ABOUT US - BATCO · ABOUT US LINE OF BUSINESS COMPANY OVERVEIW AREAS OF OPERATION SELECTED PROJECTS...
Transcript of ABOUT US - BATCO · ABOUT US LINE OF BUSINESS COMPANY OVERVEIW AREAS OF OPERATION SELECTED PROJECTS...
ABOUT US
LINE OF BUSINESS
COMPANY OVERVEIW
AREAS OF OPERATION
SELECTED PROJECTS
05
07
09
18
20
31 Usuma street, Maitama, Abuja, Nigeria
M: +234 803 5550777M: +234 813 6138208M: +234 815 2000077
W: www.batco-group.com
BATCO HOLDING, is a privately owned investment Company
and the major share holder of the Group and its subsidiaries.
BATCO HOLDING is a family of Companies offering diverse
operations in: Engineering, Civil infrastructure, Building
Works, and Solid Waste Management. With more than 3,000
employees, the Group has offices that are strategically
located in the MENA Region as well as Europe. The Group
has completed a wide range of medium to large size Projects
including EPC contracts valued at over 2 billion USD. BATCO
Group includes BATCO, BATCO-JSE, FEDERICI-STIRLING
and LAVAJET.
ABOUT US
5
BATCO Company offers engineering and contracting services
in four main areas. Within the transportation sector, the
Company is involved in roads, highways, bridges, viaducts
and tunnels construction. BATCO is equally experienced with
the construction of residential, educational and industrial
buildings as well as hotels, resorts and hospitals. The
Company provides infrastructure related services including
the construction of dams, water supply and sewerage
networks, wastewater and potable water treatment plants as
well as sewage and water pumping stations. Environmental
services such as the construction and operation of
landfills, sorting and composting plants, collection and
street sweeping services and several other types of waste
management services.
LINE OF BUSINESS
7
COMPANYOVERVIEW
9
Batco is an engineering and contracting company that has grown to become one of the pioneers in its domain. With multidisciplinary construction projects targeting a broad range of sectors, the firm has developed from an engineering and contracting company in the 1970s to a well reputed corporation with services including the construction and maintenance of highways, bridges, underpasses, dams, tunnels, buildings and utilities as well as design and waste management services such as the construction and operation of sanitary solid waste landfills.
BATCO
11
Joseph Sfeir Enterprises Company JSE, Is a
construction company specialized in the fields of
public works, Real Estate Development ,as well
as, water, energy & marine works. JSE, carried out
diversified projects in the fields of public works,
water, energy and marine works in the middle east,
namely highways, bridges; airports; sports arenas;
infrastructure projects; water and power distribution
and pipeline construction.
Today, JSE is committed to provide high quality
advanced services and professional expertise driven
by the constant quest to perfection.
JSE
13
FEDERICI-STIRLING is a world-renowned contracting
Company specialized in the construction and design of
airports, roads, highways, bridges, underpasses and tunnels.
The firm’s portfolio also comprises infrastructure contracts
as well as utility related services.
FEDERICI-STIRLING
15
LAVAJET is a regional leader in solid waste management
services in the MENA region providing an extensive variety
of related services. The Company offers integrated solid
waste management programs including the collection of
solid waste, street sweeping, construction, operation and
maintenance of sorting and composting plants as well as
construction and operation of hazardous and medical solid
waste landfills.
LAVAJET
17
AREAS OF OPERATION
LEBANON
UNITED ARAB EMIRATES
SULTANATE OF OMAN
KINGDOM OF BAHRAIN
ITALY
IVORY COAST
IRAQ
NIGERIA
19
SELECTEDPROJECTS
21
PROJECT: Slope protection work for the Dubai-Fujairah Freeway
LOCATION: Dubai, UAE
CLIENT:Ministry of Public Works United Arab Emirates
VALUE: 40.4 Million USD
The contract comprises the construction and maintenance of preventive and protective measures cautiously designed to avoid slope failures. Repairs and stabilization work involving any of the existing slopes along the freeway are also included.
