MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
INDEX
1.0 Project Background 2
2.0 Third Party Quality Audit Consultant 3
3.0 Major Activities and Review Meetings of the Month 3
4.0 Status of TPQA Visits 4
5.0 Progress of NCRMP works 5
TPQA Status Report for NCRMP Works To the end of(30-06-2012) 6
6.0 District wise status of tests conducted by TPQA 28
7.0 Details of QC Audit Reports Submitted during this Month 29
-
7/31/2019 10.June MPR 2012
3/88
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
1.0 Project Background
Andhra Pradesh (AP) state has one of the longest coastal belts in India. Out of 67,362 Km of road network in the state, the
nine coastal districts cover 26,000 km of road length. Every year during the period of April-May and September-December,
cyclonic situations set in to the Bay of Bengal. With the recent changes in climatic conditions, the catastrophic events are
increasing resulting in very devastating cyclones like Laila, Jal etc where the loss is enormous. In the 97 years ranging
from 1892 to 1989, there were as many as 67 cyclones within the State.
It is essential to provide safe residential accommodation to the vulnerable population during any eventuality or disaster due
to natural calamities such as cyclones and associated tidal waves and storm surges. The project is formulated based on
experiences of Government of Andhra Pradesh in mitigating such disasters during the past and also keeping in view the
existing facilities available in the project area in Andhra Pradesh.
The Government of India has applied for a credit of US$ 255 Million equivalent from the International Development
Association (IDA) toward the cost of National Cyclone Risk Mitigation Project (NCRMP), and it intends to apply the
proceeds to payments for goods, works, related services and consulting services under this Project.
National Cyclone Risk Mitigation Project (NCRMP) Project Implementation Unit (PIU), Andhra Pradesh, headquartered atHyderabad has invited the consultants to submit proposals for providing the consultancy services for Third Party Quality
Audit for 9 coastal districts namely Srikakulam, Vijayanagaram, Visakhapatnam, East Godavari, West Godavari, Krishna,
Guntur, Prakasam and Nellore. The project Construction of Multipurpose Cyclone Shelters, Roads to Cyclone
Shelters, and Roads to habitations and Roads & Bridges under NCRMP is funded by International Development
Association and received through Government of India. This consultancy is envisaged to audit the quality of works being
implemented by various line departments working under PIU. The number of works under progress / for which
agreements are concluded in each district is shown in the table below
-
7/31/2019 10.June MPR 2012
4/88
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
2.0 Third Party Quality Audit Consultant.
To provide Consulting Services of Third Party Quality Auditor for Construction of Multipurpose Cyclone Shelters, Roads to
-
7/31/2019 10.June MPR 2012
5/88
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
4.0 Status of TPQA Visits:
The following table shows the details of TPQA visits to sites in respective districts.
DistrictTotal Number of Visits
Up to May.'2012 In June.'2012 Up to June.'2012
Srikakulam 255 34 289
Vizianagaram 55 2 57Vishakhapatnam 231 24 255
East Godavari 421 41 462
West Godavari 323 24 347
Krishna 204 11 215
Guntur 201 15 216
Prakasam 269 24 293
Nellore 221 13 234
No. of Visits by TPQA
-
7/31/2019 10.June MPR 2012
6/88
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
5.0 Progress of NCRMP works:
The district wise progress of works is shown below. The works in the West Godavari are not started and the works in
Krishna District has just started. At many places the first milestone is completed but works are not started. The line
departments are to analyze the reasons for the slow progress and if necessary penalty for the slow progress as per the
agreement conditions should be imposed.
Third Party Quality Audit by Egis India consulting services
Summary of Activities
S.No. District
Agreements for PackagesCommunicated
Status of works
PR R&B Progress Not Started
1 Srikakulam 6 5 18 3
2 Vizianagaram - 3 3 0
3 Visakhapatnam 13 0 21 0
4 East Godavari 7 0 12 1
5 West Godavari 3 0 10 0
-
7/31/2019 10.June MPR 2012
7/88
MONTHLY REPORT
6 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
TPQA Status Report for NCRMP Works To the end of(30-06-2012)
S.No. District
Packages /Works
entrustedStatus of Works
No.of
Visitsof
TPQA
TotalNo.
of QCtestsdone
NCRsQC
ReportsIssued
Environmentaland Social
ReportsIssued
Issued closed Pending
PR R&B StartedNot
Started
1 Srikakulam 06_16 5_5 17 4 289 1105 28 22 6 23 17
2 Vizianagaram - 3_3 3 0 57 366 2 1 1 9 6
3 Visakhapatnam 13_21 - 21 0 255 1547 17 13 4 28 20
4 East Godavari 07_13 - 12 1 462 812 11 11 - 26 11
5 West Godavari 03_10 - 10 0 347 312 8 7 1 24 27
6 Krishna 04_08 - 8 0 215 75 3 3 - 16 13
7 Guntur 06_15 2_2 14 3 216 416 10 10 - 19 13
8 Prakasham 12_23 1_1 24 0 293 1835 21 16 5 24 26
9 Nellore 16_24 - 24 0 234 922 11 10 1 24 24
Total 67_130 11_11 133 8 2368 7390 111 93 18 193 157
-
7/31/2019 10.June MPR 2012
8/88
MONTHLY REPORT
7 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Status of works in Srikakulam District up to 30.06.2012
Category Packages allotted under Phase - 1Names of works under
each packageAgreement No. / Date DHS DFC
Progress up to
30.06.2012
RHB
NCRMP/B-W/AP/RHB/PRED/01/Santhabommali/003
Road from DPN R&Broad to Uddandapalem
/2010-11, Dt.30.04.2011
30.04.11 30.04.12 complete Entire work
Road from K. UmiladaJunction to Koduru (LinkRoad)
/2010-11, Dt.30.04.2011
30.04.11 30.04.12 complete Entire work
Road from Borubadra,Malagam to Kollipadu viaSeepuram, Gantapeta
/2010-11, Dt.30.04.2011
30.04.11 30.04.12 complete Entire work
NCRMP/B-W/AP/RHB/PRED/01/Polaki/006
Road from R&B road
Mobagam toDuubakavanipeta viaGajapathinagaram
/2010-11, Dt.30.04.2011
30.04.11 30.04.12
First Milestone i.eEarthwork & Cd
works &GSB
Road fromTalasamudram to DolaRegulator
/2010-11, Dt.30.04.2011
30.04.11 30.04.12
First Milestone i.eEarthwork & Cd
works &GSB
NCRMP/B-W/AP/RHB/PRED/01/Polaki/005
Road from R&B roadEdulavalasa - Killam toJonnam viaTalasamudram
/2011-12, Dt.30.04.2011
30.04.11 31.01.12
First Milestone i.eEarthwork & Cd
works &GSB
Bridges
NCRMP/B-W/ AP/Br/R&B/01/
Patnavanipeta/001
Construction of bridge atKm 11/6-8 of NH-5 toPatnavanipetaConnectingSundarapalem
46/2011, Dt.
17.12.201017.12.10 17.06.12
Completion of entire
work
NCRMP/B-W/AP/Br/R&B/01/ Surampeta/003
Construction of MinorBridge at Km 12/2-4 ofNH-5 to SurampetaRoad via Naruva,Mentada
45/2010-2011,Dt17.12.2010
17.12.10 17.03.12Completion of entire
work
-
7/31/2019 10.June MPR 2012
9/88
MONTHLY REPORT
8 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
NCRMP/B-W/AP/Br/R&B/01/Bendigadda/004
Construction of Highlevel bridge acrossBendigadda at KM 4/10of Pundi-Parlakimidi road
in Srikakulam Dt, A.P.
