(Project Name & Location) - Amazon S3s3-ap-southeast-2.amazonaws.com/resources.farm1.mycms.me... ·...

11
Date: Issue: 1A Ref: 2015 Thermographic Inspection (Project Name & Location) Accredited Thermographers

Transcript of (Project Name & Location) - Amazon S3s3-ap-southeast-2.amazonaws.com/resources.farm1.mycms.me... ·...

Page 1: (Project Name & Location) - Amazon S3s3-ap-southeast-2.amazonaws.com/resources.farm1.mycms.me... · 2015. 4. 16. · Mechanical Services Switchboard Located Level 4 Plant Room Malcolm

Date: Issue: 1A Ref:

2015 Thermographic Inspection

(Project Name & Location)

Accredited Thermographers

Page 2: (Project Name & Location) - Amazon S3s3-ap-southeast-2.amazonaws.com/resources.farm1.mycms.me... · 2015. 4. 16. · Mechanical Services Switchboard Located Level 4 Plant Room Malcolm

- 2 -

Issued By:

Thermal Imaging Services 8/139 Woolooware Rd Burraneer NSW 2230 T. (02) 9544 3588 F. (02) 9544 3688 E. [email protected]

Thermographer:

XXXXXXXXXXXXXX

Thermographer Accreditation No:

AINDT – XXXXX

IR Camera:

Manufacturer :- Serial No.:- Calibration Date :-

Client: XXXXXXXXXXXXXX

Client Representative:

XXXXXXXXXXXXXX

Location:

XXXXXXXXXXXXXX

Copyright ©2014 All riights reserved. This document and document format remains the proprty of Thermal Imaging Services. No part ot this document may be reproduced or transmitted in any form or by any means without the written permission of Thermal Imaging Sevices

Report Details

Page 3: (Project Name & Location) - Amazon S3s3-ap-southeast-2.amazonaws.com/resources.farm1.mycms.me... · 2015. 4. 16. · Mechanical Services Switchboard Located Level 4 Plant Room Malcolm

- 3 -

Section Equipment Priority Page Mechanical Services Switchboard Located Level 4 Plant Room

Compressor 3 Motor Starter

2

4

House Services Panel Located Level 3 Riser

Fan Isolating Switch & DB-2 Isolating Switch

2

5

DB-8A Located Level 4 Riser

Main Switch

2

6

DB-3 Located Warehouse Ramp

Circuit Breaker 89-90

1

7

DB-4.4 Located Level 1 Riser

A phase circuit breaker chassis

1

8

Summary of Inspection List of Reported Items 9

List of Inspected Assets 10

Certification Details 11

Table of Contents

TABLE OF CONTENTS

Page 4: (Project Name & Location) - Amazon S3s3-ap-southeast-2.amazonaws.com/resources.farm1.mycms.me... · 2015. 4. 16. · Mechanical Services Switchboard Located Level 4 Plant Room Malcolm

- 4 -

Inspected Equipment Operator:

Mechanical Services Switchboard Located Level 4 Plant Room

Malcolm Rhind

Equipment Compressor 3 Motor Starter

Equipment Type ABB A-63

Additional Information

Date 14/03/2011

Time 11:38 AM

Working conditions:

Located within a non ventilated environment

Thermoteknix TVS-600 11:38:04 AM 24/03/2011 e : 0.95 Bg : 35.9°C

-20.0

300.0

17.0

60.1

Celsius

20.0

25.0

30.0

35.0

40.0

45.0

50.0

55.0

51.4

Max.

75.8

75.8

IR Image Details

Image No.

Emissivity 0.95

Spot 1 51.4°C

Spot 2 75.8°C

Area 1 Max. 75.8°C

Area 2 Max. <unknown>

Background 36.0°C

Description of Fault High resistance A phase load side termination.

Priority Rating 2

Recommendation Re-scan within 12 months.

