10.PRICE BID 3.Sub Station

download 10.PRICE BID 3.Sub Station

of 153

Transcript of 10.PRICE BID 3.Sub Station

  • 8/18/2019 10.PRICE BID 3.Sub Station

    1/153

    Rate

    Both figures and in words

    A) Earth work Excavation

    1

    Earthwork excavation in all classes of soils such as hard stiff clay, stiff black cotton,

    hard red earth, shale’s, murram etc. except hard rock requiring blasting for

    foundation and depositing within the campus with a lead of upto 100 meters in

    levelled layer with all leads and lifts including cost of all labour materials equipment

    and all other incidental charges like cribs, sheeting, shoring, bracing, providing

    protective bunds, cofferdams, baling out water and other items which may be

    necessary or convenient to the successful completion of the excavation to the

    bottom of the drain removing of all logs, stumps, grubs and other deleterious matter

    and obstruction including trimming bottom of excavation, cost of any cleaning

    grubbing removing slips and blows if any and any surplus materials which may have

    to be thrown up during the process of excavation including setting out all labour

    materials, hire and fuel charges for all tools and plants, equipment, safe guards,

    and incidental necessary to complete the work and subsequent removal and

    cleaning the excavated materials protective bunds and cofferdams etc., as per

    Standard Specification.

    a)   Upto 2.0 Metre depth below average ground level.   Cum 480

    b)  Beyond 2.0 Metre depth and upto 3.0 Metre depth below average ground level.

    Cum 160

    c)  Beyond 3.0 Metre depth and upto 4.0 Metre depth below average ground level.

    Cum 50

    3

    Carting out and disposing of the excess contaminated earth from the proposed site

    to the assigned destination any where within the factory premises including loading,

    unloading & levelling etc., complete in all respects   Cum 240

    4

    Forming Embankment using Brought out earth (97% Proctor Density)

    Forming embankment by transporting approved soil with required lead having a

    CBR value of not less than 8% and minimum Dry Density not less than 1750 Kg/cum

    which has to be compacted properly and form a stable embankment including cost

    and labour for proper setting out, stripping and storing the top soil, compacting the

    original ground by vibratory roller of required -capacity to have a relative compactionof required proctor density, spreading the materials uniformly over the entire width of

    embankment including over section margin required for roller passing in layers of not

    exceeding 200 mm compacted thickness, breaking clods, watering with all leads for

    water, compacting to 97% proctor density for the soil under optimum moisture

    content with moisture content adjusted in the range of one percent (1%) above and

    two percent (2%) below the optimum moisture content determined as per

    ELECTRONICS CORPORATION OF TAMILNADU LTD

    (3)SUBSTATION,DGFOUNDATIONS

    PROPOSED DATA CENTRE AT PERUNGUDI

    .No Description Unit Qty Amount (Rs)

  • 8/18/2019 10.PRICE BID 3.Sub Station

    2/153

    IS:2720 (Part VII) with power roller/ vibrator roller rolling and using other

    construction equipment approved by the engineer-in-charge and finishing the

    embankment at 97% proctor density including compaction to specified requirement,

    working in narrow width of embankment including hire and fuel charges for all tools

    and plants and all other incidental charges etc. complete as per Standard

    Specification for road embankment. (The Contractor has to make his ownarrangement for the required quantity of soil and cost and transportation of earth

    including loading and unloading, etc.).

    Cu.m 160

    5

    Providing Pre-constructional anti- termite treatment and creating a chemical barrier

    to the building by injecting chemical emulsion of required concentrations under raft

    slab and beam, under Cellular raft slab, alround the footings, column pits, trenches,

    pits, tunnels, wall trenches, back fill, plinth filling, junction of wall and floor, side walls

    of foundation, external perimeter of building, surrounding of pipes expansion joints,

    etc. as per IS specification and as per the instructions of chemical manufacturer and

    all as directed. The treatment shall be carried out strictly in accordance with the

    technical specification and conforming to IS 6313 or equivalent BS specification.

    The chemical to be used as insecticides for the treatment shall be

    CHLOROPYRIPHOS 20% (or) 50% EC and the application shall be dilute one part

    of chemical 20% or 50% EC with 19 or 49 parts of water to get 1% emulsion and

    strictly in accordance with the manufacturer's specification.

    Note : Horizontal plan area at the top of cellular raft/ raft slab level of the building will

    be measured.  sqm 105

    6  Providing and laying of sand filling in layers of 150mm thick including watering and

    compacting all as per standard specification.  cum 60

    Total C/o to Summary : Rs.