1/2010,Dt.11.11.2010 11.11.10 11.05.12Completion of entire
work
Roads NCRMP/B-W/AP/RD/R&B/01/Nowpada/006)Improvements Naupada-Venkatapuram road from0/0to15/0km
43/2010-11,17.12.2010 17.12.10 17.03.12Completion of entire
work
RCS
NCRMP/B-W/AP/RCS/PRED/01/V.Kotturui/002
Road from NP road toURK Puram
G.O.Rt.No.451, Dt.06.04.2011
06.04.11 29.09.12WBM GR-II &III
complete
Road from Deppuru,Bahadapalli road toOnkuluru to CycloneShelter
G.O.Rt.No.451, Dt.06.04.2011
06.04.11 29.09.12WBM GR-II &III
complete
Road from R & B Roadto Devunthalada
G.O.Rt.No.451, Dt.06.04.2011
06.04.11 29.09.12 WBM GR-II &IIIcomplete
Road from Pollada toKomarthalada toCyclone Shelter
G.O.Rt.No.451, Dt.06.04.2011
06.04.11 29.09.12WBM GR-II &III
complete
NCRMP/B-W/AP/RCS/PRED/01/Etcherla/005
Road from Koyyam R &B Road toMoosavanipeta
G.O.Rt.No.451, Dt.06.04.2011
30.04.11 07.05.12Completion of entire
work
Road from Mentada toDovupeta
G.O.Rt.No.451, Dt.06.04.2011
30.04.11 07.05.12Completion of entire
work
Road from Kotcherelaroad to Kollibhemavaram& Cyclone Shelter
G.O.Rt.No.451, Dt.06.04.2011
30.04.11 07.05.12Completion of entire
work
Road from Kotcherlaroad toPathesundrapalem
G.O.Rt.No.451, Dt.06.04.2011
30.04.11 07.05.12Completion of entire
work
-
7/31/2019 10.June MPR 2012
10/88
MONTHLY REPORT
9 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
MPCSNCRMP/B_W/AP/MPCS/PRED/01/Sa
nthabommali/005
Construction of Cyclone shelterat Kollipadu
G.o rt No451 Dt
06.04.2010
07.01.2013
Completion ofGround floorPlinth level
Completion of stilt floor & firstfloor
Construction of Cyclone Shelterat Runku
G.o rt No451 Dt
06.04.2010
07.01.2013
Completion ofGround floorPlinth level
Completion of stilt floor & firstfloor
Status of works in Vizianagaram District up to 30.06.2012
CategoryPackages allottedunder Phase - 1
Names of works under eachpackage
Agreement No./ Date DHS DFCProgress up to
30.06.2012
Bridges
NCRMP/ B-W/ AP/Br/ R&B/ 02/
Puligadda/ 007
Construction of Minor Bridge atKm. 7/2 near Puligadda of Konada Ramatheertham R&B Road toKonathalapalem via Yerukonda,
Pasupam, Kollayavalsa (Z.P.Road)
31/2010-201 Dt.1.12.2010
01.12.10 31.05.12100% of work
completed
NCRMP/ B-W/ AP/Br/ R&B/ 02/
Chakaligadda / 008
Construction of Minor Bridge atKm 15/2 near Chakaligadda of
Konada Ramatheertham R&B roadto Konathalapalem (via)Yerukonda, Pasupam,
Kollayavalsa (ZP Road)
34/2010-2011 Dt.8.12.2010
08.12.10 07.06.1279% of workcompleted
Road (R&B)NCRMP/B-
W/AP/RD/R&B/ 02/Konada/009
Improvements to Road fromKonada Ramatheertham (R&B)Road to Konathalapalem (Via)
Pasupam, Yerukonda,Kollayavalsa from Km 12/0 to 16/5
(Km 0/0 to 4/0 i.e. up to NH-5crossing)
33/2010-201 Dt.8.12.2010
08.12.10 07.03.12100% of work
completed
-
7/31/2019 10.June MPR 2012
11/88
MONTHLY REPORT
10 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Status of works in Visakhapatnam District up to 30.06.2012
Category Packages allotted under Phase- 1Names of works
under each
package
Agreement
No. / Date
DHS DFC Progress up to 30.06.2012
RHB
NCRMP/B-W/AP/RHB/PRED/03/Nakkapalli/001
Road from Vempadu toPatimeeda
/2010-11, Dt.11.01.2011
11.01.11 11.01.12 Work is completed
Road from R&B road toMullaparra up to Beach
end
/2010-11, Dt.11.01.2011
11.01.11 27.10.11 Work is completed
NCRMP/B-W/AP/RHB/PRED/03/Anandapuram/003
Road from R&B B.PKallalu to
Matchvanipalem
/2010-11, Dt.10.03.2011
10.03.11 09.12.11 Work is completed
NCRMP/B-W/AP/RHB/PRED/03/Paravada/004
Road from R & B roadto Pothu Rajannapalem
/2010-11, Dt.28.03.2011
28.03.11 27.12.11 Work is completed
Road from R & B roadto Jalaripeta
/2010-11, Dt.28.03.2011
28.03.22 28.12.11 Work is completed
NCRMP/B-W/AP/RHB/PRED/03/Rambilli/006Road from R & B road
to Venkayyapalem/2010-11, Dt.11.01.2011
11.01.11 11.10.11 Work is completed
NCRMP/B-W/AP/RHB/PRED/03/Achyutapuram/007
Road from R&B road toAva- Somavaram
/2011-12, Dt.27.04.2011
27.04.11 26.01.12 Work is completed
Road from R&B Roadto Avarajam
/2011-12, Dt.27.04.2011
27.04.11 26.01.12 Work is completed
-
7/31/2019 10.June MPR 2012
12/88
MONTHLY REPORT
11 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Status of works in Visakhapatnam District up to 30.06.2012
CategoryPackages allotted under
Phase - 1
Names of works under each
package
Agreement No. /
Date
DHS DFCProgress up
to
30.06.2012
RCS
NCRMP/B-W/AP/RCS/PRED/03/Anandapuram/001
Road from NH-5 toRamarayadupalem
/2010-11, Dt. 15.09.2011 15.09.11 14.06.12
For 2ndMilestone i.e
B.T & C.CRoads areCompleted
NCRMP/B-W/AP/RCS/PRED/03/Rambilli/002
Road from R&B road toKrishnampalem
/2010-11, Dt. 15.09.2011 15.09.11 14.09.12
2nd Milestonei.e CD works,Retaining wallare progress &
B.T iscompleted
Road from R & B road toKattubolu to Marripalem
/2010-11, Dt. 15.09.2011 15.09.11 14.09.12
2nd Milestone
i.e CD Workcompleted andWBM Grade-IIIis in progress
Road from R & B road toRajakoduru
/2010-11, Dt. 15.09.2011 15.09.11 14.09.12
2nd Milestonei.e CD works &
B.T arecompleted
NCRMP/B-W/AP/RCS/PRED/03/Nakkapalli/003
Road from R & B road toPedateenarla to Chinatheernala
/2010-11, Dt. 15.09.2011 15.09.11 14.06.12
For 2ndMilestone i.e
B.T & C.C roadworks arecompleted
Road from Upmaka RajayyapetaR & B road to Janakayyapeta
/2010-11, Dt. 15.09.2011 15.09.11 14.06.12
For 2ndMilestone i.e
B.T Completed& CD Works
are inCompleted
-
7/31/2019 10.June MPR 2012
13/88
MONTHLY REPORT
12 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Status of works in Visakhapatnam District up to 30.06.2012
Category Packages allotted under Phase - 1Names of works under
each package
Agreement No.
/ Date
Milestone Completion Dates Progress w.r.t.milestone up to
30.06.2012First Second Third
MPCS
NCRMP/B-W/AP/MPCS/PRED/03/Payakaraopeta/003
Construction of cycloneshelter at Gajapathi
Nagaram
/2011-12, Dt.03.10.2011
02.02.12 02.06.12 02.10.12
E/W foundationexcavation is
completed & Due tosite problem work is
stopped
Construction of cycloneshelter at Ratnayampeta
/2011-12, Dt.03.10.2011
02.02.12 02.06.12 02.10.12
Stilt Slab is inCompleted. Stair
case, Ramp worksand Columns laid upto 1st floor slab level
are Completed
NCRMP/B-W/AP/MPCS/PRED/03/Nakkapalli/002
Construction of cycloneshelter at Patimeeda
/2011-12, Dt.03.10.2011
02.03.12 02.08.12 02.01.13
Columns laid up tobottom of plinth beamor Basement work isin completed & Plinthbeam is completed.
Construction of cycloneshelter at Mullaparra
/2011-12, Dt.03.10.2011
02.03.12 02.08.12 02.01.13
Columns arecompleted up to
bottom level of Plinthbeam and foundationrefilling, Plinth beam
works are in progress
Construction of cycloneshelter at Bangarampeta
/2011-12, Dt.03.10.2011
02.03.12 02.08.12 02.01.13Foundation footings
are in progress
NCRMP/B-W/AP/MPCS/PRED/03/Rambilli/004Construction of cyclone
shelter atVenkayyapalem
/2011-12, Dt.03.10.2011
02.01.12 02.04.12 02.07.12
Stilt Slab iscompleted & 1st floor
slab is alsocompleted
NCRMP/B-W/AP/MPCS/PRED/03/Paravada/001Construction of cyclone
shelter atTikkavanipalem
/2011-12, Dt.07.10.2011
06.01.12 06.04.12 06.07.12Earth work in
progress
-
7/31/2019 10.June MPR 2012
14/88
MONTHLY REPORT
13 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Status of works in East Godavari District up to 30.06.2012
Category Packages allotted under Phase - I
Names of works
under eachpackage
AgreementNo. / Date Mile stones Remarks
First Second Third
RHB (2 )RCS (8)MPCS (3)
NCRMP/B-W/AP/RHB/PRED/04/Katrenikona/003
Road from PR roadsto Dasarivanipeta and
to Cyclone Shelter
/2011-12Dt:27.04.2011
30-11-2011 30-11-2011 20-01-2012 Completed
NCRMP/B-W /RCS/PRED/04/Karapa/001Approach Road tocyclone Shelter at
Adivipudi
2011-12Dt:20.05.2011
30-11-2011 31-10-2011 31-01-2012 Completed
NCRMP/B-W/AP/RHB/PRED/04/Karapa/001/
Road fromGurjanapalli to
Bandulavaripalem
2011-12Dt:27.04.2011
30-09-2011 31-10-2011 31-01-2012 Completed
NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004
Road from R&B Roadto P.Chodipallipeta CS
2011-12Dt:07.09.2011
3 months 3 months 3 months Completed
NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004
Road from R&B Roadto K.Chodipallipeta CS
/2011-12Dt:07.09.2011 3 months 3 months 3 months Completed
NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004
Road from R&B Roadto Hukumpeta CS
/2011-12Dt:07.09.2011
3 months 3 months 3 months Completed
-
7/31/2019 10.June MPR 2012
15/88
MONTHLY REPORT
14 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004
Road from R&B Roadto Gaddipeta CS
/2011-12Dt:07.09.2011
3 months 3 months 3 months Completed
NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004
Road from R&B Roadto Danavaipeta CS
/2011-12Dt:07.09.2011
3 months 3 months 3 months Completed
NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004/
Road from R&B Roadto G.Musalayyapeta
CS
2011-12Dt:07.09.2011
3 months 3 months 3 monthsNot yet Started
NCRMP/B-W/AP/RCS/PRED/04/Uppalaguptam/003
Road from R&B Roadto Chinaraghavulapeta
Cyclone Shelter
/2011-12 Dt:23.09.2011
3 months/22.11.2011
3 months22.06.2011
-----------
Jungle Clarence inProgress
NCRMP/B-W/AP/MPCS/PRED/04/Uppalaguptam/002
Construction ofCyclone Shelter atPedaraghavulapeta ofUppalaguptam Mandal
E.G.Dt.
/2011-12Dt:17.10.2011
3 months16.01.2012
3 months16.04.2012
3 months16.07.2012
Sand filling work isin progress below
plinth beam
NCRMP/B-W/AP/MPCS/PRED/04/Thondangi/004
Construction ofCyclone Shelter at
Laxamanudupadu inThondangi
/2011-12Dt:07.09.2011
Slab form work andreinforcement is in
progress
NCRMP/B-W/AP/MPCS/PRED/04/Thondangi/004
Construction ofCyclone Shelter at
Avulamanda
/2011-12Dt:07.09.2011
RCC Columns is inprogress above
ground level
-
7/31/2019 10.June MPR 2012
16/88
MONTHLY REPORT
15 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Status of works in West Godavari District up to 30.06.2012
CategoryPackages allotted under Phase
- 1Names of works under
each packageAgreementNo. / Date
Milestone Completion Dates Progress w.r.t.milestone up to
30.06.2012
RemarksFirst Second Third
RHB
NCRMP/B-W/AP/RHB/PRED/05/Mogaltur/0
01
Road from NH 214 A atRanga Statue center to
Harijanawada of Kalipatnam(E) (Mogalthuru Mandal
W.G.Dist.)
16 /2011-12
Dt.27.04.2011
27/4/2011to
22/9/2011
23/9/2011to
24/2/2012
25/2/2012to
26/7/2012
99%Road Furniture is in
Progress.
R&B road at PanchayatOffice to Pulaparthivarithota
via Badava(Mogalthuru Mandal
W.G.Dist.)
99%Road Furniture is in
Progress.
Mogalthuru Vempa R&BRoad at Uchintha Kalava
Bridge to Gogulamma
Harijanapeta (MogalthuruMandal W.G.Dist.)
