Offshore Wind Energy – Multi Use

Bob Meijer

Page 2: Offshore Wind Energy –Multi Use - Topsector Energie · 2018-10-30 · Source: Workshop discussions, TKI Wind op Zee, Roland Berger 181005 - Offshore wind R&D agenda - WORKSHOP RESULTS.pptx

Over 160 TKI Wind op Zee partners!

29-10-18 MARIN Multi Use Event 2

R&D and education Wind turbine design & production Windfarm development

Maintenance

Miscellaneous

Consultancy, design & engineering

Construction & installation

± 100 projects ± 80 M€ R&D value

Delivering- Knowledge- Innovations- New products- Test facilities- Start up and

Innovation project support

Page 3: Offshore Wind Energy –Multi Use - Topsector Energie · 2018-10-30 · Source: Workshop discussions, TKI Wind op Zee, Roland Berger 181005 - Offshore wind R&D agenda - WORKSHOP RESULTS.pptx

29-10-18 MARIN Multi Use Event 3

Page 4: Offshore Wind Energy –Multi Use - Topsector Energie · 2018-10-30 · Source: Workshop discussions, TKI Wind op Zee, Roland Berger 181005 - Offshore wind R&D agenda - WORKSHOP RESULTS.pptx

29-10-18 MARIN Multi Use Event 4

11181005 - Offshore wind R&D agenda - WORKSHOP RESULTS.pptx

Spatial planning

The main challenges to achieve our 2050 vision were specified

Challenges Specifications

Costs

Supply security

Challenges with their specifications as defined in the workshop

Value of energy

Roll-out

Environment

Public support

Grid integration

Safety

> Reduce costs for full competitiveness in energy system (min. EUR/MWh)

> Use acceptable space of the North Sea (max. MWh/km3)

> Achieve maximum value of energy to end-users including intermittency effects

> Safeguard full supply security

> Achieve positive impact on environment

> Achieve necessary capacity for roll-out

> Achieve positive social cost-benefit

> Achieve optimal grid integration (cost, supply security)

> Achieve full safety during construction and operation

PREL

IMIN

ARY

D Beacons

Source: Workshop discussions, TKI Wind op Zee, Roland Berger

11181005 - Offshore wind R&D agenda - WORKSHOP RESULTS.pptx

Spatial planning

The main challenges to achieve our 2050 vision were specified

Challenges Specifications

Costs

Supply security

Challenges with their specifications as defined in the workshop

Value of energy

Roll-out

Environment

Public support

Grid integration

Safety

> Reduce costs for full competitiveness in energy system (min. EUR/MWh)

> Use acceptable space of the North Sea (max. MWh/km3)

> Achieve maximum value of energy to end-users including intermittency effects

> Safeguard full supply security

> Achieve positive impact on environment

> Achieve necessary capacity for roll-out

> Achieve positive social cost-benefit

> Achieve optimal grid integration (cost, supply security)

> Achieve full safety during construction and operation

PREL

IMIN

ARY

D Beacons

Source: Workshop discussions, TKI Wind op Zee, Roland Berger

11181005 - Offshore wind R&D agenda - WORKSHOP RESULTS.pptx

Spatial planning

The main challenges to achieve our 2050 vision were specified

Challenges Specifications

Costs

Supply security

Challenges with their specifications as defined in the workshop

Value of energy

Roll-out

Environment

Public support

Grid integration

Safety

> Reduce costs for full competitiveness in energy system (min. EUR/MWh)

> Use acceptable space of the North Sea (max. MWh/km3)

> Achieve maximum value of energy to end-users including intermittency effects

> Safeguard full supply security

> Achieve positive impact on environment

> Achieve necessary capacity for roll-out

> Achieve positive social cost-benefit

> Achieve optimal grid integration (cost, supply security)

> Achieve full safety during construction and operation

PREL

IMIN

ARY

D Beacons

Source: Workshop discussions, TKI Wind op Zee, Roland Berger

Page 5: Offshore Wind Energy –Multi Use - Topsector Energie · 2018-10-30 · Source: Workshop discussions, TKI Wind op Zee, Roland Berger 181005 - Offshore wind R&D agenda - WORKSHOP RESULTS.pptx

29-10-18 MARIN Multi Use Event 5

11181005 - Offshore wind R&D agenda - WORKSHOP RESULTS.pptx

Spatial planning

The main challenges to achieve our 2050 vision were specified

Challenges Specifications

Costs

Supply security

Challenges with their specifications as defined in the workshop

Value of energy

Roll-out

Environment

Public support

Grid integration

Safety

> Reduce costs for full competitiveness in energy system (min. EUR/MWh)

