STUDY INFORMATION FOR EXAM CANDIDATES CPIM PrepTest Module: Module 2 ExamREVIEW PRO & ExamREVIEW PRESS 2006 All rights reserved. No part of the contents of this book may be reproduced or transmitted in any form or by any means without the written permission of the publisher. Master Planning of Resources

Transcript of Question Bank Mpr

Page 1: Question Bank Mpr

S T U D Y I N F O R M A T I O N F O R E X A M C A N D I D A T E S

CPIM PrepTest Module: Module 2

ExamREVIEW PRO & ExamREVIEW PRESS 2006

All rights reserved. No part of the contents of this book may be reproduced or transmitted in any form or by any means without the written permission of the

publisher.

Master Planning of Resources

Page 2: Question Bank Mpr

9

Notes:

1

Demand for finished goods is an example of:

A. Independent demand

B. Dependent demand

C. Mixed demand

D. None of the choices

Page 3: Question Bank Mpr

10

Notes:

ANSWER: A

Independent demand refers to the demand for an item that is unrelated to the demand for other items. Demand for finished goods is one such example. On the other hand, dependent demand refers to the demand that is directly related to or derived from the BOM structure for other items or products.

Page 4: Question Bank Mpr

11

Notes:

2

Which of the following types of demand can be calculated?

A. Independent demand

B. Dependent demand

C. Mixed demand

D. None of the choices

Page 5: Question Bank Mpr

12

Notes:

ANSWER: B

Dependant demands can be calculated, while independent demands have to be forecasted. Note that it is possible for an inventory item to have both dependent and independent demand at any given time.

Page 6: Question Bank Mpr

13

Notes:

3

Which of the following refers to the planning process for predicting the demand of products and services based on forecasts?

A. Demand Planning

B. Demand Aggregation

C. Demand summarization

D. Demand Analyst

E. None of the choices

Page 7: Question Bank Mpr

14

Notes:

ANSWER: A

Demand Planning refers to the planning process for predicting the demand of products and services based on forecasts. By accurately forecasting customer demand, one can improve the level of customer service while decreasing costs through reducing demand uncertainty.

Page 8: Question Bank Mpr

15

Notes:

4

You may achieve increasingly accurate demand forecasts by integrating volume predictions based on:

A. price elasticity

B. customer locations

C. supply base optimization

D. demand seasoning

E. None of the choices

Page 9: Question Bank Mpr

16

Notes:

ANSWER: A As mentioned by Manugistics, optimized demand management can be achieved as follow1:

o use advanced price optimization to enhance revenue

o achieve increasingly accurate demand forecasts by integrating volume predictions based on price elasticity

o bring your supply and demand chains into balance, improving enterprise profitability and customer service (this is important)

o adaptively manage volatile demand, short product life cycles, and dynamic market changes (this is important)

o smooth demand over peak and valley periods (this is important)

o determine the best product mix to optimize the profitability of existing assets

o optimize price lists and customer quotes to maximize margins and gain market share

o steer demand between products, understanding and leveraging product cannibalization and halo effects (this is VERY important)

1 http://www.manugistics.com/solutions/profitable_demand_management.asp

Page 10: Question Bank Mpr

17

Notes:

5 Optimized demand management can be achieved via which of the following ways (choose all that apply):

A. advanced price optimization

B. bring your supply and demand chains into balance

C. adaptively manage volatile demand

D. smooth demand over peak and valley periods

E. determine the best product mix

F. None of the choices

Page 11: Question Bank Mpr

18

Notes:

ANSWER: A B C D E As mentioned by Manugistics, optimized demand management can be achieved as follow2:

o use advanced price optimization to enhance revenue

o achieve increasingly accurate demand forecasts by integrating volume predictions based on price elasticity

o bring your supply and demand chains into balance, improving enterprise profitability and customer service (this is important)

o adaptively manage volatile demand, short product life cycles, and dynamic market changes (this is important)

o smooth demand over peak and valley periods (this is important)

o determine the best product mix to optimize the profitability of existing assets

o optimize price lists and customer quotes to maximize margins and gain market share

o steer demand between products, understanding and leveraging product cannibalization and halo effects (this is VERY important)

2 http://www.manugistics.com/solutions/profitable_demand_management.asp

Page 12: Question Bank Mpr

19

Notes:

6 Actual usage might deviate significantly from the forecast due to which of the following reasons (choose all that apply):

A. unusual usage activity that will probably not occur again

B. the start of a significant new trend in the usage of the product.

C. the wrong forecast formula being applied

D. the wrong forecast method being applied

E. price elasticity

F. None of the choices

Page 13: Question Bank Mpr

20

Notes:

ANSWER: A B C D

As stated by Jon Schreibfeder,

"Today's competitive market requires accurate forecasts for the future demand of each product in inventory. We are constantly looking for ways to reduce the forecasting error (i.e., the difference between a forecast and the resulting usage). But these efforts are often frustrated by unusual activity imbedded in historic usage data"3.

Based on Jon’s reasoning, actual usage might deviate significantly from the forecast because of:

unusual usage activity that will probably not occur again in the future.

the start of a significant new trend in the usage of the product.

the wrong forecast formula or method being applied to the item.

3 http://www.effectiveinventory.com/article46.html

Page 14: Question Bank Mpr

21

Notes:

7

Which of the following represents a better way of forecasting?

