February 2018 1 GSI Unit Design Review Contacts All Green Stormwater Infrastructure or Environmental Restoration Group designs, once approved by PWD, must be submitted to the following agencies and groups for review. The PWD project manager must be copied on all submissions by Provider. GSI on water and sewer projects must also be reviewed by the agencies listed in the PWD Water & Sewer Design Manual. Depending on the project, review may be required by other agencies that are not listed. Unique partner and pilot projects may have additional review requirements. PWD project manager can provide guidance. All conflicts arising from reviews should be resolved prior to Plans, Specifications, and Estimate (PWD 90%) submission. Reviewer Applies to Time of Submission Submission Requirements Submitted By Contact Notes Guaranteed Pavement Information System (GPIS) Projects that impact public right-of-way Project is given final approval (consultant design), Substantially Complete Design (in- house design) None PWD N/A PWD submits project to GPIS. Pennsylvania Department of Environmental Protection (PADEP) NPDES Projects that disturb over 1 acre PWD approves Substantially Complete Design See requirements at: www.elibrary.dep.sta te.pa.us/dsweb/Hom ePage Start with email to PADEP requesting determination about applicability. Provider Attn: Christopher Smith Civil Engineer Manager Construction Permits Section PA Department of Environmental Protection 2 East Main Street Norristown, PA 19401 Phone: 484-250-5152 Fax: 484-250-5971 Email: [email protected] PADEP may determine that PWD GSI projects are exempt from NPDES. Determination made on case-by-case basis by PADEP. Note on Access Permits: For projects on Philadelphia Parks & Recreation, School District of Philadelphia, or SEPTA property, right-of-entry authorization and permits are required for on-site access.

Transcript of GSI Unit Design Review Contacts -...

Page 1: GSI Unit Design Review Contacts - Philadelphiadocuments.philadelphiawater.org/gsi/Review_Contacts.pdf · October 2017 1 GSI Unit Design Review Contacts All Green Stormwater Infrastructure

February 2018 1

GSI Unit Design Review Contacts All Green Stormwater Infrastructure or Environmental Restoration Group designs, once approved by PWD, must be submitted to the following agencies and groups for review. The PWD project manager must be copied on all submissions by Provider. GSI on water and sewer projects must also be reviewed by the agencies listed in the PWD Water & Sewer Design Manual. Depending on the project, review may be required by other agencies that are not listed. Unique partner and pilot projects may have additional review requirements. PWD project manager can provide guidance. All conflicts arising from reviews should be resolved prior to Plans, Specifications, and Estimate (PWD 90%) submission.

Reviewer Applies to Time of Submission

Submission Requirements

Submitted By

Contact Notes

Guaranteed Pavement Information System (GPIS)

Projects that impact public right-of-way

Project is given final approval (consultant design), Substantially Complete Design (in-house design)

None PWD N/A PWD submits project to GPIS.

Pennsylvania Department of Environmental Protection (PADEP) NPDES

Projects that disturb over 1 acre

PWD approves Substantially Complete Design

See requirements at: www.elibrary.dep.state.pa.us/dsweb/HomePage Start with email to PADEP requesting determination about applicability.

Provider

Attn: Christopher Smith Civil Engineer Manager Construction Permits Section PA Department of Environmental Protection 2 East Main Street Norristown, PA 19401 Phone: 484-250-5152 Fax: 484-250-5971 Email: [email protected]

PADEP may determine that PWD GSI projects are exempt from NPDES. Determination made on case-by-case basis by PADEP.

Note on Access Permits: For projects on Philadelphia Parks & Recreation, School District of Philadelphia, or SEPTA property, right-of-entry

authorization and permits are required for on-site access.

