Scenario OverviewBP Auto V1.600
A85: APQP - Efficient Project Management
with Control Plan
-
8/3/2019 A85 Scen Overview en De
2/19
SAP AG 2007, APQP - Efficient Project Management with Control Plan
Scenario A85 APQP Efficient Project Management with ControlPlan
This scenario is made up of several building blocks containing the preconfiguration required for the APQP EfficientProject Management with Control Plan scenario. Building blocks can help you to implement the solution and put intoproduction quickly.
To illustrate the scenario presented in this overview document, the business view, the interaction view, and the componentview, provide three different perspectives on the business scenario.
Business View
The business view shows the business partners participating in the APQP Efficient Project Management with ControlPlan scenario, the business environment, and the business requirements, and benefits for the parties involved.
Interaction View
The interaction view shows the business landscape, process flow and explains the detailed steps required to carry outthe scenario.
Technical View
The technical view shows the key function available in the APQP Efficient Project Management with Control Planscenario.
Overview
-
8/3/2019 A85 Scen Overview en De
3/19
SAP AG 2007, APQP - Efficient Project Management with Control Plan
Business View
-
8/3/2019 A85 Scen Overview en De
4/19
SAP AG 2007, APQP - Efficient Project Management with Control Plan
Information Synchronization Solution for OEM and Supplier in SAP BP
Standard template delivered for APQP Different roles and authorizations are pre-defined A control plan is generated, and can be transferred to back-end systems OEM transparency enabled
Customers
Supplier Tier 2
Supplier Tier 1 OEMSupplier Tier 2
A business scenario for APQP project management starts by creating a project following the APQP standard. Roles andauthorization should be defined for different parties. Interactive operations between the QM, PM, and engineer at the
supplier side are then processed.
A practical control plan should be created during the procedure, and be seamlessly linked to the quality execution
system.
The OEM should also have the possibility to check the working procedures and related documentation through a certain
system.
SAP Best Practices for Automotive scenario APQP Efficient Project
Management with Control Plan shows the full project management cycle
following the APQP standard. Supplier.
Information Synchronization between OEM and Supplier
-
8/3/2019 A85 Scen Overview en De
5/19
SAP AG 2007, APQP - Efficient Project Management with Control Plan
Define type of
APQP
Review/
ApprovalReview/
Approval
Review
Pre-Production
Release
Review
SOP
Release
1)ConceptPhaseRFQ / Business
case
Development Plan
Regulations (Laws,
Standards,
Objectives)Continuous
Improvement
2) ProductDesignDesign FMEA
Preliminary
Bill of Materials
Specification
Design
collaboration
Control Plan
(Prototype)
3) ProcessDesignProcess FMEARouting creation
Process flow
diagram
Statistical process
Control (SPC)
Control plan(Model)
4)Validation
Planning and
production under
real-life conditions
Control plan for
series production
and inspection plan
Process audit
Production part
approval process
5)ProductLaunchQuality
Inspections
during
Production
Requalification
tests
Process
optimization
A guideline for APQP is included in TS16949 and QS9000, which contains the general requirements on how
the supplier should handle a new product development project to meet the customer requirements by planning
the product and process quality in advance.
In this scenario, the basic requirements from the APQP manual are included in a project template, for
preparing plans and checklists, to ensure that Advanced Product Quality Planning is actually carried out at the
supplier.
