Http Boss Tam Bang
-
Upload
andrairawan -
Category
Documents
-
view
652 -
download
1
Transcript of Http Boss Tam Bang
Alat Berat dan Kapasitas Produksi | Heavy Equipment | All-Pages
Page 1 of 19
Ads by Google
Bucket List
Bucket Forks
Home Tambang Geologi Minerals Survey Surface Mining Heavy Equipment Kamus Minescape
Alat Berat dan Kapasitas ProduksiWritten by Boss Tambang Saturday, 23 January 2010 13:55Heavy Equipment - Heavy Equipment
Motor Grader Auction Premium Used Iron for Sale. See Inspection Reports. Bid Online! www.CatAuctions.com
Excavators/Plant/Backhoes One Of Europes Leading Plant And Machinery Dealers Shipped worldwide www.mullanplantsales SBM Mining Equipment Mining, Metallurgical, Construction Chemistry, Petrochemicals Equipment www.uniSBM.com Article Index Alat Berat dan Kapasitas Produksi Alat dan Kapasitas Produksi Alat Alat dan Kapasitas Produksi Alat Alat dan Kapasitas Produksi Alat All Pages 1.9/5 (30 votes)
PENJADWALAN PRODUKSI Menentukan bagaimana produksi dicapai dalam kurun waktu yang tela yang terkait dengan produksi tersebut harus di detailkan. Penjadwa tabulasi seperti contoh di bawah ini. Tabulasi meliputi antara lain : a. Volume produksi : komoditi dan waste b. Volume drilling & blasting c. Jam Kerja alat d. Jarak angkut Contoh Tabulasi Penjadwalan ProduksiProduksi Alat Tambang
PENJADWALAN JAM KERJA (ROSTER) a. Jam Kerja Jam kerja sangat menentukan jumlah dan ukuran alat yang akan digunakan. Jam kerja ini dipengaruhi oleh pola shift kerj shift dan pola maintenance alat. Dibawah contoh perhitungan jam kerja. Perhitungan Hari Kerja Jumlah hari setahun Dikurang hari libur Jadwal hari Kerja 365 hari 10 hari 355 hari
http://bosstambang.com/Heavy-Equipment/alat-berat-dan-kapasitas-produksi/All-Pag...
07/12/2011
Alat Berat dan Kapasitas Produksi | Heavy Equipment | All-Pages
Page 2 of 19
Dikurang Hari Hujan*
40 hari
Jumlah hari kerja (available)315 hari Jumlah shift per hari Jumlah Shfit pertahun Perhitungan Jam Kerja Jam per shift Dikurang pergantian shift Dikurangi Istirahat makan 8.0 jam 0.2 jam 0.5 jam 3 shift 945 shift
Dikurangi traveling, blasting 0.5 jam Jam available per shift 6.8 jam
Jadwal jam Kerja per tahun 6426 jam
Contoh Tabulasi Penjadualan Jam KerjaProduksi Alat Tambang
b. Physical Availability (PA) Ketersediaan alat yang dapat digunakan untuk bekerja, besarnya physical availability untuk alat-alat baru biasanya diatas 9 kepada perawatan dan penyediaan suku cadang.. Contoh untuk kasus di atas, apabila untuk perawatan diperlukan 1 jam dalam 1 shift maka Availability = (5.8+1.2)/(5.8+1.2+1 c. Use of Availability. (UA) Jam kerja alat yang digunakan pada saat alat itu kondisi tidak rusak. Contoh untuk kasus di atas : alat efektif bekerja 5.8 jam, sedangkan waktu stand by 1.2 jam Use of availability = 5.8/(5.8 + 1.2) x 100% =83% d. Produksi Produksi = skedul jam kerja x UA x PA x produktivitas Contoh : produktivitas alat = 150 m3/jam Produksi pershift = 8jam x 87.5% x83% x 150 m3/jam = 870bcm/shift FORMULA PA = (W+S)/ (W+S+R) UA = W/(W+S) Skedule jam kerja (SK) = W + S + R Produktivitas (P) = Vol / W Produksi (Q) = SK x PA x UA x P Q = (W+S+R) x (W+S)/(W+S+R) x W/(W+S) x Vol/W dimana : PA = Physical availability UA = use of availability
http://bosstambang.com/Heavy-Equipment/alat-berat-dan-kapasitas-produksi/All-Pag...
