Design Visualization Visualize building early in the process to support and accelerate the decision making process. Schedule Visualization Visualize construction process to review and optimize the construction sequence and the schedule. Design Validation Integrate 3D models of all trades to identify interferences and constructability issues before they materialize in the field. Estimating Tie scope of project to a price; Manage scope changes more efficiently. Introduction

description

Turner BIM Presentation

Transcript of Turner BIM Presentation

  • Design VisualizationVisualize building early in the process to support and accelerate the decision making process.Schedule VisualizationVisualize construction process to review and optimize the construction sequence and the schedule.Design Validation Integrate 3D models of all trades to identify interferences and constructability issues before they materialize in the field.EstimatingTie scope of project to a price;Manage scope changes more efficiently.Introduction

  • Search for the Best ProcessesIntegration vs. Isolation

    Design TeamGeneral ContractorSubcontractorsBIM In Pre-Construction/SubmittalsDesign Validation / CoordinationIntroduction

  • *Slide provided by Haymaker, Law, Flager, Shkolnik, Gane; CIFE Stanford University ProcessCredit: Haymaker, Law, Flager, Shkolnik, Gane; CIFE Stanford University

  • Conceptual PhaseSchematic PhaseDesign DevelopmentConstruction DocumentsConstruction PhaseBid PhaseTraditional Delivery ProcessModel Based Pre-Construction (Stewart Carroll, Beck Technology)

  • Model is the vehicle to constantly check quantities and cost during design

    Provide feedback regarding cost throughout the design process

    Steer the design process

    Model Based Pre-Construction

  • Model Based Pre-Construction

  • Model Based Pre-Construction

  • Model Based Pre-Construction

    Sheet1

    Version 1Version 2

    UnitUnit PriceQuantityPriceUnit PriceQuantityPrice

    Gross Footagesf890,000890,000

    Exterior Wallsf330,444241,433

    Bricksf$18.00247,833$4,460,994.00$18.00181,075$3,259,345.50

    Glasssf$75.0082,611$6,195,825.00$75.0060,358$4,526,868.75

    Total$10,656,819.00$7,786,214.25

  • Understand the Importance of the Right Level of Detail

    Tradeoff Between Detailed Information and Ability to Create, Analyze and Understand Different VersionsLessons Learned

  • Why are we doing this?Develop a solution for our clientsCreate a consistent information flow that everyone can understand

  • How are we doing this?CommunicationDefine the correct level of detail and abstractionMutually crafting a process that has enhanced an integrated practice approach, while further strengthening our relationships

    ObjectivesEliminate Miscommunication / Uncertainty / ReworkEnhanceCoordination / Analysis / Program Validation

  • What Has Been Accomplished?

    Reduction in field changes, tightened subcontractor bids, and improved information flow throughout the design and construction process.

    Clarity in design communications based on BIM visualization platforms. Three dimensional presentations of information allow everyone to see the project components and how they work together. This quickly and clearly conveys ideas and intent.

    Higher quality design that is not delayed during construction because of rework.

  • What Has Been Accomplished?Ability to identify collisions

    Ability to visualize what is being built in a simulated environment resulting in fewer errors and corrections in the field

    Higher reliability of expected field conditions, allowing for opportunity to do more prefabrication or materials offsite, which is usually of a higher quality at a lower cost

    The ability to do more what if scenarios, such as looking at various sequencing options, site logistics, hosting alternatives, cost, etc.

    Instructions:

    1. Edit the text fields accordingly.2. Duplicate this slide throughout your presentation as needed, or insert by choosing Text Slide from the New Slide drop-down menu.*Instructions:

    1. Edit the text fields accordingly.2. Duplicate this slide throughout your presentation as needed, or insert by choosing Text Slide from the New Slide drop-down menu.*Instructions:

    1. Edit the text fields accordingly.2. Duplicate this slide throughout your presentation as needed, or insert by choosing Text Slide from the New Slide drop-down menu.*Instructions:

    1. Edit the text fields accordingly.2. Duplicate this slide throughout your presentation as needed, or insert by choosing Text Slide from the New Slide drop-down menu.*