PACS ICC in Operations SVR-3 MPE, 8/9 Nov 2007 O.H. Bauer

14
PACS ICC in PACS ICC in Operations Operations SVR-3 SVR-3 MPE, 8/9 Nov 2007 MPE, 8/9 Nov 2007 O.H. Bauer O.H. Bauer

description

PACS ICC in Operations SVR-3 MPE, 8/9 Nov 2007 O.H. Bauer. Herschel Ground Segment Overview. Main Control Room @MOC. IEGSE@FN, ESTEC, Kourou -- ICC@MOC. PI Support Area (PISA) @MOC. ICC@MPE: Logical Overview. Logical overview (continued). - PowerPoint PPT Presentation

Transcript of PACS ICC in Operations SVR-3 MPE, 8/9 Nov 2007 O.H. Bauer

Page 1: PACS ICC in Operations SVR-3 MPE, 8/9 Nov 2007 O.H. Bauer

PACS ICC in OperationsPACS ICC in Operations

SVR-3SVR-3MPE, 8/9 Nov 2007MPE, 8/9 Nov 2007

O.H. BauerO.H. Bauer

Page 2: PACS ICC in Operations SVR-3 MPE, 8/9 Nov 2007 O.H. Bauer

PACS ICC in Operations 2

PACS SVR-3 MPE, 8/9 Nov 2007

Herschel Ground Segment Overview

Page 3: PACS ICC in Operations SVR-3 MPE, 8/9 Nov 2007 O.H. Bauer

PACS ICC in Operations 3

PACS SVR-3 MPE, 8/9 Nov 2007

Main Control Room @MOC

Page 4: PACS ICC in Operations SVR-3 MPE, 8/9 Nov 2007 O.H. Bauer

PACS ICC in Operations 4

PACS SVR-3 MPE, 8/9 Nov 2007

IEGSE@FN, ESTEC, Kourou -- ICC@MOC

Page 5: PACS ICC in Operations SVR-3 MPE, 8/9 Nov 2007 O.H. Bauer

PACS ICC in Operations 5

PACS SVR-3 MPE, 8/9 Nov 2007

PI Support Area (PISA) @MOC

Page 6: PACS ICC in Operations SVR-3 MPE, 8/9 Nov 2007 O.H. Bauer

PACS ICC in Operations 6

PACS SVR-3 MPE, 8/9 Nov 2007

HSC

HCSSDB

PALpool

ICCpipeline

processor

KUL IPAC

HCSSDB

PALpool

internalreferencearea

publicarea

Database propagation

PAL pool synchronization,due bandwidth considerationsno PACS level 0 products

MPE

ICC@MPE: Logical Overview

Page 7: PACS ICC in Operations SVR-3 MPE, 8/9 Nov 2007 O.H. Bauer

PACS ICC in Operations 7

PACS SVR-3 MPE, 8/9 Nov 2007

Logical overview (continued)

• Due to bandwidth limitation (2 Mbits/sec) the PACS level 0 products will be regenerated at MPE, KUL and NHSC. Hence the Versant database systems need to be propagated to MPE, KUL and NHSC.

• The database systems and PAL pools in the “internal reference area” will contain all data necessary for the PACS ICC to support operations. Of this data not all data might be copied to the public area due to security/protection issues.

Page 8: PACS ICC in Operations SVR-3 MPE, 8/9 Nov 2007 O.H. Bauer

PACS ICC in Operations 8

PACS SVR-3 MPE, 8/9 Nov 2007

The PACS ICC at work

Page 9: PACS ICC in Operations SVR-3 MPE, 8/9 Nov 2007 O.H. Bauer

PACS ICC in Operations 9

PACS SVR-3 MPE, 8/9 Nov 2007

Hardware setup

• Pipeline processing, trend analysis, data distribution– Two 64-bit servers, multiple CPU/cores– RAID 5 disk array– backup to campus tape library

• Processing power for local ICC users– Two 64-bit servers, multiple CPU/cores– fast access to disk array– local 4Gbyte 64-bit desktops

• Dedicated PC for OBSM ?• Dedicated PC for ExpertHSPOT + MPS

Page 10: PACS ICC in Operations SVR-3 MPE, 8/9 Nov 2007 O.H. Bauer

PACS ICC in Operations 10

PACS SVR-3 MPE, 8/9 Nov 2007

Software setup

• OS: Linux– parallel processing cluster as an option for the number

crunchers– load balancing cluster as an option for the user server

• HCSS/PCSS– careful release schedule to match HSC updates

• OBSM• ExpertHSPOT + MPS for engineering and calibration

observations

Page 11: PACS ICC in Operations SVR-3 MPE, 8/9 Nov 2007 O.H. Bauer

PACS ICC in Operations 11

PACS SVR-3 MPE, 8/9 Nov 2007

Procedures

• Uplink calibration– Testing new CALU tables and scripts using CUS at the ICC– Formal delivery via files (CCB)

• Downlink calibration– Testing new calibration products using both IA and pipeline

at the ICC– Formal delivery via files (CCB)

Page 12: PACS ICC in Operations SVR-3 MPE, 8/9 Nov 2007 O.H. Bauer

PACS ICC in Operations 12

PACS SVR-3 MPE, 8/9 Nov 2007ICC@MOC and ICC@MPE: Staffing during CP

and PV• ICC@MOC and if required also ICC@MPE staff will work on

a seven day per week schedule, taking shifts if required• Minimum ICC@MOC personnel:

– 1 Test manager (SE or CS, supervising ongoing test activities and taking decisions)

– 1 Instrument expert (instrument and test progress monitoring, interface to SPACON)

– 1 Uplink expert (modification of procedures, execution of schedule)

– 1 OBSW specialist – in case of OBSW activities– 1 Instrument expert (near real time data analysis using Packet

Recorder Files)

• ICC@MPE:– Scientists for follow-up calibration analysis– Uplink expert(s) for possible calibration observation/AOT

modifications– Software developers for possible S/W modifications– H/W, S/W, Data Base maintenace experts

Page 13: PACS ICC in Operations SVR-3 MPE, 8/9 Nov 2007 O.H. Bauer

PACS ICC in Operations 13

PACS SVR-3 MPE, 8/9 Nov 2007

Page 14: PACS ICC in Operations SVR-3 MPE, 8/9 Nov 2007 O.H. Bauer

PACS ICC in Operations 14

PACS SVR-3 MPE, 8/9 Nov 2007

MoU 9.5 6 5 4.4 1 3 2 2 f.t.e