A. identify items that might have experienced unusual usage activity and perform manual adjustment.

B. identify AND correct items that might have experienced unusual usage activity on the spot.

C. use computer simulation

D. use advanced forecast modeling (AFM) techniques

E. None of the choices

Page 15: Question Bank Mpr

22

Notes:

ANSWER: A

Jon believes that one better way of forecasting is “to identify, but not correct, items that might have experienced unusual usage activity. Buyers, planners, and/or salespeople review the list of items and determine whether unusual activity actually occurred, a significant new trend has begun, or the wrong forecasting method has been applied to the item. They can then manually adjust actual usage to reflect what usage would have been had no unusual activity occurred”.

Page 16: Question Bank Mpr

23

Notes:

8

Sporadic usage items are items that are:

A. sold infrequently.

B. sold frequently.

C. sold seasonally.

D. sol AS IS.

E. None of the choices

Page 17: Question Bank Mpr

24

Notes:

ANSWER: A

Sporadic usage items are items that are sold infrequently. It is not easy to forecast the demand of such items, and the key point to make here is that you must carefully avoid using an incorrect forecast method or you will risk stocking the wrong quantity of the wrong item in the wrong location at the wrong time.

Page 18: Question Bank Mpr

25

Notes:

9

It is advisable to have the logic for determining when and how much to order depends on (choose 3):

A. demand velocity

B. stage in life cycle

C. promotional events

D. supplier base

E. financial statement period

F. None of the choices

Page 19: Question Bank Mpr

26

Notes:

ANSWER: A B C

Calvin Lee suggests that the logic for determining when and how much to order should depend on SKU characteristics like demand velocity; stage in life cycle; and temporary impacts on demand, such as promotional events. He further points out that these characteristics can influence the amount of safety stock, the frequency of inventory status reviews, the forecast update cycle, and the order postponement decision.

Page 20: Question Bank Mpr

27

Notes:

10

Data cleansing is MOST important:

A. for the demand side

B. for the supply side

C. both for the demand side and the supply side

D. None of the choices

Page 21: Question Bank Mpr

28

Notes:

ANSWER: C

In any case, you must be sure that your data are cleansed of atypical outliers and patterns before it enters a forecasting model. In fact, data cleansing is important both for the demand side and the supply side:

“Demand data command the greatest attention in data cleansing. Supplier lead times also must be cleansed of anomalous values. One-time extraordinary lead times, which weather, natural disasters, or labor disputes can cause, must be cleansed so as to not distort the lead time estimates used in replenishment calculations”4.

4 Op.Cit., Calvin Lee

Page 22: Question Bank Mpr

29

Notes:

11

One-time extraordinary lead times can be caused by (choose all that apply):

A. weather

B. natural disasters

C. labor disputes

D. man made disaster

E. None of the choices

Page 23: Question Bank Mpr

30

Notes:

ANSWER: A B C D

In any case, you must be sure that your data are cleansed of atypical outliers and patterns before it enters a forecasting model. In fact, data cleansing is important both for the demand side and the supply side:

“Demand data command the greatest attention in data cleansing. Supplier lead times also must be cleansed of anomalous values. One-time extraordinary lead times, which weather, natural disasters, or labor disputes can cause, must be cleansed so as to not distort the lead time estimates used in replenishment calculations”5.

5 Op.Cit., Calvin Lee

Page 24: Question Bank Mpr

31

Notes:

12

Rate this comment: “Short term forecasts are always more accurate than their long term counterparts”.

A. This is mostly true unless the short term forecasts use improper methods

B. This is always true

C. This is true only if the long term forecasts use improper methods

D. None of the choices

Page 25: Question Bank Mpr

32

Notes:

ANSWER: A

Short term forecasts are always more accurate than their long term counterparts. If the forecast time frame has to be long, you may consider the use of a time phased forecast process — have your forecast spread out by day or week or month. As recommended by Calvin (above), such a forecast could better support manufacturing and warehouse capacity planning, work force assignments, sales forecasting, and budgeting. However, to obtain an accurate time-phased forecast, careful modeling of day-of-week, trend, and seasonal effects and consideration of supplier constraints within the demand chain are required.

Page 26: Question Bank Mpr

33

Notes:

13

In order to obtain an accurate time-phased forecast, which of the following are required (choose all that apply):

A. careful modeling of day-of-week, trend, and seasonal effects

B. consideration of supplier constraints within the demand chain

C. careful modeling of work flows

D. consideration of customer constraints within the supply chain

E. None of the choices

Page 27: Question Bank Mpr

34

Notes:

ANSWER: A B

Short term forecasts are always more accurate than their long term counterparts. If the forecast time frame has to be long, you may consider the use of a time phased forecast process — have your forecast spread out by day or week or month. As recommended by Calvin (above), such a forecast could better support manufacturing and warehouse capacity planning, work force assignments, sales forecasting, and budgeting. However, to obtain an accurate time-phased forecast, careful modeling of day-of-week, trend, and seasonal effects and consideration of supplier constraints within the demand chain are required.

Page 28: Question Bank Mpr

35

Notes:

14

You may define and maintain forecasts:

A. for any item at any level of your BOM.

B. for certain items at the top 2 levels of your BOM.

C. for certain items at the top 3 levels of your BOM.

D. for only the top level items at any level of your BOM.

E. None of the choices

Page 29: Question Bank Mpr

36

Notes:

ANSWER: A

You may define and maintain forecasts for any item at any level of your BOM. You may forecast demand for products directly, or forecast product families and explode forecasts to individual products through your planning bills.

Page 30: Question Bank Mpr

37

Notes:

15

When are forecasts consumed (choose the BEST answer)?

A. each time your customers place order demand for the forecasted product.

B. each time your customers place order demand for the entire line of products.

C. each time you place manufacturing order for the promoted products.

D. each time you place manufacturing order for the competing products.

E. None of the choices

Page 31: Question Bank Mpr

38

Notes:

ANSWER: A

Forecasts are consumed each time your customers place order demand for the forecasted product.

