Park Street Traffic Calming and Landscaping Concept Plan

3
Attachment A Park Street Traffic Calming and Landscaping Concept Plan

Transcript of Park Street Traffic Calming and Landscaping Concept Plan

Page 1: Park Street Traffic Calming and Landscaping Concept Plan

Attachment A

Park Street Traffic Calming and Landscaping Concept Plan

Page 2: Park Street Traffic Calming and Landscaping Concept Plan

Client: City of Sydney Project Name: Accelerated Bike Network Program - Park Street

Date: 18.02.2021 Project Number: 60620833 Traffic Calming and Landscape Concept Plan

HEN

DER

SON

RO

AD

N

PARK STREET PARKING ANALYSIS - PROPOSED 60° REAR TO KERB ANGLE PARKINGSCALE 1:100

0 2.5 5

1:100m

SOLANDER PARK

HE

ND

ER

SO

N R

OA

D

SW

AN

SO

N S

TR

EET

PARK STREET

KEY MOVES

NARROWING OF THE STREET TO CREATE A ONE WAY SLOW POINT

OPPORTUNITY FOR NEW PEDESTRIAN CROSSING OR CONTINUOUS FOOTHPATH TREATMENT

EXTENDING THE PARK INTO THE STREET

NEW PLANTED GARDEN BEDS AND MEDIANS TO REPLACE PARKING AND MATCH PLANTING PALETTE IN SOLANDER PARK.

Page 3: Park Street Traffic Calming and Landscaping Concept Plan

24201612840

metres1:400

2

Client: City of Sydney Project Name: Accelerated Bike Network Program - Park Street

Date: 18.02.2021 Project Number: 60620833 Landscape Concept Sketch - Park Street

SOLANDER PARK

Liriope muscari Philodendron ‘Xanadu’ Trachelospermum jasminoides AN EXAMPLE OF A ONE WAY SLOW POINT

PARK STREET

PROPOSED PLANTING

PROPOSED STREET TREE TO MATCH EXISTING (Lophostemon confertus)

ANGLED PARKING (REAR TO KERB) EXISTING PARALLEL PARKING

PROPOSED KERB BUILDOUT AND PEDESTRIAN CROSSING.

NARROWING OF THE STREET TO CREATE A ONE WAY SLOW POINT

PROPOSED GARDEN BED TO MATCH EXISTING PLANTING PALETTE WITHIN SOLANDER PARK