07/12/2011
Alat Berat dan Kapasitas Produksi | Heavy Equipment | All-Pages
Page 3 of 19
W = working R = break down Contoh : Skedul jam kerja 8 jam/ shift, kehilangan waktu 1.2 jam, perawatan 1 jam, produktivitas alat 150 bcm/jam Jumlah produksi pershift : =(5.8+1.2+1)x(5.8+1.2)/ (5.8+1.2+1)x5.8/(5.8+1.2)x 150 bcm/jam = 8 x 87.5% x 83% x 150 = 870 bcm/shift
KARAKTERISTIK FISIK MATERIAL Karakteristik fisik material yang akan digali baik tanah penutup maupun komoditi harus diketahui secara pasti, hal ini untuk m digunakan serta untuk memperkirakan produktivitasnya. Yang paling utama diketahui dalam pekerjaan pemindahan tanah mekanis adalah :
a.Kemudah galian (Excavability) Dalam penggalian tanah mekanis kemudah galian biasanya dikatagorikan kedalam : free dig, rippable dan un-rippable. ketig terhadap penetuan jenis dan tingkat produktivitas alat gali-muat. Untuk menentukan kriteria tersebut biasanya diketahuai da sebelum proses penggalian perlu dilakukan penelitian : - Analisa log bor, menegetahui batas atara batuan asli dan lapukan - survey seismik untuk mengetahui kecepatan seismik dari batuan yang akan digali - Analisa engineering meliputi : kondisi air tanah, tipe batuan, stregth, joint spacing.
b.Berat Jenis Berat jenis batuan harus ditentukan dengan pasti, hal ini untuk memastikan agar tidak terjadi kekurangan beban dan kelebih menyebabkan kerugian. Kalau terjadi kekurangan beban produktivitas alat tidak optimum, sedangakan kelebihan muatan ala
c.Swell Apabila tanah asli digali atau diberaikan, maka terjadi perubahan volume karena adanya pengembangan, perubahan menjadi gembur loose cubic metre (lcm) disebut dengan swell. Swell sangat penting diketahui dalam pemindahan tanah m dan diangkut adalah dalam bentuk terberai (loose) sedangkan kemajuan penggalian dihitung dalam kondisi tanah asli (bcm) produktivitas alat dalam bcm akan menurun.Produksi Alat Tambang
Download : PDF | Doc Search More Related To This Page :
SearchEmail Subscription Enter your email address:
SubscribeDelivered by FeedBurner Related Articles Basic Machine System Heavy Equipment Backhoe Bulldozer Perhitungan Produksi
http://bosstambang.com/Heavy-Equipment/alat-berat-dan-kapasitas-produksi/All-Pag...
07/12/2011
Alat Berat dan Kapasitas Produksi | Heavy Equipment | All-Pages
Page 4 of 19
Basic Calculation Of Production Faktor Produksi Dump Truck Heavy Equipment Loader
PEMILIHAN ALAT Secara garis besar pemilihan alat ditentukan oleh : a. Karakterisitik material (sifat fisik, kekerasan dll.) b. Bentuk endapan, kemiringan, perlapisan c. Tingkat produksi d. Metoda penambangan e. Jarak angkut, Kemiringan, dimensi jalan f. dll
ALAT PEMBERAIAN BATUAN Metoda yang umum digunakan untuk pemberaian material overburden, bijih (ore) dan batubara adalah ripping enggunakan blasting.
a. Ripping Ripping digunakan untuk pemberaian material sebelum dimuat oleh shovel/ Backhoe/ Loader/ Dragline ke dalam Truck atau biasanya digunakan untuk mengindikasi kemudah galian material yang akan digali. (grafik hubungan antara kecepatan seism utuk berbagai model bulldozerdapat dilihat di halaman berikut). Faktor yang berpengaruh dalam produktivitas Ripping antara lain : a. dozer Power and Weight b. Type batuan (karakteristik batuan) c. Jumlah Ripper d. Panjang Lintasan Ripping e. Kedalaman Penetrasi f. Struktur geologi (Spasi joint, sesar) CONTOH PEKERJAAN RIPPINGProduksi Alat Tambang
Grafik Hubungan Antara Kecepatan Seismik Batuan Dengan Kemapuan Ripping
http://bosstambang.com/Heavy-Equipment/alat-berat-dan-kapasitas-produksi/All-Pag...
