Reid, Janice - CREATEcreateprogram.org/tiger4_files/WA2/WA2_ECAD_TechMemo.pdf · Janice Reid Mike...

30
1 Reid, Janice From: Stewart, Danielle E [[email protected]] Sent: Thursday, September 17, 2009 2:58 PM To: Morton, John Cc: Reid, Janice; Martel, Robin; Zyznieuski, Walter G; Garcia, Mike R; Wilson, Lawrence B; [email protected] Subject: RE: Revised WA 2 Tech Memo Attachments: WA2_ECAD_TechnicalMemorandum_09152009.pdf; WA2_ECAD_TechnicalMemorandum_09152009.docx John- IDOT BDE, IDOT Bureau of Railroads, and FHWA have reviewed the attached tech memo for CREATE Project WA2 and have no further comments. The tech memo is approved. Danielle E. Stewart, P.E. Project Manager Illinois Department of Transportation Division of Public and Intermodal Transportation [email protected] Phone: (847) 705-4126 Fax: (847) 705-4159 From: Morton, John [mailto:[email protected]] Sent: Tuesday, September 15, 2009 4:10 PM To: Stewart, Danielle E; Zyznieuski, Walter G; Garcia, Mike R; Wilson, Lawrence B Cc: Reid, Janice; Martel, Robin Subject: Revised WA 2 Tech Memo Good Afternoon, Attached is the revised Tech Memo for CREATE WA 2. This memo has been revised in accordance with IDOT’s comments. Please feel free to call (402-960- 0408) or e-mail me with any comments or questions. John H. Morton, P.E. Senior Vice President HDR ONE COMPANY | Many Solutions 8404 Indian Hills Drive | Omaha, NE | 68114-4048 Phone: 402.399.4903 | Fax: 402.399.1111 | Email: [email protected]

Transcript of Reid, Janice - CREATEcreateprogram.org/tiger4_files/WA2/WA2_ECAD_TechMemo.pdf · Janice Reid Mike...

Page 1: Reid, Janice - CREATEcreateprogram.org/tiger4_files/WA2/WA2_ECAD_TechMemo.pdf · Janice Reid Mike Garcia, IDOT Bureau of Railroads September 15, 2009 RE: CREATE Project WA2 ECAD Technical

1

Reid, Janice

From: Stewart, Danielle E [[email protected]]Sent: Thursday, September 17, 2009 2:58 PMTo: Morton, JohnCc: Reid, Janice; Martel, Robin; Zyznieuski, Walter G; Garcia, Mike R; Wilson, Lawrence B; [email protected]: RE: Revised WA 2 Tech MemoAttachments: WA2_ECAD_TechnicalMemorandum_09152009.pdf; WA2_ECAD_TechnicalMemorandum_09152009.docx

John-

IDOT BDE, IDOT Bureau of Railroads, and FHWA have reviewed the attached tech memo for CREATE Project WA2 and have no further comments. The tech

memo is approved.

Danielle E. Stewart, P.E.

Project Manager

Illinois Department of Transportation

Division of Public and Intermodal Transportation

[email protected]

Phone: (847) 705-4126

Fax: (847) 705-4159

From: Morton, John [mailto:[email protected]]

Sent: Tuesday, September 15, 2009 4:10 PM

To: Stewart, Danielle E; Zyznieuski, Walter G; Garcia, Mike R; Wilson, Lawrence B

Cc: Reid, Janice; Martel, Robin

Subject: Revised WA 2 Tech Memo

Good Afternoon,

Attached is the revised Tech Memo for CREATE WA 2. This memo has been revised in accordance with IDOT’s comments. Please feel free to call (402-960-

0408) or e-mail me with any comments or questions.

John H. Morton, P.E. Senior Vice President

HDR ONE COMPANY | Many Solutions

8404 Indian Hills Drive | Omaha, NE | 68114-4048

Phone: 402.399.4903 | Fax: 402.399.1111 | Email: [email protected]

Page 2: Reid, Janice - CREATEcreateprogram.org/tiger4_files/WA2/WA2_ECAD_TechMemo.pdf · Janice Reid Mike Garcia, IDOT Bureau of Railroads September 15, 2009 RE: CREATE Project WA2 ECAD Technical

���������������� ��

� ����� Danielle Stewart & Lawrence Wilson, IDOT Bureau of Railroads

� ������Janice Reid

����� Mike Garcia, IDOT Bureau of Railroads

�� ��� September 15, 2009

RE: CREATE Project WA2 ECAD Technical Memorandum

Introduction

The purpose of this technical memorandum is to provide an update to the information included in the approved March 2009 Environmental Class of Action Document (ECAD) for the CREATE Program Project WA2 based on thedesign changes have occurred since the ECAD was approvedand A-2.

Changes/additions in Crossovers,

Control Point 51st Street (Attachment A

- Move WAS bridge signal 42' east (compass south) from station 435+89 (ECAD/Project Report equivalent station 1735+14) to 436+31734+72);

- Move crossover-13 42' east (compass south) within control point.

