADESH 460 468 460 450 460 460 465 490CHATTISGARH 150 110 150 114 155 117 155 91MAHARASHTRA 805 1108 810 1200 815 765 820 851GOA 25 25 25 25 25 25 25 25UT DD 10 15 15 15 UT DNH 30 30 35 35 Total load relief 2060 2484 2070 2515 2085 2485 2105 2482

Not received

DD and DNH have not implemented any stage of AUFLS

DD and DNH may appraise the status

Real‐time monitoring of the likely relief available from AUFLS at any given instant mandated by CERC

Telemetry to be provided at SLDC amp RLDC

Not received

8212014

16

Agenda 98 ADMS (Automatic Demand Management Scheme) Implementation as per Sec 542 of IEGC

As per CERC order dt06062014 the target of fully implementation of scheme is by January2015Constituents have to submit bi‐monthly progress report to WRPC Secretariat with a copy to the Commission and WRLDCMP has submitted its detailed action plan in the form of an affidavit to CERC for implementation of ADMS However SLDC MPPTCL is requested to furnish data to OCC forum in the above format

Item No 99 Status of Telemetry in WR

Telemetry Issuesdoc

8212014

17

Item No 910 Black Out at NTPC Kawas Power Station

bull On 11th July 2014 Kawas Gas generating complex got blackout due to tripping of evacuation lines one by one

within a short span of 30 minutes

bull The complete loss of evacuation lines occurred at 0117 Hrs The blackout has resulted in tripping of GT1A

GT1B and ST causing 320 MW generation loss in the area It was reported that weather condition was foggy with

slight drizzling was in the area

LineTime of Tripping

Kawas End Remote endRestoration Time

220 kV Kawas‐Navsari1

1246 AM

R phase to EF

Fault location 2 km

R Phase to EF

122 AM

220 kV Kawas ndashNavsari2

112 AMR phase to EF

Fault location 2208 km

R Phase to EF 347 AM

220 kV Kawas‐Haldarwa 1

107 AMR phase to EF

Fault location 16 km

R Phase to EF 246 AM

220 kV Kawas‐ R phase to EF R Phase to

bull Line restoration has failed on several attempt as the lines

were not holding due to persisting fault

bull Such an event of total loss of evacuation lines from a

generating station resulting in blackout scenario is a

matter of serious concern

bull WRTS-2 may kindly send the reasons for such faults

which has caused the incidence and the remedial action

taken in this regard220 kV Kawas‐Haldarwa 2

108 AMp

Fault location 2 kmEF 304 AM

220 kV Kawas‐Icchapur1

108 AM B phase to EFB Phase to EF

301 AM

220 kV Kawas‐Icchapur2

108 AMB phase to EF Faultlocation 356 km

B Phase to EF

331 AM

220 kV Kawas‐Vav 1 117 AMNo tripping

Hand Tripped laterLine Tripped 225 AM

220 kV Kawas Vav 2 117 AM Y Phase to EFY Phase to EF

317 AM

taken in this regard

bull Disturbance Recorder (DR) and Event Logger(EL) out

puts are yet to be received from WRTS-2

bull As per IEGC the information like DREL output relay

indications amp sequence of events etc must be sent to

RLDCRPC by 24 hrs of the event WRTS-2 may kindly

expedite amp furnish the information to WRLDC amp WRPC

Item No 911 Operating Procedure of WR-2014

The operating procedure of Western Region 2014 has been updated on 31072014 and the p g p g psame has been uploaded on WRLDC web site at the following link

httpwwwwrldccomdocsWR_OPERATING_PROCEDURE_2014pdf

8212014

18

Item No 12 Mock Black start Exercise

Station Name Date Proposed Remarks

Mock Black Start Plan for the following stations has been received by WRLDC

CLPIPL Gas Power Plant 29‐Jun‐2014 ‐

Gandhar Gas Power Plant 27‐July‐2014 ‐

Other Utilities may update the sub‐committee regarding their plan for black start exercise

SL No Name of the Station Remarks

1 Bargi DG set under outage

2 TONS Governor Problem

3 Birsinghpur Governor Problem

Healthiness of DG sets

3 Birsinghpur Governor Problem

4 Medikheda Governor Problem

5 Rajghat Governor Problem

1 Outage of DG set for longer period is matter of serious concern 2 SLDC Jabalpur may apprise the present status2 SLDC‐Jabalpur may apprise the present status3 Possibility of procurement of stand‐by DG sets to be examined to take care of such prolonged outage of DG sets which virtually renders the black start facility sterile4 There is need for blackstart generator planning in W3 area Thermal IPP generators are disconnected from state grid and there is no hydro station So with only UHV lines and large thermal units system restoration post disturbance would be extremely challenging for Chattisgarh

8212014

19

Maharashtra

Madhya Pradesh

Item No13 Review of list of feeders for load regulation in emergency

Gujarat

DD amp DNHChattisgarh

Goa

bull Decided during the 461st OCC that list ofDecided during the 461st OCC that list of

feeders identified for load control under

emergency measure for safeguarding grid

security would be reviewed in a special

meeting The list is yet to be reviewed

8212014

20

Item No 14 Implementation of voltage and time grading on OV relays to prevent tripping of multiple EHV lines emanating from single node on high voltage

bull During the 461st OCC it was informed by Power Grid representative that they have already implemented voltage grading in various line emanating from the same node (matter has not come in the MoM)

bull Power Grid amp other utilities may kindly intimate the present status of voltage grading at their respective sub‐stations

Power Station Number of instances

when the SPS signal

was received at the

station

Number of instances

when the action by

the generators was

adequate

Number of instances

when the automatic

generation reduction was

done partially

JPL 53 0 50

Item No 15 SPS for SR‐WR Inter Connection Inadequate Participation by Generators

Issues

1 10 times operation of SPS‐1 causing backing down at JPL amp KSK during 1714 to 7 8 14JPL 53 0 50

KSK 53 0 36

APML 35 0 30

Mouda 35 0 0

Koyna 0 0 0

Koradi 0 0 0

Khaparkheda 0 0 0

Chandrapur 0 0 0

to 78142 Participation by other envisaged

generators to be expedited3 PGCIL may update status of Extention of

SPS signal from Solapur(PG) to the additional generators identified for participation

4 Decided in 461st OCC to have special Chandrapur 0 0 0

DB Power 0 0 0

NSPCL 0 0 0

Balco 0 0 0

Lanco 0 0 0

KWPCL 0 0 0

pProtection Sub‐Committee meeting to discuss progress of implementation of the revised SPS at Solapur (for WR‐SR interconnection) amp extension of signal from Sholapur to additional generators in WR

8212014

21

Thank you

DiscussionhelliphelliphellipDiscussionhelliphelliphellip

  • 462 occ_minutepdf
  • participants list_462 OCC meeting 110814pdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 26-7pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 45pdf
  • 46pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84pdf
  • 84apdf
    • 26wrpc_minute 107pdf
    • 26wrpc_minute 108pdf
    • 26wrpc_minute 109pdf
    • 26wrpc_minute 110pdf
    • 26wrpc_minute 111pdf
    • 26wrpc_minute 112pdf
    • 26wrpc_minute 113pdf
      • 85pdf
      • 87pdf
      • 98pdf
      • 913pdf
      • 10pdf
Page 9: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR

9

462nd OCC MINUTES

2 400 kV DC Kosamba-Chorania line

(Package II)(From Kosamba SS to AP-54)

Aug -2014

3 400 kV DC Mundra-Zerda line No 1 Aug -2014 4 400 kV DC Mundra-Zerda line No 2 March-2015 5 400 kV DC Vadinar-Amreli line December -

2014

6 400kV Mundra-Hadala LILO to Halvad

August -2014

7 400 kV DC Amreli-Kasor line(Part-1) December-2014

8 400 kV Charanka- Veloda Oct 2014 MADHYA PRADESH 1 Chhegaon-Julwania 400 KV DCDS

Line OCT - 2014

2

Pithampur- Indore 400KV DCDS Line

August - 2014

Work of the line have been completed by MPPTCL feeder bay from Indore PGCIL is awaited

3 Satpura TPH-Ashta 400KV DCDS Line

December ndash 2014

MAHARASHTRA(STU)

1 400KV DC line from Koradi-II to Wardha SS(PG) DC

Oct- 2014

2 400 kV Akola-Taptiganga Sept 2014 3 400 kV Tiroda-Akola Dec - 2014 GUJARAT (IPTC route) by WR Transmission (Guj) Pvt Ltd

1 400 kV Rajgarh(PG)-Karamsad (GETCO) DC

Sept -2014

STERLITE (JTCL) 1 765 KvDhramjaygarh - Jabalpur (JTCL)

DC line May -2015 Severe ROW Problem

2 765 kV Jabalpur - Bina (JTCL) Sc May -2015 Severe ROW Problem STERLITE (BDTCL) 1 765 kV Bhopal - Indore (BDTCL) SC August-2014 2 765 kV Bhopal-Bhopal Commissioned on

160714 3 765 kV Dhule - Vadodara SC Oct - 2014 4 765 kV Vadodara - Dhule (BDTCL) SC Oct - 2014 5 765 kV Dhule - Aurangabad (BDTCL)

SC August-2014

RAICHUR SHOLAPUR TRANSMISSION CO LTD(RSTCL)

1 765 kV Raichur - Sholapur line 2nd SC

Commissioned on 29062014

10

462nd OCC MINUTES

It was suggested by WRLDC and constituents that important list of line will be sent by

each constituent to WRLDC and WRLDC will compile and furnish the list as per

priority of commissioning

The Sub-Committee noted and agreed as above

73 Commissioning of new Generating units in Western Region and the capacity expected to be commissioned during the current year 2014-15

The status regarding Generating units expected to be commissioned during the

current year 2014-15 is as below

Name of the Power Projects Unit No Capacity (MW)

Date of Commissioning Schedule Date

GUJARAT Bhavnagar Lignite TPP-JV I 250 August 2014 II 250 August 2014 UNO SUGEN 2 3825 July 2014 CHHATTISGARH Marwa 1 500 Sept 2014 2 500 Dec 2014 MAHARASHTRA Dhariwal 2 300 Synd On 23042014 CHANDRAPUR 8 500 Oct 2014 CHANDRAPUR 9 500 March 2015 KORADI 8 660 Oct 2014 KORADI 9 660 Jan 2015 PARLI 8 250 March 2015 MADHYA PRADESH Singhaji TPS 2 600 Oct-2014 Ms Jhabua Power Seoni 1 600 Dec ndash 2014 MB Power Anuppur 1 600 Sept ndash 2014 Jaiprakash Power Nigri 1 660 July 2014 Jaiprakash Power Nigri 2 660 Dec 2014 Moser Bear (Hindustan power) 1 600 Nov- 2014 Moser Bear (Hindustan power) 2 600 March 2015 Essar Concessional ampEssar Power 1 600 Oct 2014 Essar Concessional ampEssar Power 2 600 Dec 2014 BLA 2X4 90 March 15 Jhabua Power 1 600 Dec 2014 CENTRAL SECTORIPP KSK 2 600 August 2014 KSK 5 600 January 2015

11

462nd OCC MINUTES

ACBIL 1 300 March 2015 SASAN 5 660 July 2014 SASAN 6 660 August 2014 Sasan 4 660 Synchronized in May 2014

Sub-committee noted as above ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS (A) FOLLOW-UP ITEM NO 81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

All the constituents are requested to submit the CMP report for the First quarter

(April 2014 to June 2014) for the year 2014-15

The Sub-Committee members noted as above ITEM NO 82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR

Status of physical amp cyber security in Power Sector for the First quarter (April 2014 to

June 2014) for the year 2014-15 have not been received from some of the

constituents

The Sub-Committee members noted as above ITEM NO 83 PROCEDURE FOR CALCULATION OF TRANSMISSION SYSTEM

AVAILABILITY FACTOR FOR A MONTH AS PER CERC REGULATION 2014-19

Member Secretary WRPC informed that a procedure for calculation of

transmission system availability factor as envisaged in CERC Regulation 2014-15

was discussed in 461st OCC held at Raipur Various aspects were discussed and

finalized However there were concerns expressed by transmission licensee

regarding addition of 12 hrs to outage hrs after each tripping beyond admissible 2

tripping in a year as it will reduce availability below 95 Also concern was

expressed for multiplying outage hrs by 2 for line affecting generation Also

whether addition of 12 hrs is applicable to such lines affecting generation was

also expressed Whether these clauses are applicable to HVDC system was not

known Therefore all such concerns of transmission licenses have been taken up

with CERC for revision clarification

Meetings were held on 1st and 4th August 2014 with transmission licenses

regarding verification of data data formatting and sorting out various anomalies

and doubts for data from April to July 2014 for further processing at WRPC end

12

462nd OCC MINUTES

Member Secretary WRPC informed that certification for some transmission licensees

has already been done The certificate for PGCIL is to be issued as effect on

generation evacuation certificate from WRLDC is awaited

CM WRLDC requested all the transmission licensees to submit the data to WRLDC in

same format as submitted to WRPC

Representative from Transmission licensees agreed the same

The Sub-committee noted as above ITEM NO 84 IMPLEMENTATION OF RSD METHODOLOGY Shri Satyanarayan SE WRPC informed that GM (OSampC) NTPC HQ-I Mumbai vide letter dated 28072014 (copy enclosed at annexure 84) requested to call a meeting for resolvingclarification of methodology developed by WRPC The procedure for RSD framed by WRPC is enclosed at Annexure 84A SLDC MPPTCL Jabalpur informed that RSD was implemented for NTPC Mauda unit

on 18072014 but it was not more extended beyond 20072014 as no other major

beneficiaries agreed for extension

CE GETCO informed that intermittent rain profile in the different geographical area of

Gujarat amp increasing demand pattern didnrsquot permit them to take RSD of any NTPC

units as minimum of 3 days is required

Representative from SLDC Maharashtra also endorsed the Gujarat view points on

RSD

GM NTPC requested to the committee that if RSD wasnrsquot possible then at least

technical minimum schedule should be given

Member Secretary WRPC summarized the matter as follows

1 RSD was implemented for NTPC Mauda unit from 18072014 to 20072014

but it could not be extended due to increasing demand pattern amp uncertainty of

rain profile in the region

2 The method framed by WRPC shall be continued amp will be applied as and

when required

3 He requested constituents to schedule the NTPC generating units at its

technical minimum in case RSD is not feasible

The Sub-committee noted as above

13

462nd OCC MINUTES

ITEM NO 85 LOAD FORECASTING IN WESTERN REGION Background- As per the amended Indian Electricity Grid Code that is effective from 17th February 2014 the SLDCs SEB distribution licensees shall always restrict the net drawal of the State from the grid within the drawal schedule keeping the deviations from the schedule within the limits specified in the Deviation settlement mechanism regulations Therefore it is imperative that adequate attention may be paid towards load forecasting The matter was discussed in the past several OCC as well as in the 26th TCCWRPC board meeting wherein it was decided to create a task force for exploring development of a software for load forecasting A meeting was held on 03042014 under leadership of CE(SLDC) GETCO Gujarat at

Mumbai The outcome of the Meeting was as following

1 Short term action a) all the discoms were advised to provide maximum historical data b) Discoms have to bifurcate the geographical area in to zone and derive effect of temp rain festival on load

2 Long term action a) Provide computer base meters up to all the distribution feeders for close monitoring b) Provide weather sensors at various strategically important locations c) Formulation of forecasting desk (load amp RE) at SLDC level

The 2nd meeting regarding Load Forecasting Mechanism was held with members of WRPC WRLDC Western Region SLDCs amp State Discoms Forecasting Service Providers (FSPs) on 110614 at SLDC Vadodara Gujarat During the 460th OCC meeting CE SLDC GETCO informed that roadmap for implementation of pilot project amp main project has been prepared Budget proposal have already called from FSP amp they assured to submit till the end of the month For implementation of pilot project the Utility and their respective Pilot FSP are decided as tabulated below

Sr No STATE ndashSLDCDISCOM Pilot FSP

1 GUJARAT MS TESLA

2 MAHARASHTRA IIT MUMBAI

3 MADHYA PRADESH MS METEOLOGICA

4 CHHATISGARH MS SAS

5 GOA MS MARCADOS

6 DDDNH IITGANDHINAGAR

MP informed vide letter dated 27062014(copy enclosed at 85) that they have

already placed on order to Ms L amp T InfoTech on 12072013 for load forecasting

software project Therefore MP had requested to exclude them from pilot project

activities decided in earlier meetings

14

462nd OCC MINUTES

462nd OCC Discussions- State wise status is as under -

bull CE SLDC informed that Gujarat has prepared the NDA and forwarded to TESLA for signing and the same was signed by TESLA New Zealand office and their Mumbai office shall forward the same to SLDC Gujarat Thereafter Input data shall be provided and ID shall be provided to TESLA so as to start forecasting by them

bull SLDC Gujarat vide letter no SLDCCEMIST-6458 dtd 270614 has conveyed to all WR Nodal SLDC coordinators regarding progress of load forecasting pilot project Thereafter also e mailed on date 2082014 to all Nodal SLDC for submission of status Report on Pilot Load Forecasting Project However no proper response is received so far

bull MP SLDC conveyed that they have already awarded contract for load forecasting and the same is expected to be available by year end Therefore MP shall not participate in the present scheme

bull SLDC Chhattisgarh representative informed that matter has been taken with discom Chhattisgarh Discom were facing difficulties to contact with coordinator of Ms SAS

CE SLDC Gujarat being a group leader stated that Chhattisgarh shall intimate to them for further needful and would help them in this matter

bull Maharashtra SLDC informed that there was a meeting held on 09082014 with IIT Bombay where availability of data has been discussed amp one more meeting will be held on 22082014 outcome of the same will be intimated in next OCC meeting BEST amp TATA are already having such forecasting system

bull No one from GOA has attended last meeting even though GOA was forwarded copy of MOM Due to non availability of any coordinator details of GOA it was not possible to contact them However Ms Marcadose has also conveyed that he has not been contacted by Goa

bull No one from DDDNH has attended last meeting even though DD DNH was forwarded copy of MOM However IIT Gandhinagar conveyed that they were not been contacted by DD DNH

Member Secretary WRPC informed that a letter to DD DNH amp GOA has been written

from WRPC secretariat regarding implementation of ADMS Load Forecasting amp

telemetry status He further requested the constituents to implement the decision

taken in earlier meeting of load forecasting

OCC suggested that the next load forecasting meeting may be held at DDDNH

The Sub-committee noted as above

15

462nd OCC MINUTES

ITEM NO 86 NEED OF COOPERATION FROM WRLDC IN REAL TIME

bull CE SLDC informed that at present APL is under their control area and embedded scheduling model is used It may be noted that for units 78amp 9 at APL Gujarat has no share (all are for NR beneficiaries)There have been occasions when units 78amp 9 have tripped (given at annexure) Since APL is shown as embedded in Gujarat WRLDC requested Gujarat to reduce overdrawl when APL units 78amp 9 trips Hence Gujarat has to pick up state generationcostlier generation for no fault of Gujarat

bull Further lines are opened to curtail overdrawl when Gujarat is not faulty Gujarat is seen as overdrawing (due to embedded scheduling of APL) when APL trips

bull To complicate matters the scenario coupled with wind variations state generation has to be constantly varied to avoid overdrawl

Gujarat requested followings-

1 When large sized units (APL units 78amp 9) trips then scheduling of Gujarat should be changed with immediate effect OR Gujarat should not be pursued for deviation correction to the extent of schedule of units tripped at APL units 78amp 9 OR Schedule of Gujarat from other central sector stations should be changed as per their request with immediate effect

2 APL units 78amp 9 should be made a separate control area 3 Under above circumstances transmission lines should not be opened

due to default by APL as these affects Gujarat without any fault of their own Further this was done without informingtaking SLDC into confidence It was clear from the discussions that Gujarat Discoms are put to unnecessary financial implications WRLDC clarified that 220 KV Dehgam- Khanpur Line no1 was opened due to frequency touching 493 Hz and control of overdrawl was taken as security measure WRLDC agreed to inform CE SLDC whenever such discussions are taken and agreed to take care in future

The Sub-committee noted as above

ITEM NO 87 GUIDE LINES FOR SPLIT BUS OPERATION AT SSP RBPH SWITCHYARD CE SLDC Gujarat vide letter dated 07082014 informed that a meeting was held on

220514 at Kevadia Colony SSP regarding split bus arrangement at SSP RBPH

16

462nd OCC MINUTES

switchyard and subsequent discussions during 55th meeting of PSC of NCA held in

Vadodara on 140714 the guidelines for the same had been prepared in consultation

with GETCO protection wing and sent vide mail dated 23072014 However the same

has been attached herewith as Annexure-87 It was clarified during discussion that

split bus operation would be used only as per requirement and will not be a permanent

arrangement

The Sub-committee noted as above

ITEMS FROM WRLDC

1 OPERATION OF GRID AT HIGH FREQUENCY ( gt 505 HZ) The onsetrevival of monsoon in the last fortnight of July 2014 has reduced the demand in Western Region However the demand would pick up sharply during the dry spell in September and October months Presently the major State Central Sector IPP generators in Western Region that are facing coal shortage are tabulated as under S No Name of power

stations Unit Reason for

outage 1 VSTPS 2 (210 MW) Coal Shortage 2 VSTPS 5 (210 MW) Coal Shortage 3 Singhaji 1 (600 MW) Coal Shortage 4 SGTPS 4 (210 MW) Coal Shortage 5 JP Bina 2 (250 MW) Coal Shortage 6 Bhusawal 2 (210 MW) Coal Shortage 7 Parli 4 (210 MW) Coal Shortage 8 India Bulls 1 (270 MW) Coal Shortage Likewise several Gas Power Stations in Western Region are facing fuel shortage Under the above circumstances it is desirable that precious fuel optimally utilized to maintain adequate stock for the dry spell In the month of July 2014 the grid frequency remained above 5005 Hz for more than 15 of the time while it remained below 499 Hz for more than 34 of the time Operation of high frequency is unnecessary loss of fuel that could have been conserved and utilized during low frequency regime

The Sub Committee noted the same

17

462nd OCC MINUTES

2 OBSERVATION OF INTRA-PLANT MODE OF OSCILLATIONS (097 HZ) WITH POOR DAMPING ON 10TH AND 11TH JUNE 2014 AND LOSS OF 1800 MW IN MAHARASHTRA SYSTEM DUE TO POWER SWING UNDER N-1 CONTINGENCY ON 20TH MAY 2014 The issue of Intra plant mode of oscillations with poor damping as observed during the grid event on 10th and 11th June 2014 was discussed during the 461st OCC meeting Similar oscillations were again recorded on 11th July 2014 GM WRLDC informed that they have written to generators seeking details of MW fluctuations PSS status etc and requested constituents to share the dataHe requested that constituents may share PMU data also CESLDC Gujarat informed that they are proposing PSS tuning with consultants from IITs in their system EE SLDC Maharashtra informed that APL-Tiroda has recently tuned PSS at Tiroda units by OEM

It was once again requested constituent to furnish information as designed by WRLDC The Sub Committee noted the same

3 FREQUENT TRIPPING OF 765 KV SATNA-SASAN LINE

WRLDC informed that 765 kV Sasan-Satna Line has tripped on three occasions

while 240 MVAr Bus Reactor at 765 kV Satna tripped on one occasion The

tripping occurred due to protection mal-operation at Satna end during stability test

for the 765 kV Bus-1 The details of the tripping is given below

The above OV at Sasan end could have been avoided if the Line Reactor of this line at Sasan end had been commissioned The restoration of the tripped circuit also was considerably delayed in the absence of Line Reactor at Sasan end

Elements Date and Time of Tripping

Date and Time of Restoration

Remarks Receipt of DREL at WRLDC Satna Sasan

765 kV Sasan-Satna 2

25-07-14 1026

25-07-14 1155

Protection Mal-Operation DT at Sasan End on OV as line remain hanging from Sasan end

No Yes

765 kV 240 MVAr Bus Reactor at Satna

25-07-14 1026

25-07-14 1139

Protection Mal-Operation DT at Sasan End on OV as line remain hanging from Sasan

No Yes

765 kV Sasan-Satna 2

25-07-14 1229

25-07-14 1342

Line got charged from Satna and synchronized at Sasan No Yes

18

462nd OCC MINUTES

end but immediately DT was received at Sasan from Satna and Line tripped Prior to tripping voltage at Sasan end was 796 kV

765 kV Sasan-Satna 2

25-07-14 1628 -

Charging attempt was taken from Satna end but line tripped before synchronization at Sasan end due to DT from Satna Open end voltage at Sasan 826 kV for the line

No Yes

Representative from Sasan UMPP informed that with regards to the 765 kv Line and

Bus reactors all the material required for completion of works have been received at

site

Line reactor and bus reactor would be commissioned by Aug14 and Sep 14

respectively

The Sub Committee noted the same 4 SPS AT SIPAT

The SPS scheme implemented at NTPC Sipat has been received at WRLDC It is observed that a time delay of 15sec is provided to unload units 1 2 4 amp5 each by 150MW if any ICT s load exceeds 130 of rated load It was conveyed that if ex-bus generation at Sipat is more than 2200 MW immediate unloading of units may be done and the intentional delay which is required to prevent mal-operation may be 45 second instead of 15 second

NTPC Sipat representative agreed to implement the same accordingly The Sub Committee noted the same

5 COMMISSIONING OF SPS AT 400220 KV VAPI During the special WRPC meeting on 18032013 at Dadra an SPS for automatic load shedding subsequent to tripping of 400220 kV ICT at Vapi was approved as under It was decided that POWERGRID would extend trip signal from Vapi ICTs to the requisite feeders

Contingency Envisaged SPS action

Identified Feeders

Tripping of any one ICT at 400200 Vapi Sub-Station

Automatic Load Shedding of 100MW

DNH 1) 66 kV-Kharadpara-Rakholi-I 50 MW 2) 66 kV Khadoli-Khadoli-3 30 MW DD 1) 66 kV Magarwada-Kachigam 60 MW

19

462nd OCC MINUTES

It was felt that due to change in topology loading in ICT is not critical however SPS may be in place as defense mechanism in case of any emergency

DD amp DNH representative were absent in the meeting The Sub Committee noted the same

6 ADDRESSING HIGH VOLTAGE CONDITION IN SSP amp NEARBY AREA

High voltage condition is being observed at SSP and nearby area in off peak period particularly between 2300 hrs at night to 0500 hrs in the morning Also on many occasions the system operator is compelled to hand trip the 400 kV lines emanating from SSP to control over voltage Summary for the month of Julyrsquo14 is given under

Sl No 400 kV Line DatailsFrom To

Time Date Time Date 1 SSP-RAJGARH-I 0009 19-Jul-14 0730 29-Jul-14 2 SSP - RAJGARH-II 0406 16-Jul-14 1016 18-Jul-14 3 SSP-DHULE-I 1310 22-Jul-14 0953 23-Jul-14 4 SSP - DHULE - II 1533 15-Jul-14 0734 18-Jul-14 5 SSP - DHULE - I 1703 10-Jul-14 1100 11-Jul-14 6 SSP-DHULE-I 1712 28-Jul-14 0933 31-Jul-14 7 SSP - DHULE - II 1730 19-Jul-14 0917 20-Jul-14 8 SSP - DHULE - I 1757 18-Jul-14 0935 19-Jul-14 9 SSP-DHULE-II 1809 21-Jul-14 0914 22-Jul-14 10 SSP-DHULE-I 1815 30-Jun-14 0542 1-Jul-14 11 SSP-DHULE-I 1819 20-Jul-14 0858 21-Jul-14 12 SSP-DHULE-II 1825 8-Jul-14 0949 9-Jul-14 13 SSP - DHULE - II 1831 11-Jul-14 1007 13-Jul-14 14 SSP - DHULE - I 1838 1-Jul-14 0556 2-Jul-14 15 SSP - DHULE - I 1848 9-Jul-14 0912 10-Jul-14 16 SSP - DHULE - I 2136 13-Jul-14 0850 14-Jul-14 17 SSP-DHULE-II 2201 23-Jul-14 0945 28-Jul-14

Also it has been observed that Wanakbori TPS injects around 60 MVAr per unit even when voltage at Wanakbori is above 420 kV for nearly 100 of the time Further envisaged bus reactors at Rajgarh amp Dhule are yet to be commissioned Hence in view of system reliability it is advisable to explore all possibilities to contain high voltage condition in SSP and nearby area The following actions need to be taken to address the situation

bull Operating RBPH machines at SSP in synchronous condenser mode bull Absorption of MVAr by Wanakbori (WTPS) units bull The commissioning of Reactors at 400 kV Rajgarh may be expedited by

WRTS-2

20

462nd OCC MINUTES

bull The commissioning of Reactors at 400 kV Dhule may be expedited by MSETCL CE SLDC GETCO agreed for looking into absorption of MVAR at Wanakbori

7 IMPLEMENTATION OF THE REVISED AUFLS IN DD AND DNH Representatives from the DD and DNH intimated during the 459th OCC meeting that the tendering process was stalled because of general elections (election code of conduct was in force) amp action would be initiated post the elections Member Secretary WRPC vide letter dated 01082014 took up the matter with Secretary (P) DDDNH (copy enclosed) DD amp DNH representative were absent in the meeting to comment

The Sub Committee noted the same 8 ADMS(AUTOMATIC DEMAND MANAGEMENT SCHEME) IMPLEMENTATION

AS PER SEC 542 OF IEGC The format for reporting the progress of implementation of the ADMS in Western Region States was given as part of MoM of the 461st OCC meeting All utilities may like to furnish the updated status to WRPCWRLDC as per the above format It is understood that MP has submitted its detailed action plan in the form of an affidavit to CERC for implementation of ADMS However SLDC MPPTCL is requested to furnish data to OCC forum in the above format

The Sub Committee noted the same

9 STATUS OF TELEMETRY IN WESTERN REGION

In the 460th amp 461st OCC meetings the status of telemetry in Western Region was discussed in detail It was also highlighted that the Honrsquoble CERC vide its order in petition SM0072014 issued Notice under section 142 on several constituents of Western Region All the constituents had assured to address the telemetry issues within a month or two The telemetry status as on 4th August 2014 is tabulated below

21

462nd OCC MINUTES

a Maharashtra The non-availability of telemetry is 583 for sub-stations amp 18

for generating stations This is a matter of serious concern The issue has been

discussed in several OCC meetings since last 8 months As per the information available with WRLDC telemetry is not available from the following generating stations at 400 kV level

bull Kaparkheda bull Deepnagar

Also telemetry is not available from the following sub-stations at 400 kV level bull Warora bull Lonikhand(New) bull Chandrapur-stg-II

As per the information available with WRLDC telemetry is intermittent at 4 generating stations viz

bull Jaigad bull Paras-extension bull Trombay bull Deepnagar GCR

Also telemetry is intermittent at following sub-stations at 400 kV level bull Bableswar-II bull Deepnagar SS bull Dhule bull Khaparkheda bull Kolhapur-3

22

462nd OCC MINUTES

bull Sholapur-3 SLDC MSETCL Maharashtra informed that telemetry has been established for 46 locations

a Chhattisgarh100 available b Madhya Pradesh As per the latest status telemetered data is available from

100 of the locations c Gujarat As per the latest information submitted to CERC the non-availability of

telemetry data from Gujarat as on date is 33 for substations As per the information available with WRLDC Telemetry is not available form 2 number of 220 kV sub-stations viz bull Bhatiya bull Mokha Gujarat intimated in 460th OCCM that these sub-stations were ready but lines were in construction phase Also telemetry is intermittent from the following SS in Gujarat bull 220 kV Navasari (GETCO) ss bull 400 kV Kasor ss

SLDC GETCO may expedite amp resolve the issue for the above stations at the

earliest d Goa As per the latest information telemetry is not available form 2 number of

220 kV sub-stations viz Amona amp Cuncolim Telemetry is intermittent from 220 kV Tivim Ponda Xeldam amp 110 kV Kadamba amp Verna Thus Non availability of telemetry from Goa is 100 Goa to resolve the issue on war footing

e DD Telemetry is not available form 1 number of 220 kV sub-station viz Magarwada Thus availability of telemetry from DD is NIL DD representative intimated in 460th OCCM that RTU was being installed at 220 kV Magarwada SS under the new SCADAEMS up gradation project amp it would take 3 months to complete the work DD representative was absent in 461st OCCM so information on progress in this matter is yet to be received from DD DD to expedite the issue for the above station(s) on war footing

f DNH Telemetry is not available form 2 number of 220 kV sub-station viz Kharadpara amp Khadoli Thus availability of telemetry from DNH is NIL DNH representative was absent in 460th amp 461st OCC meetings to comment on the issue DNH to resolve the issue for the above station(s) on war footing

g ISGS As per the latest information submitted to CERC the non-availability of telemetry data from ISGS generating stations as on date is 125 Telemetry is intermittent from 220 kV Kawas(NTPC) station Power Grid NTPC to expedite

23

462nd OCC MINUTES

NTPC amp Power Grid agreed to expedite the matter during 460th amp 461st OCC meetings of WRPC However no progress has been reported

h POWERGRID As per the latest information submitted to CERC the non-availability of telemetry data from Power Grid substations as on date is 111 Telemetry is intermittent from the following ss

o 765 kV Kotra SS o 765 kV Dharamjaigad o 765 kV Tamnar SS o 400 kV Navasari SS

Additional points

a) In the report available on the WRLDC website it is clearly indicated that Communication link between all SLDC to WRLDC is in radial mode (without redundancy) and any failure in any equipment Fibre leads to total data black out Power Grid to ensure that links are on two channels

i IPP As per the latest information submitted to CERC the non-availability of

telemetry data from IPP generating stations as on date is 15 Telemetry is intermittent from Jindal amp Essar Mahan GMR Raipur JPL ESSAR Mahan GMR Raipur to expedite

Additional Points

bull Adani(APL) Tiroda There is only one channel emanating from Adani Tiroda Recently there was a case when entire station was not visible due to non-Availability of that channel

bull CGPL Mundra There is only one channel emanating from CGPL Mundra In case of non-availability of data leads to non-visibility of 4000 MW generation which creates difficulty in Grid Operation

bull Sasan There is only one channel emanating from Sasan In case of non-availability of data leads to non-visibility of 2400 + MW generation which creates difficulty in Grid Operation

bull APL Mundra There is only one channel emanating from CGPL Mundra In case of non-availability of data leads to non-visibility of 4000 + MW generation which creates difficulty in Grid Operation

The above issue was already discussed in 460th OCCM The utilities (APL SASAN CGPL) may kindly update the progress in this matter

24

462nd OCC MINUTES

j PMU data Regarding Satna to WRLDC link WRTS II informed that work is under progress for laying of OPGW from Satna 220 kV (MPPTCL) to Satna 765 kV (PG) and it may take 3-4 monthsrsquo time It was suggested that till such time the OPGW operation is in place WRTS-II may explore leased line connectivity at the earliest Power Grid to expedite

The Sub-Committee noted the same amp agreed to make availability of telemetry in their concerns and the report be updated position in next meeting

The Sub Committee noted the same

10 BLACK OUT AT NTPC KAWAS POWER STATION On 11th July 2014 Kawas Gas generating complex got blackout due to tripping of evacuation lines one by one within a short span of 30 minutes The complete loss of evacuation lines occurred at 0117 Hrs The blackout has resulted in tripping of GT1A GT1B and ST causing 320 MW generation loss in the area It was reported that weather condition was foggy with slight drizzling was in the area

Line Time of Tripping Kawas End Remote

end Restoration Time

220 kV Kawas-Navsari 1 1246 AM R phase to EF Fault location 2 km R Phase to EF 122 AM

220 kV Kawas ndashNavsari 2 112 AM R phase to EF Fault location 2208 km

R Phase to EF 347 AM

220 kV Kawas-Haldarwa 1 107 AM R phase to EF Fault location 16 km

R Phase to EF 246 AM

220 kV Kawas-Haldarwa 2 108 AM R phase to EF Fault location 2 km

R Phase to EF 304 AM

220 kV Kawas-Icchapur 1 108 AM B phase to EF B Phase to EF 301 AM

220 kV Kawas-Icchapur 2 108 AM B phase to EF Fault location 356 km

B Phase to EF 331 AM

220 kV Kawas-Vav 1 117 AM No tripping Hand Tripped later Line Tripped 225 AM

220 kV Kawas Vav 2 117 AM Y Phase to EF Y Phase to EF 317 AM

Even the line restoration has failed on several attempt as the lines were not holding due to persisting fault Such an event of total loss of evacuation lines from a generating station resulting in blackout scenario is a matter of serious concern Representative from WRTS-II stated that being highly industrial corridor the said lines are suffering with smog and informed that they are in process of replacement of existing insulator with polymer type insulators Order has been already placed amp it may be completed within next two to three month The Sub Committee noted the same

25

462nd OCC MINUTES

11 OPERATING PROCEDURE OF WR-2014 As discussed in 460th OCCM of WRPC the operating procedure of Western Region 2014 has been updated on 31072014 and the same has been uploaded on WRLDC web site at the following link httpwwwwrldccomdocsWR_OPERATING_PROCEDURE_2014pdf

The Sub Committee noted the same 12 MOCK BLACK START EXERCISE

MP representative informed that DG set at Bargi will be ready within a week time amp mock black start exercise can be performed in October 2014

NTPC Gandhar has successfully performed the mock black start exercise on 27072014

The Sub Committee noted the same

13 REVIEW OF LIST OF FEEDERS IDENTIFIED FROM ISGS LEVEL IN CASE OF

THREAT OF GRID SECURITY DUE TO LARGE DEVIATION

During the 461st OCC it was decided that list of feeders identified for load

control under emergency measure for safeguarding grid security would be

reviewed in a special meeting The list is yet to be reviewed GM WRLDC

requested SLDC to review the same amp submit Till such time the existing list will

continue

The Sub Committee noted the same 14 IMPLEMENTATION OF VOLTAGE AND TIME GRADING ON OV RELAYS TO

PREVENT TRIPPING OF MULTIPLE EHV LINES EMANATING FROM SINGLE NODE ON HIGH VOLTAGE

During the 461st OCC it was informed by Power Grid representative that they have already implemented voltage grading in various line emanating from the same node (matter has not come in the MoM) Power Grid amp other utilities may kindly intimate the present status of voltage grading at their respective sub-stations Member Secretary WRPC suggested to take the matter in PCM

The Sub Committee noted the same

26

462nd OCC MINUTES

15 INADEQUATE PARTICIPATION OF GENERATORS ENVISAGED SPS FOR SR-NEW GRID OPERATION

The details of SPS operation from 1st July 2014 till 6th August 2014 is as under

Sl No Date SPS No Condition 1 01 July 2014 SPS-1 613 SholapurRaichur DC gt1000 MW 2 01 July 2014 SPS-1 1752 SholapurRaichur DC gt1000 MW 3 04 July 2014 SPS-1 0406 SholapurRaichur DC gt1000 MW 4 09 July 2014 SPS-1 350 SholapurRaichur DC gt1000 MW 5 14 July 2014 SPS-1 506 SholapurRaichur DC gt1000 MW 6 17 July 2014 SPS-1 2204 SholapurRaichur DC gt1000 MW 7 23 July 2014 SPS-1 547 SholapurRaichur DC gt1000 MW 8 26 July 2014 SPS-1 1201 SholapurRaichur DC gt1000 MW 9 30 July 2014 SPS-1 902 SholapurRaichur DC gt1000 MW 10 30 July 2014 SPS-1 1954 SholapurRaichur DC gt1000 MW

During the last OCC the matter was discussed and it was suggested by Member Secretary WRPC to have Special Protection Sub-Committee meeting to discuss progress of implementation of the revised SPS at Solapur (for WR-SR interconnection) amp extension of signal from Solapur to additional generators in WR so as to address the issue of inadequate participation of WR Member Secretary WRPC requested to all generators who are having more than one units shall participate in implementation of SPS for SR-NEW grid operation

The Sub-committee noted the same ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING OCC reviewed the meeting roaster and finalized sheet is enclosed at Annexure-10

Due to non-readiness of BDTCL to host the next meeting NTPC KawasGandhar

would host the 463rd OCC meeting The exact date amp venue details will be intimated

separately

SlNo Organisation Name amp Designation E-mail Mobile

I WRPC1 Shri SD Taksande MS ms-wrpcnicin 98208783842 Shri Satyanarayan S opc-wrpcnicin 92233999383 Shri LKS Rathore DD lksr_2000yahoocom 98333718444 Shri Ratnesh Kumar Yadav AD ratneshkumar7437gmailcom 8903929150

II MSETCL MSEDCLMahaGenco5 Shri VD Pande EE vasantpandemahasldcin 98207419416 Shri Ajit V Pachori EE ajitpachorimahagencocoin 9619461420

III MPPTCL MPPGCL7 Shri KK Prabhakar SE sldcmpjbpyahoocom 94258052678 Shri SK Mehta EE mehtasanjay67yahooin 9425805017

IV CSPTCL CSPGCL9 Shri BR Soni Addl CE balramsonirediffmailcom 942518880710 Shri Arvind Mukherjee gccraipurgmailcom 9429227699

V GETCO GSLDC GSECL11 Shri BB Mehta CE cesldcgujgmailcom 987920073612 Shri BM Shah DyEE demissldcgetcogebmailcom 9925212836

VI WRLDC POWERGRID13 Shri P Mukhopadhyay GM prithwishmukhopadhyayposocoin 986943807314 Shri VK Shrivastava AGM vkspowergridindiacom 986945022115 Smt Sachala Mishra CM mishrasachalagmailcom 986945022316 Smt Pushpa S CM pushpa_seshadrihotmailcom 986940448217 Shri Aditya P Das Dy Mgr aditya19227gmailcom 9869404569

POWERGRID REGION-I18 Shri Anil Darode 70207powergridindiacom 942230180519 Shri Manu Sinha 02457powergridindiacom 9425293864

POWERGRID RETION -II20 Shri Abhinav Verma stawr2gmailcom 942850406221 Shri Anand Dubey ananddubey_pgrediffmailcom 9428504065

VII NTPC22 Shri PB Behre GM pbbeherentpccoin 900449708823 Shri Hari Nath AGM harinath01ntpccoin 900449713324 Shri SK Shrivastava AGM sksrivastava09ntpccoin 942517806925 Shri Amir Kr Singh SM aksingh01ntpccoin 942414081426 Shri Amitabh Kumar amitabhkumarntpccoin 9425178122

VIII TATA POWER27 Shri RM Sankhe GM rmsankhetatapowercom 909900654128 Shri PR Gadave AGM prgadavetatapowercom 9223553341

IX NHDC 29 Shri Anurag Seth CE annu226hotmailcom 9425326135

LIST OF PARTICIPANTS OF 462nd OCC MEETING OF WRPC HELD ON 11082014 AT TARAPURAnnexure-I

30 Shri Vinod Kumar Singh vinodnhdcrediffmailcom 9425925251

X APL 31 Shri CS Bobade GM chandrashekharbobadeadanicom 8980802255

XI RINFRA32 Shri SG Zirpe GM sachinzirperelianceadacom 932260763033 Shri Sanil C Namboodiripad sanilnamboodiripadrelianceadacom932104697434 Shri Subrata Das subratakudasrelianceadacom 932093072235 Shri Ishan Roy Asst Mgr ishanroyrelianceadacom 9860027348

XII KSK Mahanadi36 Shri Sudarshan B Reddy sudarshanreddybkskcoin 9000377721

XIII NPCIL37 Shri Mandeep mandeepnpcil 904991887038 Shri JS Choubey jschoubeynpcilcoin 942882191839 Shri Ritesh Chandra Singh rcsinghnpcilcoin 8007991744

XIV ESSAR 40 Shri OJ Saxena Sr Mgr osaxenaessarcom 987910126841 Shri Kamlesh Garg kamleshgargessarcom 987910284942 Shri Sarabjeet Singh sarabjeetsinghessarcom 750957010543 Shri Ashwin Ande ashwinandeessarcom 9909993594

XV JPL44 Shri RK Srivastava AGM rkshrivastavajindalpowercom 9329445016

XVI TORRENT POWER45 Shri Kamal K Vyas kamalvyastorrentpowercom 997407965746 Shri Pramod G Patel AGM pramodpateltorrentpowercom 9824370005

XVII NCA47 Shri Naveen Nath Das emc_ncarediffmailcom 9425053309

XVIII STERLITE GRID LTD48 Shri Sachin S Deshpande GM sachindeshpandesterlitecom 8966903047

XIX LANCO AMARKANTAK POWER LTD49 Shri BN Panda pandabnlancogroupcom 769770301550 Shri Anil Sharma anilshlancogroupcom 9560258009

XX KWPCL51 Mis Smruti R Nayak DGM smrutinayakavanthapowercom 9424176680

XXI MB POWER LTD 52 Shri Sandeep Kumar Gupta sandeepguptahpplin 9582896418

Anaulagnak 21

maah jaUlaa[- 2014

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5020 Hz BETWEEN 1700 Hrs amp 1800 Hrs Hrs ON 27072014

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4962 Hz BETWEEN 1900 Hrs amp 2000 Hrs Hrs ON 25072014

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4993 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5036 Hz AT 130344 Hrs ON 23072014

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4939 Hz AT 194315 hrs Hrs ON 25072014

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS JULY 2014 JUNE 2014 MAY 2014

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 008 023 000

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 314 476 093 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 3129 3216 2155 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 5016 4536 5319

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1533 1749 2433

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING JULY 2014

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

Voltage Profile during the month of July 2014

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 420 402 420 404 433 411 424 424 417 400 420 403 422 407 408 3902 417 398 420 400 431 407 424 424 417 401 427 418 421 409 410 3943 417 393 419 397 432 408 420 396 417 400 425 419 422 408 407 3934 416 398 419 401 434 412 422 402 417 400 426 421 418 406 411 3965 417 400 419 403 433 414 424 424 417 403 424 419 417 406 410 3996 420 406 422 408 438 411 421 402 419 407 427 421 422 412 409 3897 412 396 419 402 428 413 420 399 414 401 423 419 417 409 409 3968 418 400 421 410 433 400 424 400 416 400 425 419 422 400 410 3949 418 412 421 410 433 413 424 410 416 408 425 419 422 412 410 394

10 415 399 417 403 435 415 400 400 418 404 424 421 422 414 410 41111

स नक Annex-23

िभलाईBhilai

धल असोज कासोरKarad Dhule Asoj Kasor

इदौर इटारसी कराडIndore Itarsi

जतपरJetpur

11 416 402 423 407 436 416 422 407 416 405 425 421 423 413 410 39712 419 400 422 406 436 417 400 400 419 403 426 422 423 413 410 39713 415 400 422 410 437 417 400 400 417 406 425 421 422 414 411 39514 416 398 423 409 439 416 400 400 419 404 424 421 422 413 412 39815 420 403 423 408 437 413 428 401 418 404 426 422 423 413 410 39816 423 408 426 411 437 413 429 403 421 406 428 424 423 415 413 40017 421 404 424 407 436 416 400 400 419 408 423 414 423 414 411 39818 421 404 424 407 436 416 400 400 420 406 427 423 423 414 411 39819 423 407 425 410 434 415 425 411 424 405 428 425 424 416 422 39520 421 407 424 410 420 420 427 410 421 407 427 424 423 416 417 39621 421 406 424 411 420 420 400 400 420 402 428 425 426 418 413 39222 421 407 426 413 420 420 400 400 419 401 428 425 428 420 412 39623 422 409 427 410 419 415 415 402 420 403 425 419 428 420 412 39624 420 406 425 409 420 420 400 400 420 404 429 426 427 416 409 39625 422 401 421 404 420 420 400 400 424 402 428 424 423 415 415 39726 420 402 421 406 431 419 400 400 422 403 428 423 422 413 415 40027 417 404 422 407 434 416 423 407 421 405 428 424 422 413 416 40128 419 403 421 407 437 416 431 408 423 406 428 426 423 415 415 40229 419 403 420 408 437 415 400 400 421 406 429 426 423 416 415 39930 421 404 422 406 438 415 400 400 423 404 430 426 426 415 420 40331 420 395 420 402 431 406 428 403 422 403 429 425 423 414 419 398

423 393 427 397 439 400 431 396 424 400 430 403 428 400 422 389

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 418 404 411 395 423 406 430 406 789 752 788 757 787 756 791 7662 419 397 411 393 423 403 431 404 772 748 791 756 786 750 793 7553 416 402 411 397 421 397 425 399 772 748 780 751 781 757 791 7634 417 404 409 396 420 415 428 406 772 748 786 757 780 755 791 7655 418 404 418 400 421 404 427 407 772 748 796 755 796 765 802 7726 419 408 416 402 424 410 429 413 789 752 797 768 796 765 799 7757 414 406 407 397 420 403 426 407 789 752 776 758 777 757 784 7658 418 408 411 388 422 400 429 400 789 752 786 767 783 746 790 7719 412 401 403 386 422 405 429 408 789 752 781 761 772 745 783 76010 413 403 402 394 420 404 424 406 789 752 792 764 774 755 785 765

Bina Gwalior Nagda Khandwa Sipat

बना वािलयरिसविननागदावािलयर बनाBina

िसपतखडवाseoni Gwalior

10 413 403 402 394 420 404 424 406 789 752 792 764 774 755 785 76511 415 407 403 395 421 407 426 410 789 752 790 774 785 758 790 77212 418 406 407 392 422 404 427 404 789 752 796 769 784 756 796 76913 418 406 407 392 421 408 427 411 789 752 796 769 784 756 796 76914 419 410 409 397 423 406 428 409 789 752 784 768 786 763 792 77415 419 404 408 391 424 407 429 408 789 752 789 763 786 750 791 76416 424 414 408 400 427 411 431 413 789 752 792 766 785 767 797 77917 421 410 411 399 424 407 432 409 789 752 788 762 789 766 795 77618 423 412 414 396 424 407 432 409 789 752 783 770 796 765 801 77719 424 411 410 396 426 411 431 413 789 752 791 770 788 764 803 77720 425 411 411 396 424 410 428 414 789 752 786 763 789 760 800 77221 422 412 410 395 424 409 428 413 789 752 784 760 788 763 796 77522 423 416 414 402 424 410 429 414 789 752 791 774 794 773 801 78423 425 413 418 402 424 410 430 412 787 750 785 770 798 780 804 78324 422 411 411 397 425 409 431 415 789 752 790 772 791 773 801 78125 421 410 405 396 423 403 429 409 789 752 784 770 794 767 798 77726 421 410 409 395 423 404 427 409 789 752 792 773 789 767 799 77827 423 412 413 399 420 404 428 409 789 752 794 766 797 770 808 78028 422 411 411 399 421 405 428 410 789 752 789 763 794 770 793 77029 419 409 411 397 423 406 430 414 789 752 794 771 795 767 796 77430 422 409 413 398 420 404 430 413 788 753 796 766 799 766 799 77331 420 404 409 395 421 397 429 411 789 752 787 764 792 759 795 767

425 397 418 386 427 397 432 399 789 748 797 751 799 745 808 755

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Jul-14 0 0 0 0 0 0 0 02 02-Jul-14 0 0 0 0 0 0 0 03 03-Jul-14 0 0 0 0 0 0 0 04 04-Jul-14 0 0 0 0 0 0 0 05 05-Jul-14 0 0 0 0 0 0 0 06 06-Jul-14 1 67 0 0 0 0 0 07 07-Jul-14 0 0 0 0 0 0 0 08 08-Jul-14 1 278 0 0 0 0 0 09 09-Jul-14 0 0 0 0 0 0 0 0

10 10-Jul-14 1 565 0 0 0 0 0 011 11-Jul-14 0 0 0 0 0 0 0 012 12-Jul-14 0 0 0 0 0 0 0 013 13-Jul-14 3 758 0 0 0 0 0 014 14-Jul-14 0 0 0 0 0 0 0 015 15-Jul-14 0 0 0 0 0 0 016 16-Jul-14 2 2127 NIL NIL NIL 017 17-Jul-14 0 0 0 0 0 0 0 018 18-Jul-14 1 08 0 0 0 0 0 019 19-Jul-14 0 0 0 0 0 0 0 020 20-Jul-14 0 0 0 0 0 0 0 021 21-Jul-14 0 0 0 0 0 0 0 022 22-Jul-14 0 0 0 0 0 0 0 023 23-Jul-14 0 0 0 0 0 0 0 024 24-Jul-14 0 0 0 0 0 0 0 025 25-Jul-14 0 0 0 0 0 0 0 026 26-Jul-14 0 0 0 0 0 0 0 027 27-Jul-14 0 0 0 0 0 0 0 028 28-Jul-14 0 0 0 0 0 0 0 029 29-Jul-14 0 0 0 0 0 0 0 030 30-Jul-14 0 0 0 0 0 0 0 031 31-Jul-14 0 0

Max 3 758 0 0 0 00 0 0Total 9 24917 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month July 2014

Recommonded Load relief at 492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE 25

POWER CUTRESTRICTIONS IN WESTERN REGION FOR THE MONTH OF JULY-2014

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply(DLF)

01072014 31072014 2343 2105 2300

21 Three-Phase Supply(Irrigation)

01072014 31072014 0953 0857 0933

21 Three-Phase Supply(Mixed)

01072014 31072014 2339 2055 2240

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01072014 31072014 2353 2325 2344 32 District Head Qtrs 01072014 31072014 2357 2330 2348 33 Tehsil Head Qtrs 01072014 31072014 2350 2230 2319

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 010714 to 310714

SaUnya Nil

0-470 MW

SaUnya Nil

0000

SaUnya Nil 2400

SaUnya Nil

19 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs) 21 Three-Phase Supply 01072014 31072014 1000 0800 0900

22 Single-Phase Supply 01072014 31072014 1800 1800 1800 3 Anya jaanakarI Any other information There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

8860 (Av) of 31days 0000(Av) 0000 (Av)

1Rural 7109(Av) for 23447 Hrs 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0532 - -

0537 -

3 HT Industries 8261 (Av) for 17270 Hrs 0357 Total Energy Cutday 1426 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01072014 to 310714 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 3172014 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil ca gaaovaa Goa SaUnya Nil

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-26 Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai अिनवाय यिनट आऊटज का जलाई2014का वःता रत यौरा

Details of forced unit outages during the month ofJuly2014

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 एःसार Essar-2

गरा विनिल GSECL

172 1212 22-Feb-13 अनपल ध Still out

अनपल ध Still out

Shortage of gas

2 यट पीएस UTPS-2

गरा विनिल GSECL

120 1951 17-Jun-14 अनपल ध Still out

अनपल ध Still out

Turbine tripped(RSD)

3 एःसार व डनार Essar vadinar-1

गरा विनिल GSECL

600 2335 3-Jul-14 1324 22-Jul-14 Coal shortage

4 डब यट पीएस WTPS-6

गरा विनिल GSECL

210 953 10-Jul-14 0707 14-Jul-14 BTL

5 एसट पीएस STPS-1

गरा विनिल GSECL

120 1220 10-Jul-14 0710 14-Jul-14 BTL

6 जीआईपीसीएल GIPCL-STG I-2

गरा विनिल GSECL

165 1744 14-Jul-14 अनपल ध Still out

अनपल ध Still out

C ampI problem

7 एएलट पीएस ALTPS-1

गरा विनिल GSECL

120 107 15-Jul-14 2037 19-Jul-14 BTL

8 िस का ट पीएस SIKATPS-1

गरा विनिल GSECL

120 1330 17-Jul-14 अनपल ध Still out

अनपल ध Still out

RSD

9 डब यट पीएस WTPS-4

गरा विनिल GSECL

210 858 18-Jul-14 अनपल ध Still out

अनपल ध Still out

RSD

10 डब यट पीएस WTPS-3

गरा विनिल GSECL

210 1046 18-Jul-14 अनपल ध Still out

अनपल ध Still out

RSD

11 डब यट पीएस WTPS-5

गरा विनिल GSECL

210 1818 18-Jul-14 000 21-Jul-14 RSD

12 डब यट पीएस WTPS-6

गरा विनिल GSECL

210 447 19-Jul-14 अनपल ध Still out

अनपल ध Still out

RSD

13 यट पीएस UTPS-3

गरा विनिल GSECL

200 1055 26-Jul-14 2328 1-Aug-14 RSD

14 एपीएल APL-6

अदानी ADANI

660 2146 5-Jul-14 1105 2-Aug-14 Heavy hydrogen leakage

15 एपीएमएल APML-4

अदानी ADANI

660 1132 10-Jul-14 1407 23-Jul-14 Coal shortage

16 एपीएल APL-1

अदानी ADANI

330 117 20-Jul-14 612 23-Jul-14 RSD

प म ऽय भार षण कि म बई णाली चालन-ISO-I

17 एपीएल APL-8

अदानी ADANI

660 2018 18-Jul-14 2209 21-Jul-14 BTL

18 एपीएल APL-2

गरा विनिल GSECL

330 0913 26-Jul-14 1714 29-Jul-14 Air pre heater problem

19 एपीएल APL-5

गरा विनिल GSECL

660 1910 29-Jul-14 1533 2-Aug-14 Heavy steam leakage

20 डब यपीसीएल WPCL-1

मारा वउकिल MSPGCL

135 1245 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Furnace press high

21 डब यपीसीएल WPCL-4

मारा वउकिल MSPGCL

135 001 3-Apr-14 2347 11-Jul-14 Less schedule

22 कोराड Koradi-5

मारा वउकिल MSPGCL

200 1030 17-Jun-14 अनपल ध Still out

अनपल ध Still out

ID fan bearing temperature high

23 इ डयाबल Indiabulls - 1

मारा वउकिल MSPGCL

270 546 26-Jun-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

24 पल Parli -4

मारा वउकिल MSPGCL

210 1019 29-Jun-14 अनपल ध Still out

अनपल ध Still out

water shortage

25 भसावल Bhusawal-2

मारा वउकिल MSPGCL

210 1117 6-Jul-14 544 10-Jul-14 Coal problem

26 चिपर Chandrapur-1

मारा वउकिल MSPGCL

210 2211 8-Jul-14 2106 13-Jul-14 BTL

27 चिपर Chandrapur-3

मारा वउकिल MSPGCL

210 2216 14-Jul-14 1452 18-Jul-14 Safety valve problem

28 उरण Uran-6 मारा वउकिल MSPGCL

108 1634 15-Jul-14 1407 22-Jul-14 Gas shortage

29 उरण Uran -5 मारा वउकिल MSPGCL

108 2338 17-Jul-14 1125 24-Jul-14 For rotor balancing work

30 उरण Uran -A0 मारा वउकिल MSPGCL

120 2340 17-Jul-14 2315 23-Jul-14 For rotor balancing work

31 भसावल Bhusawal-2

मारा वउकिल MSPGCL

210 2346 18-Jul-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

32 खापरखड़ा Khaparkeda-3

मारा वउकिल MSPGCL

210 1036 20-Jul-14 041 29-Jul-14 Flame failure

33 जयगड Jaigad-2 मारा वउकिल MSPGCL

300 000 20-Jul-14 Ready Ready Less requisition

34 वीआईपीएल VIPL-2

मारा वउकिल MSPGCL

300 2302 20-Jul-14 1716 26-Jul-14 Coal feeding problem

35 एपीएमएल APML-3

मारा वउकिल MSPGCL

660 0444 22-Jul-14 044 26-Jul-14 Pressure release valve operated

36 भसावल Bhusawal-4

मारा वउकिल MSPGCL

500 003 23-Jul-14 151 29-Jun-14 BTL

37 वीआईपीएल VIPL-1

मारा वउकिल MSPGCL

300 015 23-Jul-14 1300 31-Jul-14 Coal feeding problem

38 उरण Uran -8 मारा वउकिल MSPGCL

108 730 26-Jul-14 1700 29-Jul-14 Gas shortage

39 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 347 29-Jul-14 638 4-Aug-14 BTL

प म ऽय भार षण कि म बई णाली चालन-ISO-I

40 पल PARLI-5 मारा वउकिल MSPGCL

210 002 30-Jul-14 अनपल ध Still out

अनपल ध Still out

Water shortage

41 टाटा TATA-8

टाटा TATA

250 2255 9-Jan-14 अनपल ध Still out

अनपल ध Still out

HT due to fire near turbine generator desk

42 टाटा TATA-6

टाटा TATA

500 2134 31-Jul-14 Ready Ready Less requisition

43 आरजीपीपीएल RGPPL-3A

आरजीपीपीएल RGPPL

320 1857 17-Apr-14 Ready Ready Less requisition

44 आरजीपीपीएल RGPPL-2B

आरजीपीपीएल RGPPL

320 1915 17-Jun-14 अनपल ध Still out

अनपल ध Still out

Raw water problem

45 आरजीपीपीएल RGPPL-2A

आरजीपीपीएल RGPPL

320 1615 25-Jun-14 1200 21-Jul-14 Less requisition

46 आरजीपीपीएल RGPPL-1A

आरजीपीपीएल RGPPL

320 1330 8-Jul-14 Ready Ready Less requisition

47 अमरकनटक Amarkantak-4

म वउकिल MPPGCL

120 1113 30-Apr-14 अनपल ध Still out

अनपल ध Still out

TURBINE BEARING VIBRATION HIGH

48 सातपरा Satpura-6

म वउकिल MPPGCL

200 305 18-Jun-14 अनपल ध Still out

अनपल ध Still out

BTL

49 एसजीट पीएस SGTPS-3

म वउकिल MPPGCL

210 617 26-Jun-14 020 26-Jul-14 Conveyer belt problem

50 अमरकनटक Amarkantak-3

म वउकिल MPPGCL

120 1640 2-Jul-14 1623 11-Jul-14 BTL

51 सातपरा Satpura-9

म वउकिल MPPGCL

210 2200 5-Jul-14 855 15-Jul-14 Condenser tube cleaning

52 सातपरा Satpura-9

म वउकिल MPPGCL

210 1310 15-Jul-14 845 24-Jul-14 BTL

53 एसजीट पीएस SGTPS-4

म वउकिल MPPGCL

210 2233 19-Jul-14 1252 4-Aug-14 Coal shortage

54 सातपरा Satpura-7

म वउकिल MPPGCL

210 225 21-Jul-14 545 24-Jul-14 BTL

55 सातपरा Satpura-10

म वउकिल MPPGCL

250 2316 22-Jul-14 07082014 High vibration in generator winding

56 एसजीट पीएस SGTPS-3

म वउकिल MPPGCL

210 1857 28-Jul-14 1020 2-Aug-14 Drum level low

57 DSPM(K(E) extn)-2

छरा वउकिल CSPGCL

250 2310 21-Jul-14 2029 22-Jul-14 Coal shortage

58 कोरबा पव Korba(E)-3

छरा वउकिल CSPGCL

210 1030 22-Jul-14 1025 27-Jul-14 CTL

59 कोरबा पव Korba(E)-5

छरा वउकिल CSPGCL

120 1345 22-Jul-14 1140 26-Jul-14 Wet coal problem

60 कोरबा पव Korba(E)-5

छरा वउकिल CSPGCL

120 2320 30-Jul-14 155 2-Aug-14 Coal shortage

61 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

62 एःसार महान Essar-Mahan-1

एःसारESSAR 600 014 22-Jun-14 1255 11-Jul-14 Less schedule

63 एःसारमहानEssar Mahan-1

एःसार ESSAR 600 620 16-Jul-14 1252 28-Jul-14 Withdrawn due to tripping of evacuation

प म ऽय भार षण कि म बई णाली चालन-ISO-I

Lines

64 सीजीपीएल CGPL-50

सीजीपीएल CGPL

830 948 13-Jun-14 409 23-Jul-14 Ash hopper refractory damage

65 सीजीपीएल CGPL-10

सीजीपीएल CGPL

830 1332 1-Jul-14 1952 9-Jul-14 BTL

66 सीजीपीएल CGPL-20

सीजीपीएल CGPL

800 1214 24-Jul-14 13-aug-14

Bottom ash Hopper works

67 सीजीपीएल CGPL - 40

सीजीपीएल CGPL

830 1918 26-Jul-14 1020 2-Aug-14 GT electrical fault

68 जपीएल JPL STG-2 UNIT-1

जपीएल JPL 600 051 26-Jun-14 अनपल ध Still out

अनपल ध Still out

Turbine vibration

69 जपीएलJPL STG-2 UNIT-2

जपीएलJPL 600 000 5-Jul-14 1457 11-Jul-14 Less requisition

70 जपीएल JPL STG-2 UNIT-2

जपीएलJPL 600 748 21-Jul-14 1800 24-Jul-14 BTL

71 एसीबीआईएल ACBIL-1

एसीबीआईएल ACBIL

135 151 6-Jul-14 1753 9-Jul-14 Furnace draft high

72 ससान Sasan -3 आरईएल REL 660 1648 15-Jul-14 2248 4-Aug-14 Ash evacuation problem

73 ससान Sasan-4 आरईएल REL 660 1645 24-Jul-14 810 3-Aug-14 High press main steam tripped

74 एमको EMCO-I एमको EMCO 200 109 16-Jul-14 अनपल ध Still out

अनपल ध Still out

Turbine vibration high

75 एसीबीआईएल ACBIL-2

एसीबीआईएल ACBIL

135 1955 21-Jul-14 601 24-Jul-14 Furnace draft high

76 मौदा Mouda -1

एनट पीसीNTPC 500 1630 18-Jun-14 2042 14-Jul-14 Flame failure

77 कावास Kawas-1C

एनट पीसीNTPC 116 2311 2-Jul-14 2100 6-Jul-14 Heavy steam leakage from stop valve

78 कावास Kawas-1B

एनट पीसीNTPC 106 2323 2-Jul-14 632 7-Jul-14 Less requisition

79 कावास Kawas-2B एनट पीसीNTPC 164 1704 10-Jul-14 Ready Ready Less requisition

80 कावास Kawas-1A एनट पीसीNTPC 164 1200 12-Jul-14 745 22-Jul-14 Less requisition

81 वीएसट पीएस VSTPS-11

एनट पीसीNTPC 500 1204 13-Jul-14 000 16-Jul-14 Coal shortage

82 गाधारGandhar-1 एनट पीसीNTPC 144 149 16-Jul-14 1807 21-Jul-14 Less requisition

83 कावास Kawas-1B एनट पीसीNTPC 164 1027 18-Jul-14 442 23-Jul-14 Less requisition

84 मौदा Mouda-1 एनट पीसीNTPC 500 000 18-Jul-14 1745 24-Jul-14 Less requisition

85 िसपतSipat-1 एनट पीसीNTPC 660 000 21-Jul-14 955 24-Jul-14 Generator H2 gas leakage

86 गाधार Gandhar-3

एनट पीसीNTPC 144 1607 21-Jul-14 अनपल ध Still out

अनपल ध Still out

BB protection operatedatJhanor

87 गाधार Gandhar-4(ST)

एनट पीसीNTPC 224 1607 21-Jul-14 1320 26-Jul-14 BB protection operatedatJhanor

88 ट स TAPS-1

एनट पीसीNTPC 160 2227 21-Jul-14 1407 26-Jul-14 Maintenance

89 गाधार एनट पीसीNTPC 144 507 22-Jul-14 Ready Ready Less requisition

प म ऽय भार षण कि म बई णाली चालन-ISO-I

Gandhar -1

90 मौदा mouda-2 एनट पीसीNTPC 500 915 23-Jul-14 315 31-Jul-14 Coal feeding problem

91 कावास Kawas-1A

एनट पीसीNTPC 106 608 24-Jul-14 1309 27-Jul-14 Less requisition

92 गाधार Gandhar-2

एनट पीसीNTPC 144 2036 26-Jul-14 100814 Less requisition

93 वीएसट पीएस VSTPS-2

एनट पीसीNTPC 210 500 27-Jul-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

94 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 748 27-Jul-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

95 मौदा Mouda-2 एनट पीसीNTPC 500 315 31-Jul-14 210 3-Aug-14 Less requisition Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का जलाई2014 का वःता रत यौरा

Details of planned unit outages during the month of July2014 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

सo From

समय दनाक

कारण Reason

Time Date Time Date

1 एसएलपीपी SLPP-2

गरा विनिल GSECL

125 045 23-Jun-14 NA 17-Jul -14 AOH

2 डब यट पीएस WTPS-5

गरा विनिल GSECL

210 000 21-Jul-14 29-0814 COH

3 यट पीएस UTPS-4

गरा विनिल GSECL

200 000 21-Jul-14 240814 AOH

4 एसएलपीपी SLPP-3

गरा विनिल GSECL

125 130 22-Jul-14 060814 AOH

5 यट पीएस UTPS-1

गरा विनिल GSECL

120 000 29-Jul-14 28814 AOH

6 पल ParlI-3

मारा वउकिल MSPGCL

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

Water supply problem

7 चिपर Chandrapur-7

मारा वउकिल MSPGCL

500 600 19-Jun-14 1124 2-Aug-14 AOH

8 नािसक NASIK -3

मारा वउकिल MSPGCL

210 1410 10-Jul-14 अनपल ध Still out

100814 AOH

9 कोरबा प म Korba(W)-2

छरा वउकिल CSPGCL

210 936 26-Jun-14 140814 AOH

10 वदनाVandana-I वदना VANDANA 135 1940 17-Jul-14 अनपल ध Still out

अनपल ध Still out

ETL

11 वीएसट पीएस VSTPS-8

एनट पीसीNTPC 500 012 1-Jun-14 253 13-Jul-14 AOH

12 कएसट पीएस KSTPS-4

एनट पीसीNTPC 500 2335 20-Jun-14 180814 COH

13 कावास Kawas-2A

एनट पीसीNTPC 106 000 27-Jun-14 260814 RampM works

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

11 Akrimota 1 125 4-Aug-14 14-Aug-14 AOH12 WTPS 2 210 5-Aug-14 3-Sep-14 AOH13 SLPP 1 125 16-Aug-14 4-Sep-14 AOH14 DGB 1 107 20-Aug-14 27-Aug-14 CI15 GIPCL-I GT-3 48 22-Aug-14 27-Aug-14 HGPI16 GIPCL-I GT-2 48 29-Aug-14 3-Sep-14 HGPI17 GIPCL-I GT-2 48 12-Aug-14 24-Aug-14 HGPI18 UTPS 3 200 19-Aug-14 12-Sep-14 AOH19 GTPS 2 120 25-Aug-14 14-Sep-14 AOH110 STPS 1 120 19-Aug-14 30-Aug-14 AOH111 GTPS 3 210 24-Aug-14 13-Sep-14 AOH112 APL 9 660 1-Sep-14 20-Sep-14 AOH

221 SGTPS 4 210 010914 250914 AOH3 Craiva]kMila CSPGCL

31 Korba East-6 6 120 21-Aug-14 13-Sep-14 AOH32 Korba East-1 1 50 15-Aug-14 1-Sep-14 AOH33 Korba East-3 3 50 21-Aug-14 30-Sep-14 AOH34 Korba West-1 1 210 12-Sep-14 27-Sep-14 COH35 Korba West-5 5 500 15-Aug-14 30-Aug-14 AOH

4

41 PARAS 3 250 20914 151014 AOH42 RELIANCE 2 250 140814 160814 TURBINE VIBRATION

5 koMd``Iya xao~ Central Sector

51 SIPAT 1 600 050914 191014 BLR OH + HPT + IPT+LPT + GEN

52VINDHYACHAL

5 500 120814 200914 CAP+TG PED CKG+GEN+BLR CHEM CLNG+ESP RampM

53VINDHYACHAL

9 500 120814 150914 BLR OH + HPT + IPT+ GEN

54VINDHYACHAL

11 500 160714 170814 AOH

55CGPL

30 800 150814 050914 Bottom ash hopper Refractory repair and General maintainance work

56 CGPL 40 800 060914 300914 UT 40B repair work57 NSPCL 1 250 200814 110914 AOH

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING AUGUST 2014 AND SEPTEMBER 2014

Capacity Outage as per Annual Maintenance Plan

Date Time Date Time

1 400 400KV BUS-I at Bilaspur Ss 14-Aug-14 900 14-Aug-14 1800 DAILY For bus bar stability of LANCO bays amp jumpering work WRTS-I LANCO C