07/12/2011
Alat Berat dan Kapasitas Produksi | Heavy Equipment | All-Pages
Page 5 of 19
Produksi Alat Tambang
Produksi Alat Tambang
Contoh Type & Ukuran BULLDOZER Produk Komatsu ModelKapasitas Blade (m3) FLYWHEEL HP D65 D85 D155 D275 D375 D475 D575 5.6 8.5 12.8 15.3 22.0 34.4 45.0 190 190 302 405 525 860 1150
b. Pemboran Produksi Prinsip dari Metoda Pemboran adalah ROTARY-PERCUSSION and ROTARY 1. ROTARY PERCUSSION DRILLING a. Top Hammer Drilling Hammer Piston yang ditempatkan di posisi paling atas (Top) diteruskan ke Drill Bit melalui batang Bor ---> jenis ini digun dangkal dibawah 20 meter
b. Down The Hole Drilling Piston diposisikan di bawah batang bor dan langsung memukul Bit ---> ekonomis digunakan untuk diameter lubang sekitar 20 meter.
2. ROTARY DRILLING Bantuan dihancurkan dengan menggunakan roller cone bit dengan menggunakan tekanan tinggi dan putaran. Umumnya digunakan untuk lubang yang lebih besar di atas 150 mm sampai dengan 300 mm, ekonomis digunakan s/d keda
http://bosstambang.com/Heavy-Equipment/alat-berat-dan-kapasitas-produksi/All-Pag...
07/12/2011
Alat Berat dan Kapasitas Produksi | Heavy Equipment | All-Pages
Page 6 of 19
Produksi Alat Tambang
Produksi Alat Tambang
Produksi Alat Tambang
c. Pemilihan Mesin Bor 1. Kekerasan Batuan 2. Kondisi/Lingkungan kerja 3. Kedalaman lubang 4. Tingkat Produksi Contoh Type & Ukuran Mesin Bor Produk Tamrock
Produksi Alat Tambang
Model Mesin Drilling Tipe RotaryProduksi Alat Tambang
Model Mesin Drilling DTHProduksi Alat Tambang
http://bosstambang.com/Heavy-Equipment/alat-berat-dan-kapasitas-produksi/All-Pag...
07/12/2011
Alat Berat dan Kapasitas Produksi | Heavy Equipment | All-Pages
Page 7 of 19
ALAT GALI / MUAT (excavator) LOADING SHOVEL a. Digunakan umumnya untuk material blasting b. Diperlukan konndisi operasi terbatas (luas dan rata) c. Dapat menangani ukuran material boulder d. Mempunyai ukuran bucket lebih besar dibanding backhoe untuk kelas yang sama. e. Dalam operasinal memerlukan alat tambahan bul dozer. f. System operasional : Alat muat dan Truck diposisikan pada lantai kerja yang samaProduksi Alat Tambang Produksi Alat Tambang
BACK HOE a. Mampu menggali material pada berbagai kondisi (Loading di floor, Channel, dan Roof) b. Manuver lebih mudah c. Dapat beroperasi dengan areal kerja lebih sempit d. Pada Kelas yang sama, Backhoe mempunyai jangkauan gali ke atas dan ke bawah lebih bes e. Ukuran Bucket lebih kecil dibanding Shovel untuk ukuran mesin yang sekelas f. System operasi : Alat muat diposisikan lebih tinggi dari alat angkut. YANG PERLU DIPERHATIKAN PADA SHOVEL & BACKHOE a. Ukuran Bucket (m3) b. Digging Reach (m) c. Digging Depth (m) d. Digging Force (Kg/Newton) e. Kecepatan Swing Contoh Type & Ukuran SHOVEL & BACHOE Produk Komatsu Model Kapasitas Bucket (m3) PC200 PC400 PC750 PC1100 PC3000 PC4000 PC5000 0.47 1.15 1.30 2.20 3.60 5.00 5.50 - 6.50 12.0 - 16.0 19.0 - 24.0 26.0 - 30.0
http://bosstambang.com/Heavy-Equipment/alat-berat-dan-kapasitas-produksi/All-Pag...
