5/20/98 CMAQ REPORTS (FY 1996) REPORT $ AMOUNT $ AMOUNT OBLIG. $ PROJECT PROJECT PROJECT VOC** CO** NOX** PM-10** STATE SUBMIT. APPORTION. OBLIGATED % AMOUNT TYPE DESCRIPTION (KG/DAY) (KG/DAY) (KG/DAY) (KG/DAY) Alabama 01/14/97 $4,201,896 $4,778,880 113.7% Alabama $800,000 Demand Mgmt Area Wide Congestion Management Program in Jefferson and Shelby N/A N/A N/A Alabama $2,851,200 Traffic Flow Birmingham Closed Loop System (Phase 1 & 2)- Purchase of Hardware 40 5 Alabama $200,000 Other Ozone Awareness Program in Birmingham Area N/A N/A N/A Alabama $841,200 Traffic Flow Traffic Flow Improvements at SR-79, SR-75 (Center Point), and US-78 18 2 Alabama $60,000 Shared Ride US-280 Between Cahaba River Road and River View Road (Rideshare Prgm) N/A N/A N/A Alabama $26,480 N/A Additional Under-Reported CMAQ Project Authr. Costs N/A N/A N/A Alaska 06/04/97 $4,201,896 $2,759,137 65.7% Alaska $159,198 Other Enhanced Training Program to Certify I/M Technicians in Fairbanks-North Star Borough 680 Alaska $454,850 Other Waterless Street Sweeper to Reduce Particulate Matter 6091 Alaska $909,700 Transit Replace 4 Existing Buses with New Buses to Meet EPA Emission Requirements 80 Alaska $454,850 Transit Convert Municipal and State Light Sedans and Trucks to Bi-Fuel Configurations 420 Alaska $86,422 Transit Increase Ridership on a Route By Route Basis 240 Alaska $290,000 Shared Ride Promote Car and Van Pools to Reduce VMT 888 Alaska $90,970 Ped/Bike Design and Construct Sidewalks Adjacent to Busy Collector Street in Eagle River 22 Alaska $68,228 Ped/Bike Design and Construct Pedestrian Improvements Adjacent to Interstate 22 Alaska $30,000 Demand Mgmt Interagency Coordination on Conformity Issues for the Fairbanks North Star Borough 170 Alaska $65,000 Demand Mgmt Oversee the 6 ISTEA Mgmt Systems 170 Alaska $610 Other Pave Select Gravel Roads to Reduce PM-10 Dust 300 Alaska $149,309 Other Pave Select Gravel Roads to Reduce PM-10 Dust 1010 Arizona 02/18/97 $11,270,204 $11,266,331 100.0% Arizona $67,730 Ped/Bike Paseo Raquet Bridge- Bicycle Project in Glendale 1 6 1 0 Arizona $135,000 Shared Ride Capital Rideshare Program in Maricopa Co. 372 2324 290 617 Arizona $460,000 Shared Ride Regional Rideshare Program in Maricopa Co. 372 2324 290 617 Arizona $910,000 Demand Mgmt Maricopa County Travel Reduction Program 182 1136 142 302 Arizona $3,949,400 Transit RPTA Bus Purchases (13 CNG 40-ft Buses) 1 11 14 <1 Arizona $190,000 Ped/Bike Bicycle Projects in Wickenburg (2.7 Mi. Bike Path) 1 6 1 0 Arizona $3,500,000 Traffic Flow Traffic Signal Computer Upgrade in Phoenix 363 2221 N/A 0 Arizona $1,600,000 Transit RPTA Bus Purchases 1 11 14 <1 Arizona $19,000 Ped/Bike Bicycle Projects in Fountain Hills (4 Miles of Striping and Signing) Not Submitted Arizona $240,000 Traffic Flow Traffic Signal Computer Upgrade in Mesa 363 2221 N/A 0 Arizona $195,201 Ped/Bike Bicycle Project in Scottsdale (16 Mi. Bike Lanes) 1 6 1 0 Arkansas* 03/07/97 $4,201,896 $8,717,225 207.5% Arkansas* $8,717,225 STP/CMAQ Various Roadway Improvements N/A N/A N/A California 02/21/97 $124,373,588 $217,546,574 174.9% California $88,500 Ped/Bike West Sacramento- From Enterprise to Tower Bridge- Construct Bikeway Not Submitted California $352,000 Traffic Flow West Sacramento- I84/275/50- Interchange Upgrade and Minor Geometrics 1 N/A <1 N/A California $17,706 Transit Davis- Unitrans- CNG Conversion; Modify Maintenance Facility N/A N/A 26 N/A California $753,000 Ped/Bike City of Sacramento- Various Locations- Construct Bicycle/Pedestrian Facilities <1 <1 <1 2 California $51,047 Ped/Bike City of Sacramento- Bike Path Construction 1 7 1 1 California $177,360 Transit City of Davis- FTA Grant for Transit Projects Not Submitted California $177,060 Shared Ride Placer County- Construct Park N Ride Lots at Various Rail Stations 3 N/A 4 N/A California $88,530 Traffic Flow Sacramento County Branch Center- Traffic Operations Center 68 530 32 N/A California $121,153 Ped/Bike Roseville- Royer Park to I-80; Class I Bicycle Facility 20 N/A 18 N/A California $354,120 Other Sacramento AQMD- "Spare the Air" Public Education Program 3103 N/A 3052 N/A California $1,539,690 Traffic Flow Placerville- Placerville Drive; Signals Channelization and Rehab (Including PE Costs) 16 N/A 12 N/A California $19,476 Ped/Bike Woodland- East Street Between Gibson Road and Main Street; Construct and Lands. 1 9 1 1 California $403,698 Transit Placer County- Various Locations; CNG Refueling/Park N Ride Facility <1 N/A <1 N/A California $670,000 Ped/Bike Sacramento City- Bicycle School Safety Program 22 N/A 14 N/A California $1,180,000 Transit Sacramento Regional Transit- CNG Fueling Facility Not Submitted California $35,855 Traffic Flow Rohnert Park- Rohnert Park Exprswy; Redwood Drive to Snyder Ln; Signal Intercon 535 798 ^ 1

Transcript of CMAQ REPORTS (FY 1996)

Page 1: CMAQ REPORTS (FY 1996)

5/20/98 CMAQ REPORTS (FY 1996)REPORT $ AMOUNT $ AMOUNT OBLIG. $ PROJECT PROJECT PROJECT VOC** CO** NOX** PM-10**

STATE SUBMIT. APPORTION. OBLIGATED % AMOUNT TYPE DESCRIPTION (KG/DAY) (KG/DAY) (KG/DAY) (KG/DAY)

Alabama 01/14/97 $4,201,896 $4,778,880 113.7%Alabama $800,000 Demand Mgmt Area Wide Congestion Management Program in Jefferson and Shelby N/A N/A N/AAlabama $2,851,200 Traffic Flow Birmingham Closed Loop System (Phase 1 & 2)- Purchase of Hardware 40 5Alabama $200,000 Other Ozone Awareness Program in Birmingham Area N/A N/A N/AAlabama $841,200 Traffic Flow Traffic Flow Improvements at SR-79, SR-75 (Center Point), and US-78 18 2Alabama $60,000 Shared Ride US-280 Between Cahaba River Road and River View Road (Rideshare Prgm) N/A N/A N/AAlabama $26,480 N/A Additional Under-Reported CMAQ Project Authr. Costs N/A N/A N/A

Alaska 06/04/97 $4,201,896 $2,759,137 65.7%Alaska $159,198 Other Enhanced Training Program to Certify I/M Technicians in Fairbanks-North Star Borough 680Alaska $454,850 Other Waterless Street Sweeper to Reduce Particulate Matter 6091Alaska $909,700 Transit Replace 4 Existing Buses with New Buses to Meet EPA Emission Requirements 80Alaska $454,850 Transit Convert Municipal and State Light Sedans and Trucks to Bi-Fuel Configurations 420Alaska $86,422 Transit Increase Ridership on a Route By Route Basis 240Alaska $290,000 Shared Ride Promote Car and Van Pools to Reduce VMT 888Alaska $90,970 Ped/Bike Design and Construct Sidewalks Adjacent to Busy Collector Street in Eagle River 22Alaska $68,228 Ped/Bike Design and Construct Pedestrian Improvements Adjacent to Interstate 22Alaska $30,000 Demand Mgmt Interagency Coordination on Conformity Issues for the Fairbanks North Star Borough 170Alaska $65,000 Demand Mgmt Oversee the 6 ISTEA Mgmt Systems 170Alaska $610 Other Pave Select Gravel Roads to Reduce PM-10 Dust 300Alaska $149,309 Other Pave Select Gravel Roads to Reduce PM-10 Dust 1010

Arizona 02/18/97 $11,270,204 $11,266,331 100.0%Arizona $67,730 Ped/Bike Paseo Raquet Bridge- Bicycle Project in Glendale 1 6 1 0Arizona $135,000 Shared Ride Capital Rideshare Program in Maricopa Co. 372 2324 290 617Arizona $460,000 Shared Ride Regional Rideshare Program in Maricopa Co. 372 2324 290 617Arizona $910,000 Demand Mgmt Maricopa County Travel Reduction Program 182 1136 142 302Arizona $3,949,400 Transit RPTA Bus Purchases (13 CNG 40-ft Buses) 1 11 14 <1Arizona $190,000 Ped/Bike Bicycle Projects in Wickenburg (2.7 Mi. Bike Path) 1 6 1 0Arizona $3,500,000 Traffic Flow Traffic Signal Computer Upgrade in Phoenix 363 2221 N/A 0Arizona $1,600,000 Transit RPTA Bus Purchases 1 11 14 <1Arizona $19,000 Ped/Bike Bicycle Projects in Fountain Hills (4 Miles of Striping and Signing) Not SubmittedArizona $240,000 Traffic Flow Traffic Signal Computer Upgrade in Mesa 363 2221 N/A 0Arizona $195,201 Ped/Bike Bicycle Project in Scottsdale (16 Mi. Bike Lanes) 1 6 1 0

Arkansas* 03/07/97 $4,201,896 $8,717,225 207.5%Arkansas* $8,717,225 STP/CMAQ Various Roadway Improvements N/A N/A N/A

California 02/21/97 $124,373,588 $217,546,574 174.9%California $88,500 Ped/Bike West Sacramento- From Enterprise to Tower Bridge- Construct Bikeway Not SubmittedCalifornia $352,000 Traffic Flow West Sacramento- I84/275/50- Interchange Upgrade and Minor Geometrics 1 N/A <1 N/ACalifornia $17,706 Transit Davis- Unitrans- CNG Conversion; Modify Maintenance Facility N/A N/A 26 N/ACalifornia $753,000 Ped/Bike City of Sacramento- Various Locations- Construct Bicycle/Pedestrian Facilities <1 <1 <1 2California $51,047 Ped/Bike City of Sacramento- Bike Path Construction 1 7 1 1California $177,360 Transit City of Davis- FTA Grant for Transit Projects Not SubmittedCalifornia $177,060 Shared Ride Placer County- Construct Park N Ride Lots at Various Rail Stations 3 N/A 4 N/ACalifornia $88,530 Traffic Flow Sacramento County Branch Center- Traffic Operations Center 68 530 32 N/ACalifornia $121,153 Ped/Bike Roseville- Royer Park to I-80; Class I Bicycle Facility 20 N/A 18 N/ACalifornia $354,120 Other Sacramento AQMD- "Spare the Air" Public Education Program 3103 N/A 3052 N/ACalifornia $1,539,690 Traffic Flow Placerville- Placerville Drive; Signals Channelization and Rehab (Including PE Costs) 16 N/A 12 N/ACalifornia $19,476 Ped/Bike Woodland- East Street Between Gibson Road and Main Street; Construct and Lands. Bikeway1 9 1 1California $403,698 Transit Placer County- Various Locations; CNG Refueling/Park N Ride Facility <1 N/A <1 N/ACalifornia $670,000 Ped/Bike Sacramento City- Bicycle School Safety Program 22 N/A 14 N/ACalifornia $1,180,000 Transit Sacramento Regional Transit- CNG Fueling Facility Not SubmittedCalifornia $35,855 Traffic Flow Rohnert Park- Rohnert Park Exprswy; Redwood Drive to Snyder Ln; Signal Interconnect/Upgr.535 798

^ 1

Page 2: CMAQ REPORTS (FY 1996)

5/20/98 CMAQ REPORTS (FY 1996)REPORT $ AMOUNT $ AMOUNT OBLIG. $ PROJECT PROJECT PROJECT VOC** CO** NOX** PM-10**

STATE SUBMIT. APPORTION. OBLIGATED % AMOUNT TYPE DESCRIPTION (KG/DAY) (KG/DAY) (KG/DAY) (KG/DAY)

California $507,011 Traffic Flow San Rafael- 4th and 5th Ave; Signal Interconnect 535 798California $47,807 Traffic Flow Marin County- Sir Francis Drake -Elisio to College; Signal Interconnect (RTSOP) 535 798California $284,181 Traffic Flow Richmond- Cutting Blvd. I-80 to I-580 and 22/23rd Str. I-580 to Reem/Signal Upgrade and Interc.535 798California $5,664,615 Transit San Mateo- Bus/Transit Center at 1st & B Street; New Train Station and Underground Pking399 490California $337,750 Transit Santa Clara Transit- Various Projects; FTA Transfer CA-90-X675 Not SubmittedCalifornia $212,472 Traffic Flow Sonoma- Hearn Ave at Dutton; Channelization and Signalization 535 798California $314,281 Traffic Flow San Francisco- Lincoln Way- Kezar Drive and Funston to JFK Blvd; Signal Interconnect 535 798California $1,541,025 Transit Martinez- Downtown/Marina Dist; Construct Intermodal Facility 399 490California $266,400 Ped/Bike Pacifica- Highway 1 and City Streets; Construct Bike Paths 36 45California $38,000 Traffic Flow Concord- Clayton/Willow Pass, Kirker Pass/Ygnacio Valley Signal Timing (RTSOP) 535 798California $53,000 Traffic Flow Pleasant Hill-Alhambra Ave- Blue Ridge to Grayson; Signal Timing and Coordination (RTSOP)535 798California $44,000 Traffic Flow Dublin- Within City of Dublin; Traffic Signal Coordination and Upgrade 535 798California $227,000 Traffic Flow Alameda- Webster Street/8th Street Couplet/ 1-Way Couplet/Left Turn/Signalization 535 798California $57,500 Traffic Flow Alameda- Park Street- Upgrade Signal Controller 535 798California $7,785,000 Transit San Francisco Muni- LRV Purchase Not SubmittedCalifornia $6,638,000 Transit Peninsula JPB (Caltrain)- San Francisco to Gilroy; Purchase 3 Locomotives Not SubmittedCalifornia $69,053 Traffic Flow Oakland- Grand Ave/Lakeshore, 42nd Ave/Lakeshore Ave/E 18th Street- Signal Interconnect535 798California $15,034,000 Transit Santa Clara County Transit- Tasman Corridor LRT West Extension (Phase I) Not SubmittedCalifornia $785,000 Transit BART-Fremont Station and Coliseum Station Transit Center Improvements 399 490California $1,239,100 Shared Ride Fairfield-Rockfield Road and Redtop Rd/ in Dixon; Park N Ride and Information Center 27 27California $3,087,533 Traffic Flow Vallejo- Phase II Citywide Signal Traffic Interconnection 535 798California $1,220,962 Traffic Flow Vallejo- Phase III Citywide Signal Traffic Interconnection 535 798California $101,721 Traffic Flow Vacaville- E. Monte Vist Ave from Traffic Signal Interconnection 535 798California $11,115 Ped/Bike Construct Bike and Ped Path in Scotts Valley/Bean Creek Rd Not SubmittedCalifornia $26,745 Ped/Bike Construct Bike and Ped Path in Scotts Valley at Lockwood Lane Not SubmittedCalifornia $282,300 Ped/Bike Construct Class II Bike Path in Santa Cruz County Not SubmittedCalifornia $82,083 Ped/Bike Construct Bike and Ped Walkway in Santa Cruz County at Summit Road Not SubmittedCalifornia $108,148 Ped/Bike Sidewalk and Bike Lane Improvement in Watsonville at Rodriquez Street Not SubmittedCalifornia $189,132 Transit Monterey Transit- Transit Plaza Install Lights/Restrooms/Walkways/Landscaping Not SubmittedCalifornia $771,055 Demand Mgmt AMBAG's Overall Work Program- Various Projects/Bicycle/Fixed Rail/TDM/CMP Not SubmittedCalifornia $45,150 Ped/Bike Monterey County- Various Locations- Install Bike Racks Not SubmittedCalifornia $100,000 Transit Operating Assistance for Monterey-Salinas Transit System (FTA Transfer) Not SubmittedCalifornia $1,060,000 Transit Purchase 6 Replacement Buses for Santa Cruz Metro Transit District Not SubmittedCalifornia $26,000 Shared Ride Monterey County- Purchase a CNG Van for Vanpool Not SubmittedCalifornia $35,412 Ped/Bike Bike/Transit Improvements at U.C. at Santa Cruz at College Drive Intersection Not SubmittedCalifornia $22,500 Ped/Bike Construct Bike Path in Monterey at Lighthouse Curve/Infantry Street Not SubmittedCalifornia $230,178 Traffic Flow Coordinate Signal System in Santa Barbara at Hollister Ave 13 78 7 0California $53,118 Ped/Bike Construct Bikeway in Santa Maria at Santa Maria Valley RR 1 8 <1 <1California $177,060 Shared Ride City of Santa Barbara (TDM 95-96) Not SubmittedCalifornia $441,000 Transit Convert 3 Diesel Buses to CNG and Purchase 1 CNG Clean Air Express Bus in Lompoc 1 0 5 <1California $172,770 Transit Purchase 24 Passenger CNG Bus (FTA Transfer) <1 10 1 <1California $325,000 Transit Convert 17 City Fleet Trucks to CNG in City of Lompoc 2 0 16 1California $177,000 Demand Mgmt Transportation Demand Mgmt in Santa Barbara County 21 11 18 192California $177,000 Demand Mgmt Transportation Demand Mgmt in Santa Barbara County 21 11 18 192California $27,000 Demand Mgmt Implement TDM Program in City of Lompoc 7 65 4 1California $304,000 Transit Shuttle Service in Santa Barbara County at UCSB and Coast Village Rd 9 87 8 4California $77,108 Traffic Flow Interconnect Traffic Signals in Fresno at Jensen Ave to Cedar Ave to Chestnut Ave 1 7 -1 N/ACalifornia $11,250 Transit Bus Turnouts in Fresno at Shaw Ave; Blackstone Ave to Palm Ave 1 5 1 <1California $33,000 Shared Ride Park N Ride Lot at Millerton Road/North Fork Road 1 10 1 N/ACalifornia $40,500 Traffic Flow Signal Interconnect in Fresno at Clovis Ave at Butler Ave to Shaw Ave 5 72 6 N/ACalifornia $13,500 Traffic Flow Signalization at Fresno at Intersection of Menning Ave and Alta Ave 1 15 1 N/ACalifornia $27,000 Traffic Flow Signal Interconnect in Fresno at Clovis Ave from Butler to American Ave 2 38 3 N/ACalifornia $14,850 Traffic Flow Signalization in Fresno at Intersection of Menocino Ave and Mountain View Ave 1 15 1 N/ACalifornia $201,405 Traffic Flow Traffic Actuated Signals in Hanford at 12th Ave On-Ramps 6 19 5 0California $42,500 Transit New Transit Service in Fresno County (Operating Cost) 1 7 1 <1California $142,500 Transit Operating Cost for New Transit Service in Fresno County (FTA Transfer) 1 7 1 <1California $318,800 Transit Purchase 2 New Electric Buses (20 Passenger) in Fresno County (FTA Transfer) 2 11 1 <1^ 2

Page 3: CMAQ REPORTS (FY 1996)

5/20/98 CMAQ REPORTS (FY 1996)REPORT $ AMOUNT $ AMOUNT OBLIG. $ PROJECT PROJECT PROJECT VOC** CO** NOX** PM-10**

STATE SUBMIT. APPORTION. OBLIGATED % AMOUNT TYPE DESCRIPTION (KG/DAY) (KG/DAY) (KG/DAY) (KG/DAY)