99%Road Furniture is in
Progress.
From Narsapur MogalthuruR&B road to Dayadaldaspetavia Venkateshwara Swamytemple (Mogalthuru Mandal
W.G.Dist.)
99%Road Furniture is in
Progress.
Road from NH 214 A road toHarijanapeta of Kothota
(Mogalthuru MandalW.G.Dist.)
27/4/2011to
22/9/2011
23/9/2011to
24/2/2012
25/2/2012to
26/7/201299%
Road Furniture is inProgress.
NCRMP/B-W/AP/RHB/PRED/05/Narsapur/0
02
R&B road to Indira Nagar
(via) Pochamma temple(Narsapur Mandal W.G.Dist.)
21 /2011-12Dt.09.05.2011
09/05/2011to
04/09/2011
05/09/2011to
06/01/2012
07/01/2011to
08/5/2012
100% Completed.
Road from R&B road toPedalanka (Narsapur Mandal
W.G.Dist.)100% Completed.
Road from LB Cheria CCroad to Chillapalemm of LBCheria (Narsapur Mandal
W.G.Dist.
100% Completed.
-
7/31/2019 10.June MPR 2012
17/88
MONTHLY REPORT
16 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Status of works in Krishna District up to 30.06.2012
Category Packages allotted under Phase - 1Names of works under each
packageAgreement No. /
DateDHS DFC
Progress up to30.06.2012
RHB
NCRMP/B-W/AP/RHB/PRED/06/Machipatnam/001
Road connecting R&B roadthrough Gantalammapalem
/2011-12Dt.27.4.2011
27.04.11 26.01.2012CD works,GSB,Gr-II,Gr-III,BT completed
NCRMP/B-W/AP/RHB/PRED/06/Machipatnam/002
Road from R & B Road to B.VThota
/2011-12Dt.27.4.2011
27.04.11 26.01.2012
CD works,GSB,Gr-II,Gr-III,BT completed
Road from Potalapalem Z.Proad to Chikativanipalem
CD works,GSB,Gr-II,Gr-III,BT completed
NCRMP/B-W/AP/RHB/PRED/06/Kruthivennu/003
Road from Intheru R&B Road toRangaraopet
/2011-12Dt.27.4.2011 27.04.11 26.01.2012
CD works,GSB,Gr-II,Gr-III,BT completed
Road from R&B road to CycloneShelter at Chandala
CD works,GSB,Gr-II,Gr-III,BT completed
NCRMP/B-W/AP/RHB/PRED/05/Kalla/003
From A-U R&B Road toSatyanarayanapuram (Kalla
Mandal W.G.Dist.)25 /2011-12
Dt.26.05.2011
26/5/2011
To20/8/2011
20/8/2011
to21/11/2011
22/11/2011
To23/2/2012
100% Completed.
From A-U R&B Road toMekaladibba (Kalla Mandal
W.G.Dist.)100% Completed.
-
7/31/2019 10.June MPR 2012
18/88
MONTHLY REPORT
17 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Status of works in Krishna Districts up to 30.06.2012
Category Packages allotted under Phase - 1
Names of works
under eachpackage
AgreementNo. / Date
Milestone Completion Dates Progressw.r.t.
milestoneup to
30.06.2012
RemarksFirst Second Third
RCSNCRMP/B-W
/AP/RCS/PRED/06/Machipatnam/001
Road fromBhogireddipalli R&B
Road toRamakhandam
/2011-12/Dt.02.09.2011
01.12.2011 01.03.12 01.06.12 13.20%
GSB,CD,G-IICOMPLETED
AND G-IIIWORK
INPROGRESS
Road from R&BRoad Chinnapuram
to Gundupalem
/2011-12/27.04.2011
01.12.2011 01.03.12 01.06.12
12.14%
BTCOMPLETED
AND CCROAD TO BE
DONE
Road fromPotalapalem Z.Proad to Potepalli.
/2011-12/Dt.02.09.2011
01.12.2011 01.03.12 01.06.1231.68%
BTCOMPLETED
AND CCROAD TO BE
DONE
-
7/31/2019 10.June MPR 2012
19/88
MONTHLY REPORT
18 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Status of works in GUNTUR District up to 30.06.2012
CategoryPackages allotted under
Phase - 1Names of works under each package
Agreement No./Date
DHS DFCProgress up to
30.06.2012
RHB
NCRMP/B-W/AP/RHB/PRED/07/KARLAPAL
EM/001
R/f Ganapavaram R&BRoad t o Kesavapuri ST colony 7/2011-2012
27.04.201127.04.11 26.01.2012 Completed.
NCRMP/B-W/AP/PRED/07/Nagaram/002
R/f R&B Road to Mohammad Alipalem
8/2011-201227.04.2011
27.04.11 26.4.2012
CC Road, BTRoad, Shoulder
work is Completed.
R/f R&B Road to Katuivaripalem. CC Road, BTRoad, Shoulder
work is Completed.
Bridges
NCRMP/B-W/AP/Br/R&B/07/Bapatla/010
Reconstruction of High level Bridge @Km5/2 ofBapatla-Suryalanka Road across Perali drain in
Guntur79/2010-2011
1.12.201001.12.10 31.5.2012
Approaches is inprogress
NCRMP/B-W/AP/Br/R&B/07/Bapatla/011
Reconstruction of High level Bridge @Km2/4 ofBapatla-Pandurangapuram Road across Perali
drain in Guntur78/2010-2011
1.12.201001.12.10 31.5.2012
Approaches is inprogress
Status of works in GUNTUR District up to 30.06.2012
Category Packages allotted under Phase - 1Names of works under each
package
Agreement No. /
DateDHS DFC Progress up to 30.06.2012
RCSNCRMP/B-W/AP/RCS/PRED/07/P
Palem/001
Road from R&B Road to
Mandevaripalem
/2010-11
Dt.01.11.201101.11.11 31.07.2012 BT , Shoulder Work is
Completed
-
7/31/2019 10.June MPR 2012
20/88
MONTHLY REPORT
19 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Road from R&B Road Alluru to
Yadavapalem
/2010-11
Dt.01.11.201101.11.11 31.07.2012
Earth work is in progress.
NCRMP/B-
W/AP/RCS/PRED/07/KarlaPalem/002
Road from Ganapavaram R & B
road to Pedamarpuvaripalem
/2010-11
Dt.01.11.201101.11.11 31.10.2012
Work yet to be start.
Road from R & B Road to
Chinapuluguvaripalem
/2010-11
Dt.01.11.201101.11.11 31.10.2011
Work yet to be start.
Road from R & B road to
Yaramvaripalem
/2010-11
Dt.01.11.201101.11.11 31.10.2011
CC Road work, GSB isCompleted, Shoulders, and
WBM is in progress.
Road from R & B road to
Pedagollapalem Cyclone Shelter
/2010-11
Dt.01.11.201101.11.11 31.10.201 CC Road work, Shoulder work
is Completed.
Pedagollapalem PR Road to
Bonthagorlapalem
/2010-11
Dt.01.11.201101.11.11 31.10.201 Earth work, Key walls is
Completed GSB is in progress.
NCRMP/B-
W/AP/RCS/PRED/07/Nizampatnam/003
Road from R&B Road to
Gurunadhanagar
/2010-11 Dt.
17.10.201117.10.11 16.07.12 Earth work Completed, CD
work is in Progress
Road from R&B Road to Adavala
H/O Bavajipalem
/2010-11 Dt.
17.10.201117.10.11 16.07.12 CC Road work, Shoulder work
is Completed,
Road from R&B Road to
Atlavaripalem
/2010-11 Dt.
17.10.2011
17.10.11 16.07.12 CC Road work is Completed.
Shoulder is in Progress
NCRMP/B-
W/AP/RCS/PRED/07/Bapatla/004
Road from R&B Road to
Hanumanthanagar2010-11
Dt13.10.201113.10.11 12.07.2012
CC Road work, Shoulder workis Completed,
Road from R & B road to
AdarsanagarCC Road work, Shoulder work
is Completed,
-
7/31/2019 10.June MPR 2012
21/88
MONTHLY REPORT
20 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Status of works in Prakasam District up to 30.06.2012
Category Packages allottedunder Phase - 1
Names of works
under eachpackage
Agreement No. /Date
Milestone completion dates
Progress up to30.06.2012 Remarks
First Second Third
BRIDGESNCRMP/B-
W/AP/Br/R&B/08/Kanaparthy/012
Construction ofHigh level Bridge at
Km 16/10 ofNaguluppalapadu Kanaparthy road inPrakasam District
76/2010-11 Dated1/12/2010
5/31/2011Completion
up to silllevel
12/31/2011Completion upto below deck
slab
5/31/2012Completion of
entire workincluding
approaches
Bridge work iscompleted
As permilestonecompleted
RHB
NCRMP/B-W/AP/RHB/PRED/0
8/S.Konda/001
Road from PakalaZP Road to
Aulavaripalem
Cyclone shelter
NCRMP/B-W/AP/RHB/PRED/0
8/S.Konda/001
Dated 25.04.2011
8/24/2011Earth work,CD work,
GSB
12/24/2011WBM, Grade II
& III
4/24/2012 BT,Shoulders &road furniture
CC Road &Shoulders work is
Completed.
Mile stone-IIIcompleted
Road from R&BRoad to
Somarajupalli
NCRMP/B-W/AP/RHB/PRED/0
8/S.Konda/001Dated 25.04.2011
BT, CC road &culverts are
completed from KM0/0 to 2/146.
Mile stone-IIIcompleted
Road from R&Broad to
Narravaripalem
NCRMP/B-W/AP/RHB/PRED/0
8/S.Konda/001Dated 25.04.2011
BT & culverts areCompleted fromKM 0/0 to 0/900.
work is completed
Mile stone-IIIcompleted
NCRMP/B-W/AP/RHB/PRED/0
8/S.Konda/002
Road from NH5 toMulaguntapadu
NCRMP/B-W/AP/RHB/PRED/0
8/S.Konda/002dated 10/02/2011
6/9/2011Earth work,CD work,
GSB
10/9/2011WBM, Grade II
& III
2/9/2012 BT,Shoulders &road furniture
WBM-Grade-IIwork is
completed.WBMgr-III work to be
started
Not Reached asper Mile stone-III (Awaiting for
2nd
EOTProposal)
-
7/31/2019 10.June MPR 2012
22/88
MONTHLY REPORT
21 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Road from R&Broad to
Chalivendradibba
NCRMP/B-W/AP/RHB/PRED/0
8/S.Konda/002dated -10/02/2011
CC work iscompleted from KM
0/0 to KM 0/270.WBM Gr-II lying
progress.
