Petrobras Experience on Deepwater Oil Production Mauricio Werneck PROCAP Coordinator Petrobras Encuentro Tecnológico Internacional sobre los Recursos Energéticos del Golfo de México

Transcript of 05 PETROBRAS Experience on Deepwater - II UNAM · Petrobras Experience on Deepwater Oil Production...

Page 1: 05 PETROBRAS Experience on Deepwater - II UNAM · Petrobras Experience on Deepwater Oil Production Mauricio Werneck PROCAP Coordinator Petrobras Encuentro Tecnológico Internacional

Petrobras Experience onDeepwater Oil Production

Mauricio WerneckPROCAP CoordinatorPetrobras

Encuentro TecnológicoInternacional sobre los RecursosEnergéticos del Golfo de México

Page 2: 05 PETROBRAS Experience on Deepwater - II UNAM · Petrobras Experience on Deepwater Oil Production Mauricio Werneck PROCAP Coordinator Petrobras Encuentro Tecnológico Internacional

Scenario – Water Depth

2005 Production

13,23 billion boe

Offshore (0-300m)Onshore Offshore (300-1500m) Offshore (> 1500m)

2005 Proven Reserves (SPE)

1.958.000 boed

10% 10%

55%

25%19%

16%

60%

5%

Exploratory Area160,500 km2

24%

12%

26%

38%

Page 3: 05 PETROBRAS Experience on Deepwater - II UNAM · Petrobras Experience on Deepwater Oil Production Mauricio Werneck PROCAP Coordinator Petrobras Encuentro Tecnológico Internacional

Proven Reserves as of Dec/2006 (SPE)(13.75 billion boe)

< 22º API(heavy)

14% 12%

28%45%

Gas > 31 º API (light)

22 – 31 º API(intermediate)

Oil Gravity Profile

Page 4: 05 PETROBRAS Experience on Deepwater - II UNAM · Petrobras Experience on Deepwater Oil Production Mauricio Werneck PROCAP Coordinator Petrobras Encuentro Tecnológico Internacional

Main Offshore Production Locations

Page 5: 05 PETROBRAS Experience on Deepwater - II UNAM · Petrobras Experience on Deepwater Oil Production Mauricio Werneck PROCAP Coordinator Petrobras Encuentro Tecnológico Internacional

• Reservoir Characteristics• Mild Environmental Conditions• Early Production Unit as a Field-scale

Lab for Definitive Systems• Extended Well Testing & Phased

Development• Lower Capital Exposure & Early Cash

Flow• Anticipation of First Oil & High Level of

Flexibility• Field-proven & Reliable Technology• Partnerships with the Main Suppliers

Petrobras Development Approach

Page 6: 05 PETROBRAS Experience on Deepwater - II UNAM · Petrobras Experience on Deepwater Oil Production Mauricio Werneck PROCAP Coordinator Petrobras Encuentro Tecnológico Internacional

P-52

MODULE

1A

MODULE

3MODULE

4MODULE

2P-54

FPSO Brasil1,500 m

1,900 m

Water depth:1,500 – 1,900 m

P-55

Roncador Field Development

221827 to 3127 to 31API

SS P-55FPSO P-54SS P-52FPSO BrasilProduction unit

2011200720072002First oil

180,000180,000180,000100,000Capacity (bpd)

76113Injection wells

Underfeasibility study

1111108Production wells

Module 4Module 3Module 2Module 1APhase II

Module 1APhase I

Highlights

Page 7: 05 PETROBRAS Experience on Deepwater - II UNAM · Petrobras Experience on Deepwater Oil Production Mauricio Werneck PROCAP Coordinator Petrobras Encuentro Tecnológico Internacional

1970

1974 – Garoupa field discovery

1979 – atmosferic subsea productionsystem

Page 8: 05 PETROBRAS Experience on Deepwater - II UNAM · Petrobras Experience on Deepwater Oil Production Mauricio Werneck PROCAP Coordinator Petrobras Encuentro Tecnológico Internacional

1980

1982 – Bonito field template

1984 – Albacora field discovery

1985 – Marlim field discovery

1985 – first diverless installation of a Xmas Treebeyond diver access depth – 383m

1986 – PROCAP first phase

Page 9: 05 PETROBRAS Experience on Deepwater - II UNAM · Petrobras Experience on Deepwater Oil Production Mauricio Werneck PROCAP Coordinator Petrobras Encuentro Tecnológico Internacional

1980

1987 – Albacora field production

1987 – R&D Subsea Technology Group creation

1986 – Layaway XTree connectionsystem in Albacora field

Page 10: 05 PETROBRAS Experience on Deepwater - II UNAM · Petrobras Experience on Deepwater Oil Production Mauricio Werneck PROCAP Coordinator Petrobras Encuentro Tecnológico Internacional

1994 – First ESP in a subsea well – RJS-221

1993 – Subsea Xmas Tree InterfacesStandardization

1990

1991 – Marlim production in pre-pilot phase

1992 – Temporary AbandonmentBase system – 600m – MRL-20D

Page 11: 05 PETROBRAS Experience on Deepwater - II UNAM · Petrobras Experience on Deepwater Oil Production Mauricio Werneck PROCAP Coordinator Petrobras Encuentro Tecnológico Internacional