Page 32: Question Bank Mpr

39

Notes:

16

Which of the following moving average techniques apply more weight on recent data (choose all that apply):

A. Standard moving averages

B. Exponential average

C. Weighted average

D. None of the choices

Page 33: Question Bank Mpr

40

Notes:

ANSWER: B C

The moving average is a way of calculating the average over a given time span. As the numbers change over time, the average reflects the change, but at a slower pace.

o Standard moving averages apply equal weight to the numbers. It adds the closing number for a number of time periods and divides this total by the number of periods. This results in the average over a specific time period.

o Exponential average puts more weight on recent data and less weight on past data. The exponential moving average applies a percentage of today's closing to yesterday's moving average. The formula used is as follow: Moving Average = ((today's close)*x) + ((yesterday's moving average)*x) while x = the selected percentage

o Weighted average puts more weight on recent and less on past data as well. However, it works by multiplying each of the previous day's data by a predetermined weight.

Page 34: Question Bank Mpr

41

Notes:

17

Which of the following moving average methods adds the closing number for a number of time periods and divides this total by the number of periods?

A. Standard moving averages

B. Exponential average

C. Weighted average

D. None of the choices

Page 35: Question Bank Mpr

42

Notes:

ANSWER: A

The moving average is a way of calculating the average over a given time span. As the numbers change over time, the average reflects the change, but at a slower pace.

o Standard moving averages apply equal weight to the numbers. It adds the closing number for a number of time periods and divides this total by the number of periods. This results in the average over a specific time period.

o Exponential average puts more weight on recent data and less weight on past data. The exponential moving average applies a percentage of today's closing to yesterday's moving average. The formula used is as follow: Moving Average = ((today's close)*x) + ((yesterday's moving average)*x) while x = the selected percentage

o Weighted average puts more weight on recent and less on past data as well. However, it works by multiplying each of the previous day's data by a predetermined weight.

Page 36: Question Bank Mpr

43

Notes:

18

ABC Analysis is a method for determining:

A. priority

B. stock turns

C. inventory level

D. EOQ

E. None of the choices

Page 37: Question Bank Mpr

44

Notes:

ANSWER: A

To maintain accurate forecast for every item and to manage the demand for every item can be an exhaustive task – no one can afford to do good on everything. With ABC Analysis, you can produce a list of priority – you decide what is the most important item to take care of, and what items can receive less focus. To be precise, an ABC analysis determines the relative value of a group of inventory items based on your valuation criterion. "ABC" refers to the rankings you assign your items as a result of this analysis, where "A" items are ranked higher than "B" items, and so on.

Page 38: Question Bank Mpr

45

Notes:

19

Which of the following statements correctly describe ABC Analysis?

A. it determines the relative value of a group of inventory items based on your valuation criterion

B. it determines the absolute value of a group of inventory items based on your valuation criterion

C. it determines the relative composition of a group of inventory items based on your valuation criterion

D. None of the choices

Page 39: Question Bank Mpr

46

Notes:

ANSWER: A

To maintain accurate forecast for every item and to manage the demand for every item can be an exhaustive task – no one can afford to do good on everything. With ABC Analysis, you can produce a list of priority – you decide what is the most important item to take care of, and what items can receive less focus. To be precise, an ABC analysis determines the relative value of a group of inventory items based on your valuation criterion. "ABC" refers to the rankings you assign your items as a result of this analysis, where "A" items are ranked higher than "B" items, and so on.

Page 40: Question Bank Mpr

47

Notes:

20

Many companies use ABC Analysis to:

A. manage order levels.

B. perform short term forecast.

C. drive cycle counts.

D. perform long term forecast.

E. None of the choices

Page 41: Question Bank Mpr

48

Notes:

ANSWER: C

Many companies use ABC Analysis to manage inventory: they drive their cycle counts based on the ABC classifications, where items of high value (A items) are counted very frequently, and items of lower value are counted less frequently. In fact, the use of ABC Analysis is not restricted to cycle counting. In the case of demand management, you may spend more resources on managing the demand for A items (and spend less to take care of B and C items). If safety stock is a way of reacting to rising demands, you may, for example, have all “A” items get 4 weeks of safety stock, all “B” items get 3 weeks, and all “C” items get 2 weeks…etc.

Page 42: Question Bank Mpr

49

Notes:

21

The primary drawbacks of the ABC approach are (choose all that apply):

A. it is not clear whether the three classes can cover the length of priority periods.

B. it is not clear whether % or decimal values should b used in the three classes.

C. it is not clear whether the three classes suffice for longer term estimation period.

D. it is not clear whether the three classes can capture the diversity and differences of the large number of SKUs many companies carry.

E. None of the choices

Page 43: Question Bank Mpr

50

Notes:

ANSWER: D

The ABC approach is believed to be flawed though. One primary drawback of this approach is that it is not clear whether the three classes can capture the diversity and differences of the large number of SKUs many companies carry.

Page 44: Question Bank Mpr

51

Notes:

22

Which of the following statements correctly describe the “Bullwhip effect” (choose all that apply):

A. Demand variability increases as one moves up the supply chain away from the retail customer

B. Any small changes in consumer demand can result in large variations in orders placed upstream

C. The supply network can oscillate in very large swings

D. The supply network can oscillate in very small and frequent swings

E. Any small changes in consumer demand can result in large variations in orders placed downstream

F. None of the choices

Page 45: Question Bank Mpr

52

Notes:

ANSWER: A B C

“Demand variability increases as one moves up the supply chain away from the retail customer, and small changes in consumer demand can result in large variations in orders placed upstream. Eventually, the network can oscillate in very large swings as each organization in the supply chain seeks to solve the problem from its own perspective”6.

