to the Rampion Offshore Wind Farm public...

30
Thank you for coming along today. We aim to introduce you to all aspects of the Rampion Offshore Wind Farm proposal covering: the offshore and onshore elements of the project details about the proposed underground onshore cable route the selection of the substation location potential impacts during the construction and operation phases how the offshore elements could look, shown from different viewpoints (photomontages) the benefits of the project an explanation of the consultation process and how we’ll consult with you. This is one of many opportunities to have your say on the project so why not: talk to the project team directly complete the community consultation questionnaire view the photomontages. It’s important that you give us your feedback and comments before the consultation deadline of Sunday 6 May 2012, so we can consider them to help shape our proposal. to the Rampion Offshore Wind Farm public exhibition Welcome

Transcript of to the Rampion Offshore Wind Farm public...

1000MM X 700MM FOAMEX BOARD – ARTWORK SET TO 100%

Thank you for coming along today. We aim to introduce you to all

aspects of the Rampion Offshore Wind Farm proposal covering:

•the offshore and onshore elements of the project

•details about the proposed underground onshore cable route

•the selection of the substation location

•potential impacts during the construction and operation phases

•how the offshore elements could look, shown from different

viewpoints (photomontages)

•the benefits of the project

•an explanation of the consultation process and how we’ll

consult with you.

This is one of many opportunities to have your say on

the project so why not:

•talk to the project team directly

•complete the community consultation questionnaire

•view the photomontages.

It’s important that you give us your feedback and comments

before the consultation deadline of Sunday 6 May 2012, so we

can consider them to help shape our proposal.

totheRampionOffshoreWindFarmpublicexhibition

Welcome

1873_RAMPION EXHIB BOARDS_AW.indd 1 01/02/2012 12:53

1000MM X 700MM FOAMEX BOARD – ARTWORK SET TO 100%

About usWe’re one of the world’s largest power and gas companies.

Here in the UK, we supply energy to more than 5 million

customers, generate enough electricity for around 8 million

homes and employ 12,000 people.

We set up a global business in 2007 to develop, construct and

operate all of our renewable energy projects. We’re helping

to shape the energy industry of tomorrow and create secure,

sustainable energy supplies for future generations.

In the UK, we’re focusing on developing onshore and offshore

wind, biomass and marine energy technologies. At present, we

own and operate 18 onshore wind farms and 3 offshore wind

farms. Together, these have an installed capacity of more than

400 megawatts (MW).

Robin Rigg Offshore Wind Farm, Solway Firth. For illustrative purposes only.

1873_RAMPION EXHIB BOARDS_AW.indd 2 01/02/2012 12:53

1000MM X 700MM FOAMEX BOARD – ARTWORK SET TO 100%

Our offshore experienceWe were early pioneers in the UK’s offshore wind energy industry,

owning and operating the UK’s very first offshore wind farm at

Blyth in Northumberland.

We built and operate one of the country’s first commercial scale

projects, Scroby Sands in Great Yarmouth, which has 30 turbines

with an installed capacity of 60MW. Our third operational offshore

wind farm, the 180MW Robin Rigg project, was completed in 2010

and has 60 turbines. In February 2011, we received planning consent

to build the 219MW Humber Gateway Offshore Wind Farm off the

east coast of Yorkshire, which will be starting construction shortly.

Building the world’s largest offshore wind farmIn March 2011, we started laying the first of 177 foundations on

Phase One of London Array, an offshore wind farm project that

we’re undertaking with our partners DONG Energy and Masdar.

When fully complete, London Array will be the largest offshore

wind farm in the world.

Scroby Sands Offshore Wind Farm, Great Yarmouth. For illustrative purposes only.

1873_RAMPION EXHIB BOARDS_AW.indd 3 01/02/2012 12:53

1000MM X 700MM FOAMEX BOARD – ARTWORK SET TO 100%

The UK’s energy gapFillingtheenergygap

Over the next 10 years, many of the older coal-fired and nuclear power stations

in the UK will close, resulting in a potential ‘energy gap’. We need to act now

to replace these power stations with cleaner, more effective solutions such

as renewable energy technologies. However, no single energy source holds the

answer on its own. That’s why we’re developing a range of generation methods,

with renewable energy sources such as wind, biomass, wave and tidal power.

Whyweneedoffshorewind

With its long coastlines and as one of Europe’s greatest wind resources, the

UK is uniquely placed to harvest offshore wind energy and lead the world in

offshore wind development.

Offshore wind is currently the only renewable energy technology which can

be built on a scale comparable to many conventional power stations, to achieve

the Government’s targets for producing renewable energy and reducing carbon

dioxide (CO2) emissions. It offers the additional benefits of higher than average

wind speeds and reduced turbulence, all leading to a greater energy yield.

Cleanerandbetterenergy

To help build a secure energy future, we need to change the way we think about

energy, from how we generate it, to how we use it in our homes and businesses.

As one of the UK’s leading electricity and gas companies we’re working hard to

make our operations cleaner and better. At the same time, we’re helping our

customers get ‘energy fit’ by giving them the tools they need to start saving

energy and money.

1873_RAMPION EXHIB BOARDS_AW.indd 4 01/02/2012 12:53

1000MM X 700MM FOAMEX BOARD – ARTWORK SET TO 100%

Background and historyThe Rampion site was identified following the Government’s

Offshore Energy Strategic Environmental Assessment (SEA),

which looked at the potential for new large-scale offshore

wind farms in UK waters. The SEA looked at a whole range

of environmental and technical criteria to establish the

area as suitable for wind farm development, including:

•wind speed

•water depth

•distance from shore

•major shipping lanes

•environmental designations

•other uses of seabed, eg aggregates extraction.

Nine zones were identified and The Crown Estate, which owns

the seabed around the UK, launched a tender process known

as ‘Round 3’, to award development rights. In January 2010, we

were awarded exclusive development rights in an area off the

Sussex coast, to seek to build and operate an offshore wind farm.

This was initially called Zone 6. A single offshore wind farm project

has now been defined within the zone. The Rampion site and its

associated offshore and onshore infrastructure form the basis

of this consultation.

WhyRampion?

The project has been named

the Rampion Offshore Wind Farm

after the county flower of Sussex.

We held a competition among local

schools to choose a name for the

site. Pupils from Davison High

School in Worthing put forward

the shortlisted entry and the final

name was decided by a public vote.

1873_RAMPION EXHIB BOARDS_AW.indd 5 01/02/2012 12:53

1000MM X 700MM FOAMEX BOARD – ARTWORK SET TO 100%

What we’re proposingThe project has offshore and onshore elements:

Offshore

•turbines and foundations

•inter array cables

•two offshore substations

•offshore export cables.

Onshore

•cable ‘landfall’

•underground onshore cable route

•onshore substation.

Robin Rigg Offshore Wind Farm, Solway Firth. For illustrative purposes only.

1873_RAMPION EXHIB BOARDS_AW.indd 6 01/02/2012 12:53

1000MM X 700MM FOAMEX BOARD – ARTWORK SET TO 100%

Figure1–ProposeddevelopmentareaoftheRampionOffshoreWindFarm

The solid red line boundary defines the site location for the offshore wind turbines. However,

a potential additional development area (marked by a dashed red line) coincides with an area

over which The Crown Estate has granted an aggregates extraction option (shown as a yellow

hatched area), which is valid until 2013. For the purposes of this community consultation, and

in order that all issues can be addressed, consultees should therefore assume that a consent

application for turbines within the area bounded by the dashed red line, may be sought.

Onshorecableroute

Proposedoffshorewindfarmdevelopmentarea

Offshorecableroutesearcharea

Potentialadditionaldevelopmentarea

Onshoresubstationsearcharea

Aggregatesextractionoptionarea

Key

1 3

2

4

5

6

7

10

11

12

9

8

8a

Coordinate Longitude Latitude

1 -0.366 50.687

2 -0.229 50.707

3 -0.074 50.678

4 0.02 50.642

5 -0.144 50.612

6 -0.151 50.643

7 -0.262 50.619

8 -0.274 50.643

8a -0.388 50.601

9 -0.345 50.623

10 -0.349 50.809

11 -0.316 50.818

12 -0.209 50.775

CLIENT:

PROJECT:

TITLE:

File Reference:

Project No: Status/Rev:

Project No:

DESCRIPTIONREV BY DATE AUTHREV'WCHK'D

AUTHORISED:ORIGINATOR:

DATE:

REVIEWED:

DATE:

CHECKED:

DATE: DATE:

ORIGINAL SIZE:SCALE:

OFFICE:

Number:Discipline: Type:

Status/Rev:Number:

Discipline:Type:

Rampion Offshore Windfarm

3.6MW symmetric 7.6 x 7.6 spacingWTG Layout excl. Area 499195 Turbines, 2 Substations

1:150000A3

EPS

SWK

22-12-11

BF

22-12-11

BF

22-12-11

BF

22-12-11

5101821 SM 036 0SE

P:\GBBMA\Geospatial\Project\_Power\5099062 - EON Rampion Engineering Services\300 Project Data\310 Datasets\311 DWG

5101821-SE-SM-036-RevB0.dwg Allen, Kit 6/07/2012, 04:07 ISO full bleed A3 (420.00 x 297.00 MM)

_atkins half size.ctb

Atkins LimitedWoodcote GroveAshley RoadEpsom, SurreyKT18 5BWEngland

Telephone +44(0)1372 726 140Fax +44(0)1372 740 055

5101821-SE-SM-036-Rev05101821

0036

SMSE

© British Crown and SeaZone Solutions Limited. All rights reserved. Products Licence No. 042010.002.This product has been derived in part from material obtained from the UK Hydrographic Office with thepermission ofthe Controller of Her Majesty's Stationery Office and UK Hydrographic Office (www.ukho.gov.uk).“NOT TO BE USED FOR NAVIGATION”.

KEYProposed Development AreaPotential AdditionalDevelopment AreaCable Route AreaOffshore Substation AreaAggregates Option AreaMet Mast LocationLandfall LocationTurbine / Substation Locations

BFSK06-01-12KAClient Approved0BFSK06-01-12KAIssue to ClientB1BFKA22-12-11SKIssue to ClientBBFBF22-12-11SKInter Discipline ReviewA

BFBFBFBF

Notes:

Projected toWGS 1984 UTM Zone 30NTransverse MercatorFalse Easting: 500000.000000False Northing: 0.000000Central Meridian: -3.000000Scale Factor: 0.999600Latitude Of Origin: 0.000000

0 KILOMETRES1 5

© British Crown and SeaZone Solutions Limited. All rights reserved. Products Licence No. 042010.002. This product has been derived in part from material obtained from the UK Hydrographic Office with the permission of the Controller of Her Majesty’s Stationery Office and UK Hydrographic Office (ukho.gov.uk). NOT TO BE USED FOR NAVIGATION.

