TO: FROM: MEMORANDUM DEPARTMENT OF PUBLIC WORKS County of Placer BOARD OF .) (.}__/ KEN GREHM I MATT RANDALL DATE: JUNE 17, 2014 SUBJECT: FORESTHILL ROAD BRIDGE SEISMIC RETROFIT AND PAINT PROJECT CONTRACT NO. 1074- NOTICE OF COMPLETION ACTION REQUESTED I RECOMMENDATION 1. Adopt a Resolution accepting the Foresthill Road Bridge Seismic Retrofit and Paint Project as complete. 2. Authorize the Director of Public Works to execute the Notice of Completion for the Foresthill Road Bridge Seismic Retrofit and Paint Project. There is no net County cost. BACKGROUND/SUMMARY The Board awarded Construction Contract No. 1074 to Golden State Bridge, Inc., on December 14, 2010, for $58,37 4,849.00, and authorized the Director of Public Works to execute the contract and CCO's up to five percent, in an amount of $2,918,742.45, for a total approval amount of $61,293,591.45. The construction contract completed the seismic retrofit and painting of the Foresthill Road Bridge. The project included: removal and replacement of existing structural steel elements and gusset plates, modification of abutment transverse shear walls, placement of abutment rock anchors, installation of buckling restrained brace systems, modification and replacement of transverse shear keys, installation of new steel stringers and concrete decking, removal of the existing lead paint and cleaning of the structural steel, painting structural steel, replacing the bridge pedestrian railing, treating the bridge deck with methacrylate and constructing a new catwalk system. Construction work began on January 13, 2011 was completed on May 6, 2014. ENVIRONMENTAL The Board of Supervisors certified and approved the Initial Study I Mitigated Negative Declaration (IS/MND) with the required findings and mitigations on September 22, 2009. FISCAL IMPACT The final construction cost is $60,778,596.48 which has been accepted by the Contractor wi th no exception. There were forty-six (46) Contract Change Orders (CCO) issued during this project. A contract data and change order summary is attached as Exhibit A The Project began as two separate projects: a seismic retrofit project and a re-painting project. The entire project is funded by 88.53% Highway Bridge Program (HBP) funds. The seismic portion received 11.47% from the Proposition 1B Local Bridge Seismic Retrofit Account (LBSRA) thus being 100% federally and state funded. All non- seismic work used a combination of State Proposition 1B Local Streets and Roads and local road funding for the 11.47% match needed. There is no net cost to the County. Attachments: Resolution Location Map Notice of Completion Contract Summary Contractor Acceptance Statement T:\DPW\RoadwaysandBridges\Engineeri ng\BOS\2014 BOS J temsVune 1 7\BOS_MEMO_FHB ACCEPT-NOC. docx

Transcript of MEMORANDUM - Placer County, CA

Page 1: MEMORANDUM - Placer County, CA

TO:

FROM:

MEMORANDUM DEPARTMENT OF PUBLIC WORKS

County of Placer

BOARD OF SUf~VISORS .)(.}__/

KEN GREHM I MATT RANDALL

DATE: JUNE 17, 2014

SUBJECT: FORESTHILL ROAD BRIDGE SEISMIC RETROFIT AND PAINT PROJECT CONTRACT NO. 1074- NOTICE OF COMPLETION

ACTION REQUESTED I RECOMMENDATION 1. Adopt a Resolution accepting the Foresthill Road Bridge Seismic Retrofit and Paint Project as

complete. 2. Authorize the Director of Public Works to execute the Notice of Completion for the Foresthill

Road Bridge Seismic Retrofit and Paint Project. There is no net County cost.

BACKGROUND/SUMMARY The Board awarded Construction Contract No. 1074 to Golden State Bridge, Inc., on December 14, 2010, for $58,37 4,849.00, and authorized the Director of Public Works to execute the contract and CCO's up to five percent, in an amount of $2,918,7 42.45, for a total approval amount of $61,293,591.45.

The construction contract completed the seismic retrofit and painting of the Foresthill Road Bridge. The project included: removal and replacement of existing structural steel elements and gusset plates, modification of abutment transverse shear walls, placement of abutment rock anchors, installation of buckling restrained brace systems, modification and replacement of transverse shear keys, installation of new steel stringers and concrete decking, removal of the existing lead paint and cleaning of the structural steel , painting structural steel, replacing the bridge pedestrian railing, treating the bridge deck with methacrylate and constructing a new catwalk system. Construction work began on January 13, 2011 was completed on May 6, 2014.

ENVIRONMENTAL The Board of Supervisors certified and approved the Initial Study I Mitigated Negative Declaration (IS/MND) with the required findings and mitigations on September 22, 2009.

