- 1 - General Information Accredited Thermographers 2011 Thermographic Inspection ACME Industries Pacific Hwy, North Sydney Vol.6 Client ACME Industries Job No. 2189 Address Pacific Hwy. North Sydney Date 14/03/11 Tel. 02 5555 5555 Fax 5555 5556 Time 09:30 AM Contact ACME Boss Vol. Six (6) Location Pacific Hwy, North Sydney IR Camera Avio 600 Serial No. 0342A1141AD Visual Camera Olympus SP-310 Serial No. J35204332 Load Measurement Device Kyoritsu-2017 Serial No. KY90-1198B Thermographer Accreditation No. AINDT - 2067 An Infrared Thermal Scan of Listed Electrical Switchboards was conducted 14 th March 2011. The complex was drawing load from the Local Supply Authority at time of inspection. Internal switchgear components and associated wiring were inspected for abnormal operating temperatures effected by load or equipment condition. Wiring and terminations were inspected for high resistance connections and insulation condition. Load conditions were as experienced during periods of normal demand. All inspected switchboards and associated wiring within were thermally operating within load conditions. Internal wiring insulation and terminations appear to be sound with exceptions as listed within. Malcolm Rhind Thermal Imaging Services 8/139 Woolooware Rd Burraneer NSW 2230 T. (02) 9544 3588 F. (02) 9544 3688 E. [email protected] W. www.thermalimagingservices.com.au

Transcript of 2011 Thermographic Inspection ACME Industries Pacific...

  • - 1 -

    General Information

    Accredited Thermographers

    2011 Thermographic Inspection

    ACME Industries Pacific Hwy, North Sydney

    Vol.6

    Client ACME Industries Job No. 2189 Address Pacific Hwy. North Sydney Date 14/03/11 Tel. 02 5555 5555 Fax 5555 5556 Time 09:30 AM Contact ACME Boss Vol. Six (6) Location Pacific Hwy, North Sydney IR Camera Avio 600 Serial No. 0342A1141AD Visual Camera Olympus SP-310 Serial No. J35204332 Load Measurement Device Kyoritsu-2017 Serial No. KY90-1198B Thermographer Accreditation No. AINDT - 2067

    An Infrared Thermal Scan of Listed Electrical Switchboards was conducted 14th March 2011. The complex was drawing load from the Local Supply Authority at time of inspection. Internal switchgear components and associated wiring were inspected for abnormal operating temperatures effected by load or equipment condition. Wiring and terminations were inspected for high resistance connections and insulation condition. Load conditions were as experienced during periods of normal demand. All inspected switchboards and associated wiring within were thermally operating within load conditions. Internal wiring insulation and terminations appear to be sound with exceptions as listed within. Malcolm Rhind

    Thermal Imaging Services 8/139 Woolooware Rd Burraneer NSW 2230 T. (02) 9544 3588 F. (02) 9544 3688 E. [email protected] W. www.thermalimagingservices.com.au

  • - 2 -

    General Information Application

    Thermal Scanning

    The information listed below is to assist in the interpretation and discharge of appropriate remedial action of reported faults or potential areas of concern. Recommendations listed within this report are within the area of our expertise and recommend you discuss the implementation of service/repair with your maintenance service provider. Scope Infrared Thermal scan of electrical switchgear and associated conductors to detect the evidence of equipment operating near or above rated thermal temperatures. Where possible load readings are taken to ensure proper diagnosis of prospective faults. Australian and IEC Standards along with Copper & Brass Association publication No.22 are used as benchmarks for assessing permissible temperature limits. Method All accessible covers are removed from the switchboards with internal PVC shrouds removed when installed in a manner that facilitates safe removal. Switchboards assigned a segregation rating greater than two (2), in accordance with AS3439, or where fitted with internal busbar shrouds can be arranged to be scanned with the arrangement of at least two shutdowns to remove and reinstall covers. Internal metal covers will not be removed whilst the switchboard is on line. An infrared radiometer with its range initially set at 20° C and 40° C is passed over all switchgear, bus system and cable connections. Areas displaying abnormal temperature variations are further investigated by means of equipment application analysis, load measurement and pinpoint temperature readings. Faults and areas of concern have infrared thermal and digital images saved for report and condition monitoring tasks. Results A priority rating schedule along with suggested remedial action plans are included for prioritising rectification works. Where faults of a life or property threatening situation are detected, notification will be immediately made to the client’s representative. Ultimately it is the owner or plant operator’s responsibility to implement or gain further advice of the recommended repairs contained within this report. Each thermal image is uniquely identified to correspond with a label placed upon the affected equipment for ready identification by maintenance personnel.

    Priority Rating Recommended Action 0 No Fault. Re-scan within 12 months 1 Corrective / Evasive Action required immediately 2 Corrective Action required urgently 3 Corrective Action at next scheduled maintenance 4 Condition monitor. Possible fault developing.

    Licensed electricians must perform all repairs and service.