6 http://www.quickmba.com/ops/bullwhip-effect/

Page 46: Question Bank Mpr

53

Notes:

23

Bullwhipping effect is caused by variability and delays that are mostly the results of (choose all that apply):

A. Overreaction to backlogs

B. Shortage gaming

C. Demand forecast inaccuracies

D. Free return policies

E. None of the choices

Page 47: Question Bank Mpr

54

Notes:

ANSWER: A B C D

It is the variability coupled with time delays in the transmission of information up the supply chain and time delays in manufacturing and shipping goods down the supply chain that produce this kind of bullwhipping effect. The variability and delays are mostly the results of:

o Overreaction to backlogs

o Poor communication along the supply chain

o Order batching produces larger orders which can produce more variance.

o Shortage gaming (customers order more than they need during a period of short supply)

o Demand forecast inaccuracies – in fact, independent multiple forecasts in the demand chain is believed to be the first cause of the bullwhip effect.

o Free return policies (this is especially true in the US where 30-day money back guarantee is the norm)

Page 48: Question Bank Mpr

55

Notes:

24

Which of the following are NOT the basic determinants for the bullwhip effect (choose all that apply):

A. the quality of the forecast

B. the update frequency of the forecast

C. the reorder frequency

D. the reorder batch size

E. protective buying

F. speculative buying

G. None of the choices

Page 49: Question Bank Mpr

56

Notes:

ANSWER: G

Lee, Padmanabhan and Whang (1997) identified the basic determinants for the bullwhip effect7:

o the quality of the forecast and its update frequency

o the reorder frequency and the reorder batch size

o the expectation of shortage, leading to protective buying

o the special price schemes, leading to speculative buying

7 http://www.stud.fernuni-hagen.de/q5153735/research/bullwhiptop.htm

Page 50: Question Bank Mpr

57

Notes:

25

Sometimes a decision maker along the chain may order in higher quantities than he receives customer orders. The most typical rationales include (choose 3):

A. protection against stockout

B. lot size economics

C. speculative ordering

D. price optimization

E. labor agreement bargaining

Page 51: Question Bank Mpr

58

Notes:

ANSWER: A B C

To reduce the impact of the effect, better communication and cooperation among chain members is the key. If information can flow through the chain timely and accurately, bullwhip effect can be minimized.

Sometimes a decision maker along the chain may order in higher quantities than he receives customer orders. The most typical rationales are:

o protection against stockout

o lot size economics

o speculative ordering

Page 52: Question Bank Mpr

59

Notes:

26

The deliverables of S&OP are:

A. key long term decisions.

B. lower level long term decisions.

C. lower level short term decisions.

D. key short term decisions.

E. MRP schedules.

F. income statements.

G. None of the choices

Page 53: Question Bank Mpr

60

Notes:

ANSWER: A

“S&OP is a formal process that consists of a series of meetings, finishing with a high level meeting where key long term decisions are made. In these meetings, data from various areas of your business is discussed. The end goal is an agreement between various departments on the best course of action to achieve the optimal balance between supply and demand and to meet your profitability goals. It's a tool that helps you properly manage your business”8.

8 http://www.sopoverview.com/definition.htm

Page 54: Question Bank Mpr

61

Notes:

27

Sales & Operations Planning is intended for achieving which of the following purposes (choose all that apply):

A. increasing teamwork between cross functional areas

B. facilitating the setting of targets

C. allowing progress against the Business Plan to be reviewed

D. putting your operational plan in line with your job shop flows

E. facilitating the setting of internal controls

F. None of the choices

Page 55: Question Bank Mpr

62

Notes:

ANSWER: A B C

Shorts for Sales & Operations Planning, S&OP is intended for helping companies to maximize customer satisfaction and meet profitability goals by achieving an optimal balance of demand and supply. In theory, S&OP can:

o increase teamwork between cross functional areas

o put your operational plan in line with your Business Plan

o facilitate the setting of targets

o allow progress against the Business Plan to be reviewed

Page 56: Question Bank Mpr

63

Notes:

28

Proper Sales & Operations Planning can contribute to which of the following results (choose all that apply):

A. Reduced lead times

B. Improved service levels

C. Reduced inventory management costs

D. Reduced obsolete inventory

E. Reduce expediting costs

F. Entire elimination of safety-stock

G. None of the choices

Page 57: Question Bank Mpr

64

Notes:

ANSWER: A B C D E

As suggested by Adexa9, proper S&OP can contribute to the following results:

o Reduce lead times

o Profitably deploy inventory across the enterprise

o Synchronize material planning, capacity planning and allocation planning

o Improve service levels

o Reduce inventory management costs and obsolete inventory

o Reduce expediting costs

o Manage by/co products

o Optimize safety-stock and raw-material levels

9 http://www.adexa.com/solutions/sales.asp

Page 58: Question Bank Mpr

65

Notes:

29

Which of the following correctly describe the order of the stages of S&OP?

