    Scenario OverviewBP Auto V1.600

    A85: APQP - Efficient Project Management

    with Control Plan

  • 8/3/2019 A85 Scen Overview en De

    2/19

    SAP AG 2007, APQP - Efficient Project Management with Control Plan

    Scenario A85 APQP Efficient Project Management with ControlPlan

    This scenario is made up of several building blocks containing the preconfiguration required for the APQP EfficientProject Management with Control Plan scenario. Building blocks can help you to implement the solution and put intoproduction quickly.

    To illustrate the scenario presented in this overview document, the business view, the interaction view, and the componentview, provide three different perspectives on the business scenario.

    Business View

    The business view shows the business partners participating in the APQP Efficient Project Management with ControlPlan scenario, the business environment, and the business requirements, and benefits for the parties involved.

    Interaction View

    The interaction view shows the business landscape, process flow and explains the detailed steps required to carry outthe scenario.

    Technical View

    The technical view shows the key function available in the APQP Efficient Project Management with Control Planscenario.

    Overview

  • 8/3/2019 A85 Scen Overview en De

    3/19

    SAP AG 2007, APQP - Efficient Project Management with Control Plan

    Business View

  • 8/3/2019 A85 Scen Overview en De

    4/19

    SAP AG 2007, APQP - Efficient Project Management with Control Plan

    Information Synchronization Solution for OEM and Supplier in SAP BP

    Standard template delivered for APQP Different roles and authorizations are pre-defined A control plan is generated, and can be transferred to back-end systems OEM transparency enabled

    Customers

    Supplier Tier 2

    Supplier Tier 1 OEMSupplier Tier 2

    A business scenario for APQP project management starts by creating a project following the APQP standard. Roles andauthorization should be defined for different parties. Interactive operations between the QM, PM, and engineer at the

    supplier side are then processed.

    A practical control plan should be created during the procedure, and be seamlessly linked to the quality execution

    system.

    The OEM should also have the possibility to check the working procedures and related documentation through a certain

    system.

    SAP Best Practices for Automotive scenario APQP Efficient Project

    Management with Control Plan shows the full project management cycle

    following the APQP standard. Supplier.

    Information Synchronization between OEM and Supplier

  • 8/3/2019 A85 Scen Overview en De

    5/19

    SAP AG 2007, APQP - Efficient Project Management with Control Plan

    Define type of

    APQP

    Review/

    ApprovalReview/

    Approval

    Review

    Pre-Production

    Release

    Review

    SOP

    Release

    1)ConceptPhaseRFQ / Business

    case

    Development Plan

    Regulations (Laws,

    Standards,

    Objectives)Continuous

    Improvement

    2) ProductDesignDesign FMEA

    Preliminary

    Bill of Materials

    Specification

    Design

    collaboration

    Control Plan

    (Prototype)

    3) ProcessDesignProcess FMEARouting creation

    Process flow

    diagram

    Statistical process

    Control (SPC)

    Control plan(Model)

    4)Validation

    Planning and

    production under

    real-life conditions

    Control plan for

    series production

    and inspection plan

    Process audit

    Production part

    approval process

    5)ProductLaunchQuality

    Inspections

    during

    Production

    Requalification

    tests

    Process

    optimization

    A guideline for APQP is included in TS16949 and QS9000, which contains the general requirements on how

    the supplier should handle a new product development project to meet the customer requirements by planning

    the product and process quality in advance.

    In this scenario, the basic requirements from the APQP manual are included in a project template, for

    preparing plans and checklists, to ensure that Advanced Product Quality Planning is actually carried out at the

    supplier.

    Advanced Product Quality Planning Phase Approach

  • 8/3/2019 A85 Scen Overview en De

    6/19

  • 8/3/2019 A85 Scen Overview en De

    7/19 SAP AG 2007, APQP - Efficient Project Management with Control Plan

    Interaction View

  • 8/3/2019 A85 Scen Overview en De

    8/19 SAP AG 2007, APQP - Efficient Project Management with Control Plan

    Project Manager Quality Manager Engineer

    Create Project base on APQP

    template

    Project Resources Planning

    Project Scheduling

    Q-Gate Setting

    Upload document to project

    Maintain Task Status

    Copy Checklist from template,

    maintain checklist and confirm

    status

    Project Evaluation

    Q-Gate: Phase Approval

    Download and Print ControlPlan

    Generate Object (Export

    Inspection Plan to R/3)Create Collaboration

    Complete Project

    Create Control Plan

    cFolders

    A85 APQP - Efficient Project Management: Process Flow

  • 8/3/2019 A85 Scen Overview en De

    9/19 SAP AG 2007, APQP - Efficient Project Management with Control Plan

    Business Benefits Supplier Business Benefits

    Increases the efficiency of thedevelopment by involving customersand external business partners in the

    development process, by accessing allobjects directly from within the project

    Standardizes the development process byusing templates

    Web-based access increases the speed ofinformation exchange with internal andexternal partners