DESCRIPTION OF WORk:• Predesign site survey and investigation• Survey and setting out work• Maintenance and protection of
exiting roads• Traffic management and roads diversion• Reinstatement of road pavement,
ditches and roads• Protective measures, repairs, remedial
work, slope protection• Drainage works• Barriers at slope end, concrete buttresses• Protection fences and barriers• Rock bolts, rock dowels and anchors• Protective mesh, Shot Crete
23
PROJECT: Rehabilitation of Aamchit - Meyfouq Road
LOCATION: Jbeil, Lebanon
CLIENT:Council for Developmentand Reconstruction
CONSULTANT:Dar Al Handasah – Nazih Taleb & Partners
VALUE: 25 Million USD
The project targets the rehabilitation of the Aamchit - Meyfouq road of total length of 24 kilometers.
DESCRIPTION OF WORk:• Earthworks for road construction, road
widening, drainage channels, culverts, bridges and walls
• Pavement works involving both new pavement and rehabilitation of existing pavement
• Construction of retaining walls, pipe culverts, bridges, concrete ditches and earth channels, sidewalks, storm water drainage network
• Protection works: slope protection, drainage ditch, grouted riprap
• Relocation of existing utilities. Drinking water networks, wastewater networks and accessories
• Electrical and street public lighting
25
PROJECT:Upgrading Tripoli’s Infrastructure Phase I - Package 1A
LOCATION:Tripoli, Lebanon
CLIENT:Council for Developmentand Reconstruction
CONSULTANT:Dar Al Handasah - Nazih Taleb & Partners
VALUE:26 Million USD
Upgrading Tripoli’s infrastructure requires the rehabilitation of several existing services and reconstruction. Utility lines excluding drinking water and electrical lines with an approximate length of 17,000 meters.
DESCRIPTION OF WORk:• Construction of new collectors• Connection of existing and new
collectors to main line• Rehabilitation of the existing network
in damaged or undersized locations• The separation of the stormwater and
wastewater networks • Construction of surface drainage
systems, including inlets, gullies and interceptors
• Rehabilitation of the new Tripoli area including the installation of the necessary equipment for the provision of drinking water
• Installation of MV and LV cables and connection
• Reconstruction of the road structure: asphalt, base course, subgrade, milling and overlaying
• Landscaping plantation, street furniture such as lighting poles, luminaries
• Testing
27
PROJECT: Rehabilitation Works (Roads, Bridges) in Quriyat, 2
LOCATION: Quriyat, Sultanate of Oman
CLIENT:Muscat Municipality
CONSULTANT:Idroesse Infrastructure spa
VALUE: 49.6 Million USD
After the disaster caused by the Cyclone Gonu, the Omani Government has taken several mitigating measures including the rehabilitation works in Quriyat.
DESCRIPTION OF WORk:• Excavation of valley bed and
embankment for dikes and roads• Soil improvement by jet
grouting technology• Construction of a 180 meter long
bridge and two viaducts with respective lengths of 210 meters and 91 meters
• Construction of reinforced concrete retaining walls
• Road works including water drainage, asphalting, road lighting, safety barriers, sidewalks, road signing and marking
29
PROJECT:Design and Construction of Wadi Bridges and Culvert in Al Qurm
LOCATION:Muscat, Sultanate of Oman
CLIENT:Muscat Municipality
CONSULTANT:Parsons International & Company LLC
VALUE:52.3 Million USD
This project encompasses the design and construction of adequate all-weather cross drainage provisions, an upgrade of the service road as well as the construction of a new flood protection dike that will ensure the safety of the neighboring commercial and residential areas.