    B CONCRETER

    1

    Providing and laying plain cement concrete 1:4:8(one part of cement, four part of

    sand and eight part of stone jelly) using 40mm size hard broken blue granite stone

     jelly for foundation and plinth beam base all as per standard specification.  Cum 70

    2

    Providing & laying cast-in-situ controlled reinforced concrete of the following

    grades using 20 mm and down size coarse graded machine crushed hard stone

    aggregate including designing the mix, weigh batching, mechanical mixing,

    transporting and placing at all lifts, vibrating, consolidating, curing and finishing

    smooth as required all exposed faces, complete for the following RC structural and

    other elements including centering, shuttering, form work either straight, curved,

    plain, tapered or sloped, supplying and mixing admixtures, dewatering wherever

    necessary, the cost of all complete materials, labour, all leads and lifts, tools, plant

    and machineries, hire and fuel charges and all other incidental charges etc

  • 8/18/2019 10.PRICE BID 3.Sub Station

    3/153

    Specifications, drawings and as directed, but excluding steel reinforcement, IRC

    mesh, insert plates which will be paid for separately under relevant items.The rates

    quoted shall hold good for all foundations at any depth, flooring, all floors, heights,

    levels, elevation, below ground level, basement, trenches, pits, tunnels etc. The

    designing of concrete mix for different grades of controlled concrete should be done

    in accordance with latest IS - SP 23. (Hand book on concrete mix design) in thefield laboratory and the same should be got approved by the Engineer. Grade of

    concrete for all concrete works specified in BOQ should be invariably followed :

    M-30 Grade :

    a   upto Ground lvl   cum 140

    b   above Ground lvl (G.F)   cum 75

    3

    Supplying and fixing of Precast slab for the following thickness made in

    CC 1:1.5:3 (One cement, one and half fine aggregate and three coarse

    aggregate) using 20mm size hard broken stone jelly including the cost ofslab, moulding, laying,finishing smooth on exposed surfaces, curing,

    transportation, pointing, and also providing necessary MS angles of

    required size based on the thickness of precast slab and to be fixed on the

    edges of the precast slab including grouting the lugs with Cement concrete

    1:1.5:3, for approach slab and other similar works but excluding the cost

    of reinforcement and MS angles  and as complete with all respects

    complying with relevant standard specification, as directed by the Engineer-

    Inchar e.

     cum 5

    Total C/o to Summary : Rs.

    C IRON AND STEEL WORKER

    1

    Supply, fabricate by straightening, cutting, bending to size, place in position and tiewith 18G binding wire for steel reinforcement for all RCC works using RTS bars of

    Fe 500 grade for steel reinforcements all as per standard specification kg 39

    2

    Supplying, fabricating and fixing in position inserts   comprising edge angle, MS

    angles, plates, tees, flats and other structural steel sections, holding down bolts,

    anchor bolts, anchor plates, pipe sleeves etc., in all cement concrete works at all

    levels and heights above finished floor level in foundation, trenches, pits, tunnels, lift

    pits etc., below finished floor level including cutting, bending to shape fabricating,

    drilling, threading, welding lugs etc., with all tools, tackles and labour as per design

    or as directed including a coat of primer of approved quality and painting the

    exposed surface with two coats of synthetic enamel paint of approved quality and

    colour etc., all complete as per drawings and as directed.

    kg 1

  • 8/18/2019 10.PRICE BID 3.Sub Station

    4/153

    3

    Supplying, fabricating and placing in position M.S.chequered plate   of

    required thickness for duct closing and shafts closing at all floors at all

    levels with necessary supports such as M.S. angles/M.S. flats including

    stiffeners to be placed on angle iron frame work. (Frame work, angles,

    stiffeners will be measured under relevant structural steel item). Rate shall

    include making necessary cutouts for inserts, All MS members shall be

    painted with one coat of red oxide primer of approved quality. etc all

    complete complying with relevant standard specifications & as directed by

    the En ineer-Inchar e.

    kg 3

    4

    Supplying, fabricating and placing in position M.S.chequered plate   of

    required thickness for duct closing and shafts closing at all floors at all

    levels with necessary supports such as M.S. angles/M.S. flats including

    stiffeners to be placed on angle iron frame work. (Frame work, angles,

    stiffeners will be measured under relevant structural steel item). Rate shall

    include making necessary cutouts for inserts, All MS members shall be

    painted with one coat of red oxide primer of approved quality. etc allcomplete complying with relevant standard specifications & as directed by

    the En ineer-Inchar e.

    kg 3

    Total C/o to Summary : Rs.

