KIRBY CENTENNIAL PUBLIC SCHOOL MODIFIED …
Transcript of KIRBY CENTENNIAL PUBLIC SCHOOL MODIFIED …
KIRBY CENTENNIAL PUBLIC SCHOOL MODIFIED ACCOMMODATION REVIEW
SCHOOL INFORMATION PROFILE
Kirby Centennial Public School Instructional Profile
Describe the number and type of teaching staff, non-teaching staff, support staff, itinerant staff, and administrative staff at the school
Teaching Staff: 7 teachers with a FTE of 6.24 – not all teachers are full time
Support Staff: 1 secretary 1.5 Educational Assistants 1 E.C.E. 1 custodian
The school has a Principal Describe the course offerings at the school K – 6 learning environment
Describe the specialized service offerings at the school (e.g. cooperative placements, guidance counselling, etc.)
The school has a School Board Counsellor who offers counselling on a referral basis to the students. The school offers co-op placements to our local high school.
Current grade configuration of the school K – 6 learning environment
Current grade organization of the school 1 – JK/SK 28 students 1 – Grades 1/2 16 students 1 – Grades 2/3 14 students 1 – Grades 4/5 18 students 1 – Grade 6 15 students
92 students total
Number of out of area students 8
Utilization factor/classroom usage There are 8 classrooms. Currently five are being used as homeroom classrooms. The other three rooms are being used as: a library; a Computer Lab; a Resource Room/Before and After Care Program/Meeting room/ quiet space for students as required.
Extracurricular activities Kirby Centennial students have the opportunity to participate in Intra-mural Soccer, Cross-Country, Volleyball, Basketball, European Handball, Slo-Pitch, as well as Choir and Hip Hop Dance
Kawartha Pine Ridge District School Board
Kirby Centennial Public School3675 Concession Road 7, Orono, Ontario L0B 1M0
Property Details: Kirby Centennial Public School
Site Size: 10.02 +/‐ Acres or 4.05 ha
Parking Spaces: 14 Portable Classrooms: 0
Water & Sewer Services: Well & Septic System
Hard Surface Play Areas: 9,000 Sq. Ft.
Hard Surface Parking & Driveways: 15,579 Sq. Ft.
Sports Track and Field: Elementary playground with play structures
Additional Sports Facilities: Storage Garage
School Facility Details: Kirby Centennial Public School OTG: 164pupil places
Gross Floor Area: 14,120 Sq. ft. or 1,312 Sq. metres Year Built:
# of Rooms OTG/Room Totals:
Instructional Spaces: Kindergarten 1 26 26
Classroom 6 23 138
Family Studies 0 23 0
Music Room (Vocal) 0 23 0
Science Lab 0 23 0
Resource Room 0 12 0
Special Education 0 9 0
General Purpose Room (Gym) 1 0 0
Total Capacity for Kirby Centennial Public School: 8 164
Non‐Instructional Spaces: Cafeteria/Cafetorium 0 0 0
Library Resource Centre 1 0 0
General Office Complex 1 0 0
Guidance Centre 0 0 0
Utility Costs (2014‐2015): Expenditure 2014‐15
Electricity 8,516$
Natural Gas 10,563$
Water & Sewer n/a
Total: 19,079$
Building Gross Floor Area: 14,120 1.35$ / Sq. Ft.
OTG: 164 116.34$ / pupil place
1968 with no additions
Kawartha Pine Ridge District School Board
Kirby Centennial Public School3675 Concession Road 7, Orono, Ontario L0B 1M0
Asbestos Assessment Report for Kirby Centennial P.S. is available for review (63 pages) June 17, 2016
Historical Information of Facility Improvements:
Year Description Value
2015 Full Day Kindergarten Renovation 354,230$
2010 Interior Painting 6,780$
2010 Window Replacement 69,610$
2007 Heating System Controls 10,924$
2007 Asphalt Paving ‐ Driveway & Parking 62,651$
2006 Exterior Restoration Roof & Walls 518,954$
1,023,149$
n/a not applicable
Kirby Centennial Public School
Orono
Hwy 35 / 115
Taunton Road
KIRBY CENTENNIAL PUBLIC SCHOOL
(BRICK)
FLAGPOLE
SOCCER
SOCCER
SOCCER
SOCCER
SOCCER
SOCCER
BACKSTOP
BASEBALL
TETHERBALL
TETHERBALL
BASKETBALL
SOCCER
SOCCER
CHAINLINKFENCE
CHAINLINKFENCE