Not Reached asper Mile stone-III (Awaiting for
2nd
EOTProposal)
NCRMP/B-W/AP/RHB/PRED/0
8/S.Konda/002
Road from PakalaR&B road to
Mosanaladinne
NCRMP/B-W/AP/RHB/PRED/0
8/S.Konda/002dated 10/02/2011
6/9/2011Earth work,CD work,
GSB
10/9/2011WBM, Grade II
& III
2/9/2012 BT,Shoulders &road furniture
WBM-Grade-IImaterial laying
work is in progress
Not Reached asper Mile stone-III (Awaiting for
2nd
EOTProposal)
Road from R&Broad to Binginapalli
HarijanawadaCyclone Shelter
NCRMP/B-W/AP/RHB/PRED/0
8/S.Konda/002dated 10/02/2011
CC road work iscompleted from KM
0/0 to KM 0/220.Shoulders work is
to be taken up.
Mile stone-III(Awaiting for 2
nd
EOT Proposal)
NCRMP/B-W/AP/RHB/PRED/08/Kothapatnam/003
Road from R&BRoad Allur to M T
Raju colony
NCRMP/B-W/AP/RHB/PRED/08/Kothapatnam/003Dated 27/04/2011
8/26/2011Earth work,CD work,
GSB
12/26/2011WBM, Grade II
& III
4/26/2012 BT,Shoulders &road furniture
BT, CC road,shoulders &culverts are
completed from km0/0 to km 3/8.work
is completed
As permilestonecompleted
NCRMP/B-W/AP/RHB/PRED/08/Kothapatnam/004
Road from KEMR&B Road to
Sankuvarigunta
NCRMP/B-W/AP/RHB/PRED/08/Kothapatnam/004
Dated 27/04/2011 9/26/2011Earth work,CD work,
GSB
2/26/2012WBM, Grade II
& III
7/26/2012 BT,Shoulders &road furniture
BT completed.CDwork completed.CC
road workcompleted from km
0/0 to km 1/430and CC dip work is
in progress.
Reached Milestone-III
Road from KEM R& B Road to
Pullareddypalem
NCRMP/B-W/AP/RHB/PRED/08/Kothapatnam/004Dated 27/04/2011
BT completed.CDwork completed.CCroad and shoulders
work completedfrom km 0/0 to km
3/900.
As permilestonecompleted
-
7/31/2019 10.June MPR 2012
23/88
MONTHLY REPORT
22 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
NCRMP/B-W/AP/RHB/PRED/0
8/Ulavapadu/07
Road from MCRoad to
Subbarayadu
Satram
NCRMP/B-W/AP/RHB/PRED/0
8/Ulavapadu/07
dated 27/04/2011
8/26/2011Earth work,CD work,
GSB
12/26/2011WBM, Grade II
& III
4/26/2012 BT,Shoulders &road furniture
BT completed.CDwork completed.CCroad and shoulderswork completedfrom km 0/0 to km
4/4. work iscompleted
As permilestonecompleted
NCRMP/B-W/AP/RHB/PRED/0
8/Ulavapadu/08
Road from R&Broad Tettu to
Ramayapatnam
NCRMP/B-W/AP/RHB/PRED/0
8/Ulavapadu/08dated 27/04/2011
8/26/2011Earth work,CD work,
GSB
12/26/2011WBM, Grade II
& III
4/26/2012 BT,Shoulders &road furniture
BT completed.CDwork completed.CCroad and shoulderswork completedfrom km 0/0 to km5/086. work iscompleted
As permilestonecompleted
NCRMP/B-W/AP/RHB/PRED/0
8/Tangutur/09
Road from R&Broad Pellur to
Vasepallipadu
NCRMP/B-W/AP/RHB/PRED/0
8/Tangutur/09dated 16/03/2011
7/15/2011Earth work,CD work,
GSB
11/15/2011WBM, Grade II
& III
3/15/2012 BT,Shoulders &
road furniture
BT completed.CDwork completed.CCroad and shoulderswork completed
from km 0/0 to km4/5. work iscompleted
As permilestone
completed
NCRMP/B-W/AP/RHB/PRED/0
8/Tangutur/10
Road from R&Broad to Kesupalem
NCRMP/B-W/AP/RHB/PRED/0
8/Tangutur/10dated 19/04/2011
7/18/2011Earth work,CD work,
GSB
10/18/2011WBM, Grade II
& II
1/18/2012 BT,Shoulders &road furniture
BT completed.CDwork completed.CCroad and shoulderswork completedfrom km 0/0 to km2/103. work iscompleted
As permilestonecompleted
RCSNCRMP/B-
W/AP/RCS/PRED/08/Vetapalem/001
Road from R&Broad to
Vijayanagaramcolony cyclone
shelterNCRMP/B-
W/AP/RCS/PRED/08/Vetapalem/001
dated 2011/12dated 30.09.2011
1/29/2012Earth work,
GSB
5/29/2012shoulders, Gr-
III
9/29/2012 BT,CC pavement
and roadfurniture
cc road completed,BT roadcompleted&
shoulderscompleted. Roadfrom km 0/0 to km0/525. work iscompleted
As per
milestonecompleted
Road from NH roadto
Challareddypalem
cc road completed,BT roadcompleted&shoulderscompleted. Roadfrom km 0/0 to km
As permilestonecompleted
-
7/31/2019 10.June MPR 2012
24/88
MONTHLY REPORT
23 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
1/735. work iscompleted
Road from R&Broad to Jeevaraksh
nagar colonycyclone shelter
C.C.Road andShoulders arecompleted Roadfrom km 0/0 to km0/500.
As permilestonecompleted
Road from R&Broad to Ramnagar
colony cycloneshelter
C.C.completedRoad from km 0/0to km0/475.Shoulders tobe taken up.
Reached Milestone-III
Road from R&Broad to cyclone
shelter atMankenavaripalem
GSB Materialspreding work is inprogress
Reached Milestone-III
NCRMP/B-W/AP/RCS/PRED/0
8/Chirala/002
Road from R&BRoad to
Keertivaripalemcyclone shelter NCRMP/B-
W/AP/RCS/PRED/08/Chirala/002
dated 27.08.2011
C.C road andShoulders arecompleted from km0/0 to km 0/265.work is completed
As permilestonecompleted
Road from R&BRoad to Devinutulacyclone shelter ofChirala Mandal in
Prakasham district.
C.C road andShoulders arecompleted from km0/0 to km 0/800.work is completed
As permilestonecompleted
MPCSNCRMP/B-
W/APMPCS/PRED/08/Ulavapadu/001
Chakicharla cycloneshelter in
Ulavapadu MandalPrakasam district
NCRMP/B-W/AP/MPCS/PRED/08/Ulavapadu/001
24.11.2011All items up
to stilt floorslab
includingramp, stair
casefoundations,columns,bea
ms,pccflooring etc.,
24.02.2012 All
items up tosecond floor
slab includingfirst floor, andin 2nd floor
including staircase, columns
etc.,
24.05.2012Head room,plastering,
flooring, watersupply
arrangements,sanitary fitting,
electricalitems,
compoundwall, cc
pavement.Earthen
St ilt floor, G.F, &Terrace floor- roofslab completed.
Brick workcompleted,Plastering workcompleted, Cattleplatform completedrevetment workcompleted, flooringwork is completed,and compound wall120 meters length
As permilestonecompleted
-
7/31/2019 10.June MPR 2012
25/88
MONTHLY REPORT
24 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
mounds(raised
portion), waterharvesting,septic tank,
slump andsoak pit.etc.
completed,Electrical work iscompleted.work is completed
NCRMP/B-W/APMPCS/PRED/
08/NG Padu/003
Kanaparthy cycloneshelter in
NaguluppapaduMandal Prakasam
district
NCRMP/B-W/AP/MPCS/PRED/08/NG Padu/003
23.11.2011All items upto stilt floor
slabincluding
ramp, staircase
foundations,columns,bea
ms,pccflooring etc.,
23.02.2012 Allitems up to
first floor slaband head
room slab in 2nd floor
including staircase, columns
etc.,
23.05.2012plastering,
flooring, watersupply
arrangements,sanitary fitting,
electricalitems,
compoundwall, cc
pavement.
Earthenmounds(raised
portion), waterharvesting,septic tank,slump and
soak pit.etc.
Stilt floor, first floorroof slabcompleted. Firstfloor brick work is
in progress.
Reached Milestone-III(Awaiting for
EOT Proposal)
Status of works in Nellore District up to 30.06.2012
(RCS)
Package Number Name of Work Milestone1 Milestone2 Milestone3Progress upto 30.06.2012
NCRMP/B-W/AP/09MUTHUKUR/RCS/002
Road from R&B Roadkappaladoruvu to bandla Palem
H.wada
3Months: EarthWork, Pipe Culverts,
GSB
6 Months: WBMGrII,GrII,CC Pavement
and Shoulders
9 Months: BTCC road and
Road Furniture
79% of workcompleted
-
7/31/2019 10.June MPR 2012
26/88
MONTHLY REPORT
25 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
NCRMP/B-W/AP/09/D.V.SATRAM/RCS/008
Road from R&B road to SullurpetaMallam to berjengalapalli cyclone
shelter 3Months: EarthWork, Pipe Culverts,
GSB
6 Months: WBM GrII,GrII Shoulders and
CC Pavement
9 Months: BT,CC Pavement
and Road
Furniture
94 % of workcompleted
NCRMP/B-W/AP/09T.P.GUDUR/RCS/005
Road from7/2 M.C Road tovenkannapalem pattapupalem
work completed
NCRMP/B-W/AP/09chillakur/RCS/004
Road from Katuivaripalem R&Broad to vellapalm
3Months: EarthWork,CD Works,
GSB
6 Months: WBM GrII,GrII and Shoulders
9 Months: BT,CC Pavement
and RoadFurniture
76 % of workcompleted
NCRMP/B-W/AP/09kota/RCS/001
road from R&B road to A.SPURAM 3Months: Earth
Work, Pipe Culverts,GSB
6 Months: WBM GrII,GrII and Shoulders
9 Months: BT,CC Pavement
and RoadFurniture
work completed
Road from GD Road to
Vavillapalem
96 % of work
completed
NCRMP/B-W/AP/RCS/PRED/09/KAVALI/007
Road from Kotha Satram R&B toIndiranagar (via) Thumalapenta
palam, Patharavadu palam,Ramudu palam, Karaduvari palam&Sreeramapuram in SPSR Nellore
District.