    All phases of development projects aresupported from concept through toplanning and execution to the closing of aproject

    Create Project base on APQP template

    Project Scheduling

    Q-Gate Setting

    Upload Document to Project

    Maintain Task Status

    Project Resources Planning

    Copy Checklist from template, maintain checklist

    and confirm status

    Step Description:

    An APQP Project is created based on the standard template

    Resources for the project are planned - roles and authorizations are defined and assigned

    Project scheduling

    A Q-Gate is set for the Concept Design phase

    Standard documents are uploaded into the c-Project system for the project

    Status of the template documents are checked and confirmed

    A85 APQP - Efficient Project Management: Process Steps 1/3

  • 8/3/2019 A85 Scen Overview en De

    10/19 SAP AG 2007, APQP - Efficient Project Management with Control Plan

    Business Benefits Supplier Business Benefits

    Better decision support

    Fulfillment of requirements such as

    QS9000/VDA6.1

    The scenario shows how the supplier caneasily create a control plan via the toolprovided by SAP cProjects

    Project Evaluation

    Q-Gate: Phase Approval

    Create Control Plan

    Download and Print Control Plan

    Generate Object (Export Inspection Plan to R/3)

    Step Description:

    Project Evaluation is done by both the project manager and quality manager Q-Gate is met project manager creates the approval

    Approval is granted by the quality manager

    Product design phase is released for execution

    Control plan is created by the engineer

    The control plan is downloaded as a pdf file

    The control plan is transferred to the R/3 system

    A85 APQP - Efficient Project Management: Process Steps 2/3

  • 8/3/2019 A85 Scen Overview en De

    11/19 SAP AG 2007, APQP - Efficient Project Management with Control Plan

    Business Benefits Supplier Business Benefits

    Full integration between project,

    documents and cFolders enables direct

    access to all project-related documents

    Integration of control plan and PLMbackend system help the supplier raisethe project management efficiency as well

    as quality management in futureproduction.

    Complete Project

    Generate and Maintain Inspection Plan in R/3

    Create Collaboration

    Step Description:

    An inspection plan is generated automatically in the R/3 system

    Project manager approve the phase Collaboration is created files during the project execution are transferred to the cFolders system

    Project complete

    A85 APQP - Efficient Project Management: Process Steps 3/3

  • 8/3/2019 A85 Scen Overview en De

    12/19 SAP AG 2007, APQP - Efficient Project Management with Control Plan

    Suppliers &

    Partners

    Customers &

    Channels

    Engineering Procurement Manufacturing Sales & Distribution Customer Service

    Time-to-Market

    New Product Development and Introduction

    Life-cycle Data Management

    Supplier Collaboration

    Strategic Sourcing

    Operational Procurement and Inbound Logistics

    Build-to-Order

    Supply-to-line

    Manufacturing

    Enterprise Asset Management

    Sales & Marketing

    Brand and Customer Management

    Vehicle Lifecycle Management

    Vehicle Planning & Forecasting

    Order-to-Delivery

    Customer Service

    Warranty Management

    Interaction Center

    Service Parts Planning

    Service Parts Execution

    Enterprise Management & Support

    Analytics

    Financials

    Human Capital Management

    Corporate Services

    Operations Support

    Automotive - OEM - Solution Map

  • 8/3/2019 A85 Scen Overview en De

    13/19 SAP AG 2007, APQP - Efficient Project Management with Control Plan

    Suppliers &

    Partners

    Customer &

    Channels

    Engineering Procurement Manufacturing Sales & Distribution Customer Service

    OEM Relationship Management

    Collaborative Engineering

    Key Account Management

    Time-to-Market

    New Product Development and Introduction

    Life-cycle Data Management

    Supplier Collaboration

    Strategic Sourcing

    Operational Procurement and Inbound Logistics

    Make-to-Order/Make-to-Stock

    Supply-to-line

    Outbound Logistics

    Enterprise Asset Management

    Manufacturing

    Sales Order Management

    Demand and Order Scheduling

    Order Execution and Receipt Settlement

    Customer Service

    Warranty Management

    Service Parts Planning

    Service Parts Execution

    Enterprise Management & Support

    Analytics

    Financials

    Human Capital Management

    Corporate Services

    Operations Support

    Automotive - Supplier - Solution Map

  • 8/3/2019 A85 Scen Overview en De

    14/19 SAP AG 2007, APQP - Efficient Project Management with Control Plan

    Technical View

  • 8/3/2019 A85 Scen Overview en De

    15/19 SAP AG 2007, APQP - Efficient Project Management with Control Plan

    Key Functions of Efficient Project Management

    c-Project is used to control the project, especially the pre-BOM phase.

