INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at...

60

Transcript of INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at...

Page 1: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY
Page 2: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

INDEX

1. Company Overview

2. Patrons in all Industries

3. Your Partners for:

a. Energy Saving Systems

b. Fired Energy Systems

c. Special Energy Systems

d. Heat Exchangers & Pressure Vessels

4. Infrastructure

5. Manufacturing Facilities

6. Design Capabilities

Page 3: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

OVERVIEW

• Two decades of Customer service: Since 1998

• Core competence: Thermal Engineering

• Strong technical capabilities

• Customized systems based on process needs, enormous benefits

• Turnkey / EPC Solutions too

• Focused Process and Quality Assurance

• Blend of experienced & young team

• Over 1000 installations across all industries, globally

• Recognized capabilities: Awards for “Innovations in Energy

Efficiency (2017)” and “Best Energy Efficient Project (2018)” from

Confederation of Indian Industry (CII)

Page 4: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

PATRONS IN ALL INDUSTRIES

Page 5: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

YOUR PARTNERS FOR……

Fired Energy

Systems Heat Exchangers &

Pressure Vessels

Special Energy

Systems

Energy Saving

Systems

Page 6: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

ENERGY SAVING SYSTEMS

• Combined-Cycle / Waste-Heat Based Power Plants

• Waste Heat Recovery - Steam Systems

• Waste Heat Recovery - Hot Water, Hot Air, Thermal Oil

• Waste to energy / Incinerator Waste Heat Recovery

• Process Integrated Boilers, Reformer Gas Boilers

Page 7: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

ENERGY SAVING SYSTEMS

• 20 x 10 MW Gas Engine

• 20 Sets. Waste Heat Recovery

Boilers

• 16 MW Power from Engine Waste

Heat at zero cost

200 MW Combined Cycle Power Plant at

United Ashuganj, Bangladesh

Page 8: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

ENERGY SAVING SYSTEMS

• Annual Cash Saving: USD 19

Million

• Equivalent to saving:

o 88,320 Nm3/day Natural Gas or

o 90,000 Litres/ day fuel oil or

o 220 Tonnes/ day Coal

• In Operation Since in 2015

• CER: 60,000 Tons/ year

200 MW Combined Cycle Power Plant at

United Ashuganj, Bangladesh

Page 9: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

ENERGY SAVING SYSTEMS

• Power savings:

o 7.2 MW for Bogra, Phase 1

o 7.2 MW for Bogra, Phase 2

o 3.6 MW for Chittagong plant

• 15 Sets Waste Heat Recovery

Boilers

• Partial Turnkey: System

Integration, Cooling Tower,

WTP, BOP etc.

• Under Execution

• Likely Payback: 6 months

113 MW + 113 MW + 55 MW Combined Cycle Power Plant

Confidence Group, Bangladesh

Page 10: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

ENERGY SAVING SYSTEMS

Indian Oil Corporation Ltd.,

• Vertical WHRB on Incinerator

• Water Wall, Hanging tube

bundle Construction

• 10.25 TPH, 14.2 Bar, 260 0C

• Height – 14m

• Turnkey

• In Operation 2017

In Operation IOCL, Mathura (Design)

Page 11: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

• WHRB for largest Sinter plant;

Second stage Hot Water at

140 Deg c

• Steam: 40 TPH; HW: 11.6 MW

• Hot Water Heat Recovery

producing 2400 TR chilling

• Gas: 600,000 kg/ h; 375 0C

• Dust loading 4000 mg/ Nm3

• Modular Construction,

Outdoor

• Total weight: 1200 MT

• Under Execution

ENERGY SAVING SYSTEMS

WHRB on Sinter Plant, Bhushan Power & Steel

Page 12: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

ENERGY SAVING SYSTEMS

• WHRB on 9.6 MW x 6 sets

Wartsila HFO Engine

• Outdoor, Horizontal, Finned

Tube

• 4.2 TPH x 6 Sets.