!!

!!

!!

!!

!!

!!

!!

!

!!

!!

!!

!

!!

!!

!!

!!

!!

!!

!!

!!!

!!

!!

!

Key

Onshore Cable Route

Proposed Development Area

Cable Route Area

!!

! ! ! !!!

!!!! Potential Additional Development Area

Onshore Substation Area of Search

Aggregates Option Area

´

Contains Ordnance Survey data © Crown copyright and database rights 2011.© British Crown and SeaZone Solutions Limited. All rights reserved. Products Licence No. 042010.002. This product has been derived in part from material obtained from the UK Hydrographic Office with the permission of the Controller of Her Majesty's Stationery Office and UK Hydrographic Office (www.ukho.gov.uk). “NOT TO BE USED FOR NAVIGATION”.

Status/Rev:Type:Discipline:

5107085 LY MP B1Project No: Number:

004

BY DATE CHK'D REV'W AUTH

KAKAKA

09-01-1205-01-1205-01-12

BFBFBF

SKSKSK

BFBFBF

REV DESCRIPTION

B1BA

For Client ReviewFor Client ReviewInter Discipline Review

File Reference:

5107085-LY-MP-004-RevB1

1 3

2

4

5

6

7

10

11

12

9

8

8a

Coordinate Longitude Latitude

1 -0.366 50.687

2 -0.229 50.707

3 -0.074 50.678

4 0.02 50.642

5 -0.144 50.612

6 -0.151 50.643

7 -0.262 50.619

8 -0.274 50.643

8a -0.388 50.601

9 -0.345 50.623

10 -0.349 50.809

11 -0.316 50.818

12 -0.209 50.775

CLIENT:

PROJECT:

TITLE:

File Reference:

Project No: Status/Rev:

Project No:

DESCRIPTIONREV BY DATE AUTHREV'WCHK'D

AUTHORISED:ORIGINATOR:

DATE:

REVIEWED:

DATE:

CHECKED:

DATE: DATE:

ORIGINAL SIZE:SCALE:

OFFICE:

Number:Discipline: Type:

Status/Rev:Number:

Discipline:Type:

Rampion Offshore Windfarm

3.6MW symmetric 7.6 x 7.6 spacingWTG Layout excl. Area 499195 Turbines, 2 Substations

1:150000A3

EPS

SWK

22-12-11

BF

22-12-11

BF

22-12-11

BF

22-12-11

5101821 SM 036 0SE

P:\GBBMA\Geospatial\Project\_Power\5099062 - EON Rampion Engineering Services\300 Project Data\310 Datasets\311 DWG

5101821-SE-SM-036-RevB0.dwg Allen, Kit 6/07/2012, 04:07 ISO full bleed A3 (420.00 x 297.00 MM)

_atkins half size.ctb

Atkins LimitedWoodcote GroveAshley RoadEpsom, SurreyKT18 5BWEngland

Telephone +44(0)1372 726 140Fax +44(0)1372 740 055

5101821-SE-SM-036-Rev05101821

0036

SMSE

© British Crown and SeaZone Solutions Limited. All rights reserved. Products Licence No. 042010.002.This product has been derived in part from material obtained from the UK Hydrographic Office with thepermission ofthe Controller of Her Majesty's Stationery Office and UK Hydrographic Office (www.ukho.gov.uk).“NOT TO BE USED FOR NAVIGATION”.

KEYProposed Development AreaPotential AdditionalDevelopment AreaCable Route AreaOffshore Substation AreaAggregates Option AreaMet Mast LocationLandfall LocationTurbine / Substation Locations

BFSK06-01-12KAClient Approved0BFSK06-01-12KAIssue to ClientB1BFKA22-12-11SKIssue to ClientBBFBF22-12-11SKInter Discipline ReviewA

BFBFBFBF

Notes:

Projected toWGS 1984 UTM Zone 30NTransverse MercatorFalse Easting: 500000.000000False Northing: 0.000000Central Meridian: -3.000000Scale Factor: 0.999600Latitude Of Origin: 0.000000

0 KILOMETRES1 5

1873_RAMPION EXHIB BOARDS_AW.indd 7 01/02/2012 12:53

1000MM X 700MM FOAMEX BOARD – ARTWORK SET TO 100%

Rampion project statisticsLocation – 13km to 23km off the Sussex coast

Site area – 167km2

Water depth – 19m to 50m

Installed electrical capacity – up to 700 megawatts (MW)

Turbine size – Turbines will have a generating capacity of between 3MW

and 7MW, with respective maximum height to tip of 180m and 210m.

Turbine numbers – Up to a maximum of 195 x 3MW or 3.6MW units.

For larger turbines, the number of units needed to generate 700MW

would vary.

Onshore works – A 27.8km underground cable route from the landfall

to the 400 kilovolts (kV) substation (owned by National Grid), around

2km south-west of Bolney village.

Power output – Based on our current expectations of the area’s wind

resource over the long-term, we estimate the site could generate more

than 2,100 gigawatt hours (GWh) of electricity each year*. In a typical

year, we estimate the project could generate enough electricity for the

domestic needs of the equivalent of around 450,000 homes#. That’s more

than two thirds of the homes in the whole of Sussex†, including the city

of Brighton and Hove.

* Based on wind speed data from our existing offshore wind farms in UK waters. This will be updated as Rampion site-specific data is gathered.

# Based on an average annual domestic household electricity consumption of 4,700kWh (DECC).

† Office of National Statistics census data.

Scroby Sands Offshore Wind Farm, Great Yarmouth. For illustrative purposes only.

1873_RAMPION EXHIB BOARDS_AW.indd 8 01/02/2012 12:53

1000MM X 700MM FOAMEX BOARD – ARTWORK SET TO 100%

1.Providingclean,renewableelectricityonalargescale

In a typical year, we estimate the Rampion Offshore Wind Farm

could generate enough electricity for the domestic needs of

the equivalent of around 450,000 homes# each year. This could

contribute to reducing the UK’s reliance on imported fuels,

help increase our security of supply and stabilise electricity

prices in the future.

2.ReducingCO2emissionsintheUK

We believe the Rampion project could avoid the emission of

over 920,000 tonnes† of CO2 each year, which would otherwise

have been released by conventional power stations.

3.Enhancingmarineecology

Environmental monitoring at operational wind farms has shown

that positive habitat changes in marine ecology can occur in and

around turbine foundations acting as a natural reef. We’re currently

monitoring the ecology at our Robin Rigg Offshore Wind Farm in

the Solway Firth, and a wide range of fish species are now being

found in the wind farm area.

# Based on an average annual domestic household electricity consumption of 4,700kWh (DECC).

† Every unit (kWh) of electricity produced by the wind displaces a unit of electricity, which would otherwise have been produced by a power station burning fossil fuel. This is a generally accepted fact used by many organisations including Government in their environmental calculations. Wind-generated electricity does not replace electricity from nuclear power stations because these operate at ‘base load’, that is they will be working for the whole time that they are available. The calculation is made using a static figure of 430g CO2/kWh representing the energy mix in the UK.

1873_RAMPION EXHIB BOARDS_AW.indd 9 01/02/2012 12:53

1000MM X 700MM FOAMEX BOARD – ARTWORK SET TO 100%

4.Boostingthelocaleconomy

The Rampion project will offer a boost to the local economy in a

number of ways. We will:

•create between 65 and 85 full-time, permanent jobs, mostly in the local area

•establish a permanent Operations and Maintenance (O&M) base at a local

port (we’re currently in discussions with Newhaven and Shoreham ports)

•use local companies to provide services, such as vessels, construction

activities and engineering consultancy

•create indirect benefits from our construction and operational activities,

such as increased revenue to hotels and local businesses

•raise awareness of the opportunities and timescales on which local

companies could tender for contracts on the project.

We’ll try to use local labour and services as much as possible during all phases

of the project. We currently employ a full-time member of staff in Brighton, and

use a number of local companies to provide vessels, consultancy services and

undertake ecological surveys to support the wind farm’s development.

5.Supportingtourism

Offshore wind farms may enhance tourism potential by providing a feature

of interest. Our Scroby Sands Offshore Wind Farm, off the coast of Great

Yarmouth in Norfolk, has operated a visitor centre on the promenade since

2004. In 2010, it attracted 40,000 visitors from both the local community and

holidaymakers visiting the area. Additionally, some local operators run boat

trips out to the wind farm.

Scroby Sands Offshore Wind Farm Visitor Centre, Great Yarmouth.

1873_RAMPION EXHIB BOARDS_AW.indd 10 01/02/2012 12:53

1000MM X 700MM FOAMEX BOARD – ARTWORK SET TO 100%

Wind turbinesWe’re looking at three-bladed horizontal axis turbines, with a generation capacity

of between 3MW and 7MW. This is subject to the maximum installed capacity

of 700MW and a maximum of 195 turbines. For example, if we select a 3MW or

3.6MW turbine, then we’ll install 195 units. If we choose a larger 7MW turbine,

then a maximum of 100 turbines will be installed. Figure 2 shows the relative

dimensions of three wind turbines within the 3MW to 7MW range. Please note,

intermediate turbine sizes within this range are also available, so the number

of units needed to generate 700MW may vary.

When we apply for the Development Consent Order (DCO), we’ll be looking for

flexibility in the number and size of the wind turbines, so that within certain

limits several different final configurations will be possible.

Maximum rotor diameter

172mMaximum rotor diameter

128mHub height116m aboveLAT*

Maximum rotor diameter

140mHub height120m aboveLAT*

Hub height124m aboveLAT*

Sea level

3MW-class wind turbine

Scheme would comprise 195 turbines

Maximum tip height 180m

5MW-class wind turbine

Scheme would comprise 140 turbines

Maximum tip height 190m

7MW-class wind turbine

Scheme would comprise 100 turbines

Maximum tip height 210m

Figure2–Indicativeturbineoptionsanddimensions

* Lowest Astronomical Tide

1873_RAMPION EXHIB BOARDS_AW.indd 11 01/02/2012 12:53

1000MM X 700MM FOAMEX BOARD – ARTWORK SET TO 100%

Indicative layoutsThe turbines will generally be set out in a regular grid pattern, at least 600m apart.