  • - 3 -

    Table of Contents

    Section Equipment Priority Page Mechanical Services Switchboard Located Level 4 Plant Room

    Compressor 3 Motor Starter

    2

    4

    House Services Panel Located Level 3 Riser

    Fan Isolating Switch & DB-2 Isolating Switch

    2

    5

    DB-8A Located Level 4 Riser

    Main Switch

    2

    6

    DB-3 Located Warehouse Ramp

    Circuit Breaker 89-90

    1

    7

    DB-4.4 Located Level 1 Riser

    A phase circuit breaker chassis

    1

    8

    Summary of Inspection List of Reported Items 9

    List of Inspected Assets 10 Certification Details 11

  • - 4 -

    Inspected Equipment Operator:

    Mechanical Services Switchboard Located Level 4 Plant Room

    Malcolm Rhind

    Equipment Compressor 3 Motor Starter

    Equipment Type ABB A-63

    Additional Information

    Date 14/03/2011

    Time 11:38 AM

    Working conditions:

    Located within a non ventilated environment

    Thermoteknix TVS-600 11:38:04 AM 24/03/2011 e : 0.95 Bg : 35.9°C-20.0

    300.0

    17.0

    60.1

    Celsius

    20.0

    25.0

    30.0

    35.0

    40.0

    45.0

    50.0

    55.0

    51.4

    Max.

    75.8

    75.8

    IR Image Details

    Image No.

    Emissivity 0.95

    Spot 1 51.4°C

    Spot 2 75.8°C

    Area 1 Max. 75.8°C

    Area 2 Max.

    Background 36.0°C

    Description of Fault High resistance A phase load side termination. Terminal was re-tensioned during inspection

    Priority Rating 2 Recommendation Re-scan within 12 months.

    Previous Fault Description Date Image Vol. Code Page Time Remedial Action Taken

    Authorised

    Reference Image

    Thermal Image

  • - 5 -

    Inspected Equipment Operator:

    House Services Panel Located Level 3 Riser

    Malcolm Rhind

    Equipment Fan Isolating Switch & DB-2 Isolating Switch

    Equipment Type Quicklag Q355C & Q3100CN

    Additional Information

    Date 20/04/2011

    Time 07:18 AM

    Working conditions:

    Located within a non ventilated environment

    Thermoteknix TVS-600 7:18:41 AM 20/04/2011 e : 0.95 Bg : 22.0°C-20.0

    300.0

    17.8

    67.0

    Celsius

    20.0

    25.0

    30.0

    35.0

    40.0

    45.0

    50.0

    55.0

    60.0

    65.0

    49.4

    Max.89.4

    89.4 76.5

    44.2

    60.7

    44.8

    IR Image Details

    Image No.

    Emissivity 0.95

    Spot 1 49.4°C

    Spot 2 89.4°C

    Area 1 Max. 89.4°C

    Area 2 Max.

    Background 22.0°C

    Description of Fault High resistance terminations. Variation in line and load side temperatures

    Priority Rating 2 Recommendation Inspect contact surfaces and re-terminate.

    Ensure tunnel terminals are securely fitted to circuit breaker housings

    Previous Fault Description Date Image Vol. Code Page Time Remedial Action Taken

    Reference Image

    Thermal Image

  • - 6 -

    Inspected Equipment Operator:

    DB-8A Located Level 4 Riser

    Malcolm Rhind

    Equipment Main Switch

    Equipment Type Quicklag Q3100C

    Additional Information Loading A Phase – 89 Amperes B Phase – 32 Amperes C Phase – 38 Amperes

    Date 2/05/2011

    Time 08:41 AM

    Working conditions:

    Located within a ventilated environment

    Thermoteknix TVS-600 8:41:04 AM 2/05/2011 e : 0.95 Bg : 25.1°C-20.0

    300.0

    2.5

    50.3

    Celsius

    5.0

    10.0

    15.0

    20.0

    25.0

    30.0

    35.0

    40.0

    45.0

    31.3

    Max.68.0

    68.0

    28.4

    58.2

    IR Image Details

    Image No.

    Emissivity 0.95

    Spot 1 31.3°C

    Spot 2 68.0°C

    Area 1 Max. 68.0°C

    Area 2 Max.

    Background 25.0°C

    Description of Fault High resistance A phase connection. Unbalanced load Priority Rating 2

    Recommendation Ensure runnel terminal is securely fitted to circuit breaker housing. Re-tension termination. Re-distribute load over adjacent phases.