DESCRIPTION OF WORk:• 4 bridges (200 meters each) with
precast post-tensioned beams• 10,000 meters cast-in-situ concrete
piles Ø 600 mm• Reinforced concrete box culvert• One 1,000 m long flood protection
rock fill dike• Reinforced concrete / reinforced
soil walls• Excavation and embankment for roads
and dikes• Road works, water drainage,
asphalting, lighting, safety barriers, guardrails, curbing works, road signing and marking
• Traffic and utilities diversion and protection on highways
31
PROJECT: Construction of Brissa Dam and Lake
LOCATION: Danniyeh, Lebanon
CLIENT:Council for Developmentand Reconstruction
CONSULTANT:Dar Al Handasah Nazih Taleb & Partners
VALUE: 18.8 Million USD
The project is located in the upper part of the Menieh-Danniyeh Caza. The construction of the dam will allow better distribution of irrigation requirements and has the potential to increase the irrigation of the nearby agricultural lands
DESCRIPTION OF WORk:• Geological investigation• Lake excavation and clay core• Transition fill and rock fill
paving protection• Filter, draining and rock fill
paving protection• Design and construction of cofferdam
and diversion structures• Construction of intake and
washout structure• Construction of overflow structure and
service roads
33
PROJECT:Maintenance of Al Ain Bridges
LOCATION:Al Ain, United Arab Emirates
CLIENT:Al Ain, United Arab Emirates
CONSULTANT:Ital-consult
VALUE:18.9 Million USD
DESCRIPTION OF WORk:• The reparation of all exposed
concrete surfaces and their reinforcement
• The removal and reinstatement of existing asphalt layers
• The replacement of bridge expansion joints with asphalt plug or elastomeric joints
• The replacement of existing kerbstones with trief kerbstone in footpaths and medians
• The installation of new decorative street lighting poles
• The establishment of a waterproofing membrane that will be protected by red sand asphalt
• The provision of waterproofing paint to all exposed concrete surfaces
• The reparation of existing aluminum bridge balustrade with approved system
• The replacement and maintenance of existing lanterns and tiles in footpaths and medians
• The installation of ducts under the footpaths
• The replacement of irrigation pipes in median
• The provision of gabion protection to bridge foundations
35
PROJECT:Dualization of Road: Zurub to Al-Buraimi Hospital Roundabout
LOCATION:Al Buraimi, Sultanate of Oman
CLIENT:Ministry of Transport and Communications
CONSULTANT:National Engineering Services Pakistan & Partners LLC
VALUE:53.5 Million USD
The project will allow the dualization of an existing single carriageway. A 17 kilometers dual carriageway and service road of a total length of 27 kilometers will be constructed.
DESCRIPTION OF WORk:• Construction of a 90 meters long post-
tensioned three-cell box girder lyover bridge• Construction of two 53 meters long
post-tensioned four-cell box girder interchanges bridges
• Construction of four pedestrian underpasses 4 m x 4 m x 45 m
• Road works including road stretching to approximately 1,000 m
• Construction of a road leading to the UAE’s border check post
• Water drainage, asphalt works, signing and marking
• Public utility service and traffic diversion and protection
37
PROJECT: Design and Construction of Dualization of Al Kharijiyah Street
LOCATION: Muscat, Sultanate of Oman
CLIENT:Muscat Municipality
CONSULTANT:Parsons International & Company LLC
VALUE: 17.8 Million USD
The construction of a dual carriageway in Al Kharijiyah will allow the municipality of Muscat to alleviate traffic congestion in the city’s busy districts
DESCRIPTION OF WORk:• Construction of a new signal junction
and two bridges with respective lengths of 55 meters and 45 meters
• Road works including water drainage, lighting
• Widening, camber correction and overlaying of carriageway
• Signalization of the existing roundabout• Construction of concrete lined drains• Public utility service and traffic
diversion and protection
39
PROJECT:The Construction of the Qattara Art Center
LOCATION:Al Ain, United Arab Emirates
CLIENT:Abu Dhabi Authority for Cultureand Heritage
CONSULTANT:Rafik El-Khoury and Partners
VALUE:15.1 Million USD
The construction of the Qattara Art Center aims to promote artisanal art forms and encourage the local community to support handmade art. The project entails the construction of three new structures within the confines of the existing fort along with an adjacent underground energy center.
DESCRIPTION OF WORk:• Restoration of the existing fort structures• Construction of a new exhibition
building, public facilities and new teaching/arts studio buildings
• Construction of a new performance hall and accommodation
• Construction of underground plant room/energy center
• Hard and soft landscaping
41
PROJECT: Construction of Wadi Adai Interchange
LOCATION: Muscat, Sultanate of Oman
CLIENT:Muscat Municipality
CONSULTANT:Parsons International & Company LLC
VALUE: 48.6 Million USD
The construction of Wadi Adai interchange incorporates the establishment of a third level “trumpet” arrangement that will facilitate left-turns. The interchange will be located in an urban zone with very heavy traffic.