07/12/2011
Alat Berat dan Kapasitas Produksi | Heavy Equipment | All-Pages
Page 8 of 19
Produksi Alat Tambang
Produksi Alat Tambang
Produksi Alat Tambang
ALAT MUAT WHEEL LOADER a. Digunakan umumnya di stocpile untuk muat ke truck, muat ke hopper, pengaturan stockpile. b. Mobilitas dan manuver-nya sangat tinggi c. Memerlukan kondisi lantai kerja yang baik. d. Kapasitas bucket tergantung density material
Contoh Type & Ukuran WHEEL LOADER Produk Komatsu Model Kapasitas Bucket (m3) WA320 WA380 WA450 WA500 WA600 WA700 WA800 WA900 2.7 3.2 3.2 4.0 4.2 5.2 4.5 5.5 6.2 8.0 8.7 11.4 11 16 13 - 17
http://bosstambang.com/Heavy-Equipment/alat-berat-dan-kapasitas-produksi/All-Pag...
07/12/2011
Alat Berat dan Kapasitas Produksi | Heavy Equipment | All-Pages
Page 9 of 19
Produksi Alat Tambang
Download : PDF | Doc Search More Related To This Page :
SearchEmail Subscription Enter your email address:
SubscribeDelivered by FeedBurner Related Articles Basic Machine System Heavy Equipment Backhoe Bulldozer Perhitungan Produksi Basic Calculation Of Production Faktor Produksi Dump Truck Heavy Equipment Loader
Produksi Alat Tambang
ALAT ANGKUT dump truck
a. Mampu beroperasi pada ukuran Fragment yang besar b. Memerlukan kondisi jalan yang baik untuk meningkatkan productivitas dan menurunkan o c. Terbatas dalam operasi ekonomisnya 4 km
http://bosstambang.com/Heavy-Equipment/alat-berat-dan-kapasitas-produksi/All-Pag...
07/12/2011
Alat Berat dan Kapasitas Produksi | Heavy Equipment | All-Pages
Page 10 of 19
d. Mobilitasnya tinggi & fleksibel Contoh Type & Ukuran RIGID DUMP TRUCK Produk Komatsu Model Max. Load (ton)Haeaped Capacity (m3) HD325 HD465 HD785 HD1500 630E 730 830E 930E 36 55 91 150 172 186 220 290 24 34.2 60 78 103 111 147 211
ALAT TRANSPORTProduksi Alat Tambang
TRAILER a. Digunakan hanya untuk material lebih ringan misalnya BatuBara b. Tepat untuk jalan datar dengan kecepatan tinggi & pengangkutan jarak jauh c. Sesuai untuk Dumping langsung di Hopper d. Kapasitas rangkaian : 40 160 ton
CONVEYOR a. Volume tinggi, jarak jauh, unit cost rendah b. Sulit untuk dipindah-pindahkan c. Memerlukan ongkos investasi yang tinggi d. Dapat menghandle material dengan grade sampai dengan 40% e. Lebih aman dibanding dengan Truck f. Dampak Polusi Lingkungan lebih rendah g. Umur pakai minimum 5 tahunProduksi Alat Tambang
HAUL ROAD MAINTENANCEProduksi Alat Tambang
GRADER a. Perbaikan jalan/meratakan jalan secara terus menerus untuk mengurangi Rollin b. Frekuensi perataan/grading tergantung pada standar konstruksi dan Fungsi lain : a. Pemeliharaan drainase b. Scarifier
Contoh Type & Ukuran motor grader Produk Komatsu Model Panjang Blade (m)Flywheel HP GD510 GD623 GD750 GD825 3.71 3.71 4.32 4.88 125 155 225 280
http://bosstambang.com/Heavy-Equipment/alat-berat-dan-kapasitas-produksi/All-Pag...
07/12/2011
Alat Berat dan Kapasitas Produksi | Heavy Equipment | All-Pages
Page 11 of 19
COMPACTOR Penimbunan jalan kadang diperlukan untuk menambah daya dukung tanah, bisa berupa tana ini harus dipadatkan agar daya dukung meningkat sesuai dengan desain. Tanpa pemadatan, us Tipe Compactor berdasarkan cara kerja: 1. Static 2. Vibrating Tipe Compactor berdasar media pemadatnya 1. Tyre 2. Steel drum, terdiri dari : a. Padfoot/Sheepfoot (tipe material : Clay / Silt) b. Smooth (tipe material : Granular atau Clay/silt)Produksi Alat Tambang
WATER SPRAYING Digunakan untuk menjaga permukaan jalan tetap lembab (tidak basah), sehingga mengurangi adanya debu, meng memelihara permukaan jalan agar tetap padat. Jumlah keperluan air tergantung pada : a. Type material permukaan jalan b. Kelembaban alami c. Curah Hujan d. Penguapan e. Kepadatan lalu lintas Jumlah Water Sprayer Truck dihitung berdasarkan cycle time truck, pengisian tank dan pompa penyemprotan.