4Months: EarthWork, Pipe Culverts,
GSB
4 Months: WBM GrII,GrII , Shoulders and
CC Pavement
4 Months: BT,CC Pavement
and RoadFurniture
78 % of workcompleted
NCRMP/B-W/AP/RCS/PRED/09/KAVALI/006
Road Connecting R&B Roadthrough Voter Village in SPSR
Nellore District.
4 Months: EarthWork, Pipe Culverts,
GSB
4 Months: WBM GrII,GrII , Shoulders and
CC Pavement
4 Months: BT,CC Pavement
and RoadFurniture
16% of workcompleted
Status of works in Nellore District up to 30.06.2012
RHBNCRMP/B-
W/AP/RHB/PRED/09RHB/KAVALI/004
Road from5/8 ofChennayapalem Road to
Gummadi bandla5Months:
Earthwork, CDWorks,ccpavement
and GSB
10 Months:WBM GrII, GrIIand Shoulders
15 Months: BTand RoadFurniture
87 % of work is completed
Road from PedattapupalemR&B road to Chennayapalem
H.wada73 % of work is completed
-
7/31/2019 10.June MPR 2012
27/88
MONTHLY REPORT
26 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Road from K.T R&B Road toAlliguntapalem
85 % of work is completed
NCRMP/B-W/AP/RHB/PRED/09BOGOLU/RHB/002
Road from 1/6 ofJuvvaladinne R&B Road to
Tellagunta KM to 2/720
3Months: EarthWork, Pipe
Culverts, GSB
6 Months: WBMGrII, GrII and
Shoulders
9 Months: BTand RoadFurniture
95 % of work is completed
NCRMP/B-W/AP/RHB/PRED/09BOGOLO/RHB/001
1. Road from NH5 toSambasivapuram
5Months: EarthWork, Pipe
Culverts, GSB
10 Months:WBM GrII, GrIIand Shoulders
15 Months: BTand RoadFurniture
94 % of work is completed
Road from 9/6 ofJuvvaladinne R&B Road to11/0 of Juvvaladinne R&BRoad Via Venkateshpalem
94 % of work is completed!
NCRMP/B-W/AP/RHB/PRED/09/VIDAVALURU/005
1)Road from kt R&B ROADTO ALLAGANIPADU to
Vavilla 5Months: EarthWork, Pipe
Culverts, GSB
10 Months:WBM GrII, GrIIand Shoulders
15 Months: BTand RoadFurniture
42 % of work is completed!
Road from R&B roadKancharapalem HW to
Alaganipadu.55 % of work is completed
NCRMP/B-W/AP/RHB/PRED/09V.CHALEM/RHB/007
ROAD FROM SUVEPALLI-PUDIPARTHI ROAD TO
SRIKANTH COLONY 4Months: EarthWork, Pipe
Culverts, GSB
8 Months: WBMGrII, GrII and
Shoulders
12 Months: BTand RoadFurniture
98 % of work is completed!
providing BT Surface to theroad from R&B road to
Edagali Kandrigawork is completed
-
7/31/2019 10.June MPR 2012
28/88
MONTHLY REPORT
27 | P a g e
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
NCRMP/B-W/AP/RHB/PRED/09CHITTAMURU/003
Road from R&B Road toMuttembake Via Pittuvanipalli
5Months: EarthWork, Pipe
Culverts, GSB
10 Months:WBM GrII, GrII
and Shoulders
15 Months: BTand Road
Furniture
49 % of work is completed
Road from R&B Chittamur toSoma Samudram
14 % of work is completed
NCRMP/B-W/AP/09/MUTHUKUR/RHB/006
Road from R&B road toPatuvariKandriga
3Months: EarthWork, Pipe
Culverts, GSB
6 Months: WBMGrII,GrII,CC
Pavement andShoulders
9 Months: BTand RoadFurniture
work is completed
NCRMP/B-W/AP/09Allur/RHB/009Road from R&Broad alluru toGalidibbalu (via)Chukavani
dibba
5Months: EarthWork, Pipe
Culverts, GSB
10 Months:WBM GrII, GrIIand Shoulders
15 Months: BTand RoadFurniture
62 % of work is completed
NCRMP/B-W/AP/RHB/PRED/009/T.P.GUDUR/012
Ring Road to TP Gudur-Salipeta R & B Road via CS
Puram and Mandapam Village3Months: Earth
Work, PipeCulverts, GSB
6 Months: WBMGrII,GrII,CC
Pavement andShoulders
9 Months: BTand RoadFurniture
71 % of work is completed
Road from R & B Road C SPuram to Sivaramapuram
73 % of work is completed
-
7/31/2019 10.June MPR 2012
29/88
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
6.0 District wise status of tests conducted by TPQA:
Apart from monitoring the tests being conducted by the implementation team (contractors & Line department) at various
stages, the Third party Quality Audit team also conducted tests to confirm its compliance with the standards. These tests are
carried out in the site itself and in some cases samples are collected and testing done in outside laboratories. The details of
tests conducted in the field till end of September 2011 are presented.
Summary of QC Tests - Up to 30.06.2012
S.No. District
No. TestsConductedduring the
Month
Total no. of TestsCumulativeTests Done
Total no. of Tests
Passed Failed Passed Failed
1 Srikakulam 218 215 3 1105 1099 6
2 Vizianagaram 0 0 0 366 366 0
3 Visakhapatnam 140 140 0 1547 1534 13
4 East Godavari 0 0 0 812 812 0
-
7/31/2019 10.June MPR 2012
30/88
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
7.0 Details of Quality Control Audit Reports Submitted During this Month:
Package Number Name of Work District
NCRMP/B-
W/AP/RCS/PRED/07/Nizampatnam/003
Road from R&B Road to
AtlavaripalemGuntur
-
7/31/2019 10.June MPR 2012
31/88
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
NCRMP/B-W/AP/RCS/PRED/08/CHIRALA/002
Road from R&B Road to
Keertivaripalem cyclone shelter of
Chirala Mandal
Prakasham
NCRMP/B-
W/AP/MPCS/PRED/03/Payakaraopeta/003
Construction of cyclone shelter at
Gajapathinagaram in PayakaraopetaVisakhapatnam
NCRMP/B-
W/AP/MPCS/PRED/03/Nakkapalli/002
Construction of cyclone shelter at
Bangarampeta in Nakkapalli MandalVisakhapatnam
NCRMP/B-
W/AP/MPCS/PRED/03/Payakaraopeta/003
Construction of cyclone shelter at
Ratnayampeta in PayakaraopetaVisakhapatnam
NCRMP/B-W/AP/RHB/PRED/08/S.Konda/001Road from R&B road to
NarravaripalemPrakasham
NCRMP/B-
W/AP/MPCS/PRED/01/Santhabommali/005
Construction of cyclone shelter at
Runku
Srikakulam
NCRMP/B-W/AP/MPCS/PRED/08/NG
Padu/003
Construction of Cyclone shelter at
Thopupalem Kanaparthy in
Naguluppapadu Mandal
Prakasam
8.0 Details of Environmental and Social Reports Submitted During this Month:
-
7/31/2019 10.June MPR 2012
32/88
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
NCRMP/B-W/AP/RHB/PRED/03/Parawada/004
Road from P&B road toPothurajanapalem in Parawada Mandal
Vishakhapatnam
NCRMP/B-W/AP/RCS/ PRED/o3/Rambilli/002
Road from R&B Road Kattubolu toMarripalem
Vishakhapatnam
NCRMP/B-W/RCS/PRED/03/Nakkapalli/003Road from R&B Road to Pedatheernalato Chinatheernala in Nakkapalli Mandal
Vishakhapatnam
NCRMP/B-W/RCS/PRED/03/Nakkapalli/003Road from Upmaka Rajayyapeta R&Broad to Janakayyapeta in Nakkapalli
MandalVishakhapatnam
NCRMP/B-W/AP/RD/R&B/02/Konada/009
Improvements to Road from KonadaRamatheertham (R&B) Road toKonathalapalem (Via) Pasupam,
Yerukonda, Kollayavalsa from Km. 12/0to 16/5 (Km. 0/0 to 4/0 i.e. up to NH-5
crossing
Vijayanagaram
9.0 Observations in the submitted reports:
Name ofWork:
Road from R&B Road to Atlavaripalem.
1. Progress: About 40% of the work is completed .C C Road is completed. Shoulders work is to be done.
Materials: Materials and Tests for CC Road
2 Cement: The fineness of cement, consistency of cement, initial & final setting of cement testsare conducted randomly and results are within the permissible limits.
3 Workability of concrete: The slump cone test was conducted for M30 grade of concrete. The values whichare obtained are satisfactory as per mix design.
-
7/31/2019 10.June MPR 2012
33/88
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
them after compaction of widened portions.18 Village name boards, cautionary and mandatory signboards of semi reflective type shall be erected at
necessary points.19 The quality control tests should be conducted as per IRC SP-11, and the same shall be produced to Q.A.
wing for verification.20 The contractor has not recruite Qualified site engineer. The field officer are request to take necessary
action and instruct to recruite Qualified site engineer.21 Compliance shall be submitted parawise at an early date after attending to the above remarks.
Name ofWork:
Road from R&B C.S.Puram to Siva Rama Puram of SPSR Nellore Dt.
1. 87 % value of the work is completed. But agreement time is over by 18.02.2012. Extension of agreementtime shall be obtained from competent authority.2 Work to be done as per Milestones:
Mile stone 1 to the end of Dt: 18.08.2011- Earthwork, CD Works, CC Pavement and GSB.Mile stone 2 to the end of Dt: 18.11.2011- WBM Gr-II, Gr-III and Shoulders.Mile stone 3 to the end of Dt: 18.02.2012- BT and Road furniture.The formation width of the road is less than 7.5 m at some stretches. The reasons for thesame shall be informed.
3 GSB from Km 0.592 to Km 1.505.4 GSB: During the collection of GSB materials, sample was collected and got tested for CBR and PI values.
GSB layer is verified for width, camber, undulations and thickness. The details are given in ANNEXURE-1.FDD tests were conducted by TPQA at regular intervals. As and when, the required relative compactionwas found to be less than 98%, re-compaction was ordered. After ensuring the minimum 98% relativecompaction, further work is allowed. O.K. cards are also being issued at each stage of work.