We’ll decide on the exact location of the turbines and offshore substations when

the environmental and engineering constraints are known, and we’ve undertaken

further site investigation work. The turbines will be marked for navigation purposes

and painted in a light grey finish, the industry standard for offshore wind turbines.

Figures 3 and 4 show two indicative layouts for the offshore site. Figure 3 shows

the layout with the greatest number of turbines and Figure 4 shows the layout

with the largest turbines proposed.

Figure3–Indicativelayoutwith195x3.6MWwindturbines

1 3

2

4

5

6

7

10

11

12

9

8

8a

Proposedoffshorewindfarmdevelopmentarea

Potentialadditionaldevelopmentarea

Offshorecableroutesearcharea

Offshoresubstationlocationarea

Aggregatesextractionoptionarea

Metmastlocation

Landfalllocation

Proposedturbine/substationlocation

Key

1 3

2

4

5

6

7

10

11

12

9

8

8a

Coordinate Longitude Latitude

1 -0.366 50.687

2 -0.229 50.707

3 -0.074 50.678

4 0.02 50.642

5 -0.144 50.612

6 -0.151 50.643

7 -0.262 50.619

8 -0.274 50.643

8a -0.388 50.601

9 -0.345 50.623

10 -0.349 50.809

11 -0.316 50.818

12 -0.209 50.775

CLIENT:

PROJECT:

TITLE:

File Reference:

Project No: Status/Rev:

Project No:

DESCRIPTIONREV BY DATE AUTHREV'WCHK'D

AUTHORISED:ORIGINATOR:

DATE:

REVIEWED:

DATE:

CHECKED:

DATE: DATE:

ORIGINAL SIZE:SCALE:

OFFICE:

Number:Discipline: Type:

Status/Rev:Number:

Discipline:Type:

Rampion Offshore Windfarm

3.6MW symmetric 7.6 x 7.6 spacingWTG Layout excl. Area 499195 Turbines, 2 Substations

1:150000A3

EPS

SWK

22-12-11

BF

22-12-11

BF

22-12-11

BF

22-12-11

5101821 SM 036 0SE

P:\GBBMA\Geospatial\Project\_Power\5099062 - EON Rampion Engineering Services\300 Project Data\310 Datasets\311 DWG

5101821-SE-SM-036-RevB0.dwg Allen, Kit 6/07/2012, 04:07 ISO full bleed A3 (420.00 x 297.00 MM)

_atkins half size.ctb

Atkins LimitedWoodcote GroveAshley RoadEpsom, SurreyKT18 5BWEngland

Telephone +44(0)1372 726 140Fax +44(0)1372 740 055

5101821-SE-SM-036-Rev05101821

0036

SMSE

© British Crown and SeaZone Solutions Limited. All rights reserved. Products Licence No. 042010.002.This product has been derived in part from material obtained from the UK Hydrographic Office with thepermission ofthe Controller of Her Majesty's Stationery Office and UK Hydrographic Office (www.ukho.gov.uk).“NOT TO BE USED FOR NAVIGATION”.

KEYProposed Development AreaPotential AdditionalDevelopment AreaCable Route AreaOffshore Substation AreaAggregates Option AreaMet Mast LocationLandfall LocationTurbine / Substation Locations

BFSK06-01-12KAClient Approved0BFSK06-01-12KAIssue to ClientB1BFKA22-12-11SKIssue to ClientBBFBF22-12-11SKInter Discipline ReviewA

BFBFBFBF

Notes:

Projected toWGS 1984 UTM Zone 30NTransverse MercatorFalse Easting: 500000.000000False Northing: 0.000000Central Meridian: -3.000000Scale Factor: 0.999600Latitude Of Origin: 0.000000

0 KILOMETRES1 5

1 3

2

4

5

6

7

10

11

12

9

8

8a

Coordinate Longitude Latitude

1 -0.366 50.687

2 -0.229 50.707

3 -0.074 50.678

4 0.02 50.642

5 -0.144 50.612

6 -0.151 50.643

7 -0.262 50.619

8 -0.274 50.643

8a -0.388 50.601

9 -0.345 50.623

10 -0.349 50.809

11 -0.316 50.818

12 -0.209 50.775

CLIENT:

PROJECT:

TITLE:

File Reference:

Project No: Status/Rev:

Project No:

DESCRIPTIONREV BY DATE AUTHREV'WCHK'D

AUTHORISED:ORIGINATOR:

DATE:

REVIEWED:

DATE:

CHECKED:

DATE: DATE:

ORIGINAL SIZE:SCALE:

OFFICE:

Number:Discipline: Type:

Status/Rev:Number:

Discipline:Type:

Rampion Offshore Windfarm

3.6MW symmetric 7.6 x 7.6 spacingWTG Layout excl. Area 499195 Turbines, 2 Substations

1:150000A3

EPS

SWK

22-12-11

BF

22-12-11

BF

22-12-11

BF

22-12-11

5101821 SM 036 0SE

P:\GBBMA\Geospatial\Project\_Power\5099062 - EON Rampion Engineering Services\300 Project Data\310 Datasets\311 DWG

5101821-SE-SM-036-RevB0.dwg Allen, Kit 6/07/2012, 04:07 ISO full bleed A3 (420.00 x 297.00 MM)

_atkins half size.ctb

Atkins LimitedWoodcote GroveAshley RoadEpsom, SurreyKT18 5BWEngland

Telephone +44(0)1372 726 140Fax +44(0)1372 740 055

5101821-SE-SM-036-Rev05101821

0036

SMSE

© British Crown and SeaZone Solutions Limited. All rights reserved. Products Licence No. 042010.002.This product has been derived in part from material obtained from the UK Hydrographic Office with thepermission ofthe Controller of Her Majesty's Stationery Office and UK Hydrographic Office (www.ukho.gov.uk).“NOT TO BE USED FOR NAVIGATION”.

KEYProposed Development AreaPotential AdditionalDevelopment AreaCable Route AreaOffshore Substation AreaAggregates Option AreaMet Mast LocationLandfall LocationTurbine / Substation Locations

BFSK06-01-12KAClient Approved0BFSK06-01-12KAIssue to ClientB1BFKA22-12-11SKIssue to ClientBBFBF22-12-11SKInter Discipline ReviewA

BFBFBFBF

Notes:

Projected toWGS 1984 UTM Zone 30NTransverse MercatorFalse Easting: 500000.000000False Northing: 0.000000Central Meridian: -3.000000Scale Factor: 0.999600Latitude Of Origin: 0.000000

0 KILOMETRES1 5

1 3

2

4

5

6

7

10

11

12

9

8

8a

Coordinate Longitude Latitude

1 -0.366 50.687

2 -0.229 50.707

3 -0.074 50.678

4 0.02 50.642

5 -0.144 50.612

6 -0.151 50.643

7 -0.262 50.619

8 -0.274 50.643

8a -0.388 50.601

9 -0.345 50.623

10 -0.349 50.809

11 -0.316 50.818

12 -0.209 50.775

CLIENT:

PROJECT:

TITLE:

File Reference:

Project No: Status/Rev:

Project No:

DESCRIPTIONREV BY DATE AUTHREV'WCHK'D

AUTHORISED:ORIGINATOR:

DATE:

REVIEWED:

DATE:

CHECKED:

DATE: DATE:

ORIGINAL SIZE:SCALE:

OFFICE:

Number:Discipline: Type:

Status/Rev:Number:

Discipline:Type:

Rampion Offshore Windfarm

3.6MW symmetric 7.6 x 7.6 spacingWTG Layout excl. Area 499195 Turbines, 2 Substations

1:150000A3

EPS

SWK

22-12-11

BF

22-12-11

BF

22-12-11

BF

22-12-11

5101821 SM 036 0SE

P:\GBBMA\Geospatial\Project\_Power\5099062 - EON Rampion Engineering Services\300 Project Data\310 Datasets\311 DWG

5101821-SE-SM-036-RevB0.dwg Allen, Kit 6/07/2012, 04:07 ISO full bleed A3 (420.00 x 297.00 MM)

_atkins half size.ctb

Atkins LimitedWoodcote GroveAshley RoadEpsom, SurreyKT18 5BWEngland

Telephone +44(0)1372 726 140Fax +44(0)1372 740 055

5101821-SE-SM-036-Rev05101821

0036

SMSE

© British Crown and SeaZone Solutions Limited. All rights reserved. Products Licence No. 042010.002.This product has been derived in part from material obtained from the UK Hydrographic Office with thepermission ofthe Controller of Her Majesty's Stationery Office and UK Hydrographic Office (www.ukho.gov.uk).“NOT TO BE USED FOR NAVIGATION”.

KEYProposed Development AreaPotential AdditionalDevelopment AreaCable Route AreaOffshore Substation AreaAggregates Option AreaMet Mast LocationLandfall LocationTurbine / Substation Locations

BFSK06-01-12KAClient Approved0BFSK06-01-12KAIssue to ClientB1BFKA22-12-11SKIssue to ClientBBFBF22-12-11SKInter Discipline ReviewA

BFBFBFBF

Notes:

Projected toWGS 1984 UTM Zone 30NTransverse MercatorFalse Easting: 500000.000000False Northing: 0.000000Central Meridian: -3.000000Scale Factor: 0.999600Latitude Of Origin: 0.000000

0 KILOMETRES1 5

© British Crown and SeaZone Solutions Limited. All rights reserved. Products Licence No. 042010.002. This product has been derived in part from material obtained from the UK Hydrographic Office with the permission of the Controller of Her Majesty’s Stationery Office and UK Hydrographic Office (ukho.gov.uk). NOT TO BE USED FOR NAVIGATION.