PERHITUNGAN PRODUKTIVITAS ALAT ALAT GALI / MUAT (EXCAVATOR) A. FAKTOR-FAKTOR YANG BERPENGARUH TERHADAP PRODUKTIVITAS ALAT MUAT 1. Kapasitas Bucket Kapasitas bucket ditentukan oleh ukuran bucket, swell material dan aktual volume muatan dari bucket tersebut. a. Kapasitas bucket (q) biasanya dinyatakan dalam vulume m3 heaped atau struck. b. Swell (SF), perubahan volume dari solid atau bank (bcm) menjadi loose (lcm) c. Faktor pengisian/ fill factor (k) menyatakan volume bucket yang dapat digunakan dibanding dengan volume (dimensi aslin 2. Klasifikasi Penggalian (Digging) Digging dapat diklasifikasi kedalam tiga kelompok : a. Easy digging, misal material yang lepas dengan ukuran kecil dan seragam atau tanah pucuk b. Medium digging, misal material dapat digali langsung dari kondisi asli seperti sub soil. c. Hard digging, misal material hasil blasting dengan ukuran tidak seragam.Produksi Alat Tambang
3. Cycle Time Cycle time alat loading terdiri dari komponen : a. Loading b. Swing muatan c. Dump d. Swing kosongan Note : cycle time tipe track loader utk kapasitas (2 22 m3) berkisar antar 24 s/d 32 detik per cycle
http://bosstambang.com/Heavy-Equipment/alat-berat-dan-kapasitas-produksi/All-Pag...
07/12/2011
Alat Berat dan Kapasitas Produksi | Heavy Equipment | All-Pages
Page 12 of 19
Faktor yang berpengaruh terhadap cycle time meliputi : a. Ukuran Alat (makin besar makin lambat) b. Kemudakhan gali c. Kondisi lantai kerja d. Kemudahan manuver e. Skill dari operator.Produksi Alat Tambang
B. FAKTOR-FAKTOR YANG MEMPENGARUHI PRODUKTIVITAS ALAT ANGKUT
1. Tahanan Gulir (Rolling Resistance) Adalah jumlah segala gaya-gaya luar yang berlawanan dengan arah gerak kendaraan y
2. Tahanan Kemiringan (Grade Resistance) Besarnya gaya berat yang melawan atau yang membantu gerak kendaraan karena kem 3. Koefisien Traksi (Traction Coefisien) Suatu faktor yang menunjukan besarnya traksi antara permukaan ban atau track dengan jalan yang dapat digunakan untuk
4. Rimpull Adalah besarnya kekuatan tarik (pulling force) yang dapat diberikan oleh mesin kepada permukaan roda atau ban penggera jalan.Produksi Alat Tambang
Produksi Alat Tambang
d. Poor
c. Contoh Perhitungan Produksi & Kapasitas BULDOZER Taksiran Produktivitas Ripping dg Grafik Produksi Aktual = Grafik x effisiensi kerja a. good = 0.75 (45 min/jam) b. Average = 0.58 ( 35 min/jam) c. Rather = 0.5 ( 30 min/jam) = 0.4 (25 min/jam)
http://bosstambang.com/Heavy-Equipment/alat-berat-dan-kapasitas-produksi/All-Pag...
07/12/2011
Alat Berat dan Kapasitas Produksi | Heavy Equipment | All-Pages
Page 13 of 19
Produksi Alat Tambang
Taksiran Produktivitas Dozing & SpreadingProduksi Alat Tambang
c. Contoh Perhitungan Produksi & Kapasitas PemboranProduksi Alat Tambang Produksi Alat Tambang
http://bosstambang.com/Heavy-Equipment/alat-berat-dan-kapasitas-produksi/All-Pag...