DESCRIPTION OF WORk:• Construction of steel gantry structure
to support bridge deck formwork without interruption of traffic
• Construction of Bridge No 2: (343 meters and 226 meters long) post-tensioned concrete two-cell box girder bridge with pile foundations
• Road works including water drainage, asphalting, road lighting, safety barriers, paving and curbing, road signing and marking
• Signalized at-grade intersection• Public utility service diversion
and protection
43
PROJECT:Protection and Stabilization of Rock Cut and Fill Areas of Jabel
LOCATION:Al Ain, United Arab Emirates Hafeet
CLIENT:Al Ain Municipality
CONSULTANT:Ital-consult
VALUE:18.9 Million USD
DESCRIPTION OF WORk:• Scaling rock cut slopes• Removing loose rocks from the slopes
to form a solid rock area• Cutting back existing unstable rock
cut slopes in high areas in order to establish a solid and safe cut surface
• Rehabilitation of the existing asphaltic pavement in order to prevent potential failures
• Repair, reinstatement or replacement of footpaths
• Repair and reinstatement of concrete crash barriers and guard rails
• Upgrading and improvement of the existing stormwater drainage
• Repair and reinstatement of damaged road slopes including the existing protection works
• Repair and reinstatement of pavement and side slopes
45
PROJECT:Roads in Different Areas in Emirates (Tawaian to Dibba)
LOCATION:Fujairah, United Arab Emirates
CLIENT:Ministry of Public Works
CONSULTANT:Halcrow
VALUE: 11.4 Million USD
The highway linking Tawaian to Dibba is about 30 kilometers long. Thirty slopes along the highway require slope stabilization improvements.
DESCRIPTION OF WORk:• Excavation and clearance of debris• Installation of rock bolts, rock dowels,
wire mesh and shot Crete• Construction of concrete buttresses
and barriers at slope toe• Installation of raking drains• Temporary traffic management and
temporary road diversions• Reinstatement of road pavement,
ditches and road facilities
47
PROJECT:Qurum to Sarooj Road Improvements
LOCATION:Muscat, Sultanate of Oman
CLIENT:Muscat Municipality
CONSULTANT:WS Atkins International & Co.
VALUE: 15.4 Million USD
The road improvements in Muscat included the construction of two bridges over two tidal lagoons that were created as a result of the floods that hit the Qurum to Sarooj beach road in June 2007. The construction work focused on protecting the beach and mangroves area as well as avoiding pollution. The tidal flow giving water access to the mangroves is still maintained.
DESCRIPTION OF WORk:• Construction of two bridges with
respective lengths of 30 meters and 150 meters with precast posttensioned
• Implementation of concrete beams and cast-in-situ concrete piles of a diameter of 600 mm and 6,000 meters of length in the lagoon
• Road works including asphalting, road lighting, concrete and steel safety barriers, paving and curbing, road signing and marking
• Rock protection against coastal erosion and sea level rise
49
PROJECT: Bahrain City Centre Interchange ¡VGrade Separated Junction
LOCATION: Manama, Kingdom of Bahrain
CLIENT:Ministry of Works and Housing
CONSULTANT:Parsons - Global Services Limited
VALUE: 15.1 Million USD
DESCRIPTION OF WORk:• Traffic diversion on main highways• Construction of a cast-in-situ double-
cell box girder bridge structure with a total length of 195 meters and 800 mm diameter piles
• Construction of new roads including asphalting, street lighting, road signing and marking, water drainage, and landscaping
51
PROJECT: Rehabilitation of Silos at Beirut Port
LOCATION: Beirut, Lebanon
CLIENT:Council for Developmentand Reconstruction
CONSULTANT:Khatib & Alami
VALUE: 7.1 Million USD
The works involve the rehabilitation of forty eight 50 m high silos with 8.5 m diameter and include the repair of various types of cracks, deteriorated concrete, and concrete protection from environmental factors.
DESCRIPTION OF WORk:• Sandblasting and water jetting• Grinding cracks out to remove
faulty materials• Grinding concrete surface• Painting the structure• Installation of galvanized anchor bolts
with epoxy grout• Installation of fiber reinforced dry mix
trowel finish shot Crete• Grinding deteriorated concrete and
steel bars• Installation of steel bars and polymer
modified concrete
53
PROJECT:Rehabilitation of Roads & Services in the southern Suburb Tunnel Haret Hreik – Sands
LOCATION:Beirut, Lebanon
CLIENT:Council for Developmentand Reconstruction
CONSULTANT:Dar Al Handasah – Shair & Partners
VALUE: 17.1 Million USD
DESCRIPTION OF WORk:Haret Hreik – Sands Tunnel constitutes a major part of an overall drainage system project designed to collect stormwater from Haret Hreik together with its surrounding sectors and discharge in the Mediterranean Sea at Ouzai Sands Beach, below the Ouzai main street. It is considered as one of the most important hydraulic infrastructure projects in Beirut, and it is the longest in Lebanon.