Control Point 39th Street (Attachment A - Move EAS Cantilever signal 377' east (compass south) from station 350+62 (ECAD/Project Report equivalent station 1820+41) to 354+39 (equivalent station 1816+64

- Move crossover-1 377' eastCP Brighton Park;

- Move proposed 8 x 8 signal house 188.67’ ea(ECAD/Project Report equivalent station 1816+57) to 356+34 (ECAD/Project Report equivalent station 1814+68)

These changes do not require a change to the way and ESRF limits.

� � ��� � ���� �� ��� ���� � � �� � �� � ��� �� ��������� �!""����� �#�#$%&$''$��

( ���� �)* * $+�$ �� , �)* * $+�$ ����-�.����-���

Danielle Stewart & Lawrence Wilson, IDOT Bureau of Railroads

( ��/� ����� CREATE Project WA2IDOT Job Number: P

of Railroads; Walt Zyznieuski, IDOT Bureau of Design & Environment

0 �1 �2 ����118942

ECAD Technical Memorandum

The purpose of this technical memorandum is to provide an update to the information included in Environmental Class of Action Document (ECAD) for the CREATE

based on the proposed changes to two control point locationsdesign changes have occurred since the ECAD was approved and are indicated in

Crossovers, Signals and Signal Support Infrastructure

(Attachment A-1):

Move WAS bridge signal 42' east (compass south) from station 435+89 (ECAD/Project Report equivalent station 1735+14) to 436+31 (ECAD/Project Report equivalent station

13 42' east (compass south) within control point.

(Attachment A-2):

Move EAS Cantilever signal 377' east (compass south) from station 350+62 equivalent station 1820+41) to 354+39 (ECAD/Project Report

equivalent station 1816+64);

1 377' east (compass south) to stay out of Norfolk South CP Pershing &

Move proposed 8 x 8 signal house 188.67’ east (compass south) from station 354+45 (ECAD/Project Report equivalent station 1816+57) to 356+34 (ECAD/Project Report equivalent station 1814+68).

se changes do not require a change to the ESRF limits, as all work will occur within the right

( ���� �)* * $+�$ �&* � ���� , �)* * $+�$ �&* � * � ����-�.����-����

( �� �%��3�$�

� � ���

WA2 Job Number: P-30-004-09

; Walt Zyznieuski, IDOT Bureau of Design & Environment

The purpose of this technical memorandum is to provide an update to the information included in Environmental Class of Action Document (ECAD) for the CREATE

proposed changes to two control point locations. The following and are indicated in Attachments A-1

s and Signal Support Infrastructure

Move WAS bridge signal 42' east (compass south) from station 435+89 (ECAD/Project 1 (ECAD/Project Report equivalent station

Move EAS Cantilever signal 377' east (compass south) from station 350+62 ECAD/Project Report

to stay out of Norfolk South CP Pershing &

st (compass south) from station 354+45 (ECAD/Project Report equivalent station 1816+57) to 356+34 (ECAD/Project Report

, as all work will occur within the right-of-

Page 3: Reid, Janice - CREATEcreateprogram.org/tiger4_files/WA2/WA2_ECAD_TechMemo.pdf · Janice Reid Mike Garcia, IDOT Bureau of Railroads September 15, 2009 RE: CREATE Project WA2 ECAD Technical

���������������� ��

� � ��� � ���� �� ��� ���� � � �� � �� � ��� �� ��������� �!""����� �#�#$%&$''$��

( ���� �)* * $+�$ �&* � ���� , �)* * $+�$ �&* � * � ����-�.����-����

( �� �'��3�$�

I. Social Economic

The current proposed work does not change the results documented in the March 2009 ECAD for items I.1 Relocations, I.2 Changes in Travel Patterns, 1.3 Economic Impacts, I.4 Change in Land Use and Economic Development, I.5. Community Cohesion, 1.6 Public Facilities and Services, I.7. Title VI and Other Protected Groups, I.8. Environmental Justice, and 1.9 Pedestrian and Bicycle Facilities.

II. Agricultural

The current proposed work will occur within the corporate limits of Chicago. There is no agriculture land production involved with or within the limits of this project. No agri-business has been identified or is known to exist within the area involved with this project. As a result, the current proposed work does not change the results documented in the March 2009 ECAD for this resource.

III. Cultural

The current proposed work is still within the ESRF limits for this project. The current proposed work does not change the results documented in the March 2009 ECAD for items III.1 through III.3.

IV. Air Quality

An air quality analysis was undertaken to update the report from the 2009 to 2010 construction year and the results indicate that there are no air quality impacts as a result of the current proposed work. Refer to the Air Quality Technical Documentation, August 31, 2009 in Attachment B. As a result, the current proposed work does not change the results documented in the March 2009 ECAD for items IV.1 through IV.3.

V. Noise & Vibration

The current proposed shift in crossovers at 39th Street and 51st Street do not place the tracks or crossovers closer to noise receptors. Therefore, the current proposed work does not further impact the receptors documented in the March 2009 ECAD.

