MRP 1&2

13
M Maximum Retail Price RP (inclusive of all tax) .Keerthivasan RM University

description

Material requirement planning Manufacuring resource planning For better visibility download this PPT

Transcript of MRP 1&2

Page 1: MRP 1&2

MMaximum Retail PriceRP(inclusive of all tax)

R.KeerthivasanSRM University

Page 2: MRP 1&2

Material Requirement Planning

Power Tools

In same year

-- -- --

IIIIIIIIIIIIIIIIVV

Page 3: MRP 1&2

MRP - I

Production Planning and Inventory Control System

Managing Manufacturing Processes

For

Most MRP Systems are Software Based

THREE OBJECTIVES of MRP - I

Plan Manufacturing activities, Delivery schedules and Purchasing activities.

Ensure Materials to available for Production and Products

available for Delivery to Customers

Maintain the lowest possible material and product levels in store

Page 4: MRP 1&2

Basic functions:

Inventory Control, Bill of Material Processing

and Elementary Scheduling

Helps Organizations to Maintain Low Inventory Levels.

Plan manufacturing, Purchasing,Delivering activities,

Page 5: MRP 1&2

Consider a Product

Page 6: MRP 1&2

StoveBowlsRice

VegetablesOil

SpicesMasala

Bill Of Materials Process Planning

Cutting VegetablesBoil rice

Adding ingredientsDecoration

Demand Quantity

No of People

What items are required?How many are required ?When are they required ?

So, MRP – I Answers these questions

At what time

Page 7: MRP 1&2

Parts Shortage Reduced

Advantages Of

MRP

Integrated Company

Data

“Real Time“Job Status

Report

AchievableWork Plan

Page 8: MRP 1&2
Page 9: MRP 1&2

MRP - IIManufacturing resource planning

MRPII is to Provide Consistent data to all players in the manufacturing process as the product moves through the production line.

Page 10: MRP 1&2
Page 11: MRP 1&2

Benefits of MRP II

Reduced working capital for inventoryImproved cash flow through quicker deliveriesAccurate inventory records

Better control of inventoriesImproved schedulingProductive relationships with suppliers

Improved design controlBetter quality and quality control

This systems provide:

For Design / Engineering:

For Financial and Costing:

Page 12: MRP 1&2

MRP-I vs MRP-II

Material Requirements Planning (MRP)

• Was an early iteration of the integrated information systems vision.

• Helped managers to determine the quantity and timing of raw materials purchases.

• MRP was Primarily concerned with materials

Manufacturing Resource Planning (MRP - II)

• Concerned with the integration of all aspects of the Manufacturing process

• Including materials,

• Finance and Human Relations.

Page 13: MRP 1&2

End