PSU Safety Conference€¦ · PSU Safety Conference Pedestrian/Bike Safety & Liability Wednesday,...
Transcript of PSU Safety Conference€¦ · PSU Safety Conference Pedestrian/Bike Safety & Liability Wednesday,...
Transportation Solutions Building Better Communities
PSU Safety Conference Pedestrian/Bike Safety & Liability
Wednesday, December 6, 2017
Page 2Transportation Solutions Building Better Communities
Pedestrian/Bike Safety Design
• Protected Intersections• Crosswalks & Crossings • Signal Phasing & Timing
Design Solutions
Transportation Solutions Building Better Communities
Protected Intersections
Source: Streetsblog NYC
Page 4Transportation Solutions Building Better Communities
Protected Intersections
Source: MassDOT Separated Bike Lane Planning & Design Guide
Page 5Transportation Solutions Building Better Communities
• Physical separation • “Head start” for crossing• Shortened crossing distance• Maximized visibility
Protected Intersections
Pedestrian + Bicycle Benefits
• Maintenance• Snow Removal• Vehicle Operations
Other Considerations
Source: MassDOT Separated Bike Lane Planning & Design Guide
Page 6Transportation Solutions Building Better Communities
Protected Intersections
Source: MassDOT Separated Bike Lane Planning & Design Guide
Page 7Transportation Solutions Building Better Communities
Protected Intersections
Inman Square Safety Improvement Project• Existing Conditions
− Bikes in road− Long crossings− Indirect crossings− Long cycle length
Page 8Transportation Solutions Building Better Communities
Protected Intersections
Inman Square Safety Improvement Project SquareCorner Refuge IslandForward Bicycle Stop BarProtected Signal Phasing
Tight Corner RadiiSeparate Turn Lanes
Off-set Stop Bars
Page 10Transportation Solutions Building Better Communities
Prioritized Crossings
Minor Street Intersections
• Raised Crossings− Improved Visibility− Emphasizes Pedestrian &
Bicycle Priority − Maintain Low Vehicle Speeds
Page 12Transportation Solutions Building Better Communities
• Inadequate gaps in traffic• High Vehicle Speeds• Excessive Pedestrian Delay
Prioritized Crossings
HAWKS Signals/Pedestrian Hybrid Beacons
Page 13Transportation Solutions Building Better Communities
Prioritized Crossings
Morrissey Boulevard
Page 14Transportation Solutions Building Better Communities
Prioritized Crossings
Morrissey Boulevard Redesign
Page 15Transportation Solutions Building Better Communities
• Lower Costs than Signals• Increase Driver Yielding• Increase Safety Effectiveness• Reduce Incidence of
Multiple-Threat Crashes
Prioritized Crossings
Rectangular Rapid Flash Beacon (RRFB)
BEFORE AFTER
Page 16Transportation Solutions Building Better Communities
• Reduced crossing length • Minimized exposure• Decreased delay • Traffic calming
Prioritized Crossings
Medians & Curb Extensions
Transportation Solutions Building Better Communities Page 18
Signal Phasing & Timing
Time Separated Movements
Source: MassDOT Separated Bike Lane Planning & Design Guide
Page 19Transportation Solutions Building Better Communities
• Establish Pedestrians and Bicycles within Crossings
• Enhance Visibility• Reinforce Right of Way Over Vehicles
Signal Phasing & Timing
Lead Pedestrian and Bicycle Interval
Source: MassDOT Separated Bike Lane Planning & Design Guide
Transportation Solutions Building Better Communities Page 21
Signal Phasing & Timing
Pedestrian and Bicycle Clearance Time
Source: Manual on Uniform Traffic Control Devices for Streets and Highways 2009 Edition
Page 22Transportation Solutions Building Better Communities
Key Takeaways
• Safety Improvements on Any Scale• Improving Visibility • Physical Separation• Separation in Time
Page 24Transportation Solutions Building Better Communities
• National Association of City Transportation Officials (NACTO)− Urban Bikeway Design Guide− Urban Street Design Guide
• MassDOT Separated Bike Lane Planning & Design Guide
• Boston Complete Streets Design Guidelines
Resources
Transportation Solutions Building Better Communities
Questions?
Erin FredetteMcMahon Associates – Boston Office
Email me: [email protected]
call: (617) 556-0020
Page 27Transportation Solutions Building Better Communities
Prioritized Crossings
HAWKS Signals/Pedestrian Hybrid Beacons
Page 28Transportation Solutions Building Better Communities
Signal Phasing & Timing
Time Separated Movements
Source: MassDOT Separated Bike Lane Planning & Design Guide
Transportation Solutions Building Better Communities Page 29
Signal Phasing & Timing
Source: MassDOT Separated Bike Lane Planning & Design Guide
Page 31Transportation Solutions Building Better Communities
Protected Intersections
McGrath Highway/Boulevard
Page 32Transportation Solutions Building Better Communities
Protected Intersections
McGrath Highway/Boulevard
• Corner Refuge Island• Forward Bicycle Stop Bar• Protected Signal Phasing• Tight Corner Radii• Separate Turn Lanes
Page 33Transportation Solutions Building Better Communities
Protected Intersections
Shea Circle – Casey Arborway Project