VI. Energy

The current proposed work does not change the results documented in the March 2009 ECAD for this resource.

VII. Natural Resources

The current proposed work is still within the ESRF limits for this project. The current proposed work does not change the results documented in the March 2009 ECAD for items this resource.

VIII. Water Quality/Resources

The current proposed work does not change the results documented in the March 2009 ECAD Record for this resource.

IX. Flood Plains

The current proposed work does not change the results documented in the March 2009 ECAD Record for this resource.

X. Wetlands

The current proposed work is still within the ESRF limits for this project. The current proposed work does not change the results documented in the March 2009 ECAD for items this resource.

Page 4: Reid, Janice - CREATEcreateprogram.org/tiger4_files/WA2/WA2_ECAD_TechMemo.pdf · Janice Reid Mike Garcia, IDOT Bureau of Railroads September 15, 2009 RE: CREATE Project WA2 ECAD Technical

���������������� ��

� � ��� � ���� �� ��� ���� � � �� � �� � ��� �� ��������� �!""����� �#�#$%&$''$��

( ���� �)* * $+�$ �&* � ���� , �)* * $+�$ �&* � * � ����-�.����-����

( �� �$��3�$�

XI. Special Waste

The project area was reviewed for changes in land use that may result in impacts to potential special waste sites. There were no changes found. In addition, a site inspection was conducted on September 15, 2009 of the two proposed control point locations for potential special waste concerns. There were no concerns observed. As a result, no PESA refresh is required.

The current proposed work was reviewed for Special Waste issues. The two changes in cantilever signal locations were reviewed against the December 2008 Special Waste Assessment (SWA) and the Preliminary Environmental Assessment (PESA) prepared for the WA2 project in February 2009.

At CP 51st Street, the proposed signal location change to station 1734+72 is within the +/-100’ buffer that was evaluated in the SWA and PESA. No special waste sites are identified within 500’ feet of the new location. There are therefore no changes to the original SWA evaluation or ECAD for this site.

At CP 39th Street, the proposed signal location is 277’ outside of the +/-100’ buffer that was evaluated in the SWA and PESA for station 1820+41. A signal to the south, at station 1812+74, was also evaluated in the SWA and PESA, and will remain in the project. One LUST site at 4139 S. Western Avenue, was determined to be within the 500’ of this signal location; however, a PSI was not recommended at this site, due to the elevated track and the low risk for potential migratory impacts.

The proposed new signal at station 1816+64 falls between two stations previously evaluated in the SWA and PESA. The LUST site at 4139 S. Western Avenue is within 500’ of the new signal. A PSI is not be recommended due to the elevated track and the low risk for potential migratory impacts. See Attachment D.

It is therefore determined that the current proposed work does not change the findings documented in the March 2009 ECAD.

XII. Special Lands

The current proposed work does not change the results documented in the March 2009 ECAD for this resource.

XIII. Other Issues

The current proposed work does not change the results documented in the March 2009 ECAD for this resource.

XIV. Permits Required

All permits that were indicated in the March 2009 ECAD are still in effect. The current proposed work does not require any additional permits to those already indicated.

Attachments

Attachment A-1: CP 51st Street

Attachment A-2: CP 39th Street

Attachment B: Revised Air Quality Analysis

Attachment C: Special Waste Screening Form

Attachment D: Special Waste Exhibit: CP 39th Street

Page 5: Reid, Janice - CREATEcreateprogram.org/tiger4_files/WA2/WA2_ECAD_TechMemo.pdf · Janice Reid Mike Garcia, IDOT Bureau of Railroads September 15, 2009 RE: CREATE Project WA2 ECAD Technical

Attachment A-1

Proposed Changes at CP 51st Street

Page 6: Reid, Janice - CREATEcreateprogram.org/tiger4_files/WA2/WA2_ECAD_TechMemo.pdf · Janice Reid Mike Garcia, IDOT Bureau of Railroads September 15, 2009 RE: CREATE Project WA2 ECAD Technical
Page 7: Reid, Janice - CREATEcreateprogram.org/tiger4_files/WA2/WA2_ECAD_TechMemo.pdf · Janice Reid Mike Garcia, IDOT Bureau of Railroads September 15, 2009 RE: CREATE Project WA2 ECAD Technical

Attachment A-2

Proposed Changes at CP 39th Street

Page 8: Reid, Janice - CREATEcreateprogram.org/tiger4_files/WA2/WA2_ECAD_TechMemo.pdf · Janice Reid Mike Garcia, IDOT Bureau of Railroads September 15, 2009 RE: CREATE Project WA2 ECAD Technical
Page 9: Reid, Janice - CREATEcreateprogram.org/tiger4_files/WA2/WA2_ECAD_TechMemo.pdf · Janice Reid Mike Garcia, IDOT Bureau of Railroads September 15, 2009 RE: CREATE Project WA2 ECAD Technical

Attachment B

Air Quality Technical Documentation, August 2009

Page 10: Reid, Janice - CREATEcreateprogram.org/tiger4_files/WA2/WA2_ECAD_TechMemo.pdf · Janice Reid Mike Garcia, IDOT Bureau of Railroads September 15, 2009 RE: CREATE Project WA2 ECAD Technical

CREATE Project WA2 IDOT Job #P-30-004-09

Air Quality Technical Documentation

Prepared by HDR Engineering, Inc.