California $478,100 Transit Purchase 3-30 Passenger CNG Buses in Fresno County (FTA Transfer) 2 7 -4 <1California $47,800 Transit Purchase one-16 Passenger Bus in City of Madera (FTA Transfer) <1 2 <1 <1California $95,612 Transit In Chowchilla, Purchase One-16 Passenger Bus (FTA Transfer) <1 1 <1 <1California $15,000 Traffic Flow Traffic Signal Installation in Kingsburg at Int. of Draper/Simpson Street <1 <1 <1 N/ACalifornia $20,000 Traffic Flow Install Signal Interconnect at Clovis-Shaw Ave and Clovis to Temperance <1 1 3 N/ACalifornia $30,000 Traffic Flow Traffic Signal and Interconnect in Clovis at Pollasky/Fifth I/S 2 29 1 N/ACalifornia $28,700 Traffic Flow Traffic Signal Interconnect in Clovis at Herndon Ave at Willow to Tollhouse <1 2 8 N/ACalifornia $159,400 Transit Purchase One-32 Passenger Bus in Kings County (FTA Transfer) <1 1 <1 0California $48,700 Transit Purchase One-15 Passenger CNG Van in Fresno County (FTA Transfer) 1 7 1 <1California $200,000 Traffic Flow Upgrade 61 Traffic Signals in City of Fresno at Various Locations 78 1224 28 N/ACalifornia $181,486 Shared Ride Establish Park N Ride Facility in Reedley at Manning Ave and I Street at Kingwood Park <1 1 <1 <1California $28,000 Traffic Flow Traffic Signals and Coordination in Reedley at Reed Ave/I Street 2 9 1 N/ACalifornia $18,000 Traffic Flow In Reedley- Traffic Signals and Coordination at Manning Ave/Haney Ave 2 15 3 N/ACalifornia $51,000 Ped/Bike Design Bike Path in Fresno at Herndon Ave at Willow Ave to Blythe Ave 5 N/A 4 N/ACalifornia $225,000 Traffic Flow Traffic Signal and Hwy Lighting in Kern at River Bend Blvd at Bernard Street 1 14 <1 1California $121,397 Traffic Flow Traffic Signal Communication in Bakersfield in Stockdale at Gosford to California Street 2 9 0 1California $162,059 Traffic Flow Traffic Signal and Highway Lighting in Kern County at Fruitvale Ave to Norris Rd Not SubmittedCalifornia $57,520 Transit Purchase 19 Passenger Van in Arvin <1 <1 <1 <1California $61,970 Transit Purchase 15 Passenger Van in Arvin <1 <1 <1 <1California $31,959 Traffic Flow Traffic Signal Interconnect in Bakersfield at Coffee Road and Stockdale Hwy to Truxton Rd 1 5 0 1California $89,415 Traffic Flow Traffic Signal Interconnect in Bakersfield at Ming Ave at New Stine Rd to Castro Lane 3 24 1 1California $115,266 Traffic Flow Traffic Signal Interconnect in Bakersfield at White Lane from Wilson to Wible 3 21 1 1California $168,915 Traffic Flow Traffic Signal Interconnect in Bakersfield at Stine Rd/New Stine Rd/White to Stockdale 4 29 1 1California $1,511,204 Traffic Flow AC Overlay in Various Locations in Kern County (Joint Funded with RSTP and CMAQ funds)4 50 2 1California $118,000 Traffic Flow Channelization at 7th Street Rd at SR-65 in Kern County <1 2 <1 1California $161,325 Transit Construct CNG Station in City of Delano (FTA Transfer) Not SubmittedCalifornia $398,385 Transit Purchase 35-ft Clean Diesel Bus for Golden Empire Transit District <1 1 <1 <1California $159,400 Transit Purchase 2-20 Passenger Buses in City of Wasco (FTA Transfer) <1 <1 <1 <1California $22,100 Transit City of Taft-One Station Wagon Replacement (FTA Transfer) <1 <1 1 <1California $88,530 Transit In Kern County, Shop Modifications for CNG Fuel Not SubmittedCalifornia $115,089 Transit Purchase 2 CNG Vans in Bakersfield for Senior Center <1 1 2 <1California $48,700 Transit Purchase one-18 Passenger Mini-bus for City of Taft (FTA Transfer) <1 <1 1 <1California $35,412 Traffic Flow Signal Communications Masterplan in City of Bakersfield Not SubmittedCalifornia $2,517,909 Transit Purchase 9 CNG Buses and 4 Vans for Golden Empire Transit District (FTA Transfer) 4 8 14 1California $4,426 Traffic Flow Traffic Signals and Hwy Lighting in Kern at East Brundage Lane at Fairfax Ave <1 1 <1 1California $1,062 Traffic Flow Traffic Signal Interconnect in Bakersfield on Mohawk Street (California to Truxton) <1 4 <1 1California $3,984 Traffic Flow Traffic Signal Interconnect in Bakersfield on Truxton Ave (Oak Street to Empire Dr.)Not SubmittedCalifornia $371,800 Transit Purchase 3 CNG Buses in Kern County (FTA Transfer) 1 2 3 <1California $208,853 Traffic Flow Signal and Ramps in Tulare at Cross Ave at "E" and Cherry Street <1 1 N/ACalifornia $200,000 Traffic Flow In Tulare, Prosperity Ave Corridor (Signal, Curb Return, Align Rd) <1 N/ACalifornia $208,853 Traffic Flow In Tulare, Signal w/Improved Grade and Drain at West Str Corridor at Cross and Tulare <1 N/ACalifornia $130,000 Traffic Flow Actuated Signals at Dinuba at Alta Ave/Kamm Ave 1 2 <1 N/ACalifornia $120,000 Traffic Flow Traffic Actuated Signals in Dinuba at Alta Ave/Nebraska Ave I/S <1 3 <1 N/ACalifornia $282,000 Traffic Flow Install Traffic Signal in Porterville at Morton Ave at Prospect (Newcome and Villa Streets) 1 5 0 N/ACalifornia $135,000 Traffic Flow In Tulare, Install Traffic Signal on Laspina Street at Cross Ave <1 N/ACalifornia $33,500 Ped/Bike Install Bicycle Lanes and Racks at Various Locations in City of Tulare <1 3 <1 <1California $11,000 Traffic Flow Install Traffic Signal in Porterville (Plano Street at Putnum Ave) 1 9 0 N/ACalifornia $10,000 Traffic Flow Install Traffic Signal in Porterville (Morton Ave at Plano) <1 2 <1 N/ACalifornia $10,000 Traffic Flow Install Traffic Signal in Porterville (Morton Ave at Westwood) <1 1 <1 N/ACalifornia $224,000 Transit In City of Tulare, Construct Downtown Transit Center (FTA Transfer) Not SubmittedCalifornia $79,000 Transit In City of Tulare, Purchase Two 5-Passenger Vans (FTA Transfer) N/A 1 <1California $73,738 Ped/Bike New PCC Sidewalk in Visalia at North Side of DOE Ave Between Kelsey/Shirk Rd <1 4 <1 <1California $22,300 Traffic Flow In Visalia, Signal Interconnect and Loops at Demaree from Caldwell to Tulare 1 2 -1California $8,900 Traffic Flow Interconnect Signals in Visalia at Mineral King Giddings to Mooney, Mooney Main <1 <1 <1California $3,895 Ped/Bike In Visalia, Construct Bike Path at North Side of Goshen Ave (Park St. to Plaza Dr.) 8 55 11 67California $12,040 Ped/Bike Construct 2.46 Miles of Class I Bike Path in Visalia at North Side of Goshen Ave 24 168 32 205California $354,000 Transit CNG Fueling Facility in City of Simi Valley (FTA Transfer) 2 11^ 3

Page 4: CMAQ REPORTS (FY 1996)

5/20/98 CMAQ REPORTS (FY 1996)REPORT $ AMOUNT $ AMOUNT OBLIG. $ PROJECT PROJECT PROJECT VOC** CO** NOX** PM-10**

STATE SUBMIT. APPORTION. OBLIGATED % AMOUNT TYPE DESCRIPTION (KG/DAY) (KG/DAY) (KG/DAY) (KG/DAY)

California $1,138,000 Transit Intercity Transit in Ventura County (3rd Year) 606 7992 -610 163California $261,098 Shared Ride Promote Rideshare Programs in Ventura County (Funded with RSTP/CMAQ Funds) 59 508 62 2California $88,530 Traffic Flow Signal Synchronization in Camarillo at Various Locations (Left Turn) 5 24 -8California $239,916 Shared Ride Construct Park N Ride Lot in Ojai at Intersection of SR-33 and 150 <1 1 <1 <1California $20,000,000 Transit Construct Transitway for Metro Red Line (Segment 3) -FTA Transfer Not SubmittedCalifornia $3,348,000 Transit Purchase 16 Expansion Transit Coaches for Long Beach Transit ( FTA Transfer) Not SubmittedCalifornia $21,200,000 Transit Operating Assistance for LA Metro Green Line (FTA Transfer) Not SubmittedCalifornia $100,000 Traffic Flow Traffic Signal System for City of Thousand Oaks- Master Signal Coordination 11 37 -25California $220,000 Ped/Bike Santa Cara River Valley Bike/Ped Path in Ventura County (PE and Env. Studies) 22 342 23 8California $34,969,350 Traffic Flow Widening for HOV Lanes at SR-14 at San Canyon Rd to 0.7 Mi. North of Escondido CanyonNot SubmittedCalifornia $15,220,961 Traffic Flow Add HOV Lanes in Each Direction at SR-67 from Lambert Road to LA-60 by CaltransNot SubmittedCalifornia $20,422,100 Traffic Flow Widening for HOV Lanes at SR-60 at San Bernardino Co. Line- Caltrans Not SubmittedCalifornia $254,966 Traffic Flow Traffic Signal and Widen Turn Lanes in Ventura from Hueneme Rd and Las Posas I/SNot SubmittedCalifornia $20,000,000 Transit Metro Red Line (Segment 3) Construct Transitway (FTA Transfer) Not SubmittedCalifornia $124,995 Traffic Flow Signal Interconnect in Moreno Valley at Ironwood Ave (Perris Blvd to Day Ave) 2 13 -5California $120,000 Traffic Flow Signal Interconnect in Banning at Highland Springs Road <1 <1 0California $64,500 Transit Acquisition of 2 Electric Cars in Riverside <1 2 <1California $200,000 Transit Rehab. Rail between Riverside and Perris for Riverside County Transit 137 1401 56California $67,500 Demand Mgmt Sun City- Various Streets; Golf Cart Transportation Program 1 7 <1California $2,557,632 Other In Riverside County in Coachella Valley, PM-10 Equipment Purchase and Operations 2 <1California $416,114 Traffic Flow Signal Interconnect in Temecula at Rancho Calif Rd/Winchester and Jefferson 51 374 14California $748,078 Transit Construct Transit Center Facility in Victorville at "D" Street and 4th/6th Street Not SubmittedCalifornia $33,034 Shared Ride Construct Park N Ride Facility in Yucca Valley from Pinon Drive to Camino Del Cielo Trail 18 44California $1,097,852 Transit Expand Transit Center in City of Merced- Purchase 7 Buses <1 3 3 1California $90,000 Other Install Automatic Permit Tracking System in Merced County (Various Cities) Info. Submitted in FY94/95 CMAQ ReportCalifornia $1,293,600 Transit Purchase 12 Transit Vehicles in County of Merced (District 10-Caltrans) <1 3 3 2California $7,000 Experimental Install Video Conference Equipment in Merced County Info. Submitted in FY94/95 CMAQ ReportCalifornia $4,427 Traffic Flow Traffic Signal Installation in City of Newman at Merced Street and Hwy-33 2 10 -3California $445,991 Ped/Bike Construct Class I Bikeway in Manteca at Tidewater Southern RR ROW near Lathrop 10 102 7 2California $1,162,535 Traffic Flow Install Fiber Optic Cable in Stockton for Citywide Traffic Signal Control System 156 922 83California $1,672,088 Transit Bus Purchase in Stockton Metro. Area (FTA Transfer) Not SubmittedCalifornia $52,000 Ped/Bike Bike Lanes in Sailida and Denair 2 22 1California $66,500 Ped/Bike Bike Path in Patterson Along Ward Ave 7 54 3California $176,960 Ped/Bike Widen Path for Peds and Bikes in Waterford on Reinway Ave from Rte 132 to Mid-Canal 4 44 2California $89,725 Traffic Flow Purchase Hardware and Software for County GIS Traffic Congestion Mgmt System Not SubmittedCalifornia $4,426 Traffic Flow Traffic Signals and Channelization in Newman at Kern Street and Hwy 33 2 10 -3California $800 Ped/Bike Bike Path in Newman at "T" Street from Yolo Ave to Inyo Ave 1 15 7California $13,600 Traffic Flow Signalization in Patterson from Los Palmas Ave and Hwy 33 I/C 3 19 -3California $300,000 Ped/Bike Construct Bike Path in San Diego County in Chula Vista and National City 7 70 4 2California $209,612 Traffic Flow Signal Interconnect in Escondido for 20 Locations 2 10 5 0California $193,880 Traffic Flow Traffic Signal Interconnect in San Diego at Linda Vista Interconnect System 3 13 6 0California $5,473 Traffic Flow Traffic Signal Interconnect in City of San Marcos at San Marcos Blvd and Mission 5 21 11 0California $143,611 Transit Planning Activities and Operating Assistance for Metro Transit Development Board-Mission Vly0 36 9 0California $22,132 Traffic Flow Traffic Signal Interconnect in Encinitas at Encinitas Blvd from Hwy 101 to Village Square 2 9 5 0California $204,008 Traffic Flow Signal Interconnection at Casa De Oro and Lakeside Areas of County 3 12 6 0California $16,815 Traffic Flow 95 Intersections in San Diego County; Communication Links/Central Control <1 1 1 0California $725,946 Transit Shuttle Service for Metro Transit Development Board (FTA Transfer) 5 37 5 4California $37,170 Traffic Flow Traffic Signal Equipment Purchase in La Mesa for 31 Locations 1 3 1 0California $200,895 Traffic Flow Traffic Signal Interconnect in La Mesa for 25 Locations 4 21 8 0California $31,871 Traffic Flow Signal Retiming in San Diego at Clairmont Blvd, El Cajon Blvd and Washington 9 34 17 0California $12,394 Traffic Flow Signal Detector Installation in San Diego at Pacific Beach 2 8 4 0

Colorado 03/25/97 $4,201,896 $3,902,514 92.9%Colorado $2,000,000 Traffic Flow Traffic Signal System Improvements and Timing (Denver Area) 440 4800Colorado $1,119 Transit New Bus Service to DIA 126 1141 117 52Colorado $294,000 Demand Mgmt Transportation Management Organization (TMO) in Denver Area Not SubmittedColorado $134,000 Shared Ride RideArrangers TDM, Denver Metro Area 7 58 6 3^ 4

Page 5: CMAQ REPORTS (FY 1996)

5/20/98 CMAQ REPORTS (FY 1996)REPORT $ AMOUNT $ AMOUNT OBLIG. $ PROJECT PROJECT PROJECT VOC** CO** NOX** PM-10**

STATE SUBMIT. APPORTION. OBLIGATED % AMOUNT TYPE DESCRIPTION (KG/DAY) (KG/DAY) (KG/DAY) (KG/DAY)

Colorado $140,000 Demand Mgmt Downtown Denver Transportation Management Association 35 304 35 16Colorado $150,000 Demand Mgmt Travel Reduction Incentive Program (TRIP) Employer Based Travel Reduction Program 15Colorado $788,240 Traffic Flow Traffic Signal Sychronization in Colorado Springs (Var. Locations) 112Colorado $150,000 Shared Ride RIDEFINDERS Program in Colorado Springs to Provide Ride Matching Services 13 108 12 <1Colorado $170,155 Shared Ride Commuter Assistance Service for NFR Area 7Colorado $75,000 Shared Ride Commuter Vanpool Service for North Front Range (3 New Alt. Fuel Vans) 175

Connecticut 01/13/97 $19,748,371 $31,311,616 159.0%Connecticut $3,170,000 Demand Mgmt Employee Commute Option program 132 98Connecticut $3,299,000 Demand Mgmt Employee Commute Option program 138 102Connecticut $660,000 Demand Mgmt Employee Commute Option program 28 20Connecticut $220,000 Demand Mgmt Employee Commute Option program 9 7Connecticut $540,000 Demand Mgmt Employee Commute Option program 23 17Connecticut $2,180,000 Demand Mgmt Employee Commute Option program 91 67Connecticut $2,846,000 Demand Mgmt Employee Commute Option program 119 88Connecticut $60,000 Traffic Flow US 1- Upgrade Signal System 3 0Connecticut $1,079,784 Traffic Flow RT 6- Computerized Signal System 5 <1Connecticut $49,000 Traffic Flow RT 63- Traffic Signals 1 <1Connecticut $2,500,000 Traffic Flow Washington Ave. Intersection Improvements 1 <1Connecticut $1,031,100 Traffic Flow RT 5- Traffic Signals 6 0Connecticut $397,700 Traffic Flow SR-845 Traffic Signals 1 <1Connecticut $798,300 Traffic Flow RT-85 Computerized Signal System 6 1Connecticut $280,000 Traffic Flow RT-66 Computerized Signal System 3 <1Connecticut $553,200 Traffic Flow RT-75 Computerized Signal System 4 1Connecticut $50,000 Traffic Flow Study Dev. Priority Segment List Not SubmittedConnecticut $950,000 Traffic Flow Hart Signal System 85 -9Connecticut $5,300,000 Shared Ride Van Pool Purchase <1 <1Connecticut $2,000,000 Transit Stamford Parking Garage 4 8Connecticut $400,000 Transit Elec. Trans. Message Boards Not SubmittedConnecticut $375,000 Transit Global Positioning System (GPS) Not SubmittedConnecticut $735,000 Transit Add. Bus Shelters and Signs Not SubmittedConnecticut $1,537,532 N/A Various Projects Previously Obligated Requiring Additional CMAQ Funding in FY96Not Submitted

Delaware 04/10/97 $4,201,896 $3,727,256 88.7%Delaware $65,000 Traffic Flow City of Newark Signals <1 <1Delaware $3,662,256 Traffic Flow City of Wilmington Signals N/A N/A

District of Columbia 07/23/97 $4,201,896 $546,905 13.0%District of Columbia $135,608 Ped/Bike Suitland Parkway Bike Trail 2 1District of Columbia $62,950 Demand Mgmt Employer Outreach for Guaranteed Ride Home Program 25 65District of Columbia $133,333 Demand Mgmt Commuter Operations Center 1 4District of Columbia $57,514 Demand Mgmt Telecommute Project 9 60District of Columbia $157,500 Shared Ride Integrated Ridesharing 27 51

Florida 01/10/97 $25,095,697 $16,930,222 67.5%Florida $300,763 Traffic Flow Addition of EB and WB Dual Turn Lanes and Intersection Reconstruction at Oakland Park 1 14 2Florida $327,720 Transit Replace Vehicles with 10 New Alt. Fuel Powered Vehicles in Broward County Motor Pool 2 2 0Florida $291,000 Transit Express Bus Service at Overland Park Boulevard for Commuters to Ft. Lauderdale 3 26 2Florida $286,755 Transit Purchase 6 MiniBuses to Provide New Service for Potential Bus Riders 1 10 0Florida $102,412 Transit Provide New Shuttle Bus Service at South Florida Educational Center in Ft. Lauderdale 5 40 3Florida $137,642 Transit Hollywood Shuttle Circulator Service to Provide New Shuttle Service in City of Hollywood 2 3 2Florida $81,930 Transit Provide Bus Shelters in Oakland Park Boulevard Corridor N/A N/A N/AFlorida $942,195 Transit New Express Bus Service to Connect Suburbs to Downtown Ft. Lauderdale 7 54 7Florida $1,662,478 Traffic Flow Coordinate Signals at 91 Intersections as Part of Broward County Signal System (Group 6) 2 12 1Florida $122,895 Demand Mgmt Funding of Downtown Ft. Lauderdale TMA for Programs to Reduce SOV Use in Downtown47 362 34Florida $975,867 Traffic Flow Coordinate Signals at 22 Intersections as Part of Belle Glade Signal System 0 3 0Florida $12,259 Traffic Flow Coordinate Traffic Signal Operation at 85 Intersections to Reduce Vehicle Delay 1 10 1^ 5

