Station Scope of Supply_Block Sub Assembly

download Station Scope of Supply_Block Sub Assembly

of 3

Transcript of Station Scope of Supply_Block Sub Assembly

  • 8/3/2019 Station Scope of Supply_Block Sub Assembly

    1/3

    Area StationType of

    operationVariant SUB OPERATIONS / ELEMENTS DESCRIPTION Station Scope of Supply

    2P Engine selection at SDP

    2P BlockBlock fetching from trolley & placement on idler conveyor

    2P Barcode attachment on history card pad and number plate placement on pallet

    2D Engine selection at SDP

    2D BlockBlock fetching from trolley & placement on idler conveyor

    2D Barcode attachment on history card pad and number plate placement on pallet

    3P Engine selection at SDP

    3P BlockBlock fetching from trolley & placement on idler conveyor

    3P Barcode attachment on history card pad and number plate placement on pallet

    2P Front and rear cover dowel fitment on engine

    2P Alternator support dowel fitment

    2P Knock sensor loose fitment and run down

    2D Oil pump and water pump dowel fitment

    2D Alternator support dowel fitment

    2D Turbo oil return stud fitment

    3P Oil pump and water pump dowel fitment on engine

    3P Plummer block support dowel fitment

    3P Knock sensor loose fitment and run down

    2P Pallet lifting station

    2D Pallet lifting station

    3P Pallet lifting station

    2P Block fetching from idler conveyor

    2P

    Pallet locating pin adjustment

    Block placement on pallet on head face

    2D Block fetching from idler conveyor

    2D

    Pallet locating pin adjustment

    Block placement on pallet on head face

    3P Block fetching from idler conveyor

    3P

    Pallet locating pin adjustment

    Block placement on pallet on head face

    2P MB cap loosening,removal and placement on pallet

    2P Crankshaft placement on pallet

    2D MB cap loosening,removal and placement on pallet

    2D Crankshaft placement on pallet

    3P MB cap loosening,removal and placement on pallet

    3P Crankshaft placement on pallet

    Manual

    Manual

    Manual

    Manual

    1)1 pce Station tool rail frame with rail(For lightening,Display board)2)1 pce mechanical end stopper

    1)1 pce Station tool rail frame without rail(For lightening,Display board)2)1 No. solenoid actuated end stopper3) 1 No. operator console

    1) 1 No. Station tool rail frame with rail(For lightening,Display board)2)1 No. solenoid actuated end stopper

    3)1 No. anti back stopper4)1 No. operator console

    1)1 pce Station tool rail frame with rail(For lightening,Display board)2)1 pce mechanical end stopper3) Lever operated 4 position rotary table

    SubAssly

    BSA

    BSA

    SubAssly

    SS2

    Block Sub Assembly process Sequence for 273 MPFI,278 Dicor and 373 MPFI

    BSA ST01 Automatic

    1)1 No. solenoid actuated end stopper2.1 No. pallet auto lifting s tation3)1 No. operator pendant4)1 No. Main conveyor console with HMI

    ST1

    ST1

    ST2

    1/3

  • 8/3/2019 Station Scope of Supply_Block Sub Assembly

    2/3

    2P BB cap loosening and placement on pallet

    2P Thrust plate fitment on BB cap 2

    2D Bedplate lower bolts(on exhaust side) loosening and placement on pallet

    2D Block rotation by 180 Deg about vertical-POP lifter

    2D Bedplate lower bolts(on intake side) loosening and placement on pallet

    2D Block rotation about vertical axis to initial position

    3P Water pump outlet loose fitment on block

    3P Water pump outlet tightening on block

    2P Idle

    2D BB bolt loosening and placement on pallet

    2D Bedplate removal and placement on LGA conveyor

    3P Idle

    2P Crankshaft & block 2D matrix scanning

    2P MB shell upper fitment on block and lower fitment on cap

    2P BB shell upper fitment on block and lower fitment on cap

    2D(OP1) Crankshaft & block 2D matrix scanning

    2D(OP1) Piton cooling nozzle fitment

    2D(OP2) MB shell and BB upper shell upper fitment on block

    2D(OP2) MB and BB lower shell fitment on bedplate

    3P Crankshaft & block 2D matrix scanning

    3P MB shell upper fitment on block and lower fitment on cap

    2P MB-BB shell oiling

    2P Balancer shaft dropping

    2P Crankshaft dropping

    2P MB cap 2 with thrust washer fitment and bolt hand spins

    2D MB-BB shell oiling

    2D Balancer shaft dropping

    2D Crankshaft dropping

    2D Bedplate positioning on block

    3P MB shell oiling

    3P Crankshaft dropping

    3P MB cap 3 with thrust waher fitment on block

    2P MB1 and MB3 placment and bolt hand spins

    2P BB 1 and BB2 cap placement and bolt hand spins

    2D MB and BB bolt hand spins

    2D Turbo oil return stud fitment

    3P MB1,MB2 and MB4 placment on block and bolt hand spins

    3P Water inlet tube fitment

    BSA

    ST5 Manual

    Semi Automatic

    Manual

    Manual

    1)1 No 180 Deg turn table with pop up lifter2) No. Station tool rail frame with rail(For lightening,Display board)3)1 No. solenoid actuated end stopper4)1 No. anti back stopper5)1 No. operator console