August 31, 2009

Page 11: Reid, Janice - CREATEcreateprogram.org/tiger4_files/WA2/WA2_ECAD_TechMemo.pdf · Janice Reid Mike Garcia, IDOT Bureau of Railroads September 15, 2009 RE: CREATE Project WA2 ECAD Technical

WA-2 ECAD Air Quality Changes in air quality due to the CREATE program were evaluated for carbon monoxide (CO), particulate matter (PM), and nitrogen oxides (NOx). The overall CREATE project will result in the maintenance of National Ambient Air Quality Standards (NAAQS) in the Chicago region. Air emissions were estimated using locomotive emission factors developed by the U.S. Environmental Protection Agency for hydrocarbons (HC), carbon monoxide (CO), nitrogen oxide (NOx), particulate matter (PM), particulate matter with a diameter less than 2.5 microns (PM2.5), and sulfur dioxide (SO2). The 2015 USEPA emission factors account for improved locomotive emission standards for newly manufactured and remanufactured locomotives and the reformulation of fuel. Annual air emissions were compared for Existing conditions (2004), 2015 Build Alternative and 2015 No-Build Alternative. The results of the analysis are: Year HC (tons

per year) CO (tons per year)

PM (tons per year)

PM2.5 (tons per year)

NOx (tons per year)

SO2 (tons per year)

2004 Existing 0.13 0.33 0.083 0.076 2.7 0.039 2015 Build 0.064 0.21 0.040 0.036 1.1 0.00072 2015 No-Build 0.17 0.55 0.11 0.10 3.0 0.0019 Based on these estimates, the annual emissions of the 2015 Build Alternative are 63% lower than the 2015 No-Build condition due to the decrease in fuel usage. The differences between the Existing Condition and the 2015 Build Alternative are also attributed to lower fuel usage. The SO2 reduction between the Existing Condition and the 2015 conditions is attributed to the reformulation of fuel.

Page 12: Reid, Janice - CREATEcreateprogram.org/tiger4_files/WA2/WA2_ECAD_TechMemo.pdf · Janice Reid Mike Garcia, IDOT Bureau of Railroads September 15, 2009 RE: CREATE Project WA2 ECAD Technical

Created by Earl Wacker Created on 1/9/2008 3:19:00 PM WA2_Air_Quality_01-09-08.doc Last printed 1/6/2009 11:39:00 AM

CREATE Project WA2 1/9/08

Air Quality Results 96 Hours

Options Fuel (Gallons) Current Operation 11,068 CREATE Build Option - Year 2015 6,790 No Build Option – Year 2015 18,208

Page 13: Reid, Janice - CREATEcreateprogram.org/tiger4_files/WA2/WA2_ECAD_TechMemo.pdf · Janice Reid Mike Garcia, IDOT Bureau of Railroads September 15, 2009 RE: CREATE Project WA2 ECAD Technical

CREATE COMPONENT PROJECT EQUIPMENT REQUIREMENTS FOR EMISSIONS CALCULATIONS

PROJECT:WA-2 TCS 71st To Ogden Jnct.

YEAR OF GREATEST CONSTRUCTION ACTIVITY 2008 Note: Use of this data for 2010 Construction YearPROVIDED BY: S.E. Posey was approved by D. Clark, CSX, on 8/24/09DATE: 2/5/2007

Please identify on this sheet each piece of railroad or construction equipment to be used and the total hours that this type of equipment will be operated during the year of greatest construction activity. If exact piece is not shown, pick one with an equal or nearly equal horsepower. Note: all equipment is Diesel powered unless otherwise shown.

EQUIPMENT HORSEPOWERHOURS/YEAR ALL PIECES

Specialized Railroad EquipmentBallast Compactors 94Ballast Regulators 83

92104117185 40200232275300

Ballast Tampers (all types) 287683

105118125140140155158174232240250260 40350385425466

On Track Tie Handlers 476480

100125

Portable Rail Drills 3Portable Rail Grinders (gas) 1Portable Rail Grinders (gas) 7

Page 14: Reid, Janice - CREATEcreateprogram.org/tiger4_files/WA2/WA2_ECAD_TechMemo.pdf · Janice Reid Mike Garcia, IDOT Bureau of Railroads September 15, 2009 RE: CREATE Project WA2 ECAD Technical