Page 6: CMAQ REPORTS (FY 1996)

5/20/98 CMAQ REPORTS (FY 1996)REPORT $ AMOUNT $ AMOUNT OBLIG. $ PROJECT PROJECT PROJECT VOC** CO** NOX** PM-10**

STATE SUBMIT. APPORTION. OBLIGATED % AMOUNT TYPE DESCRIPTION (KG/DAY) (KG/DAY) (KG/DAY) (KG/DAY)

Florida $2,173,245 Traffic Flow Coordinate Signal Operations at 69 Intersections in Palm Beach 1 10 1Florida $3,653,750 Transit Extension and New Terminal Station for 21-Mile Long Miami MetroRail System 26 219 40Florida $409,650 Shared Ride Purchase/Lease 30 Vans for Miami Area Shared Ride Program in Dade County 9 71 9Florida $9,409 Transit Preliminary Engineering for Miami Intermodal Center at Miami International Airport 62 1315 124Florida $5,440,152 Transit Purchase 25 Buses to Replace Older Buses for Pinellas Suncoast Transit 64 551 66

Georgia 08/15/97 $12,996,860 $10,508,430 80.9%Georgia $327,600 Traffic Flow Non-Freeway Surveillance System in DeKalb County 735 -163Georgia $442,915 Traffic Flow Non-Freeway Surveillance System in Clayton County See AboveGeorgia $45,738 Traffic Flow Non-Freeway Surveillance System in Atlanta, GA See AboveGeorgia $204,865 Traffic Flow Incident Management-Hwy Referencing System in Fulton County See AboveGeorgia $136,000 Traffic Flow Incident Mgmt and Radio Purchase in Fulton County See AboveGeorgia $318,891 Traffic Flow Non-Freeway Surveillance System @ N'Side in Fulton County Not SubmittedGeorgia $320,166 Traffic Flow Non-Freeway Surveillance System in Atlanta (Fulton County) Not SubmittedGeorgia $276,958 Traffic Flow Non-Freeway Surveillance System in Gwinnett County Not SubmittedGeorgia $33,648 Traffic Flow Atlanta CBD- Communication Cable in Fulton Not SubmittedGeorgia $561,382 Traffic Flow Outlying Arterial Communication Cable in Fulton Not SubmittedGeorgia $27,200 Traffic Flow Express Lane Baseline Performance Monitoring <1 <1Georgia $440,000 Traffic Flow Traffic Signal System Optimization in Gwinnett 1116 -136Georgia $144,800 Traffic Flow System Optimization @ Mt. Vernon in DeKalb County See AboveGeorgia $164,250 Traffic Flow System Optimization @ Wesley Chapel, I-20 (DeKalb County) See AboveGeorgia $540,792 Ped/Bike MLK Drive from Vine City Marta Station to W. Lake in Fulton County 7 5Georgia $100,000 Ped/Bike Eastside Trolley Bicycle-Pedestrian Way <1 <1Georgia $44,000 Ped/Bike Bicycle Rack Task Force/Atlanta <1 <1Georgia $10,400 Ped/Bike Bicycle/Ped Effective Cycling Course in Fulton <1 <1Georgia $248,192 Ped/Bike Sidewalks at Various Streets in College Park in Fulton 2 2Georgia $819,671 Transit MARTA Service Expansion 82 109Georgia $80,000 Transit MARTA Operation Enhancement in Candler Road See AboveGeorgia $725,553 Transit MARTA Service Expansion in S. DeKalb Corr. See AboveGeorgia $217,597 Transit MARTA Express Bus Route for 1996 54 73Georgia $400,000 Transit MARTA ITS Program in Fulton County Not SubmittedGeorgia $610,400 Transit Alternative Fuels Revolving Loan Program in Fulton County 8 12Georgia $161,256 Traffic Flow Non-Freeway Surveillance System in Gwinnett County Not SubmittedGeorgia $40,000 Traffic Flow Incident Mgmt Public Info. Campaign in Fulton County Not SubmittedGeorgia $1,000,000 Traffic Flow Traffic Signals in Atlanta Area (Fulton County) Not SubmittedGeorgia ($86,879) Traffic Flow SR -280/S. Cobb Drive Signal System (Cobb County) Not SubmittedGeorgia $18,666 Traffic Flow SR-155/Candler Rd from Columbia to SR 260 Not SubmittedGeorgia $302,401 Traffic Flow Traffic Signal Optimization in Clayton County Not SubmittedGeorgia $186,742 Traffic Flow System Optimization at Briarcliff & N. Druid in DeKalb County Not SubmittedGeorgia $1,499,385 Traffic Flow Northside Dr. Corridor in Fulton County Not SubmittedGeorgia $172,303 Traffic Flow System Optimization @ Panola Road, I-20 in DeKalb County Not SubmittedGeorgia ($26,462) Traffic Flow SR-16/US 27 Alt @ SR34 Parkway Not Submitted

Hawaii* 01/30/97 $4,201,896 $5,972,385 142.1%Hawaii* $2,652,385 STP/CMAQ Traffic Control Signalization at Various Locations (PE and CONSTR)Hawaii* $3,320,000 STP/CMAQ Computerized Traffic Control System, Phase IV (PE and CONSTR)

Idaho 02/26/97 $4,201,896 $1,594,019 37.9%Idaho $504,000 Transit Bus Purchase-Reduce Traffic Congestion and Need for Parking Within High Traffic Areas 65 2Idaho $240,000 Transit Bus Purchase- Reduce Traffic Congestion and Need for Parking in High Traffic Areas 33 1Idaho $4,840 Transit Bus Mounted Bike Racks to Encourage Cyclists to Use Buses Instead of Motor Vehicles 4Idaho $101,969 Ped/Bike Paving at English Point Road to Encourage Pedestrian and Bicycle Use & Reduce PM-10 463Idaho $300,010 Traffic Flow Installing Interconnect Conduit, Cable, and Radio Communication to Improve Congestion 518Idaho $259,200 Ped/Bike New Pathway to Link Segments of North Bank of Boise River Not SubmittedIdaho $96,000 Other Reduce PM-10 in Bannock and Power Counties by Reducing Anti-Skid and Washing Roads 1561Idaho $88,000 Other Reduce PM-10 in Bannock County by Washing Unwanted Material off Paved Roads 158

^ 6

Page 7: CMAQ REPORTS (FY 1996)

5/20/98 CMAQ REPORTS (FY 1996)REPORT $ AMOUNT $ AMOUNT OBLIG. $ PROJECT PROJECT PROJECT VOC** CO** NOX** PM-10**

STATE SUBMIT. APPORTION. OBLIGATED % AMOUNT TYPE DESCRIPTION (KG/DAY) (KG/DAY) (KG/DAY) (KG/DAY)

Illinois 02/25/97 $41,125,430 $41,727,470 101.5%Illinois $80,000 Ped/Bike Downtown Pedestrian Signage Program 7Illinois $276,000 Traffic Flow Signal Interconnect-LSD/Monroe to Balbo 15Illinois $688,838 Traffic Flow Signal Interconnect-IL 59/Ingalton to IL56 31Illinois $200,000 Traffic Flow Signal Interconnect-IL 56/Bradford to IL 53 8Illinois $203,835 Traffic Flow Signal Interconnect-IL 19/Westview to Bartlett 5Illinois $224,704 Traffic Flow Signal Interconnect- Barrington Rd. 6Illinois $375,000 Traffic Flow Signal Interconnect- IL58/Wilke Rd to Busse 7Illinois $341,623 Traffic Flow Signal Interconnect-U.S. 45/Arbor to Washington 4Illinois $825,190 Traffic Flow Signal Interconnect-Chicago Av/LSD to Chicago River 7Illinois $1,600,000 Transit State Street Subway Platform Renov. 33Illinois $960,000 Transit Clark/Division (Red Line) Station Renov. 4Illinois $5,341,600 Transit Southwest Service Improvements (Metra) 3Illinois $6,183,200 Transit Grand/State Station Reconstruction 17Illinois $1,000,000 Shared Ride Fast Plus- Bus Service Expansion 22Illinois $500,000 Shared Ride Vanpool (PACE) Expansion 33Illinois $1,590,700 Transit Express Bus (Tollways) Not SubmittedIllinois $500,000 Transit Green Line Marketing Program 562Illinois $2,800,000 Transit Fuel Cell Bus Development 10Illinois $15,000,000 Other Enhanced I/M (Chicago) 38186Illinois $1,000,000 Other Enhanced I/M (St. Louis) 5132Illinois $722,880 Shared Ride Regional Rideshare (St. Louis) 94Illinois $915,200 Transit Madison Co. Metro Link Express Shuttle 2Illinois $110,700 Transit Metro East Transit Commuter GRH Program 1Illinois $40,000 Traffic Flow Traffic Signal Timing Progression at IL 159 (Edwardsville/Glen Carbon) 2Illinois $40,000 Traffic Flow Signal Timing- IL 203-Granite City 2Illinois $32,000 Traffic Flow Signal Timing- IL 157 (Collinsville) 2Illinois $32,000 Traffic Flow Signal Timing- IL 162 & IL 203 (Granite City) <1Illinois $24,000 Traffic Flow Signal Timing- IL 157 & IL 159 (Edwardsville) 1Illinois $24,000 Traffic Flow Signal Timing- IL 203 (Granite City) 1Illinois $40,000 Traffic Flow Signal Timing- IL 3 (Cahokia & Sauget) 2Illinois $32,000 Traffic Flow Signal Timing- W. Hwy 50 (O'Fallon) 3Illinois $24,000 Traffic Flow Signal Timing- IL 3 (Columbia) 1

Indiana 02/04/97 $9,457,829 $10,620,126 112.3%Indiana $1,600,000 Other Inspection and Maintenance (Clark County) 717 1995 1250Indiana $160,896 Ped/Bike 8th Street, Pearl, 5th Street From College to Clinton (Elkhart County) 1 8 1Indiana $1,600,000 Other Inspection and Maintenance (Floyd County) 717 1995 1250Indiana $182,528 Transit Operating Assistance (Lake County) 60 247 16Indiana $182,528 Transit Operating Assistance- 2nd Year (Lake County) 16 108 26Indiana $60,000 Transit Operating Assistance- 2nd Year (Lake County) <1 1 <1Indiana $229,836 Transit CNG Streetcar (Lake County) 1 5 1Indiana $1,440,000 Transit Six Diesel Buses (Lake County) 3 32 16Indiana $239,568 Transit Operating Assistance- 1st Year (Lake County) 15 95 19Indiana $46,400 Transit One CNG Fueled Vehicle (Lake County) 1 15 1Indiana $87,808 Transit Operating Assistance-1st Year (Lake County) 4 29 7Indiana $87,808 Transit Operating Assistance-1st Year (Lake County) 5 34 9Indiana $853,232 Transit New/Restructured Transit Service (Clark/Floyd County) 53 N/A N/AIndiana $114,522 Transit Free fare program on Ozone Alert Days (Lake County) 6 24 2Indiana $1,800,000 Other Inspection and Maintenance (Lake County) 12420 48982 3695Indiana $1,800,000 Other Inspection and Maintenance (Porter County) 12420 48982 3695Indiana $135,000 Other Ozone Prevention and Awareness (Clark/Floyd County) 66 421 83

Iowa* 05/20/97 $4,201,896 $9,367,208 222.9% $9,367,208 STP/CMAQ Grading, Rdwy Improvements, PCC Paving, Intermodal Facility, Traffic Signals, Alt Fuel Conv.N/A N/A N/A

Kansas* 05/20/97 $4,201,896 $3,756,516 89.4%Kansas* $966,000 STP/CMAQ US-169/7th Street & Southwest Blvd Intersection N/A N/A N/A^ 7

Page 8: CMAQ REPORTS (FY 1996)

5/20/98 CMAQ REPORTS (FY 1996)REPORT $ AMOUNT $ AMOUNT OBLIG. $ PROJECT PROJECT PROJECT VOC** CO** NOX** PM-10**

STATE SUBMIT. APPORTION. OBLIGATED % AMOUNT TYPE DESCRIPTION (KG/DAY) (KG/DAY) (KG/DAY) (KG/DAY)

Kansas* $261,588 STP/CMAQ 67th and Nall Intersection N/A N/A N/AKansas* $880,000 STP/CMAQ Noland Rd. @ 95th & Santa Fe N/A N/A N/AKansas* $80,000 STP/CMAQ Harold & Northgate Intersection N/A N/A N/AKansas* $66,824 STP/CMAQ K-7 & Loula Intersection N/A N/A N/AKansas* $70,504 STP/CMAQ Kansas & Loula Intersection N/A N/A N/AKansas* $78,988 STP/CMAQ Kansas Ave & Santa Fe N/A N/A N/AKansas* $55,528 STP/CMAQ 87th & I-435 Interchange N/A N/A N/AKansas* $438,480 STP/CMAQ Seneca & McCormick N/A N/A N/AKansas* $552,644 STP/CMAQ CBD Signalization N/A N/A N/AKansas* $305,960 STP/CMAQ Motorist Assist Program N/A N/A N/A

Kentucky 02/11/97 $6,171,876 $7,196,045 116.6%Kentucky $588,720 Traffic Flow Upgrade of Traffic Signal System- Downtown Newport 33 10Kentucky $430,039 Traffic Flow Left Turn Lane on Dixie Highway at Sleepy Hollow Road 6 61 1Kentucky $1,002,177 Traffic Flow Upgrade of Traffic Signal System- Downtown Covington 77 23Kentucky $200,808 Traffic Flow Interstate Traffic Management Program 36 279Kentucky $123,608 Traffic Flow Interstate Traffic Management Program- Add Service Patrol Vehicle Not SubmittedKentucky $9,862 Traffic Flow Left Turn Lane on KY 18 at Limaberg Road 5 47 1Kentucky ($20,504) N/A CMAQ Project Closeouts (Cost Adjustments) N/A N/A N/AKentucky ($5,987) N/A CMAQ Project Closeouts (Cost Adjustments) N/A N/A N/AKentucky $3,480,000 Traffic Flow City Wide Traffic Control for Downtown Louisville 138Kentucky $763,830 Traffic Flow Right Turn Lane on KY 907 at US 31W 3Kentucky $512,000 Traffic Flow Interstate Traffic Management Program (ITMP) 38 274Kentucky $58,616 Traffic Flow IVHS Early Deployment (now part of ITMP) Not SubmittedKentucky $61,402 Traffic Flow Signal System on KY 61 from Gilmore to Eastern Parkway 11Kentucky ($8,526) N/A CMAQ Project Closeouts (Cost Adjustments) N/A N/A N/A

Louisiana 02/24/97 $4,201,896 $2,636,192 62.7%Louisiana $1,300,000 Transit East Baton Rouge Parish; Purchase transit vehicles and equipment 5 2 72Louisiana $444,304 Traffic Flow East Baton Rouge Parish; Monterrey Blvd. Improvements 7 52 1Louisiana $67,789 Traffic Flow East Baton Rouge Parish; Flannery Rd @ Florida Blvd. Intersection 2 19 <1Louisiana $59,091 Traffic Flow LA 19 @ Lavey Lane Intersection 3 20 <1Louisiana $765,008 Traffic Flow Motorist Assistance Patrol (I-10 & I-12) 11 88 3

Maine 01/31/97 $4,201,896 $1,868,042 44.5%Maine $244,000 Demand Mgmt Projects funded to staff and operate a TMA covering a N/A portion of Maine 261 436Maine $246,147 Other Auburn Intermodal Transfer Facility 7 77Maine $86,600 Other GPCOG Educational Outreach Program 1 2Maine $150,000 Other GPCOG, Public Education Project 523 873Maine $90 Ped/Bike Lewiston, Central Avenue Campus Bicycle Loop <1 <1Maine $12,000 Ped/Bike Bar Harbor Bicycle Enhancement Project 30 32Maine $55,200 Ped/Bike Augusta to Gardiner Bicycle/Pedestrian Path 3 5Maine $87,232 Ped/Bike Brunswick Bicycle Pedestrian Facility 16 28Maine $14,360 Ped/Bike Auburn Bicycle/Pedestrian Facility 1 1Maine $4,000 Shared Ride Boothbay Park & Ride 1 1Maine $9,473 Shared Ride Portland Park & Ride 1 3Maine $102,610 Shared Ride GPCOG, 3rd and 4th Year Rideshare 45 95Maine $67 Traffic Flow Portland-Morrill's Signal Study Not SubmittedMaine $21,230 Traffic Flow Camden Signalized Intersection Improvements <1 <1Maine $94,329 Traffic Flow Ellsworth Signalized Intersection Improvements 20 8Maine $11,239 Traffic Flow Portland Signalized Intersection Improvements 3 2Maine $6,503 Traffic Flow Augusta Signalized Intersection Improvements <1 <1Maine $12,391 Traffic Flow Augusta-Hospital Street Signal Project 2 1Maine $5,700 Traffic Flow Gardiner/Randolph Signal Improvements 3 1Maine $15,895 Traffic Flow Bath Signalized Intersection Improvements 1 1Maine $12,298 Traffic Flow Gray Signal Project 3 1Maine $12,042 Traffic Flow Portland Signalized Intersection Improvements 3 1^ 8

Page 9: CMAQ REPORTS (FY 1996)

5/20/98 CMAQ REPORTS (FY 1996)REPORT $ AMOUNT $ AMOUNT OBLIG. $ PROJECT PROJECT PROJECT VOC** CO** NOX** PM-10**

STATE SUBMIT. APPORTION. OBLIGATED % AMOUNT TYPE DESCRIPTION (KG/DAY) (KG/DAY) (KG/DAY) (KG/DAY)

Maine $23,281 Traffic Flow So. Portland Signalized Intersection Improvements 15 8Maine $7,225 Traffic Flow Scarborough Signalized Intersection Improvements 9 4Maine $7,225 Traffic Flow Scarborough Signalized Intersection Improvements 8 4Maine $1,846 Traffic Flow Lewiston-Main Street Signalized Intersection Improvements 1 1Maine $111,589 Experimental Traffic Calming Phase I (Experimental) 1 6Maine $12,042 Experimental Traffic Calming Phase II (Implementation) Not SubmittedMaine $60,210 Traffic Flow Portland-Veterans Bridge, Tunnel Feasibility Study <1 1Maine $99,040 Transit Lisbon Commuter Bus Service 1 2Maine $305,376 Transit Portland to Bath Subscription Bus Service 6 14Maine $36,800 Transit Shuttle Bus Enhancement 6 17

Maryland 03/12/97 $26,054,950 $21,160,000 81.2%Maryland $8,526,000 Transit Light Rail Vehicles (18 Vehicles) for MTA 2 25 6Maryland $7,695,000 Transit WMATA Bus Replacement (30 Vehicles) 17 N/A 60Maryland $194,000 Shared Ride Park N Ride Lots at MD 80 @ I-270 1 6 2Maryland $4,443,000 Traffic Flow Incident Mgmt (CCTVs, CHART System, Variable Message Signs, etc.) Not SubmittedMaryland $302,000 Traffic Flow HOV Lanes at US50 at West of Lottsford Vista Road to East of MD 3/US301 Not Submitted

