Project management processes and practices are used to coordinate resources to achieve predictable results.

Transcript of It project management and best practices

Page 1: It project management and best practices
Page 2: It project management and best practices

Introduction

• All projects need some level of project management.

• Project management processes and practices are used to coordinate resources to achieve predictable results.

Page 3: It project management and best practices

Organizations expect projects to be:-

Completed Faster

Cost Effective.

Higher Quality.

Page 4: It project management and best practices

• Objectives can be met through the effective project management processes.

• Consider the size, complexity, and other characteristics of your project.

• Build the right project management processes to effectively manage and control your project.

Page 5: It project management and best practices

A Project management best practices.

Control

Plan

Monitor

Page 6: It project management and best practices

There are three major deliveries from planning process:-

Project Definition

Project Management Procedures

Project Workshop

Planning

Page 7: It project management and best practices

Project Definition

• Project Overview• Objectives• Scope• Assumption and Risk• Organization• Initial effort, cost and duration estimate.

Best Practices : Plan the work by utilizing the project definition document

Page 8: It project management and best practices

Project workplan

• The workplan provides the step by step instruction to construct and managing the project.

• Workplan includes– Assigning resources– Estimated the work

Best Practices : Project workplan

Page 9: It project management and best practices

Best Practices : Project management procedure up in front

PROJECT

The project management procedures outline the resources that will be used to manage the project.

Quality Management

Issue Management Risk Management

Scope ManagementCommunication Management

Page 10: It project management and best practices

Quality management can be considered to have three main components: quality control ,quality assurance and quality improvement. Quality management is focused not only on product quality, but also the means to achieve it.

Issue Management refers to the discipline and process of managing business issues .

Contd….

Page 11: It project management and best practices

• Project Scope Management managing the agreed work within the stakeholders and managers.A clear and well defined scope is very important for the completion of any minor or major project on time.

• Risk management involves assessing and quantifying business risks, then taking measures to control or reduce them.

• Communications management is the systematic planning implementing, monitoring, and revision of all the channels of communication within an organization , and between organizations

Contd….

Page 12: It project management and best practices

• Manage and Control:-• Only challenge is to execute your plans and

processes correctly.

• Manage the work plan:-• Monitor the schedule• Monitor the budget

Page 13: It project management and best practices

Look for other signs that the project may be in trouble. These could include the following:

• Budget starts to get bigger.• Unscheduled overtime to hit the deadlines.• Team morale starts to decline.• Deliverable quality or service quality starts to

deteriorate.

Best Practices : Look for Warning signs

Page 14: It project management and best practices

In general, the project sponsor is the person funding the project. For infrastructure projects like an Exchange migration, the sponsor might be the CIO or CFO. Requests for scope changes will most often come from stakeholders—many of whom may be managers in their own right. One manager might want chat services for their area. Another might want an exception to the size limits you have placed on mailboxes.

Best Practices : Ensure that sponsor approves the scope changes requests

Page 15: It project management and best practices

It doesn't matter how important a change is to a stakeholder, they cannot make scope-change decisions, and they cannot give your team the approval to make the change.

In proper scope-change management, the sponsor must give the approval, since they are the only ones who can add additional funding to cover the changes and know if the project impact is acceptable.

Contd….

Page 16: It project management and best practices

Best Practices : Guard against scope creeps

Scope creep is a term used to define a series of small scope changes that are made to the project without scope-change management procedures being used.

Best Practices :Identify risks in front

Risks refer to potential events or circumstances outside the project team’s control that will have an adverse impact on the project. Technically, the value of those results may be positive or negative.

Page 17: It project management and best practices

Best Practices : Continue to assess the potential risk throughout the project.Once the project begins, periodically perform an updated risk assessment to determine if other risks have surfaced that need to be managed.

Manage Issues:All projects of any size and complexity will have issues arise that need to be dealt with and resolved. If you have not done as good a job managing risks, chances are you will have more issues to deal with than you might have otherwise.

Page 18: It project management and best practices

Cont…Issues are big problems. For instance, the Exchange servers you ordered are not ready and configured on time. Or perhaps the Windows 2000 is not set up correctly and needs to be redesigned.

The project manager should manage open issues diligently to ensure that they are being resolved. Issues, by their nature, must be resolved with a sense of urgency.

Page 19: It project management and best practices

There are always complexities in dealing with newer technology and ensuring that all the pieces integrate together.

There are also challenges in implementing infrastructure with as little impact on your customers as possible. All of these challenges can be overcome through a proper mix of planning, monitoring, controlling, and executing.

The planning, monitoring, and controlling aspects are where project management processes and techniques are needed. Proper planning and management of the migration effort will take more time up front but will be more than rewarded with efficiencies and savings throughout the rest of the project.

Conclusion

Page 20: It project management and best practices

The project management best practices:-

• Plan the work by utilizing a project definition document.

• Define project management procedures up front. • Look for other warning signs. • Ensure that the sponsor approves scope-change

requests. • Guard against scope creep. • Identify risks up front. • Continue to assess potential risks throughout the

project. • Resolve issues as quickly as possible.