Petrobras visit 4.9 - SINTEF€¦ · •3 major processing plants •6 export receiving terminals...

9
- Securing energy supply Sustainable Development Hydrogen Hyper Closing Seminar December 2019, Gassco (Svein-Erik Losnegård)

Transcript of Petrobras visit 4.9 - SINTEF€¦ · •3 major processing plants •6 export receiving terminals...

Page 1: Petrobras visit 4.9 - SINTEF€¦ · •3 major processing plants •6 export receiving terminals in Europe •Riser platforms ... Petrobras visit 4.9.2018 Author: Sten Arve Eide

- Securing energy supply

Sustainable DevelopmentHydrogen

Hyper Closing Seminar December 2019, Gassco (Svein-Erik Losnegård)

Page 2: Petrobras visit 4.9 - SINTEF€¦ · •3 major processing plants •6 export receiving terminals in Europe •Riser platforms ... Petrobras visit 4.9.2018 Author: Sten Arve Eide

1www.gassco.no

- Securing energy supply

Page 3: Petrobras visit 4.9 - SINTEF€¦ · •3 major processing plants •6 export receiving terminals in Europe •Riser platforms ... Petrobras visit 4.9.2018 Author: Sten Arve Eide

2www.gassco.no

- Securing energy supply

T h e N o r w e g i a n g a s t r a n s p o r t s y s t e m

• Integrated infrastructure system

• 9 000 km of pipelines

• 3 major processing plants

• 6 export receiving terminals in Europe

• Riser platforms

Kårstø

Kollsnes

Nyhamna

Page 4: Petrobras visit 4.9 - SINTEF€¦ · •3 major processing plants •6 export receiving terminals in Europe •Riser platforms ... Petrobras visit 4.9.2018 Author: Sten Arve Eide

3www.gassco.no

NATURAL GASFROM THE NORWEGIAN CONTINETAL SHELF

Low emission pr. energy compared to other

natural gas producing regions in the world due to:

• Effective production offshore and onshore

• No production flaring

• High focus on hydrocarbon-leakage including fugitive emissions

• Smart design of infrastructure transport system

• High share of renewable electricity from hydropower

Securing energy supply

of EU’s gas demand

Page 5: Petrobras visit 4.9 - SINTEF€¦ · •3 major processing plants •6 export receiving terminals in Europe •Riser platforms ... Petrobras visit 4.9.2018 Author: Sten Arve Eide

4www.gassco.no

- Securing energy supply

DEVELOPMENT OF THE NORWEGIAN GAS INFRASTRUCTURE

Photo: Bergen Agent, Polarled

Aasta Hansteen

Nyhamna

THE NORWEGIAN SEA

Johan Sverdrup

Kårstø

THE NORTH SEA Mongstad

BARENTS SEA

Nyhamna

Page 6: Petrobras visit 4.9 - SINTEF€¦ · •3 major processing plants •6 export receiving terminals in Europe •Riser platforms ... Petrobras visit 4.9.2018 Author: Sten Arve Eide

5www.gassco.no

- Securing energy supply

Securing energy supply

Page 7: Petrobras visit 4.9 - SINTEF€¦ · •3 major processing plants •6 export receiving terminals in Europe •Riser platforms ... Petrobras visit 4.9.2018 Author: Sten Arve Eide

6www.gassco.no

- Securing energy supply

R&D PROGRAMS

FUTUREVALUE CREATION

Page 8: Petrobras visit 4.9 - SINTEF€¦ · •3 major processing plants •6 export receiving terminals in Europe •Riser platforms ... Petrobras visit 4.9.2018 Author: Sten Arve Eide

7www.gassco.no

Hydrogen Transport in gas pipelines

Page 9: Petrobras visit 4.9 - SINTEF€¦ · •3 major processing plants •6 export receiving terminals in Europe •Riser platforms ... Petrobras visit 4.9.2018 Author: Sten Arve Eide

8www.gassco.no

Way forward…