Massachusetts 02/13/97 $34,565,772 $19,439,676 56.2%Massachusetts $142,371 Transit Lexington Shuttle 17 169 25Massachusetts $146,636 Transit Newton Shuttle 3 3 <1Massachusetts $81,250 Transit Westwood Shuttle Not SubmittedMassachusetts $170,000 Transit East Boston Shuttle <1 4 1Massachusetts $245,058 Transit Somerville Shuttle 1 <1Massachusetts $108,750 Transit Cambridge Shuttle 6 62 8Massachusetts $96,100 Shared Ride Sharon Park & Ride 40Massachusetts $6,750,000 Transit Old Colony Rail Service Restoration 3786 337Massachusetts $3,756,000 Shared Ride MBTA Park-and-Ride Program 105 1056 154Massachusetts $84,300 Transit Wareham Shuttle 1 1Massachusetts $2,500,000 Transit Bus Purchase (10 New Buses) <1 1Massachusetts $50,000 Transit Nantucket Shuttle 3 4Massachusetts $25,579 Transit MVRTA Bus (Purchase Electric Bus) <1 0Massachusetts $53,000 Transit Chatham Shuttle <1 <1Massachusetts $200,000 Transit Orleans Shuttle 1 1Massachusetts $142,500 Transit Express Bus (P. Valley) 4 45 5Massachusetts $202,500 Transit Worchester Shuttle 4 6 1Massachusetts $860,000 Transit Bus Purchase <1 1Massachusetts $1,000,000 Transit Gallagher Terminal 16 31Massachusetts $425,000 Transit Bus Replacement <1 4Massachusetts $249,923 Transit Commuter Check (Transit Voucher Program) Not SubmittedMassachusetts $950,000 Traffic Flow Southeast Freeway (Continue HOV Operation) 466 4309 2020Massachusetts $1,200,709 Traffic Flow Millbury/Rte 20 Massassoit Road Traffic Improvements 27 1 1

Michigan 02/28/97 $24,418,097 $10,599,884 43.4%Michigan $68,000 Traffic Flow Turn Lane and Traffic Signals at Prairie Street 1 <1Michigan $70,400 Traffic Flow Improve Turn Lane at Airport <1 <1Michigan $55,000 Traffic Flow Traffic Signal Upgrade at Baker Intersection 1 1Michigan $51,270 Traffic Flow Traffic Signal Upgrade at Glenside Intersection 2 <1Michigan $232,000 Traffic Flow Reconstruction at Laketon to Hackley <1 <1Michigan $797,090 Traffic Flow Traffic Signals at 9 Mile Road to Lone Pine (13 Locations) 68 9Michigan $249,000 Traffic Flow Improve Traffic Signals at Pontiac 24 -3Michigan $4,000 Traffic Flow Widen Turn Lane at 4 Locations in City of Detroit Not SubmittedMichigan $146,000 Traffic Flow Improve Traffic Signals at 5 Locations at Evergreen Road to Fairbank 11 -2Michigan $179,800 Traffic Flow Various Locations in Royal Oak (Signal Improvements) 9 -3Michigan $176,000 Traffic Flow Turn Lane at Big Beaver Intersection 8 N/AMichigan $312,800 Traffic Flow Traffic Signals at Pine Avenue to 8th Street in Fairbank 2 <1Michigan $50,000 Traffic Flow Traffic Signals (Phase II) at Main Intersection, Holand to Zeeland N/A N/A^ 9

Page 10: CMAQ REPORTS (FY 1996)

5/20/98 CMAQ REPORTS (FY 1996)REPORT $ AMOUNT $ AMOUNT OBLIG. $ PROJECT PROJECT PROJECT VOC** CO** NOX** PM-10**

STATE SUBMIT. APPORTION. OBLIGATED % AMOUNT TYPE DESCRIPTION (KG/DAY) (KG/DAY) (KG/DAY) (KG/DAY)

Michigan $157,000 Traffic Flow Widen Turn Lane at Dexter to Pinckney 1 -1Michigan $1,978,724 Traffic Flow Traffic Signals at Fernwood to 1st Street in Detroit 11 N/AMichigan $368,000 Traffic Flow Traffic Signals at Various Locations in Detroit 11 -5Michigan $60,000 Transit Purchase 11 Buses at Kent County- Grand Rapids Transit 17 14Michigan $120,000 Transit Purchase Vehicles for Muskegon Area Transit System 163 21Michigan $72,800 Transit Purchase Vehicle and Equipment for Harbor Transit System 5 3Michigan $2,000,000 Transit New Services at Wayne County-SMART 77 77Michigan $120,000 Other Ozone Action Program in Grand Rapids Metro. Area Not SubmittedMichigan $20,000 Other Ozone Action Program in Muskegon Metro. Area Not SubmittedMichigan $300,000 Other Ozone Action Program in SEMCOG Area Not SubmittedMichigan $2,167,000 Traffic Flow Design and Build ATMS/ATIS Components Not SubmittedMichigan $60,000 Shared Ride Rideshare Program in Muskegon (MSRDC) for FY96-FY98 1 1Michigan $175,000 Shared Ride Rideshare Program in Detroit (SMART-SEMCOG) 115 116Michigan $610,000 Ped/Bike Bike/pedestrian Facility in Holland/Zeeland 3 3

Minnesota 01/29/97 $4,201,896 $2,165,600 51.5%Minnesota $552,800 Transit Priority Vehicle Control System for Transit- many locations 350Minnesota $476,800 Transit Priority Vehicle Control System for Transit- Lyndale/Cedar 289Minnesota $1,136,000 Demand Mgmt Travel Demand Management Program 20

Mississippi* 06/05/97 $4,201,896 $4,207,840 100.1%Mississippi* $450,000 STP/CMAQ I-55 Fm Hernando to Tennessee State Line (PE ) N/A N/A N/AMississippi* $363,600 STP/CMAQ US 82 East of Eupora to SR15/North (ROW & Constr.) N/A N/A N/AMississippi* $3,394,240 STP/CMAQ US98 Betw. Bellevue & Weathersby Rd (Gr, Dr, & Resurface) N/A N/A N/A

Missouri 05/20/97 $8,327,134 $19,799,847 237.8%Missouri $52,289 Ped/Bike Bicycle Transportation Program in City of St. Louis 1Missouri $687,400 Demand Mgmt Downtown and Clayton TMA 1Missouri $328,838 Demand Mgmt Telebusiness Center <1Missouri $16,450 Shared Ride Park N Ride Facility in Jefferson at 67 & 110 <1Missouri $15,750 Shared Ride Park N Ride Facility at US 61/I-55 <1Missouri $42,650 Shared Ride Park N Ride Facility at Gravois <1Missouri $221,909 Shared Ride Park N Ride Facility at Eureka 1Missouri $5,941,760 Transit Hanley Station Garage Facility 4Missouri $17,000 Traffic Flow Mid Rivers Mall Drive Signals at I-70 Interchange <1Missouri $337,486 Traffic Flow I-70 Cave Springs, Zumbehl, and Fairgrounds 1Missouri $265,475 Traffic Flow Jefferson Street, MO at 100, 14th, 8th, and 5th <1Missouri $20,000 Traffic Flow Cave Springs/I-70 Interchange 1Missouri $5,500 Traffic Flow Mid Rivers Mall Drive Signals- Grand Teton <1Missouri $8,000 Traffic Flow Mexico Road- Church to Spencer <1Missouri $8,000 Traffic Flow Jungerman Road- Mexico to Willott <1Missouri $4,000 Traffic Flow Wentzville Parkway Signal <1Missouri $66,875 Traffic Flow Elm Point Road- Elm Point to Elm <1Missouri $185,900 Traffic Flow Traffic Signal Upgrades 3Missouri $861,495 Traffic Flow Big Bend and Meramec CC <1Missouri $184,807 Traffic Flow Traffic Signal Interconnects 6Missouri $465,370 Traffic Flow MO 340 Olive Blvd at MO 141 to US 67 <1Missouri $3,103,500 Traffic Flow Incident Mgmt Program 6Missouri $781,150 Traffic Flow MO 100 (Manchester) w/o I-270 Ballas 2Missouri $1,999,480 Traffic Flow I-70 EB Ramps- EB I-70 to SB I-270 1Missouri $11,450 Traffic Flow Woodson Road- SB onto WB Midland <1Missouri $426,150 Traffic Flow US-67 (Lindbergh) N/O I-270 to Flower Valley 1Missouri $17,355 Traffic Flow South Elm Avenue- Glendale <1Missouri $165,000 Traffic Flow Mason Road & Ladue Road Intersection <1Missouri $103,493 Traffic Flow Skinker-McCausland Signals 3Missouri $31,447 Traffic Flow Broadway at 7th Signals 5Missouri $273,231 Traffic Flow Gravois Avenue Signal Computerization 4^ 10

Page 11: CMAQ REPORTS (FY 1996)

5/20/98 CMAQ REPORTS (FY 1996)REPORT $ AMOUNT $ AMOUNT OBLIG. $ PROJECT PROJECT PROJECT VOC** CO** NOX** PM-10**

STATE SUBMIT. APPORTION. OBLIGATED % AMOUNT TYPE DESCRIPTION (KG/DAY) (KG/DAY) (KG/DAY) (KG/DAY)

Missouri $820,110 Traffic Flow Central Corridor Signals- Synchronization 3Missouri $521,505 Traffic Flow Traffic Signal Controller- City Wide 10Missouri $35,368 Traffic Flow Four Way Stop Sign Reduction- Ed. <1Missouri $6,440 Traffic Flow Signals at 11th, 9th at Salisbury 2Missouri $491,465 Other Technician Emission Training 32Missouri $1,275,749 Other Ozone Action Program 4

Montana 03/19/97 $4,201,896 $4,331,508 103.1%Montana $315,760 Traffic Flow Study for intersection improvements to reduce congestion and improve air quality. 89 6Montana $2,215,317 Traffic Flow Areawide Traffic Signal Improvements at 50 Locations 30Montana $265,638 Other Paving Streets and Alleys in City of Missoula to Reduce PM-10 Emissions N/A 294Montana $62,015 Other Paving Streets and Alleys in Missoula to Reduce PM-10 Emissions N/A 434Montana $1,469,504 Transit Purchase and Replace 8 Buses Not SubmittedMontana $3,274 Ped/Bike Landscaping Project w/Bike Path Installation 77 149

Nebraska* 07/25/97 $4,201,896 $912,999 21.7%Nebraska* $13,000 STP/CMAQ West 39th Street Trail (Ped/Bike Trail)- South Sioux City N/A N/A N/ANebraska* $728,267 STP/CMAQ Blondo Street, 103rd-114th in Omaha, NE N/A N/A N/ANebraska* $222,258 STP/CMAQ Murdock Trail- Lincoln, NE N/A N/A N/ANebraska* ($50,526) STP/CMAQ Project De-Obligations for 2 FY95 CMAQ Funded Projects (Nos. 21634 and 12147) N/A N/A N/A

Nevada 02/26/97 $4,201,896 $4,754,892 113.2%Nevada $224,892 Traffic Flow Signal Improvements at Kietze Ln at Galletti Way 1 7Nevada $4,530,000 Transit Purchase Vehicles for Citifare/Citilift Program 13 70 21 7

New Hampshire 05/01/97 $4,201,896 $5,065,261 120.5%New Hampshire $28,800 Traffic Flow North State Street, Upgrade and coordinate signals from Pleasant to Centra Street Not SubmittedNew Hampshire $42,365 Traffic Flow Optimize signals from Everett Turnpike to NH 122, install new controller to improve flowNot SubmittedNew Hampshire $34,400 Traffic Flow Intersection Improvements along Mast Rd@Rockland Rd &College Rd. Add Cntr Trn LaneNot SubmittedNew Hampshire $468,229 Traffic Flow Optimize Signals on NH 101 A, FEE Turnpike on NH 127, Install New Controller to Impr Flow27 3 -5New Hampshire ($9,600) Traffic Flow Signalize, Channelization and Safety Signage Not SubmittedNew Hampshire $263,940 Traffic Flow Signalize, Channelization, and Safety Signage for US 4, Portland Street Int. with Oak 19 3New Hampshire ($65,655) Traffic Flow Upgrading of Signal Systems at 8 Locations 8 64 <1New Hampshire ($43,974) Traffic Flow Connect to NHDOT's Traffic Control System and Extend to 4 more Intersections 8 41 1New Hampshire ($40,000) Traffic Flow Implementation of Traffic Circulation Improvements with Taylor Falls Bridge (WITHDRAWN)Not Submitted New Hampshire $34,400 Transit Governor's Office- Fuel Stations for Alternate Fuel Vehicles Not SubmittedNew Hampshire $1,312,149 Shared Ride Construct Park N Ride Facility Between Stickney Ave and I-93 (SB) 22 49New Hampshire ($3,920) Shared Ride Park N Ride Facility at Rear of Dover Area on NH-4 (Portland Street)-WITHDRAWNNot SubmittedNew Hampshire $600,000 Shared Ride FEE Tpk, Construct Park N Ride in Area of Exit 3 Not SubmittedNew Hampshire $636,811 Shared Ride Construct Intermodal Facility Including 125 Parking Spaces at Westville Road 1 1New Hampshire ($12,392) Shared Ride Construct Park N Ride- 64 Spaces (WITHDRAWN) Not Submitted New Hampshire $167,129 Ped/Bike Construct and Maintain System of Multi-Use Pathways Connecting Business/Residential/Inc. <1 1 <1New Hampshire $1,027 Ped/Bike Construct Ped/Bike Bridge Across Lampsey River on Existing RR ROW <1 4 1New Hampshire $24,000 Ped/Bike Sidewalk System Improvements for Nashua School District. Enhance Ped/Bike Safety in AreaNot SubmittedNew Hampshire $180,000 Transit Replace Bus <1 2New Hampshire $959,200 Transit Develop 2 Intermodal Transfer Facilities @ Pease International Tradeport and Downtown 3 4New Hampshire ($49,140) Transit Expand Seacoast Trolley to Include Portsmouth-Pease Area Park N Ride (WITHDRAWN)Not SubmittedNew Hampshire $703,200 Transit Various Purchase Replacement Equipment to Continue Operation of Commuter Service 5 7New Hampshire $188,515 Transit New Intercity Bus Route to Serve Rochester Area 2 2New Hampshire ($394,060) Transit CM Rail (WITHDRAWN) Not Submitted New Hampshire $39,837 Transit Passenger Shuttle Service Every 2 Hours from Manchester to/from Seacoast <1 <1

New Jersey 01/02/97 $48,415,755 $66,566,000 137.5%New Jersey $12,500,000 Transit Construction of High Speed Ramp Between NE Corridor just S. of Newark and Raritan Vlly Qualitative AnalysisNew Jersey $5,630,000 Transit Experimental Services, Used to Comply with Federal Clean Air Act 91New Jersey $9,000,000 Transit Construction of New Rail Station on NE Corridor and Purchase of Equipment for Bus Facility4New Jersey $2,500,000 Demand Mgmt Funding Used for Clean Air Programs for TMAs to Support ETR Program 4 2120^ 11

Page 12: CMAQ REPORTS (FY 1996)

5/20/98 CMAQ REPORTS (FY 1996)REPORT $ AMOUNT $ AMOUNT OBLIG. $ PROJECT PROJECT PROJECT VOC** CO** NOX** PM-10**

STATE SUBMIT. APPORTION. OBLIGATED % AMOUNT TYPE DESCRIPTION (KG/DAY) (KG/DAY) (KG/DAY) (KG/DAY)

New Jersey $922,000 Traffic Flow Traffic Surveillance and Control Systems 5 1New Jersey $22,000 Traffic Flow Construction of a New Overpass Carrying Secaucus Road Over Route 1 & 9 6New Jersey $68,000 Traffic Flow Utility Reconnaissance for Replacement of 66 Existing Conventional Traffic Signals 32 6New Jersey $1,542,000 Traffic Flow Surveillance and Guide System; From I-287 to the George Washington Bridge 101 8New Jersey $19,520,000 Traffic Flow Traffic Surveillance and Control Systems Qualitative AnalysisNew Jersey $277,000 Traffic Flow Construction Change Order for Closed Loop System; From Route 21 to Smith Street 4 1New Jersey $812,000 Traffic Flow Installation of Closed Loop Traffic Control System at Various Intersections Qualitative AnalysisNew Jersey $1,000 Traffic Flow Operation of Service Patrol on Rts. 676, 76, 295, 42 &55F to Deal with Traffic Accidents 3 <1New Jersey $335,000 Traffic Flow Various Signal Intersections Qualitative AnalysisNew Jersey $25,000 Traffic Flow Utility PE for Surveillance and Guide System; From I-287 to the George Wash. Bridge 101 8New Jersey $91,000 Traffic Flow Traffic Signals; From the Garden State Parkway to Route 35 4 1New Jersey $95,000 Traffic Flow Traffic Signal Improvements at Various Locations 2 <1New Jersey $545,000 Traffic Flow Replacement of 66 Existing Conv. Traffic Signals with Computer Controlled Installations 32 6New Jersey $509,000 Traffic Flow HOV Lane Enforcement 147 222New Jersey $43,000 Demand Mgmt Transportation Management Association Qualitative AnalysisNew Jersey $184,000 Demand Mgmt Development of Comprehensive Transportation Management Strategies Qualitative AnalysisNew Jersey $986,000 Traffic Flow Staff & Equipment for Traffic Ops Center in South Jersey to Manage Traffic CongestionQualitative AnalysisNew Jersey $719,000 Traffic Flow Contract Modification to Initiate 6 Key Elements of a Statewide Incident Mgmt Plan Qualitative AnalysisNew Jersey $9,240,000 Demand Mgmt Travel Demand Management Qualitative AnalysisNew Jersey $500,000 Transit Development of an Alternative Fuels Program for Fleet Conversion and Purchase Vehicles 1 1New Jersey $500,000 Traffic Flow Corridor Collaborative Study from New Brunswick to Woodbridge Qualitative Analysis- Study of TDM Alternatives in Route 1 corridor.

New Mexico 02/04/97 $4,201,896 $4,151,000 98.8%New Mexico $1,100,000 Transit Westside Transit Refueling Station 231New Mexico $610,000 Transit Intermodal Facility Downtown 25New Mexico $42,000 Shared Ride Guaranteed Ride Home Program Qualitative AssessmentNew Mexico $350,000 Traffic Flow Signal System Interconnect- Design Not SubmittedNew Mexico $640,000 Traffic Flow Signal System Interconnect- Coors 156New Mexico $54,000 Ped/Bike On Street Bike Improvements 7New Mexico $150,000 Ped/Bike Coors South Improvements 11New Mexico $230,000 Ped/Bike Bicycle/Pedestrian Safety 120New Mexico $380,000 Transit Alternative Vehicle Fuels Program 33New Mexico $495,000 Traffic Flow Congestion Information Surveillance System Not SubmittedNew Mexico $100,000 Other Environmental Health Air Quality Strategy 13

New York 04/03/97 $88,341,933 $102,145,000 115.6%New York $508,000 Demand Mgmt Nassau/Suffolk TDM Unit 42 335 75New York $300,000 Demand Mgmt LIRIC Grant Program Nassau/Suffolk See AboveNew York $162,000 Demand Mgmt Westchester Co. Transportation Mgmt Organization 67 132New York $280,000 Demand Mgmt Regional TDM Program, Hudson Valley 13 113 18New York $40,000 Shared Ride Metro North Guaranteed Ride Home 1 7 2New York $230,000 Other Public Awareness Campaign 44 146 35New York $4,627,000 Traffic Flow Inform Upgrade, LIE HOV Lane Section Qualitative AssessmentNew York $1,501,000 Transit Electric Vehicle Municipal Demo Program 520 8 402New York $960,000 Traffic Flow IVHS Early Deployment Plan 6493 68392New York $99,000 Ped/Bike Suffolk Bike RT 110-NY 112 9 96New York $79,000 Ped/Bike Nott Street East Bikepath & Sidewalk <1 <1New York ($86,000) Ped/Bike Withdraw PIN, Nott Street E. Bike Transfer N/A N/A N/ANew York $154,000 Ped/Bike North Country Trailway Quatitative AssessmentNew York $163,000 Ped/Bike Putnam Div. ROW/Bikeway Construction 11New York $1,856,000 Ped/Bike North Country Trailway 5New York $275,000 Ped/Bike NYS Bike Ped Coordinator N/A N/A N/ANew York $1,324,000 Ped/Bike Shore Parkway Bikepath <1 4 1New York $3,400,000 Ped/Bike NYC East River Bikeway 1 5 1New York $3,400,000 Ped/Bike Pedestrian Network Development 5 65 5New York $3,000,000 Ped/Bike Bicycle Network Development Qualitative AssessmentNew York $2,400,000 Ped/Bike Des. E.River Esplanade Ped/Bike 1 5 1^ 12

Page 13: CMAQ REPORTS (FY 1996)