55
PROJECT:Urban Transport Development Project Corridor Improvement Program Upgrading of Hayek and Saloumeh Intersections
LOCATION:Beirut, Lebanon
CLIENT:Council for Developmentand Reconstruction
CONSULTANT:Dar Al Handasah – Shair & Partners
VALUE: 5.2 Million USD
The works include the upgrading of the intersections at Hayek and Saloumeh Roundabouts through the construction of a permanent cast-in-situ post-tensioned concrete box girder bridge carrying Jisr El-Wati as well as Qalaa eastbound and northbound traffic over the Hayek Roundabout towards Sin El-Fil Boulevard and intersecting the Saloumeh – Dekwane Road. The overall length of the bridge (including embankment and opening) is approximately 560 m, with a 310 m long and 16 deck spans prestressed concrete. The project is executed at road intersections with very heavy traffic.
DESCRIPTION OF WORk:• Archaeological investigation.• Construction of post-tensioned
concrete box girder bridge, abutments, piers and retaining walls
• Roads, asphalting, concrete barriers, curbing and tiling
• Street lighting, traffic signals• Road signing and marking, landscaping• Utilities and utility relocation
57
59
PROJECT: Al Yas Island Development – Underpass YUP-2
LOCATION: Abu Dhabi, United Arab Emirates
CLIENT:Aldar
CONSULTANT:Halcrow
The project consists of the construction of an underpass with a total length of 537 m including retaining walls at the underpass both sides.
VALUE: 10.2 Million USD
DESCRIPTION OF WORk:• Construction of a 143m long box-
section with a width of 13.9m• Construction of two 394m long
U-sections with a width of 13.9m• Waterproofing membrane, painting
works, and wall tiling. Precast concrete side barriers
PROJECT:Extension of the National Road in Abidjan District
LOCATION:Abidjan, Ivory Coast
CLIENT:Abidjan District Administration
CONSULTANT:Abidjan District Administration
VALUE: 53.3 Million USD
The project consists of the extension of the National Road in Abidjan including road, underpass, and bridge construction.
DESCRIPTION OF WORk:• Road works including excavation,
asphalt, curbing and tiling, road signing and marking
• Construction of a reinforced concrete underpass, with a U-section reinforced concrete retaining walls at the tunnel both ends
• Construction of three prestressed concrete bridges (320 m, 470 m and 620 m of length, along with 1,000 mm diameter piles with a depth of 18 m.)
• Infrastructure works including potable water, drainage water, irrigation system, telephone networks, electrical works, and landscaping
61
PROJECT: Régions des Atchans
LOCATION: Abidjan, Ivory Coast
CLIENT:Abidjan District Administration
CONSULTANT:Abidjan District Administration
VALUE: 96.7 Million USD
The project consists of the construction of a 23.5 km highway between Songon Agban and Orbaff along with adjacent service roads, three tunnels, and one underpass.
DESCRIPTION OF WORk:• Excavation, backfill, sub-base & base
course, asphalt, curbs & sidewalks, and marking
• Construction of three tunnels of 800 m, 735 m and 550 m of length, a width of 15 m, and a maximum height of 9 m each
• Retaining walls at the tunnels both sides, including excavation in a rocky ground with treatment of cracks by high pressure injection, drainage system, ventilation system, lighting system, reinforced concrete and finishing works
• Construction of 650 m long underpass having a 220 m long covered part with 17 m width and height of 9 m, along with retaining 215 m long walls at tunnel ends
• Construction of interchanges including two prestressed concrete bridges with respectively 640 m and 580 m of length, span from 35 m to 40 m and 1,200 mm diameter piles with 18 to 22 m of depth.
• Infrastructure works including potable water supply and water drainage
63
65
PROJECT: Construction of Hazmieh Airport RoadLOCATION: Beirut, Lebanon
CLIENT:CDR, Lebanese Government
CONSULTANT:ACE consulting engineers
VALUE: 18.7 Million USD
DESCRIPTION OF WORk:• Construction of 2 bridge structures
along 2km length. • Road works Infrastructure works
including potable water, drainage, sewage system, telephone networks, and electrical works.
• Road finishing including lighting, signing, marking and landscaping.