FISCAL IMPACT The final construction cost is $60,778,596.48 which has been accepted by the Contractor with no exception. There were forty-six (46) Contract Change Orders (CCO) issued during this project. A contract data and change order summary is attached as Exhibit A The Project began as two separate projects: a seismic retrofit project and a re-painting project. The entire project is funded by 88.53% Highway Bridge Program (HBP) funds. The seismic portion received 11.47% from the Proposition 1 B Local Bridge Seismic Retrofit Account (LBSRA) thus being 100% federally and state funded. All non­seismic work used a combination of State Proposition 1 B Local Streets and Roads and local road funding for the 11.47% match needed. There is no net cost to the County.

Attachments: Resolution Location Map Notice of Completion Contract Summary Contractor Acceptance Statement

T:\DPW\RoadwaysandBridges\Engineering\BOS\2014 BOS JtemsVune 17\BOS_MEMO_FHB ACCEPT-NOC.docx

Page 2: MEMORANDUM - Placer County, CA

Before the Board of Supervisors County of Placer, State of California

In the matter of: A RESOLUTION ACCEPTING THE IMPROVEMENTS AS COMPLETE AND AUTHORIZING THE DIRECTOR OF PUBLIC WORKS TO EXECUTE A NOTICE OF COMPLETION FOR THE FORESTHILL ROAD BRIDGE SEISMIC RETROFIT AND PAINT PROJECT CONTRACT N0.1074

Resol. No: .................................. .

The following RESOLUTION was duly passed by the Board of Supervisors

of the County of Placer at a regular meeting held-----------

by the following:

Ayes:

Noes:

Absent:

Signed and approved by me after its passage.

Attest: Chair, Board of Supervisors Clerk of said Board

BE IT HEREBY RESOLVED by the Board of Supervisors of the County of Placer, State of California, that this Board adopts this Resolution Accepting the improvements as complete and authorizes the Director of Public Works to execute a Notice of Completion for the construction of the FORESTHILL ROAD BRIDGE SEISMIC RETROFIT AND PAINT PROJECT CONTRACT N0.1074.

Page 3: MEMORANDUM - Placer County, CA

SACRAMEI'H O

PLACER

LOCATION MAP

E L D 0 R A D 0 C C.

PLACER COUNTY VICINITY MAP NO SCALE

... I

( COUNTY --~,

h'al.scy~ Fore .bay

ROAD ...r--- ·--""'

I'

\,_

Cli pper Gop

DORADO COUNTY

FORES.THILL BRIDGE PROJECT LOCATION MAP NO SCALE 4D'"l

Page 4: MEMORANDUM - Placer County, CA

Name: FORESTHILL ROAD BRIDGE SEISMIC RETROFIT AND PAINT PROJECT

Contract No. 1074 -.:.....::....:.---=------

Recording requested by: Kathy Henson When recorded return to: Kathy Henson, Placer County Department of Public Works

Exempt from Recording Fees - Govt. Code 27383 Space Above for Recorder

NOTICE OF COMPLETION

COUNTY OF PLACER DEPARTMENT OF PUBLIC WORKS 3091 County Center Drive, Suite 220

Auburn, CA 95603

NOTICE IS HEREBY GIVEN, pursuant to California Civil Code Section 3093, that the following Contractor, . to wit: Golden State Bridge, Inc. performed and completed, for the County of Placer, State of California, the following contract, work of improvement, to wit: FORESTHILL ROAD BRIDGE SEISMIC RETROFIT AND PAINT PROJECT, Contract No. 1074.

The property is owned by the County of Placer -"""'in-=-f.:....::e;....:=e _______ _

Said work was accepted on __ ..:...:;M..:..::a;;...<y.....;6:;..L.-=2=-=0....:.1....:.4

Executed this day of 2014 , at Auburn, California. I declare under penalty of perjury that the foregoing is true and correct.

KEN GREHM, DIRECTOR DEPARTMENT OF PUBLIC WORKS, COUNTY OF PLACER

STATE OF CALIFORNIA )ss

COUNTY OF PLACER )

On before me JOHN P. WEBER, Notary Public, personally appeared KEN GREHM, who proved to me on the basis of satisfactory evidence to be the person whose name is subscribed to the within instrument and acknowledged to me that he executed the same in his authorized capacity, and that by his signature on the instrument the person, or the entity upon behalf of which the person acted, executed the instrument.