A. Demand Review -> Supply Review -> Partnership Meeting -> Sales and Operations Planning Meeting

B. Supply Review -> Demand Review -> Partnership Meeting -> Sales and Operations Planning Meeting

C. Demand Review -> Sales and Operations Planning Meeting -> Supply Review -> Partnership Meeting

D. Sales and Operations Planning Meeting -> Demand Review -> Supply Review -> Partnership Meeting

E. None of the choices

Page 59: Question Bank Mpr

66

Notes:

ANSWER: A

In the article “Sales and Operations Planning overview”, four stages of the S&OP process have been mentioned10:

o Demand Review - chaired by the Sales and Marketing Director, attended by Sales and Marketing Managers plus development engineers where relevant.

o Supply Review - chaired by the Logistics Director, and attended by manufacturing and planning personnel

o Partnership Meeting - bringing together the demand and supply reviews and often chaired by the Finance Director

o Sales and Operations Planning Meeting - full review and commitment to the plan, chaired by the Managing Director

10 http://www.bpic.co.uk/sop.htm

Page 60: Question Bank Mpr

67

Notes:

30

During the S&OP process, Demand Review is often chaired by:

A. the Sales and Marketing Director

B. the Logistics Director

C. the Finance Director

D. the Managing Director

E. None of the choices

Page 61: Question Bank Mpr

68

Notes:

ANSWER: A

In the article “Sales and Operations Planning overview”, four stages of the S&OP process have been mentioned11:

o Demand Review - chaired by the Sales and Marketing Director, attended by Sales and Marketing Managers plus development engineers where relevant.

o Supply Review - chaired by the Logistics Director, and attended by manufacturing and planning personnel

o Partnership Meeting - bringing together the demand and supply reviews and often chaired by the Finance Director

o Sales and Operations Planning Meeting - full review and commitment to the plan, chaired by the Managing Director

11 http://www.bpic.co.uk/sop.htm

Page 62: Question Bank Mpr

69

Notes:

31

During the S&OP process, Partnership Meeting is often chaired by:

A. the Sales and Marketing Director

B. the Logistics Director

C. the Finance Director

D. the Managing Director

E. None of the choices

Page 63: Question Bank Mpr

70

Notes:

ANSWER: C

In the article “Sales and Operations Planning overview”, four stages of the S&OP process have been mentioned12:

o Demand Review - chaired by the Sales and Marketing Director, attended by Sales and Marketing Managers plus development engineers where relevant.

o Supply Review - chaired by the Logistics Director, and attended by manufacturing and planning personnel

o Partnership Meeting - bringing together the demand and supply reviews and often chaired by the Finance Director

o Sales and Operations Planning Meeting - full review and commitment to the plan, chaired by the Managing Director

12 http://www.bpic.co.uk/sop.htm

Page 64: Question Bank Mpr

71

Notes:

32

Rate this comment: For maximum effectiveness, the S&OP process should include sales forecasting.

A. True

B. False

Page 65: Question Bank Mpr

72

Notes:

ANSWER: B

The S&OP process should NOT include sales forecasting. Sales Forecasts should be made ready prior to the S&OP meetings.

Page 66: Question Bank Mpr

73

Notes:

33

Typically speaking, S&OP shall take a monthly look at product groups at least __________ months across the planning horizon.

A. 1- 2

B. 3- 5

C. 6- 12

D. 12- 24

E. 24- 36

F. None of the choices

Page 67: Question Bank Mpr

74

Notes:

ANSWER: C

Typically speaking, S&OP shall take a monthly look at product groups at least 6- 12 months across the planning horizon (some companies can go out as far as18 months). Phil Robinson suggests that the S&OP review should cover at least 15 months so must be at a family level (dividing the product range into less than 20 families of products) and in monthly time periods.

In any case, for the S&OP process to be effective, active participation by the heads the business groups is essential.

Page 68: Question Bank Mpr

75

Notes:

34

Data that will be put on the table during the S&OP process normally does NOT include:

A. Current plan for each product group

B. Current finished goods inventory

C. Customer Service

D. Sales forecasts

E. Purchase Orders received

F. Materials available

G. Customer satisfaction level

H. None of the choices

Page 69: Question Bank Mpr

76

Notes:

ANSWER: G

Data that will be put on the table during the S&OP process normally includes:

o Current plan for each product group

o Current finished goods inventory

o Customer Service

o Sales forecasts

o Purchase Orders received

o Materials available

o Manufacturing plans

o Manufacturing capacity

o Distribution capacity

o Shipping capacity

o Performance measures

Page 70: Question Bank Mpr

77

Notes:

35

Which of the following items should you master schedule (choose all that apply):

A. end items in a make-to-stock environment

B. components in an assembly-to-order environment

C. raw materials & components in a make-to-order environment

D. item with critical impact on lower level components

E. high-value materials

F. long lead time materials

G. key production resources

H. None of the choices

Page 71: Question Bank Mpr

78

Notes:

ANSWER: A B C D E F G

Why do you master schedule? Firstly, to provide stability to materials plans. Secondly, to manage the impact on key production resources. Thirdly, to ensure the proper execution of the production plan.

Which items should you master schedule?

end items in a make-to-stock environment

components in an assembly-to-order environment

raw materials & components in a make-to-order environment

item with critical impact on lower level components

high-value materials

long lead time materials

key production resources

Page 72: Question Bank Mpr

79

Notes:

36

What should you use to validate your master schedules?

A. CRP

B. RCCP

C. EOQ

D. MRP-2

E. JIT

F. None of the choices

Page 73: Question Bank Mpr

80

Notes:

ANSWER: B

The traditional approach of Master Scheduling requires a Master Production Scheduler who calculates the schedule to present the results to production to make. Such an approach is non-participative. To be more participative approach, it is suggested that you run a planning meeting following the first cut schedule to involve production in the decision making process.

You should use RCCP (rough cut capacity planning) to validate your master schedules.

