• Identify Components of Visio 2010 interface, navigate a Visio drawing, and get help Using Visio.
• Manipulate Windows and Stencils, and Select, scale, and resize objects .
Unit 1 Getting Started
• Draw and Manipulate Shapes
• Work with compound lines and use several methods to duplicate objects.
• Align, distribute, group, and rotate objects.
Unit 2Drawing Tools
• Created custom drawings
• Created Duplicates
• Learned to draw and
manipulate shapes
Drawing Tools
• Plan a Diagram
• Create a basic Diagram and insert, connect, and modify shapes.
• Insert and format Text.
• Create and modify organization charts.
Unit 3 Basic Diagrams
Creating Basic diagrams
Start the Process Initialize
Decision
Documentation
Calculate
Reevaluate Decision Finalize
Yes
No
No Yes
• Format text and text blocks, and apply themes and effects
• Format shapes and lines, create a shadow effect, and use the Format Painter
Unit 4 Formatting Drawings
Project kickoff
Design approved?
Implement design
Modify design
Document progress
Implement feedback
Ship product
Evaluation and feedback
Res
ubm
it
Yes
No
Product development process
.
To help increase our productivity and quality, we are adopting this new process. Your feedback is appreciated.
Email feedback to [email protected]
Project closure
• Set file, page, and print properties, use Print Preview, create headers and footers, and print a diagram.
• Create and apply background pages, use fields to display Information, and add a graphic to a page.
• Create hyperlinks to internal detail pages, external files, and specific locations in a file.
Unit 5Working with pages
Product Name Product Code Quantity Price Supplier Code
Mouse 2B M002 3 300 SCA01Mouse 3B M003 12 540 SCB01Mouse Scroll M004 2 700 SCB01TVS Keyboard KT001 4 1140 SCA01Microsoft Keyboard KM002 11 1790 SCA02Samsung Keyboard KS003 1 650 SCA01
12/20/2013 David Larson 1 of 2
Initial process Data
Check inventory
Document process
Verify data
Document accurate?
Manual process
Process complete?
End process
No Yes
Yes
No
OutlanderLogo.gif
Initial process Data
Check inventory
Document process
Verify data
Document accurate?
Manual process
Process complete?
End process
No Yes
Yes
No
• Learned File management
• Used background pages
• Created internal and
External links
Visio Navigation
• Create and modify network diagrams.
• Create and modify rack diagrams
• Create brainstorming diagrams, and import and export XML data.
Unit 6Network and Brainstorming diagrams
Network Diagrams
Improving Production
Employee Satisfaction
Training
1
Suitable Environment
Optimal Work timings
Perks for good performance
1 Meeting
1 Important
1 Attention
1 Needs follow up
1 1 Priority 1
Symbol Count Description
Legend Subtitle
Legend
Brainstorming
Improving Sales
Employee Satisfaction
Training
Optimal Work timings
Suitable Environment
Perks for good performance
1
• Created a Network Diagram
• Developed Rack Diagram
• Created and Imported and Exported
data
Networking and Brainstorming
Use guides to arrange and customize shape connections.
Set shape properties and create and apply custom properties.
Create and modify property reports
Unit 7Customization and Reporting
Customized Network layout
Network layout
Comm Server
Apple Talk
IPX Only
Router 1PC 2 PC 3PC 1
Lap 1 Lap 2 Lap 3Router 2
Router 3Tablet 1 Tablet 2 Tablet 3
Configured by Department Location ManufacturerRonald Belhop Support Seattle DellRonald Belhop Support Seattle DellRonald Belhop Support Seattle Dell
Tablet Modification
• Used guides to create custom shape
connections.
• Modified, created, and set shape data.
• Developed reports.
Visio Navigation
Create and assign shapes to a layer, customize a layer, and add custom shapes to a layer.
Use a predefined scale, change the drawing scale, add and adjust shapes, change the size and position of shapes, and duplicate shapes
Add and adjust dimension lines, set display units, and calculate and display the area of a room.
Unit 1Creating technical layouts
• Apply themes, effects, and backgrounds, and create custom themes
• Create a custom template and create a new drawing based on a custom template.