PO
ST
& W
IRE
FE
NC
E
SOCCER
SOCCER
TETHERBALL
GARDEN
POST & WIRE FENCEN 67ø11'40"E 612.40'
N 70ø33'30"E 607.80'
PART 6, PLAN 10R-834
PA
RT
6,
PLA
N 1
0R
-834
PA
RT
3
PLA
N 1
18306
PART 5
10R-1288
ROAD ALLOWANCE BETWEEN CONCESSIONS 6 & 7
L O T 2 5
C O N C E S S I O N 6
SIB
SIB
HEPC EASEMENT - 10' WIDE
INS
T. N
o. 1
03
90
0
(EX
PR
OP
RIA
TE
D B
Y P
LA
N 1
18
306
)
N 1
7ø
16
'00
"W
69
8.0
0'
PO
ST
& W
IRE
FE
NC
E
INS
T. N
o. 1
27
74
4
INST. No. 127744
(M)
N 1
7ø
18
'W 4
97
.00
'(N
17ø
16'W
497.0
0' 1
0R
-834)
N 1
7ø
18
'W 2
37
.00
'(M
)
(N17ø
16'W
237.0
0' 1
0R
-2652)
PO
ST
& W
IRE
FE
NC
E
PO
ST
& W
IRE
FE
NC
E
IB
SIB
SIB WIT
INST. No. N31506
(Plan Attached)
AREA = 10.02 ACRES SWING
SWING
SWING
BASEBALLBACKSTOP
BASKETBALL
FRAME
SHED
AS
PH
ALT
GRAVEL
ASPHALT
ASPHALTASPHALT
BRICKWALL
MA
RS
H
ST
ON
ER
ETA
ININ
G W
AL
L
N 71ø22'30"E
2.20'
SIB WIT
Based on survey by Ivan B. Wallace OLS dated 8th January 1998
151 - Kirby Cent Site Plan
BALANCE
BEAM
PEASTO
NE
SS1
Grass
SIT-UP
BENCHES
BALANCE
BEAMS
CHIN-UP
BARS
PLAY
STRUCTURE
AREA 1
SAND
PLAY AREA
PLAY
STRUCTURE
AREA 2
SWINGS
AREA 3
PA
RA
LLE
L B
AR
S
AR
EA
4
Concession Road 7
CLA
SS
RO
OM
GE
NE
RA
L P
UR
PO
SE
RO
OM
STA
GE
ME
CH
AN
ICA
LR
OO
M
ST
OR
AG
EB
OY
S
W.R
GIR
LS
W.R
Sta
ff R
oo
m PR
INC
IPA
LG
EN
ER
AL
OF
FIC
E
TE
AC
HE
RS
RO
OM
LIB
RA
RY
CLA
SS
RO
OM
CLA
SS
RO
OM
CLA
SS
RO
OM
CLA
SS
RO
OM
KIN
DE
RG
AR
TE
NC
LA
SS
RO
OM
CO
RR
IDO
R
CORRIDOR
10
41
05
10
3
10
2
10
1
11
911
9A
11
3
11
2
11
411
5
11
611
7
11
81
06
10
71
08
10
9
111
11
0
H121
H1
20
V1
V2
V3
151 -
Kirby C
ent 1st F
loor
Security
Alarm
Pad
B.F
.W
.R11
5A
H11
5
CLA
SS
RO
OM
GE
NE
RA
L P
UR
PO
SE
RO
OM
STA
GE
ME
CH
AN
ICA
LR
OO
M
ST
OR
AG
EB
OY
S
W.R
GIR
LS
W.R
Sta
ff R
oo
m PR
INC
IPA
LG
EN
ER
AL
OF
FIC
E
TE
AC
HE
RS
RO
OM
LIB
RA
RY
CLA
SS
RO
OM
CLA
SS
RO
OM
CLA
SS
RO
OM
CLA
SS
RO
OM
KIN
DE
RG
AR
TE
NC
LA
SS
RO
OM
CO
RR
IDO
R
CORRIDOR
10
41
05
10
3
10
2
10
1
11
911
9A
11
3
11
2
11
411
5
11
611
7
11
81
06
10
71
08
10
9
111
11
0
H121
H1
20
V1
V2
V3
151 -
Kirby C
ent 1st F
loor
Security
Alarm
Pad
B.F
.W
.R11
5A
H11
5
Ye
ar
of C
on
str
uctio
n
Origin
al -
1968
nm
nmnm
nm
nm
nm nm
nm
nm
nm
nm
nm
nm
nm
nm
nmnm
nm
nm
nm
ZION LINE
DEYELL LINE
THORNE DR
CHALLICE LINE
AVAC
RES
BEE DR
MAIN
ST
ANNE ST
TWAYDR
CARMEL CRES
COUN
TYRO
AD10
Orono PS
Clarke HS
Newcastle PS
The Pines Sr PS
Ganaraska Forest Centre
Kirby Centennial PS
3348
3233
8
6155
364764
570
184
825
295
3926
132
3030
59
86
510
46
4255
1119
3283
24
203
4442
3218
8318
21
3930 4420
220
306
6765
3488
4828
3858
4
4825
31302429
8629
7421
3412
3960
47
6759
6347
257
4356
4158
72
12
964
2173
3383
8495
349
340 502
7320
7315
4208
7304
3937
5595
7257
2100
31
34
233
3496
3236
4312
5650
3634
4525
4761
4778
4848
3259
398
6527
4212
814
3851
55
4438
86
744
216
3239
520
2001
854
260
3130
6226
541
246
3427
3490
826
150
290
7420
3673
825
3306
3478
7575 7574
3792
3706
4180
4472
156
3796
1570
300
5784
376
6525
8665
245
796
4224
6133
4773
4765
395
40
262
3574
8020
3377
4828
3842
400
3870
4606
4667
3730
8528
3763
4878
4396
3935
90
4163
4804
3938 4196
3981
4340
3310
7486
5350
4771
3648
4269
4535
4251
3826
2800
4133
3926
4665
3625
4876
84
3569
5699 4227
2794
3387
8375
3104
3298
845
3313
3330
9683
2346
3662
3730
5191
4739
49
3827
3654
8614
8453
2814
3721
3570
4382
4098
84
8250
6466
4840
54
8169
7371
5455
5534
4854
230
2741
556
8689
3703
3249
4795
8622
6199
8436
6520
2004
4027
3977
5661
5347
4383
1108
4376
8125
4051
2727
7345
415
7368
6770
5719
4162
467
4098
3274
4107
3856
355
4590
4850
8553
4279
75
7261
3576
6692
4391
4188
3285
6100
8225
8378
619
1623
3138
2871
4443
4705
41
3431
6720
4199
5504
4566
2339
8474
7334
3044
3937
3238
4672
681
3950
3195
25
5679
3797
4050
4225
4610
1060
5011
506
4061
269
19
267
4045
307
4484
5799
1093
6860
2136
3980
3103
4752
3609
3828 40
47
235
3955
4576
3388