5 Ccpavement form Km 0.9655 to Km 1.266.Materials (CC Pavement)
6 Cement: Tests for Fineness, Consistency, Initial & final setting time were conducted and results aresatisfactory.
7 Coarse Aggregate: Combined gradation tests for the mix of Coarse aggregate and fine aggregate were
-
7/31/2019 10.June MPR 2012
34/88
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
16 Tack Coat: During the TPQA inspections, the rate of spreading of tack coat was checked as per Clause502 and Table 500.1 of MORD. Spreading temperatures of emulsion are also checked and foundvarying from 39C to 44C.(The allowable range is from 20C to 60 C)
17 13.2mm and 11.2mm Chips for OGPC: - Q.C tests of AIV, FIV, Water absorption and size were done.Under size chips were got removed and OGPC work was allowed.During OGPC work temperature of bitumin, chips and mix was monitored during the TPQA inspections.
18 6.7mm Chips for seal coat: - Under sized chips passing 2.36 mm size sieve were got removed and sealcoat work was allowed.
19 OGPC+Seal Coat from Km 0.592 Km 0.9655 and Km 1.266 to Km 1.505: Width, camber, undulations andthickness were verified and the details are given in ANNEXURE-4.
20 Bitumen Extraction Test: - Bitumen Extraction tests were conducted for OGPC+seal Coat from Km 0.592Km 0.9655 and Km 1.266 to Km 1.505.The details are given in ANNEXURE-5.
21 Cautionary and mandatory sign boards of semi reflective type shall be fixed at necessary points as per
the agreement specification.22 Guard stones painted in black and white shall be erected along the outer edge of sharp curves.23 White washing is to be done to head walls of the culverts for the clear visibil ity to vehicular traffic.24 Informatory board was erected at starting point of road as per guide lines given by SPIU, NCRMP.
Name ofWork:
Ring Road to T.P.Gudur-Salipeta R&B Road via C.S.Puram and Mandapam Village ofSPSR Nellore Dt.
1. 87 % value of the work is completed. But agreement time is over by 18.02.2012. Extension of agreementtime shall be obtained from competent authority.
2 Work to be done as per Milestones:Mile stone 1 to the end of Dt: 18.08.2011- Earthwork, CD Works, CC Pavement and GSB.Mile stone 2 to the end of Dt: 18.11.2011- WBM Gr-II, Gr-III and Shoulders.Mile stone 3 to the end of Dt: 18.02.2012- BT and Road furniture.The formation width of the road is less than 7.5 m at some stretches. The reasons for thesame shall be informed.
3 GSB from km 0.5095 to km 1.587 and branch road length = 54m.4 GSB: During the collection of GSB materials, sample was collected and got tested for CBR and PI values.
GSB layer is verified for width, camber, undulations and thickness. The details are given in ANNEXURE-
-
7/31/2019 10.June MPR 2012
35/88
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
satisfying of these results, spreading and compaction was allowed.Grade II and III layers of WBM from Km 0.558 to km 1.587 were checked for width, camber, undulations,thickness and degree of compaction by volumetric analysis. The details are given in ANNEXURE-II and
ANNEXURE -III.16 Shoulders: Shoulders shall be simultaneously compacted along with GSB and WBM layers.
Sand and gravel are not properly mixed for shoulders. They shall be scarified, remixed, watered to OMCand re-compacted to achieve a minimum of 98% relative compaction.
17 Prime Coat: During the TPQA inspections, the rate of spreading of prime coat was checked as per Clause502 and Table 500.1 of MORD. Spreading temperatures of emulsion are also checked and foundvarying from 34C to 40C.(The allowable range is from 20C to 60 C)
18 Tack Coat: During the TPQA inspectionst, the rate of spreading of tack coat was checked as per Clause502 and Table 500.1 of MORD. Spreading temperatures of emulsion are also checked and foundvarying from 35C to 41C.(The allowable range is from 20C to 60 C)
19 13.2mm and 11.2mm Chips for OGPC: - Q.C tests of AIV, FIV, Water absorption and size were done.Under size chips were got removed and OGPC work was allowed.During OGPC work temperature of bitumin, chips and mix was monitored during the TPQA inspections.
20 6.7mm Chips for seal coat: - Under sized chips passing 2.36 mm size sieve were got removed and sealcoat work was allowed.
21 OGPC+Seal Coat from Km 0.558 to Km 1.587: Width, camber, undulations and thickness were verifiedand the details are given in ANNEXURE-4.
22 Bitumen Extraction Test: - Bitumen Extraction tests were conducted for OGPC+seal Coat from Km 0/558to Km 1/587 .The details are given in ANNEXURE-5.
23 Cautionary and mandatory sign boards of semi reflective type shall be fixed at necessary points as per
the agreement specification.24 Guard stones painted in black and white shall be erected along the outer edge of sharp curves.25 White washing is to be done to head walls of the culverts for the clear visibil ity to vehicular traffic.26 Informatory board was erected at starting point of road as per guide lines given by SPIU, NCRMP.
Name ofWork:
Road from 7/2 M.C Road to Venkannapalem pattapupalem of T.P Gudur of SPSR NelloreDt.
1. The work is completed.
-
7/31/2019 10.June MPR 2012
36/88
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
10 Fine aggregate: Sieve analysis and silt content tests were conducted. Sand is conforming to zone-II.Fineness modulus is varying from 2.77 to 2.81 as against the allowable range from 2.02 to 3.5.
11 Workability of concrete: Slump cone tests were conducted for M30 grade concrete at regular intervals
and required workability was censured by TPQA during the inspections.12 CC Cubes: M30 grade concrete cubes were tested for 7 days' and 28 days' compressive strength and the
results are shown in QC summary table.13 8 cores were taken in cc road for M30 grade of concrete. The average thickness is varying from as
200mm to 206mm as against the specified 200mm thickness.The Equivalent Cube Strength is varying from 27.32 N/mm2 to 33.55 N/mm2 as against the minimumaverage required strength of 25.5 N /mm2
14 Contraction Joints were not cut as per agreement specification .They shall be provided and sealed as perMORD sub calluses 1501.8 and 1501.22
15 For WBM aggregators: Q.C.tests of AIV, FIV, and Water absorption and gradation tests was conducted.
After satisfying of these results, spreading and compaction was allowed.Grade II and III layers of WBM from Km 1.000 to km 1.820 were checked for width, camber, undulations,thickness and degree of compaction by volumetric analysis. The details are given in ANNEXURE-II andANNEXURE -III.
16 Shoulders: Shoulders shall be simultaneously compacted along with GSB and WBM layers.Sand and gravel are not properly mixed for shoulders. They shall be scarified, remixed, watered to OMCand re-compacted to achieve a minimum of 98% relative compaction.
17 Prime Coat: During the TPQA inspections, the rate of spreading of prime coat was checked as per Clause502 and Table 500.1 of MORD. Spreading temperatures of emulsion are also checked and foundvarying from 36C to 44C.(The allowable range is from 20C to 60 C)
18 Tack Coat: During the TPQA inspectionst, the rate of spreading of tack coat was checked as per Clause502 and Table 500.1 of MORD. Spreading temperatures of emulsion are also checked and foundvarying from 38C to 42C.(The allowable range is from 20C to 60 C)
19 13.2mm and 11.2mm Chips for OGPC: - Q.C tests of AIV, FIV, Water absorption and size were done.Under sized chips were got removed and OGPC work was allowed.During OGPC work temperature of bitumin, chips and mix was monitored during the TPQA inspections.
20 6.7mm Chips for seal coat: - Under sized chips passing 2.36 mm size sieve were got removed and sealcoat work was allowed.
21 OGPC+Seal Coat from km 0.00 to km 7819 and km 1.000 to km 1.820: Width, camber, undulations andthickness were verified and the details are given in ANNEXURE-4.
-
7/31/2019 10.June MPR 2012
37/88
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
conducted and it is ensured by TPQA that the gradation satisfies the requirement of MORD table-1500.17 Proportion of the concrete ingredients and w/c ratio as per MIX Design is ensured during TPQA visits.
Slump tests were also conducted and the required workability is ensured.
8 C.C Cubes: M30 grade C.C Cubes are casted and tested for 7 days' and 28 days' compressive strength.The 7 days' compressive strength is varying from 24.00 N/mm to 24.89 N/mm. The 28 days'compressive strength is varying from 31.56 N/mm to 32.89 N/mm.
9 The M30 grade CC road was completed from Km 0/672 to km 1/186. The outer measurements of widthand thicknesses are verified. The thickness is varying from 197 mm to 220 mm as against the specifiedthickness of 200mm. The width of CC road is varying from 3.67 to 3.78m as against 3.75 m as required.Approximate compressive strength is also assessed using Rebound Hammer strength of varies from28.60 N/mm to 29.60 N/mm as against the avg requirement of 3025% N/mm2. The Results areenclosed in Annexure-III.
10 6 Nos. of Cores are taken to verify the thickness and compressive strength of CC Road. The average
thickness is varying from 199 mm to 238 mm and the equivalent cube strength of cores varies from 26.00N/mm to 29.89 N/mm as against the avg requirement of 25.50 N/mm2. The Results are enclosed inAnnexure-IV.
11 Contraction of joints is provided at spacing of 2.5m to 2.8m. The joints war not sealed so far. MORD subclause 1501.8.3. specifies, "After minimum 28 days after casting the concrete pavement, joints groove atcontraction joint shall be widened to a 10 mm width and to a depth 18 to 20mm and shall be sealed".
12 GSB: Proper gradation was censured by conducting sieve analysis at regular intervals during TPQA visits.CBR test was also got conducted and CBR value obtained is 25%. During TPQA visits FDD tests wereconducted and whenever the Relative compaction was found to be less than 98%, recompaction of GSBlayer was ordered. In that manner proper compaction of GSB was ensured. GSB layer width and
thickness are verified and the details are given in Annexure13 WBM (Gr.-II): from Km 0/0 to km 0/672: AIV test, FIV tests and Gradation tests were conducted beforeallowing spreading. After completion of WBM grade II layer width and thickness are verified and thedetails are given in Annexure
14 Volumetric analysis tests were also conducted on WBM Grade-II layer as per clause 405.13 of PMGSYQuality Assurance Manual Vol-2
15 The WBM Grade-II layer was badly disturbed from Km 0/400 to Km 0/600, which is to be rectifiedimmediately. NCR was also issued.
16 The formation width varies from 6.0 meters to 7.0 meters from Km 0/672 to Km 1/186. The formationwidth shall be widened to 7.5m.
-
7/31/2019 10.June MPR 2012
38/88
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Materials(CC Pavement)
4. Cement: The fineness of cement, consistency of cement, initial & final setting of cement tests areconducted randomly and results are within the permissible limits as per IS 4031.
5. Coarse Aggregate: Sieve analysis, AIV and FIV Tests are conducted and observed values are given in QCTest Summary.
6. Fine aggregate: Sieve analysis test are conducted. Sand is conforming to zone-II as per table-800.2 ofMORD specifications. Fineness modulus is varying from 2.82 to 2.83 as against the allowable limits of 2.0to 3.50
7. Workability of concrete: The slump cone tests were conducted for M30 grade of concrete. The valueswhich are obtained are varying from 26mm to 30mm which are as per mix design.