EQUIPMENT HORSEPOWERHOURS/YEAR ALL PIECES

Portable Rail Saws (gas) 1Rail Lifters (gas) 8

23Self-Propelled Adzers 42

Self-Propelled Anchor Applicators 23384770

Self-Propelled Applicators 38100

Self-propelled Driver/Setters 3642

100Self-Propelled Pullers 17

2730427080

Self-Propelled Rail Saws 3088

Self-Propelled Track Brooms 48100117185

Tie Remover/Inserters 747685

125170175185

Work trains 1500 25Brandt Power Units 200

250300

Car Movers 150Electric Welders 40Other - not listed (enter below)

General Construction EqptAugers - Truck Mounted 50Backhoes 100 40

400Backhoes/Loaders 250Bulldozers 300 20Drilling Equipment 500

Page 15: Reid, Janice - CREATEcreateprogram.org/tiger4_files/WA2/WA2_ECAD_TechMemo.pdf · Janice Reid Mike Garcia, IDOT Bureau of Railroads September 15, 2009 RE: CREATE Project WA2 ECAD Technical

EQUIPMENT HORSEPOWERHOURS/YEAR ALL PIECES

Compactors 815 4025

Compressors - Air 100Compressors - Hydraulic 150Cranes 100

130150155200210250270275300400600750

Excavators 250300 40500100

Generators 100200

Graders 200500

Loaders 150250 25

Lowboys 500Miscellaneous Equipment 150 50Mixers 20

50Pumps 25

120500

Rollers/Compactors 110350

Saws - Concrete/Pavement 50Scrapers 300

500Sheet Pile Driving Equipment 250Speed Swings (specify HP)Trucks - Construction 300

400 40500

Haul Trucks Off-SiteLight Duty Vehciles Off-Site

On-SiteBuses On-SiteNon-road vehicles On-Site

Page 16: Reid, Janice - CREATEcreateprogram.org/tiger4_files/WA2/WA2_ECAD_TechMemo.pdf · Janice Reid Mike Garcia, IDOT Bureau of Railroads September 15, 2009 RE: CREATE Project WA2 ECAD Technical

CREATE COMPONENT PROJECT EQUIPMENT REQUIREMENTS FOR EMISSIONS CALCULATIONS

PROJECT:WA-2 TCS 71st To Ogden Jnct.

YEAR OF GREATEST CONSTRUCTION ACTIVITY 2008 Note: Use of this data for 2010 PROVIDED BY: J. Henriksen Const. year was approvedDATE: 10/11/2007 by J. Henriksen on 9/2/09

Please identify on this sheet each piece of railroad or construction equipment to be used and the total hours that this type of equipment will be operated during the year of greatest construction activity. If exact piece is not shown, pick one with an equal or nearly equal horsepower. Note: all equipment is Diesel powered unless otherwise shown.

EQUIPMENT HORSEPOWERHOURS/YEAR ALL PIECES

Specialized Railroad EquipmentBallast Compactors 94Ballast Regulators 83

92104117185200232275300

Ballast Tampers (all types) 287683

105118118125140155158174232240250260350385425466

On Track Tie Handlers 476480

100125

Portable Rail Drills 3Portable Rail Grinders (gas) 1Portable Rail Grinders (gas) 7

Page 17: Reid, Janice - CREATEcreateprogram.org/tiger4_files/WA2/WA2_ECAD_TechMemo.pdf · Janice Reid Mike Garcia, IDOT Bureau of Railroads September 15, 2009 RE: CREATE Project WA2 ECAD Technical

EQUIPMENT HORSEPOWERHOURS/YEAR ALL PIECES

Portable Rail Saws (gas) 1Rail Lifters (gas) 8

23Self-Propelled Adzers 42

Self-Propelled Anchor Applicators 23384770

Self-Propelled Applicators 38100

Self-propelled Driver/Setters 3642

100Self-Propelled Pullers 17

2730427080

Self-Propelled Rail Saws 3088

Self-Propelled Track Brooms 48100117185

Tie Remover/Inserters 747685

125170175185

Work trains 1500Brandt Power Units 200

250300

Car Movers 150Electric Welders 40Other - not listed (enter below)

General Construction EqptAugurs - Truck Mounted 50Backhoes 100 450

400Backhoes/Loaders 250Bulldozers 300Drilling Equipment 500

Page 18: Reid, Janice - CREATEcreateprogram.org/tiger4_files/WA2/WA2_ECAD_TechMemo.pdf · Janice Reid Mike Garcia, IDOT Bureau of Railroads September 15, 2009 RE: CREATE Project WA2 ECAD Technical

EQUIPMENT HORSEPOWERHOURS/YEAR ALL PIECES

Compactors 81525

Compressors - Air 100Compressors - Hydraulic 150Cranes 100

130150155200210250270275300400600750

Excavators 250300500100

Generators 100200

Graders 200500

Loaders 150250

Lowboys 500Miscellaneous Equipment 150 450Mixers 20

50Pumps 25

120500

Rollers/Compactors 110350

Saws - Concrete/Pavement 50Scrapers 300

500Sheet Pile Driving Equipment 250Speed Swings (specify HP)Trucks - Construction 300