711
4210
4648
3684
8532
454
46
8075
3860
6168
4564
2412
3225
6759
3624
4657
3921
958
3671
4780
4805
5659
3585
567
7987
3285
2525
7222
123
3048
705
4160
5742
349
51
4150
6119
4163
4825
3433
6587
3520
8733
4654
3570
5728
853
4398
4436
7044
7233
4456
4352
85
995
4200
4242
4299
4276
3551
4095
3733
4222
3425
3756
4075
3883
3830
7238
3805
4438
4240
134
4153
4931
4207
4504
947
89
4579
4123
4185
685
2889
4534
919
3800
222
6143
4653
4291
4579
4829
1121
3791
3025
3434
3267
2433
4670
3578
9505
3700
3955
8080
6179
4674
3820
5660
1550
3356 62
20
3090
3681
6580
4203
4566
17
4627
91
4166
3775
3929
3476
6567
4001
7700
4639
9796
3111
4298
1400
4159
4146
1547
1139
3440
3479
4100
3544
8100
4564
178
3783
3119
4520
3708
3774
4591
8724
4810
8445
1008532
40
9511
655
954
4822
4561
7400
7598
3143
3865
7605
4798
4399
4617
8480
3669
4636
4825
5216
5019
3676
8473
665
4263
4675
7547
4576
4490
8165
7570
8215
1667
4204
4875
8805
3384
4160
4815
4594
3582
4258
3382
10463
4754
5587
6120
4348
7205
2605
4445
3753
3682
3554
4140
4349
3542
2033
7044
3863
3860
5600
6520
363
4901
3757
700
3585
4290
3505
3465
1400
4160
3434
4536
4625
694
4116
7788
3130
4289
200
3075
3962
123
3213
4435
3845
3431
5251
4558
440
3439
8158
3110
4178
7429
3865
3014
280
1173
4060
895
4660
3278
755
4456
3636
35484330
6200
3235
219
4276
505
5800
3736
5900
3758
678
4840
3258
9015
6667
4704
688
30
3232
3897
2280
4346
91
7486
3795
7495
578
4140
5674
115
4641
5125
4826
1134
61
107
3342
6285
3660
694
4728
3975
3837
6120
3686
5454
6
204
3250
8953
4098
1291
5043
3421
191
8385
4422
580
4159
6346
1290
1063
4475
1535
797
839
3862
3610
1085
3
1545
171
4404
3086
4776
3840
87
7700
4060
4582
6400
3298
9122
2878
4436
3253
32
5450
3641
255
4673
6459
4320
4372
3880
2156
3917
4180
178
5978
7165
4856
3848
3282
4303
5526
1513
3296
1010
9
302
3260
3541
3990
8745
3730
7666
3436
4720
5411
3333
4804
6359
6234
5201
1400
8304
209
8215
3221
2560
4597
9050
4724
6265
62
4675
6732
3690
4898
879
3585
906
8671
3985
3624
3667
4570
3097
2272
3861
6040
3342
3818
8530
4705
4658
4676
4545
6954
278
4529
6826
2097
7481
4612
46754237
4045
7413
3279
8381
8101
8313
8173
3504
8241
4900
3259
462746274627
3831
4627
3771
4027
4009
3376
4790
3292
9582
652
18
3790 3870
10585
3908
3844
1990
3745
3709
43344346
190
1413
3227
75
71
38463834
46274627
263
135
1546
6054
1630
582
295435
65
1
3510
3533
1560
3171-3191
295
4627 62
3790
46274627
24
6720
4481
4050
3307
3260
216
23
4274
249
3354
421
4446
3228
385 1387
978
169
3438
3797
3336
4398
601
3210
4434
199
4785
3470
7437
3095
7165
6360
1287
3368
4075
2249
3260
3342
4704
3114
4480
3847
3797
4855
1067
3969
31623068
7486
3448
2524
3417
3016
6108
6255
34546160
260
3684
710
7677
3640
5201
35543600
34283512
3377
3464
3639
3770
337434203330
8620
4569
3727
5858
5636
3288
3683
3242
3393
8443
4555
4347
3415
37673755
64306386
4438
8571
8754
6310
8798
3750
8712
4126 4848
6294
8666
4627
42164258
3194
43734331
3219
4285
3303
42414199
35053463
8475
6254
4155
4623
41094065
4300
44154461
3221
45074630 4549
1498
4824
121
3081
35503550
3123
4755
3171
4504
7440
4593
4627
4571
3467
45904620
3501
4574
6460
44604460
4627
3255
4756
7398
44184437
3545
4627
3831
37873795
381738233839
3964
4469
4627
37143704
1452
4437
75777535
3691
3958 2793
4391
4520
43924301
38004447
4474
4125
46564672
6576
4169
6854
6500
47764858
4215
4822
6460
4259
3758
4346
3188
6786
1162
6834
3565
1400
816
218
4630
3757
3968
3168
3369
45053780
3109
5786
3820
1716
3120
420
3260
3714
4655
3690
63
200
4860
4055
7236
2505
7866
236
4328
456
3674
4487
1195
3334
3741
10520
3595
1000
626
5011
300
3378
1706
20
86
515
867
32883288
3855
2030
3609
4298
7759
200
2678
3055
3070
7454
1640
7316
743
372
8869
732 2025
598
2675
7254
340
4568
9666
3554
109
604
4360
599
3446
6690
142
3681
3226
7377
7192
7930
3060
203
7398
5147
612
3462
500
115
1435
1307
8262
561