1990

1996 – Roncador field discovery

1995 – Albacora Manifold diverlessinstallation at 620m

1996 – Vertical Direct connectionAB – 610m

1997 – Vertical Load anchors andPolyester lines Taut Leg system

Page 12: 05 PETROBRAS Experience on Deepwater - II UNAM · Petrobras Experience on Deepwater Oil Production Mauricio Werneck PROCAP Coordinator Petrobras Encuentro Tecnológico Internacional

1990

1999 – Roncador production withDrill Pipe Riser (DPR) and DP unit

1998 – First Deepwater HorizontalTree for ESP subsea wellRJS-477 – 1107m

1998 – First SCR on a semi submersible unitP18 – 910m

Page 13: 05 PETROBRAS Experience on Deepwater - II UNAM · Petrobras Experience on Deepwater Oil Production Mauricio Werneck PROCAP Coordinator Petrobras Encuentro Tecnológico Internacional

2001 – Jubarte field discovery

2000 – single point manifoldinstallation MRL – 900m

2001 – VASPS installationMA – 430m

2001 – Horizontal Trees for 2500mRO and MLS

2000

Page 14: 05 PETROBRAS Experience on Deepwater - II UNAM · Petrobras Experience on Deepwater Oil Production Mauricio Werneck PROCAP Coordinator Petrobras Encuentro Tecnológico Internacional

2003 – Golfinho field discovery

2002 – pulley manifold installationRO –1900m

2006 – pendulummanifold installationRO – 1900m

2000

2002 – Jubarte field production with DP unit, DPR andESP above the Xmas Tree

Page 15: 05 PETROBRAS Experience on Deepwater - II UNAM · Petrobras Experience on Deepwater Oil Production Mauricio Werneck PROCAP Coordinator Petrobras Encuentro Tecnológico Internacional

2005 – Golfinho field production with DPunit, DPR and ESP above the Xmas Tree

2004 – Torpedo piles – anchor system

2005 – Torpedo wellheads

2006 – Horizontal Tree for ESP wellswith tree cap installed by ROV

2000

Page 16: 05 PETROBRAS Experience on Deepwater - II UNAM · Petrobras Experience on Deepwater Oil Production Mauricio Werneck PROCAP Coordinator Petrobras Encuentro Tecnológico Internacional

2006 – FPSO BR hull concept

2006 – Mono BR hull concept

2007 – RHAS – Self standinghybrid export riser for P-52

2000

Page 17: 05 PETROBRAS Experience on Deepwater - II UNAM · Petrobras Experience on Deepwater Oil Production Mauricio Werneck PROCAP Coordinator Petrobras Encuentro Tecnológico Internacional

2009 – Tethered Riser Buoy

2008 – SBMS-500 (Multiphasepump)

2008

2010 – SSAO – O/W subseaseparation system

Page 18: 05 PETROBRAS Experience on Deepwater - II UNAM · Petrobras Experience on Deepwater Oil Production Mauricio Werneck PROCAP Coordinator Petrobras Encuentro Tecnológico Internacional

Equipment Installed Dec/2006

Planned(2007)

Subsea Trees

Subsea Manifolds

Subsea FlexibleFlowlines (km)

Umbilicals(km)

Rigid Pipelines(km)

Monobuoys

Floating ProductionUnits

1,900

608 40

1,857

428

400

200

3

275

-Fev/2002: Exploration Well at 2,853mFev/2002: Exploration Well at 2,853m

OTCOTC19921992

OTCOTC20012001

Including Espirito Santo & Santos Basins, Piranema field NE Brazil

Petrobras Offshore Activity

3,200

60 -

Page 19: 05 PETROBRAS Experience on Deepwater - II UNAM · Petrobras Experience on Deepwater Oil Production Mauricio Werneck PROCAP Coordinator Petrobras Encuentro Tecnológico Internacional

1 0 b p d

3

G 3 4 6 7G 3 4 6 7

ONSHORE OFFSHORE <= 300m OFFSHORE > 300m TARGET

-

500

1.000

1.500

2.000

2.500

1978 1980 1982 1984 1986 1988 1990 1992 1994 1996 1998 2000 2002 2005 2006 2011

YEAR

M b

pd

2374

1778

Production and Target

Page 20: 05 PETROBRAS Experience on Deepwater - II UNAM · Petrobras Experience on Deepwater Oil Production Mauricio Werneck PROCAP Coordinator Petrobras Encuentro Tecnológico Internacional

Conclusion

• Technology development provides importanttools to face the challenging scenario ofdeepwater oil production

• Equipment are available, but to be able tospecify and correctly use them is an importantlesson from the experience

• Field development in phases allow moreflexibility and the use of information fromprevious phases on calibration of the next ones

Page 21: 05 PETROBRAS Experience on Deepwater - II UNAM · Petrobras Experience on Deepwater Oil Production Mauricio Werneck PROCAP Coordinator Petrobras Encuentro Tecnológico Internacional

Thank YouMauricio WerneckPROCAP [email protected] 21 3865 4819