2 400kV 50 MVAR Bus Reactor-2 at Itarsi SS 14-Aug-14 800 15-Oct-14 1800 Continuo

us Installation of 125MVAR reactor WRTS-II WRTS-II C

3 765 Satna-Gwalior2 14-Aug-14 800 17-Aug-14 1800 DailyCompletion of 765kV Gwalior2 Main Bay Erection amp Testing works at Satna

PGCIL WRTS-II C

4 400 400kV JBP- JBP Pooling 2 Line 14-Aug-14 1000 14-Aug-14 1500 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

5 400 400KV BUS-II at Bilaspur Ss 16-Aug-14 900 16-Aug-14 1800 DAILY For bus bar stability of LANCO bays amp jumpering work WRTS-I LANCO C

6 765 Bus2 at satna 16-Aug-14 800 18-Aug-14 1800 DailyExtension of bus 2 for Gwalior2 bay amp completion of Main Bay Erection

PGCIL WRTS-II C

7 400 Khandwa-Dhule1 16-Aug-14 800 31-Aug-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WR-II C

8 400 Gandahr - Navsari DC 16-Aug-14 800 31-Aug-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WR-II R

PID testing of insulator strings

KV Line From To

Annexure-32

Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

9 400 Navsari - Vapi - Kala 16-Aug-14 800 31-Aug-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WR-II R

10 400 Satna - Bina Ckt 1amp2 16-Aug-14 800 31-Aug-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WR-II R

11 400 80 MVAR Bus Reactor at Kotra 16-Aug-14 900 17-Aug-14 1800 ContinuousTo attend isolator defects WRTS-I PGCIL C

12 400 400kV JBP- JBP Pooling 1 Line 17-Aug-14 1000 17-Aug-14 1500 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

13 765 ICT II at Bina 17-Aug-14 0900 17-Aug-14 1800 Daily Post Commissioning check of Fire-Fighting system at Bina PGCIL WRTS-II C

14 765 Bus-2 at Gwalior 17-Aug-2014 1000 18-Aug-2014 1800 Daily Busbar Jumpering ampStability test related to Bus reactor

POWERGRID WRTS-II C

15 765 Seoni 2 LR(704 LR) at Bilaspur Ss 18-Aug-14 900 18-Aug-14 1500 DAILY For taking Spare LR in service

first time WRTS-I PGCIL C

16 400 Bhadrawati-Ramagundam I 18-Aug-14 800 18-Aug-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

17 400 400kV Vchal - JBP 1 Line 18-Aug-14 1000 18-Aug-14 1200 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

18 400 400kV Vchal - JBP 2 Line 18-Aug-14 1400 18-Aug-14 1600 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

19 400 400KV BUS-II at Bilaspur Ss 19-Aug-14 900 19-Aug-14 1800 DAILY For bus bar stability of LANCO bays amp jumpering work WRTS-I LANCO C

20 400 Bhadrawati-Ramagundam II 19-Aug-14 800 19-Aug-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

21 765 ICT 1 at G alior 19 A g 14 10 00 20 A g 14 18 00 Continou SPARE ICT COMMISSIONING PGCIL WRTS II C21 765 ICT - 1 at Gwalior 19-Aug-14 1000 20-Aug-14 1800 s SPARE ICT COMMISSIONING PGCIL WRTS-II C

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

22 400 400kV JBP- Itarsi 1 Line 19-Aug-14 1000 19-Aug-14 1200 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

23 400 400kV JBP- Itarsi 2 Line 19-Aug-14 1400 19-Aug-14 1600 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

24 400 400 kV Sipat -Ranchi-1 19-Aug-14 900 20-Aug-14 1900 Continous 1 no of CT replacement NTPC NTPC

25 400 BUS-I at Aurangabad(PG) 19-Aug-14 600 20-Aug-14 1800 ContiBus-1 extn for commissioning of 400 kV Boisar-1amp2 bays with 80 MVAR Reactors

WRTS-I WRTS-I C

26 400kV 400kV SUGEN PIRANA Line (Line 2) 19-Aug-14 900 19-Aug-14 1700 Daily Corrective Maintenance of

Transfer Isolator TPL-SUGE TPL-SUG R

27 400kV 400kV PGCIL - PIRANA Feeder No 2 19-Aug-14 900 19-Aug-14 1700 Daily 400kV CT connectors replacementTPL-AHME TPL-AHM R

28 400 Bhadrawati-Parli 1amp 2 19-Aug-14 000 20-Oct-14 1800 DailyFor OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

29 400 Mundra - Jetpur line No1 19-Aug-14 800 19-Aug-14 1200 Daily protection logic checking work PGCIL GETCO30 400 Mundra - Jetpur line No 2 19-Aug-14 1400 19-Aug-14 1800 Daily protection logic checking work PGCIL GETCO

31 400 400KV BUS-I at Bilaspur Ss 20-Aug-14 900 20-Aug-14 1800 DAILY For bus bar stability of LANCO bays amp jumpering work WRTS-I LANCO C

32 400 KSK ndash Raigarh circuit 4 20-Aug-14 900 21-Aug-14 1800 CONT complete PLCC rectification works WRTS-I KSK C

33 HVDC HVDC POLE I AT BHADRAWATI 20 A 14 8 00 21 A 14 18 00 D il AMP WORKS WRTS I WRTS I R33 HVDC HVDC POLE-I AT BHADRAWATI 20-Aug-14 800 21-Aug-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

34 765kV Dharamjaygarh - Durg ckt-2 20-Aug-14 800 22-Aug-14 1800 daily CSD relay commissioning (M+T) WRTS-I PGCIL C

35 765 JBP - BINA 1 at Jabalpur Pooling Station 20-Aug-14 1000 21-Aug-14 1800 Daily Commissioning of CSD Relay for

765KV JBP - BINA Ckt 1 PGCIL WRTS-II C

36 400 Khandwa-Dhule1 20-Aug-14 1000 20-Aug-14 1500 Daily AMP PGCIL WRTS-II R

37 400 Bus-1 at Shujalpur 20-Aug-14 1000 20-Aug-14 1800 Daily AMP PGCIL WRTS-II R

38 400 Bus2 at Satna 20-Aug-14 900 20-Aug-14 1800 Daily For Bus Bar Stability and charging activity of 406 Bay PGCIL WRTS-II C

39 400 Bus1 at Indore 20-Aug-14 900 20-Aug-14 1800 Daily Jumper connection amp stability checking of Pitampur1 PGCIL WRTS-II C

40 400 400kV JBP- Itarsi 3 Line 20-Aug-14 1000 20-Aug-14 1200 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

41 765 Raigarh (Kotra) - Raigarh (Tamnar) 20-Aug-14 900 31-Aug-14 1800 ContinuousFor installation of Bird guards WRTS-I PGCIL C

42 400 Kansari - Kankroli line 20-Aug-14 800 20-Aug-14 1800 Daily PMU installation work and maintenPGCIL GETCO43 400 BUS-2 AT SOLAPUR 21-Aug-14 900 22-Aug-14 1800 Daily Pune bays extension works WRTS-I WRTS-I C

44 765 ICT 1 at Jabalpur Pooling Station 21-Aug-14 1000 21-Aug-14 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus for Spare ICT Phase

PGCIL WRTS-II C

45 400 Bina-Shujalpur1 21-Aug-14 900 21-Aug-14 1000 Daily

For Replacement of 390kV Reactor LA with 336kV LA Line will be taken in service without PGCIL WRTS-II Cj p g g y will be taken in service without Line Reactor at Shujalpur

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

46 400 Khandwa-Dhule2 21-Aug-14 1000 21-Aug-14 1800 DailyFor Replacement of 390kV Reactor LA with 336kV LA At Khandwa amp AMP

PGCIL WRTS-II C

47 220 Damoh-Sagar 21-Aug-14 1000 21-Aug-14 1500 Daily AMP of terminal equipment at Damoh SS MPPTCL WR-II R

48 765 ICT2 at Indore 21-Aug-14 900 22-Aug-14 1800 Continious

For Auxiliary bus erection at Indore PGCIL WRTS-II C

49 400 125MVAr BR at Shujalpur 21-Aug-14 900 21-Aug-14 1800 Daily Differential stability of tie bay (Under commissioning) PGCIL WRTS-II C

50 400 Raipur-Bhadrawati-III 21-Aug-14 900 21-Aug-14 1800 ContinuousBus split at Raipur WRTS-I PGCIL C51 400 Kansari - Bhinmal line 21-Aug-14 800 21-Aug-14 1800 Daily PMU installation work and maintenPGCIL GETCO

52 HVDC HVDC POLE-2 AT BHADRAWATI 22-Aug-14 800 23-Aug-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

53 765 ICT I at Bina 22-Aug-14 0900 23-Aug-14 1800 DailyCommissioning of CSD Relay for 400kV side of ICT- rescheduling of outage

PGCIL WRTS-II C

54 765 JBP - BINA 2 at Jabalpur Pooling Station 22-Aug-14 1000 23-Aug-14 1800 Daily Commissioning of CSD Relay for

765KV JBP - BINA Ckt 2 PGCIL WRTS-II C

55 400 Khandwa-Rajgarh1 22-Aug-14 800 23-Aug-14 1800 PM Continous

Rectification of damaged tower peak at locno83 due to collapse of MPPTCL tower which is under construction

PGCIL MPPTCL C

F j i amp h i th56 400 Pirana-Vadodara-Asoj DC 22-Aug-14 800 23-Aug-14 1800 Daily

For jumpering amp charging the future cirucit of line in multi-circuit towers to prevent conductor theft

PGCIL WRTS-II C

57 220 Damoh-Damoh2 22-Aug-14 1000 22-Aug-14 1500 Daily AMP of terminal equipment at Damoh SS MPPTCL WR-II R

58 400kV 400kV SUGEN VAPI Line 22-Aug-14 900 22-Aug-14 1400 Daily Corrective Maintenance amp Inspection Dropper of 5 Core CT

TPL-SUGE TPL-SUG R

59 765 Bus Reactor Kotra 22-Aug-14 900 23-Aug-14 1800 Daily WRTS-I PGCIL C

60 400 Vindhyachal-Jabalpur3 23-Aug-14 900 23-Aug-14 1800 Daily

For Replacement of 390kV Reactor LA with 336kV LA At Jabalpur Line will remain out of service due to less clearance of Reactor LA from Line conductor

PGCIL WRTS-II C

61 765 ICT1 at Indore 23-Aug-14 900 26-Aug-14 1800 Continious

re routing of cables in CMB for commissioning of spare unit at Indore

PGCIL WRTS-II C

62 765 Bus- 2 at Bina 23-Aug-2014 0900 23-Aug-2014 1800 DailyFor Bus stability required for 765kV Jabalpur 3 Bay- Rescheduling of outage

POWERGRID WRTS-II C

63 765 Bus-1 at Gwalior 24-Aug-14 1000 25-Aug-14 1800 Daily Busbar Jumpering ampStability test related to Jaipur 1 main bay PGCIL WRTS-II C

64 400 Navasari- Kala MC line 25-Aug-14 800 26-Aug-14 1800 DailyConstruction work of Navasari- Boisar line on same Multi ckt WRTS-II WRTS-I Ctower

65 765 765400 AT-1 AT SOLAPUR 25-Aug-14 900 26-Aug-14 1800 Daily Spare ICT unit Aux bus commisioning works WRTS-I WRTS-I C

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

66 220 Korba-Budhipadar Ckt-3 at CSPDCL Korba Ss 25-Aug-14 900 26-Aug-14 1800 DAILY For diversion of line for SE

Railway MCL project WRTS-I PGCIL C

67 765 765KV Bus 1 at Jabalpur Pooling Station 25-Aug-14 1000 25-Aug-14 1800 Daily

765KV Bus 1 Extension for Switchyard Extension for BINA 3 Line Dia

PGCIL WRTS-II C

68 765 765KV ICT 1 at Jabalpur Pooling Station 25-Aug-14 1000 25-Aug-14 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus Isolators for Spare ICT Phase - Heavy Induction

PGCIL WRTS-II C

69 400 Vindhyachal-Jabalpur4 25-Aug-14 900 25-Aug-14 1800 Daily

For Replacement of 390kV Reactor LA with 336kV LA At Jabalpur Line will remain out of service due to less clearance of Reactor LA from Line conductor

PGCIL WRTS-II C

70 400 Bus-I at satna 25-Aug-14 900 25-Aug-14 1800 DailyFor Changing of Jumper from Twin Moose To Quad Moose in 401 bay (jaypee nigrie line-1)

PGCIL WR-II C

71 400 Deepnagar-Thaptitanda 25-Aug-14 900 25-Aug-14 1700 Daily To attend Isolator alignment problem MSETCL MSETCL

72 765 BUS-II and 765 ICT-1 at Aurangabad (PG) 25-Aug-14 600 25-Aug-14 1800 Daily Commissioning of spare ICT unit

at Aurangabad (PG) WRTS-I WRTS-I CAurangabad (PG) at Aurangabad (PG)

73 765 Kotra-durg Ckt-2 along with line reactor 25-Aug-14 900 28-Aug-14 1800 ContinuousReplacement of spacer damper WRTS-I PGCIL C

74 765 Wardha-Aurangabad (PG)-2 and Padge-1 LReactor 26-Aug-14 600 26-Aug-14 1800 Daily Construction of up-coming

Padghe bay at Aurangabad (PG) WRTS-I WRTS-I C

75 765 Gwalior -Bina 1 26-Aug-14 1000 27-Aug-14 1800 Daily Spare reactor commissioning at Gwalior PGCIL WR-II C

76 765 1500MVA ICT 2 at Jabalpur Pooling Station 26-Aug-14 1000 26-Aug-14 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus Isolators for Spare ICT Phase - Heavy Induction

PGCIL WRTS-II C

77 400 Jabalpur-Itarsi4 26-Aug-14 900 26-Aug-14 1800 Daily

For Replacement of 390kV Reactor LA with 336kV LA At Jabalpur Line will remain out of service due to less clearance of Reactor LA from Line conductor

PGCIL WRTS-II C

78 400 Akola ll-Thaptitanda 27-Aug-14 900 27-Aug-14 1900 Daily To attend chattering noise on B-ph wave trap MSETCL MSETCL

79 400 Vapi- Kala MC Line 27-Aug-14 800 28-Aug-14 1800 DailyConstruction work of Navasari- Boisar line on same Multi ckt tower

WRTS-II WRTS-I C

80 765 Bus 1 at Jabalpur Pooling Station 27-Aug-14 1000 27-Aug-14 1800 Daily

765KV Bus 1 Extension Busbar Stability test related to BINA 3 Line Dia

PGCIL WRTS-II C

81 400 KORBA SIPAT 27 Aug 14 600 29 Aug 14 2200 CONT NORMALISED THE LILO AT PGCIL LANCO C81 400 KORBA -SIPAT 27-Aug-14 600 29-Aug-14 2200 RAMPUR PGCIL LANCO C

82 400 TARAPUR-PADGHE II 27-Aug-14 800 28-Aug-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

83 765 Gwalior-Satna1 28-Aug-14 800 28-Aug-14 1800 Daily For spare reactor commissioning works at Gwalior PGCIL WRTS-II C

84 765 BUS-II and Padge-2 LReactor at Aurangabad (PG) 28-Aug-14 600 28-Aug-14 1800 Daily

Commissioning of Padghe-2 upcoming bay at Aurangabad (PG)

WRTS-I WRTS-I C

85 765 Bilaspur 1 Main bay (710) at Seoni 28-Aug-14 800 29-Aug-14 1800 Daily AMP works WRTS-I WRTS-I R

86 765 765400 AT-2 AT SOLAPUR 28-Aug-14 900 28-Aug-14 1800 Daily Spare ICT unit Aux bus commisioning works WRTS-I WRTS-I C

87 765 Bus Reactor(706 BR) at Bilaspur Ss 28-Aug-14 900 01-Sep-14 1800 DAILY For replacement of unarmoured

cable by TBEA WRTS-I PGCIL C

88 765 Bus 2 at Jabalpur Pooling Station 28-Aug-14 1000 29-Aug-14 1800 Daily

765KV Bus 2 Extension for Switchyard Extension for BINA 3 Line Dia

PGCIL WRTS-II C

89 400 MOUDA 400KV BUS REACTOR 28-Aug-14 0900hrs 29-Aug-14 1800 ContionuouAnnual Maintainance NTPC NTPC

90 765 Satna - Bina 1 29-Aug-14 0900 31-Aug-14 1800 Daily

for erection of new TC amp TE tower forNHPTL at Bina-Rescheduling of outage

PGCIL WRTS-II C

91 765 Bus Reactor at Satna 29-Aug-14 900 30-Aug-14 1800 Continious Commissioning of spre reactor PGCIL WRTS-II Cus

92 400 125MVAr BR1 at Indore 29-Aug-14 900 29-Aug-14 1800 Daily Post Commissioning check of Fire-Fighting system at Indore PGCIL WRTS-II C

93 400 Chorania Hadala line 29-Aug-14 800 29-Aug-14 1800 Daily PMM WORK GETCO GETCO

94 765 Kotra-durg Ckt-2 along with line reactor 29-Aug-14 900 31-Aug-14 1800 Daily WRTS-I PGCIL C

95 765 765400 ICT-2 at Aurangabad (PG) 30-Aug-14 600 30-Aug-14 1800 Daily Altube erection in 400 kV Boisar-

1amp2 Tie bays WRTS-I WRTS-I C

96 765kV Dharamjaygarh - Bilaspur 30-Aug-14 800 30-Aug-14 1800 daily commissioning of JBP-1 bay (side) WRTS-I PGCIL C

97 765kV 330 MVAR Bus Rector-2 at Dharamjaygarh 30-Aug-14 800 30-Aug-14 1800 daily commissioning of JBP-1 bay

(side) WRTS-I PGCIL C

98 400 Mundra Hadala SC 30-Aug-14 800 30-Aug-14 1800 DailyPower Line Crossing of 400 KV DC Bhachau SS (PG) - Varsana SS (GETCO) TrL

GETCO WRTS-II C

99 220 Gwalior - Mahalgaon 1amp2 30-Aug-14 900 31-Aug-14 1800 Continuous

For crossing of 765kV Gwalior - Jaipur line PGCIL WRTS-II C

100 220 Gwalior - Malanpur 1amp2 30-Aug-14 900 31-Aug-14 1800 Continuous

For crossing of 765kV Gwalior - Jaipur line PGCIL WRTS-II C

101 400 400 kV Akola- Nandagaon peth sc 31-Aug-14 800 31-Aug-14 1600 Daily crossing works of 765 kV Koradi-AWRTS-I WRTS-I R

102 400 Bina-Shujalpur2 31-Aug-2014 900 31-Aug-2014 1000 DailyFor Replacement of 390kV Reactor LA with 336kV LA Line

ill b t k i i ith t

POWERGRID WRTS-II C

103 400 Mundra - Sami DC 01-Sep-14 800 01-Sep-14 1800 DailyPower Line Crossing of 400 KV DC Bhachau SS (PG) - Varsana SS (GETCO) TrL

ADANI WRTS-II C

104 400 Akola-Wardha 1amp 2 01-Sep-14 800 30-Sep-14 1800 Daily For Online PID Line in service with AR in non-auto mode WRTS-I WRTS-I For IOwith AR in non auto mode

105 765 Bilaspur 2 Main bay (716) at Seoni 01-Sep-14 800 02-Sep-14 1800 Daily AMP works WRTS-I WRTS-I R

106 400 400220 ICT-1 AT SOLAPUR 01-Sep-14 900 01-Sep-14 1500 Daily AMP WORK WRTS-I WRTS-I R

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

107 765 1000 MVA ICT I amp ICT II at Bina 01-Sep-14 0900 01-Sep-14 1800 Daily Commissioning of Master follower

scheme PGCIL WRTS-II C

108 765 Bus 1 at Jabalpur Pooling Station 01-Sep-14 100000 AM 01-Sep-14 60000 PM Daily

765KV Bus 1 Extension Busbar Stability test related to Bhopal 1 Line Dia

PGCIL WRTS-II C

109 400 Shujalpur - Bina 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

110 400 Birsinghpur-Damoh 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

111 400 Gandhar - Navsari 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

112 400 Khandwa - Rajgarh 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

113 400 Indore - Nagda 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

114 400 Jabalpur - Jabalpur Pool 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II Cnon auto mode

115 400 Khandwa - Dhule 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

116 400 Itarsi - Khandwa 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

117 220 Satna - Satna 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

118 765 Dehgam - Ranchhodpura 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

119 765 Shujalpur - Nagda 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

120 400 Asoj - SSP 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

121 400 Bhachau - Mundra 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

122 400 Bina - Gwalior 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

123 400 Satna - Gwalior 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in PGCIL WRTS-II Cnon auto mode

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

124 400 LILO portion of Vapi - Navi Mumbai at Kala(Vapi-Kala Line) 01-Sep-14 600 30-Sep-14 1800 Daily

Online replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

125 400400 kV Khandwa - Rajgarh

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

126 400400 kV Gandhar-Navsari

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

127 400400 kV Rajgarh ndash SSP

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

128 400400 kV SSP-Asoj

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

129 400 400 kV Shujalpur - Nagda (MPPTCL)

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

130 400400 kV Dehgam - Ranchodpura

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

131 400 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in PGCIL WRTS-II C

400 kV Ranchodpura ndash Bhachaup p y OPGW AR shall be kept in

non auto mode

132 400400 kV Mundra-Bhachau

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

133 400400 kV Vindhyachal NTPC -SASAN UMPP Ckt-1 01-Sep-14 600 30-Sep-14 1800 Daily

Online replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

134 400400 kV Vindhyachal Pooling -Vindhyachal NTPC 01-Sep-14 600 30-Sep-14 1800 Daily

Online replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

135 400 400 kV LILO at Kala (DNH) SS of Vapi-Navi Mumbai Line

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

136 765765 kV Bina - Gwalior

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

137 765765 kV Satna - Gwalior Ckt-I

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

138 400 Gandahr - Navsari DC 01-Sep-14 800 30-Sep-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

139 400 Navsari - Vapi - Kala 01-Sep-14 800 30-Sep-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

PID testing of insulator strings 140 400 Satna - Bina Ckt 1amp2 01-Sep-14 800 30-Sep-14 1800 Daily AR shall be kept In non auto

modePGCIL WRTS-II R

141 400 Nagda - Dehgam DC 01-Sep-14 800 30-Sep-14 1800 Daily PID testing of insulator strings AR h ll b k t I t

PGCIL WRTS-II R

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

142 220 Kakrapar - Vapi DC 01-Sep-14 800 30-Sep-14 1800 Daily PID testing of insulator strings PGCIL WRTS-II R

143

220 220 KV Jhanor - Haldrwa Line 1

01-Sep-14

800

05-Sep-14

000

Continous Replacement of existing CTCVT with 02 class CT amp CVT and for testing of the same NTPC NTPC

144 400 Akola-Aurangabad(PG) 2 01-Sep-14 800 02-Sep-14 1800 Conti commissioning of 50MVAR Lreactor at Aurangabad(PG) WRTS-I WRTS-I C

145 765 Bina-Satna 2 02-Sep-14 0900 03-Sep-14 1800 Daily Post Commissioning check of Fire-Fighting system at Bina PGCIL WRTS-II C

146 400 Vadavi-Chorania 1 02-Sep-14 800 02-Sep-14 1800 Daily PMM WORK WRTGPL GETCO147 400 BUS REACTOR AT SOLAPUR 02-Sep-14 900 02-Sep-14 1500 Daily AMP WORK WRTS-I WRTS-I R

148 765 Korba Line Main Bay (716) at Bilaspur Ss 02-Sep-14 900 02-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

149 765 Bus 2 at Jabalpur Pooling Station 02-Sep-14 100000 AM 02-Sep-14 60000 PM Daily

765KV Bus 2 Extension for Switchyard Extension for Bhopal 1 Line Dia

PGCIL WRTS-II C

150 400 Bus2 at Indore 02-Sep-14 900 02-Sep-14 1800 Daily Jumper connection amp stability checking of Pitampur1 PGCIL WRTS-II C

151 400 CGPL-Limbdi-1 02-Sep-14 2-Sep-14 8AM 6PM Daily routine maintenance and isolator aPGCIL CGPL

152400 Korba-Bhalai line -1

02-Sep-14 900 03-Sep-14 19002 days

continuous CVTs replacement

NTPC NTPC00 o ba a a e us C s ep ace e t

153 400 Sipat 400KV Bus-1 02-Sep-14 900 03-Sep-14 1900 Continous Annual Preventive maintenance NTPC NTPC

154 765 Bilaspur 2 Tie bay (717) at Seoni 03-Sep-14 800 04-Sep-14 1800 Daily AMP works WRTS-I WRTS-I R

155 400 400220 ICT-1 AT SOLAPUR 03-Sep-14 900 03-Sep-14 1500 Daily AMP WORK WRTS-I WRTS-I R

156 765 Sipat2 Main Bay (712) at Bilaspur Ss 03-Sep-14 900 03-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

157 765 Bina-Gwalior 2 03-Sep-14 0900 04-Sep-14 1800 Daily For spare reactor commissioning works at Gwalior PGCIL WRTS-II C

158 765 Bus 2 at Jabalpur Pooling Station 03-Sep-14 100000 AM 03-Sep-14 60000 PM Daily

765KV Bus 2 Extension for Switchyard Extension for Jumpering (Bus Extension) for Bhopal 1

PGCIL WRTS-II C

159 400 Indore-Asoj3 03-Sep-14 900 04-Sep-14 1800 Continuous

For checking protection transfer system at Indore (MPPTCL) PGCIL WRTS-II C

160 400 400 kv Nagda- Rajgarh ckt Pgcil ckt I 03-Sep-14 900 03-Sep-14 03092014 1800 daily Maintenan

ce Work PGCIL EHT- Mamp I

161 400 Vadavi-Chorania 2 04-Sep-14 800 04-Sep-14 1800 Daily PMM WORK WRTGPL GETCO162 220 SOLAPUR(PG)-Solapur(M) 04-Sep-14 900 04-Sep-14 1800 Daily AMP WORK MSETCL WRTS-I R

163 765 Bus 2 at Jabalpur Pooling Station 04-Sep-14 100000 AM 04-Sep-14 60000 PM Daily

765KV Bus 2 Extension Busbar Stability test related to Bhopal 1 Line Dia

PGCIL WRTS-II C

164 400 CGPL-Limbdi-2 04-Sep-14 4-Sep-14 8AM 6PM Daily routine maintenance and isolator aPGCIL CGPL

165 400 400 kv Nagda- Rajgarh ckt Pgcil ckt II 04-Sep-14 900 04-Sep-14 04092014 1800 daily Maintenan

ce Work PGCIL EHT- Mamp I

166400 Korba-Bhalai line -2

04-Sep-14 900 05-Sep-14 19002 days

continuous CVTs replacement

NTPC NTPC

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

167 400 BUS-1 AT SOLAPUR 05-Sep-14 900 05-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I C

168 400 Seoni-Khandwa 1 05-Sep-14 800 05-Sep-14 1800 Daily Line AMP works at Seoni WRTS-II WRTS-I R

169 400 400220 ICT-2 AT BOISAR 05-Sep-14 900 05-Sep-14 1500 Daily For Bushing oil DGA Testing WRTS-I WRTS-I R

170 765 Sipat2 Tie Bay (711) at Bilaspur Ss 05-Sep-14 900 05-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

171 765 Bina-Jabalpur I 05-Sep-14 0900 06-Sep-14 1800 Daily Post Commissioning check of Fire-Fighting system at Bina PGCIL WRTS-II C

172 400 Bus Reactor 1 at Jabalpur Pooling Station 05-Sep-14 100000 AM 05-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

173 220 Navsari - Nasik - 1 05-Sep-14 800 05-Sep-14 1800 Daily PMM WORK PGCIL GETCO174 400 Sipat 400KV Bus-2 05-Sep-14 900 06-Sep-14 1900 Continous Annual Preventive maintenance NTPC NTPC175 400 Akola-Wardha ckt 2 05-Sep-14 800 05-Sep-14 1700 Daily QMwork MSETCL MSETCL176 400 Kalwa-Kharghar 05-Sep-14 900 05-Sep-14 1700 Daily R amp M work MSETCL MSETCL177 400 Seoni-Khandwa 2 06-Sep-14 800 06-Sep-14 1800 Daily Line AMP works at Seoni WRTS-II WRTS-I R178 400 400220 ICT-1 AT BOISAR 06-Sep-14 900 06-Sep-14 1500 Daily For Bushing oil DGA Testing WRTS-I WRTS-I R

179 400 Bus Reactor 2 at Jabalpur Pooling Station 06-Sep-14 100000 AM 06-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

180 765 Gwalior-Satna2 06-Sep-14 800 06-Sep-14 1800 Daily For spare reactor commissioning works at Gwalior PGCIL WRTS-II C

181 400 Indore-Indore1 06-Sep-14 900 07-Sep-14 1800 Continuo For checking protection transfer t t I d (MPPTCL) PGCIL WRTS-II C181 400 Indore Indore1 06 Sep 14 900 07 Sep 14 1800 us system at Indore (MPPTCL) PGCIL WRTS II C

182 220 Navsari - Nasik - 2 06-Sep-14 800 06-Sep-14 1800 Daily PMM WORK PGCIL GETCO

183 400 VAPI-BOISAR 07-Sep-14 800 08-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

184 765 Satna-Gwalior-2 Reactor 07-Sep-14 900 07-Sep-14 1800 Daily For Commissioning of CSD relay in Gwalior-2 reactor bay at Satna PGCIL WRTS-II C

185 220 DC Welspun - Shivlakha amp Anjar shivlakha Trl 07-Sep-14 80000 AM 07-Sep-14 60000 PM Daily

Power Line Crossing of 400 KV DC Bhachau SS (PG) - Varsana SS (GETCO) TrL

GETCO WR-II C

186 765 Bilaspur 1 Tie bay (711) at Seoni 08-Sep-14 800 09-Sep-14 1800 Daily AMP works WRTS-I WRTS-I R

187 400kV Bus-1 at Itarsi SS 08-Sep-14 800 08-Sep-14 1800 Daily AMP amp Protection testing WRTS-II WRTS-II R

188 765 Seoni2 Main Bay (707) at Bilaspur Ss 08-Sep-14 900 08-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

189 765 Bina-Jabalpur II 08-Sep-14 0900 09-Sep-14 1800 Daily Post Commissioning check of Fire-Fighting system at Bina PGCIL WRTS-II C

190 765 ICT 1 at Jabalpur Pooling Station 08-Sep-14 100000 AM 08-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

191 765 Gwalior-Bina3 08-Sep-14 800 09-Sep-14 1800 Daily For spare reactor commissioning works at Gwalior PGCIL WRTS-II C

192 400 V-satna-1 08-Sep-14 900 09-Sep-14 1900 Continuous

Major OH of Line Circuit Breaker (For dismantling of poles) NTPC NTPC

193

220 220 KV Jhanor- Haldrwa Line 2

08-Sep-14

800

12-Sep-14

000

Continous Replacement of existing CTCVT with 02 class CT amp CVT and for testing of the same NTPC NTPC

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

194 400 Vadavi- Kansari- 1 09-Sep-14 800 09-Sep-14 1800 Daily PMM WORK WRTGPL GETCO195 400 Bus-1 at Damoh 09-Sep-14 1000 10-Sep-14 1800 Daily AMP PGCIL WRTS-II R

196 765 Bus Reactor 1 at Jabalpur Pooling Station 09-Sep-14 100000 AM 09-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

197 400 Bina - Shujalpur 1 09-Sep-14 1000 09-Sep-14 1400 Daily AMP PGCIL WRTS-II C

198 400 400 kv Katni- Damoh ckt 09-Sep-14 800 09-Sep-14 09092014 1800 daily Maintenance Work PGCIL EHT-

Mamp I

199 220 220 KV OMKARESHWAR -KHANDWA 09-Sep-14 900 09-Sep-14 09092014 1600 daily Maintenan

ce Work PGCIL EHT- Mamp I

200 220 220KV MALANPUR -AURAIYA 09-Sep-14 900 09-Sep-14 09092014 1700 daily Maintenance Work

EHT- Mamp I

201400 Korba 400 KV Bus coupler -1

09-Sep-14 900 10-Sep-14 19002 days

continuous Annual maintenance and testing

NTPC NTPC

202 400kV Bus-2 at Itarsi SS 10-Sep-14 800 10-Sep-14 1800 Daily AMP amp Protection testing WRTS-II WRTS-II R203 400 400220KV ICT-2 at Seoni 10-Sep-14 800 11-Sep-14 1800 Conti OLTC overhauling works WRTS-I WRTS-I R

204 400 VAPI-BOISAR 10-Sep-14 800 11-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

205 400 Parli 2 Tie Bay (417) at Solapur 10-Sep-14 900 10-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

206 765 330 MVAR Bus Rector-1 at Dharamjaygarh 10-Sep-14 800 11-Sep-14 1700 DAILY CSD relay commissioning in main

bay WRTS-I PGCIL C

207 765 ICT3 Tie Bay (717) at Bilaspur 10 S 14 9 00 10 S 14 18 00 DAILY F AMP k WRTS I PGCIL R207 765 ICT3 Tie Bay (717) at Bilaspur Ss 10-Sep-14 900 10-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

208 765 765kV Dharamjaygarh - Ranchi-2 l 10-Sep-14 900 15-Sep-14 1800 continous

For strining Jumpering of parallel ckt and Crossing of 765kV Dharamjaygarh-Jabalpur line

WRTS-I PGCIL C

209 765 ICT 2 at Jabalpur Pooling Station 10-Sep-14 100000 AM 10-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

210 400 Shujalpur-Nagda 1 10-Sep-14 1000 10-Sep-14 1400 Daily AMP PGCIL WRTS-II C211 400 Vadavi- Kansari- 2 10-Sep-14 800 10-Sep-14 1800 Daily PMM WORK WRTGPL GETCO

212 400 400 kv ISP - Nagda ckt 10-Sep-14 900 10-Sep-14 10092014 1800 daily Maintenance Work

EHT- Mamp I

213 220 220KV MALANPUR -AURAIYA 10-Sep-14 900 10-Sep-14 10092014 1700 daily Maintenance Work

EHT- Mamp I

214 220 220 KV DAMOH PGCIL IC - I 10-Sep-14 800 10-Sep-14 10092014 1800 daily Maintenance Work PGCIL EHT-

Mamp I

215765KV400K

VSipat 765KV400KV ICT-1 10-Sep-14 900 11-Sep-14

1900 Continous Annual Preventive maintenance NTPC NTPC216 400 New Koyna-Dabhol ckt 1 10-Sep-14 830 10-Sep-14 1730 Daily QMwork MSETCL MSETCL217 400 Akola-Aurangabad ckt 1 10-Sep-14 830 10-Sep-14 1730 Daily QMwork MSETCL MSETCL

218 400 TARAPUR-PADGHE I 11-Sep-14 800 12-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

219 400 ICT 2 Main Bay (409) at Mapusa 11-Sep-14 900 11-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

220 765 Korba LR (716 LR) at Bilaspur Ss 11-Sep-14 900 11-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

221 220 Bus-1 at Damoh 11-Sep-14 1000 12-Sep-14 1800 Daily AMP PGCIL WRTS-II R

222 765 Bus Reactor 2 at Jabalpur Pooling Station 11-Sep-14 100000 AM 11-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

223 220MC Bhimasar - Lalpar Bhimasar -Morbi amp Bhimasar - Mansar (on same tower)

11-Sep-14 80000 AM 11-Sep-14 60000 PM DailyPower Line Crossing of 400 KV DC Bhachau SS (PG) - Varsana SS (GETCO) TrL

GETCO WR-II C

224 220 Navsari - Dastan- 1 11-Sep-14 800 12-Sep-14 1800 Daily PMM WORK PGCIL GETCO

225 400 400 kv Rajgarh Pgcil - SSP CKT I 11-Sep-14 900 11-Sep-14 11092014 1800 daily Maintenance Work PGCIL EHT-

Mamp I

226 220 220K KV MEHGAON - AURAIYA 11-Sep-14 900 11-Sep-14 11092014 1700 daily Maintenance Work

EHT- Mamp I

227400 Korba Lanco

11-Sep-14 900 12-Sep-14 19002 days

continuous Annual maintenance and testing

NTPC NTPC

228 400 Lonikand II-Lonikand I 11-Sep-14 900 11-Sep-14 1700 Daily QMwork MSETCL MSETCL

229 400 Parali-Lonikand II ckt 2 11-Sep-14 900 11-Sep-14 1700 Daily QMwork MSETCL MSETCL

230 400 Waluj-Bableshwer 11-Sep-14 900 11-Sep-14 1700 Daily QMwork MSETCL MSETCL

231 400 Tie Transformer-II NTPC-Korba 11-Sep-14 900 12-Sep-14 1700 Maintenance NTPC NTPC

232 400kV Sipat-Raipur-2 12-Sep-14 000 12-Sep-14 1700 Daily Attending hot spots and SD nature defects WRTS-I PGCIL R

233 400 400220 ICT 1 AT WARDHA 12 Sep 14 9 00 12 Sep 14 15 00 Dail For B shing oil DGA Testing WRTS I WRTS I R233 400 400220 ICT-1 AT WARDHA 12-Sep-14 900 12-Sep-14 1500 Daily For Bushing oil DGA Testing WRTS-I WRTS-I R

234 400 Khandwa-Dhule 2 line reactor at Dhule 12-Sep-14 800 12-Sep-14 1800 Daily For Bushing oil DGA Testing

Line in service wo reactor WRTS-I WRTS-I R

235 400 BUS I AT MAPUSA 12-Sep-14 900 12-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

236 765 JBP - Dharmjaygarh Reactor Line 1 Reactor at Jabalpur Pooling Station

12-Sep-14 100000 AM 12-Sep-14 60000 PM Daily Installation amp Commissioning of CSD Relay PGCIL WRTS-II C

237 400 400 kv Rajgarh Pgcil - SSP CKT II 12-Sep-14 900 12-Sep-14 12092014 1800 daily Maintenan

ce Work PGCIL EHT- Mamp I

238 400 400 kv Indore - Nagda ckt 12-Sep-14 900 12-Sep-14 12092014 1800 daily Maintenance Work

EHT- Mamp I

239 220 220K KV MEHGAON - AURAIYA 12-Sep-14 900 12-Sep-14 12092014 1700 daily Maintenance Work

EHT- Mamp I

240 400 Lonikand-Stage IV 12-Sep-14 900 12-Sep-14 1700 Daily QMwork MSETCL MSETCL

241 400 Aurangabad(PG)-Aurangabad (Waluj)-1 12-Sep-14 800 15-Sep-14 1800 Conti Augmentation works at MSETCL

Waluj 400kV SSWRTS-I WRTS-I C

242 400 TARAPUR-PADGHE I 13-Sep-14 800 14-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

243 400 Karad-Lonikand 13-Sep-14 900 13-Sep-14 1700 Daily QMwork MSETCL MSETCL

244 400kV Sipat-Raipur-1 13-Sep-14 000 13-Sep-14 1700 Daily Attending hot spots and SD nature defects WRTS-I PGCIL R

245 400 BOISAR-PADGHE 13-Sep-14 800 14-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

246 400 400220 ICT-2 AT WARDHA 13-Sep-14 900 13-Sep-14 1500 Daily For Bushing oil DGA Testing WRTS-I WRTS-I R

247 400 Khandwa-Dhule 1 line reactor at Dhule 13-Sep-14 800 13-Sep-14 1800 Daily For Bushing oil DGA Testing

Line in service wo reactor WRTS-I WRTS-I R

248 220 BUS I AT MAPUSA 13-Sep-14 900 13-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R248 220 BUS I AT MAPUSA 13-Sep-14 900 13-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

249 765 Korba Line Main Bay (716) at Bilaspur Ss 13-Sep-14 900 13-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

250 400 Dhule-Babhleswar ckt 2 13-Sep-14 900 13-Sep-14 1700 Daily QMwork MSETCL MSETCL

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

251 400 Kolhapur-Mapusa 1 13-Sep-14 800 17-Sep-14 1800 Daily Insulator replacement due to polluted streaches

WRTS-I WRTS-I R

252 400 Kolhapur-Mapusa 1 13-Sep-14 800 17-Sep-14 1800 Daily Insulator replacement due to polluted streaches

WRTS-I WRTS-I R

253 400 Bhachau - Ranchodpura DC(Subject to SLDC consent) 14-Sep-14 80000 AM 20-Sep-14 60000 PM Continuo

us

Shifting of towers to maintain clearance for SSNL canal crossing (Loc 26-33 amp 78-84)

PGCIL WRTS-II C

254 400kV Bhilai-koradi line 15-Sep-14 000 16-Sep-14 000 Daily Attending hot spots and SD nature defects WRTS-I PGCIL R

255 400 Navasari- Kala MC line 15-Sep-14 800 16-Sep-14 1800 DailyConstruction work of Navasari- Boisar line on same Multi ckt tower

WRTS-II WRTS-I C

256 400 SOLAPUR(PG)-KARAD 15-Sep-14 900 20-Sep-14 1800 Conti Tower Erection of Line Reactor gantry of Karad Line at Solapur MSETCL WRTS-I R

257 765 WARDHA-AURANGABAD(PG) 2 15-Sep-14 800 15-Sep-14 1800 Daily

For replacement of Rph reactor unit at Wardha Line in service wo reactor Taking out reactor out of service

WRTS-I WRTS-I R

258 400 Chandrapur 3 Main Bay (420) at Bhadrawati 15-Sep-14 900 15-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

259 765 Seoni1 Main Bay (704 ) at Bilaspur Ss 15-Sep-14 900 15-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL RBilaspur Ss

260 220 Kakrapar-Haldarwa1 15-Sep-14 900 15-Sep-14 1800 DailyReplacement of existing 220kV CTs with High Fault current CTs at Haldarwa SS

PGCIL WRTS-II C

261 400 SSP - Rajgarh - 1 15-Sep-14 800 17-Sep-14 1800 Daily PMM WORK PGCIL GETCO

262

220 Jhanor 220 KV Bus1

15-Sep-14

800

16-Sep-14

000

Continous Replacement of existing CTCVT with 02 class CT amp CVT and for testing of the same NTPC NTPC

263 400 BOISAR-PADGHE 16-Sep-14 800 17-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

264 400 Chandrapur 3Tie Bay (421) at Bhadrawati 16-Sep-14 900 16-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

265 400 Indore-Asoj2 16-Sep-14 80000 AM 16-Sep-14 60000 PM Daily Replacement of broken insulators PGCIL WRTS-II R

266 765 Sasan-Satna2 16-Sep-14 900 17-Sep-14 1800 Daily Power line crossing for stringing of of 765Kv Vin pool- satna ck2 PGCIL WRTS-II C

267 400 315MVA ICT1 at Shujalpur 16-Sep-14 1000 16-Sep-14 1400 Daily AMP PGCIL WRTS-II R

268 220 Kakrapar-Haldarwa2 16-Sep-14 900 16-Sep-14 1800 DailyReplacement of existing 220kV CTs with High Fault current CTs at Haldarwa SS

PGCIL WRTS-II C

269 220 220 KV PITHAMPUR - RAJGARH PG CKT - I 16-Sep-14 900 16-Sep-14 16092014 1600 daily Maintenan

ce Work PGCIL EHT- Mamp I

270 400 V-satna-1 16-Sep-14 900 16-Sep-14 1900 Daily basis For erection of Breaker after OH NTPC NTPC

Construction work of Navasari- 271 400 Vapi- Kala MC Line 17-Sep-14 800 18-Sep-14 1800 Daily Boisar line on same Multi ckt

towerWRTS-II WRTS-I C

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

272 400 HVDC IBay (403) at Bhadrawati 17-Sep-14 900 17-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

273

220 Jhanor 220 KV Bus2

17-Sep-14

800

18-Sep-14

000

Continous Replacement of existing CTCVT with 02 class CT amp CVT and for testing of the same NTPC NTPC

274 400 Parli 1 Main Bay (423) at Bhadrawati 18-Sep-14 900 18-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

275 220 Kawas-Haldarwa1 18-Sep-14 900 18-Sep-14 1800 DailyReplacement of existing 220kV CTs with High Fault current CTs at Haldarwa SS

PGCIL WRTS-II C

276 400 SSP - Rajgarh - 2 18-Sep-14 800 20-Sep-14 1800 Daily PMM WORK PGCIL GETCO

277 400 400 KV Sarni - Seoni ckt 18-Sep-14 800 18-Sep-14 18092014 1800 daily Maintenance Work PGCIL EHT-

Mamp I

278 220 220 KV PITHAMPUR - RAJGARH PG CKT - II 18-Sep-14 900 18-Sep-14 18092014 1600 daily Maintenan

ce Work PGCIL EHT- Mamp I

279 220 220 KV DAMOH PG - TIKAMGARH CKT I 18-Sep-14 800 18-Sep-14 18092014 1800 daily Maintenan

ce Work PGCIL EHT- Mamp I

280 400Sipat 400KV Bay-9 (Raipur-1 Main bay) 18-Sep-14 900 19-Sep-14 1900 Continous Annual Preventive maintenance NTPC NTPC

281 400 Kolhapur-Mapusa 2 18-Sep-14 800 22-Sep-14 1800 Daily Insulator replacement due to polluted streaches

WRTS-I WRTS-I R

282 400 Khandwa 2 Tie bay (423) at 19 S 14 8 00 20 S 14 18 00 D il AMP k WRTS I WRTS I R282 400 Khandwa 2 Tie bay (423) at Seoni 19-Sep-14 800 20-Sep-14 1800 Daily AMP works WRTS-I WRTS-I R

283 400 BOISAR-PADGHE 19-Sep-14 800 20-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

284 400 Parli 1 Tie Bay (424) at Bhadrawati 19-Sep-14 900 19-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

285 220 Kawas-Haldarwa2 19-Sep-14 900 19-Sep-14 1800 DailyReplacement of existing 220kV CTs with High Fault current CTs at Haldarwa SS

PGCIL WRTS-II C

286 400 V-satna-2 19-Sep-14 900 20-Sep-14 1900 Continuous

Major OH of Line Circuit Breaker (For dismantling of poles) NTPC NTPC

287 400 Aurangabad(PG)-Aurangabad (Waluj)-2 19-Sep-14 800 22-Sep-14 1800 Conti Augmentation works at MSETCL

Waluj 400kV SSWRTS-I WRTS-I C

288 400 Parli 2 Main Bay (416) at Solapur 20-Sep-14 900 20-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

289 400 400220 ICT-3 AT MAPUSA 20-Sep-14 900 20-Sep-14 1500 Daily AMP WORKS WRTS-I WRTS-I R

Anaulagnak 33

Agast 2014 AaOr isatmbar 2014 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR AUGUST 2014 AND SEPTEMBER 2014

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)Agast 2014 isatmbar 2014 Agast 2014 isatmbar 2014

AUGUST 2014 SEPTEMBER 2014 AUGUST 2014 SEPTEMBER 2014

1 gaujarat

saIimat 12500 13900 7750 8500

AsaIimat 12540 13940 7760 8510

2 maQya p`doSa

saIimat 6200 6500 3800 4100

AsaIimat 6250 6500 3800 4100

3 CltaIsagaZ

saIimat 3030 3199 16425195 172052635

AsaIimat 3160 3269 172031 169036025

4 maharaYT

saIimat 16050 17750 10700 10800

AsaIimat 16100 17800 10750 10850

5 gaaovaa

saIimat 410 415 290 285

AsaIimat 425 425 300 290

6 dmana dIva

saIimat 315 320 205 200

AsaIimat 320 325 210 210

7 DI ena eca

saIimat 645 640 425 420

AsaIimat 650 645 430 425

8 piScama xao~

saIimat 37614 41048 25600 26080

AsaIimat 37898 41254 26450 27900

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah jaUlaa[- 2014

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 2236 75

]k[- Ukai - 2 529 75]k[- Ukai - 3 000 0]k[- Ukai - 4 2023 75]k[- Ukai (Total) 4788 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 094 2]k[- ela baI saI eca Ukai LBCH - 2 028 2]k[- ela baI saI eca Ukai LBCH (Total) 123 1 0018

3 kDanaa Kadana - 1 699 61 0010kDanaa Kadana - 2 910 57 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 1115 62 0000kDanaa Kadana (Total) 2724 62 0010

4 pnama PANAM amp Madhuban Dam 1 amp 2 160 8 0017 6 kula jalaIya TOTAL(H) 7794 225 0390

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 3339 57 34582 TaoronT pavar ilaimaToD yauinaT DI 6957 122 64083 TaoronT pavar ilaimaToD yauinaT [- 8082 122 67664 TaoronT pavar ilaimaToD yauinaT ef 8380 124 73285 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 037511 Qauvarna tapIya Dhuvaran - GT 2 000 0 116012 Qauvarna tapIya Dhuvaran - STG 1783 10113 ]ka[- yauinaT 1 Ukai -1 000 0 019714 ]ka[- yauinaT 2 Ukai -2 000 0 019315 ]ka[- yauinaT 3 Ukai -3 10038 202 922016 ]ka[- yauinaT 4 Ukai -4 6930 202 697517 ]ka[- yauinaT 5 Ukai -5 11833 212 1138718 ]ka[- yauinaT 6 Ukai -6 30277 507 2287219 gaaMQaInagar 1 Gandhinagar - 1 000 0 008220 gaaMQaInagar 2 Gandhinagar - 2 000 0 009221 gaaMQaInagar 3 Gandhinagar - 3 6275 213 669022 gaaMQaInagar 4 Gandhinagar - 4 6060 212 706523 gaaMQaInagar 5 Gandhinagar - 5 13495 215 1331024 vaNakbaaorI 1 Wanakbori - 1 12142 209 000025 vaaNakbaaOrI 2 Wanakbori - 2 12364 21026 vaaNakbaaOrI 3 Wanakbori - 3 6669 20227 vaaNakbaaOrI 4 Wanakbori - 4 7244 21128 vaaNakbaaOrI 5 Wanakbori - 5 6198 21029 vaaNakbaaOrI 6 Wanakbori - 6 5924 21230 vaaNakbaaOrI 7 Wanakbori - 7 9489 21031 ]trna Utran GT 1 000 0 026832 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 1200 221 024735 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 819 143 1098

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

Anaulagnak 41

ACTUAL GENERATION amp AVALABILITY FOR JULY 2014Actual vaastivak

Actual vaastivak

37 isaka Sikka - 1 1326 107 179438 isaka Sikka - 2 3489 114 401539 kcC ilagnaa[-T Kutch Lignite - 1 5092 71 859040 kcC ilagnaa[-T Kutch Lignite - 2 4929 7141 kcC ilagnaa[-T Kutch Lignite - 3 000 042 kcC ilagnaa[-T Kutch Lignite - 4 2388 68 571043 saUrt ilagnaa[-T Surat Lignite - 1 8775 130 874544 saUrt ilagnaa[-T Surat Lignite - 2 3966 130 445845 saUrt ilagnaa[-T Surat Lignite - 3 5411 130 524346 saUrt ilagnaa[-T Surat Lignite - 4 8973 130 883347 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5446 103 859048 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 6057 10749 jaI Aa[- pI saI ela GIPCL GT - 1 1123 33 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1510 3251 jaI Aa[- pI saI ela GIPCL GT - 3 598 3052 jaI Aa[- pI saI ela GIPCL ST - 1 1846 4553 jaI Aa[- pI saI ela GIPCL GT - 4 357 98 000054 jaI Aa[- pI saI ela GIPCL ST - 2 186 5055 [- esa esa e Aar ESSAR GT - 1 000 0 029356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 083 146 002860 jaI pI [- saI GPEC GT - 2 148 153 023361 jaI pI [- saI GPEC GT - 3 1387 145 028462 jaI pI [- saI GPEC STG 521 7563 jaI esa [- jaI GSEG GT - 1 206 51 112164 jaI esa [- jaI GSEG GT - 2 1079 4765 jaI esa [- jaI GSEG STG 613 2466 Sugen (GT 1 + GT 2) 000 0 693867 saIpIpI sao Aayaat Imp from CPP+MUNDRA 249228 6777

kula tapIya Total (T) 511604 7860 431554kula jalaIya+tapIya Total (H+T) 519398 8078 431944ivaMD [najaI- Wind Energy 94980kula jalaIya+tapIya+hvaa Total (H+T+Wind) 614378 9539ivainamaya Exchanges 150828 saIimat jaa- maaMga Restricted Energy Req 765205

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 767 135

11 gaaMQaI saagar Gandhi Sagar 998 117 008012 raNaa p`tap sagar RPSagar 096 86 004013 javaahr sagar Jawahar Sagar 439 66 0020

2 ponca Pench 1381 160 01003 baargaI Bargi 712 33 00704 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 5724 309 02906 banasaagar Bansagar-2 (Deolondh) 104 407 banasaagar Bansagar-3 (Silpara) 565 31 00608 banasaagar Bansagar-4 (Zinaha) 425 20 00309 maoDIKoDa Medikheda 096 58

10 ibarisaMGapur Birsingpur 680 20 002011 Tavaa Tawa 000 012 rajaGaaT Rajghat 001 7 007013 Omkareshwar 4226 340 14 [Midra saagar Indira Sagar 6679 679 0598

kula jalaIya TOTAL(H) MPPGCL 19979 2031 1152

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 2223 84 179302 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 14496 216 0

Actual vaastivak

4 satpura I Satpura-I(60Share) 000 0 00005 satpura II Satpura-II Unit 6 000 0 83106 satpura II Satpura-II Unit 7 7549 1857 satpura II Satpura-II Unit 8 12446 195 173908 satpura II Satpura-II Unit 9 4038 1759 satpura III Satpura-III Unit 10 9508 219 23440

10 satpura III Satpura-III Unit 11 8675 167 2096011 esajaITIpIesa 1 SGTPS Unit - 1 8675 167 2096012 esajaITIpIesa 2 SGTPS Unit - 2 9354 16013 esajaITIpIesa 3 SGTPS Unit - 3 1129 165 1642014 esajaITIpIesa 4 SGTPS Unit - 4 6022 16015 esajaITIpIesa 5 SGTPS Unit - 5 27597 50816 SSTPS 7895 309 9910

kula tapIya Total (T) 117479 2427 115480kula jalaIya+tapIya Total (H+T) 137458 4759 116632Injection from WIND 14572 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 152030 4759ivainamaya Exchanges 271419 saIimat jaa- maaMga Rest En Req 423449

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 606 120 01102 Gangrel 039 10 00203 Mini Micro KWB 039 7

kula jalaIya TOTAL(H) CSEB 684 137 0520tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 40 125902 kaorbaa (pU) Korba (E) Unit-2 2764 383 kaorbaa (pU) Korba (E) Unit-3 2764 384 kaorbaa (pU) Korba (E) Unit-4 2784 405 kaorbaa (pU) Korba (E) Unit -5 3685 120 244406 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 154608 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 24740

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 13343 243 1124012 KORBA(EB) Extn - 2 14104 248 11250

kula tapIya Total (T) 119955 1644 10189013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 119955 1644kula jalaIya+tapIya Total (H+T) 120639 1781 102410ivainamaya Exchanges 59759 0saIimat jaa- maaMga Rest En Req 180398 1781

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 5228 585 06952 kaoyanaa III Koyna III 3695 3203 kaoyanaa IV Koyna IV 371 11204 kaoyanaa DIpIeca Koyna DPH 414 385 TaTa jalaIya TATA Hydro 10123 741 44976 vaOtrNaa Vaitarna 1151 617 eladarI Eldari 000 168 BaTgar AaOr vaIr Bhatgar amp Vir 036 49 pOzana Paithan 976 49

10 itlaarI Tillari 1036 6511 BaIra Tola rosa Bhira Tail Race 846 4112 GaTGar Ghatghar 3639 25013 Anya CaoTo jalaIya Small Hydro (others) 1041 0

kula jalaIya TOTAL(H) 28404 -1073 5192

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL

Actual vaastivak

3 naaisak 3 Nasik Unit -3 4157 1954 naaisak 4 Nasik Unit -4 12489 1985 naaisak 5 Nasik Unit -5 12480 2006 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 30718 5038 Tambao 6 Trombay Unit -6 6619 5009 Tambao 8 Trombay Unit -8 000 0

10 Tambao 7A gaOsa Trombay -7A (Gas) 7476 127 288611 Tambao 7ba Trombay -7B (WHR) 4373 6912 kaoraDI 5 Koradi Unit -5 000 013 kaoraDI 6 Koradi Unit -6 8448 16714 kaoraDI 7 Koradi Unit -7 10994 19415 Bausaavala 2 Bhusawal Unit -2 4715 16516 Bausaavala 3 Bhusawal Unit -3 6454 16517 Bausaavala 4 Bhusawal Unit -4 20419 50518 Bausaavala 4 Bhusawal Unit -5 23286 43519 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 000 021 parlaI 5 Parli Unit -5 9315 17522 parlaI 6 Parli Unit -6 14237 25323 parlaI 7 Parli Unit -7 14028 25024 KaprKoDa 1 Khaperkheda Unit -1 8108 20025 KaprKoDa 2 Khaperkheda Unit -2 10924 19026 KaprKoDa 3 Khaperkheda Unit -3 7917 20627 KaprKoDa 4 Khaperkheda Unit -4 10446 21028 KaprKoDa 5 Khaperkheda Unit -5 24555 50030 parsa Paras-3 11676 21831 parsa Paras-4 10326 24032 ]rna Uran (Gas) 18771 40133 ]rna Uran (WHR) 10760 138 586234 caMd`pur 1 Chandrapur Unit -1 7526 16535 caMd`pur 2 Chandrapur Unit -2 9375 19936 caMd`pur 3 Chandrapur Unit -3 8728 20037 caMd`pur 4 Chandrapur Unit - 4 12276 47038 caMd`pur 5 Chandrapur Unit -5 29203 41039 caMd`pur 6 Chandrapur Unit -6 26351 040 caMd`pur 7 Chandrapur Unit -7 000 041 DhaNaU 1 Dahanu Unit-1 16882 250 1563042 DhaNaU 2 Dahanu Unit-2 19263 250 1660143 CPP 258820 41160044 RGPPL Share 000 0

kula tapIya Total (T) 692115 14094 350211MAH Wind + Solar Generation 110432 0kula jalaIya +tapIya Total (H+T+Wind) 830951 16176 396382

TOTAivainamaya Exchanges 274116saIimat jaa- maaMga Rest En Req 1105066

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1173 17ivainamaya Exchanges 33083saIimat jaa- maaMga Rest En Req 34256 459

C (F) dmana AaOr dIva DAMAN amp DIU 17467 298ja (G) dadra nagar hvaolaI DNH 43779 673

kula DD ampDNH (T) 61246 970

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 9731 160 1564312 tara`pur 2 TAPS Unit -2 11531 16013 tara`pur 3 TAPS Unit -3 40214 545 7288014 tara`pur 4 TAPS Unit -4 39284 53715 kakrapr 1 KAPS Unit -1 16048 545 3195016 kakrapr 2 KAPS Unit -2 14903 537

kula ena pI saI NPC Total 131710 24842 ena TI pI saI NTPC

Actual vaastivak

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15236 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14181 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14568 214 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 000 025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 32338 51326 kaorbaa esaTIpIesa 6 KSTPS Unit-6 33493 51427 kaorbaa esaTIpIesa 7 KSTPS Unit-7 30558 516

kula kaorbaa KSTPS Total 140373 2548 9318427 ivanQa esaTIpIesa 1 VSTPS Unit-1 13430 21528 ivanQa esaTIpIesa 2 VSTPS Unit-2 11930 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 13695 212210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14017 214211 ivanQa esaTIpIesa 5 VSTPS Unit-5 11952 215212 ivanQa esaTIpIesa 6 VSTPS Unit-6 8991 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 32786 515214 ivanQa esaTIpIesa 8 VSTPS Unit-8 19668 514215 ivanQa esaTIpIesa 9 VSTPS Unit-9 31796 516216 ivanQa esaTIpIesa 10 VSTPS Unit-10 31597 515217 ivanQa esaTIpIesa 11 VSTPS Unit-11 13881 512

kula ivanQayaacala VSTPS Total 233445 REF 16238 31 saIpt -1 -SIPAT-1 38555 66600 32 saIpt -2 -SIPAT-2 16033 66500 33 saIpt -3 -SIPAT-3 43240 66800 34 saIpt -4 -SIPAT-4 25865 51200 35 saIpt -5 SIPAT-5 33302 51500

kula saIpt -SIPAT TOTAL 156995 280100 920541 kvaasa gaOsa 1e Kawas GT-1A 2605 10442 kvaasa gaOsa 1baI Kawas GT-1B 4355 10643 kvaasa esaTI 1saI Kawas ST-1C 3365 11744 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 044 9846 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 10369 309 245151 gaMQaar gaOsa 1 Gandhar GT-1 2177 14352 gaMQaar gaOsa 2 Gandhar GT-2 3014 14553 gaMQaar gaOsa 3 Gandhar GT-3 5333 14754 gaMQaar esaTI 4 Gandhar ST-4 5586 158

kula gaMQaar GGPS Total 16109 437 475161 maaOda 1 Mauda -1 5368 514 000062 maaOda 2 Mauda -2 16240 513 0000

kula maaOda MAUDA Total 21608 756 2258161 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 000 31 000071 esa esa pI SSP RBPH - 1 1265 18872 esa esa pI SSP RBPH - 2 1102 18673 esa esa pI SSP RBPH - 3 1197 18774 esa esa pI SSP RBPH - 4 1116 18675 esa esa pI SSP RBPH - 5 1432 18676 esa esa pI SSP RBPH - 6 1653 18677 esa esa pI SSP CHPH - 1 422 3578 esa esa pI SSP CHPH - 2 384 3079 esa esa pI SSP CHPH - 3 179 34710 esa esa pI SSP CHPH - 4 1012 36711 esa esa pI SSP CHPH - 5 340 30

kula esa esa pI SSP Total 10101 1283 101081 kula poMca Pench Total 1381 160 010082 Jindal Injection 50805 083 Amarkantak Lanco 16857 0

(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2508924

(J) ]plabQata Availability 2439102 naoT ivainamaya Net Exchanges -311541 ]plabQa jaa- Energy Availability 2127561

maah jaUlaa[- 2014 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR JULY 2014 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 13833 - - - 13833 070714 1500 4972

saIimat Restricted 12500

AsaIimat Unrestricted 12540 13833 0 136 0 13969 070714 1500 4972

nyaUnatma pMjaIkRt maaMga Min Registered Demand 7617 7617 250714 0400 4999

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 7090 - - - 7090 020714 2015 4985

saIimat Restricted 6040

AsaIimat Unrestricted 6040 7090 0 31 0 7121 020714 2015 4985

nyaUnatma pMjaIkRt maaMga Min Registered Demand 3895 3895 230714 1500

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3118 3118 050714 2100 4985

saIimat Restricted 3150

AsaIimat Unrestricted 3250 2972 41792 24 0 3414 030714 2000 4977

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1336 1336 220714 1300 4995

maharaYT MAHARASHTRApMjaIkRt Registered 19283 - - - 19283 010714 1600 4994

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19283 62 40 0 19385 010714 1600 4994

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11936 11936 300714 0500 5000

gaaovaa GOApMjaIkRt Registered 405 459 - - 459 260714 2000 4967

AsaIimat Unrestricted 405 459 0 5 - 464 260714 2000 4967

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 532 - - 532 290714 0900 4998

AsaIimat Unrestricted 532 0 0 - 532 290714 0900 4998

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 287 - - 287 060714 1000 4991

AsaIimat Unrestricted 287 0 1 - 288 060714 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 721 - - 721 050714 1700 4983

AsaIimat Unrestricted 721 0 - 721 050714 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 400 435 290714

piScama xao~ WESTERN REGIONpMjaIkRt Registered 43034 - - - 43034 010714 1600 4994

saIimat Restricted 40703

AsaIimat Unrestricted 40905 43034 295 90 0 43419 010714 1600 4994

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28431 28431 240714 0500 5000 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

माह जलाई 2014Jul-14

अनब समातरवतीय चालन PARALLELRADIAL OPERATION TOTAL OPERATING HOURS

1 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-NR)

2 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-SR) 7424400

टाई लाईन TIE LINE

1 765 कवी िसवनी स वधा-I 765kV Soni to Wardha 6780100

2 765 कवी िसवनी स वधा-II 765kV Seoni to Wardha 2043700

3 400 कवी िभलाई स कोराड 400kV Bhilai to Koradi 7440000

4 400 कवी िभलाई स भिावती 400kV Bhilai to Bhadravati 7440000

5 400 कवी रायपर स भिावती -I 400kV Raipur to Bhadravati-I 7440000

6 400 कवी रायपर स भिावती ndashII 400kV Raipur to Bhadravati-II 7440000

7 400 कवी रायपर स भिावती ndashIII 400kV Raipur to Bhadravati-III 7440000

8 400 कवी सातपरा स कोराड 400kV Satpura to Koradi 7060200

9 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7440000

10 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 7440000

11 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7225100

12 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 7082500

13 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 5361200

14 400 कवी को हापर स मापसा-I 400kV Kolhapur-Mapusa-I 4561600

15 400 कवी को हापर स मापसा-II 400kV Kolhapur-Mapusa-II 4793700

16 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7440000

17 400 कवी रायगढ़ स ःटरलाइट-I 400kV Raigarh to Sterlight-I 7371100

18 400 कवी रायगढ़ स ःटरलाइट-II 400kV Raigarh to Sterlight -II 7440000

19 400 कवी रायगढ़ स झरसगड़ा-I 400kV Raigarh to Jharsuguda-I 7302900

20 400 कवी रायगढ़ स झरसगड़ा-II 400kV Raigarh to Jharsuguda-II 7303700

21 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 5400900

22 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7292200

23 400 कवी रायपर स वधाndashI 400kV Raipur to Wardha-I 7440000

24 400 कवी रायपर स वधाndashII 400kV Raipur to Wardha-II 7440000

25 220 कवी कोरबा पव स ब पादर-III 220kV K(E) to Budhipadar-III 7361200

ANNEXURE 43

maah jaUlaa[- 2014 ko daOrana pa~ta iSaDyaUla GaTkaoM Wara koMd`Iya xao~ ko sToSanaaoMM sao D`avala AaOr ivainamayaaoM ka ivavarNa

1 koMd`Iya sToSanaaoMM samaip-t koMd`Iya sToSanaoMa saMyaut inajaI sToSanaaoM kI GaaoiYat xamata (basa pr) AaOr laaBaaiqa-yaaMo kI pa~ta1 Declared Capcity (ex-bus) of Central Gen StnsDedicated CG StnsJointly owned Stns amp entitlement of beneficieries (MUs)

GaaoiYat xamata gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI + ecaDblyaubaI kula

(A) koMd`Iya ibajalaIGar A Central Gen Stns Dec Cap GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC+HWB TOTAL

kaorbaa esaTIpIesa Korba STPS 1017635 174452 237891 103616 324281 102699 23918 26164 1017635kaorbaa esaTIpIesa -III Korba STPS-III 283431 54419 44422 85553 76649 3066 3405 13029 283431ivanQa esaTIpIesa I Vindhyachal STPS-I 674012 123034 240046 1253 246970 19644 7141 23669 12255 674012ivanQa esaTIpIesa II Vindhyachal STPS-II 491154 117386 158375 0909 175903 6532 4569 16539 491154ivanQa esaTIpIesa III Vindhyachal STPS-III 627679 166963 156579 67068 186511 7093 7097 22387 627679ivanQa esaTIpIesa IV Vindhyachal STPS-IV 411100 98631 118464 26475 133406 5356 5241 19338 411100kvaasa gaOsa Kawas GPP 306920 87464 65557 0000 95562 5791 14520 37998 306920gaMQaar gaOsa Gandhar GPP 406294 146476 72428 0000 123833 7814 19389 36310 406294saIpt Sipat 1665864 454494 301337 266370 509047 19436 19662 68224 1665864kakrapar Kakrapar APS 275783 78347 69731 0000 94368 9698 5200 8018 10420 275783tara`pur 3 AaOr 4 Tarapur APS 3amp4 721903 183150 155921 32084 295823 8510 8953 31049 721903

(ba) samaip-t koMd`Iya ibajalaIGar B Dedicated CG Stations Actual injection vaasaivak [njaoSana [Midra saagar Indira Sagar 245570 245570 245570

(sa) saMyaut inajaI sToSana C Jointly owned Stationstara`pur 1 AaOr 2 Tarapur APS 1amp2 196640 98320 0000 0000 98320 0000 0000 0000 196640esaesapI SSP 97965 15674 55840 0000 26450 0000 0000 0000 97965ponca Pench 13620 9080 0000 4540 0000 0000 0000 13620

kula ([M saagar kao CaoD kr) Total (excl Indira Sagar) 11988065 2808880 2297269 640720 3692105 208667 173093 400816 1766516 11988065 Actual injection

2 koMd`Iya sToSanaaoMM samaip-t koMd`Iya sToSanaoMa saMyaut inajaI sToSanaaoM kI ]padna SaoDyaUla AaOr laaBaaiqa-yaaoM kI D`avala SaoDyaUla2 Generation Schedule (ex-bus) of Central Gen StationsDedicated CG StationsJointly owned Stations amp schedule of benificieries (MUs)

SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI+ ecaDblyaubaI kula

(A) koMd`Iya ibajalaIGar A Central Gen Stns Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH

HVDC+HWB Outside region(NR

amp SR) TOTALkaorbaa esaTIpIesa Korba STPS 1015070 174452 238276 103310 321801 102699 23918 26164 1015070kaorbaa esaTIpIesa -III $ Korba STPS-III $ 282671 54342 44422 85185 76334 3066 3405 13029 282671ivanQa esaTIpIesa I Vindhyachal STPS-I 660248 120064 239050 1253 237415 19644 7141 23473 12209 660248ivanQa esaTIpIesa II Vindhyachal STPS-II 488287 117160 156978 0909 174700 6532 4569 16539 488287ivanQa esaTIpIesa III Vindhyachal STPS- III 600504 134916 160349 67878 186319 7093 7227 22827 600504ivanQa esaTIpIesa IV Vindhyachal STPS- IV 409072 98719 118259 24888 133048 5356 5241 19374 409072kvaasa gaOsa Kawas GPP 99574 27083 25459 0000 23510 2678 5916 14915 0000 99574gaMQaar gaOsa Gandhar GPP 154677 55634 30257 0000 41633 3783 8217 15131 0000 154677saIpt Sipat 1448506 290983 323024 258111 436177 19418 23860 69790 1448506kakrapar Kakrapar APS 275783 78347 69731 0000 94368 9698 5200 8018 10420 275783tara`pur 3 AaOr 4 Tarapur APS 3amp4 721903 183150 155921 32084 295823 8510 8953 31049 721903

(ba) samaip-t koMd`Iya ibajalaIGar B Dedicated CG Stations[Midra saagar Indira Sagar 245570 245570 245570

RPPC(NVVNL) 0000

0000

0000

(sa) saMyaut inajaI sToSana C Jointly owned Stations Actual injection vaasaivak [njaoSana tara`pur 1 AaOr 2 Tarapur APS 1amp2 196640 98320 0000 0000 98320 0000 0000 0000 196640esaesapI SSP 97965 15674 55840 0000 26450 0000 0000 0000 97965ponca Pench 13620 0000 9080 0000 4540 0000 0000 0000 13620kula [M saagar kao CaoD kr Total (excl Ind Sagar) 10173905 2352674 2217883 625946 2591731 193349 149578 336130 1706614 10173905

Actual injectionNote- $ These Scheduled Transactions are done by WRLDC under STOA

3 AMtrxao~Iya ivainamayaaoM iWpxaIya ivanamayaaoM kI SaoDyaUla (ima yauinaTsa)3 Schedule for interregional exchangesbilateral exchanges (MUs)

SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kulaxao~ rajya RegionState Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL

k pUvaI- xao~ ko rasto Import SDLs through ER -110482Aayaat SaoDyaUla Indian Energy Exchange (WR to ER) 0000 0000 0000 0000 0000 0000 0000 139465

