BIM – Focus on Healthcare

1. How did we get here?

2. What is it?

3. Why is it Important for us?

4. Key Advantages

5. Case Study – Crumlin Hospital

6. Advice for New Users

7. Future Developments

Sponsored by

Sponsored by

BIM How did we get here ?

Sponsored by

External factors that lead to change

Scarcity of resources

Climate Change

Inefficient industry

Sponsored by

Inefficient Industry

Inefficiency in the building industry is estimated at over

10% Recounting, remeasuring, overestimating

15% Rework, avoidable collisions between trades

10% Poor or late planning

12% Material inefficiencies, overproduction

10% Labour inefficiencies, information treasure hunts

70% Delivered Late

73% Over Budget

Sponsored by

Scarcity of Resources

Planned depletion of resources

Sponsored by

Climate Change

Sponsored by

Carbon emissions due to buildings

• Construction Industry goals:

-60% energy consumption by 2050

Sponsored by

Chronology of the change

1997 • Kyoto Protocol on Climate Change

2002 • European Union “Energy Performance of Buildings” Directive

2005 • Kyoto Protocol enacted

2006 • Ireland enacts EPBD

2012 • European Union “Energy Efficiency Directive”

Sponsored by

Sponsored by

Sponsored by

BIM What is it ?

Sponsored by

Building Information Modeling

Based on:

A 3D model (or 4D, +time, or 5D, +cost)

Collaboration of all the users

Sponsored by

The Big BIM idea!

Sponsored by

BIM is a Building Database

• Architectural model • Structural model • HVAC model • Piping model • Telecommunications model • Electrical model • Furniture model • Civil model • Construction model • Fabrication model • Facility management model • Etc.

Sponsored by

BIM is a Building Database

• Architectural model • Structural model • HVAC model • Piping model • Telecommunications model • Electrical model • Furniture model • Civil model • Construction model • Fabrication model • Facility management model • Etc.

Sponsored by

BIM is a Building Database

• Architectural model • Structural model • HVAC model • Piping model • Telecommunications model • Electrical model • Furniture model • Civil model • Construction model • Fabrication model • Facility management model • Etc.

Sponsored by

BIM is a Building Database

• Architectural model • Structural model • HVAC model • Piping model • Telecommunications model • Electrical model • Furniture model • Civil model • Construction model • Fabrication model • Facility management model • Etc.

Sponsored by

BIM is a Building Database

• Architectural model • Structural model • HVAC model • Piping model • Telecommunications model • Electrical model • Furniture model • Civil model • Construction model • Fabrication model • Facility management model • Etc.

Sponsored by

BIM is a Building Database

• Architectural model • Structural model • HVAC model • Piping model • Telecommunications model • Electrical model • Furniture model • Civil model • Construction model • Fabrication model • Facility management model • Etc.

Sponsored by

BIM is a Building Database

• Architectural model • Structural model • HVAC model • Piping model • Telecommunications model • Electrical model • Furniture model • Civil model • Construction model • Fabrication model • Facility management model • Etc.

Sponsored by

Multidisciplinary Collaboration WHO NEEDS TO BE ON BOARD

All on Board ! Collaborate or Disintegrate …

Sponsored by

Information Flow

The BIM Cloud

Sponsored by

False ideas about BIM

BIM IS NOT .. ..New

.. Just an IT issue or just software

.. Only about 3D

.. Something only designers do

.. Just about project delivery

.. A short-lived trend

.. Irrelevant to Small Projects

.. “The Silver Bullet” or “Holy Grail”

.. Optional ?

Sponsored by

Sponsored by

BIM Why is it important for us?

Sponsored by

Traditional Project Curve

Sponsored by

BIM changes the Project Curve Perceived value of BIM by phase

Sponsored by

Reasons for Adoption

• PUBLIC WORKS CONTRACTS - ADOPTION UK : L2 BIM for all public works contracts by 2016 • LEAN CONSTRUCTION Supports off site fabrication Supports PULL dynamic of construction procurement • SUSTAINABILITY Supports Lower CARBON designs True Dynamic design – Iterative Processes

Sponsored by

BIM Maturity Model

Sponsored by

Reasons for Adoption

• PUBLIC WORKS CONTRACTS - ADOPTION UK : L2 BIM for all public works contracts by 2016 • LEAN CONSTRUCTION Supports off site fabrication Supports PULL dynamic of construction procurement • SUSTAINABILITY Supports Lower CARBON designs True Dynamic design – Iterative Processes

Sponsored by

Fundamentals of Lean Construction

Collaboration

Flow

Kaizen

No Stress

Pull

Team

Monitoring at close intervals

Cheering

Sponsored by

Reasons for Adoption

• PUBLIC WORKS CONTRACTS - ADOPTION UK : L2 BIM for all public works contracts by 2016 • LEAN CONSTRUCTION Supports off site fabrication Supports PULL dynamic of construction procurement • SUSTAINABILITY Supports Lower CARBON designs True Dynamic design – Iterative Processes

Sponsored by

BIM Usage and Awareness By Architects

Sponsored by

BIM Total Awareness

Sponsored by

Awareness means Usage is on the way!!

Sponsored by

Rapid Adopters/Promising Markets

Qatar: Technology importing

China: Rapid Construction

Brazil: Following World Cup 2014

Sponsored by

Established Players

UK

USA

Sweden

Finland

Norway

Ireland

Sponsored by

Contractors at High/Very High BIM Implementation Levels

Growth percentage between 2013 and 2015 Implementation levels

Source: Mc Grow Hill Construction

Sponsored by

Sponsored by

BIM Key Advantages

Sponsored by

Return on investment

Sponsored by

BIM Benefits Contributing the Most Value

Sponsored by

Sponsored by

BIM Case Study – Crumlin Hospital

Sponsored by

Advantages of a Collaborative Model

https://www.youtube.com/watch?v=h7HDbMTUXWo

Early User Visibility

Sponsored by

Room Data Sheets and Reflected Ceiling Plan

Advantages of a Collaborative Model

Sponsored by

Advantages of a Collaborative Model

Sponsored by

Advantages of a Collaborative Model

Sponsored by

Air Distribution - Induction

Sponsored by

PCE - Navisworks Clash detection to minimise time down

Pre-emptive adjustments reduce risk of the project running over budget

Sponsored by

Sponsored by

BIM Advice for New Users

Sponsored by

The BIM pitfalls

BARRIERS & PITFALLS

• Technology Investment

• Software Companies Monopole

• Different standards and deliverable interpretation

• Collaborative working relatively new concept for designers

• Too much focus on technology and not enough on culture change

Sponsored by

Missing the bleeding obvious!

BIM does not create better designs

Sponsored by

The BIM pitfalls

HEALTHCARE SINGULARITY

• Equipment Provider key in process

• Equipment providers not integrated in design

process (Philips, Siemens, GE, Varian)

• Procurement process inverted :

Equipment provider leading the PM/DM

Sponsored by

Sponsored by

BIM Future Developments

Sponsored by

Development Paths

• Scanning of existing

buildings

• Globalisation of standards

• Green Buildings

• Generalisation of 3D

catalogues

Sponsored by

New Research

• Just as BIM is working to make

the virtual world our reality –

current research into

technologies are focussed on

making the real world virtual -

Sponsored by

• BIM Overview – Healthcare Focus • Clive Walsh – PCE Consulting Engineers

• 28th September 2015