8 In CC pavement, key wall is not provided as per agreement drawing.9 The thickness of CC road is varying from 198 mm to 204 mm as against 200mm thickness specified.
10 The width of CC road is varying from 3.73 m to 3.78 m. The specified width is 3.75 m.
11 M30 grade concrete Cubes are casted and tested for 7 days compressive strength and the results arevarying from 25.18 N/mm to 27.67 N/mm.
12 M30 grade C.C Cubes are casted and tested for 28 days compressive strength also and the results arevarying from 33.11 N/mm to 33.78 N/mm.
13 Approximate Compressive strength of C.C.Road is assessed with rebound hammer at chi: 300m and chi:468. The values are varying from 31.7N/mm to 31.8 N/mm and given in Annexure-I. The strength ofconcrete by rebound hammer method varies by 25 percent.
14 Cores are to be taken in CC pavement to verify the internal thickness and compressive strength ofconcrete.MORD Sub Clues 1501.8.3 specified the following for contraction joints
15 i)The contraction joint shall consist of a mechanical sawn joint groove 3mm to 5 mm wide and up to 1/4the to 1/3 rd depth of slab.ii) The swan joint shall be cut as soon as the concrete has undergone initial hardening and is strongenough to bear the weight of the crew and cutting machine.iii) These joint shall be subsequently widened to 10 mm width and 20 mm depth by appropriate saw tohouse the sealant.iv) These joint shall be spaced 2.5 meters to 3.75 meters.
16 i) Can this road, contraction joints are by M S plate inserting. The width of the joint varies from 5 mm to 8mm and depth of joint varies from 7mm to 14 mm.ii) The spacing of contraction joint varies from 3.8 m to 4.2 m.
-
7/31/2019 10.June MPR 2012
39/88
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Materials(CC Pavement)
5. Cement: Test of fineness, consistency, intial and final setting time was conducted and results are foundsatisfactory.
6. Coarse Aggregate: Sieve analysis, AIV and FIV Tests are conducted and observed values are mentionedin QC Test Summary.
7. Fine aggregate: Sieve analysis test are conducted. Sand is conforming to zone-II as per table-800.2 ofMORD specifications. Fineness modulus is varying from 2.60 to 2.64 as against the allowable limits of 2.0to 3.50
8 Workability of concrete: The slump cone tests were conducted for M30 grade of concrete. The valueswhich are obtained are varying from 28mm to 36mm which are as per mix design.
9 In CC pavement, key walls are not provided as per agreement drawing.10 The thickness of CC road is varying from 197 mm to 205 mm as against 200mm thick required.11 The width of CC road is varying from 3.72 m to 3.76 m. as against 3.75 m width proposed.
12 M30 grade C.C Cubes are casted and tested for 7 days compressive strength, and the results are varyingfrom 22.67 N/mm to 25.11 N/mm.
13 M30 grade C.C Cubes are casted and tested for 28 day's compressive strength also and the results arevarying from 33.11N/mm & 33.78 N/mm.
14 Approximate Compressive strength of C.C.Road is assessed with rebound hammer at chi: 080m and chi:180. The values are varying from 30.8 N/mm to 31.1 N/mm2 and given in Annexure-II. The strength ofconcrete by rebound hammer is approximate and its variation is 25 percent.
15 Cores are to be trimmed in CC pavement to verify the internal thickness and compressive strength ofconcrete.
16 Spacing of Contraction of joints from 3.8 meters to 3.85 meters. But the Contraction of joints shall be at
spacing of 2.5 m to 3.75 m17 Joints groove at contraction joint was widened to a 7mm to 10 mm width and to a depth 16 to 20mm which
was sealed with bitumen.18 Cracks are observed near Contraction joint at ch:75m and chi: 25m,the behavior of crack shall be
observed and suitable action is to be taken as per MORD Cl.1501.26.19 Shoulders are constructed to support the CC road but the width varying from 0.2 M to 1.0 M only. The
thickness is varying from 130 MM to 150 mm. They are to be widened and completed.20 FDD tests were conducted on Side Shoulders by TPQA at regular intervals. As and when, the required
relative compaction was found to be less than 98%, suggest they shall be scarified ,remixed, watered ato.k. re-and re-compacted to achieve a minimum 0f 98% was ordered. After ensuring the minimum 98%
-
7/31/2019 10.June MPR 2012
40/88
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
8. Shoulders: Shoulders shall be simultaneously compacted along with WBM layers.Sand and gravel are not properly mixed for shoulders. They shall be scarified, remixed, watered to OMCand re-compacted to achieve a minimum of 98% relative compaction. The formation width of the road is
less than 7.5 m at some stretches. The reasons for the same shall be informed.TPQA shall be informedafter rectification for verification.
9. Prime Coat: During the TPQA inspections, the rate of spreading of prime coat was checked as per Clause502 and Table 500.1 of MORD. Spreading temperatures of emulsion are also checked and found varyingfrom 34C to 40C.(The allowable range is from 20C to 60 C)
10 Tack Coat: During the TPQA inspectionst, the rate of spreading of tack coat was checked as per Clause502 and Table 500.1 of MORD. Spreading temperatures of emulsion are also checked and found varyingfrom 35C to 41C.(The allowable range is from 20C to 60 C)
11 13.2mm and 11.2mm Chips for OGPC: - Q.C tests of AIV, FIV, Water absorption and size were done.Under size chips were got removed and OGPC work was allowed.
During OGPC work temperature of bitumin, chips and mix was monitored during the TPQA inspections.12 6.7mm Chips for seal coat: - Under sized chips passing 2.36 mm size sieve were got removed and seal
coat work was allowed.13 OGPC+Seal Coat from Km 0/000 to Km 0/960: Width, camber, undulations and thickness were verified
and the details are given in ANNEXURE-III.14 Bitumen Extraction Test: - Bitumen Extraction tests were conducted for OGPC+seal Coat from Km 0/310
to Km 0/810 .The details are given in ANNEXURE-IV.15 2 Nos of two rows 800 mm dia NP3 pipe culverts are completed in km 0/6.16 The existing open well at Ch. 0/20 LHS was to be properly barricaded to avoid the accidents. NCR was
also issued. Material was dumped at site.
17 Hector Kilometer stones and kilometer stones are provided as per agreement.18 Cautionary, direction and place identification sign boards are fixed at site. But they are not semi reflective
type as specified in the agreement. They shall be rectified immediately. TPQA shall be informed afterrectification for verification.
19 The field officers are requested to provide the guard stones at outer edge of all the sharp curves.20 O.K CARDS are being issued at every stage of work.21 Reflective stickers may be pasted on electrical poles to prevent accidents.22 The Project informatory board was erected with all details at site as per the guide lines given by SPIU,
NCRMP. But the color of the informatory boards provided i not as per SPIU instructions.23 Site order book is maintained by A.E.E but instruction of the inspecting officers was not taken.
-
7/31/2019 10.June MPR 2012
41/88
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
S.No Diameter (mm)Weight per MeterLength (As per IS:
1786-1985)
Yield Stress(N/mm)
Ultimate TensileStrength (N/mm)
1 8 0.385 571 693
2 10 0.621 632 783
3 12 0.872 513 694
4 16 1.6 608 736
Note- a) For 8mm diameter bars permissible deviation is 7% in weight.Note- b) For 10mm, 12mm and 16mm diameter bars permissible deviation is 5% in weight.Note- c) The percentage of elongation is minimum 12%.The Bend & Rebend test is also conducted on all the above samples and no transverse crack is observed
during the testing of samples.6. Graded Aggregates: Sieve analysis tests are conducted at regular intervals for graded metal (20mm 66% &12 mm 34%), and the values are within limits as per table-2 of IS 383-1970.
7. Sand: Sieve Analysis tests are conducted at regular intervals. Sand is confirming to Zone II and the valuesare within limits as per table-4 of IS 383-1970. Fineness modulus is varying from 2.45- 3.03 as against theallowable limits of 2.4 to 3.2.
8. Alkali Aggregate Reactivity Tests: Samples are collected and sent to Civil Aid for testing of Alkali Aggregatereactivity test for Fine and Coarse aggregates and the obtained results are within the limit as per IS2386(Part VII) -1963.
9. C.C Cubes: M30 grade C.C Cubes are casted and tested and the test results are summarized in QC testSummary.
10 Cement Coating of Steel: The protection of reinforcement against corrosion prior to the placement ofconcrete is done by applying a Cement slurry coating on the steel.
11 Water: Sample is collected and sent to Natural Resources Development Co-Operative Society Ltd., Ongole.Results are within the specified range as per IS: 456-2000 & IS: 3025-1986.
12 Brick Test: Water absorption and Crushing strength tests are conducted as per specification IS 3495, andthe test results are summarized in QC test Summary.
Foundation
Earth work
13 Confirmatory Design Mix
-
7/31/2019 10.June MPR 2012
42/88
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
approved drawing of Type-B Cyclone shelter with a design SBC Value of 10 t/m.17 During execution the foundation levels and measurements of steel reinforcement and concrete are verified
and they were fairly tallying with the approved drawing.
18 The field officers have not furnished the bills for cement and steel for every lot used for the shelter. Thesame shall be furnished to the TPQA staff for verification.
19Measurement details of PCC, Footings, Columns & Plinth Beam
Item LocationObserved Required
RemarksL X B L X B
PCC
D2 column3143 mm X3150 mm
3150mm X3150mm
Thickness of PCC
is varying from 146mm to 154 mm asagainst of 150 mm.
F1 column 2345 mm X2340 mm
2350 mm X 2350mm
B4 column2992 mm X3000 mm
3000 mm X 3000mm
Footing
H3 column5996 mm X2193 mm
6000 mm X 2200mm
Depth of footing isvarying from 396mm to 405 mm asagainst of 400 mm
B3 column2842 mm X2847 mm
2850 mm X 2850mm
Depth of footing isvarying from 471mm to 479 mm asagainst of 475 mm.
20Item Location
Observed RequiredRemarks
B X D B X D
A4300 mm X 377
mm300 mm X
380mm
-
7/31/2019 10.June MPR 2012
43/88
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
concreting work the workability of concrete, concrete temperature, water tests are randomly checked &cubes are casted in site and tested after the curing period is complete.