Power Exchange of India (ER to WR) 0000 0000 0000 0000 0000 0000 0000 3671ER (NTPC) 47912 28298 11592 52018 0000 0786 1209 93903

DVC to MPPTCL (Long Term Open Access) 0000 201316 0000 0000 0000 0000 0000 201316Hirakud to CSEB 0000 0000 1354 0000 0000 0000 0000 1354

APL2 GUVNL to APPCC ( AEL) -0918 0000 0000 0000 0000 0000 0000 -0918APL3 GUVNL to APPCC ( AEL) -0924 0000 0000 0000 0000 0000 0000 -0924

CSEB to APPCC ( NVVNL) 0000 0000 -44813 0000 0000 0000 0000 -44813DBPOWER to APPCC ( GMRETL) 0000 0000 -1828 0000 0000 0000 0000 -1828

JPL to APPCC ( KISPL) 0000 0000 -15225 0000 0000 0000 0000 -15225JPL-II to APPCC ( KISPL) 0000 0000 -11376 0000 0000 0000 0000 -11376

Anaulagnak 45

DETAILS OF ENTITLEMENTSCHEDULEDRAWAL BY THE CONSTITUENTS FROM CENTRAL SECTOR STATIONS AND EXCHANGES FOR THE MONTH OF JULY 2014

(pxaoivasa` Wara jaarI xao~Iya jaa- laoKa ko AaQaar pr)

13896KAWAS(RLNG)

GANDHAR(RLNG)

JPL-II to APPCC ( NVVNL) 0000 0000 -11414 0000 0000 0000 0000 -11414JPL-II to APPCC ( PTC LTD) 0000 0000 -14853 0000 0000 0000 0000 -14853

CSEB to ASEB ( PTC LTD) 0000 0000 -0575 0000 0000 0000 0000 -0575MPPMCL MPSEB to ASEB ( IEXL) 0000 -0575 0000 0000 0000 0000 0000 -0575

APL1 GUVNL to BIHAR ( AEL) -106185 0000 0000 0000 0000 0000 0000 -106185APL2 GUVNL to BIHAR ( AEL) -72520 0000 0000 0000 0000 0000 0000 -72520APL3 GUVNL to BIHAR ( AEL) -51827 0000 0000 0000 0000 0000 0000 -51827

DBPOWER to BIHAR ( MANIKARAN) 0000 0000 -0350 0000 0000 0000 0000 -0350EMCO to BIHAR ( PXIL) 0000 0000 0000 -0413 0000 0000 0000 -0413

GUVNL to BIHAR ( PXIL) -0200 0000 0000 0000 0000 0000 0000 -0200MSEB to BIHAR ( PXIL) 0000 0000 0000 -0100 0000 0000 0000 -0100

MPPMCL MPSEB to BIHAR ( PXIL) 0000 -0150 0000 0000 0000 0000 0000 -0150GUVNL to BESCOM ( GUVNL) -14041 0000 0000 0000 0000 0000 0000 -14041

ESSAR_MAHAN to BESCOM ( ESSAR_MAHAN) 0000 -4353 0000 0000 0000 0000 0000 -4353ADHUNIK to BALCO ( BALCO) 0000 0000 0064 0000 0000 0000 0000 0064

ADHUNIK to BALCO ( MANIKARAN) 0000 0000 7200 0000 0000 0000 0000 7200JSEB(ER) to BALCO ( MPPL) 0000 0000 1481 0000 0000 0000 0000 1481

JSEB(ER) to BALCO ( MANIKARAN) 0000 0000 1200 0000 0000 0000 0000 1200JITPL to BALCO ( BALCO) 0000 0000 1200 0000 0000 0000 0000 1200

STERLITE to BALCO ( BALCO) 0000 0000 18603 0000 0000 0000 0000 18603JSEB(ER) to ESIL_WR ( MPPL) 0600 0000 0000 0000 0000 0000 0000 0600STERLITE to ESIL_WR ( PXIL) 1900 0000 0000 0000 0000 0000 0000 1900

NSPCL to SAIL ROURKELA ( SAIL ROURKELA) 0000 0000 -23994 0000 0000 0000 0000 -23994APL2 GUVNL to TGPCC ( AEL) -1074 0000 0000 0000 0000 0000 0000 -1074APL3 GUVNL to TGPCC ( AEL) -1081 0000 0000 0000 0000 0000 0000 -1081

CSEB to TGPCC ( NVVNL) 0000 0000 -52359 0000 0000 0000 0000 -52359JPL to TGPCC ( KISPL) 0000 0000 -17792 0000 0000 0000 0000 -17792

JPL-II to TGPCC ( KISPL) 0000 0000 -13295 0000 0000 0000 0000 -13295JPL-II to TGPCC ( NVVNL) 0000 0000 -13342 0000 0000 0000 0000 -13342

JPL-II to TGPCC ( PTC LTD) 0000 0000 -17335 0000 0000 0000 0000 -17335TISCO to VFL MPSEB ( TPTCL) 0000 0000 0268 0000 0000 0000 0000 0268

BLAPPL MPSEB to WBSEB ( IEXL) 0000 -0016 0000 0000 0000 0000 0000 -0016DBPOWER to WBSEB ( PTC LTD) 0000 0000 -0595 0000 0000 0000 0000 -0595

MPPMCL MPSEB to WBSEB ( PTC LTD) 0000 -89184 0000 0000 0000 0000 0000 -89184

SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kulaxao~ rajya RegionState Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL

K dixaNa xao~ ko rasto Import SDLs through SR 10967

Aayaat SaoDyaUla Indian Energy Exchange (SR to WR) 0000 0000 0000 0000 0000 0000 0000 0169Power Exchange of India (SR to WR) 0000 0000 0000 0000 0000 0000 0000 0000RSTPS-SR to GOA ( BILATERAL) 0000 0000 0000 0000 2186 0000 0000 2186RSTPS-SR to GOA ( WHEELING) 0000 0000 0000 0000 3118 0000 0000 3118

RSTPS-SR to GOA ( WHEELING GOA) 0000 0000 0000 0000 5494 0000 0000 5494

ga ]trI xao~ ko rasto Import SDLs through NR -321127Aayaat SaoDyaUla Indian Energy Exchange (NR to WR) 0000 0000 0000 0000 0000 0000 0000 -164961

Power Exchange of India (NR to WR) 0000 0000 0000 0000 0000 0000 0000 -3367Rihand (Hydro) to MPPTCL (Long Term Open Access) 0000 7970 0000 0000 0000 0000 0000 7970

Matathilla (Hydro) to MPPTCL (Long Term Open Access) 0000 0000 0000 0000 0000 0000 0000 0000EMCO to BIHAR ( PXIL) 0000 0000 0000 -0188 0000 0000 0000 -0188MSEB to BIHAR ( IEXL) 0000 0000 0000 -0400 0000 0000 0000 -0400

MPPMCL MPSEB to BSES_RAJ ( MPPL) 0000 -7000 0000 0000 0000 0000 0000 -7000ADHUNIK to BALCO ( MANIKARAN) 0000 0000 5198 0000 0000 0000 0000 5198

HIMACHAL to ESIL_WR ( IEXL) 0050 0000 0000 0000 0000 0000 0000 0050HARIYANA to ESIL_WR ( IEXL) 1525 0000 0000 0000 0000 0000 0000 1525HARIYANA to ESIL_WR ( PXIL) 5610 0000 0000 0000 0000 0000 0000 5610

KWHEPS to ESIL_WR ( PXIL) 0150 0000 0000 0000 0000 0000 0000 0150SCL to ESIL_WR ( IEXL) 0610 0000 0000 0000 0000 0000 0000 0610SCL to ESIL_WR ( PXIL) 0090 0000 0000 0000 0000 0000 0000 0090

MPPMCL MPSEB to HARIYANA ( HARIYANA) 0000 -126636 0000 0000 0000 0000 0000 -126636SCL to HRJIL MSEB ( SCL) 0000 0000 0000 1993 0000 0000 0000 1993

APL3 GUVNL to JVVNL-NR ( IEXL) -0120 0000 0000 0000 0000 0000 0000 -0120APL3 GUVNL to JVVNL-NR ( PXIL) -0122 0000 0000 0000 0000 0000 0000 -0122

BLAPPL MPSEB to JVVNL-NR ( IEXL) 0000 -0250 0000 0000 0000 0000 0000 -0250EMCO to JVVNL-NR ( IEXL) 0000 0000 0000 -0720 0000 0000 0000 -0720MSEB to JVVNL-NR ( PXIL) 0000 0000 0000 -0300 0000 0000 0000 -0300

MPSEB to NDPL(DTL)-NR ( PTC LTD) 0000 -1626 0000 0000 0000 0000 0000 -1626MPPMCL MPSEB to NDPL(DTL)-NR ( PTC LTD) 0000 -35052 0000 0000 0000 0000 0000 -35052

MPPMCL MPSEB to RPPC ( RPPC) 0000 -3562 0000 0000 0000 0000 0000 -3562EMCO to TRIPURA ( IEXL) 0000 0000 0000 -0070 0000 0000 0000 -0070

ADHPL to TORRAHM GUVNL ( IEXL) 0051 0000 0000 0000 0000 0000 0000 0051

Ga iWpxaIya SaoDyaUlsa Exchanges within WRMundra APL to Gujarat (LTOA) 0000 0000 0000 0000 0000 0000 0000 0000

JPL to ARVIND GUVNL ( MPPL) 4464 0000 0000 0000 0000 0000 0000 4464JPL to AIGL MSEB ( AIGL MSEB) 0000 0000 0000 0789 0000 0000 0000 0789

JPL to ARPIPL MSEB ( ARPIPL MSEB) 0000 0000 0000 0771 0000 0000 0000 0771JPL to ACCIL MSEB ( ACCIL MSEB) 0000 0000 0000 2380 0000 0000 0000 2380

APL1 GUVNL to AWLD GUVNL ( AEL) 3874 0000 0000 0000 0000 0000 0000 3874DBPOWER to BALCO ( BALCO) 0000 0000 0120 0000 0000 0000 0000 0120

DBPOWER to BALCO ( DBPOWER) 0000 0000 15887 0000 0000 0000 0000 15887EMCO to BALCO ( EMCO) 0000 0000 0080 0000 0000 0000 0000 0080

JPL to BOSCH MSEB ( BOSCH MSEB) 0000 0000 0000 1552 0000 0000 0000 1552JPL to BCSIL MSEB ( BCSIL MSEB) 0000 0000 0000 0720 0000 0000 0000 0720JPL-II to CSEB ( CSPTRDCL CSEB) 0000 0000 12569 0000 0000 0000 0000 12569

SPECT ACBIL to CSEB ( CSPTRDCL CSEB) 0000 0000 0720 0000 0000 0000 0000 0720ACBIL to CSPTRDCL CSEB ( CSPTRDCL CSEB) 0000 0000 5374 0000 0000 0000 0000 5374

JPL to CLASSIC MSEB ( CLASSIC MSEB) 0000 0000 0000 1309 0000 0000 0000 1309JPL to CIPLA MSEB ( CIPLA MSEB) 0000 0000 0000 0610 0000 0000 0000 0610

JPL to CEAT MSEB ( MPPL) 0000 0000 0000 2921 0000 0000 0000 2921APL1 GUVNL to CHLM GUVNL ( AEL) 2187 0000 0000 0000 0000 0000 0000 2187

NSPCL to DD ( DD) 0000 0000 0000 0000 0000 13156 0000 13156EMCO to DNH ( EMCO) 0000 0000 0000 0000 0000 0000 28097 28097

JPL to DNL MSEB ( DNL MSEB) 0000 0000 0000 0870 0000 0000 0000 0870JPL to ETLC MSEB ( ETL) 0000 0000 0000 0758 0000 0000 0000 0758JPL to ETLT MSEB ( ETL) 0000 0000 0000 0758 0000 0000 0000 0758

APL2 GUVNL to ESIL_WR ( PXIL) 0283 0000 0000 0000 0000 0000 0000 0283APL3 GUVNL to ESIL_WR ( PXIL) 8355 0000 0000 0000 0000 0000 0000 8355

DBPOWER to ESIL_WR ( MANIKARAN) 0000 0000 0000 0000 0000 0000 0000 0345EOL GUVNL to ESIL_WR ( ESIL_WR) -19578 0000 0000 0000 0000 0000 0000 0000

EPGL GUVNL to ESIL_WR ( ESIL_WR) -2866 0000 0000 0000 0000 0000 0000 0000JPL to ESIL_WR ( JPL) 0000 0000 0000 0000 0000 0000 0000 45641

JSWEL(RTNGIRI) MSEB to ESIL_WR ( PXIL) 0000 0000 0000 -2328 0000 0000 0000 0000MSEB to ESIL_WR ( PXIL) 0000 0000 0000 -1705 0000 0000 0000 0000

ESSAR_MAHAN to ESIL_WR ( ESIL_WR) 0000 0000 0000 0000 0000 0000 0000 52250VANDANA to ESIL_WR ( PXIL) 0000 0000 0000 0000 0000 0000 0000 0480

JPL to ESIL MSEB ( JPL) 0000 0000 0000 0108 0000 0000 0000 0108ESSAR_MAHAN to ESIL MSEB ( ESIL_WR) 0000 0000 0000 1244 0000 0000 0000 1244

JPL to ETLW MSEB ( ETL) 0000 0000 0000 0732 0000 0000 0000 0732JPL to ETLB MSEB ( ETL) 0000 0000 0000 0866 0000 0000 0000 0866

JPL to EILR MSEB ( MPPL) 0000 0000 0000 1049 0000 0000 0000 1049JPL to ETLK MSEB ( ETL) 0000 0000 0000 0643 0000 0000 0000 0643

JPL to EXIDE MSEB ( EXIDE MSEB) 0000 0000 0000 1239 0000 0000 0000 1239CSEB to GOA ( PTC LTD) 0000 0000 -0400 0000 0400 0000 0000 0000

DBPOWER to GOA ( PTC LTD) 0000 0000 0000 0000 17390 0000 0000 17390JPL to GSL MSEB ( GSL MSEB) 0000 0000 0000 0870 0000 0000 0000 0870

EMCO to GCEL ( EMCO) 0000 0000 3394 0000 0000 0000 0000 3394JPL to HINDMOUDA MSEB ( HINDMOUDA MSEB) 0000 0000 0000 2249 0000 0000 0000 2249

HINDAHEJ GUVNL to HINDTALOJ MSEB ( HINDTALOJ MSEB) -2962 0000 0000 2962 0000 0000 0000 0000EMCO to DNH ( EMCO) 0000 0000 0000 0000 0000 0000 119290 119290

JPL to HNGIL MSEB ( HNGIL MSEB) 0000 0000 0000 5156 0000 0000 0000 5156LANCO TO MP 0000 191431 0000 0000 0000 0000 0000 191431

IEE 103711 47279 -413725 163201 0000 26840 0000 31054PEI 3561 7107 0000 -0214 0000 0000 0000 17561

ca kula Aayaat Total Import 781888 184933 483401 86303 247768 28588 40782 148596 781888kula inayaa-t Total Export 1202530 274418 268404 653270 6437 0000 0000 0000 1202530naoT Aayaat inayaa-t Net Imp (+)Exp (-) -420642 -89485 214997 -566968 241330 28588 40782 148596 -420642

4 kula gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kula

Total GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL11567423 2719395 2512265 73752 3933435 237255 213875 549412 12255 11567424

5 kI kula iSaDUyala Total Sdl incl IR bi-lateral exch Sdl 9753264 2263189 2432879 58978 2833062 221937 190360 484727 12209 97532646 ibanaa xait ko kula D`avala Total Drl excl Tr Loss 9388390 2433257 2716560 597587 2741156 286430 174671 437785 0944 93883907 xait imalaakr kula D`avala Total Drl incl Tr Loss 9703552 2433257 2716560 597587 2741156 286430 174671 437785 0976 93884228 p p`NaalaI maoM kula pUla xait Pooled loss in WR System 3151629 p xao`~ sToSanaaoM sao kaorbaa ivanQa 1 AaOr 2 ivanQa 3 kvaasa gaMQaar kakrapar tara`pur esaesapI ponca kula

vaastivak [njaoSana Actual Inj - WR Stns KSTPS VSTPS-1amp 2 VSTPS-3 KGPS GGPS KAPS TAPS SSP PENCH TOTAL (ima yauinaTsa) (MUs) 1310550 1162242 1009828 99928 156340 275783 918544 97965 13620 12860991

] xao~ Aa ]xao kao ina ] xao naoT d xao Aa d xao inayaa-t d xao naoT pU xao Aa pU xao inayaa-t pU xao naoT kula naoT10 vaasaivak AMtrxao~Iya Actual IR Exchanges NR Imp NR Exp NR Net SR Imp SR Exp SR Net ER Imp ER Exp ER Net Total Net

ivainamaya (ima yauinaTsa) (MUs) 0347 2303947 -2303600 0000 737616 -737616 73271 189494 -116223 -3157439 AMtrxao~Iya ivainamaya IR Exchange Schedule NRI sdl NRE sdl Net NR sdl SRI sdl SREsdl Net SR sdl ERI sdl ERE sdl Net ER sdl Net WR sdl iSaDyaUla (ima yauinaTsa) (MUs) 2987 714531 -711544 404371 0000 404371 0000 113469 -113469 -420642

Total Entitlement incl IR and bi-lateral exchange schedule

11

AMtrxao~Iya AaOr iWpxaIya ivanamayaaoM kI iSaDyaUla imalaakr kula pa~ta

maah jaUlaa[- 2014 ko AMtr-ajyaIya AMtrxao~Iya ivainamayaaoM ka ivavarNa Anaulagnak 46DETAILS OF INTERSTATEINTER-REGIONAL EXCHANGES FOR THE MONTH OF JULY 2014 Annex-46

k`maaMkFrom To

gauivainaila map`iva]kMila Craivabaao maraiva]kMila gaaovaa dmana dIva da na h [ssaar ] xao~ d xao~ pU xao~ piScama xao~ kulaA InterstateInter-regional Schedules

included in ISGSGUVNL MPPGCL CSEB MSPGCL GOA DD DNH ESIL NR SR ER WR TOTAL

1 gauivainaila GUVNL 2962 31082 34044

2 map`iva]kMila MPPGCL 0000

3 Craivabaao CSEB04

0400

4 maraiva]kM ila MSPGCL 4033 4033

5 gaaovaa GOA 0000

6da na h DNH 0000

7kaorbaa KORBA-III 0000

8 iMjadla pavar JPL 4464 12569 26349 45641 89023

9 ADanaI pavar APL 6061 6061

10 ESSAR MAHAN 1244 52250 53494

11 laonakao Lanco -Pathadi 0000

12 esaIbaIAa[-ela -ACBIL 6093 6093

13 KSK MAHANADI14 DB POWER 16008 17390 0345

15 VANDANA 0480

16 EMCO 3473

17 ESIL18 ena esa pI saI ela NSPCL 13157 28097 41254

19 ]ltarI xao~ NRegion (WR end) 0347 0347

20 dixaNaI xao~ S Region (S Bus) 0000 0000

21 pUvaI- xao~ E Region (WR end) 73271 73271

22 p xao~ WRegion (WR end) 737616 189494 3231057

23 enaTIpIsaI NTPC Injection 5216788

24 enapIsaI NPC Injection 1194327

25 Total ISGS drawal from the Grid incl interregional bi-lateral

2433257 2716560 597587 2741156 286430 174671 437785

B InterstateIR Exchanges not included in ISGS

20 knaa-Tk Karnataka 444 44400

21 yaUpIpIsaIela UPPCL 0000 0000

22 AarvaIpIenaela RVPNL -237 -2370

23 UPPCL ( Excess Drawn From Rajghat 0000 0000

24 kaoTa ]jjaOna Kota - Ujjain 0000 0000

25 kula ba Total B (13 to 17) 0000 -2370 0000 0000 44400 0000 0000 42030

C inavala ivainamaya Net Exchange (12+18) 2433257 2714190 597587 2741156 330830 174671 437785 9429476

D kula Aayaat Total Imp by WR 115648

E kula inayaa-t Total Export by WR 3231057

F inavala ivainamaya Net Exchange (D-E) -3115409

G p xao~ Wara vaIlD jaa- Energy wheeled by WR

26 pU xao~ sao d xao~ kao inayaa-t ER export to SR0000

0000

27 d xao~ sao ] xao~ kao inayaa-t pUxao pxao sao haokr SR export to NR via ERWR0000

0000

28 d xao~ sao ] xao~ kao inayaa-t pxao sao haokr SR export to NR via WR0000

0000

29 pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr ER export to NR via WR0000

0000

30 ] xao~ sao d xao~ kao inayaa-t pxao sao haokr NR export to SR via WR393404

393404

31 pU xao~ sao d xao~ kao inayaa-t pxao sao haokr ER export to SR via WR0000

0000

32 pU xao~ sao d xao~ kao inayaa-t ]xao pxao sao haokr ER export to SR via NRWR0000 0000

0000

33 ]pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr NER export to NR via WR0000

0000

Anaulagnak 47Annex-47

maah jaUlaa[- 2014 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39697 65459

9964 39521

Levels in Mtrs str maITr maoM

]ka[- Ukai

64932

10110

25501

25801

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF JULY 2014

ivavarNa Particulars

Sr No Details of incident (Elements Generation Tripped) Owner Utility Date TimeEffect (Loss of generation Load) if

anyCategory as per

Standards1 Bus Fault at Lonikhand 400 kV Bus 1 MSETCL 04Jul14 315 Nil GI‐22 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 06Jul14 433 load Loss 277 MW GD‐13 Tripping of Multiple Elements from 400220 kV Parli (MSETCL) Ss MSETCL 08Jul14 2359 Nil GI‐24 Poles tripping of HVDC Bhadarwati PGCIL 09Jul14 0350 amp 0504 Nil GI‐25 Tripping in Jejuri and Loanand Area MSETCL 10Jul14 126 Load Loss 400 MW GD‐16 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 11Jul14 349 load Loss 335 MW GD‐17 Blackout at Kawas Ss NTPC 11Jul14 117 Gen Loss 320 MW GD‐18 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 13Jul14 642 load Loss 263 MW GD‐19 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 15Jul14 611 load Loss 264 MW GD‐110 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 16Jul14 334 load Loss 200 MW GD‐111 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 17Jul14 417 load Loss 150 MW GD‐112 Tripping at Gandhar Ss NTPC 21Jul14 1607 Gen Loss 180 MW GD‐113 Multiple time tripping of 765 kV Sasan ‐Satna 2 ckt on Protection Mal‐operation PGCILSASAN 7252014 1026 amp 1229 Hrs Nil GI‐2

List of Grid Disturbances and Grid incidents (GDGI) in July-2014 Western RegionANNEXURE-5

SR NO UTILITIES OCC NO MONTH STATUS REMARK 1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14 HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314 AT MUMBAI BY NTPC MUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514 AT MUMBAI BY WRPC AT RELIANCE

7 WRTS-I 460 Jun-14 HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714 AT RAIPUR BY KWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-1411 RELIANCE SASAN 464 Oct-1412 MADHYA PRADESH 465 Nov-1413 BDTCLJBTCL 466 Dec-1414 NTPC Vindhyachal 467 Jan-1515 ESSAR TRANSMISSIOM 468 Feb-1516 TATA POWER 469 Mar-1517 SUGEN (TPL) 470 Apr-1518 TORRENT POWER 471 May-1519 CGPL 472 Jun-1520 NTPC Korba 473 Jul-1521 NCA 474 Aug-1522 NHDC 475 Sep-1523 NTPC Mouda 476 Oct-1524 KSK 477 Nov-1525 RELIANCE 478 Dec-1526 NTPC SIPAT CG 479 Jan-1627 TAPS-3amp4 480 Feb-1628 ESSAR ESIL 481 Mar-1629 GOA 482 Apr-1630 KAPS 483 May-1631 JPL 484 Jun-1632 DNH 485 Jul-1633 NTPC Mumbai 486 Aug-1634 ADANI TRANSMISSION 487 Sep-1635 INDIAN RAILWAY 488 Oct-1636 WRTS-II 489 Nov-16

ANNEXURE 10

8212014

1

OCC MEETING (462nd )

Power system Operation Corporation Ltd

OPERATIONAL HIGHLIGHTS amp ISSUES

Date 11082014Venue ndash Tarapur

MonthsIEGC Band

FVIlt499 499‐5005 gt5005

March14 1291 4783 3927 012

April14 3064 5233 1703 016

May14 2248 5319 2433 013

Junersquo14 3715 4536 1749 02460

80

100

120Frequency Profile for July 2014Frequency Profile for July 2014

Maximum instantaneous frequency

5036 Hz

on 23rd July 2014 at 1304 hrs

Minimum instantaneous frequency

4941 Hz

on 10th July and 25th July 2014 at 1950 hrs and 1944 hrs respectively

Julyrsquo14 3451 5016 1533 020

0

20

40

60

1‐Jul

2‐Jul

3‐Jul

4‐Jul

5‐Jul

6‐Jul

7‐Jul

8‐Jul

9‐Jul

10‐Jul

11‐Jul

12‐Jul

13‐Jul

14‐Jul

15‐Jul

16‐Jul

17‐Jul

18‐Jul

19‐Jul

20‐Jul

21‐Jul

22‐Jul

23‐Jul

24‐Jul

25‐Jul

26‐Jul

27‐Jul

28‐Jul

29‐Jul

30‐Jul

31‐Jul

Avg Frequency of the month

4993 Hz

1High frequency day due to heavy rain in almost all places in the country low demand was observed(117 GW) Heavy underdrawal by all constituents of WR around 700‐1000 MW during 1300 hrs2 Low frequency day Demand was high and Od by constituents Od by NR

lt499 499‐5005 gt5005

8212014

2

501

502

503

504

Frequency for July 2014

496

497

498

499

50

494

495

1 60 119

178

237

296

355

414

473

532

591

650

709

768

827

886

945

1004

1063

1122

1181

1240

1299

1358

1417

1476

1535

1594

1653

1712

1771

1830

1889

1948

2007

2066

2125

2184

2243

2302

2361

2420

2479

2538

2597

2656

2715

2774

2833

2892

2951

3010

3069

3128

3187

3246

3305

3364

3423

3482

3541

3600

3659

3718

3777

3836

3895

3954

4013

4072

4131

4190

4249

4308

Frequency 499 5005

26000

28000

Unit Outage‐ JULY‐14 Max 26128 MW on 26072014JUNE14 Max 20818 MW on 210714

PLANNED OUTAGE FORCED OUTAGE TOTAL OUTAGE‐JULY14 TOTAL OUTAGE‐JUNE14

10000

12000

14000

16000

18000

20000

22000

24000

26000

MW

0

2000

4000

6000

8000

10000

1‐Jul‐14 6‐Jul‐14 11‐Jul‐14 16‐Jul‐14 21‐Jul‐14 26‐Jul‐14 31‐Jul‐14Date

8212014

3

Energy ConsumptionMax

986 Mus on 2nd July+2975 as compared

to last year900

1000

1100

IN M

Us ‐‐‐‐gt

DAILY CONSUMPTION OF WESTERN REGION(2010‐11 TO 2014‐15)

Min749 Mus on 24th July

500

600

700

800

CONSU

MPT

ION

Apr

May Jun

Jul

Aug Sep

Oct

Nov Dec Jan

Feb

Mar

MONTHS ‐‐‐‐gt2010‐11 2011‐12 2012‐13 2013‐14 2014‐15

Energy Consumption MUDay

Jul‐14 Jun‐14 Jul‐13 Change wrt last month

Change wrt last Year

Average 848 927 712 ‐845 1909Max 986 971 760 156 2975Date 2‐Jul‐14 30‐Jun‐14 2‐Jul‐13 ~ ~

PEAK DEMAND (this month vis-agrave-vis last month)

STATE

CATERED(MW) UNRESTRICTED(MW)

Julyrsquo14 Junrsquo14 Julyrsquo14 Junrsquo14

GUJARAT 13833 13755 13969 13906

MP 7090 7120 7121 7434

CHATTISGARH 3118 3472 3414 3473

Regional Demand met

Max 43034 MW(1st July 1600 hrs)

2540 more than the l

MAHARASHTRA 19283 19452 19385 19755

GOA 459 475 459 482

DD 287 298 287 298

DNH 721 677 721 685

ESIL 532 535 532 535

43034 42934 43419 43802

last year

Min 28431 MW(24th July0500 hrs)

WR TOTAL 43034 42934 43419 43802

Figures shown are Maximums in the month

Demand Met Jul‐14 Jun‐14 Jul‐13 Change wrt last month

Change wrt last Year

Average 35215 40463 32253 ‐1297 918Max 43034 42934 34317 023 2540

Date when Max 1‐Jul‐14 30‐Jun‐14 2‐Jul‐13 ~ ~

8212014

4

Constituents Total Time Block Noof time block Violation of Compilance Violation of Compilancein the month of July Type ‐1 Type‐2

Chhattisgarh 2976 983 6697 927 6885Guajrat 2976 681 77 12 222 92 54

DSM Violation for the Month of July 2014

Guajrat 2976 681 7712 222 9254Madhya Pradesh 2976 528 8226 594 8004Maharashtra 2976 1045 6489 442 8515

Goa 2976 712 7608 1868 3723Daman and Diu 2976 1720 4220 2506 1579

Dadar Nagar Haveli 2976 23 9923 1299 5635

Violation Type‐2 When The drawl does not change sign in 12 consecutive time block

Violation Type‐1 When The drawl is more or less than 12 schedule or 150 MW whichever lesser

Total No of Blocks ‐ 2976

New Elements July 2014a) COMMISSIONING OF NEW GENERATING UNITSSLNO CONSTITUENT UNIT NAME UNIT NO C`ty(MW) DATE TIME

1 IPP(Jay Prakash Nigrie) JNSTPP I 660 150714(sync) 845

b) COMMISSIONING OF NEW TRANSMISSION LINES

SLNO CONSTITUENT LINE NAME CKT NO KV DATE TIME Line length( in km)

1 POWERGRID Wardha‐Aurangabad II 765 372014 2300 347 581 POWERGRID Wardha Aurangabad II 765 372014 2300 34758

2 POWERGRID Wardha‐Aurangabad I 765 572014 1900 34758

3 GETCO Kosamba‐Chorania I 400 572014 2035 230

4 GETCO Kosamba‐Chorania II 400 572014 2105 230

5 BDTCL BDTCL‐Bhopal(MP) I 400 16714 1833 864

6 POWERGRIDLILO of Raipur‐Raigarh‐4

IV 400 1872014 2200 2826 POWERGRIDat KSK

IV 400 1872014 2200 282

7 MPPTCL Indore‐Pithampura II 400 210714 1625 150

8 POWERGRIDDharamjaygarh‐Jharsuguda

I 765 29714 000 14893

9 POWERGRIDDharamjaygarh‐Jharsuguda

II 765 28714 2125 14893

Total ckt Km 189366

8212014

5

c) COMMISSIONING OF NEW ICTS

SLNO CONSTITUENT STATION NAME KV RATIOCAPACITY (MVA) DATE

TIME

1 BDTCL BDTCL(Bhopal)ICT 1 765400 3x500 372014 1657

2 POWERGRID Dharamjaygarh(ICT 1) 765400 3x500 772014 22593 POWERGRID Navasari(ICT 3) 400220 500 872014 1959

d)CO SS O G O C O Sd)COMMISSIONING OF LINE REACTORS

SLNO CONSTITUENT STATION NAME Line Name KVCty(MVAR

) DATETIME

1 BDTCL BDTCL Indore‐BDTCL I 765 3x80 23714 1935

2 POWERGRID DharamjaygarhDharamjaygarh‐Jharsuguda II

765 3x110 280714 2125

3 POWERGRID DharamjaygarhDharamjaygarh‐Jharsuguda I

765 3x110 29714 000

4 POWERGRID Satna Satna‐Gwalior‐II 765 3x80 29714 10005 POWERGRID Aurangabad Padghe Aurangabad 1 765 3x80 310714 22 475 POWERGRID Aurangabad Padghe‐Aurangabad‐1 765 3x80 310714 2247

e)COMMISSIONING OF BUS REACTORS

SLNO CONSTITUENT STATION NAME KVCty(MVA

R) DATETIME

1 POWERGRID Bhatapara 400 125 24714 19562 POWERGRID Indore 765 3x80 31714 18273 POWERGRID Sujalpur 400 125 31714 1205

Congestion Charge was applied 3 times in July 2014 on WR‐NR path ie on12th 14th amp 15th July 2014

8212014

6

5515 5484

5200

5400

5600

Congestion Charge applied on WR‐NR path Dt12714 (Block 3 ‐16)

4200

4400

4600

4800

5000WR‐NR TTC(4900 MW)

WR‐NR ATC(4400 MW)

4000

4200

030

034

038

042

046

050

054

058

102

106

110

114

118

122

126

130

134

138

142

146

150

154

158

202

206

210

214

218

222

226

230

234

238

242

246

250

254

258

302

306

310

314

318

322

326

330

WR‐NR_Act(MW) WR‐NR_TTC(4900 MW) WR_NR_ATC(4400 MW)

2200 00

240000

260000

280000

300000

320000

MW

Maharashtra Sch Vs Drawal‐12714(Block 3‐16)

140000

160000

180000

200000

220000

240000

MW

Gujarat Sch Vs Drawal_12714

200000

220000

3 4 5 6 7 8 9 10 11 12 13 14 15 16

TIme Block

Maharashtra_Sch Maharashtra_Drawal

340000

350000

W

MP Sch Vs Drawal_12714(Block 3‐16)

120000

3 4 5 6 7 8 9 10 11 12 13 14 15 16Time Block

GETCO_Sch(MW) GETCO_Drawal(MW)

750008000085000

CSPTCL‐12714(3‐16)

310000

320000

330000

3 4 5 6 7 8 9 10 11 12 13 14 15 16

MW

TIme Block

MP_Sch MP_Drawal

450005000055000600006500070000

3 4 5 6 7 8 9 10 11 12 13 14 15 16

MW

Time Block

CG_Sch CG_Drawal

Under Drawal By WR constituents during the imposition of Congestion on WR‐NR on 12714

8212014

7

5292

5100

5300

Congestion Charge applied on WR‐NR path Dt14714 (Block 57 ‐71)

4638

4300

4500

4700

4900

5100

WR‐NR TTC(4900 MW)

WR‐NR ATC(4400 MW)

3900

4100

1330

1336

1342

1348

1354

1400

1406

1412

1418

1424

1430

1436

1442

1448

1454

1500

1506

1512

1518

1524

1530

1536

1542

1548

1554

1600

1606

1612

1618

1624

1630

1636

1642

1648

1654

1700

1706

1712

1718

1724

1730

1736

1742

1748

1754

1800

WR‐NR_Act(MW) WR‐NR_TTC(4900 MW) WR_NR_ATC(4400 MW)

3600380040004200440046004800

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

MW

Maharashtra Sch Vs Drawal‐14714(Block 57‐71)

1900

2000

2100

2200

2300

2400

2500

2600

MW

Gujarat Sch Vs Drawal_14714

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

TIme Block

Maharashtra_Sch Maharashtra_Drawal

1800

1900

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

Time Block

GETCO_Sch(MW) GETCO_Drawal(MW)

700

750

800

Chhattisgarh Sch Vs Drawal_141714(Block57‐71)

2600

2700

2800

2900

MW

MP Sch Vs Drawal‐14714(57‐71)

500

550

600

650

700

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

MW

Time Block

CG_Sch CG_Drawal

2400

2500

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

Time Block

MP_Sch MP_Drawal

8212014

8

4630

45004700

Congestion Charge applied on WR‐NR path Dt15714 (Block 50 ‐96)

4463

350037003900410043004500

WR‐NR TTC(4150 MW)

WR‐NR ATC(3650 MW)

31003300

1215

1234

1253

1312

1331

1350

1409

1428

1447

1506

1525

1544

1603

1622

1641

1700

1719

1738

1757

1816

1835

1854

1913

1932

1951

2010

2029

2048

2107

2126

2145

2204

2223

2242

2301

2320

2339

2358

WR‐NR_Act(MW) WR‐NR_TTC(4150 MW) WR_NR_ATC(3650 MW)

3800

4000

4200

4400

4600

4800

MW

Maharashtra Sch Ve Actual on 15714(50‐96)

130015001700190021002300250027002900

MW

Gujarat Sch Vs Actual on 15714(50‐96)

3600

50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96

Time Block

Maharashtra_Sch Maharashtra_Drawal

1300

50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96

Time BLock

GETCO_Sch(MW) GETCO_Drawal(MW)

3500

3700

MP Sch Vs Actual for 15714(50‐96)

850

950

1050

Chhattisgarh Sch Vs Actual‐15714(50‐96)

2700

2900

3100

3300

50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96

MW

Time Block

MP_Sch MP_Drawal

350

450

550

650

750

850

50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96

MW

Time BLock

CG_Sch CG_Drawal

8212014

9

Summary of Grid Events (GD amp GI) in July 2014

Sr No

Details of incident (Elements Generation Tripped) Owner Utility Date TimeEffect (Loss of

generation Load) if any

Category as per

Standards

1 Bus Fault at Lonikhand 400 kV Bus 1 MSETCL 04Jul14 315 Nil GI‐2

2 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 06Jul14 433 load Loss 277 MW GD‐1

3Tripping of Multiple Elements from 400220 kV Parli

MSETCL 08Jul14 Nil GI 23(MSETCL) Ss

MSETCL 08Jul142359

Nil GI‐2

4 Poles tripping of HVDC Bhadarwati PGCIL 09Jul140350 amp 0504

Nil GI‐2

5 Tripping in Jejuri and Loanand Area MSETCL 10Jul14 126 Load Loss 400 MW GD‐1

6 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 11Jul14 349 load Loss 335 MW GD‐1

7 Blackout at Kawas Ss NTPC 11Jul14 117 Gen Loss 320 MW GD‐1

8 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 13Jul14 642 load Loss 263 MW GD‐1

9 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 15Jul14 611 load Loss 264 MW GD‐1

10 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 16Jul14 334 load Loss 200 MW GD‐1

11 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 17Jul14 417 load Loss 150 MW GD‐1

12 Tripping at Gandhar Ss NTPC 21Jul14 1607 Gen Loss 180 MW GD‐1

13Multiple time tripping of 765 kV Sasan ‐Satna 2 ckt on

Protection Mal‐operation PGCILSASAN 7252014

1026 amp 1229 Hrs

Nil GI‐2

S No Name of power

stations

Unit Reason for

outage

1 VSTPS 2 (210 MW) Coal Shortage

91 Operation of grid at high frequency ( gt 505 Hz) even under fuel shortage condition

Issues1 Major ISGSIPP are facing fuel

shortage1 VSTPS 2 (210 MW) Coal Shortage

2 VSTPS 5 (210 MW) Coal Shortage

3 Singhaji 1 (600 MW) Coal Shortage

4 SGTPS 4 (210 MW) Coal Shortage

5 JP Bina 2 (250 MW) Coal Shortage

6 Bhusawal 2 (210 MW) Coal Shortage

shortage2 Expected High Demand during dry

spell in September amp October3 Optimal use of precious fuel is

necessary to tackle the high demand in dry spell

7 Parli 4 (210 MW) Coal Shortage

8 India Bulls 1 (270 MW) Coal Shortage

8212014

10

Agenda 92 Insecure operation Oscillations Power Swingbull N‐1 contingency of 765 kV Tirora‐Akola2 on 10th and 11th June 2014

bull Tirora gen gt 1500 MW AR not operatedbull Intra plant mode of oscillations (097 Hz) with poor damping

bull N‐1 contingency of 400 kV Tirora‐Warora‐1 on 20th May 2014N 1 contingency of 400 kV Tirora Warora 1 on 20 May 2014bull Tirora gen gt 1500 MW 765 kV Tirora‐Akola2 out of servicebull SPS bull Power Swing and loss of complete power station GD‐1

bull The need for transmission augmentation as well as PSS tuning at APML Tirodawas discussed in the 461st OCC meeting

bull Member Secretary WRPC suggested that APML would send details of PSSMember Secretary WRPC suggested that APML would send details of PSS tuning studies to WRPC and they may consult IIT‐Mumbai for assistance and expedite

bull Representative from SLDC Kalwa APL may like to update the progress

Events at APML TiroraCase 3 Date 11‐07‐14 1529 hrsbull Line tripped on Y Phase to earth fault AR was unsuccessful due to persisting faultbull Sudden power transfer through 400 kV System resulted in swing Oscillation of 097 Hz observed across WR and

East West generation in Western region oscillatedO ill i i d f 10 dbull Oscillation persisted for 10 seconds

bull Damping ratio was 257

8212014

11

Events at APML TiroraCase 4 Date 23‐07‐14 0227 hrsbull 765400 kV APML Tirora ICT trippedbull Sudden power transfer through 400 kV System resulted in swing Oscillation of 097 Hz observed across WR

and East West generation in Western region oscillatedO ill i i d f 17 dbull Oscillation persisted for 17 seconds

bull Damping ratio was 7

bull Need for transmission augmentation as well as PSS tunning at APML Tiroda required

bull It has been decided in 461th OCC thatAPML would send details of PSS

Expected date of

tuning studies to WRPC and they may consult IIT‐Mumbai for assistance and expedite Representative from SLDC Kalwa APL may like to update the progress

Expected date of bull 2nd ckt of 765 kV Tirora‐Akola2bull 220 kV network from 400220 kV Warorabull 220 kV network from 765400 kV Akola2 and 765400 kV Taptithandabull 220 kV network from 765400 kV Aurangabad‐PG 400220 kV Pune

Redistribution of Load within Maharashtra system

8212014

12

Elements Date and

Time of

Tripping

Date and

Time of

Restoratio

n

Remarks Receipt of

DREL at WRLDC

Satna Sasan

765 kV Sasan‐Satna 225‐07‐14

1026

25‐07‐14

1155

Protection Mal‐Operation DT at Sasan End

on OV as line remain hanging from Sasan No Yes

Agenda 93 Frequent Tripping of 765 kV Satna‐Sasan line

Issues

1Expedite commissioning of Line Reactor at 765 kV Sasanend

2 Submission of DREL for1026 1155end

765 kV 240 MVAr

Bus Reactor at Satna

25‐07‐14

1026

25‐07‐14

1139

Protection Mal‐Operation DT at Sasan End

on OV as line remain hanging from SasanNo Yes

765 kV Sasan‐Satna 225‐07‐14

1342

25‐07‐14

1342

Line got charged from Satna and

synchronized at Sasan end but immediately

DT was received at Sasan from Satna and

Line tripped Prior to tripping voltage at

No Yes

2 Submission of DREL for event analysis in line with CEA standards IEGC

3 Threat to grid security and constraints in evacuation from large generation complexarising from frequent undesirable tripping particularily

Sasan end was 796 kV

765 kV Sasan‐Satna 225‐07‐14

1628‐

Charging attempt was taken from Satna end

but line tripped before synchronization at

Sasan end due to DT from Satna Open end

voltage at Sasan 826 kV for the line

No Yes

The above was a narrow miss because the tripping occurred when one of the bus was under shutdown Fortunately during theabove period only two units of Sasan were in service and the second 765 kV bus remained in service else the situation would havebeen a serious threat to the system security

during protection testing construction activities

The progress of reactor commissioning at Sasan over the last 8 months is given under

Schedule in formed in meetings

SN 451st OCC 455th

OCC

456th OCC 457th 458th 459th 460th 461st

1 Line reactor By Dec By April By May By June End of June End of By By

of 765 kV

Sasan‐Satna

ckt‐2

y

2013

y p

2014

y y

2014

y

2014(Testing under

progress)

2014 (As per

joint report

post site visit

on 26314)

June 2014

y

Aug‐

2014

y

Aug‐2014

2 765kV Bus‐1

Reactor

Jan 2014 By Mar

2014

By June

2014

By June

2014(Testing under

)

End of July

2014(As per

j i t t

End of July

2014

By

Sep‐

2014

By

Sep‐2014

Sasan may intimate the progress in reactor commissioning to the sub-committee

progress) joint report

post site visit

on 26314)

2014

8212014

13

Item no94 SPS at Sipat

bull The SPS scheme implemented at NTPC Sipat received at WRLDC

bull It is observed that a time delay of 15sec is provided to unload units 1 2 4 amp5 each by 150MW if ICT l d d 130 f t d l dany ICT s load exceeds 130 of rated load

bull As per decision of WRPC meeting on 18314 if ex‐bus generation at Sipat is more than 2200 MW immediate unloading of units were decided and the intentional delay provided needs to be re‐ examined (Maximum 2‐3 sec delay may be appropriate) as unloading by 150MW would also take another 4‐5sec

8212014

14

Contingency Envisaged SPS action Identified FeedersTripping of any oneICT at 400200 VapiSub‐Station

Automatic LoadShedding of 100MW

DNH 1) 66 kV‐Kharadpara‐Rakholi‐I 50 MW2) 66 kV Khadoli‐Khadoli‐3 30 MW

Item No95 SPS at 400220 kV Vapi(PGCIL) Item No912

DD1) 66 kV Magarwada‐Kachigam 60 MW

It was apprised by representatives from DD amp DNH in the 459th OCC meeting that the above scheme shall be implemented within a month

UT DDDNHmay apprise the status of commissioning of the envisaged SPSUT‐DDDNH may apprise the status of commissioning of the envisaged SPS

Item no96 Addressing High Voltage condition in SSP amp nearby area Sl No Line No of Times tripped in Julrsquo141 400 kV SSP‐Dhule‐I 32 400 kV SSP ‐ Rajgarh‐ I 2

Issues1 Multiple tripping of

feeders emanating from SSP

2 S l tiSl No Line No of occasions kept open on HV 2 Several emanating feeders being kept open on high voltage in SSP amp nearby area

Sl No Line No of occasions kept open on HV

1 400 kV SSP‐Dhule‐I 9

2 400 kV SSP‐Dhule‐II 6

3 400 kV SSP ‐ Rajgarh‐ I 1

4 400 kV SSP ‐ Rajgarh‐ II 1

bull Operating RBPH machines in synchronous condenser mode during offOperating RBPH machines in synchronous condenser mode during off peak hours

bull Reactor commissioning at Rajgarh amp Dhule to be expedited by WRTS‐II(PGCIL) amp MSETCL

bull Absorption of MVAr by Wanakbori WTS

8212014

15

1 Voltage at Wanakbori was gt420 kV for 100 the time during Julrsquo14

2 WTPS units 567 are injecting MVAR (~ 60 MVAR) at Voltage gt 420 kV

3 Absorption of MVAR by WTPS units is expected during the high voltage condition at WTPS amp nearby area

97Status of implementation of UFRWestern Region

States Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Stage - I 492 Hz Stage - II 490 Hz Stage - III 488 Hz Stage - IV 486 Hz

relief GUJARAT 580 773 580 726 580 1117 590 1025MADHYA PRADESH 460 468 460 450 460 460 465 490CHATTISGARH 150 110 150 114 155 117 155 91MAHARASHTRA 805 1108 810 1200 815 765 820 851GOA 25 25 25 25 25 25 25 25UT DD 10 15 15 15 UT DNH 30 30 35 35 Total load relief 2060 2484 2070 2515 2085 2485 2105 2482

Not received

DD and DNH have not implemented any stage of AUFLS

DD and DNH may appraise the status

Real‐time monitoring of the likely relief available from AUFLS at any given instant mandated by CERC

Telemetry to be provided at SLDC amp RLDC

Not received

8212014

16

Agenda 98 ADMS (Automatic Demand Management Scheme) Implementation as per Sec 542 of IEGC

As per CERC order dt06062014 the target of fully implementation of scheme is by January2015Constituents have to submit bi‐monthly progress report to WRPC Secretariat with a copy to the Commission and WRLDCMP has submitted its detailed action plan in the form of an affidavit to CERC for implementation of ADMS However SLDC MPPTCL is requested to furnish data to OCC forum in the above format

Item No 99 Status of Telemetry in WR

Telemetry Issuesdoc

8212014

17

Item No 910 Black Out at NTPC Kawas Power Station

bull On 11th July 2014 Kawas Gas generating complex got blackout due to tripping of evacuation lines one by one

within a short span of 30 minutes

bull The complete loss of evacuation lines occurred at 0117 Hrs The blackout has resulted in tripping of GT1A

GT1B and ST causing 320 MW generation loss in the area It was reported that weather condition was foggy with

slight drizzling was in the area

LineTime of Tripping

Kawas End Remote endRestoration Time

220 kV Kawas‐Navsari1

1246 AM

R phase to EF

Fault location 2 km

R Phase to EF

122 AM

220 kV Kawas ndashNavsari2

112 AMR phase to EF

Fault location 2208 km

R Phase to EF 347 AM

220 kV Kawas‐Haldarwa 1

107 AMR phase to EF

Fault location 16 km

R Phase to EF 246 AM

220 kV Kawas‐ R phase to EF R Phase to

bull Line restoration has failed on several attempt as the lines

were not holding due to persisting fault

bull Such an event of total loss of evacuation lines from a

generating station resulting in blackout scenario is a

matter of serious concern

bull WRTS-2 may kindly send the reasons for such faults

which has caused the incidence and the remedial action

taken in this regard220 kV Kawas‐Haldarwa 2

108 AMp

Fault location 2 kmEF 304 AM

220 kV Kawas‐Icchapur1

108 AM B phase to EFB Phase to EF

301 AM

220 kV Kawas‐Icchapur2

108 AMB phase to EF Faultlocation 356 km

B Phase to EF

331 AM

220 kV Kawas‐Vav 1 117 AMNo tripping

Hand Tripped laterLine Tripped 225 AM

220 kV Kawas Vav 2 117 AM Y Phase to EFY Phase to EF

317 AM

taken in this regard

bull Disturbance Recorder (DR) and Event Logger(EL) out

puts are yet to be received from WRTS-2

bull As per IEGC the information like DREL output relay

indications amp sequence of events etc must be sent to

RLDCRPC by 24 hrs of the event WRTS-2 may kindly

expedite amp furnish the information to WRLDC amp WRPC

Item No 911 Operating Procedure of WR-2014

The operating procedure of Western Region 2014 has been updated on 31072014 and the p g p g psame has been uploaded on WRLDC web site at the following link

httpwwwwrldccomdocsWR_OPERATING_PROCEDURE_2014pdf

8212014

18

Item No 12 Mock Black start Exercise

Station Name Date Proposed Remarks

Mock Black Start Plan for the following stations has been received by WRLDC

CLPIPL Gas Power Plant 29‐Jun‐2014 ‐

Gandhar Gas Power Plant 27‐July‐2014 ‐

Other Utilities may update the sub‐committee regarding their plan for black start exercise

SL No Name of the Station Remarks

1 Bargi DG set under outage

2 TONS Governor Problem

3 Birsinghpur Governor Problem

Healthiness of DG sets

3 Birsinghpur Governor Problem

4 Medikheda Governor Problem

5 Rajghat Governor Problem

1 Outage of DG set for longer period is matter of serious concern 2 SLDC Jabalpur may apprise the present status2 SLDC‐Jabalpur may apprise the present status3 Possibility of procurement of stand‐by DG sets to be examined to take care of such prolonged outage of DG sets which virtually renders the black start facility sterile4 There is need for blackstart generator planning in W3 area Thermal IPP generators are disconnected from state grid and there is no hydro station So with only UHV lines and large thermal units system restoration post disturbance would be extremely challenging for Chattisgarh

8212014

19

Maharashtra

Madhya Pradesh

Item No13 Review of list of feeders for load regulation in emergency

Gujarat

DD amp DNHChattisgarh

Goa

bull Decided during the 461st OCC that list ofDecided during the 461st OCC that list of

feeders identified for load control under

emergency measure for safeguarding grid

security would be reviewed in a special

meeting The list is yet to be reviewed

8212014

20

Item No 14 Implementation of voltage and time grading on OV relays to prevent tripping of multiple EHV lines emanating from single node on high voltage

bull During the 461st OCC it was informed by Power Grid representative that they have already implemented voltage grading in various line emanating from the same node (matter has not come in the MoM)

bull Power Grid amp other utilities may kindly intimate the present status of voltage grading at their respective sub‐stations

Power Station Number of instances

when the SPS signal

was received at the

station

Number of instances

when the action by

the generators was

adequate

Number of instances

when the automatic

generation reduction was

done partially

JPL 53 0 50

Item No 15 SPS for SR‐WR Inter Connection Inadequate Participation by Generators

Issues

1 10 times operation of SPS‐1 causing backing down at JPL amp KSK during 1714 to 7 8 14JPL 53 0 50

KSK 53 0 36

APML 35 0 30

Mouda 35 0 0

Koyna 0 0 0

Koradi 0 0 0

Khaparkheda 0 0 0

Chandrapur 0 0 0

to 78142 Participation by other envisaged

generators to be expedited3 PGCIL may update status of Extention of

SPS signal from Solapur(PG) to the additional generators identified for participation

4 Decided in 461st OCC to have special Chandrapur 0 0 0

DB Power 0 0 0

NSPCL 0 0 0

Balco 0 0 0

Lanco 0 0 0

KWPCL 0 0 0

pProtection Sub‐Committee meeting to discuss progress of implementation of the revised SPS at Solapur (for WR‐SR interconnection) amp extension of signal from Sholapur to additional generators in WR

8212014

21

Thank you

DiscussionhelliphelliphellipDiscussionhelliphelliphellip

  • 462 occ_minutepdf
  • participants list_462 OCC meeting 110814pdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 26-7pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 45pdf
  • 46pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84pdf
  • 84apdf
    • 26wrpc_minute 107pdf
    • 26wrpc_minute 108pdf
    • 26wrpc_minute 109pdf
    • 26wrpc_minute 110pdf
    • 26wrpc_minute 111pdf
    • 26wrpc_minute 112pdf
    • 26wrpc_minute 113pdf
      • 85pdf
      • 87pdf
      • 98pdf
      • 913pdf
      • 10pdf
Page 10: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR

10

462nd OCC MINUTES

It was suggested by WRLDC and constituents that important list of line will be sent by

each constituent to WRLDC and WRLDC will compile and furnish the list as per

priority of commissioning

The Sub-Committee noted and agreed as above

73 Commissioning of new Generating units in Western Region and the capacity expected to be commissioned during the current year 2014-15

The status regarding Generating units expected to be commissioned during the

current year 2014-15 is as below

Name of the Power Projects Unit No Capacity (MW)

Date of Commissioning Schedule Date

GUJARAT Bhavnagar Lignite TPP-JV I 250 August 2014 II 250 August 2014 UNO SUGEN 2 3825 July 2014 CHHATTISGARH Marwa 1 500 Sept 2014 2 500 Dec 2014 MAHARASHTRA Dhariwal 2 300 Synd On 23042014 CHANDRAPUR 8 500 Oct 2014 CHANDRAPUR 9 500 March 2015 KORADI 8 660 Oct 2014 KORADI 9 660 Jan 2015 PARLI 8 250 March 2015 MADHYA PRADESH Singhaji TPS 2 600 Oct-2014 Ms Jhabua Power Seoni 1 600 Dec ndash 2014 MB Power Anuppur 1 600 Sept ndash 2014 Jaiprakash Power Nigri 1 660 July 2014 Jaiprakash Power Nigri 2 660 Dec 2014 Moser Bear (Hindustan power) 1 600 Nov- 2014 Moser Bear (Hindustan power) 2 600 March 2015 Essar Concessional ampEssar Power 1 600 Oct 2014 Essar Concessional ampEssar Power 2 600 Dec 2014 BLA 2X4 90 March 15 Jhabua Power 1 600 Dec 2014 CENTRAL SECTORIPP KSK 2 600 August 2014 KSK 5 600 January 2015

11

462nd OCC MINUTES

ACBIL 1 300 March 2015 SASAN 5 660 July 2014 SASAN 6 660 August 2014 Sasan 4 660 Synchronized in May 2014

Sub-committee noted as above ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS (A) FOLLOW-UP ITEM NO 81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

All the constituents are requested to submit the CMP report for the First quarter

(April 2014 to June 2014) for the year 2014-15

The Sub-Committee members noted as above ITEM NO 82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR

Status of physical amp cyber security in Power Sector for the First quarter (April 2014 to

June 2014) for the year 2014-15 have not been received from some of the

constituents

The Sub-Committee members noted as above ITEM NO 83 PROCEDURE FOR CALCULATION OF TRANSMISSION SYSTEM

AVAILABILITY FACTOR FOR A MONTH AS PER CERC REGULATION 2014-19

Member Secretary WRPC informed that a procedure for calculation of

transmission system availability factor as envisaged in CERC Regulation 2014-15

was discussed in 461st OCC held at Raipur Various aspects were discussed and

finalized However there were concerns expressed by transmission licensee

regarding addition of 12 hrs to outage hrs after each tripping beyond admissible 2

tripping in a year as it will reduce availability below 95 Also concern was

expressed for multiplying outage hrs by 2 for line affecting generation Also

whether addition of 12 hrs is applicable to such lines affecting generation was

also expressed Whether these clauses are applicable to HVDC system was not

known Therefore all such concerns of transmission licenses have been taken up

with CERC for revision clarification

Meetings were held on 1st and 4th August 2014 with transmission licenses

regarding verification of data data formatting and sorting out various anomalies

and doubts for data from April to July 2014 for further processing at WRPC end

12

462nd OCC MINUTES

Member Secretary WRPC informed that certification for some transmission licensees

has already been done The certificate for PGCIL is to be issued as effect on

generation evacuation certificate from WRLDC is awaited

CM WRLDC requested all the transmission licensees to submit the data to WRLDC in

same format as submitted to WRPC

Representative from Transmission licensees agreed the same

The Sub-committee noted as above ITEM NO 84 IMPLEMENTATION OF RSD METHODOLOGY Shri Satyanarayan SE WRPC informed that GM (OSampC) NTPC HQ-I Mumbai vide letter dated 28072014 (copy enclosed at annexure 84) requested to call a meeting for resolvingclarification of methodology developed by WRPC The procedure for RSD framed by WRPC is enclosed at Annexure 84A SLDC MPPTCL Jabalpur informed that RSD was implemented for NTPC Mauda unit

on 18072014 but it was not more extended beyond 20072014 as no other major

beneficiaries agreed for extension

CE GETCO informed that intermittent rain profile in the different geographical area of

Gujarat amp increasing demand pattern didnrsquot permit them to take RSD of any NTPC

units as minimum of 3 days is required

Representative from SLDC Maharashtra also endorsed the Gujarat view points on

RSD

GM NTPC requested to the committee that if RSD wasnrsquot possible then at least

technical minimum schedule should be given

Member Secretary WRPC summarized the matter as follows

1 RSD was implemented for NTPC Mauda unit from 18072014 to 20072014

but it could not be extended due to increasing demand pattern amp uncertainty of

rain profile in the region

2 The method framed by WRPC shall be continued amp will be applied as and

when required

3 He requested constituents to schedule the NTPC generating units at its

technical minimum in case RSD is not feasible

The Sub-committee noted as above

13

462nd OCC MINUTES

ITEM NO 85 LOAD FORECASTING IN WESTERN REGION Background- As per the amended Indian Electricity Grid Code that is effective from 17th February 2014 the SLDCs SEB distribution licensees shall always restrict the net drawal of the State from the grid within the drawal schedule keeping the deviations from the schedule within the limits specified in the Deviation settlement mechanism regulations Therefore it is imperative that adequate attention may be paid towards load forecasting The matter was discussed in the past several OCC as well as in the 26th TCCWRPC board meeting wherein it was decided to create a task force for exploring development of a software for load forecasting A meeting was held on 03042014 under leadership of CE(SLDC) GETCO Gujarat at

Mumbai The outcome of the Meeting was as following

1 Short term action a) all the discoms were advised to provide maximum historical data b) Discoms have to bifurcate the geographical area in to zone and derive effect of temp rain festival on load

2 Long term action a) Provide computer base meters up to all the distribution feeders for close monitoring b) Provide weather sensors at various strategically important locations c) Formulation of forecasting desk (load amp RE) at SLDC level

The 2nd meeting regarding Load Forecasting Mechanism was held with members of WRPC WRLDC Western Region SLDCs amp State Discoms Forecasting Service Providers (FSPs) on 110614 at SLDC Vadodara Gujarat During the 460th OCC meeting CE SLDC GETCO informed that roadmap for implementation of pilot project amp main project has been prepared Budget proposal have already called from FSP amp they assured to submit till the end of the month For implementation of pilot project the Utility and their respective Pilot FSP are decided as tabulated below

Sr No STATE ndashSLDCDISCOM Pilot FSP

1 GUJARAT MS TESLA

2 MAHARASHTRA IIT MUMBAI

3 MADHYA PRADESH MS METEOLOGICA

4 CHHATISGARH MS SAS

5 GOA MS MARCADOS

6 DDDNH IITGANDHINAGAR

MP informed vide letter dated 27062014(copy enclosed at 85) that they have

already placed on order to Ms L amp T InfoTech on 12072013 for load forecasting

software project Therefore MP had requested to exclude them from pilot project

activities decided in earlier meetings

14

462nd OCC MINUTES

462nd OCC Discussions- State wise status is as under -

bull CE SLDC informed that Gujarat has prepared the NDA and forwarded to TESLA for signing and the same was signed by TESLA New Zealand office and their Mumbai office shall forward the same to SLDC Gujarat Thereafter Input data shall be provided and ID shall be provided to TESLA so as to start forecasting by them

bull SLDC Gujarat vide letter no SLDCCEMIST-6458 dtd 270614 has conveyed to all WR Nodal SLDC coordinators regarding progress of load forecasting pilot project Thereafter also e mailed on date 2082014 to all Nodal SLDC for submission of status Report on Pilot Load Forecasting Project However no proper response is received so far

bull MP SLDC conveyed that they have already awarded contract for load forecasting and the same is expected to be available by year end Therefore MP shall not participate in the present scheme

bull SLDC Chhattisgarh representative informed that matter has been taken with discom Chhattisgarh Discom were facing difficulties to contact with coordinator of Ms SAS

CE SLDC Gujarat being a group leader stated that Chhattisgarh shall intimate to them for further needful and would help them in this matter

bull Maharashtra SLDC informed that there was a meeting held on 09082014 with IIT Bombay where availability of data has been discussed amp one more meeting will be held on 22082014 outcome of the same will be intimated in next OCC meeting BEST amp TATA are already having such forecasting system

bull No one from GOA has attended last meeting even though GOA was forwarded copy of MOM Due to non availability of any coordinator details of GOA it was not possible to contact them However Ms Marcadose has also conveyed that he has not been contacted by Goa

bull No one from DDDNH has attended last meeting even though DD DNH was forwarded copy of MOM However IIT Gandhinagar conveyed that they were not been contacted by DD DNH

Member Secretary WRPC informed that a letter to DD DNH amp GOA has been written

from WRPC secretariat regarding implementation of ADMS Load Forecasting amp

telemetry status He further requested the constituents to implement the decision

taken in earlier meeting of load forecasting

OCC suggested that the next load forecasting meeting may be held at DDDNH

The Sub-committee noted as above

15

462nd OCC MINUTES

ITEM NO 86 NEED OF COOPERATION FROM WRLDC IN REAL TIME

bull CE SLDC informed that at present APL is under their control area and embedded scheduling model is used It may be noted that for units 78amp 9 at APL Gujarat has no share (all are for NR beneficiaries)There have been occasions when units 78amp 9 have tripped (given at annexure) Since APL is shown as embedded in Gujarat WRLDC requested Gujarat to reduce overdrawl when APL units 78amp 9 trips Hence Gujarat has to pick up state generationcostlier generation for no fault of Gujarat

bull Further lines are opened to curtail overdrawl when Gujarat is not faulty Gujarat is seen as overdrawing (due to embedded scheduling of APL) when APL trips

bull To complicate matters the scenario coupled with wind variations state generation has to be constantly varied to avoid overdrawl

Gujarat requested followings-

1 When large sized units (APL units 78amp 9) trips then scheduling of Gujarat should be changed with immediate effect OR Gujarat should not be pursued for deviation correction to the extent of schedule of units tripped at APL units 78amp 9 OR Schedule of Gujarat from other central sector stations should be changed as per their request with immediate effect

2 APL units 78amp 9 should be made a separate control area 3 Under above circumstances transmission lines should not be opened

due to default by APL as these affects Gujarat without any fault of their own Further this was done without informingtaking SLDC into confidence It was clear from the discussions that Gujarat Discoms are put to unnecessary financial implications WRLDC clarified that 220 KV Dehgam- Khanpur Line no1 was opened due to frequency touching 493 Hz and control of overdrawl was taken as security measure WRLDC agreed to inform CE SLDC whenever such discussions are taken and agreed to take care in future

The Sub-committee noted as above

ITEM NO 87 GUIDE LINES FOR SPLIT BUS OPERATION AT SSP RBPH SWITCHYARD CE SLDC Gujarat vide letter dated 07082014 informed that a meeting was held on

220514 at Kevadia Colony SSP regarding split bus arrangement at SSP RBPH

16

462nd OCC MINUTES

switchyard and subsequent discussions during 55th meeting of PSC of NCA held in

Vadodara on 140714 the guidelines for the same had been prepared in consultation

with GETCO protection wing and sent vide mail dated 23072014 However the same

has been attached herewith as Annexure-87 It was clarified during discussion that

split bus operation would be used only as per requirement and will not be a permanent

arrangement

The Sub-committee noted as above

ITEMS FROM WRLDC

1 OPERATION OF GRID AT HIGH FREQUENCY ( gt 505 HZ) The onsetrevival of monsoon in the last fortnight of July 2014 has reduced the demand in Western Region However the demand would pick up sharply during the dry spell in September and October months Presently the major State Central Sector IPP generators in Western Region that are facing coal shortage are tabulated as under S No Name of power

stations Unit Reason for

outage 1 VSTPS 2 (210 MW) Coal Shortage 2 VSTPS 5 (210 MW) Coal Shortage 3 Singhaji 1 (600 MW) Coal Shortage 4 SGTPS 4 (210 MW) Coal Shortage 5 JP Bina 2 (250 MW) Coal Shortage 6 Bhusawal 2 (210 MW) Coal Shortage 7 Parli 4 (210 MW) Coal Shortage 8 India Bulls 1 (270 MW) Coal Shortage Likewise several Gas Power Stations in Western Region are facing fuel shortage Under the above circumstances it is desirable that precious fuel optimally utilized to maintain adequate stock for the dry spell In the month of July 2014 the grid frequency remained above 5005 Hz for more than 15 of the time while it remained below 499 Hz for more than 34 of the time Operation of high frequency is unnecessary loss of fuel that could have been conserved and utilized during low frequency regime

The Sub Committee noted the same

17

462nd OCC MINUTES

2 OBSERVATION OF INTRA-PLANT MODE OF OSCILLATIONS (097 HZ) WITH POOR DAMPING ON 10TH AND 11TH JUNE 2014 AND LOSS OF 1800 MW IN MAHARASHTRA SYSTEM DUE TO POWER SWING UNDER N-1 CONTINGENCY ON 20TH MAY 2014 The issue of Intra plant mode of oscillations with poor damping as observed during the grid event on 10th and 11th June 2014 was discussed during the 461st OCC meeting Similar oscillations were again recorded on 11th July 2014 GM WRLDC informed that they have written to generators seeking details of MW fluctuations PSS status etc and requested constituents to share the dataHe requested that constituents may share PMU data also CESLDC Gujarat informed that they are proposing PSS tuning with consultants from IITs in their system EE SLDC Maharashtra informed that APL-Tiroda has recently tuned PSS at Tiroda units by OEM

It was once again requested constituent to furnish information as designed by WRLDC The Sub Committee noted the same

3 FREQUENT TRIPPING OF 765 KV SATNA-SASAN LINE

WRLDC informed that 765 kV Sasan-Satna Line has tripped on three occasions

while 240 MVAr Bus Reactor at 765 kV Satna tripped on one occasion The

tripping occurred due to protection mal-operation at Satna end during stability test

for the 765 kV Bus-1 The details of the tripping is given below

The above OV at Sasan end could have been avoided if the Line Reactor of this line at Sasan end had been commissioned The restoration of the tripped circuit also was considerably delayed in the absence of Line Reactor at Sasan end

Elements Date and Time of Tripping

Date and Time of Restoration

Remarks Receipt of DREL at WRLDC Satna Sasan

765 kV Sasan-Satna 2

25-07-14 1026

25-07-14 1155

Protection Mal-Operation DT at Sasan End on OV as line remain hanging from Sasan end

No Yes

765 kV 240 MVAr Bus Reactor at Satna

25-07-14 1026

25-07-14 1139

Protection Mal-Operation DT at Sasan End on OV as line remain hanging from Sasan

No Yes

765 kV Sasan-Satna 2

25-07-14 1229

25-07-14 1342

Line got charged from Satna and synchronized at Sasan No Yes

18

462nd OCC MINUTES

end but immediately DT was received at Sasan from Satna and Line tripped Prior to tripping voltage at Sasan end was 796 kV

765 kV Sasan-Satna 2

25-07-14 1628 -

Charging attempt was taken from Satna end but line tripped before synchronization at Sasan end due to DT from Satna Open end voltage at Sasan 826 kV for the line

No Yes

Representative from Sasan UMPP informed that with regards to the 765 kv Line and

Bus reactors all the material required for completion of works have been received at

site

Line reactor and bus reactor would be commissioned by Aug14 and Sep 14

respectively

The Sub Committee noted the same 4 SPS AT SIPAT

The SPS scheme implemented at NTPC Sipat has been received at WRLDC It is observed that a time delay of 15sec is provided to unload units 1 2 4 amp5 each by 150MW if any ICT s load exceeds 130 of rated load It was conveyed that if ex-bus generation at Sipat is more than 2200 MW immediate unloading of units may be done and the intentional delay which is required to prevent mal-operation may be 45 second instead of 15 second

NTPC Sipat representative agreed to implement the same accordingly The Sub Committee noted the same

5 COMMISSIONING OF SPS AT 400220 KV VAPI During the special WRPC meeting on 18032013 at Dadra an SPS for automatic load shedding subsequent to tripping of 400220 kV ICT at Vapi was approved as under It was decided that POWERGRID would extend trip signal from Vapi ICTs to the requisite feeders

Contingency Envisaged SPS action

Identified Feeders

Tripping of any one ICT at 400200 Vapi Sub-Station

Automatic Load Shedding of 100MW

DNH 1) 66 kV-Kharadpara-Rakholi-I 50 MW 2) 66 kV Khadoli-Khadoli-3 30 MW DD 1) 66 kV Magarwada-Kachigam 60 MW

19

462nd OCC MINUTES

It was felt that due to change in topology loading in ICT is not critical however SPS may be in place as defense mechanism in case of any emergency

DD amp DNH representative were absent in the meeting The Sub Committee noted the same

6 ADDRESSING HIGH VOLTAGE CONDITION IN SSP amp NEARBY AREA

High voltage condition is being observed at SSP and nearby area in off peak period particularly between 2300 hrs at night to 0500 hrs in the morning Also on many occasions the system operator is compelled to hand trip the 400 kV lines emanating from SSP to control over voltage Summary for the month of Julyrsquo14 is given under

Sl No 400 kV Line DatailsFrom To

Time Date Time Date 1 SSP-RAJGARH-I 0009 19-Jul-14 0730 29-Jul-14 2 SSP - RAJGARH-II 0406 16-Jul-14 1016 18-Jul-14 3 SSP-DHULE-I 1310 22-Jul-14 0953 23-Jul-14 4 SSP - DHULE - II 1533 15-Jul-14 0734 18-Jul-14 5 SSP - DHULE - I 1703 10-Jul-14 1100 11-Jul-14 6 SSP-DHULE-I 1712 28-Jul-14 0933 31-Jul-14 7 SSP - DHULE - II 1730 19-Jul-14 0917 20-Jul-14 8 SSP - DHULE - I 1757 18-Jul-14 0935 19-Jul-14 9 SSP-DHULE-II 1809 21-Jul-14 0914 22-Jul-14 10 SSP-DHULE-I 1815 30-Jun-14 0542 1-Jul-14 11 SSP-DHULE-I 1819 20-Jul-14 0858 21-Jul-14 12 SSP-DHULE-II 1825 8-Jul-14 0949 9-Jul-14 13 SSP - DHULE - II 1831 11-Jul-14 1007 13-Jul-14 14 SSP - DHULE - I 1838 1-Jul-14 0556 2-Jul-14 15 SSP - DHULE - I 1848 9-Jul-14 0912 10-Jul-14 16 SSP - DHULE - I 2136 13-Jul-14 0850 14-Jul-14 17 SSP-DHULE-II 2201 23-Jul-14 0945 28-Jul-14

