SARDINIA HOUSE PHASE 3 & 4 Design Team: Lse Project Manager: Sarah Beck (Phase 3) Nicholas Garwolinski (Phase4) Architect: Bisse Adams Principal Contractor: Charter Construcon (Phase 3) Peak Construcon (Phase 4) Structural Consultant: Carter Clack Services Consultant: MKP Consultants Cost Manager: Wellesley Construcon Services Project Informaon: Type: Refurbishment Budget: Phase 3—£1.2m; Phase 4— £1.7m Area/Size GIA: 1000sqm Construcon period: January—April 2015 The redevelopment of Sardinia House including new offices, meeng rooms, study spaces, toilets and kitchens to- gether with new passenger li and im- proved entrance area.

Transcript of SARDINIA HOUSE PHASE 3 & 4 · SARDINIA HOUSE PHASE 3 & 4 Design Team: Lse Project Manager: Sarah...

Page 1: SARDINIA HOUSE PHASE 3 & 4 · SARDINIA HOUSE PHASE 3 & 4 Design Team: Lse Project Manager: Sarah Beck (Phase 3) Nicholas Garwolinski (Phase4) Architect: Bisse˚ Adams Principal Contractor:

SARDINIA HOUSE PHASE 3 & 4

Design Team:

Lse Project Manager: Sarah Beck (Phase 3)

Nicholas Garwolinski (Phase4)

Architect: Bisse� Adams

Principal Contractor: Charter Construc$on (Phase 3)

Peak Construc$on (Phase 4)

Structural Consultant: Carter Clack

Services Consultant: MKP Consultants

Cost Manager: Wellesley Construc$on Services

Project Informa�on:

Type: Refurbishment

Budget: Phase 3—£1.2m; Phase 4— £1.7m

Area/Size GIA: 1000sqm

Construc$on period: January—April 2015

The redevelopment of Sardinia House

including new offices, mee$ng rooms,

study spaces, toilets and kitchens to-

gether with new passenger li? and im-

proved entrance area.