Advanced Product Quality Planning Phase Approach
-
8/3/2019 A85 Scen Overview en De
6/19
-
8/3/2019 A85 Scen Overview en De
7/19 SAP AG 2007, APQP - Efficient Project Management with Control Plan
Interaction View
-
8/3/2019 A85 Scen Overview en De
8/19 SAP AG 2007, APQP - Efficient Project Management with Control Plan
Project Manager Quality Manager Engineer
Create Project base on APQP
template
Project Resources Planning
Project Scheduling
Q-Gate Setting
Upload document to project
Maintain Task Status
Copy Checklist from template,
maintain checklist and confirm
status
Project Evaluation
Q-Gate: Phase Approval
Download and Print ControlPlan
Generate Object (Export
Inspection Plan to R/3)Create Collaboration
Complete Project
Create Control Plan
cFolders
A85 APQP - Efficient Project Management: Process Flow
-
8/3/2019 A85 Scen Overview en De
9/19 SAP AG 2007, APQP - Efficient Project Management with Control Plan
Business Benefits Supplier Business Benefits
Increases the efficiency of thedevelopment by involving customersand external business partners in the
development process, by accessing allobjects directly from within the project
Standardizes the development process byusing templates
Web-based access increases the speed ofinformation exchange with internal andexternal partners
All phases of development projects aresupported from concept through toplanning and execution to the closing of aproject
Create Project base on APQP template
Project Scheduling
Q-Gate Setting
Upload Document to Project
Maintain Task Status
Project Resources Planning
Copy Checklist from template, maintain checklist
and confirm status
Step Description:
An APQP Project is created based on the standard template
Resources for the project are planned - roles and authorizations are defined and assigned
Project scheduling
A Q-Gate is set for the Concept Design phase
Standard documents are uploaded into the c-Project system for the project
Status of the template documents are checked and confirmed
A85 APQP - Efficient Project Management: Process Steps 1/3
-
8/3/2019 A85 Scen Overview en De
10/19 SAP AG 2007, APQP - Efficient Project Management with Control Plan
Business Benefits Supplier Business Benefits
Better decision support
Fulfillment of requirements such as
QS9000/VDA6.1
The scenario shows how the supplier caneasily create a control plan via the toolprovided by SAP cProjects
Project Evaluation
Q-Gate: Phase Approval
Create Control Plan
Download and Print Control Plan
Generate Object (Export Inspection Plan to R/3)
Step Description:
Project Evaluation is done by both the project manager and quality manager Q-Gate is met project manager creates the approval
Approval is granted by the quality manager
Product design phase is released for execution
Control plan is created by the engineer
The control plan is downloaded as a pdf file
The control plan is transferred to the R/3 system
A85 APQP - Efficient Project Management: Process Steps 2/3
-
8/3/2019 A85 Scen Overview en De
11/19 SAP AG 2007, APQP - Efficient Project Management with Control Plan
Business Benefits Supplier Business Benefits
Full integration between project,
documents and cFolders enables direct
access to all project-related documents
Integration of control plan and PLMbackend system help the supplier raisethe project management efficiency as well
as quality management in futureproduction.
Complete Project
Generate and Maintain Inspection Plan in R/3
Create Collaboration
Step Description:
An inspection plan is generated automatically in the R/3 system
Project manager approve the phase Collaboration is created files during the project execution are transferred to the cFolders system
Project complete
A85 APQP - Efficient Project Management: Process Steps 3/3
-
8/3/2019 A85 Scen Overview en De
12/19 SAP AG 2007, APQP - Efficient Project Management with Control Plan
Suppliers &
Partners
Customers &
Channels
Engineering Procurement Manufacturing Sales & Distribution Customer Service
Time-to-Market
New Product Development and Introduction
Life-cycle Data Management
Supplier Collaboration
Strategic Sourcing
Operational Procurement and Inbound Logistics
Build-to-Order
Supply-to-line
Manufacturing
Enterprise Asset Management
Sales & Marketing
Brand and Customer Management
Vehicle Lifecycle Management
Vehicle Planning & Forecasting
Order-to-Delivery
Customer Service
Warranty Management
Interaction Center
Service Parts Planning
Service Parts Execution
Enterprise Management & Support
Analytics
Financials
Human Capital Management
Corporate Services
Operations Support
Automotive - OEM - Solution Map
-
8/3/2019 A85 Scen Overview en De
13/19 SAP AG 2007, APQP - Efficient Project Management with Control Plan
Suppliers &
Partners
Customer &
Channels
Engineering Procurement Manufacturing Sales & Distribution Customer Service
OEM Relationship Management
Collaborative Engineering
Key Account Management
Time-to-Market
New Product Development and Introduction
Life-cycle Data Management
Supplier Collaboration
Strategic Sourcing
Operational Procurement and Inbound Logistics
Make-to-Order/Make-to-Stock
Supply-to-line
Outbound Logistics
Enterprise Asset Management
Manufacturing
Sales Order Management
Demand and Order Scheduling
Order Execution and Receipt Settlement
Customer Service
Warranty Management
Service Parts Planning
Service Parts Execution
Enterprise Management & Support
Analytics
Financials
Human Capital Management
Corporate Services
Operations Support
Automotive - Supplier - Solution Map
-
8/3/2019 A85 Scen Overview en De
14/19 SAP AG 2007, APQP - Efficient Project Management with Control Plan
Technical View
-
8/3/2019 A85 Scen Overview en De
15/19 SAP AG 2007, APQP - Efficient Project Management with Control Plan
Key Functions of Efficient Project Management
c-Project is used to control the project, especially the pre-BOM phase.