    D MASONRY WORKS

    1 Cement Concrete Solid Block Masonry in cement mortar 1:5  ( one

    cement and five coarse sand ) 400mm thick   upto Plinth level using

    precast machine moulded blocks at all levels using standard size of 390 x

    190 mm of solid cement concrete blocks with minimum compressive

    strength of 50Kg/Sq.cm conforming to IS 2185 or equivalent BS including

    all scaffolding, staging, curing, and all leads etc. complete and as directed

    b the de artment officers/Architect.

    Cum 20

    2

    Providing and construction of Brick work in cement mortar 1:5 (One part of cement

    and five part of sand) using chamber burnt bricks of size 9” x 4½“ x 3” for

    superstructure including curing etc. as per standard specification.

    Ground floor   Cum 33Terrace floor   Cum 5

    3

    Providing and construction of Brick partition wall 115mm in cement mortar 1:3 (one

    part of cement and three part of sand) using chamber burnt bricks of size 9“x 4½“ x

    3” for superstructure including curing etc. as per standard specification.  Sqm   15

    Total C/o to Summary : Rs.E SHUTTERING WORKS

    1

    Providing and erecting centering for all RCC members with steel centering sheets/ 

    plywood sheets, including strutting propping etc. as required and de-centering after

    the specified dates for the concerned RCC members and clearing out all the

    centering materials etc, complete all as per standard specification.

    a   for Plain surfaces & Slabs at all levels   sqm 250

    b   for columns at all levels   sqm 370c   for walls at all levels   sqm 350

    Total C/o to Summary : Rs.

  • 8/18/2019 10.PRICE BID 3.Sub Station

    5/153

    F PLASTERING WORKS

    1

    Providing and plastering with cement mortar 1:3(one part of cement and three part

    of sand), 12mm thick on the exposed surfaces of RCC members including hacking

    the concrete surface for proper bonding etc. complete all as per standard

    specification.

    sqm 200

    2Providing and plastering with cement mortar 1:3 (one part of cement and three partof sand), 12mm thick for the interior faces of brick wall all as per standard

    specification.sqm 215

    3

    Providing and plastering with cement mortar 1:4 (one part of cement and four part of

    sand), 15mm thick for the exterior faces of brick wall all as per standard

    specification.sqm 215

    Total C/o to Summary : Rs.

    G PAINTING AND FINISHING WORKS

    1

    Applying white washing three coats to ceilings and beams with pure shell

    lime or fat lime conforming to IS-712 all as per Specification and as

    directed.

    sqm 200

    2

    Providing two coats of Plastic emulsion paint to walls of approved colour

    over a coat of water based primer including preparation of surface by

    thorough cleaning and wetting and applying Birla putty to fill alll the

    undulations in the plastering & as per manufacturer’s specification fully to

    give an even shade & texture before painting and curing as per

    manufacturers s ecifications and as directed.

    sqm 215

    3

    Providing two coats of first quality weather proof cement paint   to the

    external surfaces of approved make and colour over a priming coat of

    white colour weather proof cement paint or any primer specified by the

    manufacturer including preparation of surface by thorough cleaning and

    wetting before painting and curing all as per manufacturer`s specificationsand as directed. Snowcem cement aint

    sqm 215

    3   Synthetic Enamel Paint of approved quality and colour including a primingcoat including the cost all materials etc.,complete, in all floors.

    sqm 35

    Total C/o to Summary : Rs.

    H FLOORING WORKS:

    9

    Screed concrete below flooring 50 mm thick in cement concrete 1:2:4)(one

    part of cement, two part of sand and four part of stone jelly) using 6 mm to

    10 mm granite stone chips and top finished with steel trowels to the

    re uired level and finish.

    sqm 120

    Providing and laying in panels not more than 20 sqm. in plan granolithic

    flooring with cement concrete 1:2:4 by using coarse graded aggregate of

    6 to 12 mm size laid monolithic with floor concrete and finished smooth

    with power trowel including preparation of concrete surface and form work.

    The screed shall be laid for effective separation of panels not exceeding 20

    sqm. in plan etc. complete as per Specifications and as directed.

    Unevenness in floor finish shall not exceed +2mm in one squaremetre

    area. Rate to include lead , lift at all levels, pumping, placing, necessary

    formwork, curing etc., all complete complying with relevant standard

    specifications & as directed by the Engineer-Incharge.

    sqm 120

  • 8/18/2019 10.PRICE BID 3.Sub Station

    6/153

    Total C/o to Summary : Rs.

