Research Partnership Research Partnership to Secure Energy for America to Secure Energy for America PSEA Project 07121-1701 OR for Deepwater Gulf of Mexico roposed Project Management Plan bmitted: 4 March 2009 companying Uploaded Files: Project File “07121-1701 – Baseline Project Management Plan – 4 Mar 09.mpp” cel Spreadsheet “07121-1701 – Baseline Project Management Plan Report – 4 Mar 09.xls”

Transcript of Research Partnership to Secure Energy for America RPSEA Project 07121-1701 IOR for Deepwater Gulf of...

Page 1: Research Partnership to Secure Energy for America RPSEA Project 07121-1701 IOR for Deepwater Gulf of Mexico Proposed Project Management Plan Submitted:

Research Partnership Research Partnership to Secure Energy for Americato Secure Energy for America

RPSEA Project 07121-1701IOR for Deepwater Gulf of Mexico

Proposed Project Management PlanSubmitted: 4 March 2009

Accompanying Uploaded Files:MS Project File “07121-1701 – Baseline Project Management Plan – 4 Mar 09.mpp”Excel Spreadsheet “07121-1701 – Baseline Project Management Plan Report – 4 Mar 09.xls”

Page 2: Research Partnership to Secure Energy for America RPSEA Project 07121-1701 IOR for Deepwater Gulf of Mexico Proposed Project Management Plan Submitted:

KR Organization Chart

Dave CrossleyTechnical Project Director

Dave ReesContractual Project Director

Sr. VP – ReservoirJoe Lach

Sr. VP - Drilling/FacilitiesSteve Knabe

Sr. Project EngineerGavin Longmuir

Sr. Simulation EngineerRichard Dessenberger

Quality Control ManagerMike Zaldivar

Sr. IT ManagerJohn Reichardt

KB Web DeveloperContract

Reservoir EngineerXin Li

TechnicianErin Hopple / Cheryl Przygocki

Sr. GeologistRoy Cox / Phil Levine

Page 3: Research Partnership to Secure Energy for America RPSEA Project 07121-1701 IOR for Deepwater Gulf of Mexico Proposed Project Management Plan Submitted:

Key Members Contact Information

• Art Schroeder - RPSEA Manager – Deepwater Technology & Commercialization 1650 Highway 6, Suite 300 Sugar Land, TX 77478 Phone: 281-690-5506

Email: [email protected]

• Wiley H. Wells - Contract Director - Research Partnership to Secure Energy for America1650 Highway 6, Suite 300

Sugar Land, TX  77478 Office:  (281) 313-9555 Direct:  (281) 690-5504 Fax:  (281) 313-9560

Email: [email protected]

• Dave Rees - VP – Marketing & Business Development 1800 West Loop South – Suite 1000 Houston, TX 77027 Phone: 713-595-5131 Email: [email protected]

• Dave Crossley - RPSEA DW GOM Project Director 1800 West Loop South – Suite 1000 Houston, TX 77027

Phone: 713-401-5321Email: [email protected]

Page 4: Research Partnership to Secure Energy for America RPSEA Project 07121-1701 IOR for Deepwater Gulf of Mexico Proposed Project Management Plan Submitted:

Key Members Contact Information (continued)• Frank H Lim

Senior Reservoir Engineering EOR Advisor

Anadarko Petroleum Corporation

1201 Lake Robbins Drive

The Woodlands, TX 77251

Office: 832-636-3010

Mobile: 832-797-7589

Email: [email protected]

• Dandina N. Rao, Ph.D. - Distinguished Professor

Louisiana State University

3516 CEBA Building

Baton Rouge, LA 70803

Phone: 225-578-6037

Email: [email protected]

• Mayank Tyagi, Ph.D. – Assistant Professor

Louisiana State University

209 Johnston Hall

Baton Rouge, LA 70803

Office: 225-578-6041

Email: [email protected]

Page 5: Research Partnership to Secure Energy for America RPSEA Project 07121-1701 IOR for Deepwater Gulf of Mexico Proposed Project Management Plan Submitted:

Key Members Contact Information (continued) Gene Narahara Chevron Energy Technology Company 1500 Louisiana Street Houston, TX 77002 Phone: 832-854-3754 [email protected]

Walt Bozeman Team Leader - Gulf of Mexico Exploration Engineering

BP American Inc. 200 Westlake Park Blvd.