Page 74: Question Bank Mpr

81

Notes:

37

Time fences define regions that are mostly:

A. short term.

B. med term.

C. long term.

D. None of the choices

Page 75: Question Bank Mpr

82

Notes:

ANSWER: C

In the ever changing world, proper scheduling and planning will be very difficult without the help of the various time fences. What are time fences? They are boundaries between different periods in the planning horizon. They define regions (that are short term) within which planning restrictions minimize costly disruption to shop floor and supplier schedules.

Page 76: Question Bank Mpr

83

Notes:

38

Time fences can be established for which of the following (choose all that apply):

A. planning

B. demand

C. release

D. satisfaction

E. cycle counting

F. None of the choices

Page 77: Question Bank Mpr

84

Notes:

ANSWER: A B C

From a scheduler and planner point of view, time fences can be used to provide guidelines to establish where various restrictions or changes in operating procedures take place.

The 3 most popular time fences are:

o planning time fence

o demand time fence

o release time fence

Page 78: Question Bank Mpr

85

Notes:

39

Time fences should be established on what basis?

A. per product family

B. per product

C. per flow line

D. per workshop

E. None of the choices

Page 79: Question Bank Mpr

86

Notes:

ANSWER: A

You can define planning, demand, and release time fence days for your item based on the cumulative manufacturing lead time, cumulative total lead time, total lead time, or any predefined value.

The time fences should be established on a per product family basis within the manufacturing operation. And once agreed, they should be published internally and strictly enforced by the master scheduler.

Page 80: Question Bank Mpr

87

Notes:

40

Within the demand time fence, you may only consider:

A. the actual demand.

B. the forecast demand.

C. Both A and B

D. the outlined demand.

E. the stabilized demand.

F. A, C and D

G. None of the choices

Page 81: Question Bank Mpr

88

Notes:

ANSWER: A

The demand time fence is usually surrounded by the current date and a date within which the planning process does not consider forecast demand when calculating actual demand. Within the demand time fence, you may only consider the actual demand. Outside the demand time fence, you may consider the forecast demand.

Page 82: Question Bank Mpr

89

Notes:

41

For discrete items within the planning fence, the planning process:

A. cannot reschedule in order due dates or create new planned orders for the item to satisfy net demand requirements.

B. cannot reschedule in order due dates but can create new planned orders for the item to satisfy net demand requirements.

C. can reschedule in order due dates but cannot create new planned orders for the item to satisfy net demand requirements.

D. None of the choices

Page 83: Question Bank Mpr

90

Notes:

ANSWER: A

For discrete items within the planning fence, the planning process does not reschedule in order due dates or create new planned orders for the item to satisfy net demand requirements. However, the planning process can reschedule out or cancel an order when it determines that such orders create excess supply.

Page 84: Question Bank Mpr

91

Notes:

42

For discrete items outside the planning time fence, the planning process should:

A. suggest whether to create, change, and reduce entries on the master schedule.

B. produce suggested rates of production within the planning time fence that differ from the current aggregate repetitive schedule.

C. stop as soon as possible.

D. None of the choices

Page 85: Question Bank Mpr

92

Notes:

ANSWER: A

For discrete items outside the planning time fence, the planning process should suggest whether to create, change, and reduce entries on the master schedule. For repetitive items, the planning process should produce suggested rates of production within the planning time fence that differ from the current aggregate repetitive schedule by no more than the acceptable rate increase and acceptable rate decrease you defined for your item.

Page 86: Question Bank Mpr

93

Notes:

43

In the manufacturing process, the first time fence encountered is:

A. the Demand Time Fence.

B. the Planning Time Fence.

C. the Look-ahead Time Fence.

D. None of the choices

Page 87: Question Bank Mpr

94

Notes:

ANSWER: A

In the manufacturing process, the final assembly stage starts at today's date and goes as far forward to cover the final stages of manufacture. The first time fence encountered is the Demand Time Fence. The period between the Demand Time Fence and the Planning Time Fence covers the lower level manufacturing process and the procurement time for each component. From today until the Planning Time Fence is the cumulative lead time of the product. The look-ahead period is the period that goes forward from the Planning Time Fence to the subsequent planning horizon.

Page 88: Question Bank Mpr

95

Notes:

44

In the manufacturing process, from today until which Time Fence is the cumulative lead time of the product?

A. the Demand Time Fence.

B. the Planning Time Fence.

C. the Look-ahead Time Fence.

D. None of the choices

Page 89: Question Bank Mpr

96

Notes:

ANSWER: B

In the manufacturing process, the final assembly stage starts at today's date and goes as far forward to cover the final stages of manufacture. The first time fence encountered is the Demand Time Fence. The period between the Demand Time Fence and the Planning Time Fence covers the lower level manufacturing process and the procurement time for each component. From today until the Planning Time Fence is the cumulative lead time of the product. The look-ahead period is the period that goes forward from the Planning Time Fence to the subsequent planning horizon.

Page 90: Question Bank Mpr

97

Notes:

45

A firm order is an order that is frozen:

A. in quantity.

B. in time.

C. in resources.

D. both in quantity and in time.

E. None of the choices

Page 91: Question Bank Mpr

98

Notes:

ANSWER: D

A firm order is an order that is frozen, both in quantity and in time. Such order is no longer available for rescheduling. Most planning applications will automatically produce a planning time fence for a firm order if that order exists after the planning time fence date.