5/20/98 CMAQ REPORTS (FY 1996)REPORT $ AMOUNT $ AMOUNT OBLIG. $ PROJECT PROJECT PROJECT VOC** CO** NOX** PM-10**

STATE SUBMIT. APPORTION. OBLIGATED % AMOUNT TYPE DESCRIPTION (KG/DAY) (KG/DAY) (KG/DAY) (KG/DAY)

New York $40,000 Ped/Bike Putnam RR Greenway 312 3418 390New York $1,600,000 Ped/Bike Moshula-Pelham Greenway Extension 2242 2646 302New York $579,000 Ped/Bike Brooklyn Waterfront Trail 586 916 527New York $720,000 Ped/Bike Columbus Circle Pedestrian Improvements 3 37 2New York $1,400,000 Ped/Bike Lower Manhatten Pedestrian Project 3 31 2New York $500,000 Ped/Bike Staten Island RR Trail <1 2 <1New York $18,000 Shared Ride Brookhaven Park N Ride Lease 5 42 9New York $43,000 Shared Ride NY 106/107 Park N Ride Lease 3 20 4New York $350,000 Shared Ride Long Island Rideshare Program See AboveNew York $92,000 Shared Ride Park N Ride Lot Expansion, LIE HOV Lanes 19 150 33New York $80,000 Shared Ride NFTA Vanpool, Purchase Vans 1New York $88,000 Shared Ride NFTA Rideshare Program 15New York $36,000 Shared Ride NFTA Guaranteed Ride Home 30New York $38,000 Shared Ride Rte 138 Park N Ride Lot 5 35 14New York ($3,000) Traffic Flow NY 112/25 Int. Improvements 9 165New York $128,000 Traffic Flow NY 25A & Sound Ave. Intersection Improvements <1 4 1New York ($329,000) Traffic Flow Nassau NY24 TSM Front 4 90New York ($136,000) Traffic Flow Traffic Signal Computer Expansion 8 173New York $28,000 Traffic Flow Wellwood Ave Right Turn Lane Signals Qualitative AssessmentNew York $3,565,000 Traffic Flow Nassau Co. Traffic Signal Computer Expansion 33 507 -3New York $1,850,000 Traffic Flow Incident Mgmt- Long Island 38 295 54New York $1,285,000 Traffic Flow Buckley at Bear Road 4New York $43,000 Traffic Flow Oncenter Signs Onondaga County 12New York $2,827,000 Traffic Flow Syracuse Signal System Interconnect 205New York ($15,000) Traffic Flow RT 265/Lockport Rd. Intersection 5New York ($6,000) Traffic Flow RT 277, 240, 400 <1New York $494,000 Traffic Flow RT 277, William Street, Lossen Road 3New York ($376,000) Traffic Flow Thruway Incident Mgmt 36New York ($16,000) Traffic Flow Withdraw from CMAQ Funding, Using SDF N/A N/A N/ANew York $2,000 Traffic Flow Niagara Falls Signal Systems <1New York $134,000 Traffic Flow ITS Incident Mgmt, Freeway Surveillance 55New York $3,000 Traffic Flow Watertown Traffic Signals 3New York $1,954,000 Traffic Flow RT 9G@E. Market (CR-41) 2 8 1New York $943,000 Traffic Flow RT 133 @ Maple/Kisco 3New York $513,000 Traffic Flow RT 172 at Mclain Ave Intersection 1New York $53,000 Traffic Flow RT 304 @ Squadron Ridge <1 2New York ($35,000) Traffic Flow RT 202 at Brick Hill Road 1New York $7,000 Traffic Flow RT 35 at Mahopac Ave Intersection 3 6New York ($2,000) Traffic Flow Palmer/Archmont Signal <1 5 <1New York $44,000 Traffic Flow Clarkstown Traffic Signal Improvements 1New York ($112,000) Traffic Flow Aircraft Traffic Monitor, Withdrawn No Need. N/A N/A N/ANew York $6,160,000 Transit MTA LIRR High Level Platform 4 30 8New York $1,840,000 Transit MTA System-wide Station Upgrade Qualitative AssessmentNew York $771,000 Shared Ride Ronkonkoma Park N Ride Expansion Qualitative AssessmentNew York $1,040,000 Transit Nassau Co. Real Time Vehicle Info. System 93 860New York $123,000 Transit CNYRTA New Transit Service 9New York $602,000 Transit CNYRTA Outreach Activities 10New York $640,000 Transit CNYRTA Centro Downtown Info. Center 20New York $560,000 Transit Hublink, NFTA Transit Service Restructuring 32New York $2,480,000 Transit NFTA Restructured Crosstown Bus Service 13New York $186,000 Transit Westchester Parkway Lighting & Signals Qualitative AssessmentNew York $152,000 Transit Regional Transit Check Program 4 29 7New York $40,000 Transit Metro North Ferry Dock Contract to be terminatedNew York $346,000 Transit Pough-White Plains Express Bus 1 2New York $73,000 Transit West. Westchester Express Bus <1 1New York $600,000 Transit MTA, Pough-Parking/Intermodal Area 25 65New York $320,000 Transit Orange Co./Tapanzee Express Bus 1 1^ 13

Page 14: CMAQ REPORTS (FY 1996)

5/20/98 CMAQ REPORTS (FY 1996)REPORT $ AMOUNT $ AMOUNT OBLIG. $ PROJECT PROJECT PROJECT VOC** CO** NOX** PM-10**

STATE SUBMIT. APPORTION. OBLIGATED % AMOUNT TYPE DESCRIPTION (KG/DAY) (KG/DAY) (KG/DAY) (KG/DAY)

New York $1,436,000 Transit West. Co./Purchase 30 Paratransit Vehicles 492 937New York $200,000 Transit Newburgh to NYC Express Bus 19 42New York $100,000 Transit Stamford to White Plains Express Bus 5 37 10New York $800,000 Transit MTA-Secaucus Transfer 32New York $621,000 Transit Jamaica Transportation Center Qualitative AssessmentNew York $13,493,000 Transit Williamsburg Bridge Transit Signals Improvement 1 1New York $67,000 Transit NYC Buc Service Implementation 135 1101New York $1,280,000 Transit MTA, Rehab/Security Utica Ave. New Lots Line 1 1New York $2,310,000 Transit MTA, Rehab/Security Broadway, 8th Ave. Line 3 2New York $6,750,000 Transit MTA, Rail Control Center/Customer Info. 32 28New York $4,560,000 Transit MTA, New Signage 16 14New York $11,500,000 Transit MTA, Auto Train Supervision 46 45

North Carolina 06/24/97 $10,372,180 $33,341,929 321.5%North Carolina $1,057,528 Traffic Flow Computerized Signal System for High Point NC 121 N/A 42North Carolina $2,059,700 Transit High Speed Rail Corridor (Charlotte NC to Raleigh NC) Not SubmittedNorth Carolina $200,800 Traffic Flow Upgrade Downtown Signal System for Charlotte NC <1 7 1North Carolina $45,000 Traffic Flow I-40 Corridor IVHS Study; Guilford County NC Not SubmittedNorth Carolina $6,141,612 Traffic Flow NC 150 Widening from NC 279 to US 321 in Gaston County, NC 6 55 -8North Carolina $4,629,576 Traffic Flow Bryan Boulevard Extension from Airport to SR2179 2 46 -10North Carolina $52,000 Other Telephone Hotline Service for Automobile Mechanics Not SubmittedNorth Carolina $19,115,713 Traffic Flow US 29 Interchange with Charlotte Outer Loop 6 1 <1 1North Carolina $40,000 Traffic Flow Congestion Monitoring Cameras for Winston-Salem 8 39 N/A

North Dakota* 02/03/97 $4,201,896 $1,692,953 40.3%North Dakota* $1,600,000 STP/CMAQ Grade, Surf., and Incid. Work at 45th Street in Fargo (7th to 16th St. Ave NW) N/A N/ANorth Dakota* $84,976 STP/CMAQ Preliminary Engineering at 45th Street in Fargo (Main to 7th Ave NW) N/A N/ANorth Dakota* $4,994 STP/CMAQ RC Box Culvert at US 2, 3 Mi. West of Jct ND-18 N/A N/ANorth Dakota* $2,983 STP/CMAQ Grade, Aggr. Base & Incid. at US 85 from Watford City to Arnegard N/A N/A

Ohio 02/20/97 $36,876,143 $37,670,320 102.2%Ohio $555,000 Transit Akron METRO RTA Bus Conversion to CNG Not SubmittedOhio $471,210 Transit Akron METRO RTA- TDM for Cleveland and Akron Not SubmittedOhio $158 Transit MVRTA Bus Purchase (Dayton) Not SubmittedOhio $2,341,800 Transit MVRTA Bus Purchase (Dayton) 7 N/A N/AOhio $146,600 Transit MVRPC- Ozone Action Fare Subsidy (Dayton) 41 N/A N/AOhio $18,710 Shared Ride MORPC Rideshare, FY94 (Columbus) Not SubmittedOhio $1,373,000 Transit GCRTA Bus Purchase (Cleveland) 1 142 20Ohio $200,000 Demand Mgmt FRA-IR 270 TDM Program (Cleveland) Not SubmittedOhio $10,530,000 Transit STA- Intermodal Facility (Canton) Not SubmittedOhio $897,561 Transit HAM-71, TDM Bus Service (Cincinnati) 20 110 18Ohio $73,000 Shared Ride FRA- Vanpool Incentive Program (Columbus) 15 123 12Ohio $24,820 Shared Ride EDATA- Vanpool Incentive Program (Youngstown) 5 28 5Ohio $100,000 Shared Ride MORPC- FY 1997 Rideshare (Columbus) 17 142 13Ohio $50,693 Other OKI- Ozone Reduction Program (Cincinnati) Not SubmittedOhio $200,000 Other MVRPC- Ozone Action Program Extension (1996-Dayton) 98Ohio $131,140 Other NOACA- Regional Ozone Reduction Program (Cleveland) 241 1160 233Ohio $40,000 Other Clark County MPO- Regional Ozone Action Program (Springfield) 9Ohio $55,000 Traffic Flow CUY-6-15.55/Var. Locations- Improve Signalization in Cleveland Not SubmittedOhio $65,000 Traffic Flow CUY-91-11.65/Signalization Improvements in Cleveland Not SubmittedOhio $4,933,349 Traffic Flow HAM-RTMS Development/Testing (Cincinnati) Not SubmittedOhio $287,388 Traffic Flow HAM-RTMS Building (Freeway Mgmt- Cincinnati) Not SubmittedOhio $680,400 Traffic Flow CUY-6/20-5.34/2.54/Signalization Projects in Cleveland Not SubmittedOhio $120,000 Traffic Flow LAK-91/283/640/Signalization Projects in Cleveland Not SubmittedOhio ($141,849) Traffic Flow MOT-VMS Computer (Dayton) Not SubmittedOhio $110,590 Traffic Flow CUY-0-0.00/Signalization (Cleveland) Not SubmittedOhio $517,520 Traffic Flow LUC-51-.49/Signal Upgrade and Intersection Impr. (Toledo) 1 N/A N/A^ 14

Page 15: CMAQ REPORTS (FY 1996)

5/20/98 CMAQ REPORTS (FY 1996)REPORT $ AMOUNT $ AMOUNT OBLIG. $ PROJECT PROJECT PROJECT VOC** CO** NOX** PM-10**

STATE SUBMIT. APPORTION. OBLIGATED % AMOUNT TYPE DESCRIPTION (KG/DAY) (KG/DAY) (KG/DAY) (KG/DAY)

Ohio $531,090 Traffic Flow FAI-204-0.145 (R/W and Constr.) in Columbus 8 66 7Ohio $251,168 Traffic Flow LUC-South Main Street- Signal Upgrade and Intersection Imprv. (Toledo) <1 N/A N/AOhio $381,240 Traffic Flow TRU-422-12.59/Signal Upgrade in Youngstown 27 250 1Ohio $119,349 Traffic Flow LUC-Bancroft Street- Signalization and Intersection Upgrade (Toledo) <1 N/A N/AOhio $500,000 Traffic Flow LUC-Signal Computer Replacement (PE)- Toledo 50 320 273Ohio $1,248,000 Traffic Flow SUM-261-12.21 (R/W) Signal Interconnect and Turn Lanes (Akron) 2 17 <1Ohio $269,760 Traffic Flow SUM-91-15.240 (R/W) Signal Interconnect and Turn Lanes (Akron) 5 91 1Ohio $454,400 Traffic Flow SUM- State Rd. (R/W)- Signal Interconnect and Turn Lanes (Akron) 2 17 <1Ohio $868,793 Traffic Flow HAM-1-2.92 (RTMS Components)- Cincinnati Not SubmittedOhio $1,256,200 Traffic Flow FRA-Columbus Signals (Phase 8) 37 N/A 3Ohio $1,866,650 Traffic Flow SUM-Portage Trails Signal Interconnect (Akron) 7 54 <1Ohio $6,142,580 N/A Advanced Construction Obligations Converted to CMAQ Programs N/A N/A N/A

Oklahoma* 03/04/97 $4,201,896 $5,644,872Oklahoma* $347,600 STP/CMAQ ROW Purchase at SH 51A from 3 Mi. S of Southard N. to SH 51 in Southard N/A N/A N/AOklahoma* $126,560 STP/CMAQ Utility Relocation at SH 51A from 3 Mi. S of Southard N. to SH 51 in Southard N/A N/A N/AOklahoma* $3,746,902 STP/CMAQ Grade, Draining, Bridge, & Surfacing at SH 76 Fr. US 70 N. Thru Healdton (Widen & Resurf)N/A N/A N/AOklahoma* $483,715 STP/CMAQ PR-2 Agreement for Grade, Draining, Bridge, & Surfacing at SH 76 (See Above) N/A N/A N/AOklahoma* $71,367 STP/CMAQ Utility Relocation at US81 Beg. Approx. 5 Miles N. of Dover and Ext. N. to 7th Street N/A N/A N/AOklahoma* $350,000 STP/CMAQ Transit Programs- Air Quality Alert Demonstration Program/Alt Fuel Bus Replacement/RideshareN/A N/A N/AOklahoma* $50,000 STP/CMAQ Traffic Signals in Midwest City: SE 23rd at Post Road N/A N/A N/AOklahoma* $11,128 STP/CMAQ Grade, Drain, & Surface at SH 33/SH18 Fr. 3/4 Mi. W. of Cushing Urban Bndry N/A N/A N/AOklahoma* $57,600 STP/CMAQ ROW at US 54 from the 4-Lane Section in Guymon NE to Just N. of Optima N/A N/A N/AOklahoma* $206,080 STP/CMAQ ODOT Transfer of CMA Funds to FTA for Use in INCOG Area N/A N/A N/AOklahoma* $193,920 STP/CMAQ Tulsa Downtown Signal Coordination Project N/A N/A N/A

Oregon 06/04/97 $4,922,805 $4,816,111 97.8%Oregon $177,000 Ped/Bike Gresham Central Transit Oriented Development- Partial Funding for Sidewalks, Open Spaces<1 0 0 0Oregon $135,200 Ped/Bike Courtney Rd. Bike Lanes at River Road-Oatfield <1 2 0 0Oregon $152,381 Ped/Bike Hillsboro Ped Enhancements- Various Bike/Ped Enhancements <1 184 0 0Oregon ($134,429) Ped/Bike Central City Bike Shower Facilities- Provide 2 Attended Bike Parking and Shower Facilities <1 0 0 0Oregon $269,117 Ped/Bike Central City Bike Shower Facilities- Provide 2 Attended Bike Parking/Shower Facilities <1 13 0 0Oregon $348,800 Ped/Bike Steel Bridge Bike/Ped- Add Bike/Ped Lane to Steel Bridge <1 25 0 0Oregon $128,000 Ped/Bike Willametter River Bridge Improvement to Enhance Bike/Ped, Disabled Access- PE <1 13 3 0Oregon $11,200 Ped/Bike Eastside Bikeway at OMSI at Springwater- PE <1 0 0 0Oregon $89,730 Demand Mgmt Admin. Support for Developing Specific TOD Eligible Activities in Portland Area <1 0 0 0Oregon $695,000 Demand Mgmt FTA Transfer for TDM Activities in Portland <1 92 25 0Oregon $1,242,652 Transit Experimental Project- Partial Funding of Portland/Eugene Rail and Bus Service-Cascadia <1 119 -13 0Oregon $1,000,000 Transit Columbia Slough Rail Bridge in Portland- Partial Funding for ISTEA Demo Project <1 241 364 0Oregon $14,356 Shared Ride Sunset Hwy Park N Ride in Portland Area <1 4 1 0Oregon $358,669 Shared Ride Sunset Hwy Park N Ride in Portland Area <1 0 0 0Oregon $10,270 Shared Ride Or. City Park N Ride- Acquire and Develop 2 Parking Lots and Purchase Shuttle Bus <1 <1 <1 0Oregon $34,789 Shared Ride Or. City Park N Ride- Acquire and Develop 2 Parking Lots in Downtown Or. City- ROW <1 0 0 0Oregon ($15,123) Shared Ride Or. City Park N Ride- Acquire and Develop 2 Parking Lots in Downtown Or. City- Adjustmnt<1 0 0 0Oregon $200,499 Traffic Flow Gresham Traffic Signal Coordination- Develop and Install Integr. Traffic Signal and Op Sys. <1 0 0 0Oregon $98,000 Transit FTA Transfer for Bikes on Transit in Portland Nonattainment Area <1 5 1 0

Pennsylvania 02/11/97 $50,738,372 $25,913,100 51.1%Pennsylvania $104,800 Traffic Flow Upgrade Traffic Signals at 7 Intersections in City of Erie 9 83 -1Pennsylvania $800,000 Shared Ride Northwest Park N Ride (100-150 Spaces at Liberty Street at the Bayfront) <1 3 1Pennsylvania $873,840 Traffic Flow US 62 Traffic Signals- Realigning Intersection at SR 62 and Freeway/Sunset Streets <1 1 0Pennsylvania $370,700 Shared Ride Sugar Notch Park N Ride near the Sugar Notch/Ashley Interchange at SR 29 <1 1 <1Pennsylvania $445,380 Traffic Flow Updating 23 Existing Signals Along Penn Avenue at 9 Intersections on US 422 4 0 <1Pennsylvania $402,000 Transit Quick Fill CNG Fueling Stations for BARTA Buses in the City of Reading 2 19 2Pennsylvania $32,000 Traffic Flow PA 73 Intersection- Upgrading Intersections and Left Turn Lanes on PA 73 at PA 222 <1 4 0Pennsylvania $40,800 Traffic Flow Oxford Valley Closed Loop Signal System -9 Intersections with Signal Interconnections 2 14 0Pennsylvania $1,297,960 Shared Ride Bensalem Park N Ride Project - Construct 150 Space Lot Adjacent Cornwells Heights Station9 49 10^ 15

Page 16: CMAQ REPORTS (FY 1996)

5/20/98 CMAQ REPORTS (FY 1996)REPORT $ AMOUNT $ AMOUNT OBLIG. $ PROJECT PROJECT PROJECT VOC** CO** NOX** PM-10**

STATE SUBMIT. APPORTION. OBLIGATED % AMOUNT TYPE DESCRIPTION (KG/DAY) (KG/DAY) (KG/DAY) (KG/DAY)