Page 2: GSI Unit Design Review Contacts - Philadelphiadocuments.philadelphiawater.org/gsi/Review_Contacts.pdf · October 2017 1 GSI Unit Design Review Contacts All Green Stormwater Infrastructure

GSI Unit Design Review Contacts

February 2018 2

Reviewer Applies to Time of Submission

Submission Requirements

Submitted By

Contact Notes

Pennsylvania Department of Environmental Protection (PADEP) Chapter 105

Projects that include disturbance within the floodplain

PWD approves Substantially Complete Design

See requirements at: http://www.elibrary.dep.state.pa.us/dsweb/View/Collection-9531S Schedule a pre-application meeting at 30%

Provider

Attn: Domenic Rocco PA Department of Environmental Protection 2 East Main Street Norristown, PA 19401 Phone: 484-250-5160 Fax: 484-250-5971 Email: [email protected]

Review can take 93 days.

Pennsylvania Department of Environmental Protection (PADEP) Dam Safety

Dam removal projects

PWD approves Substantially Complete Design

See requirements at http://www.dep.pa.gov/Business/Water/Waterways/DamSafety/Pages/Guidelines.aspx

Provider

Attn: Josh Fair PA Department of Environmental Protection Rachel Carson State Office Building 400 Market Street Harrisburg, PA 17101 Phone: 717-772-5988 Email: [email protected]

Review can take 6 months.

Pennsylvania Department of Transportation (PennDOT) Engineering Division 6-0

Projects with work on state routes (except inlets/trench drains leading to off-street systems)

PWD approves Substantially Complete Design

Electronic copy of plan sheets relevant to affect State Route (including cover sheet and details) with work in the state route highlighted. If overflows are proposed to tie into sewers or otherwise discharge to state routes, submission must include complete calculations.

PWD N/A

Highway Occupancy Permit (HOP) application. PWD prepares submission.

Page 3: GSI Unit Design Review Contacts - Philadelphiadocuments.philadelphiawater.org/gsi/Review_Contacts.pdf · October 2017 1 GSI Unit Design Review Contacts All Green Stormwater Infrastructure

GSI Unit Design Review Contacts

February 2018 3

Reviewer Applies to Time of Submission

Submission Requirements

Submitted By

Contact Notes

Pennsylvania Department of Transportation (PennDOT) ADA Ramps

Projects that include new or retrofit ADA ramps on state routes

As soon as ramp locations are established and designs are ready (varies by project)

Follow local and state requirements.

PWD N/A

PWD attaches ramp design to HOP application for the rest of project.

Pennsylvania Fish & Boat Commission

Stream projects requiring the drawdown of water

PWD approves Substantially Complete Design

Submit application: http://www.fishandboat.com/Resource/Documents/drawdown.pdf

Provider

Daniel Ryan PA Fish & Boat Commission Division of Environmental Services 450 Robinson Lane Bellefonte, PA 16823 Phone: 814-359-5140 Email: [email protected]

Philadelphia City Planning Commission

Projects that include disturbance within the floodplain

PWD approves Substantially Complete Design

HEC-RAS model output showing 100 year water surface elevation does not rise more than 0.1 feet

Provider

Attn: Sarah Chiu, AICP Senior Planner Philadelphia City Planning Commission One Parkway, 13th Floor 1515 Arch Street Philadelphia, PA 19102 Phone: 215-683-4626 Email: [email protected]

Obtain Floodplain Consistency Letter.

Philadelphia Streets Department ADA Ramps

Projects that include new or retrofit ADA ramp designs

As soon as ramp locations are established and designs are ready (varies by project)

Follow local and state requirements.

Provider

Attn: Sunil Gill, ADA Coordinator Philadelphia Streets Department Transportation Planning & Analysis Section 1401 J.F.K. Boulevard Philadelphia, PA 19102 Tel. 215-686-5511 Email: [email protected]

Review will examine ADA ramps designs for compliance with ADA Ramp Code. Requirements differ for local roads and State Routes. 2 week review time for first submission and 1 week for subsequent submissions.

Page 4: GSI Unit Design Review Contacts - Philadelphiadocuments.philadelphiawater.org/gsi/Review_Contacts.pdf · October 2017 1 GSI Unit Design Review Contacts All Green Stormwater Infrastructure

GSI Unit Design Review Contacts

February 2018 4

Reviewer Applies to Time of Submission

Submission Requirements

Submitted By

Contact Notes

Philadelphia Streets Department Bridge Unit

Stream projects that impact bridge infrastructure or require scour protection

PWD approves Preliminary Design

One electronic copy of plan set.