3229
3820
4775
3595
52-56
6742
3515
3325
241
7024
150
424846564670
3206
400
4118
3147
3657
7552
5502
4422
3237
4453
3310
4277
3384
4471
1427
7108
7437
7233
7167
5440
3362
5500
4754
4175
3190
5505
3099
6113
9669
4312
640
4548
2220
3978
3384
6165
2472
48705789
43253876
3981
3749
3767
10126
46807066
3645
3744
3655
4115
3292
4154
3848
3122
3458
3140
4498
1774
89
3299
3181
303
6250
4570
CON RD 8
DRUM RD
FR1 01CON RD 10
REID
RD
BOUNDARY RDBE
ST RD
SANDY HOOK RD
ELLIO
TT RD
JO HNST
CON RD 3
MOSP
ORT R
D
CON RD 4
CON RD 1
CON RD 5
CON RD 6
WILM
ONT R
D
LAKESHORE RD
STAPL
ETON
RD
GOLF
CRSE
RD
MERC
ER RD
SOPE
R RD
LANG
STAF
F RD
THERTELL RD
FARMERS RD
COLD
SPRIN
GS CA
MP RD
HENR
Y RD
JEWEL
RD
SHILO
H RD
RILEY
RD
SKELDING RD
WALS
H RD
WHITE
RD
GAMS
BY RD
GILMORE RD
E TLINE RD
BROW
N RD
MOFFA
T RD
LESK
ARD R
D
COON
EY RD
WILCOX RD
STEW
ART R
D
GLAM
ORGA
N RD
SANDARASKA RD
SERV RD
JAYNE
S RD
GIVEN RD
ALLIN
RD
HILL ST
MCCULLOUGH RD
NIXON RDTH
OMPS
ON RD
NICHO
LLS RD
FR 2
WILMOT TRAIL
BELLAMY RD
THE D
ELL R
D
STATION ST
N ST
CARS
CADD
EN RD
MORG
ANS R
D
LOWE
RY RD
TO R ONTOST
STEP
HENS
ON RD
RUDE
LL RD
LA NCA STER RD
DAWS
ON RD
PORT
ER RD
GIBSO
N RD
MAYN
ARD R
D
TLINE DA RLI NGTO N MANVERS
CON RD 2
HWY 35
MILL ST S
LOVEKIN RD
LAKEBREEZE DR
EDWARD ST W
COBB
LEDIC
K RD
TLINE
DARL
INGTO
N CLA
RKE
ADAM
S RD
ANDR EW ST
MICRO RD
BROW
NSVIL
LE RD
SHIPWAY AVE
BELLW
OOD D
R
THE COVE RDBLUFF S RD FAWY DR
CEDA
R VAL
LEY R
D
TA MBLYN RD
OVENS RDSUNSET BLVD
DARL
INGTO
N CLA
RKE T
OWNL
INE RD
BEAVER ST S
ANDR
EWS R
D
MILLIGAN ST
6TH LINE
PK LANE
5TH LINE
PK ST
OLD K
IRBY R
D
OAK S
CHOO
L RD
ROYAL ES TAT E DR
SIDER
D 11 &
12
PATTE
RSON
RD
JONES AVE
POLLA
RD RD
HILLE
N RD
RESNIK DRPAYNE S CRES
COVE
N RD
GRADY DR
AMOS ST
GIFFO
RD RD
BUCK
LEY R
D
WATER ST
SKOPS
CRT
COWANVILLE RD
BROWVIEW RD
BLEWETT RD
AMELIA ST
PAYNE ST
GRAH
AM RD
HARR
IS RD
ROBIN
S RD
MAYN
ARD R
D
CON RD 4
CON RD 3
HENR
Y RD
TLINE
DARL
INGTO
N CLA
RKE
BEST
RD
ELLIO
TT RD
STATION ST
CARS
CADD
EN RD
BOUNDARY RD
JEWEL
RD
STEP
HENS
ON RD
CON RD 8
BEST
RD
E TLIN
E RD
SANDARASKA RD
CARS
CADD
EN RD
REID
RD
MORG
ANS R
D
SHILO
H RD
GILMO
RE RD
GILMO
RE RD
ELLIO
TT RD
T AM BL YN RD
HIGHWAY 401
HIGHW
AY 35
& 115
HIGHWAY 2
HIGHWAY 115
NEWTONVILLE ROAD
GANARASKA ROAD
CONCESSION ROAD 4
PONTYPOOL ROADRE
GIONA
L ROA
D 42
HIGHW
AY 35
CONCESSION ROAD 3
CONCESSION ROAD 6
CONCESSION ROAD 1
REGIONAL ROAD 20
TAUNTON ROAD
LESK
ARD R
OAD
MORG
ANS R
OAD
MAIN
STRE
ET
CONCESSION ROAD 7
CONCESSION ROAD 5
VICKE
RS RO
AD
SQUA
IR RO
ADOC
HONS
KI RO
ADPO
LLARD
ROAD
LAWR
ENCE
ROAD
ARTHUR STREET
LOCK
HART
ROAD
NORT
H STR
EET
METCALF STREET
TOWN
LINE D
ARLIN
GTON
CLAR
KE
HIGHWAY 401
CONCESSION ROAD 5
POLLA
RD RO
AD
HIGHWAY 115
MORG
ANS R
OAD
Kendal
Pontypool
Newtonville
K I R B Y C E N T E N N I A L P SK I R B Y C E N T E N N I A L P S
N E W C A S T L E P SN E W C A S T L E P S
O R O N O P SO R O N O P S
±
Disclaimer: All school boundaries are provided for general information and are illustrative only. Every effort has been made to ensure the accuracy of this information, however school boundaries can change over time. This map is not a legal survey. The Kawartha Pine Ridge District School Board (hereafter, the 'Board') does not assume any liability or responsibility for unintentional errors, accidental omissions or incomplete information. All final decisions with respect to school boundary maps are reserved to the Board. This map was produced by and is owned by the Board and is not to be copied, saved, re-used or re-transmitted by any communication medium by anyone. This map was produced by the Board with data supplied under license by Members of the Ontario Geospatial Data Exchange. © Her Majesty The Queen in right of Ontario by the Minister of Natural Resources as agent for the Ontario Ministry of Natural Resources.