07/12/2011
Alat Berat dan Kapasitas Produksi | Heavy Equipment | All-Pages
Page 14 of 19
Produksi Alat Tambang
Download : PDF | Doc Search More Related To This Page :
Email Subscription Enter your email address:
SubscribeDelivered by FeedBurner Related Articles Basic Machine System Heavy Equipment Backhoe Bulldozer Perhitungan Produksi Basic Calculation Of Production Faktor Produksi Dump Truck Heavy Equipment Loader
Produksi Alat Tambang
d. Contoh Perhitungan Produksi & Kapasitas Alat Muat Formula Alat Muat Q = q x k x 60/cm x E Q = Produktivitas per jam q = Kapasitas bucket k = faktor pengisian cm = cycle time bucket
E = efisiensi kerja (Kapasitas Loader = 20 m3 dan Swell Factor = 1.35) Loader Capacity (q) : 20/1,35 = 14,8 Bcm Bucket Fill Factor (qxk): 14,8 x 0,95 = 14,05 Bcm Cycle Time (cm) : 0,5 minute Cycle/Hour (60/cm) : 60/0,5 = 120 Efficiency Factor (E) : 83 % Produksi per jam (Q) : 0,83 x 120 x 14,05 = 1.400 Bcm/jam (Backhoe Kapasitas = 10 m3 dan Swell Factor = 1.2) Loader Capacity (q) : 10/1,2 = 8,3 Bcm Bucket Fill Factor (qxk): 8,3 x 0,95 = 7,8 Bcm Cycle Time (cm) : 0,5 menit Cycle/Hour (60/cm) : 60/0,5 = 120 Efficiency factor (k) : 83%
http://bosstambang.com/Heavy-Equipment/alat-berat-dan-kapasitas-produksi/All-Pag...
07/12/2011
Alat Berat dan Kapasitas Produksi | Heavy Equipment | All-Pages
Page 15 of 19
Produksi per jam(Q)
: 83% x 120 x 7,8 = 776 Bcm/jam
(Backhoe Kapasitas = 2 m3 dan Swell Factor = 1.35) Loader Capacity (q) : 2/1,35 = 1.48 Bcm Bucket Fill Factor (qxk): 1,48 x 0,95 = 1,4 Bcm Cycle Time (cm) : 0,4 menit Cycle/Hour (60/cm) : 60/0,4 = 150 Efficiency factor (k) : 83% Produksi per jam (Q): 83% x 150 x 1.4 = 174 Bcm/jam e. Contoh Perhitungan Produksi & Kapasitas Alat Angkut ALAT ANGKUT Q = C x 60/cm x E C=nxqxk Q = Produktivitas per jam n = Rate capacity of truck/(q x k x loose density) cm = load time + Travel T + Spot Time q = Kapasitas bucket k = faktor pengisian cm = cycle time bucket E = efisiensi kerja Berikut produktivitas Truck dengan asumsi sebagai berikut : Kondisi Lapangan a. Jalan : - Terpelihara (Rr
http://bosstambang.com/Heavy-Equipment/alat-berat-dan-kapasitas-produksi/All-Pag...
07/12/2011
Alat Berat dan Kapasitas Produksi | Heavy Equipment | All-Pages
Page 18 of 19
Comments#1 dc 2011-04-07 17:11 bosstambang ane mau tanya nich? kalo dari bcm (bank cubic meter) bisa dijakian ke ton ga sih? kalo bisa berapa? saia ambil k[censored]s pada yang diatas.. 870 bcm/shift= ton
Refresh comments list RSS feed for comments to this post
Add commentName (required) E-mail (required, but will not display) Website
1000 symbols left
c d e f g Notify me of follow-up comments
Refresh
Send
Pilih BahasaDiberdayakan oleh
Terjemahan
Paid To Promote Paid To Popup, Welcome Worldwide Members Paid Display Banner Sign up
Free Traffic Web Traffic = Cash $8 CPM
http://bosstambang.com/Heavy-Equipment/alat-berat-dan-kapasitas-produksi/All-Pag...
07/12/2011
Alat Berat dan Kapasitas Produksi | Heavy Equipment | All-Pages
Page 19 of 19
http://bosstambang.com/Heavy-Equipment/alat-berat-dan-kapasitas-produksi/All-Pag...
07/12/2011