PWD

Attn: Christopher Menna, PE Assistant Manager Structures Philadelphia Streets Department Engineering and Surveys Division 1401 JFK Boulevard, Room 830 Philadelphia, PA 19102 Phone: 215-686-5573 Email: [email protected]

Philadelphia Streets Department City Plans Unit

Projects that result in changes to the City Plan (curbline changes)

PWD approves Substantially Complete Design

See requirements at: www.philadelphiastreets.com/images/uploads/resource_library/City_Plan_Action_Request_Application.pdf

Provider

Attn: Frank Morelli, Tom Marro Philadelphia Streets Department City Plans Unit 1401 J.F.K. Boulevard Philadelphia, PA 19102 Email: [email protected] [email protected]

This is not a review, but a request to update Philadelphia City Plan to include any designed stormwater bumpouts or other curbline changes.

Philadelphia Streets Department Right of Way Unit

Projects that result in changes to the city plan (curbline changes)

PWD approves Preliminary Design. Resubmission when PWD approves Substantially Complete Design.

Three (3) full size hard copies of plans relevant to curbline changes, one (1) CD copy of plans relevant to curbline changes and Turning Analysis .PDF files, cover letter listing curbline change locations, and completed Plan Review Application (available at: http://www.philadelphiastreets.com/customer-service/downloads-and-links)

Provider

Attn: Patrick Iffrig Philadelphia Streets Department Highway Division, Right of Way Unit 1401 J.F.K. Boulevard, Room 830 Philadelphia, PA 19102 Tel. 215-686-5524 | Fax 215-686-5182 Email: [email protected]

Review of curbline changes only. TP&A will review other aspects of design.

Page 5: GSI Unit Design Review Contacts - Philadelphiadocuments.philadelphiawater.org/gsi/Review_Contacts.pdf · October 2017 1 GSI Unit Design Review Contacts All Green Stormwater Infrastructure

GSI Unit Design Review Contacts

February 2018 5

Reviewer Applies to Time of Submission

Submission Requirements

Submitted By

Contact Notes

Philadelphia Streets Department Transportation Planning & Analysis Section (TP&A)

All projects that impact public right-of-way

PWD approves Preliminary Design. Resubmission when PWD approves Substantially Complete Design.

One cover letter listing proposed ADA ramp locations and one electronic copy of full plan set

Provider

Attn: Steve Mottershead Philadelphia Streets Department Transportation Planning & Analysis Section 1401 J.F.K. Boulevard, Room 830 Philadelphia, PA 19102 Tel. 215-686-5512 Email: [email protected]

Review will examine pavement, curb, and ramp restoration.

Philadelphia Parks and Recreation (For Park Projects)

Projects with work on PP&R property

PWD approves Substantially Complete Design

One full size hard copy of plan set

PWD Project Manager

Attn: Stephanie Craighead, Director Cc: Curtis Helm Cc: Tom Witmer (for ERG Projects) Philadelphia Parks and Recreation 1515 Arch St., 10th Floor Philadelphia, PA 19102 Email: [email protected] [email protected] [email protected]

More extensive review than street tree review. Review typically coordinated by the PWD project manager.

Philadelphia Parks and Recreation (Street Tree Management Division)

Projects with proposed street trees

PWD approves Substantially Complete Design

One full size and one half size hard copy of plan set. Memo with date of submittal, PWD project number, title of project and street names.

PWD Project Manager

Attn: Frances Piller Park District Manager Street Tree Management Division Philadelphia Parks & Recreation 1515 Arch St., 10th Floor Philadelphia, PA 19102 Phone: 215-685-4363 Fax: 215-685-4364 Email: [email protected]

Review of proposed tree locations and species selection. A date for requested review completion should be specified in the submission.