LegendLot LinesSchool Boundaries
Catchment AreaKIRBY CENTENNIAL PS
KIRBY CENTENNIAL PUBLIC SCHOOLJK to Grade 6
Gr 7 and 8 to The Pines Senior P.S.3675 Concession Road 7, RR#1 Orono
(905)983-5802
Kirby Centennial PS Official Plan
ESRI Canada; ESRI Inc.; Municipality of Clarington; Teranet Inc.; MPAC;CLOCA; GRCA
ORM BoundaryHighway 407,401, 35-115 CorridorUrban Areas
Natural Core AreaNatural Linkage AreaEnvironmental Protection on Oak Ridges Moraine
August 29, 20160 0.065 0.130.0325 mi
0 0.1 0.20.05 km
1:4,000
ESRI Canada; ESRI Inc.; Municipality of Clarington; Teranet Inc.; MPAC; CLOCA; GRCA | ESRI Canada; ESRI Inc.; Municipality of Clarington | Web AppBuilder for ArcGIS
Zoning By-Law Map
Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO,USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey,
Oak Ridges Moraine (ORM) BoundaryMinimum Area of Influence (MAOI)
August 29, 20160 0.075 0.150.0375 mi
0 0.1 0.20.05 km
1:4,514
Esri, HERE, DeLorme, FAO, NOAA, USGS, EPA, NPS, AAFC, NRCan | ESRI Canada; ESRI Inc.; Municipality of Clarington; Teranet Inc.; MPAC | Municipality of Clarington
Condition Assessment
Kawartha Pine Ridge District School Board
Kirby Centennial PS, Building ID 6126-1
Asset Assessment Program 2011-2015
Kawartha Pine Ridge District School Board Page 1 of 36
Printed On: 2015/10/29
How to read the final report
The Final Report contains assessment information for 5 years for this facility.
Asset details reported are either populated from the SFIS system (e.g. GFA, year built etc) or calculated based onMinistry’s criteria (e.g. Replacement Value – OTG, Official FCI, Comparable FCI etc).
Accessibility and Energy assessment lists are provided in a yes/no format. For a full description of accessibility/energydefinitions please check the TCPS database, Asset Narratives, under the Narratives Tab.
Asset Narratives include the following:
• Architectural & Structural Summary –a brief summary of the asset including construction dates and areas of theoriginal and additions. A brief description of the structure, the exterior wall system, the roof assembly system and thebuilding interiors.
• Mechanical Summary – a brief summary of the mechanical systems.
• Electrical Summary – a brief summary of the Electrical systems.
• Site Summary – a brief summary of the Site systems.
• Limitations – a summary of the scope of work and the Tactical Planning Window.
Building Elements listed are only the ones that require replacement in the next 5 years; their condition is Critical if failed orrisk of imminent failure is observed, or Poor if it is not functioning as intended with significant repairs within the next two (2)years, or Fair if normal deterioration and minor distress is observed requiring repairs within three (3) to five (5) years.
2011-2015 Cost and Year information is a snapshot from the assessment and cannot be edited in TCPS.
2011-2015 Priority is the value of the Event priority calculated when the assessment data was imported in TCPS andstored in this read-only field.
Estimated Cost and Fiscal Year are values that can be edited at any time by end users.
Event Priority is a field populated with labels like Urgent, High, Medium and Low based on the Event Priority Value. Thisvalue is calculated based on the Element Type and Element Condition.
Photos are provided at the event level: old photos are suffixed with the world “Old”, new photos are suffixed with the dateof assessment.
A copy of this report in PDF format is saved in the TCPS database. You can access it by selecting the Asset Instance inData Manager and opening this report in PDF format from the Document Tab.
1. Architectural & Structural Executive Summary
Information was gathered and observations made by Pretium Anderson Toronto Inc. on June 9, 2015.
Kirby Centennial Public School is located at 3675 Concession Road 7, Orono, Ontario. The original building wasconstructed in 1968 as a single storey, slab-on-grade structure incorporating 1,316 square meters.
Asset Assessment Program 2011-2015
Kawartha Pine Ridge District School Board Page 4 of 36
Printed On: 2015/10/29
The educational facility consists of 7 designated classrooms; a library; a general purpose room; a stage; a staff room;teacher's room; a general office; and student and staff washrooms.
The building is a wood frame structure with a tongue and groove wood roof deck supported on a combination of loadbearing masonry walls and wood beams and columns.
The exterior walls are predominantly brick masonry.
Windows are predominantly punched type with various combinations of fixed units and awning type operators.
Exterior doors are painted insulated steel assemblies.
There are 2 main roof areas protecting the school. Both are conventional built-up membrane assemblies.
Interior floor finishes include a combination of terrazzo, vinyl tile, sheet vinyl and hardwood strip. Wall finishes includepainted concrete block, and gypsum board. Finished ceilings are a combination of gypsum board and 12" x 12" acoustictiles.
Millwork consists of a combination of varnished solid wood end gables, shelves and doors and wood veneer with plasticlaminate counter tops.
Minor repairs/replacements to vinyl and ceiling tile, interior painting, and asphalt pavement are ongoing. Major workcompleted in the last ten years is a follows:• 2015 - FDK Renovations• 2011 - Window Replacements• 2010 - Interior Painting• 2010 - Window Replacements• 2007 - Asphalt Pavement
2. Mechanical Executive Summary
The primary source of heat within the building is hydronic, with a central plant and hot water piping distribution network.
One Boiler Smith cast iron boiler, Model # CF3EW-25-G-30 with Fuel Master gas burners with a rated input of 1,005 MBH,provides hot water for heating the facility. Heating water is distributed to unit ventilators in classrooms and the stage, linearwall fin tube convectors in the administration areas, the gymnasium and staff rooms, unit heaters in service areas andwall-mounted convectors in corridors and washrooms.
The unit ventilators provide classroom ventilation. Two roof-mounted fans provide extract ventilation for the washrooms.
A roof-mounted extract fan connected through dedicated ductwork to wall grilles, working in combination with the stageunit ventilators, provides general ventilation to the gymnasium.