1 3

2

4

5

6

7

10

11

12

9

8

8a

Coordinate Longitude Latitude

1 -0.366 50.687

2 -0.229 50.707

3 -0.074 50.678

4 0.02 50.642

5 -0.144 50.612

6 -0.151 50.643

7 -0.262 50.619

8 -0.274 50.643

8a -0.388 50.601

9 -0.345 50.623

10 -0.349 50.809

11 -0.316 50.818

12 -0.209 50.775

CLIENT:

PROJECT:

TITLE:

File Reference:

Project No: Status/Rev:

Project No:

DESCRIPTIONREV BY DATE AUTHREV'WCHK'D

AUTHORISED:ORIGINATOR:

DATE:

REVIEWED:

DATE:

CHECKED:

DATE: DATE:

ORIGINAL SIZE:SCALE:

OFFICE:

Number:Discipline: Type:

Status/Rev:Number:

Discipline:Type:

Rampion Offshore Windfarm

3.6MW symmetric 7.6 x 7.6 spacingWTG Layout excl. Area 499195 Turbines, 2 Substations

1:150000A3

EPS

SWK

22-12-11

BF

22-12-11

BF

22-12-11

BF

22-12-11

5101821 SM 036 0SE

P:\GBBMA\Geospatial\Project\_Power\5099062 - EON Rampion Engineering Services\300 Project Data\310 Datasets\311 DWG

5101821-SE-SM-036-RevB0.dwg Allen, Kit 6/07/2012, 04:07 ISO full bleed A3 (420.00 x 297.00 MM)

_atkins half size.ctb

Atkins LimitedWoodcote GroveAshley RoadEpsom, SurreyKT18 5BWEngland

Telephone +44(0)1372 726 140Fax +44(0)1372 740 055

5101821-SE-SM-036-Rev05101821

0036

SMSE

© British Crown and SeaZone Solutions Limited. All rights reserved. Products Licence No. 042010.002.This product has been derived in part from material obtained from the UK Hydrographic Office with thepermission ofthe Controller of Her Majesty's Stationery Office and UK Hydrographic Office (www.ukho.gov.uk).“NOT TO BE USED FOR NAVIGATION”.

KEYProposed Development AreaPotential AdditionalDevelopment AreaCable Route AreaOffshore Substation AreaAggregates Option AreaMet Mast LocationLandfall LocationTurbine / Substation Locations

BFSK06-01-12KAClient Approved0BFSK06-01-12KAIssue to ClientB1BFKA22-12-11SKIssue to ClientBBFBF22-12-11SKInter Discipline ReviewA

BFBFBFBF

Notes:

Projected toWGS 1984 UTM Zone 30NTransverse MercatorFalse Easting: 500000.000000False Northing: 0.000000Central Meridian: -3.000000Scale Factor: 0.999600Latitude Of Origin: 0.000000

0 KILOMETRES1 5

1873_RAMPION EXHIB BOARDS_AW.indd 12 01/02/2012 12:53

1000MM X 700MM FOAMEX BOARD – ARTWORK SET TO 100%

Figure4–Indicativelayoutwith100x7MWwindturbines

1 3

2

4

5

6

7

10

11

12

9

8

8a

1 3

2

4

5

6

7

10

11

12

9

8

8a

Coordinate Longitude Latitude

1 -0.366 50.687

2 -0.229 50.707

3 -0.074 50.678

4 0.02 50.642

5 -0.144 50.612

6 -0.151 50.643

7 -0.262 50.619

8 -0.274 50.643

8a -0.388 50.601

9 -0.345 50.623

10 -0.349 50.809

11 -0.316 50.818

12 -0.209 50.775

CLIENT:

PROJECT:

TITLE:

File Reference:

Project No: Status/Rev:

Project No:

DESCRIPTIONREV BY DATE AUTHREV'WCHK'D

AUTHORISED:ORIGINATOR:

DATE:

REVIEWED:

DATE:

CHECKED:

DATE: DATE:

ORIGINAL SIZE:SCALE:

OFFICE:

Number:Discipline: Type:

Status/Rev:Number:

Discipline:Type:

Rampion Offshore Windfarm

3.6MW symmetric 7.6 x 7.6 spacingWTG Layout excl. Area 499195 Turbines, 2 Substations

1:150000A3

EPS

SWK

22-12-11

BF

22-12-11

BF

22-12-11

BF

22-12-11

5101821 SM 036 0SE

P:\GBBMA\Geospatial\Project\_Power\5099062 - EON Rampion Engineering Services\300 Project Data\310 Datasets\311 DWG

5101821-SE-SM-036-RevB0.dwg Allen, Kit 6/07/2012, 04:07 ISO full bleed A3 (420.00 x 297.00 MM)

_atkins half size.ctb

Atkins LimitedWoodcote GroveAshley RoadEpsom, SurreyKT18 5BWEngland

Telephone +44(0)1372 726 140Fax +44(0)1372 740 055

5101821-SE-SM-036-Rev05101821

0036

SMSE

© British Crown and SeaZone Solutions Limited. All rights reserved. Products Licence No. 042010.002.This product has been derived in part from material obtained from the UK Hydrographic Office with thepermission ofthe Controller of Her Majesty's Stationery Office and UK Hydrographic Office (www.ukho.gov.uk).“NOT TO BE USED FOR NAVIGATION”.

KEYProposed Development AreaPotential AdditionalDevelopment AreaCable Route AreaOffshore Substation AreaAggregates Option AreaMet Mast LocationLandfall LocationTurbine / Substation Locations

BFSK06-01-12KAClient Approved0BFSK06-01-12KAIssue to ClientB1BFKA22-12-11SKIssue to ClientBBFBF22-12-11SKInter Discipline ReviewA

BFBFBFBF

Notes:

Projected toWGS 1984 UTM Zone 30NTransverse MercatorFalse Easting: 500000.000000False Northing: 0.000000Central Meridian: -3.000000Scale Factor: 0.999600Latitude Of Origin: 0.000000

0 KILOMETRES1 5

© British Crown and SeaZone Solutions Limited. All rights reserved. Products Licence No. 042010.002. This product has been derived in part from material obtained from the UK Hydrographic Office with the permission of the Controller of Her Majesty’s Stationery Office and UK Hydrographic Office (ukho.gov.uk). NOT TO BE USED FOR NAVIGATION.

Proposedoffshorewindfarmdevelopmentarea

Potentialadditionaldevelopmentarea

Offshorecableroutesearcharea

Offshoresubstationlocationarea

Aggregatesextractionoptionarea

Metmastlocation

Landfalllocation

Proposedturbine/substationlocation

Key

1 3

2

4

5

6

7

10

11

12

9

8

8a

Coordinate Longitude Latitude

1 -0.366 50.687

2 -0.229 50.707

3 -0.074 50.678

4 0.02 50.642

5 -0.144 50.612

6 -0.151 50.643

7 -0.262 50.619

8 -0.274 50.643

8a -0.388 50.601

9 -0.345 50.623

10 -0.349 50.809

11 -0.316 50.818

12 -0.209 50.775

CLIENT:

PROJECT:

TITLE:

File Reference:

Project No: Status/Rev:

Project No:

DESCRIPTIONREV BY DATE AUTHREV'WCHK'D

AUTHORISED:ORIGINATOR:

DATE:

REVIEWED:

DATE:

CHECKED:

DATE: DATE:

ORIGINAL SIZE:SCALE:

OFFICE:

Number:Discipline: Type:

Status/Rev:Number:

Discipline:Type:

Rampion Offshore Windfarm

3.6MW symmetric 7.6 x 7.6 spacingWTG Layout excl. Area 499195 Turbines, 2 Substations

1:150000A3

EPS

SWK

22-12-11

BF

22-12-11

BF

22-12-11

BF

22-12-11

5101821 SM 036 0SE

P:\GBBMA\Geospatial\Project\_Power\5099062 - EON Rampion Engineering Services\300 Project Data\310 Datasets\311 DWG

5101821-SE-SM-036-RevB0.dwg Allen, Kit 6/07/2012, 04:07 ISO full bleed A3 (420.00 x 297.00 MM)

_atkins half size.ctb

Atkins LimitedWoodcote GroveAshley RoadEpsom, SurreyKT18 5BWEngland

Telephone +44(0)1372 726 140Fax +44(0)1372 740 055

5101821-SE-SM-036-Rev05101821

0036

SMSE

© British Crown and SeaZone Solutions Limited. All rights reserved. Products Licence No. 042010.002.This product has been derived in part from material obtained from the UK Hydrographic Office with thepermission ofthe Controller of Her Majesty's Stationery Office and UK Hydrographic Office (www.ukho.gov.uk).“NOT TO BE USED FOR NAVIGATION”.

KEYProposed Development AreaPotential AdditionalDevelopment AreaCable Route AreaOffshore Substation AreaAggregates Option AreaMet Mast LocationLandfall LocationTurbine / Substation Locations

BFSK06-01-12KAClient Approved0BFSK06-01-12KAIssue to ClientB1BFKA22-12-11SKIssue to ClientBBFBF22-12-11SKInter Discipline ReviewA

BFBFBFBF

Notes:

Projected toWGS 1984 UTM Zone 30NTransverse MercatorFalse Easting: 500000.000000False Northing: 0.000000Central Meridian: -3.000000Scale Factor: 0.999600Latitude Of Origin: 0.000000

0 KILOMETRES1 5

1 3

2

4

5

6

7

10

11

12

9

8

8a

Coordinate Longitude Latitude

1 -0.366 50.687

2 -0.229 50.707

3 -0.074 50.678

4 0.02 50.642

5 -0.144 50.612

6 -0.151 50.643

7 -0.262 50.619

8 -0.274 50.643

8a -0.388 50.601

9 -0.345 50.623

10 -0.349 50.809

11 -0.316 50.818

12 -0.209 50.775

CLIENT:

PROJECT:

TITLE:

File Reference:

Project No: Status/Rev:

Project No:

DESCRIPTIONREV BY DATE AUTHREV'WCHK'D

AUTHORISED:ORIGINATOR:

DATE:

REVIEWED:

DATE:

CHECKED:

DATE: DATE:

ORIGINAL SIZE:SCALE:

OFFICE:

Number:Discipline: Type:

Status/Rev:Number:

Discipline:Type:

Rampion Offshore Windfarm

3.6MW symmetric 7.6 x 7.6 spacingWTG Layout excl. Area 499195 Turbines, 2 Substations

1:150000A3

EPS

SWK

22-12-11

BF

22-12-11

BF

22-12-11

BF

22-12-11

5101821 SM 036 0SE

P:\GBBMA\Geospatial\Project\_Power\5099062 - EON Rampion Engineering Services\300 Project Data\310 Datasets\311 DWG

5101821-SE-SM-036-RevB0.dwg Allen, Kit 6/07/2012, 04:07 ISO full bleed A3 (420.00 x 297.00 MM)

_atkins half size.ctb

Atkins LimitedWoodcote GroveAshley RoadEpsom, SurreyKT18 5BWEngland

Telephone +44(0)1372 726 140Fax +44(0)1372 740 055

5101821-SE-SM-036-Rev05101821

0036

SMSE

© British Crown and SeaZone Solutions Limited. All rights reserved. Products Licence No. 042010.002.This product has been derived in part from material obtained from the UK Hydrographic Office with thepermission ofthe Controller of Her Majesty's Stationery Office and UK Hydrographic Office (www.ukho.gov.uk).“NOT TO BE USED FOR NAVIGATION”.