• 26 Bar, 260 Deg C

• Turnkey Project

• In operation since 2011

WHRB at Mangalore Chemicals & Fertilizers

Page 13: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

ENERGY SAVING SYSTEMS

• HRSG on Caterpillar 2 Sets x 5.5

MW Gas Turbines

• Steam output: 9.2 TPH x 2 Nos

• 41Bar, 350 Deg C

• Turnkey Project

• Commissioned in 2009

HRSG at Deepak Fertilizer ◄

Page 14: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

• HRSG on Caterpillar 2 sets 15.5

MW Gas Turbines

• Steam at: 22 TPH x 2 Nos.

• 45 Bar, 460 Deg C

• Turnkey Project

• Commissioned in 2009

ENERGY SAVING SYSTEMS

HRSG at Gujarat Fluorochemicals Ltd.

Page 15: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

ENERGY SAVING SYSTEMS

• Tri Generation System: Three

stages heat recovery

• On Caterpillar 7.5 MW x 1 No. Gas

Turbine

• Steam: 12 TPH, 66 Bar, 2820C

• Thermal Oil: 10 MkCal/hr

• Hot Water 1.8 MkCal/ hr to produce

600 TR Chilling

• Turnkey Project

• In operation since 2010

Tri Generation System at VVF, India. ◄

Page 16: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

GAS

TURBINE

TF HRU

BOILER

MODULES HW HRU

BY PASS DUCT

SUPPLIMENTRY

FIRING BURNER

VAM

FRESH AIR

BLOWER

C

H

I

M

N

E

Y

TO

PROCESS

FROM

PROCESS

CHILLED

WATER

DUCT BURNER

DIVERTER

DAMPER

STEAM TO

PROCESS

DIVERTER DAMPER

ENERGY SAVING SYSTEMS

OUT

IN

THERMAL OIL

BY PASS

STACK

Page 17: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

ENERGY SAVING SYSTEMS

Fully Shop Assembled Water Tube Boilers ◄

Page 18: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

ENERGY SAVING SYSTEMS

• Horizontal, Smoke Tube,

Packaged

• Common Boiler for Multiple

Engines Exhausts possible

• Compact

• Skid Mounted : Plug and Play

Systems

• Many in operation in the field

Smoke Tube Waste Heat Recovery Boiler ◄

Page 19: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

• WHRB containerised

• Engine : MWM, 1.5 MW

• Fully automated

• Commissioned in 2018

ENERGY SAVING SYSTEMS

Containerized WHRB,

Sterling & Wilson, Nigeria ◄

Page 20: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

ENERGY SAVING SYSTEMS

Waste Heat Recovery Boiler for

Bayer India, Vapi

• At the back end of Incinerator

• Flue Gas Inlet Temp : 1200OC

• Steam Generation: 10 TPH

• Design Pressure :18 bar

• Gas Flow: 23 TPH

• In operation since 2012

Page 21: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

ENERGY SAVING SYSTEMS

Sulphur Condenser

• Size: 3.2 m OD x 11 m Long

• Weight : 80 Tons

• Supplied in 2015

Sulphur Condenser for

Shriram EPC

Page 22: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

ENERGY SAVING SYSTEMS

Two Drum Smoke Tube Boiler

For Coke Oven

• Steam Flow: 10.5 TPH

• Pressure: 40 Bar

• Temperature: 252 Deg C

• Supplied in 2015

Page 23: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

RG Cum FG Boilers

Adani Wilmer Fatty Acid Plant

ENERGY SAVING SYSTEMS

• Steam Pressure: 21 Bar

• Gas Pressure: 19 Bar

• Gas Temperature: 900 Deg C

• Metal Temperature: 217 Deg C

• Commissioned in 2011

Page 24: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

RG Boiler for Oxo Alcohol plant

Andhra Petrochemicals

ENERGY SAVING SYSTEMS

• Tube Side : Reformed Gas at 998°C

• Gas Outlet: 260°C

• Gas Pressure:13 Kg/cm2

• Flat head Flexible Tube Sheets

• Tubes : SA 335 P12

• Commissioned in 2009

Page 25: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

ENERGY SAVING SYSTEMS

Thermal Oxidiser

Bharat Petroleum Corporation (BPCL)

Thermal Oxidiser

PDO,Oman ◄

Page 26: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

FIRED ENERGY SYSTEMS

• Hot Water Generators

• Air Heaters

• High Temperature Thermic Fluid Heaters

Page 27: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

FIRED ENERGY SYSTEMS

Hot Water Generators

• Horizontal: Lower Head Room for

installation

• Shell & Tube: Easier to clean/

maintain

• Low Pressure Drop: Lower

Operating Cost

• High Efficiency: Upto 94%

• Upto 200 Deg C

• Fuel: Oil/ Gas/ Biomass

• Waste Heat – Fuel Combi too.