Houston, TX 77079-2663 Phone: 281-366-0801 Email: [email protected]

James Sheng, Ph.D. Research Reservoir Engineer

Total E&P Research & Technology USA, LLC 1201 Louisiana, Suite 1800 Houston, TX 77210-4397 Phone: 713-647-3603 Email: [email protected]

David J Kihneman P.E. New Field Developments – GOM Deepwater Anadarko Petroleum Corporation Phone: 832-636-3883

Email: [email protected]

Page 6: Research Partnership to Secure Energy for America RPSEA Project 07121-1701 IOR for Deepwater Gulf of Mexico Proposed Project Management Plan Submitted:

Key Members Contact Information (continued)

• Joe Lach - Senior VP – Subsurface Consulting

Knowledge Reservoir

1800 West Loop South – Suite 1000

Houston, TX 77027

Phone: 713-595-5128

Email: [email protected]

• Gavin Longmuir – RPSEA Sr. Project Engineer

Knowledge Reservoir

1800 West Loop South – Suite 1000

Houston, TX 77027

Phone: 713-401-5304

Email: [email protected]

Page 7: Research Partnership to Secure Energy for America RPSEA Project 07121-1701 IOR for Deepwater Gulf of Mexico Proposed Project Management Plan Submitted:

RPSEA 07121-1701: PMP Gantt Chart with Milestones

See uploaded file for details:“07121-1701 – Baseline Project Management Plan – 4 Mar 09.mpp

Note: Hours are approximate, since budget process used estimated hourly costs

Page 8: Research Partnership to Secure Energy for America RPSEA Project 07121-1701 IOR for Deepwater Gulf of Mexico Proposed Project Management Plan Submitted:

Clarifications on Project Scope & Hours

• Project hours are approximate – based on estimated hourly labor & overhead costs.

• Project scope will include data collection on all Deepwater & Ultra-Deepwater potential targets for IOR, including:

- currently producing fields.

- planned developments.

- Paleogene horizons.• Project scope will be based on a broad definition of Improved Oil

Recovery processes – including well & facility processes which can increase Ultimate Recovery in addition to reservoir processes.

Page 9: Research Partnership to Secure Energy for America RPSEA Project 07121-1701 IOR for Deepwater Gulf of Mexico Proposed Project Management Plan Submitted:

RPSEA 07121-1701 – PMP Planned Expenditure Schedule1. Reporting Mo/Yr: Baseline Project Management Plan - 4 March 2009

a. Project Title: a. Total Project Cost: a. Start Date:

b. RPSEA Funding: b. End Date:

c. Cost Share:

5.a. Task b. Description c. 1 2 3 4 5 6 7 8 9 10 11 12 Total

1 Baseline $0 $22,222 $22,222 $22,222 $22,222 $22,222 $22,222 $22,222 $22,222 $22,222 $22,222 $22,222 $244,444

Actual $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

2 Baseline $0 $0 $72,000 $0 $72,000 $0 $0 $72,000 $0 $0 $72,000 $0 $288,000

Actual $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

3 Baseline $0 $3,320 $62,455 $66,055 $34,650 $61,278 $49,010 $45,010 $18,985 $0 $0 $0 $340,763

Actual $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

4 Baseline $0 $0 $19,710 $6,000 $0 $0 $0 $0 $49,842 $33,605 $18,985 $0 $128,142

Actual $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

5 Baseline $0 $0 $9,855 $9,855 $6,000 $0 $0 $0 $0 $0 $0 $32,241 $57,951

Actual $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

6 Baseline $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

Actual $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

7 Baseline $0 $3,352 $3,352 $0 $3,352 $0 $0 $3,352 $0 $0 $3,352 $0 $16,760

Actual $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

8 Baseline $0 $0 $0 $0 $0 $0 $0 $0 $0 $8,000 $22,880 $22,880 $53,760

Actual $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

9 Baseline $0 $73,533 $7,466 $7,466 $7,466 $7,466 $7,466 $7,466 $9,698 $7,466 $7,466 $9,698 $152,657

Actual $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

10 Baseline $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

Actual $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

Baseline $0 $102,427 $197,060 $111,598 $145,690 $90,966 $78,698 $150,050 $100,747 $71,293 $146,905 $87,041 $1,282,477

Actual $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

b. Due Date c. Actual Date

5 May 29, 093 Sep 30, 094 Nov 30, 09

Rev. 3 - 10-01-08

RPSEA RESEARCH AWARD BASELINE COST/SCHEDULE/MILESTONE REPORT

2. Project Information: #07121-1791 3. Project Cost Summary: 4. Period of Performance:$1,999,712 February 3, 2009

Development of a Research Report and Characterization Database of Deepwater and Ultra-Deepwater Assets in the Gulf of Mexico, including Technical Focus Direction, Incentives, Needs Assessment Analysis and Concepts Identification for Improved Recovery Techniques

$1,599,712 August 2, 2010

$400,000

YEAR 1 - Cost by Task - Jan to Dec 2009

Cost Share - Anadarko

LSU - Research Costs

GOM DW/UDW Resources

IOR Mechanism & Experience

IOR Potential in DW/UDW GOM

Prioritized Concepts

Technology Transfer

Knowledge Base Delivery

Organization & Reporting

TOTAL

6. MILESTONE TABLEa. Milestone DescriptionIssue report on expert/industry input on project directionIssue report on GOM DW/UDW resource baseIssue report on IOR processes, experiences, analogs