400 900500

Haul Trucks Off-SiteLight Duty Vehciles Off-Site

On-Site 360Buses On-SiteNon-road vehicles On-Site

Page 19: Reid, Janice - CREATEcreateprogram.org/tiger4_files/WA2/WA2_ECAD_TechMemo.pdf · Janice Reid Mike Garcia, IDOT Bureau of Railroads September 15, 2009 RE: CREATE Project WA2 ECAD Technical

W:\001915\000000000060472\WA2 Tech Memo\air quality\WA2_General ConformityAQ_2010 Construction - AUGUST 2009 REVISED 1W:\001915\000000000060472\WA2 Tech Memo\air quality\WA2_General ConformityAQ_2010 Construction - AUGUST 2009 REVISED 1

- CN Provided mph HR/YR g/mi Grams/YR Tons/YR

Project WA-2Construction Year 2010

Emission Calculations for Hydrocarbons

EFEquipment HP HR/YR g/hp-hra Grams/YR Tons/YR

Specialized Railroad Equipment - CSX ProvidedBallast Regulators 185 40 1.006 7444 0.008Ballast Tampers 260 40 1.006 10462 0.012Work Trains 1500 25 1.152 43196 0.048

General Construction Equipment - CN ProvidedBackhoes 100 450 1.417 63756 0.070Miscellaneous Equipment 150 450 0.348 23471 0.026Construction Trucks 400 900 0.180 64941 0.072

General Construction Equipment - CSX ProvidedBackhoes 100 40 1.417 5667 0.006Bulldozers 300 20 0.264 1585 0.002Compactors 15 40 0.760 456 0.001Excavators 300 40 0.253 3036 0.003Loaders 250 25 0.919 5746 0.006Miscellaneous Equipment 150 50 0.348 2608 0.003Construction Trucks 400 40 0.180 2886 0.003

EF- CN Provided mphb HR/YR g/mic Grams/YR Tons/YRLight Duty Trucks (On-site) 10 360 1.059 3812 0.004

Total Tons/Yr Construction Emissions 0.264

a Emission factor take from EPA's NONROAD model.b Traveling speed assumed to be 10 miles per hour for on-site haul trucks.c Emission factor take from EPA's MOBILE62 model.

Page 20: Reid, Janice - CREATEcreateprogram.org/tiger4_files/WA2/WA2_ECAD_TechMemo.pdf · Janice Reid Mike Garcia, IDOT Bureau of Railroads September 15, 2009 RE: CREATE Project WA2 ECAD Technical

W:\001915\000000000060472\WA2 Tech Memo\air quality\WA2_General ConformityAQ_2010 Construction - AUGUST 2009 REVISED 1W:\001915\000000000060472\WA2 Tech Memo\air quality\WA2_General ConformityAQ_2010 Construction - AUGUST 2009 REVISED 1

- CN Provided mph HR/YR g/mi Grams/YR Tons/YR

Project WA-2Construction Year 2010

Emission Calculations for Nitrogen Oxides

EFEquipment HP HR/YR g/hp-hra Grams/YR Tons/YR

Specialized Railroad Equipment - CSX ProvidedBallast Regulators 185 40 6.409 47425 0.052Ballast Tampers 260 40 6.409 66652 0.073Work Trains 1500 25 7.805 292670 0.323

General Construction Equipment - CN ProvidedBackhoes 100 450 6.293 283197 0.312Miscellaneous Equipment 150 450 4.449 300293 0.331Construction Trucks 400 900 3.347 1205058 1.328

General Construction Equipment - CSX ProvidedBackhoes 100 40 6.293 25173 0.028Bulldozers 300 20 3.586 21516 0.024Compactors 15 40 5.430 3258 0.004Excavators 300 40 3.377 40529 0.045Loaders 250 25 6.006 37538 0.041Miscellaneous Equipment 150 50 4.449 33366 0.037Construction Trucks 400 40 3.347 53558 0.059

EF- CN Provided mphb HR/YR g/mic Grams/YR Tons/YRLight Duty Trucks (On-site) 10 360 0.885 3186 0.004

Total Tons/Yr Construction Emissions 2.660

a Emission factor take from EPA's NONROAD model.b Traveling speed assumed to be 10 miles per hour for on-site haul trucks.c Emission factor take from EPA's MOBILE62 model.