    Q-Gate set with complex authorization.

    The control plan created in c-Project can be downloaded to a pdf file.

    The control plan can be transferred to R/3 system (inspection plan).

    cFolders is linked with the cProjects to ensure transparency for the OEM.

    A85 APQP Efficient Project Management: Key Functions

  • 8/3/2019 A85 Scen Overview en De

    16/19 SAP AG 2007, APQP - Efficient Project Management with Control Plan

    cProjects is used to control the project, especially the pre-BOM phase

    The template is pre-defined in SAP Best Practices for Automotive

    Project Template in c-Project

  • 8/3/2019 A85 Scen Overview en De

    17/19 SAP AG 2007, APQP - Efficient Project Management with Control Plan

    Control Plan created in cProjects can be downloaded as a pdf file

    Control Plan created in cProjects can be transferred to the R/3 system

    An Inspection Plan in the R/3 system can be automatically generated based on

    the Control Plan

    Control Plan in pdf Format

  • 8/3/2019 A85 Scen Overview en De

    18/19 SAP AG 2007, APQP - Efficient Project Management with Control Plan

    cFolders is linked with cProjects

    Related information during the project can be published to the cFolders

    The OEM has the possibility to monitor the project remotely

    cFolders Linked to the cProjects

  • 8/3/2019 A85 Scen Overview en De

    19/19

    No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP AG. The information containedherein may be changed without prior notice.

    Some software products marketed by SAP AG and its distributors contain proprietary software components of other software vendors.

    Microsoft, Windows, Outlook, and PowerPoint are registered trademarks of Microsoft Corporation.

    IBM, DB2, DB2 Universal Database, OS/2, Paral lel Sysplex, MVS/ESA, AIX, S/390, AS/400, OS/390, OS/400, iSeries, pSeries, xSeries, zSeries, z/OS, AFP,Intelligent Miner, WebSphere, Netfinity, Tivoli, and Informix are trademarks or registered trademarks of IBM Corporation.

    Oracle is a registered trademark of Oracle Corporation.

    UNIX, X/Open, OSF/1, and Motif are registered trademarks of the Open Group.

    Citrix, ICA, Program Neighborhood, MetaFrame, WinFrame, VideoFrame, and MultiWin are trademarks or registered trademarks of Citrix Systems, Inc.

    HTML, XML, XHTML and W3C are trademarks or registered trademarks of W3C , World Wide Web Consortium, Massachusetts Institute of Technology.

    Java is a registered trademark of Sun Microsystems, Inc.

    JavaScript is a registered trademark of Sun Microsystems, Inc., used under license for technology invented and implemented by Netscape.

    MaxDB is a trademark of MySQL AB, Sweden.

    SAP, R/3, mySAP, mySAP.com, xApps, xApp, SAP NetWeaver, and other SAP products and services mentioned herein as well as their respective logos are

    trademarks or registered trademarks of SAP AG in Germany and in several other countries all over the world. All other product and service names mentioned arethe trademarks of their respective companies. Data contained in this document serves informational purposes only. National product specifications may vary.

    The information in this document is proprietary to SAP. No part of this document may be reproduced, copied, or transmitted in any form or for any purpose withoutthe express prior written permission of SAP AG.

    This document is a preliminary version and not subject to your license agreement or any other agreement with SAP. This document contains only intendedstrategies, developments, and functionalities of the SAP product and is not intended to be binding upon SAP to any particular course of business, productstrategy, and/or development. Please note that this document is subject to change and may be changed by SAP at any time without notice.

    SAP assumes no responsibility for errors or omissions in this document. SAP does not warrant the accuracy or completeness of the information, text, graphics,links, or other items contained within this material. This document is provided without a warranty of any kind, either express or implied, including but not limited tothe implied warranties of merchantability, fitness for a particular purpose, or non-infringement.

    SAP shall have no liability for damages of any kind including without limitation direct, special, indirect, or consequential damages that may result from the use ofthese materials. This limitation shall not apply in cases of intent or gross negligence.

    The statutory liability for personal injury and defective products is not affected. SAP has no control over the information that you may access through the use of hotlinks contained in these materials and does not endorse your use of third-party Web pages nor provide any warranty whatsoever relating to third-party Web pages.

    Copyright 2007 SAP AG. All Rights Reserved