Also it has been observed that Wanakbori TPS injects around 60 MVAr per unit even when voltage at Wanakbori is above 420 kV for nearly 100 of the time Further envisaged bus reactors at Rajgarh amp Dhule are yet to be commissioned Hence in view of system reliability it is advisable to explore all possibilities to contain high voltage condition in SSP and nearby area The following actions need to be taken to address the situation

bull Operating RBPH machines at SSP in synchronous condenser mode bull Absorption of MVAr by Wanakbori (WTPS) units bull The commissioning of Reactors at 400 kV Rajgarh may be expedited by

WRTS-2

20

462nd OCC MINUTES

bull The commissioning of Reactors at 400 kV Dhule may be expedited by MSETCL CE SLDC GETCO agreed for looking into absorption of MVAR at Wanakbori

7 IMPLEMENTATION OF THE REVISED AUFLS IN DD AND DNH Representatives from the DD and DNH intimated during the 459th OCC meeting that the tendering process was stalled because of general elections (election code of conduct was in force) amp action would be initiated post the elections Member Secretary WRPC vide letter dated 01082014 took up the matter with Secretary (P) DDDNH (copy enclosed) DD amp DNH representative were absent in the meeting to comment

The Sub Committee noted the same 8 ADMS(AUTOMATIC DEMAND MANAGEMENT SCHEME) IMPLEMENTATION

AS PER SEC 542 OF IEGC The format for reporting the progress of implementation of the ADMS in Western Region States was given as part of MoM of the 461st OCC meeting All utilities may like to furnish the updated status to WRPCWRLDC as per the above format It is understood that MP has submitted its detailed action plan in the form of an affidavit to CERC for implementation of ADMS However SLDC MPPTCL is requested to furnish data to OCC forum in the above format

The Sub Committee noted the same

9 STATUS OF TELEMETRY IN WESTERN REGION

In the 460th amp 461st OCC meetings the status of telemetry in Western Region was discussed in detail It was also highlighted that the Honrsquoble CERC vide its order in petition SM0072014 issued Notice under section 142 on several constituents of Western Region All the constituents had assured to address the telemetry issues within a month or two The telemetry status as on 4th August 2014 is tabulated below

21

462nd OCC MINUTES

a Maharashtra The non-availability of telemetry is 583 for sub-stations amp 18

for generating stations This is a matter of serious concern The issue has been

discussed in several OCC meetings since last 8 months As per the information available with WRLDC telemetry is not available from the following generating stations at 400 kV level

bull Kaparkheda bull Deepnagar

Also telemetry is not available from the following sub-stations at 400 kV level bull Warora bull Lonikhand(New) bull Chandrapur-stg-II

As per the information available with WRLDC telemetry is intermittent at 4 generating stations viz

bull Jaigad bull Paras-extension bull Trombay bull Deepnagar GCR

Also telemetry is intermittent at following sub-stations at 400 kV level bull Bableswar-II bull Deepnagar SS bull Dhule bull Khaparkheda bull Kolhapur-3

22

462nd OCC MINUTES

bull Sholapur-3 SLDC MSETCL Maharashtra informed that telemetry has been established for 46 locations

a Chhattisgarh100 available b Madhya Pradesh As per the latest status telemetered data is available from

100 of the locations c Gujarat As per the latest information submitted to CERC the non-availability of

telemetry data from Gujarat as on date is 33 for substations As per the information available with WRLDC Telemetry is not available form 2 number of 220 kV sub-stations viz bull Bhatiya bull Mokha Gujarat intimated in 460th OCCM that these sub-stations were ready but lines were in construction phase Also telemetry is intermittent from the following SS in Gujarat bull 220 kV Navasari (GETCO) ss bull 400 kV Kasor ss

SLDC GETCO may expedite amp resolve the issue for the above stations at the

earliest d Goa As per the latest information telemetry is not available form 2 number of

220 kV sub-stations viz Amona amp Cuncolim Telemetry is intermittent from 220 kV Tivim Ponda Xeldam amp 110 kV Kadamba amp Verna Thus Non availability of telemetry from Goa is 100 Goa to resolve the issue on war footing

e DD Telemetry is not available form 1 number of 220 kV sub-station viz Magarwada Thus availability of telemetry from DD is NIL DD representative intimated in 460th OCCM that RTU was being installed at 220 kV Magarwada SS under the new SCADAEMS up gradation project amp it would take 3 months to complete the work DD representative was absent in 461st OCCM so information on progress in this matter is yet to be received from DD DD to expedite the issue for the above station(s) on war footing

f DNH Telemetry is not available form 2 number of 220 kV sub-station viz Kharadpara amp Khadoli Thus availability of telemetry from DNH is NIL DNH representative was absent in 460th amp 461st OCC meetings to comment on the issue DNH to resolve the issue for the above station(s) on war footing

g ISGS As per the latest information submitted to CERC the non-availability of telemetry data from ISGS generating stations as on date is 125 Telemetry is intermittent from 220 kV Kawas(NTPC) station Power Grid NTPC to expedite

23

462nd OCC MINUTES

NTPC amp Power Grid agreed to expedite the matter during 460th amp 461st OCC meetings of WRPC However no progress has been reported

h POWERGRID As per the latest information submitted to CERC the non-availability of telemetry data from Power Grid substations as on date is 111 Telemetry is intermittent from the following ss

o 765 kV Kotra SS o 765 kV Dharamjaigad o 765 kV Tamnar SS o 400 kV Navasari SS

Additional points

a) In the report available on the WRLDC website it is clearly indicated that Communication link between all SLDC to WRLDC is in radial mode (without redundancy) and any failure in any equipment Fibre leads to total data black out Power Grid to ensure that links are on two channels

i IPP As per the latest information submitted to CERC the non-availability of

telemetry data from IPP generating stations as on date is 15 Telemetry is intermittent from Jindal amp Essar Mahan GMR Raipur JPL ESSAR Mahan GMR Raipur to expedite

Additional Points

bull Adani(APL) Tiroda There is only one channel emanating from Adani Tiroda Recently there was a case when entire station was not visible due to non-Availability of that channel

bull CGPL Mundra There is only one channel emanating from CGPL Mundra In case of non-availability of data leads to non-visibility of 4000 MW generation which creates difficulty in Grid Operation

bull Sasan There is only one channel emanating from Sasan In case of non-availability of data leads to non-visibility of 2400 + MW generation which creates difficulty in Grid Operation

bull APL Mundra There is only one channel emanating from CGPL Mundra In case of non-availability of data leads to non-visibility of 4000 + MW generation which creates difficulty in Grid Operation

The above issue was already discussed in 460th OCCM The utilities (APL SASAN CGPL) may kindly update the progress in this matter

24

462nd OCC MINUTES

j PMU data Regarding Satna to WRLDC link WRTS II informed that work is under progress for laying of OPGW from Satna 220 kV (MPPTCL) to Satna 765 kV (PG) and it may take 3-4 monthsrsquo time It was suggested that till such time the OPGW operation is in place WRTS-II may explore leased line connectivity at the earliest Power Grid to expedite

The Sub-Committee noted the same amp agreed to make availability of telemetry in their concerns and the report be updated position in next meeting

The Sub Committee noted the same

10 BLACK OUT AT NTPC KAWAS POWER STATION On 11th July 2014 Kawas Gas generating complex got blackout due to tripping of evacuation lines one by one within a short span of 30 minutes The complete loss of evacuation lines occurred at 0117 Hrs The blackout has resulted in tripping of GT1A GT1B and ST causing 320 MW generation loss in the area It was reported that weather condition was foggy with slight drizzling was in the area

Line Time of Tripping Kawas End Remote

end Restoration Time

220 kV Kawas-Navsari 1 1246 AM R phase to EF Fault location 2 km R Phase to EF 122 AM

220 kV Kawas ndashNavsari 2 112 AM R phase to EF Fault location 2208 km

R Phase to EF 347 AM

220 kV Kawas-Haldarwa 1 107 AM R phase to EF Fault location 16 km

R Phase to EF 246 AM

220 kV Kawas-Haldarwa 2 108 AM R phase to EF Fault location 2 km

R Phase to EF 304 AM

220 kV Kawas-Icchapur 1 108 AM B phase to EF B Phase to EF 301 AM

220 kV Kawas-Icchapur 2 108 AM B phase to EF Fault location 356 km

B Phase to EF 331 AM

220 kV Kawas-Vav 1 117 AM No tripping Hand Tripped later Line Tripped 225 AM

220 kV Kawas Vav 2 117 AM Y Phase to EF Y Phase to EF 317 AM

Even the line restoration has failed on several attempt as the lines were not holding due to persisting fault Such an event of total loss of evacuation lines from a generating station resulting in blackout scenario is a matter of serious concern Representative from WRTS-II stated that being highly industrial corridor the said lines are suffering with smog and informed that they are in process of replacement of existing insulator with polymer type insulators Order has been already placed amp it may be completed within next two to three month The Sub Committee noted the same

25

462nd OCC MINUTES

11 OPERATING PROCEDURE OF WR-2014 As discussed in 460th OCCM of WRPC the operating procedure of Western Region 2014 has been updated on 31072014 and the same has been uploaded on WRLDC web site at the following link httpwwwwrldccomdocsWR_OPERATING_PROCEDURE_2014pdf

The Sub Committee noted the same 12 MOCK BLACK START EXERCISE

MP representative informed that DG set at Bargi will be ready within a week time amp mock black start exercise can be performed in October 2014

NTPC Gandhar has successfully performed the mock black start exercise on 27072014

The Sub Committee noted the same

13 REVIEW OF LIST OF FEEDERS IDENTIFIED FROM ISGS LEVEL IN CASE OF

THREAT OF GRID SECURITY DUE TO LARGE DEVIATION

During the 461st OCC it was decided that list of feeders identified for load

control under emergency measure for safeguarding grid security would be

reviewed in a special meeting The list is yet to be reviewed GM WRLDC

requested SLDC to review the same amp submit Till such time the existing list will

continue

The Sub Committee noted the same 14 IMPLEMENTATION OF VOLTAGE AND TIME GRADING ON OV RELAYS TO

PREVENT TRIPPING OF MULTIPLE EHV LINES EMANATING FROM SINGLE NODE ON HIGH VOLTAGE

During the 461st OCC it was informed by Power Grid representative that they have already implemented voltage grading in various line emanating from the same node (matter has not come in the MoM) Power Grid amp other utilities may kindly intimate the present status of voltage grading at their respective sub-stations Member Secretary WRPC suggested to take the matter in PCM

The Sub Committee noted the same

26

462nd OCC MINUTES

15 INADEQUATE PARTICIPATION OF GENERATORS ENVISAGED SPS FOR SR-NEW GRID OPERATION

The details of SPS operation from 1st July 2014 till 6th August 2014 is as under

Sl No Date SPS No Condition 1 01 July 2014 SPS-1 613 SholapurRaichur DC gt1000 MW 2 01 July 2014 SPS-1 1752 SholapurRaichur DC gt1000 MW 3 04 July 2014 SPS-1 0406 SholapurRaichur DC gt1000 MW 4 09 July 2014 SPS-1 350 SholapurRaichur DC gt1000 MW 5 14 July 2014 SPS-1 506 SholapurRaichur DC gt1000 MW 6 17 July 2014 SPS-1 2204 SholapurRaichur DC gt1000 MW 7 23 July 2014 SPS-1 547 SholapurRaichur DC gt1000 MW 8 26 July 2014 SPS-1 1201 SholapurRaichur DC gt1000 MW 9 30 July 2014 SPS-1 902 SholapurRaichur DC gt1000 MW 10 30 July 2014 SPS-1 1954 SholapurRaichur DC gt1000 MW

During the last OCC the matter was discussed and it was suggested by Member Secretary WRPC to have Special Protection Sub-Committee meeting to discuss progress of implementation of the revised SPS at Solapur (for WR-SR interconnection) amp extension of signal from Solapur to additional generators in WR so as to address the issue of inadequate participation of WR Member Secretary WRPC requested to all generators who are having more than one units shall participate in implementation of SPS for SR-NEW grid operation

The Sub-committee noted the same ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING OCC reviewed the meeting roaster and finalized sheet is enclosed at Annexure-10

Due to non-readiness of BDTCL to host the next meeting NTPC KawasGandhar

would host the 463rd OCC meeting The exact date amp venue details will be intimated

separately

SlNo Organisation Name amp Designation E-mail Mobile

I WRPC1 Shri SD Taksande MS ms-wrpcnicin 98208783842 Shri Satyanarayan S opc-wrpcnicin 92233999383 Shri LKS Rathore DD lksr_2000yahoocom 98333718444 Shri Ratnesh Kumar Yadav AD ratneshkumar7437gmailcom 8903929150

II MSETCL MSEDCLMahaGenco5 Shri VD Pande EE vasantpandemahasldcin 98207419416 Shri Ajit V Pachori EE ajitpachorimahagencocoin 9619461420

III MPPTCL MPPGCL7 Shri KK Prabhakar SE sldcmpjbpyahoocom 94258052678 Shri SK Mehta EE mehtasanjay67yahooin 9425805017

IV CSPTCL CSPGCL9 Shri BR Soni Addl CE balramsonirediffmailcom 942518880710 Shri Arvind Mukherjee gccraipurgmailcom 9429227699

V GETCO GSLDC GSECL11 Shri BB Mehta CE cesldcgujgmailcom 987920073612 Shri BM Shah DyEE demissldcgetcogebmailcom 9925212836

VI WRLDC POWERGRID13 Shri P Mukhopadhyay GM prithwishmukhopadhyayposocoin 986943807314 Shri VK Shrivastava AGM vkspowergridindiacom 986945022115 Smt Sachala Mishra CM mishrasachalagmailcom 986945022316 Smt Pushpa S CM pushpa_seshadrihotmailcom 986940448217 Shri Aditya P Das Dy Mgr aditya19227gmailcom 9869404569

POWERGRID REGION-I18 Shri Anil Darode 70207powergridindiacom 942230180519 Shri Manu Sinha 02457powergridindiacom 9425293864

POWERGRID RETION -II20 Shri Abhinav Verma stawr2gmailcom 942850406221 Shri Anand Dubey ananddubey_pgrediffmailcom 9428504065

VII NTPC22 Shri PB Behre GM pbbeherentpccoin 900449708823 Shri Hari Nath AGM harinath01ntpccoin 900449713324 Shri SK Shrivastava AGM sksrivastava09ntpccoin 942517806925 Shri Amir Kr Singh SM aksingh01ntpccoin 942414081426 Shri Amitabh Kumar amitabhkumarntpccoin 9425178122

VIII TATA POWER27 Shri RM Sankhe GM rmsankhetatapowercom 909900654128 Shri PR Gadave AGM prgadavetatapowercom 9223553341

IX NHDC 29 Shri Anurag Seth CE annu226hotmailcom 9425326135

LIST OF PARTICIPANTS OF 462nd OCC MEETING OF WRPC HELD ON 11082014 AT TARAPURAnnexure-I

30 Shri Vinod Kumar Singh vinodnhdcrediffmailcom 9425925251

X APL 31 Shri CS Bobade GM chandrashekharbobadeadanicom 8980802255

XI RINFRA32 Shri SG Zirpe GM sachinzirperelianceadacom 932260763033 Shri Sanil C Namboodiripad sanilnamboodiripadrelianceadacom932104697434 Shri Subrata Das subratakudasrelianceadacom 932093072235 Shri Ishan Roy Asst Mgr ishanroyrelianceadacom 9860027348

XII KSK Mahanadi36 Shri Sudarshan B Reddy sudarshanreddybkskcoin 9000377721

XIII NPCIL37 Shri Mandeep mandeepnpcil 904991887038 Shri JS Choubey jschoubeynpcilcoin 942882191839 Shri Ritesh Chandra Singh rcsinghnpcilcoin 8007991744

XIV ESSAR 40 Shri OJ Saxena Sr Mgr osaxenaessarcom 987910126841 Shri Kamlesh Garg kamleshgargessarcom 987910284942 Shri Sarabjeet Singh sarabjeetsinghessarcom 750957010543 Shri Ashwin Ande ashwinandeessarcom 9909993594

XV JPL44 Shri RK Srivastava AGM rkshrivastavajindalpowercom 9329445016

XVI TORRENT POWER45 Shri Kamal K Vyas kamalvyastorrentpowercom 997407965746 Shri Pramod G Patel AGM pramodpateltorrentpowercom 9824370005

XVII NCA47 Shri Naveen Nath Das emc_ncarediffmailcom 9425053309

XVIII STERLITE GRID LTD48 Shri Sachin S Deshpande GM sachindeshpandesterlitecom 8966903047

XIX LANCO AMARKANTAK POWER LTD49 Shri BN Panda pandabnlancogroupcom 769770301550 Shri Anil Sharma anilshlancogroupcom 9560258009

XX KWPCL51 Mis Smruti R Nayak DGM smrutinayakavanthapowercom 9424176680

XXI MB POWER LTD 52 Shri Sandeep Kumar Gupta sandeepguptahpplin 9582896418

Anaulagnak 21

maah jaUlaa[- 2014

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5020 Hz BETWEEN 1700 Hrs amp 1800 Hrs Hrs ON 27072014

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4962 Hz BETWEEN 1900 Hrs amp 2000 Hrs Hrs ON 25072014

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4993 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5036 Hz AT 130344 Hrs ON 23072014

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4939 Hz AT 194315 hrs Hrs ON 25072014

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS JULY 2014 JUNE 2014 MAY 2014

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 008 023 000

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 314 476 093 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 3129 3216 2155 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 5016 4536 5319

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1533 1749 2433

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING JULY 2014

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

Voltage Profile during the month of July 2014

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 420 402 420 404 433 411 424 424 417 400 420 403 422 407 408 3902 417 398 420 400 431 407 424 424 417 401 427 418 421 409 410 3943 417 393 419 397 432 408 420 396 417 400 425 419 422 408 407 3934 416 398 419 401 434 412 422 402 417 400 426 421 418 406 411 3965 417 400 419 403 433 414 424 424 417 403 424 419 417 406 410 3996 420 406 422 408 438 411 421 402 419 407 427 421 422 412 409 3897 412 396 419 402 428 413 420 399 414 401 423 419 417 409 409 3968 418 400 421 410 433 400 424 400 416 400 425 419 422 400 410 3949 418 412 421 410 433 413 424 410 416 408 425 419 422 412 410 394

10 415 399 417 403 435 415 400 400 418 404 424 421 422 414 410 41111

स नक Annex-23

िभलाईBhilai

धल असोज कासोरKarad Dhule Asoj Kasor

इदौर इटारसी कराडIndore Itarsi

जतपरJetpur

11 416 402 423 407 436 416 422 407 416 405 425 421 423 413 410 39712 419 400 422 406 436 417 400 400 419 403 426 422 423 413 410 39713 415 400 422 410 437 417 400 400 417 406 425 421 422 414 411 39514 416 398 423 409 439 416 400 400 419 404 424 421 422 413 412 39815 420 403 423 408 437 413 428 401 418 404 426 422 423 413 410 39816 423 408 426 411 437 413 429 403 421 406 428 424 423 415 413 40017 421 404 424 407 436 416 400 400 419 408 423 414 423 414 411 39818 421 404 424 407 436 416 400 400 420 406 427 423 423 414 411 39819 423 407 425 410 434 415 425 411 424 405 428 425 424 416 422 39520 421 407 424 410 420 420 427 410 421 407 427 424 423 416 417 39621 421 406 424 411 420 420 400 400 420 402 428 425 426 418 413 39222 421 407 426 413 420 420 400 400 419 401 428 425 428 420 412 39623 422 409 427 410 419 415 415 402 420 403 425 419 428 420 412 39624 420 406 425 409 420 420 400 400 420 404 429 426 427 416 409 39625 422 401 421 404 420 420 400 400 424 402 428 424 423 415 415 39726 420 402 421 406 431 419 400 400 422 403 428 423 422 413 415 40027 417 404 422 407 434 416 423 407 421 405 428 424 422 413 416 40128 419 403 421 407 437 416 431 408 423 406 428 426 423 415 415 40229 419 403 420 408 437 415 400 400 421 406 429 426 423 416 415 39930 421 404 422 406 438 415 400 400 423 404 430 426 426 415 420 40331 420 395 420 402 431 406 428 403 422 403 429 425 423 414 419 398

423 393 427 397 439 400 431 396 424 400 430 403 428 400 422 389

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 418 404 411 395 423 406 430 406 789 752 788 757 787 756 791 7662 419 397 411 393 423 403 431 404 772 748 791 756 786 750 793 7553 416 402 411 397 421 397 425 399 772 748 780 751 781 757 791 7634 417 404 409 396 420 415 428 406 772 748 786 757 780 755 791 7655 418 404 418 400 421 404 427 407 772 748 796 755 796 765 802 7726 419 408 416 402 424 410 429 413 789 752 797 768 796 765 799 7757 414 406 407 397 420 403 426 407 789 752 776 758 777 757 784 7658 418 408 411 388 422 400 429 400 789 752 786 767 783 746 790 7719 412 401 403 386 422 405 429 408 789 752 781 761 772 745 783 76010 413 403 402 394 420 404 424 406 789 752 792 764 774 755 785 765

Bina Gwalior Nagda Khandwa Sipat

बना वािलयरिसविननागदावािलयर बनाBina

िसपतखडवाseoni Gwalior

10 413 403 402 394 420 404 424 406 789 752 792 764 774 755 785 76511 415 407 403 395 421 407 426 410 789 752 790 774 785 758 790 77212 418 406 407 392 422 404 427 404 789 752 796 769 784 756 796 76913 418 406 407 392 421 408 427 411 789 752 796 769 784 756 796 76914 419 410 409 397 423 406 428 409 789 752 784 768 786 763 792 77415 419 404 408 391 424 407 429 408 789 752 789 763 786 750 791 76416 424 414 408 400 427 411 431 413 789 752 792 766 785 767 797 77917 421 410 411 399 424 407 432 409 789 752 788 762 789 766 795 77618 423 412 414 396 424 407 432 409 789 752 783 770 796 765 801 77719 424 411 410 396 426 411 431 413 789 752 791 770 788 764 803 77720 425 411 411 396 424 410 428 414 789 752 786 763 789 760 800 77221 422 412 410 395 424 409 428 413 789 752 784 760 788 763 796 77522 423 416 414 402 424 410 429 414 789 752 791 774 794 773 801 78423 425 413 418 402 424 410 430 412 787 750 785 770 798 780 804 78324 422 411 411 397 425 409 431 415 789 752 790 772 791 773 801 78125 421 410 405 396 423 403 429 409 789 752 784 770 794 767 798 77726 421 410 409 395 423 404 427 409 789 752 792 773 789 767 799 77827 423 412 413 399 420 404 428 409 789 752 794 766 797 770 808 78028 422 411 411 399 421 405 428 410 789 752 789 763 794 770 793 77029 419 409 411 397 423 406 430 414 789 752 794 771 795 767 796 77430 422 409 413 398 420 404 430 413 788 753 796 766 799 766 799 77331 420 404 409 395 421 397 429 411 789 752 787 764 792 759 795 767

425 397 418 386 427 397 432 399 789 748 797 751 799 745 808 755

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Jul-14 0 0 0 0 0 0 0 02 02-Jul-14 0 0 0 0 0 0 0 03 03-Jul-14 0 0 0 0 0 0 0 04 04-Jul-14 0 0 0 0 0 0 0 05 05-Jul-14 0 0 0 0 0 0 0 06 06-Jul-14 1 67 0 0 0 0 0 07 07-Jul-14 0 0 0 0 0 0 0 08 08-Jul-14 1 278 0 0 0 0 0 09 09-Jul-14 0 0 0 0 0 0 0 0

10 10-Jul-14 1 565 0 0 0 0 0 011 11-Jul-14 0 0 0 0 0 0 0 012 12-Jul-14 0 0 0 0 0 0 0 013 13-Jul-14 3 758 0 0 0 0 0 014 14-Jul-14 0 0 0 0 0 0 0 015 15-Jul-14 0 0 0 0 0 0 016 16-Jul-14 2 2127 NIL NIL NIL 017 17-Jul-14 0 0 0 0 0 0 0 018 18-Jul-14 1 08 0 0 0 0 0 019 19-Jul-14 0 0 0 0 0 0 0 020 20-Jul-14 0 0 0 0 0 0 0 021 21-Jul-14 0 0 0 0 0 0 0 022 22-Jul-14 0 0 0 0 0 0 0 023 23-Jul-14 0 0 0 0 0 0 0 024 24-Jul-14 0 0 0 0 0 0 0 025 25-Jul-14 0 0 0 0 0 0 0 026 26-Jul-14 0 0 0 0 0 0 0 027 27-Jul-14 0 0 0 0 0 0 0 028 28-Jul-14 0 0 0 0 0 0 0 029 29-Jul-14 0 0 0 0 0 0 0 030 30-Jul-14 0 0 0 0 0 0 0 031 31-Jul-14 0 0

Max 3 758 0 0 0 00 0 0Total 9 24917 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month July 2014

Recommonded Load relief at 492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE 25

POWER CUTRESTRICTIONS IN WESTERN REGION FOR THE MONTH OF JULY-2014

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply(DLF)

01072014 31072014 2343 2105 2300

21 Three-Phase Supply(Irrigation)

01072014 31072014 0953 0857 0933

21 Three-Phase Supply(Mixed)

01072014 31072014 2339 2055 2240

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01072014 31072014 2353 2325 2344 32 District Head Qtrs 01072014 31072014 2357 2330 2348 33 Tehsil Head Qtrs 01072014 31072014 2350 2230 2319

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 010714 to 310714

SaUnya Nil

0-470 MW

SaUnya Nil

0000

SaUnya Nil 2400

SaUnya Nil

19 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs) 21 Three-Phase Supply 01072014 31072014 1000 0800 0900

22 Single-Phase Supply 01072014 31072014 1800 1800 1800 3 Anya jaanakarI Any other information There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

8860 (Av) of 31days 0000(Av) 0000 (Av)

1Rural 7109(Av) for 23447 Hrs 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0532 - -

0537 -

3 HT Industries 8261 (Av) for 17270 Hrs 0357 Total Energy Cutday 1426 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01072014 to 310714 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 3172014 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil ca gaaovaa Goa SaUnya Nil

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-26 Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai अिनवाय यिनट आऊटज का जलाई2014का वःता रत यौरा

Details of forced unit outages during the month ofJuly2014

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 एःसार Essar-2

गरा विनिल GSECL

172 1212 22-Feb-13 अनपल ध Still out

अनपल ध Still out

Shortage of gas

2 यट पीएस UTPS-2

गरा विनिल GSECL

120 1951 17-Jun-14 अनपल ध Still out

अनपल ध Still out

Turbine tripped(RSD)

3 एःसार व डनार Essar vadinar-1

गरा विनिल GSECL

600 2335 3-Jul-14 1324 22-Jul-14 Coal shortage

4 डब यट पीएस WTPS-6

गरा विनिल GSECL

210 953 10-Jul-14 0707 14-Jul-14 BTL

5 एसट पीएस STPS-1

गरा विनिल GSECL

120 1220 10-Jul-14 0710 14-Jul-14 BTL

6 जीआईपीसीएल GIPCL-STG I-2

गरा विनिल GSECL

165 1744 14-Jul-14 अनपल ध Still out

अनपल ध Still out

C ampI problem

7 एएलट पीएस ALTPS-1

गरा विनिल GSECL

120 107 15-Jul-14 2037 19-Jul-14 BTL

8 िस का ट पीएस SIKATPS-1

गरा विनिल GSECL

120 1330 17-Jul-14 अनपल ध Still out

अनपल ध Still out

RSD

9 डब यट पीएस WTPS-4

गरा विनिल GSECL

210 858 18-Jul-14 अनपल ध Still out

अनपल ध Still out

RSD

10 डब यट पीएस WTPS-3

गरा विनिल GSECL

210 1046 18-Jul-14 अनपल ध Still out

अनपल ध Still out

RSD

11 डब यट पीएस WTPS-5

गरा विनिल GSECL

210 1818 18-Jul-14 000 21-Jul-14 RSD

12 डब यट पीएस WTPS-6

गरा विनिल GSECL

210 447 19-Jul-14 अनपल ध Still out

अनपल ध Still out

RSD

13 यट पीएस UTPS-3

गरा विनिल GSECL

200 1055 26-Jul-14 2328 1-Aug-14 RSD

14 एपीएल APL-6

अदानी ADANI

660 2146 5-Jul-14 1105 2-Aug-14 Heavy hydrogen leakage

15 एपीएमएल APML-4

अदानी ADANI

660 1132 10-Jul-14 1407 23-Jul-14 Coal shortage

16 एपीएल APL-1

अदानी ADANI

330 117 20-Jul-14 612 23-Jul-14 RSD

प म ऽय भार षण कि म बई णाली चालन-ISO-I

17 एपीएल APL-8

अदानी ADANI

660 2018 18-Jul-14 2209 21-Jul-14 BTL

18 एपीएल APL-2

गरा विनिल GSECL

330 0913 26-Jul-14 1714 29-Jul-14 Air pre heater problem

19 एपीएल APL-5

गरा विनिल GSECL

660 1910 29-Jul-14 1533 2-Aug-14 Heavy steam leakage

20 डब यपीसीएल WPCL-1

मारा वउकिल MSPGCL

135 1245 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Furnace press high

21 डब यपीसीएल WPCL-4

मारा वउकिल MSPGCL

135 001 3-Apr-14 2347 11-Jul-14 Less schedule

22 कोराड Koradi-5

मारा वउकिल MSPGCL

200 1030 17-Jun-14 अनपल ध Still out

अनपल ध Still out

ID fan bearing temperature high

23 इ डयाबल Indiabulls - 1

मारा वउकिल MSPGCL

270 546 26-Jun-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

24 पल Parli -4

मारा वउकिल MSPGCL

210 1019 29-Jun-14 अनपल ध Still out

अनपल ध Still out

water shortage

25 भसावल Bhusawal-2

मारा वउकिल MSPGCL

210 1117 6-Jul-14 544 10-Jul-14 Coal problem

26 चिपर Chandrapur-1

मारा वउकिल MSPGCL

210 2211 8-Jul-14 2106 13-Jul-14 BTL

27 चिपर Chandrapur-3

मारा वउकिल MSPGCL

210 2216 14-Jul-14 1452 18-Jul-14 Safety valve problem

28 उरण Uran-6 मारा वउकिल MSPGCL

108 1634 15-Jul-14 1407 22-Jul-14 Gas shortage

29 उरण Uran -5 मारा वउकिल MSPGCL

108 2338 17-Jul-14 1125 24-Jul-14 For rotor balancing work

30 उरण Uran -A0 मारा वउकिल MSPGCL

120 2340 17-Jul-14 2315 23-Jul-14 For rotor balancing work

31 भसावल Bhusawal-2

मारा वउकिल MSPGCL

210 2346 18-Jul-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

32 खापरखड़ा Khaparkeda-3

मारा वउकिल MSPGCL

210 1036 20-Jul-14 041 29-Jul-14 Flame failure

33 जयगड Jaigad-2 मारा वउकिल MSPGCL

300 000 20-Jul-14 Ready Ready Less requisition

34 वीआईपीएल VIPL-2

मारा वउकिल MSPGCL

300 2302 20-Jul-14 1716 26-Jul-14 Coal feeding problem

35 एपीएमएल APML-3

मारा वउकिल MSPGCL

660 0444 22-Jul-14 044 26-Jul-14 Pressure release valve operated

36 भसावल Bhusawal-4

मारा वउकिल MSPGCL

500 003 23-Jul-14 151 29-Jun-14 BTL

37 वीआईपीएल VIPL-1

मारा वउकिल MSPGCL

300 015 23-Jul-14 1300 31-Jul-14 Coal feeding problem

38 उरण Uran -8 मारा वउकिल MSPGCL

108 730 26-Jul-14 1700 29-Jul-14 Gas shortage

39 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 347 29-Jul-14 638 4-Aug-14 BTL

प म ऽय भार षण कि म बई णाली चालन-ISO-I

40 पल PARLI-5 मारा वउकिल MSPGCL

210 002 30-Jul-14 अनपल ध Still out

अनपल ध Still out

Water shortage

41 टाटा TATA-8

टाटा TATA

250 2255 9-Jan-14 अनपल ध Still out

अनपल ध Still out

HT due to fire near turbine generator desk

42 टाटा TATA-6

टाटा TATA

500 2134 31-Jul-14 Ready Ready Less requisition

43 आरजीपीपीएल RGPPL-3A

आरजीपीपीएल RGPPL

320 1857 17-Apr-14 Ready Ready Less requisition

44 आरजीपीपीएल RGPPL-2B

आरजीपीपीएल RGPPL

320 1915 17-Jun-14 अनपल ध Still out

अनपल ध Still out

Raw water problem

45 आरजीपीपीएल RGPPL-2A

आरजीपीपीएल RGPPL

320 1615 25-Jun-14 1200 21-Jul-14 Less requisition

46 आरजीपीपीएल RGPPL-1A

आरजीपीपीएल RGPPL

320 1330 8-Jul-14 Ready Ready Less requisition

47 अमरकनटक Amarkantak-4

म वउकिल MPPGCL

120 1113 30-Apr-14 अनपल ध Still out

अनपल ध Still out

TURBINE BEARING VIBRATION HIGH

48 सातपरा Satpura-6

म वउकिल MPPGCL

200 305 18-Jun-14 अनपल ध Still out

अनपल ध Still out

BTL

49 एसजीट पीएस SGTPS-3

म वउकिल MPPGCL

210 617 26-Jun-14 020 26-Jul-14 Conveyer belt problem

50 अमरकनटक Amarkantak-3

म वउकिल MPPGCL

120 1640 2-Jul-14 1623 11-Jul-14 BTL

51 सातपरा Satpura-9

म वउकिल MPPGCL

210 2200 5-Jul-14 855 15-Jul-14 Condenser tube cleaning

52 सातपरा Satpura-9

म वउकिल MPPGCL

210 1310 15-Jul-14 845 24-Jul-14 BTL

53 एसजीट पीएस SGTPS-4

म वउकिल MPPGCL

210 2233 19-Jul-14 1252 4-Aug-14 Coal shortage

54 सातपरा Satpura-7

म वउकिल MPPGCL

210 225 21-Jul-14 545 24-Jul-14 BTL

55 सातपरा Satpura-10

म वउकिल MPPGCL

250 2316 22-Jul-14 07082014 High vibration in generator winding

56 एसजीट पीएस SGTPS-3

म वउकिल MPPGCL

210 1857 28-Jul-14 1020 2-Aug-14 Drum level low

57 DSPM(K(E) extn)-2

छरा वउकिल CSPGCL

250 2310 21-Jul-14 2029 22-Jul-14 Coal shortage

58 कोरबा पव Korba(E)-3

छरा वउकिल CSPGCL

210 1030 22-Jul-14 1025 27-Jul-14 CTL

59 कोरबा पव Korba(E)-5

छरा वउकिल CSPGCL

120 1345 22-Jul-14 1140 26-Jul-14 Wet coal problem

60 कोरबा पव Korba(E)-5

छरा वउकिल CSPGCL

120 2320 30-Jul-14 155 2-Aug-14 Coal shortage

61 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

62 एःसार महान Essar-Mahan-1

एःसारESSAR 600 014 22-Jun-14 1255 11-Jul-14 Less schedule

63 एःसारमहानEssar Mahan-1

एःसार ESSAR 600 620 16-Jul-14 1252 28-Jul-14 Withdrawn due to tripping of evacuation

प म ऽय भार षण कि म बई णाली चालन-ISO-I

Lines

64 सीजीपीएल CGPL-50

सीजीपीएल CGPL

830 948 13-Jun-14 409 23-Jul-14 Ash hopper refractory damage

65 सीजीपीएल CGPL-10

सीजीपीएल CGPL

830 1332 1-Jul-14 1952 9-Jul-14 BTL

66 सीजीपीएल CGPL-20

सीजीपीएल CGPL

800 1214 24-Jul-14 13-aug-14

Bottom ash Hopper works

67 सीजीपीएल CGPL - 40

सीजीपीएल CGPL

830 1918 26-Jul-14 1020 2-Aug-14 GT electrical fault

68 जपीएल JPL STG-2 UNIT-1

जपीएल JPL 600 051 26-Jun-14 अनपल ध Still out

अनपल ध Still out

Turbine vibration

69 जपीएलJPL STG-2 UNIT-2

जपीएलJPL 600 000 5-Jul-14 1457 11-Jul-14 Less requisition

70 जपीएल JPL STG-2 UNIT-2

जपीएलJPL 600 748 21-Jul-14 1800 24-Jul-14 BTL

71 एसीबीआईएल ACBIL-1

एसीबीआईएल ACBIL

135 151 6-Jul-14 1753 9-Jul-14 Furnace draft high

72 ससान Sasan -3 आरईएल REL 660 1648 15-Jul-14 2248 4-Aug-14 Ash evacuation problem

73 ससान Sasan-4 आरईएल REL 660 1645 24-Jul-14 810 3-Aug-14 High press main steam tripped

74 एमको EMCO-I एमको EMCO 200 109 16-Jul-14 अनपल ध Still out

अनपल ध Still out

Turbine vibration high

75 एसीबीआईएल ACBIL-2

एसीबीआईएल ACBIL

135 1955 21-Jul-14 601 24-Jul-14 Furnace draft high

76 मौदा Mouda -1

एनट पीसीNTPC 500 1630 18-Jun-14 2042 14-Jul-14 Flame failure

77 कावास Kawas-1C

एनट पीसीNTPC 116 2311 2-Jul-14 2100 6-Jul-14 Heavy steam leakage from stop valve

78 कावास Kawas-1B

एनट पीसीNTPC 106 2323 2-Jul-14 632 7-Jul-14 Less requisition

79 कावास Kawas-2B एनट पीसीNTPC 164 1704 10-Jul-14 Ready Ready Less requisition

80 कावास Kawas-1A एनट पीसीNTPC 164 1200 12-Jul-14 745 22-Jul-14 Less requisition

81 वीएसट पीएस VSTPS-11

एनट पीसीNTPC 500 1204 13-Jul-14 000 16-Jul-14 Coal shortage

82 गाधारGandhar-1 एनट पीसीNTPC 144 149 16-Jul-14 1807 21-Jul-14 Less requisition

83 कावास Kawas-1B एनट पीसीNTPC 164 1027 18-Jul-14 442 23-Jul-14 Less requisition

84 मौदा Mouda-1 एनट पीसीNTPC 500 000 18-Jul-14 1745 24-Jul-14 Less requisition

85 िसपतSipat-1 एनट पीसीNTPC 660 000 21-Jul-14 955 24-Jul-14 Generator H2 gas leakage

86 गाधार Gandhar-3

एनट पीसीNTPC 144 1607 21-Jul-14 अनपल ध Still out

अनपल ध Still out

BB protection operatedatJhanor

87 गाधार Gandhar-4(ST)

एनट पीसीNTPC 224 1607 21-Jul-14 1320 26-Jul-14 BB protection operatedatJhanor

88 ट स TAPS-1

एनट पीसीNTPC 160 2227 21-Jul-14 1407 26-Jul-14 Maintenance

89 गाधार एनट पीसीNTPC 144 507 22-Jul-14 Ready Ready Less requisition

प म ऽय भार षण कि म बई णाली चालन-ISO-I

Gandhar -1

90 मौदा mouda-2 एनट पीसीNTPC 500 915 23-Jul-14 315 31-Jul-14 Coal feeding problem

91 कावास Kawas-1A

एनट पीसीNTPC 106 608 24-Jul-14 1309 27-Jul-14 Less requisition

92 गाधार Gandhar-2

एनट पीसीNTPC 144 2036 26-Jul-14 100814 Less requisition

93 वीएसट पीएस VSTPS-2

एनट पीसीNTPC 210 500 27-Jul-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

94 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 748 27-Jul-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

95 मौदा Mouda-2 एनट पीसीNTPC 500 315 31-Jul-14 210 3-Aug-14 Less requisition Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का जलाई2014 का वःता रत यौरा

Details of planned unit outages during the month of July2014 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

सo From

समय दनाक

कारण Reason

Time Date Time Date

1 एसएलपीपी SLPP-2

गरा विनिल GSECL

125 045 23-Jun-14 NA 17-Jul -14 AOH

2 डब यट पीएस WTPS-5

गरा विनिल GSECL

210 000 21-Jul-14 29-0814 COH

3 यट पीएस UTPS-4

गरा विनिल GSECL

200 000 21-Jul-14 240814 AOH

4 एसएलपीपी SLPP-3

गरा विनिल GSECL

125 130 22-Jul-14 060814 AOH

5 यट पीएस UTPS-1

गरा विनिल GSECL

120 000 29-Jul-14 28814 AOH

6 पल ParlI-3

मारा वउकिल MSPGCL

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

Water supply problem

7 चिपर Chandrapur-7

मारा वउकिल MSPGCL

500 600 19-Jun-14 1124 2-Aug-14 AOH

8 नािसक NASIK -3

मारा वउकिल MSPGCL

210 1410 10-Jul-14 अनपल ध Still out

100814 AOH

9 कोरबा प म Korba(W)-2

छरा वउकिल CSPGCL

210 936 26-Jun-14 140814 AOH

10 वदनाVandana-I वदना VANDANA 135 1940 17-Jul-14 अनपल ध Still out

अनपल ध Still out

ETL

11 वीएसट पीएस VSTPS-8

एनट पीसीNTPC 500 012 1-Jun-14 253 13-Jul-14 AOH

12 कएसट पीएस KSTPS-4

एनट पीसीNTPC 500 2335 20-Jun-14 180814 COH

13 कावास Kawas-2A

एनट पीसीNTPC 106 000 27-Jun-14 260814 RampM works

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

11 Akrimota 1 125 4-Aug-14 14-Aug-14 AOH12 WTPS 2 210 5-Aug-14 3-Sep-14 AOH13 SLPP 1 125 16-Aug-14 4-Sep-14 AOH14 DGB 1 107 20-Aug-14 27-Aug-14 CI15 GIPCL-I GT-3 48 22-Aug-14 27-Aug-14 HGPI16 GIPCL-I GT-2 48 29-Aug-14 3-Sep-14 HGPI17 GIPCL-I GT-2 48 12-Aug-14 24-Aug-14 HGPI18 UTPS 3 200 19-Aug-14 12-Sep-14 AOH19 GTPS 2 120 25-Aug-14 14-Sep-14 AOH110 STPS 1 120 19-Aug-14 30-Aug-14 AOH111 GTPS 3 210 24-Aug-14 13-Sep-14 AOH112 APL 9 660 1-Sep-14 20-Sep-14 AOH

221 SGTPS 4 210 010914 250914 AOH3 Craiva]kMila CSPGCL

31 Korba East-6 6 120 21-Aug-14 13-Sep-14 AOH32 Korba East-1 1 50 15-Aug-14 1-Sep-14 AOH33 Korba East-3 3 50 21-Aug-14 30-Sep-14 AOH34 Korba West-1 1 210 12-Sep-14 27-Sep-14 COH35 Korba West-5 5 500 15-Aug-14 30-Aug-14 AOH

4

41 PARAS 3 250 20914 151014 AOH42 RELIANCE 2 250 140814 160814 TURBINE VIBRATION

5 koMd``Iya xao~ Central Sector

51 SIPAT 1 600 050914 191014 BLR OH + HPT + IPT+LPT + GEN

52VINDHYACHAL

5 500 120814 200914 CAP+TG PED CKG+GEN+BLR CHEM CLNG+ESP RampM

53VINDHYACHAL

9 500 120814 150914 BLR OH + HPT + IPT+ GEN

54VINDHYACHAL

11 500 160714 170814 AOH

55CGPL

30 800 150814 050914 Bottom ash hopper Refractory repair and General maintainance work

56 CGPL 40 800 060914 300914 UT 40B repair work57 NSPCL 1 250 200814 110914 AOH

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING AUGUST 2014 AND SEPTEMBER 2014

Capacity Outage as per Annual Maintenance Plan

Date Time Date Time

1 400 400KV BUS-I at Bilaspur Ss 14-Aug-14 900 14-Aug-14 1800 DAILY For bus bar stability of LANCO bays amp jumpering work WRTS-I LANCO C

2 400kV 50 MVAR Bus Reactor-2 at Itarsi SS 14-Aug-14 800 15-Oct-14 1800 Continuo

us Installation of 125MVAR reactor WRTS-II WRTS-II C

3 765 Satna-Gwalior2 14-Aug-14 800 17-Aug-14 1800 DailyCompletion of 765kV Gwalior2 Main Bay Erection amp Testing works at Satna

PGCIL WRTS-II C

4 400 400kV JBP- JBP Pooling 2 Line 14-Aug-14 1000 14-Aug-14 1500 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

5 400 400KV BUS-II at Bilaspur Ss 16-Aug-14 900 16-Aug-14 1800 DAILY For bus bar stability of LANCO bays amp jumpering work WRTS-I LANCO C

6 765 Bus2 at satna 16-Aug-14 800 18-Aug-14 1800 DailyExtension of bus 2 for Gwalior2 bay amp completion of Main Bay Erection

PGCIL WRTS-II C

7 400 Khandwa-Dhule1 16-Aug-14 800 31-Aug-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WR-II C

8 400 Gandahr - Navsari DC 16-Aug-14 800 31-Aug-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WR-II R

PID testing of insulator strings

KV Line From To

Annexure-32

Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

9 400 Navsari - Vapi - Kala 16-Aug-14 800 31-Aug-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WR-II R

10 400 Satna - Bina Ckt 1amp2 16-Aug-14 800 31-Aug-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WR-II R

11 400 80 MVAR Bus Reactor at Kotra 16-Aug-14 900 17-Aug-14 1800 ContinuousTo attend isolator defects WRTS-I PGCIL C

12 400 400kV JBP- JBP Pooling 1 Line 17-Aug-14 1000 17-Aug-14 1500 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

13 765 ICT II at Bina 17-Aug-14 0900 17-Aug-14 1800 Daily Post Commissioning check of Fire-Fighting system at Bina PGCIL WRTS-II C

14 765 Bus-2 at Gwalior 17-Aug-2014 1000 18-Aug-2014 1800 Daily Busbar Jumpering ampStability test related to Bus reactor

POWERGRID WRTS-II C

15 765 Seoni 2 LR(704 LR) at Bilaspur Ss 18-Aug-14 900 18-Aug-14 1500 DAILY For taking Spare LR in service

first time WRTS-I PGCIL C

16 400 Bhadrawati-Ramagundam I 18-Aug-14 800 18-Aug-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

17 400 400kV Vchal - JBP 1 Line 18-Aug-14 1000 18-Aug-14 1200 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

18 400 400kV Vchal - JBP 2 Line 18-Aug-14 1400 18-Aug-14 1600 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

19 400 400KV BUS-II at Bilaspur Ss 19-Aug-14 900 19-Aug-14 1800 DAILY For bus bar stability of LANCO bays amp jumpering work WRTS-I LANCO C

20 400 Bhadrawati-Ramagundam II 19-Aug-14 800 19-Aug-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

21 765 ICT 1 at G alior 19 A g 14 10 00 20 A g 14 18 00 Continou SPARE ICT COMMISSIONING PGCIL WRTS II C21 765 ICT - 1 at Gwalior 19-Aug-14 1000 20-Aug-14 1800 s SPARE ICT COMMISSIONING PGCIL WRTS-II C

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

22 400 400kV JBP- Itarsi 1 Line 19-Aug-14 1000 19-Aug-14 1200 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

23 400 400kV JBP- Itarsi 2 Line 19-Aug-14 1400 19-Aug-14 1600 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

24 400 400 kV Sipat -Ranchi-1 19-Aug-14 900 20-Aug-14 1900 Continous 1 no of CT replacement NTPC NTPC

25 400 BUS-I at Aurangabad(PG) 19-Aug-14 600 20-Aug-14 1800 ContiBus-1 extn for commissioning of 400 kV Boisar-1amp2 bays with 80 MVAR Reactors

WRTS-I WRTS-I C

26 400kV 400kV SUGEN PIRANA Line (Line 2) 19-Aug-14 900 19-Aug-14 1700 Daily Corrective Maintenance of

Transfer Isolator TPL-SUGE TPL-SUG R

27 400kV 400kV PGCIL - PIRANA Feeder No 2 19-Aug-14 900 19-Aug-14 1700 Daily 400kV CT connectors replacementTPL-AHME TPL-AHM R

28 400 Bhadrawati-Parli 1amp 2 19-Aug-14 000 20-Oct-14 1800 DailyFor OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

29 400 Mundra - Jetpur line No1 19-Aug-14 800 19-Aug-14 1200 Daily protection logic checking work PGCIL GETCO30 400 Mundra - Jetpur line No 2 19-Aug-14 1400 19-Aug-14 1800 Daily protection logic checking work PGCIL GETCO

31 400 400KV BUS-I at Bilaspur Ss 20-Aug-14 900 20-Aug-14 1800 DAILY For bus bar stability of LANCO bays amp jumpering work WRTS-I LANCO C

32 400 KSK ndash Raigarh circuit 4 20-Aug-14 900 21-Aug-14 1800 CONT complete PLCC rectification works WRTS-I KSK C

33 HVDC HVDC POLE I AT BHADRAWATI 20 A 14 8 00 21 A 14 18 00 D il AMP WORKS WRTS I WRTS I R33 HVDC HVDC POLE-I AT BHADRAWATI 20-Aug-14 800 21-Aug-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

34 765kV Dharamjaygarh - Durg ckt-2 20-Aug-14 800 22-Aug-14 1800 daily CSD relay commissioning (M+T) WRTS-I PGCIL C

35 765 JBP - BINA 1 at Jabalpur Pooling Station 20-Aug-14 1000 21-Aug-14 1800 Daily Commissioning of CSD Relay for

765KV JBP - BINA Ckt 1 PGCIL WRTS-II C

36 400 Khandwa-Dhule1 20-Aug-14 1000 20-Aug-14 1500 Daily AMP PGCIL WRTS-II R

37 400 Bus-1 at Shujalpur 20-Aug-14 1000 20-Aug-14 1800 Daily AMP PGCIL WRTS-II R

38 400 Bus2 at Satna 20-Aug-14 900 20-Aug-14 1800 Daily For Bus Bar Stability and charging activity of 406 Bay PGCIL WRTS-II C

39 400 Bus1 at Indore 20-Aug-14 900 20-Aug-14 1800 Daily Jumper connection amp stability checking of Pitampur1 PGCIL WRTS-II C

40 400 400kV JBP- Itarsi 3 Line 20-Aug-14 1000 20-Aug-14 1200 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

41 765 Raigarh (Kotra) - Raigarh (Tamnar) 20-Aug-14 900 31-Aug-14 1800 ContinuousFor installation of Bird guards WRTS-I PGCIL C

42 400 Kansari - Kankroli line 20-Aug-14 800 20-Aug-14 1800 Daily PMU installation work and maintenPGCIL GETCO43 400 BUS-2 AT SOLAPUR 21-Aug-14 900 22-Aug-14 1800 Daily Pune bays extension works WRTS-I WRTS-I C

44 765 ICT 1 at Jabalpur Pooling Station 21-Aug-14 1000 21-Aug-14 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus for Spare ICT Phase

PGCIL WRTS-II C

45 400 Bina-Shujalpur1 21-Aug-14 900 21-Aug-14 1000 Daily

For Replacement of 390kV Reactor LA with 336kV LA Line will be taken in service without PGCIL WRTS-II Cj p g g y will be taken in service without Line Reactor at Shujalpur

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

46 400 Khandwa-Dhule2 21-Aug-14 1000 21-Aug-14 1800 DailyFor Replacement of 390kV Reactor LA with 336kV LA At Khandwa amp AMP

PGCIL WRTS-II C

47 220 Damoh-Sagar 21-Aug-14 1000 21-Aug-14 1500 Daily AMP of terminal equipment at Damoh SS MPPTCL WR-II R

48 765 ICT2 at Indore 21-Aug-14 900 22-Aug-14 1800 Continious

For Auxiliary bus erection at Indore PGCIL WRTS-II C

49 400 125MVAr BR at Shujalpur 21-Aug-14 900 21-Aug-14 1800 Daily Differential stability of tie bay (Under commissioning) PGCIL WRTS-II C

50 400 Raipur-Bhadrawati-III 21-Aug-14 900 21-Aug-14 1800 ContinuousBus split at Raipur WRTS-I PGCIL C51 400 Kansari - Bhinmal line 21-Aug-14 800 21-Aug-14 1800 Daily PMU installation work and maintenPGCIL GETCO

52 HVDC HVDC POLE-2 AT BHADRAWATI 22-Aug-14 800 23-Aug-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

53 765 ICT I at Bina 22-Aug-14 0900 23-Aug-14 1800 DailyCommissioning of CSD Relay for 400kV side of ICT- rescheduling of outage

PGCIL WRTS-II C

54 765 JBP - BINA 2 at Jabalpur Pooling Station 22-Aug-14 1000 23-Aug-14 1800 Daily Commissioning of CSD Relay for

765KV JBP - BINA Ckt 2 PGCIL WRTS-II C

55 400 Khandwa-Rajgarh1 22-Aug-14 800 23-Aug-14 1800 PM Continous

Rectification of damaged tower peak at locno83 due to collapse of MPPTCL tower which is under construction

PGCIL MPPTCL C

F j i amp h i th56 400 Pirana-Vadodara-Asoj DC 22-Aug-14 800 23-Aug-14 1800 Daily

For jumpering amp charging the future cirucit of line in multi-circuit towers to prevent conductor theft

PGCIL WRTS-II C

57 220 Damoh-Damoh2 22-Aug-14 1000 22-Aug-14 1500 Daily AMP of terminal equipment at Damoh SS MPPTCL WR-II R

58 400kV 400kV SUGEN VAPI Line 22-Aug-14 900 22-Aug-14 1400 Daily Corrective Maintenance amp Inspection Dropper of 5 Core CT

TPL-SUGE TPL-SUG R

59 765 Bus Reactor Kotra 22-Aug-14 900 23-Aug-14 1800 Daily WRTS-I PGCIL C

60 400 Vindhyachal-Jabalpur3 23-Aug-14 900 23-Aug-14 1800 Daily

For Replacement of 390kV Reactor LA with 336kV LA At Jabalpur Line will remain out of service due to less clearance of Reactor LA from Line conductor

PGCIL WRTS-II C

61 765 ICT1 at Indore 23-Aug-14 900 26-Aug-14 1800 Continious

re routing of cables in CMB for commissioning of spare unit at Indore

PGCIL WRTS-II C

62 765 Bus- 2 at Bina 23-Aug-2014 0900 23-Aug-2014 1800 DailyFor Bus stability required for 765kV Jabalpur 3 Bay- Rescheduling of outage

POWERGRID WRTS-II C

63 765 Bus-1 at Gwalior 24-Aug-14 1000 25-Aug-14 1800 Daily Busbar Jumpering ampStability test related to Jaipur 1 main bay PGCIL WRTS-II C

64 400 Navasari- Kala MC line 25-Aug-14 800 26-Aug-14 1800 DailyConstruction work of Navasari- Boisar line on same Multi ckt WRTS-II WRTS-I Ctower

65 765 765400 AT-1 AT SOLAPUR 25-Aug-14 900 26-Aug-14 1800 Daily Spare ICT unit Aux bus commisioning works WRTS-I WRTS-I C

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

66 220 Korba-Budhipadar Ckt-3 at CSPDCL Korba Ss 25-Aug-14 900 26-Aug-14 1800 DAILY For diversion of line for SE

Railway MCL project WRTS-I PGCIL C

67 765 765KV Bus 1 at Jabalpur Pooling Station 25-Aug-14 1000 25-Aug-14 1800 Daily

765KV Bus 1 Extension for Switchyard Extension for BINA 3 Line Dia

PGCIL WRTS-II C

68 765 765KV ICT 1 at Jabalpur Pooling Station 25-Aug-14 1000 25-Aug-14 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus Isolators for Spare ICT Phase - Heavy Induction

PGCIL WRTS-II C

69 400 Vindhyachal-Jabalpur4 25-Aug-14 900 25-Aug-14 1800 Daily

For Replacement of 390kV Reactor LA with 336kV LA At Jabalpur Line will remain out of service due to less clearance of Reactor LA from Line conductor

PGCIL WRTS-II C

70 400 Bus-I at satna 25-Aug-14 900 25-Aug-14 1800 DailyFor Changing of Jumper from Twin Moose To Quad Moose in 401 bay (jaypee nigrie line-1)

PGCIL WR-II C

71 400 Deepnagar-Thaptitanda 25-Aug-14 900 25-Aug-14 1700 Daily To attend Isolator alignment problem MSETCL MSETCL

72 765 BUS-II and 765 ICT-1 at Aurangabad (PG) 25-Aug-14 600 25-Aug-14 1800 Daily Commissioning of spare ICT unit

at Aurangabad (PG) WRTS-I WRTS-I CAurangabad (PG) at Aurangabad (PG)

73 765 Kotra-durg Ckt-2 along with line reactor 25-Aug-14 900 28-Aug-14 1800 ContinuousReplacement of spacer damper WRTS-I PGCIL C

74 765 Wardha-Aurangabad (PG)-2 and Padge-1 LReactor 26-Aug-14 600 26-Aug-14 1800 Daily Construction of up-coming

Padghe bay at Aurangabad (PG) WRTS-I WRTS-I C

75 765 Gwalior -Bina 1 26-Aug-14 1000 27-Aug-14 1800 Daily Spare reactor commissioning at Gwalior PGCIL WR-II C

76 765 1500MVA ICT 2 at Jabalpur Pooling Station 26-Aug-14 1000 26-Aug-14 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus Isolators for Spare ICT Phase - Heavy Induction

PGCIL WRTS-II C

77 400 Jabalpur-Itarsi4 26-Aug-14 900 26-Aug-14 1800 Daily

For Replacement of 390kV Reactor LA with 336kV LA At Jabalpur Line will remain out of service due to less clearance of Reactor LA from Line conductor

PGCIL WRTS-II C

78 400 Akola ll-Thaptitanda 27-Aug-14 900 27-Aug-14 1900 Daily To attend chattering noise on B-ph wave trap MSETCL MSETCL

79 400 Vapi- Kala MC Line 27-Aug-14 800 28-Aug-14 1800 DailyConstruction work of Navasari- Boisar line on same Multi ckt tower

WRTS-II WRTS-I C

80 765 Bus 1 at Jabalpur Pooling Station 27-Aug-14 1000 27-Aug-14 1800 Daily

765KV Bus 1 Extension Busbar Stability test related to BINA 3 Line Dia

PGCIL WRTS-II C

81 400 KORBA SIPAT 27 Aug 14 600 29 Aug 14 2200 CONT NORMALISED THE LILO AT PGCIL LANCO C81 400 KORBA -SIPAT 27-Aug-14 600 29-Aug-14 2200 RAMPUR PGCIL LANCO C

82 400 TARAPUR-PADGHE II 27-Aug-14 800 28-Aug-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

83 765 Gwalior-Satna1 28-Aug-14 800 28-Aug-14 1800 Daily For spare reactor commissioning works at Gwalior PGCIL WRTS-II C

84 765 BUS-II and Padge-2 LReactor at Aurangabad (PG) 28-Aug-14 600 28-Aug-14 1800 Daily

Commissioning of Padghe-2 upcoming bay at Aurangabad (PG)

WRTS-I WRTS-I C

85 765 Bilaspur 1 Main bay (710) at Seoni 28-Aug-14 800 29-Aug-14 1800 Daily AMP works WRTS-I WRTS-I R

86 765 765400 AT-2 AT SOLAPUR 28-Aug-14 900 28-Aug-14 1800 Daily Spare ICT unit Aux bus commisioning works WRTS-I WRTS-I C

87 765 Bus Reactor(706 BR) at Bilaspur Ss 28-Aug-14 900 01-Sep-14 1800 DAILY For replacement of unarmoured

cable by TBEA WRTS-I PGCIL C

88 765 Bus 2 at Jabalpur Pooling Station 28-Aug-14 1000 29-Aug-14 1800 Daily

765KV Bus 2 Extension for Switchyard Extension for BINA 3 Line Dia

PGCIL WRTS-II C

89 400 MOUDA 400KV BUS REACTOR 28-Aug-14 0900hrs 29-Aug-14 1800 ContionuouAnnual Maintainance NTPC NTPC

90 765 Satna - Bina 1 29-Aug-14 0900 31-Aug-14 1800 Daily

for erection of new TC amp TE tower forNHPTL at Bina-Rescheduling of outage

PGCIL WRTS-II C

91 765 Bus Reactor at Satna 29-Aug-14 900 30-Aug-14 1800 Continious Commissioning of spre reactor PGCIL WRTS-II Cus

92 400 125MVAr BR1 at Indore 29-Aug-14 900 29-Aug-14 1800 Daily Post Commissioning check of Fire-Fighting system at Indore PGCIL WRTS-II C

93 400 Chorania Hadala line 29-Aug-14 800 29-Aug-14 1800 Daily PMM WORK GETCO GETCO

94 765 Kotra-durg Ckt-2 along with line reactor 29-Aug-14 900 31-Aug-14 1800 Daily WRTS-I PGCIL C

95 765 765400 ICT-2 at Aurangabad (PG) 30-Aug-14 600 30-Aug-14 1800 Daily Altube erection in 400 kV Boisar-

1amp2 Tie bays WRTS-I WRTS-I C

96 765kV Dharamjaygarh - Bilaspur 30-Aug-14 800 30-Aug-14 1800 daily commissioning of JBP-1 bay (side) WRTS-I PGCIL C

97 765kV 330 MVAR Bus Rector-2 at Dharamjaygarh 30-Aug-14 800 30-Aug-14 1800 daily commissioning of JBP-1 bay

(side) WRTS-I PGCIL C

98 400 Mundra Hadala SC 30-Aug-14 800 30-Aug-14 1800 DailyPower Line Crossing of 400 KV DC Bhachau SS (PG) - Varsana SS (GETCO) TrL

GETCO WRTS-II C

99 220 Gwalior - Mahalgaon 1amp2 30-Aug-14 900 31-Aug-14 1800 Continuous

For crossing of 765kV Gwalior - Jaipur line PGCIL WRTS-II C

100 220 Gwalior - Malanpur 1amp2 30-Aug-14 900 31-Aug-14 1800 Continuous

For crossing of 765kV Gwalior - Jaipur line PGCIL WRTS-II C

101 400 400 kV Akola- Nandagaon peth sc 31-Aug-14 800 31-Aug-14 1600 Daily crossing works of 765 kV Koradi-AWRTS-I WRTS-I R

102 400 Bina-Shujalpur2 31-Aug-2014 900 31-Aug-2014 1000 DailyFor Replacement of 390kV Reactor LA with 336kV LA Line

ill b t k i i ith t

POWERGRID WRTS-II C

103 400 Mundra - Sami DC 01-Sep-14 800 01-Sep-14 1800 DailyPower Line Crossing of 400 KV DC Bhachau SS (PG) - Varsana SS (GETCO) TrL

ADANI WRTS-II C

104 400 Akola-Wardha 1amp 2 01-Sep-14 800 30-Sep-14 1800 Daily For Online PID Line in service with AR in non-auto mode WRTS-I WRTS-I For IOwith AR in non auto mode

105 765 Bilaspur 2 Main bay (716) at Seoni 01-Sep-14 800 02-Sep-14 1800 Daily AMP works WRTS-I WRTS-I R

106 400 400220 ICT-1 AT SOLAPUR 01-Sep-14 900 01-Sep-14 1500 Daily AMP WORK WRTS-I WRTS-I R

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

107 765 1000 MVA ICT I amp ICT II at Bina 01-Sep-14 0900 01-Sep-14 1800 Daily Commissioning of Master follower

scheme PGCIL WRTS-II C

108 765 Bus 1 at Jabalpur Pooling Station 01-Sep-14 100000 AM 01-Sep-14 60000 PM Daily

765KV Bus 1 Extension Busbar Stability test related to Bhopal 1 Line Dia

PGCIL WRTS-II C

109 400 Shujalpur - Bina 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

110 400 Birsinghpur-Damoh 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

111 400 Gandhar - Navsari 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

112 400 Khandwa - Rajgarh 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

113 400 Indore - Nagda 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

114 400 Jabalpur - Jabalpur Pool 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II Cnon auto mode

115 400 Khandwa - Dhule 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

116 400 Itarsi - Khandwa 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

117 220 Satna - Satna 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

118 765 Dehgam - Ranchhodpura 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

119 765 Shujalpur - Nagda 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

120 400 Asoj - SSP 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

121 400 Bhachau - Mundra 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

122 400 Bina - Gwalior 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

123 400 Satna - Gwalior 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in PGCIL WRTS-II Cnon auto mode

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

124 400 LILO portion of Vapi - Navi Mumbai at Kala(Vapi-Kala Line) 01-Sep-14 600 30-Sep-14 1800 Daily

Online replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

125 400400 kV Khandwa - Rajgarh

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

126 400400 kV Gandhar-Navsari

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

127 400400 kV Rajgarh ndash SSP

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

128 400400 kV SSP-Asoj

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

129 400 400 kV Shujalpur - Nagda (MPPTCL)

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

130 400400 kV Dehgam - Ranchodpura

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

131 400 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in PGCIL WRTS-II C

400 kV Ranchodpura ndash Bhachaup p y OPGW AR shall be kept in

non auto mode

132 400400 kV Mundra-Bhachau

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

133 400400 kV Vindhyachal NTPC -SASAN UMPP Ckt-1 01-Sep-14 600 30-Sep-14 1800 Daily

Online replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

134 400400 kV Vindhyachal Pooling -Vindhyachal NTPC 01-Sep-14 600 30-Sep-14 1800 Daily

Online replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

135 400 400 kV LILO at Kala (DNH) SS of Vapi-Navi Mumbai Line

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

136 765765 kV Bina - Gwalior

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

137 765765 kV Satna - Gwalior Ckt-I

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

138 400 Gandahr - Navsari DC 01-Sep-14 800 30-Sep-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

139 400 Navsari - Vapi - Kala 01-Sep-14 800 30-Sep-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

PID testing of insulator strings 140 400 Satna - Bina Ckt 1amp2 01-Sep-14 800 30-Sep-14 1800 Daily AR shall be kept In non auto

modePGCIL WRTS-II R

141 400 Nagda - Dehgam DC 01-Sep-14 800 30-Sep-14 1800 Daily PID testing of insulator strings AR h ll b k t I t

PGCIL WRTS-II R

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

142 220 Kakrapar - Vapi DC 01-Sep-14 800 30-Sep-14 1800 Daily PID testing of insulator strings PGCIL WRTS-II R

143

220 220 KV Jhanor - Haldrwa Line 1

01-Sep-14

800

05-Sep-14

000

Continous Replacement of existing CTCVT with 02 class CT amp CVT and for testing of the same NTPC NTPC

144 400 Akola-Aurangabad(PG) 2 01-Sep-14 800 02-Sep-14 1800 Conti commissioning of 50MVAR Lreactor at Aurangabad(PG) WRTS-I WRTS-I C

145 765 Bina-Satna 2 02-Sep-14 0900 03-Sep-14 1800 Daily Post Commissioning check of Fire-Fighting system at Bina PGCIL WRTS-II C

146 400 Vadavi-Chorania 1 02-Sep-14 800 02-Sep-14 1800 Daily PMM WORK WRTGPL GETCO147 400 BUS REACTOR AT SOLAPUR 02-Sep-14 900 02-Sep-14 1500 Daily AMP WORK WRTS-I WRTS-I R

148 765 Korba Line Main Bay (716) at Bilaspur Ss 02-Sep-14 900 02-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

149 765 Bus 2 at Jabalpur Pooling Station 02-Sep-14 100000 AM 02-Sep-14 60000 PM Daily

765KV Bus 2 Extension for Switchyard Extension for Bhopal 1 Line Dia

PGCIL WRTS-II C

150 400 Bus2 at Indore 02-Sep-14 900 02-Sep-14 1800 Daily Jumper connection amp stability checking of Pitampur1 PGCIL WRTS-II C

151 400 CGPL-Limbdi-1 02-Sep-14 2-Sep-14 8AM 6PM Daily routine maintenance and isolator aPGCIL CGPL

152400 Korba-Bhalai line -1

02-Sep-14 900 03-Sep-14 19002 days

continuous CVTs replacement

NTPC NTPC00 o ba a a e us C s ep ace e t

153 400 Sipat 400KV Bus-1 02-Sep-14 900 03-Sep-14 1900 Continous Annual Preventive maintenance NTPC NTPC

154 765 Bilaspur 2 Tie bay (717) at Seoni 03-Sep-14 800 04-Sep-14 1800 Daily AMP works WRTS-I WRTS-I R

155 400 400220 ICT-1 AT SOLAPUR 03-Sep-14 900 03-Sep-14 1500 Daily AMP WORK WRTS-I WRTS-I R

156 765 Sipat2 Main Bay (712) at Bilaspur Ss 03-Sep-14 900 03-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

157 765 Bina-Gwalior 2 03-Sep-14 0900 04-Sep-14 1800 Daily For spare reactor commissioning works at Gwalior PGCIL WRTS-II C

158 765 Bus 2 at Jabalpur Pooling Station 03-Sep-14 100000 AM 03-Sep-14 60000 PM Daily

765KV Bus 2 Extension for Switchyard Extension for Jumpering (Bus Extension) for Bhopal 1

PGCIL WRTS-II C

159 400 Indore-Asoj3 03-Sep-14 900 04-Sep-14 1800 Continuous

For checking protection transfer system at Indore (MPPTCL) PGCIL WRTS-II C

160 400 400 kv Nagda- Rajgarh ckt Pgcil ckt I 03-Sep-14 900 03-Sep-14 03092014 1800 daily Maintenan

ce Work PGCIL EHT- Mamp I

161 400 Vadavi-Chorania 2 04-Sep-14 800 04-Sep-14 1800 Daily PMM WORK WRTGPL GETCO162 220 SOLAPUR(PG)-Solapur(M) 04-Sep-14 900 04-Sep-14 1800 Daily AMP WORK MSETCL WRTS-I R

163 765 Bus 2 at Jabalpur Pooling Station 04-Sep-14 100000 AM 04-Sep-14 60000 PM Daily

765KV Bus 2 Extension Busbar Stability test related to Bhopal 1 Line Dia

PGCIL WRTS-II C

164 400 CGPL-Limbdi-2 04-Sep-14 4-Sep-14 8AM 6PM Daily routine maintenance and isolator aPGCIL CGPL

165 400 400 kv Nagda- Rajgarh ckt Pgcil ckt II 04-Sep-14 900 04-Sep-14 04092014 1800 daily Maintenan

ce Work PGCIL EHT- Mamp I

166400 Korba-Bhalai line -2

04-Sep-14 900 05-Sep-14 19002 days

continuous CVTs replacement

NTPC NTPC

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

167 400 BUS-1 AT SOLAPUR 05-Sep-14 900 05-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I C

168 400 Seoni-Khandwa 1 05-Sep-14 800 05-Sep-14 1800 Daily Line AMP works at Seoni WRTS-II WRTS-I R

169 400 400220 ICT-2 AT BOISAR 05-Sep-14 900 05-Sep-14 1500 Daily For Bushing oil DGA Testing WRTS-I WRTS-I R

170 765 Sipat2 Tie Bay (711) at Bilaspur Ss 05-Sep-14 900 05-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

171 765 Bina-Jabalpur I 05-Sep-14 0900 06-Sep-14 1800 Daily Post Commissioning check of Fire-Fighting system at Bina PGCIL WRTS-II C