    I JOINERY WORKS

    1

    Supply and fixing aluminium anodised Sliding / openable windows  confirmed to

    ISI specification with all fittings including supplying and fixing 6 mm thick plain glass,

    accessories,fixtures all complete as per the directions of the Engineer in charge.  Sqm 33

    2

    Supply and fixing aluminium louvered ventilators confirmed to ISI specification

    with al l f it tings including supplying and f ixing 6 mm thick plain

    glass,accessories,fixtures all complete as per the directions of the Engineer in

    charge.

    (0.6 0.6)   sqm 7

    H JOINERY WORKS

    1Supplying and providing motorised gear operated rolling shutters

    conformin to the s ecifications iven belowSHUTTER CURTAIN:

    75 1.25 .GUIDE CHANNEL:

    10 (3) 65 3.5 . , 75

    3.5 . 6.00 . 100

    6 . .

    BOTTOM PLATE :

    125 10 (3) 35 35 6

    5 .

    5 . .

     BRACKET PLATE : :

      &

    2.3 . 300 300 3.15

    2.3 2.6 . 325 325 3.15

    2.6 3.0 . 350 350 3.15

    3.0 3.5 . 375 375 3.15

    3.5 4.5 . 400 400 6.00

    4.5 5.5 . 450 450 6.00

    5.5 6.5 . 500 500 10.00 6.5 . .

     SHAFT:

    2.00 . 42 .

    2.00 . 3.00 . 48 .

    3.00 . 6.00 . 63 .

  • 8/18/2019 10.PRICE BID 3.Sub Station

    7/153

    25 35 (6 )

    150 200 35

    6 4 6 . .

    200 300 .

     HOOD:

    0.90

    25253 .

    FINISH:

    .

    ) 1 (3.5 4.5)   Each   15.75

    5   Providing and fixing of Hollow metal non fire rated doors as per BS 476part-22 for stability and integrity. Pressed Galvanized steel confirming to IS

    277 with the following specification. Recommended fire door shall have

    doors tested and third party certified by CERTIFIRE or equivavelent, for

    maximum rating of 120Mins. with vision panel. Labled doors with

    certifiaction shall be with vision glass as a part of complete assembly.

    Manufacturer test certificate shall cover doors both single and double leaf

    and all doors supplied shall be within the tested specimen, deviation in

    specification and sheet thickness other than what is mentioned in the test

    certificates are not allowed. Proper label confirming the type of door and

    the hourly rating is mandatory. Approved manufacturer or approved

    e uivalent.Door frame shall be double rebate profile of size 143 x 57 mm made out of

    1.60mm (16gauge) minimum thick galvanized steel sheet. Frames shall be

    Mitered and field assembled with self tabs. All provision should be

    mortised, drilled and tapped for receiving appropriate hardware. Rubber

    door silencers should be provided on the striking jamb. Frames should be

    provided with back plate bracket and anchor fasteners for installation on a

    finished plastered masonry wall opening. Once frame installed should be

    grouted with cement & sand slurry 1:2 ratio necessary for fire doors on the

    clear masonr o enin .

  • 8/18/2019 10.PRICE BID 3.Sub Station

    8/153

    Door leaf shall be 46mm thick fully flush double skin door with or without

    vision lite. Door leaf shall be manufactured from 1.2mm (18guage)

    minimum thick galvanised steel sheet. The internal construction of the door

    should be rigid reinforcement pads for receiving appropriate hardware. The

    infill material shall be resin bonded honeycomb core. All doors shall be

    factory prepped for receiving appropriate hardware and provided withnecessary reinforcement for hinges, locks, and door closers. The edges

    should be interlocked with a bending radius of 1.4mm. For pair of doors

    astragals has to be provided on the meeting stile for both active and

    inactive leaf. Vision lite wherever applicable should be of size 200x300mm

    with a beeding and screws from inside. The glass should be 6mm clear

    borosilicate fire rated glass of relavant rating of the door.