Page 21: Reid, Janice - CREATEcreateprogram.org/tiger4_files/WA2/WA2_ECAD_TechMemo.pdf · Janice Reid Mike Garcia, IDOT Bureau of Railroads September 15, 2009 RE: CREATE Project WA2 ECAD Technical

W:\001915\000000000060472\WA2 Tech Memo\air quality\WA2_General ConformityAQ_2010 Construction - AUGUST 2009 REVISED 1W:\001915\000000000060472\WA2 Tech Memo\air quality\WA2_General ConformityAQ_2010 Construction - AUGUST 2009 REVISED 1

- CN Provided mph HR/YR g/mi Grams/YR Tons/YR

Project WA-2Construction Year 2010

Emission Calculations for Particulate Matter

EFEquipment HP HR/YR g/hp-hra Grams/YR Tons/YR

Specialized Railroad Equipment - CSX ProvidedBallast Regulators 185 40 0.716 5298 0.006Ballast Tampers 260 40 0.716 7446 0.008Work Trains 1500 25 0.727 27269 0.030

General Construction Equipment - CN ProvidedBackhoes 100 450 1.151 51786 0.057Miscellaneous Equipment 150 450 0.341 23014 0.025Construction Trucks 400 900 0.205 73972 0.082

General Construction Equipment - CSX ProvidedBackhoes 100 40 1.151 4603 0.005Bulldozers 300 20 0.234 1405 0.002Compactors 15 40 0.483 290 0.000Excavators 300 40 0.226 2712 0.003Loaders 250 25 0.601 3753 0.004Miscellaneous Equipment 150 50 0.341 2557 0.003Construction Trucks 400 40 0.205 3288 0.004

EF- CN Provided mphb HR/YR g/mic Grams/YR Tons/YRLight Duty Trucks (On-site) 10 360 0.025 91 0.000

Total Tons/Yr Construction Emissions 0.229

a Emission factor take from EPA's NONROAD model.b Traveling speed assumed to be 10 miles per hour for on-site haul trucks.c Emission factor take from EPA's MOBILE62 model.

Page 22: Reid, Janice - CREATEcreateprogram.org/tiger4_files/WA2/WA2_ECAD_TechMemo.pdf · Janice Reid Mike Garcia, IDOT Bureau of Railroads September 15, 2009 RE: CREATE Project WA2 ECAD Technical

W:\001915\000000000060472\WA2 Tech Memo\air quality\WA2_General ConformityAQ_2010 Construction - AUGUST 2009 REVISED 1W:\001915\000000000060472\WA2 Tech Memo\air quality\WA2_General ConformityAQ_2010 Construction - AUGUST 2009 REVISED 1

- CN Provided mph HR/YR g/mi Grams/YR Tons/YR

Project WA-2Construction Year 2010

Emission Calculations for Particulate Matter 2.5

EFEquipment HP HR/YR g/hp-hra Grams/YR Tons/YR

Specialized Railroad Equipment - CSX ProvidedBallast Regulators 185 40 0.695 5139 0.006Ballast Tampers 260 40 0.695 7223 0.008Work Trains 1500 25 0.705 26451 0.029

General Construction Equipment - CN ProvidedBackhoes 100 450 1.116 50233 0.055Miscellaneous Equipment 150 450 0.331 22323 0.025Construction Trucks 400 900 0.199 71753 0.079

General Construction Equipment - CSX ProvidedBackhoes 100 40 1.116 4465 0.005Bulldozers 300 20 0.227 1363 0.002Compactors 15 40 0.469 281 0.000Excavators 300 40 0.219 2631 0.003Loaders 250 25 0.582 3641 0.004Miscellaneous Equipment 150 50 0.331 2480 0.003Construction Trucks 400 40 0.199 3189 0.004

EF- CN Provided mphb HR/YR g/mic Grams/YR Tons/YRLight Duty Trucks (On-site) 10 360 0.025 91 0.000

Total Tons/Yr Construction Emissions 0.222

a Emission factor take from EPA's NONROAD model.b Traveling speed assumed to be 10 miles per hour for on-site haul trucks.c Emission factor take from EPA's MOBILE62 model.

Page 23: Reid, Janice - CREATEcreateprogram.org/tiger4_files/WA2/WA2_ECAD_TechMemo.pdf · Janice Reid Mike Garcia, IDOT Bureau of Railroads September 15, 2009 RE: CREATE Project WA2 ECAD Technical

W:\001915\000000000060472\WA2 Tech Memo\air quality\WA2_General ConformityAQ_2010 Construction - AUGUST 2009 REVISED 1W:\001915\000000000060472\WA2 Tech Memo\air quality\WA2_General ConformityAQ_2010 Construction - AUGUST 2009 REVISED 1

- CN Provided mph HR/YR g/mi Grams/YR Tons/YR

Project WA-2Construction Year 2010

Emission Calculations for Carbon Monoxide

EFEquipment HP HR/YR g/hp-hra Grams/YR Tons/YR

Specialized Railroad Equipment - CSX ProvidedBallast Regulators 185 40 4.207 31134 0.034Ballast Tampers 260 40 4.207 43756 0.048Work Trains 1500 25 5.125 192182 0.212

General Construction Equipment - CN ProvidedBackhoes 100 450 7.627 343226 0.378Miscellaneous Equipment 150 450 1.712 115593 0.127Construction Trucks 400 900 1.453 522934 0.576

General Construction Equipment - CSX ProvidedBackhoes 100 40 7.627 30509 0.034Bulldozers 300 20 1.237 7424 0.008Compactors 15 40 3.079 1848 0.002Excavators 300 40 1.222 14669 0.016Loaders 250 25 3.618 22612 0.025Miscellaneous Equipment 150 50 1.712 12844 0.014Construction Trucks 400 40 1.453 23241 0.026

EF- CN Provided mphb HR/YR g/mic Grams/YR Tons/YRLight Duty Trucks (On-site) 10 360 15.200 54720 0.060

Total Tons/Yr Construction Emissions 1.562

a Emission factor take from EPA's NONROAD model.b Traveling speed assumed to be 10 miles per hour for on-site haul trucks.c Emission factor take from EPA's MOBILE62 model.