KEYProposed Development AreaPotential AdditionalDevelopment AreaCable Route AreaOffshore Substation AreaAggregates Option AreaMet Mast LocationLandfall LocationTurbine / Substation Locations

BFSK06-01-12KAClient Approved0BFSK06-01-12KAIssue to ClientB1BFKA22-12-11SKIssue to ClientBBFBF22-12-11SKInter Discipline ReviewA

BFBFBFBF

Notes:

Projected toWGS 1984 UTM Zone 30NTransverse MercatorFalse Easting: 500000.000000False Northing: 0.000000Central Meridian: -3.000000Scale Factor: 0.999600Latitude Of Origin: 0.000000

0 KILOMETRES1 5

1 3

2

4

5

6

7

10

11

12

9

8

8a

Coordinate Longitude Latitude

1 -0.366 50.687

2 -0.229 50.707

3 -0.074 50.678

4 0.02 50.642

5 -0.144 50.612

6 -0.151 50.643

7 -0.262 50.619

8 -0.274 50.643

8a -0.388 50.601

9 -0.345 50.623

10 -0.349 50.809

11 -0.316 50.818

12 -0.209 50.775

CLIENT:

PROJECT:

TITLE:

File Reference:

Project No: Status/Rev:

Project No:

DESCRIPTIONREV BY DATE AUTHREV'WCHK'D

AUTHORISED:ORIGINATOR:

DATE:

REVIEWED:

DATE:

CHECKED:

DATE: DATE:

ORIGINAL SIZE:SCALE:

OFFICE:

Number:Discipline: Type:

Status/Rev:Number:

Discipline:Type:

Rampion Offshore Windfarm

7.0MW symmetric 7.75 x7.75 spacingWTG Layout excl. Area 499100 Turbines, 2 Substations

1:150000A3

EPS

SWK

22-12-11

BF

22-12-11

BF

22-12-11

BF

22-12-11

5101821 SM 037 0VE

P:\GBBMA\Geospatial\Project\_Power\5099062 - EON Rampion Engineering Services\300 Project Data\310 Datasets\311 DWG

5101821-VE-SM-037-Rev0.dwg Allen, Kit 6/03/2012, 04:03 ISO full bleed A3 (420.00 x 297.00 MM)

_atkins half size.ctb

Atkins LimitedWoodcote GroveAshley RoadEpsom, SurreyKT18 5BWEngland

Telephone +44(0)1372 726 140Fax +44(0)1372 740 055

5101821-VE-SM-037-Rev05101821

0037

SMVE

© British Crown and SeaZone Solutions Limited. All rights reserved. Products Licence No. 042010.002.This product has been derived in part from material obtained from the UK Hydrographic Office with thepermission ofthe Controller of Her Majesty's Stationery Office and UK Hydrographic Office (www.ukho.gov.uk).“NOT TO BE USED FOR NAVIGATION”.

BFSK06-01-12KAClient Approved0BFSK06-01-12KAIssue to ClientB1BFKA22-12-11SKIssue to ClientBBFBF22-12-11SKInter Discipline ReviewA

BFBFBFBF

Notes:

Projected toWGS 1984 UTM Zone 30NTransverse MercatorFalse Easting: 500000.000000False Northing: 0.000000Central Meridian: -3.000000Scale Factor: 0.999600Latitude Of Origin: 0.000000

0 KILOMETRES1 5

KEYProposed Development AreaPotential AdditionalDevelopment AreaCable Route AreaOffshore Substation AreaAggregates Option AreaMet Mast LocationLandfall LocationTurbine / Substation Locations

1873_RAMPION EXHIB BOARDS_AW.indd 13 01/02/2012 12:53

1000MM X 700MM FOAMEX BOARD – ARTWORK SET TO 100%

FoundationsThe turbines will have a tubular steel tower placed on foundations which will sit on or in

the seabed. We’re currently considering a number of foundation types, including what are

known as monopile, gravity base, jacket, tripod and suction caisson. A number of factors

will dictate the appropriate technical solution, including the type and size of the wind

turbine, water depth, seabed ground conditions and metocean conditions. These elements

will be further considered during the Environmental Impact Assessment (EIA) process.

Inter array cablesWe’ll need to install a network of inter array cables, likely to be rated at either

33 kilovolts (kV) or 66kV, to transfer electricity from the wind turbines to the offshore

substations. These cables will be buried under the seabed either by ploughing, jetting

or trenching to a target burial depth of 1m, subject to local conditions. We’ll decide on

the exact location of the array cables once the turbine locations are known. The inter

array cable layout will be designed to limit the amount of cable installed.

Offshore substationsTwo offshore substations will be installed within the grey hatched area shown in Figures

3 and 4. The purpose of these substations is to collect the electricity generated by the

wind turbines via the inter array cables and step up the voltage, before transmitting it

to shore via the export cables. The offshore substations will be steel-framed structures

housing electrical equipment. The total height of the substation is likely to be up to 45m

above Lowest Astronomical Tide (LAT). The substations are expected to be marked for

navigational purposes in a similar way to the wind turbines.

Export cablesWe’ll need to lay four individual export cables to transfer the electricity to shore,

two from each offshore substation. Like the inter array cables, the export cables will

be buried under the seabed either by ploughing, jetting or trenching to a target burial

depth of 1m, subject to local conditions. The voltage of the export cables is expected

to be between 132kV and 150kV.

Offshore substation at Robin Rigg Offshore Wind Farm, Solway Firth. For illustrative purposes only.

1873_RAMPION EXHIB BOARDS_AW.indd 14 01/02/2012 12:53

Construction of the offshore elementsDue to the scale of the project, it’s likely that offshore construction would be spread

over a period of two to three years from the initial works to full commercial operation.

A large jack-up barge would typically be used to install the foundations of the turbines

and offshore substations, whilst another barge would transport turbine components

to be lifted by crane and installed on to the foundations. We’re likely to carry out both

these activities, along with the offshore cabling works, at the same time. Figure 5

shows an installation sequence used at Scroby Sands Offshore Wind Farm based

on monopile foundations.

Decommissioning the wind farmIf the project is approved, a seabed lease would be granted for 50 years. The design

life of current wind turbine technology is typically 20-25 years, so at the end of this

period a decision would need to be made whether to refurbish the scheme, replace it

with newer turbine technology, or decommission the project. Any new turbines would

require a fresh consent application and supporting Environmental Impact Assessment.

Figure 5 – Construction technique previously used at

Scroby Sands Offshore Wind Farm, Great Yarmouth

Bottom tower

Monopile

Top tower

Hub

Turbine blade

Nacelle

Jack-up barge

1000MM X 700MM FOAMEX BOARD – ARTWORK SET TO 100%

Summary of offshore design principlesThe table below summarises design principles for the offshore elements of the project.

Robin Rigg Offshore Wind Farm, Solway Firth. For illustrative purposes only.

Designprinciple Reason

Summaryofoffshoredesignprinciples

Turbinesnocloserthan13kmtoshore

Turbinesnocloserthan2nauticalmiles(nm)fromtheEnglishChannelTrafficSeparationScheme

Waterdepthsrestrictedtomaxof50m

Regularturbinearraylayoutwithstraightboundaryedgeswherepossible

Minimumspacingbetweenturbinesof600m

Turbinelocationswillhavea50mbufferfromprotectedshipwrecksites

Minimum22mairclearancebetweenhighesttidelevelandturbinebladetip

Noturbinesinareaswhereaggregatesextractionwilloccur

Cablesinbetweenturbinesandexportcablestoshorewillbeburiedtoatargetdepthof1m

To mitigate visual impact from the coast

Avoid conflicts with major shipping channel (actual separation in this proposal is 2.8nm)

This is what we consider to be the technical water depth limit for constructing offshore wind farms at this time

To aid marine navigation around or through the site, particularly in adverse weather or emergency situations

To minimise restriction to navigation through the site and to avoid a visually dense development

Avoid direct impacts on shipwrecks or other features of interest

Maritime guidance to ensure adequate clearance from vessels

Avoid conflict between different uses of the seabed (Note: ongoing discussion with one operator)

Avoid risk of cables being snagged by anchors or nets

1873_RAMPION EXHIB BOARDS_AW.indd 16 01/02/2012 12:53

1000MM X 700MM FOAMEX BOARD – ARTWORK SET TO 100%

Onshore substationWhyBolney?

The electricity generated from the Rampion project will be similar in scale

to that produced by a conventional power station. It therefore needs to be

connected into the National Grid’s UK electricity transmission system at a

voltage of 400kV. We initially looked at opportunities to connect into the

132kV distribution system nearer to the coast, but our studies confirmed

this would not be possible.

We had initial discussions with National Grid and through careful

evaluation of environmental, technical and commercial criteria, we selected

Bolney Substation as the most suitable connection point. The substation

lies around 2km south-west of the village of Bolney in Mid Sussex and sits

within fields which are very well screened by trees. The topography also

helps limit views of the substation from Wineham Lane, Bob Lane and

Twineham Lane.

The existing National Grid Bolney Substation in Mid Sussex. For illustrative purposes only.

1873_RAMPION EXHIB BOARDS_AW.indd 17 01/02/2012 12:53

1000MM X 700MM FOAMEX BOARD – ARTWORK SET TO 100%

Substationdevelopment

The search area we’re considering is shown by the red line boundary

in Figure 6. The exact location of the substation depends on ongoing

landowner negotiation, engineering and environmental work.

We anticipate that the overall land area required by the new substation

will be around half the footprint area of the existing Bolney Substation

and is not expected to contain any equipment taller than 10m.

© Crown copyright. All rights reserved. 2011 Licence No. 0100031673.

