CEN 451
PROJECT APRISAIAL
CEN 451 Project Planning & Management.
Name ID
Md. Nazrul Islam Hridoy 12106007
Md. Boshir Ahmed Khan 12106012
Md. Ashiqur Rahman 12106013
Md. Saddam Hossain 12106025
S.M. Rashaduzzam 12106101
Md. Khairul Islam 12206040
IUBAT - International University of Business Agriculture and Technology
2
PROJECT APRISAIAL
TITLE OF THE APPRAISAL: “Krishibid Villa”
1. INTRODUCTION: Project appraisal is a systematic and comprehensive of different aspects of a project to determine if it will meets its objectives.
KRISHIBID VILLA, RUPNAGAR, MIRPUR 2, DHAKA.
3
PROJECT APRISAIAL
1.1. Definition: For judgment or assessment of the value of this project with in a formal way as well as informal way.
1.1.2. Project description: We visit a project and access the viability of the project. It is personal project. Located Section 2 block- C, Road no- 1, Mirpur 2. The size of the project is total “3.4 katha. (3.4*720) or 2448 sft”.
1.1.3..PICTURE:
Recent condition of the project
KRISHIBID VILLA, RUPNAGAR, MIRPUR 2, DHAKA.
4
PROJECT APRISAIAL
2. DESCRIPTION OF THE APPRAISAL:
2.1. Meaning: Asses the viability of a project. It is used for both proposed and executed projects.
2.2. Project Appraisal may include:
2.2.1. Technical appraisal
2.2.2. Social appraisal
2.2.3. Gender appraisal
2.2.4. Economic and financial appraisal
2.2.5. Environmental appraisal
Project appraisal of that Project is given below:
2.2.1. Technical Appraisal: The size of the project is total “3.4 katha. (3.4*720) or 2448 sft”. 2.2.1.1. Water and Electricity: “1.5pipe” line is available here for water supply. Now in under construction condition Single face Electricity line is available. After completion of this project the owner will applied 3 face electricity line for domestic purpose.
2.2.1.2. Transportation Facilities: As the project is located beside 20ft width main road so all transportation are available from here.
20 Feet Road
KRISHIBID VILLA, RUPNAGAR, MIRPUR 2, DHAKA.
5
PROJECT APRISAIAL
2.2.1.3. Raw Materials Quantity and Quality:
2.2.1.3.1. Per floor it required 5 ton reinforcement 2.2.1.3.2. 1000cft brick cheeps and 2.2.1.3.3. 200 bag cement for slab casting.
Photos:
KRISHIBID VILLA, RUPNAGAR, MIRPUR 2, DHAKA.
6
PROJECT APRISAIAL
Sand Reinforcement
Bricks Rod Cutter
They also use those equipment in this project:
Concrete Mixer
KRISHIBID VILLA, RUPNAGAR, MIRPUR 2, DHAKA.
7
PROJECT APRISAIAL
Brick chipper
2.2.2. Social Appraisal:
2.2.2.1. Job Opportunity: Though it is a personal project, job opportunity is available here. 2.2.2.2. Contribution of Property Reduction: Although it is a private project, so many poor workers work here, so they are contributing to reduce poverty.
KRISHIBID VILLA, RUPNAGAR, MIRPUR 2, DHAKA.
8
PROJECT APRISAIAL
2.2.3. Gender Appraisal
They have total 30 workers, 5 of them are female.so there is no gender discrimination. Both the male female is contributing to the society.
2.2.4. Economical Financial Appraisal
2.2.4.1 Total cost: the total cost of this project approximate 2 core
2.2.4.2 Benefits: after completing this project, the benefit approximates 1.5 cores.
2.2.5 Environmental Appraisal
The building waste is emptying in a regular interval, so there is no probability of getting discharged of the waste material, and the sewerage system is also very much flexible here so there is nothing much wrong with the environment in this project, but the only problem is with the hygienic condition. And this is so much harmful for labors health.
KRISHIBID VILLA, RUPNAGAR, MIRPUR 2, DHAKA.
9
PROJECT APRISAIAL
Photos:
Cooking system Water
Unhygienic living condition
KRISHIBID VILLA, RUPNAGAR, MIRPUR 2, DHAKA.
Shade for safety
10
PROJECT APRISAIAL
3. CONCLUSION
We thing overall it is a good project having all the necessary things needed. The only place need to improve is the incensement of facilities for the labors like-food, proper wage, healthy habitation etc.
KRISHIBID VILLA, RUPNAGAR, MIRPUR 2, DHAKA.