    1) 1 No. Station tool rail frame with rail(For lightening,Display board)2)1 No. solenoid actuated end stopper3)1 No. anti back stopper4)1 No. operator console

    ST4

    Semi Automatic

    1) 1 No. Station tool rail frame with rail(For lightening,Display board)2)1 No. solenoid actuated end stopper

    3)1 No. anti back stopper4)1 No. operator console

    BSA ST7

    1)Low cost automation for oiling arrangment2) 1 No. Station tool rail frame with rail(For lightening,Display board)3)1 No. solenoid actuated end stopper4)1 No. anti back stopper5)1 No. operator console

    1)1 No. 2D matrix scanner(Cordless with parking arrangement)2)2 Nos. pick to light rack(3 tier)3) 1 No. Station tool rail frame with rail(For lightening,Display board)4)1 No. solenoid actuated end stopper5)1 No. anti back stopper6)1 No. operator console

    BSA

    BSA

    BSA

    ST3

    ST6

    2/3

  • 8/3/2019 Station Scope of Supply_Block Sub Assembly

    3/3

    2P Idle station

    2D Bedplate tightening by MSNR

    3P MB BB cap tightening by MSNR

    2P MB and BB bolt tightening with MSNR and marking

    2P Balancer third oil gallery plug fitment

    2D Idle

    3P Idle

    2P Quality gate and rework out station

    2D Quality gate and rework out station

    3P Quality gate and rework out station

    2P Crankshaft end play checking machine

    2D Crankshaft end play checking machine

    3P Crankshaft end play checking machine

    2P Balancer shaft end play checking

    2D Balancer shaft end play checking

    3P Balancer shaft end play checking

    2P Idle station

    2D Idle station

    3P Idle station

    2P Final Quality Gate and block unloading

    2D Final Quality Gate and block unloading

    3P Final Quality Gate and block unloading

    2P Pallet loweing station

    2D Pallet loweing stat ion

    3P Pallet loweing station

    1) 1 pce Station tool rail frame with rail(With lightening,Display board)2)1 pce solenoid actuated end stopper3)1 pce anti back stopper4)1 pce operator pendant

    1) 1 pce Station tool rail frame with rail(With lightening,Display board)2)1 pce solenoid actuated end stopper3)1 pce anti back stopper4)1 pce operator pendant

    1) 1 pce Station tool rail frame with rail(With lightening,Display board)2)1 pce solenoid actuated end stopper3)1 pce operator pendant

    Manual

    ST13 Manual

    BSA ST1 Manual

    BSA ST12 Manual

    1) 1 No pop up lifter for pallet lifting from conveyor2) 1 no pneumatic clamping arrangment3) 1 No. Station tool rail frame with rail(For lightening,Display board)4)1 No. solenoid actuated end stopper5)1 No. anti back stopper6)1 No. operator console

    BSA ST9 Semi Auto Matic

    1) 1 No pop up lifter for pallet lifting from conveyor2) 1 no pneumatic clamping arrangment3) 1 No. Station tool rail frame with rail(For lightening,Display board)4)1 No. solenoid actuated end stopper5)1 No. anti back stopper6)1 No. operator console

    Semi Automatic

    1) 1 No pop up lifter for pallet lifting from conveyor2) 1 no pneumatic clamping arrangment3) 1 No. Station tool rail frame with rail(For lightening,Display board)4)1 No. solenoid actuated end stopper5)1 No. anti back stopper6)1 No. operator console

    ST11

    1) 1 No pop up lifter for pallet lifting from conveyor2) 1 no pneumatic clamping arrangment3) 1 No. Station tool rail frame with rail(For lightening,Display board)4)1 No. solenoid actuated end stopper5)1 No. anti back stopper6)1 No. operator console

    Manual

    ST10

    1) 1 pce Station tool rail frame with rail(With lightening,Display board)2)1 pce solenoid actuated end stopper3)1 pce anti back stopper4)1 pce operator pendant

    Manual

    ST14

    ST8BSA

    BSA

    BSA

    BSA

    BSA

    3/3