Pond

BOB LANE

Tanks

Pond

BOB LANE

WIN

EH

AM L

ANE

Pond

Def

Pond

Downs

view

Woo

dpec

kers

ETL

Pond

Drain

FB

20.7m

Issues

Trac

k

The Gill

Twineham

FarmCourt

ETL

North Lodge

26.2m

Pond

26.1m

Grange

Tw ineham

Cottages

Pond

Pond

6

3

Twineham

Farm

Twineham Grange

Bolney Substation

Pond

29.0m

27.7m

Bolney Substation

Drain

Pond

Pond

SwallowCottage

20.1m

Pond

Pond

Pond

Night ingales

Old

Doctors

Pond

ETL

Pond

The Royal Oak(PH)

Drain

Path

(um

)

El

StaSub

GP

Ponds

Def

GP 33.5m

30.2m

Pond

Caravan Park

CR

WIN

EH

AM L

ANE

CS

CS

CP & E

D B

dy

Def

Co Const,

Track

Toll Copse

0.91

m R

H

BoundaryPos t

28.3m

Pond

Def

0.91m RHDef

Priorsbush

Issues

Pond

WIN

EH

AM L

ANE

29.6m

Co

Con

st, C

P &

ED

Bdy

Pond

Dawe's Farm

Dra

in

Pond

Pond

Pond

Sw imm ing Pool

HouseCoombe

CS

Drain

Ponds

Little Farm

The Bungalow

HouseLittle Combe Sw imm ing Pool

0.91

m R

H

Def

Existing National GridBolney Substation

Bob Lane

Wine

ham

Lane

523,600 523,800 524,000 524,200 524,400 524,600 524,800 525,000

120,

600

120,

800

121,

000

121,

200

121,

400

121,

600

121,

800

© Crown copyright, All rights reserved. 2011 License number 0100031673

±

PROJECTED TO:

British National GridProjection: Transverse_MercatorFalse_Easting: 400000.00000000False_Northing: -100000.00000000Central_Meridian: -2.00000000Scale_Factor: 0.99960127Latitude_Of_Origin: 49.00000000

ORIGINAL SIZE: ORIGINATOR: CHECKED: REVIEWED: AUTHORISED:SCALE:

OFFICE: DATE: DATE: DATE: DATE:

Status/Rev:Type:Discipline:Project No:

File Reference:

5099062 LY MP

A3

GBBMA

TITLE:

PROJECT:

CLIENT:

5099062-LY-MP-002-RevB

RAMPION OFFSHORE WINDFARM

SUBSTATION CONSULTATION BOUNDARY

1:5,000

REV DESCRIPTION BY DATE CHK'D REV'W AUTH

Atkins LimitedWoodcote GroveAshley RoadEpsom, SurreyKT18 5BWEngland

Telephone +44(0)1372 726 140Fax +44(0)1372 740 055

NOTES

1. DO NOT SCALE FROM THIS DRAWING.

Project No:Discipline:

Number:

Status/Rev:

5099062LY

MP

KEYProposed Cable RouteSubstation Area of SearchExisitng National Grid Substation

B2

B2

BF BFSKKA

21-12-11 21-12-11 21-12-11 21-12-11

Type:

002

Number:

002

B2B1BA

For Client ReviewFor Client ReviewFor Client ReviewInter Discipline Review

SKKAKAKA

18-01-1206-01-1205-01-1221-12-11

KASKSKSK

BFBFBFBF

BFBFBFBF

P:\GBBMA\Geospatial\Project\_Power\5099062 - EON Rampion Engineering Services\300 Project Data\310 Datasets\314 MXD\5099062-LY-MP-002_RevB2.mxd

0 250METRES

A23

Pond

BOB LANE

Tanks

Pond

BOB LANE

WIN

EH

AM L

ANE

Pond

Def

Pond

Downs

view

Woo

dpec

kers

ETL

Pond

Drain

FB

20.7m

Issues

Trac

k

The Gill

Twineham

FarmCourt

ETL

North Lodge

26.2m

Pond

26.1m

Grange

Tw ineham

Cottages

Pond

Pond

6

3

Twineham

Farm

Twineham Grange

Bolney Substation

Pond

29.0m

27.7m

Bolney Substation

Drain

Pond

Pond

SwallowCottage

20.1m

Pond

Pond

Pond

Night ingales

Old

Doctors

Pond

ETL

Pond

The Royal Oak(PH)

Drain

Path

(um

)

El

StaSub

GP

Ponds

Def

GP 33.5m

30.2m

Pond

Caravan Park

CR

WIN

EH

AM L

ANE

CS

CS

CP & E

D B

dy

Def

Co Const,

Track

Toll Copse

0.91

m R

H

BoundaryPos t

28.3m

Pond

Def

0.91m RHDef

Priorsbush

Issues

Pond

WIN

EH

AM L

ANE

29.6m

Co

Con

st, C

P &

ED

Bdy

Pond

Dawe's Farm

Dra

in

Pond

Pond

Pond

Sw imm ing Pool

HouseCoombe

CS

Drain

Ponds

Little Farm

The Bungalow

HouseLittle Combe Sw imm ing Pool

0.91

m R

H

Def

Existing National GridBolney Substation

Bob Lane

Wine

ham

Lane

523,600 523,800 524,000 524,200 524,400 524,600 524,800 525,000

120,

600

120,

800

121,

000

121,

200

121,

400

121,

600

121,

800

© Crown copyright, All rights reserved. 2011 License number 0100031673

±

PROJECTED TO:

British National GridProjection: Transverse_MercatorFalse_Easting: 400000.00000000False_Northing: -100000.00000000Central_Meridian: -2.00000000Scale_Factor: 0.99960127Latitude_Of_Origin: 49.00000000

ORIGINAL SIZE: ORIGINATOR: CHECKED: REVIEWED: AUTHORISED:SCALE:

OFFICE: DATE: DATE: DATE: DATE:

Status/Rev:Type:Discipline:Project No:

File Reference:

5099062 LY MP

A3

GBBMA

TITLE:

PROJECT:

CLIENT:

5099062-LY-MP-002-RevB

RAMPION OFFSHORE WINDFARM

SUBSTATION CONSULTATION BOUNDARY

1:5,000

REV DESCRIPTION BY DATE CHK'D REV'W AUTH

Atkins LimitedWoodcote GroveAshley RoadEpsom, SurreyKT18 5BWEngland

Telephone +44(0)1372 726 140Fax +44(0)1372 740 055

NOTES

1. DO NOT SCALE FROM THIS DRAWING.

Project No:Discipline:

Number:

Status/Rev:

5099062LY

MP

KEYProposed Cable RouteSubstation Area of SearchExisitng National Grid Substation

B2

B2

BF BFSKKA

21-12-11 21-12-11 21-12-11 21-12-11

Type:

002

Number:

002

B2B1BA

For Client ReviewFor Client ReviewFor Client ReviewInter Discipline Review

SKKAKAKA

18-01-1206-01-1205-01-1221-12-11

KASKSKSK

BFBFBFBF

BFBFBFBF

P:\GBBMA\Geospatial\Project\_Power\5099062 - EON Rampion Engineering Services\300 Project Data\310 Datasets\314 MXD\5099062-LY-MP-002_RevB2.mxd

0 250METRES

A23

Figure6–Gridsubstationsearcharea

The substation would contain a range of electrical equipment, including

transformers, reactive compensation equipment, control buildings (likely to be

two storeys high) and amenities buildings, all surrounded by security fencing.

It’s anticipated that the substation will take two years to build.

The likely dimensions for key equipment within the substation area are:

•transformers – 6m wide x 16m long x 10m high

•reactors – 4m wide x 7.5m long x 7m high

•filters – 20m wide x 22.5m long x 8m high.

1873_RAMPION EXHIB BOARDS_AW.indd 18 01/02/2012 12:53

700MM x 1000MM FOAMEX BOARD – ARTWORK SET TO 100%

Onshore cable routeFigure 7 shows the proposed cable route, which is 27.8km long. We would lay the

cable underground for the whole route, to avoid the long-term visual impacts from

an overhead connection.

Section 1

At the preferred landfall location, the proposed cable would be drilled under the beach,

the sea defences and underneath the A259 between East Worthing and Lancing, before

continuing under parts of the Brooklands Pleasure Park, Pitch and Putt, and Par 3 Golf

Course. The route passes close to the Southern Water works before crossing into open

space. It generally runs alongside the route of the new cycle path, until it passes under

an overgrown former landfill site.

Sections 2, 3 and 4

From here, the cable would be drilled under the railway and head north through open

land towards the A27 Sompting Bypass where another drilled section will be installed

under this major road. At this point, the cable route enters the South Downs National

Park and then heads generally north-east, avoiding the Site of Special Scientific Interest

(SSSI) at Steep Down. It then heads directly east to cross the River Adur, south of the

disused cement works.

Section 5

The route gradually ascends towards Beeding Hill. Beyond this point is the most

constrained part of the route, particularly at Tottington Mount where the route crosses

the hilltop, before taking a U-shaped course to maintain workable slope inclines. There

is a Scheduled Ancient Monument (SAM) here, a Bronze Age Cross Dyke, which the cable

can’t avoid due to slopes on either side. We held a meeting on site with English Heritage

to discuss a suitable methodology to limit the impact and agree further investigations to

understand more about this feature. The route then descends from the South Downs into

the open plain to the north and towards the Low Weald.

Sections 6 and 7

The route passes through generally open farmland, avoiding a Site of Nature Conservation

Importance (SNCI) and ancient woodland near Small Dole. The proposed route crosses

the A281 at a point between Henfield to the west and Woodmancote to the east. It then

heads north, passing to the west of Blackstone before reaching the B2116.

Section 8

The cable route then heads directly north, keeping around the same distance from

Wineham in the west and Twineham to the east, before crossing under Bob Lane and

then reaching land next to Bolney Substation. At that point, it will connect into a new

dedicated Rampion substation for connection to the National Grid.

900MM X 1485MM FOAMEX BOARD – ARTWORK SET TO 100%

Figure 7 – Map of proposed underground onshore cable route

We also have larger scale maps of the eight individual sections of the onshore

cable route available. Please ask a member of the project team to see a copy.

The Parish (or Borough/District) Council areas that the proposed cable route passes through are Worthing Borough, Sompting, Coombes,

Adur District, Upper Beeding, Henfield, Woodmancote and Twineham.

A281

A272

A2037

B2116

A27

A283

A259

A23

B2117

B2118

Section6

Section4

Section5

Section7

Section8

Section2

Section3

Section1

A27

River Adur

Crossing 16-14524061,118147

Crossing 14-02522946,115033

Crossing 10-12521474,111330

Crossing 07-05520204,107950

Crossing 03-06515941,106212

Crossing 02-18515504,105234

Crossing 01-13516511,103912

Crossing 01-02517355,103235

A281

A272

A203

7

B2116

A27

A283

A259

A23

B2117

B21

18

Section6

Section4

Section5

Section7

Section8

Section2

Section3

Section1

520000

1100

00

1100

00

1200

00

1200

00

Contains Ordnance Survey data © Crown copyright and database rights 2011.