> Use acceptable space of the North Sea (max. MWh/km3)

> Achieve maximum value of energy to end-users including intermittency effects

> Safeguard full supply security

> Achieve positive impact on environment

> Achieve necessary capacity for roll-out

> Achieve positive social cost-benefit

> Achieve optimal grid integration (cost, supply security)

> Achieve full safety during construction and operation

PREL

IMIN

ARY

D Beacons

Source: Workshop discussions, TKI Wind op Zee, Roland Berger

11181005 - Offshore wind R&D agenda - WORKSHOP RESULTS.pptx

Spatial planning

The main challenges to achieve our 2050 vision were specified

Challenges Specifications

Costs

Supply security

Challenges with their specifications as defined in the workshop

Value of energy

Roll-out

Environment

Public support

Grid integration

Safety

> Reduce costs for full competitiveness in energy system (min. EUR/MWh)

> Use acceptable space of the North Sea (max. MWh/km3)

> Achieve maximum value of energy to end-users including intermittency effects

> Safeguard full supply security

> Achieve positive impact on environment

> Achieve necessary capacity for roll-out

> Achieve positive social cost-benefit

> Achieve optimal grid integration (cost, supply security)

> Achieve full safety during construction and operation

PREL

IMIN

ARY

D Beacons

Source: Workshop discussions, TKI Wind op Zee, Roland Berger

11181005 - Offshore wind R&D agenda - WORKSHOP RESULTS.pptx

Spatial planning

The main challenges to achieve our 2050 vision were specified

Challenges Specifications

Costs

Supply security

Challenges with their specifications as defined in the workshop

Value of energy

Roll-out

Environment

Public support

Grid integration

Safety

> Reduce costs for full competitiveness in energy system (min. EUR/MWh)

> Use acceptable space of the North Sea (max. MWh/km3)

> Achieve maximum value of energy to end-users including intermittency effects

> Safeguard full supply security

> Achieve positive impact on environment

> Achieve necessary capacity for roll-out

> Achieve positive social cost-benefit

> Achieve optimal grid integration (cost, supply security)

> Achieve full safety during construction and operation

PREL

IMIN

ARY

D Beacons

Source: Workshop discussions, TKI Wind op Zee, Roland Berger

Page 6: Offshore Wind Energy –Multi Use - Topsector Energie · 2018-10-30 · Source: Workshop discussions, TKI Wind op Zee, Roland Berger 181005 - Offshore wind R&D agenda - WORKSHOP RESULTS.pptx

29-10-18 MARIN Multi Use Event 6

11181005 - Offshore wind R&D agenda - WORKSHOP RESULTS.pptx

Spatial planning

The main challenges to achieve our 2050 vision were specified

Challenges Specifications

Costs

Supply security

Challenges with their specifications as defined in the workshop

Value of energy

Roll-out

Environment

Public support

Grid integration

Safety

> Reduce costs for full competitiveness in energy system (min. EUR/MWh)

> Use acceptable space of the North Sea (max. MWh/km3)

> Achieve maximum value of energy to end-users including intermittency effects

> Safeguard full supply security

> Achieve positive impact on environment

> Achieve necessary capacity for roll-out

> Achieve positive social cost-benefit

> Achieve optimal grid integration (cost, supply security)

> Achieve full safety during construction and operation

PREL

IMIN

ARY

D Beacons

Source: Workshop discussions, TKI Wind op Zee, Roland Berger

11181005 - Offshore wind R&D agenda - WORKSHOP RESULTS.pptx

Spatial planning

The main challenges to achieve our 2050 vision were specified

Challenges Specifications

Costs

Supply security

Challenges with their specifications as defined in the workshop

Value of energy

Roll-out

Environment

Public support

Grid integration

Safety

> Reduce costs for full competitiveness in energy system (min. EUR/MWh)

> Use acceptable space of the North Sea (max. MWh/km3)

> Achieve maximum value of energy to end-users including intermittency effects

> Safeguard full supply security

> Achieve positive impact on environment

> Achieve necessary capacity for roll-out

> Achieve positive social cost-benefit

> Achieve optimal grid integration (cost, supply security)

> Achieve full safety during construction and operationPR

ELIM

INAR

Y

D Beacons

Source: Workshop discussions, TKI Wind op Zee, Roland Berger

11181005 - Offshore wind R&D agenda - WORKSHOP RESULTS.pptx

Spatial planning

The main challenges to achieve our 2050 vision were specified

Challenges Specifications

Costs

Supply security

Challenges with their specifications as defined in the workshop

Value of energy

Roll-out

Environment

Public support

Grid integration

Safety

> Reduce costs for full competitiveness in energy system (min. EUR/MWh)