Page 24: Reid, Janice - CREATEcreateprogram.org/tiger4_files/WA2/WA2_ECAD_TechMemo.pdf · Janice Reid Mike Garcia, IDOT Bureau of Railroads September 15, 2009 RE: CREATE Project WA2 ECAD Technical

W:\001915\000000000060472\WA2 Tech Memo\air quality\WA2_General ConformityAQ_2010 Construction - AUGUST 2009 REVISED 1W:\001915\000000000060472\WA2 Tech Memo\air quality\WA2_General ConformityAQ_2010 Construction - AUGUST 2009 REVISED 1

- CN Provided mph HR/YR g/mi Grams/YR Tons/YR

Project WA-2Construction Year 2010

Emission Calculations for Sulfur Dioxide

EFEquipment HP HR/YR g/hp-hra Grams/YR Tons/YR

Specialized Railroad Equipment - CSX ProvidedBallast Regulators 185 40 0.006 42 0.000Ballast Tampers 260 40 0.006 60 0.000Work Trains 1500 25 0.006 215 0.000

General Construction Equipment - CN ProvidedBackhoes 100 450 0.006 286 0.000Miscellaneous Equipment 150 450 0.005 332 0.000Construction Trucks 400 900 0.005 1775 0.002

General Construction Equipment - CSX ProvidedBackhoes 100 40 0.006 25 0.000Bulldozers 300 20 0.005 30 0.000Compactors 15 40 0.005 3 0.000Excavators 300 40 0.005 59 0.000Loaders 250 25 0.006 36 0.000Miscellaneous Equipment 150 50 0.005 37 0.000Construction Trucks 400 40 0.005 79 0.000

EF- CN Provided mphb HR/YR g/mic Grams/YR Tons/YRLight Duty Trucks (On-site) 10 360 0.010 34 0.000

Total Tons/Yr Construction Emissions 0.003

a Emission factor take from EPA's NONROAD model.b Traveling speed assumed to be 10 miles per hour for on-site haul trucks.c Emission factor take from EPA's MOBILE62 model.

Page 25: Reid, Janice - CREATEcreateprogram.org/tiger4_files/WA2/WA2_ECAD_TechMemo.pdf · Janice Reid Mike Garcia, IDOT Bureau of Railroads September 15, 2009 RE: CREATE Project WA2 ECAD Technical

Project: WA2 Construction Year: 2010

Construction Year Analysis Tons per Year

HC PM PM2.5 NOx Construction Emissions 2010 0.26 0.23 0.22 2.66 Threshold 100 100 100 100 Does Construction YR Total Emissions Exceed Threshold? N N N N

Design Year Analysis Tons per Year

HC PM PM2.5 NOx No-Build 0.17 0.11 0.10 3.0 Build 0.064 0.040 0.036 1.1 Delta due to build -0.11 -0.067 -0.061 -1.9 Threshold 100 100 100 100 Does Design YR Delta Exceed Threshold? N N N N

Page 26: Reid, Janice - CREATEcreateprogram.org/tiger4_files/WA2/WA2_ECAD_TechMemo.pdf · Janice Reid Mike Garcia, IDOT Bureau of Railroads September 15, 2009 RE: CREATE Project WA2 ECAD Technical

Attachment C

Special Waste Screening Form

Page 27: Reid, Janice - CREATEcreateprogram.org/tiger4_files/WA2/WA2_ECAD_TechMemo.pdf · Janice Reid Mike Garcia, IDOT Bureau of Railroads September 15, 2009 RE: CREATE Project WA2 ECAD Technical
Page 28: Reid, Janice - CREATEcreateprogram.org/tiger4_files/WA2/WA2_ECAD_TechMemo.pdf · Janice Reid Mike Garcia, IDOT Bureau of Railroads September 15, 2009 RE: CREATE Project WA2 ECAD Technical
Page 29: Reid, Janice - CREATEcreateprogram.org/tiger4_files/WA2/WA2_ECAD_TechMemo.pdf · Janice Reid Mike Garcia, IDOT Bureau of Railroads September 15, 2009 RE: CREATE Project WA2 ECAD Technical

Attachment D

Special Waste Exhibit: CP 39th Street

Page 30: Reid, Janice - CREATEcreateprogram.org/tiger4_files/WA2/WA2_ECAD_TechMemo.pdf · Janice Reid Mike Garcia, IDOT Bureau of Railroads September 15, 2009 RE: CREATE Project WA2 ECAD Technical