172 400 Bus Reactor 1 at Jabalpur Pooling Station 05-Sep-14 100000 AM 05-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

173 220 Navsari - Nasik - 1 05-Sep-14 800 05-Sep-14 1800 Daily PMM WORK PGCIL GETCO174 400 Sipat 400KV Bus-2 05-Sep-14 900 06-Sep-14 1900 Continous Annual Preventive maintenance NTPC NTPC175 400 Akola-Wardha ckt 2 05-Sep-14 800 05-Sep-14 1700 Daily QMwork MSETCL MSETCL176 400 Kalwa-Kharghar 05-Sep-14 900 05-Sep-14 1700 Daily R amp M work MSETCL MSETCL177 400 Seoni-Khandwa 2 06-Sep-14 800 06-Sep-14 1800 Daily Line AMP works at Seoni WRTS-II WRTS-I R178 400 400220 ICT-1 AT BOISAR 06-Sep-14 900 06-Sep-14 1500 Daily For Bushing oil DGA Testing WRTS-I WRTS-I R

179 400 Bus Reactor 2 at Jabalpur Pooling Station 06-Sep-14 100000 AM 06-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

180 765 Gwalior-Satna2 06-Sep-14 800 06-Sep-14 1800 Daily For spare reactor commissioning works at Gwalior PGCIL WRTS-II C

181 400 Indore-Indore1 06-Sep-14 900 07-Sep-14 1800 Continuo For checking protection transfer t t I d (MPPTCL) PGCIL WRTS-II C181 400 Indore Indore1 06 Sep 14 900 07 Sep 14 1800 us system at Indore (MPPTCL) PGCIL WRTS II C

182 220 Navsari - Nasik - 2 06-Sep-14 800 06-Sep-14 1800 Daily PMM WORK PGCIL GETCO

183 400 VAPI-BOISAR 07-Sep-14 800 08-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

184 765 Satna-Gwalior-2 Reactor 07-Sep-14 900 07-Sep-14 1800 Daily For Commissioning of CSD relay in Gwalior-2 reactor bay at Satna PGCIL WRTS-II C

185 220 DC Welspun - Shivlakha amp Anjar shivlakha Trl 07-Sep-14 80000 AM 07-Sep-14 60000 PM Daily

Power Line Crossing of 400 KV DC Bhachau SS (PG) - Varsana SS (GETCO) TrL

GETCO WR-II C

186 765 Bilaspur 1 Tie bay (711) at Seoni 08-Sep-14 800 09-Sep-14 1800 Daily AMP works WRTS-I WRTS-I R

187 400kV Bus-1 at Itarsi SS 08-Sep-14 800 08-Sep-14 1800 Daily AMP amp Protection testing WRTS-II WRTS-II R

188 765 Seoni2 Main Bay (707) at Bilaspur Ss 08-Sep-14 900 08-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

189 765 Bina-Jabalpur II 08-Sep-14 0900 09-Sep-14 1800 Daily Post Commissioning check of Fire-Fighting system at Bina PGCIL WRTS-II C

190 765 ICT 1 at Jabalpur Pooling Station 08-Sep-14 100000 AM 08-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

191 765 Gwalior-Bina3 08-Sep-14 800 09-Sep-14 1800 Daily For spare reactor commissioning works at Gwalior PGCIL WRTS-II C

192 400 V-satna-1 08-Sep-14 900 09-Sep-14 1900 Continuous

Major OH of Line Circuit Breaker (For dismantling of poles) NTPC NTPC

193

220 220 KV Jhanor- Haldrwa Line 2

08-Sep-14

800

12-Sep-14

000

Continous Replacement of existing CTCVT with 02 class CT amp CVT and for testing of the same NTPC NTPC

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

194 400 Vadavi- Kansari- 1 09-Sep-14 800 09-Sep-14 1800 Daily PMM WORK WRTGPL GETCO195 400 Bus-1 at Damoh 09-Sep-14 1000 10-Sep-14 1800 Daily AMP PGCIL WRTS-II R

196 765 Bus Reactor 1 at Jabalpur Pooling Station 09-Sep-14 100000 AM 09-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

197 400 Bina - Shujalpur 1 09-Sep-14 1000 09-Sep-14 1400 Daily AMP PGCIL WRTS-II C

198 400 400 kv Katni- Damoh ckt 09-Sep-14 800 09-Sep-14 09092014 1800 daily Maintenance Work PGCIL EHT-

Mamp I

199 220 220 KV OMKARESHWAR -KHANDWA 09-Sep-14 900 09-Sep-14 09092014 1600 daily Maintenan

ce Work PGCIL EHT- Mamp I

200 220 220KV MALANPUR -AURAIYA 09-Sep-14 900 09-Sep-14 09092014 1700 daily Maintenance Work

EHT- Mamp I

201400 Korba 400 KV Bus coupler -1

09-Sep-14 900 10-Sep-14 19002 days

continuous Annual maintenance and testing

NTPC NTPC

202 400kV Bus-2 at Itarsi SS 10-Sep-14 800 10-Sep-14 1800 Daily AMP amp Protection testing WRTS-II WRTS-II R203 400 400220KV ICT-2 at Seoni 10-Sep-14 800 11-Sep-14 1800 Conti OLTC overhauling works WRTS-I WRTS-I R

204 400 VAPI-BOISAR 10-Sep-14 800 11-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

205 400 Parli 2 Tie Bay (417) at Solapur 10-Sep-14 900 10-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

206 765 330 MVAR Bus Rector-1 at Dharamjaygarh 10-Sep-14 800 11-Sep-14 1700 DAILY CSD relay commissioning in main

bay WRTS-I PGCIL C

207 765 ICT3 Tie Bay (717) at Bilaspur 10 S 14 9 00 10 S 14 18 00 DAILY F AMP k WRTS I PGCIL R207 765 ICT3 Tie Bay (717) at Bilaspur Ss 10-Sep-14 900 10-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

208 765 765kV Dharamjaygarh - Ranchi-2 l 10-Sep-14 900 15-Sep-14 1800 continous

For strining Jumpering of parallel ckt and Crossing of 765kV Dharamjaygarh-Jabalpur line

WRTS-I PGCIL C

209 765 ICT 2 at Jabalpur Pooling Station 10-Sep-14 100000 AM 10-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

210 400 Shujalpur-Nagda 1 10-Sep-14 1000 10-Sep-14 1400 Daily AMP PGCIL WRTS-II C211 400 Vadavi- Kansari- 2 10-Sep-14 800 10-Sep-14 1800 Daily PMM WORK WRTGPL GETCO

212 400 400 kv ISP - Nagda ckt 10-Sep-14 900 10-Sep-14 10092014 1800 daily Maintenance Work

EHT- Mamp I

213 220 220KV MALANPUR -AURAIYA 10-Sep-14 900 10-Sep-14 10092014 1700 daily Maintenance Work

EHT- Mamp I

214 220 220 KV DAMOH PGCIL IC - I 10-Sep-14 800 10-Sep-14 10092014 1800 daily Maintenance Work PGCIL EHT-

Mamp I

215765KV400K

VSipat 765KV400KV ICT-1 10-Sep-14 900 11-Sep-14

1900 Continous Annual Preventive maintenance NTPC NTPC216 400 New Koyna-Dabhol ckt 1 10-Sep-14 830 10-Sep-14 1730 Daily QMwork MSETCL MSETCL217 400 Akola-Aurangabad ckt 1 10-Sep-14 830 10-Sep-14 1730 Daily QMwork MSETCL MSETCL

218 400 TARAPUR-PADGHE I 11-Sep-14 800 12-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

219 400 ICT 2 Main Bay (409) at Mapusa 11-Sep-14 900 11-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

220 765 Korba LR (716 LR) at Bilaspur Ss 11-Sep-14 900 11-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

221 220 Bus-1 at Damoh 11-Sep-14 1000 12-Sep-14 1800 Daily AMP PGCIL WRTS-II R

222 765 Bus Reactor 2 at Jabalpur Pooling Station 11-Sep-14 100000 AM 11-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

223 220MC Bhimasar - Lalpar Bhimasar -Morbi amp Bhimasar - Mansar (on same tower)

11-Sep-14 80000 AM 11-Sep-14 60000 PM DailyPower Line Crossing of 400 KV DC Bhachau SS (PG) - Varsana SS (GETCO) TrL

GETCO WR-II C

224 220 Navsari - Dastan- 1 11-Sep-14 800 12-Sep-14 1800 Daily PMM WORK PGCIL GETCO

225 400 400 kv Rajgarh Pgcil - SSP CKT I 11-Sep-14 900 11-Sep-14 11092014 1800 daily Maintenance Work PGCIL EHT-

Mamp I

226 220 220K KV MEHGAON - AURAIYA 11-Sep-14 900 11-Sep-14 11092014 1700 daily Maintenance Work

EHT- Mamp I

227400 Korba Lanco

11-Sep-14 900 12-Sep-14 19002 days

continuous Annual maintenance and testing

NTPC NTPC

228 400 Lonikand II-Lonikand I 11-Sep-14 900 11-Sep-14 1700 Daily QMwork MSETCL MSETCL

229 400 Parali-Lonikand II ckt 2 11-Sep-14 900 11-Sep-14 1700 Daily QMwork MSETCL MSETCL

230 400 Waluj-Bableshwer 11-Sep-14 900 11-Sep-14 1700 Daily QMwork MSETCL MSETCL

231 400 Tie Transformer-II NTPC-Korba 11-Sep-14 900 12-Sep-14 1700 Maintenance NTPC NTPC

232 400kV Sipat-Raipur-2 12-Sep-14 000 12-Sep-14 1700 Daily Attending hot spots and SD nature defects WRTS-I PGCIL R

233 400 400220 ICT 1 AT WARDHA 12 Sep 14 9 00 12 Sep 14 15 00 Dail For B shing oil DGA Testing WRTS I WRTS I R233 400 400220 ICT-1 AT WARDHA 12-Sep-14 900 12-Sep-14 1500 Daily For Bushing oil DGA Testing WRTS-I WRTS-I R

234 400 Khandwa-Dhule 2 line reactor at Dhule 12-Sep-14 800 12-Sep-14 1800 Daily For Bushing oil DGA Testing

Line in service wo reactor WRTS-I WRTS-I R

235 400 BUS I AT MAPUSA 12-Sep-14 900 12-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

236 765 JBP - Dharmjaygarh Reactor Line 1 Reactor at Jabalpur Pooling Station

12-Sep-14 100000 AM 12-Sep-14 60000 PM Daily Installation amp Commissioning of CSD Relay PGCIL WRTS-II C

237 400 400 kv Rajgarh Pgcil - SSP CKT II 12-Sep-14 900 12-Sep-14 12092014 1800 daily Maintenan

ce Work PGCIL EHT- Mamp I

238 400 400 kv Indore - Nagda ckt 12-Sep-14 900 12-Sep-14 12092014 1800 daily Maintenance Work

EHT- Mamp I

239 220 220K KV MEHGAON - AURAIYA 12-Sep-14 900 12-Sep-14 12092014 1700 daily Maintenance Work

EHT- Mamp I

240 400 Lonikand-Stage IV 12-Sep-14 900 12-Sep-14 1700 Daily QMwork MSETCL MSETCL

241 400 Aurangabad(PG)-Aurangabad (Waluj)-1 12-Sep-14 800 15-Sep-14 1800 Conti Augmentation works at MSETCL

Waluj 400kV SSWRTS-I WRTS-I C

242 400 TARAPUR-PADGHE I 13-Sep-14 800 14-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

243 400 Karad-Lonikand 13-Sep-14 900 13-Sep-14 1700 Daily QMwork MSETCL MSETCL

244 400kV Sipat-Raipur-1 13-Sep-14 000 13-Sep-14 1700 Daily Attending hot spots and SD nature defects WRTS-I PGCIL R

245 400 BOISAR-PADGHE 13-Sep-14 800 14-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

246 400 400220 ICT-2 AT WARDHA 13-Sep-14 900 13-Sep-14 1500 Daily For Bushing oil DGA Testing WRTS-I WRTS-I R

247 400 Khandwa-Dhule 1 line reactor at Dhule 13-Sep-14 800 13-Sep-14 1800 Daily For Bushing oil DGA Testing

Line in service wo reactor WRTS-I WRTS-I R

248 220 BUS I AT MAPUSA 13-Sep-14 900 13-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R248 220 BUS I AT MAPUSA 13-Sep-14 900 13-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

249 765 Korba Line Main Bay (716) at Bilaspur Ss 13-Sep-14 900 13-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

250 400 Dhule-Babhleswar ckt 2 13-Sep-14 900 13-Sep-14 1700 Daily QMwork MSETCL MSETCL

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

251 400 Kolhapur-Mapusa 1 13-Sep-14 800 17-Sep-14 1800 Daily Insulator replacement due to polluted streaches

WRTS-I WRTS-I R

252 400 Kolhapur-Mapusa 1 13-Sep-14 800 17-Sep-14 1800 Daily Insulator replacement due to polluted streaches

WRTS-I WRTS-I R

253 400 Bhachau - Ranchodpura DC(Subject to SLDC consent) 14-Sep-14 80000 AM 20-Sep-14 60000 PM Continuo

us

Shifting of towers to maintain clearance for SSNL canal crossing (Loc 26-33 amp 78-84)

PGCIL WRTS-II C

254 400kV Bhilai-koradi line 15-Sep-14 000 16-Sep-14 000 Daily Attending hot spots and SD nature defects WRTS-I PGCIL R

255 400 Navasari- Kala MC line 15-Sep-14 800 16-Sep-14 1800 DailyConstruction work of Navasari- Boisar line on same Multi ckt tower

WRTS-II WRTS-I C

256 400 SOLAPUR(PG)-KARAD 15-Sep-14 900 20-Sep-14 1800 Conti Tower Erection of Line Reactor gantry of Karad Line at Solapur MSETCL WRTS-I R

257 765 WARDHA-AURANGABAD(PG) 2 15-Sep-14 800 15-Sep-14 1800 Daily

For replacement of Rph reactor unit at Wardha Line in service wo reactor Taking out reactor out of service

WRTS-I WRTS-I R

258 400 Chandrapur 3 Main Bay (420) at Bhadrawati 15-Sep-14 900 15-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

259 765 Seoni1 Main Bay (704 ) at Bilaspur Ss 15-Sep-14 900 15-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL RBilaspur Ss

260 220 Kakrapar-Haldarwa1 15-Sep-14 900 15-Sep-14 1800 DailyReplacement of existing 220kV CTs with High Fault current CTs at Haldarwa SS

PGCIL WRTS-II C

261 400 SSP - Rajgarh - 1 15-Sep-14 800 17-Sep-14 1800 Daily PMM WORK PGCIL GETCO

262

220 Jhanor 220 KV Bus1

15-Sep-14

800

16-Sep-14

000

Continous Replacement of existing CTCVT with 02 class CT amp CVT and for testing of the same NTPC NTPC

263 400 BOISAR-PADGHE 16-Sep-14 800 17-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

264 400 Chandrapur 3Tie Bay (421) at Bhadrawati 16-Sep-14 900 16-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

265 400 Indore-Asoj2 16-Sep-14 80000 AM 16-Sep-14 60000 PM Daily Replacement of broken insulators PGCIL WRTS-II R

266 765 Sasan-Satna2 16-Sep-14 900 17-Sep-14 1800 Daily Power line crossing for stringing of of 765Kv Vin pool- satna ck2 PGCIL WRTS-II C

267 400 315MVA ICT1 at Shujalpur 16-Sep-14 1000 16-Sep-14 1400 Daily AMP PGCIL WRTS-II R

268 220 Kakrapar-Haldarwa2 16-Sep-14 900 16-Sep-14 1800 DailyReplacement of existing 220kV CTs with High Fault current CTs at Haldarwa SS

PGCIL WRTS-II C

269 220 220 KV PITHAMPUR - RAJGARH PG CKT - I 16-Sep-14 900 16-Sep-14 16092014 1600 daily Maintenan

ce Work PGCIL EHT- Mamp I

270 400 V-satna-1 16-Sep-14 900 16-Sep-14 1900 Daily basis For erection of Breaker after OH NTPC NTPC

Construction work of Navasari- 271 400 Vapi- Kala MC Line 17-Sep-14 800 18-Sep-14 1800 Daily Boisar line on same Multi ckt

towerWRTS-II WRTS-I C

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

272 400 HVDC IBay (403) at Bhadrawati 17-Sep-14 900 17-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

273

220 Jhanor 220 KV Bus2

17-Sep-14

800

18-Sep-14

000

Continous Replacement of existing CTCVT with 02 class CT amp CVT and for testing of the same NTPC NTPC

274 400 Parli 1 Main Bay (423) at Bhadrawati 18-Sep-14 900 18-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

275 220 Kawas-Haldarwa1 18-Sep-14 900 18-Sep-14 1800 DailyReplacement of existing 220kV CTs with High Fault current CTs at Haldarwa SS

PGCIL WRTS-II C

276 400 SSP - Rajgarh - 2 18-Sep-14 800 20-Sep-14 1800 Daily PMM WORK PGCIL GETCO

277 400 400 KV Sarni - Seoni ckt 18-Sep-14 800 18-Sep-14 18092014 1800 daily Maintenance Work PGCIL EHT-

Mamp I

278 220 220 KV PITHAMPUR - RAJGARH PG CKT - II 18-Sep-14 900 18-Sep-14 18092014 1600 daily Maintenan

ce Work PGCIL EHT- Mamp I

279 220 220 KV DAMOH PG - TIKAMGARH CKT I 18-Sep-14 800 18-Sep-14 18092014 1800 daily Maintenan

ce Work PGCIL EHT- Mamp I

280 400Sipat 400KV Bay-9 (Raipur-1 Main bay) 18-Sep-14 900 19-Sep-14 1900 Continous Annual Preventive maintenance NTPC NTPC

281 400 Kolhapur-Mapusa 2 18-Sep-14 800 22-Sep-14 1800 Daily Insulator replacement due to polluted streaches

WRTS-I WRTS-I R

282 400 Khandwa 2 Tie bay (423) at 19 S 14 8 00 20 S 14 18 00 D il AMP k WRTS I WRTS I R282 400 Khandwa 2 Tie bay (423) at Seoni 19-Sep-14 800 20-Sep-14 1800 Daily AMP works WRTS-I WRTS-I R

283 400 BOISAR-PADGHE 19-Sep-14 800 20-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

284 400 Parli 1 Tie Bay (424) at Bhadrawati 19-Sep-14 900 19-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

285 220 Kawas-Haldarwa2 19-Sep-14 900 19-Sep-14 1800 DailyReplacement of existing 220kV CTs with High Fault current CTs at Haldarwa SS

PGCIL WRTS-II C

286 400 V-satna-2 19-Sep-14 900 20-Sep-14 1900 Continuous

Major OH of Line Circuit Breaker (For dismantling of poles) NTPC NTPC

287 400 Aurangabad(PG)-Aurangabad (Waluj)-2 19-Sep-14 800 22-Sep-14 1800 Conti Augmentation works at MSETCL

Waluj 400kV SSWRTS-I WRTS-I C

288 400 Parli 2 Main Bay (416) at Solapur 20-Sep-14 900 20-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

289 400 400220 ICT-3 AT MAPUSA 20-Sep-14 900 20-Sep-14 1500 Daily AMP WORKS WRTS-I WRTS-I R

Anaulagnak 33

Agast 2014 AaOr isatmbar 2014 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR AUGUST 2014 AND SEPTEMBER 2014

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)Agast 2014 isatmbar 2014 Agast 2014 isatmbar 2014

AUGUST 2014 SEPTEMBER 2014 AUGUST 2014 SEPTEMBER 2014

1 gaujarat

saIimat 12500 13900 7750 8500

AsaIimat 12540 13940 7760 8510

2 maQya p`doSa

saIimat 6200 6500 3800 4100

AsaIimat 6250 6500 3800 4100

3 CltaIsagaZ

saIimat 3030 3199 16425195 172052635

AsaIimat 3160 3269 172031 169036025

4 maharaYT

saIimat 16050 17750 10700 10800

AsaIimat 16100 17800 10750 10850

5 gaaovaa

saIimat 410 415 290 285

AsaIimat 425 425 300 290

6 dmana dIva

saIimat 315 320 205 200

AsaIimat 320 325 210 210

7 DI ena eca

saIimat 645 640 425 420

AsaIimat 650 645 430 425

8 piScama xao~

saIimat 37614 41048 25600 26080

AsaIimat 37898 41254 26450 27900

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah jaUlaa[- 2014

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 2236 75

]k[- Ukai - 2 529 75]k[- Ukai - 3 000 0]k[- Ukai - 4 2023 75]k[- Ukai (Total) 4788 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 094 2]k[- ela baI saI eca Ukai LBCH - 2 028 2]k[- ela baI saI eca Ukai LBCH (Total) 123 1 0018

3 kDanaa Kadana - 1 699 61 0010kDanaa Kadana - 2 910 57 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 1115 62 0000kDanaa Kadana (Total) 2724 62 0010

4 pnama PANAM amp Madhuban Dam 1 amp 2 160 8 0017 6 kula jalaIya TOTAL(H) 7794 225 0390

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 3339 57 34582 TaoronT pavar ilaimaToD yauinaT DI 6957 122 64083 TaoronT pavar ilaimaToD yauinaT [- 8082 122 67664 TaoronT pavar ilaimaToD yauinaT ef 8380 124 73285 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 037511 Qauvarna tapIya Dhuvaran - GT 2 000 0 116012 Qauvarna tapIya Dhuvaran - STG 1783 10113 ]ka[- yauinaT 1 Ukai -1 000 0 019714 ]ka[- yauinaT 2 Ukai -2 000 0 019315 ]ka[- yauinaT 3 Ukai -3 10038 202 922016 ]ka[- yauinaT 4 Ukai -4 6930 202 697517 ]ka[- yauinaT 5 Ukai -5 11833 212 1138718 ]ka[- yauinaT 6 Ukai -6 30277 507 2287219 gaaMQaInagar 1 Gandhinagar - 1 000 0 008220 gaaMQaInagar 2 Gandhinagar - 2 000 0 009221 gaaMQaInagar 3 Gandhinagar - 3 6275 213 669022 gaaMQaInagar 4 Gandhinagar - 4 6060 212 706523 gaaMQaInagar 5 Gandhinagar - 5 13495 215 1331024 vaNakbaaorI 1 Wanakbori - 1 12142 209 000025 vaaNakbaaOrI 2 Wanakbori - 2 12364 21026 vaaNakbaaOrI 3 Wanakbori - 3 6669 20227 vaaNakbaaOrI 4 Wanakbori - 4 7244 21128 vaaNakbaaOrI 5 Wanakbori - 5 6198 21029 vaaNakbaaOrI 6 Wanakbori - 6 5924 21230 vaaNakbaaOrI 7 Wanakbori - 7 9489 21031 ]trna Utran GT 1 000 0 026832 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 1200 221 024735 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 819 143 1098

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

Anaulagnak 41

ACTUAL GENERATION amp AVALABILITY FOR JULY 2014Actual vaastivak

Actual vaastivak

37 isaka Sikka - 1 1326 107 179438 isaka Sikka - 2 3489 114 401539 kcC ilagnaa[-T Kutch Lignite - 1 5092 71 859040 kcC ilagnaa[-T Kutch Lignite - 2 4929 7141 kcC ilagnaa[-T Kutch Lignite - 3 000 042 kcC ilagnaa[-T Kutch Lignite - 4 2388 68 571043 saUrt ilagnaa[-T Surat Lignite - 1 8775 130 874544 saUrt ilagnaa[-T Surat Lignite - 2 3966 130 445845 saUrt ilagnaa[-T Surat Lignite - 3 5411 130 524346 saUrt ilagnaa[-T Surat Lignite - 4 8973 130 883347 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5446 103 859048 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 6057 10749 jaI Aa[- pI saI ela GIPCL GT - 1 1123 33 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1510 3251 jaI Aa[- pI saI ela GIPCL GT - 3 598 3052 jaI Aa[- pI saI ela GIPCL ST - 1 1846 4553 jaI Aa[- pI saI ela GIPCL GT - 4 357 98 000054 jaI Aa[- pI saI ela GIPCL ST - 2 186 5055 [- esa esa e Aar ESSAR GT - 1 000 0 029356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 083 146 002860 jaI pI [- saI GPEC GT - 2 148 153 023361 jaI pI [- saI GPEC GT - 3 1387 145 028462 jaI pI [- saI GPEC STG 521 7563 jaI esa [- jaI GSEG GT - 1 206 51 112164 jaI esa [- jaI GSEG GT - 2 1079 4765 jaI esa [- jaI GSEG STG 613 2466 Sugen (GT 1 + GT 2) 000 0 693867 saIpIpI sao Aayaat Imp from CPP+MUNDRA 249228 6777

kula tapIya Total (T) 511604 7860 431554kula jalaIya+tapIya Total (H+T) 519398 8078 431944ivaMD [najaI- Wind Energy 94980kula jalaIya+tapIya+hvaa Total (H+T+Wind) 614378 9539ivainamaya Exchanges 150828 saIimat jaa- maaMga Restricted Energy Req 765205

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 767 135

11 gaaMQaI saagar Gandhi Sagar 998 117 008012 raNaa p`tap sagar RPSagar 096 86 004013 javaahr sagar Jawahar Sagar 439 66 0020

2 ponca Pench 1381 160 01003 baargaI Bargi 712 33 00704 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 5724 309 02906 banasaagar Bansagar-2 (Deolondh) 104 407 banasaagar Bansagar-3 (Silpara) 565 31 00608 banasaagar Bansagar-4 (Zinaha) 425 20 00309 maoDIKoDa Medikheda 096 58

10 ibarisaMGapur Birsingpur 680 20 002011 Tavaa Tawa 000 012 rajaGaaT Rajghat 001 7 007013 Omkareshwar 4226 340 14 [Midra saagar Indira Sagar 6679 679 0598

kula jalaIya TOTAL(H) MPPGCL 19979 2031 1152

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 2223 84 179302 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 14496 216 0

Actual vaastivak

4 satpura I Satpura-I(60Share) 000 0 00005 satpura II Satpura-II Unit 6 000 0 83106 satpura II Satpura-II Unit 7 7549 1857 satpura II Satpura-II Unit 8 12446 195 173908 satpura II Satpura-II Unit 9 4038 1759 satpura III Satpura-III Unit 10 9508 219 23440

10 satpura III Satpura-III Unit 11 8675 167 2096011 esajaITIpIesa 1 SGTPS Unit - 1 8675 167 2096012 esajaITIpIesa 2 SGTPS Unit - 2 9354 16013 esajaITIpIesa 3 SGTPS Unit - 3 1129 165 1642014 esajaITIpIesa 4 SGTPS Unit - 4 6022 16015 esajaITIpIesa 5 SGTPS Unit - 5 27597 50816 SSTPS 7895 309 9910

kula tapIya Total (T) 117479 2427 115480kula jalaIya+tapIya Total (H+T) 137458 4759 116632Injection from WIND 14572 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 152030 4759ivainamaya Exchanges 271419 saIimat jaa- maaMga Rest En Req 423449

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 606 120 01102 Gangrel 039 10 00203 Mini Micro KWB 039 7

kula jalaIya TOTAL(H) CSEB 684 137 0520tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 40 125902 kaorbaa (pU) Korba (E) Unit-2 2764 383 kaorbaa (pU) Korba (E) Unit-3 2764 384 kaorbaa (pU) Korba (E) Unit-4 2784 405 kaorbaa (pU) Korba (E) Unit -5 3685 120 244406 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 154608 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 24740

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 13343 243 1124012 KORBA(EB) Extn - 2 14104 248 11250

kula tapIya Total (T) 119955 1644 10189013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 119955 1644kula jalaIya+tapIya Total (H+T) 120639 1781 102410ivainamaya Exchanges 59759 0saIimat jaa- maaMga Rest En Req 180398 1781

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 5228 585 06952 kaoyanaa III Koyna III 3695 3203 kaoyanaa IV Koyna IV 371 11204 kaoyanaa DIpIeca Koyna DPH 414 385 TaTa jalaIya TATA Hydro 10123 741 44976 vaOtrNaa Vaitarna 1151 617 eladarI Eldari 000 168 BaTgar AaOr vaIr Bhatgar amp Vir 036 49 pOzana Paithan 976 49

10 itlaarI Tillari 1036 6511 BaIra Tola rosa Bhira Tail Race 846 4112 GaTGar Ghatghar 3639 25013 Anya CaoTo jalaIya Small Hydro (others) 1041 0

kula jalaIya TOTAL(H) 28404 -1073 5192

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL

Actual vaastivak

3 naaisak 3 Nasik Unit -3 4157 1954 naaisak 4 Nasik Unit -4 12489 1985 naaisak 5 Nasik Unit -5 12480 2006 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 30718 5038 Tambao 6 Trombay Unit -6 6619 5009 Tambao 8 Trombay Unit -8 000 0

10 Tambao 7A gaOsa Trombay -7A (Gas) 7476 127 288611 Tambao 7ba Trombay -7B (WHR) 4373 6912 kaoraDI 5 Koradi Unit -5 000 013 kaoraDI 6 Koradi Unit -6 8448 16714 kaoraDI 7 Koradi Unit -7 10994 19415 Bausaavala 2 Bhusawal Unit -2 4715 16516 Bausaavala 3 Bhusawal Unit -3 6454 16517 Bausaavala 4 Bhusawal Unit -4 20419 50518 Bausaavala 4 Bhusawal Unit -5 23286 43519 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 000 021 parlaI 5 Parli Unit -5 9315 17522 parlaI 6 Parli Unit -6 14237 25323 parlaI 7 Parli Unit -7 14028 25024 KaprKoDa 1 Khaperkheda Unit -1 8108 20025 KaprKoDa 2 Khaperkheda Unit -2 10924 19026 KaprKoDa 3 Khaperkheda Unit -3 7917 20627 KaprKoDa 4 Khaperkheda Unit -4 10446 21028 KaprKoDa 5 Khaperkheda Unit -5 24555 50030 parsa Paras-3 11676 21831 parsa Paras-4 10326 24032 ]rna Uran (Gas) 18771 40133 ]rna Uran (WHR) 10760 138 586234 caMd`pur 1 Chandrapur Unit -1 7526 16535 caMd`pur 2 Chandrapur Unit -2 9375 19936 caMd`pur 3 Chandrapur Unit -3 8728 20037 caMd`pur 4 Chandrapur Unit - 4 12276 47038 caMd`pur 5 Chandrapur Unit -5 29203 41039 caMd`pur 6 Chandrapur Unit -6 26351 040 caMd`pur 7 Chandrapur Unit -7 000 041 DhaNaU 1 Dahanu Unit-1 16882 250 1563042 DhaNaU 2 Dahanu Unit-2 19263 250 1660143 CPP 258820 41160044 RGPPL Share 000 0

kula tapIya Total (T) 692115 14094 350211MAH Wind + Solar Generation 110432 0kula jalaIya +tapIya Total (H+T+Wind) 830951 16176 396382

TOTAivainamaya Exchanges 274116saIimat jaa- maaMga Rest En Req 1105066

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1173 17ivainamaya Exchanges 33083saIimat jaa- maaMga Rest En Req 34256 459

C (F) dmana AaOr dIva DAMAN amp DIU 17467 298ja (G) dadra nagar hvaolaI DNH 43779 673

kula DD ampDNH (T) 61246 970

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 9731 160 1564312 tara`pur 2 TAPS Unit -2 11531 16013 tara`pur 3 TAPS Unit -3 40214 545 7288014 tara`pur 4 TAPS Unit -4 39284 53715 kakrapr 1 KAPS Unit -1 16048 545 3195016 kakrapr 2 KAPS Unit -2 14903 537

kula ena pI saI NPC Total 131710 24842 ena TI pI saI NTPC

Actual vaastivak

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15236 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14181 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14568 214 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 000 025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 32338 51326 kaorbaa esaTIpIesa 6 KSTPS Unit-6 33493 51427 kaorbaa esaTIpIesa 7 KSTPS Unit-7 30558 516

kula kaorbaa KSTPS Total 140373 2548 9318427 ivanQa esaTIpIesa 1 VSTPS Unit-1 13430 21528 ivanQa esaTIpIesa 2 VSTPS Unit-2 11930 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 13695 212210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14017 214211 ivanQa esaTIpIesa 5 VSTPS Unit-5 11952 215212 ivanQa esaTIpIesa 6 VSTPS Unit-6 8991 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 32786 515214 ivanQa esaTIpIesa 8 VSTPS Unit-8 19668 514215 ivanQa esaTIpIesa 9 VSTPS Unit-9 31796 516216 ivanQa esaTIpIesa 10 VSTPS Unit-10 31597 515217 ivanQa esaTIpIesa 11 VSTPS Unit-11 13881 512

kula ivanQayaacala VSTPS Total 233445 REF 16238 31 saIpt -1 -SIPAT-1 38555 66600 32 saIpt -2 -SIPAT-2 16033 66500 33 saIpt -3 -SIPAT-3 43240 66800 34 saIpt -4 -SIPAT-4 25865 51200 35 saIpt -5 SIPAT-5 33302 51500

kula saIpt -SIPAT TOTAL 156995 280100 920541 kvaasa gaOsa 1e Kawas GT-1A 2605 10442 kvaasa gaOsa 1baI Kawas GT-1B 4355 10643 kvaasa esaTI 1saI Kawas ST-1C 3365 11744 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 044 9846 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 10369 309 245151 gaMQaar gaOsa 1 Gandhar GT-1 2177 14352 gaMQaar gaOsa 2 Gandhar GT-2 3014 14553 gaMQaar gaOsa 3 Gandhar GT-3 5333 14754 gaMQaar esaTI 4 Gandhar ST-4 5586 158

kula gaMQaar GGPS Total 16109 437 475161 maaOda 1 Mauda -1 5368 514 000062 maaOda 2 Mauda -2 16240 513 0000

kula maaOda MAUDA Total 21608 756 2258161 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 000 31 000071 esa esa pI SSP RBPH - 1 1265 18872 esa esa pI SSP RBPH - 2 1102 18673 esa esa pI SSP RBPH - 3 1197 18774 esa esa pI SSP RBPH - 4 1116 18675 esa esa pI SSP RBPH - 5 1432 18676 esa esa pI SSP RBPH - 6 1653 18677 esa esa pI SSP CHPH - 1 422 3578 esa esa pI SSP CHPH - 2 384 3079 esa esa pI SSP CHPH - 3 179 34710 esa esa pI SSP CHPH - 4 1012 36711 esa esa pI SSP CHPH - 5 340 30

kula esa esa pI SSP Total 10101 1283 101081 kula poMca Pench Total 1381 160 010082 Jindal Injection 50805 083 Amarkantak Lanco 16857 0

(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2508924

(J) ]plabQata Availability 2439102 naoT ivainamaya Net Exchanges -311541 ]plabQa jaa- Energy Availability 2127561

maah jaUlaa[- 2014 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR JULY 2014 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 13833 - - - 13833 070714 1500 4972

saIimat Restricted 12500

AsaIimat Unrestricted 12540 13833 0 136 0 13969 070714 1500 4972

nyaUnatma pMjaIkRt maaMga Min Registered Demand 7617 7617 250714 0400 4999

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 7090 - - - 7090 020714 2015 4985

saIimat Restricted 6040

AsaIimat Unrestricted 6040 7090 0 31 0 7121 020714 2015 4985

nyaUnatma pMjaIkRt maaMga Min Registered Demand 3895 3895 230714 1500

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3118 3118 050714 2100 4985

saIimat Restricted 3150

AsaIimat Unrestricted 3250 2972 41792 24 0 3414 030714 2000 4977

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1336 1336 220714 1300 4995

maharaYT MAHARASHTRApMjaIkRt Registered 19283 - - - 19283 010714 1600 4994

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19283 62 40 0 19385 010714 1600 4994

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11936 11936 300714 0500 5000

gaaovaa GOApMjaIkRt Registered 405 459 - - 459 260714 2000 4967

AsaIimat Unrestricted 405 459 0 5 - 464 260714 2000 4967

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 532 - - 532 290714 0900 4998

AsaIimat Unrestricted 532 0 0 - 532 290714 0900 4998

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 287 - - 287 060714 1000 4991

AsaIimat Unrestricted 287 0 1 - 288 060714 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 721 - - 721 050714 1700 4983

AsaIimat Unrestricted 721 0 - 721 050714 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 400 435 290714

piScama xao~ WESTERN REGIONpMjaIkRt Registered 43034 - - - 43034 010714 1600 4994

saIimat Restricted 40703

AsaIimat Unrestricted 40905 43034 295 90 0 43419 010714 1600 4994

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28431 28431 240714 0500 5000 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

माह जलाई 2014Jul-14

अनब समातरवतीय चालन PARALLELRADIAL OPERATION TOTAL OPERATING HOURS

1 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-NR)

2 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-SR) 7424400

टाई लाईन TIE LINE

1 765 कवी िसवनी स वधा-I 765kV Soni to Wardha 6780100

2 765 कवी िसवनी स वधा-II 765kV Seoni to Wardha 2043700

3 400 कवी िभलाई स कोराड 400kV Bhilai to Koradi 7440000

4 400 कवी िभलाई स भिावती 400kV Bhilai to Bhadravati 7440000

5 400 कवी रायपर स भिावती -I 400kV Raipur to Bhadravati-I 7440000

6 400 कवी रायपर स भिावती ndashII 400kV Raipur to Bhadravati-II 7440000

7 400 कवी रायपर स भिावती ndashIII 400kV Raipur to Bhadravati-III 7440000

8 400 कवी सातपरा स कोराड 400kV Satpura to Koradi 7060200

9 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7440000

10 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 7440000

11 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7225100

12 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 7082500

13 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 5361200

14 400 कवी को हापर स मापसा-I 400kV Kolhapur-Mapusa-I 4561600

15 400 कवी को हापर स मापसा-II 400kV Kolhapur-Mapusa-II 4793700

16 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7440000

17 400 कवी रायगढ़ स ःटरलाइट-I 400kV Raigarh to Sterlight-I 7371100

18 400 कवी रायगढ़ स ःटरलाइट-II 400kV Raigarh to Sterlight -II 7440000

19 400 कवी रायगढ़ स झरसगड़ा-I 400kV Raigarh to Jharsuguda-I 7302900

20 400 कवी रायगढ़ स झरसगड़ा-II 400kV Raigarh to Jharsuguda-II 7303700

21 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 5400900

22 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7292200

23 400 कवी रायपर स वधाndashI 400kV Raipur to Wardha-I 7440000

24 400 कवी रायपर स वधाndashII 400kV Raipur to Wardha-II 7440000

25 220 कवी कोरबा पव स ब पादर-III 220kV K(E) to Budhipadar-III 7361200

ANNEXURE 43

maah jaUlaa[- 2014 ko daOrana pa~ta iSaDyaUla GaTkaoM Wara koMd`Iya xao~ ko sToSanaaoMM sao D`avala AaOr ivainamayaaoM ka ivavarNa

1 koMd`Iya sToSanaaoMM samaip-t koMd`Iya sToSanaoMa saMyaut inajaI sToSanaaoM kI GaaoiYat xamata (basa pr) AaOr laaBaaiqa-yaaMo kI pa~ta1 Declared Capcity (ex-bus) of Central Gen StnsDedicated CG StnsJointly owned Stns amp entitlement of beneficieries (MUs)

GaaoiYat xamata gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI + ecaDblyaubaI kula

(A) koMd`Iya ibajalaIGar A Central Gen Stns Dec Cap GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC+HWB TOTAL

kaorbaa esaTIpIesa Korba STPS 1017635 174452 237891 103616 324281 102699 23918 26164 1017635kaorbaa esaTIpIesa -III Korba STPS-III 283431 54419 44422 85553 76649 3066 3405 13029 283431ivanQa esaTIpIesa I Vindhyachal STPS-I 674012 123034 240046 1253 246970 19644 7141 23669 12255 674012ivanQa esaTIpIesa II Vindhyachal STPS-II 491154 117386 158375 0909 175903 6532 4569 16539 491154ivanQa esaTIpIesa III Vindhyachal STPS-III 627679 166963 156579 67068 186511 7093 7097 22387 627679ivanQa esaTIpIesa IV Vindhyachal STPS-IV 411100 98631 118464 26475 133406 5356 5241 19338 411100kvaasa gaOsa Kawas GPP 306920 87464 65557 0000 95562 5791 14520 37998 306920gaMQaar gaOsa Gandhar GPP 406294 146476 72428 0000 123833 7814 19389 36310 406294saIpt Sipat 1665864 454494 301337 266370 509047 19436 19662 68224 1665864kakrapar Kakrapar APS 275783 78347 69731 0000 94368 9698 5200 8018 10420 275783tara`pur 3 AaOr 4 Tarapur APS 3amp4 721903 183150 155921 32084 295823 8510 8953 31049 721903

(ba) samaip-t koMd`Iya ibajalaIGar B Dedicated CG Stations Actual injection vaasaivak [njaoSana [Midra saagar Indira Sagar 245570 245570 245570

(sa) saMyaut inajaI sToSana C Jointly owned Stationstara`pur 1 AaOr 2 Tarapur APS 1amp2 196640 98320 0000 0000 98320 0000 0000 0000 196640esaesapI SSP 97965 15674 55840 0000 26450 0000 0000 0000 97965ponca Pench 13620 9080 0000 4540 0000 0000 0000 13620

kula ([M saagar kao CaoD kr) Total (excl Indira Sagar) 11988065 2808880 2297269 640720 3692105 208667 173093 400816 1766516 11988065 Actual injection

2 koMd`Iya sToSanaaoMM samaip-t koMd`Iya sToSanaoMa saMyaut inajaI sToSanaaoM kI ]padna SaoDyaUla AaOr laaBaaiqa-yaaoM kI D`avala SaoDyaUla2 Generation Schedule (ex-bus) of Central Gen StationsDedicated CG StationsJointly owned Stations amp schedule of benificieries (MUs)

SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI+ ecaDblyaubaI kula

(A) koMd`Iya ibajalaIGar A Central Gen Stns Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH

HVDC+HWB Outside region(NR

amp SR) TOTALkaorbaa esaTIpIesa Korba STPS 1015070 174452 238276 103310 321801 102699 23918 26164 1015070kaorbaa esaTIpIesa -III $ Korba STPS-III $ 282671 54342 44422 85185 76334 3066 3405 13029 282671ivanQa esaTIpIesa I Vindhyachal STPS-I 660248 120064 239050 1253 237415 19644 7141 23473 12209 660248ivanQa esaTIpIesa II Vindhyachal STPS-II 488287 117160 156978 0909 174700 6532 4569 16539 488287ivanQa esaTIpIesa III Vindhyachal STPS- III 600504 134916 160349 67878 186319 7093 7227 22827 600504ivanQa esaTIpIesa IV Vindhyachal STPS- IV 409072 98719 118259 24888 133048 5356 5241 19374 409072kvaasa gaOsa Kawas GPP 99574 27083 25459 0000 23510 2678 5916 14915 0000 99574gaMQaar gaOsa Gandhar GPP 154677 55634 30257 0000 41633 3783 8217 15131 0000 154677saIpt Sipat 1448506 290983 323024 258111 436177 19418 23860 69790 1448506kakrapar Kakrapar APS 275783 78347 69731 0000 94368 9698 5200 8018 10420 275783tara`pur 3 AaOr 4 Tarapur APS 3amp4 721903 183150 155921 32084 295823 8510 8953 31049 721903

(ba) samaip-t koMd`Iya ibajalaIGar B Dedicated CG Stations[Midra saagar Indira Sagar 245570 245570 245570

RPPC(NVVNL) 0000

0000

0000

(sa) saMyaut inajaI sToSana C Jointly owned Stations Actual injection vaasaivak [njaoSana tara`pur 1 AaOr 2 Tarapur APS 1amp2 196640 98320 0000 0000 98320 0000 0000 0000 196640esaesapI SSP 97965 15674 55840 0000 26450 0000 0000 0000 97965ponca Pench 13620 0000 9080 0000 4540 0000 0000 0000 13620kula [M saagar kao CaoD kr Total (excl Ind Sagar) 10173905 2352674 2217883 625946 2591731 193349 149578 336130 1706614 10173905

Actual injectionNote- $ These Scheduled Transactions are done by WRLDC under STOA

3 AMtrxao~Iya ivainamayaaoM iWpxaIya ivanamayaaoM kI SaoDyaUla (ima yauinaTsa)3 Schedule for interregional exchangesbilateral exchanges (MUs)

SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kulaxao~ rajya RegionState Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL

k pUvaI- xao~ ko rasto Import SDLs through ER -110482Aayaat SaoDyaUla Indian Energy Exchange (WR to ER) 0000 0000 0000 0000 0000 0000 0000 139465

Power Exchange of India (ER to WR) 0000 0000 0000 0000 0000 0000 0000 3671ER (NTPC) 47912 28298 11592 52018 0000 0786 1209 93903

DVC to MPPTCL (Long Term Open Access) 0000 201316 0000 0000 0000 0000 0000 201316Hirakud to CSEB 0000 0000 1354 0000 0000 0000 0000 1354

APL2 GUVNL to APPCC ( AEL) -0918 0000 0000 0000 0000 0000 0000 -0918APL3 GUVNL to APPCC ( AEL) -0924 0000 0000 0000 0000 0000 0000 -0924

CSEB to APPCC ( NVVNL) 0000 0000 -44813 0000 0000 0000 0000 -44813DBPOWER to APPCC ( GMRETL) 0000 0000 -1828 0000 0000 0000 0000 -1828

JPL to APPCC ( KISPL) 0000 0000 -15225 0000 0000 0000 0000 -15225JPL-II to APPCC ( KISPL) 0000 0000 -11376 0000 0000 0000 0000 -11376

Anaulagnak 45

DETAILS OF ENTITLEMENTSCHEDULEDRAWAL BY THE CONSTITUENTS FROM CENTRAL SECTOR STATIONS AND EXCHANGES FOR THE MONTH OF JULY 2014

(pxaoivasa` Wara jaarI xao~Iya jaa- laoKa ko AaQaar pr)

13896KAWAS(RLNG)

GANDHAR(RLNG)

JPL-II to APPCC ( NVVNL) 0000 0000 -11414 0000 0000 0000 0000 -11414JPL-II to APPCC ( PTC LTD) 0000 0000 -14853 0000 0000 0000 0000 -14853

CSEB to ASEB ( PTC LTD) 0000 0000 -0575 0000 0000 0000 0000 -0575MPPMCL MPSEB to ASEB ( IEXL) 0000 -0575 0000 0000 0000 0000 0000 -0575

APL1 GUVNL to BIHAR ( AEL) -106185 0000 0000 0000 0000 0000 0000 -106185APL2 GUVNL to BIHAR ( AEL) -72520 0000 0000 0000 0000 0000 0000 -72520APL3 GUVNL to BIHAR ( AEL) -51827 0000 0000 0000 0000 0000 0000 -51827

DBPOWER to BIHAR ( MANIKARAN) 0000 0000 -0350 0000 0000 0000 0000 -0350EMCO to BIHAR ( PXIL) 0000 0000 0000 -0413 0000 0000 0000 -0413

GUVNL to BIHAR ( PXIL) -0200 0000 0000 0000 0000 0000 0000 -0200MSEB to BIHAR ( PXIL) 0000 0000 0000 -0100 0000 0000 0000 -0100

MPPMCL MPSEB to BIHAR ( PXIL) 0000 -0150 0000 0000 0000 0000 0000 -0150GUVNL to BESCOM ( GUVNL) -14041 0000 0000 0000 0000 0000 0000 -14041

ESSAR_MAHAN to BESCOM ( ESSAR_MAHAN) 0000 -4353 0000 0000 0000 0000 0000 -4353ADHUNIK to BALCO ( BALCO) 0000 0000 0064 0000 0000 0000 0000 0064

ADHUNIK to BALCO ( MANIKARAN) 0000 0000 7200 0000 0000 0000 0000 7200JSEB(ER) to BALCO ( MPPL) 0000 0000 1481 0000 0000 0000 0000 1481

JSEB(ER) to BALCO ( MANIKARAN) 0000 0000 1200 0000 0000 0000 0000 1200JITPL to BALCO ( BALCO) 0000 0000 1200 0000 0000 0000 0000 1200

STERLITE to BALCO ( BALCO) 0000 0000 18603 0000 0000 0000 0000 18603JSEB(ER) to ESIL_WR ( MPPL) 0600 0000 0000 0000 0000 0000 0000 0600STERLITE to ESIL_WR ( PXIL) 1900 0000 0000 0000 0000 0000 0000 1900

NSPCL to SAIL ROURKELA ( SAIL ROURKELA) 0000 0000 -23994 0000 0000 0000 0000 -23994APL2 GUVNL to TGPCC ( AEL) -1074 0000 0000 0000 0000 0000 0000 -1074APL3 GUVNL to TGPCC ( AEL) -1081 0000 0000 0000 0000 0000 0000 -1081

CSEB to TGPCC ( NVVNL) 0000 0000 -52359 0000 0000 0000 0000 -52359JPL to TGPCC ( KISPL) 0000 0000 -17792 0000 0000 0000 0000 -17792

JPL-II to TGPCC ( KISPL) 0000 0000 -13295 0000 0000 0000 0000 -13295JPL-II to TGPCC ( NVVNL) 0000 0000 -13342 0000 0000 0000 0000 -13342

JPL-II to TGPCC ( PTC LTD) 0000 0000 -17335 0000 0000 0000 0000 -17335TISCO to VFL MPSEB ( TPTCL) 0000 0000 0268 0000 0000 0000 0000 0268

BLAPPL MPSEB to WBSEB ( IEXL) 0000 -0016 0000 0000 0000 0000 0000 -0016DBPOWER to WBSEB ( PTC LTD) 0000 0000 -0595 0000 0000 0000 0000 -0595

MPPMCL MPSEB to WBSEB ( PTC LTD) 0000 -89184 0000 0000 0000 0000 0000 -89184

SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kulaxao~ rajya RegionState Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL

K dixaNa xao~ ko rasto Import SDLs through SR 10967

Aayaat SaoDyaUla Indian Energy Exchange (SR to WR) 0000 0000 0000 0000 0000 0000 0000 0169Power Exchange of India (SR to WR) 0000 0000 0000 0000 0000 0000 0000 0000RSTPS-SR to GOA ( BILATERAL) 0000 0000 0000 0000 2186 0000 0000 2186RSTPS-SR to GOA ( WHEELING) 0000 0000 0000 0000 3118 0000 0000 3118

RSTPS-SR to GOA ( WHEELING GOA) 0000 0000 0000 0000 5494 0000 0000 5494

ga ]trI xao~ ko rasto Import SDLs through NR -321127Aayaat SaoDyaUla Indian Energy Exchange (NR to WR) 0000 0000 0000 0000 0000 0000 0000 -164961

Power Exchange of India (NR to WR) 0000 0000 0000 0000 0000 0000 0000 -3367Rihand (Hydro) to MPPTCL (Long Term Open Access) 0000 7970 0000 0000 0000 0000 0000 7970

Matathilla (Hydro) to MPPTCL (Long Term Open Access) 0000 0000 0000 0000 0000 0000 0000 0000EMCO to BIHAR ( PXIL) 0000 0000 0000 -0188 0000 0000 0000 -0188MSEB to BIHAR ( IEXL) 0000 0000 0000 -0400 0000 0000 0000 -0400

MPPMCL MPSEB to BSES_RAJ ( MPPL) 0000 -7000 0000 0000 0000 0000 0000 -7000ADHUNIK to BALCO ( MANIKARAN) 0000 0000 5198 0000 0000 0000 0000 5198

HIMACHAL to ESIL_WR ( IEXL) 0050 0000 0000 0000 0000 0000 0000 0050HARIYANA to ESIL_WR ( IEXL) 1525 0000 0000 0000 0000 0000 0000 1525HARIYANA to ESIL_WR ( PXIL) 5610 0000 0000 0000 0000 0000 0000 5610

KWHEPS to ESIL_WR ( PXIL) 0150 0000 0000 0000 0000 0000 0000 0150SCL to ESIL_WR ( IEXL) 0610 0000 0000 0000 0000 0000 0000 0610SCL to ESIL_WR ( PXIL) 0090 0000 0000 0000 0000 0000 0000 0090

MPPMCL MPSEB to HARIYANA ( HARIYANA) 0000 -126636 0000 0000 0000 0000 0000 -126636SCL to HRJIL MSEB ( SCL) 0000 0000 0000 1993 0000 0000 0000 1993

APL3 GUVNL to JVVNL-NR ( IEXL) -0120 0000 0000 0000 0000 0000 0000 -0120APL3 GUVNL to JVVNL-NR ( PXIL) -0122 0000 0000 0000 0000 0000 0000 -0122

BLAPPL MPSEB to JVVNL-NR ( IEXL) 0000 -0250 0000 0000 0000 0000 0000 -0250EMCO to JVVNL-NR ( IEXL) 0000 0000 0000 -0720 0000 0000 0000 -0720MSEB to JVVNL-NR ( PXIL) 0000 0000 0000 -0300 0000 0000 0000 -0300

MPSEB to NDPL(DTL)-NR ( PTC LTD) 0000 -1626 0000 0000 0000 0000 0000 -1626MPPMCL MPSEB to NDPL(DTL)-NR ( PTC LTD) 0000 -35052 0000 0000 0000 0000 0000 -35052

MPPMCL MPSEB to RPPC ( RPPC) 0000 -3562 0000 0000 0000 0000 0000 -3562EMCO to TRIPURA ( IEXL) 0000 0000 0000 -0070 0000 0000 0000 -0070

ADHPL to TORRAHM GUVNL ( IEXL) 0051 0000 0000 0000 0000 0000 0000 0051

Ga iWpxaIya SaoDyaUlsa Exchanges within WRMundra APL to Gujarat (LTOA) 0000 0000 0000 0000 0000 0000 0000 0000

JPL to ARVIND GUVNL ( MPPL) 4464 0000 0000 0000 0000 0000 0000 4464JPL to AIGL MSEB ( AIGL MSEB) 0000 0000 0000 0789 0000 0000 0000 0789

JPL to ARPIPL MSEB ( ARPIPL MSEB) 0000 0000 0000 0771 0000 0000 0000 0771JPL to ACCIL MSEB ( ACCIL MSEB) 0000 0000 0000 2380 0000 0000 0000 2380

APL1 GUVNL to AWLD GUVNL ( AEL) 3874 0000 0000 0000 0000 0000 0000 3874DBPOWER to BALCO ( BALCO) 0000 0000 0120 0000 0000 0000 0000 0120

DBPOWER to BALCO ( DBPOWER) 0000 0000 15887 0000 0000 0000 0000 15887EMCO to BALCO ( EMCO) 0000 0000 0080 0000 0000 0000 0000 0080

JPL to BOSCH MSEB ( BOSCH MSEB) 0000 0000 0000 1552 0000 0000 0000 1552JPL to BCSIL MSEB ( BCSIL MSEB) 0000 0000 0000 0720 0000 0000 0000 0720JPL-II to CSEB ( CSPTRDCL CSEB) 0000 0000 12569 0000 0000 0000 0000 12569

SPECT ACBIL to CSEB ( CSPTRDCL CSEB) 0000 0000 0720 0000 0000 0000 0000 0720ACBIL to CSPTRDCL CSEB ( CSPTRDCL CSEB) 0000 0000 5374 0000 0000 0000 0000 5374

JPL to CLASSIC MSEB ( CLASSIC MSEB) 0000 0000 0000 1309 0000 0000 0000 1309JPL to CIPLA MSEB ( CIPLA MSEB) 0000 0000 0000 0610 0000 0000 0000 0610

JPL to CEAT MSEB ( MPPL) 0000 0000 0000 2921 0000 0000 0000 2921APL1 GUVNL to CHLM GUVNL ( AEL) 2187 0000 0000 0000 0000 0000 0000 2187

NSPCL to DD ( DD) 0000 0000 0000 0000 0000 13156 0000 13156EMCO to DNH ( EMCO) 0000 0000 0000 0000 0000 0000 28097 28097

JPL to DNL MSEB ( DNL MSEB) 0000 0000 0000 0870 0000 0000 0000 0870JPL to ETLC MSEB ( ETL) 0000 0000 0000 0758 0000 0000 0000 0758JPL to ETLT MSEB ( ETL) 0000 0000 0000 0758 0000 0000 0000 0758

APL2 GUVNL to ESIL_WR ( PXIL) 0283 0000 0000 0000 0000 0000 0000 0283APL3 GUVNL to ESIL_WR ( PXIL) 8355 0000 0000 0000 0000 0000 0000 8355

DBPOWER to ESIL_WR ( MANIKARAN) 0000 0000 0000 0000 0000 0000 0000 0345EOL GUVNL to ESIL_WR ( ESIL_WR) -19578 0000 0000 0000 0000 0000 0000 0000

EPGL GUVNL to ESIL_WR ( ESIL_WR) -2866 0000 0000 0000 0000 0000 0000 0000JPL to ESIL_WR ( JPL) 0000 0000 0000 0000 0000 0000 0000 45641

JSWEL(RTNGIRI) MSEB to ESIL_WR ( PXIL) 0000 0000 0000 -2328 0000 0000 0000 0000MSEB to ESIL_WR ( PXIL) 0000 0000 0000 -1705 0000 0000 0000 0000

ESSAR_MAHAN to ESIL_WR ( ESIL_WR) 0000 0000 0000 0000 0000 0000 0000 52250VANDANA to ESIL_WR ( PXIL) 0000 0000 0000 0000 0000 0000 0000 0480

JPL to ESIL MSEB ( JPL) 0000 0000 0000 0108 0000 0000 0000 0108ESSAR_MAHAN to ESIL MSEB ( ESIL_WR) 0000 0000 0000 1244 0000 0000 0000 1244

JPL to ETLW MSEB ( ETL) 0000 0000 0000 0732 0000 0000 0000 0732JPL to ETLB MSEB ( ETL) 0000 0000 0000 0866 0000 0000 0000 0866

JPL to EILR MSEB ( MPPL) 0000 0000 0000 1049 0000 0000 0000 1049JPL to ETLK MSEB ( ETL) 0000 0000 0000 0643 0000 0000 0000 0643

JPL to EXIDE MSEB ( EXIDE MSEB) 0000 0000 0000 1239 0000 0000 0000 1239CSEB to GOA ( PTC LTD) 0000 0000 -0400 0000 0400 0000 0000 0000

DBPOWER to GOA ( PTC LTD) 0000 0000 0000 0000 17390 0000 0000 17390JPL to GSL MSEB ( GSL MSEB) 0000 0000 0000 0870 0000 0000 0000 0870

EMCO to GCEL ( EMCO) 0000 0000 3394 0000 0000 0000 0000 3394JPL to HINDMOUDA MSEB ( HINDMOUDA MSEB) 0000 0000 0000 2249 0000 0000 0000 2249

HINDAHEJ GUVNL to HINDTALOJ MSEB ( HINDTALOJ MSEB) -2962 0000 0000 2962 0000 0000 0000 0000EMCO to DNH ( EMCO) 0000 0000 0000 0000 0000 0000 119290 119290

JPL to HNGIL MSEB ( HNGIL MSEB) 0000 0000 0000 5156 0000 0000 0000 5156LANCO TO MP 0000 191431 0000 0000 0000 0000 0000 191431

IEE 103711 47279 -413725 163201 0000 26840 0000 31054PEI 3561 7107 0000 -0214 0000 0000 0000 17561

ca kula Aayaat Total Import 781888 184933 483401 86303 247768 28588 40782 148596 781888kula inayaa-t Total Export 1202530 274418 268404 653270 6437 0000 0000 0000 1202530naoT Aayaat inayaa-t Net Imp (+)Exp (-) -420642 -89485 214997 -566968 241330 28588 40782 148596 -420642

4 kula gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kula

Total GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL11567423 2719395 2512265 73752 3933435 237255 213875 549412 12255 11567424

5 kI kula iSaDUyala Total Sdl incl IR bi-lateral exch Sdl 9753264 2263189 2432879 58978 2833062 221937 190360 484727 12209 97532646 ibanaa xait ko kula D`avala Total Drl excl Tr Loss 9388390 2433257 2716560 597587 2741156 286430 174671 437785 0944 93883907 xait imalaakr kula D`avala Total Drl incl Tr Loss 9703552 2433257 2716560 597587 2741156 286430 174671 437785 0976 93884228 p p`NaalaI maoM kula pUla xait Pooled loss in WR System 3151629 p xao`~ sToSanaaoM sao kaorbaa ivanQa 1 AaOr 2 ivanQa 3 kvaasa gaMQaar kakrapar tara`pur esaesapI ponca kula

vaastivak [njaoSana Actual Inj - WR Stns KSTPS VSTPS-1amp 2 VSTPS-3 KGPS GGPS KAPS TAPS SSP PENCH TOTAL (ima yauinaTsa) (MUs) 1310550 1162242 1009828 99928 156340 275783 918544 97965 13620 12860991

] xao~ Aa ]xao kao ina ] xao naoT d xao Aa d xao inayaa-t d xao naoT pU xao Aa pU xao inayaa-t pU xao naoT kula naoT10 vaasaivak AMtrxao~Iya Actual IR Exchanges NR Imp NR Exp NR Net SR Imp SR Exp SR Net ER Imp ER Exp ER Net Total Net

ivainamaya (ima yauinaTsa) (MUs) 0347 2303947 -2303600 0000 737616 -737616 73271 189494 -116223 -3157439 AMtrxao~Iya ivainamaya IR Exchange Schedule NRI sdl NRE sdl Net NR sdl SRI sdl SREsdl Net SR sdl ERI sdl ERE sdl Net ER sdl Net WR sdl iSaDyaUla (ima yauinaTsa) (MUs) 2987 714531 -711544 404371 0000 404371 0000 113469 -113469 -420642

Total Entitlement incl IR and bi-lateral exchange schedule

11

AMtrxao~Iya AaOr iWpxaIya ivanamayaaoM kI iSaDyaUla imalaakr kula pa~ta

maah jaUlaa[- 2014 ko AMtr-ajyaIya AMtrxao~Iya ivainamayaaoM ka ivavarNa Anaulagnak 46DETAILS OF INTERSTATEINTER-REGIONAL EXCHANGES FOR THE MONTH OF JULY 2014 Annex-46

k`maaMkFrom To

gauivainaila map`iva]kMila Craivabaao maraiva]kMila gaaovaa dmana dIva da na h [ssaar ] xao~ d xao~ pU xao~ piScama xao~ kulaA InterstateInter-regional Schedules

included in ISGSGUVNL MPPGCL CSEB MSPGCL GOA DD DNH ESIL NR SR ER WR TOTAL

1 gauivainaila GUVNL 2962 31082 34044

2 map`iva]kMila MPPGCL 0000

3 Craivabaao CSEB04

0400

4 maraiva]kM ila MSPGCL 4033 4033

5 gaaovaa GOA 0000

6da na h DNH 0000

7kaorbaa KORBA-III 0000

8 iMjadla pavar JPL 4464 12569 26349 45641 89023

9 ADanaI pavar APL 6061 6061

10 ESSAR MAHAN 1244 52250 53494

11 laonakao Lanco -Pathadi 0000

12 esaIbaIAa[-ela -ACBIL 6093 6093

13 KSK MAHANADI14 DB POWER 16008 17390 0345

15 VANDANA 0480

16 EMCO 3473

17 ESIL18 ena esa pI saI ela NSPCL 13157 28097 41254

19 ]ltarI xao~ NRegion (WR end) 0347 0347

20 dixaNaI xao~ S Region (S Bus) 0000 0000

21 pUvaI- xao~ E Region (WR end) 73271 73271

22 p xao~ WRegion (WR end) 737616 189494 3231057

23 enaTIpIsaI NTPC Injection 5216788

24 enapIsaI NPC Injection 1194327

25 Total ISGS drawal from the Grid incl interregional bi-lateral

2433257 2716560 597587 2741156 286430 174671 437785

B InterstateIR Exchanges not included in ISGS

20 knaa-Tk Karnataka 444 44400

21 yaUpIpIsaIela UPPCL 0000 0000

22 AarvaIpIenaela RVPNL -237 -2370

23 UPPCL ( Excess Drawn From Rajghat 0000 0000

24 kaoTa ]jjaOna Kota - Ujjain 0000 0000

25 kula ba Total B (13 to 17) 0000 -2370 0000 0000 44400 0000 0000 42030

C inavala ivainamaya Net Exchange (12+18) 2433257 2714190 597587 2741156 330830 174671 437785 9429476

D kula Aayaat Total Imp by WR 115648

E kula inayaa-t Total Export by WR 3231057

F inavala ivainamaya Net Exchange (D-E) -3115409

G p xao~ Wara vaIlD jaa- Energy wheeled by WR

26 pU xao~ sao d xao~ kao inayaa-t ER export to SR0000

0000

27 d xao~ sao ] xao~ kao inayaa-t pUxao pxao sao haokr SR export to NR via ERWR0000

0000

28 d xao~ sao ] xao~ kao inayaa-t pxao sao haokr SR export to NR via WR0000

0000

29 pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr ER export to NR via WR0000

0000

30 ] xao~ sao d xao~ kao inayaa-t pxao sao haokr NR export to SR via WR393404

393404

31 pU xao~ sao d xao~ kao inayaa-t pxao sao haokr ER export to SR via WR0000

0000

32 pU xao~ sao d xao~ kao inayaa-t ]xao pxao sao haokr ER export to SR via NRWR0000 0000

0000

33 ]pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr NER export to NR via WR0000

0000

Anaulagnak 47Annex-47

maah jaUlaa[- 2014 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39697 65459

9964 39521

Levels in Mtrs str maITr maoM

]ka[- Ukai

64932

10110

25501

25801

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF JULY 2014

ivavarNa Particulars

Sr No Details of incident (Elements Generation Tripped) Owner Utility Date TimeEffect (Loss of generation Load) if

anyCategory as per

Standards1 Bus Fault at Lonikhand 400 kV Bus 1 MSETCL 04Jul14 315 Nil GI‐22 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 06Jul14 433 load Loss 277 MW GD‐13 Tripping of Multiple Elements from 400220 kV Parli (MSETCL) Ss MSETCL 08Jul14 2359 Nil GI‐24 Poles tripping of HVDC Bhadarwati PGCIL 09Jul14 0350 amp 0504 Nil GI‐25 Tripping in Jejuri and Loanand Area MSETCL 10Jul14 126 Load Loss 400 MW GD‐16 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 11Jul14 349 load Loss 335 MW GD‐17 Blackout at Kawas Ss NTPC 11Jul14 117 Gen Loss 320 MW GD‐18 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 13Jul14 642 load Loss 263 MW GD‐19 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 15Jul14 611 load Loss 264 MW GD‐110 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 16Jul14 334 load Loss 200 MW GD‐111 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 17Jul14 417 load Loss 150 MW GD‐112 Tripping at Gandhar Ss NTPC 21Jul14 1607 Gen Loss 180 MW GD‐113 Multiple time tripping of 765 kV Sasan ‐Satna 2 ckt on Protection Mal‐operation PGCILSASAN 7252014 1026 amp 1229 Hrs Nil GI‐2

List of Grid Disturbances and Grid incidents (GDGI) in July-2014 Western RegionANNEXURE-5

SR NO UTILITIES OCC NO MONTH STATUS REMARK 1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14 HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314 AT MUMBAI BY NTPC MUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514 AT MUMBAI BY WRPC AT RELIANCE

7 WRTS-I 460 Jun-14 HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714 AT RAIPUR BY KWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-1411 RELIANCE SASAN 464 Oct-1412 MADHYA PRADESH 465 Nov-1413 BDTCLJBTCL 466 Dec-1414 NTPC Vindhyachal 467 Jan-1515 ESSAR TRANSMISSIOM 468 Feb-1516 TATA POWER 469 Mar-1517 SUGEN (TPL) 470 Apr-1518 TORRENT POWER 471 May-1519 CGPL 472 Jun-1520 NTPC Korba 473 Jul-1521 NCA 474 Aug-1522 NHDC 475 Sep-1523 NTPC Mouda 476 Oct-1524 KSK 477 Nov-1525 RELIANCE 478 Dec-1526 NTPC SIPAT CG 479 Jan-1627 TAPS-3amp4 480 Feb-1628 ESSAR ESIL 481 Mar-1629 GOA 482 Apr-1630 KAPS 483 May-1631 JPL 484 Jun-1632 DNH 485 Jul-1633 NTPC Mumbai 486 Aug-1634 ADANI TRANSMISSION 487 Sep-1635 INDIAN RAILWAY 488 Oct-1636 WRTS-II 489 Nov-16

ANNEXURE 10

8212014

1

OCC MEETING (462nd )

Power system Operation Corporation Ltd

OPERATIONAL HIGHLIGHTS amp ISSUES

Date 11082014Venue ndash Tarapur

MonthsIEGC Band

FVIlt499 499‐5005 gt5005

March14 1291 4783 3927 012

April14 3064 5233 1703 016

May14 2248 5319 2433 013

Junersquo14 3715 4536 1749 02460

80

100

120Frequency Profile for July 2014Frequency Profile for July 2014

Maximum instantaneous frequency

5036 Hz

on 23rd July 2014 at 1304 hrs

Minimum instantaneous frequency

4941 Hz

on 10th July and 25th July 2014 at 1950 hrs and 1944 hrs respectively

Julyrsquo14 3451 5016 1533 020

0

20

40

60

1‐Jul

2‐Jul

3‐Jul

4‐Jul

5‐Jul

6‐Jul

7‐Jul

8‐Jul

9‐Jul

10‐Jul

11‐Jul

12‐Jul

13‐Jul

14‐Jul

15‐Jul

16‐Jul

17‐Jul

18‐Jul

19‐Jul

20‐Jul

21‐Jul

22‐Jul

23‐Jul

24‐Jul

25‐Jul

26‐Jul

27‐Jul

28‐Jul

29‐Jul

30‐Jul

31‐Jul

Avg Frequency of the month

4993 Hz

1High frequency day due to heavy rain in almost all places in the country low demand was observed(117 GW) Heavy underdrawal by all constituents of WR around 700‐1000 MW during 1300 hrs2 Low frequency day Demand was high and Od by constituents Od by NR

lt499 499‐5005 gt5005

8212014

2

501

502

503

504

Frequency for July 2014

496

497

498

499

50

494

495

1 60 119

178

237

296

355

414

473

532

591

650

709

768

827

886

945

1004

1063

1122

1181

1240

1299

1358

1417

1476

1535

1594

1653

1712

1771

1830

1889

1948

2007

2066

2125

2184

2243

2302

2361

2420

2479

2538

2597

2656

2715

2774

2833

2892

2951

3010

3069

3128

3187

3246

3305

3364

3423

3482

3541

3600

3659

3718

3777

3836

3895

3954

4013

4072

4131

4190

4249

4308

Frequency 499 5005

26000

28000

Unit Outage‐ JULY‐14 Max 26128 MW on 26072014JUNE14 Max 20818 MW on 210714

PLANNED OUTAGE FORCED OUTAGE TOTAL OUTAGE‐JULY14 TOTAL OUTAGE‐JUNE14

10000

12000

14000

16000

18000

20000

22000

24000

26000

MW

0

2000

4000

6000

8000

10000

1‐Jul‐14 6‐Jul‐14 11‐Jul‐14 16‐Jul‐14 21‐Jul‐14 26‐Jul‐14 31‐Jul‐14Date

8212014

3

Energy ConsumptionMax

986 Mus on 2nd July+2975 as compared

to last year900

1000

1100

IN M

Us ‐‐‐‐gt

DAILY CONSUMPTION OF WESTERN REGION(2010‐11 TO 2014‐15)

Min749 Mus on 24th July

500

600

700

800

CONSU

MPT

ION

Apr

May Jun

Jul

Aug Sep

Oct

Nov Dec Jan

Feb

Mar

MONTHS ‐‐‐‐gt2010‐11 2011‐12 2012‐13 2013‐14 2014‐15

Energy Consumption MUDay

Jul‐14 Jun‐14 Jul‐13 Change wrt last month

Change wrt last Year

Average 848 927 712 ‐845 1909Max 986 971 760 156 2975Date 2‐Jul‐14 30‐Jun‐14 2‐Jul‐13 ~ ~

