MHSEMP ECONOMIZER
TUBES REPLACEMENT
HRSG A/B
MUHAMMAD REHAN KHANMAINTENANCE ENGINEER
EXECUTIVE SUMMARY
• EQUIPMENT OVERVIEW
• REASON FOR TUBE REPLACEMENT
• TUBE REPLACEMENT SCOPE
• TUBE REPLACEMENT STRATEGY
• PRESSURE TESTING STRATEGY
• TIMELINE
3
FGC
GT/ HRSG
STG
IA/ PA
DEMIN II DEMIN I/ WWTU I
RW
CT II
NORTH
SIDE
SOUTH
SIDE
LP EVAPORATOR
MP ECONOMIZER
MP SUPER HEATER
MP EVAPORATOR
WEST SIDE VIEW
BFW INLET
TUBES REPLACEMENT SCOPE
NORTH
SIDE
SOUTH
SIDE
LP EVAPORATOR
MP ECONOMIZER
MP SUPER HEATER
MP EVAPORATOR
WEST SIDE VIEW
TUBES REPLACEMENT STRATEGY
SEPARATOR PLATES
INSULATION
SEPARATOR PLATES
INSULATION
SOUTH SIDE
METHODOLOGY
SOUTH SIDE
METHODOLOGY
CUT 13 TUBES
SOUTH SIDE
PERFORM HYDRO TEST OF THE HEADER
RE-WELD 04 TUBES & PLUG 09 TUBES
METHODOLOGY
PLUG
SOUTH SIDE
PERFORM HYDRO TEST OF THE HEADER
RE-WELD 05 MIDDLE TUBES
PLUG
METHODOLOGY
SOUTH SIDE
PERFORM HYDRO TEST OF THE HEADER
RE-WELD LAST 04 TUBES
METHODOLOGY
PRESSURE TESTING ARRANGEMENT OF HEADER
PRESSURE TESTING STRATEGY
• Current Strategy: Circulation Test of Medium Pressure Side through BFW
Pump
• Problem: Testing time is highPressure holding not possible
• Proposed Strategy:Separate Hydro Testing of the Header
• Only Outlet connections to be cut
• Flange and Nozzle to be welded
• Filling and Pressurization to be done from the bottom nozzle
• Venting to be done from top
• Pressurization will be done through a pneumatic pump
• Pipe will be welded back
Flanges are already installed outside the
equipment
TUBE PLUGGING STRATEGY
NEW TUBE INSERTION STRATEGY
SOUTH SIDE
NORTHSIDE
EAST SIDE VIEW (BFW PUMP SIDE)
Tube will be lifted horizontally with the help of crane
THANK YOU