Page 6: GSI Unit Design Review Contacts - Philadelphiadocuments.philadelphiawater.org/gsi/Review_Contacts.pdf · October 2017 1 GSI Unit Design Review Contacts All Green Stormwater Infrastructure

GSI Unit Design Review Contacts

February 2018 6

Reviewer Applies to Time of Submission

Submission Requirements

Submitted By

Contact Notes

Philadelphia School District

Projects around schools (both public and private schools)

After landscape plans have been finalized (reviewed and approved by PP&R)

One full size hard copy of final landscape or tree planting plans

Varies depending on project

Attn: Tom Schweiker Department of Capital Programs Philadelphia School District 440 N. Broad St., Room 371-374 Philadelphia, PA 19130

Plans are submitted to School District for their reference (no review/approval typically required for streets projects). Projects on School property have special review requirements that will be included in project specific scope.

PWD Collector Systems Unit

All projects (except stream projects located away from interceptor or manhole)

PWD approves Substantially Complete Design (also during Preliminary Design for GSI sewer and pilot projects)

One electronic copy of plan set

PWD Project Manager

Attn: Ben Jewell CC: Nicholas Maliha Collector Systems Unit Philadelphia Water Department 1101 Market St., 4th Floor Philadelphia, PA 19107 Email: [email protected] [email protected]

Review is coordinated internally by PWD. Review of future maintenance and performance. A 45-calendar day turnaround should be expected.

PWD Construction Unit

All PWD bid projects

PWD approves Substantially Complete Design

One electronic copy of plan set

PWD Project Manager

Attn: Blair Alegant, Jim Giffear, Pete Reilly, Jovan Como Email: [email protected], [email protected], [email protected], [email protected]

Review is coordinated internally by PWD. 30-calendar day turnaround expected. Specifications sent for review once they are developed.

PWD Green Stormwater Operations

All GSI projects

PWD approves Substantially Complete Design (also during Preliminary Design for GSI sewer and pilot projects)

One electronic copy of plan set. At Substantially Complete Design, also include the engineering estimate (.XLSX) and a table of vegetated area by SMP ID (.XLSX).

PWD Project Manager

Attn: Barbara Cushing CC: Gerald Bright, Supervisor GSI Maintenance Group Philadelphia Water Department 1101 Market St., 4th Floor Philadelphia, PA 19107 Email: [email protected] [email protected]

Review is coordinated internally by PWD. Review of future maintenance and performance and landscape selections. A 30-calendar day turnaround should be expected.

Page 7: GSI Unit Design Review Contacts - Philadelphiadocuments.philadelphiawater.org/gsi/Review_Contacts.pdf · October 2017 1 GSI Unit Design Review Contacts All Green Stormwater Infrastructure

GSI Unit Design Review Contacts

February 2018 7

Reviewer Applies to Time of Submission

Submission Requirements

Submitted By

Contact Notes

PWD Stormwater Plan Review

Partner projects that trigger Philadelphia Stormwater Regulations (more than 5,000 sf earth disturbance proposed)

PWD approves Preliminary Design Submission (ERSA application) and Substantially Complete Design (PCSMP technical review)

See requirements at: www.pwdplanreview.org

Provider

Attn: Victoria Lenoci, Manager CC: Sara Anderson Stormwater Plan Review Philadelphia Water Department 1101 Market St., 4th Floor Philadelphia, PA 19107 Phone: 215-685-6387 Email: [email protected] [email protected] [email protected]

PWD Water/Sewer Design Branch

All GSI projects managed by GSI Design group

PWD approves Substantially Complete Design (also during Preliminary Design for GSI sewer projects)

One electronic copy of plan set

PWD Project Manager

Attn: Khadija Tadimi CC: Bill Dobbins Email: [email protected], [email protected]

Review is coordinated internally by PWD.

Utilities All projects

PWD approves Substantially Complete Design

Submission requirements will vary by utility

Provider

The Committee of Highway Supervisors contact list (below, recent changes in red) can be used for utility contacts.

Any and all utilities that are affected must review and approve plans.

United States Army Corps of Engineers (USACE)

404 Permit

Projects that include disturbance within the floodplain

PWD Substantially Complete Design (70%)

Schedule a pre-application meeting at 30%

Provider

Edward E. Bonner, PWS Chief, Regulatory Branch U.S. Army Corps of Engineers 100 Penn Square East Philadelphia, PA 19107 Phone: 215-656-6725, 215-873-9302 (cell) Email: [email protected]

General permit-related questions can be directed to the “Regulator of the Day" at 215-656-6728.