I certify under PENALTY OF PURJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

John P. Weber

Page 5: MEMORANDUM - Placer County, CA

Exhibit 'A'

MEMORANDUM

DEPARTMENT OF PUBLIC WORKS County of Placer

TO:

FROM:

KEN GREHM

MATI RANDALL

DATE: June 17, 2014

SUBJECT: NOTICE OF COMPLETION FOR THE FORESTHILL ROAD BRIDGE SEISMIC RETROFIT AND PAINT PROJECT, CONTRACT NO. 1074, CONTRACT SUMMARY

Contractor: Golden State Bridge, Inc.

Work Completed: May 6, 2014

Preliminary Estimate ........ .... .. ........... .. ....... .

(1) Contract Award ............................... .

(2) Final Contract Cost:

Completed Contract Items

Contract Change Orders

Construction Deduct

TOTAL

$

$

$

$

$

$

65,330,543.60

58,374,849.00

58,094,633.45

2,403,747.48

(0.00)

60,778,596.48

Percent of Increase (Final Contract Cost vs. Contract Award) 4.12%

Page 6: MEMORANDUM - Placer County, CA

CONTRACT CHANGE ORDER SUMMARY:

Foresthill Bridge Seismic Retrofit and Paint Project

CCO No Subject Amount Type

1 . · Traffic Control, Signs & Striping $5,000.00 EW@FA

1 S1 Additional Funds · $15,000.00 EW@FA

1·s2 Additional Funds $2o,<ioo:_oo EW@FA

1 S3 .. $10,000.00 ... ·EW@FA

1 S4 $2o;ooo~oo EW@FA

1 S5 $20,000.00 EW@FA

1 S6 $10,000.00 EW@FA

2 $40,700JiO Ew@FA & Ew@LS

2 sf Additional Funds for PG&E $5;ooo.oo EW@FA

2 S2 Additional Funds for PG&E & Trailer Jan to April 20.14 . $4,682.80 EW@FA & EW@UP

3 WPCP"SWPPP Change Order :. $50,000.00 EW@FA

3 S1 Erosion Control Substitution $9,269.00 AIC@LS

4 Credit. for SecuritY . ($122,500.00) AIC@LS

5 ·. . . Gloss Retention (No Cost) · AIC@LS

6 - . Dispute Resolution Board • $50,000.00 EW@FA

7 Pedestrian Railing Picket $21,473.00 EW@LS

·- 7 S1 . Pedestrian Railing Drill & Galvanize $95,984.00 EW@LS

1 S2 Pedestrian Railing Grind Channels & Cut Threaded Studs $31,386.00 EW@FA & EW@LS

· 8 Cored Hole Eri'countered Vertic-al Rebar · · $3;52o:oo AIC@LS & ITEM

9 ReseguenCing ·per RFI #3 (No Cost) · EW@LS

$2,1.20.00 EW@LS 10 . . . . . . - . Temporary Bracing Anchors; Abut 1 Concrete Over Footings

11 Roller Bearing' Material Substitutio.ns (No Cost) 'AIC@LS

12 · Buckling Restrained Brace (BRB) UCSD Test Cost Escalation •$1,916.20 AIC@LS

f3 Federal Training -ApprentiCeship Reimbursement $14,400.00 . EW@UP

14 BRB ·Anchorage _Relocation at Abutments 1 & 2 . : $6;385.00 EW@LS

15 Modify. Steel Components $20,000.00 EW@FA

15 51 · .Additional Funds . $40,000.00 EW@FA

$30,000.00 EW@FA · . . · Additional Funds 15 S2

Additional Funds . $2o:ooo.oo EW@FA

16 Catwalk Grating Blast, Prime & Paint in ·Place (No Cost) AIC@LS . . . .

17 Replace Joint Seal Assemblies WB & EB Structure MR=30' $172,613,54 ITEM+EW@FA&LS

17 S1 Additional Funds . $1.50,000.00 EW@FA

18 HMPB (GSB & FDT) $81,600.00 EW@FA

18 S1 Additional Funds for HMPB. $4,000.00 EW@FA

19 Gap Tolerances NOPC #2 (withdrawn) $50,000.00 Ew@FA

20 (No Cost) AIC@LS

21 . Add'l Shop Dwg & Fabrication Packages 1 & 2 $77;832.00 AIC@LS . .