24 Stilt floor columns: reinforcement details are verified randomly H2, F4 column 4-20 mm dia & 4-16 mm dia
stirrups 8 mm dia at a spacing varies 148mm to 156mm as against of 150 mm c/c. And D4 & F3 column 8-16mm dia stirrups 8 mm dia at a spacing varies 147mm to 155mm as against of 150 mm c/c. The spacing ofreinforcements is not in uniform. The same was got rectified before concreting.Stilt floor column measurements are verified and the observed measurements were fairly tallying the drawingmeasurements.Stilt floor columns D5, C1, & B4 approximate compressive strength is also assessed using ReboundHammer. Strength varies from 23.17 N/mm to 33.91 N/mm as against the avg requirement of 3025%N/mm2.
25 Stilt floor roof slab completed with M30 grade concrete, before laying the concrete the reinforcement detailswere thoroughly verified with reference to the drawing. Any minor adjustments in spacing and cover etc.,
were got attended and the concreting was allowed.Stilt floor roof slab thickness are verified as 147 mm to 152 mm as against of 150 mm. and the thickness ofslab in portion B3-4 to F3-4 is 172 mm to 177mm as against of 175 mm thick.
26 STAIRCASE- The stair case and Ramp portion are constructed with M30 grade concrete. Honey Combing isobserved on the sides of ramp slab. NCR is issued to rectify the honey combing.During TPQA inspections, when concreting is going on TPQA monitored the proportioning of the ingredients,water cement ratio, slump and placement of concrete etc. Casting of cubes was also carried out.At the Time of one TPQA inspection, curing arrangements were not properly done. TPQA has got itimproved.The stair case Rise and Treads are verified, and the observed measurements. Rise is varying from 133 mmto 182 mm against of 150mm. Treads are varying from 260 mm to 300 mm as against of 280mm. All thetreads and raises of each step shall be equal to prevent accidents.
27 First floor columns reinforcement details are verified spacing, cover etc were verified before concreting.28 First floor roof slab completed with M30 grade concrete, before laying the concrete the reinforcement details
were thoroughly verified with reference to the drawing. Any minor adjustments in spacing and cover etc.,were got attended and the concreting was allowed.
29 Honey Combing is observed on the sides of First Floor Slab & Beams i.e. on B1, B2, B4, & B7 NCR isissued to rectify the honey combing.
30 First floor Brick work is in progress, the mortar joints in brick masonry work should not exceed 12 mm.Irregular brick work done, and It is not to plum bob at some places. Workmanship is not satisfactory.
31 Polyphone Covers & wooden planks are observed at the bottom of beams. Before plastering work these are
-
7/31/2019 10.June MPR 2012
44/88
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Name ofWork:
Construction of cyclone shelter at Runku in Santhabommali Mandal
1. Two works are there in this package:1) Construction of cyclone shelter at Kollipadu in Santhabommali Mandal,2) Construction of cyclone shelter at Runku in Santhabommali MandalThe individual progress of this work is nearly 21% value of work is completed.The combined progress of this package is 25%.
2 21% value of the work is completed. Steel placement work for plinth beam is inprogress.The progress ofwork is slow as per mile stone.
3 Works to be done as per Combined Milestone:Mile stone 1 to the end of Dt: 07.03.12- Ground Floor and Plinth Level.Mile stone 2 to the end of Dt: 07.08.12- First Floor Roof Slab Cast .Mile stone 3 to the end of Dt: 07.01.13- Completion of Works.
4 Laying of PCC under plinth beam work completed.5 The center line measurements for columns are verified and found fairly tallying with the drawing. Hence
the previously given NCR is closed.6 The material test registers are not shown for verification during inspection. The same shall be produced to
TPQA during inspection. One technical person appointed by the contractor is available at site duringinspection.Materials.
7 Sand: a) Sieve Analysis tests are conducted. Sand is confirming to Zone II of IS 383 table 4. Finenessmodulus is varying from 2.48 -2.59 as against the allowable limits of. 2.4 to 3.2.
8 Graded Aggregates : Sieve analysis for 20mm graded metal are conducted and observed values are
within the specified range as per IS 383 table-29 Alkali Aggregate Reactivity Tests: Samples are collected and sent to Civil Aid for testing of Alkali
Aggregate reactivity test for Fine and Coarse aggregates and the obtained results are within the limit asper IS 2386(Part VII) -1963.
10 Cement: TPQA collected the cement sample and tested for all the required tests on cement such asfineness, initial setting time, final setting time, consistency etc and the values observed are within thespecified range as per IS 4031.
11 Steel: Steel samples are collected and sent to Civil Aid for testing of Physical and Chemical properties andthe obtained results are within the specified limits as per IS 1786.
12 Water: Sample is collected and sent to Panchayatraj internal water quality monitoring Laboratory Z.P
-
7/31/2019 10.June MPR 2012
45/88
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
every consignment and ensure its suitability before proceeding with the work.23 Barricading is not provided for the work place. Insisted to provide barricades to the working portion to
prevent any casualties to the public and the workers.
24 The informatory sign boards with all details are provided at site as per the guidelines given by the SPIU,NCRMP.
25 Safety measures for workers such as Helmets, Gum Shoes .etc, are to be provided by the contractor.26 The Contractor shall take necessary precautions for safety of the workers and preserving their health while
working in such jobs, which require special protection and precaution.
Name ofWork:
Construction of cyclone shelter at Gajapathinagaram in Payakaraopeta in VishakhapatnamDistrict
1. Two works are there in this package:1) Construction of cyclone shelter at Gajapathi Nagaram in Payakaraopeta Mandal and2) Construction of cyclone shelter at Ratnayampeta in Payakaraopeta MandalThe individual progress of this work is 14% value of work is completed.The combined progress of this package is 42.81%.
2 14.00% value of the work is completed. Foundation footings & Pedestals works are completed. Columns upto below plinth beam work are in progress.
3 Works to be done as per Combined Milestone:Mile stone 1 to the end of Dt: 02.02.12- Ground Floor and Plinth Level.Mile stone 2 to the end of Dt: 02.06.12- First Floor Roof Slab Cast.Mile stone 3 to the end of Dt: 02.10.12- Completion of Works.
4 The marking for Footing positions are given with the help of Total station instrument. The linearmeasurements of the center line of columns are verified and fairly tallying with the approved drawing ofType-B Cyclone shelter with a design SBC Value of 7.5 t/m2.
5 The soil sample was collected by the contractor at a depth of 2.5m from the ground level and sent to Govt.Polytechnic college to test the SBC value of soil and the result obtained is 9.0 t/m2 as against of 7.5 t/m2 asper approved drawing. The confirmatory test for SBC is conducted by TPQA. The SBC obtained is 8.5 t/m2
6 The field officers have furnished the test results for Soil SBC value, Mix Designs, Steel reports and Waterobtained from Department of Civil Engineering in Govt. Polytechnic and Andhra university at VisakhapatnamDistricts.
7 Quality control lab is not available at site and the field officers are requested to insist the contractor to
-
7/31/2019 10.June MPR 2012
46/88
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
materials, pH value of water and slump are also tested and found within the specified limits.17 Spacing and dimension of strips are verified with reference to the drawing and they are found fairly satisfying
with drawing. Clear cover is also verified.
18 It is instructed to the contractor to improve the storage of materials as per IS:456-2000 Sub Cl. 5.7.orIS:4082-1996
19 Site order book is being maintained by the field officers. The field officers are requested to take instructionsfrom the inspecting officers.
20 The field officers have not furnished the bills for cement and steel for every lot used for the shelter. The sameshall be furnished to the TPQA staff during the inspection for verification.
21 The field officers have not furnished the approved quarry letters for metal, sand and water used for theshelter. The same shall be furnished to the TPQA staff during the inspection for verification.
22 The field officers are requested to insist the contractor to test the samples of cement and steel from everyconsignment and ensure its suitability before proceeding with the work.
23 Permanent barricading is not provided for the work place. Insisted to provide permanent barricades to theworking portion to prevent any casualties the public and the workers.NCR is issued to the agency to providethe same
24 The informatory sign boards with all details shall be provided at site as per the guidelines given by the SPIU,NCRMP.
25 Safety measures for workers such as Helmets, Gum Shoes .etc, are to be provided by the contractor.26 The Contractor shall take necessary precautions for safety of the workers and preserving their health while
working in such jobs, which require special protection and precaution.27 Para wise compliance report shall be furnished duly attending to the above remarks.
Name ofWork:
Construction of cyclone shelter at Bangarampeta in Nakkapalli Mandal inVishakhapatnam District
1. Three works are there in this package:1) Construction of cyclone shelter at Bangarampeta in Nakkapalli Mandal,2) Construction of cyclone shelter at Mullaparra in Nakkapalli Mandal and3) Construction of cyclone shelter at Patimeeda in Nakkapalli MandalThe individual progress of this work is nearly 55.87% value of work is completed.The combined progress of this package is 39.38%.
2 55.87 % value of the work is completed. Stilt Slab is in Completed. Columns laid up to 1st floor roof slab
-
7/31/2019 10.June MPR 2012
47/88
MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
11 C.C Cubes : M-20 and M30 Cubes are tested for Compressive strength and the results are satisfying therequirements as per IS 456 Table -11.
12 Spacing and dimension of strips are verified with reference to the drawing and they are found as per
drawing. Clear cover is also verified.13 It is requested to the contractor to improve the storage of materials as per IS: 456-2000 Section 2 of Sub
Cl. 5.7.14 Site order book is being maintained by the field officers. The field officers are requested to take instructions
from the inspecting officers.15 Electrical diagrams are not available at site. The same shall be furnished to the TPQA staff during the
inspection for verification.16 The field officers have not furnished the bills for cement and steel for every lot used for the shelter. The
same shall be furnished to the TPQA staff during the inspection for verification.17 The field officers have not furnished the approved quarry letters for metal, sand and water used for the
shelter. The same shall be furnished to the TPQA staff during the inspection for verification.18 The field officers are requested to insist the contractor to test the samples of cement and steel from every
consignment and ensure its suitability before proceeding with the work.19 Permanent barricading is not provided for the work place. Insisted to provide permanent barricades to the
working portion to prevent any casualties the public and the workers.20 The informatory sign boards with all details are provided at site as per the guidelines given by the SPIU,
NCRMP.21 Safety measures for workers such as Helmets, Gum Shoes .etc, are to be provided by the contractor.22 The Contractor shall take necessary precautions for safety of the workers and preserving their health while
working in such jobs, which require special protection and precaution.
23 Para wise compliance report shall be furnished duly attending to the above remarks.
Name ofWork:
Construction of cyclone shelter at Ratnayampeta in Payakaraopeta in VishakhapatnamDistrict.
1. Two works are there in this package:1) Construction of cyclone shelter at Gajapathi Nagaram in Payakar