Pennsylvania $139,180 Shared Ride Bensalem Fringe Parking- Construct Park N Ride Lot Connect to I-95, Woodhaven, rail sta. 3 17 6Pennsylvania $60,800 Shared Ride PA 113 and PA 100 Park N Ride- Construct 35 Space Lot at Intersection of PA 113 and PA 1000 <1 0Pennsylvania $280,000 Shared Ride Crest Avenue Park N Ride at the Intersection of Exton Bypass and Crest Avenue 1 2 2Pennsylvania $180,000 Traffic Flow West Chester Borough Computerized Traffic Signal System on PA 3 in West Chester 5 31 <1Pennsylvania $96,000 Traffic Flow Baltimore Pike Traffic Signal Improvements at Various Intersections along Baltimore Pike 25 146 2Pennsylvania $80,000 Ped/Bike Concord Road Pathway- Construct New Sidewalk/Bike Path Adjacent to Concord Road 1 6 1Pennsylvania $128,000 Ped/Bike Fort Washington Spur Bikeway- Construct New Bikeway on Ft. Washington Spur 1 8 1Pennsylvania $156,000 Ped/Bike Chester Valley Trail Extension- Construct Bikeway from South Gulph Rd to Hughes Park 3 22 2Pennsylvania $1,102,620 Shared Ride Philmont Park N Ride- Construct Park N Ride Lot at SEPTA's Philmont Station 7 40 8Pennsylvania $1,281,270 Traffic Flow Roosevelt Boulevard Intersection Improvements from Conwell Ave to Bucks Co. Line 29 131 -1Pennsylvania $84,800 Ped/Bike Westbank Pedestrian Bikeway in Center City Philadelphia and West Philadelphia 5 10 4Pennsylvania $1,840,780 Traffic Flow Roosevelt Boulevard Traffic Signal Improvements from 9th Street to Tyson Avenue 22 159 1Pennsylvania $480,000 Ped/Bike Develop Roadway/Bike Network in City of Philadelphia 27 0 23Pennsylvania $144,800 Traffic Flow Arterial Traffic Signal Interconnections at Various Locations throughout City of Philadelphia 69 450 8Pennsylvania $274,400 Traffic Flow State Road Intersection Improvements on State Road (SR 1007) from Cottman Ave t Bucks Co.2 13 <1Pennsylvania $932,550 Traffic Flow I-95 Operations Program for ITS (Traffic Control Center and CCTV with VMS Equip) on I-9535 230 31Pennsylvania $1,440,000 Transit Automated Route Information for SEPTA's Customer Relations Department 15 99 19Pennsylvania $632,000 Transit Frontier Division Alternative Fuels for 70-100 Buses at Frontier Division 22 474 183Pennsylvania $836,000 Traffic Flow US 30 Computerized Signal System at 12 Intersections along US 30 in Borough of Gettysburg3 29 <1Pennsylvania $480,000 Transit Construction of a New Transit Transfer Facility in Lemoyne Borough 2 0 <1Pennsylvania $112,960 Traffic Flow US 11 Computerized Traffic Signal System- 9 Intersections along US 11, from PA 581 Ramps4 25 <1Pennsylvania $92,000 Traffic Flow US 11 Intersection Improvements (Left Turn and Through Lane) with 21st Street 4 25 <1Pennsylvania $440,000 Traffic Flow US 11 Intersection Improvements (Computerized Traffic Signal System) for Var. Intersections4 25 <1Pennsylvania $357,500 Traffic Flow PA 230 Computerized Traffic Signal System- Install Computerized System at 4 Intersections 1 8 <1Pennsylvania $50,000 Shared Ride PA 147 Park N Ride (Construct 50-75 Park N Ride Lot off PA 147 in Millersburg) 0 <1 1Pennsylvania $200,000 Ped/Bike Elmerton Avenue Bikeway- Construct Bikeway from Cameron (SR 230) to Elmerton (SR 3026)1 9 1Pennsylvania $98,000 Traffic Flow Mt. Joy Signals- Upgrade 4 Traffic Signals and Install Signal System on PA 230 in Mt. Joy 1 12 <1Pennsylvania $80,000 Shared Ride Construct Park N Ride at US 222 and I-76 Interchange, PA 283 and PA 743, and PA 283 0 <1 1Pennsylvania $300,000 Traffic Flow City of Lebanon Signals- Replace and/or Upgrade 48 Signalized Intersections in Lebanon 9 72 1Pennsylvania $103,750 Shared Ride US 22- PA 34 Park N Ride- Construct 75 Space Park N Ride at Int. of US 22 and PA 34 0 -1 1Pennsylvania $65,000 Shared Ride George Street Park N Ride in Vicinity of Exit 10 of I-83 at North George Street 0 <1 1Pennsylvania $1,076,000 Traffic Flow Hanover Signals- Upgrade 22 Signals and Install Computerized Signal on PA 94 in Hanover 8 60 1Pennsylvania $280,500 Shared Ride PA 528 Park N Ride at PA 528 and I-79 Interchange 1 9 2Pennsylvania $18,250 Shared Ride PA 488 Park N Ride Near I-79 Interchange in Muddy Creek Township <1 1 <1Pennsylvania $230,000 Shared Ride PA 28/PA 356 Park N Ride- Involves Construction of 60 Space Lot at PA 28 and PA 356 <1 1 <1Pennsylvania $1,098,000 Traffic Flow Freeway Surveillance (CCTV, Loop Detectors, and CB Monitors) for Traffic Ops Center 1 8 <1Pennsylvania $1,300,000 Demand Mgmt ACTA- TDM Marketing for Airport Corridor Transportation Management Association 29 206 33Pennsylvania $234,000 Shared Ride Ride Share Incentives Program to Promote Rideshare and Vanpooling Programs <1 <1 75Pennsylvania $5,000 Shared Ride Wexford Park N Ride- Construct 150-200 Space Park N Ride Lot at PA 910 and I-279 1 4 1Pennsylvania $236,000 Traffic Flow Craigdell Road Improvements- Construct Left Turn Lanes and Upgrade Traffic Signal 1 7 <1Pennsylvania $4,519,460 N/A Cost Overruns for Projects Previously Obligated in FY 1996 N/A N/A N/A

Puerto Rico* 07/18/97 $4,201,896 $2,204,681 52.5% $2,204,681 STP/CMAQ Relocation of Route PR-10 (Utuado-Adjuntas) N/A N/A N/A

Rhode Island 07/15/97 $4,914,642 $3,931,452 80.0%Rhode Island $320,000 Traffic Flow Design/install Roadway Weather Info. System N/A N/A N/ARhode Island $400,000 Other I/M Pilot Program 16162 6810Rhode Island $100,000 Traffic Flow Intelligent Trans/Variable Message Network Not SubmittedRhode Island $7,452 Traffic Flow ITS System/Traffic Operations Center Not SubmittedRhode Island $240,000 Traffic Flow Providence System Management (TSM) Not SubmittedRhode Island $684,000 Traffic Flow Traffic Operations Center Not SubmittedRhode Island $500,000 Shared Ride Implementation of Rideshare Program Not SubmittedRhode Island $560,000 Transit Newport Transit Not SubmittedRhode Island $120,000 Transit Statewide Transit Maps Not SubmittedRhode Island $800,000 Transit Half-Fare Buy Down Program 25 203 23Rhode Island $200,000 Other Ozone Alerts Not Submitted

^ 16

Page 17: CMAQ REPORTS (FY 1996)

5/20/98 CMAQ REPORTS (FY 1996)REPORT $ AMOUNT $ AMOUNT OBLIG. $ PROJECT PROJECT PROJECT VOC** CO** NOX** PM-10**

STATE SUBMIT. APPORTION. OBLIGATED % AMOUNT TYPE DESCRIPTION (KG/DAY) (KG/DAY) (KG/DAY) (KG/DAY)

South Carolina 12/23/96 $4,201,896 $2,102,365 50.0%South Carolina $106,400 STP/CMAQ Congestion Mitigation-Various Locations in Richland N/A N/A N/ASouth Carolina $12,000 STP/CMAQ PE for US29 Project in Anderson N/A N/A N/ASouth Carolina $76,000 STP/CMAQ Install Traffic Signals at US17 @ Summerville CBD N/A N/A N/ASouth Carolina $72,000 STP/CMAQ Intersection Improvements at S76 Intersection @ S1120 N/A N/A N/ASouth Carolina $28,000 STP/CMAQ Intersection Improvement at US 78 Intersection @ S169/S535 N/A N/A N/ASouth Carolina $8,000 STP/CMAQ PE for Intersection Improvement at SC61@ Intersection of SC61 and S57 N/A N/A N/ASouth Carolina $4,000 STP/CMAQ PE for Intersection Improvement at US52 @ Intersection of US52 and S195 N/A N/A N/ASouth Carolina $8,000 STP/CMAQ PE for Intersection Improvement at S51 @ S51/S1326 N/A N/A N/ASouth Carolina $8,000 STP/CMAQ PE for Intersection Improvement at S97 @ Intersection of S97 and S1521 N/A N/A N/ASouth Carolina $696,000 STP/CMAQ Traffic Signal System in Gaffney N/A N/A N/ASouth Carolina $8,000 STP/CMAQ PE for Intersection Improvement at Intersection of S22/S13 N/A N/A N/ASouth Carolina $83,932 STP/CMAQ PE for US 52 Fr US52 @ Dewey Cater Elementary School N/A N/A N/ASouth Carolina $4,000 STP/CMAQ PE for US221 @ Intersection of SC246 N/A N/A N/ASouth Carolina $12,000 STP/CMAQ Improve Vertical Alignment at SC34 Intersection @ S20 N/A N/A N/ASouth Carolina $117,727 STP/CMAQ PE for SC9 on Canterbury Drive & Rugby Road N/A N/A N/ASouth Carolina $65,211 STP/CMAQ PE for US521 @ Intersection of US521 & SC200 N/A N/A N/ASouth Carolina $20,000 STP/CMAQ PE for US378 from Gibson Street to SC6 N/A N/A N/ASouth Carolina $32,000 STP/CMAQ PE for US21 from Axtell to Airport Entrance Road N/A N/A N/ASouth Carolina $28,000 STP/CMAQ PE for S36/S42 from Kay Street to Bush River Road N/A N/A N/ASouth Carolina $142,902 STP/CMAQ US301 Intersection of S1002 and S793 N/A N/A N/ASouth Carolina $104,000 STP/CMAQ Improve Intersection at US301 @ US301 & S33 N/A N/A N/ASouth Carolina $8,000 STP/CMAQ PE for SC93 Intersection at SC93/US123/SC93 N/A N/A N/ASouth Carolina $24,000 STP/CMAQ PE for US1 from Laurel Street to Cushman Drive N/A N/A N/ASouth Carolina $17,600 STP/CMAQ PE for S31 from Colonial Blvd to Ashland Rd N/A N/A N/ASouth Carolina $177,393 STP/CMAQ I85/I26 SPATS Metro Area Congestion/Incident Mgmt Program N/A N/A N/ASouth Carolina $12,000 STP/CMAQ PE for S47 @ Intersection of S47 and S241 N/A N/A N/ASouth Carolina $223,200 STP/CMAQ PE for Installation of Traffic Sign at US76/Bus 521 @ Sumter CBD N/A N/A N/ASouth Carolina $4,000 STP/CMAQ PE for Additional Turn Lane at SC160 Intersection of SC160 & S648 N/A N/A N/A

South Dakota* 02/03/97 $4,201,896 $4,454,320 106.0%South Dakota* $4,454,320 STP/CMAQ Various Projects to Improve Roadways (Chip Seals, Overlays, Shoulder Widening, Guardrail)N/A N/A N/A

Tennessee 02/21/97 $9,372,108 $12,081,114 128.9%Tennessee $395,000 Shared Ride Vanpool Project in Knox County Maintenance Area 3 7Tennessee $100,000 Other Public Awareness Program 3 7Tennessee $326,000 Traffic Flow Intersection Improvements, Various Locations in Knoxville, Knox County and Farragut N/A N/A N/ATennessee $160,000 Traffic Flow Intersection Improvement at Sutherland Avenue at Tobler Lane in Knoxville 6 6Tennessee $370,900 Traffic Flow Intersection Improvements at Various Locations (5) in Knox County 32 28Tennessee $50,000 Traffic Flow Broadway Traffic Signal Study in City of Knoxville N/A N/A N/ATennessee $65,000 Traffic Flow Intersection Improvement at SR62 (Oak Ridge Highway) at Ball Camp Pike in Knox Co. 6 6Tennessee $512,000 Traffic Flow Intersection Improvements at Maynardville Highway (SR-33) at Norris Freeway (SR-71) 12 11Tennessee $78,779 Demand Mgmt Project Greenlight (Analysis of Benefits) 3 7Tennessee $88,000 Ped/Bike Build Sidewalks Near Schools in Farragut 9 8Tennessee $16,200 Ped/Bike Build Sidewalks/Walkways in Farragut <1 <1Tennessee $176,000 Shared Ride Regional Commuter Transit Demo Program in Rutherford, Sumner, Williamson, Wilson Cos. 5 N/ATennessee $225,000 Shared Ride Bus and Vanpool Seat Guarantee Program N/A N/ATennessee $56,130 Shared Ride Regional Ridesharing Program- MTA 84 N/ATennessee $170,000 Shared Ride Park N Ride Lot at Sam Ridley Parkway near I-24 in Town of Smyrna N/A N/ATennessee ($1,000) Shared Ride Park N Ride Lot, Ag. Center on SR-96 near I-24 in City of Murfreesboro 1 N/ATennessee $165,000 Shared Ride Park N Ride Lot, Waldron Road in City of LaVergne N/A N/ATennessee ($5,807) Shared Ride Carpooling and Vanpooling Program in Williamson County 6 11Tennessee $55,807 Shared Ride Regional Ridesharing Program in Williamson County 16 N/ATennessee $47,000 Shared Ride Carpool/Vanpool Commute Options in Williamson County 5 N/ATennessee $100,000 Traffic Flow Intersection Improvement, SR-254 (Old Hickory Boulevard) at Granny White Pike N/A N/ATennessee ($56,828) Traffic Flow Intersection Improvement at SR-6 (Gallatin Pk) at Callendar Lane in Hendersonville 1 <1Tennessee $2,000 Traffic Flow Intersection Improvement at SR-11 (Nolensville Rd.) at Tusculum Road N/A N/A^ 17

Page 18: CMAQ REPORTS (FY 1996)

5/20/98 CMAQ REPORTS (FY 1996)REPORT $ AMOUNT $ AMOUNT OBLIG. $ PROJECT PROJECT PROJECT VOC** CO** NOX** PM-10**

STATE SUBMIT. APPORTION. OBLIGATED % AMOUNT TYPE DESCRIPTION (KG/DAY) (KG/DAY) (KG/DAY) (KG/DAY)

Tennessee $2,000 Traffic Flow Intersection Improvement on SR-11 (Old Hickory Blvd) at Graycroft Road N/A N/ATennessee $2,000 Traffic Flow Intersection Improvement on SR-12 in Clarksville Pk. at Kings Lane in Nashville/Davidson CoN/A N/ATennessee $378,000 Traffic Flow Intersection Improvement on SR-26 (U.S. 70 Bypass) at Babb Drive 1 <1Tennessee $282,870 Shared Ride Regional Ridesharing Program- RTA 96 <1Tennessee $2,000 Traffic Flow Intersection Improvement at Woodmont Blvd and Estes Road in Nashville/Davidson Co. N/A N/ATennessee $48,000 Traffic Flow Intersection Improvement at Old Nashville Hwy at Rock Springs Rd in Town of Smyrna 8 1Tennessee $150,000 Traffic Flow Intersection Improvement on SR-96 (Memorial Boulevard) at U.S. 41 (Broad Street) N/A N/ATennessee $50,000 Traffic Flow Signalization Improvement at SR-6 (Gallatin Pk.)/Belvedere Dr. to SR-109 in Gallatin 55 -8Tennessee ($758) Traffic Flow Intersection Improvement at SR-41 (Louisville Hwy) at SR-258 in White House <1 <1Tennessee ($40,064) Traffic Flow Intersection Improvements on SR-96 (Murfreesboro Rd) at Clovercroft Road and Arno Rd. 1 <1Tennessee $70,000 Traffic Flow Intersection Improvement at SR-106 (Hillsboro Rd) at Sneed Road in Williamson County <1 <1Tennessee ($16,000) Traffic Flow Tennessee Blvd, South Cumberland Ave. to College Street in City of Lebanon Not SubmittedTennessee $100,000 Traffic Flow HOV Lane Information and Promotion in Nashville MPO Area N/A N/ATennessee ($9,048) Demand Mgmt Pilot Project to Demonstrate Benefits of Telecommuting in Williamson County 14 N/ATennessee $73,048 Demand Mgmt Pilot Project to Demonstrate Benefits of Telecommuting in Williamson County 7 N/ATennessee $60,000 Traffic Flow Signal System Upgrade on SR-57 (Poplar Ave) Corridor in Collierville 66 660 22Tennessee ($7,023) Traffic Flow Winchester Road, Germantown Road to Hickory Hill Road in City of Memphis 68 933 N/ATennessee $145,000 Traffic Flow Intersection Improvement on Farmington Blvd and Brierbrook Rd. in City of Germantown 25 230 N/ATennessee $616,408 Traffic Flow Intersection Improvement on Hacks Cross Road at Old Poplar Pike in City of Germantown 42 300 N/ATennessee $1,250,000 Traffic Flow Intersection and Traffic Signalization Improvements, Various Locations in Memphis 958 10223 N/ATennessee $4,040,000 Traffic Flow Intersection and Traffic Signalization Improvements, Various Locations in Memphis 2174 33669 N/ATennessee $160,000 Traffic Flow Signal System Interconnect Extension in City of Germantown 15000 150 N/ATennessee $35,000 Traffic Flow Intersection Improvement at Kimbrough Rd. at Dogwood Rd. in City of Germantown 24 275 N/ATennessee $94,500 Traffic Flow Intersection Improvement at Yale Road at Altruria Rd in City of Bartlett N/A 13 N/ATennessee $1,500,000 Other Motor Vehicle Inspection Bureau in City of Memphis N/A N/A N/A

Texas 02/26/97 $83,412,071 $69,429,964 83.2%Texas $192,690 Traffic Flow Traffic Signals on Harry Hines from Loop 12 to Walnut Hill Lane 12Texas $133,532 Traffic Flow Traffic Signals at Skillman at Fair Oaks, Church, and Kingsley 8Texas $48,286 Traffic Flow Traffic Signals at Forest Lane at Audelia Rd 3Texas $139,528 Traffic Flow Traffic Signals at SH 121 at Bellair Blvd 5Texas $52,986 Traffic Flow Traffic Signals at FM 11382 at Cannady Dr 1Texas $210,529 Traffic Flow Construct HOV Lanes on IH 35E Not SubmittedTexas $20,000 Traffic Flow Texas U Turn Construct at Plano Parkway 2Texas $6,680,000 Traffic Flow Signal Upgrade at Various Locations Citywide 2019Texas $60,000 Traffic Flow Intersection Improvement at US 67 at Camp Wisdom Road 2Texas $37,500 Traffic Flow Intersection Improvement at Various Locations in Dallas 3Texas $9,000 Traffic Flow Intersection Improvements at LP 12 at Exchange Service Drive 1Texas $2,520,000 Traffic Flow HOV Lanes in Dallas 73Texas $182,338 Traffic Flow Signal Upgrade at Legacy Drive N. Tollway and SH 289 3Texas $33,200 Traffic Flow Traffic Signal Upgrade at Galloway and Town East Blvd 1Texas $208,900 Traffic Flow Improvements on IH30 from West of Harwood to west of Good-Latimer 1Texas $329,103 Traffic Flow Traffic Signals at SH 161 Frontage with Rochelle, Northgate, Walnut Hill, and Belt Line 4Texas $58,138 Traffic Flow Traffic Signals at Meadowglen in Denton 1Texas $2,391,729 Traffic Flow IH 35E from North of Royal Ln to N. of IH 635- HOV Connector Ramp Not SubmittedTexas $41,200 Traffic Flow PE for Intersection Improvements at Various Locations on North Garland Ave 4Texas $36,260 Traffic Flow City of Plano- Computerized Traffic Signal System 3Texas $115,320 Traffic Flow PE for Intersection Improvements at Various Locations in Duncanville 8Texas $778,816 Traffic Flow Interim Control Center- US 75 South of IH 635 52Texas $48,358 Traffic Flow US 380 on Carroll Blvd- Add Right Turn Lane 4Texas $162,003 Traffic Flow Traffic Signal @ Sellmeyer, Sierra, Garden Ridge, and McGee 2Texas $207,701 Traffic Flow Traffic Signal Improvements on MH 541 6Texas $22,716 Traffic Flow Traffic Signals on US 80 from Intersection of Belt Line in Mesquite 1Texas $16,000 Traffic Flow Improving Turning Lane Radii on Keller Springs @ Preston (SH 289) 1Texas $160,000 Traffic Flow Installation of Highway Advisory Radio on IH 635 Included BelowTexas $56,000 Traffic Flow Changeable Message Signs 345Texas $96,000 Traffic Flow Electronic Total Stations for Accident Investigations Included Above^ 18