Unit 2Custom themes and templates
Outlander Main Headquarters
Reno, NV
Northeast Operations
East Central Operations
Southeast Operations
Westfield FacilityWestfield, MA
Rutland FacilityRutland, VT
Geneva FacilityGeneva, NY
Norristown Facility
Norristown, PA
Christiansburg Facility
Christiansburg, VA
Dover FacilityDover, DE
Fayetteville Facility
Fayettevill, NC
Greenwood Facility
Greenwood, SC
Dawson FacilityDawson, GA
West Coast Regional
Headquarters
Northwest Operations
West Central Operations
Southwest Operations
Quincy FacilityQuincy, WA
Seneca FacilitySeneca, OR
Redding FacilityRedding, CA
Fresno Facility Fresno, CA
Carson City Facility
Carson City, NV
Tremonton Facility
Tremonton, UT
Phoenix FacilityPhoenix, AZ
San Diego FacilitySan Diego, CA
Farmington Facility
Farmington, NM
East Coast Regional
Headquarters
Page 1
December 20, 2013Outlander Org Chart
Outlander Main Headquarters
Reno, NV
Northeast Operations
East Central Operations
Southeast Operations
Westfield FacilityWestfield, MA
Rutland FacilityRutland, VT
Geneva FacilityGeneva, NY
Norristown Facility
Norristown, PA
Christiansburg Facility
Christiansburg, VA
Dover FacilityDover, DE
Fayetteville Facility
Fayettevill, NC
Greenwood Facility
Greenwood, SC
Dawson FacilityDawson, GA
West Coast Regional
Headquarters
Northwest Operations
West Central Operations
Southwest Operations
Quincy FacilityQuincy, WA
Seneca FacilitySeneca, OR
Redding FacilityRedding, CA
Fresno Facility Fresno, CA
Carson City Facility
Carson City, NV
Tremonton Facility
Tremonton, UT
Phoenix FacilityPhoenix, AZ
San Diego FacilitySan Diego, CA
Farmington Facility
Farmington, NM
East Coast Regional
Headquarters
Enable developer mode and create complex custom shapes by using operations commands.
Apply behaviors to a shape from modifications.
Create and modify custom master shapes and stencils.
Unit 3Custom Shapes and stencils
My Layout
Men’s Ladies’
Break Room
Receiving Department
Storage A
Stock Inspection Counter
Storage B
Storage C990.00in. Purchase Department
• Create block diagrams by using 2-D and 3-D shapes.
• Create workflow diagrams and cross-functional flowcharts
• Compare organization charts and create and organization chart by importing data.
• Manage projects by using timelines, PERT charts, and Gantt charts.
• Generate Web site maps and a report of broken links on a Web site.
Unit 4Business diagrams and Web site mapping
My Flowchart PracticeJob Opening
Print Advertisement
Placement Consultants
Select Best Candidate
Screen Resumes
Conduct Interviews
My Block PracticeTitle
Func
tion
Func
tion
Func
tion
Func
tion
Phase
Raise Material Requirements
Material Received For Production
Require Quantity Issued
Create Purchase Order
Fill Purchase Order Deliver Material
Locate Material Yes
No
My Gantt Practice
ID Task Name Start Finish DurationApr 1 2012
2 3 4 5 6
1 1d4/2/20124/2/2012Install New Machine
2 1d4/3/20124/3/2012Test Phase
3 2d4/5/20124/4/2012Quality Control Review
4 1d4/6/20124/6/2012Add new machine to production
• Created Several diagrams
• Compared charts from
data imports
• Manage projects by using
timelines, PERT charts,
and Gantt charts.
Diagrams and Web site mapping
• Draw a prototype of a windows user interface for a software program.
• Create a database model diagram and reverse engineer a table from a database.
Unit 6Software and database diagrams
Database Model Diagram
Order Details
PK Order No.
FK1 Cust. ID Product Desc. Table Item Qty Total
Customer Details
PK Cust. ID
Cust. Name Address Phone No.
• Most fascinating chapter
for me
• Learned how to plan
databases
• Learned to develop
Screen designs
Database
Top Related