SRS Recovery Act Footprint Reduction Project

18
ARRA-FY09-002-(#) Governor’s Nuclear Advisory Council Governor’s Nuclear Advisory Council SRS Recovery Act Footprint Reduction Project Presentation By Helen Belencan Recovery Act Portfolio Manager Department of Energy Savannah River Operations Office June 11, 2009

Transcript of SRS Recovery Act Footprint Reduction Project

Page 1: SRS Recovery Act Footprint Reduction Project

ARRA-FY09-002-(#)

Governor’s Nuclear Advisory CouncilGovernor’s Nuclear Advisory Council

SRS Recovery Act Footprint Reduction Project

Presentation ByHelen BelencanRecovery Act Portfolio ManagerDepartment of EnergySavannah River Operations Office

June 11, 2009

Page 2: SRS Recovery Act Footprint Reduction Project

www.srs.gov/recovery

ARRA-FY09-002-(#)

Introduction• American Recovery and Reinvestment Act (ARRA/Recovery

Act) Implementation at Savannah River Site

• SRS Recovery Act Footprint Reduction

• Accountability and Transparency

• Communications

• Footprint Reduction Project End State

Page 3: SRS Recovery Act Footprint Reduction Project

www.srs.gov/recovery

ARRA-FY09-002-(#)

The EM Recovery Act Program• The Office of Environmental Management (EM) has been given an

opportunity with the Recovery Act funds to accelerate and achieve new success in our Program

• The receipt of these funds was due to EM’s ability to demonstrate programmatic results and accountability objectives

• The purpose of these funds is to create near-term environmental cleanup jobs with an eye toward lasting economic benefits aligned to Administration goals

• Clear work scope, cost estimates, and schedules must be fully defined and supported

Page 4: SRS Recovery Act Footprint Reduction Project

www.srs.gov/recovery

ARRA-FY09-002-(#)

Distribution of $6 Billion in Recovery Act Funding for DOE Environmental Cleanup

1.615

1.6350.326

0.755

0.468

0.172

0.212

0.042

0.032

0.074

0.020

0.118

0.4610.070

South Carolina, Savannah River Site

Washington, Richland Operations Office

Washington, Office of River Protection

Tennessee, Oak Ridge Site

Idaho, Idaho National Laboratory

New Mexico, Waste Isolation Pilot Plant

New Mexico, Los Alamos National Laboratory

New York, Brookhaven National Laboratory

New York, Separations Process Research Unit

New York, West Valley

Ohio, Mound

Ohio, Portsmouth Plant

All Other States

Management & Oversight/HQ & Site Reserve

Page 5: SRS Recovery Act Footprint Reduction Project

www.srs.gov/recovery

ARRA-FY09-002-(#)

Cleanup Priorities

Tank waste

LLW / TRU dispositionSoils and groundwater

Facility D&D

Excess nuclear materialsSpent nuclear fuel

Need greater investment in these componentsSRS missions include work that

supports DOE complex – wide missions

Large riskMost challenging

Long time to completion

Page 6: SRS Recovery Act Footprint Reduction Project

www.srs.gov/recovery

ARRA-FY09-002-(#)

Balancing Cleanup PrioritiesWith Recovery Act

Tank waste LLW / TRU dispositionSoils and groundwater

Facility D&DExcess nuclear materials

Spent nuclear fuel

Recovery Act investmentsSRS missions include work that supports DOE complex – wide

missions

Large riskMost challenging

Long time to completion

Page 7: SRS Recovery Act Footprint Reduction Project

www.srs.gov/recovery

ARRA-FY09-002-(#)

SRS Recovery Act Footprint Reduction

Funds Provided: $1.615 billionJobs to be created/saved: ~3000Project duration: Completion by 2011

• Reduce the EM footprint at the SRS approximately 40% by September 2011– Maintain the current site boundaries

• Clean up legacy of nuclear weapons production• Enables reuse of DOE resources, including land and infrastructure

Page 8: SRS Recovery Act Footprint Reduction Project

www.srs.gov/recovery

ARRA-FY09-002-(#)

• Accelerate Area Completion in P, R, M, and D Areas, including decommissioning of P-and R-Reactors

• Eliminate 90% of the Pu 238 source term in 235-F

• Ship / stage / make ready all legacy TRU Waste for offsite disposal

• Ensure the reduction of environmental risk with large return on investment

• Achieve ~40% reduction of the site footprint

Page 9: SRS Recovery Act Footprint Reduction Project

www.srs.gov/recovery

ARRA-FY09-002-(#)