Page 19: CMAQ REPORTS (FY 1996)

5/20/98 CMAQ REPORTS (FY 1996)REPORT $ AMOUNT $ AMOUNT OBLIG. $ PROJECT PROJECT PROJECT VOC** CO** NOX** PM-10**

STATE SUBMIT. APPORTION. OBLIGATED % AMOUNT TYPE DESCRIPTION (KG/DAY) (KG/DAY) (KG/DAY) (KG/DAY)

Texas $80,000 Traffic Flow Install Highway Advisory Radio on IH-35E Included AboveTexas $48,358 Traffic Flow Add Right Turn Lane on US 380 on Carroll Blvd 2Texas $35,000 Traffic Flow PE- FM 1382 at Duncanville Rd 1Texas $15,000 Traffic Flow PE- US 67 at Danieldale Rd Not SubmittedTexas $23,000 Traffic Flow Pleasant Run at Chattery Rd <1Texas $84,800 Traffic Flow PE- Traffic Signal Uprgrads- 19 Off System Locations Not SubmittedTexas $3,084,000 Transit Alternatively Fueled Vehicles Not SubmittedTexas $523,813 Traffic Flow PE for Intersection Improvements at Various Locations on Beltline Rd and Arapaho 8Texas $13,200 Traffic Flow PE for Intersection Improvements at Various Locations on Illinois Ave 2Texas $131,834 Traffic Flow Traffic Signal Upgrade at Galloway and Town East Blvd 1Texas $36,000 Traffic Flow Traffic Signal at Bernard at Eagle in Denton Co. 2Texas $148,443 Traffic Flow Traffic Signals at SH 78 in Garland 19Texas $15,776 Traffic Flow Traffic Signals at IH 35E with Pleasant Run in Desoto <1Texas $58,522 Traffic Flow Traffic Signals at FM 1382 with North Clark in Cedar Hill 1Texas $22,889 Traffic Flow PE for Traffic Signal Upgrades at Various Locations in Garland 26Texas $359,912 Traffic Flow Traffic Signal Upgrades at Various Locations in Grand Prairie 12Texas $217,000 Traffic Flow Citywide Signal System Enhancement in Richardson Not SubmittedTexas $206,430 Traffic Flow Intersection Improvements at Various Locations in Grand Prairie 6Texas $128,350 Traffic Flow Intersection Improvements at Various Locations in Dallas 21Texas $135,868 Traffic Flow Intersection Improvements at Various Locations in Dallas-North Tollway and Harvest Hill Rd 1Texas $115,436 Traffic Flow Intersection Improvements at Various Locations in Coppell 1Texas $502,429 Traffic Flow Intersection Improvements at Various Locations in Dallas and Richardson on Coit Rd 6Texas $117,720 Traffic Flow Intersection Improvements at Various Locations in Dallas @ Hillcrest 2Texas $229,045 Traffic Flow Intersection Improvements at Various Locations in Farmers Branch 3Texas $252,800 Traffic Flow Incident Detection and Response System 14Texas $580,000 Transit Transit Fare Program for FTA- Ozone Alert Not SubmittedTexas $302,000 Demand Mgmt Travel Demand Mgmt Program Not SubmittedTexas $100,000 Demand Mgmt Regional Travel Demand Management Program 76Texas $250,000 Demand Mgmt Travel Demand Management Program Not SubmittedTexas $5,152 Traffic Flow Traffic Signal Upgrade at Various Locations in Mesquite, Balch Springs & SunnyvaleNot SubmittedTexas $147,746 Traffic Flow Traffic Signal Upgrade at Various Locations in Mesquite, Balch Springs & SunnyvaleNot SubmittedTexas $84,800 Traffic Flow Traffic Signal Upgrade at Various Locations in Dallas Not SubmittedTexas $211,260 Traffic Flow PE-Intersection Improvements on Live Oak Street in Dallas 2Texas $15,776 Traffic Flow Traffic Signals at IH 35E with Pleasant Run in Desoto <1Texas $58,522 Traffic Flow Traffic Signals at FM 1382 with North Clark in Cedar Hill 1Texas $101,390 Traffic Flow Intersection Improvements at FM 157 at Arkansas Lane 7Texas $71,004 Traffic Flow Traffic Signals at SH 121 at Glade Road 1Texas $61,274 Traffic Flow Intersection Improvement at FM 157 at Copeland Rd in Arlington 3Texas $2,184 Traffic Flow Intersection Improvements at SP 303 from Pioneer Parkway at Park Springs 2Texas $13,545 Traffic Flow Intersection Improvement at SH 360 at Park Row Drive 2Texas $8,040 Traffic Flow Intersection Improvements at Lamar Blvd/Ruff Snow Lane 1Texas $4,350 Traffic Flow Intersection Improvements at 8th Ave/Pennsylvania 1Texas $6,900 Traffic Flow Intersection Improvements at 7th Street/Commerce St. at Calhoun Street 1Texas $80,000 Traffic Flow Intersection Improvements at Camp Bowie Blvd/7th Street at University Dr. 2Texas $5,542 Traffic Flow Corridor Improvements at West Park Way from SH 183 to Parkview 1Texas $24,000 Traffic Flow Intersection Improvements- Grandbury Rd/Wabash Street from Trail Lake to Seminary Dr. 8Texas $216,000 Traffic Flow Bridge Construction- N. Beach Street at Railtran 1Texas $21,600 Traffic Flow Intersection Improvement- Dirk Rd. at Bryant-Irvin Rd 1Texas $8,196 Ped/Bike Bikeway Construction- Forest Hill <1Texas $6,320 Traffic Flow Intersection Improvement- SH 121 on Central Drive 1Texas $22,612 Traffic Flow Intersection Improvement-Rufe Snow at Glenview Drive 1Texas $22,069 Traffic Flow Intersection Improvements- Rufe Snow from Karen Drive to IH 820 1Texas $33,763 Traffic Flow Intersection Improvement- at Rufe Snow/Lewis Drive 1Texas $28,911 Traffic Flow Intersection Improvement at Rufe Snow/Stardust Drive 1Texas $28,433 Traffic Flow Intersection Improvement at Rufe Snow/Industrial Park 1Texas $32,749 Traffic Flow Intersection Improvement at Rufe Snow/Watauga Rd 2Texas $11,200 Traffic Flow Intersection Improvements at Pleasant Rd in Colleyville 1^ 19

Page 20: CMAQ REPORTS (FY 1996)

5/20/98 CMAQ REPORTS (FY 1996)REPORT $ AMOUNT $ AMOUNT OBLIG. $ PROJECT PROJECT PROJECT VOC** CO** NOX** PM-10**

STATE SUBMIT. APPORTION. OBLIGATED % AMOUNT TYPE DESCRIPTION (KG/DAY) (KG/DAY) (KG/DAY) (KG/DAY)

Texas $27,200 Traffic Flow Intersection Improvement on SH 26 on Glade Rd 1Texas $102,700 Ped/Bike Bikeway Connection- Little Bear Creek 3Texas $59,250 Ped/Bike Bikeway Connection- S. Electric Trail 1Texas $593,600 Traffic Flow Acquisition of ROW at Abram St from Browning to Stadium Drive 1Texas $104,880 Transit Transit Fare Program- Ozone Alert Not SubmittedTexas $852,000 Shared Ride Subsidized Van Pool (to FTA) 62Texas $250,000 Demand Mgmt Regional Traffic Demand Mgmt Program (to FTA) 25Texas $731,498 Traffic Flow Freeway Traffic Mgmt on SH 183 to IH 35W 151Texas $119,168 Traffic Flow US 287 Riverside Drive- Traffic Signal Improvement 1Texas $510,167 Traffic Flow IH 820 in Brentwood at Stair Road- Traffic Signal Improvement 1Texas $904,851 Traffic Flow IH 20 at Hulen Street- Traffic Signal Improvement 2Texas $1,214,175 Traffic Flow IH 820 to SH 360- Surveillance System 8Texas $182,440 Traffic Flow US 377 at Chapman Road-Traffic Signal Improvement 1Texas $102,029 Traffic Flow IH 820 at US 377- Traffic Signal Improvement 1Texas $80,280 Traffic Flow SH 121 at Beach, Riverside, and Sylvania- Traffic Signal Improvement Not SubmittedTexas $32,735 Traffic Flow SH 121 at Precinct Line Rd and Bedford- Traffic Signal Improvement <1Texas $41,400 Traffic Flow Acquisition of ROW at intersection of Park Row and Norwood Lane 1Texas $2,040 Traffic Flow Acquisition of ROW at FM 157 from IH 20 to Pleasant Ridge Road Not SubmittedTexas $187,404 Traffic Flow PE for Grade Separation at Rufe Snow in Richland Hills 2Texas $9,875 Ped/Bike Bikeway in North Richland Hills- Route Map and Signs Not SubmittedTexas $1,106,560 Traffic Flow SH 183 from SH 10 to Dallas County line- Traffic Surveillance System 11Texas $71,400 Traffic Flow Acquisition of ROW at Intersection of Abram Street and New York Ave 1Texas $80,000 Traffic Flow Traffic Surveillance System- IH 35W from IH 30 to IH 20 4Texas $55,080 Traffic Flow Acquisition of ROW- intersection of SH 180 and Cooper Street 2Texas $41,819 Traffic Flow Intersection improvement at FM 157 at Copeland Rd in Arlington 3Texas $731,498 Traffic Flow SH 183 to IH 35W- Freeway Traffic Management 151Texas $2,640 Traffic Flow Intersection Improvement at IH 20 at Matlock Road 1Texas $239,905 Traffic Flow Intersection Improvements at Arkansas Lane/Matlock Road 3Texas $39,330 Traffic Flow Acquisition of ROW- Intersection of Arkansas Lane & Matlock Road See AboveTexas $98,964 Traffic Flow Intersection Improvements at Lamar Blvd/Ruff Snow Lane 1Texas $375,891 Traffic Flow Traffic Signals at Ector Dr/Simmons Dr in Euless 2Texas $14,000 Traffic Flow Portable Changeable Message Signs at Various Locations 159Texas $10,000 Traffic Flow Changeable Message Signs at Various Locations See AboveTexas $4,000 Traffic Flow Accident Investigation Electronic Station at Various Locations See AboveTexas $30,000 Traffic Flow Incident Support Vehicle at Various Locations See AboveTexas $30,000 Traffic Flow Communication Information System at Various Locations See AboveTexas $250,000 Demand Mgmt Regional Traffic Demand Mgmt Program (to FTA) 25Texas $27,858 Traffic Flow Intersection Improvements at SP 303 from Pioneer Parkway at Park Springs 2Texas $3,570 Traffic Flow Intersection Improvements at FM 157 from IH 20 in Arlington to Pleasant Spring Rd 2Texas $251,027 Traffic Flow Intersection Improvement at SH 183 at SP 474 at Ruff Snow Dr 1Texas $76,300 Traffic Flow PE- Traffic Signal Improvements at Various Locations on Great Southwest Pkwy in G. Prairie2Texas $3,240 Traffic Flow PE- Intersection Improvement at IH 30 at Montgomery Street in Fort Worth <1Texas $17,538 Traffic Flow PE- Intersection Improvement at IH 30 from IH 20 on Hulen St to Barwick St in Fort Worth 2Texas $200,631 Traffic Flow Intersection Improvement on SH 360 at Park Row Drive 2Texas $2,296,829 Traffic Flow Traffic Surveillance for SH 360 from SH 183 to IH 20 13Texas $221,220 Traffic Flow Acquisition of ROW on Randol Mill Rd from Oakwood Ln to Randol Mill Park 1Texas $128,174 Traffic Flow Intersection Improvements at SH 10 at Norwood Dr in Hurst 2Texas $20,800 Traffic Flow Intersection Improvements at SH 10 at Precint Line Rd in Hurst 1Texas $23,220 Traffic Flow Acquistion of ROW at Intersection of Fielder Rd and Park Row Dr 2Texas $5,025 Traffic Flow Intersection Improvements at Ector Dr at Trojan Trail in Euless 1Texas $94,836 Traffic Flow Traffic Signals at Westpark Way at Tibets and Silvercreek in Euless 1Texas $41,501 Traffic Flow Traffic Management on IH 30 at University Drive 1Texas $317,162 Traffic Flow Traffic Signals on SH 70 in Garland 19Texas $717,682 Traffic Flow Extend Auxilary Lane to Connect Entrance & Exit Ramps on IH 35 Not SubmittedTexas $72,147 Traffic Flow Intersection Improvements on IH 20 in Arlington to Pleasant Ridge Rd 2Texas $126,113 Traffic Flow Intersection Improvement on IH 20 at Matlock Road 1Texas $4,927,000 Transit Town pedestrian/transit center (Transfer to FTA) 13^ 20

Page 21: CMAQ REPORTS (FY 1996)

5/20/98 CMAQ REPORTS (FY 1996)REPORT $ AMOUNT $ AMOUNT OBLIG. $ PROJECT PROJECT PROJECT VOC** CO** NOX** PM-10**

STATE SUBMIT. APPORTION. OBLIGATED % AMOUNT TYPE DESCRIPTION (KG/DAY) (KG/DAY) (KG/DAY) (KG/DAY)

Texas $4,095,284 Traffic Flow Install CTMS- SH 288 from US 59 to Brazoria County Line 1Texas $683,152 Traffic Flow Install Closed Loop System- US 90A from 1092 to FM 2234 1Texas $65,665 Traffic Flow Upgrade to Actuated Signals at FM 1314 in Porter and FM 1484 in New Caney <1Texas $613,200 Traffic Flow PE- Intermodal Access- Port of Houston Barbour's Cut Terminal 16Texas $194,091 Traffic Flow NASA Road 1- Widening of Non-Freeway Facility Not SubmittedTexas $588,334 Traffic Flow BW8- Upgrade to Actuated Signals 2Texas $63,814 Traffic Flow IH 10 from Sheldon Rd to North Main- Upgrade to Actuated Signals <1Texas $60,939 Traffic Flow IH 10 from Cambell Road to Bingle Rd- Upgrade to Actuated Traffic Signals 1Texas $1,764,000 Demand Mgmt 1996 Regional Commute Alternative Program 362Texas $303,118 Traffic Flow Install ATMS at SH 35 and FM 518 Not SubmittedTexas $164,720 Ped/Bike PE- Bikeways 9Texas $145,680 Ped/Bike PE- Bikeways 11Texas $128,720 Ped/Bike PE- Bikeways 5Texas $178,800 Ped/Bike PE- Bikeways 6Texas $393,360 Ped/Bike PE- Bikeways 4Texas $52,720 Ped/Bike PE- Bikeways 2Texas $21,600 Transit PE for downtown Transit (Houston) Not SubmittedTexas $120,000 Traffic Flow Upgrade Specifications for CCTV and Communications Equipment Not SubmittedTexas $60,000 Traffic Flow Utility Adjustments at IH-10 from SH-6 to Silber 8Texas $555,000 Transit PE for Construction of Main Line RR Track at Barbour's Cut@Deer Park Junction Terminal 8Texas $16,000 Traffic Flow PE for Traffic Signals at Burney Rd at Voss Rd in Sugarland- Dulles Ave at Dulles H.S. 1Texas $16,000 Traffic Flow PE for Traffic Signals at W. Airport Blvd at Industrial Blvd- Dairy Ashford at Corp. Blvd. <1Texas $91,542 Traffic Flow Install Arterial Traffic Mgmt System at FM 1942 from BU 90U to FM 1942 1Texas $246,892 Traffic Flow Install Arterial Traffic Mgmt System at FM 1876 (Eldridge/Synott) <1Texas $541,032 Traffic Flow Install Fiber Optic Cable on Old Katy Road Not SubmittedTexas $315,009 Traffic Flow Install ATMS on SH 288 from Park to SH 36 1Texas $228,191 Traffic Flow Install ATMS on SH 249 and on FM 2920 1Texas $3,951,348 Traffic Flow Install Computerized Traffic Management System on IH 10 from SH 6 to Fort Bend 24Texas $130,000 Traffic Flow Install ATMS on SH 35 from Orange to Walnut <1Texas $400,000 Traffic Flow Install Signal Coordination System- NASA 1 from E. of FM Not SubmittedTexas $473,800 Traffic Flow Install ATMS on FM 518 from Harkey O'Day to Westminster 1Texas $88,000 Traffic Flow Install ATMS on FM 2234 from US 90A to Quail Run 1Texas $227,000 Traffic Flow Install ATMS on FM 2920 from SH 249 to Cherry in Tomball <1Texas $455,000 Traffic Flow Install ATMS on FM 3345 from FM 1092 to FM 2234 1Texas $363,600 Traffic Flow Greater Houston Transportation and Emergency Center- Media Outreach Not SubmittedTexas $2,000,000 Traffic Flow Various Locations- Install IVHS Not SubmittedTexas $150,400 Traffic Flow Central Operations Facility at Various Locations in Texas City 1Texas $138,000 Traffic Flow BW 8 from Hardy to Wilson- Upgrade Fixed Time to Actuated Signals 1Texas $166,000 Traffic Flow BW 8 from Lockwood to IH 10 East- Upgrade Fixed Time to Actuated Signals 1Texas $2,648,000 Traffic Flow SH 288 from IH 610 to Brazoria- Install CTMS <1Texas $1,500,000 Transit FY 95 Ozone Advisory Day Transit Program 33Texas $483,000 Demand Mgmt FY 95 Regional Commute Alternatives Not SubmittedTexas $223,111 Traffic Flow Construct Turn Around Lanes at Washington Blvd Interchange 1 <1 10 N/ATexas $10,000 Transit Natural Gas Technology Transfer Center Research Project on Alternative Fuels N/ATexas $32,000 Transit Natural Gas Technology Transfer Center Research Project on Alternative Fuels <1 <1 0 N/ATexas $67,062 Shared Ride Install or Upgrade Park N Ride at US 96 and US 69 1 1 3 N/ATexas $116,494 Shared Ride Install or Upgrade Park N Ride at US 96 at US 69 1 3 10 N/ATexas $944,838 Traffic Flow Install Changeable Message Signs at Various Locations 28 74 222 N/ATexas $96,000 Traffic Flow Purchase Portable Message Signs at Various Locations 5 12 36 N/A

Utah 02/24/97 $4,201,896 $11,782,525 280.4%Utah $436,316 Transit West Valley Transit Center Near Valley Fair Mall 8 85 11Utah $521,263 Shared Ride Park N Ride Lot (9400 South 2000 East) 7 71 9Utah $8,692 Shared Ride Park N Ride Lot (6200 South @ 3000 East) 4 43 5Utah $257,588 Shared Ride Park N Ride Lot (6600 South 950 East) 2 19 2Utah $8,689 Shared Ride Park N Ride Lot (Layton Hills Mall) 16 166 24Utah $8,692 Shared Ride Park N Ride Lot (I-15 @ 5600 South) 17 180 26

^ 21

Page 22: CMAQ REPORTS (FY 1996)

5/20/98 CMAQ REPORTS (FY 1996)REPORT $ AMOUNT $ AMOUNT OBLIG. $ PROJECT PROJECT PROJECT VOC** CO** NOX** PM-10**

STATE SUBMIT. APPORTION. OBLIGATED % AMOUNT TYPE DESCRIPTION (KG/DAY) (KG/DAY) (KG/DAY) (KG/DAY)

Utah $1,616,519 Traffic Flow Intersection Improvement- Highland Drive and 3300 South 1 10 <1Utah $2,032,670 Traffic Flow Regional Traffic Management System for Salt Lake Area 52 542 67Utah $765,786 Traffic Flow Signal Coordination for the Salt Lake Area 270 2822 350Utah $3,557,170 Traffic Flow Signal Coordination for the Ogden Area 120 1246 177Utah $17,384 Traffic Flow Signal Coordination for the Roy Area 3 34 5Utah $230,334 Demand Mgmt Transportation Demand Mgmt for the Salt Lake City Area 4 38 5Utah $37,292 Ped/Bike Beck Street Bike Route Engineering in Salt Lake Area 1 7 1Utah $4,346 Ped/Bike Sunnyside Ave Bike Lane in Salt Lake Area <1 3 <1Utah $139,845 Other Equipment for Enhanced I/M Training in Salt Lake and Ogden Urbanized Areas <1 0 0Utah $434,592 Traffic Flow Provo City Downtown Congested Intersection Improvements 72Utah $64,827 Traffic Flow Provo City Three Locations on 200 West (Add Turn Lanes) 16Utah $255,192 Traffic Flow Provo City Signals (Improve Intersection Geometry) 27Utah $546,985 Traffic Flow Provo City Intersection Improvements (Add Turn Lanes) 60Utah $9,323 Other Utah County I/M Program Training Materials N/A N/A N/AUtah $651,883 Transit UTA Clean Fuel Buses (3 Sundance Ski Buses) 20 146 20Utah $177,137 Shared Ride UTA Vanpool Vans (10 Vans to Provide Businesses with Vanpools) 10 73 10