Page 8: GSI Unit Design Review Contacts - Philadelphiadocuments.philadelphiawater.org/gsi/Review_Contacts.pdf · October 2017 1 GSI Unit Design Review Contacts All Green Stormwater Infrastructure

DEPARTMENT OF STREETS RIGHT OF WAY UNIT

Company Contact Address/Email Telephone/Fax/CellCity Planning Commission Sarah Chiu 1515 Arch Street, One Parkway, 13th Floor T: (215)-683-4626

Philadelphia, PA [email protected]

PennDOT Anthony Antonelli Blaine and Ruffner Streets T: (215) 225-1415County Permits Manager Philadelphia, PA 19140

[email protected]

Matthew Miele 7000 Geerdes Blvd T: (610) 205-6795District Permits Manager King of Prussia, PA 19406 F: (610) 205-6599

[email protected]

PIDC Edward Duffy 2600 Center Square West, 1500 Market StPhiladelphia, PA [email protected]

Philadelphia Department of Commerce Vincent Dougherty One Parkway, 1515 Arch Street, 12th FloorPhiladelphia, PA [email protected]

Police (Traffic Division) Captain Helker [email protected] T: (215) [email protected]

Lieutenant Anderson [email protected] T: (215) [email protected]

Public Property Francesco Cerrai T: (215) 683-44491515 Arch Street, 11th Floor [email protected]

Cable Franchise Manager Mark McLaughlin Room 632 City Hall T:(215) 686-9950Philadelphia, PA 19107 F:(215) [email protected]

City Departments/Agencies/Authorities

Committee Of Highway Supervisors Membership January 1, 2015 (more recent edits in red)

Master CHS Contact List.xlsx 1

Daniel.Moran
Sticky Note
Unmarked set by Daniel.Moran
Benjamin.Clements
Text Box
PWD submits PennDOT HOP Application. See contact list above for details.
Page 9: GSI Unit Design Review Contacts - Philadelphiadocuments.philadelphiawater.org/gsi/Review_Contacts.pdf · October 2017 1 GSI Unit Design Review Contacts All Green Stormwater Infrastructure

DEPARTMENT OF STREETS RIGHT OF WAY UNIT

Company Contact Address/Email Telephone/Fax/Cell

City Departments/Agencies/Authorities

Committee Of Highway Supervisors MembershipJanuary 1, 2015

Cable Franchise Manager James Napier Room 632 City Hall T:(215) 686-9946Phhiladelphia, PA 19107 F:(215) [email protected]

Capital Program Office Monique Vincent 1515 Arch Street, 11th Floor T:(215) 683-4440Philadelphia, PA 19107 F:(215) [email protected]

Redevelopment Authority Mike Maenner 1234 Market Street, 16th Floor T:(215) 209-8713Philadelphia, PA 19107 M:(215) [email protected]

Deputy Commissioner of Transportation Michael A. Carroll 1401 John F. Kenndey Boulevard, Room 900Philadelphia, PA [email protected]

Right-Of-Way Unit Patrick O'Donnell 1401 John F. Kennedy Blvd, Room 960 T:(215) 686-5621Right of Way Manager Philadelphia, PA 19102

patrick.o'[email protected]

T:(215) 686-5524Patrick Iffrig CHS Chairman

1401 John F. Kennedy Blvd, Room 960 Philadelphia, PA [email protected]

John Scanlon 1401 John F. Kennedy Blvd, Room 960 T:(215) 686-5525Permits Philadelphia, PA 19102 F: (215) 686-5062

[email protected]

Streets Department

Master CHS Contact List.xlsx 2

Benjamin.Clements
Text Box
See contact list above for specific submission details.
Page 10: GSI Unit Design Review Contacts - Philadelphiadocuments.philadelphiawater.org/gsi/Review_Contacts.pdf · October 2017 1 GSI Unit Design Review Contacts All Green Stormwater Infrastructure