> Use acceptable space of the North Sea (max. MWh/km3)

> Achieve maximum value of energy to end-users including intermittency effects

> Safeguard full supply security

> Achieve positive impact on environment

> Achieve necessary capacity for roll-out

> Achieve positive social cost-benefit

> Achieve optimal grid integration (cost, supply security)

> Achieve full safety during construction and operation

PREL

IMIN

ARY

D Beacons

Source: Workshop discussions, TKI Wind op Zee, Roland Berger

Page 7: Offshore Wind Energy –Multi Use - Topsector Energie · 2018-10-30 · Source: Workshop discussions, TKI Wind op Zee, Roland Berger 181005 - Offshore wind R&D agenda - WORKSHOP RESULTS.pptx

The scope of the R&D Program

Cost Reduction andOptimisation

• Support Structures

• Wind Turbine and Wind Farm

• Inter Array network and grid

connection

• Transport Installation and

Logistics

• Operations and Maintenance

Integration in the Energy System

• Offshore Grid

• Conversion and Storage

Offshore Wind and theEnvironment

• Multi-use

• Increase ecological value

29-10-18 MARIN Multi Use Event 7

TKI Wind op Zee Programma 2018-2019

Versie: Finale versie

Datum: december 2017

Page 8: Offshore Wind Energy –Multi Use - Topsector Energie · 2018-10-30 · Source: Workshop discussions, TKI Wind op Zee, Roland Berger 181005 - Offshore wind R&D agenda - WORKSHOP RESULTS.pptx

Spatial claims

29-10-18 MARIN Multi Use Event 8

Source: TNO North Sea Energy Atlas

Page 9: Offshore Wind Energy –Multi Use - Topsector Energie · 2018-10-30 · Source: Workshop discussions, TKI Wind op Zee, Roland Berger 181005 - Offshore wind R&D agenda - WORKSHOP RESULTS.pptx

Transitions impacting spatial claims

Energy Transition: • Wind energy: potentially using 20-25% of the EEZ

• Oil & Gas transition: decommissioning – reuse of infrastructure

• CCS

• Transmission systems and pipelines

• Offshore energy storage and conversion

• Energy Islands and port infrastructure

• Offshore Solar, Wave & Tidal energy

Food Transition:• Fishing

• Aquaculture

Safety: • Working Offshore

• Navigation

• Aviation

• Coastal defence

• Military activities

• Security of supply

Nature: • Improvement of the biodiversity

• Ecological networks

• Fish, Bats, Birds, Sea mammals

• Hazardous materials

• Recreation

29-10-18 MARIN Multi Use Event 9

International dimension

Page 10: Offshore Wind Energy –Multi Use - Topsector Energie · 2018-10-30 · Source: Workshop discussions, TKI Wind op Zee, Roland Berger 181005 - Offshore wind R&D agenda - WORKSHOP RESULTS.pptx

Multi Use

Integrated

Must be close to wind farms

• Wave & Tidal Energy

• Floating Solar

• Energy Storage

• Energy Conversion

• Grid Integration and Interconnection

• Oil & Gas systems (electrification)

• CCS

• …

Co-located

Can be in the vicinity of wind farms but not required

• Oil & Gas systems (stand alone)

• CCS

• Seaweed, Algae

• Oysters, Scallops, Mussels

• Shipping (incl. recreational)

• Fisheries

• …

29-10-18 MARIN Multi Use Event 10

Page 11: Offshore Wind Energy –Multi Use - Topsector Energie · 2018-10-30 · Source: Workshop discussions, TKI Wind op Zee, Roland Berger 181005 - Offshore wind R&D agenda - WORKSHOP RESULTS.pptx

Tender System Integration on the North Sea

• Objective: development of new components, products, tools and services to support the integration of very high volumes of offshore wind power

• Reduction of imbalance risk and cost• Create flexibilibility in the chain from generation to use of electricity• Optimise the technical integration• Not at all cost

29-10-18 MARIN Multi Use Event 11

Call open until 6 November (1M€ available)

Page 12: Offshore Wind Energy –Multi Use - Topsector Energie · 2018-10-30 · Source: Workshop discussions, TKI Wind op Zee, Roland Berger 181005 - Offshore wind R&D agenda - WORKSHOP RESULTS.pptx

www.tki-windopzee.nl

Onderdeel van de Topsector Energie