PROJECT: Construction of Halate Airport(Military airport)
LOCATION: Halate, Lebanon
CLIENT:Lebanese Army
CONSULTANT:S.E.G Lebanon
VALUE: 30 Million USD
DESCRIPTION OF WORk:• Clearing and structural excavation• Geotechnical investigation• Drainage works• Road works• Construction of runways• Construction of 3 terminals• Construction of a control tower• Construction of buildings• Construction of an underground parking• Finishing works
67
PROJECT: Design and construction of Edde Sands Resort (#1 resort in the Middle East)
LOCATION: Byblos, Lebanon
CLIENT:Mrs. Roger and Alice Edde
CONSULTANT:J.S.E Lebanon
VALUE: 18 Million USD
DESCRIPTION OF WORk:• Clearing and structural excavation• Drainage works• Construction of 4 restaurants• Construction of 4 swimming pools• Construction of 12 bungalow and 14 cabanas• Construction of 5 conference rooms• Construction of a luxurious health club
and Spa• Construction of Edde Sands Hotel• Electrical installations• Sanitary installations• Finishing works
69
71
PROJECT:Al Dhafra Landfill & Transfer Station
LOCATION:Abu Dhabi, UAE
CLIENT:Center for Waste Management Abu Dhabi, UAE
VALUE:25 Million USD
Operation and management services for the landfill of Al Dhafra as well as a transfer station for municipal solid waste that amount to 15,000 tons a day. The contract is binding for three years but can be extended for up to two years and for a maximum term of 5 years.
DESCRIPTION OF WORk:• Design of the landfill extension
and closure• Upgrading of entrance and
administrational facilities• Earthwork and access roads construction• Installation of a liner system
(geo-membrane and geotextile)• Daily operation including daily cover
and compaction• Cells construction and closure• Client employee training• Environmental monitoring
73
PROJECT: Solid Waste Collection, Cleaning and Street Sweeping, and On-call Services in Abu Dhabi - Service Area 1
LOCATION: Abu Dhabi, UAE
CLIENT:Center for Waste Management Abu Dhabi, UAE
VALUE: 85 Million USD
The project targets the collection of up to 750 tons of municipal solid waste generated daily within Abu Dhabi. The service agreement stipulates that the contract will be effective for a duration of five years that may be extended to an additional two.
DESCRIPTION OF WORk:• Collection of MSW (750 t/d)• Sweeping and cleaning of all
roadways, streets and all public areas including public beaches, public parks, under passes, public bathrooms, markets, bus stops, parking service areas, and properties of special importance such as palaces and monuments
• On-Call services• Public awareness, educational
programs and customer services• Improvement and optimization
of the existing waste collection management system
PROJECT: Outsourcing Of Solid Waste Collection &Transportation, Street Sweeping And Cleansing Services To the northern region of Al Ain
LOCATION: Al Ain, UAE
CLIENT:Al Ain Municipality - Center forwaste management
CONSULTANT:Entec
VALUE: 140 Million USD
Waste collection, street sweeping and cleaning services in the northern region of Al Ain for a population of 350,000 and daily waste averaging 900 tons.
DESCRIPTION OF WORk:• Daily waste collection (municipal,
commercial, green, agricultural and industrial wastes)
• Street sweeping and litter picking• Manual and mechanical
street washing• Graffiti removal• Operation of a 24/24hr operation room
with stand-by emergency services• Operation of a Customer Call Center
(for complaints)• Operation and maintenance of the
service (PMV; QA; QC)• Environmental monitoring
75
PROJECT: Construction and Operation of Tripoli Landfill
LOCATION: Tripoli, Lebanon
CLIENT:Council for Developmentand Reconstruction
CONSULTANT:Dar Al Handasah – Nazih Taleb & Partners
VALUE: 25.3 Million USD
This project is the continuation of the first phase of Tripoli Landfill Expansion project.
DESCRIPTION OF WORk:• Design of the landfill extension
and closure • Earthworks, access roads, liner system• Construction of a reinforced earth fill
wall to increase capacity• Construction of a peripheral leachate
collection system with wells Extension of the wave breaker
• Operation of landfill• Leachate collection and treatment• Landfill gas extraction and flaring
77
LEBANON - UNITED ARAB EMIRATES - SULTANATE OF OMAN - kINGDOM OF BAHRAIN
ITALY - IVORY COAST - IRAQ - NIGERIA
www.batco-group.com