PEAK DEMAND (this month vis-agrave-vis last month)

STATE

CATERED(MW) UNRESTRICTED(MW)

Julyrsquo14 Junrsquo14 Julyrsquo14 Junrsquo14

GUJARAT 13833 13755 13969 13906

MP 7090 7120 7121 7434

CHATTISGARH 3118 3472 3414 3473

Regional Demand met

Max 43034 MW(1st July 1600 hrs)

2540 more than the l

MAHARASHTRA 19283 19452 19385 19755

GOA 459 475 459 482

DD 287 298 287 298

DNH 721 677 721 685

ESIL 532 535 532 535

43034 42934 43419 43802

last year

Min 28431 MW(24th July0500 hrs)

WR TOTAL 43034 42934 43419 43802

Figures shown are Maximums in the month

Demand Met Jul‐14 Jun‐14 Jul‐13 Change wrt last month

Change wrt last Year

Average 35215 40463 32253 ‐1297 918Max 43034 42934 34317 023 2540

Date when Max 1‐Jul‐14 30‐Jun‐14 2‐Jul‐13 ~ ~

8212014

4

Constituents Total Time Block Noof time block Violation of Compilance Violation of Compilancein the month of July Type ‐1 Type‐2

Chhattisgarh 2976 983 6697 927 6885Guajrat 2976 681 77 12 222 92 54

DSM Violation for the Month of July 2014

Guajrat 2976 681 7712 222 9254Madhya Pradesh 2976 528 8226 594 8004Maharashtra 2976 1045 6489 442 8515

Goa 2976 712 7608 1868 3723Daman and Diu 2976 1720 4220 2506 1579

Dadar Nagar Haveli 2976 23 9923 1299 5635

Violation Type‐2 When The drawl does not change sign in 12 consecutive time block

Violation Type‐1 When The drawl is more or less than 12 schedule or 150 MW whichever lesser

Total No of Blocks ‐ 2976

New Elements July 2014a) COMMISSIONING OF NEW GENERATING UNITSSLNO CONSTITUENT UNIT NAME UNIT NO C`ty(MW) DATE TIME

1 IPP(Jay Prakash Nigrie) JNSTPP I 660 150714(sync) 845

b) COMMISSIONING OF NEW TRANSMISSION LINES

SLNO CONSTITUENT LINE NAME CKT NO KV DATE TIME Line length( in km)

1 POWERGRID Wardha‐Aurangabad II 765 372014 2300 347 581 POWERGRID Wardha Aurangabad II 765 372014 2300 34758

2 POWERGRID Wardha‐Aurangabad I 765 572014 1900 34758

3 GETCO Kosamba‐Chorania I 400 572014 2035 230

4 GETCO Kosamba‐Chorania II 400 572014 2105 230

5 BDTCL BDTCL‐Bhopal(MP) I 400 16714 1833 864

6 POWERGRIDLILO of Raipur‐Raigarh‐4

IV 400 1872014 2200 2826 POWERGRIDat KSK

IV 400 1872014 2200 282

7 MPPTCL Indore‐Pithampura II 400 210714 1625 150

8 POWERGRIDDharamjaygarh‐Jharsuguda

I 765 29714 000 14893

9 POWERGRIDDharamjaygarh‐Jharsuguda

II 765 28714 2125 14893

Total ckt Km 189366

8212014

5

c) COMMISSIONING OF NEW ICTS

SLNO CONSTITUENT STATION NAME KV RATIOCAPACITY (MVA) DATE

TIME

1 BDTCL BDTCL(Bhopal)ICT 1 765400 3x500 372014 1657

2 POWERGRID Dharamjaygarh(ICT 1) 765400 3x500 772014 22593 POWERGRID Navasari(ICT 3) 400220 500 872014 1959

d)CO SS O G O C O Sd)COMMISSIONING OF LINE REACTORS

SLNO CONSTITUENT STATION NAME Line Name KVCty(MVAR

) DATETIME

1 BDTCL BDTCL Indore‐BDTCL I 765 3x80 23714 1935

2 POWERGRID DharamjaygarhDharamjaygarh‐Jharsuguda II

765 3x110 280714 2125

3 POWERGRID DharamjaygarhDharamjaygarh‐Jharsuguda I

765 3x110 29714 000

4 POWERGRID Satna Satna‐Gwalior‐II 765 3x80 29714 10005 POWERGRID Aurangabad Padghe Aurangabad 1 765 3x80 310714 22 475 POWERGRID Aurangabad Padghe‐Aurangabad‐1 765 3x80 310714 2247

e)COMMISSIONING OF BUS REACTORS

SLNO CONSTITUENT STATION NAME KVCty(MVA

R) DATETIME

1 POWERGRID Bhatapara 400 125 24714 19562 POWERGRID Indore 765 3x80 31714 18273 POWERGRID Sujalpur 400 125 31714 1205

Congestion Charge was applied 3 times in July 2014 on WR‐NR path ie on12th 14th amp 15th July 2014

8212014

6

5515 5484

5200

5400

5600

Congestion Charge applied on WR‐NR path Dt12714 (Block 3 ‐16)

4200

4400

4600

4800

5000WR‐NR TTC(4900 MW)

WR‐NR ATC(4400 MW)

4000

4200

030

034

038

042

046

050

054

058

102

106

110

114

118

122

126

130

134

138

142

146

150

154

158

202

206

210

214

218

222

226

230

234

238

242

246

250

254

258

302

306

310

314

318

322

326

330

WR‐NR_Act(MW) WR‐NR_TTC(4900 MW) WR_NR_ATC(4400 MW)

2200 00

240000

260000

280000

300000

320000

MW

Maharashtra Sch Vs Drawal‐12714(Block 3‐16)

140000

160000

180000

200000

220000

240000

MW

Gujarat Sch Vs Drawal_12714

200000

220000

3 4 5 6 7 8 9 10 11 12 13 14 15 16

TIme Block

Maharashtra_Sch Maharashtra_Drawal

340000

350000

W

MP Sch Vs Drawal_12714(Block 3‐16)

120000

3 4 5 6 7 8 9 10 11 12 13 14 15 16Time Block

GETCO_Sch(MW) GETCO_Drawal(MW)

750008000085000

CSPTCL‐12714(3‐16)

310000

320000

330000

3 4 5 6 7 8 9 10 11 12 13 14 15 16

MW

TIme Block

MP_Sch MP_Drawal

450005000055000600006500070000

3 4 5 6 7 8 9 10 11 12 13 14 15 16

MW

Time Block

CG_Sch CG_Drawal

Under Drawal By WR constituents during the imposition of Congestion on WR‐NR on 12714

8212014

7

5292

5100

5300

Congestion Charge applied on WR‐NR path Dt14714 (Block 57 ‐71)

4638

4300

4500

4700

4900

5100

WR‐NR TTC(4900 MW)

WR‐NR ATC(4400 MW)

3900

4100

1330

1336

1342

1348

1354

1400

1406

1412

1418

1424

1430

1436

1442

1448

1454

1500

1506

1512

1518

1524

1530

1536

1542

1548

1554

1600

1606

1612

1618

1624

1630

1636

1642

1648

1654

1700

1706

1712

1718

1724

1730

1736

1742

1748

1754

1800

WR‐NR_Act(MW) WR‐NR_TTC(4900 MW) WR_NR_ATC(4400 MW)

3600380040004200440046004800

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

MW

Maharashtra Sch Vs Drawal‐14714(Block 57‐71)

1900

2000

2100

2200

2300

2400

2500

2600

MW

Gujarat Sch Vs Drawal_14714

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

TIme Block

Maharashtra_Sch Maharashtra_Drawal

1800

1900

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

Time Block

GETCO_Sch(MW) GETCO_Drawal(MW)

700

750

800

Chhattisgarh Sch Vs Drawal_141714(Block57‐71)

2600

2700

2800

2900

MW

MP Sch Vs Drawal‐14714(57‐71)

500

550

600

650

700

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

MW

Time Block

CG_Sch CG_Drawal

2400

2500

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

Time Block

MP_Sch MP_Drawal

8212014

8

4630

45004700

Congestion Charge applied on WR‐NR path Dt15714 (Block 50 ‐96)

4463

350037003900410043004500

WR‐NR TTC(4150 MW)

WR‐NR ATC(3650 MW)

31003300

1215

1234

1253

1312

1331

1350

1409

1428

1447

1506

1525

1544

1603

1622

1641

1700

1719

1738

1757

1816

1835

1854

1913

1932

1951

2010

2029

2048

2107

2126

2145

2204

2223

2242

2301

2320

2339

2358

WR‐NR_Act(MW) WR‐NR_TTC(4150 MW) WR_NR_ATC(3650 MW)

3800

4000

4200

4400

4600

4800

MW

Maharashtra Sch Ve Actual on 15714(50‐96)

130015001700190021002300250027002900

MW

Gujarat Sch Vs Actual on 15714(50‐96)

3600

50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96

Time Block

Maharashtra_Sch Maharashtra_Drawal

1300

50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96

Time BLock

GETCO_Sch(MW) GETCO_Drawal(MW)

3500

3700

MP Sch Vs Actual for 15714(50‐96)

850

950

1050

Chhattisgarh Sch Vs Actual‐15714(50‐96)

2700

2900

3100

3300

50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96

MW

Time Block

MP_Sch MP_Drawal

350

450

550

650

750

850

50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96

MW

Time BLock

CG_Sch CG_Drawal

8212014

9

Summary of Grid Events (GD amp GI) in July 2014

Sr No

Details of incident (Elements Generation Tripped) Owner Utility Date TimeEffect (Loss of

generation Load) if any

Category as per

Standards

1 Bus Fault at Lonikhand 400 kV Bus 1 MSETCL 04Jul14 315 Nil GI‐2

2 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 06Jul14 433 load Loss 277 MW GD‐1

3Tripping of Multiple Elements from 400220 kV Parli

MSETCL 08Jul14 Nil GI 23(MSETCL) Ss

MSETCL 08Jul142359

Nil GI‐2

4 Poles tripping of HVDC Bhadarwati PGCIL 09Jul140350 amp 0504

Nil GI‐2

5 Tripping in Jejuri and Loanand Area MSETCL 10Jul14 126 Load Loss 400 MW GD‐1

6 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 11Jul14 349 load Loss 335 MW GD‐1

7 Blackout at Kawas Ss NTPC 11Jul14 117 Gen Loss 320 MW GD‐1

8 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 13Jul14 642 load Loss 263 MW GD‐1

9 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 15Jul14 611 load Loss 264 MW GD‐1

10 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 16Jul14 334 load Loss 200 MW GD‐1

11 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 17Jul14 417 load Loss 150 MW GD‐1

12 Tripping at Gandhar Ss NTPC 21Jul14 1607 Gen Loss 180 MW GD‐1

13Multiple time tripping of 765 kV Sasan ‐Satna 2 ckt on

Protection Mal‐operation PGCILSASAN 7252014

1026 amp 1229 Hrs

Nil GI‐2

S No Name of power

stations

Unit Reason for

outage

1 VSTPS 2 (210 MW) Coal Shortage

91 Operation of grid at high frequency ( gt 505 Hz) even under fuel shortage condition

Issues1 Major ISGSIPP are facing fuel

shortage1 VSTPS 2 (210 MW) Coal Shortage

2 VSTPS 5 (210 MW) Coal Shortage

3 Singhaji 1 (600 MW) Coal Shortage

4 SGTPS 4 (210 MW) Coal Shortage

5 JP Bina 2 (250 MW) Coal Shortage

6 Bhusawal 2 (210 MW) Coal Shortage

shortage2 Expected High Demand during dry

spell in September amp October3 Optimal use of precious fuel is

necessary to tackle the high demand in dry spell

7 Parli 4 (210 MW) Coal Shortage

8 India Bulls 1 (270 MW) Coal Shortage

8212014

10

Agenda 92 Insecure operation Oscillations Power Swingbull N‐1 contingency of 765 kV Tirora‐Akola2 on 10th and 11th June 2014

bull Tirora gen gt 1500 MW AR not operatedbull Intra plant mode of oscillations (097 Hz) with poor damping

bull N‐1 contingency of 400 kV Tirora‐Warora‐1 on 20th May 2014N 1 contingency of 400 kV Tirora Warora 1 on 20 May 2014bull Tirora gen gt 1500 MW 765 kV Tirora‐Akola2 out of servicebull SPS bull Power Swing and loss of complete power station GD‐1

bull The need for transmission augmentation as well as PSS tuning at APML Tirodawas discussed in the 461st OCC meeting

bull Member Secretary WRPC suggested that APML would send details of PSSMember Secretary WRPC suggested that APML would send details of PSS tuning studies to WRPC and they may consult IIT‐Mumbai for assistance and expedite

bull Representative from SLDC Kalwa APL may like to update the progress

Events at APML TiroraCase 3 Date 11‐07‐14 1529 hrsbull Line tripped on Y Phase to earth fault AR was unsuccessful due to persisting faultbull Sudden power transfer through 400 kV System resulted in swing Oscillation of 097 Hz observed across WR and

East West generation in Western region oscillatedO ill i i d f 10 dbull Oscillation persisted for 10 seconds

bull Damping ratio was 257

8212014

11

Events at APML TiroraCase 4 Date 23‐07‐14 0227 hrsbull 765400 kV APML Tirora ICT trippedbull Sudden power transfer through 400 kV System resulted in swing Oscillation of 097 Hz observed across WR

and East West generation in Western region oscillatedO ill i i d f 17 dbull Oscillation persisted for 17 seconds

bull Damping ratio was 7

bull Need for transmission augmentation as well as PSS tunning at APML Tiroda required

bull It has been decided in 461th OCC thatAPML would send details of PSS

Expected date of

tuning studies to WRPC and they may consult IIT‐Mumbai for assistance and expedite Representative from SLDC Kalwa APL may like to update the progress

Expected date of bull 2nd ckt of 765 kV Tirora‐Akola2bull 220 kV network from 400220 kV Warorabull 220 kV network from 765400 kV Akola2 and 765400 kV Taptithandabull 220 kV network from 765400 kV Aurangabad‐PG 400220 kV Pune

Redistribution of Load within Maharashtra system

8212014

12

Elements Date and

Time of

Tripping

Date and

Time of

Restoratio

n

Remarks Receipt of

DREL at WRLDC

Satna Sasan

765 kV Sasan‐Satna 225‐07‐14

1026

25‐07‐14

1155

Protection Mal‐Operation DT at Sasan End

on OV as line remain hanging from Sasan No Yes

Agenda 93 Frequent Tripping of 765 kV Satna‐Sasan line

Issues

1Expedite commissioning of Line Reactor at 765 kV Sasanend

2 Submission of DREL for1026 1155end

765 kV 240 MVAr

Bus Reactor at Satna

25‐07‐14

1026

25‐07‐14

1139

Protection Mal‐Operation DT at Sasan End

on OV as line remain hanging from SasanNo Yes

765 kV Sasan‐Satna 225‐07‐14

1342

25‐07‐14

1342

Line got charged from Satna and

synchronized at Sasan end but immediately

DT was received at Sasan from Satna and

Line tripped Prior to tripping voltage at

No Yes

2 Submission of DREL for event analysis in line with CEA standards IEGC

3 Threat to grid security and constraints in evacuation from large generation complexarising from frequent undesirable tripping particularily

Sasan end was 796 kV

765 kV Sasan‐Satna 225‐07‐14

1628‐

Charging attempt was taken from Satna end

but line tripped before synchronization at

Sasan end due to DT from Satna Open end

voltage at Sasan 826 kV for the line

No Yes

The above was a narrow miss because the tripping occurred when one of the bus was under shutdown Fortunately during theabove period only two units of Sasan were in service and the second 765 kV bus remained in service else the situation would havebeen a serious threat to the system security

during protection testing construction activities

The progress of reactor commissioning at Sasan over the last 8 months is given under

Schedule in formed in meetings

SN 451st OCC 455th

OCC

456th OCC 457th 458th 459th 460th 461st

1 Line reactor By Dec By April By May By June End of June End of By By

of 765 kV

Sasan‐Satna

ckt‐2

y

2013

y p

2014

y y

2014

y

2014(Testing under

progress)

2014 (As per

joint report

post site visit

on 26314)

June 2014

y

Aug‐

2014

y

Aug‐2014

2 765kV Bus‐1

Reactor

Jan 2014 By Mar

2014

By June

2014

By June

2014(Testing under

)

End of July

2014(As per

j i t t

End of July

2014

By

Sep‐

2014

By

Sep‐2014

Sasan may intimate the progress in reactor commissioning to the sub-committee

progress) joint report

post site visit

on 26314)

2014

8212014

13

Item no94 SPS at Sipat

bull The SPS scheme implemented at NTPC Sipat received at WRLDC

bull It is observed that a time delay of 15sec is provided to unload units 1 2 4 amp5 each by 150MW if ICT l d d 130 f t d l dany ICT s load exceeds 130 of rated load

bull As per decision of WRPC meeting on 18314 if ex‐bus generation at Sipat is more than 2200 MW immediate unloading of units were decided and the intentional delay provided needs to be re‐ examined (Maximum 2‐3 sec delay may be appropriate) as unloading by 150MW would also take another 4‐5sec

8212014

14

Contingency Envisaged SPS action Identified FeedersTripping of any oneICT at 400200 VapiSub‐Station

Automatic LoadShedding of 100MW

DNH 1) 66 kV‐Kharadpara‐Rakholi‐I 50 MW2) 66 kV Khadoli‐Khadoli‐3 30 MW

Item No95 SPS at 400220 kV Vapi(PGCIL) Item No912

DD1) 66 kV Magarwada‐Kachigam 60 MW

It was apprised by representatives from DD amp DNH in the 459th OCC meeting that the above scheme shall be implemented within a month

UT DDDNHmay apprise the status of commissioning of the envisaged SPSUT‐DDDNH may apprise the status of commissioning of the envisaged SPS

Item no96 Addressing High Voltage condition in SSP amp nearby area Sl No Line No of Times tripped in Julrsquo141 400 kV SSP‐Dhule‐I 32 400 kV SSP ‐ Rajgarh‐ I 2

Issues1 Multiple tripping of

feeders emanating from SSP

2 S l tiSl No Line No of occasions kept open on HV 2 Several emanating feeders being kept open on high voltage in SSP amp nearby area

Sl No Line No of occasions kept open on HV

1 400 kV SSP‐Dhule‐I 9

2 400 kV SSP‐Dhule‐II 6

3 400 kV SSP ‐ Rajgarh‐ I 1

4 400 kV SSP ‐ Rajgarh‐ II 1

bull Operating RBPH machines in synchronous condenser mode during offOperating RBPH machines in synchronous condenser mode during off peak hours

bull Reactor commissioning at Rajgarh amp Dhule to be expedited by WRTS‐II(PGCIL) amp MSETCL

bull Absorption of MVAr by Wanakbori WTS

8212014

15

1 Voltage at Wanakbori was gt420 kV for 100 the time during Julrsquo14

2 WTPS units 567 are injecting MVAR (~ 60 MVAR) at Voltage gt 420 kV

3 Absorption of MVAR by WTPS units is expected during the high voltage condition at WTPS amp nearby area

97Status of implementation of UFRWestern Region

States Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Stage - I 492 Hz Stage - II 490 Hz Stage - III 488 Hz Stage - IV 486 Hz

relief GUJARAT 580 773 580 726 580 1117 590 1025MADHYA PRADESH 460 468 460 450 460 460 465 490CHATTISGARH 150 110 150 114 155 117 155 91MAHARASHTRA 805 1108 810 1200 815 765 820 851GOA 25 25 25 25 25 25 25 25UT DD 10 15 15 15 UT DNH 30 30 35 35 Total load relief 2060 2484 2070 2515 2085 2485 2105 2482

Not received

DD and DNH have not implemented any stage of AUFLS

DD and DNH may appraise the status

Real‐time monitoring of the likely relief available from AUFLS at any given instant mandated by CERC

Telemetry to be provided at SLDC amp RLDC

Not received

8212014

16

Agenda 98 ADMS (Automatic Demand Management Scheme) Implementation as per Sec 542 of IEGC

As per CERC order dt06062014 the target of fully implementation of scheme is by January2015Constituents have to submit bi‐monthly progress report to WRPC Secretariat with a copy to the Commission and WRLDCMP has submitted its detailed action plan in the form of an affidavit to CERC for implementation of ADMS However SLDC MPPTCL is requested to furnish data to OCC forum in the above format

Item No 99 Status of Telemetry in WR

Telemetry Issuesdoc

8212014

17

Item No 910 Black Out at NTPC Kawas Power Station

bull On 11th July 2014 Kawas Gas generating complex got blackout due to tripping of evacuation lines one by one

within a short span of 30 minutes

bull The complete loss of evacuation lines occurred at 0117 Hrs The blackout has resulted in tripping of GT1A

GT1B and ST causing 320 MW generation loss in the area It was reported that weather condition was foggy with

slight drizzling was in the area

LineTime of Tripping

Kawas End Remote endRestoration Time

220 kV Kawas‐Navsari1

1246 AM

R phase to EF

Fault location 2 km

R Phase to EF

122 AM

220 kV Kawas ndashNavsari2

112 AMR phase to EF

Fault location 2208 km

R Phase to EF 347 AM

220 kV Kawas‐Haldarwa 1

107 AMR phase to EF

Fault location 16 km

R Phase to EF 246 AM

220 kV Kawas‐ R phase to EF R Phase to

bull Line restoration has failed on several attempt as the lines

were not holding due to persisting fault

bull Such an event of total loss of evacuation lines from a

generating station resulting in blackout scenario is a

matter of serious concern

bull WRTS-2 may kindly send the reasons for such faults

which has caused the incidence and the remedial action

taken in this regard220 kV Kawas‐Haldarwa 2

108 AMp

Fault location 2 kmEF 304 AM

220 kV Kawas‐Icchapur1

108 AM B phase to EFB Phase to EF

301 AM

220 kV Kawas‐Icchapur2

108 AMB phase to EF Faultlocation 356 km

B Phase to EF

331 AM

220 kV Kawas‐Vav 1 117 AMNo tripping

Hand Tripped laterLine Tripped 225 AM

220 kV Kawas Vav 2 117 AM Y Phase to EFY Phase to EF

317 AM

taken in this regard

bull Disturbance Recorder (DR) and Event Logger(EL) out

puts are yet to be received from WRTS-2

bull As per IEGC the information like DREL output relay

indications amp sequence of events etc must be sent to

RLDCRPC by 24 hrs of the event WRTS-2 may kindly

expedite amp furnish the information to WRLDC amp WRPC

Item No 911 Operating Procedure of WR-2014

The operating procedure of Western Region 2014 has been updated on 31072014 and the p g p g psame has been uploaded on WRLDC web site at the following link

httpwwwwrldccomdocsWR_OPERATING_PROCEDURE_2014pdf

8212014

18

Item No 12 Mock Black start Exercise

Station Name Date Proposed Remarks

Mock Black Start Plan for the following stations has been received by WRLDC

CLPIPL Gas Power Plant 29‐Jun‐2014 ‐

Gandhar Gas Power Plant 27‐July‐2014 ‐

Other Utilities may update the sub‐committee regarding their plan for black start exercise

SL No Name of the Station Remarks

1 Bargi DG set under outage

2 TONS Governor Problem

3 Birsinghpur Governor Problem

Healthiness of DG sets

3 Birsinghpur Governor Problem

4 Medikheda Governor Problem

5 Rajghat Governor Problem

1 Outage of DG set for longer period is matter of serious concern 2 SLDC Jabalpur may apprise the present status2 SLDC‐Jabalpur may apprise the present status3 Possibility of procurement of stand‐by DG sets to be examined to take care of such prolonged outage of DG sets which virtually renders the black start facility sterile4 There is need for blackstart generator planning in W3 area Thermal IPP generators are disconnected from state grid and there is no hydro station So with only UHV lines and large thermal units system restoration post disturbance would be extremely challenging for Chattisgarh

8212014

19

Maharashtra

Madhya Pradesh

Item No13 Review of list of feeders for load regulation in emergency

Gujarat

DD amp DNHChattisgarh

Goa

bull Decided during the 461st OCC that list ofDecided during the 461st OCC that list of

feeders identified for load control under

emergency measure for safeguarding grid

security would be reviewed in a special

meeting The list is yet to be reviewed

8212014

20

Item No 14 Implementation of voltage and time grading on OV relays to prevent tripping of multiple EHV lines emanating from single node on high voltage

bull During the 461st OCC it was informed by Power Grid representative that they have already implemented voltage grading in various line emanating from the same node (matter has not come in the MoM)

bull Power Grid amp other utilities may kindly intimate the present status of voltage grading at their respective sub‐stations

Power Station Number of instances

when the SPS signal

was received at the

station

Number of instances

when the action by

the generators was

adequate

Number of instances

when the automatic

generation reduction was

done partially

JPL 53 0 50

Item No 15 SPS for SR‐WR Inter Connection Inadequate Participation by Generators

Issues

1 10 times operation of SPS‐1 causing backing down at JPL amp KSK during 1714 to 7 8 14JPL 53 0 50

KSK 53 0 36

APML 35 0 30

Mouda 35 0 0

Koyna 0 0 0

Koradi 0 0 0

Khaparkheda 0 0 0

Chandrapur 0 0 0

to 78142 Participation by other envisaged

generators to be expedited3 PGCIL may update status of Extention of

SPS signal from Solapur(PG) to the additional generators identified for participation

4 Decided in 461st OCC to have special Chandrapur 0 0 0

DB Power 0 0 0

NSPCL 0 0 0

Balco 0 0 0

Lanco 0 0 0

KWPCL 0 0 0

pProtection Sub‐Committee meeting to discuss progress of implementation of the revised SPS at Solapur (for WR‐SR interconnection) amp extension of signal from Sholapur to additional generators in WR

8212014

21

Thank you

DiscussionhelliphelliphellipDiscussionhelliphelliphellip

  • 462 occ_minutepdf
  • participants list_462 OCC meeting 110814pdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 26-7pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 45pdf
  • 46pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84pdf
  • 84apdf
    • 26wrpc_minute 107pdf
    • 26wrpc_minute 108pdf
    • 26wrpc_minute 109pdf
    • 26wrpc_minute 110pdf
    • 26wrpc_minute 111pdf
    • 26wrpc_minute 112pdf
    • 26wrpc_minute 113pdf
      • 85pdf
      • 87pdf
      • 98pdf
      • 913pdf
      • 10pdf
Page 11: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR

11

462nd OCC MINUTES

ACBIL 1 300 March 2015 SASAN 5 660 July 2014 SASAN 6 660 August 2014 Sasan 4 660 Synchronized in May 2014

Sub-committee noted as above ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS (A) FOLLOW-UP ITEM NO 81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

All the constituents are requested to submit the CMP report for the First quarter

(April 2014 to June 2014) for the year 2014-15

The Sub-Committee members noted as above ITEM NO 82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR

Status of physical amp cyber security in Power Sector for the First quarter (April 2014 to

June 2014) for the year 2014-15 have not been received from some of the

constituents

The Sub-Committee members noted as above ITEM NO 83 PROCEDURE FOR CALCULATION OF TRANSMISSION SYSTEM

AVAILABILITY FACTOR FOR A MONTH AS PER CERC REGULATION 2014-19

Member Secretary WRPC informed that a procedure for calculation of

transmission system availability factor as envisaged in CERC Regulation 2014-15

was discussed in 461st OCC held at Raipur Various aspects were discussed and

finalized However there were concerns expressed by transmission licensee

regarding addition of 12 hrs to outage hrs after each tripping beyond admissible 2

tripping in a year as it will reduce availability below 95 Also concern was

expressed for multiplying outage hrs by 2 for line affecting generation Also

whether addition of 12 hrs is applicable to such lines affecting generation was

also expressed Whether these clauses are applicable to HVDC system was not

known Therefore all such concerns of transmission licenses have been taken up

with CERC for revision clarification

Meetings were held on 1st and 4th August 2014 with transmission licenses

regarding verification of data data formatting and sorting out various anomalies

and doubts for data from April to July 2014 for further processing at WRPC end

12

462nd OCC MINUTES

Member Secretary WRPC informed that certification for some transmission licensees

has already been done The certificate for PGCIL is to be issued as effect on

generation evacuation certificate from WRLDC is awaited

CM WRLDC requested all the transmission licensees to submit the data to WRLDC in

same format as submitted to WRPC

Representative from Transmission licensees agreed the same

The Sub-committee noted as above ITEM NO 84 IMPLEMENTATION OF RSD METHODOLOGY Shri Satyanarayan SE WRPC informed that GM (OSampC) NTPC HQ-I Mumbai vide letter dated 28072014 (copy enclosed at annexure 84) requested to call a meeting for resolvingclarification of methodology developed by WRPC The procedure for RSD framed by WRPC is enclosed at Annexure 84A SLDC MPPTCL Jabalpur informed that RSD was implemented for NTPC Mauda unit

on 18072014 but it was not more extended beyond 20072014 as no other major

beneficiaries agreed for extension

CE GETCO informed that intermittent rain profile in the different geographical area of

Gujarat amp increasing demand pattern didnrsquot permit them to take RSD of any NTPC

units as minimum of 3 days is required

Representative from SLDC Maharashtra also endorsed the Gujarat view points on

RSD

GM NTPC requested to the committee that if RSD wasnrsquot possible then at least

technical minimum schedule should be given

Member Secretary WRPC summarized the matter as follows

1 RSD was implemented for NTPC Mauda unit from 18072014 to 20072014

but it could not be extended due to increasing demand pattern amp uncertainty of

rain profile in the region

2 The method framed by WRPC shall be continued amp will be applied as and

when required

3 He requested constituents to schedule the NTPC generating units at its

technical minimum in case RSD is not feasible

The Sub-committee noted as above

13

462nd OCC MINUTES

ITEM NO 85 LOAD FORECASTING IN WESTERN REGION Background- As per the amended Indian Electricity Grid Code that is effective from 17th February 2014 the SLDCs SEB distribution licensees shall always restrict the net drawal of the State from the grid within the drawal schedule keeping the deviations from the schedule within the limits specified in the Deviation settlement mechanism regulations Therefore it is imperative that adequate attention may be paid towards load forecasting The matter was discussed in the past several OCC as well as in the 26th TCCWRPC board meeting wherein it was decided to create a task force for exploring development of a software for load forecasting A meeting was held on 03042014 under leadership of CE(SLDC) GETCO Gujarat at

Mumbai The outcome of the Meeting was as following

1 Short term action a) all the discoms were advised to provide maximum historical data b) Discoms have to bifurcate the geographical area in to zone and derive effect of temp rain festival on load

2 Long term action a) Provide computer base meters up to all the distribution feeders for close monitoring b) Provide weather sensors at various strategically important locations c) Formulation of forecasting desk (load amp RE) at SLDC level

The 2nd meeting regarding Load Forecasting Mechanism was held with members of WRPC WRLDC Western Region SLDCs amp State Discoms Forecasting Service Providers (FSPs) on 110614 at SLDC Vadodara Gujarat During the 460th OCC meeting CE SLDC GETCO informed that roadmap for implementation of pilot project amp main project has been prepared Budget proposal have already called from FSP amp they assured to submit till the end of the month For implementation of pilot project the Utility and their respective Pilot FSP are decided as tabulated below

Sr No STATE ndashSLDCDISCOM Pilot FSP

1 GUJARAT MS TESLA

2 MAHARASHTRA IIT MUMBAI

3 MADHYA PRADESH MS METEOLOGICA

4 CHHATISGARH MS SAS

5 GOA MS MARCADOS

6 DDDNH IITGANDHINAGAR

MP informed vide letter dated 27062014(copy enclosed at 85) that they have

already placed on order to Ms L amp T InfoTech on 12072013 for load forecasting

software project Therefore MP had requested to exclude them from pilot project

activities decided in earlier meetings

14

462nd OCC MINUTES

462nd OCC Discussions- State wise status is as under -

bull CE SLDC informed that Gujarat has prepared the NDA and forwarded to TESLA for signing and the same was signed by TESLA New Zealand office and their Mumbai office shall forward the same to SLDC Gujarat Thereafter Input data shall be provided and ID shall be provided to TESLA so as to start forecasting by them

bull SLDC Gujarat vide letter no SLDCCEMIST-6458 dtd 270614 has conveyed to all WR Nodal SLDC coordinators regarding progress of load forecasting pilot project Thereafter also e mailed on date 2082014 to all Nodal SLDC for submission of status Report on Pilot Load Forecasting Project However no proper response is received so far

bull MP SLDC conveyed that they have already awarded contract for load forecasting and the same is expected to be available by year end Therefore MP shall not participate in the present scheme

bull SLDC Chhattisgarh representative informed that matter has been taken with discom Chhattisgarh Discom were facing difficulties to contact with coordinator of Ms SAS

CE SLDC Gujarat being a group leader stated that Chhattisgarh shall intimate to them for further needful and would help them in this matter

bull Maharashtra SLDC informed that there was a meeting held on 09082014 with IIT Bombay where availability of data has been discussed amp one more meeting will be held on 22082014 outcome of the same will be intimated in next OCC meeting BEST amp TATA are already having such forecasting system

bull No one from GOA has attended last meeting even though GOA was forwarded copy of MOM Due to non availability of any coordinator details of GOA it was not possible to contact them However Ms Marcadose has also conveyed that he has not been contacted by Goa

bull No one from DDDNH has attended last meeting even though DD DNH was forwarded copy of MOM However IIT Gandhinagar conveyed that they were not been contacted by DD DNH

Member Secretary WRPC informed that a letter to DD DNH amp GOA has been written

from WRPC secretariat regarding implementation of ADMS Load Forecasting amp

telemetry status He further requested the constituents to implement the decision

taken in earlier meeting of load forecasting

OCC suggested that the next load forecasting meeting may be held at DDDNH

The Sub-committee noted as above

15

462nd OCC MINUTES

ITEM NO 86 NEED OF COOPERATION FROM WRLDC IN REAL TIME

bull CE SLDC informed that at present APL is under their control area and embedded scheduling model is used It may be noted that for units 78amp 9 at APL Gujarat has no share (all are for NR beneficiaries)There have been occasions when units 78amp 9 have tripped (given at annexure) Since APL is shown as embedded in Gujarat WRLDC requested Gujarat to reduce overdrawl when APL units 78amp 9 trips Hence Gujarat has to pick up state generationcostlier generation for no fault of Gujarat

bull Further lines are opened to curtail overdrawl when Gujarat is not faulty Gujarat is seen as overdrawing (due to embedded scheduling of APL) when APL trips

bull To complicate matters the scenario coupled with wind variations state generation has to be constantly varied to avoid overdrawl

Gujarat requested followings-

1 When large sized units (APL units 78amp 9) trips then scheduling of Gujarat should be changed with immediate effect OR Gujarat should not be pursued for deviation correction to the extent of schedule of units tripped at APL units 78amp 9 OR Schedule of Gujarat from other central sector stations should be changed as per their request with immediate effect

2 APL units 78amp 9 should be made a separate control area 3 Under above circumstances transmission lines should not be opened

due to default by APL as these affects Gujarat without any fault of their own Further this was done without informingtaking SLDC into confidence It was clear from the discussions that Gujarat Discoms are put to unnecessary financial implications WRLDC clarified that 220 KV Dehgam- Khanpur Line no1 was opened due to frequency touching 493 Hz and control of overdrawl was taken as security measure WRLDC agreed to inform CE SLDC whenever such discussions are taken and agreed to take care in future

The Sub-committee noted as above

ITEM NO 87 GUIDE LINES FOR SPLIT BUS OPERATION AT SSP RBPH SWITCHYARD CE SLDC Gujarat vide letter dated 07082014 informed that a meeting was held on

220514 at Kevadia Colony SSP regarding split bus arrangement at SSP RBPH

16

462nd OCC MINUTES

switchyard and subsequent discussions during 55th meeting of PSC of NCA held in

Vadodara on 140714 the guidelines for the same had been prepared in consultation

with GETCO protection wing and sent vide mail dated 23072014 However the same

has been attached herewith as Annexure-87 It was clarified during discussion that

split bus operation would be used only as per requirement and will not be a permanent

arrangement

The Sub-committee noted as above

ITEMS FROM WRLDC

1 OPERATION OF GRID AT HIGH FREQUENCY ( gt 505 HZ) The onsetrevival of monsoon in the last fortnight of July 2014 has reduced the demand in Western Region However the demand would pick up sharply during the dry spell in September and October months Presently the major State Central Sector IPP generators in Western Region that are facing coal shortage are tabulated as under S No Name of power

stations Unit Reason for

outage 1 VSTPS 2 (210 MW) Coal Shortage 2 VSTPS 5 (210 MW) Coal Shortage 3 Singhaji 1 (600 MW) Coal Shortage 4 SGTPS 4 (210 MW) Coal Shortage 5 JP Bina 2 (250 MW) Coal Shortage 6 Bhusawal 2 (210 MW) Coal Shortage 7 Parli 4 (210 MW) Coal Shortage 8 India Bulls 1 (270 MW) Coal Shortage Likewise several Gas Power Stations in Western Region are facing fuel shortage Under the above circumstances it is desirable that precious fuel optimally utilized to maintain adequate stock for the dry spell In the month of July 2014 the grid frequency remained above 5005 Hz for more than 15 of the time while it remained below 499 Hz for more than 34 of the time Operation of high frequency is unnecessary loss of fuel that could have been conserved and utilized during low frequency regime

The Sub Committee noted the same

17

462nd OCC MINUTES

2 OBSERVATION OF INTRA-PLANT MODE OF OSCILLATIONS (097 HZ) WITH POOR DAMPING ON 10TH AND 11TH JUNE 2014 AND LOSS OF 1800 MW IN MAHARASHTRA SYSTEM DUE TO POWER SWING UNDER N-1 CONTINGENCY ON 20TH MAY 2014 The issue of Intra plant mode of oscillations with poor damping as observed during the grid event on 10th and 11th June 2014 was discussed during the 461st OCC meeting Similar oscillations were again recorded on 11th July 2014 GM WRLDC informed that they have written to generators seeking details of MW fluctuations PSS status etc and requested constituents to share the dataHe requested that constituents may share PMU data also CESLDC Gujarat informed that they are proposing PSS tuning with consultants from IITs in their system EE SLDC Maharashtra informed that APL-Tiroda has recently tuned PSS at Tiroda units by OEM

It was once again requested constituent to furnish information as designed by WRLDC The Sub Committee noted the same

3 FREQUENT TRIPPING OF 765 KV SATNA-SASAN LINE

WRLDC informed that 765 kV Sasan-Satna Line has tripped on three occasions

while 240 MVAr Bus Reactor at 765 kV Satna tripped on one occasion The

tripping occurred due to protection mal-operation at Satna end during stability test

for the 765 kV Bus-1 The details of the tripping is given below

The above OV at Sasan end could have been avoided if the Line Reactor of this line at Sasan end had been commissioned The restoration of the tripped circuit also was considerably delayed in the absence of Line Reactor at Sasan end

Elements Date and Time of Tripping

Date and Time of Restoration

Remarks Receipt of DREL at WRLDC Satna Sasan

765 kV Sasan-Satna 2

25-07-14 1026

25-07-14 1155

Protection Mal-Operation DT at Sasan End on OV as line remain hanging from Sasan end

No Yes

765 kV 240 MVAr Bus Reactor at Satna

25-07-14 1026

25-07-14 1139

Protection Mal-Operation DT at Sasan End on OV as line remain hanging from Sasan

No Yes

765 kV Sasan-Satna 2

25-07-14 1229

25-07-14 1342

Line got charged from Satna and synchronized at Sasan No Yes

18

462nd OCC MINUTES

end but immediately DT was received at Sasan from Satna and Line tripped Prior to tripping voltage at Sasan end was 796 kV

765 kV Sasan-Satna 2

25-07-14 1628 -

Charging attempt was taken from Satna end but line tripped before synchronization at Sasan end due to DT from Satna Open end voltage at Sasan 826 kV for the line

No Yes

Representative from Sasan UMPP informed that with regards to the 765 kv Line and

Bus reactors all the material required for completion of works have been received at

site

Line reactor and bus reactor would be commissioned by Aug14 and Sep 14

respectively

The Sub Committee noted the same 4 SPS AT SIPAT

The SPS scheme implemented at NTPC Sipat has been received at WRLDC It is observed that a time delay of 15sec is provided to unload units 1 2 4 amp5 each by 150MW if any ICT s load exceeds 130 of rated load It was conveyed that if ex-bus generation at Sipat is more than 2200 MW immediate unloading of units may be done and the intentional delay which is required to prevent mal-operation may be 45 second instead of 15 second

NTPC Sipat representative agreed to implement the same accordingly The Sub Committee noted the same

5 COMMISSIONING OF SPS AT 400220 KV VAPI During the special WRPC meeting on 18032013 at Dadra an SPS for automatic load shedding subsequent to tripping of 400220 kV ICT at Vapi was approved as under It was decided that POWERGRID would extend trip signal from Vapi ICTs to the requisite feeders

Contingency Envisaged SPS action

Identified Feeders

Tripping of any one ICT at 400200 Vapi Sub-Station

Automatic Load Shedding of 100MW

DNH 1) 66 kV-Kharadpara-Rakholi-I 50 MW 2) 66 kV Khadoli-Khadoli-3 30 MW DD 1) 66 kV Magarwada-Kachigam 60 MW

19

462nd OCC MINUTES

It was felt that due to change in topology loading in ICT is not critical however SPS may be in place as defense mechanism in case of any emergency

DD amp DNH representative were absent in the meeting The Sub Committee noted the same

6 ADDRESSING HIGH VOLTAGE CONDITION IN SSP amp NEARBY AREA

High voltage condition is being observed at SSP and nearby area in off peak period particularly between 2300 hrs at night to 0500 hrs in the morning Also on many occasions the system operator is compelled to hand trip the 400 kV lines emanating from SSP to control over voltage Summary for the month of Julyrsquo14 is given under

Sl No 400 kV Line DatailsFrom To

Time Date Time Date 1 SSP-RAJGARH-I 0009 19-Jul-14 0730 29-Jul-14 2 SSP - RAJGARH-II 0406 16-Jul-14 1016 18-Jul-14 3 SSP-DHULE-I 1310 22-Jul-14 0953 23-Jul-14 4 SSP - DHULE - II 1533 15-Jul-14 0734 18-Jul-14 5 SSP - DHULE - I 1703 10-Jul-14 1100 11-Jul-14 6 SSP-DHULE-I 1712 28-Jul-14 0933 31-Jul-14 7 SSP - DHULE - II 1730 19-Jul-14 0917 20-Jul-14 8 SSP - DHULE - I 1757 18-Jul-14 0935 19-Jul-14 9 SSP-DHULE-II 1809 21-Jul-14 0914 22-Jul-14 10 SSP-DHULE-I 1815 30-Jun-14 0542 1-Jul-14 11 SSP-DHULE-I 1819 20-Jul-14 0858 21-Jul-14 12 SSP-DHULE-II 1825 8-Jul-14 0949 9-Jul-14 13 SSP - DHULE - II 1831 11-Jul-14 1007 13-Jul-14 14 SSP - DHULE - I 1838 1-Jul-14 0556 2-Jul-14 15 SSP - DHULE - I 1848 9-Jul-14 0912 10-Jul-14 16 SSP - DHULE - I 2136 13-Jul-14 0850 14-Jul-14 17 SSP-DHULE-II 2201 23-Jul-14 0945 28-Jul-14

Also it has been observed that Wanakbori TPS injects around 60 MVAr per unit even when voltage at Wanakbori is above 420 kV for nearly 100 of the time Further envisaged bus reactors at Rajgarh amp Dhule are yet to be commissioned Hence in view of system reliability it is advisable to explore all possibilities to contain high voltage condition in SSP and nearby area The following actions need to be taken to address the situation

bull Operating RBPH machines at SSP in synchronous condenser mode bull Absorption of MVAr by Wanakbori (WTPS) units bull The commissioning of Reactors at 400 kV Rajgarh may be expedited by

WRTS-2

20

462nd OCC MINUTES

bull The commissioning of Reactors at 400 kV Dhule may be expedited by MSETCL CE SLDC GETCO agreed for looking into absorption of MVAR at Wanakbori

7 IMPLEMENTATION OF THE REVISED AUFLS IN DD AND DNH Representatives from the DD and DNH intimated during the 459th OCC meeting that the tendering process was stalled because of general elections (election code of conduct was in force) amp action would be initiated post the elections Member Secretary WRPC vide letter dated 01082014 took up the matter with Secretary (P) DDDNH (copy enclosed) DD amp DNH representative were absent in the meeting to comment

The Sub Committee noted the same 8 ADMS(AUTOMATIC DEMAND MANAGEMENT SCHEME) IMPLEMENTATION

AS PER SEC 542 OF IEGC The format for reporting the progress of implementation of the ADMS in Western Region States was given as part of MoM of the 461st OCC meeting All utilities may like to furnish the updated status to WRPCWRLDC as per the above format It is understood that MP has submitted its detailed action plan in the form of an affidavit to CERC for implementation of ADMS However SLDC MPPTCL is requested to furnish data to OCC forum in the above format

The Sub Committee noted the same

9 STATUS OF TELEMETRY IN WESTERN REGION

In the 460th amp 461st OCC meetings the status of telemetry in Western Region was discussed in detail It was also highlighted that the Honrsquoble CERC vide its order in petition SM0072014 issued Notice under section 142 on several constituents of Western Region All the constituents had assured to address the telemetry issues within a month or two The telemetry status as on 4th August 2014 is tabulated below

21

462nd OCC MINUTES

a Maharashtra The non-availability of telemetry is 583 for sub-stations amp 18

for generating stations This is a matter of serious concern The issue has been

discussed in several OCC meetings since last 8 months As per the information available with WRLDC telemetry is not available from the following generating stations at 400 kV level

bull Kaparkheda bull Deepnagar

Also telemetry is not available from the following sub-stations at 400 kV level bull Warora bull Lonikhand(New) bull Chandrapur-stg-II

As per the information available with WRLDC telemetry is intermittent at 4 generating stations viz

bull Jaigad bull Paras-extension bull Trombay bull Deepnagar GCR

Also telemetry is intermittent at following sub-stations at 400 kV level bull Bableswar-II bull Deepnagar SS bull Dhule bull Khaparkheda bull Kolhapur-3

22

462nd OCC MINUTES

bull Sholapur-3 SLDC MSETCL Maharashtra informed that telemetry has been established for 46 locations

a Chhattisgarh100 available b Madhya Pradesh As per the latest status telemetered data is available from

100 of the locations c Gujarat As per the latest information submitted to CERC the non-availability of

telemetry data from Gujarat as on date is 33 for substations As per the information available with WRLDC Telemetry is not available form 2 number of 220 kV sub-stations viz bull Bhatiya bull Mokha Gujarat intimated in 460th OCCM that these sub-stations were ready but lines were in construction phase Also telemetry is intermittent from the following SS in Gujarat bull 220 kV Navasari (GETCO) ss bull 400 kV Kasor ss

SLDC GETCO may expedite amp resolve the issue for the above stations at the

earliest d Goa As per the latest information telemetry is not available form 2 number of

220 kV sub-stations viz Amona amp Cuncolim Telemetry is intermittent from 220 kV Tivim Ponda Xeldam amp 110 kV Kadamba amp Verna Thus Non availability of telemetry from Goa is 100 Goa to resolve the issue on war footing

e DD Telemetry is not available form 1 number of 220 kV sub-station viz Magarwada Thus availability of telemetry from DD is NIL DD representative intimated in 460th OCCM that RTU was being installed at 220 kV Magarwada SS under the new SCADAEMS up gradation project amp it would take 3 months to complete the work DD representative was absent in 461st OCCM so information on progress in this matter is yet to be received from DD DD to expedite the issue for the above station(s) on war footing

f DNH Telemetry is not available form 2 number of 220 kV sub-station viz Kharadpara amp Khadoli Thus availability of telemetry from DNH is NIL DNH representative was absent in 460th amp 461st OCC meetings to comment on the issue DNH to resolve the issue for the above station(s) on war footing

g ISGS As per the latest information submitted to CERC the non-availability of telemetry data from ISGS generating stations as on date is 125 Telemetry is intermittent from 220 kV Kawas(NTPC) station Power Grid NTPC to expedite

23

462nd OCC MINUTES

NTPC amp Power Grid agreed to expedite the matter during 460th amp 461st OCC meetings of WRPC However no progress has been reported

h POWERGRID As per the latest information submitted to CERC the non-availability of telemetry data from Power Grid substations as on date is 111 Telemetry is intermittent from the following ss

o 765 kV Kotra SS o 765 kV Dharamjaigad o 765 kV Tamnar SS o 400 kV Navasari SS

Additional points

a) In the report available on the WRLDC website it is clearly indicated that Communication link between all SLDC to WRLDC is in radial mode (without redundancy) and any failure in any equipment Fibre leads to total data black out Power Grid to ensure that links are on two channels

i IPP As per the latest information submitted to CERC the non-availability of

telemetry data from IPP generating stations as on date is 15 Telemetry is intermittent from Jindal amp Essar Mahan GMR Raipur JPL ESSAR Mahan GMR Raipur to expedite

Additional Points

bull Adani(APL) Tiroda There is only one channel emanating from Adani Tiroda Recently there was a case when entire station was not visible due to non-Availability of that channel

bull CGPL Mundra There is only one channel emanating from CGPL Mundra In case of non-availability of data leads to non-visibility of 4000 MW generation which creates difficulty in Grid Operation

bull Sasan There is only one channel emanating from Sasan In case of non-availability of data leads to non-visibility of 2400 + MW generation which creates difficulty in Grid Operation

bull APL Mundra There is only one channel emanating from CGPL Mundra In case of non-availability of data leads to non-visibility of 4000 + MW generation which creates difficulty in Grid Operation

The above issue was already discussed in 460th OCCM The utilities (APL SASAN CGPL) may kindly update the progress in this matter

24

462nd OCC MINUTES

j PMU data Regarding Satna to WRLDC link WRTS II informed that work is under progress for laying of OPGW from Satna 220 kV (MPPTCL) to Satna 765 kV (PG) and it may take 3-4 monthsrsquo time It was suggested that till such time the OPGW operation is in place WRTS-II may explore leased line connectivity at the earliest Power Grid to expedite

The Sub-Committee noted the same amp agreed to make availability of telemetry in their concerns and the report be updated position in next meeting

The Sub Committee noted the same

10 BLACK OUT AT NTPC KAWAS POWER STATION On 11th July 2014 Kawas Gas generating complex got blackout due to tripping of evacuation lines one by one within a short span of 30 minutes The complete loss of evacuation lines occurred at 0117 Hrs The blackout has resulted in tripping of GT1A GT1B and ST causing 320 MW generation loss in the area It was reported that weather condition was foggy with slight drizzling was in the area

Line Time of Tripping Kawas End Remote

end Restoration Time

220 kV Kawas-Navsari 1 1246 AM R phase to EF Fault location 2 km R Phase to EF 122 AM

220 kV Kawas ndashNavsari 2 112 AM R phase to EF Fault location 2208 km

R Phase to EF 347 AM

220 kV Kawas-Haldarwa 1 107 AM R phase to EF Fault location 16 km

R Phase to EF 246 AM

220 kV Kawas-Haldarwa 2 108 AM R phase to EF Fault location 2 km

R Phase to EF 304 AM

220 kV Kawas-Icchapur 1 108 AM B phase to EF B Phase to EF 301 AM

220 kV Kawas-Icchapur 2 108 AM B phase to EF Fault location 356 km

B Phase to EF 331 AM

220 kV Kawas-Vav 1 117 AM No tripping Hand Tripped later Line Tripped 225 AM

220 kV Kawas Vav 2 117 AM Y Phase to EF Y Phase to EF 317 AM

Even the line restoration has failed on several attempt as the lines were not holding due to persisting fault Such an event of total loss of evacuation lines from a generating station resulting in blackout scenario is a matter of serious concern Representative from WRTS-II stated that being highly industrial corridor the said lines are suffering with smog and informed that they are in process of replacement of existing insulator with polymer type insulators Order has been already placed amp it may be completed within next two to three month The Sub Committee noted the same

25

462nd OCC MINUTES

11 OPERATING PROCEDURE OF WR-2014 As discussed in 460th OCCM of WRPC the operating procedure of Western Region 2014 has been updated on 31072014 and the same has been uploaded on WRLDC web site at the following link httpwwwwrldccomdocsWR_OPERATING_PROCEDURE_2014pdf

The Sub Committee noted the same 12 MOCK BLACK START EXERCISE

MP representative informed that DG set at Bargi will be ready within a week time amp mock black start exercise can be performed in October 2014

NTPC Gandhar has successfully performed the mock black start exercise on 27072014

The Sub Committee noted the same

13 REVIEW OF LIST OF FEEDERS IDENTIFIED FROM ISGS LEVEL IN CASE OF

THREAT OF GRID SECURITY DUE TO LARGE DEVIATION

During the 461st OCC it was decided that list of feeders identified for load

control under emergency measure for safeguarding grid security would be

reviewed in a special meeting The list is yet to be reviewed GM WRLDC

requested SLDC to review the same amp submit Till such time the existing list will

continue

The Sub Committee noted the same 14 IMPLEMENTATION OF VOLTAGE AND TIME GRADING ON OV RELAYS TO

PREVENT TRIPPING OF MULTIPLE EHV LINES EMANATING FROM SINGLE NODE ON HIGH VOLTAGE

During the 461st OCC it was informed by Power Grid representative that they have already implemented voltage grading in various line emanating from the same node (matter has not come in the MoM) Power Grid amp other utilities may kindly intimate the present status of voltage grading at their respective sub-stations Member Secretary WRPC suggested to take the matter in PCM

The Sub Committee noted the same

26

462nd OCC MINUTES

15 INADEQUATE PARTICIPATION OF GENERATORS ENVISAGED SPS FOR SR-NEW GRID OPERATION

The details of SPS operation from 1st July 2014 till 6th August 2014 is as under

Sl No Date SPS No Condition 1 01 July 2014 SPS-1 613 SholapurRaichur DC gt1000 MW 2 01 July 2014 SPS-1 1752 SholapurRaichur DC gt1000 MW 3 04 July 2014 SPS-1 0406 SholapurRaichur DC gt1000 MW 4 09 July 2014 SPS-1 350 SholapurRaichur DC gt1000 MW 5 14 July 2014 SPS-1 506 SholapurRaichur DC gt1000 MW 6 17 July 2014 SPS-1 2204 SholapurRaichur DC gt1000 MW 7 23 July 2014 SPS-1 547 SholapurRaichur DC gt1000 MW 8 26 July 2014 SPS-1 1201 SholapurRaichur DC gt1000 MW 9 30 July 2014 SPS-1 902 SholapurRaichur DC gt1000 MW 10 30 July 2014 SPS-1 1954 SholapurRaichur DC gt1000 MW

During the last OCC the matter was discussed and it was suggested by Member Secretary WRPC to have Special Protection Sub-Committee meeting to discuss progress of implementation of the revised SPS at Solapur (for WR-SR interconnection) amp extension of signal from Solapur to additional generators in WR so as to address the issue of inadequate participation of WR Member Secretary WRPC requested to all generators who are having more than one units shall participate in implementation of SPS for SR-NEW grid operation

The Sub-committee noted the same ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING OCC reviewed the meeting roaster and finalized sheet is enclosed at Annexure-10

Due to non-readiness of BDTCL to host the next meeting NTPC KawasGandhar

would host the 463rd OCC meeting The exact date amp venue details will be intimated

separately

SlNo Organisation Name amp Designation E-mail Mobile

I WRPC1 Shri SD Taksande MS ms-wrpcnicin 98208783842 Shri Satyanarayan S opc-wrpcnicin 92233999383 Shri LKS Rathore DD lksr_2000yahoocom 98333718444 Shri Ratnesh Kumar Yadav AD ratneshkumar7437gmailcom 8903929150

II MSETCL MSEDCLMahaGenco5 Shri VD Pande EE vasantpandemahasldcin 98207419416 Shri Ajit V Pachori EE ajitpachorimahagencocoin 9619461420

III MPPTCL MPPGCL7 Shri KK Prabhakar SE sldcmpjbpyahoocom 94258052678 Shri SK Mehta EE mehtasanjay67yahooin 9425805017

IV CSPTCL CSPGCL9 Shri BR Soni Addl CE balramsonirediffmailcom 942518880710 Shri Arvind Mukherjee gccraipurgmailcom 9429227699

V GETCO GSLDC GSECL11 Shri BB Mehta CE cesldcgujgmailcom 987920073612 Shri BM Shah DyEE demissldcgetcogebmailcom 9925212836

VI WRLDC POWERGRID13 Shri P Mukhopadhyay GM prithwishmukhopadhyayposocoin 986943807314 Shri VK Shrivastava AGM vkspowergridindiacom 986945022115 Smt Sachala Mishra CM mishrasachalagmailcom 986945022316 Smt Pushpa S CM pushpa_seshadrihotmailcom 986940448217 Shri Aditya P Das Dy Mgr aditya19227gmailcom 9869404569

POWERGRID REGION-I18 Shri Anil Darode 70207powergridindiacom 942230180519 Shri Manu Sinha 02457powergridindiacom 9425293864

POWERGRID RETION -II20 Shri Abhinav Verma stawr2gmailcom 942850406221 Shri Anand Dubey ananddubey_pgrediffmailcom 9428504065

VII NTPC22 Shri PB Behre GM pbbeherentpccoin 900449708823 Shri Hari Nath AGM harinath01ntpccoin 900449713324 Shri SK Shrivastava AGM sksrivastava09ntpccoin 942517806925 Shri Amir Kr Singh SM aksingh01ntpccoin 942414081426 Shri Amitabh Kumar amitabhkumarntpccoin 9425178122

VIII TATA POWER27 Shri RM Sankhe GM rmsankhetatapowercom 909900654128 Shri PR Gadave AGM prgadavetatapowercom 9223553341

IX NHDC 29 Shri Anurag Seth CE annu226hotmailcom 9425326135

LIST OF PARTICIPANTS OF 462nd OCC MEETING OF WRPC HELD ON 11082014 AT TARAPURAnnexure-I

30 Shri Vinod Kumar Singh vinodnhdcrediffmailcom 9425925251

X APL 31 Shri CS Bobade GM chandrashekharbobadeadanicom 8980802255

XI RINFRA32 Shri SG Zirpe GM sachinzirperelianceadacom 932260763033 Shri Sanil C Namboodiripad sanilnamboodiripadrelianceadacom932104697434 Shri Subrata Das subratakudasrelianceadacom 932093072235 Shri Ishan Roy Asst Mgr ishanroyrelianceadacom 9860027348

XII KSK Mahanadi36 Shri Sudarshan B Reddy sudarshanreddybkskcoin 9000377721

XIII NPCIL37 Shri Mandeep mandeepnpcil 904991887038 Shri JS Choubey jschoubeynpcilcoin 942882191839 Shri Ritesh Chandra Singh rcsinghnpcilcoin 8007991744

XIV ESSAR 40 Shri OJ Saxena Sr Mgr osaxenaessarcom 987910126841 Shri Kamlesh Garg kamleshgargessarcom 987910284942 Shri Sarabjeet Singh sarabjeetsinghessarcom 750957010543 Shri Ashwin Ande ashwinandeessarcom 9909993594

XV JPL44 Shri RK Srivastava AGM rkshrivastavajindalpowercom 9329445016

XVI TORRENT POWER45 Shri Kamal K Vyas kamalvyastorrentpowercom 997407965746 Shri Pramod G Patel AGM pramodpateltorrentpowercom 9824370005

XVII NCA47 Shri Naveen Nath Das emc_ncarediffmailcom 9425053309

XVIII STERLITE GRID LTD48 Shri Sachin S Deshpande GM sachindeshpandesterlitecom 8966903047

XIX LANCO AMARKANTAK POWER LTD49 Shri BN Panda pandabnlancogroupcom 769770301550 Shri Anil Sharma anilshlancogroupcom 9560258009

XX KWPCL51 Mis Smruti R Nayak DGM smrutinayakavanthapowercom 9424176680

XXI MB POWER LTD 52 Shri Sandeep Kumar Gupta sandeepguptahpplin 9582896418

Anaulagnak 21

maah jaUlaa[- 2014

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5020 Hz BETWEEN 1700 Hrs amp 1800 Hrs Hrs ON 27072014

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4962 Hz BETWEEN 1900 Hrs amp 2000 Hrs Hrs ON 25072014

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4993 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5036 Hz AT 130344 Hrs ON 23072014

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4939 Hz AT 194315 hrs Hrs ON 25072014

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS JULY 2014 JUNE 2014 MAY 2014

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 008 023 000

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 314 476 093 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 3129 3216 2155 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 5016 4536 5319

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1533 1749 2433

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING JULY 2014

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

Voltage Profile during the month of July 2014

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 420 402 420 404 433 411 424 424 417 400 420 403 422 407 408 3902 417 398 420 400 431 407 424 424 417 401 427 418 421 409 410 3943 417 393 419 397 432 408 420 396 417 400 425 419 422 408 407 3934 416 398 419 401 434 412 422 402 417 400 426 421 418 406 411 3965 417 400 419 403 433 414 424 424 417 403 424 419 417 406 410 3996 420 406 422 408 438 411 421 402 419 407 427 421 422 412 409 3897 412 396 419 402 428 413 420 399 414 401 423 419 417 409 409 3968 418 400 421 410 433 400 424 400 416 400 425 419 422 400 410 3949 418 412 421 410 433 413 424 410 416 408 425 419 422 412 410 394

10 415 399 417 403 435 415 400 400 418 404 424 421 422 414 410 41111

स नक Annex-23

िभलाईBhilai

धल असोज कासोरKarad Dhule Asoj Kasor

इदौर इटारसी कराडIndore Itarsi

जतपरJetpur

11 416 402 423 407 436 416 422 407 416 405 425 421 423 413 410 39712 419 400 422 406 436 417 400 400 419 403 426 422 423 413 410 39713 415 400 422 410 437 417 400 400 417 406 425 421 422 414 411 39514 416 398 423 409 439 416 400 400 419 404 424 421 422 413 412 39815 420 403 423 408 437 413 428 401 418 404 426 422 423 413 410 39816 423 408 426 411 437 413 429 403 421 406 428 424 423 415 413 40017 421 404 424 407 436 416 400 400 419 408 423 414 423 414 411 39818 421 404 424 407 436 416 400 400 420 406 427 423 423 414 411 39819 423 407 425 410 434 415 425 411 424 405 428 425 424 416 422 39520 421 407 424 410 420 420 427 410 421 407 427 424 423 416 417 39621 421 406 424 411 420 420 400 400 420 402 428 425 426 418 413 39222 421 407 426 413 420 420 400 400 419 401 428 425 428 420 412 39623 422 409 427 410 419 415 415 402 420 403 425 419 428 420 412 39624 420 406 425 409 420 420 400 400 420 404 429 426 427 416 409 39625 422 401 421 404 420 420 400 400 424 402 428 424 423 415 415 39726 420 402 421 406 431 419 400 400 422 403 428 423 422 413 415 40027 417 404 422 407 434 416 423 407 421 405 428 424 422 413 416 40128 419 403 421 407 437 416 431 408 423 406 428 426 423 415 415 40229 419 403 420 408 437 415 400 400 421 406 429 426 423 416 415 39930 421 404 422 406 438 415 400 400 423 404 430 426 426 415 420 40331 420 395 420 402 431 406 428 403 422 403 429 425 423 414 419 398

423 393 427 397 439 400 431 396 424 400 430 403 428 400 422 389

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 418 404 411 395 423 406 430 406 789 752 788 757 787 756 791 7662 419 397 411 393 423 403 431 404 772 748 791 756 786 750 793 7553 416 402 411 397 421 397 425 399 772 748 780 751 781 757 791 7634 417 404 409 396 420 415 428 406 772 748 786 757 780 755 791 7655 418 404 418 400 421 404 427 407 772 748 796 755 796 765 802 7726 419 408 416 402 424 410 429 413 789 752 797 768 796 765 799 7757 414 406 407 397 420 403 426 407 789 752 776 758 777 757 784 7658 418 408 411 388 422 400 429 400 789 752 786 767 783 746 790 7719 412 401 403 386 422 405 429 408 789 752 781 761 772 745 783 76010 413 403 402 394 420 404 424 406 789 752 792 764 774 755 785 765

Bina Gwalior Nagda Khandwa Sipat

बना वािलयरिसविननागदावािलयर बनाBina

िसपतखडवाseoni Gwalior

10 413 403 402 394 420 404 424 406 789 752 792 764 774 755 785 76511 415 407 403 395 421 407 426 410 789 752 790 774 785 758 790 77212 418 406 407 392 422 404 427 404 789 752 796 769 784 756 796 76913 418 406 407 392 421 408 427 411 789 752 796 769 784 756 796 76914 419 410 409 397 423 406 428 409 789 752 784 768 786 763 792 77415 419 404 408 391 424 407 429 408 789 752 789 763 786 750 791 76416 424 414 408 400 427 411 431 413 789 752 792 766 785 767 797 77917 421 410 411 399 424 407 432 409 789 752 788 762 789 766 795 77618 423 412 414 396 424 407 432 409 789 752 783 770 796 765 801 77719 424 411 410 396 426 411 431 413 789 752 791 770 788 764 803 77720 425 411 411 396 424 410 428 414 789 752 786 763 789 760 800 77221 422 412 410 395 424 409 428 413 789 752 784 760 788 763 796 77522 423 416 414 402 424 410 429 414 789 752 791 774 794 773 801 78423 425 413 418 402 424 410 430 412 787 750 785 770 798 780 804 78324 422 411 411 397 425 409 431 415 789 752 790 772 791 773 801 78125 421 410 405 396 423 403 429 409 789 752 784 770 794 767 798 77726 421 410 409 395 423 404 427 409 789 752 792 773 789 767 799 77827 423 412 413 399 420 404 428 409 789 752 794 766 797 770 808 78028 422 411 411 399 421 405 428 410 789 752 789 763 794 770 793 77029 419 409 411 397 423 406 430 414 789 752 794 771 795 767 796 77430 422 409 413 398 420 404 430 413 788 753 796 766 799 766 799 77331 420 404 409 395 421 397 429 411 789 752 787 764 792 759 795 767

425 397 418 386 427 397 432 399 789 748 797 751 799 745 808 755

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Jul-14 0 0 0 0 0 0 0 02 02-Jul-14 0 0 0 0 0 0 0 03 03-Jul-14 0 0 0 0 0 0 0 04 04-Jul-14 0 0 0 0 0 0 0 05 05-Jul-14 0 0 0 0 0 0 0 06 06-Jul-14 1 67 0 0 0 0 0 07 07-Jul-14 0 0 0 0 0 0 0 08 08-Jul-14 1 278 0 0 0 0 0 09 09-Jul-14 0 0 0 0 0 0 0 0

10 10-Jul-14 1 565 0 0 0 0 0 011 11-Jul-14 0 0 0 0 0 0 0 012 12-Jul-14 0 0 0 0 0 0 0 013 13-Jul-14 3 758 0 0 0 0 0 014 14-Jul-14 0 0 0 0 0 0 0 015 15-Jul-14 0 0 0 0 0 0 016 16-Jul-14 2 2127 NIL NIL NIL 017 17-Jul-14 0 0 0 0 0 0 0 018 18-Jul-14 1 08 0 0 0 0 0 019 19-Jul-14 0 0 0 0 0 0 0 020 20-Jul-14 0 0 0 0 0 0 0 021 21-Jul-14 0 0 0 0 0 0 0 022 22-Jul-14 0 0 0 0 0 0 0 023 23-Jul-14 0 0 0 0 0 0 0 024 24-Jul-14 0 0 0 0 0 0 0 025 25-Jul-14 0 0 0 0 0 0 0 026 26-Jul-14 0 0 0 0 0 0 0 027 27-Jul-14 0 0 0 0 0 0 0 028 28-Jul-14 0 0 0 0 0 0 0 029 29-Jul-14 0 0 0 0 0 0 0 030 30-Jul-14 0 0 0 0 0 0 0 031 31-Jul-14 0 0

Max 3 758 0 0 0 00 0 0Total 9 24917 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month July 2014

Recommonded Load relief at 492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE 25

POWER CUTRESTRICTIONS IN WESTERN REGION FOR THE MONTH OF JULY-2014

k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply(DLF)

01072014 31072014 2343 2105 2300

21 Three-Phase Supply(Irrigation)

01072014 31072014 0953 0857 0933

21 Three-Phase Supply(Mixed)

01072014 31072014 2339 2055 2240

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01072014 31072014 2353 2325 2344 32 District Head Qtrs 01072014 31072014 2357 2330 2348 33 Tehsil Head Qtrs 01072014 31072014 2350 2230 2319

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 010714 to 310714

SaUnya Nil

0-470 MW

SaUnya Nil

0000

SaUnya Nil 2400

SaUnya Nil

19 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs) 21 Three-Phase Supply 01072014 31072014 1000 0800 0900

22 Single-Phase Supply 01072014 31072014 1800 1800 1800 3 Anya jaanakarI Any other information There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

8860 (Av) of 31days 0000(Av) 0000 (Av)

1Rural 7109(Av) for 23447 Hrs 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0532 - -

0537 -

3 HT Industries 8261 (Av) for 17270 Hrs 0357 Total Energy Cutday 1426 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01072014 to 310714 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 3172014 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil ca gaaovaa Goa SaUnya Nil

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-26 Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai अिनवाय यिनट आऊटज का जलाई2014का वःता रत यौरा

Details of forced unit outages during the month ofJuly2014

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 एःसार Essar-2

गरा विनिल GSECL

172 1212 22-Feb-13 अनपल ध Still out

अनपल ध Still out

Shortage of gas

2 यट पीएस UTPS-2

गरा विनिल GSECL

120 1951 17-Jun-14 अनपल ध Still out

अनपल ध Still out

Turbine tripped(RSD)