0 2

km

ORIGINAL SIZE: ORIGINATOR: CHECKED: REVIEWED: AUTHORISED:SCALE:

OFFICE: DATE: DATE: DATE: DATE:

Status/Rev:Type:Discipline:

5107085 GS DG

A3

GBBMA1:60,000

1

BF BFSKKA

20-12-11 20-12-11 20-12-11 20-12-11

File Reference:

5107085-GS-DG-002-Rev1

MILLIMETRES0 10 50Atkins LimitedWoodcote GroveAshley RoadEpsom, SurreyKT18 5BWEngland

Telephone +44(0)1372 726 140Fax +44(0)1372 740 055

PROJECT:

RAMPION OFFSHORE WINDFARMTITLE:

ONSHORE CABLE ROUTETRANSPORT ACCESS ANDCONSTRAINTS

CLIENT:

Project No:

BY DATE CHK'D REV'W AUTHREV DESCRIPTION

±

Number:

001

NOTES

1. DO NOT SCALE FROM THIS DRAWING.

PROJECTED TO:

British_National_GridProjection: Transverse_MercatorFalse_Easting: 400000.000000False_Northing: -100000.000000Central_Meridian: -2.000000Scale_Factor: 0.999601Latitude_Of_Origin: 49.000000

KEYProposed Cable RoutePrimary RoadA RoadB RoadMinor RoadPublic FootpathExport Cables (Indicative)Landfall Working AreasSubstation Area of SearchSouth Downs National ParkSSSISNCILocal Nature Reserve

! ! ! ! ! !

! ! ! ! ! !

! ! ! ! ! !

RSPB ReserveNational Trust AreaAncient Woodland

! ! ! ! ! !

! ! ! ! ! !

! ! ! ! ! ! Scheduled Monument

10BA

Client ApprovedClient ApprovedFor Client ReviewInter Discipline Review

KAKAKAKA

09-01-1222-12-1120-12-1120-12-11

BFBFBFBF

SKSKSKSK

P:\GBBMA\Geospatial\Project\_Power\5099062 - EON Rampion Engineering Services\300 Project Data\310 Datasets\314 MXD\5107085-GS-DG-002-Rev1.mxd

BFBFBFBF

Key

Crossing 16-14524061,118147

Crossing 14-02522946,115033

Crossing 10-12521474,111330

Crossing 07-05520204,107950

Crossing 03-06515941,106212

Crossing 02-18515504,105234

Crossing 01-13516511,103912

Crossing 01-02517355,103235

A281

A272

A203

7

B2116

A27

A283

A259

A23

B2117

B21

18

Section6

Section4

Section5

Section7

Section8

Section2

Section3

Section1

520000

1100

00

1100

00

1200

00

1200

00

Contains Ordnance Survey data © Crown copyright and database rights 2011.

0 2

km

ORIGINAL SIZE: ORIGINATOR: CHECKED: REVIEWED: AUTHORISED:SCALE:

OFFICE: DATE: DATE: DATE: DATE:

Status/Rev:Type:Discipline:

5107085 GS DG

A3

GBBMA1:60,000

1

BF BFSKKA

20-12-11 20-12-11 20-12-11 20-12-11

File Reference:

5107085-GS-DG-002-Rev1

MILLIMETRES0 10 50Atkins LimitedWoodcote GroveAshley RoadEpsom, SurreyKT18 5BWEngland

Telephone +44(0)1372 726 140Fax +44(0)1372 740 055

PROJECT:

RAMPION OFFSHORE WINDFARMTITLE:

ONSHORE CABLE ROUTETRANSPORT ACCESS ANDCONSTRAINTS

CLIENT:

Project No:

BY DATE CHK'D REV'W AUTHREV DESCRIPTION

±

Number:

001

NOTES

1. DO NOT SCALE FROM THIS DRAWING.

PROJECTED TO:

British_National_GridProjection: Transverse_MercatorFalse_Easting: 400000.000000False_Northing: -100000.000000Central_Meridian: -2.000000Scale_Factor: 0.999601Latitude_Of_Origin: 49.000000

KEYProposed Cable RoutePrimary RoadA RoadB RoadMinor RoadPublic FootpathExport Cables (Indicative)Landfall Working AreasSubstation Area of SearchSouth Downs National ParkSSSISNCILocal Nature Reserve

! ! ! ! ! !

! ! ! ! ! !

! ! ! ! ! !

RSPB ReserveNational Trust AreaAncient Woodland

! ! ! ! ! !

! ! ! ! ! !

! ! ! ! ! ! Scheduled Monument

10BA

Client ApprovedClient ApprovedFor Client ReviewInter Discipline Review

KAKAKAKA

09-01-1222-12-1120-12-1120-12-11

BFBFBFBF

SKSKSKSK

P:\GBBMA\Geospatial\Project\_Power\5099062 - EON Rampion Engineering Services\300 Project Data\310 Datasets\314 MXD\5107085-GS-DG-002-Rev1.mxd

BFBFBFBF

Proposed cable route

Primary road

A road

B road

Minor road

Public footpath

Offshore export cables (indicative)

Landfall working areas

Substation search area

South Downs National Park

Site of Special Scientific Interest

Site of Nature Conservation Importance

Local Nature Reserve

RSPB Reserve

National Trust Area

Ancient Woodland

Scheduled Ancient Monument

Crossing 16-14 524061,118147

Crossing 14-02 522946,115033

Crossing 10-12521474,111330

Crossing 07-05520204,107950

Crossing 03-06515941,106212

Crossing 02-18515504,105234

Crossing 01-13516511,103912

Crossing 01-02517355,103235

Contains Ordinance Survey data at © Crown copyright and database rights 2011.

1000MM X 700MM FOAMEX BOARD – ARTWORK SET TO 100%

Cable landfall With the grid connection point defined as Bolney Substation, we then started a

process to identify the preferred route for underground cabling from the wind farm

to reach this location. It was important to carefully select the landfall location, where

the marine cables would be brought ashore.

The degree of urbanisation along the Sussex coastline meant that potential landfall

locations were extremely limited. Cliffs and environmental designations ruled out a

route to the east of Brighton, and taking a route west of Worthing would have resulted

in unnecessarily long offshore and onshore cable routes with associated environmental

impacts. So we defined a search area in between Worthing and Shoreham, and three

possible cable landfalls were identified within this area:

•between East Worthing and Lancing, through Brooklands Pleasure Park

•eastern end of Widewater Lagoon in Shoreham-by-Sea and through the beach

•west of Norfolk Bridge, Shoreham-by-Sea.

Following a number of studies, we decided that the most suitable option would be

between East Worthing and Lancing, through Brooklands Pleasure Park. The Widewater

Lagoon option would have required demolition of at least two existing houses, so was

immediately discounted. The cable landfall near Norfolk Bridge would have impacted

on a Local Nature Reserve and the cable would also have been routed through a Site

of Special Scientific Interest (SSSI). Furthermore, this option would have impacted on

residents of house boats on the River Adur, owners of beach huts, and required closure

of a children’s outdoor play area.

1873_RAMPION EXHIB BOARDS_AW.indd 19 01/02/2012 12:53

1000MM X 700MM FOAMEX BOARD – ARTWORK SET TO 100%

Summary of onshore design principlesThe table below summarises design principles for the onshore elements of the project.

Designprinciple Reason

Summaryofonshoredesignprinciples

Landfalllocationselectedtoavoidhighlyurbanisedareas

GridconnectionattheexistingBolneySubstation

15mmaximumcablecorridorwidth

15mworkingwidthalongsidethecablecorridorforconstructionaccessandtemporarystorage

Cabletobelaidundergroundforthewholeroute

Cableroutetoavoidmajorsettlements

AvoidSitesofSpecialScientificInterest(SSSI),SitesofNatureConservationImportance(SNCI),ScheduledAncientMonuments(SAM)andanyotherdesignationswherepossible

AvoidcrossingmajorhighwaysandPublicRightsofWaywherepossible

Avoidmaturetreesorwoodlands

Minimise impacts on residents, businesses and existing infrastructure

Closest and least environmental impact point on National Grid’s transmission system with sufficient capacity for a new generator of up to 700MW

Technical requirement to transmit up to 700MW of power from the scheme through four circuits

Facilitates access along the cable route and reduces number of required access points from public highways and associated traffic

Avoid visual impact due to overhead lines

Minimise disruption to communities and residents during the temporary construction period

Select route with the least environmental impact from landfall to grid connection location. However, one SAM (Bronze Age Cross Dyke) will need to be crossed by the onshore underground cable

Avoid disruption on major routes during construction

Minimise the need to remove trees, and reduce impact on landscape and habitat (eg bats)

1873_RAMPION EXHIB BOARDS_AW.indd 22 01/02/2012 12:53

1000MM X 700MM FOAMEX BOARD – ARTWORK SET TO 100%

What’s an EIA?We’re carrying out an EIA for the project, which means we look at the current

environmental conditions and identify any impacts that may arise as a result

of the project. We’ll then look at ways in which we can reduce these impacts

through mitigation – either through design or other measures. This is being

undertaken in line with UK and European EIA legislation.

EIA–currentstatus

We’ve carried out surveys to help us establish the baseline conditions for

the offshore site and onshore elements of our proposal. We’ve also looked

at each of the project’s lifecycle phases in turn, to identify the impacts

which could arise from:

•the wind farm’s initial construction phase

•the operational phase

•the eventual decommissioning of the wind farm at the end of its

operational lifetime (typically 20 to 25 years).

The following tables show the offshore and onshore surveys we’ve

undertaken so far.

Description

Offshoresurveys

Birdsurveys

Marinemammalsurveys

Benthicsurveys

Fishsurveys

Commercialfisheries

Geophysicalandgeotechnicalsurveys

Navigationsurveys

Ornithologists have been identifying the bird species, their activities and the numbers present in the area of the offshore wind farm and across a wider reference area. These surveys have been carried out by boat and by plane on a monthly basis (twice a month in spring and autumn) since March 2010, as we need to collect two years of site-specific bird data.

Alongside the ornithologists, marine mammal experts have been recording the numbers of seals, dolphins, porpoises and whales in the area of the offshore wind farm and a wider survey area.

To understand the flora and fauna that live on the seabed, we’ve sampled a number of sites along the cable route and in the wind farm area to identify any species of conservation interest within the area, and their relationship to the wider ecological network.

We’re looking at the fish ecology so we can understand the fish species that occur in the area and their breeding or nesting sites.

We’ve been engaging with commercial fishing organisations and fishermen who use the area for commercial fishing activities. We’ve also set up a project liaison group to meet regularly so we can collect information on the types of fishing activity which occur in and around the offshore wind farm site.

We’ve undertaken non-invasive geophysical surveys across the entire offshore site to obtain bathymetry information (the shape of the seabed), and to provide details of the site’s seabed geology. We then carried out geotechnical surveys which involved drilling a number of borehole samples at key points on the site, to further understand the conditions under the seabed.