    Previous Fault Description Date Image Vol. Code Page Time Remedial Action Taken

    Authorised

    Reference Image

    Thermal Image

  • - 7 -

    Inspected Equipment Operator:

    DB-3 Located Warehouse Ramp

    Malcolm Rhind

    Equipment Circuit Breaker 89-90

    Equipment Type Hager

    Additional Information Neutral Conductor

    Date 23/04/2010

    Time 09:30 AM

    Working conditions:

    Located within a ventilated environment

    Thermoteknix TVS-600 9:30:38 AM 23/04/2010 e : 0.95 Bg : 24.9°C-20.0

    300.0

    26.1

    86.2

    Celsius

    30.0

    35.0

    40.0

    45.0

    50.0

    55.0

    60.0

    65.0

    70.0

    75.0

    80.0121.0

    Max.121.0

    60.0

    IR Image Details

    Image No.

    Emissivity 0.95

    Spot 1 121.0°C

    Spot 2 60.0°C

    Area 1 Max. 121.0°C

    Area 2 Max.

    Background 25.0°C

    Description of Fault High resistance termination.

    Priority Rating 1

    Recommendation Make good cable end and re-terminate

    Previous Fault Description Date Image Vol. Code Page Time Remedial Action Taken

    Authorised

    Reference Image

    Thermal Image

  • - 8 -

    Inspected Equipment Operator:

    DB-4.4 Located Level 1 Riser

    Malcolm Rhind

    Equipment A phase circuit breaker chassis

    Equipment Type Merlin Gerin

    Additional Information

    Date 24/03/2010

    Time 08:26 AM

    Working conditions:

    Located within a non ventilated environment.

    Thermoteknix TVS-600 8:26:28 AM 24/03/2010 e : 0.95 Bg : 24.9°C-20.0

    300.0

    35.0

    183.5

    Celsius

    40.0

    60.0

    80.0

    100.0

    120.0

    140.0

    160.0

    >300.033.7

    IR Image Details

    Image No.

    Emissivity 0.95

    Spot 1 300.0°C

    Spot 2 33.7°C

    Area 1 Max. 300.0°C

    Area 2 Max.

    Background 25.0°C

    Description of Fault High resistance A phase connection to circuit breaker chassis

    Priority Rating 1

    Recommendation Replace circuit breaker chassis and make good connection hardware and conductor.

    Previous Fault Description Date Image Vol. Code Page Time Remedial Action Taken

    Authorised

    Reference Image

    Thermal Image

  • - 9 -

    Summary of Inspection

    List of Reported Items

    Switchboard Equipment Fault Priority/Recommendation Mechanical Services Switchboard Located Level 4 Plant Room

    Compressor 3 Motor Starter

    High resistance A phase load side termination was detected

    2

    Termination re-tensioned during inspection

    House Services Panel Located Level 3 Riser

    Fan Isolating Switch & DB-2 Isolating Switch

    High resistance terminations. Variation in line and load side temperatures

    2

    Inspect contact surfaces and re-terminate. Ensure tunnel terminals are securely fitted to circuit breaker housings

    DB-8A Located Level 4 Riser

    Main Switch

    High resistance A phase connection. Unbalanced load

    2

    Ensure runnel terminal is securely fitted to circuit breaker housing. Re-tension termination. Re-distribute load over adjacent phases.

    DB-3 Located Warehouse Ramp

    Circuit Breaker 89-90

    High resistance termination.

    1

    Make good cable end and re-terminate

    DB-4.4 Located Level 1 Riser

    A phase circuit breaker chassis

    High resistance A phase connection to circuit breaker chassis

    1

    Replace circuit breaker chassis and make good connection hardware and conductor.

  • - 10 -

    List of Inspected Assets

    Location Switchboard Fault Comment Main Switchroom Main Switchboard Nil

    PFC Unit 1 Nil

    PFC Unit 2 Nil

    Unmarked DB Nil

    Admin. Block Data Recovery Room

    UPS DB Nil

    By Pass Switch Nil

    Located Level 1 Riser DB-4.4 √ See Report Page 8

    Under Art Department (Building Void)

    DB-7 Nil

    DB-8 Nil

    Compressor Load Centre Nil

    Under Administration Block DB-5 Nil

    Air Conditioning Sub Board Nil

    Warehouse Ramp DB-3 √ See Report Page 7

    DB-3A Nil

    Warehouse Mezzanine MCC Nil

    Warehouse (Adj. Loading Dock)

    DB-3C Nil

    Warehouse Customer Service

    DB-3D Nil

    Warehouse (Rear Wall)

    DB-6

    Nil

    DB-3CB Nil

    Workshop Sub Board - No load

    Located Level 4 Riser DB-8A

    √ See Report Page 6

    Level 4 Plant Room Mechanical Services Switchboard

    √ See Report Page 4

    House Services Panel Located Level 3 Riser

    Fan Isolating Switch & DB-2 Isolating Switch

    √ See Report Page 5

    Data Room DB Nil

    UPS By Pass Switch Nil

    Book Fare Warehouse DB-1 Nil

    Level 1 Admin. New Media

    DB-2 Nil

    DB-3 Nil

    DB-3 (Special Purpose) Nil

    Level 1 Comms. Room New Media

    UPS -1 Sub Board Nil

    UPS -2 Sub Board Nil

  • - 11 -