See uploaded file: “07121-1701 – Baseline Project Management Plan Report – 4 Mar 09.xls”

Page 10: Research Partnership to Secure Energy for America RPSEA Project 07121-1701 IOR for Deepwater Gulf of Mexico Proposed Project Management Plan Submitted:

1. Reporting Mo/Yr: Baseline Project Management Plan - 4 March 2009

a. Project Title: a. Total Project Cost: a. Start Date:

b. RPSEA Funding: b. End Date:

c. Cost Share:

5.a. Task b. Description c. 1 2 3 4 5 6 7 8 9 10 11 12 Total

1 Baseline $22,222 $22,222 $22,222 $22,222 $22,222 $22,222 $22,222 $0 $155,556

Actual $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

2 Baseline $0 $72,000 $0 $0 $70,585 $0 $0 $0 $142,585

Actual $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

3 Baseline $0 $0 $0 $0 $0 $0 $0 $0 $0

Actual $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

4 Baseline $0 $0 $0 $0 $0 $0 $0 $0 $0

Actual $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

5 Baseline $33,882 $31,006 $16,845 $0 $0 $0 $0 $0 $81,733

Actual $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

6 Baseline $0 $0 $0 $62,615 $50,015 $39,245 $2,225 $0 $154,100

Actual $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

7 Baseline $0 $0 $3,352 $0 $8,000 $1,752 $13,429 $0 $26,533

Actual $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

8 Baseline $22,880 $21,020 $15,440 $15,440 $13,440 $7,440 $10,840 $0 $106,500

Actual $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

9 Baseline $7,466 $7,466 $9,698 $7,466 $7,466 $7,466 $3,200 $0 $0 $0 $0 $0 $50,228

Actual $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

10 Baseline $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

Actual $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

Baseline $86,450 $153,714 $67,557 $107,743 $171,728 $78,125 $51,916 $0 $0 $0 $0 $0 $717,235

Actual $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

b. Due Date c. Actual Date

5 Mar 31, 106 Jun 30, 107 Jul 30, 10

Rev. 3 - 10-01-08

RPSEA RESEARCH AWARD BASELINE COST/SCHEDULE/MILESTONE REPORT

2. Project Information: #07121-1791 3. Project Cost Summary: 4. Period of Performance:$1,999,712 February 3, 2009

Development of a Research Report and Characterization Database of Deepwater and Ultra-Deepwater Assets in the Gulf of Mexico, including Technical Focus Direction, Incentives, Needs Assessment Analysis and Concepts Identification for Improved Recovery Techniques

$1,599,712 August 2, 2010

$400,000

YEAR 2 - Cost by Task - Jan to Aug 2010

Cost Share - Anadarko

LSU - Research Costs

GOM DW/UDW Resources

IOR Mechanism & Experience

IOR Potential in DW/UDW GOM

Prioritized Concepts

Technology Transfer

Knowledge Base Delivery

Organization & Reporting

TOTAL

6. MILESTONE TABLEa. Milestone DescriptionIssue report on IOR potential for DW GOMIssue report on prioritized concepts for closing technical gapsDeliver final report 7 knowledge base, and complete technology transfer program

RPSEA 07121-1701 – PMP Planned Expenditure Schedule

See uploaded file: “07121-1701 – Baseline Project Management Plan Report – 4 Mar 09.xls”

Page 11: Research Partnership to Secure Energy for America RPSEA Project 07121-1701 IOR for Deepwater Gulf of Mexico Proposed Project Management Plan Submitted:

Communication & Interface Management Plan

• Open Information Flow – Anyone can communicate with anyone else, for information.

• Instructions, requests, etc go through Single Points of Contacts(Dave Crossley, Art Schroeder)

LSU Staff

Dan Rao

Dave Crossley

Art Schroeder

RPSEA

Wiley WellsDave Rees

KR Staff

PWC, TAC &ChampionsFrank Lim

APC Staff

• All Official Communication (Reports, Change Requests, Etc) done in writing, through RPSEA Sharepoint system

• Nothing Confidential to be put on Sharepoint system

Contract communications

Page 12: Research Partnership to Secure Energy for America RPSEA Project 07121-1701 IOR for Deepwater Gulf of Mexico Proposed Project Management Plan Submitted:

Technology Transfer Plan

• Interim Reports at Milestones & Comprehensive Final Report

• Knowledge Base – Access to all study materials

• Participation in RPSEA conference booths, etc.

• Roadshow for interested parties

Tentatively July 2010

• KR, LSU & APC present paper(s) at conferences

Tentatively SPE/DOE IOR Conf, Tulsa – Apr 2010