Previous Fault Description

Date Image

Vol. Code

Page Time

Remedial Action Taken

Authorised

Reference Image

Thermal Image

Page 5: (Project Name & Location) - Amazon S3s3-ap-southeast-2.amazonaws.com/resources.farm1.mycms.me... · 2015. 4. 16. · Mechanical Services Switchboard Located Level 4 Plant Room Malcolm

- 5 -

Inspected Equipment Operator:

House Services Panel Located Level 3 Riser

Malcolm Rhind

Equipment Fan Isolating Switch & DB-2 Isolating Switch

Equipment Type Quicklag Q355C & Q3100CN

Additional Information

Date 20/04/2011

Time 07:18 AM

Working conditions:

Located within a non ventilated environment

Thermoteknix TVS-600 7:18:41 AM 20/04/2011 e : 0.95 Bg : 22.0°C

-20.0

300.0

17.8

67.0

Celsius

20.0

25.0

30.0

35.0

40.0

45.0

50.0

55.0

60.0

65.0

49.4

Max.

89.4

89.4 76.5

44.2

60.7

44.8

IR Image Details

Image No.

Emissivity 0.95

Spot 1 49.4°C

Spot 2 89.4°C

Area 1 Max. 89.4°C

Area 2 Max. <unknown>

Background 22.0°C

Description of Fault High resistance terminations. Variation in line and load side temperatures

Priority Rating 2

Recommendation Inspect contact surfaces and re-terminate. Ensure tunnel terminals are securely fitted to circuit breaker housings

Previous Fault Description

Date Image

Vol. Code

Page Time

Remedial Action Taken

Reference Image

Thermal Image

Page 6: (Project Name & Location) - Amazon S3s3-ap-southeast-2.amazonaws.com/resources.farm1.mycms.me... · 2015. 4. 16. · Mechanical Services Switchboard Located Level 4 Plant Room Malcolm

- 6 -

Inspected Equipment Operator:

DB-8A Located Level 4 Riser

Malcolm Rhind

Equipment Main Switch

Equipment Type Quicklag Q3100C

Additional Information Loading A Phase – 89 Amperes B Phase – 32 Amperes C Phase – 38 Amperes

Date 2/05/2011

Time 08:41 AM

Working conditions:

Located within a ventilated environment

Thermoteknix TVS-600 8:41:04 AM 2/05/2011 e : 0.95 Bg : 25.1°C

-20.0

300.0

2.5

50.3

Celsius

5.0

10.0

15.0

20.0

25.0

30.0

35.0

40.0

45.0

31.3

Max.68.0

68.0

28.4

58.2

IR Image Details

Image No.

Emissivity 0.95

Spot 1 31.3°C

Spot 2 68.0°C

Area 1 Max. 68.0°C

Area 2 Max. <unknown>

Background 25.0°C

Description of Fault High resistance A phase connection. Unbalanced load

Priority Rating 2

Recommendation Ensure runnel terminal is securely fitted to circuit breaker housing. Re-tension termination. Re-distribute load over adjacent phases.

Previous Fault Description

Date Image

Vol. Code

Page Time

Remedial Action Taken

Authorised

Reference Image

Thermal Image

Page 7: (Project Name & Location) - Amazon S3s3-ap-southeast-2.amazonaws.com/resources.farm1.mycms.me... · 2015. 4. 16. · Mechanical Services Switchboard Located Level 4 Plant Room Malcolm

- 7 -

Inspected Equipment Operator:

DB-3 Located Warehouse Ramp

Malcolm Rhind

Equipment Circuit Breaker 89-90

Equipment Type Hager

Additional Information Neutral Conductor

Date 23/04/2010

Time 09:30 AM

Working conditions:

Located within a ventilated environment

Thermoteknix TVS-600 9:30:38 AM 23/04/2010 e : 0.95 Bg : 24.9°C

-20.0

300.0

26.1

86.2

Celsius

30.0

35.0

40.0

45.0

50.0

55.0

60.0

65.0

70.0

75.0

80.0121.0

Max.121.0

60.0

IR Image Details

Image No.

Emissivity 0.95

Spot 1 121.0°C

Spot 2 60.0°C

Area 1 Max. 121.0°C

Area 2 Max. <unknown>

Background 25.0°C

Description of Fault High resistance termination.

Priority Rating 1

Recommendation Make good cable end and re-terminate

Previous Fault Description

Date Image

Vol. Code

Page Time

Remedial Action Taken

Authorised

Reference Image

Thermal Image

Page 8: (Project Name & Location) - Amazon S3s3-ap-southeast-2.amazonaws.com/resources.farm1.mycms.me... · 2015. 4. 16. · Mechanical Services Switchboard Located Level 4 Plant Room Malcolm

- 8 -

Inspected Equipment Operator:

DB-4.4 Located Level 1 Riser

Malcolm Rhind

Equipment A phase circuit breaker chassis

Equipment Type Merlin Gerin

Additional Information

Date 24/03/2010

Time 08:26 AM

Working conditions:

Located within a non ventilated environment.