21 S1 Add'l Shop Dwg .& Fabrication Package 3 $8,794.00 AIC@LS

21 S2 · .Add'l Shop Dwg & Fabrication Package 4 · $56,9o3.oo AIC@LS

22 Cherokee Bar Gate Coating (No Cost) . AIC@LS

23 Extension Spring,' Bearing Mod & HS Rods~ Piers 2 & 3 $148,480.00 AIC@LS & EW@FA

23 S1 Additional Funds $50,000.00 EW@FA

23 S2 Additional Funds . . $30,000.00 EW@FA

LllO

Page 7: MEMORANDUM - Placer County, CA

Alternative Painting Procedure (Existing Structural Steel Faying (NCi Cost) 24 Surfaces) AIC@LS

25 Improve Drainage Inlets & Guardrail $40,000.00 EW@FA

-26 · Add'l Shop Dwg &.Fabrication PCk .5- Catwalk $39,253.20 AIC@LS & ITEM . . . . . 27 Replace Bolts @ Exp Bearings (Deck Expansion Jt) $30,000.00 EW@FA

. 28 Clip' Existing Floor. Beam Stiffeners ; G Bracket · $'2j ,495.00 -AIC@LS

29 Paint Material Sub at Galvanized Fasteners $5,361:oo AIC@LS

30 catwalk Ladders & NOPC #4 settlement · $184,601.75 AIC@LS .

: 31 . Additional Catwalk Details , $416,515.63 AIC@LS&FA .

32 . $89,474.26 'AIC@LS

33 · Pedestrian Patti Improvements · $141,503.27 . EW@LS + ITEM

33$1 Additional Red Path Improvements - SE Quadrant · $30,597.41 . ' EW@LS

33 S2 Additional Ped Path Improvements - NE Quadrant · · $75,182;54 . EW@LS+ ITEM

. 33 S3 •. NE Pedestrian Path Dike & Guardrail Alignment EW@FA & EW@UP

34 Modify Catwaik Components .EW@FA

34 S1 Additional Funds EW@FA

35 New Handrail in Abutment Houses $106,724.44 EW@FA & EW@LS . . . .

. 36 :Abut Doors in Abutment Houses $6,000.00 . . . AIC@LS

37 Immersion Service & Weep Hoies · $10,000.00

38 . Lamination Repair U7 - us 39 · U15 Angle .Replacement

40 Heat Straightening·. $50,000.00 . EW@FA

41 Pedestrian Rail Post Replacement $1,500.00 . EW@FA

42 .. ' State Park Gates Layout & Detail . (No cost) ' EW@FA

AIC@UP, Ew@FA & 43 $98,885.48 EW@LS, ITEM

43 s1 Additional_ MicroS~rfacing· & Striping · .· $38,401.04 EW@LS

44 Closeout Deferred Time CCO's ' . $0.00 AIC@LS 45 . .• Temporary Highway Deterrents · $8,058.00 EW@LS

46 Final Balancing Change Order ($351 ,241.88) ITEM+ EW@FA+EW@UP

$ 2,403,747.48

Revised Contract $ 60,778,596.48 . '

Contingency Balance - Executed CCO's I" ·$ . , 514,!)94.97 . · , . . ~~~~~~~--~_J

Lt ll

Page 8: MEMORANDUM - Placer County, CA

PLACER COUNTY DEPARTMENT OF PUBLIC WORKS

ACCEPTANCE STATEMENT

Ken Grehm, Director Peter Kraatz, Deputy Director

Project Name: FORESTHILL ROAD BRIDGE SEISMIC RETROFIT AND PAINT PROJECT

Contract No. 1074

I have examined the quantities of contract items and amounts indicated as paymen' for extra work and deductions on the Proposed Final Estimate dated May 12, 2014 and find them to be correct. I agree to the amounts listed below, as total amount earned for all work performed on the above contract except as may be indicated below.

Contract Items (as detailed on the attached) $58,094,633.45

$2,683,963.03

$60,778,596.48

Contract Change Order Work

Total Work done

Deductions $ 0.00

TOTAL AMOUNT DUE TO CONTRACTOR $60,778,596.48

EXCEPTIONS (check one)

NONE

As indicated per attached letter dated:

Approved by Contractor:

:YJS ~ ~ Title p,z.,£' s 1 DE 1\.\ T'

Date _ 5_' _l_2 __ .7_..:.l_z_o__;· I_Y .__· . _

Auburn (Dewitt Center) 3091 County Center Drive, Ste. 220 I Auburn, CA 95603 I (530) 745-7500 I Fax (530) 745-7544 Road Division: 11428 F Avenue I Auburn CA 95603-27141 (530) 745-75651 Fax (530) 889-6989

Tahoe Engineering Division, P.O. Box 336, 7717 North Lake Blvd. (SR 28), Kings Beach, CA 961431530-581-62381 Fax 530-581-6239 Tahoe (Cabin Creek) 870 Cabin Creek Rd. - Truckee, CA 961611 P.O. Box 1909- Tahoe City, CA 96145-1909 1 530-550-12121 Fax 530-550-0266

www.placer.ca.gov/works • [email protected]