3 एःसार व डनार Essar vadinar-1

गरा विनिल GSECL

600 2335 3-Jul-14 1324 22-Jul-14 Coal shortage

4 डब यट पीएस WTPS-6

गरा विनिल GSECL

210 953 10-Jul-14 0707 14-Jul-14 BTL

5 एसट पीएस STPS-1

गरा विनिल GSECL

120 1220 10-Jul-14 0710 14-Jul-14 BTL

6 जीआईपीसीएल GIPCL-STG I-2

गरा विनिल GSECL

165 1744 14-Jul-14 अनपल ध Still out

अनपल ध Still out

C ampI problem

7 एएलट पीएस ALTPS-1

गरा विनिल GSECL

120 107 15-Jul-14 2037 19-Jul-14 BTL

8 िस का ट पीएस SIKATPS-1

गरा विनिल GSECL

120 1330 17-Jul-14 अनपल ध Still out

अनपल ध Still out

RSD

9 डब यट पीएस WTPS-4

गरा विनिल GSECL

210 858 18-Jul-14 अनपल ध Still out

अनपल ध Still out

RSD

10 डब यट पीएस WTPS-3

गरा विनिल GSECL

210 1046 18-Jul-14 अनपल ध Still out

अनपल ध Still out

RSD

11 डब यट पीएस WTPS-5

गरा विनिल GSECL

210 1818 18-Jul-14 000 21-Jul-14 RSD

12 डब यट पीएस WTPS-6

गरा विनिल GSECL

210 447 19-Jul-14 अनपल ध Still out

अनपल ध Still out

RSD

13 यट पीएस UTPS-3

गरा विनिल GSECL

200 1055 26-Jul-14 2328 1-Aug-14 RSD

14 एपीएल APL-6

अदानी ADANI

660 2146 5-Jul-14 1105 2-Aug-14 Heavy hydrogen leakage

15 एपीएमएल APML-4

अदानी ADANI

660 1132 10-Jul-14 1407 23-Jul-14 Coal shortage

16 एपीएल APL-1

अदानी ADANI

330 117 20-Jul-14 612 23-Jul-14 RSD

प म ऽय भार षण कि म बई णाली चालन-ISO-I

17 एपीएल APL-8

अदानी ADANI

660 2018 18-Jul-14 2209 21-Jul-14 BTL

18 एपीएल APL-2

गरा विनिल GSECL

330 0913 26-Jul-14 1714 29-Jul-14 Air pre heater problem

19 एपीएल APL-5

गरा विनिल GSECL

660 1910 29-Jul-14 1533 2-Aug-14 Heavy steam leakage

20 डब यपीसीएल WPCL-1

मारा वउकिल MSPGCL

135 1245 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Furnace press high

21 डब यपीसीएल WPCL-4

मारा वउकिल MSPGCL

135 001 3-Apr-14 2347 11-Jul-14 Less schedule

22 कोराड Koradi-5

मारा वउकिल MSPGCL

200 1030 17-Jun-14 अनपल ध Still out

अनपल ध Still out

ID fan bearing temperature high

23 इ डयाबल Indiabulls - 1

मारा वउकिल MSPGCL

270 546 26-Jun-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

24 पल Parli -4

मारा वउकिल MSPGCL

210 1019 29-Jun-14 अनपल ध Still out

अनपल ध Still out

water shortage

25 भसावल Bhusawal-2

मारा वउकिल MSPGCL

210 1117 6-Jul-14 544 10-Jul-14 Coal problem

26 चिपर Chandrapur-1

मारा वउकिल MSPGCL

210 2211 8-Jul-14 2106 13-Jul-14 BTL

27 चिपर Chandrapur-3

मारा वउकिल MSPGCL

210 2216 14-Jul-14 1452 18-Jul-14 Safety valve problem

28 उरण Uran-6 मारा वउकिल MSPGCL

108 1634 15-Jul-14 1407 22-Jul-14 Gas shortage

29 उरण Uran -5 मारा वउकिल MSPGCL

108 2338 17-Jul-14 1125 24-Jul-14 For rotor balancing work

30 उरण Uran -A0 मारा वउकिल MSPGCL

120 2340 17-Jul-14 2315 23-Jul-14 For rotor balancing work

31 भसावल Bhusawal-2

मारा वउकिल MSPGCL

210 2346 18-Jul-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

32 खापरखड़ा Khaparkeda-3

मारा वउकिल MSPGCL

210 1036 20-Jul-14 041 29-Jul-14 Flame failure

33 जयगड Jaigad-2 मारा वउकिल MSPGCL

300 000 20-Jul-14 Ready Ready Less requisition

34 वीआईपीएल VIPL-2

मारा वउकिल MSPGCL

300 2302 20-Jul-14 1716 26-Jul-14 Coal feeding problem

35 एपीएमएल APML-3

मारा वउकिल MSPGCL

660 0444 22-Jul-14 044 26-Jul-14 Pressure release valve operated

36 भसावल Bhusawal-4

मारा वउकिल MSPGCL

500 003 23-Jul-14 151 29-Jun-14 BTL

37 वीआईपीएल VIPL-1

मारा वउकिल MSPGCL

300 015 23-Jul-14 1300 31-Jul-14 Coal feeding problem

38 उरण Uran -8 मारा वउकिल MSPGCL

108 730 26-Jul-14 1700 29-Jul-14 Gas shortage

39 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 347 29-Jul-14 638 4-Aug-14 BTL

प म ऽय भार षण कि म बई णाली चालन-ISO-I

40 पल PARLI-5 मारा वउकिल MSPGCL

210 002 30-Jul-14 अनपल ध Still out

अनपल ध Still out

Water shortage

41 टाटा TATA-8

टाटा TATA

250 2255 9-Jan-14 अनपल ध Still out

अनपल ध Still out

HT due to fire near turbine generator desk

42 टाटा TATA-6

टाटा TATA

500 2134 31-Jul-14 Ready Ready Less requisition

43 आरजीपीपीएल RGPPL-3A

आरजीपीपीएल RGPPL

320 1857 17-Apr-14 Ready Ready Less requisition

44 आरजीपीपीएल RGPPL-2B

आरजीपीपीएल RGPPL

320 1915 17-Jun-14 अनपल ध Still out

अनपल ध Still out

Raw water problem

45 आरजीपीपीएल RGPPL-2A

आरजीपीपीएल RGPPL

320 1615 25-Jun-14 1200 21-Jul-14 Less requisition

46 आरजीपीपीएल RGPPL-1A

आरजीपीपीएल RGPPL

320 1330 8-Jul-14 Ready Ready Less requisition

47 अमरकनटक Amarkantak-4

म वउकिल MPPGCL

120 1113 30-Apr-14 अनपल ध Still out

अनपल ध Still out

TURBINE BEARING VIBRATION HIGH

48 सातपरा Satpura-6

म वउकिल MPPGCL

200 305 18-Jun-14 अनपल ध Still out

अनपल ध Still out

BTL

49 एसजीट पीएस SGTPS-3

म वउकिल MPPGCL

210 617 26-Jun-14 020 26-Jul-14 Conveyer belt problem

50 अमरकनटक Amarkantak-3

म वउकिल MPPGCL

120 1640 2-Jul-14 1623 11-Jul-14 BTL

51 सातपरा Satpura-9

म वउकिल MPPGCL

210 2200 5-Jul-14 855 15-Jul-14 Condenser tube cleaning

52 सातपरा Satpura-9

म वउकिल MPPGCL

210 1310 15-Jul-14 845 24-Jul-14 BTL

53 एसजीट पीएस SGTPS-4

म वउकिल MPPGCL

210 2233 19-Jul-14 1252 4-Aug-14 Coal shortage

54 सातपरा Satpura-7

म वउकिल MPPGCL

210 225 21-Jul-14 545 24-Jul-14 BTL

55 सातपरा Satpura-10

म वउकिल MPPGCL

250 2316 22-Jul-14 07082014 High vibration in generator winding

56 एसजीट पीएस SGTPS-3

म वउकिल MPPGCL

210 1857 28-Jul-14 1020 2-Aug-14 Drum level low

57 DSPM(K(E) extn)-2

छरा वउकिल CSPGCL

250 2310 21-Jul-14 2029 22-Jul-14 Coal shortage

58 कोरबा पव Korba(E)-3

छरा वउकिल CSPGCL

210 1030 22-Jul-14 1025 27-Jul-14 CTL

59 कोरबा पव Korba(E)-5

छरा वउकिल CSPGCL

120 1345 22-Jul-14 1140 26-Jul-14 Wet coal problem

60 कोरबा पव Korba(E)-5

छरा वउकिल CSPGCL

120 2320 30-Jul-14 155 2-Aug-14 Coal shortage

61 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

62 एःसार महान Essar-Mahan-1

एःसारESSAR 600 014 22-Jun-14 1255 11-Jul-14 Less schedule

63 एःसारमहानEssar Mahan-1

एःसार ESSAR 600 620 16-Jul-14 1252 28-Jul-14 Withdrawn due to tripping of evacuation

प म ऽय भार षण कि म बई णाली चालन-ISO-I

Lines

64 सीजीपीएल CGPL-50

सीजीपीएल CGPL

830 948 13-Jun-14 409 23-Jul-14 Ash hopper refractory damage

65 सीजीपीएल CGPL-10

सीजीपीएल CGPL

830 1332 1-Jul-14 1952 9-Jul-14 BTL

66 सीजीपीएल CGPL-20

सीजीपीएल CGPL

800 1214 24-Jul-14 13-aug-14

Bottom ash Hopper works

67 सीजीपीएल CGPL - 40

सीजीपीएल CGPL

830 1918 26-Jul-14 1020 2-Aug-14 GT electrical fault

68 जपीएल JPL STG-2 UNIT-1

जपीएल JPL 600 051 26-Jun-14 अनपल ध Still out

अनपल ध Still out

Turbine vibration

69 जपीएलJPL STG-2 UNIT-2

जपीएलJPL 600 000 5-Jul-14 1457 11-Jul-14 Less requisition

70 जपीएल JPL STG-2 UNIT-2

जपीएलJPL 600 748 21-Jul-14 1800 24-Jul-14 BTL

71 एसीबीआईएल ACBIL-1

एसीबीआईएल ACBIL

135 151 6-Jul-14 1753 9-Jul-14 Furnace draft high

72 ससान Sasan -3 आरईएल REL 660 1648 15-Jul-14 2248 4-Aug-14 Ash evacuation problem

73 ससान Sasan-4 आरईएल REL 660 1645 24-Jul-14 810 3-Aug-14 High press main steam tripped

74 एमको EMCO-I एमको EMCO 200 109 16-Jul-14 अनपल ध Still out

अनपल ध Still out

Turbine vibration high

75 एसीबीआईएल ACBIL-2

एसीबीआईएल ACBIL

135 1955 21-Jul-14 601 24-Jul-14 Furnace draft high

76 मौदा Mouda -1

एनट पीसीNTPC 500 1630 18-Jun-14 2042 14-Jul-14 Flame failure

77 कावास Kawas-1C

एनट पीसीNTPC 116 2311 2-Jul-14 2100 6-Jul-14 Heavy steam leakage from stop valve

78 कावास Kawas-1B

एनट पीसीNTPC 106 2323 2-Jul-14 632 7-Jul-14 Less requisition

79 कावास Kawas-2B एनट पीसीNTPC 164 1704 10-Jul-14 Ready Ready Less requisition

80 कावास Kawas-1A एनट पीसीNTPC 164 1200 12-Jul-14 745 22-Jul-14 Less requisition

81 वीएसट पीएस VSTPS-11

एनट पीसीNTPC 500 1204 13-Jul-14 000 16-Jul-14 Coal shortage

82 गाधारGandhar-1 एनट पीसीNTPC 144 149 16-Jul-14 1807 21-Jul-14 Less requisition

83 कावास Kawas-1B एनट पीसीNTPC 164 1027 18-Jul-14 442 23-Jul-14 Less requisition

84 मौदा Mouda-1 एनट पीसीNTPC 500 000 18-Jul-14 1745 24-Jul-14 Less requisition

85 िसपतSipat-1 एनट पीसीNTPC 660 000 21-Jul-14 955 24-Jul-14 Generator H2 gas leakage

86 गाधार Gandhar-3

एनट पीसीNTPC 144 1607 21-Jul-14 अनपल ध Still out

अनपल ध Still out

BB protection operatedatJhanor

87 गाधार Gandhar-4(ST)

एनट पीसीNTPC 224 1607 21-Jul-14 1320 26-Jul-14 BB protection operatedatJhanor

88 ट स TAPS-1

एनट पीसीNTPC 160 2227 21-Jul-14 1407 26-Jul-14 Maintenance

89 गाधार एनट पीसीNTPC 144 507 22-Jul-14 Ready Ready Less requisition

प म ऽय भार षण कि म बई णाली चालन-ISO-I

Gandhar -1

90 मौदा mouda-2 एनट पीसीNTPC 500 915 23-Jul-14 315 31-Jul-14 Coal feeding problem

91 कावास Kawas-1A

एनट पीसीNTPC 106 608 24-Jul-14 1309 27-Jul-14 Less requisition

92 गाधार Gandhar-2

एनट पीसीNTPC 144 2036 26-Jul-14 100814 Less requisition

93 वीएसट पीएस VSTPS-2

एनट पीसीNTPC 210 500 27-Jul-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

94 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 748 27-Jul-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

95 मौदा Mouda-2 एनट पीसीNTPC 500 315 31-Jul-14 210 3-Aug-14 Less requisition Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का जलाई2014 का वःता रत यौरा

Details of planned unit outages during the month of July2014 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

सo From

समय दनाक

कारण Reason

Time Date Time Date

1 एसएलपीपी SLPP-2

गरा विनिल GSECL

125 045 23-Jun-14 NA 17-Jul -14 AOH

2 डब यट पीएस WTPS-5

गरा विनिल GSECL

210 000 21-Jul-14 29-0814 COH

3 यट पीएस UTPS-4

गरा विनिल GSECL

200 000 21-Jul-14 240814 AOH

4 एसएलपीपी SLPP-3

गरा विनिल GSECL

125 130 22-Jul-14 060814 AOH

5 यट पीएस UTPS-1

गरा विनिल GSECL

120 000 29-Jul-14 28814 AOH

6 पल ParlI-3

मारा वउकिल MSPGCL

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

Water supply problem

7 चिपर Chandrapur-7

मारा वउकिल MSPGCL

500 600 19-Jun-14 1124 2-Aug-14 AOH

8 नािसक NASIK -3

मारा वउकिल MSPGCL

210 1410 10-Jul-14 अनपल ध Still out

100814 AOH

9 कोरबा प म Korba(W)-2

छरा वउकिल CSPGCL

210 936 26-Jun-14 140814 AOH

10 वदनाVandana-I वदना VANDANA 135 1940 17-Jul-14 अनपल ध Still out

अनपल ध Still out

ETL

11 वीएसट पीएस VSTPS-8

एनट पीसीNTPC 500 012 1-Jun-14 253 13-Jul-14 AOH

12 कएसट पीएस KSTPS-4

एनट पीसीNTPC 500 2335 20-Jun-14 180814 COH

13 कावास Kawas-2A

एनट पीसीNTPC 106 000 27-Jun-14 260814 RampM works

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

11 Akrimota 1 125 4-Aug-14 14-Aug-14 AOH12 WTPS 2 210 5-Aug-14 3-Sep-14 AOH13 SLPP 1 125 16-Aug-14 4-Sep-14 AOH14 DGB 1 107 20-Aug-14 27-Aug-14 CI15 GIPCL-I GT-3 48 22-Aug-14 27-Aug-14 HGPI16 GIPCL-I GT-2 48 29-Aug-14 3-Sep-14 HGPI17 GIPCL-I GT-2 48 12-Aug-14 24-Aug-14 HGPI18 UTPS 3 200 19-Aug-14 12-Sep-14 AOH19 GTPS 2 120 25-Aug-14 14-Sep-14 AOH110 STPS 1 120 19-Aug-14 30-Aug-14 AOH111 GTPS 3 210 24-Aug-14 13-Sep-14 AOH112 APL 9 660 1-Sep-14 20-Sep-14 AOH

221 SGTPS 4 210 010914 250914 AOH3 Craiva]kMila CSPGCL

31 Korba East-6 6 120 21-Aug-14 13-Sep-14 AOH32 Korba East-1 1 50 15-Aug-14 1-Sep-14 AOH33 Korba East-3 3 50 21-Aug-14 30-Sep-14 AOH34 Korba West-1 1 210 12-Sep-14 27-Sep-14 COH35 Korba West-5 5 500 15-Aug-14 30-Aug-14 AOH

4

41 PARAS 3 250 20914 151014 AOH42 RELIANCE 2 250 140814 160814 TURBINE VIBRATION

5 koMd``Iya xao~ Central Sector

51 SIPAT 1 600 050914 191014 BLR OH + HPT + IPT+LPT + GEN

52VINDHYACHAL

5 500 120814 200914 CAP+TG PED CKG+GEN+BLR CHEM CLNG+ESP RampM

53VINDHYACHAL

9 500 120814 150914 BLR OH + HPT + IPT+ GEN

54VINDHYACHAL

11 500 160714 170814 AOH

55CGPL

30 800 150814 050914 Bottom ash hopper Refractory repair and General maintainance work

56 CGPL 40 800 060914 300914 UT 40B repair work57 NSPCL 1 250 200814 110914 AOH

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING AUGUST 2014 AND SEPTEMBER 2014

Capacity Outage as per Annual Maintenance Plan

Date Time Date Time

1 400 400KV BUS-I at Bilaspur Ss 14-Aug-14 900 14-Aug-14 1800 DAILY For bus bar stability of LANCO bays amp jumpering work WRTS-I LANCO C

2 400kV 50 MVAR Bus Reactor-2 at Itarsi SS 14-Aug-14 800 15-Oct-14 1800 Continuo

us Installation of 125MVAR reactor WRTS-II WRTS-II C

3 765 Satna-Gwalior2 14-Aug-14 800 17-Aug-14 1800 DailyCompletion of 765kV Gwalior2 Main Bay Erection amp Testing works at Satna

PGCIL WRTS-II C

4 400 400kV JBP- JBP Pooling 2 Line 14-Aug-14 1000 14-Aug-14 1500 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

5 400 400KV BUS-II at Bilaspur Ss 16-Aug-14 900 16-Aug-14 1800 DAILY For bus bar stability of LANCO bays amp jumpering work WRTS-I LANCO C

6 765 Bus2 at satna 16-Aug-14 800 18-Aug-14 1800 DailyExtension of bus 2 for Gwalior2 bay amp completion of Main Bay Erection

PGCIL WRTS-II C

7 400 Khandwa-Dhule1 16-Aug-14 800 31-Aug-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WR-II C

8 400 Gandahr - Navsari DC 16-Aug-14 800 31-Aug-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WR-II R

PID testing of insulator strings

KV Line From To

Annexure-32

Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

9 400 Navsari - Vapi - Kala 16-Aug-14 800 31-Aug-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WR-II R

10 400 Satna - Bina Ckt 1amp2 16-Aug-14 800 31-Aug-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WR-II R

11 400 80 MVAR Bus Reactor at Kotra 16-Aug-14 900 17-Aug-14 1800 ContinuousTo attend isolator defects WRTS-I PGCIL C

12 400 400kV JBP- JBP Pooling 1 Line 17-Aug-14 1000 17-Aug-14 1500 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

13 765 ICT II at Bina 17-Aug-14 0900 17-Aug-14 1800 Daily Post Commissioning check of Fire-Fighting system at Bina PGCIL WRTS-II C

14 765 Bus-2 at Gwalior 17-Aug-2014 1000 18-Aug-2014 1800 Daily Busbar Jumpering ampStability test related to Bus reactor

POWERGRID WRTS-II C

15 765 Seoni 2 LR(704 LR) at Bilaspur Ss 18-Aug-14 900 18-Aug-14 1500 DAILY For taking Spare LR in service

first time WRTS-I PGCIL C

16 400 Bhadrawati-Ramagundam I 18-Aug-14 800 18-Aug-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

17 400 400kV Vchal - JBP 1 Line 18-Aug-14 1000 18-Aug-14 1200 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

18 400 400kV Vchal - JBP 2 Line 18-Aug-14 1400 18-Aug-14 1600 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

19 400 400KV BUS-II at Bilaspur Ss 19-Aug-14 900 19-Aug-14 1800 DAILY For bus bar stability of LANCO bays amp jumpering work WRTS-I LANCO C

20 400 Bhadrawati-Ramagundam II 19-Aug-14 800 19-Aug-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

21 765 ICT 1 at G alior 19 A g 14 10 00 20 A g 14 18 00 Continou SPARE ICT COMMISSIONING PGCIL WRTS II C21 765 ICT - 1 at Gwalior 19-Aug-14 1000 20-Aug-14 1800 s SPARE ICT COMMISSIONING PGCIL WRTS-II C

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

22 400 400kV JBP- Itarsi 1 Line 19-Aug-14 1000 19-Aug-14 1200 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

23 400 400kV JBP- Itarsi 2 Line 19-Aug-14 1400 19-Aug-14 1600 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

24 400 400 kV Sipat -Ranchi-1 19-Aug-14 900 20-Aug-14 1900 Continous 1 no of CT replacement NTPC NTPC

25 400 BUS-I at Aurangabad(PG) 19-Aug-14 600 20-Aug-14 1800 ContiBus-1 extn for commissioning of 400 kV Boisar-1amp2 bays with 80 MVAR Reactors

WRTS-I WRTS-I C

26 400kV 400kV SUGEN PIRANA Line (Line 2) 19-Aug-14 900 19-Aug-14 1700 Daily Corrective Maintenance of

Transfer Isolator TPL-SUGE TPL-SUG R

27 400kV 400kV PGCIL - PIRANA Feeder No 2 19-Aug-14 900 19-Aug-14 1700 Daily 400kV CT connectors replacementTPL-AHME TPL-AHM R

28 400 Bhadrawati-Parli 1amp 2 19-Aug-14 000 20-Oct-14 1800 DailyFor OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

29 400 Mundra - Jetpur line No1 19-Aug-14 800 19-Aug-14 1200 Daily protection logic checking work PGCIL GETCO30 400 Mundra - Jetpur line No 2 19-Aug-14 1400 19-Aug-14 1800 Daily protection logic checking work PGCIL GETCO

31 400 400KV BUS-I at Bilaspur Ss 20-Aug-14 900 20-Aug-14 1800 DAILY For bus bar stability of LANCO bays amp jumpering work WRTS-I LANCO C

32 400 KSK ndash Raigarh circuit 4 20-Aug-14 900 21-Aug-14 1800 CONT complete PLCC rectification works WRTS-I KSK C

33 HVDC HVDC POLE I AT BHADRAWATI 20 A 14 8 00 21 A 14 18 00 D il AMP WORKS WRTS I WRTS I R33 HVDC HVDC POLE-I AT BHADRAWATI 20-Aug-14 800 21-Aug-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

34 765kV Dharamjaygarh - Durg ckt-2 20-Aug-14 800 22-Aug-14 1800 daily CSD relay commissioning (M+T) WRTS-I PGCIL C

35 765 JBP - BINA 1 at Jabalpur Pooling Station 20-Aug-14 1000 21-Aug-14 1800 Daily Commissioning of CSD Relay for

765KV JBP - BINA Ckt 1 PGCIL WRTS-II C

36 400 Khandwa-Dhule1 20-Aug-14 1000 20-Aug-14 1500 Daily AMP PGCIL WRTS-II R

37 400 Bus-1 at Shujalpur 20-Aug-14 1000 20-Aug-14 1800 Daily AMP PGCIL WRTS-II R

38 400 Bus2 at Satna 20-Aug-14 900 20-Aug-14 1800 Daily For Bus Bar Stability and charging activity of 406 Bay PGCIL WRTS-II C

39 400 Bus1 at Indore 20-Aug-14 900 20-Aug-14 1800 Daily Jumper connection amp stability checking of Pitampur1 PGCIL WRTS-II C

40 400 400kV JBP- Itarsi 3 Line 20-Aug-14 1000 20-Aug-14 1200 DailyChecking of Remote operation of Line Isolators amp Protection signals from NTAMC Manesar

PGCIL WRTS-II C

41 765 Raigarh (Kotra) - Raigarh (Tamnar) 20-Aug-14 900 31-Aug-14 1800 ContinuousFor installation of Bird guards WRTS-I PGCIL C

42 400 Kansari - Kankroli line 20-Aug-14 800 20-Aug-14 1800 Daily PMU installation work and maintenPGCIL GETCO43 400 BUS-2 AT SOLAPUR 21-Aug-14 900 22-Aug-14 1800 Daily Pune bays extension works WRTS-I WRTS-I C

44 765 ICT 1 at Jabalpur Pooling Station 21-Aug-14 1000 21-Aug-14 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus for Spare ICT Phase

PGCIL WRTS-II C

45 400 Bina-Shujalpur1 21-Aug-14 900 21-Aug-14 1000 Daily

For Replacement of 390kV Reactor LA with 336kV LA Line will be taken in service without PGCIL WRTS-II Cj p g g y will be taken in service without Line Reactor at Shujalpur

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

46 400 Khandwa-Dhule2 21-Aug-14 1000 21-Aug-14 1800 DailyFor Replacement of 390kV Reactor LA with 336kV LA At Khandwa amp AMP

PGCIL WRTS-II C

47 220 Damoh-Sagar 21-Aug-14 1000 21-Aug-14 1500 Daily AMP of terminal equipment at Damoh SS MPPTCL WR-II R

48 765 ICT2 at Indore 21-Aug-14 900 22-Aug-14 1800 Continious

For Auxiliary bus erection at Indore PGCIL WRTS-II C

49 400 125MVAr BR at Shujalpur 21-Aug-14 900 21-Aug-14 1800 Daily Differential stability of tie bay (Under commissioning) PGCIL WRTS-II C

50 400 Raipur-Bhadrawati-III 21-Aug-14 900 21-Aug-14 1800 ContinuousBus split at Raipur WRTS-I PGCIL C51 400 Kansari - Bhinmal line 21-Aug-14 800 21-Aug-14 1800 Daily PMU installation work and maintenPGCIL GETCO

52 HVDC HVDC POLE-2 AT BHADRAWATI 22-Aug-14 800 23-Aug-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

53 765 ICT I at Bina 22-Aug-14 0900 23-Aug-14 1800 DailyCommissioning of CSD Relay for 400kV side of ICT- rescheduling of outage

PGCIL WRTS-II C

54 765 JBP - BINA 2 at Jabalpur Pooling Station 22-Aug-14 1000 23-Aug-14 1800 Daily Commissioning of CSD Relay for

765KV JBP - BINA Ckt 2 PGCIL WRTS-II C

55 400 Khandwa-Rajgarh1 22-Aug-14 800 23-Aug-14 1800 PM Continous

Rectification of damaged tower peak at locno83 due to collapse of MPPTCL tower which is under construction

PGCIL MPPTCL C

F j i amp h i th56 400 Pirana-Vadodara-Asoj DC 22-Aug-14 800 23-Aug-14 1800 Daily

For jumpering amp charging the future cirucit of line in multi-circuit towers to prevent conductor theft

PGCIL WRTS-II C

57 220 Damoh-Damoh2 22-Aug-14 1000 22-Aug-14 1500 Daily AMP of terminal equipment at Damoh SS MPPTCL WR-II R

58 400kV 400kV SUGEN VAPI Line 22-Aug-14 900 22-Aug-14 1400 Daily Corrective Maintenance amp Inspection Dropper of 5 Core CT

TPL-SUGE TPL-SUG R

59 765 Bus Reactor Kotra 22-Aug-14 900 23-Aug-14 1800 Daily WRTS-I PGCIL C

60 400 Vindhyachal-Jabalpur3 23-Aug-14 900 23-Aug-14 1800 Daily

For Replacement of 390kV Reactor LA with 336kV LA At Jabalpur Line will remain out of service due to less clearance of Reactor LA from Line conductor

PGCIL WRTS-II C

61 765 ICT1 at Indore 23-Aug-14 900 26-Aug-14 1800 Continious

re routing of cables in CMB for commissioning of spare unit at Indore

PGCIL WRTS-II C

62 765 Bus- 2 at Bina 23-Aug-2014 0900 23-Aug-2014 1800 DailyFor Bus stability required for 765kV Jabalpur 3 Bay- Rescheduling of outage

POWERGRID WRTS-II C

63 765 Bus-1 at Gwalior 24-Aug-14 1000 25-Aug-14 1800 Daily Busbar Jumpering ampStability test related to Jaipur 1 main bay PGCIL WRTS-II C

64 400 Navasari- Kala MC line 25-Aug-14 800 26-Aug-14 1800 DailyConstruction work of Navasari- Boisar line on same Multi ckt WRTS-II WRTS-I Ctower

65 765 765400 AT-1 AT SOLAPUR 25-Aug-14 900 26-Aug-14 1800 Daily Spare ICT unit Aux bus commisioning works WRTS-I WRTS-I C

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

66 220 Korba-Budhipadar Ckt-3 at CSPDCL Korba Ss 25-Aug-14 900 26-Aug-14 1800 DAILY For diversion of line for SE

Railway MCL project WRTS-I PGCIL C

67 765 765KV Bus 1 at Jabalpur Pooling Station 25-Aug-14 1000 25-Aug-14 1800 Daily

765KV Bus 1 Extension for Switchyard Extension for BINA 3 Line Dia

PGCIL WRTS-II C

68 765 765KV ICT 1 at Jabalpur Pooling Station 25-Aug-14 1000 25-Aug-14 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus Isolators for Spare ICT Phase - Heavy Induction

PGCIL WRTS-II C

69 400 Vindhyachal-Jabalpur4 25-Aug-14 900 25-Aug-14 1800 Daily

For Replacement of 390kV Reactor LA with 336kV LA At Jabalpur Line will remain out of service due to less clearance of Reactor LA from Line conductor

PGCIL WRTS-II C

70 400 Bus-I at satna 25-Aug-14 900 25-Aug-14 1800 DailyFor Changing of Jumper from Twin Moose To Quad Moose in 401 bay (jaypee nigrie line-1)

PGCIL WR-II C

71 400 Deepnagar-Thaptitanda 25-Aug-14 900 25-Aug-14 1700 Daily To attend Isolator alignment problem MSETCL MSETCL

72 765 BUS-II and 765 ICT-1 at Aurangabad (PG) 25-Aug-14 600 25-Aug-14 1800 Daily Commissioning of spare ICT unit

at Aurangabad (PG) WRTS-I WRTS-I CAurangabad (PG) at Aurangabad (PG)

73 765 Kotra-durg Ckt-2 along with line reactor 25-Aug-14 900 28-Aug-14 1800 ContinuousReplacement of spacer damper WRTS-I PGCIL C

74 765 Wardha-Aurangabad (PG)-2 and Padge-1 LReactor 26-Aug-14 600 26-Aug-14 1800 Daily Construction of up-coming

Padghe bay at Aurangabad (PG) WRTS-I WRTS-I C

75 765 Gwalior -Bina 1 26-Aug-14 1000 27-Aug-14 1800 Daily Spare reactor commissioning at Gwalior PGCIL WR-II C

76 765 1500MVA ICT 2 at Jabalpur Pooling Station 26-Aug-14 1000 26-Aug-14 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus Isolators for Spare ICT Phase - Heavy Induction

PGCIL WRTS-II C

77 400 Jabalpur-Itarsi4 26-Aug-14 900 26-Aug-14 1800 Daily

For Replacement of 390kV Reactor LA with 336kV LA At Jabalpur Line will remain out of service due to less clearance of Reactor LA from Line conductor

PGCIL WRTS-II C

78 400 Akola ll-Thaptitanda 27-Aug-14 900 27-Aug-14 1900 Daily To attend chattering noise on B-ph wave trap MSETCL MSETCL

79 400 Vapi- Kala MC Line 27-Aug-14 800 28-Aug-14 1800 DailyConstruction work of Navasari- Boisar line on same Multi ckt tower

WRTS-II WRTS-I C

80 765 Bus 1 at Jabalpur Pooling Station 27-Aug-14 1000 27-Aug-14 1800 Daily

765KV Bus 1 Extension Busbar Stability test related to BINA 3 Line Dia

PGCIL WRTS-II C

81 400 KORBA SIPAT 27 Aug 14 600 29 Aug 14 2200 CONT NORMALISED THE LILO AT PGCIL LANCO C81 400 KORBA -SIPAT 27-Aug-14 600 29-Aug-14 2200 RAMPUR PGCIL LANCO C

82 400 TARAPUR-PADGHE II 27-Aug-14 800 28-Aug-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

83 765 Gwalior-Satna1 28-Aug-14 800 28-Aug-14 1800 Daily For spare reactor commissioning works at Gwalior PGCIL WRTS-II C

84 765 BUS-II and Padge-2 LReactor at Aurangabad (PG) 28-Aug-14 600 28-Aug-14 1800 Daily

Commissioning of Padghe-2 upcoming bay at Aurangabad (PG)

WRTS-I WRTS-I C

85 765 Bilaspur 1 Main bay (710) at Seoni 28-Aug-14 800 29-Aug-14 1800 Daily AMP works WRTS-I WRTS-I R

86 765 765400 AT-2 AT SOLAPUR 28-Aug-14 900 28-Aug-14 1800 Daily Spare ICT unit Aux bus commisioning works WRTS-I WRTS-I C

87 765 Bus Reactor(706 BR) at Bilaspur Ss 28-Aug-14 900 01-Sep-14 1800 DAILY For replacement of unarmoured

cable by TBEA WRTS-I PGCIL C

88 765 Bus 2 at Jabalpur Pooling Station 28-Aug-14 1000 29-Aug-14 1800 Daily

765KV Bus 2 Extension for Switchyard Extension for BINA 3 Line Dia

PGCIL WRTS-II C

89 400 MOUDA 400KV BUS REACTOR 28-Aug-14 0900hrs 29-Aug-14 1800 ContionuouAnnual Maintainance NTPC NTPC

90 765 Satna - Bina 1 29-Aug-14 0900 31-Aug-14 1800 Daily

for erection of new TC amp TE tower forNHPTL at Bina-Rescheduling of outage

PGCIL WRTS-II C

91 765 Bus Reactor at Satna 29-Aug-14 900 30-Aug-14 1800 Continious Commissioning of spre reactor PGCIL WRTS-II Cus

92 400 125MVAr BR1 at Indore 29-Aug-14 900 29-Aug-14 1800 Daily Post Commissioning check of Fire-Fighting system at Indore PGCIL WRTS-II C

93 400 Chorania Hadala line 29-Aug-14 800 29-Aug-14 1800 Daily PMM WORK GETCO GETCO

94 765 Kotra-durg Ckt-2 along with line reactor 29-Aug-14 900 31-Aug-14 1800 Daily WRTS-I PGCIL C

95 765 765400 ICT-2 at Aurangabad (PG) 30-Aug-14 600 30-Aug-14 1800 Daily Altube erection in 400 kV Boisar-

1amp2 Tie bays WRTS-I WRTS-I C

96 765kV Dharamjaygarh - Bilaspur 30-Aug-14 800 30-Aug-14 1800 daily commissioning of JBP-1 bay (side) WRTS-I PGCIL C

97 765kV 330 MVAR Bus Rector-2 at Dharamjaygarh 30-Aug-14 800 30-Aug-14 1800 daily commissioning of JBP-1 bay

(side) WRTS-I PGCIL C

98 400 Mundra Hadala SC 30-Aug-14 800 30-Aug-14 1800 DailyPower Line Crossing of 400 KV DC Bhachau SS (PG) - Varsana SS (GETCO) TrL

GETCO WRTS-II C

99 220 Gwalior - Mahalgaon 1amp2 30-Aug-14 900 31-Aug-14 1800 Continuous

For crossing of 765kV Gwalior - Jaipur line PGCIL WRTS-II C

100 220 Gwalior - Malanpur 1amp2 30-Aug-14 900 31-Aug-14 1800 Continuous

For crossing of 765kV Gwalior - Jaipur line PGCIL WRTS-II C

101 400 400 kV Akola- Nandagaon peth sc 31-Aug-14 800 31-Aug-14 1600 Daily crossing works of 765 kV Koradi-AWRTS-I WRTS-I R

102 400 Bina-Shujalpur2 31-Aug-2014 900 31-Aug-2014 1000 DailyFor Replacement of 390kV Reactor LA with 336kV LA Line

ill b t k i i ith t

POWERGRID WRTS-II C

103 400 Mundra - Sami DC 01-Sep-14 800 01-Sep-14 1800 DailyPower Line Crossing of 400 KV DC Bhachau SS (PG) - Varsana SS (GETCO) TrL

ADANI WRTS-II C

104 400 Akola-Wardha 1amp 2 01-Sep-14 800 30-Sep-14 1800 Daily For Online PID Line in service with AR in non-auto mode WRTS-I WRTS-I For IOwith AR in non auto mode

105 765 Bilaspur 2 Main bay (716) at Seoni 01-Sep-14 800 02-Sep-14 1800 Daily AMP works WRTS-I WRTS-I R

106 400 400220 ICT-1 AT SOLAPUR 01-Sep-14 900 01-Sep-14 1500 Daily AMP WORK WRTS-I WRTS-I R

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

107 765 1000 MVA ICT I amp ICT II at Bina 01-Sep-14 0900 01-Sep-14 1800 Daily Commissioning of Master follower

scheme PGCIL WRTS-II C

108 765 Bus 1 at Jabalpur Pooling Station 01-Sep-14 100000 AM 01-Sep-14 60000 PM Daily

765KV Bus 1 Extension Busbar Stability test related to Bhopal 1 Line Dia

PGCIL WRTS-II C

109 400 Shujalpur - Bina 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

110 400 Birsinghpur-Damoh 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

111 400 Gandhar - Navsari 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

112 400 Khandwa - Rajgarh 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

113 400 Indore - Nagda 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

114 400 Jabalpur - Jabalpur Pool 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II Cnon auto mode

115 400 Khandwa - Dhule 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

116 400 Itarsi - Khandwa 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

117 220 Satna - Satna 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

118 765 Dehgam - Ranchhodpura 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

119 765 Shujalpur - Nagda 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

120 400 Asoj - SSP 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

121 400 Bhachau - Mundra 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

122 400 Bina - Gwalior 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

123 400 Satna - Gwalior 1 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in PGCIL WRTS-II Cnon auto mode

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

124 400 LILO portion of Vapi - Navi Mumbai at Kala(Vapi-Kala Line) 01-Sep-14 600 30-Sep-14 1800 Daily

Online replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

125 400400 kV Khandwa - Rajgarh

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

126 400400 kV Gandhar-Navsari

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

127 400400 kV Rajgarh ndash SSP

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

128 400400 kV SSP-Asoj

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

129 400 400 kV Shujalpur - Nagda (MPPTCL)

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

130 400400 kV Dehgam - Ranchodpura

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

131 400 01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in PGCIL WRTS-II C

400 kV Ranchodpura ndash Bhachaup p y OPGW AR shall be kept in

non auto mode

132 400400 kV Mundra-Bhachau

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

133 400400 kV Vindhyachal NTPC -SASAN UMPP Ckt-1 01-Sep-14 600 30-Sep-14 1800 Daily

Online replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

134 400400 kV Vindhyachal Pooling -Vindhyachal NTPC 01-Sep-14 600 30-Sep-14 1800 Daily

Online replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

135 400 400 kV LILO at Kala (DNH) SS of Vapi-Navi Mumbai Line

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

136 765765 kV Bina - Gwalior

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

137 765765 kV Satna - Gwalior Ckt-I

01-Sep-14 600 30-Sep-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

138 400 Gandahr - Navsari DC 01-Sep-14 800 30-Sep-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

139 400 Navsari - Vapi - Kala 01-Sep-14 800 30-Sep-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

PID testing of insulator strings 140 400 Satna - Bina Ckt 1amp2 01-Sep-14 800 30-Sep-14 1800 Daily AR shall be kept In non auto

modePGCIL WRTS-II R

141 400 Nagda - Dehgam DC 01-Sep-14 800 30-Sep-14 1800 Daily PID testing of insulator strings AR h ll b k t I t

PGCIL WRTS-II R

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

142 220 Kakrapar - Vapi DC 01-Sep-14 800 30-Sep-14 1800 Daily PID testing of insulator strings PGCIL WRTS-II R

143

220 220 KV Jhanor - Haldrwa Line 1

01-Sep-14

800

05-Sep-14

000

Continous Replacement of existing CTCVT with 02 class CT amp CVT and for testing of the same NTPC NTPC

144 400 Akola-Aurangabad(PG) 2 01-Sep-14 800 02-Sep-14 1800 Conti commissioning of 50MVAR Lreactor at Aurangabad(PG) WRTS-I WRTS-I C

145 765 Bina-Satna 2 02-Sep-14 0900 03-Sep-14 1800 Daily Post Commissioning check of Fire-Fighting system at Bina PGCIL WRTS-II C

146 400 Vadavi-Chorania 1 02-Sep-14 800 02-Sep-14 1800 Daily PMM WORK WRTGPL GETCO147 400 BUS REACTOR AT SOLAPUR 02-Sep-14 900 02-Sep-14 1500 Daily AMP WORK WRTS-I WRTS-I R

148 765 Korba Line Main Bay (716) at Bilaspur Ss 02-Sep-14 900 02-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

149 765 Bus 2 at Jabalpur Pooling Station 02-Sep-14 100000 AM 02-Sep-14 60000 PM Daily

765KV Bus 2 Extension for Switchyard Extension for Bhopal 1 Line Dia

PGCIL WRTS-II C

150 400 Bus2 at Indore 02-Sep-14 900 02-Sep-14 1800 Daily Jumper connection amp stability checking of Pitampur1 PGCIL WRTS-II C

151 400 CGPL-Limbdi-1 02-Sep-14 2-Sep-14 8AM 6PM Daily routine maintenance and isolator aPGCIL CGPL

152400 Korba-Bhalai line -1

02-Sep-14 900 03-Sep-14 19002 days

continuous CVTs replacement

NTPC NTPC00 o ba a a e us C s ep ace e t

153 400 Sipat 400KV Bus-1 02-Sep-14 900 03-Sep-14 1900 Continous Annual Preventive maintenance NTPC NTPC

154 765 Bilaspur 2 Tie bay (717) at Seoni 03-Sep-14 800 04-Sep-14 1800 Daily AMP works WRTS-I WRTS-I R

155 400 400220 ICT-1 AT SOLAPUR 03-Sep-14 900 03-Sep-14 1500 Daily AMP WORK WRTS-I WRTS-I R

156 765 Sipat2 Main Bay (712) at Bilaspur Ss 03-Sep-14 900 03-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

157 765 Bina-Gwalior 2 03-Sep-14 0900 04-Sep-14 1800 Daily For spare reactor commissioning works at Gwalior PGCIL WRTS-II C

158 765 Bus 2 at Jabalpur Pooling Station 03-Sep-14 100000 AM 03-Sep-14 60000 PM Daily

765KV Bus 2 Extension for Switchyard Extension for Jumpering (Bus Extension) for Bhopal 1

PGCIL WRTS-II C

159 400 Indore-Asoj3 03-Sep-14 900 04-Sep-14 1800 Continuous

For checking protection transfer system at Indore (MPPTCL) PGCIL WRTS-II C

160 400 400 kv Nagda- Rajgarh ckt Pgcil ckt I 03-Sep-14 900 03-Sep-14 03092014 1800 daily Maintenan

ce Work PGCIL EHT- Mamp I

161 400 Vadavi-Chorania 2 04-Sep-14 800 04-Sep-14 1800 Daily PMM WORK WRTGPL GETCO162 220 SOLAPUR(PG)-Solapur(M) 04-Sep-14 900 04-Sep-14 1800 Daily AMP WORK MSETCL WRTS-I R

163 765 Bus 2 at Jabalpur Pooling Station 04-Sep-14 100000 AM 04-Sep-14 60000 PM Daily

765KV Bus 2 Extension Busbar Stability test related to Bhopal 1 Line Dia

PGCIL WRTS-II C

164 400 CGPL-Limbdi-2 04-Sep-14 4-Sep-14 8AM 6PM Daily routine maintenance and isolator aPGCIL CGPL

165 400 400 kv Nagda- Rajgarh ckt Pgcil ckt II 04-Sep-14 900 04-Sep-14 04092014 1800 daily Maintenan

ce Work PGCIL EHT- Mamp I

166400 Korba-Bhalai line -2

04-Sep-14 900 05-Sep-14 19002 days

continuous CVTs replacement

NTPC NTPC

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

167 400 BUS-1 AT SOLAPUR 05-Sep-14 900 05-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I C

168 400 Seoni-Khandwa 1 05-Sep-14 800 05-Sep-14 1800 Daily Line AMP works at Seoni WRTS-II WRTS-I R

169 400 400220 ICT-2 AT BOISAR 05-Sep-14 900 05-Sep-14 1500 Daily For Bushing oil DGA Testing WRTS-I WRTS-I R

170 765 Sipat2 Tie Bay (711) at Bilaspur Ss 05-Sep-14 900 05-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

171 765 Bina-Jabalpur I 05-Sep-14 0900 06-Sep-14 1800 Daily Post Commissioning check of Fire-Fighting system at Bina PGCIL WRTS-II C

172 400 Bus Reactor 1 at Jabalpur Pooling Station 05-Sep-14 100000 AM 05-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

173 220 Navsari - Nasik - 1 05-Sep-14 800 05-Sep-14 1800 Daily PMM WORK PGCIL GETCO174 400 Sipat 400KV Bus-2 05-Sep-14 900 06-Sep-14 1900 Continous Annual Preventive maintenance NTPC NTPC175 400 Akola-Wardha ckt 2 05-Sep-14 800 05-Sep-14 1700 Daily QMwork MSETCL MSETCL176 400 Kalwa-Kharghar 05-Sep-14 900 05-Sep-14 1700 Daily R amp M work MSETCL MSETCL177 400 Seoni-Khandwa 2 06-Sep-14 800 06-Sep-14 1800 Daily Line AMP works at Seoni WRTS-II WRTS-I R178 400 400220 ICT-1 AT BOISAR 06-Sep-14 900 06-Sep-14 1500 Daily For Bushing oil DGA Testing WRTS-I WRTS-I R

179 400 Bus Reactor 2 at Jabalpur Pooling Station 06-Sep-14 100000 AM 06-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

180 765 Gwalior-Satna2 06-Sep-14 800 06-Sep-14 1800 Daily For spare reactor commissioning works at Gwalior PGCIL WRTS-II C

181 400 Indore-Indore1 06-Sep-14 900 07-Sep-14 1800 Continuo For checking protection transfer t t I d (MPPTCL) PGCIL WRTS-II C181 400 Indore Indore1 06 Sep 14 900 07 Sep 14 1800 us system at Indore (MPPTCL) PGCIL WRTS II C

182 220 Navsari - Nasik - 2 06-Sep-14 800 06-Sep-14 1800 Daily PMM WORK PGCIL GETCO

183 400 VAPI-BOISAR 07-Sep-14 800 08-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

184 765 Satna-Gwalior-2 Reactor 07-Sep-14 900 07-Sep-14 1800 Daily For Commissioning of CSD relay in Gwalior-2 reactor bay at Satna PGCIL WRTS-II C

185 220 DC Welspun - Shivlakha amp Anjar shivlakha Trl 07-Sep-14 80000 AM 07-Sep-14 60000 PM Daily

Power Line Crossing of 400 KV DC Bhachau SS (PG) - Varsana SS (GETCO) TrL

GETCO WR-II C

186 765 Bilaspur 1 Tie bay (711) at Seoni 08-Sep-14 800 09-Sep-14 1800 Daily AMP works WRTS-I WRTS-I R

187 400kV Bus-1 at Itarsi SS 08-Sep-14 800 08-Sep-14 1800 Daily AMP amp Protection testing WRTS-II WRTS-II R

188 765 Seoni2 Main Bay (707) at Bilaspur Ss 08-Sep-14 900 08-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

189 765 Bina-Jabalpur II 08-Sep-14 0900 09-Sep-14 1800 Daily Post Commissioning check of Fire-Fighting system at Bina PGCIL WRTS-II C

190 765 ICT 1 at Jabalpur Pooling Station 08-Sep-14 100000 AM 08-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

191 765 Gwalior-Bina3 08-Sep-14 800 09-Sep-14 1800 Daily For spare reactor commissioning works at Gwalior PGCIL WRTS-II C

192 400 V-satna-1 08-Sep-14 900 09-Sep-14 1900 Continuous

Major OH of Line Circuit Breaker (For dismantling of poles) NTPC NTPC

193

220 220 KV Jhanor- Haldrwa Line 2

08-Sep-14

800

12-Sep-14

000

Continous Replacement of existing CTCVT with 02 class CT amp CVT and for testing of the same NTPC NTPC

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

194 400 Vadavi- Kansari- 1 09-Sep-14 800 09-Sep-14 1800 Daily PMM WORK WRTGPL GETCO195 400 Bus-1 at Damoh 09-Sep-14 1000 10-Sep-14 1800 Daily AMP PGCIL WRTS-II R

196 765 Bus Reactor 1 at Jabalpur Pooling Station 09-Sep-14 100000 AM 09-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

197 400 Bina - Shujalpur 1 09-Sep-14 1000 09-Sep-14 1400 Daily AMP PGCIL WRTS-II C

198 400 400 kv Katni- Damoh ckt 09-Sep-14 800 09-Sep-14 09092014 1800 daily Maintenance Work PGCIL EHT-

Mamp I

199 220 220 KV OMKARESHWAR -KHANDWA 09-Sep-14 900 09-Sep-14 09092014 1600 daily Maintenan

ce Work PGCIL EHT- Mamp I

200 220 220KV MALANPUR -AURAIYA 09-Sep-14 900 09-Sep-14 09092014 1700 daily Maintenance Work

EHT- Mamp I

201400 Korba 400 KV Bus coupler -1

09-Sep-14 900 10-Sep-14 19002 days

continuous Annual maintenance and testing

NTPC NTPC

202 400kV Bus-2 at Itarsi SS 10-Sep-14 800 10-Sep-14 1800 Daily AMP amp Protection testing WRTS-II WRTS-II R203 400 400220KV ICT-2 at Seoni 10-Sep-14 800 11-Sep-14 1800 Conti OLTC overhauling works WRTS-I WRTS-I R

204 400 VAPI-BOISAR 10-Sep-14 800 11-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

205 400 Parli 2 Tie Bay (417) at Solapur 10-Sep-14 900 10-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

206 765 330 MVAR Bus Rector-1 at Dharamjaygarh 10-Sep-14 800 11-Sep-14 1700 DAILY CSD relay commissioning in main

bay WRTS-I PGCIL C

207 765 ICT3 Tie Bay (717) at Bilaspur 10 S 14 9 00 10 S 14 18 00 DAILY F AMP k WRTS I PGCIL R207 765 ICT3 Tie Bay (717) at Bilaspur Ss 10-Sep-14 900 10-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

208 765 765kV Dharamjaygarh - Ranchi-2 l 10-Sep-14 900 15-Sep-14 1800 continous

For strining Jumpering of parallel ckt and Crossing of 765kV Dharamjaygarh-Jabalpur line

WRTS-I PGCIL C

209 765 ICT 2 at Jabalpur Pooling Station 10-Sep-14 100000 AM 10-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

210 400 Shujalpur-Nagda 1 10-Sep-14 1000 10-Sep-14 1400 Daily AMP PGCIL WRTS-II C211 400 Vadavi- Kansari- 2 10-Sep-14 800 10-Sep-14 1800 Daily PMM WORK WRTGPL GETCO

212 400 400 kv ISP - Nagda ckt 10-Sep-14 900 10-Sep-14 10092014 1800 daily Maintenance Work

EHT- Mamp I

213 220 220KV MALANPUR -AURAIYA 10-Sep-14 900 10-Sep-14 10092014 1700 daily Maintenance Work

EHT- Mamp I

214 220 220 KV DAMOH PGCIL IC - I 10-Sep-14 800 10-Sep-14 10092014 1800 daily Maintenance Work PGCIL EHT-

Mamp I

215765KV400K

VSipat 765KV400KV ICT-1 10-Sep-14 900 11-Sep-14

1900 Continous Annual Preventive maintenance NTPC NTPC216 400 New Koyna-Dabhol ckt 1 10-Sep-14 830 10-Sep-14 1730 Daily QMwork MSETCL MSETCL217 400 Akola-Aurangabad ckt 1 10-Sep-14 830 10-Sep-14 1730 Daily QMwork MSETCL MSETCL

218 400 TARAPUR-PADGHE I 11-Sep-14 800 12-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

219 400 ICT 2 Main Bay (409) at Mapusa 11-Sep-14 900 11-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

220 765 Korba LR (716 LR) at Bilaspur Ss 11-Sep-14 900 11-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

221 220 Bus-1 at Damoh 11-Sep-14 1000 12-Sep-14 1800 Daily AMP PGCIL WRTS-II R

222 765 Bus Reactor 2 at Jabalpur Pooling Station 11-Sep-14 100000 AM 11-Sep-14 60000 PM Daily Installation amp Commissioning of

CSD Relay PGCIL WRTS-II C

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

223 220MC Bhimasar - Lalpar Bhimasar -Morbi amp Bhimasar - Mansar (on same tower)

11-Sep-14 80000 AM 11-Sep-14 60000 PM DailyPower Line Crossing of 400 KV DC Bhachau SS (PG) - Varsana SS (GETCO) TrL

GETCO WR-II C

224 220 Navsari - Dastan- 1 11-Sep-14 800 12-Sep-14 1800 Daily PMM WORK PGCIL GETCO

225 400 400 kv Rajgarh Pgcil - SSP CKT I 11-Sep-14 900 11-Sep-14 11092014 1800 daily Maintenance Work PGCIL EHT-

Mamp I

226 220 220K KV MEHGAON - AURAIYA 11-Sep-14 900 11-Sep-14 11092014 1700 daily Maintenance Work

EHT- Mamp I

227400 Korba Lanco

11-Sep-14 900 12-Sep-14 19002 days

continuous Annual maintenance and testing

NTPC NTPC

228 400 Lonikand II-Lonikand I 11-Sep-14 900 11-Sep-14 1700 Daily QMwork MSETCL MSETCL

229 400 Parali-Lonikand II ckt 2 11-Sep-14 900 11-Sep-14 1700 Daily QMwork MSETCL MSETCL

230 400 Waluj-Bableshwer 11-Sep-14 900 11-Sep-14 1700 Daily QMwork MSETCL MSETCL

231 400 Tie Transformer-II NTPC-Korba 11-Sep-14 900 12-Sep-14 1700 Maintenance NTPC NTPC

232 400kV Sipat-Raipur-2 12-Sep-14 000 12-Sep-14 1700 Daily Attending hot spots and SD nature defects WRTS-I PGCIL R

233 400 400220 ICT 1 AT WARDHA 12 Sep 14 9 00 12 Sep 14 15 00 Dail For B shing oil DGA Testing WRTS I WRTS I R233 400 400220 ICT-1 AT WARDHA 12-Sep-14 900 12-Sep-14 1500 Daily For Bushing oil DGA Testing WRTS-I WRTS-I R

234 400 Khandwa-Dhule 2 line reactor at Dhule 12-Sep-14 800 12-Sep-14 1800 Daily For Bushing oil DGA Testing

Line in service wo reactor WRTS-I WRTS-I R

235 400 BUS I AT MAPUSA 12-Sep-14 900 12-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

236 765 JBP - Dharmjaygarh Reactor Line 1 Reactor at Jabalpur Pooling Station

12-Sep-14 100000 AM 12-Sep-14 60000 PM Daily Installation amp Commissioning of CSD Relay PGCIL WRTS-II C

237 400 400 kv Rajgarh Pgcil - SSP CKT II 12-Sep-14 900 12-Sep-14 12092014 1800 daily Maintenan

ce Work PGCIL EHT- Mamp I

238 400 400 kv Indore - Nagda ckt 12-Sep-14 900 12-Sep-14 12092014 1800 daily Maintenance Work

EHT- Mamp I

239 220 220K KV MEHGAON - AURAIYA 12-Sep-14 900 12-Sep-14 12092014 1700 daily Maintenance Work

EHT- Mamp I

240 400 Lonikand-Stage IV 12-Sep-14 900 12-Sep-14 1700 Daily QMwork MSETCL MSETCL

241 400 Aurangabad(PG)-Aurangabad (Waluj)-1 12-Sep-14 800 15-Sep-14 1800 Conti Augmentation works at MSETCL

Waluj 400kV SSWRTS-I WRTS-I C

242 400 TARAPUR-PADGHE I 13-Sep-14 800 14-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

243 400 Karad-Lonikand 13-Sep-14 900 13-Sep-14 1700 Daily QMwork MSETCL MSETCL

244 400kV Sipat-Raipur-1 13-Sep-14 000 13-Sep-14 1700 Daily Attending hot spots and SD nature defects WRTS-I PGCIL R

245 400 BOISAR-PADGHE 13-Sep-14 800 14-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

246 400 400220 ICT-2 AT WARDHA 13-Sep-14 900 13-Sep-14 1500 Daily For Bushing oil DGA Testing WRTS-I WRTS-I R

247 400 Khandwa-Dhule 1 line reactor at Dhule 13-Sep-14 800 13-Sep-14 1800 Daily For Bushing oil DGA Testing

Line in service wo reactor WRTS-I WRTS-I R

248 220 BUS I AT MAPUSA 13-Sep-14 900 13-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R248 220 BUS I AT MAPUSA 13-Sep-14 900 13-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

249 765 Korba Line Main Bay (716) at Bilaspur Ss 13-Sep-14 900 13-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL R

250 400 Dhule-Babhleswar ckt 2 13-Sep-14 900 13-Sep-14 1700 Daily QMwork MSETCL MSETCL

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

251 400 Kolhapur-Mapusa 1 13-Sep-14 800 17-Sep-14 1800 Daily Insulator replacement due to polluted streaches

WRTS-I WRTS-I R

252 400 Kolhapur-Mapusa 1 13-Sep-14 800 17-Sep-14 1800 Daily Insulator replacement due to polluted streaches

WRTS-I WRTS-I R

253 400 Bhachau - Ranchodpura DC(Subject to SLDC consent) 14-Sep-14 80000 AM 20-Sep-14 60000 PM Continuo

us

Shifting of towers to maintain clearance for SSNL canal crossing (Loc 26-33 amp 78-84)

PGCIL WRTS-II C

254 400kV Bhilai-koradi line 15-Sep-14 000 16-Sep-14 000 Daily Attending hot spots and SD nature defects WRTS-I PGCIL R

255 400 Navasari- Kala MC line 15-Sep-14 800 16-Sep-14 1800 DailyConstruction work of Navasari- Boisar line on same Multi ckt tower

WRTS-II WRTS-I C

256 400 SOLAPUR(PG)-KARAD 15-Sep-14 900 20-Sep-14 1800 Conti Tower Erection of Line Reactor gantry of Karad Line at Solapur MSETCL WRTS-I R

257 765 WARDHA-AURANGABAD(PG) 2 15-Sep-14 800 15-Sep-14 1800 Daily

For replacement of Rph reactor unit at Wardha Line in service wo reactor Taking out reactor out of service

WRTS-I WRTS-I R

258 400 Chandrapur 3 Main Bay (420) at Bhadrawati 15-Sep-14 900 15-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

259 765 Seoni1 Main Bay (704 ) at Bilaspur Ss 15-Sep-14 900 15-Sep-14 1800 DAILY For AMP work WRTS-I PGCIL RBilaspur Ss

260 220 Kakrapar-Haldarwa1 15-Sep-14 900 15-Sep-14 1800 DailyReplacement of existing 220kV CTs with High Fault current CTs at Haldarwa SS

PGCIL WRTS-II C

261 400 SSP - Rajgarh - 1 15-Sep-14 800 17-Sep-14 1800 Daily PMM WORK PGCIL GETCO

262

220 Jhanor 220 KV Bus1

15-Sep-14

800

16-Sep-14

000

Continous Replacement of existing CTCVT with 02 class CT amp CVT and for testing of the same NTPC NTPC

263 400 BOISAR-PADGHE 16-Sep-14 800 17-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

264 400 Chandrapur 3Tie Bay (421) at Bhadrawati 16-Sep-14 900 16-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

265 400 Indore-Asoj2 16-Sep-14 80000 AM 16-Sep-14 60000 PM Daily Replacement of broken insulators PGCIL WRTS-II R

266 765 Sasan-Satna2 16-Sep-14 900 17-Sep-14 1800 Daily Power line crossing for stringing of of 765Kv Vin pool- satna ck2 PGCIL WRTS-II C

267 400 315MVA ICT1 at Shujalpur 16-Sep-14 1000 16-Sep-14 1400 Daily AMP PGCIL WRTS-II R

268 220 Kakrapar-Haldarwa2 16-Sep-14 900 16-Sep-14 1800 DailyReplacement of existing 220kV CTs with High Fault current CTs at Haldarwa SS

PGCIL WRTS-II C

269 220 220 KV PITHAMPUR - RAJGARH PG CKT - I 16-Sep-14 900 16-Sep-14 16092014 1600 daily Maintenan

ce Work PGCIL EHT- Mamp I

270 400 V-satna-1 16-Sep-14 900 16-Sep-14 1900 Daily basis For erection of Breaker after OH NTPC NTPC

Construction work of Navasari- 271 400 Vapi- Kala MC Line 17-Sep-14 800 18-Sep-14 1800 Daily Boisar line on same Multi ckt

towerWRTS-II WRTS-I C

Date Time Date TimeKV Line From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of Aug- 2014 amp Sep-2014 SN

272 400 HVDC IBay (403) at Bhadrawati 17-Sep-14 900 17-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

273

220 Jhanor 220 KV Bus2

17-Sep-14

800

18-Sep-14

000

Continous Replacement of existing CTCVT with 02 class CT amp CVT and for testing of the same NTPC NTPC

274 400 Parli 1 Main Bay (423) at Bhadrawati 18-Sep-14 900 18-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

275 220 Kawas-Haldarwa1 18-Sep-14 900 18-Sep-14 1800 DailyReplacement of existing 220kV CTs with High Fault current CTs at Haldarwa SS

PGCIL WRTS-II C

276 400 SSP - Rajgarh - 2 18-Sep-14 800 20-Sep-14 1800 Daily PMM WORK PGCIL GETCO

277 400 400 KV Sarni - Seoni ckt 18-Sep-14 800 18-Sep-14 18092014 1800 daily Maintenance Work PGCIL EHT-

Mamp I

278 220 220 KV PITHAMPUR - RAJGARH PG CKT - II 18-Sep-14 900 18-Sep-14 18092014 1600 daily Maintenan

ce Work PGCIL EHT- Mamp I

279 220 220 KV DAMOH PG - TIKAMGARH CKT I 18-Sep-14 800 18-Sep-14 18092014 1800 daily Maintenan

ce Work PGCIL EHT- Mamp I

280 400Sipat 400KV Bay-9 (Raipur-1 Main bay) 18-Sep-14 900 19-Sep-14 1900 Continous Annual Preventive maintenance NTPC NTPC

281 400 Kolhapur-Mapusa 2 18-Sep-14 800 22-Sep-14 1800 Daily Insulator replacement due to polluted streaches

WRTS-I WRTS-I R

282 400 Khandwa 2 Tie bay (423) at 19 S 14 8 00 20 S 14 18 00 D il AMP k WRTS I WRTS I R282 400 Khandwa 2 Tie bay (423) at Seoni 19-Sep-14 800 20-Sep-14 1800 Daily AMP works WRTS-I WRTS-I R

283 400 BOISAR-PADGHE 19-Sep-14 800 20-Sep-14 1800 Daily Insulator replacement due to polluted streaches WRTS-I WRTS-I R

284 400 Parli 1 Tie Bay (424) at Bhadrawati 19-Sep-14 900 19-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

285 220 Kawas-Haldarwa2 19-Sep-14 900 19-Sep-14 1800 DailyReplacement of existing 220kV CTs with High Fault current CTs at Haldarwa SS

PGCIL WRTS-II C

286 400 V-satna-2 19-Sep-14 900 20-Sep-14 1900 Continuous

Major OH of Line Circuit Breaker (For dismantling of poles) NTPC NTPC

287 400 Aurangabad(PG)-Aurangabad (Waluj)-2 19-Sep-14 800 22-Sep-14 1800 Conti Augmentation works at MSETCL

Waluj 400kV SSWRTS-I WRTS-I C

288 400 Parli 2 Main Bay (416) at Solapur 20-Sep-14 900 20-Sep-14 1800 Daily AMP WORKS WRTS-I WRTS-I R

289 400 400220 ICT-3 AT MAPUSA 20-Sep-14 900 20-Sep-14 1500 Daily AMP WORKS WRTS-I WRTS-I R

Anaulagnak 33

Agast 2014 AaOr isatmbar 2014 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR AUGUST 2014 AND SEPTEMBER 2014

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)Agast 2014 isatmbar 2014 Agast 2014 isatmbar 2014

AUGUST 2014 SEPTEMBER 2014 AUGUST 2014 SEPTEMBER 2014

1 gaujarat

saIimat 12500 13900 7750 8500

AsaIimat 12540 13940 7760 8510

2 maQya p`doSa

saIimat 6200 6500 3800 4100

AsaIimat 6250 6500 3800 4100

3 CltaIsagaZ

saIimat 3030 3199 16425195 172052635

AsaIimat 3160 3269 172031 169036025

4 maharaYT

saIimat 16050 17750 10700 10800

AsaIimat 16100 17800 10750 10850

5 gaaovaa

saIimat 410 415 290 285

AsaIimat 425 425 300 290

6 dmana dIva

saIimat 315 320 205 200

AsaIimat 320 325 210 210

7 DI ena eca

saIimat 645 640 425 420

AsaIimat 650 645 430 425

8 piScama xao~

saIimat 37614 41048 25600 26080

AsaIimat 37898 41254 26450 27900

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah jaUlaa[- 2014

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 2236 75

]k[- Ukai - 2 529 75]k[- Ukai - 3 000 0]k[- Ukai - 4 2023 75]k[- Ukai (Total) 4788 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 094 2]k[- ela baI saI eca Ukai LBCH - 2 028 2]k[- ela baI saI eca Ukai LBCH (Total) 123 1 0018

3 kDanaa Kadana - 1 699 61 0010kDanaa Kadana - 2 910 57 0000kDanaa Kadana - 3 000 0kDanaa Kadana - 4 1115 62 0000kDanaa Kadana (Total) 2724 62 0010

4 pnama PANAM amp Madhuban Dam 1 amp 2 160 8 0017 6 kula jalaIya TOTAL(H) 7794 225 0390

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 3339 57 34582 TaoronT pavar ilaimaToD yauinaT DI 6957 122 64083 TaoronT pavar ilaimaToD yauinaT [- 8082 122 67664 TaoronT pavar ilaimaToD yauinaT ef 8380 124 73285 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 037511 Qauvarna tapIya Dhuvaran - GT 2 000 0 116012 Qauvarna tapIya Dhuvaran - STG 1783 10113 ]ka[- yauinaT 1 Ukai -1 000 0 019714 ]ka[- yauinaT 2 Ukai -2 000 0 019315 ]ka[- yauinaT 3 Ukai -3 10038 202 922016 ]ka[- yauinaT 4 Ukai -4 6930 202 697517 ]ka[- yauinaT 5 Ukai -5 11833 212 1138718 ]ka[- yauinaT 6 Ukai -6 30277 507 2287219 gaaMQaInagar 1 Gandhinagar - 1 000 0 008220 gaaMQaInagar 2 Gandhinagar - 2 000 0 009221 gaaMQaInagar 3 Gandhinagar - 3 6275 213 669022 gaaMQaInagar 4 Gandhinagar - 4 6060 212 706523 gaaMQaInagar 5 Gandhinagar - 5 13495 215 1331024 vaNakbaaorI 1 Wanakbori - 1 12142 209 000025 vaaNakbaaOrI 2 Wanakbori - 2 12364 21026 vaaNakbaaOrI 3 Wanakbori - 3 6669 20227 vaaNakbaaOrI 4 Wanakbori - 4 7244 21128 vaaNakbaaOrI 5 Wanakbori - 5 6198 21029 vaaNakbaaOrI 6 Wanakbori - 6 5924 21230 vaaNakbaaOrI 7 Wanakbori - 7 9489 21031 ]trna Utran GT 1 000 0 026832 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 1200 221 024735 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 819 143 1098

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

Anaulagnak 41

ACTUAL GENERATION amp AVALABILITY FOR JULY 2014Actual vaastivak

Actual vaastivak

37 isaka Sikka - 1 1326 107 179438 isaka Sikka - 2 3489 114 401539 kcC ilagnaa[-T Kutch Lignite - 1 5092 71 859040 kcC ilagnaa[-T Kutch Lignite - 2 4929 7141 kcC ilagnaa[-T Kutch Lignite - 3 000 042 kcC ilagnaa[-T Kutch Lignite - 4 2388 68 571043 saUrt ilagnaa[-T Surat Lignite - 1 8775 130 874544 saUrt ilagnaa[-T Surat Lignite - 2 3966 130 445845 saUrt ilagnaa[-T Surat Lignite - 3 5411 130 524346 saUrt ilagnaa[-T Surat Lignite - 4 8973 130 883347 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5446 103 859048 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 6057 10749 jaI Aa[- pI saI ela GIPCL GT - 1 1123 33 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1510 3251 jaI Aa[- pI saI ela GIPCL GT - 3 598 3052 jaI Aa[- pI saI ela GIPCL ST - 1 1846 4553 jaI Aa[- pI saI ela GIPCL GT - 4 357 98 000054 jaI Aa[- pI saI ela GIPCL ST - 2 186 5055 [- esa esa e Aar ESSAR GT - 1 000 0 029356 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 083 146 002860 jaI pI [- saI GPEC GT - 2 148 153 023361 jaI pI [- saI GPEC GT - 3 1387 145 028462 jaI pI [- saI GPEC STG 521 7563 jaI esa [- jaI GSEG GT - 1 206 51 112164 jaI esa [- jaI GSEG GT - 2 1079 4765 jaI esa [- jaI GSEG STG 613 2466 Sugen (GT 1 + GT 2) 000 0 693867 saIpIpI sao Aayaat Imp from CPP+MUNDRA 249228 6777

kula tapIya Total (T) 511604 7860 431554kula jalaIya+tapIya Total (H+T) 519398 8078 431944ivaMD [najaI- Wind Energy 94980kula jalaIya+tapIya+hvaa Total (H+T+Wind) 614378 9539ivainamaya Exchanges 150828 saIimat jaa- maaMga Restricted Energy Req 765205

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 767 135

11 gaaMQaI saagar Gandhi Sagar 998 117 008012 raNaa p`tap sagar RPSagar 096 86 004013 javaahr sagar Jawahar Sagar 439 66 0020

2 ponca Pench 1381 160 01003 baargaI Bargi 712 33 00704 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 5724 309 02906 banasaagar Bansagar-2 (Deolondh) 104 407 banasaagar Bansagar-3 (Silpara) 565 31 00608 banasaagar Bansagar-4 (Zinaha) 425 20 00309 maoDIKoDa Medikheda 096 58

10 ibarisaMGapur Birsingpur 680 20 002011 Tavaa Tawa 000 012 rajaGaaT Rajghat 001 7 007013 Omkareshwar 4226 340 14 [Midra saagar Indira Sagar 6679 679 0598

kula jalaIya TOTAL(H) MPPGCL 19979 2031 1152

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 2223 84 179302 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 14496 216 0

Actual vaastivak

4 satpura I Satpura-I(60Share) 000 0 00005 satpura II Satpura-II Unit 6 000 0 83106 satpura II Satpura-II Unit 7 7549 1857 satpura II Satpura-II Unit 8 12446 195 173908 satpura II Satpura-II Unit 9 4038 1759 satpura III Satpura-III Unit 10 9508 219 23440

10 satpura III Satpura-III Unit 11 8675 167 2096011 esajaITIpIesa 1 SGTPS Unit - 1 8675 167 2096012 esajaITIpIesa 2 SGTPS Unit - 2 9354 16013 esajaITIpIesa 3 SGTPS Unit - 3 1129 165 1642014 esajaITIpIesa 4 SGTPS Unit - 4 6022 16015 esajaITIpIesa 5 SGTPS Unit - 5 27597 50816 SSTPS 7895 309 9910

kula tapIya Total (T) 117479 2427 115480kula jalaIya+tapIya Total (H+T) 137458 4759 116632Injection from WIND 14572 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 152030 4759ivainamaya Exchanges 271419 saIimat jaa- maaMga Rest En Req 423449

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 606 120 01102 Gangrel 039 10 00203 Mini Micro KWB 039 7

kula jalaIya TOTAL(H) CSEB 684 137 0520tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 40 125902 kaorbaa (pU) Korba (E) Unit-2 2764 383 kaorbaa (pU) Korba (E) Unit-3 2764 384 kaorbaa (pU) Korba (E) Unit-4 2784 405 kaorbaa (pU) Korba (E) Unit -5 3685 120 244406 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 154608 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 24740

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 13343 243 1124012 KORBA(EB) Extn - 2 14104 248 11250

kula tapIya Total (T) 119955 1644 10189013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 119955 1644kula jalaIya+tapIya Total (H+T) 120639 1781 102410ivainamaya Exchanges 59759 0saIimat jaa- maaMga Rest En Req 180398 1781

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 5228 585 06952 kaoyanaa III Koyna III 3695 3203 kaoyanaa IV Koyna IV 371 11204 kaoyanaa DIpIeca Koyna DPH 414 385 TaTa jalaIya TATA Hydro 10123 741 44976 vaOtrNaa Vaitarna 1151 617 eladarI Eldari 000 168 BaTgar AaOr vaIr Bhatgar amp Vir 036 49 pOzana Paithan 976 49