Vermont* 05/01/97 $4,201,896 $4,803,247 114.3%Vermont* $80,022 STP/CMAQ Modify Project Agreement for Construction Overrun (Basecoat, Cold Plane, Resurface)Not SubmittedVermont* $73,353 STP/CMAQ Pre-Engineering Overrun- Modification of Project Agreement Not SubmittedVermont* $218,000 STP/CMAQ SEVCA Transit Operating Assistance Not SubmittedVermont* $80,000 STP/CMAQ Bus Shelters, Signs and Shop Equipment Not SubmittedVermont* $200,000 STP/CMAQ Bus Purchases Not SubmittedVermont* $68,000 STP/CMAQ Bus Purchases and Radios Not SubmittedVermont* $68,000 STP/CMAQ Purchase Bus and Bus Stop Bench Not SubmittedVermont* $178,000 STP/CMAQ VT Public Transp. Association- Program Admin. Not SubmittedVermont* $320,000 STP/CMAQ Purchase 3 Buses, Shop Equip., Office Equip., Renovation to Maintenance Facility Not SubmittedVermont* $420,000 STP/CMAQ Purchase 2 Trolleys, Bus Shelters, Renovations to Maintenance Facility Not SubmittedVermont* $360,000 STP/CMAQ SEVCA Transportation- Maintenance/Office Facility, Shop Equipment, 3 Buses Not SubmittedVermont* $11,201 STP/CMAQ Modify Project Agreement for Construction Over-run (Resurfacing) Not SubmittedVermont* $139,100 STP/CMAQ Light Rail Feasibility Study Not SubmittedVermont* $23,594 STP/CMAQ Modify Project Agreement for PE and ROW Overruns (Constr. for Drainage/Erosion Control)Not SubmittedVermont* $222,970 STP/CMAQ Purchase of Hoosick Branch of the Boston and Maine RR Not SubmittedVermont* $40,662 STP/CMAQ Rehabilitate Roadway at Sutton (Modify Project Agreement) Not SubmittedVermont* $255,600 STP/CMAQ Operating Assistance for Marble Valley/Middlesbury/Rural Comm. Transit Not SubmittedVermont* $847,729 STP/CMAQ Ditch Rehabilitation (Constr.) Not SubmittedVermont* $160,000 STP/CMAQ Operating Assistance for Chittenden County Transit Authority Not SubmittedVermont* $544,818 STP/CMAQ Rehabilitate Roadway at Burlington Co. (U.S. 7) Not SubmittedVermont* $116 STP/CMAQ Modify Project Agreement (PE Overrun) Not SubmittedVermont* $492,082 STP/CMAQ Replace Signals at 5 Intersection Locations in Bennington Not Submitted

Virginia 01/21/97 $17,870,684 $18,780,841 105.1%Virginia $480,000 Transit Tyson's Corner Transit Station- Fairfax County 5 12Virginia $4,650,000 Transit Replace Metrobus rolling Stock- WMATA 6 17Virginia $1,000,000 Transit New Bus Service Start Up- PRTC 13 15Virginia $40,000 Transit Improved Bus Stop Accessibility- City of Alexandria 1 1Virginia $696,000 Transit Transit Service to York County, Phases II and III- Peninsula Transportation District Commiss.15 14Virginia $77,880 Transit Extend Bus Service and Construct Bus Pullout- Chesterfield County 1 1Virginia $920,000 Transit Implement Strategies Recommended in Comprehensive Transit Plan (Bus Shelters)- Richmond7 10Virginia $711,600 Shared Ride Van/buspool Service Thru Midtown Tunnel from Various Park N Ride Lots 3 3Virginia $100,000 Traffic Flow Citywide Signal System Upgrade- City of Hampton 189 -46Virginia $1,445,000 Traffic Flow Citywide Signal System Upgrade- Phase I (City of Portsmouth) 113 -22Virginia $120,000 Traffic Flow Retime Signals at 70 Locations- City of Virginia Beach 219 11Virginia $5,658,209 Traffic Flow Computerized Signal System Expansion- Phase II (City of Norfolk) 461 -45Virginia $16,000 Traffic Flow Route 5/Route 607 Intersection Improvements- Charles City County <1 <1Virginia $138,756 Traffic Flow Route 10/Route 145 Intersection Improvements- Chesterfield County 1 <1Virginia $138,756 Traffic Flow Route 10 at Courthouse and Whitepine Roads Intersection Improvements- Chesterfield County1 <1^ 22

Page 23: CMAQ REPORTS (FY 1996)

5/20/98 CMAQ REPORTS (FY 1996)REPORT $ AMOUNT $ AMOUNT OBLIG. $ PROJECT PROJECT PROJECT VOC** CO** NOX** PM-10**

STATE SUBMIT. APPORTION. OBLIGATED % AMOUNT TYPE DESCRIPTION (KG/DAY) (KG/DAY) (KG/DAY) (KG/DAY)

Virginia $116,640 Traffic Flow Wamsley Road Boulevard/Newbys Bridge Road Intersection Improvements- Chesterfield Cty 1 <1Virginia $200,000 Shared Ride Commuter Assistance - City of Arlington 9 9Virginia $390,000 Shared Ride Ridefinders Air Pollution Reduction Program 215 290Virginia $50,000 Other Enhanced Ozone Advisory Program- DEQ/MRAQC 112 151Virginia $19,200 Ped/Bike Bikeway- Phase IV-J. Clyde Morris Boulevard from Cannon Blvd to Oyster Pt Road-Newport10 8Virginia $20,800 Ped/Bike Bikeway-from Boxley Blvd/Oyster Pt to Menchville Rd- City of Newport News 3 2Virginia $750,000 Transit Alternative Fuels Revolving Fund 2 4Virginia $150,000 Shared Ride Expanded Rideshare Program 64 146Virginia $24,000 Demand Mgmt Employer Outreach See AboveVirginia $518,000 Demand Mgmt Guaranteed Ride Home Program See AboveVirginia $350,000 Demand Mgmt Support Telecommuting Implementation 273 600

Washington 10/31/97 $13,351,989 $20,857,021 156.2%Washington $10,340 Ped/Bike Prepare City-wide Bike Plan and Construct Highest Priority Projects 25 227 33 0Washington $14,570 Ped/Bike Design and Construct Pedestrian Paths on Both Sides of NE 94th Ave, include Ped Xing 0 0 0 0Washington $799,000 Transit Transit Signal Priority. Procure and Install Signal Priority Equipment with AVI Devices 28 275 34 0Washington $47,567 Transit Transit Green Time. Procure and Install Signal Priority Equipment Transit Coaches with AVI28 275 34 0Washington $74,800 Other Transportation Planning Study 0 0 0 0Washington $50,000 Other Transportation Planning Study 0 0 0 0Washington $183,000 Traffic Flow Planning Study to Evaluate Existing AVI Systems 0 0 0 0Washington $175,000 Demand Mgmt Develop Revised Congestion Management System Work Plan 0 0 0 0Washington $744,256 Ped/Bike Design and Construct Bike Lanes on East and West Side of Lk Wash. Blvd and a Ped Path 2 20 3 0Washington $1,125,364 Ped/Bike Install New Signals at Qtr Mile Points to Help Ped Xing and Improve Transit Access 0 3 1 0Washington $1,210,000 Ped/Bike City Wide Pedestrian Improvements 0 1 0 0Washington $400,000 Ped/Bike City Wide Bike Facility Improvements 1 6 1 0Washington $836,000 Ped/Bike Construct a Grade Separated Xing in form of Precast Concrete Tunnel 0 2 0 0Washington $360,000 Ped/Bike Construct an Overcrossing for Bikes and Peds at 124th Street SE at I-5 Corridor 9 46 9 0Washington $398,000 Traffic Flow Construct 12' Lane Westbound to be Designated as Peak Hour HOV Lane (Add 5 Bike Lns) 31 300 39 0Washington $100,000 Traffic Flow Study to Collect and Analyze Traffic Count Data in Clark County Urban Area for CMS 0 0 0 0Washington $320,400 Ped/Bike Design/Construct an Overpass over I-705 and BNRR at Union Station Historic District 7 67 10 0Washington $120,000 Traffic Flow Procurement and Installation of Various Equip. and Hardware Including Signal Masters 19 288 1 0Washington $1,877,000 Traffic Flow Signal Timing Improvement Project on 104th Ave NE 9 9 9 0Washington $5,410,667 Transit Tacoma Dome Park and Ride Facilities 53 511 66 2Washington $490,000 Transit Edmonds Community College Transit Center 103 801 84 N/AWashington $1,637,000 Transit Partial Purchase of 360 Buses 273 2625 340 N/AWashington $1,586,000 Transit Automated Trip Planning 249 2391 310 N/AWashington $210,000 Transit Ridematch Signage Project 129 1236 160 N/AWashington $686,000 Transit Equipment for Regional Pass System 104 996 129 N/AWashington $266,000 Transit Innovative CTR, Employers Incentive Program 66 637 82 N/AWashington $240,000 Transit Training and Promotional Materials for CTR Employers 67 647 84 N/AWashington $113,000 Transit Debit Card Parking for HOV Use 14 135 18 N/AWashington $134,000 Transit Overlake Flex Pass Demonstration Project 45 447 50 N/AWashington $150,000 Transit Community College Flex Pass Demonstration Project 76 731 95 N/AWashington $100,000 Transit Vanpool/Carpool Operator Association 44 423 55 N/AWashington $95,000 Transit Centralized Van/Carpool Registration 72 688 89 N/AWashington $144,000 Transit Regional Ridematch Hotline 104 998 129 N/AWashington $475,981 Transit Small Bus Shuttles Not SubmittedWashington $50,000 Transit Cable TV Information and Promotional Programming 68 657 1 N/AWashington $224,076 Transit Purchase 1-ADA equipped 30-35 Foot Bus 10 97 13 N/A

West Virginia 03/31/97 $4,201,896 $13,952,000 332.0%West Virginia $1,180,000 STP/CMAQ St. Albans-Pt Pleasant EIS Not SubmittedWest Virginia $205,000 STP/CMAQ Parkersburg-Clarksburg Corr. Rock Buttress Not SubmittedWest Virginia $13,000 STP/CMAQ Hanover Slab Bridge Not SubmittedWest Virginia $118,000 STP/CMAQ Install Guardrail at Kimball-Eckman Rd. Not SubmittedWest Virginia $14,000 STP/CMAQ Repair Scouring at Burnt Fork Bridge Not SubmittedWest Virginia $919,000 STP/CMAQ Resurfacing at Webster Spring-Diana Road- Guardrail Repair Not Submitted^ 23

Page 24: CMAQ REPORTS (FY 1996)

5/20/98 CMAQ REPORTS (FY 1996)REPORT $ AMOUNT $ AMOUNT OBLIG. $ PROJECT PROJECT PROJECT VOC** CO** NOX** PM-10**

STATE SUBMIT. APPORTION. OBLIGATED % AMOUNT TYPE DESCRIPTION (KG/DAY) (KG/DAY) (KG/DAY) (KG/DAY)

West Virginia $996,000 STP/CMAQ Widen and Resurface Road at Glenville-Grantsville Not SubmittedWest Virginia $963,000 STP/CMAQ Resurface Pavement at New Cumberland-Chest./Guardrail Repair Not SubmittedWest Virginia $411,000 STP/CMAQ Resurface Pavement at Marlowe-Potomac Park/Guardrail Repair Not SubmittedWest Virginia $53,000 STP/CMAQ Install Guardrail at Limestone/Glen Daile Not SubmittedWest Virginia $46,000 STP/CMAQ Install Guardrail at Barker Road Not SubmittedWest Virginia $30,000 STP/CMAQ Install Guardrail at Rush Fork-Friendly Rd. Not SubmittedWest Virginia $3,988,000 STP/CMAQ Replace Bridge at Bridgeport Rd. Not SubmittedWest Virginia $1,050,000 STP/CMAQ Add Lane to Fairmont Ave Not SubmittedWest Virginia $409,000 STP/CMAQ Add Turning Lane and Improve Surface at Lavalette I/S Not SubmittedWest Virginia $23,000 STP/CMAQ Repair Guardrail at Mt. View High School Not SubmittedWest Virginia $618,000 STP/CMAQ Improve Corr. Slide (Piling) at Stout Mill and Burnsville Rd. Not SubmittedWest Virginia $434,000 STP/CMAQ Resurface Road at Parkersburg-Lubeck Rd. Not SubmittedWest Virginia $280,000 STP/CMAQ Resurface Road at Emerson Avenue Not SubmittedWest Virginia $40,000 STP/CMAQ Upgrade to 5 Lanes at Hurricane Creek Rd. Not SubmittedWest Virginia $40,000 STP/CMAQ Upgrade to 3 Lanes, Replace Bridge at Teays Valley Rd. Not SubmittedWest Virginia $1,653,000 STP/CMAQ Roadway Resurfacing/Widening at Spring Valley Road Not SubmittedWest Virginia $18,000 STP/CMAQ Repair Scour at Ameagle Church Bridge Not SubmittedWest Virginia $18,000 STP/CMAQ Repair Scour at Beaver Arch Bridge Not SubmittedWest Virginia $11,000 STP/CMAQ Repair Scour at Alpoca Bridge Not SubmittedWest Virginia $81,000 STP/CMAQ Install Extra Material/Structural Support at Shinnston Truss Not SubmittedWest Virginia $128,000 STP/CMAQ Correct Sliding w/ Piling at Gauley Bridge- Chimney Creek Not SubmittedWest Virginia $80,000 STP/CMAQ Add Right Turn Lane at Jefferson Road Not SubmittedWest Virginia $133,000 STP/CMAQ Replace/Repair Structure at Walnut Street Bridge Not Submitted

Wisconsin 02/03/97 $10,531,375 $5,093,284 48.4%Wisconsin $250,000 Transit Local Government Alternative Fuel Vehicle Facilitation 2Wisconsin $50,000 Transit New Berlin CNG Fueling Facility 7Wisconsin $32,000 Transit West Allis CNG Fueling Facility 7Wisconsin $43,200 Ped/Bike Racine- Sturtevant Bicycle/Pedestrian Trail 1 1Wisconsin $31,500 Ped/Bike Rubicon River Bike/Ped Trail 1 1Wisconsin $206,405 Other Waukesha Co. Tech. College Inspection/Maintenance 240 Training 18140 3600Wisconsin $28,000 Transit SMART MOVES Transit NOW <1 <1Wisconsin $185,800 Demand Mgmt Employer Trip Reduction Response Program (2nd Year) 1 2Wisconsin $187,500 Demand Mgmt Ozaukee Co. Transportation Partnership 2 3Wisconsin $352,000 Transit Sussex Intermodal Facility 3 4Wisconsin $4,608 Shared Ride Kewaskum Park N Ride Lot 1 1Wisconsin $13,760 Traffic Flow Kohler Memorial Drive Close Loop System (P.E.) 2Wisconsin $40,320 Traffic Flow Grandview Blvd Traffic Responsive Closed Loop 3Wisconsin $40,000 Transit Installation of CNG Fuel Facility- Bus Not SubmittedWisconsin $120,854 Transit Waukesha Metro Transit Night Service 6 11Wisconsin $254,240 Transit County-wide CNG Fueling Station <1Wisconsin $1,348,000 Transit Southeastern Wisconsin Marketing Partnership 7 12Wisconsin $20,787 Transit Expanded Caledonia Bus Service <1 <1Wisconsin $18,003 Transit Expanded Connection Kenosha Transit at UW Parkside <1 <1Wisconsin $31,380 Transit Airport Industrial Park Shuttle Route <1 1Wisconsin $168,267 Transit Expanded Peak Hour Transit Service 2 4Wisconsin $57,720 Transit Kenosha Racine Express Bus 1 1Wisconsin $300,000 Transit PE and EIS for E/W Corridor Transit 96 168Wisconsin $990,300 Other Wisconsin Vehicle Inspection 18140 3600Wisconsin $12,000 Traffic Flow Computer Optimization of 25 Signal Systems 20Wisconsin $128,000 Traffic Flow Computer Optimization of 83 Signal Systems 28Wisconsin $178,640 Traffic Flow Traffic Signal Coordination in City of Milwaukee 14

Wyoming* 03/10/97 $4,201,896 $6,324,218 150.5%Wyoming* $6,202,843 STP/CMAQ Reconstruct 10.4 miles US-87 between Casper & Glenrock. Include Bridge Replacement N/A N/A N/AWyoming* $121,375 STP/CMAQ Bridge ROW Acquisition, Relocation and Expenses, UPRR Overpass, Green River, SweetwaterN/A N/A N/A

^ 24

Page 25: CMAQ REPORTS (FY 1996)

5/20/98 CMAQ REPORTS (FY 1996)REPORT $ AMOUNT $ AMOUNT OBLIG. $ PROJECT PROJECT PROJECT VOC** CO** NOX** PM-10**

STATE SUBMIT. APPORTION. OBLIGATED % AMOUNT TYPE DESCRIPTION (KG/DAY) (KG/DAY) (KG/DAY) (KG/DAY)

Nationwide Totals= $840,378,953 $946,908,916 112.7%

NOTES: * States without ozone or CO nonattainment or maintenance areas. ** State-reported emission reductions are estimated for the completed project or a group of projects and not any particular phase reported in a single year. Emission reduction estimates are based on State-submitted CMAQ annual reports. Emission reduction estimates are provided without comment on their accuracy.

^ 25

Page 26: CMAQ REPORTS (FY 1996)

5/20/98

^ 26

Page 27: CMAQ REPORTS (FY 1996)

5/20/98

^ 27

Page 28: CMAQ REPORTS (FY 1996)

5/20/98

^ 28

Page 29: CMAQ REPORTS (FY 1996)

5/20/98

^ 29

Page 30: CMAQ REPORTS (FY 1996)

5/20/98

^ 30

Page 31: CMAQ REPORTS (FY 1996)

5/20/98

^ 31

Page 32: CMAQ REPORTS (FY 1996)

5/20/98

^ 32

Page 33: CMAQ REPORTS (FY 1996)

5/20/98

^ 33

Page 34: CMAQ REPORTS (FY 1996)

5/20/98

^ 34

Page 35: CMAQ REPORTS (FY 1996)

5/20/98

^ 35

Page 36: CMAQ REPORTS (FY 1996)

5/20/98

^ 36

Page 37: CMAQ REPORTS (FY 1996)

5/20/98

Qualitative Analysis- Study of TDM Alternatives in Route 1 corridor.

^ 37

Page 38: CMAQ REPORTS (FY 1996)

5/20/98

^ 38

Page 39: CMAQ REPORTS (FY 1996)

5/20/98

^ 39

Page 40: CMAQ REPORTS (FY 1996)

5/20/98

^ 40

Page 41: CMAQ REPORTS (FY 1996)

5/20/98

^ 41

Page 42: CMAQ REPORTS (FY 1996)

5/20/98

^ 42

Page 43: CMAQ REPORTS (FY 1996)

5/20/98

^ 43

Page 44: CMAQ REPORTS (FY 1996)

5/20/98

^ 44

Page 45: CMAQ REPORTS (FY 1996)

5/20/98

^ 45

Page 46: CMAQ REPORTS (FY 1996)

5/20/98

^ 46

Page 47: CMAQ REPORTS (FY 1996)

5/20/98

^ 47

Page 48: CMAQ REPORTS (FY 1996)

5/20/98

^ 48

Page 49: CMAQ REPORTS (FY 1996)

5/20/98

^ 49

Page 50: CMAQ REPORTS (FY 1996)

5/20/98

^ 50