Q-Gate set with complex authorization.
The control plan created in c-Project can be downloaded to a pdf file.
The control plan can be transferred to R/3 system (inspection plan).
cFolders is linked with the cProjects to ensure transparency for the OEM.
A85 APQP Efficient Project Management: Key Functions
-
8/3/2019 A85 Scen Overview en De
16/19 SAP AG 2007, APQP - Efficient Project Management with Control Plan
cProjects is used to control the project, especially the pre-BOM phase
The template is pre-defined in SAP Best Practices for Automotive
Project Template in c-Project
-
8/3/2019 A85 Scen Overview en De
17/19 SAP AG 2007, APQP - Efficient Project Management with Control Plan
Control Plan created in cProjects can be downloaded as a pdf file
Control Plan created in cProjects can be transferred to the R/3 system
An Inspection Plan in the R/3 system can be automatically generated based on
the Control Plan
Control Plan in pdf Format
-
8/3/2019 A85 Scen Overview en De
18/19 SAP AG 2007, APQP - Efficient Project Management with Control Plan
cFolders is linked with cProjects
Related information during the project can be published to the cFolders
The OEM has the possibility to monitor the project remotely
cFolders Linked to the cProjects
-
8/3/2019 A85 Scen Overview en De
19/19
No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP AG. The information containedherein may be changed without prior notice.
Some software products marketed by SAP AG and its distributors contain proprietary software components of other software vendors.
Microsoft, Windows, Outlook, and PowerPoint are registered trademarks of Microsoft Corporation.
IBM, DB2, DB2 Universal Database, OS/2, Paral lel Sysplex, MVS/ESA, AIX, S/390, AS/400, OS/390, OS/400, iSeries, pSeries, xSeries, zSeries, z/OS, AFP,Intelligent Miner, WebSphere, Netfinity, Tivoli, and Informix are trademarks or registered trademarks of IBM Corporation.
Oracle is a registered trademark of Oracle Corporation.
UNIX, X/Open, OSF/1, and Motif are registered trademarks of the Open Group.
Citrix, ICA, Program Neighborhood, MetaFrame, WinFrame, VideoFrame, and MultiWin are trademarks or registered trademarks of Citrix Systems, Inc.
HTML, XML, XHTML and W3C are trademarks or registered trademarks of W3C , World Wide Web Consortium, Massachusetts Institute of Technology.
Java is a registered trademark of Sun Microsystems, Inc.
JavaScript is a registered trademark of Sun Microsystems, Inc., used under license for technology invented and implemented by Netscape.
MaxDB is a trademark of MySQL AB, Sweden.
SAP, R/3, mySAP, mySAP.com, xApps, xApp, SAP NetWeaver, and other SAP products and services mentioned herein as well as their respective logos are
trademarks or registered trademarks of SAP AG in Germany and in several other countries all over the world. All other product and service names mentioned arethe trademarks of their respective companies. Data contained in this document serves informational purposes only. National product specifications may vary.
The information in this document is proprietary to SAP. No part of this document may be reproduced, copied, or transmitted in any form or for any purpose withoutthe express prior written permission of SAP AG.
This document is a preliminary version and not subject to your license agreement or any other agreement with SAP. This document contains only intendedstrategies, developments, and functionalities of the SAP product and is not intended to be binding upon SAP to any particular course of business, productstrategy, and/or development. Please note that this document is subject to change and may be changed by SAP at any time without notice.
SAP assumes no responsibility for errors or omissions in this document. SAP does not warrant the accuracy or completeness of the information, text, graphics,links, or other items contained within this material. This document is provided without a warranty of any kind, either express or implied, including but not limited tothe implied warranties of merchantability, fitness for a particular purpose, or non-infringement.
SAP shall have no liability for damages of any kind including without limitation direct, special, indirect, or consequential damages that may result from the use ofthese materials. This limitation shall not apply in cases of intent or gross negligence.
The statutory liability for personal injury and defective products is not affected. SAP has no control over the information that you may access through the use of hotlinks contained in these materials and does not endorse your use of third-party Web pages nor provide any warranty whatsoever relating to third-party Web pages.
Copyright 2007 SAP AG. All Rights Reserved