Unit ventilators and the gymnasium-heating units are remotely controlled by a Reliable building automationsystem. Corridor baseboard units and area fan heaters are provided with individual thermostats.
The entire school relies on domestic water supplied from an on-site well. the water is filtered and treated before beingdistributed.
One gas-fired atmospheric water heater manufactured by John Wood, Model # JW50S40FV-02 with a storage capacity of50 US gallons, provides the domestic hot water for the student and staff washrooms.
Hot and cold water services with respective sanitary drainage are provided throughout the school.
Asset Assessment Program 2011-2015
Kawartha Pine Ridge District School Board Page 5 of 36
Printed On: 2015/10/29
A conventional septic system is used for on-site waste water treatment. The system consists of a sewage-collection tankfor initial decomposition of solid matter and a drainage field for the discharge of the effluent.
Dry chemical fire extinguishers are provided for fire protection for the building.
3. Electrical Executive Summary
Hydro One provides a 120/208V single phase 3 wire electrical feed directly from a local transformer to the school.
The main breaker which is located in the boiler room is rated for 200 amps and feeds numerous sub-panels for thebuilding services equipment, lighting and general usage.
The base building lighting system is comprised of surface mounted and suspended fluorescent lighting fixtures with T8,32W cool white lamps and electromagnetic ballasts. The emergency lighting consists of fixtures hard-wired to centralbattery packs and individual battery pack units. The exit signs are a mixture of 15 watt incandescent units converted to useLED lamps and newer fully illuminated LED signs.
The building does not have a lighting control system. Exterior lights are controlled by the building automation system.Individual classrooms and common areas are equipped with manual control switches.
The fire alarm system is based on an Edwards fire panel configured for two zone application. The system consists of pullstations and smoke/heat detectors that activate horn devices to provide an audible alarm to all internal areas of thebuilding. Visual alarms are provided in corridors and areas where the ambient sound level might make it difficult to hear anaudible alarm.
The building is equipped with a motion sensing security system with keypad activation.
The public address system is reported to be in good operational condition and in general, the school communications areacceptable.
A local area network (LAN) is provided for sharing of school resources (files, printers etc.) with a microwave interschooland internet connection.
4. Site Summary
Vehicular access to the site is via two paved roadways onto the property from Concession Road 7. These lead to pavedroadways across the north side of the school and to a parking lot on the northeast side of the property. The parking lot canaccommodate about 12 vehicles.
There are asphalt paved walkways along the east, north (main entrance) and west sides of the school. Planting beds,shrubs, trees, and sodded areas are provided around the site.
There is an unpaved sports field to the south of the school which incorporates a number of peewee soccer fields.
There is a four foot high wire fence along the east, south and west property lines.
Limited site work has been required including asphalt pavement repairs and concrete walkway leveling.
Definitions for Energy Checklist
Energy audit report: An ASHRAE Level I energy audit report was completed within the last three years.
Asset Assessment Program 2011-2015
Kawartha Pine Ridge District School Board Page 6 of 36
Printed On: 2015/10/29
Energy efficient boiler: The energy efficient boiler provided is a condensing boiler installed within the last five years or isenergy star rated.
Energy efficient domestic hot water heater: The energy efficient domestic hot water heater provided is direct or powervented natural gas fired or has an electric heat coil.
Energy efficient recovery system: The building is provided with a Heat Recovery Unit (HRU).
Energy efficient HVAC pumps and fan motors: The energy efficient HVAC pumps and fan motors are reportedly providedwith a variable frequency drive.
Energy efficient interior lighting: The provided interior lighting is controlled by motion sensors or building automationsystem and/or the interior light fixtures are provided with T8 or T5 fluorescent lamps and electronic ballast.
Building Automation System: The building has a comprehensive Direct Digital Control (DCC) automation system to monitorand control the mechanical system.
Energy efficient faucets: Approximately 50% of the lavatory faucets are provided with aerators and motion sensors.
Energy efficient urinals and toilets: Approximately 50% of the urinals and toilets are provided with a low flow flush valve(less than 1.6 gpf)
Definitions for Accessibility Checklist
Designated parking space: The provided designated Barrier Free Accessible parking space is a minimum 2,400 mm wideand is clearly marked with an accessibility sign.
Path of travel to the main entrance door: The provided accessible path of travel from the designated Barrier FreeAccessible parking space to an accessible building entrance is a minimum 910 mm wide and includes curb cuts and ramps
Designated entrances: The provided designated Barrier Free Accessible entrance is a minimum 850 mm wide to allow amobility device, clearly marked with an accessibility sign and is provided with an automatic door open device.
Path of travel to all floors/elevations: The Barrier Free Accessible path of travel is provided with either an accessible rampor a vertical transportation device where a floor or an elevation difference exists.
Elevator: The provided Barrier Free Accessible Elevator has the following: clear audible communication indicating floorsand up/down direction; doors, which open long enough and a minimum 900 mm wide; and a control panel, which isprovided with Braille and an emergency call system and where the top is at a maximum height of 1,400 mm above floor.
Instructional spaces entrance doors: The instructional spaces are provided with an entrance door which is a minimum of850 mm wide.
Asset Assessment Program 2011-2015
Kawartha Pine Ridge District School Board Page 7 of 36
Printed On: 2015/10/29
Fire policy and fire safety plan: Fire policy and fire safety plans are reportedly in place for the evacuation of people withdisabilities.
Fire alarm system with strobe and audible signals: Fire alarm system is reported to include strobe lights and audiblesignals
Communal washrooms: There is a Barrier Free Accessible washroom stall, which is a minimum of 1,500 x 1,500 mm, inthe each boys and girls washroom on each accessible floor.