DEPARTMENT OF STREETS RIGHT OF WAY UNIT

Company Contact Address/Email Telephone/Fax/Cell

City Departments/Agencies/Authorities

Committee Of Highway Supervisors MembershipJanuary 1, 2015

Street Lighting Kristin Del Rossi 840 Municipal Services Building T:(215) 686-55171401 John F. Kennedy [email protected]

Streets Design Unit Vadim Fleysh 1401 John F. Kennedy Blvd, Room 830 T:(215) 686-5574Chief Design Engineer Philadelphia, PA 19102

[email protected]

Chris Menna 1401 John F. Kennedy Blvd, Room 830 T:(215) 686-5573Bridge Design Philadelphia, PA 19102 F:(215) 686-5059

[email protected]

Smitha Mathew 1401 John F. Kennedy Blvd, Room 830 T:(215) 686-5514Transportation Design Philadelphia, PA 19102

[email protected]

Transportation, Planning and Analysis Nancy Sen 1401 John F. Kennedy Blvd, Room 940 T:(215) 686-5509Philadelphia, PA 19102 F:(215) [email protected]

Traffic Engineering Kasim Ali 980 Municipal Services Building T:(215) 686-55721401 John F. Kennedy [email protected]

Master CHS Contact List.xlsx 3

Benjamin.Clements
Text Box
See contact list above for specific submission details.
Page 11: GSI Unit Design Review Contacts - Philadelphiadocuments.philadelphiawater.org/gsi/Review_Contacts.pdf · October 2017 1 GSI Unit Design Review Contacts All Green Stormwater Infrastructure

DEPARTMENT OF STREETS RIGHT OF WAY UNIT

Company Contact Address/Email Telephone/Fax/CellAbovenet Communications Jack Howells 170 Robbins Road T:(484) 696-3904 (now the Zayo Group) Downingtown, PA 19335 F:(484) 696-3910

[email protected] C:(610) 476-1634

Chris Ricciuti 170 Robbins Road T:(484) 696-3903Downingtown, PA 19335 F:(484) [email protected]

Cavalier Telephone Harry Sheppard 18 Shea Way T:(302) 224-7121Newark, Delaware [email protected]

Center City District Hal Welch 660 Chestnut Street T:(215) 440-5528Philadelphia, PA 19107 F:(215) [email protected]

Comcast Jack Clayton 4400 Wayne Avenue T:(215) 339-7912Philadelphia, PA 19140 F:(215) [email protected] C:(215) 920-2233

Alvin Munson 4400 Wayne AvenuePhiladelphia, PA [email protected]

Drexel University Paul Tobin Trades & Facilities Management T:(215) 895-6901330 Market Street - 16th Floor T:(215) 895-2822Philadelphia,PA [email protected]

FiberTech Networks Allan Lane [email protected] T:(215) [email protected] T:(215) 884-1651

C:(585) 255-0160

Committee Of Highway Supervisors MembershipJanuary 1, 2015

Utility Members

File: Master CHS Contact List.xlsx 1

Page 12: GSI Unit Design Review Contacts - Philadelphiadocuments.philadelphiawater.org/gsi/Review_Contacts.pdf · October 2017 1 GSI Unit Design Review Contacts All Green Stormwater Infrastructure

DEPARTMENT OF STREETS RIGHT OF WAY UNIT

Company Contact Address/Email Telephone/Fax/Cell

Committee Of Highway Supervisors MembershipJanuary 1, 2015

Utility Members

Level 3 Communications Timothy Eskridge 3020 Market Street T: (610) 785-1469OSP Project Mgr. Philadelphia, PA 19104 F: (720) 567-3827

[email protected]

Adolfo Colon 3020 Market Street, 3rd FloorPhiladelphia, PA [email protected]

Guy Haslett 3020 Market Street, 3rd FloorPhiladelphia, PA [email protected]

Level 3 Communications Rocco Parise 3020 Market Street, 3rd FloorPhiladelphia, PA [email protected]

Lightower Fiber Networks Thomas Sprigle 196 Van Buren Street T:(443) 250-1873Sr. Fiber & Construction Mgr. Suite 250 C:(443) 250-1873