    All doors and frames shall be finished with polyurethane aliphatic grade

    paint   of approved colour. The door leaf and frame shall have passed

    minimum 250 hours of salt s re test.Rate should include supply and installation of door and hardware set as

    mentioned in the door and hardware schedule.Single leaf of size : 1200x2400mm with (200x300) vision panel with

    hardware set # 1Hardware Set 1

    4 nos-CE 4330 Ball Bearing but hinge 4'' x 3'' x 3mm CE marked in SSS

    1 no -Pushbar panic latch 1211, suitable for door width up to 1200mm,

    Silver finishI no -1185 WC External locking arrangement ELA with lever handle

    prepared for euro profile cylinder.one pair NMK 5542C-S 5pin EP half cyl. L=42mm one side key in SNP

    (Non-master keyed)1 no 5000 series labled door closer 5014 size 1-4 BC, with std arm in silver

    5.8 mtr Self adhesive sponge seal for frames 188S, Black   sqm 5Total C/o to Summary : Rs.

    M MISCELLANEOUS ITEMS

    1

    Weathering coarse with brick jelly lime concrete at 32:12.5 ratio prportion using

    20mm size brick jelly in pure slaked lime (no sand to be added) for average depth of

    80mm for roof weathering coarse.

    cum 18

    2

    Finishing the top of roof slab with one course of machine pressed tiles 20cm x 20cm

    x 2cm set in CM 1:3(one part of cement and three part of sand) and pointed with

    1:3(one part of cement and three part of sand) mixed with water proofing compound

    for weathering course all as directed by the Engineer-in-charge.

    sqm 110

    3

    Providing and fixing PVC Down take   pipe of specified dia below and

    approved make as water down take pipe with all with special PVC clamps ,

    necessary bends and shoes,bends,elbows,anchor bolts and all other

    specials, accessories and joints with solvent cement solution according to

    manufacturer’s s ecification.

  • 8/18/2019 10.PRICE BID 3.Sub Station

    9/153

    110mm dia (4kg/sqm class for rain water downtake)   RM 10160mm dia (6kg/sqm class for rain water downtake)   RM 5

    4

    Supplying and fixing 50mm dia. and 150mm or more long PVC spouts in sun

    shades of approved make and tint all as per specification and as directed.   Each 6

    5

    Construction of inspection chamber with best quality bricks with 230mm

    wall thickness up to 1.5 M depth, and 345mm wall thicknes for depth

    deeper than 1.5 M in CM1:4(one part of cement and five part of sand )

    over a bed of 150mm thick PCC 1:4:8 (one part of cement,four part of sand

    and eight part of stone jelly)for 1.0M depth, 200mm thick for depth 1.0M to

    2.0M and 300mm thick for depth more than 2.0M , wall plastered smooth in

    CM 1:3 (one part of cement and three part of sand) 12mm thick inside,

    and outside with rougth plastering, including 600x600 SFRC cover slab

    and frame-100kg, necessary excavation and refilling in any type of soil,

    including benching and channelling in PCC1:3:6(one part of cement,three

    part of sand and six part of stone jelly). Supplying and fixing provideinsulated CI steps at 300mm intervel for depth more than 0.8M

    a   450x450 mm Each 2

    b   600x600 mm Each

    Total C/o to Summary : Rs.

    Total Buiding cost : Rs.

  • 8/18/2019 10.PRICE BID 3.Sub Station

    10/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    11/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    12/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    13/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    14/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    15/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    16/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    17/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    18/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    19/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    20/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    21/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    22/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    23/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    24/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    25/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    26/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    27/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    28/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    29/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    30/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    31/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    32/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    33/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    34/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    35/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    36/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    37/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    38/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    39/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    40/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    41/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    42/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    43/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    44/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    45/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    46/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    47/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    48/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    49/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    50/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    51/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    52/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    53/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    54/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    55/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    56/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    57/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    58/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    59/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    60/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    61/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    62/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    63/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    64/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    65/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    66/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    67/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    68/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    69/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    70/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    71/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    72/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    73/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    74/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    75/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    76/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    77/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    78/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    79/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    80/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    81/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    82/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    83/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    84/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    85/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    86/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    87/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    88/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    89/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    90/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    91/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    92/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    93/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    94/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    95/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    96/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    97/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    98/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    99/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    100/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    101/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    102/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    103/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    104/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    105/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    106/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    107/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    108/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    109/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    110/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    111/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    112/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    113/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    114/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    115/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    116/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    117/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    118/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    119/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    120/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    121/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    122/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    123/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    124/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    125/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    126/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    127/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    128/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    129/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    130/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    131/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    132/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    133/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    134/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    135/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    136/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    137/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    138/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    139/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    140/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    141/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    142/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    143/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    144/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    145/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    146/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    147/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    148/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    149/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    150/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    151/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    152/153

  • 8/18/2019 10.PRICE BID 3.Sub Station

    153/153