Designated washroom: A designated Barrier Free Accessible washroom is provided on each floor, and is equipped withthe following: an automatic door open device; grab bars; emergency call button; lever handle or motion sensor faucets;and a lavatory, where an insulated knee space is provided and the height of lavatory top is a maximum of 815 mm abovethe floor.
Limitations
This report has been prepared to meet the Ministry of Education (EDU) objectives for the Condition Assessment Programfor Educational Facilities in Ontario. The purpose of the Condition Assessment Program was to assess the current physicalcondition of the schools and associated site features, and to validate information currently contained in the online capitalrenewal database software Total Capital Planning Solution (TCPS).
The validation of data was limited to a five year period, which is defined as the current assessment year plus four years.Information contained in the database beyond this period was not validated or reviewed.
The provided event costs are intended for global budgeting purposes only. The event costs were adjusted to includeregional factors and were based on an approved unit cost list. Actual event costs for the work recommended may differsince the event costs can only be determined after preparation of tender documents, which would consider: specific designconditions, site restrictions, effects of ongoing building operations and construction schedule. The approved cost thresholdfor the Condition Assessment Program is $ 10,000.
Barrier Free Accessibility and Energy Conservation Measures assessments were limited to a preapproved checklistpresented on Page 2. The assessment of portables (classrooms not integrated with the building envelope), solarphotovoltaic panels, other solar energy collectors, wind turbines, sheds, less than 45 sq.m., play-equipment/structures,score boards, goal posts and flag poles, fire extinguishers, decommissioned swimming pools, window coverings,black/white boards, benches, gymnastic equipment and the appropriateness of room space were excluded from the scopeof work. Information related to these components contained in the database was not updated to reflect condition observed.Information related to events which are either planned or in progress, and currently locked were not updated.
Asset Assessment Program 2011-2015
Kawartha Pine Ridge District School Board Page 8 of 36
John PogacarDigitally signed by John PogacarDN: C=CA, [email protected],O=Pretium Anderson Toronto Inc, CN=John PogacarReason: I have reviewed this documentDate: 2015.10.31 07:34:39-04'00'
Event Listing By Ascending Event Year
Kawartha Pine Ridge District School Board
Kirby Centennial PS,Building ID 6126-1
Major Repair [B2010 Exterior Walls - OriginalBuilding]
Validation Survey2011-2015
71.01High 2016 $10,300.00 $10,300.00B2010 Exterior Walls - OriginalBuilding
Kirby Centennial PS,Building ID 6126-1
Replacement [D502002 Lighting Equipment -Interior]
Validation Survey2011-2015
67.01High 2016 $131,840.00 $142,140.00D502002 Lighting Equipment - Interior
Kirby Centennial PS,Building ID 6126-1
Replacement [D502002 Lighting Equipment -Emergency and Exit]
Validation Survey2011-2015
67.01High 2016 $10,300.00 $152,440.00D502002 Lighting Equipment -Emergency and Exit
Kirby Centennial PS,Building ID 6126-1
Replacement [D2010 Plumbing Fixtures -Original Building]
Validation Survey2011-2015
63.01High 2016 $73,130.00 $225,570.00D2010 Plumbing Fixtures - OriginalBuilding
Kirby Centennial PS,Building ID 6126-1
Replacement [D2020 Domestic WaterDistribution - Original Building]
Validation Survey2011-2015
63.01High 2016 $41,200.00 $266,770.00D2020 Domestic Water Distribution -Original Building
Kirby Centennial PS,Building ID 6126-1
Replacement [C1030 Fittings - Original Building] Validation Survey2011-2015
59.01High 2016 $22,660.00 $289,430.00C1030 Fittings - Original Building(Washroom Facilities)
Kirby Centennial PS,Building ID 6126-1
Replacement [C1020 Interior Doors- OriginalBldg.]
Validation Survey2011-2015
57.01High 2016 $60,770.00 $350,200.00C1020 Interior Doors- Original Bldg.
Kirby Centennial PS,Building ID 6126-1
Replacement [C3030 Ceiling Finishes - OriginalBuilding - Classrms,Gym,Halls]
Validation Survey2011-2015
57.01High 2016 $86,520.00 $436,720.00C3030 Ceiling Finishes - OriginalBuilding - Entire Building
Kirby Centennial PS,Building ID 6126-1
Replacement [B2030 Exterior Doors - OriginalBuilding]
Validation Survey2011-2015
54.01High 2017 $86,520.00 $523,240.00B2030 Exterior Doors - OriginalBuilding
Kirby Centennial PS,Building ID 6126-1
Replacement [G204007 Playing Fields - Site -Sports Field]
Validation Survey2011-2015
40.01Medium 2017 $15,450.00 $538,690.00G204007 Playing Fields - Site(Unpaved Sports Fields)
Kirby Centennial PS,Building ID 6126-1
Replacement [D5010 Electrical Service &Distribution - Primary and SecondarySwitchgear]
Validation Survey2011-2015
64.01High 2018 $51,500.00 $590,190.00D5010 Electrical Service & Distribution- Primary and Secondary Switchgear
Kirby Centennial PS,Building ID 6126-1
Study [D304003 Heating/Chilling waterdistribution systems - Original Building - HeatingPiping only]
Validation Survey2011-2015
62.01High 2018 $10,300.00 $600,490.00D304003 Heating/Chilling waterdistribution systems - OriginalBuilding - Heating Piping only
Kirby Centennial PS,Building ID 6126-1
Replacement [C1030 Fittings - Original Building- Misc Upgrades]
Validation Survey2011-2015
44.01Medium 2018 $74,160.00 $674,650.00C1030 Fittings - Original Building(Millwork)
Asset Brief Description Data Origin PriorityValuePriority Year Cost Cumulative Cost
Printed On: 2015/11/02
Element
Event Listing By Ascending Event Year (2015 - 2019)Kawartha Pine Ridge District School Board Page 1 of 2
Kirby Centennial Public School - Replacement Value = $4,501,830.