(Attn: Fiber Engineering & Construction Team) Mid-Atlantic Region Herndon, VA [email protected]

MCI Worldcom Donald Lugg 201 Centennial Avenue T:(610) 656-1252 (Verizon Enterpirse Solutions) Piscataway, NJ 08854

[email protected]

Tom Roberts 201 Centennial Avenue T:(732) 885-2417Piscataway, NJ 08854 C:(917) [email protected] T:(610) 656-1252

File: Master CHS Contact List.xlsx 2

Page 13: GSI Unit Design Review Contacts - Philadelphiadocuments.philadelphiawater.org/gsi/Review_Contacts.pdf · October 2017 1 GSI Unit Design Review Contacts All Green Stormwater Infrastructure

DEPARTMENT OF STREETS RIGHT OF WAY UNIT

Company Contact Telephone/Fax/Cell

Committee Of Highway Supervisors MembershipJanuary 1, 2015

Utility Members

PECO Energy Lauryn Bell (main contact) T:(215) 731-3232F:(215) 731-3195

Address/Email830 S. Schyulkill Avenue Philadelphia, PA 19146 [email protected]

Jim Bezila 830 S. Schyulkill Avenue T:(215) 731-3095 (801)Philadelphia, PA 19146 C:(610) [email protected]

Lou Robinson T:(215) 731-3283F:(215) 731-3195

830 S. Schyulkill Avenue Philadelphia, PA [email protected]

Philadelphia Gas Works Monica Lyv (main contact) T:(215) 684-6116 800 W. Montgomery Avenue Philadelphia, PA 19122 [email protected]

T:(215) 684-6827

File: Master CHS Contact List.xlsx 3

Samantha Comerota (copy) 800 W. Montgomery Avenue Philadelphia, PA 19122 [email protected]

Benjamin.Clements
Text Box
Also copy PGW engineers by area (see last page) on submission.
Page 14: GSI Unit Design Review Contacts - Philadelphiadocuments.philadelphiawater.org/gsi/Review_Contacts.pdf · October 2017 1 GSI Unit Design Review Contacts All Green Stormwater Infrastructure

DEPARTMENT OF STREETS RIGHT OF WAY UNIT

Company Contact Address/Email Telephone/Fax/Cell

Committee Of Highway Supervisors MembershipJanuary 1, 2015

Utility Members

Philadelphia Water DepartmentDesign Branch Mike Quinn 1101 Market St, Aramark Tower, 2nd Floor T:(215) 685-6309

Primary Contact Philadelphia, PA [email protected]

Frank Mawson 1101 Market St. Aramark Tower, 2nd Floor T:(215) 685-6279Secondary Contact Philadelphia, PA 19107

[email protected]

Erik Smith 1101 Market St, Aramark Tower, 2nd Floor T:(215) 685-6270Philadelphia, PA [email protected]

Construction Unit William Connors 1101 Market St, Aramark Tower, 2nd Floor T:(215) 685-6372Primary Contact Philadelphia, PA 19107 F:(215) 685-6211

[email protected] C:(215) 200-4413

Robert Rotermund 1101 Market Street, Aramark Tower, 2nd Floor T:(215) 685-6351 Philadelphia, PA [email protected]

Qwest Communications Corp George McElvain 1860 Lincoln Street, 2nd Floor T:(303) 837-3926Denver, Colorado 80295 F:(303) [email protected] C:(720) 260-2514

RCN Telecom SVCS Kevin Cochran 3 Raymond Drive T:(484) 461-6020RF/CAD Engineer Havertown, PA 19083-3153 F:(484) 461-6084

[email protected]

Kevin Cochran Northampton Office T:(610) 440 81135508 Nor Bath Blvd. C:(610) 636 1454Northampton, PA 18067 F:(610) 443 2832

SEPTA T:(215) 580-8255 1234 Market Street Philadelphia, PA 19107 [email protected]