Thermoteknix TVS-600 8:26:28 AM 24/03/2010 e : 0.95 Bg : 24.9°C

-20.0

300.0

35.0

183.5

Celsius

40.0

60.0

80.0

100.0

120.0

140.0

160.0

>300.033.7

IR Image Details

Image No.

Emissivity 0.95

Spot 1 300.0°C

Spot 2 33.7°C

Area 1 Max. 300.0°C

Area 2 Max. <unknown>

Background 25.0°C

Description of Fault High resistance A phase connection to circuit breaker chassis

Priority Rating 1

Recommendation Replace circuit breaker chassis and make good connection hardware and conductor.

Previous Fault Description

Date Image

Vol. Code

Page Time

Remedial Action Taken

Authorised

Reference Image

Thermal Image

Page 9: (Project Name & Location) - Amazon S3s3-ap-southeast-2.amazonaws.com/resources.farm1.mycms.me... · 2015. 4. 16. · Mechanical Services Switchboard Located Level 4 Plant Room Malcolm

- 9 -

List of Reported Items

Switchboard Equipment Fault Priority/Recommendation Mechanical Services Switchboard Located Level 4 Plant Room

Compressor 3 Motor Starter

High resistance A phase load side termination was detected

2

Termination re-tensioned during inspection

House Services Panel Located Level 3 Riser

Fan Isolating Switch & DB-2 Isolating Switch

High resistance terminations. Variation in line and load side temperatures

2

Inspect contact surfaces and re-terminate. Ensure tunnel terminals are securely fitted to circuit breaker housings

DB-8A Located Level 4 Riser

Main Switch

High resistance A phase connection. Unbalanced load

2

Ensure runnel terminal is securely fitted to circuit breaker housing. Re-tension termination. Re-distribute load over adjacent phases.

DB-3 Located Warehouse Ramp

Circuit Breaker 89-90

High resistance termination.

1

Make good cable end and re-terminate

DB-4.4 Located Level 1 Riser

A phase circuit breaker chassis

High resistance A phase connection to circuit breaker chassis

1

Replace circuit breaker chassis and make good connection hardware and conductor.

Page 10: (Project Name & Location) - Amazon S3s3-ap-southeast-2.amazonaws.com/resources.farm1.mycms.me... · 2015. 4. 16. · Mechanical Services Switchboard Located Level 4 Plant Room Malcolm

- 10 -

List of Inspected Assets

Location Switchboard Fault Comment Main Switch Room Main Switchboard Nil

PFC Unit 1 Nil

PFC Unit 2 Nil

Unmarked DB Nil

Admin. Block Data Recovery Room

UPS DB Nil

By Pass Switch Nil

Located Level 1 Riser DB-4.4 √

Under Art Department (Building Void)

DB-7 Nil

DB-8 Nil

Compressor Load Centre Nil

Under Administration Block DB-5 Nil

Air Conditioning Sub Board Nil

Warehouse Ramp DB-3 √

DB-3A Nil

Warehouse Mezzanine MCC Nil

Warehouse (Adj. Loading Dock)

DB-3C Nil

Warehouse Customer Service

DB-3D Nil

Warehouse (Rear Wall)

DB-6

Nil

DB-3CB Nil

Workshop Sub Board - No load

Located Level 4 Riser DB-8A

Level 4 Plant Room Mechanical Services Switchboard

House Services Panel Located Level 3 Riser

Fan Isolating Switch & DB-2 Isolating Switch

Data Room DB Nil

UPS By Pass Switch Nil

Book Fare Warehouse DB-1 Nil

Level 1 Admin. New Media

DB-2 Nil

DB-3 Nil

DB-3 (Special Purpose) Nil

Level 1 Comms. Room New Media

UPS -1 Sub Board Nil

UPS -2 Sub Board Nil

Page 11: (Project Name & Location) - Amazon S3s3-ap-southeast-2.amazonaws.com/resources.farm1.mycms.me... · 2015. 4. 16. · Mechanical Services Switchboard Located Level 4 Plant Room Malcolm

- 11 -

Accreditation Details

ACCREDITATION DETAILS