Kirby Centennial PS,Building ID 6126-1
Replacement [G2030 Pedestrian Paving - Site] Validation Survey2011-2015
42.01Medium 2018 $15,450.00 $690,100.00G2030 Pedestrian Paving - Site
Kirby Centennial PS,Building ID 6126-1
Replacement [D304003 Heating/Chilling waterdistribution systems - Original Building - HeatingPiping only]
Validation Survey2011-2015
62.01High 2019 $233,810.00 $923,910.00D304003 Heating/Chilling waterdistribution systems - OriginalBuilding - Heating Piping only
Asset Brief Description Data Origin PriorityValuePriority Year Cost Cumulative Cost
Printed On: 2015/11/02
Element
Event Listing By Ascending Event Year (2015 - 2019)Kawartha Pine Ridge District School Board Page 2 of 2
5 Year - FCI = 20.52%
2015-2016 Kirby Centennial Public SchoolDistance Map
Hampton
Bowmanville
Orono
Newcastle
Campbellcroft
urtice
Hampton Junior PSOrono PS
Kirby Centennial PS
Enniskillen PS
Clarke HS
Harold Longworth PS
M.J. Hobbs Senior PS
The Pines Senior PS
John M. James PS
11.37 KM
12.77 KM
North Hope Central PS
11.58 KM
Newcastle PS
2015-2016 Kirby Centennial Public SchoolDistance Map
Hampton
Bowmanville
Orono
Newcastle
Campbellcroft
urtice
Hampton Junior PSOrono PS
Kirby Centennial PS
Enniskillen PS
Clarke HS
Harold Longworth PS
M.J. Hobbs Senior PS
The Pines Senior PS
John M. James PS
11.37 KM
12.77 KM
North Hope Central PS
11.58 KM
Newcastle PS
North Hope Central PSCatchment
Ganaraska Trail PS Catchment
Enniskillen PSCatchment
VincentMassey PSCatchment
Newcastle PSCatchment
Ganaraska Rd
Cold Springs C
amp R
d
Challice Line
Concession 6 Rd
Concession 5 RdG
ilmore R
d
Descriptions:
Main Floor Accessible The main floor of the school is accessible for wheelchair, barrier-free (BF) parking spot available, level access into building and main floor, entry doors are accessible by wheelchair or automatic openers.
Other Floors Accessible Other floors are accessible for wheelchairs.Accessible Stage The stage area is accessible for wheelchair via lift, ramp or portable lift.BF Washroom There is a staff and/or private washroom that meets the requirements of the
Ontario Building Code (OBC) for a BF washroom facility.BF Drinking Fountain There is a drinking fountain on each of the floors at the school that mees the BF requirements
of the OBC.Visual Enhancements Visual improvements have been made at the school for the visually impaired; may include
Braille room signs highlighting of stair edges, visual contrasting stripes on posts and around doors.
Access to Staff Areas There are clearances around doors and within rooms to allow easy access in a wheelchair.Accessible PA System Controls are mounted at a maximum height of 1200 mm.
Legend:
Y YesN NoR Some restrictions may apply, see comments
NA Not applicableblank Not determinedBF Barrier-free
SCHOOL
Mai
n Fl
oor
Acc
essi
ble
Oth
er F
loor
s A
cces
sibl
e
Acc
essi
ble
Stag
e
BF
Was
hroo
m
BF
Drin
king
Fo
unta
in
Visu
al
Enha
ncem
ents
Acc
ess
to S
taff
Are
as
Acc
essi
ble
PA
syst
em
Comments
Kirby Centennial Y NA N Y N N Y N
KAWARTHA PINE RIDGE DISTRICT SCHOOL BOARDAccessibility Features of Kawartha Pine Ridge Buildings
October 2016
02-12-2016
Kirby Centennial Public School - Historical Enrolment (Headcount)
Building Capacity 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 Projected
2016-17HEADCOUNT 164 192 176 178 169 164 157 165 143 145 141 142 123 122 100 92 92 92
Utilization % 117% 107% 108% 103% 100% 96% 100% 87% 88% 86% 87% 75% 74% 61% 56% 56% 56%
-
50
100
150
200
250
2000
-01
2001
-02
2002
-03
2003
-04
2004
-05
2005
-06
2006
-07
2007
-08
2008
-09
2009
-10
2010
-11
2011
-12
2012
-13
2013
-14
201
4-15
201
5-16
HEADCOUNT
Building Capacity
Board: Kawartha Pine Ridge District School BoardSchool: Kirby Centennial PSAll ProgramsGrades: JK-6
Year
Total Enrolment
Regular OCEnrolment
Board OCEnrolment
Overage Students
Attending Elsewhere
Catchment Students in
Board Schools
Population of School Aged
Children
Annual Market Share
Market Share Change
School Annual Market Share
Other KPR Schools Market Share
CheckOther Board
Market Share
Check
2010 143 9 0 0 29 163 171 95.3% N/A 6 yr avg 88.0% 78.4% 17.0% 0.0% 4.7% 0.0%2011 117 7 0 0 27 137 155 88.4% -6.93% 5 yr avg 81.6% 71.0% 17.4% 0.0% 11.6% 0.0%2012 123 5 0 0 30 148 166 89.2% 0.77% 4 yr avg 80.0% 71.1% 18.1% 0.0% 10.8% 0.0%2013 101 3 0 0 33 131 159 82.4% -6.77% 3 yr avg 76.9% 61.6% 20.8% 0.0% 17.6% 0.0%2014 92 7 0 0 35 120 161 74.5% -7.86% 2 yr avg 74.3% 52.8% 21.7% 0.0% 25.5% 0.0%2015 92 8 0 0 45 129 174 74.1% -0.40% 1 yr avg 74.1% 48.3% 25.9% 0.0% 25.9% 0.0%
-4.24% per year
Average Market Share
Historic average rate change =