File: Master CHS Contact List.xlsx

Lydia Grose

4

Benjamin.Clements
Text Box
PWD coordinates internally. See contact list above for details.
Page 15: GSI Unit Design Review Contacts - Philadelphiadocuments.philadelphiawater.org/gsi/Review_Contacts.pdf · October 2017 1 GSI Unit Design Review Contacts All Green Stormwater Infrastructure

DEPARTMENT OF STREETS RIGHT OF WAY UNIT

Company Contact Address/Email Telephone/Fax/Cell

Committee Of Highway Supervisors MembershipJanuary 1, 2015

Utility Members

Sunesys David Hayward 185 Titus Avenue T: (267) 927-2033Warrington, PA 18976 F: (267) [email protected]

Jason Wehn 185 Titus Avenue T: (267) 927-2040Warrington, PA [email protected]

Teleport Communications Group Mike Henderson [email protected] T:(732) 896-5449(AT&T Local Services)

University of Pennsylvania Richard Russell 3101 Walnut Street T: (215) 898-5835Philadelphia, PA 19104 F: (215) [email protected]

Veolia Energy North America Howard Sellers 2600 Christian Street T:(267) 350-5848Manager, Philadelphia, PA 19146 F:(267) 350-5849Distribution Engineering [email protected]

Reji Sreedharan 2600 Christian StreetPhiladelphia, PA [email protected]

Bill Lindquist 2600 Christian StreetPhiladelphia, PA [email protected]

Rich Deaver 2600 Christian StreetPhiladelphia, PA [email protected]

File: Master CHS Contact List.xlsx 5

Page 16: GSI Unit Design Review Contacts - Philadelphiadocuments.philadelphiawater.org/gsi/Review_Contacts.pdf · October 2017 1 GSI Unit Design Review Contacts All Green Stormwater Infrastructure

DEPARTMENT OF STREETS RIGHT OF WAY UNIT

Company Contact Address/Email Telephone/Fax/Cell

Committee Of Highway Supervisors MembershipJanuary 1, 2015

Utility Members

Verizon Communications Brian M. Magee 900 Race Street, 6th Floor T:(215) 351-6051Manager, OSPE Philadelphia, PA 19107 C:(610) 368-7786

[email protected]

John Alessandrini 630 Clark Avenue T:(610) 337-6707Lead Specialist Engineer King of Pruswsia, PA 19406 C:(610) 517-8456Verizon Business [email protected] F:(610) 337-6720

Anthony Portolese 900 Race Street, 6th Floor T:(215) 351 6042OSP Engineering Philadelphia, PA 19107 F:(215) 351-8222

[email protected]

XO Communications Scott Dreiling 1220 Broadcasting Rd. T:(610) 288-5329Wyomissing, PA 19610 F:(610) [email protected] C:(610) 842-4323

Mike Harrison 1220 Broadcasting Rd. T:(610) 288-5644Wyomissing, PA 19610 F:(610) [email protected] C:(610) 842-0043

* acquired by Level 3Zayo Group Jack Howells 170 Robbins Road T:(484) 696-3904

(formerly Abovenet Communications) Downingtown, PA 19335 F:(484) [email protected] C:(610) 476-1634

Chris Ricciuti 170 Robbins Road T:(484) 696-3903Downingtown, PA 19335 F:(484) [email protected]

File: Master CHS Contact List.xlsx 6

Page 17: GSI Unit Design Review Contacts - Philadelphiadocuments.philadelphiawater.org/gsi/Review_Contacts.pdf · October 2017 1 GSI Unit Design Review Contacts All Green Stormwater Infrastructure

21

3 Area EngineersZapata, Levan, LlanosZhao, OgdenZhao, Ogden

Field Operations

SUPERVISORS ENGINEERSJim Davin 215-787-4351Al Donaldson 215-787-3220Bill Wilcox 215-787-4823

Andrew Levan: 215-684-6053 [email protected] Llanos: 215-684-6420 [email protected] Ogden: 215-684-6785 [email protected]

Alejandro Zapata: 267-249-7476 [email protected] Zhao: 215-684-6504

[email protected]

Distribution Areas

Area SupervisorsDonaldsonDavinWilcox

123

0 1 2 3 4Miles