Project Status• Work is underway in all project areas

– Area Completion

– Facility Decommissioning

– Transuranic and Solid Waste Disposition

• RH-TRU waste shipped to WIPP last week

• Strong track record in these project areas

– Decommissioned over 240 facilities representing approximately 2.5 million square feet

– Completed over 360 of our 515 waste units

– Shipped over 29,000 drums of TRU waste

Page 10: SRS Recovery Act Footprint Reduction Project

www.srs.gov/recovery

ARRA-FY09-002-(#)

Area Closure – P Area Completion• Complete deactivation and in-situ

decommissioning of P Reactor• Place 130,000 cubic yards of

permanent grout – Treat four million gallons of

contaminated water from the Reactor Disassembly Basin building

• Complete remediation of 12 contaminated areas

– Remediate three miles of underground process sewer lines

– Remediate 100 acres of contaminated soils

• Install two vadose zone remediation systems

NowNow

End StateEnd State

Page 11: SRS Recovery Act Footprint Reduction Project

www.srs.gov/recovery

ARRA-FY09-002-(#)

Area Closure – R Area Completion

NowNow End StateEnd State

• Complete characterization and remediation of 12 contaminated areas− Remediate 120 acres of contaminated

soils• Complete characterization and

remediation of the 500-acre R-Discharge Canal

• Complete deactivation and in-situ decommissioning of R Reactor

• Complete grouting of the R-Reactor Disassembly Basin

Page 12: SRS Recovery Act Footprint Reduction Project

www.srs.gov/recovery

ARRA-FY09-002-(#)

Area Closure – D Area Completion• Complete closure of D Area,

former site of Heavy Water Production Facilities

• Complete deactivation and decommissioning of D-Area Powerhouse and 30 support facilities

• Complete remediation of 11 contaminated areas

– Remediate 210 acres and 117,000 cubic yards of tritium contaminated soils and concrete

– Remediate 30-acre volatile organic contaminated groundwater plume

NowNow

End StateEnd State

Page 13: SRS Recovery Act Footprint Reduction Project

www.srs.gov/recovery

ARRA-FY09-002-(#)

Area Closure – M Area Completion

ThenThen• Complete closure ofM Area, former reactor fuel manufacturing area

• Complete remediation of 19 contaminated areas

– Remediate 45 acres of contaminated soils

– Remove all known sources to a 1,500 acre groundwater plume

NowNow

Page 14: SRS Recovery Act Footprint Reduction Project

www.srs.gov/recovery

ARRA-FY09-002-(#)

Area Closure – Acceleration in Other Areas

235-F• Complete characterization of waste units in A Area and N Area

• 235-F stack and removal of 90% of Pu-238 source term

• Decommission facilities:– Heavy Water Components Test Reactor

– A-Line Facility in F-Area

– Consolidated Incineration Facility

– A Area facilities, including 703-A

– K-Area Powerhouse, K-Cooling Tower, and other excess K-Area facilities

– 645-N, 690-N, and 728-N

CIF

Page 15: SRS Recovery Act Footprint Reduction Project

www.srs.gov/recovery

ARRA-FY09-002-(#)

Waste and Material Disposition• Disposition approximately

4,500 cubic meters of legacy transuranic waste presently in inventory at SRS – Waste will either be shipped or

characterized for offsite shipment to WIPP (TRU waste) or NTS (treated MLLW)

• Consolidate all RCRA hazardous waste storage operations to E Area, and close other facilities

• Disposition 16,000 drums of depleted uranium oxide

Page 16: SRS Recovery Act Footprint Reduction Project

www.srs.gov/recovery

ARRA-FY09-002-(#)

Accountability and TransparencyRegulatory Agency Involvement

• Air, Water, and RCRA Permit planning / processing

• FFA & STP

• Process modifications– Accelerated review schedules

– Co-location

• End State planning

Page 17: SRS Recovery Act Footprint Reduction Project

www.srs.gov/recovery

ARRA-FY09-002-(#)

Communications• www. srs.gov/recovery

• Internal SRS employee communications• Regularly scheduled meetings

– Regulators (SCDHEC, EPA, etc…)– Economic Development Organizations– Editorial board meetings– Business leaders in the CSRA– Government

• Job Fairs

Page 18: SRS Recovery Act Footprint Reduction Project

www.srs.gov/recovery

ARRA-FY09-002-(#)

The Opportunity Ahead

• Demonstrate our ability to deliver– Conduct work safely

– Meet commitments

– Reduce lifecycle cost

– Clear the way for future missions at SRS

• Maintain perspective – Nuclear materials and liquid waste remain high priority

projects