We’ve been monitoring the movement of vessels in and around the proposed wind farm site to understand how ships and other vessels use the area. This includes the movement of commercial vessels in and out of ports, and how recreational users use the area.

1873_RAMPION EXHIB BOARDS_AW.indd 23 01/02/2012 12:53

1000MM X 700MM FOAMEX BOARD – ARTWORK SET TO 100%

EIA–currentstatus(continued)

Although we’re still carrying out the EIA for each element of the project, we’ve already

identified potential impacts to the local community that could arise as a result of developing

the Rampion Offshore Wind Farm. We’ve presented these for both the offshore and onshore

elements, and in terms of temporary impacts (construction phase) and ongoing impacts

(operational phase).

Description

Onshoresurveys

Ecologicalsurveys

Geophysicalsurveys

Engineeringsurveys

We’ve mapped the presence of bats, birds, dormice, badgers, newts and plants, amongst other flora and fauna along the cable route. We’ve also taken account of trees, hedgerows and agricultural practices along the route. Surveys were carried out at appropriate times of the year by suitably experienced and, where necessary, licensed ecologists.

We’re undertaking geophysical surveys along the route to establish whether there’s any evidence of cultural and historical interest in close proximity, such as archaeological artefacts and historical roads, fields or settlements.

These surveys will enable us to refine detailed engineering methodologies, better quantify likely environmental impacts and identify potential mitigations to these impacts.

1873_RAMPION EXHIB BOARDS_AW.indd 24 01/02/2012 12:53

1000MM X 700MM FOAMEX BOARD – ARTWORK SET TO 100%

Potential offshore impactsTemporaryimpactsduringconstruction

•Disturbance to other sea users due to exclusion/safety zones.

•Disturbance to the seabed.

•Noise during construction activities.

•Visual impact during construction activities.

Ongoingimpactsduringoperation

•Potential exclusion of certain types of activities within

the wind farm site.

•Increased movements of vessels to and from the

wind farm site.

•Change to the seascape.

•Potential impacts on birds.

Pages 34 to 37 of the Community Consultation Document

describe these impacts in more detail and suggest potential

mitigation options.

1873_RAMPION EXHIB BOARDS_AW.indd 25 01/02/2012 12:54

1000MM X 700MM FOAMEX BOARD – ARTWORK SET TO 100%

Potential onshore impacts1.Impactswhichcouldarisefromthelandfallandcableroute

Temporaryimpactsduringconstruction

•Disruption to beach access/the intertidal area at the landfall.

•Increase in noise during Horizontal Directional Drilling at the landfall.

•Visual impact during construction at the landfall.

•Temporary disruption to traffic during construction of the cable route.

•Disruption to farming operations along the cable route.

•Temporary disturbance at the Brooklands Pleasure Park, Pitch and Putt,

and Par 3 Golf Course as a result of cable trenching.

•Temporary disruption to Public Rights of Way and cycle routes.

•Temporary visual impacts due to construction of the cable route.

•Temporary impacts on the ecology along and near the cable route.

Ongoingimpactsduringoperation

•Visual impact due to chalk grassland disturbance.

•Disturbance to areas of archaeological interest.

2.Impactswhichcouldarisefromthesubstation

Temporaryimpactsduringconstruction

•Increased traffic and noise during construction of the substation.

Ongoingimpactsduringoperation

•Visual impact as a result of the physical presence of the substation.

•Additional noise from the substation during operation.

•Permanent access to the substation.

Pages 52 to 57 of the Community Consultation Document describe

these impacts in more detail and suggest potential mitigation options.

Robin Rigg Offshore Wind Farm, Solway Firth. For illustrative purposes only.

1873_RAMPION EXHIB BOARDS_AW.indd 26 01/02/2012 12:54

1000MM X 700MM FOAMEX BOARD – ARTWORK SET TO 100%

What are photomontages?Photomontages are photographic illustration tools which give an indication

of the potential scale and extent of the proposed development. They’re used

to gain an appreciation of how the proposed development may appear within

any given view and are intended for guidance only.

How should I view the images to give the best representation?The relative viewing distance needs to be correctly understood, eg if an image

is viewed too far from the eye then the elements will appear too small, whilst

if an image is viewed too closely, elements will appear disproportionately large.

The photomontages displayed today are printed to a width of 150cm and present

a 120° field of view. To view these images at the scale that best represents what

you would see in real life, you’re advised to view them at a distance of 72cm.

Which turbine layouts have you used to generate the images?For the purpose of this community consultation, we’ve produced photomontages

based on 195 x 3.6MW turbines (‘worst case scenario’) for each of the viewpoints,

and an additional indicative photomontage for 100 x 7MW turbines from Brighton

Seafront Promenade (Viewpoint 02), for comparison purposes.

Our Environmental Impact Assessment (EIA) work to date indicates that a greater

number of the smaller turbines (195 x 3.6MW) would have a more significant impact

on the seascape than fewer larger turbines (100 x 7MW), as they look more densely

packed on the horizon and the height difference in the turbines is difficult for the

eye to make out from a distance of 13km.

Scroby Sands Offshore Wind Farm, Great Yarmouth. For illustrative purposes only.

1873_RAMPION EXHIB BOARDS_AW.indd 27 01/02/2012 12:54

1000MM X 700MM FOAMEX BOARD – ARTWORK SET TO 100%

Consenting processThe Rampion Offshore Wind Farm proposal is defined as a Nationally Significant

Infrastructure Project (NSIP) under the Planning Act 2008. This is because it will

have an electrical output greater than 100MW.

Unlike planning applications which are submitted to local authorities under the

Town and Country Planning Act, we’ll be applying to the Infrastructure Planning

Commission (IPC) for a Development Consent Order (DCO) under the Planning

Act 2008. The IPC currently decides applications for NSIPs within the framework

of the relevant National Policy Statements, although the regime for authorising

NSIPs is to be amended by the recently enacted Localism Act 2011. Under the

revised provisions, the IPC (or its successor) will examine the application and

recommend to the Secretary of State if it should be approved.

Once the application is lodged with the IPC, all interested parties will have a

further opportunity to comment on the proposals by contacting the IPC directly.

Theconsentingprocesscanbesummarisedinthefollowingsixphases:

1. Pre-application

(the current phase)

We’ll begin

consultation with

the community

about our

proposal and use

the comments

we receive to

help shape the

proposal, where

appropriate

and feasible.

2. Acceptance

(28 days)

Once we submit

our application

to the IPC, they’ll

decide whether

to accept it, taking

into consideration

whether we have

identified the right

environmental

issues and carried

out adequate

community

consultation.

3. Pre-examination

(3 months)

In this phase,

you’ll be able to

register to have

your say about

the application

to the IPC and

express your

views in writing.

4. Examination

(6 months)

The IPC will invite

those who have

registered to give

further details of

their views.

5. Decision

(3 months)

The IPC will make

a recommendation

to the Secretary of

State (DECC) and

when a decision

is made, the IPC

will publish the

decision on

their website.

6. Post decision

If our application

for a Development

Consent Order is

consented by the

Secretary of State,

a period for legal

challenge runs

from the date of

the publication

of the decision.

1873_RAMPION EXHIB BOARDS_AW.indd 28 01/02/2012 12:54

1000MM X 700MM FOAMEX BOARD – ARTWORK SET TO 100%

ConsultationThere is a legal requirement for developers of Nationally Significant Infrastructure

Projects, such as the Rampion Offshore Wind Farm, to consult with the community

under Section 47 of the Planning Act 2008. A Consultation Report detailing consultation

responses will accompany our application for a DCO to the IPC in 2012.

Although we’re legally required to consult with the community, we also understand

that our relationship with the community is vital in developing a successful project.

As with all our other projects around the UK, we’re keen to build strong relationships

with the community and be good neighbours throughout the lifetime of the project.

The aims of our community consultation are to:

•provide an opportunity for the local community to review our proposals, understand

the project and what it will mean to them

•enable the community to put forward any views and ideas they have which may

influence certain elements of our proposals

•help the community understand any impacts our proposals may have on them, and

help shape any potential mitigation measures we could use to lessen these impacts

•encourage communities to actively participate and engage with us.

The community consultation will run for a period of 12 weeks from

Monday 13 February 2012 until Sunday 6 May 2012.

Notificationofpublicexhibitions

•BeginanalysisofSection47responses

•BeginConsultationReport

•ContinueEIA

•Refineproposalsfollowingtheconsultation

•PreparationforSection42andSection48consultation

•BeginanalysisofSection42andSection48responses

•ConsultationReportupdated

•DraftDCO,ESupdated

•Refineproposalsfollowingtheconsultation

•FinaliseandcompleteConsultationReport

•PreparedraftDCOandotherdocumentation

•FinaliseandcompleteES

Formal Community Consultation (12 weeks) Section 47 of the Planning Act 2008

Have your say

January 2012

Abbreviations

SOCC – Statement of Community Consultation

EIA – Environmental Impact Assessment

DCO – Development Consent Order

IPC – Infrastructure Planning Commission

ES – Environmental Statement

SubmitDCOapplicationtoIPC

JulyJuneMayAprilMarchFebruary

Formal Statutory ConsultationSection 42 and Section 48 of the Planning Act 2008 (including statutory bodies and publicising the proposed application)

Have your say

DecisionexpectedfromIPC

Section42and48consultationnotification

August

SOCCpublished

Autumn 2013

Figure8–Indicativetimelineforpre-applicationconsultation

1873_RAMPION EXHIB BOARDS_AW.indd 29 01/02/2012 12:54

1000MM X 700MM FOAMEX BOARD – ARTWORK SET TO 100%

Take part in the consultationWe’ve prepared a Community Consultation Document which includes a description of

the project elements, information about the Environmental Impact Assessment which

constitutes Preliminary Environmental Information, and details of how the community

can respond to the consultation.

Pick up a copy today and use it to complete the community consultation questionnaire.

You can hand your questionnaire in to a member of the project team or post it to

FREEPOST RAMPION OFFSHORE WIND FARM (no stamp required). You can also go

online to eon-uk.com/rampion to fill it in.

Contact usYou can also respond to the consultation or contact us in one of the following ways:

•Email us at [email protected]

•Write to our freepost address: FREEPOST RAMPION OFFSHORE WIND FARM

(no stamp required).

•Call our consultation line: 01273 694 876 (9am to 5pm, Monday to Friday).

All the consultation documents are available to download from eon-uk.com/rampion

or call 01273 694 876 if you would like us to send you a printed or CD copy.

The closing date for responses is Sunday 6 May 2012

It’s important that you submit your feedback and comments to us before

the closing date so we can consider them to help shape our proposals.