Page 28: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

FIRED ENERGY SYSTEMS

Hot Water Generator System 1 MW

TVS, Indonesia ◄

Page 29: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

FIRED ENERGY SYSTEMS

Hot Water Generator

Page 30: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

FIRED ENERGY SYSTEMS

Hot Air Generators/ Air Heaters

• Indirect Fired: Upto 300 Deg C

• Direct Fired: Upto 300 Deg C

• Without refractory

• Fully Custom Built

• Efficiency upto 98%

• Easy removal of Heater

• Complete System with Burner,

Process Air Fan etc.

• Waste Heat – Fuel fired combi too.

Page 31: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

FIRED ENERGY SYSTEMS

Indirect Fired Heaters

Page 32: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

FIRED ENERGY SYSTEMS

Thermic Fluid Heaters

• And Vaporizers too..

• Waste Heat or Fuel Fired or Combi

• High Temperatures: 280 to 400°C

• For any fuel: Fuel oil, gas, Biomass

• Efficiencies upto 90%

• Turnkey Solutions

Page 33: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

Thermal Oil Heater for Biscuit baking: 3.5 MW

FIRED ENERGY SYSTEMS

Page 34: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

FIRED ENERGY SYSTEMS

Custom Built

• Compact Water Tube Design

with external Superheater

• Steam Generation: 1 TPH

• Pressure: 80bar

• Fuel: Natural Gas & HSD

HP Boiler for Carotino SDN BHD ◄

Page 35: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

FIRED ENERGY SYSTEMS

Electrical Thermic Fluid Heating System for

Malayan Daching Co.

• Electrical Thermal Oil Heater Custom

Built for specific Application

• Fully skid mounted with circulation

pumps, expansion tank, PLC etc.

• Capacity: 300 KW

• Inlet/ outlet Temperature : 220/ 250 Deg C

Page 36: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

SPECIAL ENERGY SYSTEMS

• For Biscuit Baking Ovens

• For Paint Baking & Pre - Treatment

• High Pressure - Low Capacity for Edible Oil Plants

• Thermosiphon Systems

• Incinerator / WHR for Chemical, MSW & Graphite Industry

Page 37: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

Heating Systems for Special

Applications

• Heating / Cooling System

Development for Processes from

Basic Description

• “First of a Kind” Systems

• Completed Innovative Projects

like:

Biscuit Baking Oven,

Industrial Latex Gloves

procee

Pitch Fume Incinerators for

Graphic Industries

Thermo-roll Heating System

for Paper Mills

SPECIAL ENERGY SYSTEMS

Page 38: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

• Biscuit baking on Biomass:

Huge cash savings, Green

Energy

• Reduction in under baking and

over baking losses to 1% or

below

• High system thermal efficiency

• Fully automated temperature

controls, oven process controls

SPECIAL ENERGY SYSTEMS

Biscuit Baking Ovens

Page 39: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

• Shell & Tube Type (BEMA), TEMA C

• Lloyds Inspection

• Design Pressure : Paste - 10 Kg/Cm² & Steam

– 14 Bar

• MDMT : - 42.5°C

• MOC -SA 516 Gr. 70/ SA 240 TP 304

• Skid mounted systems, as required

Skid mounted heating System

Koksan Pet Packaging, Turkey ◄

SPECIAL ENERGY SYSTEMS

Page 40: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

SPECIAL ENERGY SYSTEMS

Separator Skid

Page 41: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

SPECIAL ENERGY SYSTEMS

Paper-roll Heating System ◄

Page 42: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

• Shell & Tube Heat Exchangers

• Finned Tube Heat Exchangers

• Fin Fan Coolers

• All other Thermal Equipment

HEAT EXCHANGERS & PRESSURE VESSELS

Page 43: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

HEAT EXCHANGERS & PRESSURE VESSELS

• Size: 4 m OD x 11.5 m Long

• Weight : 33 Tons

• Year of Supply: 2018

Sulphur Storage Tank

SVI, Indonesia

Page 44: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

HEAT EXCHANGERS & PRESSURE VESSELS

• Stacked Shell & Tube Heat Exchangers

• Design Code : ASME Sec VIII Div I, TEMA,

• Documentation as per GOST standards

• National Board ‘NB’ Stamping

• Design Pressure: 83 Bar

• MDMT : - 42.5°C

• MOC : SA 516 Gr. 70/ SA 350 LF2 CL1/ SA 333

Gr. 6

• Tube Sheet : 110 mm Thick

• Tube Length : 9.1 m long x 550 Nos Gas Heat Exchanger for

Exterran Belleli Energy, Kazakhstan ◄

Page 45: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

HEAT EXCHANGERS & PRESSURE VESSELS

• Design Pressure: 20 Bar

• MDMT : - 45°C

• MOC : SA 516 Gr. 70/ SA 350

LF2 CL1/ SA 333 Gr. 1

• Tube Sheet : 107 mm Thick

• Tube Length : 11 m x 330

Nos

• TTP Joint: Expanded Only Deethaniser OVHD Exchanger for

GASCO

Page 46: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

HEAT EXCHANGERS & PRESSURE VESSELS

• Design Pressure: 27 Bar

• Design Temperature: 235°C

• MOC: SA 516 Gr. 70

• Shell : 25 mm thick

• Dished End : 32 mm thick

Co2 Solution Reboiler for

Andhra Petrochemicals ◄

Page 47: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

HEAT EXCHANGERS & PRESSURE VESSELS

Process Columns & Vessels for Sequoia Energy, US

Authorized Inspectors : Lloyds, India ◄

Page 48: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

HEAT EXCHANGERS & PRESSURE VESSELS

Reboiler for Kaltimex, Indonesia

Heat Exchangers for

GEICO, S.P.A, Italy

Hi-Tech, Indian Boiler Regulations

Page 49: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

HEAT EXCHANGERS & PRESSURE VESSELS

Bharat Petroleum Corporation

NKN Type

Page 50: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

HEAT EXCHANGERS & PRESSURE VESSELS

Tube Bundles for

Takreer Refineries, Abu Dhabi ◄

Page 51: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

• Design Pressure: 99 Bar

• MDMT: - 29°C

• Shell: 50 mm thick

• Dish 56 mm thick

• Weight : 16 MT

HEAT EXCHANGERS & PRESSURE VESSELS

Production Separator for

APLUS Projects ◄

Page 52: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

INFRASTRUCTURE

Page 53: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

INFRASTRUCTURE

• ISO 9001 : 2015 certified

• Plant 1 Built Up : 50,000 Sq. ft

• Expansion project: 66,000 Sq. ft

Page 54: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

INFRASTRUCTURE

Corporate Office ◄

Page 55: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

MANUFACTURING FACILITIES

Manufacturing Plant

• Approved under Indian Boiler

Regulation

• ISO 9001 : 2015 Certified

• All procedures are as per Quality

Management System

• Strong Process Assurance &

Quality assurance

Page 56: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

MANUFACTURING FACILITIES

Tube Finning Machine ◄

Page 57: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

MANUFACTURING FACILITIES

CNC Plasma Cutting Machine

Page 58: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

MANUFACTURING FACILITIES

Nozzle Opening Machine SAW Machine

Page 59: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

DESIGN CAPABILITIES

Mechanical Engineering

Process Engineering

Detail Engineering

Page 60: INDEX []600 TR Chilling • Turnkey Project • In operation since 2010 Tri Generation System at VVF, India. GAS ... GAS TURBINE TF HRU BOILER MODULES HW HRU BY PASS DUCT SUPPLIMENTRY

THANK YOU

meenergy.com

[email protected]