10 itlaarI Tillari 1036 6511 BaIra Tola rosa Bhira Tail Race 846 4112 GaTGar Ghatghar 3639 25013 Anya CaoTo jalaIya Small Hydro (others) 1041 0

kula jalaIya TOTAL(H) 28404 -1073 5192

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL

Actual vaastivak

3 naaisak 3 Nasik Unit -3 4157 1954 naaisak 4 Nasik Unit -4 12489 1985 naaisak 5 Nasik Unit -5 12480 2006 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 30718 5038 Tambao 6 Trombay Unit -6 6619 5009 Tambao 8 Trombay Unit -8 000 0

10 Tambao 7A gaOsa Trombay -7A (Gas) 7476 127 288611 Tambao 7ba Trombay -7B (WHR) 4373 6912 kaoraDI 5 Koradi Unit -5 000 013 kaoraDI 6 Koradi Unit -6 8448 16714 kaoraDI 7 Koradi Unit -7 10994 19415 Bausaavala 2 Bhusawal Unit -2 4715 16516 Bausaavala 3 Bhusawal Unit -3 6454 16517 Bausaavala 4 Bhusawal Unit -4 20419 50518 Bausaavala 4 Bhusawal Unit -5 23286 43519 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 000 021 parlaI 5 Parli Unit -5 9315 17522 parlaI 6 Parli Unit -6 14237 25323 parlaI 7 Parli Unit -7 14028 25024 KaprKoDa 1 Khaperkheda Unit -1 8108 20025 KaprKoDa 2 Khaperkheda Unit -2 10924 19026 KaprKoDa 3 Khaperkheda Unit -3 7917 20627 KaprKoDa 4 Khaperkheda Unit -4 10446 21028 KaprKoDa 5 Khaperkheda Unit -5 24555 50030 parsa Paras-3 11676 21831 parsa Paras-4 10326 24032 ]rna Uran (Gas) 18771 40133 ]rna Uran (WHR) 10760 138 586234 caMd`pur 1 Chandrapur Unit -1 7526 16535 caMd`pur 2 Chandrapur Unit -2 9375 19936 caMd`pur 3 Chandrapur Unit -3 8728 20037 caMd`pur 4 Chandrapur Unit - 4 12276 47038 caMd`pur 5 Chandrapur Unit -5 29203 41039 caMd`pur 6 Chandrapur Unit -6 26351 040 caMd`pur 7 Chandrapur Unit -7 000 041 DhaNaU 1 Dahanu Unit-1 16882 250 1563042 DhaNaU 2 Dahanu Unit-2 19263 250 1660143 CPP 258820 41160044 RGPPL Share 000 0

kula tapIya Total (T) 692115 14094 350211MAH Wind + Solar Generation 110432 0kula jalaIya +tapIya Total (H+T+Wind) 830951 16176 396382

TOTAivainamaya Exchanges 274116saIimat jaa- maaMga Rest En Req 1105066

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1173 17ivainamaya Exchanges 33083saIimat jaa- maaMga Rest En Req 34256 459

C (F) dmana AaOr dIva DAMAN amp DIU 17467 298ja (G) dadra nagar hvaolaI DNH 43779 673

kula DD ampDNH (T) 61246 970

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 9731 160 1564312 tara`pur 2 TAPS Unit -2 11531 16013 tara`pur 3 TAPS Unit -3 40214 545 7288014 tara`pur 4 TAPS Unit -4 39284 53715 kakrapr 1 KAPS Unit -1 16048 545 3195016 kakrapr 2 KAPS Unit -2 14903 537

kula ena pI saI NPC Total 131710 24842 ena TI pI saI NTPC

Actual vaastivak

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 15236 215 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 14181 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14568 214 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 000 025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 32338 51326 kaorbaa esaTIpIesa 6 KSTPS Unit-6 33493 51427 kaorbaa esaTIpIesa 7 KSTPS Unit-7 30558 516

kula kaorbaa KSTPS Total 140373 2548 9318427 ivanQa esaTIpIesa 1 VSTPS Unit-1 13430 21528 ivanQa esaTIpIesa 2 VSTPS Unit-2 11930 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 13695 212210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14017 214211 ivanQa esaTIpIesa 5 VSTPS Unit-5 11952 215212 ivanQa esaTIpIesa 6 VSTPS Unit-6 8991 210213 ivanQa esaTIpIesa 7 VSTPS Unit-7 32786 515214 ivanQa esaTIpIesa 8 VSTPS Unit-8 19668 514215 ivanQa esaTIpIesa 9 VSTPS Unit-9 31796 516216 ivanQa esaTIpIesa 10 VSTPS Unit-10 31597 515217 ivanQa esaTIpIesa 11 VSTPS Unit-11 13881 512

kula ivanQayaacala VSTPS Total 233445 REF 16238 31 saIpt -1 -SIPAT-1 38555 66600 32 saIpt -2 -SIPAT-2 16033 66500 33 saIpt -3 -SIPAT-3 43240 66800 34 saIpt -4 -SIPAT-4 25865 51200 35 saIpt -5 SIPAT-5 33302 51500

kula saIpt -SIPAT TOTAL 156995 280100 920541 kvaasa gaOsa 1e Kawas GT-1A 2605 10442 kvaasa gaOsa 1baI Kawas GT-1B 4355 10643 kvaasa esaTI 1saI Kawas ST-1C 3365 11744 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 044 9846 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 10369 309 245151 gaMQaar gaOsa 1 Gandhar GT-1 2177 14352 gaMQaar gaOsa 2 Gandhar GT-2 3014 14553 gaMQaar gaOsa 3 Gandhar GT-3 5333 14754 gaMQaar esaTI 4 Gandhar ST-4 5586 158

kula gaMQaar GGPS Total 16109 437 475161 maaOda 1 Mauda -1 5368 514 000062 maaOda 2 Mauda -2 16240 513 0000

kula maaOda MAUDA Total 21608 756 2258161 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 000 31 000071 esa esa pI SSP RBPH - 1 1265 18872 esa esa pI SSP RBPH - 2 1102 18673 esa esa pI SSP RBPH - 3 1197 18774 esa esa pI SSP RBPH - 4 1116 18675 esa esa pI SSP RBPH - 5 1432 18676 esa esa pI SSP RBPH - 6 1653 18677 esa esa pI SSP CHPH - 1 422 3578 esa esa pI SSP CHPH - 2 384 3079 esa esa pI SSP CHPH - 3 179 34710 esa esa pI SSP CHPH - 4 1012 36711 esa esa pI SSP CHPH - 5 340 30

kula esa esa pI SSP Total 10101 1283 101081 kula poMca Pench Total 1381 160 010082 Jindal Injection 50805 083 Amarkantak Lanco 16857 0

(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2508924

(J) ]plabQata Availability 2439102 naoT ivainamaya Net Exchanges -311541 ]plabQa jaa- Energy Availability 2127561

maah jaUlaa[- 2014 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR JULY 2014 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 13833 - - - 13833 070714 1500 4972

saIimat Restricted 12500

AsaIimat Unrestricted 12540 13833 0 136 0 13969 070714 1500 4972

nyaUnatma pMjaIkRt maaMga Min Registered Demand 7617 7617 250714 0400 4999

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 7090 - - - 7090 020714 2015 4985

saIimat Restricted 6040

AsaIimat Unrestricted 6040 7090 0 31 0 7121 020714 2015 4985

nyaUnatma pMjaIkRt maaMga Min Registered Demand 3895 3895 230714 1500

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3118 3118 050714 2100 4985

saIimat Restricted 3150

AsaIimat Unrestricted 3250 2972 41792 24 0 3414 030714 2000 4977

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1336 1336 220714 1300 4995

maharaYT MAHARASHTRApMjaIkRt Registered 19283 - - - 19283 010714 1600 4994

saIimat Restricted 19600

AsaIimat Unrestricted 19650 19283 62 40 0 19385 010714 1600 4994

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11936 11936 300714 0500 5000

gaaovaa GOApMjaIkRt Registered 405 459 - - 459 260714 2000 4967

AsaIimat Unrestricted 405 459 0 5 - 464 260714 2000 4967

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 532 - - 532 290714 0900 4998

AsaIimat Unrestricted 532 0 0 - 532 290714 0900 4998

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 287 - - 287 060714 1000 4991

AsaIimat Unrestricted 287 0 1 - 288 060714 1000 4991

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 721 - - 721 050714 1700 4983

AsaIimat Unrestricted 721 0 - 721 050714 1700 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 400 435 290714

piScama xao~ WESTERN REGIONpMjaIkRt Registered 43034 - - - 43034 010714 1600 4994

saIimat Restricted 40703

AsaIimat Unrestricted 40905 43034 295 90 0 43419 010714 1600 4994

nyaUnatma pMjaIkRt maaMga Min Registered Demand 28431 28431 240714 0500 5000 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

माह जलाई 2014Jul-14

अनब समातरवतीय चालन PARALLELRADIAL OPERATION TOTAL OPERATING HOURS

1 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-NR)

2 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-SR) 7424400

टाई लाईन TIE LINE

1 765 कवी िसवनी स वधा-I 765kV Soni to Wardha 6780100

2 765 कवी िसवनी स वधा-II 765kV Seoni to Wardha 2043700

3 400 कवी िभलाई स कोराड 400kV Bhilai to Koradi 7440000

4 400 कवी िभलाई स भिावती 400kV Bhilai to Bhadravati 7440000

5 400 कवी रायपर स भिावती -I 400kV Raipur to Bhadravati-I 7440000

6 400 कवी रायपर स भिावती ndashII 400kV Raipur to Bhadravati-II 7440000

7 400 कवी रायपर स भिावती ndashIII 400kV Raipur to Bhadravati-III 7440000

8 400 कवी सातपरा स कोराड 400kV Satpura to Koradi 7060200

9 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7440000

10 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 7440000

11 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7225100

12 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 7082500

13 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 5361200

14 400 कवी को हापर स मापसा-I 400kV Kolhapur-Mapusa-I 4561600

15 400 कवी को हापर स मापसा-II 400kV Kolhapur-Mapusa-II 4793700

16 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7440000

17 400 कवी रायगढ़ स ःटरलाइट-I 400kV Raigarh to Sterlight-I 7371100

18 400 कवी रायगढ़ स ःटरलाइट-II 400kV Raigarh to Sterlight -II 7440000

19 400 कवी रायगढ़ स झरसगड़ा-I 400kV Raigarh to Jharsuguda-I 7302900

20 400 कवी रायगढ़ स झरसगड़ा-II 400kV Raigarh to Jharsuguda-II 7303700

21 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 5400900

22 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7292200

23 400 कवी रायपर स वधाndashI 400kV Raipur to Wardha-I 7440000

24 400 कवी रायपर स वधाndashII 400kV Raipur to Wardha-II 7440000

25 220 कवी कोरबा पव स ब पादर-III 220kV K(E) to Budhipadar-III 7361200

ANNEXURE 43

maah jaUlaa[- 2014 ko daOrana pa~ta iSaDyaUla GaTkaoM Wara koMd`Iya xao~ ko sToSanaaoMM sao D`avala AaOr ivainamayaaoM ka ivavarNa

1 koMd`Iya sToSanaaoMM samaip-t koMd`Iya sToSanaoMa saMyaut inajaI sToSanaaoM kI GaaoiYat xamata (basa pr) AaOr laaBaaiqa-yaaMo kI pa~ta1 Declared Capcity (ex-bus) of Central Gen StnsDedicated CG StnsJointly owned Stns amp entitlement of beneficieries (MUs)

GaaoiYat xamata gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI + ecaDblyaubaI kula

(A) koMd`Iya ibajalaIGar A Central Gen Stns Dec Cap GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC+HWB TOTAL

kaorbaa esaTIpIesa Korba STPS 1017635 174452 237891 103616 324281 102699 23918 26164 1017635kaorbaa esaTIpIesa -III Korba STPS-III 283431 54419 44422 85553 76649 3066 3405 13029 283431ivanQa esaTIpIesa I Vindhyachal STPS-I 674012 123034 240046 1253 246970 19644 7141 23669 12255 674012ivanQa esaTIpIesa II Vindhyachal STPS-II 491154 117386 158375 0909 175903 6532 4569 16539 491154ivanQa esaTIpIesa III Vindhyachal STPS-III 627679 166963 156579 67068 186511 7093 7097 22387 627679ivanQa esaTIpIesa IV Vindhyachal STPS-IV 411100 98631 118464 26475 133406 5356 5241 19338 411100kvaasa gaOsa Kawas GPP 306920 87464 65557 0000 95562 5791 14520 37998 306920gaMQaar gaOsa Gandhar GPP 406294 146476 72428 0000 123833 7814 19389 36310 406294saIpt Sipat 1665864 454494 301337 266370 509047 19436 19662 68224 1665864kakrapar Kakrapar APS 275783 78347 69731 0000 94368 9698 5200 8018 10420 275783tara`pur 3 AaOr 4 Tarapur APS 3amp4 721903 183150 155921 32084 295823 8510 8953 31049 721903

(ba) samaip-t koMd`Iya ibajalaIGar B Dedicated CG Stations Actual injection vaasaivak [njaoSana [Midra saagar Indira Sagar 245570 245570 245570

(sa) saMyaut inajaI sToSana C Jointly owned Stationstara`pur 1 AaOr 2 Tarapur APS 1amp2 196640 98320 0000 0000 98320 0000 0000 0000 196640esaesapI SSP 97965 15674 55840 0000 26450 0000 0000 0000 97965ponca Pench 13620 9080 0000 4540 0000 0000 0000 13620

kula ([M saagar kao CaoD kr) Total (excl Indira Sagar) 11988065 2808880 2297269 640720 3692105 208667 173093 400816 1766516 11988065 Actual injection

2 koMd`Iya sToSanaaoMM samaip-t koMd`Iya sToSanaoMa saMyaut inajaI sToSanaaoM kI ]padna SaoDyaUla AaOr laaBaaiqa-yaaoM kI D`avala SaoDyaUla2 Generation Schedule (ex-bus) of Central Gen StationsDedicated CG StationsJointly owned Stations amp schedule of benificieries (MUs)

SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI+ ecaDblyaubaI kula

(A) koMd`Iya ibajalaIGar A Central Gen Stns Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH

HVDC+HWB Outside region(NR

amp SR) TOTALkaorbaa esaTIpIesa Korba STPS 1015070 174452 238276 103310 321801 102699 23918 26164 1015070kaorbaa esaTIpIesa -III $ Korba STPS-III $ 282671 54342 44422 85185 76334 3066 3405 13029 282671ivanQa esaTIpIesa I Vindhyachal STPS-I 660248 120064 239050 1253 237415 19644 7141 23473 12209 660248ivanQa esaTIpIesa II Vindhyachal STPS-II 488287 117160 156978 0909 174700 6532 4569 16539 488287ivanQa esaTIpIesa III Vindhyachal STPS- III 600504 134916 160349 67878 186319 7093 7227 22827 600504ivanQa esaTIpIesa IV Vindhyachal STPS- IV 409072 98719 118259 24888 133048 5356 5241 19374 409072kvaasa gaOsa Kawas GPP 99574 27083 25459 0000 23510 2678 5916 14915 0000 99574gaMQaar gaOsa Gandhar GPP 154677 55634 30257 0000 41633 3783 8217 15131 0000 154677saIpt Sipat 1448506 290983 323024 258111 436177 19418 23860 69790 1448506kakrapar Kakrapar APS 275783 78347 69731 0000 94368 9698 5200 8018 10420 275783tara`pur 3 AaOr 4 Tarapur APS 3amp4 721903 183150 155921 32084 295823 8510 8953 31049 721903

(ba) samaip-t koMd`Iya ibajalaIGar B Dedicated CG Stations[Midra saagar Indira Sagar 245570 245570 245570

RPPC(NVVNL) 0000

0000

0000

(sa) saMyaut inajaI sToSana C Jointly owned Stations Actual injection vaasaivak [njaoSana tara`pur 1 AaOr 2 Tarapur APS 1amp2 196640 98320 0000 0000 98320 0000 0000 0000 196640esaesapI SSP 97965 15674 55840 0000 26450 0000 0000 0000 97965ponca Pench 13620 0000 9080 0000 4540 0000 0000 0000 13620kula [M saagar kao CaoD kr Total (excl Ind Sagar) 10173905 2352674 2217883 625946 2591731 193349 149578 336130 1706614 10173905

Actual injectionNote- $ These Scheduled Transactions are done by WRLDC under STOA

3 AMtrxao~Iya ivainamayaaoM iWpxaIya ivanamayaaoM kI SaoDyaUla (ima yauinaTsa)3 Schedule for interregional exchangesbilateral exchanges (MUs)

SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kulaxao~ rajya RegionState Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL

k pUvaI- xao~ ko rasto Import SDLs through ER -110482Aayaat SaoDyaUla Indian Energy Exchange (WR to ER) 0000 0000 0000 0000 0000 0000 0000 139465

Power Exchange of India (ER to WR) 0000 0000 0000 0000 0000 0000 0000 3671ER (NTPC) 47912 28298 11592 52018 0000 0786 1209 93903

DVC to MPPTCL (Long Term Open Access) 0000 201316 0000 0000 0000 0000 0000 201316Hirakud to CSEB 0000 0000 1354 0000 0000 0000 0000 1354

APL2 GUVNL to APPCC ( AEL) -0918 0000 0000 0000 0000 0000 0000 -0918APL3 GUVNL to APPCC ( AEL) -0924 0000 0000 0000 0000 0000 0000 -0924

CSEB to APPCC ( NVVNL) 0000 0000 -44813 0000 0000 0000 0000 -44813DBPOWER to APPCC ( GMRETL) 0000 0000 -1828 0000 0000 0000 0000 -1828

JPL to APPCC ( KISPL) 0000 0000 -15225 0000 0000 0000 0000 -15225JPL-II to APPCC ( KISPL) 0000 0000 -11376 0000 0000 0000 0000 -11376

Anaulagnak 45

DETAILS OF ENTITLEMENTSCHEDULEDRAWAL BY THE CONSTITUENTS FROM CENTRAL SECTOR STATIONS AND EXCHANGES FOR THE MONTH OF JULY 2014

(pxaoivasa` Wara jaarI xao~Iya jaa- laoKa ko AaQaar pr)

13896KAWAS(RLNG)

GANDHAR(RLNG)

JPL-II to APPCC ( NVVNL) 0000 0000 -11414 0000 0000 0000 0000 -11414JPL-II to APPCC ( PTC LTD) 0000 0000 -14853 0000 0000 0000 0000 -14853

CSEB to ASEB ( PTC LTD) 0000 0000 -0575 0000 0000 0000 0000 -0575MPPMCL MPSEB to ASEB ( IEXL) 0000 -0575 0000 0000 0000 0000 0000 -0575

APL1 GUVNL to BIHAR ( AEL) -106185 0000 0000 0000 0000 0000 0000 -106185APL2 GUVNL to BIHAR ( AEL) -72520 0000 0000 0000 0000 0000 0000 -72520APL3 GUVNL to BIHAR ( AEL) -51827 0000 0000 0000 0000 0000 0000 -51827

DBPOWER to BIHAR ( MANIKARAN) 0000 0000 -0350 0000 0000 0000 0000 -0350EMCO to BIHAR ( PXIL) 0000 0000 0000 -0413 0000 0000 0000 -0413

GUVNL to BIHAR ( PXIL) -0200 0000 0000 0000 0000 0000 0000 -0200MSEB to BIHAR ( PXIL) 0000 0000 0000 -0100 0000 0000 0000 -0100

MPPMCL MPSEB to BIHAR ( PXIL) 0000 -0150 0000 0000 0000 0000 0000 -0150GUVNL to BESCOM ( GUVNL) -14041 0000 0000 0000 0000 0000 0000 -14041

ESSAR_MAHAN to BESCOM ( ESSAR_MAHAN) 0000 -4353 0000 0000 0000 0000 0000 -4353ADHUNIK to BALCO ( BALCO) 0000 0000 0064 0000 0000 0000 0000 0064

ADHUNIK to BALCO ( MANIKARAN) 0000 0000 7200 0000 0000 0000 0000 7200JSEB(ER) to BALCO ( MPPL) 0000 0000 1481 0000 0000 0000 0000 1481

JSEB(ER) to BALCO ( MANIKARAN) 0000 0000 1200 0000 0000 0000 0000 1200JITPL to BALCO ( BALCO) 0000 0000 1200 0000 0000 0000 0000 1200

STERLITE to BALCO ( BALCO) 0000 0000 18603 0000 0000 0000 0000 18603JSEB(ER) to ESIL_WR ( MPPL) 0600 0000 0000 0000 0000 0000 0000 0600STERLITE to ESIL_WR ( PXIL) 1900 0000 0000 0000 0000 0000 0000 1900

NSPCL to SAIL ROURKELA ( SAIL ROURKELA) 0000 0000 -23994 0000 0000 0000 0000 -23994APL2 GUVNL to TGPCC ( AEL) -1074 0000 0000 0000 0000 0000 0000 -1074APL3 GUVNL to TGPCC ( AEL) -1081 0000 0000 0000 0000 0000 0000 -1081

CSEB to TGPCC ( NVVNL) 0000 0000 -52359 0000 0000 0000 0000 -52359JPL to TGPCC ( KISPL) 0000 0000 -17792 0000 0000 0000 0000 -17792

JPL-II to TGPCC ( KISPL) 0000 0000 -13295 0000 0000 0000 0000 -13295JPL-II to TGPCC ( NVVNL) 0000 0000 -13342 0000 0000 0000 0000 -13342

JPL-II to TGPCC ( PTC LTD) 0000 0000 -17335 0000 0000 0000 0000 -17335TISCO to VFL MPSEB ( TPTCL) 0000 0000 0268 0000 0000 0000 0000 0268

BLAPPL MPSEB to WBSEB ( IEXL) 0000 -0016 0000 0000 0000 0000 0000 -0016DBPOWER to WBSEB ( PTC LTD) 0000 0000 -0595 0000 0000 0000 0000 -0595

MPPMCL MPSEB to WBSEB ( PTC LTD) 0000 -89184 0000 0000 0000 0000 0000 -89184

SaoDyaUla gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kulaxao~ rajya RegionState Schedule GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL

K dixaNa xao~ ko rasto Import SDLs through SR 10967

Aayaat SaoDyaUla Indian Energy Exchange (SR to WR) 0000 0000 0000 0000 0000 0000 0000 0169Power Exchange of India (SR to WR) 0000 0000 0000 0000 0000 0000 0000 0000RSTPS-SR to GOA ( BILATERAL) 0000 0000 0000 0000 2186 0000 0000 2186RSTPS-SR to GOA ( WHEELING) 0000 0000 0000 0000 3118 0000 0000 3118

RSTPS-SR to GOA ( WHEELING GOA) 0000 0000 0000 0000 5494 0000 0000 5494

ga ]trI xao~ ko rasto Import SDLs through NR -321127Aayaat SaoDyaUla Indian Energy Exchange (NR to WR) 0000 0000 0000 0000 0000 0000 0000 -164961

Power Exchange of India (NR to WR) 0000 0000 0000 0000 0000 0000 0000 -3367Rihand (Hydro) to MPPTCL (Long Term Open Access) 0000 7970 0000 0000 0000 0000 0000 7970

Matathilla (Hydro) to MPPTCL (Long Term Open Access) 0000 0000 0000 0000 0000 0000 0000 0000EMCO to BIHAR ( PXIL) 0000 0000 0000 -0188 0000 0000 0000 -0188MSEB to BIHAR ( IEXL) 0000 0000 0000 -0400 0000 0000 0000 -0400

MPPMCL MPSEB to BSES_RAJ ( MPPL) 0000 -7000 0000 0000 0000 0000 0000 -7000ADHUNIK to BALCO ( MANIKARAN) 0000 0000 5198 0000 0000 0000 0000 5198

HIMACHAL to ESIL_WR ( IEXL) 0050 0000 0000 0000 0000 0000 0000 0050HARIYANA to ESIL_WR ( IEXL) 1525 0000 0000 0000 0000 0000 0000 1525HARIYANA to ESIL_WR ( PXIL) 5610 0000 0000 0000 0000 0000 0000 5610

KWHEPS to ESIL_WR ( PXIL) 0150 0000 0000 0000 0000 0000 0000 0150SCL to ESIL_WR ( IEXL) 0610 0000 0000 0000 0000 0000 0000 0610SCL to ESIL_WR ( PXIL) 0090 0000 0000 0000 0000 0000 0000 0090

MPPMCL MPSEB to HARIYANA ( HARIYANA) 0000 -126636 0000 0000 0000 0000 0000 -126636SCL to HRJIL MSEB ( SCL) 0000 0000 0000 1993 0000 0000 0000 1993

APL3 GUVNL to JVVNL-NR ( IEXL) -0120 0000 0000 0000 0000 0000 0000 -0120APL3 GUVNL to JVVNL-NR ( PXIL) -0122 0000 0000 0000 0000 0000 0000 -0122

BLAPPL MPSEB to JVVNL-NR ( IEXL) 0000 -0250 0000 0000 0000 0000 0000 -0250EMCO to JVVNL-NR ( IEXL) 0000 0000 0000 -0720 0000 0000 0000 -0720MSEB to JVVNL-NR ( PXIL) 0000 0000 0000 -0300 0000 0000 0000 -0300

MPSEB to NDPL(DTL)-NR ( PTC LTD) 0000 -1626 0000 0000 0000 0000 0000 -1626MPPMCL MPSEB to NDPL(DTL)-NR ( PTC LTD) 0000 -35052 0000 0000 0000 0000 0000 -35052

MPPMCL MPSEB to RPPC ( RPPC) 0000 -3562 0000 0000 0000 0000 0000 -3562EMCO to TRIPURA ( IEXL) 0000 0000 0000 -0070 0000 0000 0000 -0070

ADHPL to TORRAHM GUVNL ( IEXL) 0051 0000 0000 0000 0000 0000 0000 0051

Ga iWpxaIya SaoDyaUlsa Exchanges within WRMundra APL to Gujarat (LTOA) 0000 0000 0000 0000 0000 0000 0000 0000

JPL to ARVIND GUVNL ( MPPL) 4464 0000 0000 0000 0000 0000 0000 4464JPL to AIGL MSEB ( AIGL MSEB) 0000 0000 0000 0789 0000 0000 0000 0789

JPL to ARPIPL MSEB ( ARPIPL MSEB) 0000 0000 0000 0771 0000 0000 0000 0771JPL to ACCIL MSEB ( ACCIL MSEB) 0000 0000 0000 2380 0000 0000 0000 2380

APL1 GUVNL to AWLD GUVNL ( AEL) 3874 0000 0000 0000 0000 0000 0000 3874DBPOWER to BALCO ( BALCO) 0000 0000 0120 0000 0000 0000 0000 0120

DBPOWER to BALCO ( DBPOWER) 0000 0000 15887 0000 0000 0000 0000 15887EMCO to BALCO ( EMCO) 0000 0000 0080 0000 0000 0000 0000 0080

JPL to BOSCH MSEB ( BOSCH MSEB) 0000 0000 0000 1552 0000 0000 0000 1552JPL to BCSIL MSEB ( BCSIL MSEB) 0000 0000 0000 0720 0000 0000 0000 0720JPL-II to CSEB ( CSPTRDCL CSEB) 0000 0000 12569 0000 0000 0000 0000 12569

SPECT ACBIL to CSEB ( CSPTRDCL CSEB) 0000 0000 0720 0000 0000 0000 0000 0720ACBIL to CSPTRDCL CSEB ( CSPTRDCL CSEB) 0000 0000 5374 0000 0000 0000 0000 5374

JPL to CLASSIC MSEB ( CLASSIC MSEB) 0000 0000 0000 1309 0000 0000 0000 1309JPL to CIPLA MSEB ( CIPLA MSEB) 0000 0000 0000 0610 0000 0000 0000 0610

JPL to CEAT MSEB ( MPPL) 0000 0000 0000 2921 0000 0000 0000 2921APL1 GUVNL to CHLM GUVNL ( AEL) 2187 0000 0000 0000 0000 0000 0000 2187

NSPCL to DD ( DD) 0000 0000 0000 0000 0000 13156 0000 13156EMCO to DNH ( EMCO) 0000 0000 0000 0000 0000 0000 28097 28097

JPL to DNL MSEB ( DNL MSEB) 0000 0000 0000 0870 0000 0000 0000 0870JPL to ETLC MSEB ( ETL) 0000 0000 0000 0758 0000 0000 0000 0758JPL to ETLT MSEB ( ETL) 0000 0000 0000 0758 0000 0000 0000 0758

APL2 GUVNL to ESIL_WR ( PXIL) 0283 0000 0000 0000 0000 0000 0000 0283APL3 GUVNL to ESIL_WR ( PXIL) 8355 0000 0000 0000 0000 0000 0000 8355

DBPOWER to ESIL_WR ( MANIKARAN) 0000 0000 0000 0000 0000 0000 0000 0345EOL GUVNL to ESIL_WR ( ESIL_WR) -19578 0000 0000 0000 0000 0000 0000 0000

EPGL GUVNL to ESIL_WR ( ESIL_WR) -2866 0000 0000 0000 0000 0000 0000 0000JPL to ESIL_WR ( JPL) 0000 0000 0000 0000 0000 0000 0000 45641

JSWEL(RTNGIRI) MSEB to ESIL_WR ( PXIL) 0000 0000 0000 -2328 0000 0000 0000 0000MSEB to ESIL_WR ( PXIL) 0000 0000 0000 -1705 0000 0000 0000 0000

ESSAR_MAHAN to ESIL_WR ( ESIL_WR) 0000 0000 0000 0000 0000 0000 0000 52250VANDANA to ESIL_WR ( PXIL) 0000 0000 0000 0000 0000 0000 0000 0480

JPL to ESIL MSEB ( JPL) 0000 0000 0000 0108 0000 0000 0000 0108ESSAR_MAHAN to ESIL MSEB ( ESIL_WR) 0000 0000 0000 1244 0000 0000 0000 1244

JPL to ETLW MSEB ( ETL) 0000 0000 0000 0732 0000 0000 0000 0732JPL to ETLB MSEB ( ETL) 0000 0000 0000 0866 0000 0000 0000 0866

JPL to EILR MSEB ( MPPL) 0000 0000 0000 1049 0000 0000 0000 1049JPL to ETLK MSEB ( ETL) 0000 0000 0000 0643 0000 0000 0000 0643

JPL to EXIDE MSEB ( EXIDE MSEB) 0000 0000 0000 1239 0000 0000 0000 1239CSEB to GOA ( PTC LTD) 0000 0000 -0400 0000 0400 0000 0000 0000

DBPOWER to GOA ( PTC LTD) 0000 0000 0000 0000 17390 0000 0000 17390JPL to GSL MSEB ( GSL MSEB) 0000 0000 0000 0870 0000 0000 0000 0870

EMCO to GCEL ( EMCO) 0000 0000 3394 0000 0000 0000 0000 3394JPL to HINDMOUDA MSEB ( HINDMOUDA MSEB) 0000 0000 0000 2249 0000 0000 0000 2249

HINDAHEJ GUVNL to HINDTALOJ MSEB ( HINDTALOJ MSEB) -2962 0000 0000 2962 0000 0000 0000 0000EMCO to DNH ( EMCO) 0000 0000 0000 0000 0000 0000 119290 119290

JPL to HNGIL MSEB ( HNGIL MSEB) 0000 0000 0000 5156 0000 0000 0000 5156LANCO TO MP 0000 191431 0000 0000 0000 0000 0000 191431

IEE 103711 47279 -413725 163201 0000 26840 0000 31054PEI 3561 7107 0000 -0214 0000 0000 0000 17561

ca kula Aayaat Total Import 781888 184933 483401 86303 247768 28588 40782 148596 781888kula inayaa-t Total Export 1202530 274418 268404 653270 6437 0000 0000 0000 1202530naoT Aayaat inayaa-t Net Imp (+)Exp (-) -420642 -89485 214997 -566968 241330 28588 40782 148596 -420642

4 kula gauivainaila map`iva]kM Craivabaao maraiva]kM gaaovaa dmana dIva da na h ecavaIDIsaI kula

Total GUVNL MPPGCL CSEB MSPGCL GOA DD DNH HVDC TOTAL11567423 2719395 2512265 73752 3933435 237255 213875 549412 12255 11567424

5 kI kula iSaDUyala Total Sdl incl IR bi-lateral exch Sdl 9753264 2263189 2432879 58978 2833062 221937 190360 484727 12209 97532646 ibanaa xait ko kula D`avala Total Drl excl Tr Loss 9388390 2433257 2716560 597587 2741156 286430 174671 437785 0944 93883907 xait imalaakr kula D`avala Total Drl incl Tr Loss 9703552 2433257 2716560 597587 2741156 286430 174671 437785 0976 93884228 p p`NaalaI maoM kula pUla xait Pooled loss in WR System 3151629 p xao`~ sToSanaaoM sao kaorbaa ivanQa 1 AaOr 2 ivanQa 3 kvaasa gaMQaar kakrapar tara`pur esaesapI ponca kula

vaastivak [njaoSana Actual Inj - WR Stns KSTPS VSTPS-1amp 2 VSTPS-3 KGPS GGPS KAPS TAPS SSP PENCH TOTAL (ima yauinaTsa) (MUs) 1310550 1162242 1009828 99928 156340 275783 918544 97965 13620 12860991

] xao~ Aa ]xao kao ina ] xao naoT d xao Aa d xao inayaa-t d xao naoT pU xao Aa pU xao inayaa-t pU xao naoT kula naoT10 vaasaivak AMtrxao~Iya Actual IR Exchanges NR Imp NR Exp NR Net SR Imp SR Exp SR Net ER Imp ER Exp ER Net Total Net

ivainamaya (ima yauinaTsa) (MUs) 0347 2303947 -2303600 0000 737616 -737616 73271 189494 -116223 -3157439 AMtrxao~Iya ivainamaya IR Exchange Schedule NRI sdl NRE sdl Net NR sdl SRI sdl SREsdl Net SR sdl ERI sdl ERE sdl Net ER sdl Net WR sdl iSaDyaUla (ima yauinaTsa) (MUs) 2987 714531 -711544 404371 0000 404371 0000 113469 -113469 -420642

Total Entitlement incl IR and bi-lateral exchange schedule

11

AMtrxao~Iya AaOr iWpxaIya ivanamayaaoM kI iSaDyaUla imalaakr kula pa~ta

maah jaUlaa[- 2014 ko AMtr-ajyaIya AMtrxao~Iya ivainamayaaoM ka ivavarNa Anaulagnak 46DETAILS OF INTERSTATEINTER-REGIONAL EXCHANGES FOR THE MONTH OF JULY 2014 Annex-46

k`maaMkFrom To

gauivainaila map`iva]kMila Craivabaao maraiva]kMila gaaovaa dmana dIva da na h [ssaar ] xao~ d xao~ pU xao~ piScama xao~ kulaA InterstateInter-regional Schedules

included in ISGSGUVNL MPPGCL CSEB MSPGCL GOA DD DNH ESIL NR SR ER WR TOTAL

1 gauivainaila GUVNL 2962 31082 34044

2 map`iva]kMila MPPGCL 0000

3 Craivabaao CSEB04

0400

4 maraiva]kM ila MSPGCL 4033 4033

5 gaaovaa GOA 0000

6da na h DNH 0000

7kaorbaa KORBA-III 0000

8 iMjadla pavar JPL 4464 12569 26349 45641 89023

9 ADanaI pavar APL 6061 6061

10 ESSAR MAHAN 1244 52250 53494

11 laonakao Lanco -Pathadi 0000

12 esaIbaIAa[-ela -ACBIL 6093 6093

13 KSK MAHANADI14 DB POWER 16008 17390 0345

15 VANDANA 0480

16 EMCO 3473

17 ESIL18 ena esa pI saI ela NSPCL 13157 28097 41254

19 ]ltarI xao~ NRegion (WR end) 0347 0347

20 dixaNaI xao~ S Region (S Bus) 0000 0000

21 pUvaI- xao~ E Region (WR end) 73271 73271

22 p xao~ WRegion (WR end) 737616 189494 3231057

23 enaTIpIsaI NTPC Injection 5216788

24 enapIsaI NPC Injection 1194327

25 Total ISGS drawal from the Grid incl interregional bi-lateral

2433257 2716560 597587 2741156 286430 174671 437785

B InterstateIR Exchanges not included in ISGS

20 knaa-Tk Karnataka 444 44400

21 yaUpIpIsaIela UPPCL 0000 0000

22 AarvaIpIenaela RVPNL -237 -2370

23 UPPCL ( Excess Drawn From Rajghat 0000 0000

24 kaoTa ]jjaOna Kota - Ujjain 0000 0000

25 kula ba Total B (13 to 17) 0000 -2370 0000 0000 44400 0000 0000 42030

C inavala ivainamaya Net Exchange (12+18) 2433257 2714190 597587 2741156 330830 174671 437785 9429476

D kula Aayaat Total Imp by WR 115648

E kula inayaa-t Total Export by WR 3231057

F inavala ivainamaya Net Exchange (D-E) -3115409

G p xao~ Wara vaIlD jaa- Energy wheeled by WR

26 pU xao~ sao d xao~ kao inayaa-t ER export to SR0000

0000

27 d xao~ sao ] xao~ kao inayaa-t pUxao pxao sao haokr SR export to NR via ERWR0000

0000

28 d xao~ sao ] xao~ kao inayaa-t pxao sao haokr SR export to NR via WR0000

0000

29 pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr ER export to NR via WR0000

0000

30 ] xao~ sao d xao~ kao inayaa-t pxao sao haokr NR export to SR via WR393404

393404

31 pU xao~ sao d xao~ kao inayaa-t pxao sao haokr ER export to SR via WR0000

0000

32 pU xao~ sao d xao~ kao inayaa-t ]xao pxao sao haokr ER export to SR via NRWR0000 0000

0000

33 ]pU xao~ sao ] xao~ kao inayaa-t pxao sao haokr NER export to NR via WR0000

0000

Anaulagnak 47Annex-47

maah jaUlaa[- 2014 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39697 65459

9964 39521

Levels in Mtrs str maITr maoM

]ka[- Ukai

64932

10110

25501

25801

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF JULY 2014

ivavarNa Particulars

Sr No Details of incident (Elements Generation Tripped) Owner Utility Date TimeEffect (Loss of generation Load) if

anyCategory as per

Standards1 Bus Fault at Lonikhand 400 kV Bus 1 MSETCL 04Jul14 315 Nil GI‐22 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 06Jul14 433 load Loss 277 MW GD‐13 Tripping of Multiple Elements from 400220 kV Parli (MSETCL) Ss MSETCL 08Jul14 2359 Nil GI‐24 Poles tripping of HVDC Bhadarwati PGCIL 09Jul14 0350 amp 0504 Nil GI‐25 Tripping in Jejuri and Loanand Area MSETCL 10Jul14 126 Load Loss 400 MW GD‐16 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 11Jul14 349 load Loss 335 MW GD‐17 Blackout at Kawas Ss NTPC 11Jul14 117 Gen Loss 320 MW GD‐18 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 13Jul14 642 load Loss 263 MW GD‐19 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 15Jul14 611 load Loss 264 MW GD‐110 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 16Jul14 334 load Loss 200 MW GD‐111 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 17Jul14 417 load Loss 150 MW GD‐112 Tripping at Gandhar Ss NTPC 21Jul14 1607 Gen Loss 180 MW GD‐113 Multiple time tripping of 765 kV Sasan ‐Satna 2 ckt on Protection Mal‐operation PGCILSASAN 7252014 1026 amp 1229 Hrs Nil GI‐2

List of Grid Disturbances and Grid incidents (GDGI) in July-2014 Western RegionANNEXURE-5

SR NO UTILITIES OCC NO MONTH STATUS REMARK 1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14 HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314 AT MUMBAI BY NTPC MUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514 AT MUMBAI BY WRPC AT RELIANCE

7 WRTS-I 460 Jun-14 HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714 AT RAIPUR BY KWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-1411 RELIANCE SASAN 464 Oct-1412 MADHYA PRADESH 465 Nov-1413 BDTCLJBTCL 466 Dec-1414 NTPC Vindhyachal 467 Jan-1515 ESSAR TRANSMISSIOM 468 Feb-1516 TATA POWER 469 Mar-1517 SUGEN (TPL) 470 Apr-1518 TORRENT POWER 471 May-1519 CGPL 472 Jun-1520 NTPC Korba 473 Jul-1521 NCA 474 Aug-1522 NHDC 475 Sep-1523 NTPC Mouda 476 Oct-1524 KSK 477 Nov-1525 RELIANCE 478 Dec-1526 NTPC SIPAT CG 479 Jan-1627 TAPS-3amp4 480 Feb-1628 ESSAR ESIL 481 Mar-1629 GOA 482 Apr-1630 KAPS 483 May-1631 JPL 484 Jun-1632 DNH 485 Jul-1633 NTPC Mumbai 486 Aug-1634 ADANI TRANSMISSION 487 Sep-1635 INDIAN RAILWAY 488 Oct-1636 WRTS-II 489 Nov-16

ANNEXURE 10

8212014

1

OCC MEETING (462nd )

Power system Operation Corporation Ltd

OPERATIONAL HIGHLIGHTS amp ISSUES

Date 11082014Venue ndash Tarapur

MonthsIEGC Band

FVIlt499 499‐5005 gt5005

March14 1291 4783 3927 012

April14 3064 5233 1703 016

May14 2248 5319 2433 013

Junersquo14 3715 4536 1749 02460

80

100

120Frequency Profile for July 2014Frequency Profile for July 2014

Maximum instantaneous frequency

5036 Hz

on 23rd July 2014 at 1304 hrs

Minimum instantaneous frequency

4941 Hz

on 10th July and 25th July 2014 at 1950 hrs and 1944 hrs respectively

Julyrsquo14 3451 5016 1533 020

0

20

40

60

1‐Jul

2‐Jul

3‐Jul

4‐Jul

5‐Jul

6‐Jul

7‐Jul

8‐Jul

9‐Jul

10‐Jul

11‐Jul

12‐Jul

13‐Jul

14‐Jul

15‐Jul

16‐Jul

17‐Jul

18‐Jul

19‐Jul

20‐Jul

21‐Jul

22‐Jul

23‐Jul

24‐Jul

25‐Jul

26‐Jul

27‐Jul

28‐Jul

29‐Jul

30‐Jul

31‐Jul

Avg Frequency of the month

4993 Hz

1High frequency day due to heavy rain in almost all places in the country low demand was observed(117 GW) Heavy underdrawal by all constituents of WR around 700‐1000 MW during 1300 hrs2 Low frequency day Demand was high and Od by constituents Od by NR

lt499 499‐5005 gt5005

8212014

2

501

502

503

504

Frequency for July 2014

496

497

498

499

50

494

495

1 60 119

178

237

296

355

414

473

532

591

650

709

768

827

886

945

1004

1063

1122

1181

1240

1299

1358

1417

1476

1535

1594

1653

1712

1771

1830

1889

1948

2007

2066

2125

2184

2243

2302

2361

2420

2479

2538

2597

2656

2715

2774

2833

2892

2951

3010

3069

3128

3187

3246

3305

3364

3423

3482

3541

3600

3659

3718

3777

3836

3895

3954

4013

4072

4131

4190

4249

4308

Frequency 499 5005

26000

28000

Unit Outage‐ JULY‐14 Max 26128 MW on 26072014JUNE14 Max 20818 MW on 210714

PLANNED OUTAGE FORCED OUTAGE TOTAL OUTAGE‐JULY14 TOTAL OUTAGE‐JUNE14

10000

12000

14000

16000

18000

20000

22000

24000

26000

MW

0

2000

4000

6000

8000

10000

1‐Jul‐14 6‐Jul‐14 11‐Jul‐14 16‐Jul‐14 21‐Jul‐14 26‐Jul‐14 31‐Jul‐14Date

8212014

3

Energy ConsumptionMax

986 Mus on 2nd July+2975 as compared

to last year900

1000

1100

IN M

Us ‐‐‐‐gt

DAILY CONSUMPTION OF WESTERN REGION(2010‐11 TO 2014‐15)

Min749 Mus on 24th July

500

600

700

800

CONSU

MPT

ION

Apr

May Jun

Jul

Aug Sep

Oct

Nov Dec Jan

Feb

Mar

MONTHS ‐‐‐‐gt2010‐11 2011‐12 2012‐13 2013‐14 2014‐15

Energy Consumption MUDay

Jul‐14 Jun‐14 Jul‐13 Change wrt last month

Change wrt last Year

Average 848 927 712 ‐845 1909Max 986 971 760 156 2975Date 2‐Jul‐14 30‐Jun‐14 2‐Jul‐13 ~ ~

PEAK DEMAND (this month vis-agrave-vis last month)

STATE

CATERED(MW) UNRESTRICTED(MW)

Julyrsquo14 Junrsquo14 Julyrsquo14 Junrsquo14

GUJARAT 13833 13755 13969 13906

MP 7090 7120 7121 7434

CHATTISGARH 3118 3472 3414 3473

Regional Demand met

Max 43034 MW(1st July 1600 hrs)

2540 more than the l

MAHARASHTRA 19283 19452 19385 19755

GOA 459 475 459 482

DD 287 298 287 298

DNH 721 677 721 685

ESIL 532 535 532 535

43034 42934 43419 43802

last year

Min 28431 MW(24th July0500 hrs)

WR TOTAL 43034 42934 43419 43802

Figures shown are Maximums in the month

Demand Met Jul‐14 Jun‐14 Jul‐13 Change wrt last month

Change wrt last Year

Average 35215 40463 32253 ‐1297 918Max 43034 42934 34317 023 2540

Date when Max 1‐Jul‐14 30‐Jun‐14 2‐Jul‐13 ~ ~

8212014

4

Constituents Total Time Block Noof time block Violation of Compilance Violation of Compilancein the month of July Type ‐1 Type‐2

Chhattisgarh 2976 983 6697 927 6885Guajrat 2976 681 77 12 222 92 54

DSM Violation for the Month of July 2014

Guajrat 2976 681 7712 222 9254Madhya Pradesh 2976 528 8226 594 8004Maharashtra 2976 1045 6489 442 8515

Goa 2976 712 7608 1868 3723Daman and Diu 2976 1720 4220 2506 1579

Dadar Nagar Haveli 2976 23 9923 1299 5635

Violation Type‐2 When The drawl does not change sign in 12 consecutive time block

Violation Type‐1 When The drawl is more or less than 12 schedule or 150 MW whichever lesser

Total No of Blocks ‐ 2976

New Elements July 2014a) COMMISSIONING OF NEW GENERATING UNITSSLNO CONSTITUENT UNIT NAME UNIT NO C`ty(MW) DATE TIME

1 IPP(Jay Prakash Nigrie) JNSTPP I 660 150714(sync) 845

b) COMMISSIONING OF NEW TRANSMISSION LINES

SLNO CONSTITUENT LINE NAME CKT NO KV DATE TIME Line length( in km)

1 POWERGRID Wardha‐Aurangabad II 765 372014 2300 347 581 POWERGRID Wardha Aurangabad II 765 372014 2300 34758

2 POWERGRID Wardha‐Aurangabad I 765 572014 1900 34758

3 GETCO Kosamba‐Chorania I 400 572014 2035 230

4 GETCO Kosamba‐Chorania II 400 572014 2105 230

5 BDTCL BDTCL‐Bhopal(MP) I 400 16714 1833 864

6 POWERGRIDLILO of Raipur‐Raigarh‐4

IV 400 1872014 2200 2826 POWERGRIDat KSK

IV 400 1872014 2200 282

7 MPPTCL Indore‐Pithampura II 400 210714 1625 150

8 POWERGRIDDharamjaygarh‐Jharsuguda

I 765 29714 000 14893

9 POWERGRIDDharamjaygarh‐Jharsuguda

II 765 28714 2125 14893

Total ckt Km 189366

8212014

5

c) COMMISSIONING OF NEW ICTS

SLNO CONSTITUENT STATION NAME KV RATIOCAPACITY (MVA) DATE

TIME

1 BDTCL BDTCL(Bhopal)ICT 1 765400 3x500 372014 1657

2 POWERGRID Dharamjaygarh(ICT 1) 765400 3x500 772014 22593 POWERGRID Navasari(ICT 3) 400220 500 872014 1959

d)CO SS O G O C O Sd)COMMISSIONING OF LINE REACTORS

SLNO CONSTITUENT STATION NAME Line Name KVCty(MVAR

) DATETIME

1 BDTCL BDTCL Indore‐BDTCL I 765 3x80 23714 1935

2 POWERGRID DharamjaygarhDharamjaygarh‐Jharsuguda II

765 3x110 280714 2125

3 POWERGRID DharamjaygarhDharamjaygarh‐Jharsuguda I

765 3x110 29714 000

4 POWERGRID Satna Satna‐Gwalior‐II 765 3x80 29714 10005 POWERGRID Aurangabad Padghe Aurangabad 1 765 3x80 310714 22 475 POWERGRID Aurangabad Padghe‐Aurangabad‐1 765 3x80 310714 2247

e)COMMISSIONING OF BUS REACTORS

SLNO CONSTITUENT STATION NAME KVCty(MVA

R) DATETIME

1 POWERGRID Bhatapara 400 125 24714 19562 POWERGRID Indore 765 3x80 31714 18273 POWERGRID Sujalpur 400 125 31714 1205

Congestion Charge was applied 3 times in July 2014 on WR‐NR path ie on12th 14th amp 15th July 2014

8212014

6

5515 5484

5200

5400

5600

Congestion Charge applied on WR‐NR path Dt12714 (Block 3 ‐16)

4200

4400

4600

4800

5000WR‐NR TTC(4900 MW)

WR‐NR ATC(4400 MW)

4000

4200

030

034

038

042

046

050

054

058

102

106

110

114

118

122

126

130

134

138

142

146

150

154

158

202

206

210

214

218

222

226

230

234

238

242

246

250

254

258

302

306

310

314

318

322

326

330

WR‐NR_Act(MW) WR‐NR_TTC(4900 MW) WR_NR_ATC(4400 MW)

2200 00

240000

260000

280000

300000

320000

MW

Maharashtra Sch Vs Drawal‐12714(Block 3‐16)

140000

160000

180000

200000

220000

240000

MW

Gujarat Sch Vs Drawal_12714

200000

220000

3 4 5 6 7 8 9 10 11 12 13 14 15 16

TIme Block

Maharashtra_Sch Maharashtra_Drawal

340000

350000

W

MP Sch Vs Drawal_12714(Block 3‐16)

120000

3 4 5 6 7 8 9 10 11 12 13 14 15 16Time Block

GETCO_Sch(MW) GETCO_Drawal(MW)

750008000085000

CSPTCL‐12714(3‐16)

310000

320000

330000

3 4 5 6 7 8 9 10 11 12 13 14 15 16

MW

TIme Block

MP_Sch MP_Drawal

450005000055000600006500070000

3 4 5 6 7 8 9 10 11 12 13 14 15 16

MW

Time Block

CG_Sch CG_Drawal

Under Drawal By WR constituents during the imposition of Congestion on WR‐NR on 12714

8212014

7

5292

5100

5300

Congestion Charge applied on WR‐NR path Dt14714 (Block 57 ‐71)

4638

4300

4500

4700

4900

5100

WR‐NR TTC(4900 MW)

WR‐NR ATC(4400 MW)

3900

4100

1330

1336

1342

1348

1354

1400

1406

1412

1418

1424

1430

1436

1442

1448

1454

1500

1506

1512

1518

1524

1530

1536

1542

1548

1554

1600

1606

1612

1618

1624

1630

1636

1642

1648

1654

1700

1706

1712

1718

1724

1730

1736

1742

1748

1754

1800

WR‐NR_Act(MW) WR‐NR_TTC(4900 MW) WR_NR_ATC(4400 MW)

3600380040004200440046004800

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

MW

Maharashtra Sch Vs Drawal‐14714(Block 57‐71)

1900

2000

2100

2200

2300

2400

2500

2600

MW

Gujarat Sch Vs Drawal_14714

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

TIme Block

Maharashtra_Sch Maharashtra_Drawal

1800

1900

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

Time Block

GETCO_Sch(MW) GETCO_Drawal(MW)

700

750

800

Chhattisgarh Sch Vs Drawal_141714(Block57‐71)

2600

2700

2800

2900

MW

MP Sch Vs Drawal‐14714(57‐71)

500

550

600

650

700

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

MW

Time Block

CG_Sch CG_Drawal

2400

2500

57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72

Time Block

MP_Sch MP_Drawal

8212014

8

4630

45004700

Congestion Charge applied on WR‐NR path Dt15714 (Block 50 ‐96)

4463

350037003900410043004500

WR‐NR TTC(4150 MW)

WR‐NR ATC(3650 MW)

31003300

1215

1234

1253

1312

1331

1350

1409

1428

1447

1506

1525

1544

1603

1622

1641

1700

1719

1738

1757

1816

1835

1854

1913

1932

1951

2010

2029

2048

2107

2126

2145

2204

2223

2242

2301

2320

2339

2358

WR‐NR_Act(MW) WR‐NR_TTC(4150 MW) WR_NR_ATC(3650 MW)

3800

4000

4200

4400

4600

4800

MW

Maharashtra Sch Ve Actual on 15714(50‐96)

130015001700190021002300250027002900

MW

Gujarat Sch Vs Actual on 15714(50‐96)

3600

50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96

Time Block

Maharashtra_Sch Maharashtra_Drawal

1300

50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96

Time BLock

GETCO_Sch(MW) GETCO_Drawal(MW)

3500

3700

MP Sch Vs Actual for 15714(50‐96)

850

950

1050

Chhattisgarh Sch Vs Actual‐15714(50‐96)

2700

2900

3100

3300

50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96

MW

Time Block

MP_Sch MP_Drawal

350

450

550

650

750

850

50 52 54 56 58 60 62 64 66 68 70 72 74 76 78 80 82 84 86 88 90 92 94 96

MW

Time BLock

CG_Sch CG_Drawal

8212014

9

Summary of Grid Events (GD amp GI) in July 2014

Sr No

Details of incident (Elements Generation Tripped) Owner Utility Date TimeEffect (Loss of

generation Load) if any

Category as per

Standards

1 Bus Fault at Lonikhand 400 kV Bus 1 MSETCL 04Jul14 315 Nil GI‐2

2 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 06Jul14 433 load Loss 277 MW GD‐1

3Tripping of Multiple Elements from 400220 kV Parli

MSETCL 08Jul14 Nil GI 23(MSETCL) Ss

MSETCL 08Jul142359

Nil GI‐2

4 Poles tripping of HVDC Bhadarwati PGCIL 09Jul140350 amp 0504

Nil GI‐2

5 Tripping in Jejuri and Loanand Area MSETCL 10Jul14 126 Load Loss 400 MW GD‐1

6 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 11Jul14 349 load Loss 335 MW GD‐1

7 Blackout at Kawas Ss NTPC 11Jul14 117 Gen Loss 320 MW GD‐1

8 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 13Jul14 642 load Loss 263 MW GD‐1

9 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 15Jul14 611 load Loss 264 MW GD‐1

10 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 16Jul14 334 load Loss 200 MW GD‐1

11 Black out at Essar Steel India Ltd(ESIL) Hazira ESIL 17Jul14 417 load Loss 150 MW GD‐1

12 Tripping at Gandhar Ss NTPC 21Jul14 1607 Gen Loss 180 MW GD‐1

13Multiple time tripping of 765 kV Sasan ‐Satna 2 ckt on

Protection Mal‐operation PGCILSASAN 7252014

1026 amp 1229 Hrs

Nil GI‐2

S No Name of power

stations

Unit Reason for

outage

1 VSTPS 2 (210 MW) Coal Shortage

91 Operation of grid at high frequency ( gt 505 Hz) even under fuel shortage condition

Issues1 Major ISGSIPP are facing fuel

shortage1 VSTPS 2 (210 MW) Coal Shortage

2 VSTPS 5 (210 MW) Coal Shortage

3 Singhaji 1 (600 MW) Coal Shortage

4 SGTPS 4 (210 MW) Coal Shortage

5 JP Bina 2 (250 MW) Coal Shortage

6 Bhusawal 2 (210 MW) Coal Shortage

shortage2 Expected High Demand during dry

spell in September amp October3 Optimal use of precious fuel is

necessary to tackle the high demand in dry spell

7 Parli 4 (210 MW) Coal Shortage

8 India Bulls 1 (270 MW) Coal Shortage

8212014

10

Agenda 92 Insecure operation Oscillations Power Swingbull N‐1 contingency of 765 kV Tirora‐Akola2 on 10th and 11th June 2014

bull Tirora gen gt 1500 MW AR not operatedbull Intra plant mode of oscillations (097 Hz) with poor damping

bull N‐1 contingency of 400 kV Tirora‐Warora‐1 on 20th May 2014N 1 contingency of 400 kV Tirora Warora 1 on 20 May 2014bull Tirora gen gt 1500 MW 765 kV Tirora‐Akola2 out of servicebull SPS bull Power Swing and loss of complete power station GD‐1

bull The need for transmission augmentation as well as PSS tuning at APML Tirodawas discussed in the 461st OCC meeting

bull Member Secretary WRPC suggested that APML would send details of PSSMember Secretary WRPC suggested that APML would send details of PSS tuning studies to WRPC and they may consult IIT‐Mumbai for assistance and expedite

bull Representative from SLDC Kalwa APL may like to update the progress

Events at APML TiroraCase 3 Date 11‐07‐14 1529 hrsbull Line tripped on Y Phase to earth fault AR was unsuccessful due to persisting faultbull Sudden power transfer through 400 kV System resulted in swing Oscillation of 097 Hz observed across WR and

East West generation in Western region oscillatedO ill i i d f 10 dbull Oscillation persisted for 10 seconds

bull Damping ratio was 257

8212014

11

Events at APML TiroraCase 4 Date 23‐07‐14 0227 hrsbull 765400 kV APML Tirora ICT trippedbull Sudden power transfer through 400 kV System resulted in swing Oscillation of 097 Hz observed across WR

and East West generation in Western region oscillatedO ill i i d f 17 dbull Oscillation persisted for 17 seconds

bull Damping ratio was 7

bull Need for transmission augmentation as well as PSS tunning at APML Tiroda required

bull It has been decided in 461th OCC thatAPML would send details of PSS

Expected date of

tuning studies to WRPC and they may consult IIT‐Mumbai for assistance and expedite Representative from SLDC Kalwa APL may like to update the progress

Expected date of bull 2nd ckt of 765 kV Tirora‐Akola2bull 220 kV network from 400220 kV Warorabull 220 kV network from 765400 kV Akola2 and 765400 kV Taptithandabull 220 kV network from 765400 kV Aurangabad‐PG 400220 kV Pune

Redistribution of Load within Maharashtra system

8212014

12

Elements Date and

Time of

Tripping

Date and

Time of

Restoratio

n

Remarks Receipt of

DREL at WRLDC

Satna Sasan

765 kV Sasan‐Satna 225‐07‐14

1026

25‐07‐14

1155

Protection Mal‐Operation DT at Sasan End

on OV as line remain hanging from Sasan No Yes

Agenda 93 Frequent Tripping of 765 kV Satna‐Sasan line

Issues

1Expedite commissioning of Line Reactor at 765 kV Sasanend

2 Submission of DREL for1026 1155end

765 kV 240 MVAr

Bus Reactor at Satna

25‐07‐14

1026

25‐07‐14

1139

Protection Mal‐Operation DT at Sasan End

on OV as line remain hanging from SasanNo Yes

765 kV Sasan‐Satna 225‐07‐14

1342

25‐07‐14

1342

Line got charged from Satna and

synchronized at Sasan end but immediately

DT was received at Sasan from Satna and

Line tripped Prior to tripping voltage at

No Yes

2 Submission of DREL for event analysis in line with CEA standards IEGC

3 Threat to grid security and constraints in evacuation from large generation complexarising from frequent undesirable tripping particularily

Sasan end was 796 kV

765 kV Sasan‐Satna 225‐07‐14

1628‐

Charging attempt was taken from Satna end

but line tripped before synchronization at

Sasan end due to DT from Satna Open end

voltage at Sasan 826 kV for the line

No Yes

The above was a narrow miss because the tripping occurred when one of the bus was under shutdown Fortunately during theabove period only two units of Sasan were in service and the second 765 kV bus remained in service else the situation would havebeen a serious threat to the system security

during protection testing construction activities

The progress of reactor commissioning at Sasan over the last 8 months is given under

Schedule in formed in meetings

SN 451st OCC 455th

OCC

456th OCC 457th 458th 459th 460th 461st

1 Line reactor By Dec By April By May By June End of June End of By By

of 765 kV

Sasan‐Satna

ckt‐2

y

2013

y p

2014

y y

2014

y

2014(Testing under

progress)

2014 (As per

joint report

post site visit

on 26314)

June 2014

y

Aug‐

2014

y

Aug‐2014

2 765kV Bus‐1

Reactor

Jan 2014 By Mar

2014

By June

2014

By June

2014(Testing under

)

End of July

2014(As per

j i t t

End of July

2014

By

Sep‐

2014

By

Sep‐2014

Sasan may intimate the progress in reactor commissioning to the sub-committee

progress) joint report

post site visit

on 26314)

2014

8212014

13

Item no94 SPS at Sipat

bull The SPS scheme implemented at NTPC Sipat received at WRLDC

bull It is observed that a time delay of 15sec is provided to unload units 1 2 4 amp5 each by 150MW if ICT l d d 130 f t d l dany ICT s load exceeds 130 of rated load

bull As per decision of WRPC meeting on 18314 if ex‐bus generation at Sipat is more than 2200 MW immediate unloading of units were decided and the intentional delay provided needs to be re‐ examined (Maximum 2‐3 sec delay may be appropriate) as unloading by 150MW would also take another 4‐5sec

8212014

14

Contingency Envisaged SPS action Identified FeedersTripping of any oneICT at 400200 VapiSub‐Station

Automatic LoadShedding of 100MW

DNH 1) 66 kV‐Kharadpara‐Rakholi‐I 50 MW2) 66 kV Khadoli‐Khadoli‐3 30 MW

Item No95 SPS at 400220 kV Vapi(PGCIL) Item No912

DD1) 66 kV Magarwada‐Kachigam 60 MW

It was apprised by representatives from DD amp DNH in the 459th OCC meeting that the above scheme shall be implemented within a month

UT DDDNHmay apprise the status of commissioning of the envisaged SPSUT‐DDDNH may apprise the status of commissioning of the envisaged SPS

Item no96 Addressing High Voltage condition in SSP amp nearby area Sl No Line No of Times tripped in Julrsquo141 400 kV SSP‐Dhule‐I 32 400 kV SSP ‐ Rajgarh‐ I 2

Issues1 Multiple tripping of

feeders emanating from SSP

2 S l tiSl No Line No of occasions kept open on HV 2 Several emanating feeders being kept open on high voltage in SSP amp nearby area

Sl No Line No of occasions kept open on HV

1 400 kV SSP‐Dhule‐I 9

2 400 kV SSP‐Dhule‐II 6

3 400 kV SSP ‐ Rajgarh‐ I 1

4 400 kV SSP ‐ Rajgarh‐ II 1

bull Operating RBPH machines in synchronous condenser mode during offOperating RBPH machines in synchronous condenser mode during off peak hours

bull Reactor commissioning at Rajgarh amp Dhule to be expedited by WRTS‐II(PGCIL) amp MSETCL

bull Absorption of MVAr by Wanakbori WTS

8212014

15

1 Voltage at Wanakbori was gt420 kV for 100 the time during Julrsquo14

2 WTPS units 567 are injecting MVAR (~ 60 MVAR) at Voltage gt 420 kV

3 Absorption of MVAR by WTPS units is expected during the high voltage condition at WTPS amp nearby area

97Status of implementation of UFRWestern Region

States Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Required Load relief

Implemented Load relief

Stage - I 492 Hz Stage - II 490 Hz Stage - III 488 Hz Stage - IV 486 Hz

relief GUJARAT 580 773 580 726 580 1117 590 1025MADHYA PRADESH 460 468 460 450 460 460 465 490CHATTISGARH 150 110 150 114 155 117 155 91MAHARASHTRA 805 1108 810 1200 815 765 820 851GOA 25 25 25 25 25 25 25 25UT DD 10 15 15 15 UT DNH 30 30 35 35 Total load relief 2060 2484 2070 2515 2085 2485 2105 2482

Not received

DD and DNH have not implemented any stage of AUFLS

DD and DNH may appraise the status

Real‐time monitoring of the likely relief available from AUFLS at any given instant mandated by CERC

Telemetry to be provided at SLDC amp RLDC

Not received

8212014

16

Agenda 98 ADMS (Automatic Demand Management Scheme) Implementation as per Sec 542 of IEGC

As per CERC order dt06062014 the target of fully implementation of scheme is by January2015Constituents have to submit bi‐monthly progress report to WRPC Secretariat with a copy to the Commission and WRLDCMP has submitted its detailed action plan in the form of an affidavit to CERC for implementation of ADMS However SLDC MPPTCL is requested to furnish data to OCC forum in the above format

Item No 99 Status of Telemetry in WR

Telemetry Issuesdoc

8212014

17

Item No 910 Black Out at NTPC Kawas Power Station

bull On 11th July 2014 Kawas Gas generating complex got blackout due to tripping of evacuation lines one by one

within a short span of 30 minutes

bull The complete loss of evacuation lines occurred at 0117 Hrs The blackout has resulted in tripping of GT1A

GT1B and ST causing 320 MW generation loss in the area It was reported that weather condition was foggy with

slight drizzling was in the area

LineTime of Tripping

Kawas End Remote endRestoration Time

220 kV Kawas‐Navsari1

1246 AM

R phase to EF

Fault location 2 km

R Phase to EF

122 AM

220 kV Kawas ndashNavsari2

112 AMR phase to EF

Fault location 2208 km

R Phase to EF 347 AM

220 kV Kawas‐Haldarwa 1

107 AMR phase to EF

Fault location 16 km

R Phase to EF 246 AM

220 kV Kawas‐ R phase to EF R Phase to

bull Line restoration has failed on several attempt as the lines

were not holding due to persisting fault

bull Such an event of total loss of evacuation lines from a

generating station resulting in blackout scenario is a

matter of serious concern

bull WRTS-2 may kindly send the reasons for such faults

which has caused the incidence and the remedial action

taken in this regard220 kV Kawas‐Haldarwa 2

108 AMp

Fault location 2 kmEF 304 AM

220 kV Kawas‐Icchapur1

108 AM B phase to EFB Phase to EF

301 AM

220 kV Kawas‐Icchapur2

108 AMB phase to EF Faultlocation 356 km

B Phase to EF

331 AM

220 kV Kawas‐Vav 1 117 AMNo tripping

Hand Tripped laterLine Tripped 225 AM

220 kV Kawas Vav 2 117 AM Y Phase to EFY Phase to EF

317 AM

taken in this regard

bull Disturbance Recorder (DR) and Event Logger(EL) out

puts are yet to be received from WRTS-2

bull As per IEGC the information like DREL output relay

indications amp sequence of events etc must be sent to

RLDCRPC by 24 hrs of the event WRTS-2 may kindly

expedite amp furnish the information to WRLDC amp WRPC

Item No 911 Operating Procedure of WR-2014

The operating procedure of Western Region 2014 has been updated on 31072014 and the p g p g psame has been uploaded on WRLDC web site at the following link

httpwwwwrldccomdocsWR_OPERATING_PROCEDURE_2014pdf

8212014

18

Item No 12 Mock Black start Exercise

Station Name Date Proposed Remarks

Mock Black Start Plan for the following stations has been received by WRLDC

CLPIPL Gas Power Plant 29‐Jun‐2014 ‐

Gandhar Gas Power Plant 27‐July‐2014 ‐

Other Utilities may update the sub‐committee regarding their plan for black start exercise

SL No Name of the Station Remarks

1 Bargi DG set under outage

2 TONS Governor Problem

3 Birsinghpur Governor Problem

Healthiness of DG sets

3 Birsinghpur Governor Problem

4 Medikheda Governor Problem

5 Rajghat Governor Problem

1 Outage of DG set for longer period is matter of serious concern 2 SLDC Jabalpur may apprise the present status2 SLDC‐Jabalpur may apprise the present status3 Possibility of procurement of stand‐by DG sets to be examined to take care of such prolonged outage of DG sets which virtually renders the black start facility sterile4 There is need for blackstart generator planning in W3 area Thermal IPP generators are disconnected from state grid and there is no hydro station So with only UHV lines and large thermal units system restoration post disturbance would be extremely challenging for Chattisgarh

8212014

19

Maharashtra

Madhya Pradesh

Item No13 Review of list of feeders for load regulation in emergency

Gujarat

DD amp DNHChattisgarh

Goa

bull Decided during the 461st OCC that list ofDecided during the 461st OCC that list of

feeders identified for load control under

emergency measure for safeguarding grid

security would be reviewed in a special

meeting The list is yet to be reviewed

8212014

20

Item No 14 Implementation of voltage and time grading on OV relays to prevent tripping of multiple EHV lines emanating from single node on high voltage

bull During the 461st OCC it was informed by Power Grid representative that they have already implemented voltage grading in various line emanating from the same node (matter has not come in the MoM)

bull Power Grid amp other utilities may kindly intimate the present status of voltage grading at their respective sub‐stations

Power Station Number of instances

when the SPS signal

was received at the

station

Number of instances

when the action by

the generators was

adequate

Number of instances

when the automatic

generation reduction was

done partially

JPL 53 0 50

Item No 15 SPS for SR‐WR Inter Connection Inadequate Participation by Generators

Issues

1 10 times operation of SPS‐1 causing backing down at JPL amp KSK during 1714 to 7 8 14JPL 53 0 50

KSK 53 0 36

APML 35 0 30

Mouda 35 0 0

Koyna 0 0 0

Koradi 0 0 0

Khaparkheda 0 0 0

Chandrapur 0 0 0

to 78142 Participation by other envisaged

generators to be expedited3 PGCIL may update status of Extention of

SPS signal from Solapur(PG) to the additional generators identified for participation

4 Decided in 461st OCC to have special Chandrapur 0 0 0

DB Power 0 0 0

NSPCL 0 0 0

Balco 0 0 0

Lanco 0 0 0

KWPCL 0 0 0

pProtection Sub‐Committee meeting to discuss progress of implementation of the revised SPS at Solapur (for WR‐SR interconnection) amp extension of signal from Sholapur to additional generators in WR

8212014

21

Thank you

DiscussionhelliphelliphellipDiscussionhelliphelliphellip

  • 462 occ_minutepdf
  • participants list_462 OCC meeting 110814pdf
  • 21pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 26-7pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 45pdf
  • 46pdf
  • 47pdf
  • 5pdf
  • 83pdf
  • 84pdf
  • 84apdf
    • 26wrpc_minute 107pdf
    • 26wrpc_minute 108pdf
    • 26wrpc_minute 109pdf
    • 26wrpc_minute 110pdf
    • 26wrpc_minute 111pdf
    • 26wrpc_minute 112pdf
    • 26wrpc_minute 113pdf
      • 85pdf
      • 87pdf
      • 98pdf
      • 913pdf
      • 10pdf
Page 12: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 13: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 14: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 15: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 16: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 17: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 18: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 19: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 20: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 21: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 22: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 23: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 24: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 25: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 26: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 27: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 28: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 29: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 30: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 31: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 32: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 33: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 34: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 35: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 36: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 37: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 38: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 39: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 40: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 41: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 42: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 43: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 44: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 45: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 46: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 47: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 48: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 49: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 50: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 51: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 52: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 53: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 54: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 55: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 56: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 57: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 58: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 59: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 60: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 61: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 62: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 63: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 64: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 65: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 66: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 67: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 68: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 69: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 70: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 71: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 72: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 73: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 74: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 75: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 76: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 77: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 78: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 79: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 80: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 81: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 82: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 83: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 84: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 85: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 86: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 87: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 88: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 89: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 90: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR
Page 91: MINUTES OF 462wrpc.gov.in/occ/462occ_minute1.pdf · 2014. 8. 22. · MINUTES OF 462ND MEETING OF OPERATION & COORDINATION SUB-COMMITTEE OF WRPC HELD ON 11TH AUGUST 2014 AT TARAPUR