Page 92: Question Bank Mpr

99

Notes:

46

Which of the following are the objectives of FAS (choose all that apply):

A. keeps inventory to a minimum

B. provides maximum flexibility to customers

C. provides short lead times

D. simplifies the control of complex assemblies

E. None of the choices

Page 93: Question Bank Mpr

100

Notes:

ANSWER: A B C D

Shorts for final assembly schedule, FAS is a schedule of end items either to replenish finished goods inventory or to finish the product for specific customers' orders in a "make-to-order" or "assemble-to-order" environment. The objective of such a schedule is to keep inventory to a minimum and at the same time providing maximum flexibility to the customers. It aims at providing short lead times to meet customer's needs quickly and simplifying the control of complex assemblies which have many different variations in configuration.

Page 94: Question Bank Mpr

101

Notes:

47

The FAS is made up of:

A. actual customer's orders received.

B. inputs from the company’s production plan.

C. major stock assemblies.

D. None of the choices

Page 95: Question Bank Mpr

102

Notes:

ANSWER: A

MPS is the anticipated build schedule, whereas FAS is the actual build schedule.

The FAS is made up of actual customer's orders received, whereas the MPS is a plan for manufacturing created from the company’s production plan. Put it this way, the MPS provides stock of major assemblies to be used on the FAS, and the planning horizon of FAS is in general shorter than that of the MPS.

Page 96: Question Bank Mpr

103

Notes:

48

Which of the following correctly describe the Two Level Master Scheduling process?

A. It master schedules and builds key subassemblies first based on the anticipated demand, and then assembles the specific configurations only after receiving the customer orders.

B. It master schedules and builds key subassemblies first based on the actual received order, and then assembles the specific configurations early before receiving the customer orders.

C. It master schedules and builds key subassemblies first based on the actual received order, and then assembles the specific configurations as quick as possible.

D. None of the choices

Page 97: Question Bank Mpr

104

Notes:

ANSWER: A

Companies operate in configure-to-order manufacturing environment are normally characterized by many different product configurations, each made from combinations of a few key subassemblies. Due to competitive pressures from the market, customer delivery lead times are often required to be far shorter than the manufacturing lead times. To achieve this, companies must start building products before customers place the orders. A common way of implementing the above is to master schedule and build key subassemblies first based on the anticipated demand, and then assemble the specific configurations only after receiving the customer orders. This is what we called the Two Level Master Scheduling process.

Page 98: Question Bank Mpr

105

Notes:

49

Developing meaningful and useful performance measurements involve what steps (choose all that apply):

A. defining the mission

B. identifying the key results

C. selecting measures for the key results

D. identifying the pitfalls

E. selecting measures for ALL results

F. None of the choices

Page 99: Question Bank Mpr

106

Notes:

ANSWER: A B C

If performance measurements are to help to achieve results, you must ensure that they relate directly to your business plan's mission and its key results. Developing meaningful and useful performance measurements is a three step process:

o define the mission

o identify the key results

o select measures for the key results

Page 100: Question Bank Mpr

107

Notes:

50

Which of the following is seen as the most frequent and important use of performance measurement?

A. Operational planning and control

B. Internal budgeting

C. Departmental communications

D. Work flow planning

E. Job scheduling

F. None of the choices

Page 101: Question Bank Mpr

108

Notes:

ANSWER: A

Operational planning and control is seen as the most frequent and important use of performance measurement, because the shorter term operational planning and control horizon requires focus on the ongoing efficiency and effectiveness of the operation. Key results are mostly identifiable at this stage.

Page 102: Question Bank Mpr

109

Notes:

51

Which of the following is the ratio of the net gain from a proposed business divided by its total costs?

A. ROI

B. NPV

C. IRR

D. RAE

E. None of the choices

Page 103: Question Bank Mpr

110

Notes:

ANSWER: A

ROI: Shorts for Return on Investment, it is the ratio of the net gain from a proposed business divided by its total costs. It is seen as a great measure for illustrating how much each dollar of expense will yield in returns.

Page 104: Question Bank Mpr

111

Notes:

52

Which of the following shows the difference between the present value of an investment's anticipated future savings and its costs?

A. ROI

B. NPV

C. IRR

D. RAE

E. None of the choices

Page 105: Question Bank Mpr

112

Notes:

ANSWER: B

NPV: Shorts for Net Present Value, it is believed to be the most popular of all investment analysis techniques which shows the difference between the present value of an investment's anticipated future savings and its costs. It can highlight projects that have large up-front expenditures and dramatic expected returns in future years.

Page 106: Question Bank Mpr

113

Notes:

53

The discount rate necessary to drive the NPV to zero is known as:

A. BR

B. EOE

C. EOR

D. BOR

E. IRR

F. NPV can never be driven to zero

G. None of the choices

Page 107: Question Bank Mpr

114

Notes:

ANSWER: E

IRR: Shorts for Internal Rate of Return, it is the discount rate necessary to drive the NPV to zero.

Page 108: Question Bank Mpr

115

Notes:

54

Which of the following is the ratio of the total number of items shipped divided by the total number of items ordered?

A. Item Fill Rate

B. Line item fill rate

C. Order fill rate

D. On-Time Delivery Percentage

E. Order-Entry Lead Time

F. Order-Entry Accuracy

G. Percent Variability in Lead Time

H. Stock to sales ratio

I. None of the choices

Page 109: Question Bank Mpr

116

Notes:

ANSWER: A

Item Fill Rate: the ratio of the total number of items shipped divided by the total number of items ordered.

Line item fill rate: the ratio that measures the percentage of line items on the order shipped in their entirety.

Order fill rate: the ratio that measures the percentage of orders shipped completely.

On-Time Delivery Percentage: a ratio that has (generally) a value between 96-100% as a benchmark.

Order-Entry Lead Time: a ratio that measures the time taken to take customer order.

Order-Entry Accuracy: a ratio that measures the accuracy with which a customer order is interpreted and maintained.

Percent Variability in Lead Time: a ratio that measures the level adjustment of the SKU to variation in pattern and quantity of demand.

Stock to sales ratio: a ratio for comparing actual orders and forecasted orders for the purpose of keeping track of stock-outs, losses due to stock outs and any flaws in the existing forecasting system.

Page 110: Question Bank Mpr

117

Notes:

55

Which of the following is the ratio that measures the time taken to take customer order?

A. Item Fill Rate

B. Line item fill rate

C. Order fill rate

D. On-Time Delivery Percentage

E. Order-Entry Lead Time

F. Order-Entry Accuracy

G. Percent Variability in Lead Time

H. Stock to sales ratio

I. None of the choices

Page 111: Question Bank Mpr

118

Notes:

ANSWER: E

Item Fill Rate: the ratio of the total number of items shipped divided by the total number of items ordered.

Line item fill rate: the ratio that measures the percentage of line items on the order shipped in their entirety.

Order fill rate: the ratio that measures the percentage of orders shipped completely.

On-Time Delivery Percentage: a ratio that has (generally) a value between 96-100% as a benchmark.

Order-Entry Lead Time: a ratio that measures the time taken to take customer order.

Order-Entry Accuracy: a ratio that measures the accuracy with which a customer order is interpreted and maintained.

Percent Variability in Lead Time: a ratio that measures the level adjustment of the SKU to variation in pattern and quantity of demand.

Stock to sales ratio: a ratio for comparing actual orders and forecasted orders for the purpose of keeping track of stock-outs, losses due to stock outs and any flaws in the existing forecasting system.

Page 112: Question Bank Mpr

119

Notes:

56

Which of the following is the ratio that measures the percentage of orders shipped completely?

A. Item Fill Rate

B. Line item fill rate

C. Order fill rate

D. On-Time Delivery Percentage

E. Order-Entry Lead Time

F. Order-Entry Accuracy

G. Percent Variability in Lead Time

H. Stock to sales ratio

I. None of the choices

Page 113: Question Bank Mpr

120

Notes:

ANSWER: C

Item Fill Rate: the ratio of the total number of items shipped divided by the total number of items ordered.

Line item fill rate: the ratio that measures the percentage of line items on the order shipped in their entirety.

Order fill rate: the ratio that measures the percentage of orders shipped completely.

On-Time Delivery Percentage: a ratio that has (generally) a value between 96-100% as a benchmark.

Order-Entry Lead Time: a ratio that measures the time taken to take customer order.

Order-Entry Accuracy: a ratio that measures the accuracy with which a customer order is interpreted and maintained.

Percent Variability in Lead Time: a ratio that measures the level adjustment of the SKU to variation in pattern and quantity of demand.

Stock to sales ratio: a ratio for comparing actual orders and forecasted orders for the purpose of keeping track of stock-outs, losses due to stock outs and any flaws in the existing forecasting system.

Page 114: Question Bank Mpr

121

Notes:

57

To determine the rate in which Accounts Receivables are collected, which of the following formulas should be used?

A. Receivable Turnover = Net Sales ÷ Average Net Accounts Receivable

B. Receivable Turnover = Net Sales x Average Net Accounts Receivable

C. Receivable Turnover = Gross Sales ÷ Average Net Accounts Receivable

D. Receivable Turnover = (Gross Sales - Net Sales) ÷ Average Net Accounts Receivable

Page 115: Question Bank Mpr

122

Notes:

ANSWER: A

To determine the rate which Accounts Receivables are collected:

Receivable Turnover = Net Sales ÷ Average Net Accounts Receivable

Page 116: Question Bank Mpr

123

Notes:

58

To determine the rate in which inventory is sold, which of the following formulas should be used?

A. Inventory Turnover = Cost of Goods Sold / Average Inventory

B. Inventory Turnover = Cost of Goods Sold x Average Inventory / 100

C. Inventory Turnover = Average Inventory / Cost of Goods Sold

D. Inventory Turnover = (Cost of Goods Sold + Average Inventory) / Daily Inventory

E. None of the choices

Page 117: Question Bank Mpr

124

Notes:

ANSWER: A

To measure how quickly inventory is sold:

Inventory Turnover = Cost of Goods Sold / Average Inventory

The higher the inventory turnover rate means the more efficiently a company is able to grow sales volume.

Page 118: Question Bank Mpr

125

Notes:

59

To indicate how efficiently a firm utilizes its assets, which of the following formulas should be used?

A. Asset Turnover = Net Sales / Average Total Assets

B. Asset Turnover = Net Sales x 100 / Average Total Assets

C. Asset Turnover = Gross Sales / Net Total Assets

D. Asset Turnover = Gross Sales X Average Total Assets / Daily Assets Total

E. None of the choices

Page 119: Question Bank Mpr

126

Notes:

ANSWER: A

To indicate how efficiently a firm utilizes its assets:

Asset Turnover = Net Sales / Average Total Assets

The higher the total asset turnover ratio, the more efficiently a firms assets have been used.

Page 120: Question Bank Mpr

127

Notes:

60

Benchmarking should be applied at least:

A. monthly.

B. quarterly.

C. annually.

D. every 5 years.

E. None of the choices

Page 121: Question Bank Mpr

128

Notes:

ANSWER: C

Benchmarking is a tool or methodology used to measure and compare your processes with those in other companies or industries. The goal of benchmarking is to increase your performance by adopting the best practices of your benchmarking partners. Since best practices are always evolving, benchmarking should be applied at least annually.

Page 122: Question Bank Mpr

129

Notes:

End of module 2